y                              MIDLAND ENERGY CENTER SPATIAL SYSTEMS INTERACTION PROGRAM / SEISMIC MGJEC PROJECT QUALITY PLAN 5               I s
MIDLAND ENERGY CENTER y
Revision 2 Q                                               June 03, lab 3 0
SPATIAL SYSTEMS INTERACTION PROGRAM / SEISMIC MGJEC PROJECT QUALITY PLAN 5
I s%
Revision 2 Q
June 03, lab 3 0
a h
a h
8 c                                      Prepared for i
8 Prepared for i
c 2          'W   k    -
c k
Censumers Power Con.cany                 .
c
  $          t            3 1945 West Parnall Read
'W 2
  )   %(  4;\0
t 3
              .%          2 N                     Jackson, Michigan 49201 5
Censumers Power Con.cany
E                    *$
%(
  ; %i " ci:.
2 1945 West Parnall Read
PREPARED BY/DATE:                         30             d-f-/8 0
)
APPROVED BY/DATE:   ,    .
N Jackson, Michigan 49201 5
A    6 E 3 l Y. OR.       T:
4;\\0
M AT 0. C.1!.Y Mark G. Jones Engineering Consultants, Inc.
% " ci:.
E i
PREPARED BY/DATE:
30 d-f-/8 0
A 6 E 3 APPROVED BY/DATE:
l Y. OR. AT 0. C.1!.Y M
T:
Mark G.
Jones Engineering Consultants, Inc.
333 Hayes Street San Francisco, Calif ornia 94102 8306140539 830607 PDR ADOCK 05000
333 Hayes Street San Francisco, Calif ornia 94102 8306140539 830607 PDR ADOCK 05000


            ','                                                                                i t
i t
l l
l MGJEC Project Quality Plan i
MGJEC Project Quality Plan
i i
                                                                                                  !. i i
TABLE QE REVISIONS i
i TABLE QE REVISIONS i
Revision 0, Date:
Revision 0, Date:   April 122 1983 Original Issue.                                                       ,
April 122 1983 Original Issue.
Revision 1, Dates   tigy_ 2A M9.3 General Revision.
Revision 1, Dates tigy_ 2A M9.3 General Revision.
Revision 2, Date:     June Im 1987 Revised Cover Sheet, Paragraphs I, III, VII, VIII, Attachment II.1;       Deleted Attachment III.1; Added Table of Revisions.
Revision 2, Date:
June Im 1987 Revised Cover Sheet, Paragraphs I, III, VII, VIII, Attachment II.1; Deleted Attachment III.1; Added Table of Revisions.
M
M
't i                                       .                                                    .
't i
I
I


Line 54: Line 65:
TABLE OF CONTENTS a
TABLE OF CONTENTS a
EASLE th2.s.
EASLE th2.s.
I I.     Purpose of the Project Quality Plan                                                         4
I I.
* II.     Index of MGJEC Quality Procedures                                                           5 III.     Project Schedule                                                                             6 IV.     Engineering Decision Documentation Requirements                                             7 V.     MGJEC/CPCo Interface Procedure                                                               O VI.     MGJEC Project Personnel                                                                     '9 VII.     References                                                                                   to VIII.     Attachments                                                                                 11 w
Purpose of the Project Quality Plan 4
II.
Index of MGJEC Quality Procedures 5
III.
Project Schedule 6
IV.
Engineering Decision Documentation Requirements 7
V.
MGJEC/CPCo Interface Procedure O
VI.
MGJEC Project Personnel
'9 VII.
References to VIII.
Attachments 11 w
I e
I e
l 3
l 3


