                                                            /                                                                 Page 1 of 13 FACP-3 TITI.E:           Handling Contractor Engineering Documents on Westinghouse NSSS Material, Equipment and/or Components for kequired Interface with Westinghouse Site Representative Y*      *      *
/
                                                                              "~               . _ . . . .
j Page 1 of 13 FACP-3 TITI.E:
l   ,
Handling Contractor Engineering Documents on Westinghouse NSSS Material, Equipment and/or Components for kequired Interface with Westinghouse Site Representative Y*
[h G.                                                                                 -
"~
I, RE7.           DATE                       DESCRIPTION                     PDi             RE       PS-QC/QA         RCM e $                        PW"A# AMON                                 APPROVAL                             APPROVAL O           PREPARED BY                         DATE     RESIDEiT CIGR.                 DATE           PROJ. ING. MGR.             DATE R. A. Hersom                     1/26/81   77/, Q,                     f t8 Cl .'r   ,    v.g ,
l
                                                                                                                                    ,    m ,,, ., ,
[h G.
h7                             APPROVAL                                 APPROVAL                                 ISSUANCE 8$           F'-     SUPT. QC/Q                 DATE       r-     r'I/CCNSTR. MGR,   2 ATE         DATE ORTG. ISSUE         PROC.NO.
I, RE7.
4 /         .
DATE DESCRIPTION PDi RE PS-QC/QA RCM PW"A# AMON APPROVAL APPROVAL e
                                                                        .s  'M               k                   4/30/81             F AC?-3 *
O PREPARED BY DATE RESIDEiT CIGR.
    @g$           This document is the property of (ited                           ears (s Constm2ccors Inc. and is to be cla.g         returned upon completion of the (                             DEABROOK STATION                       ) project. It is loaned in confidence and upon the condition that it will not be reproduced in l
DATE PROJ. ING. MGR.
      .          whole or in part nor will the information contained in it be disclosed except as
DATE R. A. Hersom 1/26/81 77/, Q, f t8 Cl.'r v.g,
                  - 2       m-- aa. -- . . a n - -- n--.
m,,,.,,
h7 APPROVAL APPROVAL ISSUANCE 8$
F'-
SUPT. QC/Q DATE r-r'I/CCNSTR. MGR, 2 ATE DATE ORTG. ISSUE PROC.NO.
4 /
'M k
4/30/81 F AC?-3 *
.s
@g$
This document is the property of (ited ears (s Constm2ccors Inc. and is to be cla.g returned upon completion of the (
DEABROOK STATION
) project.
It is loaned in confidence and upon the condition that it will not be reproduced in l
whole or in part nor will the information contained in it be disclosed except as
- 2 m--
aa. --.. a n - -- n--.


mited en gineers haconsvucersnc SEABROOK STATION P ROC. NO.       DATE ORIGINAL ISSUE REVISION NO.       DATE OF REVISION FACP-3         4-30-81                 0                                     2       ., 13
haconsvucersnc gineers mited en SEABROOK STATION P ROC. NO.
                                                                                                              .Aet 1.0 SCOPE 1.1 These instructions provide the method for obtaining Westinghouse Site Representative concurrence for any Site Contractor Engineering Document which is issued against Westinghouse Nuclear Steam Supply System (NSSS) material, equipment and/* "-,                     _ . . . . .
DATE ORIGINAL ISSUE REVISION NO.
2.0 PURPOSE 2.1 The pu       se of these instructions s                   provide the necessary direct 21on and responsibility in order to assure that Site
DATE OF REVISION FACP-3 4-30-81 0
                                              /
2 13
Contractor Engineering D                 nts affe\ct:ing Westinghouse NSSS
.Aet 1.0 SCOPE 1.1 These instructions provide the method for obtaining Westinghouse Site Representative concurrence for any Site Contractor Engineering Document which is issued against Westinghouse Nuclear Steam Supply System (NSSS) material, equipment and/* "-,
                '                          /                 /
2.0 PURPOSE 2.1 The pu se of these instructions s provide the necessary direct 21on and responsibility in order to assure that Site
/
nts affe\\
Contractor Engineering D ct:ing Westinghouse NSSS
/
/
N V.
Items are reviewed by Westinghouse Site Representative.
Items are reviewed by Westinghouse Site Representative.
N V.                      2.2  Thes/einstructions/                   e     w             \
Thes/einstructions/ e w
also establish a channel of coussunication ad                         -
\\
                                                                    ^               '
2.2 also establish a channel of coussunication ad fo/
                                                      /                                          I fo/                                                          UE&C, Westinghosse, 1 r responsibility E between Site Contracors, I TAEC Construction (Sitei anu uu.v vuuuuucuon Manager I(Framingham) in tiesolvin *S,Q;3f,aset actor agineering Documents kffecting Westinghouse \ NSSS items.
/
                                    \
I
3.0 RESPONSIBILITIES N
^
!                                      \
r responsibility between Site Contracors, I UE&C, Westinghosse, 1
3.1 UE&C4Jtesident Construction Engineer shall be responsible for co-ordin               entation of this croce                         11 Contractor's Engineering Documents.
E TAEC Construction (Sitei anu uu.v vuuuuucuon Manager I(Framingham) in tiesolvin *S,Q;3f,aset actor agineering Documents kffecting Westing \\
l                             3.2 UE&C Construction Engineering Field Administrator (CEFA) will be I
house NSSS items.
responsible for obtaining Westinghouse Site Representative appro-l val of all Contractor Nonconformance Report's related to t' %                         Westinghouse NSSS items.
\\
U                                                                                                                             -
N 3.0 RESPONSIBILITIES
\\
3.1 UE&C4Jtesident Construction Engineer shall be responsible for co-ordin entation of this croce 11 Contractor's Engineering Documents.
l 3.2 UE&C Construction Engineering Field Administrator (CEFA) will be I
responsible for obtaining Westinghouse Site Representative appro-l val of all Contractor Nonconformance Report's related to t' %
Westinghouse NSSS items.
U


