ML20070R149: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:o-OPERATING DATA REPORT.
{{#Wiki_filter:o-
DOCKET NO.       50-244 DATE Decembe r 6.1982 COMPLETED BY                   f. N-          -
. OPERATING DATA REPORT.
                                                                                                                                      ^ ^ ^ '
DOCKET NO.
Andrew E. McNAMAiiA TELEP110NE 1 (315) 524-4446 OPERATING STAT,U,5                                                               Ext. 301
50-244 DATE Decembe r 6.1982 COMPLETED BY
: 1. Unit Name:     GINNA STATION. UNIT #1                           Notes The reuctor power leve1
: f. N-
: 2. Reporting Period: Nove mbe r,1982                                       was maintained at 100%
^ ^ ^ '
: 3. Licensed Thermal Power (MWr):       1520                                for the majority of the
Andrew E. McNAMAiiA TELEP110NE 1 (315) 524-4446 OPERATING STAT,U,5 Ext. 301
: 4. Nameplate Rating (Gross MTe):       490                                report month, with one
: 1. Unit Name:
: 5. Design Electrical Rating (Net MWe): 470 except ?on detailed on 490                       page #3.
GINNA STATION. UNIT #1 Notes The reuctor power leve1
: 2. Reporting Period: Nove mbe r,1982 was maintained at 100%
1520 for the majority of the
: 3. Licensed Thermal Power (MWr):
490 report month, with one
: 4. Nameplate Rating (Gross MTe):
: 5. Design Electrical Rating (Net MWe): 470 except ?on detailed on 490 page #3.
: 6. Maximum Dependable Capacity (Gross MTe):
: 6. Maximum Dependable Capacity (Gross MTe):
: 7. Maximum Dependable Capacity (Net MWe):       470
470
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level to Which Restricted, If Any (Net MWe):
: 9. Power Level to Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:
This Month           Yr. to-Date         Cumulative
This Month Yr. to-Date Cumulative
: 11. Ilours In Reporting Period                   720.00             8.016.00             11tu n n _ nn
: 11. Ilours In Reporting Period 720.00 8.016.00 11tu n n _ nn
: 12. Number of flours Reactor Tas Critical       720.00        _ 4,499.53                 86,i42.15
: 12. Number of flours Reactor Tas Critical
: 13. Reactor Reserve Shutdown llours              0.00               0.00                 1.631.32*
_ 4,499.53 86,i42.15 720.00 0.00 0.00 1.631.32*
720.00        _   4,408.50               84,236.13 I4. Ifours Generator On-Line 0.00               0.00                 8.50
: 13. Reactor Reserve Shutdown llours I4. Ifours Generator On-Line
: 15. Unit Reserve Shutdown flours 1,082,784           6,555,552             115,461,106
_ 4,408.50 84,236.13 720.00 0.00 0.00 8.50
: 16. Gross Thermal Energy Generated (MWil) 358,207             2,161,422             37,596,387
: 15. Unit Reserve Shutdown flours
: 16. Gross Thermal Energy Generated (MWil) 1,082,784 6,555,552 115,461,106 358,207 2,161,422 37,596,387
: 17. Gross Electrical Energy Generated (MWH).
: 17. Gross Electrical Energy Generated (MWH).
340,952             2,055,464             35,633,537
340,952 2,055,464 35,633,537
: 18. Net Electrical Energy Generated (MWil) 100.00%             55.00%          _ 73.84%
: 18. Net Electrical Energy Generated (MWil) 100.00%
55.00%
: 19. Unit Service Factor
: 19. Unit Service Factor
: 20. Unit Availability Factor                      100.00%             55.00%               73.85%                 _
_ 73.84%
: 21. Unit Capacity Factor (Using MDC I!ct)        100.75%             54.56%               68.38%**
100.00%
: 22. Unit Capacity Factor (Using DER Net)         100.75%-           "M%                   68.38%**
55.00%
              - 23. Unit Forced Outage Rate                      0.00%           _
73.85%
13.'41%               8.65%
: 20. Unit Availability Factor 100.75%
54.56%
68.38%**
: 21. Unit Capacity Factor (Using MDC I!ct) 100.75%-
"M%
68.38%**
: 22. Unit Capacity Factor (Using DER Net) 0.00%
13.'41%
8.65%
- 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Mid-Ma ch - 1983 - Refuelino & Maintenance
Mid-Ma ch - 1983 - Refuelino & Maintenance
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                 Forecast           Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION s
: 26. Units In Test Status (Prior to Commercial Operation):
    .o-   Cummulative Total Commencing January-1,1975 to Th2 Cummulative capacity factor in, the October,1982 report was incorrectly                           4... i se r v. i/ven given as 75.90%. The correct number should have been 68.17%.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
8301270303 821206 PDR ADOCK 05000244 m                                                  W                     PDR                                                     __
.o-Cummulative Total Commencing January-1,1975 s
to Th2 Cummulative capacity factor in, the October,1982 report was incorrectly 4...
i se r v.
i/ven given as 75.90%. The correct number should have been 68.17%.
8301270303 821206 PDR ADOCK 05000244 W
PDR m


