OPERATING DATA REPORT DOCKET NO. J0-333 DATE     AUGIST 1981 COMPLETED BY       E. zGFALT TELEPilONE       (315) 342-3840 OPERATING STATUS N '''
OPERATING DATA REPORT DOCKET NO. J0-333 DATE AUGIST 1981 COMPLETED BY E.
: 1. Unit Name:             FITZPATRICK
zGFALT 3 2-3840 4
TELEPilONE (315)
OPERATING STATUS N '''
: 1. Unit Name:
FITZPATRICK 810701 - 810731
: 2. Reporting Period:
: 2. Reporting Period:
810701 - 810731
2436
: 3. Licensed Thennal Pov.cr (MWt):
: 3. Licensed Thennal Pov.cr (MWt):
2436
883
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
883
821
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
821
830
: 6. Maximum Dependable Capacity (Gross MWe):         830
: 6. Maximum Dependable Capacity (Gross MWe):
810
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
810
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since 12st Report, Give Reasons:
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since 12st Report, Give Reasons:
NONE
NONE NONE
: 9. Power Lesel To Which Restricted,if Any (Net MWe):         NONE
: 9. Power Lesel To Which Restricted,if Any (Net MWe):
: 10. Reasons For Restrictions,If Any:
: 10. Reasons For Restrictions,If Any:
This Month           Yr to Date         Cumulatise 744               5087             52704 I1. Hours in Reporting Period
This Month Yr to Date Cumulatise 744 5087 52704 I1. Hours in Reporting Period 744 4638.9 37552.9
: 12. Number Of floun Reactor Was Critical 744                4638.9            37552.9 0                     0                   0
: 12. Number Of floun Reactor Was Critical 0
: 13. Reactor Resene Shutdown Hours
0 0
: 14. Ilours Generator On-Line 744                4577 3            36480.1 0                       0                 0
: 13. Reactor Resene Shutdown Hours 744 4577 3 36480.1
: 15. Unit Resene Shutdown Hours
: 14. Ilours Generator On-Line 0
: 16. Gross Thermal Energy Generated (MWH)                 1719432          10690896            74874490
0 0
: 17. Gross Electrical Energy Generated (MWH) 581160            3696750          f526260
: 15. Unit Resene Shutdown Hours 1719432 10690896 74874490
: 18. Net Electrical Energy Generated (MWH)                 563370            3583690          24708y 0 100.0%               90.0%             69 2%
: 16. Gross Thermal Energy Generated (MWH) 581160 3696750 f526260
: 19. Unit Senice Factor 100.0%               90.0%             69 2%
: 17. Gross Electrical Energy Generated (MWH) 563370 3583690 24708y 0
: 20. Unit Availability Factor
: 18. Net Electrical Energy Generated (MWH) 100.0%
: 21. Unit Capacity Factor IUsing MDC Net) 93 5%             17 0%         ''~62.9%
90.0%
92.2%             ~ E 6%               ' 7.1T 5
69 2%
: 22. Unit Capacity Factor (Using DER Net) 0.0%               10.0%             17 3%
: 19. Unit Senice Factor 100.0%
: 23. Unit Forced Outage Rate                                                                           _
90.0%
69 2%
: 20. Unit Availability Factor 93 5%
17 0%
''~62.9%
: 21. Unit Capacity Factor IUsing MDC Net)
' 7.1T 92.2%
~ E 6%
5
: 22. Unit Capacity Factor (Using DER Net) 0.0%
10.0%
17 3%
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht Refueling and maintenance outage scheduled for_ October for a period of 110 days.
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht Refueling and maintenance outage scheduled for_ October for a period of 110 days.
: 25. If Shut Down At End Of Report Period Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period Estimated Date of Startup:
: 26. Units In Test Status (Prior io Commercial Operation):                     Forecast       \     Achiesed INITIAL CRITICA LITY INITIAL ELECT RICITY CO\l%1ERCl41. OPER ATION 8211020501 010805 DR ADOCK 05000
: 26. Units In Test Status (Prior io Commercial Operation):
Forecast
\\
Achiesed INITIAL CRITICA LITY INITIAL ELECT RICITY CO\\l%1ERCl41. OPER ATION 8211020501 010805 DR ADOCK 05000


