ML20070L058: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:__
{{#Wiki_filter:__
/   's
/
                    .        . TENNESSEE VALLEY AUTHORITY f               CH ATTANOOGA, TENNESSEE 374ol 400 Chestnut Street Tower II December 23, 1982 TVA-SQN-TS-39 Director of Nuclear Reactor Regulation Attention: Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Coimnission Washington   D.C. 20555
's
. TENNESSEE VALLEY AUTHORITY f
CH ATTANOOGA, TENNESSEE 374ol 400 Chestnut Street Tower II December 23, 1982 TVA-SQN-TS-39 Director of Nuclear Reactor Regulation Attention:
Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Coimnission Washington D.C.
20555


==Dear Ms. Adensam:==
==Dear Ms. Adensam:==
 
In the Matter of
In the Matter of                               )           Docket Nos. 50-327 Tennessee Valley Authority                     )                       50-328 In accordance with 10 CFR Part 50.59, we are enclosing 40 copies of a requested amendment to the operating licenses DPR-77 and DPR-79 for           ,
)
a change to the Sequoyah Nuclear Plant units 1 and 2 technical specifications (enclosure 1). The proposed change requests relief in the surveillance requirement, 4.8.1.1.2.d.11, alternating current sources for electrical power systems. Enclosure 2 provides the justification for the proposed changes.
Docket Nos. 50-327 Tennessee Valley Authority
In accordance with the requirements of 10 CFR Part 170.22, we have determined the proposed amendment to be Class III for unit 1 and Class I for unit 2. These classifications are based on the facts that the changes involve a single safety issue and that the changes apply to two identical units on the same site. The remittance fee of $4400 is being wired to the Nuclear Regulatory Commission, Attention: Licensing Fee Management Branch.
)
f   0 P,0 8212300351 821223 PDR ADOCK 05000327 P                 pgg An Equal Opportunity Employer
50-328 In accordance with 10 CFR Part 50.59, we are enclosing 40 copies of a requested amendment to the operating licenses DPR-77 and DPR-79 for a change to the Sequoyah Nuclear Plant units 1 and 2 technical specifications (enclosure 1).
The proposed change requests relief in the surveillance requirement, 4.8.1.1.2.d.11, alternating current sources for electrical power systems. Enclosure 2 provides the justification for the proposed changes.
In accordance with the requirements of 10 CFR Part 170.22, we have determined the proposed amendment to be Class III for unit 1 and Class I for unit 2.
These classifications are based on the facts that the changes involve a single safety issue and that the changes apply to two identical units on the same site. The remittance fee of $4400 is being wired to the Nuclear Regulatory Commission, Attention: Licensing Fee Management Branch.
f 0
P,0 8212300351 821223 PDR ADOCK 05000327 P
pgg An Equal Opportunity Employer


e.
e.
  /         ,
/
          .J
,.J
* c, Director of Nuclear Reactor Regulation -                           December 23, 1982 If you have any questions concerning this matter, please get in touch with Jerry Wills at FTS 858-2683 Very truly yours, TENNESSEE 1 ALLEY AUTHORITY fti hv L. M. fi' .s. Manager Nuclear     ensing Staff Sworn           subscri   before me th             ay of   / D 1932
* c, Director of Nuclear Reactor Regulation -
                &/h$
December 23, 1982 If you have any questions concerning this matter, please get in touch with Jerry Wills at FTS 858-2683 Very truly yours, TENNESSEE 1 ALLEY AUTHORITY fti hv L. M. fi'
.s. Manager Nuclear ensing Staff Sworn subscri before me th ay of
/ D 1932
&/h$
Notar Public
Notar Public
                                            / /
/ /
My       ission Expires 4//7/
My ission Expires 4//7/
                                          /   //
/
,              Enclosure cc: U.S. Nuclear Regulatory Commission (Enclosarn Region II Attn: Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 4
//
                                                            . .-.-              .      .,    - .- --- -- --, -}}
Enclosure cc:
U.S. Nuclear Regulatory Commission (Enclosarn Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 4
--- -- --, -}}

Latest revision as of 09:28, 16 December 2024

Application for Amend to Licenses DPR-77 & DPR-79,consisting of Proposed Changes to Tech Spec 4.8.1.1.2.d.11 Re Surveillance Requirement for Ac Sources for Electrical Power Sys
ML20070L058
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/23/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20070L061 List:
References
NUDOCS 8212300351
Download: ML20070L058 (2)


Text

__

/

's

. TENNESSEE VALLEY AUTHORITY f

CH ATTANOOGA, TENNESSEE 374ol 400 Chestnut Street Tower II December 23, 1982 TVA-SQN-TS-39 Director of Nuclear Reactor Regulation Attention:

Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Coimnission Washington D.C.

20555

Dear Ms. Adensam:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 In accordance with 10 CFR Part 50.59, we are enclosing 40 copies of a requested amendment to the operating licenses DPR-77 and DPR-79 for a change to the Sequoyah Nuclear Plant units 1 and 2 technical specifications (enclosure 1).

The proposed change requests relief in the surveillance requirement, 4.8.1.1.2.d.11, alternating current sources for electrical power systems. Enclosure 2 provides the justification for the proposed changes.

In accordance with the requirements of 10 CFR Part 170.22, we have determined the proposed amendment to be Class III for unit 1 and Class I for unit 2.

These classifications are based on the facts that the changes involve a single safety issue and that the changes apply to two identical units on the same site. The remittance fee of $4400 is being wired to the Nuclear Regulatory Commission, Attention: Licensing Fee Management Branch.

f 0

P,0 8212300351 821223 PDR ADOCK 05000327 P

pgg An Equal Opportunity Employer

e.

/

,.J

  • c, Director of Nuclear Reactor Regulation -

December 23, 1982 If you have any questions concerning this matter, please get in touch with Jerry Wills at FTS 858-2683 Very truly yours, TENNESSEE 1 ALLEY AUTHORITY fti hv L. M. fi'

.s. Manager Nuclear ensing Staff Sworn subscri before me th ay of

/ D 1932

&/h$

Notar Public

/ /

My ission Expires 4//7/

/

//

Enclosure cc:

U.S. Nuclear Regulatory Commission (Enclosarn Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 4

--- -- --, -