so,
so,
                                                        .E         h                                       SEABROOK STATION P AOC. he.         DATE CAresmak ettet ht yttson no. DATE OF REVISION FACP-3           4-30-31             0                                       3       13 3.3 UE&C Power Engineering will be responsible for interfacing with Westinghouse Site Representative to resolve Contractor's Engi-neering questions and/or problems related to Westinghouse NSSS items.
.E h
; ',                              ~
SEABROOK STATION P AOC. he.
3.4 Westinghouse Site Repres utative will review all Contracter'=                               --
DATE CAresmak ettet ht yttson no.
Engineeridg questions and/or%blerts reist                       o Westinghouse NSSS
DATE OF REVISION FACP-3 4-30-31 0
                                                        /
3 13 3.3 UE&C Power Engineering will be responsible for interfacing with Westinghouse Site Representative to resolve Contractor's Engi-neering questions and/or problems related to Westinghouse NSSS items.
items and reconusend dispositions                   /
~
                                                                                                  \
Westinghouse Site Repres utative will review all Contracter'=
                                                                                          , responses   and/or concurrences as I
3.4 Engineeridg questions and/or%blerts reist o Westinghouse NSSS
noted in this procedure.                           (
/
3.5 UEEC       nstruction Manag             shall be esponsible to determine
items and reconusend dispositions \\/
                      ~
, responses and/or concurrences as I
h
(
                                                    /                    /
noted in this procedure.
whether or not a backcharge would be requtwed       N              as a result of -
3.5 UEEC nstruction Manag shall be esponsible to determine
Ce                                                            a Westinghouse        SS ig.ractor'sEng,iaering,Do7ument7et,atedt                                   '
/
f                                       ,
/
I               V 3.6 PE&C Contract Adminiserr                 " " '-
N
                                                                                                        }ibleforco-o inating
~
                                                                \                                    <                    l iresolution of aI2 backc\   harg          lac >ed to p acinghouse NSSB items.
h whether or not a backcharge would be requtwed as a result of -
3.7
ig.ractor'sEng,iaering,Do7ument7et,atedt Ce a Westinghouse SS f
                                                                  \
I V
Site contractor shall be responsible far/ initiating reqdired               /
}ibleforco-o 3.6 PE&C Contract Adminiserr inating iresolution of aI2 backc\\ lac >ed to p acinghouse NSSB items.
                                            \Engineering Documents     % in acuerfa/                                  /
\\
l harg
\\
/
Site contractor shall be responsible far/ initiating reqdired 3.7
\\
/
Engineering Documents in acuerfa/
nce with their procedure (s) and
nce with their procedure (s) and
                                                \
\\
sub'mittal to UE&C, as required.
sub'mittal to UE&C, as required.
3.8 The         e W ndividuals or departments _                       in this procedure shall mean the individual holding the title or his designee, unless specifically excluded.
3.8 The e W ndividuals or departments _
            .                1
in this procedure shall mean the individual holding the title or his designee, unless specifically excluded.
1


          , n. ,
, n.,
mitad ennineers aconswucasre. e SEABROOK STATION r
mitad ennineers aconswucasre. e SEABROOK STATION r
PROC.No.                 DATE GRitenAL ISSUS AC VISION Ng.       DATE OF NEV1310N FACP-3                                     0                                              4 4-30-81                                                       ,,,            ,    13 4.0 CENERAL 4.1 References 4.1.1       FACP Project Instructions for Handling Contractor Nonconformance Report I
PROC.No.
4.1.2       FACP Handling Contractor's Incident Interf=~ * - - __                                   -
DATE GRitenAL ISSUS AC VISION Ng.
4.1.3 FGdP Design Chan b tice, F                                           nge Request, En/                                     T gineer Change Approval, Site pyrove Change and Request or Information.                           i k
DATE OF NEV1310N FACP-3 4-30-81 0
4.1.4 AP Changes t                         oject Documents
4 13 4.0 CENERAL 4.1 References 4.1.1 FACP Project Instructions for Handling Contractor Nonconformance Report I
            ^
4.1.2 FACP Handling Contractor's Incident Interf=~ * - - __
4.1.
4.1.3 FGdP Design Chan b tice, F nge Request, En/
e                                                    FCAP-1-- Fie           Construction Conte               Administration Procedure
T gineer Change Approval, Site pyrove Change and Request or Information.
( ./                                     4.        6 All Contradtor's Py^cedures \                          Ryated t{ Engineering         uments.     Doc /
i k
4.1.4 AP Changes t oject Documents
^
e 4.1.
FCAP-1-- Fie Construction Conte Administration Procedure
(./
\\
All Contradtor's Py^cedures Ryated t{ Engineering Doc /
4.
6 uments.
/
5.0 PROCEDSRE - PRELIMINARY REOUIREMENTS
5.0 PROCEDSRE - PRELIMINARY REOUIREMENTS
                                                                          /                                          ]
]
1 5.1 Prerequisites I
1 5.1 Prerequisites I
                                                '5.1.1         All Engineering Documints subai                   'd by Contractors to UE&C, k
'5.1.1 All Engineering Documints subai
relating to 9se Qnghouse_                     items, will meet ti Contractor's procedural requirements.
'd by Contractors to UE&C, k
l                                               5.1.2         In responding and/or issueing either an4CA or RFI, J
relating to 9se Qnghouse_
Westinghouse :u.ce Representative must supply a Westinghouse
items, will meet ti Contractor's procedural requirements.
      ,                                                        Shop Order Number under the reference document section of the Project Change Form (see Reference 4.1.3).
l 5.1.2 In responding and/or issueing either an4CA or RFI, J
i 5.1.3         Prior to initiating the work resulting from an answered and/or approved Contractor Engineering Document, which has
Westinghouse :u.ce Representative must supply a Westinghouse Shop Order Number under the reference document section of the Project Change Form (see Reference 4.1.3).
          /     ,
i 5.1.3 Prior to initiating the work resulting from an answered and/or approved Contractor Engineering Document, which has
i                                                                                                                                                                     .
/
i l
l l
l l
l


SEABROOK STATION pa0C No.             DATE ONIGINAL ISSUE NEV1510m No. I OAft OF REvlsl0N FACP-3             4-30-81             0                                       5         13 been determined by UE&C Construction Management to be backchargeable, one of the following must be obtained:
SEABROOK STATION pa0C No.
DATE ONIGINAL ISSUE NEV1510m No.
I OAft OF REvlsl0N FACP-3 4-30-81 0
5 13 been determined by UE&C Construction Management to be backchargeable, one of the following must be obtained:
5.1.3.1 Westinghouse Site Representative signs authorization to backcharge with the concurrence of Westinghouse Projects Personnel.
5.1.3.1 Westinghouse Site Representative signs authorization to backcharge with the concurrence of Westinghouse Projects Personnel.
5#1.3.2 A release fr h NH/YAEC ,beenreceivedbyUE&Cpo s
I
I
                                                                                            \
,beenreceivedbyUE&Cpo 5 1.3.2 A release fr h NH/YAEC s
\\
/
do work not accepted as backchargeable by Westingbouse.
do work not accepted as backchargeable by Westingbouse.
                                                                                                                                        /
f 5.2 Precautions l
5.2 Precautions f
5.2.1 In addition to theaparticular w uirements delineated thin thisprocedur/
l 5.2.1         In addition to theaparticular w uirements delineated                     thin
/
          -    ,N                                         thisprocedur/    e for required Westi             ouse interface, all
,N e for required Westi ouse interface, all and/or,approvaldy,UE&CofContractorEng sering r
                                                                                                                                    /
response Documents shall also meet the require lments noted the I
              * ''                                          response r
l applicable UE&C. -
and/or,approvaldy,UE&CofContractorEng sering Documents shall also meet the require lments noted                   the
l_...
        '                                                          I applicable UE&C . -         l_...
# 's
/
5.2.2 No Site roved. g,AC will be issued
*UE&C Resident Construction Enginee n response to Contractor's ting to Westinghouse /
Engineering Docume NSSS items.
All required design changes will be issued Engineering Approvals, (ECA) only.
6.0 DETAILED PROCEDURE 6.1 Contractor Nonconformance Reports - NCR 6.1.1 Contractor's Nonconformance Reports relating to Westinghouse NSSS items shall be submitted to UE&C as required by I
Contractor's Procedure.
l
l
                                                                                                        /
5.2.2          No Site      roved . g,#AC's              will be issued        *UE&C Resident Construction Enginee              n response to Contractor's Engineering Docume                ting to Westinghouse      NSSS / items.
All required design changes will be issued                  Engineering Approvals, (ECA) only.
6.0 DETAILED PROCEDURE 6.1 Contractor Nonconformance Reports - NCR 6.1.1        Contractor's Nonconformance Reports relating to Westinghouse NSSS items shall be submitted to UE&C as required by I                                                Contractor's Procedure.
l                                                                                                                                              *