AVER ACE DAILY UNIT POWER LEVEL DOCKEINO. .50-33J UNIT- JAFNPP DATE  AUGUST. 19BJ COi!PLETED By   E. ZUFELT TELEPHONE    (315) 342-3840 July, 1981 AfoNni DAY       AVERAGE DAILY POWER LEVEL DAY     AVER AGE DAILY POWER LEVEL (alWe-Ner)
AVER ACE DAILY UNIT POWER LEVEL DOCKEINO..50-33J UNIT-JAFNPP AUGUST. 19BJ DATE COi!PLETED By E. ZUFELT (315) 342-3840 TELEPHONE July, 1981 AfoNni DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (alWe-Ner)
(MWe Net) 17                762
(MWe Net) 762 805 17 805 38 5'L3 2
:              805 2              805                           38                 5'L3 802                           19                 687 3
687 802 19 3
801                           20                 747 4
801 20 747 4
798                           21     _
752 798 21 5
752 5
790 22 751 6
790                           22   -              751 6
751 70b 23 7
70b                         23 751 7
756 783 24 g
783                         24                 756 g
780 25 761 9
780                         25                   761 9
772 26 761 to 764 613 27 11 769 743 2s 12 77n 772 29 13 76s 765 30 14 764 768 3:
772                         26                   761               -
15 768 16
to 613                         27                   764 11 743                         2s 769 12 77n 13 772                         29 765                         30                 76s 14 768                         3:                 764 15 16 768


==SUMMARY==
==SUMMARY==
:    The unit operated at near full rated thermal power for this reporting period.
The unit operated at near full rated thermal power for this reporting period.
Two power reductions on July 11 and July 1B for rebrushing of recire MG's and scram testing, respectively.
Two power reductions on July 11 and July 1B for rebrushing of recire MG's and scram testing, respectively.


DOCKET NO.         50-737             -
DOCKET NO.
I                                                              UNIT SilVTDOWNS AND POWER REDUCT10NS                                     JAFNPP UNIT N AME DATE       AUGUET. 1981 COMPLETED BY         E. ZUFELT REPORT MONTli JULY, 1981                                          (119) 14P-7840 TELEPilONE i
50-737 I
UNIT SilVTDOWNS AND POWER REDUCT10NS UNIT N AME JAFNPP DATE AUGUET. 1981 REPORT MONTli JULY, 1981 COMPLETED BY E.
ZUFELT TELEPilONE (119) 14P-7840 i
I e,
I e,
                                  -.        .! E           E   Y4         Licensee   E v, o"
.! E E
o                Cause & Currective
Y4 Licensee E v, Cause & Currective o
        %.            Date         R       5?             i .3 s 5       Event     u '2                               Action to
Date R
                                    *                      $                          NG
5?
                                            $E               j;5g         Report =               j                  Prevent Recurrence 1
i
0 t
.3 s 5 Event u '2 o"
8           810711       S           O         H     5     NA           NA         NA       Power reduced for rebrushing A and B Recirculation pump MG's.
Action to j
9           810718       S           O         H     5     NA           NA         NA       Power reduced for scram time testing.
$E j;5g Report =
NG Prevent Recurrence 0
1 t
8 810711 S
O H
5 NA NA NA Power reduced for rebrushing A and B Recirculation pump MG's.
9 810718 S
O H
5 NA NA NA Power reduced for scram time testing.
i i
i i
i i
i i
r
r
      'l                     2                                                   3                               4 F: Forced                 Reason:                                         Method:                           Exhibit G Instructions S: Seneduled             A Equipment Failure (Explair)                     1. Manual                       for Preparation of Data B-Maintenance of Test                             2-Manual Scram.                 Entry Sheets for Licensee C.Refuelin g                                       3 Automatic Scram.               Event Report (LER) File (NUREG-D Regulatory Restriction                         4-Other (Explain)               0161)
'l 2
E-Operator Training & Ucense Examination F.Administ rative                 ,
3 4
5 G Operational Error (Explain)                                                       Exlubit 1 - Same Source Il-Othe r ( E xplain)
F: Forced Reason:
Method:
Exhibit G Instructions S: Seneduled A Equipment Failure (Explair)
: 1. Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C.Refuelin g 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Examination F.Administ rative 5
G Operational Error (Explain)
Exlubit 1 - Same Source Il-Othe r ( E xplain)