f s       .
f s
l I. PURPOSE OF THE PROJECT QUALITY PLAN The MGJEC Project Quality Plan defines the means by which the Quality   Assurance requirements of CPCo Contract No. CP10-8764-0 shall be met.       Such requirements include, but are not limited to, quality procedures for conducting           work under the contract, internal QA audits, correspondence interface procedures and MGJEC personnel qualifications. The following Sections of this Quality                     "
l I.
Plan and the associated procedures describe in detail                       the requisite Quality Assurance items of this project.
PURPOSE OF THE PROJECT QUALITY PLAN The MGJEC Project Quality Plan defines the means by which the Quality Assurance requirements of CPCo Contract No.
The governing documents for all quality-related work performed by MGJEC personnel are the MGJEC Ouality Assurance Manual, Revision 2 and this Project Quality Plan.         The Quality   Assurance Manual describes in general terms the GA requirements for design and analysis work ,       procedures for document control, and reporting of discrepancies.         The' requirements of the MGJEC Quality Assurance Manual,   which has been previously submitted to CPCo,                     are augmented by the procedures presented.in this           Project   Quality Plan.
CP10-8764-0 shall be met.
Such requirements include, but are not limited to, quality procedures for conducting work under the
: contract, internal QA audits, correspondence interface procedures and MGJEC personnel qualifications.
The following Sections of this Quality Plan and the associated procedures describe in detail the requisite Quality Assurance items of this project.
The governing documents for all quality-related work performed by MGJEC personnel are the MGJEC Ouality Assurance Manual, Revision 2
and this Project Quality Plan.
The Quality Assurance Manual describes in general terms the GA requirements for design and analysis work,
procedures for document control, and reporting of discrepancies.
The' requirements of the MGJEC Quality Assurance
: Manual, which has been previously submitted to
: CPCo, are augmented by the procedures presented.in this Project Quality Plan.
D a
D a
4
4


                                                                                    '      ~
~
s                 .
s I
I e
e l
l II. INDEX OF MGJEC QUALITY PROCEDURES The documented measures established to ensure conformance to the project quality-related CPCo contract requirements are provided herein.
II.
4                                                                                                                                 .
INDEX OF MGJEC QUALITY PROCEDURES The documented measures established to ensure conformance to the project quality-related CPCo contract requirements are provided herein.
The Project Quality Procedures (Attachment II.1) and                   the MGJEC Quality Assurance Manual                 (Reference 2)       contain the specific '
4 The Project Quality Procedures (Attachment II.1) and the MGJEC Quality Assurance Manual (Reference 2) contain the specific '
requirements             and instructions necessary for MGJEC personnel to perform   all quality-related tasks.                 Contract requirements             are cross-referenced to the specific MGJEC Quality document and shown l                         in Attachment II.2.
requirements and instructions necessary for MGJEC personnel to perform all quality-related tasks.
MGJEC   procedures shall not be used by project personnel without evidence of CPCo review and approval either by cover stamps                             and approval   signature (s)             on the first page or by                 approval signature (s)             contained on a cover sheet attached to                       the procedure.                                              .
Contract requirements are cross-referenced to the specific MGJEC Quality document and shown l
Procurement of quality related items and services shall                         not           be
in Attachment II.2.
                                                                                                                            ~
MGJEC procedures shall not be used by project personnel without evidence of CPCo review and approval either by cover stamps and approval signature (s) on the first page or by approval signature (s) contained on a
undertaken without appropriate procedures and CPCo approval.
cover sheet attached to the procedure.
Preparation             of   Specifications and drawings and performance of design review activities currently do not apply to                     the MGJEC scope of work.                 In the event such activities become necessary, they shall be undertaken following the generation of                   appropriate procedures and approval by CPCo.
Procurement of quality related items and services shall not be undertaken without appropriate procedures and CPCo approval.
: i.                                                                                                                      .
~
Preparation of Specifications and drawings and performance of design review activities currently do not apply to the MGJEC scope of work.
In the event such activities become necessary, they shall be undertaken following the generation of appropriate procedures and approval by CPCo.
i.
9
9
_____._____~_c                -...,.-v--                           . .          +-,   ,  ,..--r   e - ~ ~ - - -   w e
~ c
-...,.-v--
+-,
,..--r e
- ~ ~ - - -
w e


i   s III. PROJECT SCHEDULE The SSIP/S Schedule consists of three major phases:           Phase I, Program Definition; Phase   II, Inspections and   Resolutions; Phase III, Program Finali:ation.     Each phase is   divided into discrete identifiable tasks to permit thorough planning and effective control of the work. Client requirements, key milestones, and other general scheduling constraints are identified.                      .
i s
III.
PROJECT SCHEDULE The SSIP/S Schedule consists of three major phases:
Phase I,
Program Definition; Phase II, Inspections and Resolutions; Phase
: III, Program Finali:ation.
Each phase is divided into discrete identifiable tasks to permit thorough planning and effective control of the work.
Client requirements, key milestones, and other general scheduling constraints are identified.
e 4
e 4
4
4
    =
=
6 6
6 6
L           .
L