      /-
/-
mited ennineers aacrwvuewsrc U                                       SEABROOK STATION n noc. no.       mart onie mat issue   as vision me. nave or navassom FACP-3           4-30-81               0
mited ennineers U
                                                                                                ,,,,      6 ,, 13
SEABROOK STATION aacrwvuewsrc n noc. no.
    =             -.
mart onie mat issue as vision me.
nave or navassom FACP-3 4-30-81 0
6 13
=
6.1.1.1 Upon receipt, UE&C Construction Engineer Field Administrator shall forward copies of the Contractors Nonconformance Report to the following:
6.1.1.1 Upon receipt, UE&C Construction Engineer Field Administrator shall forward copies of the Contractors Nonconformance Report to the following:
6.1.1.1.1 YAEC - QA (Site) 6.1.1.1.2     YAEC - Construction Manager (T*               2-j l 6.1.1.1.3 f
6.1.1.1.1 YAEC - QA (Site) 6.1.1.1.2 YAEC - Construction Manager (T*
Construction (Site)
2-j l f
                                                                            /
6.1.1.1.3 Construction (Site)
6.1.1.1.4 YAEC P ject Manager (Framingham) 6.1.1.1.5       UE&C I/
/
QA 6.1.1.1.           estinghou         p. (Site)
6.1.1.1.4 YAEC P ject Manager (Framingham)
N           6.1.2   Westinghous Site Representative shall review Contractor's V                   f
I/
                          /   Nonconform/ance Repo             proposa^rt, a Adisp,osition and forw/   ard
6.1.1.1.5 UE&C QA 6.1.1.1.
                                          /
estinghou
1 to UE& Cit:onstruction Engineering FieId Admisnistrator                 /
: p. (Site)
i assuringcomple:..........^j..1imlationandinstructions I
N 6.1.2 Westinghous Site Representative shall review Contractor's V
                                        \                             /       /
/
to do the work,           neces p , arejprovided.
Nonconform/ance Repo ^rt, A
t        Note:
proposa a disp,osition and forw/
X Westinghouse           Site Repre/ sentative's     signature on the "Non'     ormance Ressew Board Response Form" to a Contractor         neonformance Report consiitutes spe-cific approval to do the described work, whether work is backchargeable or not. Additionally, Westinghouse Site Representative /shall denote which require revisions and w Q Lbe' responsible for making T.h'ese required revisions and forwarding these revised. drawings to carry out the work.
f ard
/
1
/
to UE& Cit:onstruction Engineering FieId Admisnistrator i
I assuringcomple:..........^j..1imlationandinstructions
\\
/
/
to do the work, neces p, arejprovided.
X Westinghouse Site Repre/
t Note:
sentative's signature on the "Non' ormance Ressew Board Response Form" to a Contractor neonformance Report consiitutes spe-cific approval to do the described work, whether work is backchargeable or not. Additionally, Westinghouse Site Representative /shall denote which require revisions and w Q Lbe' responsible for making T.h'ese required revisions and forwarding these revised. drawings to carry out the work.
6.1.2.1 UE&C Construction Engineering Field Administrator shall expedite the approval of the dispositioned Nonconformance Report, in accordance with Reference
6.1.2.1 UE&C Construction Engineering Field Administrator shall expedite the approval of the dispositioned Nonconformance Report, in accordance with Reference
        .g                               4.1.1, assuring Westinghouse Site Representive has
.g 4.1.1, assuring Westinghouse Site Representive has
~
~
signed the Nonconformance Review Board Response Form                         .'
signed the Nonconformance Review Board Response Form for the Nonconformance Report.
for the Nonconformance Report.


mited engineers
mited engineers
                                            & oc''stmcws m                                   SEABROOK STATION emoc. wo.         one ommust issus er visio n wo. onrr or arvestow FACP-3           4-30-81             0                           , se     7    y 13 6.1.2.1.1   UE&C Construction Field Administration shall assure that the UE&C Mechanical Liaison Engineer reviewed and approved all Westinghouse dispositions to Contractors Nonconfor==~ * -           __...
& oc''stmcws m SEABROOK STATION emoc. wo.
6.1.2.1.2   U MEonstrue                   near Field T     /
one ommust issus er visio n wo.
Admini rator shall forward copies of the dispo      tie /ned Contractor Nonconformanc     e
onrr or arvestow FACP-3 4-30-81 0
                                                                                  \
7 13
eport to t         persons, as noted in I                                                               Faragraph 6.1.1. .
, se y
Y                                                     f           h 6.2 Contractor Limited Wo*k Aartherizations - LWA             ,
6.1.2.1.1 UE&C Construction Field Administration shall assure that the UE&C Mechanical Liaison Engineer reviewed and approved all Westinghouse dispositions to Contractors Nonconfor==~ * -
l 6 .1     Contrac rs Limited Work Authorizations on a Noncon ormance i
6.1.2.1.2 U MEonstrue near Field T
i Report related to UE&C s requi l
/
wescingnouse asss items shall b submitted ractor s Procedures.
Admini rator shall forward copies of the tie /ned Contractor Nonconformanc dispo e
l t
\\
6.2.2    Upon rece\ UE&C Resident                     Con /Engineer shall struction                      obtain ipt. t             s concurrenceofWestinghouseSiteRepresentativ/               e for the Limited Work Authorization.
eport to t persons, as noted in I
: 6. . J Fantine. house slee Wanea--- stive concurrence shall be noted by initialing and dating the Limited Work Authorization.
Faragraph 6.1.1..
Y f
h l
6.2 Contractor Limited Wo*k Aartherizations - LWA 6.1 Contrac rs Limited Work Authorizations on a Noncon ormance i
i l
Report related wescingnouse asss items shall b submitted to UE&C s requi ractor s Procedures.
Upon rece\\ UE&C Resident Con /
t 6.2.2 ipt. t s
struction Engineer shall obtain concurrenceofWestinghouseSiteRepresentativ/
e for the Limited Work Authorization.
: 6.. J Fantine. house slee Wanea--- stive concurrence shall be noted by initialing and dating the Limited Work Authorization.
6.2.2.2 Approved Limited Work Authorization shall then be signed by UE&C Resident Construction Engineer and returned to the applicable Contractor.
6.2.2.2 Approved Limited Work Authorization shall then be signed by UE&C Resident Construction Engineer and returned to the applicable Contractor.
9
9


