ML20072T323: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.-                                                       -                .- - - -.                                                                        .
{{#Wiki_filter:.-
                                    .3. -                       ..                .-......                  . _ _ _
.3. -
eq Pu!!inan Power Producis 33_;x_34
eq Pu!!inan Power Producis 33_;x_34 D ves.c,n ne 8%ur%n ine.orticratec
            .                                                                                          D ves.c,n ne 8%ur%n ine.orticratec                                                               .
=
                                      =                                                                                   .__                                                                                                DoCL".'E N T r.O.
DoCL".'E N T r.O.
PREPARED BY: D.R. Geske                                             _
PREPARED BY: D.R. Geske ArPaovEo sy: H. Hinkley M l @ 1/30/81 I:
ArPaovEo sy: H. Hinkley                                             M l @ 1/30/81                                                                   I:
7 SEABROOK 4
4                                    7                                   SEABROOK
PROJECT PROCEDURE stfoNg e
                          ~          ;                    PROJECT PROCEDURE                                                 stfoNg e                                     '1085 h?,ee                             "
'1085 h?,ee
e LATIST REV. DATE 1/30/81                                       ,
~
DEFECT REMOVAL AND REPAIR BY WELDING 4
LATIST REV. DATE e
1/30/81 DEFECT REMOVAL AND REPAIR BY WELDING 4
Copyright 1980 PULLMAN PO'a'ER PRODUCTS
Copyright 1980 PULLMAN PO'a'ER PRODUCTS
                                                          ~
~
i DIVISION OF PULLMAN INCORPORATED HEADQUARTERS AT UE&C                                                                       -
i DIVISION OF PULLMAN INCORPORATED HEADQUARTERS AT UE&C CODE WILLIAMSPORT, PENHSYLVANIA 06 ^
CODE             .                                                                  WILLIAMSPORT, PENHSYLVANIA 06 ^
aCY15:0N racPanED BY APPROVED BY INITIALS OCSCRIPTION I
aCY15:0N                       racPanED BY                       APPROVED BY INITIALS                                                             OCSCRIPTION I                                               00 l
00 l
7-31-78                       D.F. Gehr                         K.A. Swisher                     KAS                 I'nitial Issue 01                                                                                                           Revised para. 5.z; Acced para. J.z.1, 4.1.4,
7-31-78 D.F. Gehr K.A. Swisher KAS I'nitial Issue 01
                                        .9-15-78                        D.F. Gehr                        K.A. Swisher                      KAS.              4.2.2.1 & Foms 18,19 & 22
.9-15-78 D.F. Gehr K.A. Swisher KAS.
                                                                                                                                                                                                                                                                ~
Revised para. 5.z; Acced para. J.z.1, 4.1.4, 4.2.2.1 & Foms 18,19 & 22
02                                                                                                           Revised para. 1.3, 2.1, 2.2, 3.1, 3.2, 3.3, 6-9-79                       H. Hinkley K. Freed                                                 KF                 6.1, 8.1, 8.2, Foms 18,19,19A,22,32;
~
        .                                                                                                                                                      changed para. 4.2.21 to A; Deleted para.                                                                           ,
02 Revised para. 1.3, 2.1, 2.2, 3.1, 3.2, 3.3, 6-9-79 H. Hinkley K. Freed KF 6.1, 8.1, 8.2, Foms 18,19,19A,22,32; changed para. 4.2.21 to A; Deleted para.
3.2.1, 5.4, 5.5, added index.
3.2.1, 5.4, 5.5, added index.
i :i                                             03                                                                                                           Revised para. 3.1, 4.1.3, Added para. 3.1.1
i :i 03 Revised para. 3.1, 4.1.3, Added para. 3.1.1 6-19-80 B. Willard H. Hinkley HH 3.1.2, 3.1.3, Attach A page 2 of 2 Fom 38 04 Revised rom 18, 19, 19A 22 8-7-80 H. Hinkley A. Eck AE Added para. 4.1.4 05 1-13-81 D. Geske H. Hinkley
        -                                6-19-80                       B. Willard H. Hinkley                                               HH                 3.1.2, 3.1.3, Attach A page 2 of 2 Fom 38
* HH,
:                                        04                                                                                                           Revised rom 18, 19, 19A 22 H. Hinkley A. Eck 8-7-80                                                                                            AE               Added para. 4.1.4 05                                                                                                                   .
Extensively Revised 1-3 81 D. Geske H. Hinkley Extensively Revised r
1-13-81                       D. Geske                           H. Hinkley
I B304080031 8303'04
* HH ,               Extensively Revised                                                                   ,
~
1-3 81                     D. Geske                           H. Hinkley                                         Extensively Revised r       I
~
                                                                                                                        ~
PDR FOIA KINDER 82-524 PDR
  '                                                                                                                                                                                                                          ~
.r--
B304080031 8303'04 PDR FOIA KINDER 82-524                                                   PDR                                                                                                                                                                       -
..-.mv
    .          .r--       - - .---            ..-.mv       -,,.-,....,-~---.--....-..,2--....-,--                             w-   --- ,  ww ., -,e--.i---e,....-         ,,%-+-~,r -,  .~c.--...   --
-,,.-,....,-~---.--....-..,2--....-,--
                                                                                                                                                                                                            . , e m e re       -,-.,...-_m.,..-..--.-,-w,                 ,- . .=--,-
w-ww.,
-,e--.i---e,....-
,,%-+-~,r
.~c.--...
., e m e re
-,-.,...-_m.,..-..--.-,-w,
,-..=--,-


,(c.)
Pullman Power Products JS-rx-14
Pullman Power Products JS-rx-14
                                        ,(c.)
/
Div+on of Put::r.an incorporated
Div+on of Put::r.an incorporated
                                            /                                                         //        DoCU?.*ENT No.
//
                                                                                                      ~2/8   $liN 1/30/81 D.R. Geske              APPROVED BY:    H. Hinklev PREPARED BY-PAGE To BE USED tiiR00K                      oNLY oN JoS #        I'.              NO. 2 or,9
DoCU?.*ENT No.
                                        .)   PROCEDURE PROJ 1.0 SCOPE 1.1 Jhis procedure shall be employed to remove unacceptable indications from l,ase materials or welds, and Subsequent repair by welding to meet the
D.R. Geske APPROVED BY:
H. Hinklev
~2/8
$liN 1/30/81 PREPARED BY-I'.
PAGE To BE USED NO.
2 or,9 tiiR00K oNLY oN JoS #
PROJ
.)
PROCEDURE 1.0 SCOPE Jhis procedure shall be employed to remove unacceptable indications from l,ase materials or welds, and Subsequent repair by welding to meet the 1.1
:equirements of the applicable Code.
:equirements of the applicable Code.
IJnacceptable defects, detected by examinations required by-Code       The acceptance  and/or /
IJnacceptable defects, detected by examinations required by-Code and/or The acceptance /
1.2 s,pecification, shall be reported under this procedure.
1.2 s,pecification, shall be reported under this procedure.
rejection criteria for conditions discovered by the required examinations are defined by the applicable Code and outlined in the approved Project                             .
rejection criteria for conditions discovered by the required examinations are defined by the applicable Code and outlined in the approved Project Procedures.
Procedures.
Jn-Process conditions which are corrected upon discovery, by controls fmposed on the Process Sheet for that operation and made acceptable to 1.3 the Field QC/ Welding Inspector, are not considered a repair reportable under this procedure.-
Jn-Process conditions which are corrected upon discovery, by controls 1.3    fmposed on the Process Sheet for that operation and made acceptable to the Field QC/ Welding Inspector, are not considered a repair reportable under this procedure.-
Jn addition, this procedure does not include P.eceiving Inspection 1.4 activi' ties which are governed by Project Procedure X-5.
Jn addition, this procedure does not include P.eceiving Inspection 1.4     activi' ties which are governed by Project Procedure X-5.
2.0 REP 0plING REQUIREMENTS Arc strikes shall be circled on. the material with soapstone or an a) proved marker and reported by the Field QC/ Welding Inspector through 2.1 tle NDE Supervi'sor to Engineering on an Arc Strike Surveillance Report, r,ee Attachment A.
2.0 REP 0plING REQUIREMENTS 2.1 Arc strikes shall be circled on. the material with soapstone or an a) proved marker and reported by the Field QC/ Welding Inspector through tle NDE Supervi'sor to Engineering on an Arc Strike Surveillance Report, r,ee Attachment A.
Unacceptable Field Weld conditions which cannot be corrected at the 2.2 time of discovery and made acceptable to the Field QC/ Welding Inspector, liy controls imposed by the Process Sheet for that operation, shall be circled with soapstone or an approved r.arker and reported by the Field i
Unacceptable Field Weld conditions which cannot be corrected at the 2.2 time of discovery and made acceptable to the Field QC/ Welding Inspector, liy controls imposed by the Process Sheet for that operation, shall be circled with soapstone or an approved r.arker and reported by the Field i
QC/ Welding Inspector through the NDE Supervisor to Engineering on a Weld Repair Order, see attachment B.
QC/ Welding Inspector through the NDE Supervisor to Engineering on a Weld Repair Order, see attachment B.
IJnacceptable Base Material conditions shall be circled on the material 2.3    with soapstone or an approved 0Idiirehand reported by the Field QC/
IJnacceptable Base Material conditions shall be circled on the material with soapstone or an approved 0Idiirehand reported by the Field QC/
Welding Inspector through the NDClupervisor to Engineering on a Base l
2.3 Welding Inspector through the NDClupervisor to Engineering on a Base l
ttaterial Surveillance Report, see attachment C.
ttaterial Surveillance Report, see attachment C.
    -                                      Unacceptable conditions identified through application of approved 2.4      Non-destructive Examination methods shall be reported by the NDE Technician in accordance with the appropriate Project Procedure. In inddition, the Technician shall plot the indication on the material                                 -
Unacceptable conditions identified through application of approved Non-destructive Examination methods shall be reported by the NDE 2.4 In Technician in accordance with the appropriate Project Procedure.
with soapstone or an approved marker and report the condition through the NDE Supervisor to Engineering on a Weld Repair Order, see attachment, B.
inddition, the Technician shall plot the indication on the material with soapstone or an approved marker and report the condition through the NDE Supervisor to Engineering on a Weld Repair Order, see attachment, B.
sF 1.ot A (4-79) 7
sF 1.ot A (4-79) 7
        *~                 ~                                                             ._              _
*~
~


                                                                                                                  .                                                                )
)
                                                                                                                                                                                    \
\\
Jx-Ix-u Pullman. Power Products E=J      Oms on of Pullman locorporated
E=J Pullman. Power Products Jx-Ix-u Oms on of Pullman locorporated f /
                                  -                                                              _              f /                 DoCUVENT No.
DoCUVENT No.
PREPARED BY:       D.R. Geske               APPROVED BY:   H. Hinkley         M      $i?U 1/30/81_                      '
M
                                                                                                                                                                        ~
$i?U 1/30/81_
SEABROOK PROJECT PROCEDURE QeE o    ,.          4'085                 ::.e 3 e, ,
PREPARED BY:
Y 2.0 REPORTING REQUIREMENTS - CONTINUED                     .
D.R. Geske APPROVED BY:
                              -        2.5 If the conditions reported in 2.1 through 2.4 above exceed. limits as                                                                   '
H. Hinkley SEABROOK QeE 4'085
indicated below, a Non-conformance Report in accordance with Project Procedure XV-2 is required.
::.e 3 e,,
~
o PROJECT PROCEDURE Y
2.0 REPORTING REQUIREMENTS - CONTINUED 2.5 If the conditions reported in 2.1 through 2.4 above exceed. limits as indicated below, a Non-conformance Report in accordance with Project Procedure XV-2 is required.
2.5.1 Customer /0wner defined repairs as follows:
2.5.1 Customer /0wner defined repairs as follows:
A.         Following final heat treatment.
A.
B.         Following final hydrostatic test.
Following final heat treatment.
C.         Repair be welding of end preparations.
B.
D.         Additional repair beyond the third cycle of repair.                                           ,
Following final hydrostatic test.
E.         Repair of base material which exceed 1/3 actual thickness Repair of cracks.
C.
F.                                                                                                            .
Repair be welding of end preparations.
D.
Additional repair beyond the third cycle of repair.
E.
Repair of base material which exceed 1/3 actual thickness F.
Repair of cracks.
3.0 INDICATION REMOVAL 3.1 Upon discovery of unacceptable Field Weld conditions, the Field QC/
3.0 INDICATION REMOVAL 3.1 Upon discovery of unacceptable Field Weld conditions, the Field QC/
Weloing Inspector shall point out the condition to the crafts assigned.
Weloing Inspector shall point out the condition to the crafts assigned.
The crafts msy eliminate the condition using approved methods con: olled by the Process Sheet sequence event which required the inspection or
The crafts msy eliminate the condition using approved methods con: olled by the Process Sheet sequence event which required the inspection or examination.
                                .          examination.             If the condition is not eliminated or reduced to an a:ceptable size within acceptable weld deposit size, work shall be                                                                 '
If the condition is not eliminated or reduced to an a:ceptable size within acceptable weld deposit size, work shall be stopped and a report per paragraph 2.2 is required.
stopped and a report per paragraph 2.2 is required.
4 3.1.1 As an example, if during a visual inspection following a surface preparation for examination, an unacceptable condition is dis-covered, the crafts may repeat the " Prepare Surface for Examina-~
4                                                                                                                                                                           ,
3.1.1 As an example, if during a visual inspection following a surface preparation for examination, an unacceptable condition is dis-covered, the crafts may repeat the " Prepare Surface for Examina-~
tion" sequence event. Any work necessary may be perfonned other than depositing filler metal.
tion" sequence event. Any work necessary may be perfonned other than depositing filler metal.
3.1.2 Weld deposit may be reduced to the minimum allowable during attempts to remove unacceptable conditions. If upon reduction of deposit size to minimum the condition is not reduced to an acceptable size, work shall be stopped and the appropriate report rendered.
3.1.2 Weld deposit may be reduced to the minimum allowable during attempts to remove unacceptable conditions.
3.1.3 If the condition is reduced to an acceptable size, the obvicus and                                                     -
If upon reduction of deposit size to minimum the condition is not reduced to an acceptable size, work shall be stopped and the appropriate report rendered.
out of the ordinary weld profile condition shall be reted at the process sheet checklist entry for the examination documented.
3.1.3 If the condition is reduced to an acceptable size, the obvicus and out of the ordinary weld profile condition shall be reted at the process sheet checklist entry for the examination documented.
sF 1.ot A (4-79)
sF 1.ot A (4-79)
            = =-                                                                         .-                      .                                    _
= =-


            --                                                            - ..                =       - -
=
4j Oms.onPullman Power Products                                                                             JS-Ix-14 g/
4j Pullman Power Products JS-Ix-14 g/
r of Pullman incorporated
Oms.on of Pullman incorporated
                                                                                                                                          //                 DOCUMENT No.
//
PREPARED BY: D.R. Geske                         APPROVED oY:   H. Hinklev                           M     lijn                 1/30/81 s                         .m .:,,
DOCUMENT No.
:                                                  SEASROOK PROJECT PROCEDURE To BE UsED oNLY oN Jos #
r PREPARED BY: D.R. Geske APPROVED oY:
U h3        PAGE No.                 4 of 9 3.0 INDICATION REMOVAL - CONTINUED
H. Hinklev M
'                                                3.2 Upon receipt of an Arc Strike Surveillance Report, Weld Repair Order, or Base Material Surveillance Report, the NDE Supervisor shall assign a control number and enter the document into the Repair Control Log,                                                             f see attachment D, and. proceed as follows:                                                                                       l 3.2.1 Contact Ouality Engineering-Records and determine the final heat treatment, hydrostatic test and repair cycle status.
lijn 1/30/81 s
3.2.2 Record the status on the document, file a copy for record                                                                   i and forward the original to Engineering for issue to a Defect Removal Process Sheet, see attachment E.
.m h3 SEASROOK To BE UsED U
PAGE PROJECT PROCEDURE oNLY oN Jos #
No.
4 of 9 3.0 INDICATION REMOVAL - CONTINUED 3.2 Upon receipt of an Arc Strike Surveillance Report, Weld Repair Order, or Base Material Surveillance Report, the NDE Supervisor shall assign a control number and enter the document into the Repair Control Log, f
see attachment D, and. proceed as follows:
3.2.1 Contact Ouality Engineering-Records and determine the final heat treatment, hydrostatic test and repair cycle status.
3.2.2 Record the status on the document, file a copy for record i
and forward the original to Engineering for issue to a Defect Removal Process Sheet, see attachment E.
3.3 Upon receipt of the document from the NDE Supervisor, the Engineering Department shall issue a standardized " Defect Removal Process Sheet",
3.3 Upon receipt of the document from the NDE Supervisor, the Engineering Department shall issue a standardized " Defect Removal Process Sheet",
see attachment E, with the Arc Strike Surveillance Report, Weld Repair Order or Base Material Surveillance Report, attached.
see attachment E, with the Arc Strike Surveillance Report, Weld Repair Order or Base Material Surveillance Report, attached.
3.3.1   Process sheets shall be identified by unique numbers as follows:
3.3.1 Process sheets shall be identified by unique numbers as follows:
A. Field Weld Repair work shall be identified by the identifica-tion number assigned on the current revision drawing.
A.
B. Base material work, including arc strikes, shall be identified by the assigned control number and indication number entered on the appropriate report, see paragraph 3.2 and attachments A, B and C.
Field Weld Repair work shall be identified by the identifica-tion number assigned on the current revision drawing.
B.
Base material work, including arc strikes, shall be identified by the assigned control number and indication number entered on the appropriate report, see paragraph 3.2 and attachments A, B and C.
3.3.2 All unacceptable ~ indications, including Arc Strikes, shall be removed by grinding, chipping, machining, are gouging, or flame gouging.
3.3.2 All unacceptable ~ indications, including Arc Strikes, shall be removed by grinding, chipping, machining, are gouging, or flame gouging.
A. For low Alloy mateHals, i.e., P-4 and P-5, adequate preheat (same as for welding) shall be established prior to any thermal cutting or gouging.
A.
B. Upon completion of any thermal cutting operation, all
For low Alloy mateHals, i.e., P-4 and P-5, adequate preheat (same as for welding) shall be established prior to any thermal cutting or gouging.
                                                                  . cutting residue shall be removed and the cut surface shall be ground back to bright metal, removing a minimum of 1/16" .
B.
C. When working Stainless Steel products, only Stainless Steel                                                 -
Upon completion of any thermal cutting operation, all
                            -                                      wire brushes and approved grinding wheels shall be used.
. cutting residue shall be removed and the cut surface shall be ground back to bright metal, removing a minimum of 1/16".
l sF 1.ot A (4-79)
C.
                        . - , . - . - - - ,    .            -      w  ,nn     -v-,         ,      n     .,,,,--.,,--m---,,,,,n,w,           . , , - , . . , -          -        <
When working Stainless Steel products, only Stainless Steel wire brushes and approved grinding wheels shall be used.
l:.
sF 1.ot A (4-79) w
,nn
-v-,
n
.,,,,--.,,--m---,,,,,n,w,


_-              ..                    .      - . .                .        . - .                    ..  ~   .
~
l                                       Jg Orv        Pullman Power Products                                                 aS-Ix-14
l Jg Pullman Power Products aS-Ix-14
                                                /               sion of Pulirran incorporaiec
/
                                                                                                                        //     DoCUVENT No.
Orv sion of Pulirran incorporaiec
APPROVED BY:      H. Hinklev            c        1/30/81 PREFARED BY:       0.R. Geske SEABROOK                               To BE USED                   W =GL Q     PAGE PROJECT PROCEDURE cNt.Y oN job #               d G eJ e     No. 5 of 9
//
          -                    3.0 INDICATION REPOVAL - CONTINUED 3.3 Continued 3.3.3 Upon removal of all visible evidence of the indication (s),
DoCUVENT No.
1/30/81 PREFARED BY:
0.R. Geske APPROVED BY:
H. Hinklev c
SEABROOK To BE USED W =GL Q PAGE PROJECT PROCEDURE cNt.Y oN job #
d G eJ e No.
5 of 9 3.0 INDICATION REPOVAL - CONTINUED 3.3 Continued 3.3.3 Upon removal of all visible evidence of the indication (s),
the defect removal area (s) shall be examined by the Liquid Penetrant or Magnetic Particle method to assure complete removal of the indication (s) or reduction to an acc.eptable size.
the defect removal area (s) shall be examined by the Liquid Penetrant or Magnetic Particle method to assure complete removal of the indication (s) or reduction to an acc.eptable size.
3.3.4 Following removal of the indication (s) and acceptable.
3.3.4 Following removal of the indication (s) and acceptable.
      ~
~
non-destructive examination, the NDE Technician shall measure and report the cavity size.
non-destructive examination, the NDE Technician shall measure and report the cavity size.
A.     Mechanica11y measure the length, width and' depth of the cavity at it's longest, widest and deepest points.                 If the cavity penetrates the wall be recorded as "THRU-WALL".6m, the cavity depth shallfv                               !
A.
bmsunousq p.             J
Mechanica11y measure the length, width and' depth of the cavity at it's longest, widest and deepest points.
                                -                          B. Ultrasonically measure the actual wall thickness of the base material in the area of the repair cavity. Record the actual wall thickness with the cavity dimensions.
If be recorded as "THRU-WALL".6m, the cavity depth shallfv the cavity penetrates the wall J
4.0 CAVITY EVALUATION 4.1- Upon receipt of a Defect Removal Process Sheet for evaluation, the Quality Assurance Supervisor or his designated representative shall notify the appropriate Quality Engineer-Process personnel of the receipt. The Quality Engineer-Process personnel shall post their log to reflect the current location status of the Process Sheet (s).
bmsunousq p.
    '                                  4.2 The Quality Assurance Supervisor or his designated representative shall i                                       be responsible for the evaluation of indication removal sites through review of the defect removal documentation to determine regilirements for further action. The evaluation process may be conducted by the Weldin3 Engineer or a designated Engineering representative who has been specifically trained in the application of this procedure.
B.
4.2.1 Non-conformance Report Required A.     Only those conditions indicated in paragraph 2.5 above shall require initiation.. of NCR.
Ultrasonically measure the actual wall thickness of the base material in the area of the repair cavity. Record the actual wall thickness with the cavity dimensions.
B.     Document the appropriate steps on the Defect Removal Process Sheet to indicate: NCR required "YES"; Process                         ~
4.0 CAVITY EVALUATION 4.1-Upon receipt of a Defect Removal Process Sheet for evaluation, the Quality Assurance Supervisor or his designated representative shall notify the appropriate Quality Engineer-Process personnel of the receipt. The Quality Engineer-Process personnel shall post their log to reflect the current location status of the Process Sheet (s).
Sheet required               "NO"; Weld Repair P.S. issued "NA".
4.2 The Quality Assurance Supervisor or his designated representative shall i
be responsible for the evaluation of indication removal sites through review of the defect removal documentation to determine regilirements for further action. The evaluation process may be conducted by the Weldin3 Engineer or a designated Engineering representative who has been specifically trained in the application of this procedure.
4.2.1 Non-conformance Report Required A.
Only those conditions indicated in paragraph 2.5 above shall require initiation.. of NCR.
B.
Document the appropriate steps on the Defect Removal Process Sheet to indicate: NCR required "YES"; Process
~
Sheet required "NO"; Weld Repair P.S. issued "NA".
Initial and date all three hold points.
Initial and date all three hold points.
sF 1.ot A (4-79)
sF 1.ot A (4-79)
WM,
WM,


            . . - .            . ~ . .                           ..- - _ _ . . . - _ .                            -_      __
. ~..
                                                                #J Pullman Power Products                                                                                           as-Ix-14
#J Pullman Power Products as-Ix-14
  ~               '
~
Div sion of Pullman incorporated
Div sion of Pullman incorporated
                                                                                                                                                                    //         DoCUVENT No.
//
PREPAAEo BY:                      D. R. Geske                     APPROVED SY:           H. Hinkley                     #8       $1s U 1/30/81 To BE USED                                                     PAGE SEABROOK                                   oNI.Y ON JoS #                                                 No.         6 of 9 PROJECT PROCEDURE 4.0 CAVITY EVALUATION - CONTINUED 4.2 Continued                                                                                                       .
DoCUVENT No.
4.2.1           C.           When a non-conformance is detennined, the items involved shall be segregated when possible by the Field QC/ Welding Inspector and/or a Hold Tag shall be affixed adjacent to
D. R. Geske APPROVED SY:
          '                                                                                    the condition requiring the NCR. Should multiple cavities be non-conforming, one Hold Tag shall be sufficient for
H. Hinkley
        !                                                                                      hardware control.
#8
D.          Affixed Hold Tags shall remain in place pending disposition of the NCR at which time a Repair Tag shall be affixed per Project Procedure XV-2.
$1s U 1/30/81 PREPAAEo BY:
E.           Completion of weld repair shall then be consistent with the sequence of events shown in Project Procedure XV-2,                                             ,,
To BE USED PAGE SEABROOK oNI.Y ON JoS #
Non-Conformance Procedure.
No.
4.2.2 No Further Repair Action Required                                                                         .
6 of 9 PROJECT PROCEDURE 4.0 CAVITY EVALUATION - CONTINUED 4.2 Continued 4.2.1 C.
A.            Surface indication in weldments and base material may be removed without subsequent repair welding provided:
When a non-conformance is detennined, the items involved shall be segregated when possible by the Field QC/ Welding Inspector and/or a Hold Tag shall be affixed adjacent to the condition requiring the NCR. Should multiple cavities be non-conforming, one Hold Tag shall be sufficient for hardware control.
(11 The remaining,sec on thickness, verified as indicated
Affixed Hold Tags shall remain in place pending disposition D.
                                                                        %                            in paragraph (3.3.3 above, is not reduced below accept-able weld depYo                   ize for welds and 87.5% of nominal g },3,4)           ' ' ' wall for base material.
of the NCR at which time a Repair Tag shall be affixed per Project Procedure XV-2.
        .                                        m._..
E.
    'I                                                                                           (.21 The depression, after indication removal, is blended
Completion of weld repair shall then be consistent with the sequence of events shown in Project Procedure XV-2, Non-Conformance Procedure.
'                                                                                                      uniformly (3:1 taper) into the surrounding surface.
4.2.2 No Further Repair Action Required A.
q (31 The area is examined by the Liquid Penetrant or l                                                                                                      Magnetic Particle method, as appropriate, to assure the indication has been removed or reduced to an                                     ,
Surface indication in weldments and base material may be removed without subsequent repair welding provided:
acceptable limit.
(11 The remaining,sec on thickness, verified as indicated in paragraph (3.3.3 above, is not reduced below accept-able weld depYo ize for welds and 87.5% of nominal g },3,4) ' ' ' wall for base material.
NOTE: In addition to Liquid Penetrant or Magnetic i                                                                                                      Particle examination those surface indications discovered through Radiographic or Ultrasonic examination methods shall be verified as removed or reduced to an acceptable limit by the same method.                                                                                   _
m._..
                                ~
'I
(.21 The depression, after indication removal, is blended uniformly (3:1 taper) into the surrounding surface.
q l
(31 The area is examined by the Liquid Penetrant or Magnetic Particle method, as appropriate, to assure the indication has been removed or reduced to an acceptable limit.
NOTE: In addition to Liquid Penetrant or Magnetic Particle examination those surface indications i
discovered through Radiographic or Ultrasonic examination methods shall be verified as removed or reduced to an acceptable limit by the same method.
i
i
~
(.41 The accepted cavity is identified as evaluated by per-manently marking the adjacent base material with the assigned identification, see paragraph 3.3.1 above.
(.41 The accepted cavity is identified as evaluated by per-manently marking the adjacent base material with the assigned identification, see paragraph 3.3.1 above.
sF 1.o f S (4-79)
sF 1.o f S (4-79)
__(,;
__(,;
          *X M                                           -~                                                                                         _                                    _
*X M
-~


4 y
Pullman Power Products JS-ix-14 y
p Pullman Power Products o.v.s.on c Punman warporaieo JS-ix-14 PREPARED By:                     D.R. Geske               APPRovEo ey:         H. Hinkley                   3E2[_ $$IEf                 1/30/81 l
o.v.s.on c 4
SEABROOK                           To BE UsED               'Fif                   f)           PAGE No.             7 of 9 PROJECT PROCEDURE                             oNLY oN JoS #             .j'
p Punman warporaieo l
                                                                                                                        ,    e              y3 s
PREPARED By:
4.0 CAVITY EVALUATION - CONTINUED                                                                                                               ;
D.R. Geske APPRovEo ey:
4.2'           Continued 4.2.2 B.           Document the appropriate- steps of the Defect Removal l                                                                          Process Sheet to indicate: NCR required "NO"; Process i
H. Hinkley 3E2[_ $$IEf 1/30/81 SEABROOK To BE UsED
Sheet required "N0"; Weld Repair P.S. issued "NA".
'Fif f)
PAGE e
y3 No.
7 of 9 PROJECT PROCEDURE oNLY oN JoS #
.j' s
4.0 CAVITY EVALUATION - CONTINUED 4.2' Continued l
4.2.2 B.
Document the appropriate-steps of the Defect Removal Process Sheet to indicate: NCR required "NO"; Process i
Sheet required "N0";
Weld Repair P.S. issued "NA".
Initial and date all three hold points.
Initial and date all three hold points.
4.2.3 Repair By Welding Required                                                                               ,
4.2.3 Repair By Welding Required A.
A.       All other cavities shall be corrected in process in accordance with this procedure by issue of a standardized Weld Repair Process or Base Material Repair Process Sheet, see attachment F, three parts.
All other cavities shall be corrected in process in accordance with this procedure by issue of a standardized Weld Repair Process or Base Material Repair Process Sheet, see attachment F, three parts.
B.         Document the appropriate steps of the Defect Removal Process Sheet to indicate: NCR required "NO"; Proces,s Sheet required "YES". Initial and date both hold points.
B.
C.         Forward the original Defect Removal Process Sheet with attachments to the Quality Engineer-Process to announce additional process sheets required.
Document the appropriate steps of the Defect Removal Process Sheet to indicate:
D.         Forward one copy of the Arc Strike Surveillance Report, Weld Repair Order, or Base Material Suryeillance Report, with the cavity dimensions, to the Engineering Department for issue of the appropriate Repair Welding Process Sheet.
NCR required "NO"; Proces,s Sheet required "YES".
5.0 REPAIR BY WELDING 5.1 The documentation procedure used for butt welCing shall also be used for all repairs made by welding. The appropriate process sheet, as                                                   .
Initial and date both hold points.
shown in attachment F, shall be selected by the Engineering Department to effect fill of the established. cavities.
C.
5.2 Repairs shall be in accordance with an approved qualified Pullman i                                                        Power Products welding procedure for the type of base material involved and recognizing that the cavity may differ in contour and dimensions from a normal butt welded joint.                                                                                         ;
Forward the original Defect Removal Process Sheet with attachments to the Quality Engineer-Process to announce additional process sheets required.
                                                                                                                                                                                          ~
D.
1 i                                                                                                                                                                                           1 I
Forward one copy of the Arc Strike Surveillance Report, Weld Repair Order, or Base Material Suryeillance Report, with the cavity dimensions, to the Engineering Department for issue of the appropriate Repair Welding Process Sheet.
f I
5.0 REPAIR BY WELDING 5.1 The documentation procedure used for butt welCing shall also be used for all repairs made by welding. The appropriate process sheet, as shown in attachment F, shall be selected by the Engineering Department to effect fill of the established. cavities.
5.2 Repairs shall be in accordance with an approved qualified Pullman Power Products welding procedure for the type of base material involved i
and recognizing that the cavity may differ in contour and dimensions from a normal butt welded joint.
~
i 1
I f
sF 1.ot A (4-79)
sF 1.ot A (4-79)
                    =                                                                                                               -              .                  __~.-     -    _J
=
    ~g-~               ,e ,-          - - -        , , , - . , ,                , , - -          - ,, ,,- -                , . . , . , . . .          .n.- .--, ---- -
_ _ ~. -
_J
~g-~
,e
.n.-


r                                                                                                                                                                     =
r
  '          ' ~
=
Ag       Pullman Power Products                                                                           aS-Ix-14 0.v sion of Pulirran incorporated
' ~
                                                                                                                          ,  /           DoCUYENT No.
Ag Pullman Power Products aS-Ix-14 0.v sion of Pulirran incorporated
0.R.' Geske                  APPROVED BY:        H. Hinklev            2/8 - $INI 1/30/81 PREPARED SY:
/
SEABROOK 70 BE UsED                 Cf 4
DoCUYENT No.
d'       o PAGE No.                8 of 9 oNt.Y oN Jc8 #
2/8 - $INI 1/30/81 PREPARED SY:
PROJECT PROCEDURE 5.0 REPAIR BY WELDING - CONTINUED                                                                                               .
0.R.' Geske APPROVED BY:
5.3 Repairs shall be made by qualified welders.
H. Hinklev 70 BE UsED Cf d' PAGE SEABROOK oNt.Y oN Jc8 #
      '                          5.4 For base material repairs 'and for repair in welds made by a welder
4 o
      !                                other than the original welder, the repair welder shall apply his symbol
No.
      ;                                adjacent to the repaired area.
8 of 9 PROJECT PROCEDURE 5.0 REPAIR BY WELDING - CONTINUED 5.3 Repairs shall be made by qualified welders.
6.0 GENERAL REQUIREMENTS 6.1 Elimination of Base Material Surface Defects 6.1.1 Unacceptable base material surface defects shall be removed by grinding or machining provided that:                                 .
5.4 For base material repairs 'and for repair in welds made by a welder other than the original welder, the repair welder shall apply his symbol adjacent to the repaired area.
A. The remaining section thickness is not reduced below 87.5%
6.0 GENERAL REQUIREMENTS 6.1 Elimination of Base Material Surface Defects 6.1.1 Unacceptable base material surface defects shall be removed by grinding or machining provided that:
f                                                        of nominal wall. Thickness report is required.
f A.
The depression after indication removal is blended uniformly l
The remaining section thickness is not reduced below 87.5%
B.
of nominal wall. Thickness report is required.
I into the surrounding surface. Visual inspection documentation is required. (See4.2.2A)
l B.
C. The area is examined by the Liquid Penetrant or Magnetic Particle method, as appropriate, to assure the indication has been removed or reduced to an acceptable limit.
The depression after indication removal is blended uniformly I
Examination report is required.                                                  .
into the surrounding surface. Visual inspection documentation is required.
6.1.2 Areas ground to remove oxide scale or other mechanically caused imperfections for appearance or to facilitate proper Ultrasonic testing need not be examined by the Magnetic
(See4.2.2A)
* Particle or Liquid Penetrant method.
C.
6.1.3 When the elimination of the defect reduces the remaining section thickness less than 87'.5% of nominal but greater than 2/3 actual wall, the product shall be repaired by welding. An NCR per                                                                     '
The area is examined by the Liquid Penetrant or Magnetic Particle method, as appropriate, to assure the indication has been removed or reduced to an acceptable limit.
paragraph 2.5 is not required. (See 5.0) 6.2 Repair.by Welding 6.2.1 The crafts, under control of issued process sheets, may repair by welding material from which defects have been removed, provided the following requirements are met:
Examination report is required.
                        -                          A. The defect shall be removed or the indication reduced to an acceptable size by suitable mechanical or thermal cutting or gouging methods and the cavity prepared for repair.
6.1.2 Areas ground to remove oxide scale or other mechanically caused imperfections for appearance or to facilitate proper Ultrasonic testing need not be examined by the Magnetic Particle or Liquid Penetrant method.
6.1.3 When the elimination of the defect reduces the remaining section thickness less than 87'.5% of nominal but greater than 2/3 actual wall, the product shall be repaired by welding. An NCR per paragraph 2.5 is not required.
(See 5.0) 6.2 Repair.by Welding 6.2.1 The crafts, under control of issued process sheets, may repair by welding material from which defects have been removed, provided the following requirements are met:
A.
The defect shall be removed or the indication reduced to an acceptable size by suitable mechanical or thermal cutting or gouging methods and the cavity prepared for repair.
sF 1.ot A (4-79)
sF 1.ot A (4-79)
                                                                                            .w.
.w.
                                                                +----y--'              =,r:        i
-e----Tp*wm=wp 4-w y-
* 4-w y-   =--ww--er-         m--w*-- ~----   -eay1 --
=--ww--er-m--w*--
~----
-eay1 --
v--i w.w.in
-.-se+m r eme v-r-v w
--i,--v
+----y--'
kw--g
=,r:
rir.
-w i *
-94v,--
w v


                      ~
~
JG         Pullman Power Products                                                                                               !
JG Pullman Power Products Civ:5,,,n of Pullman loco porated
Civ:5,,,n of Pullman loco porated                                     //                 oOCUYENT No.
//
APPROVED BY:               H. Hinkley           N@_             l>!IEI. 1/30/81 PREPARED BY:                       0.R. Gesf e To BE UsED                           JSy p G g~~                 PAGE SEABR00X oNtY oN JoS #                          4 .y Q g,j                   no.       9 of 9 PROJECT PROCEDUPE                                                                                                               .
oOCUYENT No.
        -'                                  6.0 GENEPAL REQUI (MENTS - CONTINUED t
0.R. Gesf e APPROVED BY:
        'l 6.2 Continued                   ,
H. Hinkley N@_ l>!IEI.
When thennal cutting is'perfonned to prepare weld joints
1/30/81 PREPARED BY:
:                                                          6.2.1 8. or edges, to remove defective material or for any other i
SEABR00X To BE UsED JSy p G g~~
purpose, consideration shall be given to preheating the
PAGE 4.y Q g,j no.
        '                                                                                material, using preheating schedules as shown in the appropriate Weld Procedure Specification. (See 3.3.1.A).
9 of 9 PROJECT PROCEDUPE oNtY oN JoS #
Ii
GENEPAL REQUI (MENTS - CONTINUED 6.0 t'l 6.2 Continued When thennal cutting is'perfonned to prepare weld joints 6.2.1 8.
        #                                                                            C,  The welding procedure and welders or welding operators shall be qualified in accordance with Project Procedure II-S and
or edges, to remove defective material or for any other purpose, consideration shall be given to preheating the i
* ASME Section IX.
material, using preheating schedules as shown in the appropriate Weld Procedure Specification. (See 3.3.1.A).
p, .After repair, the surface shall be blended uniformly into
Ii The welding procedure and welders or welding operators shall C,
'                                                                                        the surrounding surface.
be qualified in accordance with Project Procedure II-S and ASME Section IX.
E,  Each repair weld shall be examined by the Magnetic Particle
.After repair, the surface shall be blended uniformly into p,
                                                                                        .or Liquid Penetrant method. ,In addition, when the depth of the repair cavity exceeds the lesser of 3/8" or 107, of the actual section thickness, the repair weld shall be radiographed.
the surrounding surface.
'          ;                                                                        F,  The product shall be heat treated after repair, if required.
Each repair weld shall be examined by the Magnetic Particle E,.or Liquid Penetrant method.,In addition, when the depth of the repair cavity exceeds the lesser of 3/8" or 107, of the actual section thickness, the repair weld shall be radiographed.
6.3 Elimination of Weld Metal Defects 6.3.1 See paragraph 4.2.2 above.
The product shall be heat treated after repair, if required.
6.3.2 Epamination of Repair Welds A, The examination of a weld repair shall be repeated as required for the . original weld except that when the defect was origianlly detected by Liquid Penetrant or Magnetic Particle methods and when the repair cavity does not exceed the lesser of 3/8" or 107, of the actual i
F, 6.3 Elimination of Weld Metal Defects 6.3.1 See paragraph 4.2.2 above.
thickness, it need only be examined by the Liquid Penetrant or Magnetic Particle method.
6.3.2 Epamination of Repair Welds The examination of a weld repair shall be repeated as A,
required for the. original weld except that when the defect was origianlly detected by Liquid Penetrant or Magnetic Particle methods and when the repair cavity does not exceed the lesser of 3/8" or 107, of the actual thickness, it need only be examined by the Liquid Penetrant i
or Magnetic Particle method.
t um Su s
t um Su s
sr 1.ot A (4-79)
sr 1.ot A (4-79)
  , - , _ - , - . ,.          . . . - , ~   . . , - , _ , - , .              , . .                  ..-        . , - , , - - . . .              . , _ _ . - -                          - ~.
... -, ~
- ~.


I j                                       u                                                                                                                                                   .
I j
e
u e
                                                        #          '                                                  *              *                                                                                  ' ATCit.C                                                     7, O'    "O C
7,
,            i         n         =     ~             .C                                                                                                                                                      odg. cDde PX 52                                                         -
' ATCit.C "O
:                      7          .- R 2                                                                                      SEABROOK STATION                                                                                        41'03'010-
.C O'
* x z             s             u   -                                                                                                                                                   R* T"'
C i
T         ya ~'                 s.                                 -
n
PULLMAN POWER PRODUCTS                                                                                                                                                 5
=
              !        D                              ~ o                                                                                           ,    Status.
~
1 M S Index                                                              .
7 R 2 SEABROOK STATION odg. cDde PX 52 R*
o         u                   <        "                                                                                                        Heat Treatment                             Actual Wall Thickness                                                 u BASE HATERIAI. SUR'.*EtLLANCE REPORT 8 w. sw               w                                                                                                               Hydrostatic Test                                                                                                in i                                                                                                                                          JOB 7035                     penair tveie concietea i
T"'
3                 gd                                                                                                                                       Maledal          Site                      Tles.
41'03'010-x z s
                                        -o               n. 7         Sys.                                 Une No.                       IsoN       .
u -
Wold No.
T y ~' s.
I s                                                                             .
PULLMAN POWER PRODUCTS 5
  !                                N k                                                                                      INDICATION                                                                           CAVITY l
1 M S Index
4 is                3Q                                                                                                ,
~ o Status.
* Dale
D a
o u
Heat Treatment Actual Wall Thickness u
8 BASE HATERIAI. SUR'.*EtLLANCE REPORT Hydrostatic Test in w.
i sw w
JOB 7035 penair tveie concietea i
3 gd
-o
: n. 7 Sys.
Une No.
IsoN Wold No.
Maledal Site Tles.
I s
k N
l is 3Q INDICATION CAVITY 4
Prepared By Dale Prepared By Dale
[
hi t:.
tm m_
Deon LOOKINC NORTH g
I l,'
C 1
,g g
o z
\\
~
i
/
3 C
73 E
LOOKIIIC EAST g
m p,.
y D-2 1
I a) ?
S*
h f
l u2 5
m 0
o m
(
1
/
5 o$
s "5
(
o a
w p_ s a.
m >.
h i
g
[
[
Prepared By                                                  Dale                              Prepared By m_
oj IAOKINC WEST g
'.                                                                                                                                                                                    tm                                Deon hi t:.                LOOKINC NORTH                                                                            g l,'                                                      C                                                                                                                                                                                                            I
.m T
                      ,g                  g                          1 o                z                  ,                                                                                                                  ,                                                .
C ji I
                                                                                                                                                                                                                                    ~
r l<
3 73                E C
(U 2
                                                                                                                                                                \
/
i        /                                                                        -
Es j
LOOKIIIC EAST g                      m            p ,.
/
y                                                                                                                                                                                                                            '
1 l
2 D-                                      .        ,
i:
u2                5                    m f
=s
1            I          a) ?0 S*              h                                                                                                    ;
.=
l 5                o              m                                                                                                      (
i 3a m
                                                                                                                                                                            /
a
1                                                                                                                                                                                                                                                                                -
~
                        >                sa              "5
CL w
(                                                                                                                              .
gg e_9 m
            !          o$
Depa o
p_ s o
LOOKillC SOUTH L
a.
l 82 i
w m >.
4%.
i                        g        [              oj                 IAOKINC WEST g
!?ti
                                                                                                                                                                                                                .m           h                            .
/
T
/
;                        C ji                                                     r I
e o
l<                       (U 2                                                                                                             '
cx:
Es                                                     j
I wm I
                                                                                                                                                                      /                                    -
DO m
                                                                                                                                                                                                                                                                        /
i 9
::                                                                                                                                                                                1                                                                           -
(
i:      :
I S
                        =s 3a
E rj TE: Autr.s swuet to new intettfo1 tm **ws nitTt':r' j
                                          .*m                .=a                  ;
FROM CENTER OF VELO.
l i                                                                   -
n.
                                                                                                                                ~
a l
CL                                     w o              LOOKillC SOUTH                                                                                              e_9                 m           Depa
l.
                                              .          gg                                                                            .
1-lA i
l
I 3
,                        e                o
i.
                                              .          82 cx:
-J
                                                                                ,                                                                                      L i                      4%.                               !?ti                                             .                                                          /                                                                                           .      /
                                            >            wm                                                                                                       I I                     .
m           DO                                                                    -
i                                                               9                                                                                                     (                   -
I                       S                 E                                                                                                                                                                                                           ,
;                                              rj                                     TE: Autr.s swuet to new intettfo1 tm **ws nitTt':r'                                                                                                                   ,
: n.                                            FROM CENTER OF VELO.                                                                                                             ,
j                                                                                    ,
          .,                                  a 1-                 lA                                                                                                                                                                                                           i l          l.
I                                                                                                                                                                                                                                                                     .
3
: i.                                                                                                                                                                                                                                                                            .
                                                                                                                                                                                                                                                                                  ---- _            -J


i                         <                                                                                                                                                                                                            , .
i ATCil.A l
ATCil.A                                           !
f Y
l              f         Y                                                                                                                                                               PX-52                              *        !'
Ei j-SEABROOK STATION odg. Cod PX-52 Rec. Type 41 03 010-i 5 E %t PULLMAN POWER PRODUCTS 3
odg. Cod Ei     j-                                                 SEABROOK STATION Rec. Type       41 03 010-i><5:-Es        %t PULLMAN POWER PRODUCTS                   St,t    .                                                  I M S Index 3
I M S Index o
o 7 b                                                                                                             Hest Treatnent                                                                                    E
>< :- s St,t E
                              <                                            ARC STRIKE SURVEtt.tR:CE RF.Po h
7 b ARC STRIKE SURVEtt.tR:CE RF.Po h Hest Treatnent
* HydrostatlC Test                                                                                   a
$ 8 HydrostatlC Test a
                $ 8 w. g                                                                        JOB 7035                         ge., ate Cycle                                 Actual Wall Thickness                           m jg          g
w.
                                  < @.           Sys.             Une No.                   IsoJOwg.
JOB 7035 ge., ate Cycle Actual Wall Thickness m
                                                                                                                        ' We'd No.                           Material           Site              Thks.
g g @.
s N %I                                                                                                                                                         CAVITY r                                         INDICATION                                                                                                -                      .
Sys.
s            Prepared By                                 Date                                     Prepared By                                     Date tooKINC NORTH                                                                                 tengs                     YAct       oe92
Une No.
                                                  ,                                .                                                i                                                                             .
IsoJOwg.
1         '
' We'd No.
U)        >        yes),
Material Si e Thks.
k                                                                         l
t jg s
      .      "o         a"' t.u                                                                           -
%I N
j                     .
INDICATION CAVITY r
3        3
Prepared By Date Prepared By Date s
              'O         =                                                                                                             ,
tooKINC NORTH tengs YAct oe92 i
O           .                      'toottNc EA$t i
1 yes),
t,                                   e.
U) k l
w-       x                           ,                                                  .                        ,                                                                          .              t
"o a"' t.u 3
    ,          G.                     n    ,
3 j
i                                     .
'O
l
=
                'I       5         o8 k                                                                         /             >
i O
                                                                                                                                                                                                                          /
'toottNc EA$t t,
m,                                                                                      i
e.
              )e eb       O       $z                                                                                         (
t w-x G.
O8         $      w     11 i
i l
Dc         E       *D     l           LooKINC WEST                                                                                   g won         0%                   .
n
CE         'I l
'I 5
                                                                                                                                            )
o8 k
to 2                                                                                                             j                          .
/
l
/
[5 o                 w  !                                                                  .                  j                                                                               .
)e eb O
                = 8       I           %    '
$z
                                                        ,                                                                        t       )                                                   -
(
3p       g           S                                     .      --
i m,
D. 6     5 x8                   tooKINc Sount                                                                                 t, won         o.
O8 11 w
J 82                         r l                                                           '            '
Dc E
Q        d       'kg                                                     -
*D l
                                                                                                                          ./                 )
LooKINC WEST g
f 1
won 0%
Afu               ww                     -
i CE
y     DO                                                                                          l              j m        @
'I l
L         /*
j
NOTE: ASSICN WMBERS To EACH INDICAf to:t MD SHoV DISTMCC 5                               nox Comt or vuo.              .                                                                                  .
)
i                         a     .
to 2
    -                        W
[5 o l
                              ~b
j
  .                                                                                                                                                                                                      g I                                                                                                                                                                                                                             -
= 8 I
l r.
t
; i       .
)
.! i
w 3p g
* 1 i
S D. 6 5
* 1
x8 tooKINc Sount t,
                                                                      - - ~     -
won o.
J 82 l
r d 'kg
./
f
)
1 Q
Afu ww l
j DO y
L
/*
m NOTE: ASSICN WMBERS To EACH INDICAf to:t MD SHoV DISTMCC 5
nox Comt or vuo.
i a
W
~b g
I l r.
; i i
1 i
- - ~
1


See
See
                                                                                                                                                                            ~
/'
~
W 2H heAtMbq
W 2H heAtMbq
                                                                                                                                                                                      /'
.o N
                              .o N
_ V4Ec _
_,                    U EE c_                                                                                                           _ V4Ec _
U EE c_
                    ~P L Gsva~. Qv. bra *S                                                                                                         9,6skat.P.g.?qkeudHAudchr
~P L Gsva~. Qv. bra *S 9,6skat.P.g.?qkeudHAudchr
_ . D P.c                           and %                                             .
_. D P.c and %
                                                                                                                  ~..: _ _ .Ihg.g & A be                                                             _.
~..: _ _.Ihg.g & A be
( A K _ ' .. . A % L et _ _ _ . L 3 % g j FG A Eye
( A K _ '... A % L t _ _ _. L 3 % g j FG A Eye e
        ~.
~.
        -m     . . , .              . .          ..-.mi..n             ..-...s..                .. * . .              .-..%,_ . . . .                                                .
-m
B .httis o%A+ ' Al%'4 p.v.ts.+... .. . g 4
..-.mi..n
g,ewn ..               ,.-
..-...s..
a 4
B.httis o%A+ ' Al%'4 p.v.ts.+...
___-.. _ p s p .q.e_.r                 g                   N_ .2. . . p
... g 4
                                                                                                                                                      #A^Mmo OM #41                             ._..
g,ewn..
  ~
4 N_.2... p
            -,.          W h ..                                  . . . . - . . . . - .                                ... -                    .
___-.. _ p s p.q.e_.r a
                                                                                                                                                      .@^T?"'"O.: ~ ~ ~ '
g
(N ;-hCh * .                                                                                                                             %vilw h aa'qqik L           .
#A^Mmo OM #41
            .                                                                                                                                _ R..hcAm_ cA bpkg_b_ _
~
      ._                                                                                                                                      1    ~~ M.hW A ~ _ MeLbdtb..
W h..
    . _ . _ 'P e t                                                                                                                                     ..R_. _ h a..d _4 5h r_o. &
. @ ^ T ? " ' " O. :
  .             7 hmes                                       .N ft_                                              _
(N hCh *.
                                                                                                                                                    .. % .. A % o ^ e. d h s e n )
%vilw h aa'qqik L
                                                                                                                                                        .& iPer B%r_                                   ..
~ ~ ~ '
R .. _ g R e r W n .o r
_ R..hcAm_ cA bpkg_b_ _
                                                                                                                                                      .18.4r!".@c M.Kbs?,
~~ M.hW A ~ _ MeLbdtb 1
    ):
. _. _ 'P e t
_          _        __                _ . _ _ . _ _ _ .                                          _                          _3 D.o W.            .
..R_. _ h a..d _4 5h r_o. &
      'L..
. 7 hmes
        .                                                                                                                                    .._... ? CoJ\o % 't. 2._ "_ _
.N t_
3 Aur                   Aa m                                                     .          .                    _.
.. %.. A % o ^ e. d h s e n )
b,w hkki g hw 1 h eo $ 3 r .___ _ _ . _ _.. _. _ .. K . 3 4 _ k h 6 _ . _ . .
f
F % hnrsa bNT                                                        ..__-._-.__.                                                                                    ser.._.._
.& iPer B%r_
        .Adb N .a M1. ._._..                                                                                         _ . _ . _ . _ . . .              A_%@al&
R.. _ g R e r W n.o r
                                                                                                                                                          .1_ q 4%fh                       M
.18.4r!".@c M.Kbs?,
_Aky Q'..%A % .- Q Q v                                                                                                                                   %c ?rm.ter_kg%&
):
_3 D.o W.
'L..
.._... ? CoJ\\o % 't. 2._ "_ _
3 Aur Aa m b,w hkki hw g
1 h eo
$ 3 r.___ _ _. _ _.. _. _.. K. 3 4 _ k h 6 _. _..
F % hnrsa bN A_%@al& M ser.._.._
T
.Adb N.a M1.._._..
.1_ q 4%fh
%c ?rm.ter_kg%&
_Aky Q'..%A %.- Q Q v


                                ~
~
p_ g.
p_ g.
h. gb w k, 2l G Adyc (24.
P.
P.
h . gb w ,k 2l G 'Adyc                                                                                                                                  " (24.                    l
l
                                                                                                                                                                                                                                                                                                                            '                            "                      I
.. _.... _ -__. A w k R>l W J' I
                                                                                                              . . _ .. .. _ -__. A w k R>l W J'
...$. sa%hl WLNv
                                                                                                                                                                                      ...$. sa%hl                                                                                                                   WLNv
. LFaz
                                                                        ..                      .                            .                                              -                . LFaz ?qbe Lg v'
?qbe L v' g
_I) AIkhk % p %                                                                                                     g Eh L,
. _I) A h % p % E h L,
                                                                                                                                                                                                                                                                                                                ~
~ g Ik k
_ . --.                                                ..- .. . _ _ .                                          - . - . .. . . - . -.. T @rx+                                                                                                                           . Mk.
. Mk.
C tr _
-. -..... -. -.. T @rx+
                  . .              .-                - ...                              -                .        .                  - - - ._ . TW                                                                                                                                                       t
- - -._. TW C tr _
                              ~'
t
                                    . . . .                                    . .                              . . .                        . .                                                %%kv QC % v 3 ~''                '
%%kv QC % v T, hhn Ah
T, hhn Ah C..                                                                                                           (A.)o.cq s
~'
3 C..
(A.)o.cq
~''
o# %
o# %
    -l i
s
__.. . . _ _ _ . _                                                              _              _                              . . _              _.e._.                       ..._..__e.__                                                   . _                                  ..__._e                                 .._.                  .          ._
- l i
            = e6 h               m + . e enmum               me         us.       w                 .                                    e.--
_.e._.
emme                          h                                                      e     e     eO           N euh* mee                       e-.us.i         e         e         e--.me                 qu     me                         e                                     e e-. e           *.                            e                                                                     .m.       -
..._..__e.__
e       e               em 4
..__._e
            -aw.                       .                    -        ..-e-.-n-                     ._                  .    -a.                                                                   ..                                    wee-                               -                                        ---...m.                                   . w.         - h .
= e6 h m
4                                 e ehm-a       we   ee       &            me     ei.ee         eh           h ..             e       me e                             . 4               eme-           e       .          muuDmm. e           m.                                                   e ese W<                         b                             e a                                 e
+. e enmum me us.
                    /p                                     . .                            . _ __ .                              _                  . ___
w emme h
w           d N
e.--
e=W               ...gM en .                                                         e   6 I
e e
              .-----...--w.,-                           ,      _.w-r----mt--M-                     - --              +     e-   ww-y       =rew-+-             - --                - - ~ '             e     -    '7-*--''       ww     m-'--''wis"-m-             r-+-N*=*-essM             urn"'ee-eew       w-m.- -'a==s-wmm.uv-.           semwr     -w-'r-v~-'-en-
eO N euh* mee e-.us.i e
e e--.me qu me e
e e-.
e e
.m.
e e
em 4
-aw.
..-e-.-n-
-a.
wee-
---...m.
w.
- h.
4 e ehm-a we ee me ei.ee eh h..
e me e
. 4 eme-e muuDmm.
e m.
e ese W <
b e
a e
/p d
w N
e=W
...gM en.
e 6
I
.-----...--w.,-
.w-r----mt--M-
+
e-ww-y
=rew-+-
- - ~ '
e
'7-*--''
ww m-'--''wis"-m-r-+-N*=*-essM urn"'ee-eew w-m.-
-'a==s-wmm.uv-.
semwr
-w-'r-v~-'-en-


                ,.          s,_                                                                       . C -          .                      h     4- Jc         4   L,.Jgr.-     #    4m-'W4-tL.              .      .m.L_         s     _w_-_             +               . . ,              4             u., ee--. J-5-.,.i.att     e -d A.4 .'n-id-   wJ.e-       4.r--e.-     ai-..n-a
s,_
                                  .J       Me             e.#-     e   beu.ia                   a9.w W M'm.                   *                              ..g.w--4.-                   .ew-._+                           - %oe         -                --h.a,               --                    .-w                                                           -
C h
i
4-Jc 4
                                                                                                                                                                                                                                                                      . - -                        ..              .. ..                _                    ,                        _ _ _ ..___                                j f                                                                                                                                                                                                                                                                                                                                                                                                       '
L,.Jgr.-
4m-'W4-tL
.m.L_
s
_w_-_
+
4 u.,
ee--.
J-5-.,.i.att e -d A.4
.'n-id-wJ.e-4.r--e.-
ai-..n-a
.J Me e.#-
e beu.ia a9.w W M'm.
..g.w--4.-
.ew-._+
- %oe
--h.a,
.-w i
j f
e 9
e 9
L k
L k
l l
l l
l 9.
l 9.
1 L                         b1I                         ID D                                                                                                   hO                                             b.)
1 L
i
b1I ID D hO b.)
                                                  . f                                     V N.A.                     . . .                    .,              -
bk i
bk      . (. . . . .                                                          .          .. .. -                                                                                                                                .
f V N.A.
1 E t Y M O...).                                                           .                            d                                                   b% dixf                                                                 bMI                                                                                     ;
. (.....
:                                                                                                                                                                                                        l I
1 E t Y M O...).
1                                               ._.                                          .            . . . .                                  .                    .. . .. ..                                                                                                                              .
d b% dixf bMI l
I 1
:l 1
:l 1
.                                                                                                                                                                                                                                                                                                                                                                                                                              1 t                                                               ..            .          .              .. .                                . ., ,                    . ..                                .                                                                      .. .
1 t
r l                   4_
r l
9
4_
* t l
9 l
y 6
t y
                      .                                   .                            .        .                                                      .                      .                          .                            .                                          t
. ?
                                                                                                                                                                                                                                                                                                                                                                                            =
t 6
.                .?
=
1 1
1 1
t t
t t
1,
+
+
1, h
h*
                      *                .. e                                         ... .-                                                                                            ~ . . . , ; _..- .                                          ..                          . . .                        .. . . .                                                                    .
.. e
  ,                  I 1
~..., ; _..-.
p                                 a                                     * .. .. ... .                                                        .--                    . . . .                            .,
I 1
p a
r 1
r 1
1 d!
1 d!
J i
J i
w ome e                     e     . eoe .,         ..g                       ..ee..         *. .        .ee.*   so..e.-
w ome e e
i                 4 4
. eoe.,
* g
..g
;                  y...
..ee..
                                          .._          m_                 _ -                    .
.ee.*
so..e.-
i 4
4 g
y...
m_
f t
f t
*                  %-...                ....m                                   .. -                          .. _.- w.                         - - .                            %          ......... .                                                __._.,....u.                                                                                      _          . .                    ..                  .
....m
i                   i i                   $.                                  .
.. _.- w.
t d
__._.,....u.
i i
i t
d*
I
I
                                                                                                                                                                                                                                                                                                                                                                                                  ..._ .,. ,. h
..._.,.,. h t
.                  t
+
                    +
l
l                             , .* 6             .. .                  . .. .                    . 4       . .            , __ . .                                  . ..                        . . . . .                                                                                            .
,.* 6
3_
. 4 3_
f 4
f 4
f k
f k
i
i T
                                                                =. . . . -         .-.e-.         a       .                . m                 ape .                . . .                            #..                                                              .,
=.... -
T                                                                                                                                                                                                                                                                                                                                                                                                        ...
.-.e-.
a
. m ape.
k*
k*
I                           -- . + . .                                           -- .. . .. ... - .                                                                                    _                      . . . . . . . ~ .                               ...m                                                                                                     . ,.            .            . .
I
I I
--. +..
e t
....... ~.
* e                    -.e W
...m I
e I                                                                                                                                                                   e/                                                                                                                                                                                                                                     >
I e
                                                                                                                  *'"*48**'**h                                                                                                                                         -Neb .                                                                   "A ew=-.             ,
t e
7 ..-i?.-e.               wye-. q T ym - 9W4Mt?*T''*T'Mpf'W*r-'F-W.-SF"p""D.y'*3-Ty-fy"P'"'X**E''M*B'2         RPPM FP N M9'- N.."-NrW*                                                         *-"M'D"s'e"r3f"""***P.#WP'9"*-N''                                                   *** " ' " ***-
-.e W
I e/
e
*'"*48**'**h
-Neb.
"A ew=-.
7
..-i?.-e.
wye-. q T ym - 9W4Mt?*T''*T'Mpf'W*r-'F-W.-SF"p""D.y'*3-Ty-fy"P'"'X**E''M*B'2 RPPM FP N M9'- N.."-NrW*
*-"M'D"s'e"r3f"""***P.#WP'9"*-N''


                                                                                                                                                                                                    . . _ . .                  . - .                                                                l
,m.,:
            ,m .,:
* as t 'C on.
* as t 'C on.                                                                                                                                                                                                                        .              .
_,...,.o
_,...,.o                                                                                   -                      =                 ~
=
                                                                                          ..          . J                                                                                                                 ,
~
                                                                                                                                                                                                                            *        =
. J
                                                                                                                                                                                                        . . . . . .                  . . . . .:                    .    ..:o.      -
=
                        ..                              .                        DIMETRIC WELDER STATUS . . .
DIMETRIC WELDER STATUS SHEET
SHEET                                                            ~                                                     ~
~
                                            .     .                     .                             s .                                                                        . .                    ...
~
                                                                                                                                                                                                    . . .s....,       .. ..
..:o.
                                                                                                                                                                                                                                  ..            v.       p.
s.
                    -                                                                                                                                                                                                                                                                              J
s....,
: y.                   ,
v.
TOTAL                                TOTAL                                    REJECT                          i
p.
__ T.D.                               WELDERS NAME                                                                       -
TOTAL TOTAL REJECT J'
WELDS                               REJECTS                                       RATE
y.
                                                                                                                                                                                                                                                              'COPl4ENTS                         3 IB           BOLSTER                                                                                                             ' lK '                               @                                        $3.3             3 BP             JONES 'I .             _
i
                                                                                    ~
__ T.D.
19                                     ~7                                     M96                               - .
WELDERS NAME WELDS REJECTS RATE
C2             FULLER
'COPl4ENTS 3
* 9                                                                               " ~
IB BOLSTER
li          -.
' lK '
                                                                                                                                                                                                                  . . t.l-'} 8/d                     s c2             B'nSouE                                                                                                                                                     3 2..                       :                                          .noa % .
$3.3 3 BP JONES 'I.
                                                                                                                                                                                                                            ' R9,1
~
__        me             annnwnTer                                                                               --
19
4, --                                                                  e - ' ..
~7 M96 C2 FULLER li 9
nn            nFronn
.. t.l-'} 8/d
                                                                                ~
" ~
                                                                                                                                                    ~l
s c2 B'nSouE 2..
                                                                                                                                                                            '=~
3
                                                                                                                                                                                      . -l '              "*
.noa %.
                                                                                                                                                                                                                              'W $b '                       ' -
4, --
* we            unnnrr.               -
' R9,1 me annnwnTer e - '..
                                                                                                                                          - 10                                           2                                   ~36075 we           a m nrne                                                                                           -
~l
                                                                                                                                          ' ;Q                           -
' = ~
12                                     545%i                             .' . -
nn nFronn
ET             ASHTON
~
_Il                                       'l
'W $b '
                                                          ~
-. -l '
7 076 FR             HEDLEY               -                -        a-~~
- 10 2
                                                                                                                                          ~~10
~36075 we unnnrr.
* Y t/d 70 K4             KEY.'!ONT                                   ---
we a m nrne
l4
' ;Q 12 545%i ET ASHTON
_Il
'l 7 076 FR HEDLEY a-~~
~~10
* Y t/d 70
~
K4 KEY.'!ONT l4
* 9
* 9
                                                                                                                                                                                                                              ~ 5 7. l %
~ 5 7. l %
LE **        _MARTEL                                                                                                            59 I 7                                     2$.E#7b LP                                                                                                                                                                         4 cAMPB E T.T.                                       o
59 7
                                                                                                                                              *ll                                                                       . . ,_2f, q % *                         -
2$.E#7b LE **
5-MD             H AYN'T'nN                                             - '
_MARTEL I
l'             I                               ' SO 7U                                 -
LP cAMPB E T.T.
pp             cannnr.                                                                                                           I'14 '                     ' .' '/o 3/ ~874 np            norsw                                                                                                                28-                                     Ih                                     357% i q                                                                                                                                 '4-                                                                            75#k
*ll 4
_                      MT r.nnu                                                                                             -
..,_2f, q %
                                                                                                                                                                              - 3
* o MD H AYN'T'nN 5-l' I
                                                                                                                                                'h
' SO 7U pp cannnr.
          .Z           PORTWOOD M"                             *
I'14 '
                                                                                                                                                                                                                            -e l %.S .                         -
'.' '/o 3/ ~874 28-Ih 357% i np norsw q
                                                                                                                                                                                                                                                                                  " ~
MT r.nnu
ZA           SU$LIVAN                                                                                             ''
'4-
* h                         .
- 3 75#k
                                                                                                                                                                                      /                                         I I.4 $d                     *      -                  -
.Z PORTWOOD
55           we b% n.                                                                         . . . . - -                  .
'h M"
1                              t                               .      .wo o7a C.L             M2y mne n                                                             - -              '                        -
-e l %.S.
I O                     -      -
" ~
0 9d RY               Csue b -
ZA SU$LIVAN h
                                                                                                                                      -              \                     -
/
I                           : Fon%                       -
I I.4 $d 55 we b% n.
.wo 7a 1
t o
C.L M2y mne n I
O 0 9d RY Csue b -
\\
I
: Fon%
t.
t.
                                                                  .'                                                                      - . e ~ .". .-             .:2.                                       .-.-
-. e ~."..-
                                                                      -..=:                                   ...;. ..<s-     .
2.
                                                                                            .            .                            . .      .t - -            * . -
-..=:
g    .9                                                                 .
...;...<s-
4 8                                                                                                                   -
.t - -
.9 g
4 8
g l
g l
                                                                                                                                                                                                  .l .                                                                     ,
.l.
1
1 M
                                                                                                                                                                                                        '~
'~
M                                                                                                -


          - . ~ , -                    - - -
-. ~, -
                                                ...            e,   .w.                                                                     mg                 4. ., m._. _
e,
.w.
mg 4.
m._.
e
e
                '                  #          *                  >     4mh                                                     a,M                                         -    Au,
> 4mh a,M Au, eg%y4 WJw c vnec] m (+maas s.
: s.              eg%y4 WJw c vnec] m (+maas Y-               M n                           w.:c. ._ J     .
Y-M n w.:c.._ J g
g              a meg                                 y
a meg y r.
: r.                 w.- s wg                                                     p               p,( ,
w.- s wg p
                ^*-             Y^ *
p,(,
                                                  &                    " - " % - J ~ p n a l.o a7,,aw t
^*-
Y^ * &
" - " % - J ~ p n a l.o a7,,aw t
(
(
1 4
1 4
          .*N*                                                                                         ,
.*N*
              .b-                                   .
.b-4 e
4 e
4 9
4 9
9 d
9 d
                                                                                                                                                '                                              e k
e k
9
9
  - .                  , , , , - , - ,      .g       -  ,.-a,             .,-p.-   , --,,___,,.                  v. -, , - --                  - , , - , - , -            , - , , - . - - _ . -
.g
,.-a,
.,-p.-
v.