    ..  -.        = _ .                - - _ .        -              .          . _ _ _ _ - -                        - - --            .
= _.
1 4
1 4
i i
i i
POWER AUIMORITY OF THE STATE OF NEW YORK i                             JAMES A. FITZPATRICK IUCIEAR POWER PLANT NARRATIVE SUM 4ARY OF OPERATING EXPERLTCES JULY 1981                                                                                             i 4
POWER AUIMORITY OF THE STATE OF NEW YORK i
The FitzPatrick unit operated at near full rated thermal power for this reporting period. Power was reduced on July 11, 1981 3
JAMES A. FITZPATRICK IUCIEAR POWER PLANT NARRATIVE SUM 4ARY OF OPERATING EXPERLTCES JULY 1981 i
to approximately 620 MWe for rebrushing of the A and B recirculation pump motor generators.
4 The FitzPatrick unit operated at near full rated thermal power for this reporting period. Power was reduced on July 11, 1981 to approximately 620 MWe for rebrushing of the A and B recirculation 3
pump motor generators.
Power was reduced again on July 18, 1981 for scram time testing.
Power was reduced again on July 18, 1981 for scram time testing.
Power is becoming FfPR limited.
Power is becoming FfPR limited.
Line 101: Line 138:
4 I
4 I


POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                       .
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE  
SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE  


==SUMMARY==
==SUMMARY==
0 DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
ENT 6/26 71 11947 Visual Maintenance Replaced Broken Caps 4
A LPCI Batt 6/26 27 11188 N/A None Preventive Maintenance 18 BMCC-1 &4 6/17 10 8729 Visual NRC Bulletin 79-02 Modified H10-542 143 3
~
H10-542 Inspection 7/9 88 8718 N/A None Preventive Maintenance - NDE Hool.s 4
CR-2 7/9 88 12413 Operational Modification to Radio Installed Circuit Boards and 16 CR-2 Adjusted Limits 7/9 88 8700 Preventive Use Corre,cted Discrepancies, Replacet 215 CR-2 Maintenance Bridge Drive Bearing Inspection 7/16 23 1261_8_
Operational None Replaced Gasket & Cold Torqued 11 T-3 After System Hot, Hot Torqued 7/16 70 12598 Operational Found Loose Screw in Had Motor Rewound & Installed 72 RWC-2A Motor Same - Tested Satisfactory 7/20 66 12437 Operational Bad Ground Found Bad Fuse in Control Panel 24 FN-61C 7/20 76 12591 Operational Faulty Module Replaced Module 20 Trouble Lite SRP Control Panel 1


0 DATE SYSTEM                HOW DETECTED  CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ENT 6/26  71      11947          Visual      Maintenance          Replaced Broken Caps                    4 A LPCI Batt 6/26  27      11188          N/A          None                  Preventive Maintenance                18 BMCC-1 &4 6/17  10      8729          Visual      NRC Bulletin 79-02    Modified H10-542                      143 3    ~
POWER AUTHORITY OF THE STATE OF NEW YORK
H10-542                    Inspection 7/9    88    8718          N/A          None                  Preventive Maintenance - NDE Hool.s    4 CR-2 7/9    88    12413          Operational  Modification to Radio Installed Circuit Boards and          16 CR-2                                              Adjusted Limits 7/9    88    8700          Preventive  Use                  Corre,cted Discrepancies, Replacet    215 CR-2          Maintenance                        Bridge Drive Bearing Inspection 7/16  23    1261_8_        Operational  None                  Replaced Gasket & Cold Torqued        11 T-3                                              After System Hot, Hot Torqued 7/16  70    12598          Operational  Found Loose Screw in  Had Motor Rewound & Installed          72 RWC-2A                      Motor                Same - Tested Satisfactory 7/20  66    12437          Operational  Bad Ground            Found Bad Fuse in Control Panel      24 FN-61C 7/20  76    12591          Operational  Faulty Module          Replaced Module                      20 Trouble Lite SRP Control Panel 1
~
 
JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE  
                                                                                                      ~
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE  