s         .
s IV.
l IV. ENGINEERING DECISION DOCUMENTATION REQUIREMENTS Engineering decisions resulting from the execution of the various SSIP/S work tasks are documented and retained in accordance with established MGJEC Procedures and Quality Assurance Program.
ENGINEERING DECISION DOCUMENTATION REQUIREMENTS Engineering decisions resulting from the execution of the various SSIP/S work tasks are documented and retained in accordance with established MGJEC Procedures and Quality Assurance Program.
Specific documentation requirements f or engineering decisions and tasks defined in the SSIP/S Manual (Reference 1) are presented in Attachment IV.1.
Specific documentation requirements f or engineering decisions and tasks defined in the SSIP/S Manual (Reference 1) are presented in Attachment IV.1.
w 4
w 4
Line 96: Line 145:


s i
s i
V.     MGJEC - CPCo INTERFACE PROCEDURE The    MGJEC      -
V.
CPCo   interface requirements   are specified and controlled by MGJEC Procedure No.         8301-PIP-1-0 (see Attachment II.1).       This       procedure   defines   the   MGJEC                       interface responsibilities,         including external interfaces with                     CPCo   and other project participants.
MGJEC - CPCo INTERFACE PROCEDURE CPCo interface requirements are specified and The MGJEC controlled by MGJEC Procedure No.
8301-PIP-1-0 (see Attachment II.1).
This procedure defines the MGJEC interface responsibilities, including external interfaces with CPCo and other project participants.
Exhibit A of Procedure 8301-PIP-1-0 shall be used as Exhibit 10.1 oof the MGJEC Quality Assurance Manual for this project.
Exhibit A of Procedure 8301-PIP-1-0 shall be used as Exhibit 10.1 oof the MGJEC Quality Assurance Manual for this project.
* I M
I M
e 1
e 1
8                                                           l
8


s 3
s 3
VI.             MGJEC PROJECT PERSONNEL Resumes         and   job     descriptions     of     MGJEC               technical                                       personnel assigned to the SSIP/S will be transmitted to CPCo f or review and
VI.
;            approval.         All       records relating           to job-specific                                                   training, verification of           education,       experience,                       certifications                                       and licenses as required by contract will be retained in MGJEC                                                                       home office files and will be available for CPCo inspection upon
MGJEC PROJECT PERSONNEL Resumes and job descriptions of MGJEC technical personnel assigned to the SSIP/S will be transmitted to CPCo f or review and approval.
* request.
All records relating to job-specific
: training, verification of education, experience, certifications and licenses as required by contract will be retained in MGJEC home office files and will be available for CPCo inspection upon request.
4 3
4 3
w i
w i
Line 113: Line 165:
9
9


VII. REFERENCdS
VII.
: 1.   " Program Manual:   Spatial Systems Interaction Program /
REFERENCdS 1.
" Program Manual:
Spatial Systems Interaction Program /
Seismic, Midland Energy Center," Consumers Power Company.
Seismic, Midland Energy Center," Consumers Power Company.
: 2. MGJEC Quality Assurance Manual (Revision 2).
2.
MGJEC Quality Assurance Manual (Revision 2).
e 10
e 10


s l
s l
l       .
l VIII.
VIII.      ATTACHMENTS II.1 -
ATTACHMENTS MGJEC Quality Procedures II.1 II.2 Quality Procedures Cross-Reference IV.1 SSIP/S Engineering Decision Documentation Requirements
MGJEC Quality Procedures II.2 -
.e 1
Quality Procedures Cross-Reference IV.1 -
SSIP/S   Engineering       Decision   Documentation Requirements
                                                                                      .e 1
4 11
4 11