                                        ^
^
                                                                                                                  -..__.___.,__.._.-[
-..__.___.,__.._.-[
J
J SEABROOK STATION INTERIM PROCEDURE CRANGE FGCP-1 IV.A.6 UE&C Procedure FGCP-3 Revs No.
* SEABROOK STATION INTERIM PROCEDURE CRANGE               FGCP-1 IV.A.6 7      IPC No. 4 UE&C Procedure                             FGCP-3               Revs No.                                                   !
7 IPC No.
: 1. Reason For Change:                                                                                                   1 To-be consistent with UE&C QCP-13, Revision 11 entitlel
4 1.
_ _"Storage Level Requirements"                                                         RECEIVED U. E. & C. INC.
Reason For Change:
DEC.? 2198l
1 To-be consistent with UE&C QCP-13, Revision 11 entitlel
            ~
_ _ Storage Level Requirements" RECEIVED U. E. & C. INC.
SEABROOK STATION                   i
~
: 2. Affected Pararraoh(s)/ Existing Recuirementj Reference IPC 1, Paragraph 5.1.2 a) c.
DEC.? 2198l SEABROOK STATION i
2.
Affected Pararraoh(s)/ Existing Recuirementj Reference IPC 1, Paragraph 5.1.2 a) c.
5.1.2 a) Fire retardant structure or room will be provided with the following environmental conditions maintained:
5.1.2 a) Fire retardant structure or room will be provided with the following environmental conditions maintained:
_ _ a) Relative humiditg 50%
_ _ a) Relative humiditg 50%
b) Te'mperature - 65 F i 10,F r
b) Te'mperature - 65 F i 10,F c) - Filtered air supply using filters with a 75% efficiency rating.
c) - Filtered air supply using filters with a 75% efficiency rating.
d). Housekeeping to minimize dust and other contaminents.
                  -                                              d) . Housekeeping to minimize dust and other contaminents.
r 3.
: 3. Revise (2)'As Follows:                                                                               ,
Revise (2)'As Follows:
l                                           5.1.2 a) Fire retardant structure or room will be provided with the
l 5.1.2 a) Fire retardant structure or room will be provided with the following environmental conditions maintained:
'                                                                    following environmental conditions maintained:
a) Relative humidity 50%
a) Relative humidity 50%
i                                                                    b) Temperature - 65"F i 10 F c) ~ Filtered air supply using filters with a 75% dust arrestance efficiency rating.
b) Temperature - 65"F i 10 F i
c) ~ Filtered air supply using filters with a 75% dust arrestance efficiency rating.
d) Housekeeping to minimize dust and other contaminents.
d) Housekeeping to minimize dust and other contaminents.
J.J.,Moran                   Date:   12/18/81 Originator:
12/18/81 J.J.,Moran Date:
Resident Con truction Mgr.: b                                           .
Originator:
Date: NO~N JProjectEngineeringMgr.:                                 k . /d                         Dates II!/ <i
NO~N Resident Con truction Mgr.: b Date:
                                                                                                                                      /I '      I Resident Construction Engr.:                                   .9       A,           Date:
II!/ <i JProjectEngineeringMgr.:
Field Supt. 0A N O d b ym + /                               > 84 /n NO                Date// bbl                      ,
k. /d Dates Resident Construction Engr.:
x k : b v._u h b               Date /=/A*/h/
.9 A,
l Authorized Nuclear Inspector
Date:
* f                                                                                                (J       f]
/I '
I
> 84 /n NO Date// bbl Field Supt. 0A N O d b ym + /
xk : b v._u h b Date /=/A*/h/
l f
Authorized Nuclear Inspector *
(J f]
* Concurrence for ASME Section III Proceddies i
* Concurrence for ASME Section III Proceddies i
l
l


Esn1       w d % f e .4u , E c x - 4 ca s n3     o b m b c?ch (83                                                               cq s % w :, ._
Esn1 w d % f e.4u, E c x - 4 ca s n3 o b m b c?ch (83 a lt x L k k i U 4 - v.) % d
i U 4 - v.) % d                           ?M q                                 .,
?M q cq s % w :,._
t8i   a lt x L k k y a3     o> u - s.. . w .
t8i y
18 C Ut M o-en cf %,.(dg iT7 blbt pap (87 walk qua.0
a3 o> u - s...
                  /b.c!%
w.
cf %,.(dg 18 C Ut M o-en blb pap iT7 t
(87 walk qua.0
/b.c!%
* rr/73 55l89/
* rr/73 55l89/
                                                                                                                            ~
~
Tv d (4^4-           do                 N"                                           7 37, 7,                uM 3c, yo*/,- Est:                         1 s.1--       sstat J                                         %'q4
Tv d (4^4-do N"
                                ~&                        se l.     - sst's 5 s t 82.
uM 1
                                                                                                        .fo 9 1 IG a g11.r TTl73 { 1ote 3 % SS / 85 J 3.to t,.
7 37, 7, yo*/,- Est:
5s IK 55177 F7
3c, s.1--
_i  f'88 gas         WIS7                                           $
sstat J
g,        W 5'I 7 8 '
%'q4 s l. - sst's
.fo e
~&
1 5 s t 82.
9 IG a
g11.r TTl73 { 1ote
% SS / 85 J 3
F7 f'8 3.to 5s IK
_i 8
55177 t,.
gas WIS7 W 5'I 7 8 '
g,


  -(                             ;
-(
f15 U T~ ?.1*/
f15 U T~ ?.1*/
V0             ICM1 9763,013-10SS2, (PH 50S1, l         c                 o,,, u2H 568 2 g PH 5683-)              -
V0 ICM1 9763,013-10SS2, (PH 50S1, g
3 Public Service Co.of b.ew Hampshire
-)
                                                                                                                                .................o,d.,g.,1,Q1,5,2,,2,,,
PH 5683 l
C/0 United Engineers f. Constructors Inc.
c o,,, u2H 568 2 Public Service Co.of b.ew Hampshire
Route No. 1 - Site                     03874 Access Road                                                   sNgged . . . . . . . . . . . . . . . . . . . . . . . . . , , ,, , , , ,
.................o,d.,g.,1,Q1,5,2,,2,,,
Seabrook, NH                                                                                                                _
3 C/0 United Engineers f. Constructors Inc.
                                                                                                                        .J       T w . ai w                       e n. -
Route No. 1 - Site Access Road Seabrook, NH 03874 sNgged.........................,,,,,,,,
t._                                                                           -                              ,
.J T w. ai w e n. -
Cust. Spec..IV 502 Dtd.10/17/77 Tsado N wne                                                                      Fa.
t._
Arcaloy 316 AC DC                                                              ASM.E...S..F. A... 5. 4 .S..ec.. 11...P
Cust. Spec..IV 502 Dtd.10/17/77 ASM.E...S..F. A... 5. 4.S..ec.. 11...P Tsado N wne Arcaloy 316 AC DC Fa.
          ., r,ad.na,e                                                                                                   333 as                      sia. 3/32"                                                                                 Type ..... E 310 14 fI                       -      - -            --
., r,ad.na,e 333 3/32" Type..... E 310 14 fI as sia.
1,350 lbs.
1,350 lbs.
tm Mvmber:               05-1-A912M                                                                     Test No. 2642 u : w.nn.,:                   17616C                                                                         Mix 1                                 .
tm Mvmber:
cuto"                                                  Concentricity 4%
05-1-A912M Test No. 2642 u : w.nn.,:
8daa9*" "
17616C Mix 1 Concentricity 4%
3                                        Type Steel A-285                                                                                                       !
cuto" 3
cmeanian           19.96                                                                                     Split.                 Volts                      Amps Tes,tN,o.                   Full
Type Steel A-285 8daa9*" "
                                  , sew     13.21 6                    2S                      80 smosa             59                                 Tensiles                     1
Full Split.
                                      +           02 T*""*"".
Volts Amps cmeanian 19.96 13.21 Tes,tN,o.
01                                 Test                                    As-                             F ' ' " #-
, sew smosa 59 Tensiles 1
2 43                                   Results:                                 Welded N
6 2S 80 02
                          - has*8ea                                                                                               ------                        '' N
+
                                                .10                                    Yield                                    90,600                         3AS f f f4 _
01 As-F ' ' " #-
!            /                  copper Tensile
T*""*"".
          .'                  3m                  .04                                     Elongation                              36.0%                                                     .
Test Welded 2 43 Results:
      ./                 ph       ,h ,u.         .024                                    Red.of Area ausphu,         .017 Overhead m                   .05                                     pillets:
N
OK Vertical                                                                                 l CoheR                                                           AN                 N Penne     6% Schaeffler 5.4% Magne Gage                                                 U f5E"k            8
'' N
                                                                                                              . ..t%.sLg *r *
- has*8ea Yield
* 20,e.yu sw                                           N-1224 Ou any sysses cour.casion us:
/
098                                                                                                                                          198_1 Nitrogen QA/QC SITE                       b au o.ic_ September 8.
Tensile 90,600 3AS f f f4 _
VIEWED sbie n                              Penna.                3 si he undamenas causws thes the consens W
copper
          %, g York                   3                gY          -
.10
g his eeport ase convece and accurate and inat ani 4'**"*"*"'*""*'''"*""***'"***"'*
.04 36.0%
                                            .                                      UE & C J27-/79                                 _
3m Elongation
                                                                                                              #(lie )               d''"* 'naimias smincanon and ASME Boita and subac ibed and swoen to befose ene n 7"                                                                                        .on m oin g:
.024 Red.of Area
un 21st d.y ot                       February pressure vmes cgI section scA seco r                 3                                    ,
./
AI.LOY           RODS DIVISION sEAi.. .                        ..                  .
ph
                                                                  -                            .                                                            I                       /
,h,u.
av ..... ........ .'..              .      .. ............
.017
Mr canassica == pie . 11/22/82 D. G. Flohr avr.no                                                                                        ,, q f                                                                           .    .
: ausphu, m
.05 pillets:
OK Vertical Overhead l
U f5E"k N
CoheR AN Penne 6% Schaeffler 8
5.4% Magne Gage
...t%.sLg
* *
* 20,e.yu sw N-1224 r Ou any sysses cour.casion us:
198_1 QA/QC SITE b au o.ic_ September 8.
Nitrogen 098 VIEWED he undamenas causws thes the consens W Penna.
3 sbie n si York his eeport ase convece and accurate and inat ani
%, g 3
gY g4'**"*"*"'*""*'''"*""***'"***"'*
UE & C J27-/79
#(lie )
d''"* 'naimias smincanon and ASME Boita and subac ibed and swoen to befose ene pressure vmes cgI 3 g :
un 21st d.y ot February n 7"
.on m oin section scA seco r AI.LOY RODS DIVISION sEAi...
I
/
av..............'..
Mr canassica== pie. 11/22/82 D. G. Flohr
,, q f avr.no


l               1                                                                 A p.o. w es2.
l A
N T 31 $ qzy Ct' AL!n* m     L C1!ECKI.!ST DELTA FERRITF CONTENT TEST (PRODUCTICN OF VELD PADS)
1 p.o. w es2.
TEST NO.          /         _
N T 31 $ qzy Ct' AL!n* m L C1!ECKI.!ST DELTA FERRITF CONTENT TEST (PRODUCTICN OF VELD PADS)
ROD TYPE d '3/$ ~/6           ROD SIZE       8/5P     %
/
                                                        .7   86             HEAT NO. //d /4C.           1.0T NO. CS-/-A-9/2M DATE MANUFACTURER         /e wi[#ad [o4#
ROD TYPE d '3/$ ~/6 ROD SIZE 8/5P%
V0GT/ AWnP METER 2D        279~0*$
TEST NO.
INSPECTORS INITIALS _
DATE
: 1. Base Plate Material        8OY db                             w M VJ y
.7 86 HEAT NO. //d /4C.
: 2. Plate Marking   #/                              _
1.0T NO. CS-/-A-9/2M MANUFACTURER
: 3. Amp Range         OO                                   '
/e wi[#ad
[o4#
279~0*$
V0GT/ AWnP METER 2D INSPECTORS INITIALS _
8OY db w M VJ y 1.
Base Plate Material
#/
2.
Plate Marking 3.
Amp Range OO
((
((
Voltage Range     2/
Voltage Range 2/
: 4. Copper Bar Spacing     N6   #
4.
[               _
Copper Bar Spacing N6
: 5. Preheat temp 50*F min. 78 # 8                           // [               _
[
: 6. Interpass Temp 350*F max.     6#                             /
5.
: 7. Weld buildup in Reverse Direction each bead layer. 6M-                        /
Preheat temp 50*F min.
[    '
78 8
No Stops or Starts in Test 8.
// [
Area.                          OY                      /
/
: 9. Quenching with Water and                                               ~
6.
Air correct                     ON                            _
Interpass Temp 350*F max.
: 10. Pad Surface Finish Complete         gg                         /
6#
                                                                                                          /
7.
UEM: Review P.P.P. Q.A. Review                   YAECReviewd Int. f                            Inc. ?cN                          In('b!f.o .N.
Weld buildup in Reverse 6M-
j                                                                                                                Date      n i,. e-Date 3 - 2 I- TO                   Date ^l:d <:
[
l h     N ad was               mduc.1<d         uG
Direction each bead layer.
;                                        pm Jen 4c- n9 , Ae % pedes
/
!                                                                            ,[tq (Ep                   PAGE 30_ QfN.               -e 1
8.
No Stops or Starts in Test OY Area.
/
9.
Quenching with Water and
~
ON Air correct
: 10. Pad Surface Finish Complete gg
/
/
YAECReviewd UEM: Review P.P.P. Q.A. Review In('b!f.o.N.
Int. f Inc. ?cN n i,. e-j Date 3 - 2 I-TO Date ^l:d <:
Date l
h N
ad was mduc.1<d uG
, Ae % pedes pm Jen 4c-n9
,[tq (Ep PAGE 30_ QfN.
-e 1
I I
I I


MMTE
MMTE 0 IC0Sh EE R Q. 3 4...r,~[d Evms
                                                                                                        -  0 IC0Sh
$'$$ I
                                                                                                                        -    EE R Q. 3 4. ..r,~[d Evms
-Ukhb5j, g,gf,1f CUALITY CCNTROL CHECALIST
                                                                                                                            $'$$   I
"" ''N iM&v DELTA TERRITT. CONTENT TEST fgrg" (TEST RESULTS)
                                                                                                                            -Ukhb5j, g,gf,1f CUALITY CCNTROL CHECALIST                                                               "" ''N iM&v DELTA TERRITT. CONTENT TEST                                                           fgrg" (TEST RESULTS)
I3.2 _
RCD NO.     [-8/6-//2 ROD SIZE                       I3.2
/
                                                                                                  /            _
[-8/6-//2 ROD SIZE RCD NO.
                                                                                                  ~
LOT NO. 03 ~hA -9]d M TEST NO.
TEST NO.                                                                    LOT NO. 03 ~hA -9]d M 3/20!& _              EEAT NO./74/h A _             -
EEAT NO./74/h A _
UAIE                ,/
~
MANUFACTURE [ ) tM.-[ h O pp,                     '
3/20!& _
FEREliCSCOPE LD 09       7 ~8975' TEST PAD NO. _         /
UAIE MANUFACTURE [ ) tM.-[ h O pp,
Ferritescope Readings in 1
,/
: 1.        d,[ %           __
09 7 ~8975' FEREliCSCOPE LD
2 .__
/
6.S Z 3._       6.8     2
TEST PAD NO. _
: 6. 0     1
Ferritescope Readings in 1 d,[ %
: d. 4 4 ._
1.
1 s ._      6.51                                     _
2.__
                                                      .8, k
6.S Z 3._
6.8 2
: 6. 0 1
: d. 4 4._
1 6.51 s._
.8, k
: 6. _
: 6. _
Avg.      4,88 2 Territescope Reading in FN
4,88 2 Avg.
: 1.      4. 9       n
Territescope Reading in FN
: 2.       f4       FN           __
: 4. 9 n
: 3.     IY       W           ___
1.
I
2.
: 4.     $O       W               _
f4 FN 3.
5.1
IY W
: s.      50        n                _
4.
$O W
5.1 I
rN.
rN.
l                                            s.     4,9       n l                                             Avg. 6/       FN t
s.
t UE&C Review YAEC Revicy_                 .
50 n
P .P.P . Q. A. Reviev                               w is-                                   '
l 4,9 n
f I                                                      Int._ 'e[             _
s.
In t .,'    ,    _
l 6/
Int. _/             _
FN Avg.
Date__
t UE&C Review t
Date '/l.// 4 Date 3-J/ fD           _
YAEC Revicy_
f P.P.P. Q. A. Reviev w is-In t.,'
'e[
I Int._
Int. _/
Date '/l.// 4 Date__
Date 3-J/ fD
' - - ~ _ _. _ _
a~


                                                                                                                    ~
~
                - ~ . - .
- ~. -.
                                                                                                                          ~
~
                                                                .                                    1330 FR[ /ork)[f g[
1330 FR[
:.RC Exit Interview Attendance List
/ork)[f g[
                                            'nspection Nude- 50-443/SI- 17._ 50-444/81_[Q ~                                             .O
Interview Attendance List
                            ~
:.RC Exit
Inspection TypekJkb blb.-UA!MAbddlEA-th5lT
'nspection Nude-50-443/SI-17._ 50-444/81_[Q ~
                                                                                                                          -S.k6)ldkXM NA.E (Print)                                         TITLE                                             ORGANIZATION a].T~ nyonwror)                                       OA3Pseinusr                               CAEC                 F6A6 Ju)..DKl.Efod                                         FGA MGd                               "h!92C 2.? n-kee                                           as' h-o M=c,                               >erc(s,,,,ncom<     '
.O Inspection TypekJkb blb.-UA!MAbddlEA-th5lT -S.k6)ldkXM
                                                                                                                                                  /
~
0-           - /AN/SW                                 Fis- GA_             __
NA.E (Print)
__            UE+C
TITLE ORGANIZATION a].T~ nyonwror)
              .          lC 6N Al l}                                   he         $          e                      $C       A A ff/N d b/,/
OA3Pseinusr CAEC F6A6 Ju)..DKl.Efod FGA MGd "h!92C 2.? n-kee as' h-o M=c,
: J K cAav. .                                                   !=O M                                     ; &c 37d Nhaf                                               Sarde                                   py4///get.
>erc(s,,,,ncom<
TF.-           ~                              .
/
a .-                         .        ,- / ' ; i .                 ' ' ' ' '
0-
                                                                                                                                  .E,._
- /AN/SW Fis-GA_
C fd 6                           365 fftb^                                           dlidC                           l S.2evno?de                                           Ltre.b   6 urKRc.
UE+C lC 6N Al l}
[                                     .
he
              - . =           _-                              ,
$C A A ff/N d b/,/
f 1
e
: J K cAav..
!=O M
; &c 37d Nhaf Sarde py4///get.
a.-
TF.-
,- / ' ; i.
.E,.
~
C fd 6 365 fftb^
dlidC l
S.2evno?de Ltre.b urKRc.
6
[
-. =
f i
l i
N..' '
1 l
?: '
i l
i l
i N. .' '
l
1 l                                                                                                                                               .. .
- i w
,    ?: '                              ,
i                                        .
      $-                                                                                                    l l    % _.                                                                                              - i     .          -
w