==SUMMARY==
==SUMMARY==
 
b DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
DATE b
7/6 03 8891 Visual NRC Bulletin 79-02/14 Fabricated &
SYSTEM             HOW DETECTED   CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 7/6   03   8891       Visual       NRC Bulletin 79-02/14 Fabricated &
InstalledPFSK-3014B20 PFSK-3014B Inspection 6/30 03 8805 Visual NRC Bulletin 79-02/14 Fabricated & Installed PFSK-3012A 200.25 PFSK-3012A Inspection 7/9 03 8800 Visual NRC Bulletin 79-02/14 Fabricated & Installed PFSK-3016 159.0 PFSK-3016 Inspection 7/14 00 8858 Visual NRC Bulletin 80-11 Installed Stiffener 91 EB-272-15/
PFSK-3014B               Inspection InstalledPFSK-3014B2 6/30   03   8805       Visual       NRC Bulletin 79-02/14 PFSK-3012A                Inspection            Fabricated & Installed PFSK-3012A 200.25 7/9   03   8800       Visual       NRC Bulletin 79-02/14 PFSK-3016                Inspection Fabricated & Installed PFSK-3016     159.0 7/14   00   8858       Visual       NRC Bulletin 80-11   Installed Stiffener EB-272-15/                                                                           91
-16 t
            -16                                                                                         '
7/15 00 8856 Visual NRC Bulletin 80-11 Added Masonry Block 57 EB-Mezzanine 7/24 17 12922 Visual Worn Out Installed New Pump 4
t 7/15   00   8856       Visual       NRC Bulletin 80-11   Added Masonry Block                         '
P,30A 7/24 76 12409 Alarm Welding in CRD Room Stopped Welding 5
EB-                                                                                   57 Mezzanine 7/24   17   12922       Visual       Worn Out               Installed New Pump                     4 P ,30A 7/24   76   12409       Alarm       Welding in CRD Room   Stopped Welding Zone 9                                                                                 5
Zone 9
            , Smoke Det.
, Smoke Det.
7/24   23   9089       Visual       Broken Nipple         Replaced Nipple & Installed HPCI PNL-2                                                                             9 Support Piece i
7/24 23 9089 Visual Broken Nipple Replaced Nipple & Installed 9
6/18   71   10051       Visual       Dirty Filters         Replaced Filters I
HPCI PNL-2 Support Piece i
LPCI A Inv                                                                             1  !
I 6/18 71 10051 Visual Dirty Filters Replaced Filters 1
                                        -                                                              l i
LPCI A Inv l
i


POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE  
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE  


==SUMMARY==
==SUMMARY==
JULY 1981 I&C j
WORK REQUEST #
CAUSE OF RESULTS OF Ti REPAIR DATE SYSTEM HOW DETECTED COMPONENT #
MALFUNCTION MALFUNCTION RECURRENCE HOURS 7/20/81 02-3 12687 OPS Bearings bound Recorder does
: Cleaned, 7.0 02-3 LPR 94 up not follow lubricated, trends.
aligned.
7/6/01 02-3 9094 OPS incorrect gain nigner tnan neviseu 3.u 02-3-PA-97 values in actual flows procedure, procedure were indicated calibrated uni' 7/10/81 07 12446 OPS Transmit.ters Abnormal flow Reca11brated 30.0 Flow units A-D for flow units signals sent flow out of to APRMS transmitters adj ustment.
02-F-T-110 A-H 7/20/81 07 12847 OPS Difference Set points (%)
Reca11brated 1.0 APRM-B between voltage appeared too per IMP 7.6 setpoint and %
high setpoint.
7/20/81 10 12585 OPS Short in slide Recorder pegged Repaired short 6.0 10 FR 143 wire downscale and calibrated 7/13/81 14 12717 OPS N/A Switch Could not 8.0 14 Ls 20A sometimes duplicate indicates dry problem 7/22/81 14' 12828 OPS Time delay Switch Replaced K-2 16.C l
14 LS 20A failure indicates dry and adjusted I
gain f
7/1/81 16 12584 OPS Motor bearings Unit not track-Cleaned and 14.0 16-1-DPIT-102 bound up ing changes in lubricated pressure 7/13/81 17 12577 OPS Age Unit indicates Replaced unit 10.0 17 RM 251C below normal y
a