s ATTACHMENT II.1                                     Page 1 of 2 Midland Energy Center Spatial Systems Interaction Program / Seismic MGJEC Quality Procedures Index MGJEC Procedure No.                                                 Title STD-1-Q                                 Qualifications               of     Quality                   Assurance Audit Personnel ATP-1-Q                                 Procedure         for         Control           of                 Project Correspondence l                                     ATP-2-Q                                 Procedure         for Distributing                                 Quality-
s ATTACHMENT II.1 Page 1 of 2 Midland Energy Center Spatial Systems Interaction Program / Seismic MGJEC Quality Procedures Index MGJEC Procedure No.
!                                                                            Related Procedures ATP-4-0                                 Procedure       for Providing Orientation                                   to the MGJEC Quality Assurance Program ATP-5-0                                 Procedure           for           Providing                         Project Orientation ATP-6-Q                                 Procedure           for         Performing                         Internal Quality Assurance Audits ATP-7-Q                                 Procedure for Training MGJEC Audit                                         Team ~
Title STD-1-Q Qualifications of Quality Assurance Audit Personnel ATP-1-Q Procedure for Control of Project Correspondence l
ATP-2-Q Procedure for Distributing Quality-Related Procedures ATP-4-0 Procedure for Providing Orientation to the MGJEC Quality Assurance Program ATP-5-0 Procedure for Providing Project Orientation ATP-6-Q Procedure for Performing Internal Quality Assurance Audits ATP-7-Q Procedure for Training MGJEC Audit Team ~
Members
Members
                          ~
~
ATP-8-Q                                 Procedure         for         Control. of                         Computer Programs ATP-9-Q                                 10CFR21     - Procedure               for     Reporting                   of Defects and Noncompliance ATP-10-Q                                 Procedure for Document Control ATP-11-0                         .      Procedure          for        Identification                            and Documentation of Corrective Action                                         for Nonconformances                                                                                       I ATP-12-Q                                 Procedure f or Perf ormance of Engineering Calculations (In Preparation)
ATP-8-Q Procedure for Control. of Computer Programs ATP-9-Q 10CFR21
ATP-13-Q                                 Procedure for Preparation of Project Technical Reports (In Preparation) 8301-WTP-1-Q                                 Procedure           for           Documentation                             of Postulated Interactions 12
- Procedure for Reporting of Defects and Noncompliance ATP-10-Q Procedure for Document Control Procedure for Identification and ATP-11-0 Documentation of Corrective Action for Nonconformances I
____ - - - ___ _ ____                  _____________________-________________n_-     _ _ _ _ _ _          _ _ _ _ _ _ _ _ _
ATP-12-Q Procedure f or Perf ormance of Engineering Calculations (In Preparation)
ATP-13-Q Procedure for Preparation of Project Technical Reports (In Preparation) 8301-WTP-1-Q Procedure for Documentation of Postulated Interactions 12
_____________________-________________n_-


a ATTACHMENT II.1           Page 2 of 2 8301-WTP-2-Q   Procedure     for Training of SSIP Walkdown Team Members 8301-WTP-3-Q   Procedure for Performing       Walkdowns   of SSIP/S Targets 8301-WTP-4-Q   Procedure for Resolution of SSIP/S Postulated Interactions (In Preparation) 8301-WTP-5-Q   Procedure for Performance of Engineering Tests (In Preparation) 8301-PIP-1-0. Procedure for Project Interface Control w
a ATTACHMENT II.1 Page 2 of 2 8301-WTP-2-Q Procedure for Training of SSIP Walkdown Team Members 8301-WTP-3-Q Procedure for Performing Walkdowns of SSIP/S Targets 8301-WTP-4-Q Procedure for Resolution of SSIP/S Postulated Interactions (In Preparation) 8301-WTP-5-Q Procedure for Performance of Engineering Tests (In Preparation) 8301-PIP-1-0.
Procedure for Project Interface Control w
G 13
G 13