      . p".                                    .        .
. p".
                                                                        ~~~
~~~
BEU E~ SH EET~~
BEU E~ SH EET~~
                                                                                                                                                            ~        ~ ~
~
ius ~ - s 4.2.7-
ius ~ - s 4.2.7-
                                  .                                                                                                                                FORM - 001 PAGE       1       OF 1 SEABROOK STATION                                                                     ,
~ ~
NO*         032 REQUEST FOR FOLLOW-UP ACTION NRC INSPECTIONS
FORM - 001 PAGE 1
                                                  . c. 9/ . ,3. .                               ,    W ..         s- ...            ..          ..
OF 1 SEABROOK STATION NO*
  ;                    TO:         J. F. Veught '.. .y.                           .                  I,e   7,.:.,,.T       .
032 REQUEST FOR FOLLOW-UP ACTION NRC INSPECTIONS
DATE:    6/22/81          .
. c. 9/.,3..
  .                                  ....;~.. .                             ....            .s           y..,,
W..
s-DATE:
6/22/81 TO:
J. F. Veught '...y.
I,e 7,.:.,,.T
....;~...
.s y..,,
inspection item'
inspection item'


== Description:==
== Description:==
Clarify Cross-Over, Restraint Requirements UNIT:                                                                 #1 '                         -
Clarify Cross-Over, Restraint Requirements UNIT:
(Dwg. F101482)
#1 '
                                                          ...."..a.~.
(Dwg. F101482) 7
                  ,                    7 .~                                                             .  .  ..
...."..a.~.
                                              . ~. ..        ..
.~
Reff RFI 73/1442                                                 .
. ~....
Fiel'd' Instruction F1-92 Rev. 1                                                     .                                    ,
Reff RFI 73/1442 Fiel'd' Instruction F1-92 Rev. 1 "AsIresult'of'NRCInspection81-08byInspectorsReynoldsandSanders,"the
      "'~~~                  "AsIresult'of'NRCInspection81-08byInspectorsReynoldsandSanders,"the following preliminary questions need response.                                                                    .
"'~~~
                                      . 4 . . . .                               c               .
following preliminary questions need response.
  ;,                      1.      Justification for taot stress relieving field welds (material being susceptible to
4....
                                                                    ~ - , ,
c 1.
Justification for taot stress relieving field welds (material being susceptible to
~ -,,
laminar tearing,~underbead' cracking, etc.).
laminar tearing,~underbead' cracking, etc.).
: 2.       The elim4' nation of NDE after weld buttering in field.
2.
          - - - Corrective Action Required: As indicated above.                                                             UE&C's response should include the shop fabrication requirements (Cives).
The elim4' nation of NDE after weld buttering in field.
s   .
- - - Corrective Action Required: As indicated above.
f b
UE&C's response should include the shop fabrication requirements (Cives).
Date Required: 6/29/81                                                                                                   Approved By: J. W. Singleton l                                                                                                                                                           -
s f
6                                                                                                                                                                     .
b Date Required: 6/29/81 Approved By:
Requested By:
J. W. Singleton l
l                                                                                                                                                           YAEC FCAE M i                                                                                                                                                                                           _.
6 Requested By:
l
l YAEC FCAE M i
    ,                  NOTE: Contractor is requested to respond by memo referring ident. number of this report.                                                                   ,
l NOTE: Contractor is requested to respond by memo referring ident. number of this report.
i t .:. ._ . ..                           ..                                                                    .. .,          ,
i.
              =                     .              ..                                . , -
t.:.._...
=


                                                                                                                ~~                    ~~
E,,P EM-!EET- ~
                                        ~
~~
                                            ,6 E, ,P a v v: f,r,-
~~
EM-!EET- ~                 ius n - e 4.2.7 FORM - 001 3 n ,*,   ,pp
ius n - e 4.2.7
                                                                ,* b, G b*                                         PAGE 1         OF           2 SEABROOK STATION                         "
~
                  .                                                                                                no'                       '
a v v: f,r,- n,*,, p p FORM - 001
MAR 231981REQUEST FOR FOLLOW-UP ACTION
,6 3
                                            ,n, NRC INSPECTIONS
, b, G b*
                                          'MISSOEl[l."fj,yp         -v
PAGE 1 OF 2
                                                                        .rg i
SEABROOK STATION MAR 231981 no' REQUEST FOR FOLLOW-UP ACTION
J.F. Vought                                                     DATE:
,n,
'MISSOEl[l."fj,yp i NRC INSPECTIONS
.rg
-v J.F. Vought DATE:
TO.
TO.
u_.
Inspe'cti6n item
Inspe'cti6n item


== Description:==
== Description:==
-                    Cross-Over Leg Restraint         UNIT: #1
Cross-Over Leg Restraint UNIT: #1 u_.
  - - - -                                  Upon inspection.of the restraints as on UE&C dwg. F-10182, ECA 01/1775 and
Upon inspection.of the restraints as on UE&C dwg. F-10182, ECA 01/1775 and ECA 01/189_5_and Cives documentation of the fabrication of these restraints (Site Documentation Package) the conditions were identified:
_...; . . _ . - .                        ECA 01/189_5_and Cives documentation of the fabrication of these restraints
..y_..__
          -                                  (Site Documentation Package) the conditions were identified:
  ..y_..__
(1) UE&C'dwg. F-101482 Section 101482C shows a horizontal frame at E1.(-)
(1) UE&C'dwg. F-101482 Section 101482C shows a horizontal frame at E1.(-)
there are two stiffner plates installed.
there are two stiffner plates installed.
(2)     a. ECA-01/1775A sht. 2 shows a typical corner detail. Is this applicable to every corner?
(2) a.
                  /-                                                                                  (Cord. oW M.A '
ECA-01/1775A sht. 2 shows a typical corner detail. Is this applicable to every corner?
(Cord. oW M.A
/-
r Corrective Action Required:
r Corrective Action Required:
Address the above noted conditions and provide corrective action as necessary.
Address the above noted conditions and provide corrective action as necessary.
                                                                                                          .                                          i i
i i
                                                                                                                              /
/
Date Required: 3/30/$f                                                         Approved M             ,g AECdi. i~_.
Date Required: 3/30/$f Approved M
                                                                                                                                  -                  l Hequested By: h.(~, Mdh YAEC FQAE l
,g AECdi. i~_.
NOTE: Contractor is requested to respond by memo referring ident. number of this report.
Hequested By: h.(~, Mdh YAEC FQAE NOTE: Contractor is requested to respond by memo referring ident. number of this report.
l N
N l


BLUE SHEET - SEABROOK STATION                                                                                                 ,                                  PAGE 2 REQUEST FOR FOLLOW-UP ACTION NRC INSPECTIONS
BLUE SHEET - SEABROOK STATION PAGE 2 REQUEST FOR FOLLOW-UP ACTION NRC INSPECTIONS A
* A (2)               b.           Is the orientation as shown on sht. 6 of this ECA mandatory?
(2) b.
(3)                             Does Cives weld procedures require a backing , trip for their
Is the orientation as shown on sht. 6 of this ECA mandatory?
                ,                                                                      single-vee groove welds?
(3)
                                                                      )                 UE&C Spec. 12-5 para. 3.3.1.7.b. requires single-vee groove
Does Cives weld procedures require a backing, trip for their single-vee groove welds?
            .i i                                                                   -
)
weld corner joints to be b%ttered and that the battered weld
UE&C Spec. 12-5 para. 3.3.1.7.b. requires single-vee groove
          -j                                                                           be visual and magnetic particle examined. There are no MT
.i i weld corner joints to be b%ttered and that the battered weld
        -i inspection reports in the~ Site Documentation Package that would substantiate that this is done.
-j be visual and magnetic particle examined. There are no MT
(5)                             The MT inspection reports show the type of joint that was MT exam $ned.                             The only type of joints MT examined, according i
-i inspection reports in the~ Site Documentation Package that would substantiate that this is done.
to the records in the Site Documentation Package, are single double bevel groove welds. There are no MT inspection reports for single or double-vee groove welds.
(5)
(6)                             There is one visual inspection report for each fabricated piece t
The MT inspection reports show the type of joint that was MT exam $ned.
and these pieces may include multiple welds. B it acceptable                                                                       ,
The only type of joints MT examined, according to the records in the Site Documentation Package, are single i
double bevel groove welds. There are no MT inspection reports for single or double-vee groove welds.
(6)
There is one visual inspection report for each fabricated piece t
and these pieces may include multiple welds. B it acceptable,
when welding to the requirements of AWS, to not identify the visual inspection of each individual weld?
when welding to the requirements of AWS, to not identify the visual inspection of each individual weld?
{                                     (7)                           UE&C dwg. F-101482 and applicable ECA's do not reflect the as-
{
              ,j                                                                   built condition of the pieces-fabricated by Cives.
(7)
(8)                             Some of the welds under the copes on the stiffner plates shown i.
UE&C dwg. F-101482 and applicable ECA's do not reflect the as-
,j built condition of the pieces-fabricated by Cives.
(8)
Some of the welds under the copes on the stiffner plates shown i.
on UE&C dwg. F-101482 Section 101482A appear to be incomplete.
on UE&C dwg. F-101482 Section 101482A appear to be incomplete.
4 i
4 i
I 1
I 1
  - , .*..              -,-      ym.,.-,,.m.         --- - - - -                    , . - , - . , , , . - , , , . , , - , _ - - , , , . - . - , , - - . - - -                ,,,~--,,__m_            - -
ym.,.-,,.m.
,,,~--,,__m_
,--.g.
e.-w


                                        -                A  sea                      . . .        g ,,, _,,
.._,___.,'.**^--9_ _.....
                  .._,___.,'.**^--9_ _ . . . . .                           ..            _ _ . .                            _ . _ _ _ _ _ _ . . . ,                __            ,,          __
A sea g
                          .                                                                                                                                                                            l l
l e
e                                                                                                                                                             .
l April 2, 1981 BLUE SHEET No. 22 Revised Power Engineering Response:
l
We have the comments on Blue Sheet No. 22:
          ',                                                                                                                                        .      April 2, 1981 BLUE SHEET No. 22 Revised Power Engineering Response:
1.
          ;                                                  We have the comments on Blue Sheet No. 22:
This is in accordance with the sendor detail and ECA 01/17753.
: 1.         This is in accordance with the sendor detail and ECA 01/17753.
l 2.
l                             2.         a.             ECA 01/1775A is intended to indicate typical in any direction.
a.
                .                                                      - Vendor- drawings correctly show various details.
ECA 01/1775A is intended to indicate typical in any direction.
- Vendor-drawings correctly show various details.
i
- ~
2.
b.''No.
^ Actual orientation is shown on vendor detailed drawings.
1
: 3. ~ Yes.
A' backing strip is required.
~
The~present' documents cont. sin complete reports and include buttering, root, and final weld pass. These are not identified separately and the vendor ~is in the process of reviewing these docu.nents to identify them separately.
~
5.
Single vee and doubir. vee groove welds will be documented when these welds' occuf.~~ All full penetration joints were MT examined and documented.,_
6.
Docurentation is done for each component and is in accordance with the approved procedure VIS-P-78, FP 12877-01.
7.
'Ihe ECA is revised to 01/1775B.
r 8.
The vendor details show complete detail for all joints. These were reviewed by UE&C Engineering in Philadelphia.
i
i
                          - ~
: 2.        b.''No. ^ Actual orientation is shown on vendor detailed drawings.
1          ,
: 3. ~ Yes .                      A' backing strip is required.
The~present' documents cont. sin complete reports and include buttering,
                                            ~
root, and final weld pass. These are not identified separately and the vendor ~is in the process of reviewing these docu.nents to identify them separately.      ._              -
                                                                                                                                                                                                      ~
: 5.        Single vee and doubir. vee groove welds will be documented when these welds' occuf.~~ All full penetration joints were MT examined and documented.,_
: 6.        Docurentation is done for each component and is in accordance with
                                        .              the approved procedure VIS-P-78, FP 12877-01.                                                  .
r                                7.        'Ihe ECA is revised to 01/1775B.
: 8.        The vendor details show complete detail for all joints. These were reviewed by UE&C Engineering in Philadelphia.
i                                  *
(
(
Ks         .        ___->-      '
Ks
{
{
R. N. Kuehn RNK:cao                                                                                                                                           ,
R. N. Kuehn RNK:cao i
i                            cc: JA Grusetskie TP Vassallo AJ Hulshizer i                                                         MA Edgar i                                                           RG Blair PL Francis
cc: JA Grusetskie TP Vassallo AJ Hulshizer i
                ;          g                                JR h pe                                                                                                 -
MA Edgar i
                .                                          MP Hanson RN Kuchn
RG Blair PL Francis JR h pe g
                .                                          H Shah i
MP Hanson RN Kuchn H Shah i
i                                                                                                                                                                                     _
i I
I


                                                                                                                - - . ~
- -. ~
  ,'                      UE&C QA Response g - m Item 4               Vendor Surveillance Supervising Engineer was contacted and requested that the UE&C Resident Vendor Surveillance Repre-sentative review the records at Cives to assure that mag-netic particle inspection of the buttering was performed as required. The Vendor Surveillance Representative will review the documentation prior to submittal to the Site.
UE&C QA Response g - m Item 4 Vendor Surveillance Supervising Engineer was contacted and requested that the UE&C Resident Vendor Surveillance Repre-sentative review the records at Cives to assure that mag-netic particle inspection of the buttering was performed as required. The Vendor Surveillance Representative will review the documentation prior to submittal to the Site.
Item 8.               UE6C QA is in the process of inspecting the welds under the copes on the stiffner plate. Welds have been found that are not complete. This inspection will be complete by 4/8/81 and the incomplete welds documented on an NCR.
Item 8.
t D. C. Lambert                                             ,
UE6C QA is in the process of inspecting the welds under the copes on the stiffner plate. Welds have been found that are not complete. This inspection will be complete by 4/8/81 and the incomplete welds documented on an NCR.
i i
t D. C. Lambert i
I i
i Ii
    +
+
t i&
t i&
t 6                                                                                                                                       .
t 6
9   wee w   a =*
9 wee w a =*
-w.


                                                                                                                            -- I
; w m.u.a 9 L y g g 9 g gg
  ..      7
-- ---,,,3_,;,_7
                    ;           w m.u.a                   9 L y g g 9 g gg                 -- --- ,,,3_ ,;,_7 FORM - 001 APR 2 0 1981                                                       PAGE     1   F   1 SEABROOK STATION W 7 TTM-I                                                   NO*     022A
-- I 7
((jj ..n,-"E j$,JS
FORM - 001 APR 2 0 1981 PAGE 1
* r,Mut. REQUEST FOR FOLLOW-UP ACTION NRC INSPECTIONS         t- 23   J.F.YOUGIE l
F 1
TO:         J. F. Vought                                                         DATE:     4/17/81                 '
SEABROOK STATION W 7 TTM-I NO*
inspection item
022A
((jj..n,-"E S
* r,Mut. REQUEST FOR FOLLOW-UP ACTION j$,J NRC INSPECTIONS t-23 J.F.YOUGIE TO:
J. F. Vought DATE:
4/17/81 inspection item


== Description:==
== Description:==
Cross-Over Leg Restraint                   UNIT:   #1 The response to two of the eight items identified on BS 022 was incomplete and/or incorrect. Item #1 and #7 stated ECA 01/1775B was revised to indicate there were 2 stiffner plates in the place of the flange.           In reviewing the ECA it was still not apparent that was the intent of pg. 6 of6 of the ECA.           This was discussed with Mr. Mehta and !1r. Grusetskie of UE&C and they agreed to revise the ECA. ' Item #4 is incomplete.
Cross-Over Leg Restraint UNIT:
The present MT reports in the Site Data Package for Spec. 12-5. S.O.6687. do identify when the MT is for the root weld and when for the final weld but no where do the MT reports indicate there was any MT on the butterine of the reouired icints.                   Additionally the cives shon drawines do noe indfrnee all_ only some of the ningle-ve, grnnve bure gr w       w s for corner joints requh buttering.
#1 The response to two of the eight items identified on BS 022 was incomplete and/or incorrect. Item #1 and #7 stated ECA 01/1775B was revised to indicate there were 2 stiffner plates in the place of the flange.
borIbYve kcMh0e8:
In reviewing the ECA it was still not apparent that was the intent of pg. 6 of6 of the ECA.
: 1. Assure that ECA 01/1775 is revised as agreed upon by Mr. Mehta and Mr. Grusetskie Respond how programmatically the vendor is going to determind which joints were v
This was discussed with Mr. Mehta and !1r. Grusetskie of UE&C and they agreed to revise the ECA. ' Item #4 is incomplete.
The present MT reports in the Site Data Package for Spec. 12-5. S.O.6687. do identify when the MT is for the root weld and when for the final weld but no where do the MT reports indicate there was any MT on the butterine of the reouired icints.
Additionally the cives shon drawines do noe indfrnee all_ only some of the ningle-ve, grnnve bure borIbYve kcMh0e8:
gr w w s for corner joints requh buttering.
1.
Assure that ECA 01/1775 is revised as agreed upon by Mr. Mehta and Mr. Grusetskie Respond how programmatically the vendor is going to determind which joints were v
actually buttered.
actually buttered.
        ,      2b. How programmatically they are going to identify the buttered joints that were Mr'ed.
2b. How programmatically they are going to identify the buttered joints that were Mr'ed.
2c. UE&C shall identify,if any,unsat./ deficient items via the appropriate document.
2c. UE&C shall identify,if any,unsat./ deficient items via the appropriate document.
2d. State when will the documentation be revised / corrected, i       i l
2d. State when will the documentation be revised / corrected, i
Date Required: 4/24/81                                               Approved By:     J. W. Singleton Requested By: h,( f YAEC FOAE h
i l
NOTE: Contractor is requested to respond by memo referring ident. number of this report.                            .
Date Required: 4/24/81 Approved By:
J. W. Singleton Requested By: h,( f h
YAEC FOAE NOTE: Contractor is requested to respond by memo referring ident. number of this report.


      . - . - - -            .y     - . - -                                                                            -.  - . . . . .      . _ . - . . .    . . . . . . .
.y April 29, 1981 BLUE SHEET No. 22A Power Engineering Response:
                                  .                                                                                                    April 29, 1981 BLUE SHEET No. 22A Power Engineering Response:
1.
: 1.         ECA 01/1775 has been revised'to a C revision.
ECA 01/1775 has been revised'to a C revision.
l                           2.           The vendor is going to determine which joints are actually buttered i                           based on the information in the structural steel detail drawings. The structural steel detail drawings are prepared by the vendor, Cives. All
l 2.
    .                          joints that require buttering are indicated on these drawings. The Cives detailed drawings are reviewed and accepted by UE&C Power Engineering.
The vendor is going to determine which joints are actually buttered i
2b.                 All buttered joints are required to be magnetic particle inspected this specification. The vendor will perform MT of all these joints in accordance with this specification.
based on the information in the structural steel detail drawings. The structural steel detail drawings are prepared by the vendor, Cives. All joints that require buttering are indicated on these drawings. The Cives detailed drawings are reviewed and accepted by UE&C Power Engineering.
9 2c. UE&C vendor surveillance is and will identify deficiencies as and when they occur.
2b.
4 2d.                 The UE&C vendor surveillan'ce representative reviewed and accepted
All buttered joints are required to be magnetic particle inspected this specification. The vendor will perform MT of all these joints in accordance with this specification.
                *--            the revised and corrected vendor documentation for the discrepancies reported in this Blue Sheet on April 23, 1981. These were transmitted to the Seabrook site on April 24, 1981 by the vendor.
9 2c.
_nnd /
UE&C vendor surveillance is and will identify deficiencies as and when they occur.
IA7asa%~                 ~
4 2d.
The UE&C vendor surveillan'ce representative reviewed and accepted the revised and corrected vendor documentation for the discrepancies reported in this Blue Sheet on April 23, 1981. These were transmitted to the Seabrook site on April 24, 1981 by the vendor.
_nnd
/
IA7asa%~
~
Martin P. Ha'nson "
Martin P. Ha'nson "
MPH:cao ec: MP Hanson H Shah MA Edgar l                                               JA Crusetskie l
MPH:cao ec: MP Hanson H Shah MA Edgar l
TP Vassallo AJ Hulshizer RC Lesnefsky DC Lambert i                                               RG Blair I
JA Crusetskie l
I
TP Vassallo AJ Hulshizer RC Lesnefsky DC Lambert i
                                        -                            n a .> e-. .                                                      __
RG Blair I
                                            . _ . - . _ . . . . - .            .  ,-. _. , ,.-.-...-_.,___.._..,-.w.                                     .              ,
I n a e-.
,.-.-...-_.,___.._..,-.w.


                                        ~
. -_ '~,~-...
                                            . -_ '~,~-.. .
~
k Q
k Q
                                                  & EACCdbK
& EACCdbK
    . .      .8.               -                                                                                                ,
.8.
                                    ,g              ,g            ~. S     O -s       tW. g 7   / N N ft l//t=?A ) L       i
S O
                                                                                              'PerteM M GL ceMm N/FM dMDd                           ON     M N 8/=/3     M g. + Z   PP 4-1
-s tW. g 7
            @                Aer                 aa ta. ~.-           sur     w<m         cumuone-     aus           m c-(D                    Y W c.              5J&iN,                   ae     'PA'
/ N N ft l//t=?A )
            @                    toeb. h m n 4.i m                               oucTLeV               P:-Am q CQ c.
L i
      .                      4 e 6 d i e v5 e                      o r w t.              ik             saar         n~ .ni~ c     do P4 i
,g
            @                  $UWL-Seit                   882. W h i A t C A @ A #
,g
~.
'PerteM M GL ceMm N/FM dMDd ON M N 8/=/3 M g. + Z PP 4-1 Aer aa ta. ~.-
sur w<m cumuone-aus m c-5J&iN, ae
'PA' (D
Y W c.
toeb.
h m n 4.i m oucTLeV P:-Am q CQ c.
4 e 6 d i e v5 ik saar n~.ni~ c do P4 e
o r w t.
i
$UWL-Seit 882. W h i A t C A @ A #
TitAtMIN & =
TitAtMIN & =
        !.                      /A.i.Dec r/Crw A. Tea AJ                   f.y     Gl W 88 MN h7-f nao g>                 g.cvt eu                   aie
Gl W 88 MN h7-f
_@ TA W D"JK ~                                           H%       iM Ch*
/A.i.Dec r/Crw A. Tea AJ f.y g>
          '@                  Se ustTIEkrea.<J                           Q Uesrta M (D                   h F%c % FSMC                           CAyb /7
g.cvt eu aie nao TA W D"JK ~
              @ ecpmus                                                 debar     DAfGS         UE46 97U -o" '% ~ 4)
H%
iM Ch*
Se ustTIEkrea.<J Q Uesrta M (D
h F%c % FSMC CAyb /7 ecpmus debar DAfGS UE46 97U -o" '% ~ 4) s
---e
,,---,--,+,-,,e.e--,m-en,.
,,,-,,-,ee-
--,e--
- - - - - - -, -., - ~ - - - - - - - ~


h     M.M M   W hh 4.he NhM 9
h M.M M
  ,                                            O     N
W hh 4.he NhM 9
                                              % A                   q-c     /             :
O N
h v ~          A43 e
% A q-c
                                                                      =
/
              =-
h v A43 e
J ANEU[P-L4[LJ6~d-.C_                                       .
~
hi h i Gu4ft% 9                                     '
=
I I
=-
1   .
J ANEU[P-L4[LJ6~d-.C_
hi h i Gu4ft% 9 I
I 1
i l
i l
i-
i-


ow. .-m                                                       e
ow.
* M                 '9'O             4- e e66 ghp   g.       ,,gg,   , ,,  ,p   p         ,    ,
.-m e
M
'9'O 4-e e66 ghp g.
,,gg,
,p p
b U
b U
Y    f
Y09t}
* R 09t}                lb /d.n                 t o ',-to t
lb /d.n t o ',-to R
                                                                        %k
f t
{%Ch(M               A~         W                                     g       .,  , 4U 05?l 'l ' t-I
{%Ch(M A~
      ;m                                                                                                                 ^% .   *
W
      .t I
%k g
4U 05?l 'l ' t-I
;m
^%.
.t I
l
l
    ,i 1
!,i 1
1 4
1 4
1 1
1 1
i i
i i
o e           n e                                   I 9
o e
n e
I 9
u
u


l             . ~ .               . _ . . . . .          . . . . _ . _
l
i                                                      PROCEDURE REVIEW AND PRE-TRAINING RECORD PROC. NO.                                     REV. NO. PRPR NO.
. ~.
      .                  PROCEDURE CORRECTIVE ACTION                                                                                                                               XVI-2                                   04                       001 TITLE INITIAL                           PREPARER                       K.' Swisher                                                             EXT.                           3:I                                         5/27/82 DRAFT
PROCEDURE REVIEW AND PRE-TRAINING RECORD i
          ~
PROC. NO.
ENGINEERING                           C. Scan                                                                   NDE M DISTRIBUTED FOR                               FIELDQk                                 k DOIsk                                                                 T                       NG Vonedantrv/ Sexton QC            bb                      R.                                   bu eM,                                             SYSTEMS M K. Swisher i\'                               V                                                       i                                         II\
REV. NO.
!                        F                         _      f                                                                                                                                   hh
PRPR NO.
        ~~
PROCEDURE CORRECTIVE ACTION XVI-2 04 001 TITLE INITIAL PREPARER K.' Swisher EXT.
                                                              \
3:I 5/27/82 DRAFT
I                         ..
~
!                        INSTRUC 0                                        *
ENGINEERING C. Scan NDE M DISTRIBUTED FOR FIELDQk k DOIsk T
* W" Supe tsor of                               each de; 179 y route the procedure y
NG Vonedantrv/ Sexton R.
t               r.             el in his de                               tme t as                                       a{'                U sp                t        .      Cements s           1                 ocumented by attac i                                                                     eets or by                           .        up the draft.
bu eM, SYSTEMS M K.
p                       Sup               isor shalJ approva                                                         1 comments and return them, with this
QC bb Swisher II\\
[                  e        ,totheQrgearer.
i\\'
COMMENTS U                            -
V i
                                                                                    -          iO                            NTS
F f
                                                                                                                                          /     \C ACTIONS
hh
                                                                                                                                                                      \3                                                 RESPOND BY 6/1/82
\\
                    --                                                                          . OR COMMENT                                                                                                                               -
I
_      NEWd-'
~~
(      j                                                                f               R CO'                                                                   -
*
CONCUR
* W" INSTRUC 0 a{'
                .V                                                               h                                                                                                               PLEASE RETURN. PRIOR TO ISSUE I
route the procedure 179 y Supe tsor of each de; U
PERSONNEL WITH INPUT                                     \N                                           d)
sp t
SUPERVISOR
Cements y
                                                                                                                  ,            ITLE                                                                                         DATE EVALUATION                                         W      C0                                 VALUATED                                                                                     SUBSEQUENT DRAFT REQUIRED                                       ;
t r.
g OF COMMENTS                                               DISCU                             WITH SIGNATORIES                                                                     _ MEETING REQUIRED RETURNED PRPR EXCEPTIONS PREPARER                                                                                            DATE                                      ro ,/4/8 '2-t TYPED AND PROOFREAD                                                                                                           REVIEWED BY PREPARER l                  p DOCUMENT CONTROL SPECIALIST: (                                                                             m                                               ure               DATE [o- A/-[$L FINAL DR' APT                     REVIEWED, FINAL COMMENTS INCORPORATED, AND APPROVED BY:
el in his de tme t as s
APPROVAL dA PSI!PV.-SYSTEMS dv/n. e c-
1 ocumented by attac i eets or by up the draft.
                                                                            'DATE                 CHIEF FIEfD ENGINEi!R Ma9f ~.                                DATE 01hi OA FANAGER e n 4 z.
p Sup isor shalJ approva 1 comments and return them, with this
DATF            _o i                                                       79 "
,totheQrgearer.
                                                                                    . CHIEF FIELD ENG. c- d.'                                                                                 VF9                     QA MANAGER (
[
        ;                PRE-TRAINING
e
        ;        , *xREQUIREMENTS                           PERSONNEL OR GROUPS TO BE PRE-TRAINED                                                                                                           ,, -     ,c r . o L M . s C od h _ ECM '                    '
/
                        )
\\
                      ~ PRE-TRAINING COMPLETED BY TRAINING OFFICER:                                                                                                                                                               DATE
\\3 U
                                                                                                                                                                                                                                                                                      ~
iO NTS ACTIONS RESPOND BY 6/1/82 C
[              QA SYSTEMS                                             ALL PRPR'S ACCOUNTED FOR                                                                         "'"'
COMMENTS OR COMMENT NEWd-'
ALL PRE-TRAINING RECORDS ATTACHED CLOSEOUT DATE                          QA SUPV. AC130WLEDGEMENT                                                            DATE RECORDS:                           DOC. CONTROL SPEC.
f R CO'
l ...- _ _.. _ .__, . . _ _ _ _ , . , , _ _ .                _ _ _                            _      , _ _ . . . _ _ . . _ _              _ _ _ _ _ _ _ _ _ _ _ _ , _ _ , _ _ _ , _ _ _ _                                          . _                _                _ , _ .
(
j CONCUR
.V h
PLEASE RETURN. PRIOR TO ISSUE I
PERSONNEL WITH INPUT
\\N d)
SUPERVISOR ITLE DATE W
EVALUATION C0 VALUATED SUBSEQUENT DRAFT REQUIRED OF COMMENTS g DISCU WITH SIGNATORIES
_ MEETING REQUIRED RETURNED PRPR EXCEPTIONS ro,/4/8 '2-PREPARER DATE t
l TYPED AND PROOFREAD REVIEWED BY PREPARER p
DOCUMENT CONTROL SPECIALIST: (
m ure DATE [o-A/-[$L FINAL DR' APT REVIEWED, FINAL COMMENTS INCORPORATED, AND APPROVED BY:
APPROVAL dA dv/n. e c-Ma9f ~. 01hi PSI!PV.-SYSTEMS e n 4 z.
'DATE CHIEF FIEfD ENGINEi!R DATE OA FANAGER DATF
_o i
79 "
. CHIEF FIELD ENG.
c-d.'
VF9 QA MANAGER (
PRE-TRAINING
*xREQUIREMENTS PERSONNEL OR GROUPS TO BE PRE-TRAINED
,, -,c r. o L M. s C od h _ ECM '
)
~ PRE-TRAINING COMPLETED BY TRAINING OFFICER:
DATE
[
QA SYSTEMS ALL PRPR'S ACCOUNTED FOR ALL PRE-TRAINING RECORDS ATTACHED
~
CLOSEOUT RECORDS:
DOC. CONTROL SPEC.
DATE QA SUPV. AC130WLEDGEMENT DATE l...- _ _.. _.__,.. _ _ _ _,.,, _ _.


                                                                                                                                                                    ~~     ~                 ~           ~       ~ ~~ ~
~~
                      .              ,.                                                  CORRECTIVE ACTION FOR SIGNIFICANT CONDITIONS ADVERSE TO QUALITY i
~
a 1.0 SCOPE '1 .        This procedure provides measuresto assure that conditions adverse to quality which s               have been identified as being significant per Paragraph 2.0 are investigated.                                                                                                                     l corrected, documented and verified.
~
~
~ ~~ ~
CORRECTIVE ACTION FOR SIGNIFICANT CONDITIONS ADVERSE TO QUALITY i
a 1.0 SCOPE
'1 This procedure provides measuresto assure that conditions adverse to quality which f
s have been identified as being significant per Paragraph 2.0 are investigated.
corrected, documented and verified.
1.2 Corrective measures established herein are in addition to corrective measures accomplished through the NCR, SWO, and audit systems.
1.2 Corrective measures established herein are in addition to corrective measures accomplished through the NCR, SWO, and audit systems.
i 2.0 POLICY 2.1 This procedure describes the use of the Corrective Action Report (CAR) (see Appendix
i 2.0 POLICY 2.1 This procedure describes the use of the Corrective Action Report (CAR) (see Appendix A).
                ,                          A). CARS are not required when corrective action is adequately accomplished through                                                                                                             i
CARS are not required when corrective action is adequately accomplished through i
          ;,                                other corrective action systems such as NCRs SW0s, and AARs, but may be generated under any of the following conditions.
other corrective action systems such as NCRs SW0s, and AARs, but may be generated under any of the following conditions.
i                                 2.1.1 When corrective action through another system (see Para. 2.1) is not timely                                                                                                           -
i 2.1.1 When corrective action through another system (see Para. 2.1) is not timely or adequate.
or adequate.
2.1.2 When programatic conditions adverse to quality are identified through trend analysis or audit.
2.1.2 When programatic conditions adverse to quality are identified through trend analysis or audit.
2.1.3 When a higher level of priority is required for resolution of conditions adverse to. quality which have been identified as significant.
2.1.3 When a higher level of priority is required for resolution of conditions adverse to. quality which have been identified as significant.
                              ''. 2 CARS require response within five (5) working days by the organization responsible j for implementing corrective action. Response shall include immediate corrective
'' 2 CARS require response within five (5) working days by the organization responsible j
                  -          s              action to be teken and completed within five (5) working days. Immediate corrective action may include a schedule for completion of proposed corrective action when such corrective action exceeds a fire workday period for projected implementation, and is authorized by the QA Manager or designee. Any CAR responsa not received by the due
for implementing corrective action. Response shall include immediate corrective s
          -                                data shall be referred directly to the QA Manager and Resident Construction Manager for action.                                                                                                                                           q 3.0 INITIATING THE CAR                                                                                       h                                      ()    h                                ,
action to be teken and completed within five (5) working days. Immediate corrective action may include a schedule for completion of proposed corrective action when such corrective action exceeds a fire workday period for projected implementation, and is authorized by the QA Manager or designee. Any CAR responsa not received by the due data shall be referred directly to the QA Manager and Resident Construction Manager for action.
            !                3.1 CARS shall be initiated by the QA Supervisor, or his designee, at the direction
q h
:l                               of the QA Manager. Sections 1 through 3 shall be comp a                                                                                               s indicated below.
()
            ;                              Section 1 - Enter the governing requirement (s) (spec. , manual, code, etc.)
h 3.0 INITIATING THE CAR 3.1 CARS shall be initiated by the QA Supervisor, or his designee, at the direction
                      'v                   Section 2 - Identify the basis of the CAR (trend analysis, NCR, audit finding, etc.)
:l of the QA Manager. Sections 1 through 3 shall be comp a s indicated below.
Section 1 - Enter the governing requirement (s) (spec., manual, code, etc.)
'v Section 2 - Identify the basis of the CAR (trend analysis, NCR, audit finding, etc.)
Section 3 - Enter the description of the condition (s) adverse to quality (CATQ).
Section 3 - Enter the description of the condition (s) adverse to quality (CATQ).
t I
t h
h                                                      Itemize each specific area for which corrective action is to be addressed.
Itemize each specific area for which corrective action is to be addressed.
The description cif conditions adverse to quality shall be signed by the QA Supervisor ant the QA Manager.
I The description cif conditions adverse to quality shall be signed by the QA Supervisor ant the QA Manager.
3.2                \JJM                                                                                                 b                                 The QA~ Supervisor or
\\JJM b
The QA~ Supervisor or 3.2
_ designee will assign the next sequential CAR number and enter the date the CAR was
_ designee will assign the next sequential CAR number and enter the date the CAR was
                            .s             typed in the heading of the CAR form. At this time, the date the corrective action i         response is dus will also be entered in Section 4. The response due date shall not be longer than five (5) working days from the date indicated in the heading unless
.s typed in the heading of the CAR form. At this time, the date the corrective action i
            ;                              authorized by the QA Manager or designee as documented by signature adjacent to an extended response date.                                                                                                                                                                       -
response is dus will also be entered in Section 4.
j         1 l
The response due date shall not be longer than five (5) working days from the date indicated in the heading unless authorized by the QA Manager or designee as documented by signature adjacent to an extended response date.
j 1
l


l
~-
; --                                                                        ~-
Q l-]O 3.'3 The QA Supervisor o designee hall then enter the CAR on a CAR log and handcarry the CAR and obtain sw = wres as required in Section 3.
                                          ,                                                                  Q l-]O 3.'3           The QA Supervisor o designee hall then enter the CAR on a CAR log and handcarry I
the CAR and obtain sw = wres as required in Section 3.
4.0 ACKNOWLEDGEMENT OF CONDITIONS ADVERSE TO QUALITY (CATQ)
4.0 ACKNOWLEDGEMENT OF CONDITIONS ADVERSE TO QUALITY (CATQ)
                                '.1             The department head or designee responsible for assuring the completion of corrective action shall review the CAR and acknowledge the CATQ by signing Section 3. Editorial corrections to specified'CATQ (for purpose of clarity) may be'made after consultation with the-QN Manager.
'.1 The department head or designee responsible for assuring the completion of corrective action shall review the CAR and acknowledge the CATQ by signing Section 3.
    -i -5.0 - DISTRIBUTION
Editorial corrections to specified'CATQ (for purpose of clarity) may be'made after consultation with the-QN Manager.
              ~~                                        ~
-i -5.0 - DISTRIBUTION
5'.i. ihe QA Supervisor or designee will distribute copies of the CAR to *the following personnel-as a minimum.
~~
5'.i. ihe QA Supervisor or designee will distribute copies of the CAR to *the following
~
personnel-as a minimum.
5.1.1 Resident Construction Manager
5.1.1 Resident Construction Manager
:_. ._ __ ..--3.1. 2 -- QA Manager-
:_.._ __..--3.1. 2 -- QA Manager-5.1.3 QA Supervisor - Systems 5.1.4 Responsible Department Head 5.1.5 Director of QA (through Monthly Advisory Report)
:                                        5.1.3             QA Supervisor - Systems
~ ~ '. 6. 0 CORRECTIVE ACTION &~ ACTION TO PREVENT RECURRENCE 6.1 The dapartment head shall identify the individual (assignee) who shall respond to the CAR by the date indicated in Section 4 (Response Due By).
            !                                    5.1.4             Responsible Department Head 5.1.5 Director of QA (through Monthly Advisory Report)
._.A 2 The response sha11 be recorded on individual CAR Response forms (Appendices B & C) which are to be attached to the CAR. Separate response forms shall be used to address each Item identified in Section 3 as follows.
  ~ ~ '. 6. 0 CORRECTIVE ACTION &~ ACTION TO PREVENT RECURRENCE 6.1 The dapartment head shall identify the individual (assignee) who shall respond to the
          ;              -                      CAR by the date indicated in Section 4 (Response Due By).                                            .
                          ._.A 2 The response sha11 be recorded on individual CAR Response forms (Appendices B & C) which are to be attached to the CAR. Separate response forms shall be used to address each Item identified in Section 3 as follows.
6.2.1 Action taken to correct the CATQ.
6.2.1 Action taken to correct the CATQ.
6.2.2 Date when action taken to correct the CATQ will be completed, or schedule for completion of corrective action (see Para. 2.2).                             When the " schedule option" is exercised, progress on corrective action implementation shall be reported per Para. 8.3 through 8.5.
6.2.2 Date when action taken to correct the CATQ will be completed, or schedule for completion of corrective action (see Para. 2.2).
6.2.3               Action taken to prevent recurrence of the CATQ.
When the " schedule option" is exercised, progress on corrective action implementation shall be reported per Para. 8.3 through 8.5.
6.2.4               Data when action taken to prevent recurrence of the CATQ will be completed, or scheduled (see Para. 6.2.2) for completion.
6.2.3 Action taken to prevent recurrence of the CATQ.
          . 7.0 EVALUATION OF RESPONSES 7.1 Evaluation of CAR Responses will be completed by = d d e =ented on each CAR Response form (Appendices B & C) by the CA Supervisor                                       is design
6.2.4 Data when action taken to prevent recurrence of the CATQ will be completed, or scheduled (see Para. 6.2.2) for completion.
[/[7 .
. 7.0 EVALUATION OF RESPONSES 7.1 Evaluation of CAR Responses will be completed by = d d e =ented on each CAR Response form (Appendices B & C) by the CA Supervisor is design
:i                     7.2 The " Response Received By" will be signed and dated as received.
[/[7
7.3 Each response will be reviewed for acceptance. (A)                                               07 -
:i 7.2 The " Response Received By" will be signed and dated as received.
hp                                         ;
7.3 Each response will be reviewed for acceptance. (A) 07 hp i
i


m                                                                                               -
m
                              ' 7.3.1 Unsatisfactory responses willbe so indicated by checking the tpproprieta
' 7.3.1 Unsatisfactory responses willbe so indicated by checking the tpproprieta box. The " Comments" portion of the original response sheet will be marked with the date the response was returned tu the Assignee and the comments appropriate to the unsatisfactory response. The original response will be retained and a copy forwarded to the Assignee for preparation of a satisf.actory responS6.
                  -                      box. The " Comments" portion of the original response sheet will be marked with the date the response was returned tu the Assignee and the comments
  ,                                      appropriate to the unsatisfactory response. The original response will be retained and a copy forwarded to the Assignee for preparation of a satisf.actory responS6.
i.3.2 Satisfactory responses will be so indicated by checking the appropriate box.
i.3.2 Satisfactory responses will be so indicated by checking the appropriate box.
Signature of the QA Manager or QA Supervisor also indicates acceptance of a
Signature of the QA Manager or QA Supervisor also indicates acceptance of a
                                          " schedule" for corrective action, if applicable.
" schedule" for corrective action, if applicable.
8.0 FOLLOW-UP 8.1 Satisfactory CAR responses will be returned to the Assignee responsible for effecting remedial and/or preventative corrective action.
8.0 FOLLOW-UP 8.1 Satisfactory CAR responses will be returned to the Assignee responsible for effecting remedial and/or preventative corrective action.
8.2 The Assignee shall follow up on each response to assure completion of corrective action within the committed time frame (normally within five (5) days, unless a schedule for completion or extension has been approved.       (see Para. 2.2).
8.2 The Assignee shall follow up on each response to assure completion of corrective action within the committed time frame (normally within five (5) days, unless a schedule for completion or extension has been approved.
8.3 CAR Responses which include an approved schedule for completion shall be followed up and documented by the Assignee weekly on a Corrective Action Progress Report
(see Para. 2.2).
  .                              (Appendix D). The report shall reference the CAR number and CAR Item number and shall include the following as a =4n4=nm.
8.3 CAR Responses which include an approved schedule for completion shall be followed up and documented by the Assignee weekly on a Corrective Action Progress Report (Appendix D).
The report shall reference the CAR number and CAR Item number and shall include the following as a =4n4=nm.
8.3.1 Date the report was submittted.
8.3.1 Date the report was submittted.
8.3.2 Name of Assignee (see Para. 6.1) 8.3.3 Name of the individual (s) with responsibility for acting on the CAR Item. '
8.3.2 Name of Assignee (see Para. 6.1) 8.3.3 Name of the individual (s) with responsibility for acting on the CAR Item. '
8.3.4   The action taken during the reporting period.
8.3.4 The action taken during the reporting period.
8.3.5   The present status of the CAR Item.
8.3.5 The present status of the CAR Item.
8.4 The Assignee shall submit a copy of the Corrective Action Progress Report to the QA Supervisor or his designee and retain the original. The original report may be '
8.4 The Assignee shall submit a copy of the Corrective Action Progress Report to the QA Supervisor or his designee and retain the original. The original report may be used for subsequent reporting until ffiled.
used for subsequent reporting until ffiled.
8.5 When corrective action has been completed, all original progress reports will be forwarded to the QA Supervisor or his designee.
8.5 When corrective action has been completed, all original progress reports will be forwarded to the QA Supervisor or his designee.
9.0 VERIFICATION OF CORRECTIVE ACTION TAKEN 9.1 Verification of implementation of corrective and preventacive action shall be made within five (5) working days of the dates indicated on the CAR Response.           gA\f[3 9.2 Verification shall be accomplished and recorded by the QA Supervisor orJhi designee on each CAR Response. Responses for which weekly progress reports (Appen3IR u) are submitted shall be documented under " Weekly Progress Report Dates".
9.0 VERIFICATION OF CORRECTIVE ACTION TAKEN 9.1 Verification of implementation of corrective and preventacive action shall be made within five (5) working days of the dates indicated on the CAR Response.
)                   9.3 When corrective and preventative action has been verified the CAR response sheets can be closed out by dating and signature by the QA Supervisor or his designee.
gA\\f[3 9.2 Verification shall be accomplished and recorded by the QA Supervisor orJhi designee on each CAR Response. Responses for which weekly progress reports (Appen3IR u) are submitted shall be documented under " Weekly Progress Report Dates".
)
9.3 When corrective and preventative action has been verified the CAR response sheets can be closed out by dating and signature by the QA Supervisor or his designee.
4 CARS will be closed out only after all individual' CAR responses have been closed out.
4 CARS will be closed out only after all individual' CAR responses have been closed out.
(
(~9. 5 Any CAR Responses not closed out by the committment date shall be referred directly to the QA Manager and Resident Construction Manager for action.
                  ~9. 5 Any CAR Responses not closed out by the committment date shall be referred directly to the QA Manager and Resident Construction Manager for action.


          '.0. 0 RECORDS 10.1 The QA Supervisor or hi designee shall maintain a CAR Log. The log shall identify the CAR by number, date             , basis (see Para. 3.1, Section 2), and date   ,
'.0. 0 RECORDS 10.1 The QA Supervisor or hi designee shall maintain a CAR Log. The log shall identify the CAR by number, date
closed.                                                                             '
, basis (see Para. 3.1, Section 2), and date closed.
                                .2 Closed out CARS and appurtenent reports shall be maintained in accordance with Procedure XVII-3.
.2 Closed out CARS and appurtenent reports shall be maintained in accordance with Procedure XVII-3.
10.3 All CAR records shall be made available to the ANI upon request.
10.3 All CAR records shall be made available to the ANI upon request.
i l
i l
e 9
e 9
T
T
                /           \
/
                \   . -.
\\
\\
6 I
6 I
x
x l.
                \
\\v l.
v l.
l.


_ _, _ _./lyp.v J.< r, ._ . _
_ _, _ _./lyp.v J.< r,._. _
DATE-* ~
DATE-*
CORRECTIVE ACTION REPORT           . CAR NO.
CORRECTIVE ACTION REPORT
CUSTOMER: UE&C PROJECT:           SEABROCK STATION PAGE 1 of 1.
. CAR NO.
~
CUSTOMER: UE&C PROJECT:
SEABROCK STATION PAGE 1 of 1.
GOVERNING REQUIREMENT:
GOVERNING REQUIREMENT:
                          ..        ' BASIS OF CAR:
' BASIS OF CAR:
: 3.         CONDITIONS ADVERSE TO QUALITY (itemize):
3.
CONDITIONS ADVERSE TO QUALITY (itemize):
l t
l t
s g                                                     .
s g
i           ;      .
i gs T
g s
i s
T i
l l
s l
l       .
t I
t I
l                   PREPARED BY                                       APPROVED BY                   ACKNOWLEDGED BY
l PREPARED BY APPROVED BY ACKNOWLEDGED BY
        ^           ~
^
RESPONSE DUE BY:                                       EXTENSION APPROVED BY:
~
(            L '}4. ALL CAR RESPONSES i
RESPONSE DUE BY:
l                                 COMPLETED AND VERIFIED l t                                       .
EXTENSION APPROVED BY:
! -                                      y t
L '}4.
r   !
(
* QA SUPERVISOR           .DATE         QA MANAGER               DATE i ,
ALL CAR RESPONSES i
l
l COMPLETED AND VERIFIED l t y
r QA SUPERVISOR
.DATE QA MANAGER DATE t
i l


    ,, . .,        _ m .,_...
_ m.,_...
                                                                                                                                              )';Cb dit C AR NO.
)';Cb dit C AR NO.
CAR RESPONSE (REMEDIAL ACTION)
CAR RESPONSE (REMEDIAL ACTION)
PAGE                     of           :
PAGE of
                          'REPARED BY:
'REPARED BY:
ACTION TAKEN TO CORRE'CT' CONDITIONS ADVERSE TO QUAL 1TY (CATQ):
ACTION TAKEN TO CORRE'CT' CONDITIONS ADVERSE TO QUAL 1TY (CATQ):
(CONTINUED ON ATTACHED SHEET:
(CONTINUED ON ATTACHED SHEET:
DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED:                                             ~ SCHEDULE ATTACHED: YES/NO RESPONSE RECEIVED BYi'                                       'DATE:                             SAT                   UNSAT COMMENTS:
DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED:
            ,          t                     .
~ SCHEDULE ATTACHED: YES/NO RESPONSE RECEIVED BYi'
ACTION TAKEN TO~ CORRECT CATQ'i                           ,
'DATE:
4 4
SAT UNSAT COMMENTS:
l (CONTINUED ON ATTACHED SHEET)
t ACTION TAKEN TO~ CORRECT CATQ'i 4
DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED                                               SCHEDULE ATTACHED: YES/NO RESPONSE RECEIVED BY:                                         DATE:                             SAT                 UNSAT WEEKLY PROGRESS REPORT DATES                                 FOLLOW-UP CORRECTIVE ACTION COMPLETED:
4 l
(CONTINUED ON ATTACHED SHEET)
DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED SCHEDULE ATTACHED: YES/NO RESPONSE RECEIVED BY:
DATE:
SAT UNSAT WEEKLY PROGRESS REPORT DATES FOLLOW-UP CORRECTIVE ACTION COMPLETED:
VERIFICATION CORRECTIVE ACTION VERIFIED i
VERIFICATION CORRECTIVE ACTION VERIFIED i
_ /-
_ /-
          "                  " * * ' * ' '          9                                               . - * .              _ . . , . . . . _            ,
9


i y y .i a r
r i y y.i a v.
v.
NO.
NO.
CAR RESPONSE ITEM NO.
CAR RESPONSE ITEM NO.
        ,                                                                    (PREVENTATIVE ACTION)
(PREVENTATIVE ACTION)
        ;                                                                                                                                                                    PAGE             of
PAGE of
                          ' 'REPARED BY:
' 'REPARED BY:
                      ,_ ACTION _ TAKEN TO CORRECT CONDITIONS ADVERSE TO QUALITY (CATQ):
,_ ACTION _ TAKEN TO CORRECT CONDITIONS ADVERSE TO QUALITY (CATQ):
l C
l C
(CONTINUED ON ATTACHED SHEET DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED:                                                                             SCHEDULE ATTACHED: TES/NO RESPONSE RECEIVED BY:'                                                   'DATE:                                                         SAT                   UNSAT COMMENTS:
(CONTINUED ON ATTACHED SHEET DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED:
SCHEDULE ATTACHED: TES/NO RESPONSE RECEIVED BY:'
'DATE:
SAT UNSAT COMMENTS:
l.
l.
N*
N*
                        \                                                                                                                     .
\\
l                   ACTION TAKEN TO CORRECT CATQ':
l ACTION TAKEN TO CORRECT CATQ':
i (CONTINUED ON ATTACHED SHEET)I
i (CONTINUED ON ATTACHED SHEET)I DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED SCHEDULE ATTACHED: YES/NO J
          ,                  DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED                                                                             SCHEDULE ATTACHED: YES/NO                                 J RESPONSE RECEIVED BY:                       .                              DATE:                                                         SAT                 UNSAT                   l
RESPONSE RECEIVED BY:
                    .        WEEKLY PROGRESS REPORT DATES                                             FOLLOW-UP CORRECTIVE ACTION COMPLETED:                                                                             )
DATE:
l VERIFICATION CORRECTIVE ACTION VERIFIED i                                                                                                                                               .
SAT UNSAT WEEKLY PROGRESS REPORT DATES FOLLOW-UP CORRECTIVE ACTION COMPLETED:
                                                                                                                                                                                                        , . _ _ .I
l VERIFICATION CORRECTIVE ACTION VERIFIED i
,. _ _.I


                    -- . . _~                                         .                    . . . _ . . -                            .                -.
--.. _~
kxC1 dI*             J CAR NO.
kxC1 dI*
J CAR NO.
* CORRECTIVE ACTION ITEM NO*
* CORRECTIVE ACTION ITEM NO*
PROGRESS REPORT PAGE     OF
PROGRESS REPORT PAGE OF
                                        .DATE           ASSIGNEE _                                   ACTION ~B;                         FOLLOW UP ACTIONS AND STATUS e
.DATE ASSIGNEE _
ACTION ~B; FOLLOW UP ACTIONS AND STATUS e
e 9
e 9
0
0
    . . , . . ~ . - -               . + . . .            - . .            , - . .
..,.. ~. - -
l
. +...
(. ,r                                                                                                   ,                      -
(.,r l
1 1
l l
l l
l l
4 i
4 i
                        .                                                                                                                                                                        1
t l -
        . ,                                                                                                                                                                                    l l
*we'ne-..eww
t l-
                      *we'ne-..eww                 -                                .,


                                    ~--                       -  ~~ ~           ~
~--
      ~
~~ ~
~
ic.9. w i
ic.9. w i
                                                  ".. .*        . BLUE SHEET                                 ius , - e 4.2.7 FORM - 001 PAGE       1   OF 1 SEABROOK STATION MAR 9- 1932                                                                         038C NO' REQUEST FOR FOLLOW-UP ACTION
~
                          - .;b[..',bbic i
. BLUE SHEET ius, - e 4.2.7 FORM - 001 PAGE 1
Ji.  '. ..: . .        NRC INSPECTIONS TO:     UE&C RCM/ Power Engineering 9 VL/        DATE:     3/9/82 Inspection item
OF 1 SEABROOK STATION MAR 9-1932 038C NO' REQUEST FOR FOLLOW-UP ACTION
-.;b[..',bbic J i.
NRC INSPECTIONS i
9 VL/
TO:
UE&C RCM/ Power Engineering DATE:
3/9/82 Inspection item


== Description:==
== Description:==
The welding of attachments across                 UNIT:       1&2 i                 (transverso to the beam axis) the tension flange of beams except as shown on UE&C design drawing is not permitted unless approved by the construction managers. All of UESC Specific'ations address this area differently.
The welding of attachments across UNIT:
            .e.m.-
1&2 i
(transverso to the beam axis) the tension flange of beams except as shown on UE&C design drawing is not permitted unless approved by the construction managers. All of UESC Specific'ations address this area differently.
.e.m.-
O,
O,
                    -drrective Action Required:       Ref. UE&C Memo S/L CE1652, dated Nov. 19, 1981 and UE&C Power Engineering Letter, Feb. 5, 1982, response to B.S. 038A and 038B:
-drrective Action Required:
: 1. Torsion limitations are outlined on inemo MM7610. This memo has not been utilized in support design for cable tray and conduit supports. Realizing torsion is not accounted for, for normal design loading, how does UE&C, account for torsional i
Ref. UE&C Memo S/L CE1652, dated Nov. 19, 1981 and UE&C Power Engineering Letter, Feb. 5, 1982, response to B.S. 038A and 038B:
i                         loadinn in structural framing for the above mentioned supports?
1.
l l                                                                                                                               .
Torsion limitations are outlined on inemo MM7610. This memo has not been utilized in support design for cable tray and conduit supports. Realizing torsion is not accounted for, for normal design loading, how does UE&C, account for torsional i
1 A               l
i loadinn in structural framing for the above mentioned supports?
                                            , ,n
l l
                                                                                                                ~
1 A
Date Required: 3k2                                                  Approved WW. SiGeton
                                                                                                        -                          j Requested By:((
l
l
                                                                                                    /YIEC'FOAE ((                   l 1
,,n Date Required: 3k2 Approved WW. SiGeton
NOTE: Contractor is requested to respond by memo referring ident. number of this report.
~
j Requested By:((
/YIEC'FOAE ((
l NOTE: Contractor is requested to respond by memo referring ident. number of this report.


g P.es3 JRef.7,e '90 21:13 tMT SET.BR00lf STATION - 9763
g P.es3 JRef.7,e '90 21:13 tMT SET.BR00lf STATION - 9763
                  , FORM 3500 MEMORANDUM
, FORM 3500 MEMORANDUM
[uilimdsitgDtsama                                       -
[uilimdsitgDtsama W.
O m et:       Philadelphia W.            9763.006 Dan.; ~ Engineering - Power Division                                                       Dire          March 23, 1982 mi-8802A To:                     Hareesh Shah - Field                                               COPIES:       See Distribution
9763.006 O m et:
* File No.:       1.0.1.22 No Response Required psgou ,                 D. D. Boyle - 06UO SusJacT:       Public Service Company of New Hampshire Seabrook Station j
Philadelphia Dire March 23, 1982 Dan.; ~ Engineering - Power Division mi-8802A To:
Hareesh Shah - Field COPIES:
See Distribution File No.:
1.0.1.22 No Response Required psgou,
D. D. Boyle - 06UO SusJacT:
Public Service Company of New Hampshire Seabrook Station j
Weldina to Dean Flanac;3,,- Blue Sheet 38C
Weldina to Dean Flanac;3,,- Blue Sheet 38C
                                          '              '      ~-
~-
References         W-8039A - Response to Blue Sheet 38 m-8470A - Responsa to Blue Sheet 38A Attached response to Blue Sheet 383 Inspection Item Description _of Blue Sheet 38C                                       .
References W-8039A - Response to Blue Sheet 38 m-8470A - Responsa to Blue Sheet 38A Attached response to Blue Sheet 383 Inspection Item Description _of Blue Sheet 38C "The welding of attachments across (transverse to the beam axis) the
                              -                  "The welding of attachments across (transverse to the beam axis) the
: tension flange of beams except as shown on UE&C design drawing is not
: tension flange of beams except as shown on UE&C design drawing is not
                ._ /-g':;                      permitted unless approved by the construction manasers. All of UE&C N ,/ -                     Specifications address this area differently."
._ /-g permitted unless approved by the construction manasers.
All of UE&C N,/ -
Specifications address this area differently."
Corrective Action Raouired:
Corrective Action Raouired:
                                                  "Raf. UEEC memo S/L CE1652, dated November 19, 1981 and UE&C Power j
"Raf. UEEC memo S/L CE1652, dated November 19, 1981 and UE&C Power j
                                                -Engineering Letter, February 5,1982, response to 3.S. 038A and 0385:
-Engineering Letter, February 5,1982, response to 3.S. 038A and 0385:
        -l                                     1.         Torsion limitatiota are outlined on memo M -7610. This memo has not been utilized in support design for cable tray and conduit
-l 1.
                    .-                                      supports. Realizing torsion is not accounted for, for hermal design loading, how does UE&C account for torsional loading in
Torsion limitatiota are outlined on memo M -7610.
        ,l
This memo has not been utilized in support design for cable tray and conduit supports. Realizing torsion is not accounted for, for hermal
        .i                                                  structural framing for the above mentioned supports?"
,l design loading, how does UE&C account for torsional loading in structural framing for the above mentioned supports?"
i
.i i
:                                    Responses t                                                                                               .
Responses t
This is not a deficiency.
This is not a deficiency.
      ' i                                         No corrective action is required.
' i No corrective action is required.
l l           l                                     Discussion:
l l
        'l                    '
l Discussion:
The allowable torsion curves contained in memo M-7610 have been used in the design of crble tray and conduit supports where torsion is unavoidable.
The allowable torsion curves contained in memo M-7610 have been used in
e        At the top of t'..e curves in the memo it clearly states, "for conduit supports." s In drawins 300228, Rev.16, conduit tables are provided on sheets 12C and-12C1 providing the minimum size building steel for the support types. Thess 1
'l the design of crble tray and conduit supports where torsion is unavoidable.
l
At the top of t'..e curves in the memo it clearly states, "for conduit supports." s e
:          i                                                                                                                                                                         -
In drawins 300228, Rev.16, conduit tables are provided on sheets 12C and-Thess 12C1 providing the minimum size building steel for the support types.
l
1 l
                                                                                                  .    . ~ . . - - . . . . _ . . . . . . . . , _ _ , _                           ,,,
i l
. ~.. - -.... _........, _ _, _


                                      . . - - - - ._ 2... : ~. - .                   L               . _ _ _ . _        _
.. - - - -._ 2... : ~. -.
g p,gg4 Jr.w.go.'ee 21:15 ant sr.ns :ook sinTION - 9733 4
L g
i                                                                                                                     .
Jr.w.go.'ee 21:15 ant sr.ns :ook sinTION - 9733 p,gg4 4
Discussions                       (Cont'd.)
2-i Discussions (Cont'd.)
building steel tables were developed using the same allowable beam torsion curves as used for the~ design of pipe supports. The Conduit Notes and details on sheet 3E note F.4.C. states, "The method of attaching to steel
building steel tables were developed using the same allowable beam torsion curves as used for the~ design of pipe supports. The Conduit Notes and details on sheet 3E note F.4.C. states, "The method of attaching to steel
    -- -_.                      _ ___ ._ framing and welding details for these attachments shall remain as shown and noted on the sheets included in these notes and details." Supports are i !_______ _____shown_od beam centerline or with the limits of off center supports as shown on sheet C-12.
_ ___._ framing and welding details for these attachments shall remain as shown and noted on the sheets included in these notes and details." Supports are i
                                            ~~ The Cable Tfay~ System Notes and Details sheet 3B note 7.4.C repeats the quota-
_____shown_od beam centerline or with the limits of off center supports as shown on sheet C-12.
      '                                                ^
~~ The Cable Tfay~ System Notes and Details sheet 3B note 7.4.C repeats the quota-
^
tion above and attachments ara shown on the beam centerlines. ECA-013152A of
tion above and attachments ara shown on the beam centerlines. ECA-013152A of
                                          ~ ~ March'~5, 1982~recently reemphasized that: "for support details which attach
- --_~
          - --_~
~ ~ March'~5, 1982~recently reemphasized that:
to the bottom flanges of structural steel beams, the location of the support
"for support details which attach to the bottom flanges of structural steel beams, the location of the support attachment shall be restricted to the centerline of the affected beam,
        ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~
* attachment shall be restricted to the centerline of the affected beam,
exceptions to be submitted to site engineering for approval. Any support
                                    -            exceptions to be submitted to site engineering for approval. Any support
+
        +             . . - , - -                which-does-not-mast above mentioned criteria is to be documented in the form of as-built".                   _
which-does-not-mast above mentioned criteria is to be documented in the form of as-built".
As previously discussed in 101-8470A, response to Blue Sheet 38A, UE&C will.                                                                 !
101-8470A, response to Blue Sheet 38A, UE&C will.
    -,                  .-- .- . ' Irun a beam design verification program after major installations have been
As previously discussed in
: r.       :
.--.-. ' Irun a beam design verification program after major installations have been r.
                                                ~
. completed. The program will detect'any overload conditions, including any
                                                  . completed. The program will detect'any overload conditions, including any
~
    - - . .            _.- __--_ torsional.. loads.
_.- __--_ torsional.. loads.
If you_should have any questions, please call.
If you_should have any questions, please call.
                          .m
.m g
                                                                      + - - ,
+ - -,
g
/
                                /
o f
o f             _ ,
D. D. Bo l
D. D. Bo l                                                 DDB/ cod 8
DDB/ cod 8
              ;                                    Attachment-i I                                                                       -
Attachment-i I
t t
t t
I g
I g
O U
OU I
I d
d
            'h                                                                                                                                                                                     <
'h
                                                                                                                        - - ~ ~       - - - - . . - . . . - . .      _ , . _            _,,_
- - ~ ~


[
[
nw.2s.'ee 2: is ont str.exoor sinTrow - srss                                                                                                                                                           P.ees RESPONSE TO ELtTE SHEET #38B
nw.2s.'ee 2: is ont str.exoor sinTrow - srss P.ees RESPONSE TO ELtTE SHEET #38B 1(a) Estimated uniformly distributed load due to equipment and piping along with Dead, Live and other design loads are considered in the design sf all structural framing members per procedures stated in the Structural Design Criteria (SD-66), Pages 18 through 24. The containment annulus steel framing has also been re-evaluated based on frequency criteria (thus assuring low stress levels) per the General Proceduras for Re-svaluation of Cont =4= ant Annulus Steel Framing (Appendix to SD-66).
                                .                                          .          1(a) Estimated uniformly distributed load due to equipment and piping along                                                                                                       -
Any secondary stress which could be imposed on the framing due the i
with Dead, Live and other design loads are considered in the design sf
configuration of attachments of supplementary and support connections is not considered separately at this stage of design and construction.
                            .                                                                                              all structural framing members per procedures stated in the Structural Design Criteria (SD-66), Pages 18 through 24. The containment annulus steel framing has also been re-evaluated based on frequency criteria (thus assuring low stress levels) per the General Proceduras for Re-svaluation of Cont =4= ant Annulus Steel Framing (Appendix to SD-66).
Estimated design loads are conservative and can safely be assumed to
Any secondary stress which could be imposed on the framing due the                                                                           i configuration of attachments of supplementary and support connections is not considered separately at this stage of design and construction.
_;; _i cover all primary sad secondary loading conditions.
_;; _i                                                                                                    Estimated design loads are conservative and can safely be assumed to cover all primary sad secondary loading conditions.                                                                                            .
(b)-
(b)-                               The ' construction management is not required to review the stress
The ' construction management is not required to review the stress condition of the structural framing. The stresses are controlled by engineering per procedures described in (a).. Please also see response to Blue Sheet 38A, where we withdraw design requirements from Spec 12-2.
:                        condition of the structural framing. The stresses are controlled by engineering per procedures described in (a).. Please also see response
: u
: u                                                                                            to Blue Sheet 38A, where we withdraw design requirements from Spec 12-2.
+
                          +
: (c)
                                                      !                  : (c)                                           Field welding of attachments across (i.e.' transverse to the beam axis)
Field welding of attachments across (i.e.' transverse to the beam axis) the tension flange is controlled at the design stage by keeping the weld ei a
;                                                                    ei                        a                          the tension flange is controlled at the design stage by keeping the weld length within 75% of the flange width. Supports requiring cross flange field welding are located to avoid high stressed areas. An examPla
length within 75% of the flange width. Supports requiring cross flange l
                                              /.- g                                                                     would be avoiding cross flange welding on the tension flange in the                                                                                           '
field welding are located to avoid high stressed areas. An examP a
                                , ,                          ' _/
/.- g would be avoiding cross flange welding on the tension flange in the
middle third span of a simply supported beam. Furthermore, safeguard
' _/
                                -                                                                                        is inherent in the design of all safety-related structures due to the fact that during construction when attachments are installed, the
middle third span of a simply supported beam. Furthermore, safeguard is inherent in the design of all safety-related structures due to the fact that during construction when attachments are installed, the seismic sad majority of live loads are not present. The absence of these loads provides sufficient factors of safety against sudden failure.
                                                                    ..-                                                  seismic sad majority of live loads are not present. The absence of a                                                these loads provides sufficient factors of safety against sudden failure.
a
                                                                                  '(d)                                 Physical intierferences are being checked by plotting all supports on
'(d)
              -                                                                  .                                      supplementary steel / coordination plans. The final check of the stress condition of all framing members will be made by the beam design                                                                                 -
Physical intierferences are being checked by plotting all supports on supplementary steel / coordination plans. The final check of the stress condition of all framing members will be made by the beam design verification program during which all imposed loads will be considered.
                                                                            -                                            verification program during which all imposed loads will be considered.
-l l
                    -l                                                                                                                                               ,.
2.
l                                                          2.                                 All loading conditions will be considered during the beam design verification'                                                                           -
All loading conditions will be considered during the beam design verification' program. The program will detect all overload conditions. The verification program will be started soon after major installations have been completed.
program. The program will detect all overload conditions. The verification 3
3 i
program will be started soon after major installations have been completed.
The computerised beam verification program is scheduled to start by i
i                                                                                               The computerised beam verification program is scheduled to start by                                                                                     ..
July 1, 1982.
i                                                                                                July 1, 1982.
l t
l t                       !
l
l
                        -                                                                                                                                                                                                                                                \
\\
:                  U                                                                                                                                                                                                                                       -
**U l
l                                                                                                                                                                                                                                                            s o
s o


y                     -                    ~ --             - - - - -                                                  ...
y
JON.20.'88 31:18 SMT SEQBROOK STQTION - 0763                                                                                                                       .                                          P.886
~ --
                  +         *
JON.20.'88 31:18 SMT SEQBROOK STQTION - 0763 P.886
* SHEET             1       QF         2
+
                      $.sto.60s arv.s/s                                 cournacrom
SHEET 1
                                                                                                    'S }E M E@E D U P-ROJECT CHANGE
QF 2
                                                                                                .SEE
$.sto.60s arv.s/s cournacrom P-ROJECT CHANGE
(          REVERSE SIDE FOR NOTES, INSTRUCTIONS AND OlSTRIBUTIONS.)
'S }E M E@E D U
                    /* ,.AB ROOK STATION.                                                                                                                                                                                                                   e1 Tg 0F                                                                         El,AL   ga g,g 3;g:5i2 je Jl0 9'     7 6 3        3ili3                                                                  E C lA DATE           3/2/82                             i,e   .  .    .    .    ,.. .                      Eg;',.cb.ren.
.SEE REVERSE SIDE FOR NOTES, INSTRUCTIONS AND OlSTRIBUTIONS.)
g             c                    sac                                                      ,,,,, ,,,,,,,,,,,,,
/*, AB ROOK STATION.
DESCRIPTION OF CHANGE / REQUEST _                                                             %sME YES                                         NO R l SAFETY RELATED YES ZZ            NO _
(
e1 Jl0 9' 7 6 3 3ili3 Tg 0F E C lA El,AL g,g 3;g:5i2 je Eg;',.cb.ren. sac ga DATE 3/2/82 i,e c
g R l SAFETY RELATED YES ZZ NO _
DESCRIPTION OF CHANGE / REQUEST _
%sME YES NO
* MA OQ tt !5 1 RE !E !S IT !E.II IC iT i L iC IN ' 30 tF ; II IL lE lC I !5 IP :T !s ; !O iW i 18 8 TIE lEiLi ! alm:S_.
* MA OQ tt !5 1 RE !E !S IT !E.II IC iT i L iC IN ' 30 tF ; II IL lE lC I !5 IP :T !s ; !O iW i 18 8 TIE lEiLi ! alm:S_.
i.ei..t.e tm i i uissi                              oi . issi        .e.
,.,ica ns r. esin in me.sinaiso ninia.ia.inici=Im. oles sai ss.w mar s.,
                        , .,ica   ns r. esin in me.sinaiso ninia.ia.inici=Im. oles sai ss.w mar s.,
i.ei..t.e tm i i uissi oi. issi
Add the following note to Canaral Notes - Supports of M. M-3002.28 and M. &300229L For support details whic.h attach to the bottom flanges of structural steel beans, the location of the support ste-6-at shall be restricted to the ceraterlina of the affected beam. exce).t-i ions to be submitted to '51 tsp Engineering for approval. Any support wh:Leh does not meet above mentioned criteria is to be documented in the form of as-built.                                                                                                                                                                .
.e.
                      ,N_OTE t No retrofitting is required to already installed supports prior to issuance of this ECA<
Add the following note to Canaral Notes - Supports of M. M-3002.28 and M. &300229L For support details whic.h attach to the bottom flanges of structural steel beans, the location of the support ste-6-at shall be restricted to the ceraterlina of the affected beam. exce).t-ions to be submitted to '51 tsp Engineering for approval. Any support wh:Leh does not meet i
REASON FOR CHANGE                                 rio; lt;rtgj r;,r. lTioimi s!I:ot si t o!Ni : s! T'1: t C'                                                                                   a 't a a t I - . i l             REQUEST FOR INFO                                   ,, s sa tis % m unrusaemow, wa ma mam% mrm. w.i oi.. inim .                                                                           iini.vws.i.om. ma w                   .m i                               .
above mentioned criteria is to be documented in the form of as-built.
e
,N_OTE t No retrofitting is required to already installed supports prior to issuance of this ECA<
                            .cre.c.ca secuma.ts:"                         Cable tray and- conduit supports have not been restricted to require-
REASON FOR CHANGE rio; lt;rtgj r;,r. lTioimi s!I:ot si t o!Ni : s! T'1: t C' a 't a a t I -. i l
        ,              eo mo ni >u.insineistinta               no their ate.eh-c .to structural steel in such a -n=e :co avoid torsiona strasses. M. W300228 and M. x-300229 do not limit the contractor-
REQUEST FOR INFO
    '.                #w iw : 'is li '9 !T IA'            A 1
,, s sa tis % m unrusaemow, wa ma mam% mrm. w.i oi.. inim.
to stemehing supports at the centroid or along the cantarlina of
iini.vws.i.om. ma w
                      #n su M w i a n in 's is is                        structural steel. The above mentioned change willrestrie.t/ limit torsic
.m i
                      #D TWIG IM ;310101212 !9- in structural steeldue to alacerical supports.
Cable tray and-conduit supports have not been restricted to require-e
                        -)i l i i ! ! !!!
.cre.c.ca secuma.ts:"
s        F C R l
eo mo ni >u.insineistinta no their ate.eh-c.to structural steel in such a -n=e :co avoid torsiona
2 l2 11 i'l lA
#w iw : 'is li '9 !T IA' strasses.
                  ' pdblR F I                 l : I                 - "8V-conve's 33 wir cendr4eh                   . fab Pne.             ACTION PARTY!                                                                                 FIELD CONTACT *.