a conswucers rr.                                 SEABROOK STATION e moc. mo.         e47s onminaLissus arvision no. mars or navisiom FACP-3             4-30-81         0                                     ,,,,      8 ,        13 6.2.3     If Westinghouse Site Representative does not concur with
a conswucers rr.
                          .                    the Contractors Limited Work Authorizatiot, he shall explain on Limited Work Authorization why dissaproved, initial and date the Limited Work Authorization and return it to UE&C Resident Construction Engineer.
SEABROOK STATION e moc. mo.
6 2.3.1 UE&C Resident           strucci                 eer shall then also disapprove the L           ed Work Authorization and forward to the a li able contractor.
e47s onminaLissus arvision no.
6.3 Contnactor Request fo                   nformatien -
mars or navisiom FACP-3 4-30-81 0
          ,N j                                       f                                               g                 *
8 13 6.2.3 If Westinghouse Site Representative does not concur with the Contractors Limited Work Authorizatiot, he shall explain on Limited Work Authorization why dissaproved, initial and date the Limited Work Authorization and return it to UE&C Resident Construction Engineer.
( _-/                             6.3!1   Contracto         Reque     .            tions relating to Westin         use NSS. "..
6 2.3.1 UE&C Resident strucci eer shall then also disapprove the L ed Work Authorization and forward to the a li able contractor.
                                                                                  ^
6.3 Contnactor Request fo nformatien -
                                                                                ..._.. be su       tted to UE&C as require by Contractor's Procedure.
,N j
f g
(
/
6.3!1 Contracto Reque tions relating to Westin use NSS. "..
..._.. be su tted to UE&C as
^
require by Contractor's Procedure.
r
r
                                        .3.2   Upon receipt, UE&C Residen                     tion Engineer shall
.3.2 Upon receipt, UE&C Residen tion Engineer shall
                                                            \       L assign UEEC Power Engineer responsible for the Raquest for l
\\
Informatio\n anddorward espue/stothefollowing/                       :
L assign UEEC Power Engineer responsible for the Raquest for l
6.3.2.1 YAEC - QA (Site) 6.3.2.2 YAEC - Construction Manag                             ngham) 6.3.2.3 YAEG - construction (Site) 6.3.2.4 YAEC - Project Manager (Premingham) l l   ,- ^)
Informatio\\n anddorward espue/stothefollowing/
I                                                                                               - - - - - -          - - - -  - - . . -      - - - - -
6.3.2.1 YAEC - QA (Site) 6.3.2.2 YAEC - Construction Manag ngham) 6.3.2.3 YAEG - construction (Site) 6.3.2.4 YAEC - Project Manager (Premingham) l l
,- ^)
I


s mited annineers a constructors re. U                               SEABROOK STATION PROC.NO.             DATE ORtSINAL ISSUE RE VISION NO. DATE CF REV838cas FACP-3                                 0
s mited annineers a constructors re. U SEABROOK STATION PROC.NO.
__                        _ _ _ _      _                      4-30-81                                       ,,,,  9   ,, 13 6.3.3   UE&C Power Engineering shall forward a ccpy of the Contractor Request for information to Westinghouse Site Representative.
DATE ORtSINAL ISSUE RE VISION NO.
DATE CF REV838cas FACP-3 4-30-81 0
9 13 6.3.3 UE&C Power Engineering shall forward a ccpy of the Contractor Request for information to Westinghouse Site Representative.
6.3.3.1 UE&C Power Engineering shall obtain a response
6.3.3.1 UE&C Power Engineering shall obtain a response
                                                                **~- me=*innhouse Site ReprseeWative and complete               '
**~- me=*innhouse Site ReprseeWative and complete h
h              [
[
theRFI,asrequiredbpeference4.1.3.
theRFI,asrequiredbpeference4.1.3.
                                                                                    $/
$/
6.3.3.2WestinghouseSitepeyresentativeinputshall
6.3.3.2WestinghouseSitepeyresentativeinputshall
                                                                                    / l include the a pficabLe Westinghouse Shop order
/
              .'                                                Numbeneas a Reference     Doesasent. \
l include the a pficabLe Westinghouse Shop order Numbeneas a Reference \\
('' ' /                                     6.3.3.3 Wes/tinghouse h presen\               tative concurrence arith
Doesasent.
                                                                /
('' ' /
required   / N be Tnoted by       1 his signin/g   line f
6.3.3.3 Wes/tinghouse h presen\\
                                                              .22-A of the Project Change Fprm.
tative concurrence arith
I l         r 6.3.3.4
/
                                                            \          W LIf an ECA/DCN wo?uldwired to resolve the RFI,
/
                                                                                              /
T 1
required N be noted by his signin/g line f
I
.22-A of the Project Change Fprm.
l r
6.3.3.4 LIf an ECA/DCN wo?uldwired to resolve the RFI,
\\
W
/
/
the Westinghouse Site Representative shall provide
the Westinghouse Site Representative shall provide
                                                                                                                  /
\\
                                                                  \
/
neces g input t3,JE&C     / Mechanical Liais/
neces g input t3,JE&C Mechanical Liais/
on Engineer to generate the ECA/DCN in accordance/         with Reference 4.1.3.
on Engineer to generate the ECA/DCN in accordance/
6.3.4     Upon receipt or cne answered RFI, UE&C Resident Construction Engineer shall, in addition to existing requirements in Reference 4.1.3, verify that a Westinghouse Shop Order Number has been added in the Reference Document section and distribute copies to those persons noted in Paragraph 6.3.2.
with Reference 4.1.3.
O                                                                                                                         9
6.3.4 Upon receipt or cne answered RFI, UE&C Resident Construction Engineer shall, in addition to existing requirements in Reference 4.1.3, verify that a Westinghouse Shop Order Number has been added in the Reference Document section and distribute copies to those persons noted in Paragraph 6.3.2.
O 9


1
^
                      .                                                                                                                          l
SEABROOK STATION pagg NO.
        ^         .
DATE GR448 MAL ISSUE REVISION NO.
                                            .                                                          SEABROOK STATION pagg NO.           DATE GR448 MAL ISSUE REVISION NO.         DATE OF REvlsl0m FACP-3                                       0 4-30-81                                                 ,,,,      10 ,,     13 6.4 Projece Change Form - FCR's and ECA's                                                                             5 6.4.1   In addition to existing requirements in Contractor                             .
DATE OF REvlsl0m FACP-3 0
Procedures and References 4.1.3 and 4.1.4, the following shall be adhered to for Field Change Request's (FCR) and Engineering Change Approvals Related to Westinehn"--                          " " " - - -
4-30-81 10,,
13 5
6.4 Projece Change Form - FCR's and ECA's 6.4.1 In addition to existing requirements in Contractor Procedures and References 4.1.3 and 4.1.4, the following shall be adhered to for Field Change Request's (FCR) and Engineering Change Approvals Related to Westinehn"--
idens
idens
                                                .4.1.1 Approval and/or d2.msa royal, as required, of a Freld Change Request                 ngineering Change Approval by the Westing i
.4.1.1 Approval and/or d2.msa royal, as required, of a Freld Change Request ngineering Change Approval by the i
ite Representative shall be note by his
Westing ite Representative shall be note by his
            )                                           signa                               Y                   -
)
ture/ on line 22-A of 'the Project Change Born.
signa /
                                                                                                                            /
Y
                                                                  .1.1.1           aini   the We jinghouse Site R resen-f,         .
/
t tative's signature shall be coordinated by i
ture on line 22-A of 'the Project Change Born.
I r      C'     L.. Z.. 1 iering for disapproved CR's      ECA'sfDCN'sonly.
.1.1.1 aini the We jinghouse Site R resen-f, tative's signature shall be coordinated by t
                                  ;        6.4.1.2 A1 ECA's relati                       We tinghouse NSSS tems shall be aproved y uu w , in accordance with Ra'ference 4.1.4.
i C'
6.4.1.3 UE&C Power Engineering shall assu                         that a Westinghouse Shop Order _N W has been added under l
L..
the Reference. Document section for disapproved FCR's and ECA's/DCN's only.
Z.. 1 i I
ering for disapproved r
ECA'sfDCN'sonly.
CR's 6.4.1.2 A1 ECA's relati We tinghouse NSSS tems shall be aproved y uu w, in accordance with Ra'ference 4.1.4.
6.4.1.3 UE&C Power Engineering shall assu that a Westinghouse Shop Order _N W has been added under the Reference. Document section for disapproved FCR's l
and ECA's/DCN's only.