t ATTACHMENT II.2 Midland Energy Center Spatial Systems Interaction Program / Seismic Procedures and Document Cross-Reference Contract Requirement (Exhibit C)                   MGJEC Procedures and Documents                       ,
t ATTACHMENT II.2 Midland Energy Center Spatial Systems Interaction Program / Seismic Procedures and Document Cross-Reference Contract Requirement (Exhibit C)
3.1.1                       See Attachment.II.1 3.1.3.1                   MGJEC QA Manual 3.1.3.2                   8301-WTP-1-Q, ATP-10-Q       -
MGJEC Procedures and Documents 3.1.1 See Attachment.II.1 3.1.3.1 MGJEC QA Manual 3.1.3.2 8301-WTP-1-Q, ATP-10-Q 3.1.3.3 MGJEC QA Manua3 3.1.3.4 MGJEC QA Manual 3.'1.3.5 ATP-1-0 3.1.3.6 MGJEC QA Manual 3.1.3.7 ATP-8-Q 3.1.3.8 8301-PIP-1-0 3.1.3.9 8301-WTP-2-Q, ATP-5-Q 3.1.3.10 ATP-6-Q, STD-1-Q 3.1.3.11 ATP-9-Q
3.1.3.3                   MGJEC QA Manua3 3.1.3.4                   MGJEC QA Manual 3.'1.3.5                   ATP-1-0 3.1.3.6                   MGJEC QA Manual                     -
'3.1.3.13 ATP-9-Q, MGJEC QA Manual, ATP-11-Q 3.1.4 See Attachment IV.1 3.1.5 8301-PIP-1-Q, SSIP/S Program Manual 3.1.6 See Attachment VI.1 14
3.1.3.7                   ATP-8-Q 3.1.3.8                   8301-PIP-1-0 3.1.3.9                   8301-WTP-2-Q, ATP-5-Q 3.1.3.10                   ATP-6-Q, STD-1-Q 3.1.3.11                   ATP-9-Q
                  '3.1.3.13       -          ATP-9-Q, MGJEC QA Manual, ATP-11-Q 3.1.4                       See Attachment IV.1 3.1.5                     8301-PIP-1-Q, SSIP/S Program Manual 3.1.6                       See Attachment VI.1 14


9 ATTACHMENT IV.1 Midland Energy Center SSIP/S Engineering Decision Documentation Requirements Enaineerino Decision                       Documentation Reauired SSIP/S Target List                         Target   Criteria,     Pr'ogram Manual Postulated Interaction                     IIS Identification Walkdown Results                           IIS, Walkdown Summary Interaction Resolution                     IIS By Inspection Interaction Resolution                     IIS, Resolution Report By Onsite/ Office                                                       ~
9 ATTACHMENT IV.1 Midland Energy Center SSIP/S Engineering Decision Documentation Requirements Enaineerino Decision Documentation Reauired SSIP/S Target List Target
Engineering Analysis Verification of Re, solution               IIS, Field Verification Report By Plant Modification Calculation Assumptions                   Calculation Package Technical Review Results                   Technical Review Form I
: Criteria, Pr'ogram Manual Postulated Interaction IIS Identification Walkdown Results IIS, Walkdown Summary Interaction Resolution IIS By Inspection Interaction Resolution IIS, Resolution Report By Onsite/ Office
1 1
~
l l
Engineering Analysis Verification of Re, solution IIS, Field Verification Report By Plant Modification Calculation Assumptions Calculation Package Technical Review Results Technical Review Form 1
15                                   l 1
1 15 1
_ . ,    -   .-}}
. - -}}

Latest revision as of 02:41, 15 December 2024

Rev 2 to Midland Energy Ctr Spatial Sys Interaction Program/Seismic Mgjec Project Quality Plan
ML20076G063
Person / Time
Site: Midland
Issue date: 06/02/1983
From: Durand R
MARK G. JONES ENGINEERING CONSULTANTS, INC.
To:
Shared Package
ML20076G013 List:
References
NUDOCS 8306140539
Download: ML20076G063 (15)


Text

(

Y ~

't e

D b

MIDLAND ENERGY CENTER y

SPATIAL SYSTEMS INTERACTION PROGRAM / SEISMIC MGJEC PROJECT QUALITY PLAN 5

I s%

Revision 2 Q

June 03, lab 3 0

a h

8 Prepared for i

c k

c

'W 2

t 3

Censumers Power Con.cany

%(

2 1945 West Parnall Read

)

N Jackson, Michigan 49201 5

4;\\0

% " ci:.

E i

PREPARED BY/DATE:

30 d-f-/8 0

A 6 E 3 APPROVED BY/DATE:

l Y. OR. AT 0. C.1!.Y M

T:

Mark G.

Jones Engineering Consultants, Inc.