M. W300228 and M. x-300229 do not limit the contractor-A 1
naast -         inlTIATs0 of               TITha
#n su M w i a n in 's is is to stemehing supports at the centroid or along the cantarlina of structural steel. The above mentioned change willrestrie.t/ limit torsic
  ,                      tfE R.C                                                 ren/sas/ars                                                                                           ,
#D TWIG IM ;310101212 !9-in structural steeldue to alacerical supports.
    '                                                                              appnevas of omaa.a zario. -                                                                         """
-)i l i i ! ! !!!
WORKING DOCUMENT RES'D BYs 1/15/82               .                                  sai/ren                                                              -
2 l2 1 i'l lA 1
asocussse worse rom casalmaron                                             roe caart supr.                               ron ass.co.sta.s.en.
l F C R s
' pdblR F
I l : I
- "8V-conve's 33 wir cendr4eh
. fab Pne.
ACTION PARTY!
FIELD CONTACT *.
naast -
inlTIATs0 of TITha tfE R.C ren/sas/ars omaa.a zario. -
appnevas of WORKING DOCUMENT RES'D BYs sai/ren 1/15/82 asocussse worse rom casalmaron roe caart supr.
ron ass.co.sta.s.en.
oat:
oat:
AFFECTED DOCUMENTS                                                                         pip.e mees own.s                                                             {sursa ssismes posuuser er anei.icaa l
AFFECTED DOCUMENTS pip.e mees own.s
  .                  s u ,_.,           _......            i         me-                       ..s.       -   1 eras            es e.insiseinvirein soni      ao e,
{sursa ssismes posuuser er anei.icaa l
                                                                                                                                                                                                                                      . .. . . s . r .o .
s u,_.,
ieswariss ia.e s.o . i ni no e, en as   e.instralertesise so             so   si sa as   e.is i inefaeins             se   no                                                                                     s e_ :
i me-
3 o w e                                                 s p E C ll' -                                                    l               s A R         l'           ll1             l s           d d :i! :il s                                                       i o_w n          s                                                       li o w e n         s   .cl e di,                   o   w s           ,
..s.
I                              s p E c ll'u                                                     [         E   R     l1l[cl[                             t
- 1
:                o w s                        I-l                  o w s             Ii                  L        _
..... s. r.o.
s P             E       C         I I ! -t I                     i         .i.     i l'!               l l i               :
no e, en as e.instralertesise so so si sa as e.is i inefaeins se no eras es e.insiseinvirein soni ao e, s e_ :
j',             o w s             lg          11                 o w e         .
ieswariss ia.e s.o. i ni 3
llllt                             s :o                       ll                                              + ! iIi                     I: 1iii
l s A R l'
                                                                                                                                                                                                                                            .., vent e a r'
ll1 l
  !'''                                                                                                                                                                                  inittat narr RJ 11ch, Jr.                                 '
o_w s n s d d :i! :il s o w e li i
N/A i
s p E C ll' o w e n s.cl e di, o w s I
DCN/ECA APPROV4l.S PREPARED BY                                                                                                         IaC                         N/A                         mEcM. SERV
s p E c ll'u
  ~l ut C M.                     N/A                         NUCLEAR                 N/A
[
                      ,kesC ME WE Raading _ [S                                     M                                   l Cl                 NE REVIEW _                            ~{b[%                     fW. SMh"IIn"[#a.                                        N/A' dARAFFECTED YEs                    NO I                                                            AmalTING                                BOSTON                     N/A                         STRUCT.             W/HR       Ma PPROVCD                    m,
E R l1l[cl[
                                                                                                  ' ' _ _ ^_-
t s
SAFETT RELATED APPROVAL
P E C I I ! -t I i
                                            -ess on PTni estfreyfoes'cousta.smen.                                       FIELD /                               OA wo        e,        we        CONTRACTOR                             AP9R0vatI.I                                         #                        I' A'N l
.i. i l'!
                                ;. [. !
l l i o w s I-l o w s Ii L
vEs            Ro
:j',
                                                                                        )],{
o w s l g 11 o w e llllt s :o l l
{ {2             ,      YEQ                                   0,",'t,     "
+ ! iIi I: 1iii inittat narr
Afor- assu/kea
.., vent e a r' RJ 11ch, Jr.
                                                                                                                          . . ~ ~ - . . . - - . , . - - - . . - . . -             . , . . .          _
i
                                                                                                          -m.
~l DCN/ECA APPROV4l.S PREPARED BY IaC N/A mEcM. SERV N/A ut C M.
N/A NUCLEAR N/A
,kesC ME WE Raading _ [S M
l Cl NE AFFECTED YEs NO I AmalTING
~{b[%
fW. SMh"IIn"[#
N/A' REVIEW _
a.
dAR BOSTON N/A STRUCT.
W/HR Ma
' ' _ _ ^_-
SAFETT RELATED APPROVAL PPROVCD m,
-ess on PTni estfreyfoes'cousta.smen.
FIELD /
OA CONTRACTOR AP9R0vatI.I I' A'N wo e,
we assu/kea
)],(( {2 YEQ 0,",'t, Afor-l
;. [. !
vEs Ro
.. ~ ~ -... - -.,. - - -.. -.. -
-.----,-c---------
-m.


                      . ~ . - . _ . - - . .                                               .---._..                                                                                              __.                                  . . . . _                      __
. ~. -. _. - -..
e P.BO7 ,
e JRN.{f.'DS 21:21 EMT SET.8200it STRTION - 9763 P.BO7,
JRN.{f .'DS 21:21 EMT SET.8200it STRTION - 9763
. '. r2.
            . ' . r2 .                                                                                                                                                                                               -
^
                                                                                                                                                                                                                                                  ^                                                     "            *
'9763 zcI*0t 3U2
                                                                                                                                                                                                                                                                            '9763                       zcI*0t 3U2
~$' ~.'.r2W 22D 20:557[MT SERBROOK STATIC geortustao MEMORANOUM O
                      ~$' ~.'.r2W 22D 20:557[MT SERBROOK STATIC                                                                 '
E M
geortustao                                                                                                                         MEMORANOUM                                                                                                                   .
M T & cons w cars ECA 01/3152
O              E                       M                       M T & cons w cars                                                                                           .
/
ECA 01/3152
. shamt 2 of 2 9763.006 Orirics,:: Philadelphia m No.
                                                                                                /                                                                                                                                                                                                         .
Ensinaaring - P w er Division pai g: Decenhar 22, 1981 20 0 8197A.
shamt 2 of 2 9763.006 Orirics,:: Philadelphia m No.
DsPT.
Ensinaaring - P w er Division                                                                                                                       pai g: Decenhar 22, 1981 DsPT.                                                                                                                                          .,
Comes: AM Ebaar OF Kalan&
20 0                                 8197A.
Yet h.F. McKenna DE Bhoads NE Sanshsvi DD Boyle DCC F11st 3.0.25 No Respcmse Reeuived
Comes: AM Ebaar                                                         OF Kalan&
. peoM e A.J. Nulshisst.
Yet                           h.F. McKenna                                                                 '                                                                                                        DE Bhoads                           NE Sanshsvi
)....
                                                                                                                                  -                                                                                                                      DD Boyle                             DCC F11st 3.0.25
SuasseT Public Service Company of New Hampshire 1"
                                                                                                                                                                                        -                                                                No Respcmse Reeuived
Saabrook Scation
                                . peoM e                         A.J. Nulshisst.                                                                                                                                        .
'Itsesion of Structural Steel Rai.: MMt 7610X. dated August.20, 1981 i
                                                                                                                                                                                                                                                                                  )....                                  .
By this asasi. we are approving the use of tharts,which wata attached to the refereses mean,for the satire Sombrook plant.
SuasseT Public Service Company of New Hampshire                                                                                                                                                   1"
'zhis will allow you to design amaupports transeh*4 = a meninal to thm ="al men:baradTt shouas ie-senizared ifthere is t_ orad an
                                            .                                                                Saabrook Scation                                                                                     *
~
                          -              ,                                                                  'Itsesion of Structural Steel                                                                                                                 -
se than eee siippert on 'this atosi member and the total sorsion should t azeead the allowabia limits sat in the chart 3,-
Rai.: MMt 7610X. dated August.20, 1981                                                                     .
w _
                              .                                                                                                                                                                                                                                                                        i
=
              - -                                                              By this asasi. we are approving the use of tharts,which wata attached to the refereses mean,for the satire Sombrook plant.
=
                -                                                'zhis will allow you to design amaupports transeh*4 = a meninal t_ orad an          to thm ="al men:baradTt shouas ie-senizared ifthere is se than eee siippert on 'this atosi member and the total sorsion should
If thers era any questionee plasse feel free to contact us.
                                                                            -                        ~                                                                                                                                                                                                                    .              .
} < M. k s w a h :,-
t azeead the allowabia limits sat                                                               =
1
in the chart 3,-
, (.
w _                                   =
g m
                                              '          -    '              If thers era any questionee plasse feel free to contact us.
: a. u suia..
1                                                      .
.- i Wad
                                                                                                                                                          .. -                                                  } < M . k s w a h : ,-
..n..
                                                                                                                                , (.                                                   gm                                                        a. u suia..
. '. -m n.~
        .- i                                                     Wad                                                                                                                                                                                                                                           .
= ' +..
                ~n                           s ,             . s. .           . ..              -          ,.- v um. . -                                     =               , .n n. xa v .                                                            .
m
                                                                                                                                                                                                                                                                  ..n ..            . ' . -m          n.~        ='+..                  m i         ;
~n s,
1                                                         .                                                                                                                                                                                                              . ,
: s..
,.- v um.. -
=
,.n n. xa v.
i 1
l
l
                                ',                    ..      . .                  .. c .                 ''..                                ~ :                   . .:              . . .                  . --.. .
.. c.
~ :
a-
a-
                                                                                    .                                                                                                                                                                                                          .                                ~
~
( j\).
( j\\
i                               .                                . . . . _ . . . . - .                                    ..            .              . - _ . . . . .                                              . . . . . . .                                  . .              . . . .
).
1 i                                                                                                                                                                                                                                                                                                                                   2
i 1
__. .                          .__ _ - . _ _ . ,                                      - . - -                  _ _ _ _ ~               .--_-                          . - .                    _-_ . _ _ _ _ _ - _ - _ . -_ _ - _ _ _
i 2
~


                  ..      3                                                                                               -
3 e.
: e.       !                                                                                                                                  -
TI 2512/07 Appendix s l 4 l
TI 2512/07 l4                                                                                                                      Appendix s                         -
i l
l i
METRLTim TEAM INSPECTIM DEOLIST PACE _1_ Or 37 REVISION I
l                                                              METRLTim TEAM INSPECTIM DEOLIST                                                 37 PACE _1_ Or i
i CRNERAL INSPECTION AREA Construction Controle REY. DATE 2/ lJ/ ni j
REVISION             I 2/ lJ/ ni CRNERAL INSPECTION AREA Construction Controle                 REY. DATE                           j l             SITE                                             INSPECTOR-                         DATES OF INSPECTION l                                                                                                                     _ .            .          _
l SITE INSPECTOR-DATES OF INSPECTION l
INSPECTION AREA                           ACCEPTANCE CRITERIA                         FINDINGS                               i i
l INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS i
: 1.     Implementation - Contractor / Licensee 1.1. Construction / Fabrication / Installation Adequacy                                                         -
i 1.
55 t91 (eM Select the appropriate IE Hodulee p t33 Coo) regarding (1) observation of Esn5N I) work and (2) records review for the g a y g(gw) subject inspection area.                         ,
Implementation - Contractor / Licensee 1.1. Construction / Fabrication / Installation Adequacy 55 t91 (eM Select the appropriate IE Hodulee p t33 Coo) regarding (1) observation of Esn5N I) work and (2) records review for the g a y g(gw) subject inspection area.
g.,'gFollowtheinstructionandguidance only to the extent necessary to establish confidence that the activity is adequately egntrolled or to an extent that will support indicated enforcement actions by HRC. The specific instructions of the Modulas may be abandoned and replaced with independent pursuite
g.,'gFollowtheinstructionandguidance only to the extent necessary to establish confidence that the activity is adequately egntrolled or to an extent that will support indicated enforcement actions by HRC. The specific instructions of the Modulas may be abandoned and replaced with independent pursuite that are determined to be more germane to the subject inspectf.on area, with concurrence of the team leader.
  ,                          that are determined to be more germane to the subject inspectf.on area, with concurrence of the i
i Specific paragraphs of the applicable IE modules shall be added to this checklist in the space,provided with concurrence 'of the team leader.
team leader.
Specific paragraphs of the applicable
  ,                          IE modules shall be added to this checklist in the space,provided with concurrence 'of the team leader.


I MMIM M IMCTIW OECEIST
I MMIM M IMCTIW OECEIST rh
* rh REVISION
%) 37 REVISION 1
                                                                                                                                                %) 37 1
CENERAL INSPECTION AREA Construction controls REY. DATE 2/13/81 SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA
    ,                                  CENERAL INSPECTION AREA Construction controls                                             REY. DATE 2/13/81
' ACCEPTANCE CRITERIA FINDINGS e
    !    SITE                             INSPECTOR                                           DATES OF INSPECTION INSPECTION AREA               ' ACCEPTANCE CRITERIA                                                     FINDINGS e
b t
b                                   t t
t a
a t
t O
O s
s
* x                                             .-
\\
x


                                                                                                                                "PA              0FAppengx5 CWSTIUCTim TF#1 INSPECTIGl OECEIST REVISION                       1 CENERAL INSPECTION AREA Construction Controls              REY. DATE 2/13/81 SITE                                               INSPECTOR                         DATES OF INSPECTION INSPECTION AREA                           ACCEPTANCE CRITERIA                       FINDINGS l
Appengx5 CWSTIUCTim TF#1 INSPECTIGl OECEIST PA 0F REVISION 1
REY. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS l
D
D


8         i
8 i
                          ,                                                                                                                            r                                 .  .      . ,.
r TI 2512/07 Appendix 5 GETRLTIGliFAM ItMRilGI GEr11ST PACE 4 Or n
TI 2512/07 Appendix 5 GETRLTIGliFAM ItMRilGI GEr11ST
~
                                                                                                                                    ~
REVISION 1
PACE 4 Or                 n REVISION           1 I
I A
GENERAL INSPECTION AREA Construction Controls
2#I3#0I GENERAL INSPECTION AREA Construction Controls i'
* A        2#I3#0I                    i' i                               .
i SITE INSPECTOR DATES OF INSPECTION
SITE                                                                     INSPECTOR                             -  DATES OF INSPECTION
._ u l
                                                                                                                                                                                                ._ u INSPECTION AREA                                         ACCEPTANCE CRITERIA                                         FINDINGS l
INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS l
l 2
2 s
s i
i 1
1 e
e t
t O
e o
O e
O e
o O
l l
e


            '.                                                              '                          ~
~
                                                                                                          .                    ,    ,~       .  .
,~
  ~
~
                              .'                                                              j                                                     -
j TI 2512/07 Appendix 5 C0tETRLTIGl TFM INSPECTI0fl GECKLIST '
                                                                                              !                TI 2512/07 Appendix 5 C0tETRLTIGl TFM INSPECTI0fl GECKLIST '                     race s or_37_                       .
race s or_37_
i                 REVISION.             1 REY. DATE       2/13/81 CENERAL INSPECTION AREA Construction Controls INSPECTOR                             DATES OF INSPECTION SITE                                                                                                                              ~ -~~'
i REVISION.
ACCEPTANCE CRITERIA                    FINDINGS INSPECTION AREA                                                     l 1.2 Is the_ mission or t,a_Q for each I
1 REY. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION
organization involved q1. ear _1y               .
~ -~~'
documented 1 1.3 lias the support required for the mission or task,been clearly                                                                                                         t documented and planned for7 1.4 Do involved personnel regardless of extent of responsibility under-stand the overall task or mission?
FINDINGS INSPECTION AREA ACCEPTANCE CRITERIA l
I 1.2 Is the_ mission or t,a_Q for each organization involved q1. ear _1y documented 1 1.3 lias the support required for the mission or task,been clearly t
documented and planned for7 1.4 Do involved personnel regardless of extent of responsibility under-stand the overall task or mission?
Do they clearly understand how their responsibility supports the mission?
Do they clearly understand how their responsibility supports the mission?
1.5 Is the identified mission or task               Subjective evaluation appropriate?
1.5 Is the identified mission or task Subjective evaluation appropriate?
QA/QC organization                             Subjective evaluation 1.6
1.6 QA/QC organization Subjective evaluation
                      - Is the location of housing con-veniently near the location of the work activitly?
- Is the location of housing con-veniently near the location of the work activitly?
j
j
                      - Are work areas, supplies, and records maintenance facilities adequate?                                                                                                           .
- Are work areas, supplies, and records maintenance facilities adequate?
                      - Aro special tools and equipment immendiately available and sufficient in number?
- Aro special tools and equipment immendiately available and sufficient in number?


                    -                                                                                                                    *8 CmSTRUCTim TEM If&ECTI0fl OEd(LIST                           VACE f 0[PP' $
CmSTRUCTim TEM If&ECTI0fl OEd(LIST VACE f 0[PP' $
* 3
* 3
                                                                                                                ,                    REVISION   I 2/13/U1
*8 REVISION I
                                                                                                                                                                      ~
GENERAL INSPECTION AREA ConstructionConhrols REV. DATE 2/13/U1
GENERAL INSPECTION AREA ConstructionConhrols                      REV. DATE SITE                                                           ' INSPECTOR                               ! DATES OF INSPECTION
~
                                                                                --.u..._...                                            .
SITE
INSPECTION' AREA'                                 ACCEPTANCE CRITERIA                     . FINDINCS t
' INSPECTOR
                                - Are the provisions for all the                                   '
! DATES OF INSPECTION
above commensurate with other site organizations?                                 -
--.u..._...
                                - Are there any identifiable con-                 -
INSPECTION' AREA' ACCEPTANCE CRITERIA FINDINCS t
ditions which adversely affect                       , ,
- Are the provisions for all the above commensurate with other site organizations?
functions of the QA/QC organiza-                       ,
- Are there any identifiable con-ditions which adversely affect functions of the QA/QC organiza-tion?
tion?
1.7 Hanpower Resources
1.7             Hanpower Resources               .
- Are there documented work pro-jections showing QA/QC manpower requirements over the course of construction?
                                - Are there documented work pro-                 '
- Is the current manpower adequate to sufficiently support the level of activity?
jections showing QA/QC manpower requirements over the course of construction?
- Is the current manpower (manage-ment and staff) clearly qualified?
                                - Is the current manpower adequate to sufficiently support the level                                     ,
- Have documented QA/QC manpower requests and justifications been expediously handled by management? Have they been handled in accordance with documented administrative procedures?
of activity?                                   ,
N,
                                - Is the current manpower (manage-ment and staff) clearly qualified?
                                - Have documented QA/QC manpower requests and justifications been expediously handled by management? Have they been handled in accordance with documented administrative procedures?
N,                                                                             ..


          ,-                                                                                                                                        .                    .~~     '
.~~
                                                                                                                                                                                                                .~g   .    .
.~g p
    ..        ,                                                                                                                                          p TI 2512/07                 Appendix 5 NMIM M IMCTIm 0FD1_IST                                                             l                     PACE         7 Or               37         .
TI 2512/07 Appendix 5 NMIM M IMCTIm 0FD1_IST l
                                                                                                                                                      .I                       REVISION                   1                 .
PACE 7 Or 37
CENERAL INSPECTION AREA Construction Controls                                                                           . DATE          2MM SITE                                                               INSPECTOR                                                                   ~ DATES OF INSPECTION
.I REVISION 1
_    . . _      . . - . _                                                                      .            . . . - .            - =   .,
. DATE 2MM CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR
i INSPECTION AREA                                               ACCEPTANCE CRITERIA                                                     ,                FINDINGS
~ DATES OF INSPECTION
                - Are the administrative procedures                               '                                                                                '
- =
l clearly responsibe'to the unique conditions at the construction                                               ,
i INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS
site? (i.e.., rapid changes.in                                         ,'
- Are the administrative procedures l
needs)
clearly responsibe'to the unique conditions at the construction site?
                - Do manpower requests clearly                                                                                                                                           -
(i.e.., rapid changes.in needs)
identify the level of qualifica-                                                                           .
- Do manpower requests clearly identify the level of qualifica-tions (education and experience) needed?
tions (education and experience) needed?                                                                                                                           *
- Is the monetary compensation, relative to other trades,-such that clearly qualified and capable candidates will be ettracted to l
                - Is the monetary compensation, relative to other trades,-such                                                                                         ,
these positions?
that clearly qualified and capable                                                         "
t.*
candidates will be ettracted to                     '
1.8 Personnel Qualifications
l                    these positions?                                                                             .
- Is there a documented system for the training and indoctrin-ation of personnel?
t .*          ,*
- Is there a documented system to assure that personnel qualifica-tions are maintained and changed as needed?
1.8     Personnel Qualifications                                                                                 *    *
- Is there a system to'essily verify the status of personnel qualifica-tions?
                - Is there a documented system                                       .
;                    for the training and indoctrin-                                                   -
;                  ation of personnel?                                                                                                                     -
                - Is there a documented system to                                                                                                                                     ,
assure that personnel qualifica-tions are maintained and changed as needed?
                - Is there a system to'essily verify the status of personnel qualifica-tions?
1 l
1 l


1 TI 2512/07 I
I 1
            "                      -                                                                                                                      App.indix 5 OGEEUCTIGI T@ JNSPECTIQl DEdd.IS[                             race _a.__Or -- 37
TI 2512/07 App.indix 5 OGEEUCTIGI T@ JNSPECTIQl DEdd.IS[
.t                                                                                                                                                         REVISION        1 CENERAL INSPECTION AREA Construction Controls                            W.DM 2/13/81
race _a.__Or -- 37 REVISION 1
!        SITE                                                                               INSPECTOR                                 DATES OF INSPECTION
.t W.DM 2/13/81 CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION
                      .                                  . . . .  .-                                                  . . . _                                        ..      .._-.._u,,
.._-.._u,,
INSPECTION AREA                                       ACCEPTANCE CRITERIA                           FINDINGS l                                               - Is there a mechanism which clearly informa personnel of the status of their qualifications?
INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS l
                                                - Are qualifications responsive to                                               -
- Is there a mechanism which clearly informa personnel of the status of their qualifications?
and in accordance with require-                                       .
- Are qualifications responsive to and in accordance with require-ments?
;                                                    ments?
l
l                                               - Do the contacted personnel perceive                                                                         ,
- Do the contacted personnel perceive any prnblems with current qualifica-i tions system and associated records 1 NOTE: Confirm the implementation and evaluate the adequacy of each of the elements above.
any prnblems with current qualifica-                                           .
.i 1.9 Craftsmen Regulatory r.uide 1.28 1
i                                                     tions system and associated records 1                             ,                                    ,
Regulatory Guide 1.74
NOTE: Confirm the implementation and evaluate the adequacy
- Is there an adequate supply of ANSI N45.2 qualified craftsmen?
,                                                                of each of the elements above.                                                                                           ,
ANSI M45.2.10 ANSI M45.2.23
1.9             Craftsmen                                           Regulatory r.uide 1.28
- When fully qualified (journeyman) 10 CFR Part 50 Apx B.
.i 1                                                                                                      Regulatory Guide 1.74
j craftsmen are not available, what Criterion 11 provisions have been established to assure quality production?
                                                  - Is there an adequate supply of                     ANSI N45.2 qualified craftsmen?                             ANSI M45.2.10 ANSI M45.2.23 j
- Are'there training and indoctrin-ation programs for craftsmen?
                                                  - When fully qualified (journeyman)                 10 CFR Part 50 Apx B.
- Are records of such training maintained?
craftsmen are not available, what                     Criterion 11 provisions have been established to assure quality production?
,r~.
                                                  - Are'there training and indoctrin-ation programs for craftsmen?                                                                                                               ,
,.~,
                                                  - Are records of such training maintained?                                                                                                                                 .
~
                                              ~
/
                                                                                                                      ,r~ .   .
                                                                                                                                                                                      /
                                                                                                                                                                                        ,.~,     .


                                                                                ,                                                                  g       ,
g s
s .            e TI 2512/07 DESTRLTI@l TDN INSPELTIQl DECKLIST PM'fM REVISION
e TI 2512/07 DESTRLTI@l TDN INSPELTIQl DECKLIST PM'fM 37
                                                                                                                                            ~
~
37
REVISION
                                                                                                                                                  'l CENEP4L INSPECTION AREA Construction Controls                          REV. DATE     . 2/I3/81 SITE                                           INSPECTOR                                       DATES OF INSPECTION INSPECTION AREA                           ACCEPTANCE CRITF.RIA                                 FINDINGS
'l REV. DATE
                      - Is such training periodicS.y updated?
. 2/I3/81 CENEP4L INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITF.RIA FINDINGS
                      - Elicit the opinions of such train-ing and indoctrination from crafts-nen contacted.
- Is such training periodicS.y updated?
1.10       Employee Morale                             Subjective evaluation During the conduct of any portion of these checklists, elicit from the persons contacted their opinions relative to the adequacy oft
- Elicit the opinions of such train-ing and indoctrination from crafts-nen contacted.
                        - construction management;
1.10 Employee Morale Subjective evaluation During the conduct of any portion of these checklists, elicit from the persons contacted their opinions relative to the adequacy oft
                        - concern for a quality product;                                                           ,
- construction management;
                        - working conditions;
- concern for a quality product;
                        - harmony between construction and QA/QC organizations;
- working conditions;
                        - harmony between the various design, engineering and construction per-sonnel; and procurement organira-tions;
- harmony between construction and l
                        - personnel management practices;
QA/QC organizations;
                        - compensation and work loading (i.e., overtime) practicest
- harmony between the various design, engineering and construction per-i sonnel; and procurement organira-tions;
- personnel management practices;
- compensation and work loading (i.e., overtime) practicest


              -        '                                                                                                          .        L               -
L UETRI. IM TEN 1 INsitcilm OEdiiST
UETRI.TIM TEN 1 INsitcilm OEdiiST                                                                                             'IPAcz
'I *'$0r 77Pendix 5 T
                                                                                                                                                                                                      *'$0r 77Pendix 5
PAcz REVISION 1
                                                                                                                                            ;                                                    REVISION                         1 CENERAL IllSPECTION AREA Construction Co'ntrols                                                                                     REY. DATE 2/13/81 SITE                                               . INSPECTOR                                                                       DATES OF INSPECTION
CENERAL IllSPECTION AREA Construction Co'ntrols REY. DATE 2/13/81 SITE
_..___u INSPECTION AREA                                                 ACCEPTANCE. CRITERIA                                                                             , FINDINGS j                                                                                                             .                                      .
. INSPECTOR DATES OF INSPECTION
personal safety and related                           ,
_..___u INSPECTION AREA ACCEPTANCE. CRITERIA
issues.                   -
, FINDINGS j
0
personal safety and related issues.
,                      Based on an assessment of,the above,'                                   ,
0 Based on an assessment of,the above,'
.                      make a subjective determination of                                                                                                                               -
make a subjective determination of S
S                                                       '
employee morale. This consideration is for management, staff, and crafts-men.
employee morale. This consideration                                             -
, ~
;'                      is for management, staff, and crafts-                       ..                             ,                        ,
1.11 Construction /QA/QC Orsanization
                                                                                                                                                                                            , ~
* Regulatory Guide 1.28 Interface Control Regulatory Guide 1,74
men.                                                                  ,-          .                  .
.. Regulatory' Guide 1.123 1.11.1 Are documented administrative pro.
1.11         Construction /QA/QC Orsanization
ANSI N45.2 cedures defining organizational' ''
* Regulatory Guide 1.28 Interface Control                                                   Regulatory Guide 1,74                                                                             ,
ANSI N45.2.10 interfaces in use?-
                                                                                        .. Regulatory' Guide 1.123 1.11.1       Are documented administrative pro.                                   ANSI N45.2                                                                                     .
. ANSI M45.2.13 1.11.2 Do forms and records used to communi-cate across such interfaces conform to the requirements of the QA program and administrative procedures?
cedures defining organizational' ''                                 ANSI N45.2.10 interfaces in use?-                                               . ANSI M45.2.13                                                                     ,
1.11.3 Is there a functional flow chart demonstrating how information flows across the interfaces? If not, is there an adequate documented descrip-
1.11.2       Do forms and records used to communi-                                                                                                                             '
!. ion of information flow?
cate across such interfaces conform to the requirements of the QA program and administrative procedures?                                                                                                                         ,
1.11.4 Examine interface documents used in this area and determine the followings
1.11.3       Is there a functional flow chart demonstrating how information flows
'N
* across the interfaces? If not, is there an adequate documented descrip-                                                 '
.***g e
                      !. ion of information flow?                                       ., , ,. .                                                                  -
1.11.4       Examine interface documents used in                                                                                           '
this area and determine the followings                       -
                    'N                                                                                     #                                                                                                                          .***g
                                                                                                                    %                                                                                                                                e


i
i
                                                                                                                .3                                                 ,      .          .    .
.3 l
l             .
r l
r                                                                                             !
4 MMIm M IMCTim OECEIST_
l                                                   !.
PACE OF 17 REVISION,
4 MMIm M IMCTim OECEIST_                                                                         PACE     OF     17                         ,
1 REV. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS r
REVISION ,  1 CENERAL INSPECTION AREA Construction Controls                                                      REV. DATE 2/13/81 SITE                                         INSPECTOR                                                 DATES OF INSPECTION INSPECTION AREA                         ACCEPTANCE CRITERIA                                 '
I Documents and records clearly identify the subject, its specified criteria, the authority of the signature (s), date, the action acc~omplished, and the unique identity of the document.
FINDINGS r
Is the document traceable and is the scope of addressees appropri-stat 1.11.5 Examine any deficiency noted above to the extent that a clear corree-tive action can be established.
Documents and records clearly identify the subject, its specified criteria, the authority of the signature (s), date, the action acc~omplished, and the unique identity of the document.
1.11.6 Are the contseted personnel clearly knowledgeable of the interface con-trol system?
Is the document traceable and is the scope of addressees appropri-                                     .
1.11.7 Elicit employee opinions relative to the adequacy of the system examined.
stat 1.11.5       Examine any deficiency noted above to the extent that a clear corree-tive action can be established.
1.12 Document Contrcl In this inspection area determine.if documents are being issued, revised, handled, stored, and discarded in accordance with QA program, adminis -
1.11.6       Are the contseted personnel clearly knowledgeable of the interface con-trol system?                                                                                                                       -
1.11.7       Elicit employee opinions relative to the adequacy of the system examined.                                                                                            .
1.12         Document Contrcl                                                     -
In this inspection area determine.if documents are being issued, revised, handled, stored, and discarded in accordance with QA program, adminis -
trative procedures and other desig-nated requirements.
trative procedures and other desig-nated requirements.


                                                                                            .f.                   -                                          _
.f.
i TI 2512/07 Appendix 5 GETRLTIGl TEAM IllSPECTIGl DEDLIST :                             Pact _1L0r                                   I 37 REVISION I-                                                                             REV* DATE 4/8J/05 CENERAL INSPECTION AREA Construction controls
i TI 2512/07 Appendix 5 GETRLTIGl TEAM IllSPECTIGl DEDLIST :
                                          ~
Pact _1L0r 37 REVISION I
SITE                                        'INSFECTOR                           DATES OF INSPECTION 4
I-CENERAL INSPECTION AREA Construction controls REV* DATE 4/8J/05 SITE
INSFECTION AREA                         ACCEPTANCE CRITRIA         !                        FINDINGS b
~
* 1.12.1       Has a central document control facility been established?
'INSFECTOR DATES OF INSPECTION 4
j                 - Are the facilities and control systems adequate?
INSFECTION AREA ACCEPTANCE CRITRIA FINDINGS b
                    - Are the document receipiente aware j                     of the interfaces control between their organizations and central l                   document controlf                                 .
1.12.1 Has a central document control facility been established?
)                   - Are material / fabrication qualifica-tion and inspection records adequ-                                                                                                                             !
j
i ately controlled by the documenta-tion control center?
- Are the facilities and control systems adequate?
1.12.2         Are there clearly defined indications of the status of each document (i.e..
- Are the document receipiente aware j
;.                  controlled or not) on the document?
of the interfaces control between their organizations and central l
i 1.12.3 ,       Do personnel clearly understand that uncontrolled documente are not to be used for construction or decisione I                 relative to constructionef                     '
document controlf
  !  1.12. 4       Tsetermine through review if personnel have to extent necessary, access to controlled documente;                                                                                                                                             l
)
                    - Are such documents available at                                                                                                                 .
- Are material / fabrication qualifica-tion and inspection records adequ-ately controlled by the documenta-i tion control center?
the work location?                   '
1.12.2 Are there clearly defined indications of the status of each document (i.e..
controlled or not) on the document?
i 1.12.3,
Do personnel clearly understand that
?
uncontrolled documente are not to be used for construction or decisione I
relative to constructionef 1.12. 4 Tsetermine through review if personnel have to extent necessary, access to controlled documente; l
- Are such documents available at the work location?
I,
I,


i e                                               . ,                      _          . . . .                          ._
i e
                                                                                                                                              /"
T'7"13ar T
MNIW M IMGlm 0FE_M                                               T'7"13ar rAC REVISION               1 T*5      -
* 5
GENERAL IMSPECTION AREA Construction Controls                         REY. DATE 2/13/81 SITE                                             INSPECTOR                                   DATES OF INSPECTION N                                                                                                                                           ..        -_
/"
INSPECTION AREA                               ACCEPTANCE. CRITERIA                           FINDINGS I,
MNIW M IMGlm 0FE_M rAC REVISION 1
1.12.5       Do recipients of controlled documents clearly understand their responsibili-ties relative to handling and follow-ing these documents?                                 ,
GENERAL IMSPECTION AREA Construction Controls REY. DATE 2/13/81 SITE INSPECTOR DATES OF INSPECTION N
INSPECTION AREA ACCEPTANCE. CRITERIA FINDINGS I,
1.12.5 Do recipients of controlled documents clearly understand their responsibili-ties relative to handling and follow-ing these documents?
Do personnel using these documents -
Do personnel using these documents -
know how to initiate a change to                                                                                                       '
know how to initiate a change to these documents?
these documents?
I Is there a system which directly informs the document receipt of changes?
I Is there a system which directly                                                                                                       '
Is the document recipient knowledge-able of this sytem?
informs the document receipt of changes?
1.12.6 Examine a variety of controlled documents in use at any field location to determine if they are in fact controlled in accord-ance with the requirements.
Is the document recipient knowledge-               '
able of this sytem?
1.12.6       Examine a variety of controlled documents in use at any field                     ,
location to determine if they are in fact controlled in accord-
* ance with the requirements.
Determine if issued documents are maintained in a legible condition free of personal notes and/or comunents.
Determine if issued documents are maintained in a legible condition free of personal notes and/or comunents.
Is a clear record maintained for
Is a clear record maintained for
                          " voided" controlled documents an,h .. men. i..... 4.. .... ..                                _      _              _  _    _ _ _ _ _ _
" voided" controlled documents an,h.. men.
i.....
4..


1
1 T'c'!Ter
  ;      -      .                                            CG6TRI.TIGl TE#1 INSPECTIGl DEGLIST                                                                  T'c'!Ter rA REVISION _          1
@P'"di"8 CG6TRI. IGl TE#1 INSPECTIGl DEGLIST T
                                                                                                                                                                                              @P'"di"8
rA REVISION _
                                    .                CENERAL INSPECTION AREA Construction Centrols                                                                REY. DATE           2/13/g1                         ;
1 REY. DATE 2/13/g1 CENERAL INSPECTION AREA Construction Centrols 4
4                       ,
SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA i
SITE                                                 INSPECTOR                                                     DATES OF INSPECTION i
FINDINGS i
INSPECTION AREA                             .          ACCEPTANCE CRITERIA                       i                                   FINDINGS                         -
l
                                        . . . . . . .  .. ...~ -.                                      . . _ . . . . .    .__        . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _                              ____  _ _ , .
.....~ -.
l i
i i
i 1
1 Are uncontrolled documents such se memorands, " notes", etc. used to supplant or circumvent controlled documents used to to report problems and other adverse issues.
                    -  Are uncontrolled documents such se               '
1.12.7 Elicit opinions from contacted personnel relative to the adequacy of document control.
memorands, " notes", etc. used to               ,,
supplant or circumvent controlled documents used to to report                                                                               .
problems and other adverse issues.
Elicit opinions from contacted 1.12.7                                                                               ,
personnel relative to the adequacy                             ,
of document control.                            .                      .                                    .
e o
e o
i l
i l
1 1
1 1
D                                                                                                                                             1 1
D 1
                ,. 3                                                                           ....                                                                                                        .
1
,. 3


    ..                                                                              ''                                              e.             .. .  .                              ,_
e.
3 l                           *                                                                          ,
3 l
I                               TI 2512/07             Appendix 5 or 37                 .
I TI 2512/07 Appendix 5 or 37 EIEUI@lIf#!_INSitLIiGI OMI Pact m 'I REVISION
EIEUI@lIf#!_INSitLIiGI OMI                                                                         Pact m 'I REVISION                                 :
. DATE WM l
                                                                                                                                                                                . DATE     WM                     l GENERAL INSPECTION AREA _ Construction Controls                                                                                                   t DATES OF INSPECTION INSPECTOR                                                   '                                                          .-- ... -- .,
GENERAL INSPECTION AREA _ Construction Controls t
j              SITE                                                                                                                                                         .      .-.. .
DATES OF INSPECTION INSPECTOR j
                                                                                                      ,._-__. =
SITE
FINDINGS
,._-__. =
                                                                          ~
FINDINGS INSPECTION AREA
ACCEPTANCE CRITERIA a                                     INSPECTION AREA                                                                      .-
~
i Regulatory Guide 1.28 1.13         Audits / Surveillance _                                     Regulatory Guide 1.74 Has a comprehensive schedule and                           ANSI N45.2 1.13.1     audit plan been established?
ACCEPTANCE CRITERIA a
                                                                                          . ANSI N45.2.10 j                                                                                             ANSI N45.2.12                                                        ,
i Regulatory Guide 1.28 1.13 Audits / Surveillance _
Regulatory Guide 1.74 ANSI N45.2 Has a comprehensive schedule and ANSI N45.2.10 1.13.1 audit plan been established?
ANSI N45.2.12 j
AN91 N45.2.23
AN91 N45.2.23
                                  - Is the plan regularly reviewed                                                                                                                                                 '
- Is the plan regularly reviewed and updated in response to' con-l struction progress of identification i
and updated in response to' con-                                                                                           .
of adverse conditions?
l                                     struction progress of identification                                     '
i                                                                                                                                   ,
of adverse conditions?                                                                                                 -
l
l
                                  - What is the implementation status of this plant     (behind schedule or 4                                     not)                         .                                                                                                  .
- What is the implementation status of this plant (behind schedule or 4
                                    - If planned audits / surveillance                                                                                                                                             t were missed determine why they were missed.                   .                                                                                                      -
not)
4                                                                             '
- If planned audits / surveillance t
l                      1.13.2     Review audit and surveillance reports, associated checklists l                                   and not the basis (planned or                                         ,
were missed determine why they were missed.
problem inittsted). Determine ift i
4 Review audit and surveillance l
1.13.2 reports, associated checklists l
and not the basis (planned or problem inittsted). Determine ift i
i
i
                                    - The scope of the activity was                                       ,
- The scope of the activity was i'
i'                                     appropriate.                                                             .s
appropriate.
                                    - If personnel conducting the audit were appropriately qualified.
.s
                                      - If audit checklist appropriately                                                                               ,
- If personnel conducting the audit were appropriately qualified.
                                -      addressed the specified require-ments.
- If audit checklist appropriately addressed the specified require-ments.
1
1


    ~'
~'
* e
* e Appendix 5
;        ,                                                                                                                                              Appendix 5
@ nim TE#1 IMCTIm DWg TCl5%r~I**~~
                                                                @ nim TE#1 IMCTIm DWg                                                                 3 TCl5%r~I**~~
3
                                                                                                            ~:                         REVISION                 ~
~ :
W . DATE '2/13/81 CENERAL INSPECTION AREA Construction Controls i                                                                                                               ,
REVISION W. DATE '2/13/81
INSPECTOR                                       DATES OF INSPECTION SITE
~
                                                                                                                                          . __    ..._......_.__u ACCEPTANCE CRITERIA                                   FINDINGS INSPECTION AREA
CENERAL INSPECTION AREA Construction Controls i
;                          - If the audit basis and findings are clearly documented.
SITE INSPECTOR DATES OF INSPECTION
                          - If the QA auditors were adequately supported by technically qualified j
..._......_.__u INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS
personnel (i.e., metallurgist.
- If the audit basis and findings are clearly documented.
- If the QA auditors were adequately j
supported by technically qualified personnel (i.e., metallurgist.
l discipline engineers and appropri-l ate).
l discipline engineers and appropri-l ate).
j                           - If the audit surveillance results
j
!                                  are appropriately distributed to
- If the audit surveillance results are appropriately distributed to affected organizations.
;                                  affected organizations.                                                                                                               ,
- If management effectively evaluates audit / findings, as shown by docu-mented involvement.
                            - If management effectively evaluates
- D9es management regularly use this information to effectively evaluate the quality of the construction effort?
!                                  audit / findings, as shown by docu-
1.14 Audit / Surveillance Follow-up i
'                                  mented involvement.                                                  .
Determine through review, if follow-up and corrective actions for adverse i
                            - D9es management regularly use this                                                                                                           ,
surveillance and sudit findings are appropriate, including:
information to effectively evaluate the quality of the construction effort?
4
1.14           Audit / Surveillance Follow-up i
- notificiation of affected organ-izations; 0
  !                        Determine through review, if follow-
a
!                            up and corrective actions for adverse i                           surveillance and sudit findings are 4
 
appropriate, including: .
)
                            - notificiation of affected organ-izations; 0                                                                                                                                                       .-           -
o
                                - - .     - - - _                                                                            -                             a__________
~
TI 2512/07 Appendix 5 MNim Hi IfLittilW OECEIST PACE 15 0F 37 REVISION
* T REV. DATE 2/13/81 GENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA I
FINDINGS I
.e i
1.13 Audits / Surveillance
' Regulatory Guide 1.28 l'
Regulatory Guide 1.74
'1.13.1 Has a comprehensive schedule and ANSI N45.2 audit plan been established?
ANSI N45.2.10 ANSI N45.2.12
- Is the plan regularly reviewed ANSI N45.2.23 and updated in response to con-struction progress of identification of adverse conditions?
- What is the implementation status of this plan?
(behind schedule or not)
- If planned audits / surveillance vere missed determine why theyt were missed.
1.13.2 Review audit and surveillance reports, associated checklists and not the basis (planned or problem initiated). Determine ift
- The scope of the activity was appropriate.
- If personnel conducting the audit were appropriately qualified.
- If audit checklist appropriately addressed the specified require-ments.


o                                        ,.            .
i
                                                                                                      ,                                                              )  .
.3 i
                                                                                            ~
j TI 2512/07 Appendix 5 CWSTRK. im 10#1 IllSPECTim DECKLIST PACE n Or 37 T
TI 2512/07       Appendix 5 MNim Hi IfLittilW OECEIST                                                        PACE 15 0F 37                       -
I
~
REVISION
REVISION
* T                            ,
~l REV. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls I
REV. DATE      2/13/81 GENERAL INSPECTION AREA Construction Controls SITE                                            INSPECTOR                                                      DATES OF INSPECTION INSPECTION AREA                                                  ACCEPTANCE CRITERIA              I              FINDINGS I
DATES OF INSPECTION INSPECTOR i
                                                                                                                                                                                .e i
SITE
Audits / Surveillance                                            ' Regulatory Guide 1.28            l' 1.13                                                                        Regulatory Guide 1.74 Has a comprehensive schedule and                                    ANSI N45.2
.._.-_a FINDIHCS l
          '1.13.1                                                                      ANSI N45.2.10 audit plan been established?
INSPECTION AREA
ANSI N45.2.12
, ACCEPTANCE CRITERIA I
                    - Is the plan regularly reviewed                                    ANSI N45.2.23                                  ,
l
and updated in response to con-struction progress of identification                                                                        ,
- notification of ef fective favels of management;
of adverse conditions?
- identification and control of the nonconforming item of serv,1ce:
                    - What is the implementation status                                                        .
- identification of specific time limits for corrective actions; i
of this plan?        (behind schedule or not)
- determination of adverse trends;
                    - If planned audits / surveillance                                                                      ,
- consideration for additional management actions to effect resolution of problems.
!                      vere missed determine why theyt were missed.
1.14.1
1.13.2    Review audit and surveillance reports, associated checklists and not the basis (planned or problem initiated). Determine ift                                                          .
' Discuss the audit and surveillance reports with the managers whose organizations were audited. Determine ift
                    - The scope of the activity was                                '
- management is knowledgeable of findings and their significance;
appropriate.                                                                    *
- management has taken other actions to resolve problems;
                    - If personnel conducting the audit were appropriately qualified.
- management attitude regarding quality issues is appropriate.
                    - If audit checklist appropriately addressed the specified require-ments.
 
i            --
                                                                                                                  .3                                                              .
i  .
j                                                                    .    :    ,
TI 2512/07          Appendix 5 CWSTRK. T im 10#1 IllSPECTim DECKLIST                                              PACE n Or 37                    .
REVISION        ~l
                                                                      ~
I REV. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls I
!                                                                                                                    DATES OF INSPECTION INSPECTOR i
SITE                                                                                                                               __        ..    . .            .._.-_a FINDIHCS l                                   INSPECTION AREA                                 , ACCEPTANCE CRITERIA         ;
I l
!                                  - notification of ef fective favels of management;                                                                                                   ,
                                  - identification and control of the nonconforming item of serv,1ce:
                                  - identification of specific time limits for corrective actions; i
                                  - determination of adverse trends;
                                  - consideration for additional management actions to effect resolution of problems.                                  .
1.14.1               ' Discuss the audit and surveillance reports with the managers whose organizations were audited. Determine ift
                                    - management is knowledgeable of findings and their significance;
                                    - management has taken other actions                                                             -
to resolve problems;
                                    - management attitude regarding quality issues is appropriate.


l TI 2512/07 d
l TI 2512/07 CRETlHT. IGi TEAM INSittil&l DEDLIST '
CRETlHT. IGi TEAM INSittil&l DEDLIST '                                                                             Tl&1'Or REVISION       1 u
Tl&1'Or d
CENERAL INSPECTION AREA Construction Controls                                                                         REV. DATE   9/13/g1 SITE                                                                         INSPECTOR                                                               DATES OF INSPECTION INSPECTION AREA                                                                 ' ACCEPTANCE CRITERIA                                                                 FINDINGS l
u REVISION 1
l                         .
CENERAL INSPECTION AREA Construction Controls REV. DATE 9/13/g1 SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA
1.15       Hold Points                                                                 ' Regulatory cuide 1.28 Regulatory Culde 1.74                                             '
' ACCEPTANCE CRITERIA FINDINGS l
Frequently QA/QC systems and associ-                                           ANSI N45.2 ated administrative procedures                                                 ANSI N45.2.10                                       -
l 1.15 Hold Points
established hold-points to limit                                                         .
' Regulatory cuide 1.28 Regulatory Culde 1.74 Frequently QA/QC systems and associ-ANSI N45.2 ated administrative procedures ANSI N45.2.10 established hold-points to limit the progress of an activity uncil confirmation of adequacy has been established by properly qualified persons or organizations.
the progress of an activity uncil                                           ..'
Identify hold-points for activities in this inspection area and deter.
confirmation of adequacy has been                                             '
established by properly qualified persons or organizations.
Identify hold-points for activities in this inspection area and deter .
mine if:
mine if:
                              - personnel understand the hold-point system;
- personnel understand the hold-point system;
                              - established hold-points are appro-                           '
- established hold-points are appro-priate;
priate;
- QA/QC regularly audits the perform-ance of personnel relative to hold-points;
                              - QA/QC regularly audits the perform-ance of personnel relative to hold-points;
- QA/QC has identified any organtastions who abuse the hold-point system by not stop-ping the activity santil required confirmations are in P ace; l
                              - QA/QC has identified any organtastions who abuse the hold-point system by not stop-                                     '
O I
ping the activity santil required confirmations are in P lace; O


i 8    O 9       s                                                                                                                                                   .
i 9
                                                                                                              !                                TI 2512/07 i                                 Appendix 5                                 *
s 8
                                                  @MI@ M IfMCE,,QECQ!%                                                                         PAGE ia OF         37 j                                 REVISION   1 GENERAL INSPECTION AREA Construction Controls                                                      REV. DATE 2/13/81 i
O TI 2512/07 i
SITE                                           INSPECTOR                                                 DATES OF INSPECTION l
Appendix 5
INSPECTION AREA                               ACCEPTANCE CRITERIA                                                       FINDINGS
@MI@ M IfMCE,,QECQ!%
              -  corrective actions taken or speci-fled for any. abuse of hold-points was appropriate.
PAGE ia OF 37 j
1.16       Stop-Work /Stop-Process
REVISION 1
                - Determine through conversation if QA/QC personnel clearly understand and exercise their stop-work /stop process authority and responsibil-ity.
REV. DATE 2/13/81 GENERAL INSPECTION AREA Construction Controls i
                - Determine through discussion if                         -
SITE INSPECTOR DATES OF INSPECTION l
the QA/QC organization management and staff have any reservations about exercising this authority.
INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS corrective actions taken or speci-fled for any. abuse of hold-points was appropriate.
                - Determine through discussion ~if the practices at the site com-promise QA/QC exercise of' this                                                                     ,
1.16 Stop-Work /Stop-Process
authroity.                                           ,
- Determine through conversation if QA/QC personnel clearly understand and exercise their stop-work /stop process authority and responsibil-ity.
1.16.1       Examine the functional implementation of stop-work /stop-process authority                             '
- Determine through discussion if the QA/QC organization management and staff have any reservations about exercising this authority.
                                                                                                                                              ~
- Determine through discussion ~if the practices at the site com-promise QA/QC exercise of' this authroity.
1.16.1 Examine the functional implementation of stop-work /stop-process authority
~
established by the QA/QC programs and administrative procedures to deter-mine if:
established by the QA/QC programs and administrative procedures to deter-mine if:
                  - QA/QC can act unilateraly in this regard or to what extent:
- QA/QC can act unilateraly in this regard or to what extent:
                  - management adequately supports                                                                                                                                           :
1
QA/QC actions in this regard;
- management adequately supports QA/QC actions in this regard; j


i                                                                                                     .                                                i TI 2512
i i
.                                                                                            MNim M Ihllm ORIE                                                               pAWy/07byf                           ;
MNim M Ihllm ORIE pAWy/07byf 3,
t CENERAL INSPECTION APEA                                         j                                       3, 31TE                                                                                                       Construction Controls                             REVISION _     1
TI 2512 t
                                                                                                                                                                                                          ~
CENERAL INSPECTION APEA j
INSPECTOR M . DATE_     2/13/81
31TE Construction Controls REVISION _
                                                                                                                                                                                                          ]
1 INSPECTOR M. DATE_
                                                                                                                                                        ! DATES OF INSPECTION INSPECTION AREA mmm MRM                                   ;
~
FINDINGS
2/13/81
                                      - that this authority had been                                 ,'
]
sufficiently delegated down to                               ii the lowest practical level of the QA/QC organisation.
! DATES OF INSPECTION INSPECTION AREA mmm MRM FINDINGS
- that this authority had been sufficiently delegated down to i
the lowest practical level of i
the QA/QC organisation.
1.16.2
1.16.2
)                                     Review any records demonstrating i                                   QA/QC Stop-work /stop process                                     l I
)
1 implementation and determine ift                                                                                                         I i
Review any records demonstrating i
QA/QC Stop-work /stop process l
I implementation and determine 1
ift I
i
i
                                    - management adequately supported                                       <
- management adequately supported i
the actiong 8
the actiong
                                  -affectedorganisationtookeffec-f tive corrective action; J                                                                               '
-affectedorganisationtookeffec-f 8
,                                      corrective actions were timely
tive corrective action; J
                                    -and effectivet                                                                                                           ,
corrective actions were timely
j                                - actions to preclude re-occurrence t
-and effectivet
i were taken.
- actions to preclude re-occurrence j
; 1.17 i                               Records System and Facilities Regulatory Cuide 1.28 1                                                                                                                                                                                                                      ,
were taken.
i                                - Determine if all QA/QC and
t i
* Regulatory Cuide 1.74
; 1.17 i
;                                  construction management person-                                     Regulatory Culd, 1.88 nel have received training and                                       ANSI N45.2 j                                   indoctrination regarding the                                       ANSI N45.2.!O                         .I j                                 principal system..
Records System and Facilities 1
records maintenance                             ANSI N45.2.9 i                                                                                                      10 CFR 50, Apx B. Crit i                                                                                                           XVII
Regulatory Cuide 1.28 i
- Determine if all QA/QC and Regulatory Cuide 1.74 construction management person-Regulatory Culd, 1.88 nel have received training and ANSI N45.2 j
indoctrination regarding the ANSI N45.2.!O
.I j
principal records maintenance ANSI N45.2.9 system..
10 CFR 50, Apx B. Crit i
i XVII
[
[
I
I
                                                                                                                        ,          _,3             - - --
_,3
                                                                                                                                                                    -    ^~                         --
^~


s
s l
                      .      .                                                                              m.,.
m.,.
l      . . .    . - - .            ..
1 TI 2512/07
            .-          ..                                                                              1 TI 2512/07
@MIE E IkitCl10! 0Ff11ST l Appendix 5 l
* Appendix 5
PACE M OF 37 REVISION I
                                                              @MIE E IkitCl10! 0Ff11ST ll                                  PACE M OF     37
i CENERAL INSPECTION AREA ConstructionContrbia REY. DATE 2/13/81 i
:                REVISION     I i
SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA l ACCEPTANCE CRITERIA FINDINGS e
CENERAL INSPECTION AREA ConstructionContrbia                     REY. DATE 2/13/81 i
i
  ;          SITE                                             INSPECTOR                               DATES OF INSPECTION INSPECTION AREA                     le ACCEPTANCE CRITERIA                         FINDINGS i
- Determine if any involved individ-ual can adequately access the re-cord system.
                            - Determine if any involved individ-ual can adequately access the re-cord system.
2
2
                            - Determine if records are identifiable                                                                                           i and retrievable with ease and facility.
- Determine if records are identifiable i
                            - Determine if records and properly j                               stored and safe guarded.
and retrievable with ease and facility.
                            - Determine if record interface
- Determine if records and properly j
* i control between individuals and organizations is in accordance with QA/QC and administrative procedures.
stored and safe guarded.
!                          - Determine how record or document-l                               ation deficiencies are identified and controlled until resolved.
- Determine if record interface i
l   1.17.1                 Determine if records contain the
control between individuals and organizations is in accordance with QA/QC and administrative procedures.
;                          minimum required information.
- Determine how record or document-l ation deficiencies are identified and controlled until resolved.
                            - Deternine if information is clear and legible.
l 1.17.1 Determine if records contain the minimum required information.
- Deternine if information is clear and legible.
i
i
                            - If initials are used to sign I                               records, determine if cross reference to full names are j                             available.                                   ,
- If initials are used to sign I
records, determine if cross reference to full names are j
available.
l
l


                                                                                    .--..                ...                        l.
l.
                                                                                                                                        ~..       -              ..      . . . -      . -
~..
TI 2512/07 i                         App;ndix 5
TI 2512/07 i
                                                                      @ E I E D Ill i t [ il @ Ef M M -                                                       PACE LOF                 17 j                           REVISION               1 CENERAL INSPECTION AREA Construction "Jntrols                                                 REV. DATE             2/13/g1 SITE                                                   INSPECTOR                                                       DATES OF INSPECTION INSPECTION AREA                                   ACCEPTANCE CRITERIA                     ,                        FINDINGS
App;ndix 5
,t t. ..
@ E I E D Ill i t [ il @ Ef M M -
                                                                                                                            \.
PACE LOF 17 j
1.18                 Nonconformance and Trendins                       Regulatory Guide 1.28                                             '
REVISION 1
Regulatory Guide 1.74
CENERAL INSPECTION AREA Construction "Jntrols REV. DATE 2/13/g1 SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS t
                              - Determine if nonconforming items.                 ANSI. N45.2                                                           '
\\.
or services are being routinely                 ANSI N45.10
, t...
* identified and documented.                                                                                                           ~
1.18 Nonconformance and Trendins Regulatory Guide 1.28 Regulatory Guide 1.74
(Discuss and record review.)         .
- Determine if nonconforming items.
                                - Determine h,ow many types.or.              .
ANSI. N45.2 or services are being routinely ANSI N45.10 identified and documented.
categories of nonconformance                                                                                                     -  -                                                    '
~
documentation is used. (i.e.,                     .i
(Discuss and record review.)
                                    " Deficiency Reports", " Corrective-   ,
- Determine h,ow many types.or.
Action Requests", " Deviation Reports", and " Audit Findings",                          ,
categories of nonconformance documentation is used.
(i.e.,
.i
" Deficiency Reports", " Corrective-Action Requests", " Deviation Reports", and " Audit Findings",
etc.
etc.
                              - Determine if proposed corrective actions are appropriate and                 .
- Determine if proposed corrective actions are appropriate and timely.
timely.
- Determine if prescribed levels of authority and independence.
                              - Determine if prescribed levels of authority and independence.
concurred in resolution.of issue.
concurred in resolution.of                       ''
- Determine if nonconformance and corrective action documentation is properly identified and con-trolled.
issue.
e r,
                              - Determine if nonconformance and corrective action documentation
* is properly identified and con-trolled.                                           .-
e
                                  .                                                                          . r,                                                                                                    ,


i   .
i
:                    i                                ;      )
)
TI 2512/07 Appendix 5                   .