(~
( ~
mited en n:. gineers aconsouctors                                            SEABROOK STATION e noc. no.         mart onisinALissus azvessow me.         mars or acvision FACP-3                                 0                                               11 ,,   13 4-30-81                                               ,,,,
mited en aconsouctors n:. gineers SEABROOK STATION e noc. no.
6.5 Project Change Continustion Sheet - ECA Close-Outs 6.5.1     In addition to existing requirements in Contractors Procedures and Reference 4.1.3, the following shall be adhered to when closing out ECA's related to Westinghouse NSSS items.                                                                         -
mart onisinALissus azvessow me.
6!5.1.1 UE&C Residen h strucci                             eer shall obtain Westinghouse Site Re T        /sentative concurrsnee for i
mars or acvision FACP-3 0
the close-out of he CA by having Westinghouse Site Re       neative i             ial Item 12 of the Pro *ect N.                                           Chaste Continuation Sheet.
11,,
(   ''                                                /         n 6.5.1.2 Westingho,use Site Re.pyesents iive concurrenceswill
13 4-30-81 6.5 Project Change Continustion Sheet - ECA Close-Outs 6.5.1 In addition to existing requirements in Contractors Procedures and Reference 4.1.3, the following shall be adhered to when closing out ECA's related to Westinghouse NSSS items.
                                                          /                                           I                 /
6!5.1.1 UE&C Residen h strucci eer shall obtain T
palso be required when "As-Bu. fits" are submitted, s                 /
/
                                                                                                    .ne Project Change
Westinghouse Site Re sentative concurrsnee for i
                                                          .as requi---     --r------i         vu ontinu
the close-out of he CA by having Westinghouse Site Re neative i ial Item 12 of the Pro *ect N.
                                                            \   leted co 6.5.1.3 Comp % pies J          of Prdject Change Cont;nuation   /
Chaste Continuation Sheet.
(
/
n 6.5.1.2 Westingho,use Site Re.pyesents iive concurrenceswill
/
I
/
palso be required when "As-Bu. fits" are submitted, s
/
.as requi---
.ne Project Change
--r------i vu ontinu
\\
6.5.1.3 Comp % pies of Prdject Change Cont;nuation leted co J
/
Sheets shaAA oe~torwarded to the following personnel:
Sheets shaAA oe~torwarded to the following personnel:
6.5.1.3.1   YAEC - QA (Site) 6.5.1.3.2   YAEC - Constrmr.bita Manager (Framinghsm) 6.5.1.3.3   YAEC - Construction (Site) l 6.5.1.3.4   YAEC Project Manager (Framinghsm) 7      's
6.5.1.3.1 YAEC - QA (Site) 6.5.1.3.2 YAEC - Constrmr.bita Manager (Framinghsm) 6.5.1.3.3 YAEC - Construction (Site) l 6.5.1.3.4 YAEC Project Manager (Framinghsm)
's 7


fx N BR aconsoucurs         nr. $98tB                               SEABROOK STATION pnoc. me.               nate onminaL issus   msvision no.         mars or navision FACP-3                   4-30-81           0                                     ,,,,    12 ,, 13 6.6 Contractor Incident Interface Report                                                                                 I
fx N BR aconsoucurs nr. $98tB SEABROOK STATION pnoc. me.
;                                          6.6.1           In addition to existing requirements in Contractor's Procedures and Reference 4.1.2, the following shall be adhered to for Contractor Incident Interface Report related to Westinghouse NSSS items:
nate onminaL issus msvision no.
6 6.1.1 Concurrence                       tingh                 Representative shall be obtained by UE&C Resident Construction i i Engineer through                 & Power Engineering by havi Westing       e Re,presen           ive sign the answered S                                                             actor Incident Inter                 e Report.
mars or navision FACP-3 4-30-81 0
                      ,.      7.0 WESTINGE USE NSSS ITEMS - BACKCBAR 7.1 I addition to                   isting requirements stated (n Reference 4. 1                   5 e following             all be     ~ ... uu ... . m uarges related o Westinghouse NSSB items:
12,,
                                                                    \
13 6.6 Contractor Incident Interface Report 6.6.1 In addition to existing requirements in Contractor's Procedures and Reference 4.1.2, the following shall be adhered to for Contractor Incident Interface Report related to Westinghouse NSSS items:
l 7.1.1             UE&C will
6 6.1.1 Concurrence tingh Representative shall be obtained by UE&C Resident Construction i
                                                                        \    apare a cost estimate for all work required.
i Engineer through
l i                                        (1.2 7t.
& Power Engineering by havi Westing e Re,presen ive sign the answered S
                                                                                            )
actor Incident Inter e Report.
7.0 WESTINGE USE NSSS ITEMS - BACKCBAR 7.1 I addition to isting requirements stated (n Reference 4.
5 1
e following all be
~...
uu.... m uarges related o
\\
Westinghouse NSSB items:
\\
l 7.1.1 UE&C will apare a cost estimate for all work required.
(1.2
)
l i
7t.
If backcharge acceptea ny Westinghouse, UE&C ill assign an account number and complete the work.
If backcharge acceptea ny Westinghouse, UE&C ill assign an account number and complete the work.
                                                              ._  1 UE&C prepares actual co=* i oice with backing and forwards to Westinghouse Site Representative.
1 UE&C prepares actual co=* i oice with backing and forwards to Westinghouse Site Representative.
7.1.2.2 Westinghouse Site Representative will be respon-sible to concur that costs are satisfactory and fowards to Westinghouse Project Manager for processing.
7.1.2.2 Westinghouse Site Representative will be respon-sible to concur that costs are satisfactory and fowards to Westinghouse Project Manager for processing.
y-e
y-e
                                                                                                                                                            /
/


