THE CINCINNATI GAS & ELECTRIC COMPANY dr CINCIN N ATI. OHIO 4520t January 27, 1983 EAB-S0L-20 E. A. BORG M AN N PRipCIPAL STAFF sc~ oa v.cc -cs.ocut D/RA GNF U. S. NUCLEAR REGULATORY COMMISSION AfgA gygf fz Region III D D r.R P PA0 799 Roosevelt Road DEPr.0S SLO Glen Ellyn, Illinois 60137 TEr,TP ML a
THE CINCINNATI GAS & ELECTRIC COMPANY                                     dr CINCIN N ATI. OHIO 4520t January 27, 1983 EAB-S0L-20 PRipCIPAL STAFF E. A. BORG M AN N                                               _
Attention:
sc~ oa v.cc -cs.ocut                                                       ,
Mr. J. G.
D/RA               GNF U. S. NUCLEAR REGULATORY COMMISSION                           AfgA             gygf fz Region III                                                     D D r.R P         PA0 799 Roosevelt Road                                             DEPr.0S           SLO Glen Ellyn, Illinois             60137                         TEr,TP                 __
Keppler DL FILE
ML                           a Attention:             Mr. J. G. Keppler                       DL                 FILE     % d4/
% d4/
Regional Administrator RE:     Wm. H. Zimmer Nuclear Power Station - Unit 1 MONTHLY STATUS REPORT FOR THE QUALITY CONFIRMATION PROGRAM Docket No. 50-358   Construction Permit No. CPPR-88 W. O. 57300     Job E-5590     File 956 Gentlemen:
Regional Administrator RE:
In accordance with Mr. R. F. Warnick's {{letter dated|date=December 30, 1982|text=letter dated December 30, 1982}}, regarding the monthly status report for the Quality Confirmation Program (QCP), we are forwarding a copy of QCP's December Status Report and Summary Sheet to you for your review. We have also forwarded a copy of this report to the parties specified in your letter, the Senior Resident Inspector, the Zimmer Project Inspector, the Office of Inspection and Enforcement, and the Office of Nuclear Reactor Regulations.
Wm. H. Zimmer Nuclear Power Station - Unit 1 MONTHLY STATUS REPORT FOR THE QUALITY CONFIRMATION PROGRAM Docket No. 50-358 Construction Permit No. CPPR-88 W. O.
In the future we shall forward copies of the QCP Status Report and Summary Sheet to these organizations on a monthly basis as requested.           The Summary Sheet should meet your request for an Executive Summary of this report.
57300 Job E-5590 File 956 Gentlemen:
In accordance with Mr. R.
F. Warnick's {{letter dated|date=December 30, 1982|text=letter dated December 30, 1982}}, regarding the monthly status report for the Quality Confirmation Program (QCP), we are forwarding a copy of QCP's December Status Report and Summary Sheet to you for your review.
We have also forwarded a copy of this report to the parties specified in your letter, the Senior Resident Inspector, the Zimmer Project Inspector, the Office of Inspection and Enforcement, and the Office of Nuclear Reactor Regulations.
In the future we shall forward copies of the QCP Status Report and Summary Sheet to these organizations on a monthly basis as requested.
The Summary Sheet should meet your request for an Executive Summary of this report.
If you have any questions or comments, you may contact myself or Mr. James F. Shaffer, Director of the Quality Confirmation Program at (513) 553-2003 extension 408.
If you have any questions or comments, you may contact myself or Mr. James F. Shaffer, Director of the Quality Confirmation Program at (513) 553-2003 extension 408.
I trust this meets the intent of the {{letter dated|date=December 30, 1982|text=December 30, 1982 letter}}.
I trust this meets the intent of the {{letter dated|date=December 30, 1982|text=December 30, 1982 letter}}.
Please advise if you have any further concerns regarding this matter.
Please advise if you have any further concerns regarding this matter.
Very truly yours, THE CINCINNATI GAS & ELECTRIC C0.
Very truly yours, THE CINCINNATI GAS & ELECTRIC C0.
By E. A. Borgmann 8302040083 830127                                       Senior Vice President PDR ADOCK 05000358 A                         PDR EAB: rem                                                   JAN 31 1933                     _
By E. A. Borgmann 8302040083 830127 Senior Vice President PDR ADOCK 05000358 A
PDR EAB: rem JAN 31 1933
_L Eo/
_L Eo/