i TI 2512/07 Appendix 5 MNIm lT#1 IfffEclim gel 1151' PAGE L OF 37 REVISION I
MNIm lT#1 IfffEclim gel 1151'                                               PAGE L OF 37 REVISION I CENERAI. INSPECTION AREA Construction Controls                                   M . DATE 4WN SITE                                           INSPECTOR                                               ! DATES OF INSPECTION INSPECTION AREA                               ACCEPTANCE CRITEP.IA                                     FINDINGS t
CENERAI. INSPECTION AREA Construction Controls M. DATE 4WN SITE INSPECTOR
                    - Is a central log identifying nonconformance documentation maintained? Is it adequate?
! DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITEP.IA FINDINGS t
                    - By record review, determine if procedures controlling noncon-formance documentation are       '
- Is a central log identifying nonconformance documentation maintained? Is it adequate?
adhered to..
- By record review, determine if procedures controlling noncon-formance documentation are adhered to..
1.18.1         Determine if there is a systematic and regularly reviewed " Trending" of repeat nonconformances.
1.18.1 Determine if there is a systematic and regularly reviewed " Trending" of repeat nonconformances.
1.18.2         Determine if the trending program includes all types or categories of nonconformances. (i.e., "Defici-ency Reports", "Nonconformance Reports", " Deviation Reports", and                                                 '
1.18.2 Determine if the trending program includes all types or categories of nonconformances.
                    " Audit Findings"n etc.
(i.e., "Defici-ency Reports", "Nonconformance Reports", " Deviation Reports", and
                    - If it does not, establish the               ,
" Audit Findings"n etc.
reason.                                                                       '
- If it does not, establish the reason.
                    - Determine if the " Trending"         '
- Determine if the " Trending" system used by contractors and licensee are compatable or interface adequately.
system used by contractors and licensee are compatable                                                                   -
- Review corrective action caused by the identification of adverse trends.
or interface adequately.
                    - Review corrective action caused by the identification of adverse                                                                                                         ,,
trends.


        .-    ..                                                                                                        TI 2512/07 C0fGTETIGlIF#1 If&TfiiDi UEcklj5r                                           H 5 AWdH b_Or                 37 REVISION         1 i'
TI 2512/07 H 5 C0fGTETIGlIF#1 If&TfiiDi UEcklj5r AWdH b_Or 37 REVISION 1
REY. DATE       2/13/81 CENERAL INSPECTION AREA Coce ttsatf ou,C_ontrols i
i REY. DATE 2/13/81 CENERAL INSPECTION AREA Coce ttsatf ou,C_ontrols i
SITE                                         INSPECTOR                                       DATES OF INSPECTION
SITE INSPECTOR DATES OF INSPECTION
                                                                              - ._. m                                       .    . . _ _ _ . . . _ _ . .
-._. m INSPECTION AREA ACCEPTANCE CRT.TERIA l
  !                      INSPECTION AREA                           ACCEPTANCE CRT.TERIA   l                           FINDINGS i                                                                                       ,
FINDINGS i
t i                                                                                                                                                           .
t i
1.18.3     Determine if the subject organizations' management regularly reviews noncon-
1.18.3 Determine if the subject organizations' management regularly reviews noncon-formance summary reports and trend evaluations.
;                formance summary reports and trend                                 '
- Determine if the subject organiza-tions' management took any actions or wrote any directives as a result of this information.
;                evaluations.
l 1.18.4 Determine if involved personnel under-stand the system for identification and control of nonconformances.
                  - Determine if the subject organiza-tions' management took any actions           -
- Did they receive adequate training?
or wrote any directives as a result of this information.
1.19 Construction Contrals Regulatory Guide 1.28 i
l     1.18.4     Determine if involved personnel under-                                                                     -
Regulatory Guide 1.74 Determine how the site construction ANSI N45.2.4 orhanizations are organized to' con-ANSI N45.2.23 trol the subject construction activity ANSI N&5.2.12 and evaluate the adequacy of QA/QC ANSI N45.2.13 interfaces with these construction ANSI N45.2 organizations. The specific elements ANSI M45.10 to consider are
stand the system for identification                                             ,
- Is the organization arrangement functionally resre-:1ve to QA/QC and Administrative procedures?
and control of nonconformances.                    .
- Adequate QA/QC participation in specific construction activities.
;                - Did they receive adequate training?
1.19       Construction Contrals                         Regulatory Guide 1.28             ,
i                                                                Regulatory Guide 1.74 Determine how the site construction           ANSI N45.2.4 orhanizations are organized to' con-         ANSI N45.2.23 trol the subject construction activity       ANSI N&5.2.12 and evaluate the adequacy of QA/QC           ANSI N45.2.13 interfaces with these construction           ANSI N45.2 organizations. The specific elements         ANSI M45.10 to consider are
                    - Is the organization arrangement functionally resre-:1ve to QA/QC and Administrative procedures?
                    - Adequate QA/QC participation in specific construction activities.                                       ;
i
i


                                                                                                                  ,  [.;_ _             ,
[.;_ _
o i
o i
                                                                                                                                                                              )
)
  .u                                                                                                                 I ll                                                                                                                   t                           TI 2512/07 G16TRI.
.u I
APP    x5 i                                                                            T I(N YAM ltGTCTIGtGRMJg                                                                             ,
ll t
l                                                                                                                   j                               REVIS         1 M . DATE CgNERAL INSPECTION ARRA Constructica Controls                                                           2/13/81 SITE                                     INSPECTOR                                   _
TI 2512/07 G16TRI. I(N YAM ltGTCTIGtGRMJg APP x5 i
_l       DATES OF INSPECTION
T l
                                                                                        -_y.._-..         -_
j REVIS 1
l                                   INSPECTION AREA                               ACCEPTA2CE CR1YEIIA                                           FINDINGS f
CgNERAL INSPECTION ARRA Constructica Controls M. DATE 2/13/81 SITE INSPECTOR
                              - Assignment of QA/QC management and staff to specific areas of contractor j,                               responsibility.
_l DATES OF INSPECTION
                              - Is information flow for hold-point
-_y.._-..
* notification clearly provided for                                                                                                                     l' and do involved personnel under-j                               stand the system?
l INSPECTION AREA ACCEPTA2CE CR1YEIIA FINDINGS f
l
- Assignment of QA/QC management and staff to specific areas of contractor j,
!                1.19.1     Does the QA/QC organization participate
responsibility.
'                            in work planning an'd scheduling meetings?
- Is information flow for hold-point notification clearly provided for l'
Determine the existance and adequacy l                             of the following
and do involved personnel under-j stand the system?
                              - Does QA/QC management forecast it's staffing requirements and assign-mente based on particpation in scheduling and planning meetings?
l 1.19.1 Does the QA/QC organization participate in work planning an'd scheduling meetings?
                              - Examine records attesting to this participation'and evaluate the extent of participation.
Determine the existance and adequacy l
1.19.2       Is there adequate coverage of activit-                                                     l tes by the QA/QC organisation? Deter-                                                       l mine by:
of the following
                              - discussions with QA/QC inspectorsg                                                     j
- Does QA/QC management forecast it's staffing requirements and assign-mente based on particpation in scheduling and planning meetings?
                              - discussion with craftemen, shop                                                         ,
- Examine records attesting to this participation'and evaluate the extent of participation.
stewarts, and third party inspectorat                                                 !
1.19.2 Is there adequate coverage of activit-l tes by the QA/QC organisation? Deter-l mine by:
    - - _ _          _                                                    .        -- _    M:   f-
- discussions with QA/QC inspectorsg j
- discussion with craftemen, shop stewarts, and third party inspectorat M:
f-


3 l                       TI 2512/07 Appendix 5 j                                     ,
3 l
l (QlSIIHIlGLIEMI IIEPECTIGl GE04 IST                               FACE .26_0F _ i u REVISION       1                           s CINERAL INSPECTION AREA Construction Co trols i
TI 2512/07 j
I,                       SITE                                       _
l Appendix 5 (QlSIIHIlGLIEMI IIEPECTIGl GE04 IST FACE.26_0F _ i u REVISION 1
INSPECTOR                                 DATES OF INSPECTION i.
s CINERAL INSPECTION AREA Construction Co trols i
INSPECTION AREA                               ACCEPTANCE CRITERIA                               FINDINGS i                                                                                     !
I, SITE INSPECTOR DATES OF INSPECTION i.
                                      - discussion with craft supervision personnel.                            :                                                            ,                                              .
INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS i
1,19,3           Determine to the extent possibles                                           .
- discussion with craft supervision personnel.
                                      - if there are any instances where-in a work activity was.stoppe'd because of the unavailability of '                     .                                        t QA/QC participation and why they                                                                                                               ''
1,19,3 Determine to the extent possibles
were unavilable by:                                                                   , ,
- if there are any instances where-in a work activity was.stoppe'd because of the unavailability of '
l                                      - discussion with production                                                                    '.
t QA/QC participation and why they were unavilable by:
managers;                                                                                                                                      .
l
l
                                      - concurrently determine the pro-                                                                 '
- discussion with production managers; l
i                                         duction managers attitude regarding
- concurrently determine the pro-i duction managers attitude regarding the adequacy and availability of QA/QC staff; 1
;                                        the adequacy and availability of               -
- review and discussion of procedures written to preclude ongoing activit-l 1es without QA/QC participation;
!                                        QA/QC staff; 1
- determine extent of licensee manage-ment notification. and participation in the resolution of the problem associated with these considerations; e
!                                      - review and discussion of procedures written to preclude ongoing activit-l 1es without QA/QC participation;                                                 ,
s
                                      - determine extent of licensee manage-ment notification. and participation in the resolution of the problem                                           ,
associated with these considerations; e
s                                                           .--                                                                                  .


                                                            .  . i.                        .
. i.
i                                                                                 .
i MNI M If N i E D EC EIST_
MNI             M If N i E D EC EIST_                                               PAGE 2 REVISION 0F 1
PAGE 2 0F REVISION 1
REV. DATE 2/13/81 GENERAL INSPECTION AREA Construntion Controls
REV. DATE 2/13/81 GENERAL INSPECTION AREA Construntion Controls t
                                                                                  .                          t SITE                                           INSPECTOR.                                         DATES OF INSPECTION ACCEPTANCE CRIT):,RIA                 ,'                          FINDINGS INSPECTION AREA                         ,
SITE INSPECTOR.
                                                                                                            }
DATES OF INSPECTION ACCEPTANCE CRIT):,RIA FINDINGS INSPECTION AREA
4                                                                 i 1
}
1.20         Equipment Qualification and                       Fegulatory Guide 1.28 4
4 i
1 Calibration
1 1.20 Equipment Qualification and Fegulatory Guide 1.28 4
                                                          -            Regulatory Guide 1.74 Regulatory Guide 1.23 ANSI N45.2 4
Regulatory Guide 1.74 1
Confirm through records review                                                      -
Calibration Regulatory Guide 1.23 Confirm through records review ANSI N45.2 4
that the QA/QC and administrative                 ANSI N45.2.10 procedural requirements for equip-               ANSI N45.2.13 ment and materials qualification /
that the QA/QC and administrative ANSI N45.2.10 procedural requirements for equip-ANSI N45.2.13 ment and materials qualification /
calibration are adhered to by the following:                                                                                                             .
calibration are adhered to by the following:
                    -  verify thint responsible personnel
verify thint responsible personnel are qualified to make determina-tions as to adequacy 3 verify that such items are labeled to show atatus:
* are qualified to make determina-tions as to adequacy 3
verify that adequate documentation is available to support acceptability:
                    -    verify that such items are labeled to show atatus:                           .
verify adequacy of item by comparison and evaluation of purchase order specification, receipt inspection records, and other pertinent records:
                      -  verify that adequate documentation is available to support                                             ,
verify the traceability of qualif-ication/ calibration records to items is maintained.
acceptability:                                                       ,
I elicit commients'and opinions from~
                      -  verify adequacy of item by comparison and evaluation of purchase order specification, receipt inspection records, and other pertinent                                           .
contacted personnel regarding
records:                                                                                 .
                      -  verify the traceability of qualif-ication/ calibration records to                                                                               ,
items is maintained.
I
                      -  elicit commients'and opinions from~                                                 ;    ,
contacted personnel regarding                     -                    - ._


              '      '                                                                                  1
1
                                                                                                    ~'
~'
                                                                                                        !' ~               Appnidix 5         7           -
!' ~
      ,-            -                                      UIETRLTim TEM INsitt:ilm UELYdhT!                               PAos_za_or       M g
Appnidix 5 7
REVISION     1                     ,
UIETRLTim TEM INsitt:ilm UELYdhT!
                                                                                                                                .        2/ W 81 t
PAos_za_or M
GsNERAI. INSFECTION AREA              i Construe _t_fca Coatrela                                                   l-t INSFECTOR                                 DATES OF INSFECTION SITE l; _ _ _ _ _
REVISION 1
\                                                                          ACCEPTANCE CRITERIA                           FINDINGS INSFECTION AREA 1
g 2/ W 81 Construe _t_fca Coatrela l-i GsNERAI. INSFECTION AREA t
'                      - review outstanding nonconformances i
t SITE INSFECTOR DATES OF INSFECTION l;
and open items involving the subj.ect l                           Inspection area.
INSFECTION AREA ACCEPTANCE CRITERIA FINDINGS
I Handlina and Storage of Materials                 Regulatory Guide 1.28 1.21                                                             Regulatory Guide 1.37                                   -
\\
Determine if the implementation of               Regulatory Guide 1.74 l                        meterial and equipment handling,                 ANSI N45.2 storage, shipping, cleaning, and                 ANSI N45.2.1.
1
l f                        preservation is in accordance                   ANSI N45.2.2 with QA/QC and administrative                   ANSI N45.2.10 procedures and instructions by the following i
- review outstanding nonconformances i
                        - observe all storage areas for e
and open items involving the subj.ect l
                            . subject items 3                                                                                                                   \
Inspection area.
1; i                       - verify the adequacy of storage i
I Handlina and Storage of Materials Regulatory Guide 1.28 1.21 Regulatory Guide 1.37 l
Determine if the implementation of Regulatory Guide 1.74 meterial and equipment handling, ANSI N45.2 ANSI N45.2.1.
storage, shipping, cleaning, and l
ANSI N45.2.2 preservation is in accordance f
with QA/QC and administrative ANSI N45.2.10 procedures and instructions by the following
- observe all storage areas for i
. subject items 3
\\
e 1;
i
- verify the adequacy of storage i
of selected itemag 4
of selected itemag 4
                          - review QA/QC surveillance records                                                                                                 ' ,I f
f
for frequency and comprehensive-l                           ness of inspectiong
- review QA/QC surveillance records
                          - determine awareness and qualifica-7 1
',I for frequency and comprehensive-l ness of inspectiong
- determine awareness and qualifica-7 1
tion of store-keeperst b
tion of store-keeperst b
d                          - determine the adequacy of issue controit                                                                                                                       .
- determine the adequacy of issue d
I
controit I
;                          - are conditional releases used and j                             are the appropriately contro11eds                                                                                             -
- are conditional releases used and j
a
are the appropriately contro11eds a


1 .
1
                                                                                                  . p.      ..  .
. p.
3,   .
3, TI 2512/07 UETRLTIGl TERN INSPECTIGl DEddSI AM W Y 0r u
TI 2512/07 UETRLTIGl TERN INSPECTIGl DEddSI                               AM W Y 0r u                     -
l REVISION i
l                 REVISION i GENERAL INSPECTION AREA Construction _ Controls                       REY. DATE 9/11/ni SITE                                       INSPECTOR f
GENERAL INSPECTION AREA Construction _ Controls REY. DATE 9/11/ni SITE f
DATES Or INSPECTION INSPECTION AREA                             ACCEPTANC CRITFI.IA                             FINDINGS
INSPECTOR DATES Or INSPECTION INSPECTION AREA ACCEPTANC CRITFI.IA FINDINGS
                    - observe material handling and handling equipment; determine adequacy;
- observe material handling and handling equipment; determine adequacy;
                    - evaluate housekeeping conditionst
- evaluate housekeeping conditionst
                    - evaluate fire and other hasard protectioni
- evaluate fire and other hasard protectioni
                    - evaluate adequacy of storage areas;                                                       '
- evaluate adequacy of storage areas;
                    - determine if there are controlled areas for nonconforming items;
- determine if there are controlled areas for nonconforming items;
                    - are there adequate measures to preclude use of nonconforming items;
- are there adequate measures to preclude use of nonconforming items;
                    - are nonconforming items adequately identified;
- are nonconforming items adequately identified;
                    - are manufacturer's recommendations appropriately addressed                     *
- are manufacturer's recommendations appropriately addressed
                    - are material control personnel adequately trained and indoctrinated regarding QA/QC requiremente?
- are material control personnel adequately trained and indoctrinated regarding QA/QC requiremente?
4
4 A
_                ____A                                  _  __ _ _ _    _


                                                                          ~
~
      .    ,                                                                                                                            l E IECII@OMIS['
l I
I                                                                                                              PACE             OF     3 i
E IECII@OMIS['
                                                                              . *                                                        !                                      REVISION            1 GENERAL INSPECTION ADEA Construction control's                                                                                   REY. DATE             2/13/5!
REVISION 1
i'                                                                                                                                         ;
PACE OF 3
SITE                                           INSPECTOR                                             _          _
i GENERAL INSPECTION ADEA Construction control's REY. DATE 2/13/5!
DATES OF INSPECTION i                                                     -    .
i' SITE INSPECTOR DATES OF INSPECTION i
                                                                                                                                                                                                                    . . . _ _ _ _ _ _ , i 1
... _ _ _ _ _ _, i 1
l                   INSPECTION AREA                                         ACCEPTANCE CP.ITERIA                                         1.                               -FINDINGS 4
l INSPECTION AREA ACCEPTANCE CP.ITERIA 1.
i           . - . . . . _ _ . . . . _ _ . _ . _ _ _ -                  ... _          .,-
-FINDINGS i
l   2. Management Involvement QA/QC Organization                         Regulatory Gei.f4 1.26
4 l
'          Corporate / Site                                                 Regt:14tcry Cride 1."#4
2.
                                                                    . ANSI N45.2 2.1     Does the documented policy state-             ,    ., ANSI N45.2.10 ment include a concise definition ANSI M45.2.3                                                 .                                        -
Management Involvement QA/QC Organization Regulatory Gei.f4 1.26 l
of the management mission or task                       SAI Chepter li                                                                                         -
Corporate / Site Regt:14tcry Cride 1."#4
objectivest                                                                                                                                           '.
''. ANSI N45.2 2.1 Does the documented policy state-
e                                                              t 2.2     Determine through discussion.if                       -
., ANSI N45.2.10 ment include a concise definition ANSI M45.2.3 of the management mission or task SAI Chepter li objectivest e
principal management personnel                                                           '
t 2.2 Determine through discussion.if principal management personnel clearly understand and support quality assurance constituents and requirements.
clearly understand and support quality assurance constituents                                                                                     '
~
and requirements.
2.3 Do principal corporate individuals assigned responsibility for QA/QC direction, have responsibilities for other areas: Does multiple responsibility adversely affect QA/QCf 2.4 Does corporate management have clearly defined administrative procedures controlling the delegation of authority?
                                                                            ~
Does the assigned individual have clearly defined r,esponsi-bilities and authority?
2.3     Do principal corporate individuals                                                                                                                           '
er e
assigned responsibility for QA/QC                             '                                                  '
g 1
direction, have responsibilities for other areas: Does multiple responsibility adversely affect QA/QCf 2.4     Does corporate management have clearly defined administrative procedures controlling the                                                                                       .
*r
delegation of authority?
,p.
Does the assigned individual                                 ' '
have clearly defined r,esponsi-
* bilities and authority?                                                       .
er .
e                                                                                                      g
              %                                                                                *r 1
                                                                                                                                                                                                                ,p.                 ,


                    .                                                                   . _ . . _.    . g._. f. .           -                                          _
.._. f..
          .'    '*                                                                                                                                                                        e i
g e
TI 2512/07     Appendix 5 CGETRETIM TFM IECTIGl DEdd_IST                                                                         PACE L OF         37
i TI 2512/07 Appendix 5 CGETRETIM TFM IECTIGl DEdd_IST PACE L OF 37 l
        -                                                                                                      l                                                REVISION     I CENERAL INSPECTION AREA _ Construction Controls                                                           REV. DATE 2/13/81 SITE
REVISION I
  ,                                                      INSPECTOR
CENERAL INSPECTION AREA _ Construction Controls REV. DATE 2/13/81 SITE INSPECTOR DATES OF INSPECTION 4
                                                                                                      -          DATES OF INSPECTION 4                               -- --
_ __.=, ;_m.2_..
_ __ .=, ;_m.2_..                                                                        ._      . . .
INSPECTION AREA ACCEPTANCE CRITERIA
INSPECTION AREA                         ACCEPTANCE CRITERIA
{
{                                           FINDINGS I
FINDINGS I
J 2.5     Does corporate management regularly review the performance of individ-uals with delegated responsibilitieel i
J 2.5 Does corporate management regularly review the performance of individ-uals with delegated responsibilitieel i
Now frequently does corporate management visit the site? Does                                                               -
Now frequently does corporate management visit the site? Does it appear adequate?
it appear adequate?
4 Does corporate management rou-tinely review audit and noncon-l formance trending reports from the site? From vendors and suppliers?
4 Does corporate management rou-tinely review audit and noncon-l                           formance trending reports from the site? From vendors and suppliers?
Is there documented evidence that corporate management positively responds to adverse 3
Is there documented evidence that corporate management positively responds to adverse                                                                                                                                 3 routine site audits? Surveil '
routine site audits? Surveil '
lance and nonconformance report summaries and trendatf. From vendors and suppliers?
lance and nonconformance report summaries and trendatf. From vendors and suppliers?
l Does corporate management i
l Does corporate management i
Line 2,177: Line 2,703:


i
i
  ._ .                                                                                                    ,,c.,..-.       .                                                        .      _
,,c.,..-.
j 8
j GETRLTIM TIW1 IfEPELTim DErXIST, Ncs'$ 7
Ncs'$ 70r ^$$"d'*'
^$$"d'*'
GETRLTIM TIW1 IfEPELTim DErXIST,                                                                                                                            ~
8 0r 4.
REVISION                     1 ~~                                   !
l REVISION 1 ~~
: 4.                                                                                          l REY. DATE 2/13/81 GENERAL INSPECTION AREA Construction Controls i
~
SITE                                         INSPECTOR                                             !DATESOFINSPECTION                                                                                           '
GENERAL INSPECTION AREA Construction Controls REY. DATE 2/13/81 i
INSPECTION AREA                           ACCEPTANCE CRITERIA                       '
SITE INSPECTOR
FINDINGS                                                               !
!DATESOFINSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS 2.6 Does corporate management'have a i
2.6 Does corporate management'have a         ,
doctamented plan and schedule for independent management audits of all site activitiest How frequently do these audits occur?
i                    doctamented plan and schedule             ,
Have previous audits been com-prehensive and substantivd in t
for independent management
their implementation?
,                    audits of all site activitiest How frequently do these audits
I What is the implementation status of this independent audit function? (On schedule or nott)
,                        occur?
If not on schedule, examine the cause.
                    -    Have previous audits been com-
Note any indication of e porate management attitude
;                        prehensive and substantivd in their implementation?                                                                                                                                                                         t I                   -
~
What is the implementation status                                                                                                                                                             -
of this independent audit                                                                                                                                                                     '
function? (On schedule or nott)                                                                                                                                               .
If not on schedule, examine the cause. Note any indication of e porate management attitude                                                                                                                                                       ~
problems.
problems.
Is there documented evidence that management took comprehensive corrective actions for all noted nonconformances and further examined and evaluated all concerns and observations?
Is there documented evidence that management took comprehensive corrective actions for all noted nonconformances and further examined and evaluated all concerns and observations?
                    - Was corrective action followed up in a timely and effective manner, and its implementation verified by corporate management? Were                                                   '
- Was corrective action followed up in a timely and effective manner, and its implementation verified by corporate management? Were additional follow-up audits directed by corporate management?
additional follow-up audits directed by corporate management?


i                           TI 2512/07 Appendix 5
i TI 2512/07 Appendix 5
                                                  @6fRI, TIGi WRI!!SKCTd' LUECEISri                                                       PACE 33 Or 37_
@6fRI, IGi WRI!!SKCTd' LUECEISri PACE 33 Or 37_
REVISION l CENERAL INSPECTIO*! ARCA_ Construction _ Controls                                                     . DA E 2/13/M SITE                                                                                                      I                                                                               '
T REVISION l CENERAL INSPECTIO*! ARCA_ Construction _ Controls
INSPECTOR                                                 DATES OF INSPECTION                                                             i INSPECIION AREA                                   ACCEPTANCE CRITERIA                                             FINDINGS                                               t Determine through meeting record                                                                                                                                     -
. DA E 2/13/M I
review, and discussions with corporate management personnel                                                                                                                                       f if the QA/QC organization is                                                                                                                                         l provided support and considera-tion cosamensurate with that                                               -
SITE INSPECTOR DATES OF INSPECTION i
provided other construction organizations?                                                                                                                                                         ,
INSPECIION AREA ACCEPTANCE CRITERIA FINDINGS t
i, 2.7   Examine the organization and opera-                                                                                                                                         i tion of the corporate management                                               ,
Determine through meeting record review, and discussions with f
individuals or groups responsible for evaluation and approval of QA/QC manpower request.
corporate management personnel if the QA/QC organization is l!.
Were assessment and approvals                                                                                                                                         ''
provided support and considera-tion cosamensurate with that provided other construction organizations?
responsive to demonstrated needs?
i, 2.7 Examine the organization and opera-i tion of the corporate management individuals or groups responsible for evaluation and approval of QA/QC manpower request.
Were assessment and approvals responsive to demonstrated needs?
Was adequate compensation, relati"e to other trades, estab-lished to attract fully qualified candidates?
Was adequate compensation, relati"e to other trades, estab-lished to attract fully qualified candidates?
Were the evaluations and appro-vals reasonable in the context of justified need?
Were the evaluations and appro-vals reasonable in the context of justified need?
Is unjustified rigor imposed on the justification for such requisitions?                                                                     '
Is unjustified rigor imposed on the justification for such requisitions?


                                                                                                                          - - i                                                                   .        .
- - i M N ImTMilBMIm0W qi M f orAPPgdix5 REVISION i
        .-      ..                                      M N ImTMilBMIm0W qi                                                                                     M f orAPPgdix5 REVISION           i                                       l:
l:
                                                                                                                                                                                                              ~
i, GENERAL INSFECTION AREA _ Ceastruction controla REV. DATE _2/13/A1
i, GENERAL INSFECTION AREA _ Ceastruction controla                                                               REV. DATE _2/13/A1                                         j i'
~
                                                                                          -                                    !                                                                                            t' SITE INSPECTOR                                                           LATES OP INSPECTION                                                                             *
j i'
                                                                              . . ~ _ _ _ _ . _
t' SITE INSPECTOR LATES OP INSPECTION
s INSPECTION AREA                                 ACCEPTAMCE CRITERIA                                                             FINDINGS'
.. ~ _ _ _ _. _
                                                  ..                                                                                                                                                                          t I
s INSPECTION AREA ACCEPTAMCE CRITERIA FINDINGS' t
2.8         Examine the organization and opera-       g.
I t'
t' tion of corporate management indivi-         6 i
2.8 Examine the organization and opera-g.
duals or groups responsible for                     ',                  *  -              -
tion of corporate management indivi-6 i
evaluating and approving QA/QC                 ,      ,
duals or groups responsible for evaluating and approving QA/QC housing equipment and facility '
housing equipment and facility '                                                                                                    '
i requisitions.
                                                                                                                                                                                                                .            i requisitions.                                                                                                   '            '
Were assessments and approvals /
Were assessments and approvals /
denials adequately responsive         '      '
denials adequately responsive l
l                              to justified needs?                                                             *
to justified needs?
* Corroborate opinions of site                                                                         ,
Corroborate opinions of site based QA/QC management by discussion with QA/QC auditors and inspectors and document conclusions.
based QA/QC management by                     '
2.9 Has the licensee established a QA l.
discussion with QA/QC auditors and inspectors and document           ;
review committeet What is the. composition of the committee (i.e., job descrip-tions of individuals)?
* conclusions.                                                                                                                             ,
2.9 Has the licensee established a QA                     ,                      .
l.
,,                    review committeet                                               .
What is the. composition of the committee (i.e., job descrip-tions of individuals)?
:i l
:i l
Are the responsibilities and l
Are the responsibilities and interfaces clearly documented?
interfaces clearly documented?
l
                                                                                                                                ' ('
' ('
  '                        Does the review committee meet                                 "
Does the review committee meet frequently enough to be effec-tive?
frequently enough to be effec-tive?
i ll l '
i ll l '
(                                                                                           '
(
o.
o.
e                        I ;     (
I ;
(
e


                                                                                                    ..  , j. _       ..
, j. _
i NEIh E IECf5MEM                                           i GE REVISION OF 1
i NEIh E IECf5MEM GE OF i
GENERAL INSPECTION AREA __Ccastruction Centrols                                                   REV. DATE 2/13/81 SITE                                       . INSPECTOR.                                               DATES OF INSPECTION INSPECTION AREA                                   ACCEPTANCE CRITERIA                                                 FINDINGS 7..._.
REVISION 1
i i                                      {
GENERAL INSPECTION AREA __Ccastruction Centrols REV. DATE 2/13/81 SITE
Does the review committee followup' on its directives?
. INSPECTOR.
DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS 7..._.
i
{
i Does the review committee followup' on its directives?
Does corporate management take initiative regarding safety issues or wait for expression of NRC concern?
Does corporate management take initiative regarding safety issues or wait for expression of NRC concern?
(Verify through inspection experi-                                                                                                 '
(Verify through inspection experi-ence and any indication of un-addressed prior knowledge of nonconforming conditions).
ence and any indication of un-addressed prior knowledge of nonconforming conditions).
Is corporate management adequately responsive to NRC concerns and noncompliance items?
Is corporate management adequately responsive to NRC concerns and                                                                                                                                                                                         -
2.10 Hansgement Effectineness (Through records review and discuss-lon with personnel, evaluate the following):
noncompliance items?
2.10.1 Are responsibilities of management and subordinates clearly defined?
2.10       Hansgement Effectineness (Through records review and discuss-lon with personnel, evaluate the following):
2.10.2 Do corporate management and sub-ordinates appear to completely understand their responsibilitiest i
2.10.1     Are responsibilities of management                                                                   #
2.10.3 Are subordinates held accountable for assigned responsibilities?
and subordinates clearly defined?
2.10.2   Do corporate management and sub-ordinates appear to completely understand their responsibilitiest                                                                 i 2.10.3   Are subordinates held accountable for assigned responsibilities?                                                                     '


NG$"as'Or $f*"                         "'
C0f6TitLTim_IDVi !NSPECTION DEDilST" NG$"as'Or$f*" " '
C0f6TitLTim_IDVi !NSPECTION DEDilST" REVISION             1 GENERAL INSPECTION AREA Construct _ ion controls                                                      REY. DATE           2/13/81 i
REVISION 1
SITE                                                     INSPECTOR                                               DATES OF INSPECTION l
REY. DATE 2/13/81 GENERAL INSPECTION AREA Construct _ ion controls i
                                                                                                                    ^
SITE INSPECTOR DATES OF INSPECTION l
I                 INSPECTION AREA                                           ACCEPTANCE CRITERIA                                                         FINDINGS 2.10.4     Are interfacing management activities between different oiganizations clearly defined?
I INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS
2.10.5     Is the management attitude regard-                                               .
^
ing safety related construction i
2.10.4 Are interfacing management activities between different oiganizations clearly defined?
auch that adequate attention and                                     ,
2.10.5 Is the management attitude regard-ing safety related construction i
suppoct can be expected in all
auch that adequate attention and suppoct can be expected in all areas of safety significance?
;              areas of safety significance?                                                   -
i t
i                                                                                                                                                                                                                 t 2.10.6     Does corporate management provide adequate support and compensation, rela tive to other trades, tre assure that the requisite quality of personnel, materials, and services is available?
2.10.6 Does corporate management provide adequate support and compensation, rela tive to other trades, tre assure that the requisite quality of personnel, materials, and services is available?
2.10.7   Does management require timely and thorough reporting of 50.55(e) and part 21 occurrences?
2.10.7 Does management require timely and thorough reporting of 50.55(e) and part 21 occurrences?
2.10.8     Is management kept adequately informed by subordinates?
2.10.8 Is management kept adequately informed by subordinates?
2.10.9   Is management aware of current issues and problems?
2.10.9 Is management aware of current issues and problems?
O e
O e
o                                        ,e
,e o


                                                                                      ~
~
_ ,  j.              .      .
j.
TI 2512/07 Appendix 5 C@SIllUIM TtM ll6ttilGi GiECRIST                                                 PACS 37 Or                 37         -
TI 2512/07 Appendix 5 C@SIllUIM TtM ll6ttilGi GiECRIST PACS 37 Or 37 REVISION ~
                                                                                                          ,                            REVISION ~             l GENERAL INSPECTION AREA Construction Controle                                             . DATE _2/13/81 SITE                                               INSPECTOR iDATES OF INSPECTION
l GENERAL INSPECTION AREA Construction Controle
_._-3 INSPECTION AREA                                                                                                                           '
. DATE _2/13/81 SITE INSPECTOR iDATES OF INSPECTION
ACCEPTANCE ORITERTA             f                           FINDINGS                                     '
_._-3 INSPECTION AREA ACCEPTANCE ORITERTA f
                                                                                              .. -. .-l.     ...--.. ..- .. . .-        . .- ---..--- - .-.              -. e 2.10.10                                                                                             i Are subordinates informed by manage-                                                     '
FINDINGS
ment?
.. -..-l.
-. e i
2.10.10 Are subordinates informed by manage-ment?
What is the routine procedure?
What is the routine procedure?
1 What special procedures are implemented?
1 What special procedures are implemented?
2.10.11   Does corporate management support the delega: ba c" stop/werk-stop process authority co lowest level practical (QA/QG inspet. tor)?                       .
2.10.11 Does corporate management support the delega: ba c" stop/werk-stop process authority co lowest level practical (QA/QG inspet. tor)?
a 9
a 9
O
O


                                                                                              ,                                                          j..-..-..                                                     , - -        ,
j..-..-..
: i.                         \.     .)                                                                       '
I i.
r                                                                                                   ,
\\.
l;                                                                                                                                                                                     *
.)
:i                                                                                                                                                                   -
r l;
ii   ;
:i ii TI 2512/07 APPenclx 6 CONSTRUCTICN TEAM INSPECT 10li CllECKLIS'T Page of 6 Revision No.
TI 2512/07                                         .
1 GENERAL INSPECTION APEA: PROCHREMENT CONTROLS - SITE Dal;e:-
APPenclx 6 CONSTRUCTICN TEAM INSPECT 10li CllECKLIS'T                                                                         Page         of 6 Revision No.                 1 GENERAL INSPECTION APEA: PROCHREMENT CONTROLS                                                                           Dal;e:-           -2/13/81 SITE INSPECTIONSETE:                                         INSPECTOR:
2/13/81 INSPECTIONSETE:
1 1
1 INSPECTOR:
DATES OF INSPECTION _ / i to_ / J                                     ;,
1 DATES OF INSPECTION _ / i to_ / J INSPECTION AREA hy ICE FINDINGS 4
hy INSPECTION AREA                                                 ICE FINDINGS 4
3 3
3 3
: 1.           Program implementation '                                                                                                           .
1.
1.1         Procurement Activity (Major Contractors /.                                                                                                                                                       '
Program implementation '
Disciplines / Subcontractors)                                                                         '
1.1 Procurement Activity (Major Contractors /.
!l Selectively examine several procurement documents for major con. tractors, disciplines an<l/or subcontractors at the site.
!l Disciplines / Subcontractors)
2                                                                                                                   .
Selectively examine several procurement documents for major con. tractors, disciplines an<l/or subcontractors at the site.
      ,          1.1.1 Are the specified design parameters in                       .                        ,        >J     -
2 1.1.1 Are the specified design parameters in
:                accordance with those ilsted in th:i SAR or other AE/ Licensee specifications applicable to the
>J accordance with those ilsted in th:i SAR or other AE/ Licensee specifications applicable to the
                                                                                                                                                                      .7
.7 preparation of site procurement documents?
>!              preparation of site procurement documents?                                 -
~
                                                                                                ~
~''
                                                                                                              ~''
Is the AE/Itcensee monitoring site issued. procure-g ment documents for inclusion of th6se requirements
Is the AE/Itcensee monitoring site issued. procure-
.?'
                                                                                                                                                                  ''                                                                        g
i 1.1.2 60 procurement specifications identify the j
.; .              ment documents for inclusion of th6se requirements                 -
appilcable technical requirements (i.e..'
                                                                                                                .?'                       .        ...-
appilcable codes and standards)?
i 1.1.2 60 procurement specifications identify the                 ,
p j'
j appilcable technical requirements (i.e..'                                                                           .
1.1.3 Do the purchasing documents impose the requirements of 10 CFR 21 when " basic componentt"
appilcable codes and standards)?                 -                                                .
^
p                                                                                                           ,                  .
' are purchased? (Basic components are. discussed l-inNUREG0302.)
j'                 1.1.3 Do the purchasing documents impose the             .
1.1.4 Is the supplier on the ap' proved list of suppliers?
!-          . requirements of 10 CFR 21 when " basic componentt"                                                           ^
are purchased? (Basic components are. discussed                                   ,                        ,', , .                                            -
l- .
inNUREG0302.)                         ,,
1.1.4 Is the supplier on the ap' proved list of suppliers?                                                                                     ,,
1.1. 5 Have the vendor's Quality Assurance Programs been audited by the purchaser organizatioi?
1.1. 5 Have the vendor's Quality Assurance Programs been audited by the purchaser organizatioi?
1.1. 6 Do procurement specifications identify                                                                             .
1.1. 6 Do procurement specifications identify appropriate QA requirements including requirements t
appropriate QA requirements including requirements                                                                                         t
to protect the item against environmental condi-l tions for periods of long-tem storage (i.e., hot and humid, sub ect to ocean atmosphere, cold
  ;.            to protect the item against environmental condi-                                                                                                                                                                             ,
l'            tions for periods of long-tem storage (i.e., hot and humid, sub ect to ocean atmosphere, cold


4                                                                                                                   ,
4 t
t
.., L
                                                                                                              . ., L       '4      -
- ' * * ~. ~ ~ '
                                                                                                                                        .--  .---        -'**~.~~' .
'4 i
,        ,                                                                                                        i TI25g2/07 Agendix6 i-CONSTRUCTION TEAM INSPECTION CHECVLi$T '                     hh       j,I y             ;
i-TI25g2/07 Agendix6 CONSTRUCTION TEAM INSPECTION CHECVLi$T '
GENERAL INSPECTION AREAt PROCUP.EHENT CONTROLS - SITE Date:-                  -
hh j,I y GENERAL INSPECTION AREAt PROCUP.EHENT CONTROLS - SITE Date:-
2/13/81 INSPECTION SITE:                                                           I
2/13/81 INSPECTION SITE:
_ INSPECTOR:-                         DATES OF INSPECTION _/ J _ to j _ /         i i                                                   INSPECTION AREA                                                           ' '-
_ INSPECTOR:-
ACCEPTANCE           !
I DATES OF INSPECTION _/ J _ to j _ /
CRITERIA         ;                  FINDINGS 1.1.7 Where a Certificate of Conformance (C0C) is to be used for acceptance in lieu of some or alli
i i
: i.         final conformance records, do the specifications ;                                                                                 '
INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS 1.1.7 Where a Certificate of Conformance (C0C) is to be used for acceptance in lieu of some or alli i.
fcr the C0C document require the following                                                                                                 N information to be included in the C0C:
final conformance records, do the specifications ;
1.1.7.1 Identification of the purchased material                                                               -
fcr the C0C document require the following N
t er item (reference to P0 or procurement document l         1sacceptable)?                                                             "
information to be included in the C0C:
1
1.1.7.1 Identification of the purchased material t
!        1.1.7.2                   Identification of specific requirements
er item (reference to P0 or procurement document l
:        met (via list or reference to procurement                                                                                                                         '
1sacceptable)?
;,        document)?
1 1.1.7.2 Identification of specific requirements met (via list or reference to procurement document)?
* 1.1.7.3 Identification of procurement require-5 ments not met. If any?                                           '
1.1.7.3 Identification of procurement require-5 ments not met. If any?
;        1.1.7.4 Signature of an appropriate member of supplier's QA function?
1.1.7.4 Signature of an appropriate member of supplier's QA function?
1.1.7.5 Identification of procedures or QA program to be followed for filling out, review and approval of certificates?
1.1.7.5 Identification of procedures or QA program to be followed for filling out, review and approval of certificates?
1 1.1.7.6 Receiving inspection as the means to                                     .                                  -
1 1.1.7.6 Receiving inspection as the means to i
i        determine that purchaser / agent has verified by audit (or source verification) the validity /
determine that purchaser / agent has verified by audit (or source verification) the validity /
{-       effectiveness of the suppliers C0C system?
{-
1.1.8 When required (e.g. for complex engineeredcomponents)inadditiontotheC0C, was any source verification relative to acceptance                                 -
effectiveness of the suppliers C0C system?
i
1.1.8 When required (e.g. for complex engineeredcomponents)inadditiontotheC0C, was any source verification relative to acceptance i
  !. cf the item specified and/or perfonned?
cf the item specified and/or perfonned?
e
e


    ~
~
                                                            -"        ~~
~~
                                                                                                                      . ..            7     :        2- - . . . .
7 2- -....
3                                                               .                                    +' '                                     _
3
          '''      ''                                                                \,, )                                           ,y
+' '
                                                                                                      '                                                                N . *,        ,
\\,, )
TI 2512/07 Appendix 6
,y N. *,
  ,                                                              CONSTRUCTION TEAM INSPECTION CHECRI.ISTPa                                                     of 6                 i GENERAL. INSPECTION AREA:                                                                     p,             g INSPECTION SITE:
TI 2512/07 Appendix 6 CONSTRUCTION TEAM INSPECTION CHECRI.ISTPa of 6 i
PROCUREENT CONTR0_t.S . S..ITE Date:s 2/ /ai           -:
GENERAL. INSPECTION AREA:
INSPECTOR:
p, g
h INSPECTION AREA DATES OF INSPECTION _ / 1 to,'
PROCUREENT CONTR0_t.S. S..ITE Date:s INSPECTOR:
ACCEPfANCE CRITERIA                                                     FINDINGS i
2/ /ai INSPECTION SITE:
1 31 . 9 Was implementation for the protection,                               I i
DATES OF INSPECTION _ / 1 to 1 h
INSPECTION AREA ACCEPfANCE CRITERIA FINDINGS i
1 31. 9 Was implementation for the protection, I
handling, control of procurement specifications and purchasing documents adequate?
handling, control of procurement specifications and purchasing documents adequate?
1.2       Receiving Inspection 1.1.1                                                                                 4
i 1.2 Receiving Inspection 1.1.1 Are receiving inspection records available.?
;                  Are receiving inspection records available.?
4 Ara identified dit:repancies reviewed by QA and/or engineering, as appropriate, to assure proper disposition?
Ara identified dit:repancies reviewed by QA and/or engineering, as appropriate, to assure proper disposition?
1.2.2 Are procurement document requirements for i
1.2.2 i                    Are procurement document requirements for accceptance adequate?              of the item by receiving inspection (Factors such as safety significance anc 4hether the procurement relates to an engineered                                                                                           ,
accceptance of the item by receiving inspection adequate?
item or one of standard design (off the shelf) shouldbeconsidered.)                                               ,
(Factors such as safety significance anc 4hether the procurement relates to an engineered item or one of standard design (off the shelf) shouldbeconsidered.)
1.2.3
1.2.3 Is the documentation for certificates of
:bnfermance Is the      documentation adequate?           for certificates Where procurement of U
:bnfermance adequate?
'      Jo they include the following: documents do not require a COC from tha supplier.                           -
Where procurement Jo they include the following: documents do not require a COC from tha supplier.
!      1.2.3.1 h                      Identification of the purchased material 3r item (reference to P0 or procurement document.                           .          .                  -
U 1.2.3.1 Identification of the purchased material h
if cn-hand, is acceptable)?                                                   '
3r item (reference to P0 or procurement document.
\
if cn-hand, is acceptable)?
l' 1.2.3.2 Identification of specified requirements l
\\
jocument)? (via list or reference to procurement to      ha  met 1.2.3.3 iny?              Identification procurements not met, if                                   '
l' 1.2.3.2 Identification of specified requirements l
to ha met (via list or reference to procurement jocument)?
1.2.3.3 Identification procurements not met, if iny?


_.g.....-                   ,
_.g.....-
                                                                                                                                                                      - 7   ,
- 7 1
1 T! 2512/07 Appendix 6 Il CONSTRUCT 10N TEAM INSPECTION,CHECKI.!ST GENERAL INSPECTION AREA: PROCUREMEili CONTROL 5 - SITE                                     Date:s 2/13/u1 (v                            ,
T! 2512/07 Appendix 6 CONSTRUCT 10N TEAM INSPECTION,CHECKI.!ST (v
D                                                       "
Il GENERAL INSPECTION AREA: PROCUREMEili CONTROL 5 - SITE Date:s 2/13/u1 D
INSPECTION SITE:                                   _ INSPECTOR:-                                         DATES OF INSPECTION _f ,,f _to j ,_f                     l, INSPECTION AREA                               A                   E     ;
INSPECTION SITE:
j    1.2.3.4 Signature of an appropriate member of ,          ,                                ,
_ INSPECTOR:-
suppliers QA function?-                             '
DATES OF INSPECTION _f,,f _to j,_f l,
1.2.3.5 Identification of procedures or QA .                             -
INSPECTION AREA A
program to be followed for. filling out review and                                         ,
E j
approval of C0Cs?                                                                                 .
1.2.3.4 Signature of an appropriate member of,
1.2.3.6 Receiving inspection as the means to             -              -
suppliers QA function?-
l    determine that purchaser / agent has vertfled by                   d       ..
1.2.3.5 Identification of procedures or QA.
audit (or source verification) the validity /..           u                 -i, effectiveness of the supplier's COC system?                                    ''                                                          '
program to be followed for. filling out review and approval of C0Cs?
1.2.3.6 Receiving inspection as the means to l
determine that purchaser / agent has vertfled by d
audit (or source verification) the validity /..
u
-i,
]
]
i   1.2.4     When source verification is spectfled       -
effectiveness of the supplier's COC system?
!    for acceptance of an item in addition to a C0C, is                                                     '                                                    .
i 1.2.4 When source verification is spectfled for acceptance of an item in addition to a C0C, is the appropriate receiving inspection organization i
i the appropriate receiving inspection organization
)
)   aware of the source verification results?
aware of the source verification results?
1 1.2 . 5     Do material receiving inspection records                                                                                                                             5 indicate compliance with acceptance requirements?
1 1.2. 5 Do material receiving inspection records 5
1.2 .6     Are nonconfoming items properly tagged and segregated?
indicate compliance with acceptance requirements?
1.2 .7     Does the procurement documentation show that the specific procurement requirements such as                 ,
1.2.6 Are nonconfoming items properly tagged and segregated?
c des, standards, and other specifications, have i   been met for the purchased material or equipment?
1.2.7 Does the procurement documentation show that the specific procurement requirements such as c des, standards, and other specifications, have i
I Also, have selected material and physical                                                                                                                       .
been met for the purchased material or equipment?
requirements in the procurement document been met'                                 >
I Also, have selected material and physical requirements in the procurement document been met' i
i 1.2.8       Has other documentation (e.g., test.                       -
1.2.8 Has other documentation (e.g., test.
material and inspection data) presented with                         -
material and inspection data) presented with certificates of comp 1tance been reviewed by ttchnical personnel who are capable (through experience, education or training) to assure that components meet all spectfled safety-related s.
certificates of comp 1tance been reviewed by ttchnical personnel who are capable (through experience, education or training) to assure that                               '
requirements? Do other vendor documentation (naterial, test, inspection, etc.) include rsquired data?
components meet all spectfled safety-related                                                                                                                                 s.
~ ~.
requirements? Do other vendor documentation                                                                               -
(naterial, test, inspection, etc.) include                                                                                                                                 ,    ,
rsquired data?
              ~~.                                         '


  -        c. .
c.
                ..                        .                -                            x -
x -
                                                                                                                  - - ---- --          - - - -                    - -~
- -~
i
~,!
                      ,                                                      .,  ~,!                                                                                         s, , ,'     (
i s,,,'
* TI 2512/07                 Appendix 6 CONSTRUCTION TEAM INSPECTION CHECKLIST GENERAL INSPECTION AREA: PROCUREMENT CONTROLS - SITE (a e s              o. 1 t
(
Date:s 2/13/81
TI 2512/07 Appendix 6 CONSTRUCTION TEAM INSPECTION CHECKLIST (a
    ~
e s
l                   INSPECTION SITE:                                 INSPECTOR:-
: o. 1 GENERAL INSPECTION AREA: PROCUREMENT CONTROLS - SITE Date:s 2/13/81 t
~
l INSPECTION SITE:
INSPECTOR:-
DATES OF INSPECTION _ / J _to_ /_/
DATES OF INSPECTION _ / J _to_ /_/
INSPECTION ARE/.                           ACP NE FINDINGS L
INSPECTION ARE/.
1.2 9       In cases where the receiving inspection-                                                   '
ACP NE FINDINGS L
function has identified a nonconformance which l relates to a deviation from specified requirements
1.2 9 In cases where the receiving inspection-function has identified a nonconformance which l relates to a deviation from specified requirements n3t previously identified on the C0C or other vendor supplied documentatinn, does the corrective action proposed include a need to re-audit the vendors system for preparation and issuance of a C0C7 Also, was the " deviation" subject to a Part 21 evaluation?
* n3t previously identified on the C0C or other                                                       .
1.3 Storage ANSI N45.2.2 1.3.1 Are the work and QA/QC procedures established to conduct activities of storage-for safety-related items in Class A, B, C and D levels of storage adequate?
vendor supplied documentatinn, does the corrective action proposed include a need to re-audit the         ,
1.3.2 Do the facilities for storage of Class A ^
vendors system for preparation and issuance of a C0C7 Also, was the " deviation" subject to a Part 21 evaluation?                                                     '
~
1.3     Storage                                       ANSI N45.2.2 1.3.1 Are the work and QA/QC procedures established to conduct activities of storage-                               ,
equipment have an environmentally controlled atmosphere and provisions to prevent animals (especially rodents) and birds from entering?
for safety-related items in Class A, B, C and D levels of storage adequate?                               .,                            ,
1.3.3 Are the facilities for Class B, C and D equipment storage satisfactory?
                                                      ~
1.3.4 Is protection from damage during storage ad:quate?
1.3.2 Do the facilities for storage of Class A ^                                                                                     -
1.3.5 Is testing equipment available and suit-able for intended use?
equipment have an environmentally controlled                                 ..
1.3.6 Are records of storage conditions being 3,
atmosphere and provisions to prevent animals (especially rodents) and birds from entering?                                             -
maintained as specified and are.they current?
1.3.3 Are the facilities for Class B, C and D equipment storage satisfactory?                                                                                                                   .
Do the records reflect that the specified st:: rage conditions are being met?
1.3.4     Is protection from damage during storage                                                                                         .        .
ad:quate?                                                                                                                                       '
1.3.5 Is testing equipment available and suit-                                               .              .
able for intended use?                                                                           ,
1.3.6 Are records of storage conditions being                                   3,         .
maintained as specified and are.they current?                                                                                     -
Do the records reflect that the specified st:: rage conditions are being met?                                 -


___.c         a
___.c a
                                                                                                                              ~
~
      .,,,,,,                                                                                            TI 2512/07 Appendix 6 CONSTRUCTION TEAM INSPECTION CHECKLIST Page 6 of 6                     ;
TI 2512/07 Appendix 6 CONSTRUCTION TEAM INSPECTION CHECKLIST Page 6 of 6 Reviiloii No.7 GENERAL INSPECTION AREA PROCUlt.EMEN(,9ETROLS - SITE Date:, 2/13/81 C
Reviiloii No.7         " -
INSPECTION SITE:
GENERAL INSPECTION AREA     PROCUlt.EMEN(,9ETROLS C          - SITE           Date:, 2/13/81 INSPECTION SITE:                               INSPECTOR:-
INSPECTOR:-
DATES OF INSPECTION / 1 to_ f _ /
DATES OF INSPECTION / 1 to_ f _ /
IllSI'ECT10ll AREA A   Pull E FillDillGS Ig3.7 llave appropriate controls been imposed on
IllSI'ECT10ll AREA A
  . access to storage aress?                                             .
Pull E FillDillGS I 3.7 llave appropriate controls been imposed on g
l
. access to storage aress?
                            .                                              I i
l I
I 4
i I
J .
4 J.
y   %
y f* N
f* N


  ~         .
~
6.0     Pullman-Higgins (P-H) 6.1     Organization                               !
6.0 Pullman-Higgins (P-H) 6.1 Organization 6.1a1 Pullman-Higgins (P-H) is of the Pullman Powe~r Products Division (Williamsport, Pa. ) of Pullman, Inc.
6.1a1     Pullman-Higgins (P-H) is of the Pullman Powe~r Products Division (Williamsport, Pa. ) of Pullman, Inc.
P-H is responsible for field fabrication of piping systems to meet UE and C specifications and applicable ASME and B31.1 requirements.
P-H is responsible for field fabrication of piping systems to meet UE and C specifications and applicable ASME and B31.1 requirements.
                              $3B     Inspection focused on P-H ASME pipe welding to verify system and personnel adequacy and to evaluate th(effectiveness             implement     of appnoved procedures by responsible personnel.         Included..La the
$3B Inspection focused on P-H ASME pipe welding to verify system and personnel adequacy and to evaluate th(effectiveness implement of appnoved procedures by responsible personnel.
(     inspection was a review of the YAEC surveillance and auditing activities of P-H welding activities.
Included..La the
6.1 Areas Insp 5ptetSc. m areas inspected included filler metal controls, QC Insp,ection activities, interview of weldors and welding foremen, weldor training and per-formance qualification, QC weld monitoring, machine GTA butt , welding, ANI/P-H inter ace for weldor quali-fication and pipe welding, and control of austenitic l
(
stainless steel welding to avoid sensitization. Tours i
inspection was a review of the YAEC surveillance and auditing activities of P-H welding activities.
6.1 Areas Insp 5ptetSc. m areas inspected included filler metal controls, QC Insp,ection activities, interview of weldors and welding foremen, weldor training and per-formance qualification, QC weld monitoring, machine GTA butt, welding, ANI/P-H inter ace for weldor quali-fication and pipe welding, and control of austenitic stainless steel welding to avoid sensitization.
Tours l
of the site were made to observe pipe welding and weldor i
of the site were made to observe pipe welding and weldor i
performance qualification testing. The inspector reviewed procedures and specifications for conformance to regulatory rqquirements and to determine their effectiveness in providing measures to control special processes.              .
i performance qualification testing.
The inspector reviewed procedures and specifications for conformance to regulatory rqquirements and to determine their effectiveness in providing measures to control special processes.
5,3 Ftvdwo
5,3 Ftvdwo


            .g41           web.\ % # au4.fW w m % L W w -
.g41 web. % # au4.fW w m % L W w -
                                        '    .                6 Tha NRC Inspsetor 'ravicw2d tha walder parformance
\\
                  '    procedures used b     P-H for
6 Tha NRC Inspsetor 'ravicw2d tha walder parformance procedures used b P-H for 4o snper e. M ii.n7I,q w ne"weldorgalified ite A detailed analysis was% qua.1made of the
* ite 4o snper e. M ii.n7I,q w ne"weldorgalified
' sp t
                                                        ' sp t                                 "
['
                                                                                                  ,f ', ]
,f ', ]
and off-site g A detailed analysis was% qua.1made['@,-  of the      *
and off-site
(
(
controls exercised in the maintenance of, identification during welding and evaluation of the test assemblies.          .
g controls exercised in the maintenance of, identification during welding and evaluation of the test assemblies.
The NRC Inspector attended a typical indoctrination course where a recently qualified weldor is instructed to understand those portions of the Field Weld Process Sheet   and the Weld Rod Stores Reauisition applicable
The NRC Inspector attended a typical indoctrination course where a recently qualified weldor is instructed to understand those portions of the Field Weld Process Sheet and the Weld Rod Stores Reauisition applicable
                    .to the weldor       , Pullman Power Prodtic,ts PH001 dated                 j 12/     1 Laocuctions for Weldors" is read to and with the weldor.           D       "        '
.to the weldor
                            .A review was made of the P-H 6/21/82 Qualified Weldor Li,st which indicated that 95 of the cur. rent                       .
, Pullman Power Prodtic,ts PH001 dated j
              ~
12/
                  + 36[eldors[M)were qualified by' weldingpoff-site      tassemblie[underP-HQCSupervision.         All except 3 welded P-H Standard Welding Test SWT #1.
1 Laocuctions for Weldors" is read to and with the weldor.
Weldors qualified off-site were trained and tested at UA Welding Schools at Seabrook, N. H.; Cleveland, Ohio; Terre Haute, Indiana; or Pasco, Washington. All of the Seabrook, N. H.,     test assemblies were radiographed by P-H at the Seabrook Site.         The disposition sheets for the RT are maintained with the ASME PQR document.
D
4 Currently (since 6'/82), weldors qualified'off site                       .
.A review was made of the P-H 6/21/82 Qualified Weldor Li,st which indicated that 95 of the cur. rent
are photographed by the P-H QC Welding Inspector supervising the welding and the photographs are referred to at time of employment at the Seabrook Site.
+ 36[eldors[M)were qualified by' weldingpoff-
4 ho Vlok Ab             N i               i     *
~
tassemblie[underP-HQCSupervision.
site All except 3 welded P-H Standard Welding Test SWT #1.
Weldors qualified off-site were trained and tested at UA Welding Schools at Seabrook, N. H.; Cleveland, Ohio; Terre Haute, Indiana; or Pasco, Washington.
All of the Seabrook, N.
H., test assemblies were radiographed by P-H at the Seabrook Site.
The disposition sheets for the RT are maintained with the ASME PQR document.
4 Currently (since 6'/82), weldors qualified'off site are photographed by the P-H QC Welding Inspector supervising the welding and the photographs are referred to at time of employment at the Seabrook Site.
4 ho Vlok Ab N i i


      ..        t, '
t, '
(,,$,1 3 evteuJ e{ D d W b                           bb The NRC Inspector discussed with P-H the lack of ff clarity in                     . directions to the weldor provided by the welding parameter table which is Attachment ~5 to PH001 and which is issued by the Weld
(,,$,1 3 evteuJ e{ D d W b bb The NRC Inspector discussed with P-H the lack of ff clarity in
                                                  ~
. directions to the weldor provided by the welding parameter table which is Attachment ~5 to PH001 and which is issued by the Weld
Rod Issue Stations w3.th all filler metal.                       P-H indicated changes would be made to the presentation of the GTAW parameters to provide more explicit information for the welding.of. consumable inssrts,and other GTAW welding.
~
  ,                            Included with the proposed changes to PH001 would also be a review of th,e method of present;ing the GTA                         j           lian elec{nca l parameters in tlie WPS documents.
Rod Issue Stations w3.th all filler metal.
P-H indicated changes would be made to the presentation of the GTAW parameters to provide more explicit information for the welding.of. consumable inssrts,and other GTAW welding.
Included with the proposed changes to PH001 would also be a review of th,e method of present;ing the GTA j
lian elec{nca l parameters in tlie WPS documents.
The NRC Inspector interviewed a number of weldors
The NRC Inspector interviewed a number of weldors
                          'and welding. foremdn .to review information on their s         .
'and welding. foremdn.to review information on their s
training, qualification testing, and unde'rstanding of 2                              the variables in'dicated in the ASME WPS documents.
training, qualification testing, and unde'rstanding of the variables in'dicated in the ASME WPS documents.
Specific questions were aske                             ;requirem u
2 Specific questions were aske
: v. n ,.           _
;requirem
                                                                                                                        )                  Ac6J for accept'able oxygen level in purge, gag.                       The P-H welding foremen     and weldors have not been trained in the purpose and content of these documents that con-stitute the ASME WPS.     Both the P_H general welding specificatlons(e.g.,GWS-III)'andP-HWeldingPro-                                               '
)
cedure Specifications (e.g. , IT1 -III-1 -KI-12) are                                               '            ~
Ac6J uv. n,.
needed to constitute the complete list of essential, non.-essential and supplementary essential variables required'by the ASME Code.       QW,100.1 and QW-200.1 indicate that the manufacturer or contractor shall 9
for accept'able oxygen level in purge, gag.
The P-H welding foremen and weldors have not been trained in the purpose and content of these documents that con-stitute the ASME WPS.
Both the P_H general welding specificatlons(e.g.,GWS-III)'andP-HWeldingPro-cedure Specifications (e.g., IT1 -III-1 -KI-12) are
~
needed to constitute the complete list of essential,
' non.-essential and supplementary essential variables required'by the ASME Code.
QW,100.1 and QW-200.1 indicate that the manufacturer or contractor shall 9
e
e


g 3                                   -
g 3
                  ,            prepare written WPS documents to provide direction to the weldor while making welds to Code requirements.
prepare written WPS documents to provide direction to the weldor while making welds to Code requirements.
Contrary to this requirement, the weldor cannot receive directions from the WP,S documents when neither the weldors nor the welding foremen who technically assist wekYS                                                       -
Contrary to this requirement, the weldor cannot receive directions from the WP,S documents when neither the weldors nor the welding foremen who technically assist wekYS the weixts are instructed in the P-H GWS and dee. mute:4
the weixts are instructed in         .      the P-H GWS and
* P-H Welding Procedure Specification ~s Inspection p
                            .                                        dee. mute:4
indicated that these documents were physically avail-able for reference by the weldorp at the QC Welding Inspectors Stand,,but, as the weldors did not know of.the existence of these documents, they could not provide " directions to the weldor" as required by ASME Section III N'A 4133 9 and Sections IX' QW 100.1 and QW 200.1 (a) M DA WSM
* P-H Welding Procedure Specification ~s p           Inspection indicated that these documents were physically avail-able for reference by the weldorp at the QC Welding Inspectors Stand,,but, as the weldors did not know                   -
* M eG)k ' M -Ot e 2.b.A,e Q p a;%
of .the existence of these documents, they could not provide " directions   ', to the weldor" as required by ASME Section III N'A 4133 9 and Sections IX' QW 100.1 and QW 200.1 (a) M                 '"** # %
Mew I4S*^Etd a
                    -                         e 2.b.A,e Q DA Mew          WSM *                    .
uue % mde a s
M    eG)k ' M -Ot p a;%                                             I4S*^Etd uue % mde a                                       s       a g#
g#
: h. vio\w4b
: h. vio\\w4b k ION b
                                .gy:l k et w         L- =
.gy:l k et w L- =
k  ION b O
O e
e
e 0
* e
,n.
                                              $            0


  ,          e,                                                                                           .                                                                                                      .
e, Welding Filler Metal Control Review GaiO A review was made of filler metal control system inelod m g.
Welding Filler Metal Control Review GaiO                                             A review was made of filler metal control system inelod m g.
:GEtun initial indication of filler metal type on the P-H ISO drawing, storage of filler metal' at the Rod Issue Stations, issuance control measures and return of stubs and unused filler metal.
:GEtun initial indication of filler metal type on the P-H ISO drawing, storage of filler metal' at the Rod Issue Stations, issuance control measures and return of stubs and unused filler metal.                                                                     Personnel in the QA Engineering Process area and in Rod R'ooms #4 and #1 were interviewed to determine their understafnding of the control measures                                                         No violations in the filler metal control system were identified.
Personnel in the QA Engineering Process area and in Rod R'ooms #4 and #1 were interviewed to determine their understafnding of the control measures No violations in the filler metal control system were identified.
i e
e i
O 8                             e O
O 8
e O
e e
e e
6 e
6 e
                                                                                                                                                                                                                  %  8 e
8 e
G S
G S
O S
O S
e e
e e
e O
e O
9 9                                                                                             ,                                                                                    e G
9 9
e G
9 e
9 e
* e O
e O
e 9
e 9
e
e
                                                                                                                                              . , . , - - , . - ,      ,-  ,n , . , - , -, - - -      , , , _ - -
,w-
            ,    ,w-      ,. -        ~,..- . . . ,         , _ , . . . , . . . - _ . - . , ~ ., -               ,--        , , - - - . .
~,..-...,
, _,...,... - _. -., ~., -
,n


'p.3 k             Machina Orbiting GTA Butt Welding                                                                                                   \
\\
'p.3 k Machina Orbiting GTA Butt Welding
{
{
                                                                                  +be The NRC Inspector reviewed ttle status of the sub-                                                                       !
+be The NRC Inspector reviewed ttle status of the sub-ject welding activities previously reported in combined reports 50-W3/81-07; 50-4W/81-06 and report 50-W3/81-13 The following welds have been completed and m.it ASME radiographic soundness requirements in the as-welded condition as of the dates indicated:
ject welding activities previously reported in combined reports 50-W3/81-07; 50-4W/81-06 and report 50-W3/81-13 The following welds have been completed and m.it                                       .
RC-8-01, F 0101 3/24/82 F 0102 3/24/82 F 0103 3/17/82 RC-5-01, F 0101 4/2/82.
ASME radiographic soundness requirements in the as-welded condition as of the dates indicated:
F 0102 3/29/82 F 0103 3/29/82 RC-2-01, F 0101 4/19/82 F 0102 4/21 /8 2 F 0103
RC-8-01, F 0101                     3/24/82                             -
/12/82 RC-11-01,F 0102 28/82 F 0103 23/82
                                                , F 0102 3/24/82
- - F 0104 4/30/82 These welds will be re-radiographed for final ASME acceptance following ISI grinding.'
                                                , F 0103           3/17/82                                                                         '
uo vi olgh % ida~d 6M S
RC-5-01, F 0101                 ,  4/2/82 .
e e
                                                , F 0102           3/29/82                                   *
G 9
                                                , F 0103           3/29/82 RC-2-01, F 0101                     4/19/82
e e
                                                , F 0102 4/21 /8 2                                                                         .
e w
                                                , F 0103
, ~
                                                                    /12/82 RC-11-01,F 0102                         28/82                                           .
-,o---w.----
F 0103 23/82                                                 '
,m m--
F 0104 ,        4/30/82 These welds will be re-radiographed for final ASME acceptance following ISI grinding.'
e,
uo vi olgh                           % ida~d 6M                       .
                                                  .                                                                S e
e G
9
                        @                                        -                                              e e
e
                                    ,, , - - -      ,- ,    ,        - - - , ,  w , ~       -,o---w.----   -    ,m , -  m--   e,    - - , ,


o     -
o 6.3.5 AuthoriEed Nuclear Inspector (ANI) Interface with P-H The inspector interviewed three Royal Insurance Co ANI's and their, supervisor to review their actitities in weldor qualification, routine weld hold point inspections, and to solicit information on any specific areas of concern for the quality of pipe welds currently being produced.
6.3.5   AuthoriEed Nuclear Inspector (ANI) Interface with P-H The inspector interviewed three Royal Insurance Co ANI's and their , supervisor to review their actitities in weldor qualification, routine weld hold point inspections, and to solicit information on any specific areas of concern for the quality of pipe welds currently being produced. The ANI's provide routine unannounced surveillance inspection.of the P-H Site Training and Qualification Test Shop.     They insure that the stencil numbers assigned are not duplication of existing stencils. They , check union card identification, but do not specifically verify the weldor's picture badge identification. They check the test assemblies for permananii fixturing and proper stenciled identification of test assemblies. The ANI follows NCA 5254 and ANSI N 626.2 - 1976 Paragraph 4 2.9.
The ANI's provide routine unannounced surveillance inspection.of the P-H Site Training and Qualification Test Shop.
They insure that the stencil numbers assigned are not duplication of existing stencils.
They, check union card identification, but do not specifically verify the weldor's picture badge identification.
They check the test assemblies for permananii fixturing and proper stenciled identification of test assemblies.
The ANI follows NCA 5254 and ANSI N 626.2 - 1976 Paragraph 4 2.9.
The ANI's have questioned the qualifications and called for requalification testing of three weldors during erection of the Seabrook Site.
The ANI's have questioned the qualifications and called for requalification testing of three weldors during erection of the Seabrook Site.
The inspector checked 6 ANI interoffice memoranda that indicated ANI review of WPS and PQR documents and the ANI chronological log lists for this activity dated 6/9/8,0 and 6/18/82. A cursory review of the ANI log entries was made by the inspector.
The inspector checked 6 ANI interoffice memoranda that indicated ANI review of WPS and PQR documents and the ANI chronological log lists for this activity dated 6/9/8,0 and 6/18/82.
pft  %s% \        hMdM4                     A4 gg                     p'amx S \c$MM          %
A cursory review of the ANI log entries was made by the inspector.
m u     a p
%s%
                        $        p a aW s dlhe A m & e -
hMdM4 gg $
            % gh qu Me                                                     %
p'amx S \\c$ %
w ad m a U + A. 4
A4
\\
pft MM u a p p dlhe A m & e -
aW s
m
% gh qu Me a
. w ad m a U + A. 4
* 2 tu # A,
* 2 tu # A,


        . . . _        =     - - .          . - - - - - - -
=
        ,        .                                                  - -      . . -          .--                                                                                                    t
t
    ~~         "
\\
                                                                                                                                                                                                    \
~~
t 6 3.6 Review of Audits of P-H Welding Activities                                                                                                               l The inspector reviewed YAEC weekly survie11ance reports numbers 163 to 175 for the period 2/27/82 to 5/22/82 and interviewed the YAEC personnel performing the surveillance. A weekly report activity report is made and YAEC-Framingham is informally kept up to date witbitthe surveillance information.
t 6 3.6 Review of Audits of P-H Welding Activities The inspector reviewed YAEC weekly survie11ance reports numbers 163 to 175 for the period 2/27/82 to 5/22/82 and interviewed the YAEC personnel performing the surveillance.
The inspector reviewed YAEC Audit Reports SA 598CSao3 (November 21.i., 25,1981                                           -
A weekly report activity report is made and YAEC-Framingham is informally kept up to date witbitthe surveillance information.
December 3,8 a 30, 1981 - January 6. 7. & 19,1982) and SA 596CS202 (March 8-10,1982). Audit Report SA $98CS203 indicated as one of the areas of concern that P H was not conducting weld monitoring in compliance with their QA Procedure Requirements stated in Document X-10 paragraphs 5.1, 5.2, and 5 3.
The inspector reviewed YAEC Audit Reports SA 598CSao3 (November 21.i., 25,1981 December 3,8 a 30, 1981 - January 6. 7. & 19,1982) and SA 596CS202 (March 8-10,1982). Audit Report SA $98CS203 indicated as one of the areas of concern that P H was not conducting weld monitoring in compliance with their QA Procedure Requirements stated in Document X-10 paragraphs 5.1, 5.2, and 5 3.
Paragraph 5.2 requires monitoring each weldor at a minimum of once every three months (which is a relaxation       'Eunkn  of a previous
Paragraph 5.2 requires monitoring each weldor at a minimum of once every three months (which is a relaxation of a previous re,quirem6nt for monthly
                                                              . m "_p ,re,quirem6nt for monthly monitorin              ib b 4 D h +4                              "                                                                h' *              '-
'Eunkn m "
3'.
T W C A A 4 4 Q* N Y 3'.
T W C A A 4 4 Q* N Y
_p,
                                                                                                                                                                  ,                           ~
h' * '-
                                                                                            }
monitorin ib b 4 D h +4
                                                                  **'r. *.
~
                                                                                                ~
}
n                                                                     *                                                                    ,
**'r. *.
u                                      ,.              -. ,
~
p            B 4
n u
p
;, y"I ? '; 5 -,,.
B 4
4
4
                                                                                                                                                              ;, y"I ? '; 5 - ,,.
.v*
                                                                                                                  .v*
*a I
                                                                                                                                *a I
e
e
: m. . . .,. . - . - - . . , . ,           ,,m.r_
: m....,.. -. - -..,.,
,,m.r_


6.3 6 Review of Audits of P-H Welding Activities
6.3 6 Review of Audits of P-H Welding Activities Ths inspe'ctor reviewed YAEC weekly surviellance
                                                                        ~
~
Ths inspe'ctor reviewed YAEC weekly surviellance reports numbers 163 to 175 for the period 2/27/82 to 5/22/82 and interviewed the YAEC personnel performing the surveillance.                                       A weekly report activity report is made and YAEC-Framingham is informally kept up to date withitthe surveillance information.
reports numbers 163 to 175 for the period 2/27/82 to 5/22/82 and interviewed the YAEC personnel performing the surveillance.
The inspector reviewed YAEC Audit Reports SA 598CS203 (November 214., 25, 1981 - December 3,8 & 30, 1981 - January 6                                   7. & 19,1982) and SA 596CS202 (March 8-10,1982). Audit Report SA 598CS203 indicated as one of the areas of concern that P H was not conducting weld monitoring in compliance with their QA Procedure Requirements stated in Document X-10 paragraphs 5.1, 5.2, and 5.3.                                 Paragraph 5.2 r,equires monitoring each weldor at a minimum of once every three months (which is a relaxation of a previous re                                                       i   6 t for monthly monitoring)brJ3Mn.er+1ga4furemnWC k i-4 WNt444M M                                                             bat 4E 'Q
A weekly report activity report is made and YAEC-Framingham is informally kept up to date withitthe surveillance information.
                                                                                                            .. .. m.-p.-,                             .
The inspector reviewed YAEC Audit Reports SA 598CS203 (November 214., 25, 1981 - December 3,8 & 30, 1981 - January 6
M{%                       .
: 7. & 19,1982) and SA 596CS202 (March 8-10,1982). Audit Report SA 598CS203 indicated as one of the areas of concern that P H was not conducting weld monitoring in compliance with their QA Procedure Requirements stated in Document X-10 paragraphs 5.1, 5.2, and 5.3.
3 . C._,
Paragraph 5.2 r,equires monitoring each weldor at a minimum of once every three months (which is a relaxation of a previous re i
6 t for monthly monitoring)brJ3Mn.er+1ga4furemnWC bat 4E 'Q k i-4 WNt444M M 3. _,
... m.-p.-,
M{%
C.
as
as
                                                                            ..                                    -a ,
-a,
f                                                                                   -
f t,
t ,            ,
,4 i
                                                                                                              ,4 i e
e 4
4 O
O y
y                          - - - - * - - .                 , , - . _ , , - _ _ , - - -      -
,-r-.
                                                                                                      ,                                                            ,w-r
,w-r
_                                                _          -. , - - - , -        ,-r-. --              %e-
%e-


chowing discrepancies signed off as reviewed with no comment, (2) incomplete and questionable record entries, am              erage and voltage outside the (3) travel speed, T-range of the WPS.
chowing discrepancies signed off as reviewed with no comment, (2) incomplete and questionable record entries, (3) travel speed, T-am erage and voltage outside the range of the WPS.
commendations from this review include improved training in the requirmments of Procedure X-10 end revisions to the WPS documents to broaden the paramenter ranges. The NRC inspec. tor i
commendations from this review include improved training in the requirmments of Procedure X-10 end revisions to the WPS documents to broaden the paramenter ranges.
requested that a review be made of the effect of changes in joulian heat input ranges on notch toughness require-
The NRC inspec. tor i
    ,                                                  mants and sensitization (where applicable) and to generally review the clarity of parameter tables for consumable insirt $ fusion and GTAW.                                                                                                       (As further stated in paragraph 6.3.1).
requested that a review be made of the effect of changes in joulian heat input ranges on notch toughness require-mants and sensitization (where applicable) and to generally review the clarity of parameter tables for consumable insirt $ fusion and GTAW.
(As further stated in paragraph 6.3.1).
a e
a e
o                                   *
o
                                %wgye w.awu% M c(,, M AeAvMdo                                                           oeA e %                                                                                             %
%wgye w.awu% M c(,, M AeAvMdo oeA e % %
p ._ w                       t u ,e u k Q , u .                                                                                                                     A= m ^ ^ *$
p._ w t u,e u k Q, u.
WQ                                     Auew                                                                       hko.                                                   r w % g # w w waaw m, y% v,                                                                                                                                                                                               w% \;
A= m ^ ^ *$
i                          to cca se                                    hy@l                                                                           h M
WQ Auew hko.
                                                                        ~
r w % g # w w waaw m, y% v, w% \\;
l w---     .,w--,           ,,_g-----,_-,-.-w-ym   -
hy@l h M i
_,.9,     ,--____,--.9.           , , - . _ , _ _ _ _ , . , - , . . - , - - _ - - .                  __ _ _ _ , , _ , , , , , _ , . .  ,
to cca se
-..-s,,     , --c-   -4   - , - - , . - -
~
l w---
.,w--,
,,_g-----,_-,-.-w-ym
_,.9,
,--____,--.9.
-..-s,,
--c-
-4


1--
1--
    * ,e                                                           .
,e b i1 i1
b i1 i1     ,, ._b
,,._b
* k'_   _.A.C M N                 7 6 h k ga A                                 ac3s u o! % h ch           %A-,e         S w
* k'_
wde uuc~4 we        e\    haA g..
_.A.C M N 7
T- 4 M 'u             te.-%eq 6 4                  a~A umn 43   04 th 4# o       fg . J2- A A         hsut. catu.4~3 y       MD m M.I m ov e .                       h           I 4 x-          I A p er- tt x tt 7 ~
6 h k ga A u o! % h ac3s
q & gu b M M .geK1 a At b n           am &+m w nd
. w we e\\ ch
              ~
%A-,e S
LA ghcdAd v Mtito                       W
wde uuc~4 te.-% q 6 4 haAg..
                                                                            <uace hp g,h> pes                           b s weaJ ae u.s%m , %                               Qi, w SoIJ to W                               warg       gh au em                 u m ma L                         ,Wj n % y hem                                       t a4v cw d he y                        cu k q w 5 4 % y m s-wh          w w hQ %s pu wA. % gl'J 4 %                                     hu i-M4y%MkWalG!a k % s&, JA.                                   %su Taa               '
T-4 M 'u e
6 { yw W 9 Wan_4 m
a~A umn 43 04 th 4# o fg. J2-A A hsut. catu.4~3 y
MD I
m M.I m ov e.
h A p er-tt x tt 7 ~ q & g 4 x-u At b b M M
.geK1 a I
n am &+m w nd
~
LA ghcdAd v Mtito
<uace hp g,h> pes b W u.s%m, %
Qi, s weaJ ae I
So J to W warg gh wau em u m ma L
,Wj n % y hem t a4v cw q w 5 4 % y m s-d he y cu k w hQ %s pu wh w
wA. % gl'J 4 %
hu i-M4y%MkWalG!a k %
s&,
JA.
%su Taa 6 { yw W 9 Wan_4 m


s                   =*-4.               '-4-w           4                   g-     4     -.                                                      - , . . .
s
b b o e *                                                                                                                                                                   ,
=*-4.
9 w
'-4-w 4
kw a % % ** Q1 i~L wx                                                                                                         -
g-4 b
M W h na+                                                                          h,.$e~- ms w   wu
b o
                                                                                                                                                                                              .M o u$ 2+%
e
J                                                 W "A 2 %                                                                                             "'
* 9 w
aw wed                                                                                                                                                                   aD        c M q R                                                                                                                                               m%   m-g s              h O.L Qll   _0 Q b %$                                                                                                                   '
kw a % % ** Q1 i~L wx
M u s t % ?-8-- w 4 m, N\tc* e smd YA M W ***&c@kh,                                                                                                                                         6 1
* W h h,.$e~- ms w wu
9
. M na+
.M o u$ 2+%
J W "A 2 %
aw wed M q R m%
g aD c
m-h O.L Qll
_0 Q
s b %$
M u s t % ?-8-- w 4 m, N\\tc* e smd YA M W
***&c@kh, 6
1 9


f, O, Q tt eItl7 As><<* L 3I           Ot1MI19'b'                                       -
f, O, Q tt eItl7 As><<* L 3I Ot1MI19'b' 3 lel F.<b/ri Jeevile%,
3 lel F.<b/ri Jeevile%,                               y p/ jf,, j),,,, ,j,,y [pfgjj) g,'f h<!
y p/ jf,, j),,,,,j,,y [pfgjj) g,'f h<!
ennIl reifm.idil'4 /,e yua/,1,,.,,a,,,,,,-(pgj I'! de/ya/<d' W erk M s % w/ m J ,,.;,j,. ,,,,/,4,1v b S h 9A fny+~< h 44ee dk4 st cJric                                                                               I
ennIl reifm.idil'4
                                                      %f~y (Y4s-c), PSx // 7"'/'t'$' l y!?" !? ,4                                         ..
/,e yua/,1,,.,,a,,,,,,-(pgj I'! de/ya/<d' W erk M s % w/ m J,,.;,j,.,,,,/,4,1v b S h 9A fny+~<
                                                      +h e o payre by K                                           yaarletty 0A Smiedia, Atf rhi h V4sc ,                       y       p ,,te,9, y g - yem.<,J
h 44ee dk4 st cJric I
  '.                                                    Heeheyi .aJ4 y'sec m J by, repre/cu /,Ji~ oi                                                                   ,
%f~y (Y4s-c), PSx // 7"'/'t'$' l y!?" !?,4
                                                      ~cece selec/sJ anus ,1 y4e e, c4c4rr -,< d sda m b-chrs                                                                                       - . -
+h e o payre by K yaarlett 0A Smiedia, y
3.1.1.         yMc lui < niinaJ <<>pmisb '!<'h or ne I''"< l'"'l' o1 9 A              m aI< at A ~ l* y '{''l Y & ?if,'?I<iv-are    n + a c. y sinee #cr ~
Atf rhi h V4sc, y p,,te,9, y g - yem.<,J m J b, repre/cu /,Ji~
Lon i I - q u ,,t,'l y cminI (ec) y                                 ed[
oi Heeheyi
s.4enir d or f.r his a elib,' int                                   ni ;1                       _
.aJ4 y'sec y
ths'leL Eyihrer'.s m) Cm 7jyac l<rJ,, /n cy(cieac), E                                               -
~cece selec/sJ anus,1 y4e e, c4c4rr -,< d sda m b-chrs 3.1.1.
    ;                                                    &          Zm riracG // wye, $<                               eec,,ainy, aifeelire od .r M ye.
yMc lui < niinaJ <<>pmisb '!<'h or ne I''"<
Jevei 2. - Led //o ue                           G y'sec m ,j/
l'"'l' m aI< at A ~ l* y '{''l Y & ?if,'?I<iv-o1 9 A n + a c. y sinee #cr ~
are Lon i I - q u,,t,'l y cminI (ec) y ed[
s.4enir d or f.r his a elib,' int ni ;1 ths'leL Eyihrer'.s m) Cm 7jyac l<rJ,, /n cy(cieac), E Zm riracG // wye, $< eec,,ainy, aifeelire od.r M ye.
Jevei 2. - Led //o ue G y'sec m,j/
a<J Ullfu pai- % ed 1,7 Laacl l arymi2al&u
a<J Ullfu pai- % ed 1,7 Laacl l arymi2al&u
                                                          ~1ly 05 sc m eiu i( ~ J strucJun/ a&nio
~1ly 05 sc m eiu i( ~ J strucJun/ a&nio
                                                                            <u           ,                  ,
<u C'
C'           &!  $.D   lll l'$'$fi{     f/l$$&
$.D lll l'$'$fi{
l've'l $ - A< k /.s by Y4EC m ac/su~o'lles o f
f/l$$&
;  :.                                                  Ees'vt l m d Ki bet 2 u p ,,'z a li k u .] y eac4                                             i Le**cf f Nd '2~
l've'l $
                                                        $'5 C'
- A< k /.s by Y4EC m ac/su~o'lles o f Ees'vt l m d Ki bet 2 u p,,'z a li k u.] y eac4 i
Le**cf f Nd '2~
14btsi h/Clc7oI gcln,e[hth/
b
~
[
[
M'   14btsi h/Clc7oI gcln,e[hth/
$'5 C'
s                                                     b
M' s
                                                                                                                                                                          ~
\\
                                                                                                                                                                            \
\\
    \                                                    yerfw ~<d by /Leir arym:2.a?/ dis, 1                                                                                                                                   - - - - -
yerfw ~<d by
/Leir arym:2.a?/ dis, 1


NGh.+   my _
NGh.+
:          w wnu                         ;ii-n         ,,  c                           an 1er -W dieechk o,s             ae tI~9 ,ly,',;%,up         k
my an w wnu
                            ~
$.s
Gewpl $.s                                  /             y lo   H     yer, Cm ikc/tk               qA  [94 M) irr 44. Yk&c "7T,dc         g,<c e ,   y,go s,z                 = =   g = w y+ y']         cec ad&
;ii-n c
q&             n       ??       -
,s a 9,ly,',;%,up k
w<f<<%d17 ad;/ ri refirhiv                               y Av4/4GPt a frie,          QM
Gewpl 1er -W dieechk o /
                        ~1 amyneL p. A wfnk                                         h rec k s rc{,,p, m ,   ~ ~ . -
tI~ y
p   p M     i     .F         4g hfstrMCr ' WY l'1-     #      f
~
                          $h       Mtf pk    vue n ia n t k & n d f"J " l-YkDpt sc                 sPsvev;// o sd             G&       auf hd y'A  i~c/&
e lo H
Y
yer, Cm ikc/tk q A
                                                                              +4e q  faett eA 7,uy , m r,le, eder A MA of a fvjerth&,<b.+/ All OA(O QS ecf rk k + th, c,ayrah t/~<yr , ac/04,%&w
[94 M) irr 44. Yk&c "7T,dc g,<c e, y,go s,z
              ~        $"*l' Y Anar~cc (R.t QA] +ktwy4 14 dwp~,- fgnh QA.
= = g = w y+ y'] cec ad&
q&
n
??
w<f<<%d17 ad;/ ri refirhiv y A /4 QM
~1 amyneL p. A wfnk a frie, v4 GPt h rec k s rc{,,p, m,
p p M i.F 4g
~ ~. -
f hfstrMCr
' WY l'1-
$h Mtf n ia n t k & n d f"J " l-pk vue h
auf y'A Y YkDpt sc sPsvev;// o sd G&
+4e d i~c/&
7,uy, m r,le, eder faett eA q
of a fvjerth&,<b.+/ All OA(O QS A MA ecf rk k + th, c,ayrah t/~<yr, ac/04,%&w
$"*l' Y Anar~cc (R.t QA] +ktwy4 14 dwp~,- fgnh
~
QA.
5 e
5 e
                                                                                            ,e O
,e O
O
O
          ~     ~
~
                                                                                  ~~
~
~~


                                                                                                ---m
---m
                  *"*. hew 4       _,
*"*. hew 4 1995_
1995_
**'**e-wm,,
                                                                                  **'**e-wm,,
Wee
Wee   -e%,
-e%,
3- 2 drer/ Init, clcl mchcIsd YAEc ad,/
3-2 drer/ Init, clcl 21
21            ,:,qW 11a               issy echs
,:,qW 11a issy echs mchcIsd YAEc ad,/
                                                                                                        .ra,-,,th,1<< ~/
s,~<<% ce y,,yrm,,j as a.r,-,,th,1<< ~/
mi s,~<<% ce y,,yrm, ,j as a
a mi q c p,,y,,.,<.s, g k,
          !                      q c p,,y,,.,<.s ,           g   k ,   ,;     ; q ,,p               n ai ,,Jc A o b!'r*'s W .s fx fut o I emr/rwc h ~ s1 at-lwr //
,; ; q,,p n ai,,Jc A
cmJlWm               o f g, n. et< ,
o b!'r*'s W
Fr eac4 yroytm n. i ipi,1oc                            le reau:.-,l ar,%
.s fx fut o I emr/rwc h ~ s1 at-lwr //
'                                                                        k
cmJlWm o f g, n. et<,
                                                                            ~
: n. i ip oc le reau:.-,l ar,%
l,<<ike / u ,aye - / m.f f
k Fr eac4 yroytm a,., J re ce /<mi,- i,1 l,<<ike / u,aye - / m.f
* IA iel a,., Jfre ce /<mi,-
~
                                      & scleele J 9A (ersee/; m1 nati -e/ sefuk/
f
d oce m lr. Poliedt mJ froce ef<res w,re revu;< <d                                           ,.
* IA iel f
de c ,,, ta -.ac 4 y ratry ,cp,)< m Ar..r(<ais?/,1 g     n , ,>< a ta i.a ,<.,1~ u ,e a, espc ,,,.aa4si
& scleele J 9A (ersee/; m1 nati -e/ sefuk/
                                                                                          ~ i w , w , . t ,,c i,, a ;
d oce m lr.
p            g a a r u ,., , ,; s. c n ; . u ,
Poliedt mJ froce ef<res w,re revu;< <d y ratry,cp,)< m Ar..r(<ais?/,1 de c,,, ta -.ac 4
                                      ~1 , m ,yc m J c- p. /                 ,/ p./Ny ac/> .hk unn 9
g n,,>< a ta i.a,<.,1~ u,e a, espc,,,.aa4si p
HAe-eL , p~ ,m /- ik fr<vi-i d a w iseJ .+6 >~ "'Ni' r uy,,, i ti/,f , a u ,/dre:/y     s.,
g a a r u,.,,,; s. c n ;. u,
                                                                                <<7~<1        emf !"ff th) Inl"- "I' b.14 5-nil, M i,~, (<a-m/p d n,% olirr 6mheI<r'l                             "I''''''''''"
~ i w, w,. t,,c i,, a ;
mf sJ-mIr <kr.i; sta f,Q; mi p< bf~ ^I"' Ar ,4 /r<ATv;         ~
m,yc m J c-p. /,/ p./Ny ac/>.hk unn
DHrr u, k vis.-i           d & c cri exy,,,,:a, , ,,,s,ei,in a b;;<
~1 HAe-eL, p~,m /- ik fr<vi-i d a w iseJ
l*rrJf i < ~7emA s.<jfel,'" poc.<m //
.+6 >~
ft''*NI'~ ~<
9 r uy,,, i ti/,f, a u,/dre:/y ~<1 s., <<7 emf !"ff th) Inl"- "I'"'Ni' b.14 5-nil, M i,~, (<a-m/p d n,% olirr 6mheI<r'l sta f,Q; mi p< bf~ ^I"' Ar "I''''''''''"
                                                ~ ' ~' *c tw;lel m< M nJ s.<wntha 'e's                          s $4 d</?, to o
mf sJ-mIr <kr.i; exy,,,,:a,,,,,s,ei,in a b;;<,4 /r<ATv;
en-.i p i.nl..i, ~ g Q            ,1, n ,.eearJi o f es es c h s e etkis,;                   , ,
~
                                  ' % = 3 .. ! ! ,.       ;                                                            #
DHrr u, k vis.-i d & c cri f i < ~7emA s.<jfel,' poc.<m //
l*rrJ f '*NI' ~ ' ' * ;lel m< M nJ s.<wntha 'e's $4 d</?, to s
en-.i p i.nl..i, ~ g,1, n,.eearJi o f es es c h s e etkis,;
t' ~ ~<
~ c tw o
Q
' % = 3.. ! !,.54 n! :, v<yrrfr k "'f'""O #
1
1
                                        =l ':           54          n! : , v<yrrfr k "'f'""O #
=l ':
rec,vli./ i1 ,ye ~ h in~d'7' e %
e %
l f
rec,vli./ i1,ye ~ h in~d'7' l
e 1
f e
i     !
1 i
                                                                                                          .=---
. = - - -
                                                  . - .          .                                                            -m-
-m-
 
: 3. 3 F i n ct m,d S,
p F i n ct m ,d S ,
p 3.3.I v', la h m.s y;7% gggiar~~ M k'!$nif echr revte*s fl lretriiny md ycse/&$r,cerltm
: 3. 3 3.3.I v', la h m.s                                                                   ~
~
y;7% gggiar~~ M k'!$nif lretriinyechr          revte*s fl md ycse/&$r,cerltm af .selecIed y ,riorne/ ey<yned' b & UEL C teorh Field       g 4 c,wf, k<cedi , /                       +,n ,, j, _ ,e-re:. id, 5 4 ,t n                  a,,c    .cer-llSi<l           as yaat< C&,1 Ov L<a! t Sarveillmce . Jbeu e r, 4 la. corIc'lica./cs,' did noS I den ia'ly      .ga.
teorh af.selecIed
aeF1 a M/ wkiet                 Iby
,riorne/ ey<yned' b & UEL C y
* 7"''5'N 4
Field g 4 c,wf, k<cedi, /
                            $o                 J.< r v st ll51/~<,       Tl1       M CM W''Y N fathy w as d
+,n
                              %(ynle % d-J N.. X-3,"na<l3r'c</ti> .                                              '
,, j, _,e-re:. id,
car b '$rc a fd,         oO     twpe G ,Teihb & Mu?'E"*
.cer-llSi<l as yaat< C&,1 Ov L<a! t 5 4
fern n e t, saeM 2. v.c             Aict ., Ma ni & 7 eL W i s n e f S 4 d / b e $ c e w lc d I n fK<
,t n a,,c Sarveillmce. Jbeu e r, 4 la. corIc'lica./cs,' did noS aeF1 a M/ wkiet Iby
m        Ilk U *bS *[ b, iseG<J.?y K.;dlie Ay affafnil< Ar                                                                             "
* 7"''5'N I den ia'ly
0 ok e~f yee:     1              -Qcpllies ya. Jet Idb("lk"'~
.ga.
-                              nu t, < aus                   ,i % en o, senh, o, enf''"
4
ae G-1iu a $ c l & y u ~ /< /7 0'
$o fathy w J.< r v st ll51/~<,
wh<n ry&ai % F                                                                  I j                              y <a << pal < 1 b y agn ynkIr jncaJaic/ -v1 a ec~j "M t8 ace el-             ,74 pau fa ec law- %e sl?t-M-                                 ,
Tl1 M CM W''Y N as d
V4 t'/P '-o G-         ) L p,'                     i n                             .
%(ynle
                                          ~
% d-J N.. X-3,"na<l3r'c</ti>
car b '$rc a fd, oO twpe G,Teihb & Mu?'E"*
L fern n e t, saeM
: 2. v.c Aict., Ma ni & 7 e W i s n e f S 4 d / b e $ c e w lc d I n fK< Ilk U *bS *[ b, iseG<J.?y K.;dlie Ay affafnil< Ar m
0 ok e~f yee:
-Qcpllies ya. Jet Idb("lk"'~
1 nu t, < aus
,i % en o, senh, o, enf''"
wh<n ry&ai % F ae G-1iu a $ c l & y u ~ /< /
0' 7
y agn ynkIr jncaJaic/ -v1 a ec~j "M I
j y <a << pal < 1b ace el-
,74 pau fa ec law- %e sl?t-M-t8 V4 t'/P '-o G-
) L p,'
i n
~


j ).]. x Wahr.rht hilalkhm fpnLns.                                                                   ,
j ).]. x Wahr.rht hilalkhm fpnLns.
Dar,4 4Le                             sile Mr & wfec U obtr>~r 1 41-- Flc L n a t/. , , / oui 42.Sur!Jl1r^f' V < l< r s l ok                    ,( ii la lle l bw(dlay h < J him dujined in sn l o c s l1 0 U t o ' '_ b m r*acA e                                 4 reiZ1fn eiy .1 6 f ,         fryi7.t, rfac< /r(" NI"'
Dar,4 4Le sile Mr & wfec U obtr>~r 1 41-- Flc 42.Sur!Jl1r^f' V < l< r s l,( i ok i la lle l L n a t/.,, /
mJ              n m,c Le/unes iniIrwe4;ar win wi%'I 4 ele {er nikg. Ma s'estallbh er vib!W>1l1 ML
oui bw(dlay h < J him dujined in sn l o c s l1 0 U t o ' '_ b m r*acA e
* 4 a bcujicJ      uil4 0 1 C- eny b <<". ""7-in< ((w ws 9 741 - F - 10 t L 7 L                           .16 {es JLJ wa/a,.i4f a 4,b< }ac</od h#W Ven rJ C.,- her re m Try c1 & . & " f I&N
4 reiZ1fn eiy.1 6 f,
                          'n +a Ne fure<r TarMeck,u/ m b                                            s h ~b  c l y joId>
fryi7.t, rfac< /r(" NI"'
o I
m J n m,c Le/unes iniIrwe4;ar win wi%'I 4 4
m ~ b -rf*r m;/1 ikth
ele {er nikg.
* n '*'Im04 6' cK2 win ava,'falky
Ma s'estallbh er vib!W>1l1 ML
                                          ~                   -
* eny b <<". ""7-a bcujicJ uil4 0
1 C-in< ((w ws 9 741 - F - 10 t L 7 L
.16 {es JLJ wa/a,.i4f a 4,b< }ac</od I&N h#W Ven rJ C.,-
her re m Try c1 &. & " f m b j Id>
m ~ b -rf*r m;/1s h ~b c l y o I o
'n +a Ne fure<r TarMeck,u/
ikth cK2 win ava,'falky
~
g*
g*
4ba                                     als k             o i to cep so, g yyen t& s,
* n '*'Im04 6' 4ba als k o i to cep so, g yyen t& s,
[n'leriM Z Ad4 reywire/                                           Mah   ae hbsl!N d et h % 7a d. % t                               be   y,lscrIlich 17 eff f d
[n'leriM Z Ad4 reywire/
p r, c eb re.s e
Mah ae hbsl!N d
d et h %
7a d. % t be y,lscrIlich 17 eff f p r, c eb re.s e
4 3
4 3
i i
i i
i i
i i
      ' ~ - ~ '' C'       n.,                 _ . . _ _          _ . .
' ~ - ~ '' C' n.,


3,3,1       $synWlcm/ 'OSofert/etltbJ                                                                                       ;
3,3,1
2 1. 3..I _ W ee lc H e rf                                                                               '
$synWlcm/ 'OSofert/etltbJ 2 1. 3..I
Scleclcf VAE C                        Sl lP The i               relW~ fevtew'I QA survdi/m.cs refirft                             m J w.,,(dy                    ref e b ol sered /Imcr ds<r eb J~ ary .fM- /, J n e ITF1
_ W ee lc H e rf The i
                                        -r ~f^f-
relW~ fevtew'I Scleclcf VAE C Sl lP QA survdi/m.cs refirft m J w.,,(d ref e b y
                                      .Th e.*
ol sered /Imcr ds<r eb J~ ary.fM- /, J n e ITF1 y rc y tril.
e4.ly tril .
* F.sservdil cuce oI klI'''' ~
* F .sservdil cuce oI klI'''' ~
.Th ~f^f-P,eiew r e4.l
                                                    ,' P,eiewyr rc                                                                            -
-r e.*,'
J (P-ID                               m ,Jy % .                        de (<<,ieu v e' Wj7 11 1           ware ee-ce~<J.
(P-ID J
j                                  wer<          Idrule'ffr/ m !L - Sete ref a4) inm(N"''NN vi#             s'r,fe m bc.m e w&el h he skr+~n Kr#
m,J de (<<,ieu v e' Wj7 11 1 ware ee-ce~<J.
* b wcflor (ro e e r/ sb se f1 .i.?l%
y Idrule'ffr/ m !L - Sete ref a4) in (N"''NN j
                                                            &        JUcwsitl>v w44 YAEC d tIclo/tl re c <<-Js l
wer<
no          e<rrecIek ec {c mi la/cen                             hevedM*
w&el h he skr+~n m
de fdienciht .
vi#
r<Ie Fe'F sk revikt d VAE crik.                                        atilsof,i o /
s'r,fe m bc.m e
S Tk i t/f ecltv        '
(ro e e r/
f-Y durt"1                  June    tct n 1. A pri ( , l # L on d idowM sel +k f.Ilwi s '                                             ,, gt                       ,,
sb se f1.i.?l%
* A ude I A . ss a t es ist %,,E 17 4lm d e S' U'"','''
wcflor Kr#
i 1Je,.FiCau i,,Jd J <*'y w </eer ua.!i., m f e d I'**
* b d tIclo/tl l
l
re c <<-Js &
                                                                                                                          ~
JUcwsitl>v w44 YAEC e<rrecIek ec {c mi la/cen hevedM*
I'#**
no r<Ie Fe'F sk de fdienciht.
                                                  *b h I'-g q A ymem , p<fe(d uols>in /
rik.
                                                  *5      e reje/u%k cleJc'ctiary a/t.
Tk i t/f ecltv revikt d VAE c atilsof,i o /
(dea </<lir.Ily
S tct n 1. A pri (, l # L on d f-Y durt"1 June
-                                                  YAE c        sm.eIIfmee nd f-Ilv.,                    Gtler~/, w ./
+k f.Ilwi s '
ae4h,-
idowM sel
I                                  '    j<b b YO Sb M&CJ lP(f Peefo.dtr,IffI~
, gt
g, g,5,,,,, e ipi, yse c lde.Jit at L,w
* A ude I A. ss a t es ist %,,E 17 4lm d e S' U'"','''
                                                                                                                                '"
i m f e d I'**
* c IaW'r o f f r ~ > +>.1 hl re e m m de.J r
l 1Je,.FiCau i,,Jd J <*'y w </eer ua.!i.,
A,d o e frida /iL'''O es/<//*t*wh e ~f re h en tr've    t                               is raprv u Li u -.w'., , ,vT -lp a h ~ rn i
I
f r= y res.t4asuial s1 l                                                                                                                                         '
~
I'-g q A ymem, p<fe(d uols>in /
*b h (dea </<lir.Ily reje/u%k cleJc'ctiary a/t.
*5 e
sm.eIIfmee nd f-Il Gtler~/ ae4h,-
YAE c v.,, w
./
j<b b YO Sb M&CJ lP(f Peefo.dtr,IffI~
I lde.Jit at L,w g, g,5,,,,, e ipi, yse c IaW'r o f f r ~ > +>.1 hl re e m m de.J
'"
* c r
e ~f re h en tr've A,d o e frida /iL'''O es/<//*t*wh t
is
: s. asuial raprv u Li u -.w'.,,,vT -lp a h ~ rn i
l f r= y re t4 s1 l
. c <> y <> d e 7.<y7tr$ I, 4 St tl is reyubed -
7
7
                                              . c <> y <> d e 7.<y7tr$ I, 4 St tl is reyubed -
.=::
l
    .=::                                                                       . _ .                    _          _


i
i ful & Ao Jf s 73 c 5 t tt, d v, k,- ttH - Jav e9 I9M_ ---
* ful & Ao Jf s 73 c 5 t tt, d v, k,- ttH - Jav e9 I9M_ ---
rk.
rk.                                    .
W Ilewbe'/(e/ fark g,p, hd cfei, f,.af,,y,,/
W Ilewbe'/(e/ fark g,p, hd cfei, Af,.af,,y,,/                                                                                         l le //er           te e twwn Jed m ygr a 4 1ltiolv<~'d k
A le //er te e twwn Jed m ygr a 4 1ltiolv<~'d k
                                              }gk f-lhQA bporm-        aum m n efGeta.1e maai n + minf*/
f-lh b aum m n efGeta.1e maai n + minf*/
19tl ~ lla,la'fal Auld- No. .rA ste c3 zosi )Y,, l                                                     t l ~ewly defari-cas. riu anj;; , y ,,, t, tau k               (rt A*'y arra/o S cacern: ma /s af idmh'In=l'*
}gk QA porm-Auld-No..rA ste c3 zosi )Y,, l 19tl ~ lla,la'fal t
mJ               v e L l u s irr in.r . T 4 le I/< r w is o .rf.r /ed h l-             9-ll m ~ y c m A ss a.i /<s/ /11~ detI'"'%'
l ~ewly defari-cas.
t A m_ t             c<~ < <.% , a , m m 4 . a ,                                                 ,,,,,,2 5<'fm/nby                           f-Hk             We e ,< Ja'/.s & a aef k.J/e                                               -
riu anj;;
                            += c crreeFa r a e % k n T.<.uv i u u w/ defelimeus                                                                                                 l b4 _-                  :.1 1 da'J uol- aclewledyr ow!/ml                                                       ,
, y,,, t, tau k
                                                                                                                                                            ,, j,,'
(rt A*'y arra/o S cacern: ma /s af idmh'In=l'*
                                                                                                                                        'O N       r*g W MPvt <$ g. htN19,f W f(YfgC/                                                       ("[
mJ v e L l u s irr in.r. T 4 le I/< r w is o.rf.r /ed h l-9-ll m ~ y c m A ss a.i /<s/ /11~ detI'"'%'
                                                                                                                                                '** A "" ' -
t A m_ t c<~ < <.%, a, m m 4. a,,,,,,,2 5<'fm/nby f-Hk We e,< Ja'/.s & a aef.J/e k
I n-                                      IO.I,     leas,       Ouri 4 +k''                                                               l r"[</// ,&.e                          r-n                                                    f" 4 'p*j""
+= c crreeFa r a e % k n T.<.uv i u u w/ defelimeus l
aLGlehut uJ&                                     wr,e       cm tuchJ fe ve                                                            \.
b4
                  '                                                                                                                      d'0'I"*"''
:.1 1 da'J uol-aclewledyr ow!/ml
ol- wree W< aehe k . In D s'd. eA                                                                                                       i
,, j,,'
                  ,                  w. , ,e 6,;g ecyreeleI arecyI<&y , in l                              a e aic, ua
N r*g W MPvt <$ g. htN19,f W f(YfgC/
:                                   e<> grr. ,4 .r y p r /                     wLi ayain vec n*** L 4w .<st.'4 h. fq-/ c<rg4 <ya c ~ 4<c/< l
("[
                                                                                                /acg,vu                                            t''
'O
j m eet ir et . Y= : - . - J P-H ~~ ye m l- "-->
'** A "" ' -
j
l r"[<///,&.e IO.I, leas, Ouri 4 +k'' f" 4 'p*j""
    '                        %1 I,, b< sua c 11ad ly se </olue J 14 m ouIdiyaled b e u ~ ca-14 /<.a .ita si2,91,1.&J,tA.snsnatu           -
\\.
j                          Weit           CM TIdired' l* be                     traI,*$ m J u nek myeJ,                                                             t e
I n-r-n cm tuchJ fe ve aLGlehut uJ&
            ._ ..    +w   ew------m-
wr,e ol-wree W<
                                                -+v -    we-   -  --    ww-                         - - - - -              -y-
aehe k. In D s'd. eA d'0'I"*"''
i 6,;g ecyreeleI arecyI<&y, in a e aic, ua l
: w.,,e e<> grr.,4.r y p r / wLi ayain vec n*** L
/acg,vu j
4w.<st.'4 h. fq-/ c<rg4 <ya c ~ 4<c/< l t''
j m eet ir et.
Y= : -. - J P-H ~~ ye m l- "-->
%1 I,,
b< sua c 11ad ly se </olue J 14 m ouIdiyaled b e u ~ ca-14 /<.a.ita si2,91,1.&J,tA.snsnatu Weit CM TIdired' l* be traI,*$ m J u nek myeJ, t
j e
+w ew------m-
-+v we-ww-
-y-


A rewh of %dc c - ,,- 4 O
O A
i ifecW revu'~el ec h si 4alec, by Y45c I, egr,<c / 14 p-H m,nya,,F                                                           l' m1 fry r m u /ic de {d su tik jdeak'fG/ elk!5 su rveillmcc     acJ eqJrVr, rk I?Il5.7 'c'k'h                       l
i ifecW revu'~el rewh of %dc c -
      .                    y'isee wen cr ~ <:r ee Y45C klaa,      pe4,4ute k ,Qantily Arturawe 6c'*I""I                   ~
,,- 4 ec h si 4alec, b
h Ai n rk february lYPl. ref tr$ di/c w//''S N f                                             /- ~A14AA~#
Y45c I, egr,<c /
locic of f-g o . c<y(ry,,,le say,,k led & f
14 p-H m,nya,,F l
                                          %Ia mactry kJ &arn rek r                                              h " #'"
y m1 fry r m u /ic de {d su tik jdeak'fG/ elk!5 rveillmcc acJ eqJrVr, rk I?Il5.7 'c'k'h l
V<cc     fnn Jse/- o 4 e udfly Jrre ute 74 aetun reyaciej k reivin +4a ~ dn 8(n(,l9FL          re        l   dIrcurr< d     }l'' YU *I
y'isee su wen cr ~ <:r ee k pe ute k,Qantily Arturawe 6c'*I""I Y45C laa, 4,4 h Ai rk february lYPl. ref tr$ di/c w//''S N
                                            %      P-fl Cwf nlr _gy cdh                                                       _
~
                                    -    Yksc wed17 rcj r-li k                   in w p m .t,               n           <<,,,rti
f n
* l- J ~ ~ <y !< 't !L, J m any u,19 FL , r/re4 tr, i 9 FL N d n J n. wp&d j
/- ~A14AA locic of f-g o. c<y(ry,,,le say,,k led &
                                            !!*y *qjf t,l,fununeJ*-ek m'm ye 4 acJ.icu.s,             Jy nVip a capns4 bWeie r 1 - u ,,e / ,9 -, M P-t/ siVe ia myed e u carniry -het< J +,kly ~ 1 (.ir'/ <k w'" k'^'
~#
    !                                        = c %,
f
* l4 an a ( bwvv/- 0 K<flrrly Q f         {1s     wtileb'*fe Ju e<//eJ Jung 1
%Ia mactry kJ &arn rek h " #'"
p.H     yr,y nu 4neu -as i4 r = . X y a J m .< ary n , i m . ,
V<cc fnn Jse/- o 4 e udfly Jrre ute r
  }
k reivin +4a ~ dn 74 aetun reyaciej l
                                            *  $ tY irscebl     w sik
dIrcurr< d }l'' YU *I 8(n(,l9FL re P-fl Cwf nlr _gy cdh Yksc wed17 rcj r-li k in w p m.t, n
                                                                      ~
<<,,,rti
f $ l"         lc       o[ rb faab m.t  {a als earcethe ac k L, ei a&caud. sie                                             \
* l-J ~ ~ <y !< 't !L, J m any u,19 FL, r/re4 tr, i 9 FL N d n
l                                             em cer 11 -o-e i a ed'421 as wat.t swr >,Ihri% ~d m levas / N ea h'Cita hin , y.Q 3 j,, fed 4Ml GA o      '~ -u           'c i+YAga6c [,f4             a.a      a h p/ s'                 i 4r,,-a" aeuetw sro        p. , <i< ag atri< w   1- /,
J n. wp&d
                                                                                        ~ ,,,,~     , n           ,, _ , ,,,,,,
!!*y *qjf t,l,fununeJ*-ek Jy Vi m'm ye 4 acJ.icu.s, n p a capns4 j
bWeie r 1 - u,,e /,9 -, M P-t/ siVe ia myed e u carniry -het< J +,kl
~ 1 (.ir'/ <k w'" k'^'
y
= c %,
l4 an a ( bwvv/-
0 K<flrrly Q f
{1s wtileb'*fe Ju e<//eJ Jung 1
p.H yr,y nu 4neu -as
}
i4 r =. X y a J m.< ary n, i m.,
o[ rb aab
$ tY irscebl w sik f $ l" lc f
~
{a als earcethe ac k L, ei a&caud. sie m.t
\\
l em cer 11 -o-e i a ed'421 as wat.t swr >,Ihri% ~d N ea h'Cita hin, y.Q 3 j,, fed 4Ml GA m levas /
-u
'c i+YAg c [,f4 a h p/ '
a6 a.a i
4r - " e etw <i< g tri w /,
'~
o s
a a < 1- ~,,,,~, n ro s,, a a u p.,


ducette1               -          g                                                                                 0 L        P-I[ Je /c 2iem c As m J VASC $kl N IHJf''C
0 ducette1 g
                    $*o       olhth         + b k c- w ,r e c d e k ,. , g y g g c ,g , u y ,. Q ,.
P-I[ Je /c 2iem c As m J VASC $kl N IHJf''C L
                      $          frdlemj             I, < J     lo ren idea lilfr d b y, k'AEC soh                                                                       '
$*o olhth
eimore/ as we ll a/ly f-IlthS"'I 9A       m a au J,,l 9stdIl0r3                 d y r~ t ny,'y M o d - } 9fl os,s J cn u umsto *t/
+ b k c-w,r e c d e k,., g y g g c,g, u y,. Q,.
0CC4///N1J ll4rc 4 Skrh y ff[g (_ isqetsjen& s*'t1 a w< cc. , & ll e (,,Llemi m.t I,aL a 64~ /<1 b ofk'"                                                                                         j
frdlemj I, < J lo ren idea lilfr d b, k'AEC soh ya/ly f-IlthS"'I eimore/ as we ll 9A m a au J,,l y,'y 9stdIl0r3 d y r~ t n M o d - } 9fl os,s J cn u umsto *t/
                        ^ ~ -      L'~'      . .- ! ' . . .
0CC4///N1J ll4rc 4 Skrh y ff[g (_
                                                ^
isqetsjen& s*'t1 a w< cc., & ll e (,,Llemi m.t I,aL a 64~ /<1 b ofk'"
c yy-(gl-g y'4 gy/g                                       fry f-ll
j c yy-(gl-g y'4 gy/g fry f-ll
                                                                                                    /e gj l-- JiH Cr J**'" " ! f I
^ ~ -
                                                                      ^
L'~'
                      - $-- p N -i e . g n -
^
                                                                        .g         a/                                                                            r    !
I
A h,l'1P L ,}l-e m*JIr T      j'''"'"'''                     4.)oS.           ._lvu<.                       '
/
f.-en CorKJ, we (,l. & J.,y,Gy Q m 4 fo,.ia }.- [dP+tl5bIcult 14 w~erx 7 F l ll v *t m , / v e J m J m >~< rkW e FAl'" A4 i
/e gj l-- JiH Cr J**'" " ! f p N -i e. g n -
la iscl[ o l- g dejue/e .rycevOI N*                                                                                    '. .
^
FarIw-c h                 ,.,, 2 a f e.(i N m ~s d h k !v r*''I"
a r
              .          .u      .    ,. . . . . _        .
.g I
                                                                        .. . ! - a;                 of. flu f~// O A-cle,he c ies seFei is a w,a4,1er/ o& Me YHc 47                                                                                                                    .
j'''"'"'''
P '''' 7'm -
4.)oS.
j               3.3. 2. 2.             (? coy <m Stre f                      _
._lvu<. A h,l'1P L,}l-e m*J r T
p.h           n ae a ! yts e m:1.4                                                 L j..v.==! "'O
f.-en CorKJ, we (,l. & J.,y,Gy Q m 4 fo,.ia }.- [dP+tl5bIcult 14 w~erx 7 F l ll v *t m, / v e J m J m >~<
                                        . ' . ' . l . -u         llk__ft-
rkW e FAl'" A4 i
                                                                                                  "              ;;:l-]
N*
;                            &A                                                              I' ::!c
la iscl[ o l-g dejue/e.rycevOI FarIw-c h
                                                                  ., M ,, A ga                                u ud c l., -
,.,, 2 a f e.(i N m ~s d h k !v r*''I"
f dif et.lsr n I'                                                                                                                                                              '!J TL Nsf ecle revNs.aeJ #L<qwi fe/ec,/e] Qu.AVN & iN''"',9Qu                      Y46C f                                                                                                                            .                r                .
... ! - a; of. flu f~// O A-
rug ,                                                          ^
.u 47 cle,he c ies seFei is a w,a4,1er/ o& Me YHc P '''' 7'm -
                              .f ttrveillo><
(? coy <m Stre f j
at.L pnum                 rce riv krsber.4-s t(W'e       A -         l+1lrtr/         te")         werc           en t'aclcd I
3.3. 2. 2.
p.h n ae a !
yts e m:1.4 L j..v.==! "'O I' ::!c ;;:l-]
& A
. '. '. l. -u llk__ft-u ud c l., -
f dif et.lsr n., M,, A ga
'!J I'
Nsf ecle revNs.aeJ #L Y46C Qu f
TL
<qwi r fe/ec,/e] Qu.AVN & iN''"',9 *
.f ttrveillo>< ce krsber.4-s rug,
^
e t'aclcd at.L pnum riv t(W'e A -
l+1lrtr/ te") werc r
n I
l were I
l were I
ref -1                                                                     ex Jc/ m J.revel thin-g g,            e/,e jel perimneI ra 14 4
ref -1 J.revel thin-e/,e jel perimneI ra 14 ex Jc/ m g g, 4
I .
I.
i
i
_.,-....y                                                                                                               . _ . . . . . .    . .
_.,-....y


                                            - Iv.ltrouwcl                                                                 8' y       ,,      p;,,nn,lpicek1 6 L                         h~t<&Jle 'E M eir helels .m J w,4 y od I"b "'~'"                               "''f ~ " '
- Iv.ltrouwcl 8'
a .< R l- ce      di      w er<. well f "f'"       A
y p;,,nn,lpicek1 6 L h~t<&Jle 'E M eir helels.m J w,4 y od I"b "'~'"
                                                                                    "'I     N       ''''''W"
"''f ~ " '
                        .bqh       J.       L/- LL W yidm h                        f"I''"""'                 '?I" A m. t m.p . Rece a < ja /igu     ,      n. k~"#
well "f'" A
oA                                                                              .
"'I N ''''''W" di w er<.
                                                                                                                '" j ie hr1        sIt we SI en~d'"" n,i- c z,us;1er e k y ,,N  c uaa,t y<CM g .g.a. caut< o f               e V! i fid4*f                               it                         . .j     f.
a.< R l-ce f
f,,jp1 a"j'p     n d sarceril               ,   ,
.bqh J.
rb 7ullAde/m- . I              *
L/- LL W yidm f"I''"""' '?I" h
                                                                          "tj''
p. Rece a < ja /igu
w         n y u tlIy F &                                   'eI1(k' arc                                   y 7 jronj SL ,J l''e
: n. k~"#
                                                              *KN           f 7"' '                                             )
o A A m. t m.
L3r 2,3 kccryj afe Ibse l
sI we SI en~d'"" n,i-c us;1er e k '" j ie hr1 t
                                                                                                                        ~
z, g.g.a. caut< o f y,,N c uaa,t e
3a.3. 2.!. .H n ,, x 7. e u p g
y<CM fid4*f it
                                                                          ~~                    ~ ~ ~ ~ ~
..j
f
: f. f,,jp1 i
                    $ t5 fWW reve em 1 pf,,t aye >um A jg ,l,,L refgbs fy. j 9 y Q np-x , (ta(gg g, et-i,s t.
V!
l                   % 3- H-3             ai< Jlld t w r ec h k a c h h , m .1 // a ,                                             i h ~l a < L' led de.<ef, em }n / ac.h b s'Iat. Oui m A'                                                 L l                   _
. I a"j'p n d sarceril,,
s4      Flo'c     aceEli     w,'it, y'4sc         su~ay< mmA Jhcloid                               d-
rb 7ullAde/m-w n y u tlIy F &
                                                                ~
"tj'' 'eI1(k' arc y
o<1-      yrew A wp A/                                     aF          es FisA$~                          ~
*KN f 7"' '
.                                              ace.t %r., , + w . t ~ 'ura            au+va.,,     fLe A                   o ec. 7<-
)
i, a i                               .
7 jronj SL,J l''e L3r 2,3 kccry afe
                                                                                                                    '        ~
~
M my e onA 1,h, TLe scole o/ R.e aa< la'i.e 4 < J l'er" re/I'r< cId ;
fl j
th   !9 M wl 19F-2.,         i[,     cyJa.,y. k     of,),gh       in (,y. m ,// m                 (
Ibse -
VIt Sh      sr % /        le.e     e h m tr'c v al+t c hy- crev a{l CMlrai' i                             'TW        w.l.                                                                        '
~ ~ ~ ~ ~
o& M Q.A yeay>-o>-1,4 '~ -__7 -' :':-.=:L[..
3a.3. 2.!..H n,, x 7. e u p g
u      -
~~
p(=~-
t5 WW reve em 1 pf,,t aye >um A jg,l,,L f
                                                                                                                ; ; ~,'4je-lk l
refgbs fy. j 9 y Q np-x,
Wy.0 tm an- 4 Ar l*                     g & 4:= ,w su; & ,;/ a.. [ L. w S = $y                             m nm            % e -u < a IAI!''i
(ta(gg g, et-i,s t.
l
% 3-H-3 ai< Jlld t w r ec h k a c h h, m.1 // a,
i h ~l a < L' led de.<ef, em }n / ac.h b s'Iat. Oui m A' L
d-l
_s4 Flo'c aceEli w,'it, y'4sc su~ay< mmA Jhcloid yrew A wp A/
ace.t %r.,, + w. t ~ ' au+ fLe
~
es FisA$~
o<1-aF
~
ura va.,, A o
ec. 7<-
i, a i
~
M my e onA 1,h, TLe scole o/ R.e aa< la'i.e 4 < J l'er" re/I'r cId ;
th
!9 M wl 19F-2.,
i[,
cyJa.,y. k of,),gh in (,y. m,// m
(
' T W w.l.
le.e e h m tr'c v l+t c hy-crev a{l CMlrai' VIt Sh sr % /
a i
yeay>-o>-1,4 '~ -__7 -' ': =:L[.. p ; ; ~,'4je-l o& M Q.A
(=~-
: -. u l
l*
g & 4:=,w su; &,;/ a.. [ L. w S = $y m % e -u < a Wy.0 tm an-4 Ar m n IAI!''i


                                                              - - -  --a,-~           n-   -          -_a a,   -_ . -__---                                -n   m         -,eas- -e   - - -            , m   .-a,--         4       -  4   - ,-- + _ _ .
--a,-~
y a m enu snu-9
n-
                                              ^^
-_a a,
_ mee 6                     N hM h "                 _- - - - -      m - "- - - -
-n m
                                                                                                                                                                                                        ,4     m       ,gg,.         -
-,eas-
9               *9 e
-e m
W
.-a,--
: s.                   z-1r vr s c4 e - A 2 "                                                                                                                                                                                             l r- 12 -se                                         %af 4 e&g w
4 4
: 2.                   /d WA J.2c4 f.a.ti^$aL. n
-,-- + _ _.
                                                                                                                                                                  ~
y a
MS O*- LXhe,h                     I A                                          E_! f O f ? $A) k .                                                                             k                                                           $8, a                     km -A                                                           e444                       4 ~B . e44,< a;%
m enu snu-9
^^
_ mee 6 N hM h "
m - "- - - -
,4 m
,gg,.
9
*9 e
W s.
z-1r vr s c4 e - A 2 "
r-12 -se %af 4 e&g w 2.
/d WA J.2c4 f.a.ti^$aL. n MS *- LXhe,h
~
O I
O f
? $A) k.
A k E_! f
$8, a
km -A e444 4 ~B. e44,< a;%
P
P
                      <                    %f l As,A eA+ pc. en$ef i
%f l As,A eA+ pc. en$ef i
l I
l I
i l
i l
l
l
                                                                                                                                          ---..----,7                 , - -.,_-.        n,       . , _                        ,    n,     , --
---..----,7 n,
n,


                                'E    - . - - -
- ~ ' *
            - ~ '
'E m
* m 9
9 s
s                                            e i
e i
f;eso s-     a %nsa                                 , , ,
f;eso s-a %nsa
                                }%e             Mr                 fang
}%e Mr fang
)
)
0 Fo u?                   SM
0 Fo u?
                      /
SM
: f.                           e             .
/
/#                                         p ub                                                       UNITED STATES
 
                                    +                 ?#                             NUCLEAR REGULATORY COMMISSION
f.
[ ..                 f ,a                                               nEGION I e                        f                                         $31 PARK AVENUE g                             -*
e
                                                        /                               niNa'OP PRUS$1 A PENNSYLVANIA 1,408
/ #
;[                                           *****
p ub UNITED STATES
JUN 0 41982 MEMORANDUM FOR:                 F. J. Miraglia, Jr., Chief, Licensing Branch 3, NRR FROM:                         R. W. Starostecki, Director, Division of Project and
+
}               ,
?#
NUCLEAR REGULATORY COMMISSION
[..
f,a nEGION I f
$31 PARK AVENUE e
,g
/
niNa'OP PRUS$1 A PENNSYLVANIA 1,408
;[
JUN 0 41982 MEMORANDUM FOR:
F. J. Miraglia, Jr., Chief, Licensing Branch 3, NRR FROM:
R. W. Starostecki, Director, Division of Project and
}
Resident Programs
Resident Programs
      ./
./


==SUBJECT:==
==SUBJECT:==
10 CFR 2.206 PETITION REGARDING THE FINANCIAL QUALIFICATIONS OFTHEPUBLICSERVICECOMPANYOFNEWHAMPSHIRE(PSNH) i This forwards Region I's plans relative to the petition filed on February 8,
10 CFR 2.206 PETITION REGARDING THE FINANCIAL QUALIFICATIONS OFTHEPUBLICSERVICECOMPANYOFNEWHAMPSHIRE(PSNH) i This forwards Region I's plans relative to the petition filed on February 8, 1982 by the Seacoast Anti-Pollution League.
* 1982 by the Seacoast Anti-Pollution League.
Region I will provide technical infomation to NRR to assist in the reply to the subject petition. This infomation will be provided after the Construction Assessment Team (CAT) inspection at Seabrook Station has been completed and documented. The CAT inspection is presently scheduled to begin on June 21 and end on July 2, 1982. Documentation of the findings of the inspection will be available during the week of July 19, 1982. Region I will supply infomation as requested in Mr. Grosso's March 26, 1982 memorandum by August 6,1982.
Region I will provide technical infomation to NRR to assist in the reply to the subject petition. This infomation will be provided after the Construction Assessment Team (CAT) inspection at Seabrook Station has been completed and documented. The CAT inspection is presently scheduled to begin on June 21 and end on July 2, 1982. Documentation of the findings of the inspection will be available during the week of July 19, 1982. Region I will supply infomation as requested in Mr. Grosso's March 26, 1982 memorandum by August 6,1982.
We foresee the scope of our input to include:
We foresee the scope of our input to include:
                                                --    our assessment of the construction-Quality Assurance Program at Seabrook i~
our assessment of the construction-Quality Assurance Program at Seabrook i~
i                                              --
the results of our review of the implementation of the QA program by the i
the results of our review of the implementation of the QA program by the T
\\
<                        \                                 utility                                                     -
T utility i
i
/ -- an evaluation of the quality controls implemented at the site sa-an analysis of quality control problems identified by the utility and i
                                            / -- an evaluation of the quality controls implemented at the site sa-
4 the NRC to detemine trends and causal linkages among these problems If you have questions regarding our plans, do not hesitate to contact me.
                                                -    an analysis of quality control problems identified by the utility and i
t l
4                           the NRC to detemine trends and causal linkages among these problems If you have questions regarding our plans, do not hesitate to contact me.
R. W. Staros ecki, % Director s
t s                          '
,l 0 Division of Project and Resident Programs cc:
l                                                                                                              R. W. Staros ecki, % Director Division of Project and Resident         ,
s A. Grosso, ELD l
        ,l* 0                                                                                                    Programs s
A. Cerne, SRI Seabrook
cc:
-4. Durr DETP,, RI L. Wheeler,NRR D. Eisenhut, NRR l
!                                                A. Grosso, ELD l                                               A. Cerne, SRI Seabrook
R A O V
                                            -4. Durr DETP,, RI L. Wheeler,NRR D. Eisenhut, NRR l
Cl O.
R A O   $          &
lv V" U %v
V                  Cl           O.           .a w    lv V" U %v
.a w
_}}
-}}

Latest revision as of 04:18, 15 December 2024

Rev 6 to JS-IX-14, Defect Removal & Repair by Welding. Related Info Encl
ML20072T323
Person / Time
Site: Seabrook, 05000000
Issue date: 01/30/1981
From: Geske D, Hinkley H
PULLMAN POWER PRODUCTS CORP. (FORMERLY PULLMAN, INC.)
To:
Shared Package
ML20071K200 List:
References
FOIA-82-524 JS-IX-14, NUDOCS 8304080031
Download: ML20072T323 (114)


Text

.-

.3. -

eq Pu!!inan Power Producis 33_;x_34 D ves.c,n ne 8%ur%n ine.orticratec

=

DoCL".'E N T r.O.

PREPARED BY: D.R. Geske ArPaovEo sy: H. Hinkley M l @ 1/30/81 I:

7 SEABROOK 4

PROJECT PROCEDURE stfoNg e

'1085 h?,ee

~

LATIST REV. DATE e

1/30/81 DEFECT REMOVAL AND REPAIR BY WELDING 4

Copyright 1980 PULLMAN PO'a'ER PRODUCTS

~

i DIVISION OF PULLMAN INCORPORATED HEADQUARTERS AT UE&C CODE WILLIAMSPORT, PENHSYLVANIA 06 ^

aCY15:0N racPanED BY APPROVED BY INITIALS OCSCRIPTION I

00 l

7-31-78 D.F. Gehr K.A. Swisher KAS I'nitial Issue 01

.9-15-78 D.F. Gehr K.A. Swisher KAS.

Revised para. 5.z; Acced para. J.z.1, 4.1.4, 4.2.2.1 & Foms 18,19 & 22

~

02 Revised para. 1.3, 2.1, 2.2, 3.1, 3.2, 3.3, 6-9-79 H. Hinkley K. Freed KF 6.1, 8.1, 8.2, Foms 18,19,19A,22,32; changed para. 4.2.21 to A; Deleted para.

3.2.1, 5.4, 5.5, added index.

i :i 03 Revised para. 3.1, 4.1.3, Added para. 3.1.1 6-19-80 B. Willard H. Hinkley HH 3.1.2, 3.1.3, Attach A page 2 of 2 Fom 38 04 Revised rom 18, 19, 19A 22 8-7-80 H. Hinkley A. Eck AE Added para. 4.1.4 05 1-13-81 D. Geske H. Hinkley

  • HH,

Extensively Revised 1-3 81 D. Geske H. Hinkley Extensively Revised r

I B304080031 8303'04

~

~

PDR FOIA KINDER 82-524 PDR

.r--

..-.mv

-,,.-,....,-~---.--....-..,2--....-,--

w-ww.,

-,e--.i---e,....-

,,%-+-~,r

.~c.--...

., e m e re

-,-.,...-_m.,..-..--.-,-w,

,-..=--,-

,(c.)

Pullman Power Products JS-rx-14

/

Div+on of Put::r.an incorporated

//

DoCU?.*ENT No.

D.R. Geske APPROVED BY:

H. Hinklev

~2/8

$liN 1/30/81 PREPARED BY-I'.

PAGE To BE USED NO.

2 or,9 tiiR00K oNLY oN JoS #

PROJ

.)

PROCEDURE 1.0 SCOPE Jhis procedure shall be employed to remove unacceptable indications from l,ase materials or welds, and Subsequent repair by welding to meet the 1.1

equirements of the applicable Code.

IJnacceptable defects, detected by examinations required by-Code and/or The acceptance /

1.2 s,pecification, shall be reported under this procedure.

rejection criteria for conditions discovered by the required examinations are defined by the applicable Code and outlined in the approved Project Procedures.

Jn-Process conditions which are corrected upon discovery, by controls fmposed on the Process Sheet for that operation and made acceptable to 1.3 the Field QC/ Welding Inspector, are not considered a repair reportable under this procedure.-

Jn addition, this procedure does not include P.eceiving Inspection 1.4 activi' ties which are governed by Project Procedure X-5.

2.0 REP 0plING REQUIREMENTS Arc strikes shall be circled on. the material with soapstone or an a) proved marker and reported by the Field QC/ Welding Inspector through 2.1 tle NDE Supervi'sor to Engineering on an Arc Strike Surveillance Report, r,ee Attachment A.

Unacceptable Field Weld conditions which cannot be corrected at the 2.2 time of discovery and made acceptable to the Field QC/ Welding Inspector, liy controls imposed by the Process Sheet for that operation, shall be circled with soapstone or an approved r.arker and reported by the Field i

QC/ Welding Inspector through the NDE Supervisor to Engineering on a Weld Repair Order, see attachment B.

IJnacceptable Base Material conditions shall be circled on the material with soapstone or an approved 0Idiirehand reported by the Field QC/

2.3 Welding Inspector through the NDClupervisor to Engineering on a Base l

ttaterial Surveillance Report, see attachment C.

Unacceptable conditions identified through application of approved Non-destructive Examination methods shall be reported by the NDE 2.4 In Technician in accordance with the appropriate Project Procedure.

inddition, the Technician shall plot the indication on the material with soapstone or an approved marker and report the condition through the NDE Supervisor to Engineering on a Weld Repair Order, see attachment, B.

sF 1.ot A (4-79) 7

  • ~

~

)

\\

E=J Pullman. Power Products Jx-Ix-u Oms on of Pullman locorporated f /

DoCUVENT No.

M

$i?U 1/30/81_

PREPARED BY:

D.R. Geske APPROVED BY:

H. Hinkley SEABROOK QeE 4'085

.e 3 e,,

~

o PROJECT PROCEDURE Y

2.0 REPORTING REQUIREMENTS - CONTINUED 2.5 If the conditions reported in 2.1 through 2.4 above exceed. limits as indicated below, a Non-conformance Report in accordance with Project Procedure XV-2 is required.

2.5.1 Customer /0wner defined repairs as follows:

A.

Following final heat treatment.

B.

Following final hydrostatic test.

C.

Repair be welding of end preparations.

D.

Additional repair beyond the third cycle of repair.

E.

Repair of base material which exceed 1/3 actual thickness F.

Repair of cracks.

3.0 INDICATION REMOVAL 3.1 Upon discovery of unacceptable Field Weld conditions, the Field QC/

Weloing Inspector shall point out the condition to the crafts assigned.

The crafts msy eliminate the condition using approved methods con: olled by the Process Sheet sequence event which required the inspection or examination.

If the condition is not eliminated or reduced to an a:ceptable size within acceptable weld deposit size, work shall be stopped and a report per paragraph 2.2 is required.

4 3.1.1 As an example, if during a visual inspection following a surface preparation for examination, an unacceptable condition is dis-covered, the crafts may repeat the " Prepare Surface for Examina-~

tion" sequence event. Any work necessary may be perfonned other than depositing filler metal.

3.1.2 Weld deposit may be reduced to the minimum allowable during attempts to remove unacceptable conditions.

If upon reduction of deposit size to minimum the condition is not reduced to an acceptable size, work shall be stopped and the appropriate report rendered.

3.1.3 If the condition is reduced to an acceptable size, the obvicus and out of the ordinary weld profile condition shall be reted at the process sheet checklist entry for the examination documented.

sF 1.ot A (4-79)

= =-

=

4j Pullman Power Products JS-Ix-14 g/

Oms.on of Pullman incorporated

//

DOCUMENT No.

r PREPARED BY: D.R. Geske APPROVED oY:

H. Hinklev M

lijn 1/30/81 s

.m h3 SEASROOK To BE UsED U

PAGE PROJECT PROCEDURE oNLY oN Jos #

No.

4 of 9 3.0 INDICATION REMOVAL - CONTINUED 3.2 Upon receipt of an Arc Strike Surveillance Report, Weld Repair Order, or Base Material Surveillance Report, the NDE Supervisor shall assign a control number and enter the document into the Repair Control Log, f

see attachment D, and. proceed as follows:

3.2.1 Contact Ouality Engineering-Records and determine the final heat treatment, hydrostatic test and repair cycle status.

3.2.2 Record the status on the document, file a copy for record i

and forward the original to Engineering for issue to a Defect Removal Process Sheet, see attachment E.

3.3 Upon receipt of the document from the NDE Supervisor, the Engineering Department shall issue a standardized " Defect Removal Process Sheet",

see attachment E, with the Arc Strike Surveillance Report, Weld Repair Order or Base Material Surveillance Report, attached.

3.3.1 Process sheets shall be identified by unique numbers as follows:

A.

Field Weld Repair work shall be identified by the identifica-tion number assigned on the current revision drawing.

B.

Base material work, including arc strikes, shall be identified by the assigned control number and indication number entered on the appropriate report, see paragraph 3.2 and attachments A, B and C.

3.3.2 All unacceptable ~ indications, including Arc Strikes, shall be removed by grinding, chipping, machining, are gouging, or flame gouging.

A.

For low Alloy mateHals, i.e., P-4 and P-5, adequate preheat (same as for welding) shall be established prior to any thermal cutting or gouging.

B.

Upon completion of any thermal cutting operation, all

. cutting residue shall be removed and the cut surface shall be ground back to bright metal, removing a minimum of 1/16".

C.

When working Stainless Steel products, only Stainless Steel wire brushes and approved grinding wheels shall be used.

l:.

sF 1.ot A (4-79) w

,nn

-v-,

n

.,,,,--.,,--m---,,,,,n,w,

~

l Jg Pullman Power Products aS-Ix-14

/

Orv sion of Pulirran incorporaiec

//

DoCUVENT No.

1/30/81 PREFARED BY:

0.R. Geske APPROVED BY:

H. Hinklev c

SEABROOK To BE USED W =GL Q PAGE PROJECT PROCEDURE cNt.Y oN job #

d G eJ e No.

5 of 9 3.0 INDICATION REPOVAL - CONTINUED 3.3 Continued 3.3.3 Upon removal of all visible evidence of the indication (s),

the defect removal area (s) shall be examined by the Liquid Penetrant or Magnetic Particle method to assure complete removal of the indication (s) or reduction to an acc.eptable size.

3.3.4 Following removal of the indication (s) and acceptable.

~

non-destructive examination, the NDE Technician shall measure and report the cavity size.

A.

Mechanica11y measure the length, width and' depth of the cavity at it's longest, widest and deepest points.

If be recorded as "THRU-WALL".6m, the cavity depth shallfv the cavity penetrates the wall J

bmsunousq p.

B.

Ultrasonically measure the actual wall thickness of the base material in the area of the repair cavity. Record the actual wall thickness with the cavity dimensions.

4.0 CAVITY EVALUATION 4.1-Upon receipt of a Defect Removal Process Sheet for evaluation, the Quality Assurance Supervisor or his designated representative shall notify the appropriate Quality Engineer-Process personnel of the receipt. The Quality Engineer-Process personnel shall post their log to reflect the current location status of the Process Sheet (s).

4.2 The Quality Assurance Supervisor or his designated representative shall i

be responsible for the evaluation of indication removal sites through review of the defect removal documentation to determine regilirements for further action. The evaluation process may be conducted by the Weldin3 Engineer or a designated Engineering representative who has been specifically trained in the application of this procedure.

4.2.1 Non-conformance Report Required A.

Only those conditions indicated in paragraph 2.5 above shall require initiation.. of NCR.

B.

Document the appropriate steps on the Defect Removal Process Sheet to indicate: NCR required "YES"; Process

~

Sheet required "NO"; Weld Repair P.S. issued "NA".

Initial and date all three hold points.

sF 1.ot A (4-79)

WM,

. ~..

  1. J Pullman Power Products as-Ix-14

~

Div sion of Pullman incorporated

//

DoCUVENT No.

D. R. Geske APPROVED SY:

H. Hinkley

  1. 8

$1s U 1/30/81 PREPAAEo BY:

To BE USED PAGE SEABROOK oNI.Y ON JoS #

No.

6 of 9 PROJECT PROCEDURE 4.0 CAVITY EVALUATION - CONTINUED 4.2 Continued 4.2.1 C.

When a non-conformance is detennined, the items involved shall be segregated when possible by the Field QC/ Welding Inspector and/or a Hold Tag shall be affixed adjacent to the condition requiring the NCR. Should multiple cavities be non-conforming, one Hold Tag shall be sufficient for hardware control.

Affixed Hold Tags shall remain in place pending disposition D.

of the NCR at which time a Repair Tag shall be affixed per Project Procedure XV-2.

E.

Completion of weld repair shall then be consistent with the sequence of events shown in Project Procedure XV-2, Non-Conformance Procedure.

4.2.2 No Further Repair Action Required A.

Surface indication in weldments and base material may be removed without subsequent repair welding provided:

(11 The remaining,sec on thickness, verified as indicated in paragraph (3.3.3 above, is not reduced below accept-able weld depYo ize for welds and 87.5% of nominal g },3,4) ' ' ' wall for base material.

m._..

'I

(.21 The depression, after indication removal, is blended uniformly (3:1 taper) into the surrounding surface.

q l

(31 The area is examined by the Liquid Penetrant or Magnetic Particle method, as appropriate, to assure the indication has been removed or reduced to an acceptable limit.

NOTE: In addition to Liquid Penetrant or Magnetic Particle examination those surface indications i

discovered through Radiographic or Ultrasonic examination methods shall be verified as removed or reduced to an acceptable limit by the same method.

i

~

(.41 The accepted cavity is identified as evaluated by per-manently marking the adjacent base material with the assigned identification, see paragraph 3.3.1 above.

sF 1.o f S (4-79)

__(,;

  • X M

-~

Pullman Power Products JS-ix-14 y

o.v.s.on c 4

p Punman warporaieo l

PREPARED By:

D.R. Geske APPRovEo ey:

H. Hinkley 3E2[_ $$IEf 1/30/81 SEABROOK To BE UsED

'Fif f)

PAGE e

y3 No.

7 of 9 PROJECT PROCEDURE oNLY oN JoS #

.j' s

4.0 CAVITY EVALUATION - CONTINUED 4.2' Continued l

4.2.2 B.

Document the appropriate-steps of the Defect Removal Process Sheet to indicate: NCR required "NO"; Process i

Sheet required "N0";

Weld Repair P.S. issued "NA".

Initial and date all three hold points.

4.2.3 Repair By Welding Required A.

All other cavities shall be corrected in process in accordance with this procedure by issue of a standardized Weld Repair Process or Base Material Repair Process Sheet, see attachment F, three parts.

B.

Document the appropriate steps of the Defect Removal Process Sheet to indicate:

NCR required "NO"; Proces,s Sheet required "YES".

Initial and date both hold points.

C.

Forward the original Defect Removal Process Sheet with attachments to the Quality Engineer-Process to announce additional process sheets required.

D.

Forward one copy of the Arc Strike Surveillance Report, Weld Repair Order, or Base Material Suryeillance Report, with the cavity dimensions, to the Engineering Department for issue of the appropriate Repair Welding Process Sheet.

5.0 REPAIR BY WELDING 5.1 The documentation procedure used for butt welCing shall also be used for all repairs made by welding. The appropriate process sheet, as shown in attachment F, shall be selected by the Engineering Department to effect fill of the established. cavities.

5.2 Repairs shall be in accordance with an approved qualified Pullman Power Products welding procedure for the type of base material involved i

and recognizing that the cavity may differ in contour and dimensions from a normal butt welded joint.

~

i 1

I f

sF 1.ot A (4-79)

=

_ _ ~. -

_J

~g-~

,e

.n.-

r

=

' ~

Ag Pullman Power Products aS-Ix-14 0.v sion of Pulirran incorporated

/

DoCUYENT No.

2/8 - $INI 1/30/81 PREPARED SY:

0.R.' Geske APPROVED BY:

H. Hinklev 70 BE UsED Cf d' PAGE SEABROOK oNt.Y oN Jc8 #

4 o

No.

8 of 9 PROJECT PROCEDURE 5.0 REPAIR BY WELDING - CONTINUED 5.3 Repairs shall be made by qualified welders.

5.4 For base material repairs 'and for repair in welds made by a welder other than the original welder, the repair welder shall apply his symbol adjacent to the repaired area.

6.0 GENERAL REQUIREMENTS 6.1 Elimination of Base Material Surface Defects 6.1.1 Unacceptable base material surface defects shall be removed by grinding or machining provided that:

f A.

The remaining section thickness is not reduced below 87.5%

of nominal wall. Thickness report is required.

l B.

The depression after indication removal is blended uniformly I

into the surrounding surface. Visual inspection documentation is required.

(See4.2.2A)

C.

The area is examined by the Liquid Penetrant or Magnetic Particle method, as appropriate, to assure the indication has been removed or reduced to an acceptable limit.

Examination report is required.

6.1.2 Areas ground to remove oxide scale or other mechanically caused imperfections for appearance or to facilitate proper Ultrasonic testing need not be examined by the Magnetic Particle or Liquid Penetrant method.

6.1.3 When the elimination of the defect reduces the remaining section thickness less than 87'.5% of nominal but greater than 2/3 actual wall, the product shall be repaired by welding. An NCR per paragraph 2.5 is not required.

(See 5.0) 6.2 Repair.by Welding 6.2.1 The crafts, under control of issued process sheets, may repair by welding material from which defects have been removed, provided the following requirements are met:

A.

The defect shall be removed or the indication reduced to an acceptable size by suitable mechanical or thermal cutting or gouging methods and the cavity prepared for repair.

sF 1.ot A (4-79)

.w.

-e----Tp*wm=wp 4-w y-

=--ww--er-m--w*--

~----

-eay1 --

v--i w.w.in

-.-se+m r eme v-r-v w

--i,--v

+----y--'

kw--g

=,r:

rir.

-w i *

-94v,--

w v

~

JG Pullman Power Products Civ:5,,,n of Pullman loco porated

//

oOCUYENT No.

0.R. Gesf e APPROVED BY:

H. Hinkley N@_ l>!IEI.

1/30/81 PREPARED BY:

SEABR00X To BE UsED JSy p G g~~

PAGE 4.y Q g,j no.

9 of 9 PROJECT PROCEDUPE oNtY oN JoS #

GENEPAL REQUI (MENTS - CONTINUED 6.0 t'l 6.2 Continued When thennal cutting is'perfonned to prepare weld joints 6.2.1 8.

or edges, to remove defective material or for any other purpose, consideration shall be given to preheating the i

material, using preheating schedules as shown in the appropriate Weld Procedure Specification. (See 3.3.1.A).

Ii The welding procedure and welders or welding operators shall C,

be qualified in accordance with Project Procedure II-S and ASME Section IX.

.After repair, the surface shall be blended uniformly into p,

the surrounding surface.

Each repair weld shall be examined by the Magnetic Particle E,.or Liquid Penetrant method.,In addition, when the depth of the repair cavity exceeds the lesser of 3/8" or 107, of the actual section thickness, the repair weld shall be radiographed.

The product shall be heat treated after repair, if required.

F, 6.3 Elimination of Weld Metal Defects 6.3.1 See paragraph 4.2.2 above.

6.3.2 Epamination of Repair Welds The examination of a weld repair shall be repeated as A,

required for the. original weld except that when the defect was origianlly detected by Liquid Penetrant or Magnetic Particle methods and when the repair cavity does not exceed the lesser of 3/8" or 107, of the actual thickness, it need only be examined by the Liquid Penetrant i

or Magnetic Particle method.

t um Su s

sr 1.ot A (4-79)

... -, ~

- ~.

I j

u e

7,

' ATCit.C "O

.C O'

C i

n

=

~

7 R 2 SEABROOK STATION odg. cDde PX 52 R*

T"'

41'03'010-x z s

u -

T y ~' s.

PULLMAN POWER PRODUCTS 5

1 M S Index

~ o Status.

D a

o u

Heat Treatment Actual Wall Thickness u

8 BASE HATERIAI. SUR'.*EtLLANCE REPORT Hydrostatic Test in w.

i sw w

JOB 7035 penair tveie concietea i

3 gd

-o

n. 7 Sys.

Une No.

IsoN Wold No.

Maledal Site Tles.

I s

k N

l is 3Q INDICATION CAVITY 4

Prepared By Dale Prepared By Dale

[

hi t:.

tm m_

Deon LOOKINC NORTH g

I l,'

C 1

,g g

o z

\\

~

i

/

3 C

73 E

LOOKIIIC EAST g

m p,.

y D-2 1

I a) ?

S*

h f

l u2 5

m 0

o m

(

1

/

5 o$

s "5

(

o a

w p_ s a.

m >.

h i

g

[

oj IAOKINC WEST g

.m T

C ji I

r l<

(U 2

/

Es j

/

1 l

i:

=s

.=

i 3a m

a

~

CL w

gg e_9 m

Depa o

LOOKillC SOUTH L

l 82 i

4%.

!?ti

/

/

e o

cx:

I wm I

DO m

i 9

(

I S

E rj TE: Autr.s swuet to new intettfo1 tm **ws nitTt':r' j

FROM CENTER OF VELO.

n.

a l

l.

1-lA i

I 3

i.

-J

i ATCil.A l

f Y

Ei j-SEABROOK STATION odg. Cod PX-52 Rec. Type 41 03 010-i 5 E %t PULLMAN POWER PRODUCTS 3

I M S Index o

>< :- s St,t E

7 b ARC STRIKE SURVEtt.tR:CE RF.Po h Hest Treatnent

$ 8 HydrostatlC Test a

w.

JOB 7035 ge., ate Cycle Actual Wall Thickness m

g g @.

Sys.

Une No.

IsoJOwg.

' We'd No.

Material Si e Thks.

t jg s

%I N

INDICATION CAVITY r

Prepared By Date Prepared By Date s

tooKINC NORTH tengs YAct oe92 i

1 yes),

U) k l

"o a"' t.u 3

3 j

'O

=

i O

'toottNc EA$t t,

e.

t w-x G.

i l

n

'I 5

o8 k

/

/

)e eb O

$z

(

i m,

O8 11 w

Dc E

  • D l

LooKINC WEST g

won 0%

i CE

'I l

j

)

to 2

[5 o l

j

= 8 I

t

)

w 3p g

S D. 6 5

x8 tooKINc Sount t,

won o.

J 82 l

r d 'kg

./

f

)

1 Q

Afu ww l

j DO y

L

/*

m NOTE: ASSICN WMBERS To EACH INDICAf to:t MD SHoV DISTMCC 5

nox Comt or vuo.

i a

W

~b g

I l r.

i i

1 i

- - ~

1

See

/'

~

W 2H heAtMbq

.o N

_ V4Ec _

U EE c_

~P L Gsva~. Qv. bra *S 9,6skat.P.g.?qkeudHAudchr

_. D P.c and %

~..: _ _.Ihg.g & A be

( A K _ '... A % L t _ _ _. L 3 % g j FG A Eye e

~.

-m

..-.mi..n

..-...s..

B.httis o%A+ ' Al%'4 p.v.ts.+...

... g 4

g,ewn..

4 N_.2... p

___-.. _ p s p.q.e_.r a

g

  1. A^Mmo OM #41

~

W h..

. @ ^ T ? " ' " O. :

(N hCh *.

%vilw h aa'qqik L

~ ~ ~ '

_ R..hcAm_ cA bpkg_b_ _

~~ M.hW A ~ _ MeLbdtb 1

. _. _ 'P e t

..R_. _ h a..d _4 5h r_o. &

. 7 hmes

.N t_

.. %.. A % o ^ e. d h s e n )

f

.& iPer B%r_

R.. _ g R e r W n.o r

.18.4r!".@c M.Kbs?,

):

_3 D.o W.

'L..

.._... ? CoJ\\o % 't. 2._ "_ _

3 Aur Aa m b,w hkki hw g

1 h eo

$ 3 r.___ _ _. _ _.. _. _.. K. 3 4 _ k h 6 _. _..

F % hnrsa bN A_%@al& M ser.._.._

T

.Adb N.a M1.._._..

.1_ q 4%fh

%c ?rm.ter_kg%&

_Aky Q'..%A %.- Q Q v

~

p_ g.

h. gb w k, 2l G Adyc (24.

P.

l

.. _.... _ -__. A w k R>l W J' I

...$. sa%hl WLNv

. LFaz

?qbe L v' g

. _I) A h % p % E h L,

~ g Ik k

. Mk.

-. -..... -. -.. T @rx+

- - -._. TW C tr _

t

%%kv QC % v T, hhn Ah

~'

3 C..

(A.)o.cq

~

o# %

s

- l i

_.e._.

..._..__e.__

..__._e

= e6 h m

+. e enmum me us.

w emme h

e.--

e e

eO N euh* mee e-.us.i e

e e--.me qu me e

e e-.

e e

.m.

e e

em 4

-aw.

..-e-.-n-

-a.

wee-

---...m.

w.

- h.

4 e ehm-a we ee me ei.ee eh h..

e me e

. 4 eme-e muuDmm.

e m.

e ese W <

b e

a e

/p d

w N

e=W

...gM en.

e 6

I

.-----...--w.,-

.w-r----mt--M-

+

e-ww-y

=rew-+-

- - ~ '

e

'7-*--

ww m-'--wis"-m-r-+-N*=*-essM urn"'ee-eew w-m.-

-'a==s-wmm.uv-.

semwr

-w-'r-v~-'-en-

s,_

C h

4-Jc 4

L,.Jgr.-

4m-'W4-tL

.m.L_

s

_w_-_

+

4 u.,

ee--.

J-5-.,.i.att e -d A.4

.'n-id-wJ.e-4.r--e.-

ai-..n-a

.J Me e.#-

e beu.ia a9.w W M'm.

..g.w--4.-

.ew-._+

- %oe

--h.a,

.-w i

j f

e 9

L k

l l

l 9.

1 L

b1I ID D hO b.)

bk i

f V N.A.

. (.....

1 E t Y M O...).

d b% dixf bMI l

I 1

l 1

1 t

r l

4_

9 l

t y

. ?

t 6

=

1 1

t t

1,

+

h*

.. e

~..., ; _..-.

I 1

p a

r 1

1 d!

J i

w ome e e

. eoe.,

..g

..ee..

.ee.*

so..e.-

i 4

4 g

y...

m_

f t

....m

.. _.- w.

__._.,....u.

i i

i t

d*

I

..._.,.,. h t

+

l

,.* 6

. 4 3_

f 4

f k

i T

=.... -

.-.e-.

a

. m ape.

k*

I

--. +..

....... ~.

...m I

I e

t e

-.e W

I e/

e

  • '"*48**'**h

-Neb.

"A ew=-.

7

..-i?.-e.

wye-. q T ym - 9W4Mt?*T*T'Mpf'W*r-'F-W.-SF"p""D.y'*3-Ty-fy"P'"'X**EM*B'2 RPPM FP N M9'- N.."-NrW*

  • -"M'D"s'e"r3f"""***P.#WP'9"*-N

,m.,:

  • as t 'C on.

_,...,.o

=

~

. J

=

DIMETRIC WELDER STATUS SHEET

~

~

..:o.

s.

s....,

v.

p.

TOTAL TOTAL REJECT J'

y.

i

__ T.D.

WELDERS NAME WELDS REJECTS RATE

'COPl4ENTS 3

IB BOLSTER

' lK '

$3.3 3 BP JONES 'I.

~

19

~7 M96 C2 FULLER li 9

.. t.l-'} 8/d

" ~

s c2 B'nSouE 2..

3

.noa %.

4, --

' R9,1 me annnwnTer e - '..

~l

' = ~

nn nFronn

~

'W $b '

-. -l '

- 10 2

~36075 we unnnrr.

we a m nrne

' ;Q 12 545%i ET ASHTON

_Il

'l 7 076 FR HEDLEY a-~~

~~10

  • Y t/d 70

~

K4 KEY.'!ONT l4

  • 9

~ 5 7. l %

59 7

2$.E#7b LE **

_MARTEL I

LP cAMPB E T.T.

  • ll 4

..,_2f, q %

  • o MD H AYN'T'nN 5-l' I

' SO 7U pp cannnr.

I'14 '

'.' '/o 3/ ~874 28-Ih 357% i np norsw q

MT r.nnu

'4-

- 3 75#k

.Z PORTWOOD

'h M"

-e l %.S.

" ~

ZA SU$LIVAN h

/

I I.4 $d 55 we b% n.

.wo 7a 1

t o

C.L M2y mne n I

O 0 9d RY Csue b -

\\

I

Fon%

t.

-. e ~."..-

2.

-..=:

...;...<s-

.t - -

.9 g

4 8

g l

.l.

1 M

'~

-. ~, -

e,

.w.

mg 4.

m._.

e

> 4mh a,M Au, eg%y4 WJw c vnec] m (+maas s.

Y-M n w.:c.._ J g

a meg y r.

w.- s wg p

p,(,

^*-

Y^ * &

" - " % - J ~ p n a l.o a7,,aw t

(

1 4

.*N*

.b-4 e

4 9

9 d

e k

9

.g

,.-a,

.,-p.-

v.

^

-..__.___.,__.._.-[

J SEABROOK STATION INTERIM PROCEDURE CRANGE FGCP-1 IV.A.6 UE&C Procedure FGCP-3 Revs No.

7 IPC No.

4 1.

Reason For Change:

1 To-be consistent with UE&C QCP-13, Revision 11 entitlel

_ _ Storage Level Requirements" RECEIVED U. E. & C. INC.

~

DEC.? 2198l SEABROOK STATION i

2.

Affected Pararraoh(s)/ Existing Recuirementj Reference IPC 1, Paragraph 5.1.2 a) c.

5.1.2 a) Fire retardant structure or room will be provided with the following environmental conditions maintained:

_ _ a) Relative humiditg 50%

b) Te'mperature - 65 F i 10,F c) - Filtered air supply using filters with a 75% efficiency rating.

d). Housekeeping to minimize dust and other contaminents.

r 3.

Revise (2)'As Follows:

l 5.1.2 a) Fire retardant structure or room will be provided with the following environmental conditions maintained:

a) Relative humidity 50%

b) Temperature - 65"F i 10 F i

c) ~ Filtered air supply using filters with a 75% dust arrestance efficiency rating.

d) Housekeeping to minimize dust and other contaminents.

12/18/81 J.J.,Moran Date:

Originator:

NO~N Resident Con truction Mgr.: b Date:

II!/ 84 /n NO Date// bbl Field Supt. 0A N O d b ym + /

xk : b v._u h b Date /=/A*/h/

l f

Authorized Nuclear Inspector *

(J f]

l

Esn1 w d % f e.4u, E c x - 4 ca s n3 o b m b c?ch (83 a lt x L k k i U 4 - v.) % d

?M q cq s % w :,._

t8i y

a3 o> u - s...

w.

cf %,.(dg 18 C Ut M o-en blb pap iT7 t

(87 walk qua.0

/b.c!%

  • rr/73 55l89/

~

Tv d (4^4-do N"

uM 1

7 37, 7, yo*/,- Est:

3c, s.1--

sstat J

%'q4 s l. - sst's

.fo e

~&

1 5 s t 82.

9 IG a

g11.r TTl73 { 1ote

% SS / 85 J 3

F7 f'8 3.to 5s IK

_i 8

55177 t,.

gas WIS7 W 5'I 7 8 '

g,

-(

f15 U T~ ?.1*/

V0 ICM1 9763,013-10SS2, (PH 50S1, g

-)

PH 5683 l

c o,,, u2H 568 2 Public Service Co.of b.ew Hampshire

.................o,d.,g.,1,Q1,5,2,,2,,,

3 C/0 United Engineers f. Constructors Inc.

Route No. 1 - Site Access Road Seabrook, NH 03874 sNgged.........................,,,,,,,,

.J T w. ai w e n. -

t._

Cust. Spec..IV 502 Dtd.10/17/77 ASM.E...S..F. A... 5. 4.S..ec.. 11...P Tsado N wne Arcaloy 316 AC DC Fa.

., r,ad.na,e 333 3/32" Type..... E 310 14 fI as sia.

1,350 lbs.

tm Mvmber:

05-1-A912M Test No. 2642 u : w.nn.,:

17616C Mix 1 Concentricity 4%

cuto" 3

Type Steel A-285 8daa9*" "

Full Split.

Volts Amps cmeanian 19.96 13.21 Tes,tN,o.

, sew smosa 59 Tensiles 1

6 2S 80 02

+

01 As-F ' ' " #-

T*""*"".

Test Welded 2 43 Results:

N

N

- has*8ea Yield

/

Tensile 90,600 3AS f f f4 _

copper

.10

.04 36.0%

3m Elongation

.024 Red.of Area

./

ph

,h,u.

.017

ausphu, m

.05 pillets:

OK Vertical Overhead l

U f5E"k N

CoheR AN Penne 6% Schaeffler 8

5.4% Magne Gage

...t%.sLg

  • *
  • 20,e.yu sw N-1224 r Ou any sysses cour.casion us:

198_1 QA/QC SITE b au o.ic_ September 8.

Nitrogen 098 VIEWED he undamenas causws thes the consens W Penna.

3 sbie n si York his eeport ase convece and accurate and inat ani

%, g 3

gY g4'**"*"*"'*""*"*""***'"***"'*

UE & C J27-/79

  1. (lie )

d"* 'naimias smincanon and ASME Boita and subac ibed and swoen to befose ene pressure vmes cgI 3 g :

un 21st d.y ot February n 7"

.on m oin section scA seco r AI.LOY RODS DIVISION sEAi...

I

/

av..............'..

Mr canassica== pie. 11/22/82 D. G. Flohr

,, q f avr.no

l A

1 p.o. w es2.

N T 31 $ qzy Ct' AL!n* m L C1!ECKI.!ST DELTA FERRITF CONTENT TEST (PRODUCTICN OF VELD PADS)

/

ROD TYPE d '3/$ ~/6 ROD SIZE 8/5P%

TEST NO.

DATE

.7 86 HEAT NO. //d /4C.

1.0T NO. CS-/-A-9/2M MANUFACTURER

/e wi[#ad

[o4#

279~0*$

V0GT/ AWnP METER 2D INSPECTORS INITIALS _

8OY db w M VJ y 1.

Base Plate Material

  1. /

2.

Plate Marking 3.

Amp Range OO

((

Voltage Range 2/

4.

Copper Bar Spacing N6

[

5.

Preheat temp 50*F min.

78 8

// [

/

6.

Interpass Temp 350*F max.

6#

7.

Weld buildup in Reverse 6M-

[

Direction each bead layer.

/

8.

No Stops or Starts in Test OY Area.

/

9.

Quenching with Water and

~

ON Air correct

10. Pad Surface Finish Complete gg

/

/

YAECReviewd UEM: Review P.P.P. Q.A. Review In('b!f.o.N.

Int. f Inc. ?cN n i,. e-j Date 3 - 2 I-TO Date ^l:d <:

Date l

h N

ad was mduc.1<d uG

, Ae % pedes pm Jen 4c-n9

,[tq (Ep PAGE 30_ QfN.

-e 1

I I

MMTE 0 IC0Sh EE R Q. 3 4...r,~[d Evms

$'$$ I

-Ukhb5j, g,gf,1f CUALITY CCNTROL CHECALIST

"" N iM&v DELTA TERRITT. CONTENT TEST fgrg" (TEST RESULTS)

I3.2 _

/

[-8/6-//2 ROD SIZE RCD NO.

LOT NO. 03 ~hA -9]d M TEST NO.

EEAT NO./74/h A _

~

3/20!& _

UAIE MANUFACTURE [ ) tM.-[ h O pp,

,/

09 7 ~8975' FEREliCSCOPE LD

/

TEST PAD NO. _

Ferritescope Readings in 1 d,[ %

1.

2.__

6.S Z 3._

6.8 2

6. 0 1
d. 4 4._

1 6.51 s._

.8, k

6. _

4,88 2 Avg.

Territescope Reading in FN

4. 9 n

1.

2.

f4 FN 3.

IY W

4.

$O W

5.1 I

rN.

s.

50 n

l 4,9 n

s.

l 6/

FN Avg.

t UE&C Review t

YAEC Revicy_

f P.P.P. Q. A. Reviev w is-In t.,'

'e[

I Int._

Int. _/

Date '/l.// 4 Date__

Date 3-J/ fD

' - - ~ _ _. _ _

a~

~

- ~. -.

~

1330 FR[

/ork)[f g[

Interview Attendance List

.RC Exit

'nspection Nude-50-443/SI-17._ 50-444/81_[Q ~

.O Inspection TypekJkb blb.-UA!MAbddlEA-th5lT -S.k6)ldkXM

~

NA.E (Print)

TITLE ORGANIZATION a].T~ nyonwror)

OA3Pseinusr CAEC F6A6 Ju)..DKl.Efod FGA MGd "h!92C 2.? n-kee as' h-o M=c,

>erc(s,,,,ncom<

/

0-

- /AN/SW Fis-GA_

UE+C lC 6N Al l}

he

$C A A ff/N d b/,/

e

J K cAav..

!=O M

&c 37d Nhaf Sarde py4///get.

a.-

TF.-

,- / ' ; i.

.E,.

~

C fd 6 365 fftb^

dlidC l

S.2evno?de Ltre.b urKRc.

6

[

-. =

f i

l i

N..' '

1 l

?: '

i l

l

- i w

. p".

