ML20072A871: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Georgd Power Company Post Office Box 4345 Attinta, Georgia 30302 Telephone 404 5264526 g   ,,
{{#Wiki_filter:Georgd Power Company Post Office Box 4345 Attinta, Georgia 30302 Telephone 404 5264526 g
Southern Corrpany services, Inc.
. 7FOAG'f4 Georgia Power Southern Corrpany services, Inc.
Post Office Box 2625                               . 7FOAG'f4 Georgia Power Birmingham. Alabama 35202                                                                 -
Post Office Box 2625 Birmingham. Alabama 35202 83 Jgg g SOuthem CompanyServices Telephone 205 870-6011 D. O. Foster Pres ent and General Manager United States Nuclear Regulatory Commission File:
Telephone 205 870-6011 83 Jgg g          ,
X78G03-M39 Office of Inspection and Enforcement Log:
SOuthem CompanyServices D. O. Foster Pres ent and General Manager United States Nuclear Regulatory Commission                     File:   X78G03-M39 Office of Inspection and Enforcement                             Log:   GN-230 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
GN-230 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303


==Reference:==
==Reference:==
Line 27: Line 27:
Georgia Power Company now expects to submit a final report on this issue by July 29, 1983.
Georgia Power Company now expects to submit a final report on this issue by July 29, 1983.
This letter contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.
This letter contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.
You     tr ly I     '
You tr ly I
D. O. Foster D0F/CWH/jr xc:     U. S. Nuclear Regulatory Connission Document Control Desk Washington, D. C. 20555 R. J. Kelly                   R. H. Pinson               E. D. Groover R. E. Conway                 D. L. McCrary             L. T. Gucwa G. F. Head                   R. A. Thomas               M. Malcom J. T. Beckham, Jr.           J. A. Bailey               G. Bockhold, Jr.
D. O. Foster D0F/CWH/jr xc:
D. N. MacLemore               0. Batum                   P. D. Rice   .,,
U. S. Nuclear Regulatory Connission Document Control Desk Washington, D. C. 20555 R. J. Kelly R. H. Pinson E. D. Groover R. E. Conway D. L. McCrary L. T. Gucwa G. F. Head R. A. Thomas M. Malcom J. T. Beckham, Jr.
D. E. Dutton                 H. H. Gregory, III         J. L. Vota   'OCFK d' copy W. F. Sanders 8306100274 830601 PDR ADOCK 05000424 8
J. A. Bailey G. Bockhold, Jr.
                                  ~
D. N. MacLemore
[E M PDR                                                             g j}}
: 0. Batum P. D. Rice
'OCFK d' copy D. E. Dutton H. H. Gregory, III J. L. Vota W. F. Sanders 8306100274 830601
~
[E M PDR ADOCK 05000424 8
PDR g j}}

Latest revision as of 05:51, 15 December 2024

Interim Deficiency Rept Re Use of Cadwelds as End Anchorages.Info from Ae Expected within Next Month.Final Rept Will Be Submitted 830729
ML20072A871
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/01/1983
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-230, NUDOCS 8306100274
Download: ML20072A871 (1)


Text

Georgd Power Company Post Office Box 4345 Attinta, Georgia 30302 Telephone 404 5264526 g

. 7FOAG'f4 Georgia Power Southern Corrpany services, Inc.

Post Office Box 2625 Birmingham. Alabama 35202 83 Jgg g SOuthem CompanyServices Telephone 205 870-6011 D. O. Foster Pres ent and General Manager United States Nuclear Regulatory Commission File:

X78G03-M39 Office of Inspection and Enforcement Log:

GN-230 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Reference:

Vogtle Electric Generating Plant - Units 1 and 2 50-424, 50-425; Use of Cadwelds as End Anchorages Letter April 5, 1983 to J. P. O'Reilly Attention: Mr. James P. O'Reilly Gentlemen:

In our previous letter on this subject dated April 5,1983, Georgia Power Company expected to be able to submit a final report on this subject to the NRC on May 27, 1983. At this time, Georgia Power Company needs information from the architect / engineer to complete the evaluation. This infortnation will be received within the next month.

Georgia Power Company now expects to submit a final report on this issue by July 29, 1983.

This letter contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

You tr ly I

D. O. Foster D0F/CWH/jr xc:

U. S. Nuclear Regulatory Connission Document Control Desk Washington, D. C. 20555 R. J. Kelly R. H. Pinson E. D. Groover R. E. Conway D. L. McCrary L. T. Gucwa G. F. Head R. A. Thomas M. Malcom J. T. Beckham, Jr.

J. A. Bailey G. Bockhold, Jr.

D. N. MacLemore

0. Batum P. D. Rice

'OCFK d' copy D. E. Dutton H. H. Gregory, III J. L. Vota W. F. Sanders 8306100274 830601

~

[E M PDR ADOCK 05000424 8

PDR g j