t QCP SUPMARY i
t QCP SUPMARY i
Task 1                   Structural Steel - This task is currently staffed with 20 people working mainly in the Service Water and Reactor Building at this
Task 1 Structural Steel - This task is currently staffed with 20 people working mainly in the Service Water and Reactor Building at this reporting period.
  .                                              reporting period. CG&E Stop Work Order 82-02, addressing miscell-l                                               aneous work requests, has impacted inspection. This Stop Work                                                                 :
CG&E Stop Work Order 82-02, addressing miscell-l aneous work requests, has impacted inspection. This Stop Work j
j                                                Order was lifted, consistent with the requirements of CAR 82-64,                                                               I i                                               on 12/20/82. This task is currently estimated to be 69% complete.
Order was lifted, consistent with the requirements of CAR 82-64, I
i                     Task 2                   Weld Quality - This task is currently staffed with 5 people, work-
i on 12/20/82. This task is currently estimated to be 69% complete.
;                                                ing mostly on the welders qualification and final small bore reviews.
i Task 2 Weld Quality - This task is currently staffed with 5 people, work-ing mostly on the welders qualification and final small bore reviews.
1
Presently 2,725 small bore document packages are under final review.
:                                              Presently 2,725 small bore document packages are under final review.
1 This task is currently estimated to be 70% complete.
This task is currently estimated to be 70% complete.
Task 3 Heat Number Traceability - This task is currently staffed with 6 people, working mostly on the Purchase Order Reviews and Gamma Plug inspections.
Task 3                   Heat Number Traceability - This task is currently staffed with 6 people, working mostly on the Purchase Order Reviews and Gamma Plug
An inventory of Purchase Orders by H.J. Kaiser, has l
!                                              inspections.                       An inventory of Purchase Orders by H.J. Kaiser, has l                                             limited those P.O.'s available for QCP review. This task is current-ly estimated to be-41% complete.
limited those P.O.'s available for QCP review. This task is current-ly estimated to be-41% complete.
Task 4                   Socket Weld Disengagement - This task is currently staffed with 3 I
Task 4 Socket Weld Disengagement - This task is currently staffed with 3 I
people, mostly concentrating on the review of Document Packages.
people, mostly concentrating on the review of Document Packages.
This review started during this report period. This task is current-ly estimated to be 98% complete.
This review started during this report period. This task is current-ly estimated to be 98% complete.
1
1 Task 5 Radiographs - This task is being supported by the personnel assigned to Task III. The final report for this task has been written, and is being reviewed by the site assigned applicable parties. This task is currently estimated to be 99% complete.
!.                    Task 5                   Radiographs - This task is being supported by the personnel assigned
Task 6 Cable Separation - This task is currently staffed with 8 people, l
",                                              to Task III. The final report for this task has been written, and                                                               ;
working mainly on the cable tray system walkdown in the Aux. Build-ing. This task is currently estimated to be 61% complete.
is being reviewed by the site assigned applicable parties. This                                                                 "
l Task 7 Nonconformance Reports - This task is currently staffed with 9 l
task is currently estimated to be 99% complete.
people, working mainly on the Voided NR and Surveillance Report (SR) i review.
.                    Task 6                   Cable Separation - This task is currently staffed with 8 people, l                                             working mainly on the cable tray system walkdown in the Aux. Build-ing. This task is currently estimated to be 61% complete.
Task personnel are tagging items in the plant, which were l
l                     Task 7                   Nonconformance Reports - This task is currently staffed with 9 l                                             people, working mainly on the Voided NR and Surveillance Report (SR) i review. Task personnel are tagging items in the plant, which were l                                             identified as nonconforming during the review of voided NR's. This j                                             task is currently estimated to be 65% complete.
identified as nonconforming during the review of voided NR's.
i                     Task 8                 Design Control and Verification - This task was originally supported by Sargent and Lundy (S&L).                                 Their report has been submitted to CG&E l
This j
QCP and is being finalized into a final report. This task is current-l                                             ly estimated to be 99% complete.
task is currently estimated to be 65% complete.
,                    Task 9                 Design Document Changes - This task is currently staffed with 15 people,
i Task 8 Design Control and Verification - This task was originally supported by Sargent and Lundy (S&L).
;                                            working mainly on-the review of DDC's and inspection of cable tray i                                             hangers in the Control Room. This task is currently estimated to be                                                               :
Their report has been submitted to CG&E l
40% complete.
QCP and is being finalized into a final report. This task is current-l ly estimated to be 99% complete.
Task 9 Design Document Changes - This task is currently staffed with 15 people, working mainly on-the review of DDC's and inspection of cable tray i
hangers in the Control Room. This task is currently estimated to be 40% complete.
i i
i i
e
e
    ~-,,-,,,y   n -
~-,,-,,,y n
                          -m.,   ,  w m. nn ,-     -7,,.n-,. - - - - ~ - , ,         , , , .    ,,_,,_e   r,   .m,         - .,    .,,,--m, -w, ,wn-wen,   .m- - - - - -- -s
-m.,
w
: m. nn,-
-7,,.n-,. - - - - ~ -,,
,,_,,_e r,
.m,
.,,,--m,
-w,
,wn-wen,
.m-
-s


