ML20069C013: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
PHILADELPHIA ELECTRIC COMPANY | PHILADELPHIA ELECTRIC COMPANY | ||
/e 23O1 MARKCT STREET | |||
[ | [ | ||
g,q.pfED P.O. BOX 8699 PHILADELPHI A. PA.19101 MAR 051982* b r | |||
h* | |||
(215)841-4000 | |||
~~ | |||
Nirp'inapupu ~ | |||
Y | in5.11 DC13114 ff> | ||
Y February 26, 1982 | |||
Co | / | ||
Co Docket Nos. 50-277 6 50-278 g | |||
Pir. | |||
R. | |||
C. | |||
Ilayn e s, Director Region I Office of Inspection G Enforcement U.S. | |||
Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Subj ect : | |||
Report of Annual Occupational Exposure No. 6 - January 1, | |||
1981 through December 31, 1981 - Peach Bottom Atomic Power Station Units 2 6 3. | |||
==Dear b!r. Ilayn e s :== | ==Dear b!r. Ilayn e s :== | ||
Enclosed are two copics of the Annual Occupational Exposure Tabulation No. | |||
Enclosed are two copics of the Annual Occupational Exposure Tabulation No. 6, January 1 - December 31, 1981, for Peach Bottom Atomic Power Station Unit Nos. 2 and 3. | 6, January 1 - December 31, 1981, for Peach Bottom Atomic Power Station Unit Nos. 2 and 3. | ||
This report is being submitted in compliance with the Technical Specifications of Operating Licenses DPR-44 and DPR-56. | This report is being submitted in compliance with the Technical Specifications of Operating Licenses DPR-44 and DPR-56. | ||
Very truly yours, W. F! . Alden Engineer-In-Charge Nuclear Section WblA:Imd | Very truly yours, W. | ||
Inspection G Enforcement | F!. Alden Engineer-In-Charge Nuclear Section WblA:Imd Generation Division Enclosures cc: | ||
8203090203 820226 | Ft r. Victor Stello, Jr. | ||
b!r. Norman h!. Italler Director (NRC) | |||
Director (NRC) | |||
Inspection G Enforcement blan a g em en t G Program Analysis f.R1'l~ | |||
8203090203 820226 di i 0 | |||
iQ4 PDR ADOCK 0S000277 | |||
/ | |||
I R | |||
PDR}} | |||
Latest revision as of 11:09, 16 December 2024
| ML20069C013 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/26/1982 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20069C017 | List: |
| References | |
| NUDOCS 8203080203 | |
| Download: ML20069C013 (1) | |
Text
PHILADELPHIA ELECTRIC COMPANY
/e 23O1 MARKCT STREET
[
g,q.pfED P.O. BOX 8699 PHILADELPHI A. PA.19101 MAR 051982* b r
h*
(215)841-4000
~~
Nirp'inapupu ~
in5.11 DC13114 ff>
Y February 26, 1982
/
Co Docket Nos. 50-277 6 50-278 g
Pir.
R.
C.
Ilayn e s, Director Region I Office of Inspection G Enforcement U.S.
Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Subj ect :
Report of Annual Occupational Exposure No. 6 - January 1,
1981 through December 31, 1981 - Peach Bottom Atomic Power Station Units 2 6 3.
Dear b!r. Ilayn e s :
Enclosed are two copics of the Annual Occupational Exposure Tabulation No.
6, January 1 - December 31, 1981, for Peach Bottom Atomic Power Station Unit Nos. 2 and 3.
This report is being submitted in compliance with the Technical Specifications of Operating Licenses DPR-44 and DPR-56.
Very truly yours, W.
F!. Alden Engineer-In-Charge Nuclear Section WblA:Imd Generation Division Enclosures cc:
Ft r. Victor Stello, Jr.
b!r. Norman h!. Italler Director (NRC)
Director (NRC)
Inspection G Enforcement blan a g em en t G Program Analysis f.R1'l~
8203090203 820226 di i 0
iQ4 PDR ADOCK 0S000277
/
I R