                                                            .E-.                                                              SEABROOK STATION
.E SEABROOK STATION
                                                ,noc. no.               oarc onioimat issue acvision me.               oar or navision FACP-3                                                                                                 13   13 4-30-81                                                           paes             w 7.1.3     UE&C Contract Administrator shall forward copies of actual
,noc. no.
  ~~
oarc onioimat issue acvision me.
oar or navision FACP-3 13 13 4-30-81 paes w
7.1.3 UE&C Contract Administrator shall forward copies of actual
~~
cost invoices without backing to the following:
cost invoices without backing to the following:
7.1.3.1 YAEC - % (Site) 7.1.3.2 YAEC - Construction Manager (Framingham) 7.l.3.3 YAEC - Construction (Site) f ngham) 7/1.3.4 I              YAEC - ProjectNianager     \                              f(F 7.1.4   Kf the backcharge is not acce ed by Westinghouse, UE&C will forward the cost es                               e to do the work to pers                   1 noted in Paragra                       . 3.1 th           7.1.3.4.
7.1.3.1 YAEC - % (Site) 7.1.3.2 YAEC - Construction Manager (Framingham) 7.l.3.3 YAEC - Construction (Site) f 7/1.3.4 YAEC - ProjectNianager f(F ngham)
7.1.4.1 PS                     C must forward to               &C a release prio to (c                                                                 ,
I
\\
7.1.4 Kf the backcharge is not acce ed by Westinghouse, UE&C will forward the cost es e to do the work to pers 1
noted in Paragra
. 3.1 th 7.1.3.4.
7.1.4.1 PS C must forward to
&C a release prio to (c
,rk ac i
ne 7.1.4.2D,ponreceiptoftherelease,,vty.
ne 7.1.4.2D,ponreceiptoftherelease,,vty.
                                                                                                            ,rk ac            i k shall pro eed with se               r: :: _ _ _z             __. being utili d in cordi 7.1.5     UE&C will             pare a Release Statement to be signed by I
k shall pro eed with se r: :: _ _ _z
Westinghouse Si e m.,,..~.entative stating that                                       rk was completed correctly and in accordance wit                                   es;taghouse cal instructions.
__. being utili d in cordi 7.1.5 UE&C will pare a Release Statement to be signed by Westinghouse Si e m.,,..~.entative stating that rk was I
completed correctly and in accordance wit es;taghouse cal instructions.
7.1.5.1 Signed Release Statement to be returned by UE&C.
7.1.5.1 Signed Release Statement to be returned by UE&C.
DZ&C will then forward copies to those personnel l                                                                         noted in Paragraph 7.1.3.1 thru 7.1.3.4.
DZ&C will then forward copies to those personnel l
noted in Paragraph 7.1.3.1 thru 7.1.3.4.
{
{
l I
l I
G,a                                                                                                                                                             ~
l G,a
l l
~
t
l t
                                                    -            m em                                             **
m em M_-
M_-
T**"*'-
__ _                      T**"*'-
-r-,-
                                                                                                                                                        -r-,-             -}}
T
.}}

Latest revision as of 04:18, 15 December 2024

Rev 0 to FACP-3, Handling Contractor Engineering Documents on Westinghouse NSSS Matl,Equipment &/Or Components for Required Interface W/Westinghouse Site Representative
ML20072T344
Person / Time
Site: Seabrook, 05000000
Issue date: 04/30/1981
From: Hersom R, Lambert D
UNITED ENGINEERS & CONSTRUCTORS, INC.
To:
Shared Package
ML20071K200 List:
References
FOIA-82-524 FACP-3, NUDOCS 8304080047
Download: ML20072T344 (13)


Text

..

.~

l mited en

'"'"*y,*gineers

.c l

I SEABROOK STATION I'

a

/

j Page 1 of 13 FACP-3 TITI.E:

Handling Contractor Engineering Documents on Westinghouse NSSS Material, Equipment and/or Components for kequired Interface with Westinghouse Site Representative Y*

"~

l

[h G.

I, RE7.

DATE DESCRIPTION PDi RE PS-QC/QA RCM PW"A# AMON APPROVAL APPROVAL e

O PREPARED BY DATE RESIDEiT CIGR.

DATE PROJ. ING. MGR.

DATE R. A. Hersom 1/26/81 77/, Q, f t8 Cl.'r v.g,

m,,,.,,

h7 APPROVAL APPROVAL ISSUANCE 8$

F'-

SUPT. QC/Q DATE r-r'I/CCNSTR. MGR, 2 ATE DATE ORTG. ISSUE PROC.NO.

4 /

'M k

4/30/81 F AC?-3 *

.s

@g$

This document is the property of (ited ears (s Constm2ccors Inc. and is to be cla.g returned upon completion of the (

DEABROOK STATION

) project.

It is loaned in confidence and upon the condition that it will not be reproduced in l

whole or in part nor will the information contained in it be disclosed except as

- 2 m--

aa. --.. a n - -- n--.

haconsvucersnc gineers mited en SEABROOK STATION P ROC. NO.

DATE ORIGINAL ISSUE REVISION NO.

DATE OF REVISION FACP-3 4-30-81 0

2 13

.Aet 1.0 SCOPE 1.1 These instructions provide the method for obtaining Westinghouse Site Representative concurrence for any Site Contractor Engineering Document which is issued against Westinghouse Nuclear Steam Supply System (NSSS) material, equipment and/* "-,

2.0 PURPOSE 2.1 The pu se of these instructions s provide the necessary direct 21on and responsibility in order to assure that Site

/

nts affe\\

Contractor Engineering D ct:ing Westinghouse NSSS

/

/

N V.

Items are reviewed by Westinghouse Site Representative.

Thes/einstructions/ e w

\\

2.2 also establish a channel of coussunication ad fo/

/

I

^

r responsibility between Site Contracors, I UE&C, Westinghosse, 1

E TAEC Construction (Sitei anu uu.v vuuuuucuon Manager I(Framingham) in tiesolvin *S,Q;3f,aset actor agineering Documents kffecting Westing \\

house NSSS items.

\\

N 3.0 RESPONSIBILITIES

\\

3.1 UE&C4Jtesident Construction Engineer shall be responsible for co-ordin entation of this croce 11 Contractor's Engineering Documents.

l 3.2 UE&C Construction Engineering Field Administrator (CEFA) will be I

responsible for obtaining Westinghouse Site Representative appro-l val of all Contractor Nonconformance Report's related to t' %

Westinghouse NSSS items.

U

so,

.E h

SEABROOK STATION P AOC. he.

DATE CAresmak ettet ht yttson no.

DATE OF REVISION FACP-3 4-30-31 0

3 13 3.3 UE&C Power Engineering will be responsible for interfacing with Westinghouse Site Representative to resolve Contractor's Engi-neering questions and/or problems related to Westinghouse NSSS items.

~

Westinghouse Site Repres utative will review all Contracter'=

3.4 Engineeridg questions and/or%blerts reist o Westinghouse NSSS

/

items and reconusend dispositions \\/

, responses and/or concurrences as I

(

noted in this procedure.

3.5 UEEC nstruction Manag shall be esponsible to determine

/

/

N

~

h whether or not a backcharge would be requtwed as a result of -

ig.ractor'sEng,iaering,Do7ument7et,atedt Ce a Westinghouse SS f

I V

}ibleforco-o 3.6 PE&C Contract Adminiserr inating iresolution of aI2 backc\\ lac >ed to p acinghouse NSSB items.