JULY 1981    I&C WORK REQUEST #                                                          CAUSE OF        RESULTS OF      Ti        ,
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE  
REPAIR    j DATE                              SYSTEM                                                      HOW DETECTED                      MALFUNCTION COMPONENT #                                                            MALFUNCTION RECURRENCE    HOURS 7/20/81                                  02-3  12687                                              OPS            Bearings bound  Recorder does    Cleaned,            7.0 02-3 LPR 94                                                        up              not follow      lubricated, trends.          aligned.
7/6/01                                  02-3  9094                                                OPS            incorrect gain  nigner tnan      neviseu            3.u 02-3-PA-97                                                        values in        actual flows    procedure, procedure        were indicated  calibrated uni' 7/10/81                                  07    12446                                              OPS            Transmit.ters    Abnormal flow    Reca11brated      30.0 Flow units A-D                                                      for flow units  signals sent    flow out of          to APRMS        transmitters adj ustment .                -
02-F-T-110 A-H 7/20/81                                07    12847                                                OPS            Difference      Set points (%)  Reca11brated        1.0 APRM-B                                                              between voltage appeared too    per IMP 7.6 setpoint and % high setpoint.
7/20/81                              10    12585                                                OPS            Short in slide  Recorder pegged Repaired short        6.0 10 FR 143                                                          wire            downscale        and calibrated 7/13/81                              14    12717                                                OPS            N/A            Switch          Could not            8.0 14 Ls 20A                                                                          sometimes        duplicate indicates dry  problem 7/22/81                              14'  12828                                              OPS            Time delay      Switch            Replaced K-2      16.C l                                                                        14 LS 20A                                                            failure        indicates dry    and adjusted I                                                                                                                                                                              gain f                              7/1/81                              16    12584                                              OPS            Motor bearings  Unit not track- Cleaned and        14.0 16-1-DPIT-102                                                      bound up        ing changes in lubricated pressure 7/13/81                              17    12577                                              OPS  ,        Age            Unit indicates  Replaced unit      10.0 17 RM 251C                                                                          below normal y                                                                                                                                                                                              _______ a
 
POWER AUTHORITY OF THE STATE OF NEW YORK                                                               -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE  


==SUMMARY==
==SUMMARY==
JULY Ic81 T&C CAUSE OF RESULTS OF ACTION TAKEN REPAIR WORK REQUEST #_
H ETECTED DATE SYSTEM COMPONENT #
MALFUNCTION MALFUNCTION CURRE H
S 7/20/81 17 12835 OPS Short in Unit pegged Repaired short, 35.0 17 RS 458A recorder upscale performed ISP2t 7/20/81 20 12716 OPS Dirty connect-Integrator Cleaned 24.0 FQ 527 tors at test creeps connectors,
.iacks when recalibrated calibrating.
7/10/81 23 9455 I&C Unknown Reading unable Repalced 40.0 23 LT 201A to be adjusted transmitter within end tolerances calibrated.
7/22/81 23 12640 I&C Loose No indication Tightened 10.0 23 TE 92A connection of ambient connection on switch temperature 7/7/81 27 9459 OPS Unknown Black pen Calibrated 2.0 27 PR100 does not work black pen 7/7/81 27 12661 OPS Unknown Red pen does Calibrated 2.0 27 PR100 not work red pen 7/1/81 46-12634 1&C N/A Administrative Performed Surv.
4.U E6 DPS 132A review found Test and switch out corrected of spec.
setpoint 7/7/81 70 9941 I&C Work in area N/A Relocated 9.0 70 DPS 132A required during work.
relocation Returned to of switch orig. location after work.


JULY Ic81                            T&C CAUSE OF      RESULTS OF  ACTION TAKEN    REPAIR DATE  SYSTEM  WORK REQUEST #_  H    ETECTED COMPONENT #                                                  MALFUNCTION    MALFUNCTION CURRE        H    S 7/20/81  17      12835          OPS                                      Short in      Unit pegged    Repaired short,    35.0 17 RS 458A                                                recorder      upscale        performed ISP2t 7/20/81  20      12716          OPS                                      Dirty connect- Integrator    Cleaned            24.0 FQ 527                                                    tors at test  creeps        connectors,
0 S
                                                                            .iacks when                  recalibrated calibrating.
7/10/81  23      9455            I&C                                      Unknown        Reading unable Repalced            40.0 23 LT 201A                                                              to be adjusted transmitter within        end tolerances    calibrated.
7/22/81  23      12640            I&C                                      Loose          No indication  Tightened          10.0 23 TE 92A                                                connection    of ambient    connection on switch      temperature 7/7/81    27      9459            OPS                                      Unknown        Black pen      Calibrated          2.0 27 PR100                                                                does not work  black pen 7/7/81    27      12661            OPS                                      Unknown        Red pen does  Calibrated          2.0 27 PR100                                                                not work      red pen 7/1/81    46-    12634            1&C                                    N/A            Administrative  Performed Surv. 4.U E6 DPS 132A                                                              review found  Test and switch out    corrected of spec.      setpoint 7/7/81    70      9941            I&C  ,
Work in area    N/A            Relocated            9.0 70 DPS 132A                                              required                      during work.
relocation                    Returned to of switch                    orig. location after work.
 