333 Hayes Street San Francisco, Calif ornia 94102 8306140539 830607 PDR ADOCK 05000

i t

l MGJEC Project Quality Plan i

i i

TABLE QE REVISIONS i

Revision 0, Date:

April 122 1983 Original Issue.

Revision 1, Dates tigy_ 2A M9.3 General Revision.

Revision 2, Date:

June Im 1987 Revised Cover Sheet, Paragraphs I, III, VII, VIII, Attachment II.1; Deleted Attachment III.1; Added Table of Revisions.

M

't i

I

s i

TABLE OF CONTENTS a

EASLE th2.s.

I I.

Purpose of the Project Quality Plan 4

II.

Index of MGJEC Quality Procedures 5

III.

Project Schedule 6

IV.

Engineering Decision Documentation Requirements 7

V.

MGJEC/CPCo Interface Procedure O

VI.

MGJEC Project Personnel

'9 VII.

References to VIII.

Attachments 11 w

I e

l 3

f s

l I.

PURPOSE OF THE PROJECT QUALITY PLAN The MGJEC Project Quality Plan defines the means by which the Quality Assurance requirements of CPCo Contract No.

CP10-8764-0 shall be met.

Such requirements include, but are not limited to, quality procedures for conducting work under the

contract, internal QA audits, correspondence interface procedures and MGJEC personnel qualifications.

The following Sections of this Quality Plan and the associated procedures describe in detail the requisite Quality Assurance items of this project.

The governing documents for all quality-related work performed by MGJEC personnel are the MGJEC Ouality Assurance Manual, Revision 2

and this Project Quality Plan.

The Quality Assurance Manual describes in general terms the GA requirements for design and analysis work,

procedures for document control, and reporting of discrepancies.

The' requirements of the MGJEC Quality Assurance

Manual, which has been previously submitted to
CPCo, are augmented by the procedures presented.in this Project Quality Plan.

D a

4

~

s I

e l

II.

INDEX OF MGJEC QUALITY PROCEDURES The documented measures established to ensure conformance to the project quality-related CPCo contract requirements are provided herein.

4 The Project Quality Procedures (Attachment II.1) and the MGJEC Quality Assurance Manual (Reference 2) contain the specific '

requirements and instructions necessary for MGJEC personnel to perform all quality-related tasks.

Contract requirements are cross-referenced to the specific MGJEC Quality document and shown l

in Attachment II.2.

MGJEC procedures shall not be used by project personnel without evidence of CPCo review and approval either by cover stamps and approval signature (s) on the first page or by approval signature (s) contained on a

cover sheet attached to the procedure.

Procurement of quality related items and services shall not be undertaken without appropriate procedures and CPCo approval.

~

Preparation of Specifications and drawings and performance of design review activities currently do not apply to the MGJEC scope of work.

In the event such activities become necessary, they shall be undertaken following the generation of appropriate procedures and approval by CPCo.

i.

9

~ c

-...,.-v--

+-,

,..--r e

- ~ ~ - - -

w e

i s

III.

PROJECT SCHEDULE The SSIP/S Schedule consists of three major phases:

Phase I,

Program Definition; Phase II, Inspections and Resolutions; Phase

III, Program Finali:ation.

Each phase is divided into discrete identifiable tasks to permit thorough planning and effective control of the work.

Client requirements, key milestones, and other general scheduling constraints are identified.

e 4

4

=

6 6

L

s IV.

ENGINEERING DECISION DOCUMENTATION REQUIREMENTS Engineering decisions resulting from the execution of the various SSIP/S work tasks are documented and retained in accordance with established MGJEC Procedures and Quality Assurance Program.

Specific documentation requirements f or engineering decisions and tasks defined in the SSIP/S Manual (Reference 1) are presented in Attachment IV.1.

w 4

J 7

s i

V.

MGJEC - CPCo INTERFACE PROCEDURE CPCo interface requirements are specified and The MGJEC controlled by MGJEC Procedure No.

8301-PIP-1-0 (see Attachment II.1).

This procedure defines the MGJEC interface responsibilities, including external interfaces with CPCo and other project participants.

Exhibit A of Procedure 8301-PIP-1-0 shall be used as Exhibit 10.1 oof the MGJEC Quality Assurance Manual for this project.

I M

e 1

8

s 3

VI.