      -    -.                                                                                                    2-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50 244 UNIT #1. Ginna Station DATE December 6,1982
2-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50 244
                                                                                      && pfttn . ~ .- -
#1. Ginna Station UNIT December 6,1982 DATE && pfttn. ~.
COMPLETED BY
COMPLETED BY
                                                                                                            ^ ~ ~
^ ~ ~
Andrew E. McNamara' TELEPHONE 1 (315) 524-4446 Ext. 301 MONTil       Novembe r, 1982 DAY AVERAGE DAILY POWER LEVEL                         DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                           (MWe-Net) 1 477                                                   478 17 2
Andrew E. McNamara' 1 (315) 524-4446 TELEPHONE Ext. 301 MONTil Novembe r, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
477                                   13 478 477                                                   477 3                                                   gg 4 76                                                 478 4                                                   20                                                           '
(MWe-Net) 1 477 478 17 2
476                                                   371 5                                                   21 477                                                   477 g                                                   g 477                                                   477 7                                                   23 477                                                   477 3
477 478 13 477 477 3
g
gg 4 76 478 4
                          '478                                                    477 25 4 76                                                 477 le gg 476                                                   478 27 12 47I                                                   476 478                                                   476 13                                                   29 477                                                   g 14                                                   "
20 476 371 5
8 i           15 gg L78 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
21 g
477 477 g
477 477 7
23 477 477 3
'478 g
25 477 4 76 477 le 476 478 gg 27 47I 476 12 478 476 13 29 477 g
14 8
i 15 L78 gg INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
                                                                                                      . ..n     n a v. ./ ..
...n n a v../..


                                                                                                            ' D(X'KET NO.
' D(X'KET NO.
3 0-244                                               "
3 0-244
                                                                                                                . UNITNAME _ W1,Ginas Station                                         ,
. UNITNAME _ W1,Ginas Station UNIT SHUTDOWN AND POWER REDUCTIONS :
UNIT SHUTDOWN AND POWER REDUCTIONS :                       DATE December 6,1982 COMPLETED itY 45-3 .f               O--_._
DATE December 6,1982 COMPLETED itY 45-3.f O--_._
liRfrew
liRfrew c amara
                                                                                                                                                                        ~~
~~
                                                                                                                                          . c amara                                  .
REPORT MONTII Novembe r 1 (315) 524-4446 Ext. 301 m
REPORT MONTII Novembe r                     .
~mE n
1 (315) 524-4446 Ext. 301 m
c Licensee e,.
,                                                    n      ~mE o e u    Licensee c
Cause & Corrective o e u oO c.
                                                                                                  **                    Cause & Corrective oO         c.                            e ,.
No.
No.
Date'         -1     jj         *
Date'
                                                            } ,} j     Event         {4         g
-1 jj
[j Action to .
},} j Event
                                      >-    gz        y    2
{4
                                                              .e      Repor' #       y         u u                  Prevent Recurrence g
[j g
O PR*         11-21-82           5. W 9 Hrs       B     N/A   N/A           HA       (Turbine) i. ad reduction to ~46% reactor power level to-perform a series of monthly                                   4     '
Action to.
turbine valve and trip tests. At the
Repor' #
                                                                                        ,              same. time.a containment entry was made to perform some necessary maintenance inside the secondary shield.
y u
1                        2
Prevent Recurrence gz y
* Power Reduction                 3                                   4 F: Forced                 Reason:                                       Method:                             Exhibit G - Instructions S: Scheduled               A-Equipment Failure (Explain)                 1-Manual                             for Preparation of Data Il-Maintenance or Test                         2-Manual Scram.                     Entry Sheets for Licensee C-Refueling                                   3-Automatic Scram.                   Event Report (LER) File (NUREG-D-Regulatory Restriction ~                     4-Other (Explain)                   0161)
.e 2
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)                                                     5                                                          1 4.. m av. ins,             II-Other (Explain)                                                                 Exhibit I - Srme Source
g u
* i
O PR*
11-21-82 5.
W 9 Hrs B
N/A N/A HA (Turbine) i. ad reduction to ~46% reactor power level to-perform a series of monthly 4
turbine valve and trip tests. At the same. time.a containment entry was made to perform some necessary maintenance inside the secondary shield.
* Power Reduction 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction ~
4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
1 G-Operational Error (Explain) 4..
m av. ins, II-Other (Explain)
Exhibit I - Srme Source i