0
                '              S       .
0 6
0 6
TH d
TH de tars be ih lc C
e t
at O
a
ci ew Rs p
  '                                  rs be ih lc C     at O           ci ew Rs p         -
nm oe t
nm oe t
K T                   I s
K T I
R                      C pw ON                            io YA L                           t rl L             e WP                             ts E R                    M       il na                                             .
s R
N E                           Uf FW OOP                                  t Y                 t n E           R         N O       ue TR          A                om AA           M         C      ss t
pw O N C
TE           M U
io Y A rl L
C
t L
                    &        N     eu SL           S I F
e WP ts E
U     hj C                   L      cd E U           E        A       ta H N           C 1
M il R
M    i wf T             N 8
na N
9             So K        A 1 F
Uf E
OI C        N Y R         E L   D YT           T U   E TA I
FW OO t
P N
P Y
I A
E R
J   T C
N t n TR A
R Z                 E M     T O
O ue om AA M
HI T                E D
t TE M
T F                           S U     .            W O       P AA                  H       O j
C C
RS EE WM OA                 #
ss N
PJ A
eu SL U
T         2 N         C E   9 N 8 R O    0 P
U hj I
0 0 O   17 C
C S
M                                      /,
FL cd E U A
E.       0 T       7 S
ta H N E
Y S
1 M
1 8
i T
E      /
C 8
T       9                                               -
wf K
A       /
N 9
D       7 f
So 1
            ,;;      ,  j Il         i j
A F C OI N
i
Y R
                                                  , utI!
E L
                                                      , '    4   !i i   , ,; L}}
YT T
U DE T A I
C N
J T
P A
IR Z M
T E
O T E
HI D
T F U
W SP AA O
O H
RS j
EE WM OA PJ A
2 T
N C
E 9
N NO 8
R P
0 0
0 O
17 C
/
M E.
0 T
7 S
YS 1
8 E
/
T 9
A
/
D 7
Il i
i f
j j
, utI!
l 4
!i i
,; L
, '}}

Latest revision as of 06:02, 15 December 2024

Monthly Operating Rept for Jul 1981
ML20071P405
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/31/1981
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20071P388 List:
References
NUDOCS 8211020501
Download: ML20071P405 (9)


Text

c s

OPERATING DATA REPORT DOCKET NO. J0-333 DATE AUGIST 1981 COMPLETED BY E.

zGFALT 3 2-3840 4

TELEPilONE (315)

OPERATING STATUS N

1. Unit Name:

FITZPATRICK 810701 - 810731

2. Reporting Period:

2436

3. Licensed Thennal Pov.cr (MWt):

883

4. Nameplate Rating (Gross MWe):

821

5. Design Electrical Rating (Net MWe):

830

6. Maximum Dependable Capacity (Gross MWe):

810

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since 12st Report, Give Reasons:

NONE NONE

9. Power Lesel To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr to Date Cumulatise 744 5087 52704 I1. Hours in Reporting Period 744 4638.9 37552.9

12. Number Of floun Reactor Was Critical 0

0 0

13. Reactor Resene Shutdown Hours 744 4577 3 36480.1
14. Ilours Generator On-Line 0

0 0

15. Unit Resene Shutdown Hours 1719432 10690896 74874490
16. Gross Thermal Energy Generated (MWH) 581160 3696750 f526260
17. Gross Electrical Energy Generated (MWH) 563370 3583690 24708y 0
18. Net Electrical Energy Generated (MWH) 100.0%

90.0%

69 2%

19. Unit Senice Factor 100.0%

90.0%

69 2%

20. Unit Availability Factor 93 5%

17 0%

~62.9%

21. Unit Capacity Factor IUsing MDC Net)

' 7.1T 92.2%

~ E 6%

5

22. Unit Capacity Factor (Using DER Net) 0.0%

10.0%

17 3%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht Refueling and maintenance outage scheduled for_ October for a period of 110 days.
25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units In Test Status (Prior io Commercial Operation):