~~~

BEU E~ SH EET~~

~

ius ~ - s 4.2.7-

~ ~

FORM - 001 PAGE 1

OF 1 SEABROOK STATION NO*

032 REQUEST FOR FOLLOW-UP ACTION NRC INSPECTIONS

. c. 9/.,3..

W..

s-DATE:

6/22/81 TO:

J. F. Veught '...y.

I,e 7,.:.,,.T

....;~...

.s y..,,

inspection item'

Description:

Clarify Cross-Over, Restraint Requirements UNIT:

  1. 1 '

(Dwg. F101482) 7

...."..a.~.

.~

. ~....

Reff RFI 73/1442 Fiel'd' Instruction F1-92 Rev. 1 "AsIresult'of'NRCInspection81-08byInspectorsReynoldsandSanders,"the

"'~~~

following preliminary questions need response.

4....

c 1.

Justification for taot stress relieving field welds (material being susceptible to

~ -,,

laminar tearing,~underbead' cracking, etc.).

2.

The elim4' nation of NDE after weld buttering in field.

- - - Corrective Action Required: As indicated above.

UE&C's response should include the shop fabrication requirements (Cives).

s f

b Date Required: 6/29/81 Approved By:

J. W. Singleton l

6 Requested By:

l YAEC FCAE M i

l NOTE: Contractor is requested to respond by memo referring ident. number of this report.

i.

t.:.._...

=

E,,P EM-!EET- ~

~~

~~

ius n - e 4.2.7

~

a v v: f,r,- n,*,, p p FORM - 001

,6 3

, b, G b*

PAGE 1 OF 2

SEABROOK STATION MAR 231981 no' REQUEST FOR FOLLOW-UP ACTION

,n,

'MISSOEl[l."fj,yp i NRC INSPECTIONS

.rg

-v J.F. Vought DATE:

TO.

Inspe'cti6n item

Description:

Cross-Over Leg Restraint UNIT: #1 u_.

Upon inspection.of the restraints as on UE&C dwg. F-10182, ECA 01/1775 and ECA 01/189_5_and Cives documentation of the fabrication of these restraints (Site Documentation Package) the conditions were identified:

..y_..__

(1) UE&C'dwg. F-101482 Section 101482C shows a horizontal frame at E1.(-)

there are two stiffner plates installed.

(2) a.

ECA-01/1775A sht. 2 shows a typical corner detail. Is this applicable to every corner?

(Cord. oW M.A

/-

r Corrective Action Required:

Address the above noted conditions and provide corrective action as necessary.

i i

/

Date Required: 3/30/$f Approved M

,g AECdi. i~_.

Hequested By: h.(~, Mdh YAEC FQAE NOTE: Contractor is requested to respond by memo referring ident. number of this report.

N l

BLUE SHEET - SEABROOK STATION PAGE 2 REQUEST FOR FOLLOW-UP ACTION NRC INSPECTIONS A

(2) b.

Is the orientation as shown on sht. 6 of this ECA mandatory?

(3)

Does Cives weld procedures require a backing, trip for their single-vee groove welds?

)

UE&C Spec. 12-5 para. 3.3.1.7.b. requires single-vee groove

.i i weld corner joints to be b%ttered and that the battered weld

-j be visual and magnetic particle examined. There are no MT

-i inspection reports in the~ Site Documentation Package that would substantiate that this is done.

(5)

The MT inspection reports show the type of joint that was MT exam $ned.

The only type of joints MT examined, according to the records in the Site Documentation Package, are single i

double bevel groove welds. There are no MT inspection reports for single or double-vee groove welds.

(6)

There is one visual inspection report for each fabricated piece t

and these pieces may include multiple welds. B it acceptable,

when welding to the requirements of AWS, to not identify the visual inspection of each individual weld?

{

(7)

UE&C dwg. F-101482 and applicable ECA's do not reflect the as-

,j built condition of the pieces-fabricated by Cives.

(8)

Some of the welds under the copes on the stiffner plates shown i.

on UE&C dwg. F-101482 Section 101482A appear to be incomplete.

4 i

I 1

ym.,.-,,.m.

,,,~--,,__m_

,--.g.

e.-w

.._,___.,'.**^--9_ _.....

A sea g

l e

l April 2, 1981 BLUE SHEET No. 22 Revised Power Engineering Response:

We have the comments on Blue Sheet No. 22:

1.

This is in accordance with the sendor detail and ECA 01/17753.

l 2.

a.

ECA 01/1775A is intended to indicate typical in any direction.

- Vendor-drawings correctly show various details.

i

- ~

2.

b.No.

^ Actual orientation is shown on vendor detailed drawings.

1

3. ~ Yes.

A' backing strip is required.

~

The~present' documents cont. sin complete reports and include buttering, root, and final weld pass. These are not identified separately and the vendor ~is in the process of reviewing these docu.nents to identify them separately.

~

5.

Single vee and doubir. vee groove welds will be documented when these welds' occuf.~~ All full penetration joints were MT examined and documented.,_

6.

Docurentation is done for each component and is in accordance with the approved procedure VIS-P-78, FP 12877-01.

7.

'Ihe ECA is revised to 01/1775B.

r 8.

The vendor details show complete detail for all joints. These were reviewed by UE&C Engineering in Philadelphia.

i

(

Ks

{

R. N. Kuehn RNK:cao i

cc: JA Grusetskie TP Vassallo AJ Hulshizer i

MA Edgar i

RG Blair PL Francis JR h pe g

MP Hanson RN Kuchn H Shah i

i I

- -. ~

UE&C QA Response g - m Item 4 Vendor Surveillance Supervising Engineer was contacted and requested that the UE&C Resident Vendor Surveillance Repre-sentative review the records at Cives to assure that mag-netic particle inspection of the buttering was performed as required. The Vendor Surveillance Representative will review the documentation prior to submittal to the Site.

Item 8.

UE6C QA is in the process of inspecting the welds under the copes on the stiffner plate. Welds have been found that are not complete. This inspection will be complete by 4/8/81 and the incomplete welds documented on an NCR.

t D. C. Lambert i

i Ii

+

t i&

t 6

9 wee w a =*

-w.

w m.u.a 9 L y g g 9 g gg

-- ---,,,3_,;,_7

-- I 7

FORM - 001 APR 2 0 1981 PAGE 1

F 1

SEABROOK STATION W 7 TTM-I NO*

022A

((jj..n,-"E S

  • r,Mut. REQUEST FOR FOLLOW-UP ACTION j$,J NRC INSPECTIONS t-23 J.F.YOUGIE TO:

J. F. Vought DATE:

4/17/81 inspection item

Description:

Cross-Over Leg Restraint UNIT:

  1. 1 The response to two of the eight items identified on BS 022 was incomplete and/or incorrect. Item #1 and #7 stated ECA 01/1775B was revised to indicate there were 2 stiffner plates in the place of the flange.

In reviewing the ECA it was still not apparent that was the intent of pg. 6 of6 of the ECA.

This was discussed with Mr. Mehta and !1r. Grusetskie of UE&C and they agreed to revise the ECA. ' Item #4 is incomplete.

The present MT reports in the Site Data Package for Spec. 12-5. S.O.6687. do identify when the MT is for the root weld and when for the final weld but no where do the MT reports indicate there was any MT on the butterine of the reouired icints.

Additionally the cives shon drawines do noe indfrnee all_ only some of the ningle-ve, grnnve bure borIbYve kcMh0e8:

gr w w s for corner joints requh buttering.

1.

Assure that ECA 01/1775 is revised as agreed upon by Mr. Mehta and Mr. Grusetskie Respond how programmatically the vendor is going to determind which joints were v

actually buttered.

2b. How programmatically they are going to identify the buttered joints that were Mr'ed.

2c. UE&C shall identify,if any,unsat./ deficient items via the appropriate document.

2d. State when will the documentation be revised / corrected, i

i l

Date Required: 4/24/81 Approved By:

J. W. Singleton Requested By: h,( f h

YAEC FOAE NOTE: Contractor is requested to respond by memo referring ident. number of this report.

.y April 29, 1981 BLUE SHEET No. 22A Power Engineering Response:

1.

ECA 01/1775 has been revised'to a C revision.

l 2.

The vendor is going to determine which joints are actually buttered i

based on the information in the structural steel detail drawings. The structural steel detail drawings are prepared by the vendor, Cives. All joints that require buttering are indicated on these drawings. The Cives detailed drawings are reviewed and accepted by UE&C Power Engineering.

2b.

All buttered joints are required to be magnetic particle inspected this specification. The vendor will perform MT of all these joints in accordance with this specification.

9 2c.

UE&C vendor surveillance is and will identify deficiencies as and when they occur.

4 2d.

The UE&C vendor surveillan'ce representative reviewed and accepted the revised and corrected vendor documentation for the discrepancies reported in this Blue Sheet on April 23, 1981. These were transmitted to the Seabrook site on April 24, 1981 by the vendor.

_nnd

/

IA7asa%~

~

Martin P. Ha'nson "

MPH:cao ec: MP Hanson H Shah MA Edgar l

JA Crusetskie l

TP Vassallo AJ Hulshizer RC Lesnefsky DC Lambert i

RG Blair I

I n a e-.

,.-.-...-_.,___.._..,-.w.

. -_ '~,~-...

~

k Q

& EACCdbK

.8.

S O

-s tW. g 7

/ N N ft l//t=?A )

L i

,g

,g

~.

'PerteM M GL ceMm N/FM dMDd ON M N 8/=/3 M g. + Z PP 4-1 Aer aa ta. ~.-

sur w<m cumuone-aus m c-5J&iN, ae

'PA' (D

Y W c.

toeb.

h m n 4.i m oucTLeV P:-Am q CQ c.

4 e 6 d i e v5 ik saar n~.ni~ c do P4 e

o r w t.

i

$UWL-Seit 882. W h i A t C A @ A #

TitAtMIN & =

Gl W 88 MN h7-f

/A.i.Dec r/Crw A. Tea AJ f.y g>

g.cvt eu aie nao TA W D"JK ~

H%

iM Ch*

Se ustTIEkrea.<J Q Uesrta M (D

h F%c % FSMC CAyb /7 ecpmus debar DAfGS UE46 97U -o" '% ~ 4) s

---e

,,---,--,+,-,,e.e--,m-en,.

,,,-,,-,ee-

--,e--

- - - - - - -, -., - ~ - - - - - - - ~

h M.M M

W hh 4.he NhM 9

O N

% A q-c

/

h v A43 e

~

=

=-

J ANEU[P-L4[LJ6~d-.C_

hi h i Gu4ft% 9 I

I 1

i l

i-

ow.

.-m e

M

'9'O 4-e e66 ghp g.

,,gg,

,p p

b U

Y09t}

lb /d.n t o ',-to R

f t

{%Ch(M A~

W

%k g

4U 05?l 'l ' t-I

m

^%.

.t I

l

!,i 1

1 4

1 1

i i

o e

n e

I 9

u

l

. ~.

PROCEDURE REVIEW AND PRE-TRAINING RECORD i

PROC. NO.

REV. NO.

PRPR NO.

PROCEDURE CORRECTIVE ACTION XVI-2 04 001 TITLE INITIAL PREPARER K.' Swisher EXT.

3:I 5/27/82 DRAFT

~

ENGINEERING C. Scan NDE M DISTRIBUTED FOR FIELDQk k DOIsk T

NG Vonedantrv/ Sexton R.

bu eM, SYSTEMS M K.

QC bb Swisher II\\

i\\'

V i

F f

hh

\\

I

~~

  • W" INSTRUC 0 a{'

route the procedure 179 y Supe tsor of each de; U

sp t

Cements y

t r.

el in his de tme t as s

1 ocumented by attac i eets or by up the draft.

p Sup isor shalJ approva 1 comments and return them, with this

,totheQrgearer.

[

e

/

\\

\\3 U

iO NTS ACTIONS RESPOND BY 6/1/82 C

COMMENTS OR COMMENT NEWd-'

f R CO'

(

j CONCUR

.V h

PLEASE RETURN. PRIOR TO ISSUE I

PERSONNEL WITH INPUT

\\N d)

SUPERVISOR ITLE DATE W

EVALUATION C0 VALUATED SUBSEQUENT DRAFT REQUIRED OF COMMENTS g DISCU WITH SIGNATORIES

_ MEETING REQUIRED RETURNED PRPR EXCEPTIONS ro,/4/8 '2-PREPARER DATE t

l TYPED AND PROOFREAD REVIEWED BY PREPARER p

DOCUMENT CONTROL SPECIALIST: (

m ure DATE [o-A/-[$L FINAL DR' APT REVIEWED, FINAL COMMENTS INCORPORATED, AND APPROVED BY:

APPROVAL dA dv/n. e c-Ma9f ~. 01hi PSI!PV.-SYSTEMS e n 4 z.

'DATE CHIEF FIEfD ENGINEi!R DATE OA FANAGER DATF

_o i

79 "

. CHIEF FIELD ENG.

c-d.'

VF9 QA MANAGER (

PRE-TRAINING

  • xREQUIREMENTS PERSONNEL OR GROUPS TO BE PRE-TRAINED

,, -,c r. o L M. s C od h _ ECM '

)

~ PRE-TRAINING COMPLETED BY TRAINING OFFICER:

DATE

[

QA SYSTEMS ALL PRPR'S ACCOUNTED FOR ALL PRE-TRAINING RECORDS ATTACHED

~

CLOSEOUT RECORDS:

DOC. CONTROL SPEC.

DATE QA SUPV. AC130WLEDGEMENT DATE l...- _ _.. _.__,.. _ _ _ _,.,, _ _.

~~

~

~

~

~ ~~ ~

CORRECTIVE ACTION FOR SIGNIFICANT CONDITIONS ADVERSE TO QUALITY i

a 1.0 SCOPE

'1 This procedure provides measuresto assure that conditions adverse to quality which f

s have been identified as being significant per Paragraph 2.0 are investigated.

corrected, documented and verified.

1.2 Corrective measures established herein are in addition to corrective measures accomplished through the NCR, SWO, and audit systems.

i 2.0 POLICY 2.1 This procedure describes the use of the Corrective Action Report (CAR) (see Appendix A).

CARS are not required when corrective action is adequately accomplished through i

other corrective action systems such as NCRs SW0s, and AARs, but may be generated under any of the following conditions.

i 2.1.1 When corrective action through another system (see Para. 2.1) is not timely or adequate.

2.1.2 When programatic conditions adverse to quality are identified through trend analysis or audit.

2.1.3 When a higher level of priority is required for resolution of conditions adverse to. quality which have been identified as significant.

2 CARS require response within five (5) working days by the organization responsible j

for implementing corrective action. Response shall include immediate corrective s

action to be teken and completed within five (5) working days. Immediate corrective action may include a schedule for completion of proposed corrective action when such corrective action exceeds a fire workday period for projected implementation, and is authorized by the QA Manager or designee. Any CAR responsa not received by the due data shall be referred directly to the QA Manager and Resident Construction Manager for action.

q h

()

h 3.0 INITIATING THE CAR 3.1 CARS shall be initiated by the QA Supervisor, or his designee, at the direction

l of the QA Manager. Sections 1 through 3 shall be comp a s indicated below.

Section 1 - Enter the governing requirement (s) (spec., manual, code, etc.)

'v Section 2 - Identify the basis of the CAR (trend analysis, NCR, audit finding, etc.)

Section 3 - Enter the description of the condition (s) adverse to quality (CATQ).

t h

Itemize each specific area for which corrective action is to be addressed.

I The description cif conditions adverse to quality shall be signed by the QA Supervisor ant the QA Manager.

\\JJM b

The QA~ Supervisor or 3.2

_ designee will assign the next sequential CAR number and enter the date the CAR was

.s typed in the heading of the CAR form. At this time, the date the corrective action i

response is dus will also be entered in Section 4.

The response due date shall not be longer than five (5) working days from the date indicated in the heading unless authorized by the QA Manager or designee as documented by signature adjacent to an extended response date.

j 1

l

~-

Q l-]O 3.'3 The QA Supervisor o designee hall then enter the CAR on a CAR log and handcarry the CAR and obtain sw = wres as required in Section 3.

4.0 ACKNOWLEDGEMENT OF CONDITIONS ADVERSE TO QUALITY (CATQ)

'.1 The department head or designee responsible for assuring the completion of corrective action shall review the CAR and acknowledge the CATQ by signing Section 3.

Editorial corrections to specified'CATQ (for purpose of clarity) may be'made after consultation with the-QN Manager.

-i -5.0 - DISTRIBUTION

~~

5'.i. ihe QA Supervisor or designee will distribute copies of the CAR to *the following

~

personnel-as a minimum.

5.1.1 Resident Construction Manager

_.._ __..--3.1. 2 -- QA Manager-5.1.3 QA Supervisor - Systems 5.1.4 Responsible Department Head 5.1.5 Director of QA (through Monthly Advisory Report)

~ ~ '. 6. 0 CORRECTIVE ACTION &~ ACTION TO PREVENT RECURRENCE 6.1 The dapartment head shall identify the individual (assignee) who shall respond to the CAR by the date indicated in Section 4 (Response Due By).

._.A 2 The response sha11 be recorded on individual CAR Response forms (Appendices B & C) which are to be attached to the CAR. Separate response forms shall be used to address each Item identified in Section 3 as follows.

6.2.1 Action taken to correct the CATQ.

6.2.2 Date when action taken to correct the CATQ will be completed, or schedule for completion of corrective action (see Para. 2.2).

When the " schedule option" is exercised, progress on corrective action implementation shall be reported per Para. 8.3 through 8.5.

6.2.3 Action taken to prevent recurrence of the CATQ.

6.2.4 Data when action taken to prevent recurrence of the CATQ will be completed, or scheduled (see Para. 6.2.2) for completion.

. 7.0 EVALUATION OF RESPONSES 7.1 Evaluation of CAR Responses will be completed by = d d e =ented on each CAR Response form (Appendices B & C) by the CA Supervisor is design

[/[7

i 7.2 The " Response Received By" will be signed and dated as received.

7.3 Each response will be reviewed for acceptance. (A) 07 hp i

m

' 7.3.1 Unsatisfactory responses willbe so indicated by checking the tpproprieta box. The " Comments" portion of the original response sheet will be marked with the date the response was returned tu the Assignee and the comments appropriate to the unsatisfactory response. The original response will be retained and a copy forwarded to the Assignee for preparation of a satisf.actory responS6.

i.3.2 Satisfactory responses will be so indicated by checking the appropriate box.

Signature of the QA Manager or QA Supervisor also indicates acceptance of a

" schedule" for corrective action, if applicable.

8.0 FOLLOW-UP 8.1 Satisfactory CAR responses will be returned to the Assignee responsible for effecting remedial and/or preventative corrective action.

8.2 The Assignee shall follow up on each response to assure completion of corrective action within the committed time frame (normally within five (5) days, unless a schedule for completion or extension has been approved.

(see Para. 2.2).

8.3 CAR Responses which include an approved schedule for completion shall be followed up and documented by the Assignee weekly on a Corrective Action Progress Report (Appendix D).

The report shall reference the CAR number and CAR Item number and shall include the following as a =4n4=nm.

8.3.1 Date the report was submittted.

8.3.2 Name of Assignee (see Para. 6.1) 8.3.3 Name of the individual (s) with responsibility for acting on the CAR Item. '

8.3.4 The action taken during the reporting period.

8.3.5 The present status of the CAR Item.

8.4 The Assignee shall submit a copy of the Corrective Action Progress Report to the QA Supervisor or his designee and retain the original. The original report may be used for subsequent reporting until ffiled.

8.5 When corrective action has been completed, all original progress reports will be forwarded to the QA Supervisor or his designee.

9.0 VERIFICATION OF CORRECTIVE ACTION TAKEN 9.1 Verification of implementation of corrective and preventacive action shall be made within five (5) working days of the dates indicated on the CAR Response.

gA\\f[3 9.2 Verification shall be accomplished and recorded by the QA Supervisor orJhi designee on each CAR Response. Responses for which weekly progress reports (Appen3IR u) are submitted shall be documented under " Weekly Progress Report Dates".

)

9.3 When corrective and preventative action has been verified the CAR response sheets can be closed out by dating and signature by the QA Supervisor or his designee.

4 CARS will be closed out only after all individual' CAR responses have been closed out.

(~9. 5 Any CAR Responses not closed out by the committment date shall be referred directly to the QA Manager and Resident Construction Manager for action.

'.0. 0 RECORDS 10.1 The QA Supervisor or hi designee shall maintain a CAR Log. The log shall identify the CAR by number, date

, basis (see Para. 3.1, Section 2), and date closed.

.2 Closed out CARS and appurtenent reports shall be maintained in accordance with Procedure XVII-3.

10.3 All CAR records shall be made available to the ANI upon request.

i l

e 9

T

/

\\

\\

6 I

x l.

\\v l.

_ _, _ _./lyp.v J.< r,._. _

DATE-*

CORRECTIVE ACTION REPORT

. CAR NO.

~

CUSTOMER: UE&C PROJECT:

SEABROCK STATION PAGE 1 of 1.

GOVERNING REQUIREMENT:

' BASIS OF CAR:

3.

CONDITIONS ADVERSE TO QUALITY (itemize):

l t

s g

i gs T

i s

l l

t I

l PREPARED BY APPROVED BY ACKNOWLEDGED BY

^

~

RESPONSE DUE BY:

EXTENSION APPROVED BY:

L '}4.

(

ALL CAR RESPONSES i

l COMPLETED AND VERIFIED l t y

r QA SUPERVISOR

.DATE QA MANAGER DATE t

i l

_ m.,_...

)';Cb dit C AR NO.

CAR RESPONSE (REMEDIAL ACTION)

PAGE of

'REPARED BY:

ACTION TAKEN TO CORRE'CT' CONDITIONS ADVERSE TO QUAL 1TY (CATQ):

(CONTINUED ON ATTACHED SHEET:

DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED:

~ SCHEDULE ATTACHED: YES/NO RESPONSE RECEIVED BYi'

'DATE:

SAT UNSAT COMMENTS:

t ACTION TAKEN TO~ CORRECT CATQ'i 4

4 l

(CONTINUED ON ATTACHED SHEET)

DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED SCHEDULE ATTACHED: YES/NO RESPONSE RECEIVED BY:

DATE:

SAT UNSAT WEEKLY PROGRESS REPORT DATES FOLLOW-UP CORRECTIVE ACTION COMPLETED:

VERIFICATION CORRECTIVE ACTION VERIFIED i

_ /-

9

r i y y.i a v.

NO.

CAR RESPONSE ITEM NO.

(PREVENTATIVE ACTION)

PAGE of

' 'REPARED BY:

,_ ACTION _ TAKEN TO CORRECT CONDITIONS ADVERSE TO QUALITY (CATQ):

l C

(CONTINUED ON ATTACHED SHEET DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED:

SCHEDULE ATTACHED: TES/NO RESPONSE RECEIVED BY:'

'DATE:

SAT UNSAT COMMENTS:

l.

N*

\\

l ACTION TAKEN TO CORRECT CATQ':

i (CONTINUED ON ATTACHED SHEET)I DATE WHEN CORRECTIVE ACTION WILL BE COMPLETED SCHEDULE ATTACHED: YES/NO J

RESPONSE RECEIVED BY:

DATE:

SAT UNSAT WEEKLY PROGRESS REPORT DATES FOLLOW-UP CORRECTIVE ACTION COMPLETED:

l VERIFICATION CORRECTIVE ACTION VERIFIED i

,. _ _.I

--.. _~

kxC1 dI*

J CAR NO.

  • CORRECTIVE ACTION ITEM NO*

PROGRESS REPORT PAGE OF

.DATE ASSIGNEE _

ACTION ~B; FOLLOW UP ACTIONS AND STATUS e

e 9

0

..,.. ~. - -

. +...

(.,r l

l l

4 i

t l -

  • we'ne-..eww

~--

~~ ~

~

ic.9. w i

~

. BLUE SHEET ius, - e 4.2.7 FORM - 001 PAGE 1

OF 1 SEABROOK STATION MAR 9-1932 038C NO' REQUEST FOR FOLLOW-UP ACTION

-.;b[..',bbic J i.

NRC INSPECTIONS i

9 VL/

TO:

UE&C RCM/ Power Engineering DATE:

3/9/82 Inspection item

Description:

The welding of attachments across UNIT:

1&2 i

(transverso to the beam axis) the tension flange of beams except as shown on UE&C design drawing is not permitted unless approved by the construction managers. All of UESC Specific'ations address this area differently.

.e.m.-

O,

-drrective Action Required:

Ref. UE&C Memo S/L CE1652, dated Nov. 19, 1981 and UE&C Power Engineering Letter, Feb. 5, 1982, response to B.S. 038A and 038B:

1.

Torsion limitations are outlined on inemo MM7610. This memo has not been utilized in support design for cable tray and conduit supports. Realizing torsion is not accounted for, for normal design loading, how does UE&C, account for torsional i

i loadinn in structural framing for the above mentioned supports?

l l

1 A

l

,,n Date Required: 3k2 Approved WW. SiGeton

~

j Requested By:((

/YIEC'FOAE ((

l NOTE: Contractor is requested to respond by memo referring ident. number of this report.

g P.es3 JRef.7,e '90 21:13 tMT SET.BR00lf STATION - 9763

, FORM 3500 MEMORANDUM

[uilimdsitgDtsama W.

9763.006 O m et:

Philadelphia Dire March 23, 1982 Dan.; ~ Engineering - Power Division mi-8802A To:

Hareesh Shah - Field COPIES:

See Distribution File No.:

1.0.1.22 No Response Required psgou,

D. D. Boyle - 06UO SusJacT:

Public Service Company of New Hampshire Seabrook Station j

Weldina to Dean Flanac;3,,- Blue Sheet 38C

~-

References W-8039A - Response to Blue Sheet 38 m-8470A - Responsa to Blue Sheet 38A Attached response to Blue Sheet 383 Inspection Item Description _of Blue Sheet 38C "The welding of attachments across (transverse to the beam axis) the

tension flange of beams except as shown on UE&C design drawing is not

._ /-g permitted unless approved by the construction manasers.

All of UE&C N,/ -

Specifications address this area differently."

Corrective Action Raouired:

"Raf. UEEC memo S/L CE1652, dated November 19, 1981 and UE&C Power j

-Engineering Letter, February 5,1982, response to 3.S. 038A and 0385:

-l 1.

Torsion limitatiota are outlined on memo M -7610.

This memo has not been utilized in support design for cable tray and conduit supports. Realizing torsion is not accounted for, for hermal

,l design loading, how does UE&C account for torsional loading in structural framing for the above mentioned supports?"

.i i

Responses t

This is not a deficiency.

' i No corrective action is required.

l l

l Discussion:

The allowable torsion curves contained in memo M-7610 have been used in

'l the design of crble tray and conduit supports where torsion is unavoidable.

At the top of t'..e curves in the memo it clearly states, "for conduit supports." s e

In drawins 300228, Rev.16, conduit tables are provided on sheets 12C and-Thess 12C1 providing the minimum size building steel for the support types.

1 l

i l

. ~.. - -.... _........, _ _, _

.. - - - -._ 2... : ~. -.

L g

Jr.w.go.'ee 21:15 ant sr.ns :ook sinTION - 9733 p,gg4 4

2-i Discussions (Cont'd.)

building steel tables were developed using the same allowable beam torsion curves as used for the~ design of pipe supports. The Conduit Notes and details on sheet 3E note F.4.C. states, "The method of attaching to steel

_ ___._ framing and welding details for these attachments shall remain as shown and noted on the sheets included in these notes and details." Supports are i

_____shown_od beam centerline or with the limits of off center supports as shown on sheet C-12.

~~ The Cable Tfay~ System Notes and Details sheet 3B note 7.4.C repeats the quota-

^

tion above and attachments ara shown on the beam centerlines. ECA-013152A of

- --_~

~ ~ March'~5, 1982~recently reemphasized that:

"for support details which attach to the bottom flanges of structural steel beams, the location of the support attachment shall be restricted to the centerline of the affected beam,

~ ~ ~ ~ ~ ~

exceptions to be submitted to site engineering for approval. Any support

+

which-does-not-mast above mentioned criteria is to be documented in the form of as-built".

101-8470A, response to Blue Sheet 38A, UE&C will.

As previously discussed in

.--.-. ' Irun a beam design verification program after major installations have been r.

. completed. The program will detect'any overload conditions, including any

~

_.- __--_ torsional.. loads.

If you_should have any questions, please call.

.m g

+ - -,

/

o f

D. D. Bo l

DDB/ cod 8

Attachment-i I

t t

I g

OU I

d

'h

- - ~ ~

[

nw.2s.'ee 2: is ont str.exoor sinTrow - srss P.ees RESPONSE TO ELtTE SHEET #38B 1(a) Estimated uniformly distributed load due to equipment and piping along with Dead, Live and other design loads are considered in the design sf all structural framing members per procedures stated in the Structural Design Criteria (SD-66), Pages 18 through 24. The containment annulus steel framing has also been re-evaluated based on frequency criteria (thus assuring low stress levels) per the General Proceduras for Re-svaluation of Cont =4= ant Annulus Steel Framing (Appendix to SD-66).

Any secondary stress which could be imposed on the framing due the i

configuration of attachments of supplementary and support connections is not considered separately at this stage of design and construction.

Estimated design loads are conservative and can safely be assumed to

_;; _i cover all primary sad secondary loading conditions.

(b)-

The ' construction management is not required to review the stress condition of the structural framing. The stresses are controlled by engineering per procedures described in (a).. Please also see response to Blue Sheet 38A, where we withdraw design requirements from Spec 12-2.

u

+

(c)

Field welding of attachments across (i.e.' transverse to the beam axis) the tension flange is controlled at the design stage by keeping the weld ei a

length within 75% of the flange width. Supports requiring cross flange l

field welding are located to avoid high stressed areas. An examP a

/.- g would be avoiding cross flange welding on the tension flange in the

' _/

middle third span of a simply supported beam. Furthermore, safeguard is inherent in the design of all safety-related structures due to the fact that during construction when attachments are installed, the seismic sad majority of live loads are not present. The absence of these loads provides sufficient factors of safety against sudden failure.

a

'(d)

Physical intierferences are being checked by plotting all supports on supplementary steel / coordination plans. The final check of the stress condition of all framing members will be made by the beam design verification program during which all imposed loads will be considered.

-l l

2.

All loading conditions will be considered during the beam design verification' program. The program will detect all overload conditions. The verification program will be started soon after major installations have been completed.

3 i

The computerised beam verification program is scheduled to start by i

July 1, 1982.

l t

l

\\

    • U l

s o

y

~ --

JON.20.'88 31:18 SMT SEQBROOK STQTION - 0763 P.886

+

SHEET 1

QF 2

$.sto.60s arv.s/s cournacrom P-ROJECT CHANGE

'S }E M E@E D U

.SEE REVERSE SIDE FOR NOTES, INSTRUCTIONS AND OlSTRIBUTIONS.)

/*, AB ROOK STATION.

(

e1 Jl0 9' 7 6 3 3ili3 Tg 0F E C lA El,AL g,g 3;g:5i2 je Eg;',.cb.ren. sac ga DATE 3/2/82 i,e c

g R l SAFETY RELATED YES ZZ NO _

DESCRIPTION OF CHANGE / REQUEST _

%sME YES NO

  • MA OQ tt !5 1 RE !E !S IT !E.II IC iT i L iC IN ' 30 tF ; II IL lE lC I !5 IP :T !s ; !O iW i 18 8 TIE lEiLi ! alm:S_.

,.,ica ns r. esin in me.sinaiso ninia.ia.inici=Im. oles sai ss.w mar s.,

i.ei..t.e tm i i uissi oi. issi

.e.

Add the following note to Canaral Notes - Supports of M. M-3002.28 and M. &300229L For support details whic.h attach to the bottom flanges of structural steel beans, the location of the support ste-6-at shall be restricted to the ceraterlina of the affected beam. exce).t-ions to be submitted to '51 tsp Engineering for approval. Any support wh:Leh does not meet i

above mentioned criteria is to be documented in the form of as-built.

,N_OTE t No retrofitting is required to already installed supports prior to issuance of this ECA<

REASON FOR CHANGE rio; lt;rtgj r;,r. lTioimi s!I:ot si t o!Ni : s! T'1: t C' a 't a a t I -. i l

REQUEST FOR INFO

,, s sa tis % m unrusaemow, wa ma mam% mrm. w.i oi.. inim.

iini.vws.i.om. ma w

.m i

Cable tray and-conduit supports have not been restricted to require-e

.cre.c.ca secuma.ts:"

eo mo ni >u.insineistinta no their ate.eh-c.to structural steel in such a -n=e :co avoid torsiona

  1. w iw : 'is li '9 !T IA' strasses.

M. W300228 and M. x-300229 do not limit the contractor-A 1

  1. n su M w i a n in 's is is to stemehing supports at the centroid or along the cantarlina of structural steel. The above mentioned change willrestrie.t/ limit torsic
  1. D TWIG IM ;310101212 !9-in structural steeldue to alacerical supports.

-)i l i i ! ! !!!

2 l2 1 i'l lA 1

l F C R s

' pdblR F

I l : I

- "8V-conve's 33 wir cendr4eh

. fab Pne.

ACTION PARTY!

FIELD CONTACT *.

naast -

inlTIATs0 of TITha tfE R.C ren/sas/ars omaa.a zario. -

appnevas of WORKING DOCUMENT RES'D BYs sai/ren 1/15/82 asocussse worse rom casalmaron roe caart supr.

ron ass.co.sta.s.en.

oat:

AFFECTED DOCUMENTS pip.e mees own.s

{sursa ssismes posuuser er anei.icaa l

s u,_.,

i me-

..s.

- 1

..... s. r.o.

no e, en as e.instralertesise so so si sa as e.is i inefaeins se no eras es e.insiseinvirein soni ao e, s e_ :

ieswariss ia.e s.o. i ni 3

l s A R l'

ll1 l

o_w s n s d d :i! :il s o w e li i

s p E C ll' o w e n s.cl e di, o w s I

s p E c ll'u

[

E R l1l[cl[

t s

P E C I I ! -t I i

.i. i l'!

l l i o w s I-l o w s Ii L

j',

o w s l g 11 o w e llllt s :o l l

+ ! iIi I: 1iii inittat narr

.., vent e a r' RJ 11ch, Jr.

i

~l DCN/ECA APPROV4l.S PREPARED BY IaC N/A mEcM. SERV N/A ut C M.

N/A NUCLEAR N/A

,kesC ME WE Raading _ [S M

l Cl NE AFFECTED YEs NO I AmalTING

~{b[%

fW. SMh"IIn"[#

N/A' REVIEW _

a.

dAR BOSTON N/A STRUCT.

W/HR Ma

' ' _ _ ^_-

SAFETT RELATED APPROVAL PPROVCD m,

-ess on PTni estfreyfoes'cousta.smen.

FIELD /

OA CONTRACTOR AP9R0vatI.I I' A'N wo e,

we assu/kea

)],(( {2 YEQ 0,",'t, Afor-l

. [. !

vEs Ro

.. ~ ~ -... - -.,. - - -.. -.. -

-.----,-c---------

-m.

. ~. -. _. - -..

e JRN.{f.'DS 21:21 EMT SET.8200it STRTION - 9763 P.BO7,

. '. r2.

^

'9763 zcI*0t 3U2

~$' ~.'.r2W 22D 20:557[MT SERBROOK STATIC geortustao MEMORANOUM O

E M

M T & cons w cars ECA 01/3152

/

. shamt 2 of 2 9763.006 Orirics,:: Philadelphia m No.

Ensinaaring - P w er Division pai g: Decenhar 22, 1981 20 0 8197A.

DsPT.

Comes: AM Ebaar OF Kalan&

Yet h.F. McKenna DE Bhoads NE Sanshsvi DD Boyle DCC F11st 3.0.25 No Respcmse Reeuived

. peoM e A.J. Nulshisst.

)....

SuasseT Public Service Company of New Hampshire 1"

Saabrook Scation

'Itsesion of Structural Steel Rai.: MMt 7610X. dated August.20, 1981 i

By this asasi. we are approving the use of tharts,which wata attached to the refereses mean,for the satire Sombrook plant.

'zhis will allow you to design amaupports transeh*4 = a meninal to thm ="al men:baradTt shouas ie-senizared ifthere is t_ orad an

~

se than eee siippert on 'this atosi member and the total sorsion should t azeead the allowabia limits sat in the chart 3,-

w _

=

=

If thers era any questionee plasse feel free to contact us.

} < M. k s w a h :,-

1

, (.

g m

a. u suia..

.- i Wad

..n..

. '. -m n.~

= ' +..

m

~n s,

s..

,.- v um.. -

=

,.n n. xa v.

i 1

l

.. c.

~ :

a-

~

( j\\

).

i 1

i 2

~

3 e.

TI 2512/07 Appendix s l 4 l

i l

METRLTim TEAM INSPECTIM DEOLIST PACE _1_ Or 37 REVISION I

i CRNERAL INSPECTION AREA Construction Controle REY. DATE 2/ lJ/ ni j

l SITE INSPECTOR-DATES OF INSPECTION l

l INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS i

i 1.

Implementation - Contractor / Licensee 1.1. Construction / Fabrication / Installation Adequacy 55 t91 (eM Select the appropriate IE Hodulee p t33 Coo) regarding (1) observation of Esn5N I) work and (2) records review for the g a y g(gw) subject inspection area.

g.,'gFollowtheinstructionandguidance only to the extent necessary to establish confidence that the activity is adequately egntrolled or to an extent that will support indicated enforcement actions by HRC. The specific instructions of the Modulas may be abandoned and replaced with independent pursuite that are determined to be more germane to the subject inspectf.on area, with concurrence of the team leader.

i Specific paragraphs of the applicable IE modules shall be added to this checklist in the space,provided with concurrence 'of the team leader.

I MMIM M IMCTIW OECEIST rh

%) 37 REVISION 1

CENERAL INSPECTION AREA Construction controls REY. DATE 2/13/81 SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA

' ACCEPTANCE CRITERIA FINDINGS e

b t

t a

t O

s

\\

x

Appengx5 CWSTIUCTim TF#1 INSPECTIGl OECEIST PA 0F REVISION 1

REY. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS l

D

8 i

r TI 2512/07 Appendix 5 GETRLTIGliFAM ItMRilGI GEr11ST PACE 4 Or n

~

REVISION 1

I A

2#I3#0I GENERAL INSPECTION AREA Construction Controls i'

i SITE INSPECTOR DATES OF INSPECTION

._ u l

INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS l

2 s

i 1

e t

O e

o O

l l

e

~

,~

~

j TI 2512/07 Appendix 5 C0tETRLTIGl TFM INSPECTI0fl GECKLIST '

race s or_37_

i REVISION.

1 REY. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION

~ -~~'

FINDINGS INSPECTION AREA ACCEPTANCE CRITERIA l

I 1.2 Is the_ mission or t,a_Q for each organization involved q1. ear _1y documented 1 1.3 lias the support required for the mission or task,been clearly t

documented and planned for7 1.4 Do involved personnel regardless of extent of responsibility under-stand the overall task or mission?

Do they clearly understand how their responsibility supports the mission?

1.5 Is the identified mission or task Subjective evaluation appropriate?

1.6 QA/QC organization Subjective evaluation

- Is the location of housing con-veniently near the location of the work activitly?

j

- Are work areas, supplies, and records maintenance facilities adequate?

- Aro special tools and equipment immendiately available and sufficient in number?

CmSTRUCTim TEM If&ECTI0fl OEd(LIST VACE f 0[PP' $

  • 3
  • 8 REVISION I

GENERAL INSPECTION AREA ConstructionConhrols REV. DATE 2/13/U1

~

SITE

' INSPECTOR

! DATES OF INSPECTION

--.u..._...

INSPECTION' AREA' ACCEPTANCE CRITERIA FINDINCS t

- Are the provisions for all the above commensurate with other site organizations?

- Are there any identifiable con-ditions which adversely affect functions of the QA/QC organiza-tion?

1.7 Hanpower Resources

- Are there documented work pro-jections showing QA/QC manpower requirements over the course of construction?

- Is the current manpower adequate to sufficiently support the level of activity?

- Is the current manpower (manage-ment and staff) clearly qualified?

- Have documented QA/QC manpower requests and justifications been expediously handled by management? Have they been handled in accordance with documented administrative procedures?

N,

.~~

.~g p

TI 2512/07 Appendix 5 NMIM M IMCTIm 0FD1_IST l

PACE 7 Or 37

.I REVISION 1

. DATE 2MM CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR

~ DATES OF INSPECTION

- =

i INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS

- Are the administrative procedures l

clearly responsibe'to the unique conditions at the construction site?

(i.e.., rapid changes.in needs)

- Do manpower requests clearly identify the level of qualifica-tions (education and experience) needed?

- Is the monetary compensation, relative to other trades,-such that clearly qualified and capable candidates will be ettracted to l

these positions?

t.*

1.8 Personnel Qualifications

- Is there a documented system for the training and indoctrin-ation of personnel?

- Is there a documented system to assure that personnel qualifica-tions are maintained and changed as needed?

- Is there a system to'essily verify the status of personnel qualifica-tions?

1 l

I 1

TI 2512/07 App.indix 5 OGEEUCTIGI T@ JNSPECTIQl DEdd.IS[

race _a.__Or -- 37 REVISION 1

.t W.DM 2/13/81 CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION

.._-.._u,,

INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS l

- Is there a mechanism which clearly informa personnel of the status of their qualifications?

- Are qualifications responsive to and in accordance with require-ments?

l

- Do the contacted personnel perceive any prnblems with current qualifica-i tions system and associated records 1 NOTE: Confirm the implementation and evaluate the adequacy of each of the elements above.

.i 1.9 Craftsmen Regulatory r.uide 1.28 1

Regulatory Guide 1.74

- Is there an adequate supply of ANSI N45.2 qualified craftsmen?

ANSI M45.2.10 ANSI M45.2.23

- When fully qualified (journeyman) 10 CFR Part 50 Apx B.

j craftsmen are not available, what Criterion 11 provisions have been established to assure quality production?

- Are'there training and indoctrin-ation programs for craftsmen?

- Are records of such training maintained?

,r~.

,.~,

~

/

g s

e TI 2512/07 DESTRLTI@l TDN INSPELTIQl DECKLIST PM'fM 37

~

REVISION

'l REV. DATE

. 2/I3/81 CENEP4L INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITF.RIA FINDINGS

- Is such training periodicS.y updated?

- Elicit the opinions of such train-ing and indoctrination from crafts-nen contacted.

1.10 Employee Morale Subjective evaluation During the conduct of any portion of these checklists, elicit from the persons contacted their opinions relative to the adequacy oft

- construction management;

- concern for a quality product;

- working conditions;

- harmony between construction and l

QA/QC organizations;

- harmony between the various design, engineering and construction per-i sonnel; and procurement organira-tions;

- personnel management practices;

- compensation and work loading (i.e., overtime) practicest

L UETRI. IM TEN 1 INsitcilm OEdiiST

'I *'$0r 77Pendix 5 T

PAcz REVISION 1

CENERAL IllSPECTION AREA Construction Co'ntrols REY. DATE 2/13/81 SITE

. INSPECTOR DATES OF INSPECTION

_..___u INSPECTION AREA ACCEPTANCE. CRITERIA

, FINDINGS j

personal safety and related issues.

0 Based on an assessment of,the above,'

make a subjective determination of S

employee morale. This consideration is for management, staff, and crafts-men.

, ~

1.11 Construction /QA/QC Orsanization

.. Regulatory' Guide 1.123 1.11.1 Are documented administrative pro.

ANSI N45.2 cedures defining organizational'

ANSI N45.2.10 interfaces in use?-

. ANSI M45.2.13 1.11.2 Do forms and records used to communi-cate across such interfaces conform to the requirements of the QA program and administrative procedures?

1.11.3 Is there a functional flow chart demonstrating how information flows across the interfaces? If not, is there an adequate documented descrip-

!. ion of information flow?

1.11.4 Examine interface documents used in this area and determine the followings

'N

.***g e

i

.3 l

r l

4 MMIm M IMCTim OECEIST_

PACE OF 17 REVISION,

1 REV. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS r

I Documents and records clearly identify the subject, its specified criteria, the authority of the signature (s), date, the action acc~omplished, and the unique identity of the document.

Is the document traceable and is the scope of addressees appropri-stat 1.11.5 Examine any deficiency noted above to the extent that a clear corree-tive action can be established.

1.11.6 Are the contseted personnel clearly knowledgeable of the interface con-trol system?

1.11.7 Elicit employee opinions relative to the adequacy of the system examined.

1.12 Document Contrcl In this inspection area determine.if documents are being issued, revised, handled, stored, and discarded in accordance with QA program, adminis -

trative procedures and other desig-nated requirements.

.f.

i TI 2512/07 Appendix 5 GETRLTIGl TEAM IllSPECTIGl DEDLIST :

Pact _1L0r 37 REVISION I

I-CENERAL INSPECTION AREA Construction controls REV* DATE 4/8J/05 SITE

~

'INSFECTOR DATES OF INSPECTION 4

INSFECTION AREA ACCEPTANCE CRITRIA FINDINGS b

1.12.1 Has a central document control facility been established?

j

- Are the facilities and control systems adequate?

- Are the document receipiente aware j

of the interfaces control between their organizations and central l

document controlf

)

- Are material / fabrication qualifica-tion and inspection records adequ-ately controlled by the documenta-i tion control center?

1.12.2 Are there clearly defined indications of the status of each document (i.e..

controlled or not) on the document?

i 1.12.3,

Do personnel clearly understand that

?

uncontrolled documente are not to be used for construction or decisione I

relative to constructionef 1.12. 4 Tsetermine through review if personnel have to extent necessary, access to controlled documente; l

- Are such documents available at the work location?

I,

i e

T'7"13ar T

  • 5

/"

MNIW M IMGlm 0FE_M rAC REVISION 1

GENERAL IMSPECTION AREA Construction Controls REY. DATE 2/13/81 SITE INSPECTOR DATES OF INSPECTION N

INSPECTION AREA ACCEPTANCE. CRITERIA FINDINGS I,

1.12.5 Do recipients of controlled documents clearly understand their responsibili-ties relative to handling and follow-ing these documents?

Do personnel using these documents -

know how to initiate a change to these documents?

I Is there a system which directly informs the document receipt of changes?

Is the document recipient knowledge-able of this sytem?

1.12.6 Examine a variety of controlled documents in use at any field location to determine if they are in fact controlled in accord-ance with the requirements.

Determine if issued documents are maintained in a legible condition free of personal notes and/or comunents.

Is a clear record maintained for

" voided" controlled documents an,h.. men.

i.....

4..

1 T'c'!Ter

@P'"di"8 CG6TRI. IGl TE#1 INSPECTIGl DEGLIST T

rA REVISION _

1 REY. DATE 2/13/g1 CENERAL INSPECTION AREA Construction Centrols 4

SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA i

FINDINGS i

l

.....~ -.

i i

1 Are uncontrolled documents such se memorands, " notes", etc. used to supplant or circumvent controlled documents used to to report problems and other adverse issues.

1.12.7 Elicit opinions from contacted personnel relative to the adequacy of document control.

e o

i l

1 1

D 1

1

,. 3

e.

3 l

I TI 2512/07 Appendix 5 or 37 EIEUI@lIf#!_INSitLIiGI OMI Pact m 'I REVISION

. DATE WM l

GENERAL INSPECTION AREA _ Construction Controls t

DATES OF INSPECTION INSPECTOR j

SITE

,._-__. =

FINDINGS INSPECTION AREA

~

ACCEPTANCE CRITERIA a

i Regulatory Guide 1.28 1.13 Audits / Surveillance _

Regulatory Guide 1.74 ANSI N45.2 Has a comprehensive schedule and ANSI N45.2.10 1.13.1 audit plan been established?

ANSI N45.2.12 j

AN91 N45.2.23

- Is the plan regularly reviewed and updated in response to' con-l struction progress of identification i

of adverse conditions?

l

- What is the implementation status of this plant (behind schedule or 4

not)

- If planned audits / surveillance t

were missed determine why they were missed.

4 Review audit and surveillance l

1.13.2 reports, associated checklists l

and not the basis (planned or problem inittsted). Determine ift i

i

- The scope of the activity was i'

appropriate.

.s

- If personnel conducting the audit were appropriately qualified.

- If audit checklist appropriately addressed the specified require-ments.

1

~'

  • e Appendix 5

@ nim TE#1 IMCTIm DWg TCl5%r~I**~~

3

~ :

REVISION W. DATE '2/13/81

~

CENERAL INSPECTION AREA Construction Controls i

SITE INSPECTOR DATES OF INSPECTION

..._......_.__u INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS

- If the audit basis and findings are clearly documented.

- If the QA auditors were adequately j

supported by technically qualified personnel (i.e., metallurgist.

l discipline engineers and appropri-l ate).

j

- If the audit surveillance results are appropriately distributed to affected organizations.

- If management effectively evaluates audit / findings, as shown by docu-mented involvement.

- D9es management regularly use this information to effectively evaluate the quality of the construction effort?

1.14 Audit / Surveillance Follow-up i

Determine through review, if follow-up and corrective actions for adverse i

surveillance and sudit findings are appropriate, including:

4

- notificiation of affected organ-izations; 0

a

)

o

~

TI 2512/07 Appendix 5 MNim Hi IfLittilW OECEIST PACE 15 0F 37 REVISION

  • T REV. DATE 2/13/81 GENERAL INSPECTION AREA Construction Controls SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA I

FINDINGS I

.e i

1.13 Audits / Surveillance

' Regulatory Guide 1.28 l'

Regulatory Guide 1.74

'1.13.1 Has a comprehensive schedule and ANSI N45.2 audit plan been established?

ANSI N45.2.10 ANSI N45.2.12

- Is the plan regularly reviewed ANSI N45.2.23 and updated in response to con-struction progress of identification of adverse conditions?

- What is the implementation status of this plan?

(behind schedule or not)

- If planned audits / surveillance vere missed determine why theyt were missed.

1.13.2 Review audit and surveillance reports, associated checklists and not the basis (planned or problem initiated). Determine ift

- The scope of the activity was appropriate.

- If personnel conducting the audit were appropriately qualified.