\\

l harg

\\

/

Site contractor shall be responsible far/ initiating reqdired 3.7

\\

/

Engineering Documents in acuerfa/

nce with their procedure (s) and

\\

sub'mittal to UE&C, as required.

3.8 The e W ndividuals or departments _

in this procedure shall mean the individual holding the title or his designee, unless specifically excluded.

1

, n.,

mitad ennineers aconswucasre. e SEABROOK STATION r

PROC.No.

DATE GRitenAL ISSUS AC VISION Ng.

DATE OF NEV1310N FACP-3 4-30-81 0

4 13 4.0 CENERAL 4.1 References 4.1.1 FACP Project Instructions for Handling Contractor Nonconformance Report I

4.1.2 FACP Handling Contractor's Incident Interf=~ * - - __

4.1.3 FGdP Design Chan b tice, F nge Request, En/

T gineer Change Approval, Site pyrove Change and Request or Information.

i k

4.1.4 AP Changes t oject Documents

^

e 4.1.

FCAP-1-- Fie Construction Conte Administration Procedure

(./

\\

All Contradtor's Py^cedures Ryated t{ Engineering Doc /

4.

6 uments.

/

5.0 PROCEDSRE - PRELIMINARY REOUIREMENTS

]

1 5.1 Prerequisites I

'5.1.1 All Engineering Documints subai

'd by Contractors to UE&C, k

relating to 9se Qnghouse_

items, will meet ti Contractor's procedural requirements.

l 5.1.2 In responding and/or issueing either an4CA or RFI, J

Westinghouse :u.ce Representative must supply a Westinghouse Shop Order Number under the reference document section of the Project Change Form (see Reference 4.1.3).

i 5.1.3 Prior to initiating the work resulting from an answered and/or approved Contractor Engineering Document, which has

/

i l

l l

SEABROOK STATION pa0C No.

DATE ONIGINAL ISSUE NEV1510m No.

I OAft OF REvlsl0N FACP-3 4-30-81 0

5 13 been determined by UE&C Construction Management to be backchargeable, one of the following must be obtained:

5.1.3.1 Westinghouse Site Representative signs authorization to backcharge with the concurrence of Westinghouse Projects Personnel.

I

,beenreceivedbyUE&Cpo 5 1.3.2 A release fr h NH/YAEC s

\\

/

do work not accepted as backchargeable by Westingbouse.

f 5.2 Precautions l

5.2.1 In addition to theaparticular w uirements delineated thin thisprocedur/

/

,N e for required Westi ouse interface, all and/or,approvaldy,UE&CofContractorEng sering r

response Documents shall also meet the require lments noted the I

l applicable UE&C. -

l_...

  1. 's

/

5.2.2 No Site roved. g,AC will be issued

  • UE&C Resident Construction Enginee n response to Contractor's ting to Westinghouse /

Engineering Docume NSSS items.

All required design changes will be issued Engineering Approvals, (ECA) only.

6.0 DETAILED PROCEDURE 6.1 Contractor Nonconformance Reports - NCR 6.1.1 Contractor's Nonconformance Reports relating to Westinghouse NSSS items shall be submitted to UE&C as required by I

Contractor's Procedure.

l

/-

mited ennineers U

SEABROOK STATION aacrwvuewsrc n noc. no.

mart onie mat issue as vision me.

nave or navassom FACP-3 4-30-81 0

6 13

=

6.1.1.1 Upon receipt, UE&C Construction Engineer Field Administrator shall forward copies of the Contractors Nonconformance Report to the following:

6.1.1.1.1 YAEC - QA (Site) 6.1.1.1.2 YAEC - Construction Manager (T*

2-j l f

6.1.1.1.3 Construction (Site)

/

6.1.1.1.4 YAEC P ject Manager (Framingham)

I/

6.1.1.1.5 UE&C QA 6.1.1.1.

estinghou

p. (Site)

N 6.1.2 Westinghous Site Representative shall review Contractor's V

/

Nonconform/ance Repo ^rt, A

proposa a disp,osition and forw/

f ard

/

1

/

to UE& Cit:onstruction Engineering FieId Admisnistrator i

I assuringcomple:..........^j..1imlationandinstructions

\\

/

/

to do the work, neces p, arejprovided.

X Westinghouse Site Repre/

t Note:

sentative's signature on the "Non' ormance Ressew Board Response Form" to a Contractor neonformance Report consiitutes spe-cific approval to do the described work, whether work is backchargeable or not. Additionally, Westinghouse Site Representative /shall denote which require revisions and w Q Lbe' responsible for making T.h'ese required revisions and forwarding these revised. drawings to carry out the work.

6.1.2.1 UE&C Construction Engineering Field Administrator shall expedite the approval of the dispositioned Nonconformance Report, in accordance with Reference

.g 4.1.1, assuring Westinghouse Site Representive has

~

signed the Nonconformance Review Board Response Form for the Nonconformance Report.

mited engineers

& ocstmcws m SEABROOK STATION emoc. wo.

one ommust issus er visio n wo.

onrr or arvestow FACP-3 4-30-81 0

7 13

, se y

6.1.2.1.1 UE&C Construction Field Administration shall assure that the UE&C Mechanical Liaison Engineer reviewed and approved all Westinghouse dispositions to Contractors Nonconfor==~ * -

6.1.2.1.2 U MEonstrue near Field T

/

Admini rator shall forward copies of the tie /ned Contractor Nonconformanc dispo e

\\

eport to t persons, as noted in I

Faragraph 6.1.1..

Y f

h l

6.2 Contractor Limited Wo*k Aartherizations - LWA 6.1 Contrac rs Limited Work Authorizations on a Noncon ormance i

i l

Report related wescingnouse asss items shall b submitted to UE&C s requi ractor s Procedures.

Upon rece\\ UE&C Resident Con /

t 6.2.2 ipt. t s

struction Engineer shall obtain concurrenceofWestinghouseSiteRepresentativ/

e for the Limited Work Authorization.

6.. J Fantine. house slee Wanea--- stive concurrence shall be noted by initialing and dating the Limited Work Authorization.

6.2.2.2 Approved Limited Work Authorization shall then be signed by UE&C Resident Construction Engineer and returned to the applicable Contractor.

9

a conswucers rr.

SEABROOK STATION e moc. mo.

e47s onminaLissus arvision no.

mars or navisiom FACP-3 4-30-81 0

8 13 6.2.3 If Westinghouse Site Representative does not concur with the Contractors Limited Work Authorizatiot, he shall explain on Limited Work Authorization why dissaproved, initial and date the Limited Work Authorization and return it to UE&C Resident Construction Engineer.

6 2.3.1 UE&C Resident strucci eer shall then also disapprove the L ed Work Authorization and forward to the a li able contractor.

6.3 Contnactor Request fo nformatien -

,N j

f g

(

/

6.3!1 Contracto Reque tions relating to Westin use NSS. "..