Forecast

\\

Achiesed INITIAL CRITICA LITY INITIAL ELECT RICITY CO\\l%1ERCl41. OPER ATION 8211020501 010805 DR ADOCK 05000

AVER ACE DAILY UNIT POWER LEVEL DOCKEINO..50-33J UNIT-JAFNPP AUGUST. 19BJ DATE COi!PLETED By E. ZUFELT (315) 342-3840 TELEPHONE July, 1981 AfoNni DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (alWe-Ner)

(MWe Net) 762 805 17 805 38 5'L3 2

687 802 19 3

801 20 747 4

752 798 21 5

790 22 751 6

751 70b 23 7

756 783 24 g

780 25 761 9

772 26 761 to 764 613 27 11 769 743 2s 12 77n 772 29 13 76s 765 30 14 764 768 3:

15 768 16

SUMMARY

The unit operated at near full rated thermal power for this reporting period.

Two power reductions on July 11 and July 1B for rebrushing of recire MG's and scram testing, respectively.

DOCKET NO.

50-737 I

UNIT SilVTDOWNS AND POWER REDUCT10NS UNIT N AME JAFNPP DATE AUGUET. 1981 REPORT MONTli JULY, 1981 COMPLETED BY E.

ZUFELT TELEPilONE (119) 14P-7840 i

I e,

.! E E

Y4 Licensee E v, Cause & Currective o

Date R

5?

i

.3 s 5 Event u '2 o"

Action to j

$E j;5g Report =

NG Prevent Recurrence 0

1 t

8 810711 S

O H

5 NA NA NA Power reduced for rebrushing A and B Recirculation pump MG's.

9 810718 S

O H

5 NA NA NA Power reduced for scram time testing.

i i

i i

r

'l 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Seneduled A Equipment Failure (Explair)

1. Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C.Refuelin g 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F.Administ rative 5

G Operational Error (Explain)

Exlubit 1 - Same Source Il-Othe r ( E xplain)

= _.

1 4

i i

POWER AUIMORITY OF THE STATE OF NEW YORK i

JAMES A. FITZPATRICK IUCIEAR POWER PLANT NARRATIVE SUM 4ARY OF OPERATING EXPERLTCES JULY 1981 i

4 The FitzPatrick unit operated at near full rated thermal power for this reporting period. Power was reduced on July 11, 1981 to approximately 620 MWe for rebrushing of the A and B recirculation 3

pump motor generators.

Power was reduced again on July 18, 1981 for scram time testing.

Power is becoming FfPR limited.

l I

l t

3 l

4 I

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE

SUMMARY

0 DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

ENT 6/26 71 11947 Visual Maintenance Replaced Broken Caps 4

A LPCI Batt 6/26 27 11188 N/A None Preventive Maintenance 18 BMCC-1 &4 6/17 10 8729 Visual NRC Bulletin 79-02 Modified H10-542 143 3

~

H10-542 Inspection 7/9 88 8718 N/A None Preventive Maintenance - NDE Hool.s 4

CR-2 7/9 88 12413 Operational Modification to Radio Installed Circuit Boards and 16 CR-2 Adjusted Limits 7/9 88 8700 Preventive Use Corre,cted Discrepancies, Replacet 215 CR-2 Maintenance Bridge Drive Bearing Inspection 7/16 23 1261_8_

Operational None Replaced Gasket & Cold Torqued 11 T-3 After System Hot, Hot Torqued 7/16 70 12598 Operational Found Loose Screw in Had Motor Rewound & Installed 72 RWC-2A Motor Same - Tested Satisfactory 7/20 66 12437 Operational Bad Ground Found Bad Fuse in Control Panel 24 FN-61C 7/20 76 12591 Operational Faulty Module Replaced Module 20 Trouble Lite SRP Control Panel 1

POWER AUTHORITY OF THE STATE OF NEW YORK

~

JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

b DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

7/6 03 8891 Visual NRC Bulletin 79-02/14 Fabricated &

InstalledPFSK-3014B20 PFSK-3014B Inspection 6/30 03 8805 Visual NRC Bulletin 79-02/14 Fabricated & Installed PFSK-3012A 200.25 PFSK-3012A Inspection 7/9 03 8800 Visual NRC Bulletin 79-02/14 Fabricated & Installed PFSK-3016 159.0 PFSK-3016 Inspection 7/14 00 8858 Visual NRC Bulletin 80-11 Installed Stiffener 91 EB-272-15/

-16 t

7/15 00 8856 Visual NRC Bulletin 80-11 Added Masonry Block 57 EB-Mezzanine 7/24 17 12922 Visual Worn Out Installed New Pump 4

P,30A 7/24 76 12409 Alarm Welding in CRD Room Stopped Welding 5

Zone 9

, Smoke Det.