MGJEC PROJECT PERSONNEL Resumes and job descriptions of MGJEC technical personnel assigned to the SSIP/S will be transmitted to CPCo f or review and approval.

All records relating to job-specific

training, verification of education, experience, certifications and licenses as required by contract will be retained in MGJEC home office files and will be available for CPCo inspection upon request.

4 3

w i

e e

9 4

9

VII.

REFERENCdS 1.

" Program Manual:

Spatial Systems Interaction Program /

Seismic, Midland Energy Center," Consumers Power Company.

2.

MGJEC Quality Assurance Manual (Revision 2).

e 10

s l

l VIII.

ATTACHMENTS MGJEC Quality Procedures II.1 II.2 Quality Procedures Cross-Reference IV.1 SSIP/S Engineering Decision Documentation Requirements

.e 1

4 11

s ATTACHMENT II.1 Page 1 of 2 Midland Energy Center Spatial Systems Interaction Program / Seismic MGJEC Quality Procedures Index MGJEC Procedure No.

Title STD-1-Q Qualifications of Quality Assurance Audit Personnel ATP-1-Q Procedure for Control of Project Correspondence l

ATP-2-Q Procedure for Distributing Quality-Related Procedures ATP-4-0 Procedure for Providing Orientation to the MGJEC Quality Assurance Program ATP-5-0 Procedure for Providing Project Orientation ATP-6-Q Procedure for Performing Internal Quality Assurance Audits ATP-7-Q Procedure for Training MGJEC Audit Team ~

Members

~

ATP-8-Q Procedure for Control. of Computer Programs ATP-9-Q 10CFR21

- Procedure for Reporting of Defects and Noncompliance ATP-10-Q Procedure for Document Control Procedure for Identification and ATP-11-0 Documentation of Corrective Action for Nonconformances I

ATP-12-Q Procedure f or Perf ormance of Engineering Calculations (In Preparation)

ATP-13-Q Procedure for Preparation of Project Technical Reports (In Preparation) 8301-WTP-1-Q Procedure for Documentation of Postulated Interactions 12

_____________________-________________n_-

a ATTACHMENT II.1 Page 2 of 2 8301-WTP-2-Q Procedure for Training of SSIP Walkdown Team Members 8301-WTP-3-Q Procedure for Performing Walkdowns of SSIP/S Targets 8301-WTP-4-Q Procedure for Resolution of SSIP/S Postulated Interactions (In Preparation) 8301-WTP-5-Q Procedure for Performance of Engineering Tests (In Preparation) 8301-PIP-1-0.

Procedure for Project Interface Control w

G 13

t ATTACHMENT II.2 Midland Energy Center Spatial Systems Interaction Program / Seismic Procedures and Document Cross-Reference Contract Requirement (Exhibit C)

MGJEC Procedures and Documents 3.1.1 See Attachment.II.1 3.1.3.1 MGJEC QA Manual 3.1.3.2 8301-WTP-1-Q, ATP-10-Q 3.1.3.3 MGJEC QA Manua3 3.1.3.4 MGJEC QA Manual 3.'1.3.5 ATP-1-0 3.1.3.6 MGJEC QA Manual 3.1.3.7 ATP-8-Q 3.1.3.8 8301-PIP-1-0 3.1.3.9 8301-WTP-2-Q, ATP-5-Q 3.1.3.10 ATP-6-Q, STD-1-Q 3.1.3.11 ATP-9-Q

'3.1.3.13 ATP-9-Q, MGJEC QA Manual, ATP-11-Q 3.1.4 See Attachment IV.1 3.1.5 8301-PIP-1-Q, SSIP/S Program Manual 3.1.6 See Attachment VI.1 14

9 ATTACHMENT IV.1 Midland Energy Center SSIP/S Engineering Decision Documentation Requirements Enaineerino Decision Documentation Reauired SSIP/S Target List Target

Criteria, Pr'ogram Manual Postulated Interaction IIS Identification Walkdown Results IIS, Walkdown Summary Interaction Resolution IIS By Inspection Interaction Resolution IIS, Resolution Report By Onsite/ Office

~

Engineering Analysis Verification of Re, solution IIS, Field Verification Report By Plant Modification Calculation Assumptions Calculation Package Technical Review Results Technical Review Form 1

1 15 1

. - -