    ~
~
* _  4_
4_
l i
l i
NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT   Ginna Station, Unit #1 DATE December 6,1982 COMPLETED BY      :    r_f 8./ M         m _
OF OPERATING EXPERIENCE DOCKET NO.
Andrew E. McNamara' ~ ~
50-244 UNIT Ginna Station, Unit #1 DATE December 6,1982 r_f 8./ M m _
TELEPHONE 1 (315) 524-4446 MONTil   November, 1982 The reactor power level was maintained at 100% for the majority of the report period, with the following exception: On 11/21 the reactor power . level was reduced to ~46% to perform a series of monthly turbine valve and trip test.
COMPLETED BY Andrew E. McNamara' ~ ~
TELEPHONE 1 (315) 524-4446 MONTil November, 1982 The reactor power level was maintained at 100% for the majority of the report period, with the following exception: On 11/21 the reactor power. level was reduced to ~46% to perform a series of monthly turbine valve and trip test.
A containment entry was made at the same time to perform some necessary maintenance inside the secondary shield. The reactor power level was restored
A containment entry was made at the same time to perform some necessary maintenance inside the secondary shield. The reactor power level was restored
            ~
~
to 100% after,the tests and remained there for the ' rest of the report period.
to 100% after,the tests and remained there for the ' rest of the report period.
2 49 123 (1/78)
2 49 123 (1/78)


                                                        =-        -
(_;
(_;                         ,
=-
                                          .-              -(                                    -
. 3, 7,
                      . 3 , 7,
- (
                        'h
' h
                                                  'y-                             p         ,
'y-p
                                            -          ~
~
4                                   ,,4'     .
4
                                                                                                        . - 5'       ,
,,4' 5'
                                                                                    -GIMMA STATION.
-GIMMA STATION.
                                                                                ~ Maintenance Report t
~ Maintenance Report t
November, 1982 y
November, 1982 y
                                    ' During Novembers : routine' maintenance - and..' inspections were completed as' scheduled.
' During Novembers : routine' maintenance - and..' inspections were completed as' scheduled.
J 4
J 4
D D
D D
  ' .                                                                                                          8 g
8 g
                        %                        Y' 2-     .
Y' 2-f i
f i
e-r.-
e-r .-
r
[.
[.
M.,
r M.,
r I.
rI.
                                                                                          ~
I
I                    i                                                                                                 ,
~
i ll                               -i,'-
i i
ll
-i,'-
I~
I~
[
[
r
r
\,
\\,
1       -
1 t-
t-
,,}}
                                                                                                                          , ,}}

Latest revision as of 09:13, 16 December 2024

Monthly Operating Rept for Nov 1982
ML20070R149
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/06/1982
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20070R137 List:
References
NUDOCS 8301270303
Download: ML20070R149 (5)


Text

o-

. OPERATING DATA REPORT.

DOCKET NO.