..._.. be su tted to UE&C as

^

require by Contractor's Procedure.

r

.3.2 Upon receipt, UE&C Residen tion Engineer shall

\\

L assign UEEC Power Engineer responsible for the Raquest for l

Informatio\\n anddorward espue/stothefollowing/

6.3.2.1 YAEC - QA (Site) 6.3.2.2 YAEC - Construction Manag ngham) 6.3.2.3 YAEG - construction (Site) 6.3.2.4 YAEC - Project Manager (Premingham) l l

,- ^)

I

s mited annineers a constructors re. U SEABROOK STATION PROC.NO.

DATE ORtSINAL ISSUE RE VISION NO.

DATE CF REV838cas FACP-3 4-30-81 0

9 13 6.3.3 UE&C Power Engineering shall forward a ccpy of the Contractor Request for information to Westinghouse Site Representative.

6.3.3.1 UE&C Power Engineering shall obtain a response

    • ~- me=*innhouse Site ReprseeWative and complete h

[

theRFI,asrequiredbpeference4.1.3.

$/

6.3.3.2WestinghouseSitepeyresentativeinputshall

/

l include the a pficabLe Westinghouse Shop order Numbeneas a Reference \\

Doesasent.

( ' /

6.3.3.3 Wes/tinghouse h presen\\

tative concurrence arith

/

/

T 1

required N be noted by his signin/g line f

I

.22-A of the Project Change Fprm.

l r

6.3.3.4 LIf an ECA/DCN wo?uldwired to resolve the RFI,

\\

W

/

/

the Westinghouse Site Representative shall provide

\\

/

neces g input t3,JE&C Mechanical Liais/

on Engineer to generate the ECA/DCN in accordance/

with Reference 4.1.3.

6.3.4 Upon receipt or cne answered RFI, UE&C Resident Construction Engineer shall, in addition to existing requirements in Reference 4.1.3, verify that a Westinghouse Shop Order Number has been added in the Reference Document section and distribute copies to those persons noted in Paragraph 6.3.2.

O 9

^

SEABROOK STATION pagg NO.

DATE GR448 MAL ISSUE REVISION NO.

DATE OF REvlsl0m FACP-3 0

4-30-81 10,,

13 5

6.4 Projece Change Form - FCR's and ECA's 6.4.1 In addition to existing requirements in Contractor Procedures and References 4.1.3 and 4.1.4, the following shall be adhered to for Field Change Request's (FCR) and Engineering Change Approvals Related to Westinehn"--

idens

.4.1.1 Approval and/or d2.msa royal, as required, of a Freld Change Request ngineering Change Approval by the i

Westing ite Representative shall be note by his

)

signa /

Y

/

ture on line 22-A of 'the Project Change Born.

.1.1.1 aini the We jinghouse Site R resen-f, tative's signature shall be coordinated by t

i C'

L..

Z.. 1 i I

ering for disapproved r

ECA'sfDCN'sonly.

CR's 6.4.1.2 A1 ECA's relati We tinghouse NSSS tems shall be aproved y uu w, in accordance with Ra'ference 4.1.4.

6.4.1.3 UE&C Power Engineering shall assu that a Westinghouse Shop Order _N W has been added under the Reference. Document section for disapproved FCR's l

and ECA's/DCN's only.

( ~

mited en aconsouctors n:. gineers SEABROOK STATION e noc. no.

mart onisinALissus azvessow me.

mars or acvision FACP-3 0

11,,

13 4-30-81 6.5 Project Change Continustion Sheet - ECA Close-Outs 6.5.1 In addition to existing requirements in Contractors Procedures and Reference 4.1.3, the following shall be adhered to when closing out ECA's related to Westinghouse NSSS items.

6!5.1.1 UE&C Residen h strucci eer shall obtain T

/

Westinghouse Site Re sentative concurrsnee for i

the close-out of he CA by having Westinghouse Site Re neative i ial Item 12 of the Pro *ect N.

Chaste Continuation Sheet.

(

/

n 6.5.1.2 Westingho,use Site Re.pyesents iive concurrenceswill

/

I

/

palso be required when "As-Bu. fits" are submitted, s

/

.as requi---

.ne Project Change

--r------i vu ontinu

\\

6.5.1.3 Comp % pies of Prdject Change Cont;nuation leted co J

/

Sheets shaAA oe~torwarded to the following personnel:

6.5.1.3.1 YAEC - QA (Site) 6.5.1.3.2 YAEC - Constrmr.bita Manager (Framinghsm) 6.5.1.3.3 YAEC - Construction (Site) l 6.5.1.3.4 YAEC Project Manager (Framinghsm)

's 7

fx N BR aconsoucurs nr. $98tB SEABROOK STATION pnoc. me.

nate onminaL issus msvision no.

mars or navision FACP-3 4-30-81 0

12,,

13 6.6 Contractor Incident Interface Report 6.6.1 In addition to existing requirements in Contractor's Procedures and Reference 4.1.2, the following shall be adhered to for Contractor Incident Interface Report related to Westinghouse NSSS items:

6 6.1.1 Concurrence tingh Representative shall be obtained by UE&C Resident Construction i

i Engineer through

& Power Engineering by havi Westing e Re,presen ive sign the answered S

actor Incident Inter e Report.

7.0 WESTINGE USE NSSS ITEMS - BACKCBAR 7.1 I addition to isting requirements stated (n Reference 4.

5 1

e following all be

~...

uu.... m uarges related o

\\

Westinghouse NSSB items:

\\

l 7.1.1 UE&C will apare a cost estimate for all work required.

(1.2

)

l i

7t.

If backcharge acceptea ny Westinghouse, UE&C ill assign an account number and complete the work.

1 UE&C prepares actual co=* i oice with backing and forwards to Westinghouse Site Representative.

7.1.2.2 Westinghouse Site Representative will be respon-sible to concur that costs are satisfactory and fowards to Westinghouse Project Manager for processing.

y-e

/

.E SEABROOK STATION

,noc. no.

oarc onioimat issue acvision me.

oar or navision FACP-3 13 13 4-30-81 paes w

7.1.3 UE&C Contract Administrator shall forward copies of actual

~~

cost invoices without backing to the following:

7.1.3.1 YAEC - % (Site) 7.1.3.2 YAEC - Construction Manager (Framingham) 7.l.3.3 YAEC - Construction (Site) f 7/1.3.4 YAEC - ProjectNianager f(F ngham)

I

\\

7.1.4 Kf the backcharge is not acce ed by Westinghouse, UE&C will forward the cost es e to do the work to pers 1

noted in Paragra

. 3.1 th 7.1.3.4.

7.1.4.1 PS C must forward to

&C a release prio to (c

,rk ac i

ne 7.1.4.2D,ponreceiptoftherelease,,vty.

k shall pro eed with se r: :: _ _ _z

__. being utili d in cordi 7.1.5 UE&C will pare a Release Statement to be signed by Westinghouse Si e m.,,..~.entative stating that rk was I

completed correctly and in accordance wit es;taghouse cal instructions.

7.1.5.1 Signed Release Statement to be returned by UE&C.

DZ&C will then forward copies to those personnel l

noted in Paragraph 7.1.3.1 thru 7.1.3.4.

{