                                                                                                . = _ - .-.  -    .
. = _ -.-.
QCP Summary Page 2 Task 10     Subcontractor /QA Program - This task is currently staffed with 2 people,. working on the evaluations of past audits reviewed of subcontractors. This task is currently estimated to be 79%
QCP Summary Page 2 Task 10 Subcontractor /QA Program - This task is currently staffed with 2 people,. working on the evaluations of past audits reviewed of subcontractors. This task is currently estimated to be 79%
complete.
complete.
Task 11     Audits - This task is staffed with the same personnel as Task 10.
Task 11 Audits - This task is staffed with the same personnel as Task 10.
The audit review has been completed and evaluations are being done.
The audit review has been completed and evaluations are being done.
This task is currently estimated to be 83% complete.
This task is currently estimated to be 83% complete.
Line 73: Line 91:
l l
l l
l i
l i
u   pv5e'         a   w   +       -
u pv5e' a
v vm * - -wye +ree+m ---$-***+-n- w-t--1r+g-
w
* N  '--f-++--* -}}
+
v vm
-wye +ree+m
---$-***+-n-w-t--1r+g-N
'--f-++--*
-}}

Latest revision as of 09:11, 16 December 2024

Forwards Quality Confirmation Program,Status as of 821231, for Review
ML20070R908
Person / Time
Site: Zimmer
Issue date: 01/27/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20070R911 List:
References
EAB-SOL-20, NUDOCS 8302040083
Download: ML20070R908 (3)


Text

e i

THE CINCINNATI GAS & ELECTRIC COMPANY dr CINCIN N ATI. OHIO 4520t January 27, 1983 EAB-S0L-20 E. A. BORG M AN N PRipCIPAL STAFF sc~ oa v.cc -cs.ocut D/RA GNF U. S. NUCLEAR REGULATORY COMMISSION AfgA gygf fz Region III D D r.R P PA0 799 Roosevelt Road DEPr.0S SLO Glen Ellyn, Illinois 60137 TEr,TP ML a

Attention:

Mr. J. G.

Keppler DL FILE

% d4/

Regional Administrator RE:

Wm. H. Zimmer Nuclear Power Station - Unit 1 MONTHLY STATUS REPORT FOR THE QUALITY CONFIRMATION PROGRAM Docket No. 50-358 Construction Permit No. CPPR-88 W. O.