- If audit checklist appropriately addressed the specified require-ments.

i

.3 i

j TI 2512/07 Appendix 5 CWSTRK. im 10#1 IllSPECTim DECKLIST PACE n Or 37 T

I

~

REVISION

~l REV. DATE 2/13/81 CENERAL INSPECTION AREA Construction Controls I

DATES OF INSPECTION INSPECTOR i

SITE

.._.-_a FINDIHCS l

INSPECTION AREA

, ACCEPTANCE CRITERIA I

l

- notification of ef fective favels of management;

- identification and control of the nonconforming item of serv,1ce:

- identification of specific time limits for corrective actions; i

- determination of adverse trends;

- consideration for additional management actions to effect resolution of problems.

1.14.1

' Discuss the audit and surveillance reports with the managers whose organizations were audited. Determine ift

- management is knowledgeable of findings and their significance;

- management has taken other actions to resolve problems;

- management attitude regarding quality issues is appropriate.

l TI 2512/07 CRETlHT. IGi TEAM INSittil&l DEDLIST '

Tl&1'Or d

u REVISION 1

CENERAL INSPECTION AREA Construction Controls REV. DATE 9/13/g1 SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA

' ACCEPTANCE CRITERIA FINDINGS l

l 1.15 Hold Points

' Regulatory cuide 1.28 Regulatory Culde 1.74 Frequently QA/QC systems and associ-ANSI N45.2 ated administrative procedures ANSI N45.2.10 established hold-points to limit the progress of an activity uncil confirmation of adequacy has been established by properly qualified persons or organizations.

Identify hold-points for activities in this inspection area and deter.

mine if:

- personnel understand the hold-point system;

- established hold-points are appro-priate;

- QA/QC regularly audits the perform-ance of personnel relative to hold-points;

- QA/QC has identified any organtastions who abuse the hold-point system by not stop-ping the activity santil required confirmations are in P ace; l

O I

i 9

s 8

O TI 2512/07 i

Appendix 5

@MI@ M IfMCE,,QECQ!%

PAGE ia OF 37 j

REVISION 1

REV. DATE 2/13/81 GENERAL INSPECTION AREA Construction Controls i

SITE INSPECTOR DATES OF INSPECTION l

INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS corrective actions taken or speci-fled for any. abuse of hold-points was appropriate.

1.16 Stop-Work /Stop-Process

- Determine through conversation if QA/QC personnel clearly understand and exercise their stop-work /stop process authority and responsibil-ity.

- Determine through discussion if the QA/QC organization management and staff have any reservations about exercising this authority.

- Determine through discussion ~if the practices at the site com-promise QA/QC exercise of' this authroity.

1.16.1 Examine the functional implementation of stop-work /stop-process authority

~

established by the QA/QC programs and administrative procedures to deter-mine if:

- QA/QC can act unilateraly in this regard or to what extent:

1

- management adequately supports QA/QC actions in this regard; j

i i

MNim M Ihllm ORIE pAWy/07byf 3,

TI 2512 t

CENERAL INSPECTION APEA j

31TE Construction Controls REVISION _

1 INSPECTOR M. DATE_

~

2/13/81

]

! DATES OF INSPECTION INSPECTION AREA mmm MRM FINDINGS

- that this authority had been sufficiently delegated down to i

the lowest practical level of i

the QA/QC organisation.

1.16.2

)

Review any records demonstrating i

QA/QC Stop-work /stop process l

I implementation and determine 1

ift I

i

- management adequately supported i

the actiong

-affectedorganisationtookeffec-f 8

tive corrective action; J

corrective actions were timely

-and effectivet

- actions to preclude re-occurrence j

were taken.

t i

1.17 i

Records System and Facilities 1

Regulatory Cuide 1.28 i

- Determine if all QA/QC and Regulatory Cuide 1.74 construction management person-Regulatory Culd, 1.88 nel have received training and ANSI N45.2 j

indoctrination regarding the ANSI N45.2.!O

.I j

principal records maintenance ANSI N45.2.9 system..

10 CFR 50, Apx B. Crit i

i XVII

[

I

_,3

^~

s l

m.,.

1 TI 2512/07

@MIE E IkitCl10! 0Ff11ST l Appendix 5 l

PACE M OF 37 REVISION I

i CENERAL INSPECTION AREA ConstructionContrbia REY. DATE 2/13/81 i

SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA l ACCEPTANCE CRITERIA FINDINGS e

i

- Determine if any involved individ-ual can adequately access the re-cord system.

2

- Determine if records are identifiable i

and retrievable with ease and facility.

- Determine if records and properly j

stored and safe guarded.

- Determine if record interface i

control between individuals and organizations is in accordance with QA/QC and administrative procedures.

- Determine how record or document-l ation deficiencies are identified and controlled until resolved.

l 1.17.1 Determine if records contain the minimum required information.

- Deternine if information is clear and legible.

i

- If initials are used to sign I

records, determine if cross reference to full names are j

available.

l

l.

~..

TI 2512/07 i

App;ndix 5

@ E I E D Ill i t [ il @ Ef M M -

PACE LOF 17 j

REVISION 1

CENERAL INSPECTION AREA Construction "Jntrols REV. DATE 2/13/g1 SITE INSPECTOR DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS t

\\.

, t...

1.18 Nonconformance and Trendins Regulatory Guide 1.28 Regulatory Guide 1.74

- Determine if nonconforming items.

ANSI. N45.2 or services are being routinely ANSI N45.10 identified and documented.

~

(Discuss and record review.)

- Determine h,ow many types.or.

categories of nonconformance documentation is used.

(i.e.,

.i

" Deficiency Reports", " Corrective-Action Requests", " Deviation Reports", and " Audit Findings",

etc.

- Determine if proposed corrective actions are appropriate and timely.

- Determine if prescribed levels of authority and independence.

concurred in resolution.of issue.

- Determine if nonconformance and corrective action documentation is properly identified and con-trolled.

e r,

i

)

i TI 2512/07 Appendix 5 MNIm lT#1 IfffEclim gel 1151' PAGE L OF 37 REVISION I

CENERAI. INSPECTION AREA Construction Controls M. DATE 4WN SITE INSPECTOR

! DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITEP.IA FINDINGS t

- Is a central log identifying nonconformance documentation maintained? Is it adequate?

- By record review, determine if procedures controlling noncon-formance documentation are adhered to..

1.18.1 Determine if there is a systematic and regularly reviewed " Trending" of repeat nonconformances.

1.18.2 Determine if the trending program includes all types or categories of nonconformances.

(i.e., "Defici-ency Reports", "Nonconformance Reports", " Deviation Reports", and

" Audit Findings"n etc.

- If it does not, establish the reason.

- Determine if the " Trending" system used by contractors and licensee are compatable or interface adequately.

- Review corrective action caused by the identification of adverse trends.

TI 2512/07 H 5 C0fGTETIGlIF#1 If&TfiiDi UEcklj5r AWdH b_Or 37 REVISION 1

i REY. DATE 2/13/81 CENERAL INSPECTION AREA Coce ttsatf ou,C_ontrols i

SITE INSPECTOR DATES OF INSPECTION

-._. m INSPECTION AREA ACCEPTANCE CRT.TERIA l

FINDINGS i

t i

1.18.3 Determine if the subject organizations' management regularly reviews noncon-formance summary reports and trend evaluations.

- Determine if the subject organiza-tions' management took any actions or wrote any directives as a result of this information.

l 1.18.4 Determine if involved personnel under-stand the system for identification and control of nonconformances.

- Did they receive adequate training?

1.19 Construction Contrals Regulatory Guide 1.28 i

Regulatory Guide 1.74 Determine how the site construction ANSI N45.2.4 orhanizations are organized to' con-ANSI N45.2.23 trol the subject construction activity ANSI N&5.2.12 and evaluate the adequacy of QA/QC ANSI N45.2.13 interfaces with these construction ANSI N45.2 organizations. The specific elements ANSI M45.10 to consider are

- Is the organization arrangement functionally resre-:1ve to QA/QC and Administrative procedures?

- Adequate QA/QC participation in specific construction activities.

i

[.;_ _

o i

)

.u I

ll t

TI 2512/07 G16TRI. I(N YAM ltGTCTIGtGRMJg APP x5 i

T l

j REVIS 1

CgNERAL INSPECTION ARRA Constructica Controls M. DATE 2/13/81 SITE INSPECTOR

_l DATES OF INSPECTION

-_y.._-..

l INSPECTION AREA ACCEPTA2CE CR1YEIIA FINDINGS f

- Assignment of QA/QC management and staff to specific areas of contractor j,

responsibility.

- Is information flow for hold-point notification clearly provided for l'

and do involved personnel under-j stand the system?

l 1.19.1 Does the QA/QC organization participate in work planning an'd scheduling meetings?

Determine the existance and adequacy l

of the following

- Does QA/QC management forecast it's staffing requirements and assign-mente based on particpation in scheduling and planning meetings?

- Examine records attesting to this participation'and evaluate the extent of participation.

1.19.2 Is there adequate coverage of activit-l tes by the QA/QC organisation? Deter-l mine by:

- discussions with QA/QC inspectorsg j

- discussion with craftemen, shop stewarts, and third party inspectorat M:

f-

3 l

TI 2512/07 j

l Appendix 5 (QlSIIHIlGLIEMI IIEPECTIGl GE04 IST FACE.26_0F _ i u REVISION 1

s CINERAL INSPECTION AREA Construction Co trols i

I, SITE INSPECTOR DATES OF INSPECTION i.

INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS i

- discussion with craft supervision personnel.

1,19,3 Determine to the extent possibles

- if there are any instances where-in a work activity was.stoppe'd because of the unavailability of '

t QA/QC participation and why they were unavilable by:

l

- discussion with production managers; l

- concurrently determine the pro-i duction managers attitude regarding the adequacy and availability of QA/QC staff; 1

- review and discussion of procedures written to preclude ongoing activit-l 1es without QA/QC participation;

- determine extent of licensee manage-ment notification. and participation in the resolution of the problem associated with these considerations; e

s

. i.

i MNI M If N i E D EC EIST_

PAGE 2 0F REVISION 1

REV. DATE 2/13/81 GENERAL INSPECTION AREA Construntion Controls t

SITE INSPECTOR.

DATES OF INSPECTION ACCEPTANCE CRIT):,RIA FINDINGS INSPECTION AREA

}

4 i

1 1.20 Equipment Qualification and Fegulatory Guide 1.28 4

Regulatory Guide 1.74 1

Calibration Regulatory Guide 1.23 Confirm through records review ANSI N45.2 4

that the QA/QC and administrative ANSI N45.2.10 procedural requirements for equip-ANSI N45.2.13 ment and materials qualification /

calibration are adhered to by the following:

verify thint responsible personnel are qualified to make determina-tions as to adequacy 3 verify that such items are labeled to show atatus:

verify that adequate documentation is available to support acceptability:

verify adequacy of item by comparison and evaluation of purchase order specification, receipt inspection records, and other pertinent records:

verify the traceability of qualif-ication/ calibration records to items is maintained.

I elicit commients'and opinions from~

contacted personnel regarding

1

~'

!' ~

Appnidix 5 7

UIETRLTim TEM INsitt:ilm UELYdhT!

PAos_za_or M

REVISION 1

g 2/ W 81 Construe _t_fca Coatrela l-i GsNERAI. INSFECTION AREA t

t SITE INSFECTOR DATES OF INSFECTION l;

INSFECTION AREA ACCEPTANCE CRITERIA FINDINGS

\\

1

- review outstanding nonconformances i

and open items involving the subj.ect l

Inspection area.

I Handlina and Storage of Materials Regulatory Guide 1.28 1.21 Regulatory Guide 1.37 l

Determine if the implementation of Regulatory Guide 1.74 meterial and equipment handling, ANSI N45.2 ANSI N45.2.1.

storage, shipping, cleaning, and l

ANSI N45.2.2 preservation is in accordance f

with QA/QC and administrative ANSI N45.2.10 procedures and instructions by the following

- observe all storage areas for i

. subject items 3

\\

e 1;

i

- verify the adequacy of storage i

of selected itemag 4

f

- review QA/QC surveillance records

',I for frequency and comprehensive-l ness of inspectiong

- determine awareness and qualifica-7 1

tion of store-keeperst b

- determine the adequacy of issue d

controit I

- are conditional releases used and j

are the appropriately contro11eds a

1

. p.

3, TI 2512/07 UETRLTIGl TERN INSPECTIGl DEddSI AM W Y 0r u

l REVISION i

GENERAL INSPECTION AREA Construction _ Controls REY. DATE 9/11/ni SITE f

INSPECTOR DATES Or INSPECTION INSPECTION AREA ACCEPTANC CRITFI.IA FINDINGS

- observe material handling and handling equipment; determine adequacy;

- evaluate housekeeping conditionst

- evaluate fire and other hasard protectioni

- evaluate adequacy of storage areas;

- determine if there are controlled areas for nonconforming items;

- are there adequate measures to preclude use of nonconforming items;

- are nonconforming items adequately identified;

- are manufacturer's recommendations appropriately addressed

- are material control personnel adequately trained and indoctrinated regarding QA/QC requiremente?

4 A

~

l I

E IECII@OMIS['

REVISION 1

PACE OF 3

i GENERAL INSPECTION ADEA Construction control's REY. DATE 2/13/5!

i' SITE INSPECTOR DATES OF INSPECTION i

... _ _ _ _ _ _, i 1

l INSPECTION AREA ACCEPTANCE CP.ITERIA 1.

-FINDINGS i

4 l

2.

Management Involvement QA/QC Organization Regulatory Gei.f4 1.26 l

Corporate / Site Regt:14tcry Cride 1."#4

. ANSI N45.2 2.1 Does the documented policy state-

., ANSI N45.2.10 ment include a concise definition ANSI M45.2.3 of the management mission or task SAI Chepter li objectivest e

t 2.2 Determine through discussion.if principal management personnel clearly understand and support quality assurance constituents and requirements.

~

2.3 Do principal corporate individuals assigned responsibility for QA/QC direction, have responsibilities for other areas: Does multiple responsibility adversely affect QA/QCf 2.4 Does corporate management have clearly defined administrative procedures controlling the delegation of authority?

Does the assigned individual have clearly defined r,esponsi-bilities and authority?

er e

g 1

  • r

,p.

.._. f..

g e

i TI 2512/07 Appendix 5 CGETRETIM TFM IECTIGl DEdd_IST PACE L OF 37 l

REVISION I

CENERAL INSPECTION AREA _ Construction Controls REV. DATE 2/13/81 SITE INSPECTOR DATES OF INSPECTION 4

_ __.=, ;_m.2_..

INSPECTION AREA ACCEPTANCE CRITERIA

{

FINDINGS I

J 2.5 Does corporate management regularly review the performance of individ-uals with delegated responsibilitieel i

Now frequently does corporate management visit the site? Does it appear adequate?

4 Does corporate management rou-tinely review audit and noncon-l formance trending reports from the site? From vendors and suppliers?

Is there documented evidence that corporate management positively responds to adverse 3

routine site audits? Surveil '

lance and nonconformance report summaries and trendatf. From vendors and suppliers?

l Does corporate management i

routinely follow-up on the effectiveness of their corrective action directives?

Is' follow-up comprehensive and effective?

i

,,c.,..-.

j GETRLTIM TIW1 IfEPELTim DErXIST, Ncs'$ 7

^$$"d'*'

8 0r 4.

l REVISION 1 ~~

~

GENERAL INSPECTION AREA Construction Controls REY. DATE 2/13/81 i

SITE INSPECTOR

!DATESOFINSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS 2.6 Does corporate management'have a i

doctamented plan and schedule for independent management audits of all site activitiest How frequently do these audits occur?

Have previous audits been com-prehensive and substantivd in t

their implementation?

I What is the implementation status of this independent audit function? (On schedule or nott)

If not on schedule, examine the cause.

Note any indication of e porate management attitude

~

problems.

Is there documented evidence that management took comprehensive corrective actions for all noted nonconformances and further examined and evaluated all concerns and observations?

- Was corrective action followed up in a timely and effective manner, and its implementation verified by corporate management? Were additional follow-up audits directed by corporate management?

i TI 2512/07 Appendix 5

@6fRI, IGi WRI!!SKCTd' LUECEISri PACE 33 Or 37_

T REVISION l CENERAL INSPECTIO*! ARCA_ Construction _ Controls

. DA E 2/13/M I

SITE INSPECTOR DATES OF INSPECTION i

INSPECIION AREA ACCEPTANCE CRITERIA FINDINGS t

Determine through meeting record review, and discussions with f

corporate management personnel if the QA/QC organization is l!.

provided support and considera-tion cosamensurate with that provided other construction organizations?

i, 2.7 Examine the organization and opera-i tion of the corporate management individuals or groups responsible for evaluation and approval of QA/QC manpower request.

Were assessment and approvals responsive to demonstrated needs?

Was adequate compensation, relati"e to other trades, estab-lished to attract fully qualified candidates?

Were the evaluations and appro-vals reasonable in the context of justified need?

Is unjustified rigor imposed on the justification for such requisitions?

- - i M N ImTMilBMIm0W qi M f orAPPgdix5 REVISION i

l:

i, GENERAL INSFECTION AREA _ Ceastruction controla REV. DATE _2/13/A1

~

j i'

t' SITE INSPECTOR LATES OP INSPECTION

.. ~ _ _ _ _. _

s INSPECTION AREA ACCEPTAMCE CRITERIA FINDINGS' t

I t'

2.8 Examine the organization and opera-g.

tion of corporate management indivi-6 i

duals or groups responsible for evaluating and approving QA/QC housing equipment and facility '

i requisitions.

Were assessments and approvals /

denials adequately responsive l

to justified needs?

Corroborate opinions of site based QA/QC management by discussion with QA/QC auditors and inspectors and document conclusions.

2.9 Has the licensee established a QA l.

review committeet What is the. composition of the committee (i.e., job descrip-tions of individuals)?

i l

Are the responsibilities and interfaces clearly documented?

l

' ('

Does the review committee meet frequently enough to be effec-tive?

i ll l '

(

o.

I ;

(

e

, j. _

i NEIh E IECf5MEM GE OF i

REVISION 1

GENERAL INSPECTION AREA __Ccastruction Centrols REV. DATE 2/13/81 SITE

. INSPECTOR.

DATES OF INSPECTION INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS 7..._.

i

{

i Does the review committee followup' on its directives?

Does corporate management take initiative regarding safety issues or wait for expression of NRC concern?

(Verify through inspection experi-ence and any indication of un-addressed prior knowledge of nonconforming conditions).

Is corporate management adequately responsive to NRC concerns and noncompliance items?

2.10 Hansgement Effectineness (Through records review and discuss-lon with personnel, evaluate the following):

2.10.1 Are responsibilities of management and subordinates clearly defined?

2.10.2 Do corporate management and sub-ordinates appear to completely understand their responsibilitiest i

2.10.3 Are subordinates held accountable for assigned responsibilities?

C0f6TitLTim_IDVi !NSPECTION DEDilST" NG$"as'Or$f*" " '

REVISION 1

REY. DATE 2/13/81 GENERAL INSPECTION AREA Construct _ ion controls i

SITE INSPECTOR DATES OF INSPECTION l

I INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS

^

2.10.4 Are interfacing management activities between different oiganizations clearly defined?

2.10.5 Is the management attitude regard-ing safety related construction i

auch that adequate attention and suppoct can be expected in all areas of safety significance?

i t

2.10.6 Does corporate management provide adequate support and compensation, rela tive to other trades, tre assure that the requisite quality of personnel, materials, and services is available?

2.10.7 Does management require timely and thorough reporting of 50.55(e) and part 21 occurrences?

2.10.8 Is management kept adequately informed by subordinates?

2.10.9 Is management aware of current issues and problems?

O e

,e o

~

j.

TI 2512/07 Appendix 5 C@SIllUIM TtM ll6ttilGi GiECRIST PACS 37 Or 37 REVISION ~

l GENERAL INSPECTION AREA Construction Controle

. DATE _2/13/81 SITE INSPECTOR iDATES OF INSPECTION

_._-3 INSPECTION AREA ACCEPTANCE ORITERTA f

FINDINGS

.. -..-l.

-. e i

2.10.10 Are subordinates informed by manage-ment?

What is the routine procedure?

1 What special procedures are implemented?

2.10.11 Does corporate management support the delega: ba c" stop/werk-stop process authority co lowest level practical (QA/QG inspet. tor)?

a 9

O

j..-..-..

I i.

\\.

.)

r l;

i ii TI 2512/07 APPenclx 6 CONSTRUCTICN TEAM INSPECT 10li CllECKLIS'T Page of 6 Revision No.

1 GENERAL INSPECTION APEA: PROCHREMENT CONTROLS - SITE Dal;e:-

2/13/81 INSPECTIONSETE:

1 INSPECTOR:

1 DATES OF INSPECTION _ / i to_ / J INSPECTION AREA hy ICE FINDINGS 4

3 3

1.

Program implementation '

1.1 Procurement Activity (Major Contractors /.

!l Disciplines / Subcontractors)

Selectively examine several procurement documents for major con. tractors, disciplines an<l/or subcontractors at the site.

2 1.1.1 Are the specified design parameters in

>J accordance with those ilsted in th:i SAR or other AE/ Licensee specifications applicable to the

.7 preparation of site procurement documents?

~

~

Is the AE/Itcensee monitoring site issued. procure-g ment documents for inclusion of th6se requirements

.?'

i 1.1.2 60 procurement specifications identify the j

appilcable technical requirements (i.e..'

appilcable codes and standards)?

p j'

1.1.3 Do the purchasing documents impose the requirements of 10 CFR 21 when " basic componentt"

^

' are purchased? (Basic components are. discussed l-inNUREG0302.)

1.1.4 Is the supplier on the ap' proved list of suppliers?

1.1. 5 Have the vendor's Quality Assurance Programs been audited by the purchaser organizatioi?

1.1. 6 Do procurement specifications identify appropriate QA requirements including requirements t

to protect the item against environmental condi-l tions for periods of long-tem storage (i.e., hot and humid, sub ect to ocean atmosphere, cold

4 t

.., L

- ' * * ~. ~ ~ '

'4 i

i-TI25g2/07 Agendix6 CONSTRUCTION TEAM INSPECTION CHECVLi$T '

hh j,I y GENERAL INSPECTION AREAt PROCUP.EHENT CONTROLS - SITE Date:-

2/13/81 INSPECTION SITE:

_ INSPECTOR:-

I DATES OF INSPECTION _/ J _ to j _ /

i i

INSPECTION AREA ACCEPTANCE CRITERIA FINDINGS 1.1.7 Where a Certificate of Conformance (C0C) is to be used for acceptance in lieu of some or alli i.

final conformance records, do the specifications ;

fcr the C0C document require the following N

information to be included in the C0C:

1.1.7.1 Identification of the purchased material t

er item (reference to P0 or procurement document l

1sacceptable)?

1 1.1.7.2 Identification of specific requirements met (via list or reference to procurement document)?

1.1.7.3 Identification of procurement require-5 ments not met. If any?

1.1.7.4 Signature of an appropriate member of supplier's QA function?

1.1.7.5 Identification of procedures or QA program to be followed for filling out, review and approval of certificates?

1 1.1.7.6 Receiving inspection as the means to i

determine that purchaser / agent has verified by audit (or source verification) the validity /

{-

effectiveness of the suppliers C0C system?

1.1.8 When required (e.g. for complex engineeredcomponents)inadditiontotheC0C, was any source verification relative to acceptance i

cf the item specified and/or perfonned?

e

~

~~

7 2- -....

3

+' '

\\,, )

,y N. *,

TI 2512/07 Appendix 6 CONSTRUCTION TEAM INSPECTION CHECRI.ISTPa of 6 i

GENERAL. INSPECTION AREA:

p, g

PROCUREENT CONTR0_t.S. S..ITE Date:s INSPECTOR:

2/ /ai INSPECTION SITE:

DATES OF INSPECTION _ / 1 to 1 h

INSPECTION AREA ACCEPfANCE CRITERIA FINDINGS i

1 31. 9 Was implementation for the protection, I

handling, control of procurement specifications and purchasing documents adequate?

i 1.2 Receiving Inspection 1.1.1 Are receiving inspection records available.?

4 Ara identified dit:repancies reviewed by QA and/or engineering, as appropriate, to assure proper disposition?

1.2.2 Are procurement document requirements for i

accceptance of the item by receiving inspection adequate?

(Factors such as safety significance anc 4hether the procurement relates to an engineered item or one of standard design (off the shelf) shouldbeconsidered.)

1.2.3 Is the documentation for certificates of

bnfermance adequate?

Where procurement Jo they include the following: documents do not require a COC from tha supplier.

U 1.2.3.1 Identification of the purchased material h

3r item (reference to P0 or procurement document.

if cn-hand, is acceptable)?

\\

l' 1.2.3.2 Identification of specified requirements l

to ha met (via list or reference to procurement jocument)?

1.2.3.3 Identification procurements not met, if iny?

_.g.....-

- 7 1

T! 2512/07 Appendix 6 CONSTRUCT 10N TEAM INSPECTION,CHECKI.!ST (v

Il GENERAL INSPECTION AREA: PROCUREMEili CONTROL 5 - SITE Date:s 2/13/u1 D

INSPECTION SITE:

_ INSPECTOR:-

DATES OF INSPECTION _f,,f _to j,_f l,

INSPECTION AREA A

E j

1.2.3.4 Signature of an appropriate member of,

suppliers QA function?-

1.2.3.5 Identification of procedures or QA.

program to be followed for. filling out review and approval of C0Cs?

1.2.3.6 Receiving inspection as the means to l

determine that purchaser / agent has vertfled by d

audit (or source verification) the validity /..

u

-i,

]

effectiveness of the supplier's COC system?

i 1.2.4 When source verification is spectfled for acceptance of an item in addition to a C0C, is the appropriate receiving inspection organization i

)

aware of the source verification results?

1 1.2. 5 Do material receiving inspection records 5

indicate compliance with acceptance requirements?

1.2.6 Are nonconfoming items properly tagged and segregated?

1.2.7 Does the procurement documentation show that the specific procurement requirements such as c des, standards, and other specifications, have i

been met for the purchased material or equipment?

I Also, have selected material and physical requirements in the procurement document been met' i

1.2.8 Has other documentation (e.g., test.

material and inspection data) presented with certificates of comp 1tance been reviewed by ttchnical personnel who are capable (through experience, education or training) to assure that components meet all spectfled safety-related s.

requirements? Do other vendor documentation (naterial, test, inspection, etc.) include rsquired data?

~ ~.

c.

x -

- -~

~,!

i s,,,'

(

TI 2512/07 Appendix 6 CONSTRUCTION TEAM INSPECTION CHECKLIST (a

e s

o. 1 GENERAL INSPECTION AREA: PROCUREMENT CONTROLS - SITE Date:s 2/13/81 t

~

l INSPECTION SITE:

INSPECTOR:-

DATES OF INSPECTION _ / J _to_ /_/

INSPECTION ARE/.

ACP NE FINDINGS L

1.2 9 In cases where the receiving inspection-function has identified a nonconformance which l relates to a deviation from specified requirements n3t previously identified on the C0C or other vendor supplied documentatinn, does the corrective action proposed include a need to re-audit the vendors system for preparation and issuance of a C0C7 Also, was the " deviation" subject to a Part 21 evaluation?

1.3 Storage ANSI N45.2.2 1.3.1 Are the work and QA/QC procedures established to conduct activities of storage-for safety-related items in Class A, B, C and D levels of storage adequate?

1.3.2 Do the facilities for storage of Class A ^

~

equipment have an environmentally controlled atmosphere and provisions to prevent animals (especially rodents) and birds from entering?

1.3.3 Are the facilities for Class B, C and D equipment storage satisfactory?

1.3.4 Is protection from damage during storage ad:quate?

1.3.5 Is testing equipment available and suit-able for intended use?

1.3.6 Are records of storage conditions being 3,

maintained as specified and are.they current?

Do the records reflect that the specified st:: rage conditions are being met?

___.c a

~

TI 2512/07 Appendix 6 CONSTRUCTION TEAM INSPECTION CHECKLIST Page 6 of 6 Reviiloii No.7 GENERAL INSPECTION AREA PROCUlt.EMEN(,9ETROLS - SITE Date:, 2/13/81 C

INSPECTION SITE:

INSPECTOR:-

DATES OF INSPECTION / 1 to_ f _ /

IllSI'ECT10ll AREA A

Pull E FillDillGS I 3.7 llave appropriate controls been imposed on g

. access to storage aress?

l I

i I

4 J.

y f* N

~

6.0 Pullman-Higgins (P-H) 6.1 Organization 6.1a1 Pullman-Higgins (P-H) is of the Pullman Powe~r Products Division (Williamsport, Pa. ) of Pullman, Inc.

P-H is responsible for field fabrication of piping systems to meet UE and C specifications and applicable ASME and B31.1 requirements.

$3B Inspection focused on P-H ASME pipe welding to verify system and personnel adequacy and to evaluate th(effectiveness implement of appnoved procedures by responsible personnel.

Included..La the

(

inspection was a review of the YAEC surveillance and auditing activities of P-H welding activities.

6.1 Areas Insp 5ptetSc. m areas inspected included filler metal controls, QC Insp,ection activities, interview of weldors and welding foremen, weldor training and per-formance qualification, QC weld monitoring, machine GTA butt, welding, ANI/P-H inter ace for weldor quali-fication and pipe welding, and control of austenitic stainless steel welding to avoid sensitization.

Tours l

of the site were made to observe pipe welding and weldor i

i performance qualification testing.

The inspector reviewed procedures and specifications for conformance to regulatory rqquirements and to determine their effectiveness in providing measures to control special processes.

5,3 Ftvdwo

.g41 web. % # au4.fW w m % L W w -

\\

6 Tha NRC Inspsetor 'ravicw2d tha walder parformance procedures used b P-H for 4o snper e. M ii.n7I,q w ne"weldorgalified ite A detailed analysis was% qua.1made of the

' sp t

['

,f ', ]

and off-site

(

g controls exercised in the maintenance of, identification during welding and evaluation of the test assemblies.

The NRC Inspector attended a typical indoctrination course where a recently qualified weldor is instructed to understand those portions of the Field Weld Process Sheet and the Weld Rod Stores Reauisition applicable

.to the weldor

, Pullman Power Prodtic,ts PH001 dated j

12/

1 Laocuctions for Weldors" is read to and with the weldor.

D

.A review was made of the P-H 6/21/82 Qualified Weldor Li,st which indicated that 95 of the cur. rent

+ 36[eldors[M)were qualified by' weldingpoff-

~

tassemblie[underP-HQCSupervision.

site All except 3 welded P-H Standard Welding Test SWT #1.

Weldors qualified off-site were trained and tested at UA Welding Schools at Seabrook, N. H.; Cleveland, Ohio; Terre Haute, Indiana; or Pasco, Washington.

All of the Seabrook, N.

H., test assemblies were radiographed by P-H at the Seabrook Site.

The disposition sheets for the RT are maintained with the ASME PQR document.

4 Currently (since 6'/82), weldors qualified'off site are photographed by the P-H QC Welding Inspector supervising the welding and the photographs are referred to at time of employment at the Seabrook Site.

4 ho Vlok Ab N i i

t, '

(,,$,1 3 evteuJ e{ D d W b bb The NRC Inspector discussed with P-H the lack of ff clarity in

. directions to the weldor provided by the welding parameter table which is Attachment ~5 to PH001 and which is issued by the Weld

~

Rod Issue Stations w3.th all filler metal.

P-H indicated changes would be made to the presentation of the GTAW parameters to provide more explicit information for the welding.of. consumable inssrts,and other GTAW welding.

Included with the proposed changes to PH001 would also be a review of th,e method of present;ing the GTA j

lian elec{nca l parameters in tlie WPS documents.

The NRC Inspector interviewed a number of weldors

'and welding. foremdn.to review information on their s

training, qualification testing, and unde'rstanding of the variables in'dicated in the ASME WPS documents.

2 Specific questions were aske

requirem

)

Ac6J uv. n,.

for accept'able oxygen level in purge, gag.

The P-H welding foremen and weldors have not been trained in the purpose and content of these documents that con-stitute the ASME WPS.

Both the P_H general welding specificatlons(e.g.,GWS-III)'andP-HWeldingPro-cedure Specifications (e.g., IT1 -III-1 -KI-12) are

~

needed to constitute the complete list of essential,

' non.-essential and supplementary essential variables required'by the ASME Code.

QW,100.1 and QW-200.1 indicate that the manufacturer or contractor shall 9

e

g 3

prepare written WPS documents to provide direction to the weldor while making welds to Code requirements.

Contrary to this requirement, the weldor cannot receive directions from the WP,S documents when neither the weldors nor the welding foremen who technically assist wekYS the weixts are instructed in the P-H GWS and dee. mute:4

  • P-H Welding Procedure Specification ~s Inspection p

indicated that these documents were physically avail-able for reference by the weldorp at the QC Welding Inspectors Stand,,but, as the weldors did not know of.the existence of these documents, they could not provide " directions to the weldor" as required by ASME Section III N'A 4133 9 and Sections IX' QW 100.1 and QW 200.1 (a) M DA WSM

  • M eG)k ' M -Ot e 2.b.A,e Q p a;%

Mew I4S*^Etd a

uue % mde a s

g#

h. vio\\w4b k ION b

.gy:l k et w L- =

O e

e 0

,n.

e, Welding Filler Metal Control Review GaiO A review was made of filler metal control system inelod m g.

GEtun initial indication of filler metal type on the P-H ISO drawing, storage of filler metal' at the Rod Issue Stations, issuance control measures and return of stubs and unused filler metal.

Personnel in the QA Engineering Process area and in Rod R'ooms #4 and #1 were interviewed to determine their understafnding of the control measures No violations in the filler metal control system were identified.

e i

O 8

e O

e e

6 e

8 e

G S

O S

e e

e O

9 9

e G

9 e

e O

e 9

e

,w-

~,..-...,

, _,...,... - _. -., ~., -

,n

\\

'p.3 k Machina Orbiting GTA Butt Welding

{

+be The NRC Inspector reviewed ttle status of the sub-ject welding activities previously reported in combined reports 50-W3/81-07; 50-4W/81-06 and report 50-W3/81-13 The following welds have been completed and m.it ASME radiographic soundness requirements in the as-welded condition as of the dates indicated:

RC-8-01, F 0101 3/24/82 F 0102 3/24/82 F 0103 3/17/82 RC-5-01, F 0101 4/2/82.

F 0102 3/29/82 F 0103 3/29/82 RC-2-01, F 0101 4/19/82 F 0102 4/21 /8 2 F 0103

/12/82 RC-11-01,F 0102 28/82 F 0103 23/82

- - F 0104 4/30/82 These welds will be re-radiographed for final ASME acceptance following ISI grinding.'

uo vi olgh % ida~d 6M S

e e

G 9

e e

e w

, ~

-,o---w.----

,m m--

e,

o 6.3.5 AuthoriEed Nuclear Inspector (ANI) Interface with P-H The inspector interviewed three Royal Insurance Co ANI's and their, supervisor to review their actitities in weldor qualification, routine weld hold point inspections, and to solicit information on any specific areas of concern for the quality of pipe welds currently being produced.

The ANI's provide routine unannounced surveillance inspection.of the P-H Site Training and Qualification Test Shop.

They insure that the stencil numbers assigned are not duplication of existing stencils.

They, check union card identification, but do not specifically verify the weldor's picture badge identification.

They check the test assemblies for permananii fixturing and proper stenciled identification of test assemblies.

The ANI follows NCA 5254 and ANSI N 626.2 - 1976 Paragraph 4 2.9.

The ANI's have questioned the qualifications and called for requalification testing of three weldors during erection of the Seabrook Site.

The inspector checked 6 ANI interoffice memoranda that indicated ANI review of WPS and PQR documents and the ANI chronological log lists for this activity dated 6/9/8,0 and 6/18/82.

A cursory review of the ANI log entries was made by the inspector.

%s%

hMdM4 gg $

p'amx S \\c$ %

A4

\\

pft MM u a p p dlhe A m & e -

aW s

m

% gh qu Me a

. w ad m a U + A. 4

  • 2 tu # A,

=

t

\\

~~

t 6 3.6 Review of Audits of P-H Welding Activities The inspector reviewed YAEC weekly survie11ance reports numbers 163 to 175 for the period 2/27/82 to 5/22/82 and interviewed the YAEC personnel performing the surveillance.

A weekly report activity report is made and YAEC-Framingham is informally kept up to date witbitthe surveillance information.

The inspector reviewed YAEC Audit Reports SA 598CSao3 (November 21.i., 25,1981 December 3,8 a 30, 1981 - January 6. 7. & 19,1982) and SA 596CS202 (March 8-10,1982). Audit Report SA $98CS203 indicated as one of the areas of concern that P H was not conducting weld monitoring in compliance with their QA Procedure Requirements stated in Document X-10 paragraphs 5.1, 5.2, and 5 3.

Paragraph 5.2 requires monitoring each weldor at a minimum of once every three months (which is a relaxation of a previous re,quirem6nt for monthly

'Eunkn m "

T W C A A 4 4 Q* N Y 3'.

_p,

h' * '-

monitorin ib b 4 D h +4

~

}

    • 'r. *.

~

n u

p

, y"I ? '; 5 -,,.

B 4

4

.v*

  • a I

e

m....,.. -. - -..,.,

,,m.r_

6.3 6 Review of Audits of P-H Welding Activities Ths inspe'ctor reviewed YAEC weekly surviellance

~

reports numbers 163 to 175 for the period 2/27/82 to 5/22/82 and interviewed the YAEC personnel performing the surveillance.

A weekly report activity report is made and YAEC-Framingham is informally kept up to date withitthe surveillance information.

The inspector reviewed YAEC Audit Reports SA 598CS203 (November 214., 25, 1981 - December 3,8 & 30, 1981 - January 6

7. & 19,1982) and SA 596CS202 (March 8-10,1982). Audit Report SA 598CS203 indicated as one of the areas of concern that P H was not conducting weld monitoring in compliance with their QA Procedure Requirements stated in Document X-10 paragraphs 5.1, 5.2, and 5.3.

Paragraph 5.2 r,equires monitoring each weldor at a minimum of once every three months (which is a relaxation of a previous re i

6 t for monthly monitoring)brJ3Mn.er+1ga4furemnWC bat 4E 'Q k i-4 WNt444M M 3. _,

... m.-p.-,

M{%

C.

as

-a,

f t,

,4 i

e 4

O y

,-r-.

,w-r

%e-

chowing discrepancies signed off as reviewed with no comment, (2) incomplete and questionable record entries, (3) travel speed, T-am erage and voltage outside the range of the WPS.

commendations from this review include improved training in the requirmments of Procedure X-10 end revisions to the WPS documents to broaden the paramenter ranges.

The NRC inspec. tor i

requested that a review be made of the effect of changes in joulian heat input ranges on notch toughness require-mants and sensitization (where applicable) and to generally review the clarity of parameter tables for consumable insirt $ fusion and GTAW.

(As further stated in paragraph 6.3.1).

a e

o

%wgye w.awu% M c(,, M AeAvMdo oeA e % %

p._ w t u,e u k Q, u.

A= m ^ ^ *$

WQ Auew hko.

r w % g # w w waaw m, y% v, w% \\;

hy@l h M i

to cca se

~

l w---

.,w--,

,,_g-----,_-,-.-w-ym

_,.9,

,--____,--.9.

-..-s,,

--c-

-4

1--

,e b i1 i1

,,._b

  • k'_

_.A.C M N 7

6 h k ga A u o! % h ac3s

. w we e\\ ch

%A-,e S

wde uuc~4 te.-% q 6 4 haAg..

T-4 M 'u e

a~A umn 43 04 th 4# o fg. J2-A A hsut. catu.4~3 y

MD I

m M.I m ov e.

h A p er-tt x tt 7 ~ q & g 4 x-u At b b M M

.geK1 a I

n am &+m w nd

~

LA ghcdAd v Mtito

<uace hp g,h> pes b W u.s%m, %

Qi, s weaJ ae I

So J to W warg gh wau em u m ma L

,Wj n % y hem t a4v cw q w 5 4 % y m s-d he y cu k w hQ %s pu wh w

wA. % gl'J 4 %

hu i-M4y%MkWalG!a k %

s&,

JA.

%su Taa 6 { yw W 9 Wan_4 m

s

=*-4.

'-4-w 4

g-4 b

b o

e

  • 9 w

kw a % % ** Q1 i~L wx

  • W h h,.$e~- ms w wu

. M na+

.M o u$ 2+%

J W "A 2 %

aw wed M q R m%

g aD c

m-h O.L Qll

_0 Q

s b %$

M u s t % ?-8-- w 4 m, N\\tc* e smd YA M W

      • &c@kh, 6

1 9

f, O, Q tt eItl7 As><<* L 3I Ot1MI19'b' 3 lel F.<b/ri Jeevile%,

y p/ jf,, j),,,,,j,,y [pfgjj) g,'f h<!

ennIl reifm.idil'4

/,e yua/,1,,.,,a,,,,,,-(pgj I'! de/ya/<d' W erk M s % w/ m J,,.;,j,.,,,,/,4,1v b S h 9A fny+~<

h 44ee dk4 st cJric I

%f~y (Y4s-c), PSx // 7"'/'t'$' l y!?" !?,4

+h e o payre by K yaarlett 0A Smiedia, y

Atf rhi h V4sc, y p,,te,9, y g - yem.<,J m J b, repre/cu /,Ji~

oi Heeheyi

.aJ4 y'sec y

~cece selec/sJ anus,1 y4e e, c4c4rr -,< d sda m b-chrs 3.1.1.

yMc lui < niinaJ <<>pmisb '!<'h or ne I"<

l'"'l' m aI< at A ~ l* y '{l Y & ?if,'?I<iv-o1 9 A n + a c. y sinee #cr ~

are Lon i I - q u,,t,'l y cminI (ec) y ed[

s.4enir d or f.r his a elib,' int ni ;1 ths'leL Eyihrer'.s m) Cm 7jyac l<rJ,, /n cy(cieac), E Zm riracG // wye, $< eec,,ainy, aifeelire od.r M ye.

Jevei 2. - Led //o ue G y'sec m,j/

a<J Ullfu pai- % ed 1,7 Laacl l arymi2al&u

~1ly 05 sc m eiu i( ~ J strucJun/ a&nio

<u C'

$.D lll l'$'$fi{

f/l$$&

l've'l $

- A< k /.s by Y4EC m ac/su~o'lles o f Ees'vt l m d Ki bet 2 u p,,'z a li k u.] y eac4 i

Le**cf f Nd '2~

14btsi h/Clc7oI gcln,e[hth/

b

~

[

$'5 C'

M' s

\\

\\

yerfw ~<d by

/Leir arym:2.a?/ dis, 1

NGh.+

my an w wnu

$.s

ii-n c

,s a 9,ly,',;%,up k

Gewpl 1er -W dieechk o /

tI~ y

~

e lo H

yer, Cm ikc/tk q A

[94 M) irr 44. Yk&c "7T,dc g,<c e, y,go s,z

= = g = w y+ y'] cec ad&

q&

n

??

w<f<<%d17 ad;/ ri refirhiv y A /4 QM

~1 amyneL p. A wfnk a frie, v4 GPt h rec k s rc{,,p, m,

p p M i.F 4g

~ ~. -

f hfstrMCr

' WY l'1-

$h Mtf n ia n t k & n d f"J " l-pk vue h

auf y'A Y YkDpt sc sPsvev;// o sd G&

+4e d i~c/&

7,uy, m r,le, eder faett eA q

of a fvjerth&,<b.+/ All OA(O QS A MA ecf rk k + th, c,ayrah t/~<yr, ac/04,%&w

$"*l' Y Anar~cc (R.t QA] +ktwy4 14 dwp~,- fgnh

~

QA.

5 e

,e O

O

~

~

~~

---m

  • "*. hew 4 1995_
    • '**e-wm,,

Wee

-e%,

3-2 drer/ Init, clcl 21

,:,qW 11a issy echs mchcIsd YAEc ad,/

s,~<<% ce y,,yrm,,j as a.r,-,,th,1<< ~/

a mi q c p,,y,,.,<.s, g k,

,; ; q,,p n ai,,Jc A

o b!'r*'s W

.s fx fut o I emr/rwc h ~ s1 at-lwr //

cmJlWm o f g, n. et<,

n. i ip oc le reau:.-,l ar,%

k Fr eac4 yroytm a,., J re ce /<mi,- i,1 l,<<ike / u,aye - / m.f

~

f

& scleele J 9A (ersee/; m1 nati -e/ sefuk/

d oce m lr.

Poliedt mJ froce ef<res w,re revu;< <d y ratry,cp,)< m Ar..r(<ais?/,1 de c,,, ta -.ac 4

g n,,>< a ta i.a,<.,1~ u,e a, espc,,,.aa4si p

g a a r u,.,,,; s. c n ;. u,

~ i w, w,. t,,c i,, a ;

m,yc m J c-p. /,/ p./Ny ac/>.hk unn

~1 HAe-eL, p~,m /- ik fr<vi-i d a w iseJ

.+6 >~

9 r uy,,, i ti/,f, a u,/dre:/y ~<1 s., <<7 emf !"ff th) Inl"- "I'"'Ni' b.14 5-nil, M i,~, (<a-m/p d n,% olirr 6mheI<r'l sta f,Q; mi p< bf~ ^I"' Ar "I'''''"

mf sJ-mIr <kr.i; exy,,,,:a,,,,,s,ei,in a b;;<,4 /r<ATv;

~

DHrr u, k vis.-i d & c cri f i < ~7emA s.<jfel,' poc.<m //

l*rrJ f '*NI' ~ ' ' * ;lel m< M nJ s.<wntha 'e's $4 d</?, to s

en-.i p i.nl..i, ~ g,1, n,.eearJi o f es es c h s e etkis,;

t' ~ ~<

~ c tw o

Q

' % = 3.. ! !,.54 n! :, v<yrrfr k "'f'""O #

1

=l ':

e %

rec,vli./ i1,ye ~ h in~d'7' l

f e

1 i

. = - - -

-m-

3. 3 F i n ct m,d S,

p 3.3.I v', la h m.s y;7% gggiar~~ M k'!$nif echr revte*s fl lretriiny md ycse/&$r,cerltm

~

teorh af.selecIed

,riorne/ ey<yned' b & UEL C y

Field g 4 c,wf, k<cedi, /

+,n

,, j, _,e-re:. id,

.cer-llSi<l as yaat< C&,1 Ov L<a! t 5 4

,t n a,,c Sarveillmce. Jbeu e r, 4 la. corIc'lica./cs,' did noS aeF1 a M/ wkiet Iby

  • 7"5'N I den ia'ly

.ga.

4

$o fathy w J.< r v st ll51/~<,

Tl1 M CM WY N as d

%(ynle

% d-J N.. X-3,"na<l3r'c</ti>

car b '$rc a fd, oO twpe G,Teihb & Mu?'E"*

L fern n e t, saeM

2. v.c Aict., Ma ni & 7 e W i s n e f S 4 d / b e $ c e w lc d I n fK< Ilk U *bS *[ b, iseG<J.?y K.;dlie Ay affafnil< Ar m

0 ok e~f yee:

-Qcpllies ya. Jet Idb("lk"'~

1 nu t, < aus

,i % en o, senh, o, enf"

wh<n ry&ai % F ae G-1iu a $ c l & y u ~ /< /

0' 7

y agn ynkIr jncaJaic/ -v1 a ec~j "M I

j y <a << pal < 1b ace el-

,74 pau fa ec law- %e sl?t-M-t8 V4 t'/P '-o G-

) L p,'

i n

~

j ).]. x Wahr.rht hilalkhm fpnLns.

Dar,4 4Le sile Mr & wfec U obtr>~r 1 41-- Flc 42.Sur!Jl1r^f' V < l< r s l,( i ok i la lle l L n a t/.,, /

oui bw(dlay h < J him dujined in sn l o c s l1 0 U t o ' '_ b m r*acA e

4 reiZ1fn eiy.1 6 f,

fryi7.t, rfac< /r(" NI"'

m J n m,c Le/unes iniIrwe4;ar win wi%'I 4 4

ele {er nikg.

Ma s'estallbh er vib!W>1l1 ML

  • eny b <<". ""7-a bcujicJ uil4 0

1 C-in< ((w ws 9 741 - F - 10 t L 7 L

.16 {es JLJ wa/a,.i4f a 4,b< }ac</od I&N h#W Ven rJ C.,-

her re m Try c1 &. & " f m b j Id>

m ~ b -rf*r m;/1s h ~b c l y o I o

'n +a Ne fure<r TarMeck,u/

ikth cK2 win ava,'falky

~

g*

  • n '*'Im04 6' 4ba als k o i to cep so, g yyen t& s,

[n'leriM Z Ad4 reywire/

Mah ae hbsl!N d

d et h %

7a d. % t be y,lscrIlich 17 eff f p r, c eb re.s e

4 3

i i

i i

' ~ - ~ C' n.,

3,3,1

$synWlcm/ 'OSofert/etltbJ 2 1. 3..I

_ W ee lc H e rf The i

relW~ fevtew'I Scleclcf VAE C Sl lP QA survdi/m.cs refirft m J w.,,(d ref e b y

ol sered /Imcr ds<r eb J~ ary.fM- /, J n e ITF1 y rc y tril.

  • F.sservdil cuce oI klI' ~

.Th ~f^f-P,eiew r e4.l

-r e.*,'

(P-ID J

m,J de (<<,ieu v e' Wj7 11 1 ware ee-ce~<J.

y Idrule'ffr/ m !L - Sete ref a4) in (N"NN j

wer<

w&el h he skr+~n m

vi#

s'r,fe m bc.m e

(ro e e r/

sb se f1.i.?l%

wcflor Kr#

  • b d tIclo/tl l

re c <<-Js &

JUcwsitl>v w44 YAEC e<rrecIek ec {c mi la/cen hevedM*

no r<Ie Fe'F sk de fdienciht.

rik.

Tk i t/f ecltv revikt d VAE c atilsof,i o /

S tct n 1. A pri (, l # L on d f-Y durt"1 June

+k f.Ilwi s '

idowM sel

, gt

  • A ude I A. ss a t es ist %,,E 17 4lm d e S' U'"',

i m f e d I'**

l 1Je,.FiCau i,,Jd J <*'y w </eer ua.!i.,

I

~

I'-g q A ymem, p<fe(d uols>in /

  • b h (dea </<lir.Ily reje/u%k cleJc'ctiary a/t.
  • 5 e

sm.eIIfmee nd f-Il Gtler~/ ae4h,-

YAE c v.,, w

./

j +>.1 hl re e m m de.J

'"

  • c r

e ~f re h en tr've A,d o e frida /iLO es/<//*t*wh t

is

s. asuial raprv u Li u -.w'.,,,vT -lp a h ~ rn i

l f r= y re t4 s1 l

. c <> y <> d e 7.<y7tr$ I, 4 St tl is reyubed -

7

.=::

i ful & Ao Jf s 73 c 5 t tt, d v, k,- ttH - Jav e9 I9M_ ---

rk.

W Ilewbe'/(e/ fark g,p, hd cfei, f,.af,,y,,/

A le //er te e twwn Jed m ygr a 4 1ltiolv<~'d k

f-lh b aum m n efGeta.1e maai n + minf*/

}gk QA porm-Auld-No..rA ste c3 zosi )Y,, l 19tl ~ lla,la'fal t

l ~ewly defari-cas.

riu anj;;

, y,,, t, tau k

(rt A*'y arra/o S cacern: ma /s af idmh'In=l'*

mJ v e L l u s irr in.r. T 4 le I/< r w is o.rf.r /ed h l-9-ll m ~ y c m A ss a.i /<s/ /11~ detI'"'%'

t A m_ t c<~ < <.%, a, m m 4. a,,,,,,,2 5<'fm/nby f-Hk We e,< Ja'/.s & a aef.J/e k

+= c crreeFa r a e % k n T.<.uv i u u w/ defelimeus l

b4

.1 1 da'J uol-aclewledyr ow!/ml

,, j,,'

N r*g W MPvt <$ g. htN19,f W f(YfgC/

("[

'O

'** A "" ' -

l r"[<///,&.e IO.I, leas, Ouri 4 +k f" 4 'p*j""

\\.

I n-r-n cm tuchJ fe ve aLGlehut uJ&

wr,e ol-wree W<

aehe k. In D s'd. eA d'0'I"*"

i 6,;g ecyreeleI arecyI<&y, in a e aic, ua l

w.,,e e<> grr.,4.r y p r / wLi ayain vec n*** L

/acg,vu j

4w.<st.'4 h. fq-/ c<rg4 <ya c ~ 4<c/< l t

j m eet ir et.

Y= : -. - J P-H ~~ ye m l- "-->

%1 I,,

b< sua c 11ad ly se </olue J 14 m ouIdiyaled b e u ~ ca-14 /<.a.ita si2,91,1.&J,tA.snsnatu Weit CM TIdired' l* be traI,*$ m J u nek myeJ, t

j e

+w ew------m-

-+v we-ww-

-y-

O A

i ifecW revu'~el rewh of %dc c -

,,- 4 ec h si 4alec, b

Y45c I, egr,<c /

14 p-H m,nya,,F l

y m1 fry r m u /ic de {d su tik jdeak'fG/ elk!5 rveillmcc acJ eqJrVr, rk I?Il5.7 'c'k'h l

y'isee su wen cr ~ <:r ee k pe ute k,Qantily Arturawe 6c'*I""I Y45C laa, 4,4 h Ai rk february lYPl. ref tr$ di/c w//S N

~

f n

/- ~A14AA locic of f-g o. c<y(ry,,,le say,,k led &

~#

f

%Ia mactry kJ &arn rek h " #'"

V<cc fnn Jse/- o 4 e udfly Jrre ute r

k reivin +4a ~ dn 74 aetun reyaciej l

dIrcurr< d }l YU *I 8(n(,l9FL re P-fl Cwf nlr _gy cdh Yksc wed17 rcj r-li k in w p m.t, n

<<,,,rti

  • l-J ~ ~ <y !< 't !L, J m any u,19 FL, r/re4 tr, i 9 FL N d n

J n. wp&d

!!*y *qjf t,l,fununeJ*-ek Jy Vi m'm ye 4 acJ.icu.s, n p a capns4 j

bWeie r 1 - u,,e /,9 -, M P-t/ siVe ia myed e u carniry -het< J +,kl

~ 1 (.ir'/ <k w'" k'^'

y

= c %,

l4 an a ( bwvv/-

0 K<flrrly Q f

{1s wtileb'*fe Ju e<//eJ Jung 1

p.H yr,y nu 4neu -as

}

i4 r =. X y a J m.< ary n, i m.,

o[ rb aab

$ tY irscebl w sik f $ l" lc f

~

{a als earcethe ac k L, ei a&caud. sie m.t

\\

l em cer 11 -o-e i a ed'421 as wat.t swr >,Ihri% ~d N ea h'Cita hin, y.Q 3 j,, fed 4Ml GA m levas /

-u

'c i+YAg c [,f4 a h p/ '

a6 a.a i

4r - " e etw <i< g tri w /,

'~

o s

a a < 1- ~,,,,~, n ro s,, a a u p.,

0 ducette1 g

P-I[ Je /c 2iem c As m J VASC $kl N IHJfC L

$*o olhth

+ b k c-w,r e c d e k,., g y g g c,g, u y,. Q,.

frdlemj I, < J lo ren idea lilfr d b, k'AEC soh ya/ly f-IlthS"'I eimore/ as we ll 9A m a au J,,l y,'y 9stdIl0r3 d y r~ t n M o d - } 9fl os,s J cn u umsto *t/

0CC4///N1J ll4rc 4 Skrh y ff[g (_

isqetsjen& s*'t1 a w< cc., & ll e (,,Llemi m.t I,aL a 64~ /<1 b ofk'"

j c yy-(gl-g y'4 gy/g fry f-ll

^ ~ -

L'~'

^

I

/

/e gj l-- JiH Cr J**'" " ! f p N -i e. g n -

^

a r

.g I

j"'"

4.)oS.

._lvu<. A h,l'1P L,}l-e m*J r T

f.-en CorKJ, we (,l. & J.,y,Gy Q m 4 fo,.ia }.- [dP+tl5bIcult 14 w~erx 7 F l ll v *t m, / v e J m J m >~<

rkW e FAl'" A4 i

N*

la iscl[ o l-g dejue/e.rycevOI FarIw-c h

,.,, 2 a f e.(i N m ~s d h k !v r*I"

... ! - a; of. flu f~// O A-

.u 47 cle,he c ies seFei is a w,a4,1er/ o& Me YHc P ' 7'm -

(? coy <m Stre f j

3.3. 2. 2.

p.h n ae a !

yts e m:1.4 L j..v.==! "'O I' ::!c ;;:l-]

& A

. '. '. l. -u llk__ft-u ud c l., -

f dif et.lsr n., M,, A ga

'!J I'

Nsf ecle revNs.aeJ #L Y46C Qu f

TL

<qwi r fe/ec,/e] Qu.AVN & iN"',9 *

.f ttrveillo>< ce krsber.4-s rug,

^

e t'aclcd at.L pnum riv t(W'e A -

l+1lrtr/ te") werc r

n I

l were I

ref -1 J.revel thin-e/,e jel perimneI ra 14 ex Jc/ m g g, 4

I.

i

_.,-....y

- Iv.ltrouwcl 8'

y p;,,nn,lpicek1 6 L h~t<&Jle 'E M eir helels.m J w,4 y od I"b "'~'"

"f ~ " '

well "f'" A

"'I N 'W" di w er<.

a.< R l-ce f

.bqh J.

L/- LL W yidm f"I"""' '?I" h

p. Rece a < ja /igu

n. k~"#

o A A m. t m.

sI we SI en~d'"" n,i-c us;1er e k '" j ie hr1 t

z, g.g.a. caut< o f y,,N c uaa,t e

y<CM fid4*f it

..j

f. f,,jp1 i

V!

. I a"j'p n d sarceril,,

rb 7ullAde/m-w n y u tlIy F &

"tj 'eI1(k' arc y

  • KN f 7"' '

)

7 jronj SL,J le L3r 2,3 kccry afe

~

fl j

Ibse -

~ ~ ~ ~ ~

3a.3. 2.!..H n,, x 7. e u p g

~~

t5 WW reve em 1 pf,,t aye >um A jg,l,,L f

refgbs fy. j 9 y Q np-x,

(ta(gg g, et-i,s t.

l

% 3-H-3 ai< Jlld t w r ec h k a c h h, m.1 // a,

i h ~l a < L' led de.<ef, em }n / ac.h b s'Iat. Oui m A' L

d-l

_s4 Flo'c aceEli w,'it, y'4sc su~ay< mmA Jhcloid yrew A wp A/

ace.t %r.,, + w. t ~ ' au+ fLe

~

es FisA$~

o<1-aF

~

ura va.,, A o

ec. 7<-

i, a i

~

M my e onA 1,h, TLe scole o/ R.e aa< la'i.e 4 < J l'er" re/I'r cId ;

th

!9 M wl 19F-2.,

i[,

cyJa.,y. k of,),gh in (,y. m,// m

(

' T W w.l.

le.e e h m tr'c v l+t c hy-crev a{l CMlrai' VIt Sh sr % /

a i

yeay>-o>-1,4 '~ -__7 -' ': =:L[.. p ; ; ~,'4je-l o& M Q.A

(=~-

-. u l

l*

g & 4:=,w su; &,;/ a.. [ L. w S = $y m % e -u < a Wy.0 tm an-4 Ar m n IAI!i

--a,-~

n-

-_a a,

-n m

-,eas-

-e m

.-a,--

4 4

-,-- + _ _.

y a

m enu snu-9

^^

_ mee 6 N hM h "

m - "- - - -

,4 m

,gg,.

9

  • 9 e

W s.

z-1r vr s c4 e - A 2 "

r-12 -se %af 4 e&g w 2.

/d WA J.2c4 f.a.ti^$aL. n MS *- LXhe,h

~

O I

O f

? $A) k.

A k E_! f

$8, a

km -A e444 4 ~B. e44,< a;%

P

%f l As,A eA+ pc. en$ef i

l I

i l

l

---..----,7 n,

n,

- ~ ' *

'E m

9 s

e i

f;eso s-a %nsa

}%e Mr fang

)

0 Fo u?

SM

/

f.

e

/ #

p ub UNITED STATES

+

?#

NUCLEAR REGULATORY COMMISSION

[..

f,a nEGION I f

$31 PARK AVENUE e

,g

/

niNa'OP PRUS$1 A PENNSYLVANIA 1,408

[

JUN 0 41982 MEMORANDUM FOR:

F. J. Miraglia, Jr., Chief, Licensing Branch 3, NRR FROM:

R. W. Starostecki, Director, Division of Project and

}

Resident Programs

./

SUBJECT:

10 CFR 2.206 PETITION REGARDING THE FINANCIAL QUALIFICATIONS OFTHEPUBLICSERVICECOMPANYOFNEWHAMPSHIRE(PSNH) i This forwards Region I's plans relative to the petition filed on February 8, 1982 by the Seacoast Anti-Pollution League.

Region I will provide technical infomation to NRR to assist in the reply to the subject petition. This infomation will be provided after the Construction Assessment Team (CAT) inspection at Seabrook Station has been completed and documented. The CAT inspection is presently scheduled to begin on June 21 and end on July 2, 1982. Documentation of the findings of the inspection will be available during the week of July 19, 1982. Region I will supply infomation as requested in Mr. Grosso's March 26, 1982 memorandum by August 6,1982.

We foresee the scope of our input to include:

our assessment of the construction-Quality Assurance Program at Seabrook i~

the results of our review of the implementation of the QA program by the i

\\

T utility i

/ -- an evaluation of the quality controls implemented at the site sa-an analysis of quality control problems identified by the utility and i

4 the NRC to detemine trends and causal linkages among these problems If you have questions regarding our plans, do not hesitate to contact me.

t l

R. W. Staros ecki, % Director s

,l 0 Division of Project and Resident Programs cc:

s A. Grosso, ELD l

A. Cerne, SRI Seabrook

-4. Durr DETP,, RI L. Wheeler,NRR D. Eisenhut, NRR l

R A O V

Cl O.

lv V" U %v

.a w

-