7/24 23 9089 Visual Broken Nipple Replaced Nipple & Installed 9

HPCI PNL-2 Support Piece i

I 6/18 71 10051 Visual Dirty Filters Replaced Filters 1

LPCI A Inv l

i

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

JULY 1981 I&C j

WORK REQUEST #

CAUSE OF RESULTS OF Ti REPAIR DATE SYSTEM HOW DETECTED COMPONENT #

MALFUNCTION MALFUNCTION RECURRENCE HOURS 7/20/81 02-3 12687 OPS Bearings bound Recorder does

Cleaned, 7.0 02-3 LPR 94 up not follow lubricated, trends.

aligned.

7/6/01 02-3 9094 OPS incorrect gain nigner tnan neviseu 3.u 02-3-PA-97 values in actual flows procedure, procedure were indicated calibrated uni' 7/10/81 07 12446 OPS Transmit.ters Abnormal flow Reca11brated 30.0 Flow units A-D for flow units signals sent flow out of to APRMS transmitters adj ustment.

02-F-T-110 A-H 7/20/81 07 12847 OPS Difference Set points (%)

Reca11brated 1.0 APRM-B between voltage appeared too per IMP 7.6 setpoint and %

high setpoint.

7/20/81 10 12585 OPS Short in slide Recorder pegged Repaired short 6.0 10 FR 143 wire downscale and calibrated 7/13/81 14 12717 OPS N/A Switch Could not 8.0 14 Ls 20A sometimes duplicate indicates dry problem 7/22/81 14' 12828 OPS Time delay Switch Replaced K-2 16.C l

14 LS 20A failure indicates dry and adjusted I

gain f

7/1/81 16 12584 OPS Motor bearings Unit not track-Cleaned and 14.0 16-1-DPIT-102 bound up ing changes in lubricated pressure 7/13/81 17 12577 OPS Age Unit indicates Replaced unit 10.0 17 RM 251C below normal y

a

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

JULY Ic81 T&C CAUSE OF RESULTS OF ACTION TAKEN REPAIR WORK REQUEST #_

H ETECTED DATE SYSTEM COMPONENT #

MALFUNCTION MALFUNCTION CURRE H

S 7/20/81 17 12835 OPS Short in Unit pegged Repaired short, 35.0 17 RS 458A recorder upscale performed ISP2t 7/20/81 20 12716 OPS Dirty connect-Integrator Cleaned 24.0 FQ 527 tors at test creeps connectors,

.iacks when recalibrated calibrating.

7/10/81 23 9455 I&C Unknown Reading unable Repalced 40.0 23 LT 201A to be adjusted transmitter within end tolerances calibrated.

7/22/81 23 12640 I&C Loose No indication Tightened 10.0 23 TE 92A connection of ambient connection on switch temperature 7/7/81 27 9459 OPS Unknown Black pen Calibrated 2.0 27 PR100 does not work black pen 7/7/81 27 12661 OPS Unknown Red pen does Calibrated 2.0 27 PR100 not work red pen 7/1/81 46-12634 1&C N/A Administrative Performed Surv.

4.U E6 DPS 132A review found Test and switch out corrected of spec.

setpoint 7/7/81 70 9941 I&C Work in area N/A Relocated 9.0 70 DPS 132A required during work.

relocation Returned to of switch orig. location after work.

0 S

0 6

TH de tars be ih lc C

at O

ci ew Rs p

nm oe t

K T I

s R

pw O N C

io Y A rl L

t L

e WP ts E

M il R

na N

Uf E

FW OO t

P Y

E R

N t n TR A

O ue om AA M

t TE M

C C

ss N

eu SL U

U hj I

C S

FL cd E U A

ta H N E

1 M

i T

C 8

wf K

N 9

So 1

A F C OI N

Y R

E L

YT T

U DE T A I

C N

J T

P A

IR Z M

T E

O T E

HI D

T F U

W SP AA O

O H

RS j

EE WM OA PJ A

2 T

N C

E 9

N NO 8

R P

0 0

0 O

17 C

/

M E.

0 T

7 S

YS 1

8 E

/

T 9

A

/

D 7

Il i

i f

j j

, utI!

l 4

!i i

,; L

, '