57300 Job E-5590 File 956 Gentlemen:

In accordance with Mr. R.

F. Warnick's letter dated December 30, 1982, regarding the monthly status report for the Quality Confirmation Program (QCP), we are forwarding a copy of QCP's December Status Report and Summary Sheet to you for your review.

We have also forwarded a copy of this report to the parties specified in your letter, the Senior Resident Inspector, the Zimmer Project Inspector, the Office of Inspection and Enforcement, and the Office of Nuclear Reactor Regulations.

In the future we shall forward copies of the QCP Status Report and Summary Sheet to these organizations on a monthly basis as requested.

The Summary Sheet should meet your request for an Executive Summary of this report.

If you have any questions or comments, you may contact myself or Mr. James F. Shaffer, Director of the Quality Confirmation Program at (513) 553-2003 extension 408.

I trust this meets the intent of the December 30, 1982 letter.

Please advise if you have any further concerns regarding this matter.

Very truly yours, THE CINCINNATI GAS & ELECTRIC C0.

By E. A. Borgmann 8302040083 830127 Senior Vice President PDR ADOCK 05000358 A

PDR EAB: rem JAN 31 1933

_L Eo/

t QCP SUPMARY i

Task 1 Structural Steel - This task is currently staffed with 20 people working mainly in the Service Water and Reactor Building at this reporting period.

CG&E Stop Work Order 82-02, addressing miscell-l aneous work requests, has impacted inspection. This Stop Work j

Order was lifted, consistent with the requirements of CAR 82-64, I

i on 12/20/82. This task is currently estimated to be 69% complete.

i Task 2 Weld Quality - This task is currently staffed with 5 people, work-ing mostly on the welders qualification and final small bore reviews.

Presently 2,725 small bore document packages are under final review.

1 This task is currently estimated to be 70% complete.

Task 3 Heat Number Traceability - This task is currently staffed with 6 people, working mostly on the Purchase Order Reviews and Gamma Plug inspections.

An inventory of Purchase Orders by H.J. Kaiser, has l

limited those P.O.'s available for QCP review. This task is current-ly estimated to be-41% complete.

Task 4 Socket Weld Disengagement - This task is currently staffed with 3 I

people, mostly concentrating on the review of Document Packages.

This review started during this report period. This task is current-ly estimated to be 98% complete.

1 Task 5 Radiographs - This task is being supported by the personnel assigned to Task III. The final report for this task has been written, and is being reviewed by the site assigned applicable parties. This task is currently estimated to be 99% complete.

Task 6 Cable Separation - This task is currently staffed with 8 people, l

working mainly on the cable tray system walkdown in the Aux. Build-ing. This task is currently estimated to be 61% complete.

l Task 7 Nonconformance Reports - This task is currently staffed with 9 l

people, working mainly on the Voided NR and Surveillance Report (SR) i review.

Task personnel are tagging items in the plant, which were l

identified as nonconforming during the review of voided NR's.

This j

task is currently estimated to be 65% complete.

i Task 8 Design Control and Verification - This task was originally supported by Sargent and Lundy (S&L).

Their report has been submitted to CG&E l

QCP and is being finalized into a final report. This task is current-l ly estimated to be 99% complete.

Task 9 Design Document Changes - This task is currently staffed with 15 people, working mainly on-the review of DDC's and inspection of cable tray i

hangers in the Control Room. This task is currently estimated to be 40% complete.

i i

e

~-,,-,,,y n

-m.,

w

m. nn,-

-7,,.n-,. - - - - ~ -,,

,,_,,_e r,

.m,

.,,,--m,

-w,

,wn-wen,

.m-

-s

. = _ -.-.

QCP Summary Page 2 Task 10 Subcontractor /QA Program - This task is currently staffed with 2 people,. working on the evaluations of past audits reviewed of subcontractors. This task is currently estimated to be 79%

complete.

Task 11 Audits - This task is staffed with the same personnel as Task 10.

The audit review has been completed and evaluations are being done.

This task is currently estimated to be 83% complete.