50-244 DATE Decembe r 6.1982 COMPLETED BY

f. N-

^ ^ ^ '

Andrew E. McNAMAiiA TELEP110NE 1 (315) 524-4446 OPERATING STAT,U,5 Ext. 301

1. Unit Name:

GINNA STATION. UNIT #1 Notes The reuctor power leve1

2. Reporting Period: Nove mbe r,1982 was maintained at 100%

1520 for the majority of the

3. Licensed Thermal Power (MWr):

490 report month, with one

4. Nameplate Rating (Gross MTe):
5. Design Electrical Rating (Net MWe): 470 except ?on detailed on 490 page #3.
6. Maximum Dependable Capacity (Gross MTe):

470

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr. to-Date Cumulative

11. Ilours In Reporting Period 720.00 8.016.00 11tu n n _ nn
12. Number of flours Reactor Tas Critical

_ 4,499.53 86,i42.15 720.00 0.00 0.00 1.631.32*

13. Reactor Reserve Shutdown llours I4. Ifours Generator On-Line

_ 4,408.50 84,236.13 720.00 0.00 0.00 8.50

15. Unit Reserve Shutdown flours
16. Gross Thermal Energy Generated (MWil) 1,082,784 6,555,552 115,461,106 358,207 2,161,422 37,596,387
17. Gross Electrical Energy Generated (MWH).

340,952 2,055,464 35,633,537

18. Net Electrical Energy Generated (MWil) 100.00%

55.00%

19. Unit Service Factor

_ 73.84%

100.00%

55.00%

73.85%

20. Unit Availability Factor 100.75%

54.56%

68.38%**

21. Unit Capacity Factor (Using MDC I!ct) 100.75%-

"M%

68.38%**

22. Unit Capacity Factor (Using DER Net) 0.00%

13.'41%

8.65%

- 23. Unit Forced Outage Rate

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Mid-Ma ch - 1983 - Refuelino & Maintenance

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

.o-Cummulative Total Commencing January-1,1975 s

to Th2 Cummulative capacity factor in, the October,1982 report was incorrectly 4...

i se r v.

i/ven given as 75.90%. The correct number should have been 68.17%.

8301270303 821206 PDR ADOCK 05000244 W

PDR m

2-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50 244

  1. 1. Ginna Station UNIT December 6,1982 DATE && pfttn. ~.

COMPLETED BY

^ ~ ~

Andrew E. McNamara' 1 (315) 524-4446 TELEPHONE Ext. 301 MONTil Novembe r, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 477 478 17 2

477 478 13 477 477 3

gg 4 76 478 4

20 476 371 5

21 g

477 477 g

477 477 7

23 477 477 3

'478 g

25 477 4 76 477 le 476 478 gg 27 47I 476 12 478 476 13 29 477 g

14 8

i 15 L78 gg INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

...n n a v../..

' D(X'KET NO.

3 0-244

. UNITNAME _ W1,Ginas Station UNIT SHUTDOWN AND POWER REDUCTIONS :

DATE December 6,1982 COMPLETED itY 45-3.f O--_._

liRfrew c amara

~~

REPORT MONTII Novembe r 1 (315) 524-4446 Ext. 301 m

~mE n

c Licensee e,.

Cause & Corrective o e u oO c.

No.

Date'

-1 jj

},} j Event

{4

[j g

Action to.

Repor' #

y u

Prevent Recurrence gz y

.e 2

g u

O PR*

11-21-82 5.

W 9 Hrs B

N/A N/A HA (Turbine) i. ad reduction to ~46% reactor power level to-perform a series of monthly 4

turbine valve and trip tests. At the same. time.a containment entry was made to perform some necessary maintenance inside the secondary shield.

  • Power Reduction 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction ~

4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

1 G-Operational Error (Explain) 4..

m av. ins, II-Other (Explain)

Exhibit I - Srme Source i

~

4_

l i

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE December 6,1982 r_f 8./ M m _

COMPLETED BY Andrew E. McNamara' ~ ~

TELEPHONE 1 (315) 524-4446 MONTil November, 1982 The reactor power level was maintained at 100% for the majority of the report period, with the following exception: On 11/21 the reactor power. level was reduced to ~46% to perform a series of monthly turbine valve and trip test.

A containment entry was made at the same time to perform some necessary maintenance inside the secondary shield. The reactor power level was restored

~

to 100% after,the tests and remained there for the ' rest of the report period.

2 49 123 (1/78)

(_;

=-

. 3, 7,

- (

' h

'y-p

~

4

,,4' 5'

-GIMMA STATION.

~ Maintenance Report t

November, 1982 y

' During Novembers : routine' maintenance - and..' inspections were completed as' scheduled.

J 4

D D

8 g

Y' 2-f i

e-r.-

[.

r M.,

rI.

I

~

i i

ll

-i,'-

I~

[

r

\\,

1 t-

,,