ML20069C013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
{{#Wiki_filter:*
{{#Wiki_filter:*
PHILADELPHIA ELECTRIC COMPANY
PHILADELPHIA ELECTRIC COMPANY
                            /e             23O1 MARKCT STREET P.O. BOX 8699
/e 23O1 MARKCT STREET
[       g,q.pfED
[
      -                                  PHILADELPHI A. PA.19101 r      MAR 051982* b h*
g,q.pfED P.O. BOX 8699 PHILADELPHI A. PA.19101 MAR 051982* b r
      ~~
h*
                                  -              (215)841-4000
(215)841-4000
      '    Nirp'inapupu ~
~~
        ,    in5.11 DC13114   ff>
Nirp'inapupu ~
Y                                                 February 26, 1982
in5.11 DC13114 ff>
            /               '
Y February 26, 1982
Co     g                                  Docket Nos. 50-277 6 50-278 Pir . R. C. Ilayn e s , Director Region I Office of Inspection G Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Subj ect : Report of Annual Occupational Exposure No. 6 - January 1, 1981 through December 31, 1981 - Peach Bottom Atomic Power Station Units 2 6 3.
/
Co Docket Nos. 50-277 6 50-278 g
Pir.
R.
C.
Ilayn e s, Director Region I Office of Inspection G Enforcement U.S.
Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Subj ect :
Report of Annual Occupational Exposure No. 6 - January 1,
1981 through December 31, 1981 - Peach Bottom Atomic Power Station Units 2 6 3.


==Dear b!r. Ilayn e s :==
==Dear b!r. Ilayn e s :==
 
Enclosed are two copics of the Annual Occupational Exposure Tabulation No.
Enclosed are two copics of the Annual Occupational Exposure Tabulation No. 6, January 1 - December 31, 1981, for Peach Bottom Atomic Power Station Unit Nos. 2 and 3.
6, January 1 - December 31, 1981, for Peach Bottom Atomic Power Station Unit Nos. 2 and 3.
This report is being submitted in compliance with the Technical Specifications of Operating Licenses DPR-44 and DPR-56.
This report is being submitted in compliance with the Technical Specifications of Operating Licenses DPR-44 and DPR-56.
Very truly yours, W. F! . Alden Engineer-In-Charge Nuclear Section WblA:Imd                                   Generation Division Enclosures cc:     Ft r . Victor Stello, Jr.               b!r . Norman h!. Italler Director (NRC)                           Director (NRC)
Very truly yours, W.
Inspection G Enforcement                 blan a g em en t G Program Analysis f.R1'l~
F!. Alden Engineer-In-Charge Nuclear Section WblA:Imd Generation Division Enclosures cc:
8203090203 820226                                                                             di i
Ft r. Victor Stello, Jr.
                                                                                                /
b!r. Norman h!. Italler Director (NRC)
0 PDR ADOCK 0S000277                                                                               I iQ4 R                       PDR}}
Director (NRC)
Inspection G Enforcement blan a g em en t G Program Analysis f.R1'l~
8203090203 820226 di i 0
iQ4 PDR ADOCK 0S000277
/
I R
PDR}}

Latest revision as of 11:09, 16 December 2024

Forwards Annual Occupational Exposure Tabulation Number 6,1981
ML20069C013
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/26/1982
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20069C017 List:
References
NUDOCS 8203080203
Download: ML20069C013 (1)


Text

PHILADELPHIA ELECTRIC COMPANY

/e 23O1 MARKCT STREET

[

g,q.pfED P.O. BOX 8699 PHILADELPHI A. PA.19101 MAR 051982* b r

h*

(215)841-4000

~~

Nirp'inapupu ~

in5.11 DC13114 ff>

Y February 26, 1982

/

Co Docket Nos. 50-277 6 50-278 g

Pir.

R.

C.

Ilayn e s, Director Region I Office of Inspection G Enforcement U.S.

Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Subj ect :

Report of Annual Occupational Exposure No. 6 - January 1,

1981 through December 31, 1981 - Peach Bottom Atomic Power Station Units 2 6 3.

Dear b!r. Ilayn e s :

Enclosed are two copics of the Annual Occupational Exposure Tabulation No.

6, January 1 - December 31, 1981, for Peach Bottom Atomic Power Station Unit Nos. 2 and 3.

This report is being submitted in compliance with the Technical Specifications of Operating Licenses DPR-44 and DPR-56.

Very truly yours, W.

F!. Alden Engineer-In-Charge Nuclear Section WblA:Imd Generation Division Enclosures cc:

Ft r. Victor Stello, Jr.

b!r. Norman h!. Italler Director (NRC)

Director (NRC)

Inspection G Enforcement blan a g em en t G Program Analysis f.R1'l~

8203090203 820226 di i 0

iQ4 PDR ADOCK 0S000277

/

I R

PDR