ML20077C259: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:v                                 1 e Service'                                           ;"J J' "L.
{{#Wiki_filter:v 1
Q Publ 16805 WCR 19 1/2, Platteville, Colorado 80651 May 15,' 1991                                                               1 Fort St. Vrain                                                               '
Q Publ e Service'
Unit No. 1 P-91165 U. S. Nuclear Regulatory Commission ATTN:   Document Control Desk Washington, D.C. 20555 Docket No. 50-267
;"J J' "L.
16805 WCR 19 1/2, Platteville, Colorado 80651 May 15,' 1991 Fort St. Vrain Unit No. 1 P-91165 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Docket No. 50-267


==SUBJECT:==
==SUBJECT:==
Line 27: Line 30:


==Dear Sirs:==
==Dear Sirs:==
Enclosed, please find the Monthly Defueling Operations report for the month of April, 1991, submitted per the requirements of Fort St.
Enclosed, please find the Monthly Defueling Operations report for the month of April, 1991, submitted per the requirements of Fort St.
Vrain Technical Specification AC 7.5.1.
Vrain Technical Specification AC 7.5.1.
If you have any questions,         please contact Mr. M. H. Holmes at (303) 480-6960.
If you have any questions, please contact Mr.
M. H. Holmes at (303) 480-6960.
Sincerely,
Sincerely,
                          /     "
/
Cha/
J,Xu//x.
J,Xu//x.
Cha/rles H. Fuller Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station CHF:DLW/bh Enclosure cc: Regional Administrator, Region IV Mr;-J. B. Baird Senior Resident Inspector Fort St. Vrain 9105210131 910430 1
rles H. Fuller Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station CHF:DLW/bh Enclosure cc: Regional Administrator, Region IV Mr;-J. B. Baird Senior Resident Inspector Fort St. Vrain 9105210131 910430 1
PDR   ADOCK 05000267 R                     FDR
PDR ADOCK 05000267 R
                                                                                          $$hY L,.                                       _
FDR
lit
$$hY lit L,.


t g                             PUBLIC SERVICE COMPANY OF COLORADO FORT ST. VRAIN NUCLEAR GENERATING STATION i
t g
PUBLIC SERVICE COMPANY OF COLORADO FORT ST. VRAIN NUCLEAR GENERATING STATION i
I l
I l
MONTHLY DEFUELING OPERATIONS REPORT NO. 207 April, 1991 I
MONTHLY DEFUELING OPERATIONS REPORT NO. 207 April, 1991 I
l-
l-
  .-,_.mm__.-~~-.-               _.      .._,__.__-_;.__.~._.       _-__________i
.-,_.mm__.-~~-.-
.._,__.__-_;.__.~._.
i


1-Ibis report contains the highlights of the Fort St. Vrain, Unit No. 1, activities operated under the provisions of the Nuclear Regulatory Commission Operating License No. OPR-34.                                                                             This report is for the month of April, 1991.
1-Ibis report contains the highlights of the Fort St. Vrain, Unit No. 1, activities operated under the provisions of the Nuclear Regulatory Commission Operating License No. OPR-34.
This report is for the month of April, 1991.
1.0 NARRATIVE  
1.0 NARRATIVE  


Line 52: Line 60:
Preparations for shipping spent fuel are proceeding.
Preparations for shipping spent fuel are proceeding.
Construction of the Independent Spent Fuel Storage Installation (ISFSI) is proceeding.
Construction of the Independent Spent Fuel Storage Installation (ISFSI) is proceeding.
                                                -2.0 SINGLE- RELEASES OF RADI0 ACTIVITY OR RADIATION EXPOSURE IN EXCESS 6P 10*; 0F THE ALLodABLE ANNUAL VALUE                                                                                                                                                         ,
-2.0 SINGLE-RELEASES OF RADI0 ACTIVITY OR RADIATION EXPOSURE IN EXCESS 6P 10*; 0F THE ALLodABLE ANNUAL VALUE i
i None P
None P
3.0 INDICATION                               OF             FAILED FUEL' RESULTING FROM IRRADIATED FUEL EXAM [NXfl0N5 None 4.0 MONTHLY OPERATING DATA REPORT Attached l
3.0 INDICATION OF FAILED FUEL' RESULTING FROM IRRADIATED FUEL EXAM [NXfl0N5 None 4.0 MONTHLY OPERATING DATA REPORT Attached l
.-r,..~....       ,,'-..-.#-  , .,  3.--.-                   ,.,._..y-.,.*w-wC+                 rn+     +-,=ve-Fw--ww-+h's -w,--e   w - ' m v -w w -~ wt w =irw-y-m--''y'ven vvr'w-*=rvet w q< m     y"<v'w--=- v m - e-~m n g+ w w w y"'r --
.-r,..~....
3.--.-
,.,._..y-.,.*w-wC+
rn+
+-,=ve-Fw--ww-+h's
-w,--e w
- ' m v -w w -~ wt w =irw-y-m--''y'ven vvr'w-*=rvet w q< m y"<v'w--=-
v m - e-~m n g+ w w w y"'r


                                  .            - - . . _ - _      . ..-      - . . _ -        _-      -_ ~ - _ . . _ _ . .                                  - - . - _ _ .
-_ ~ - _.. _ _..
  +
+
* OFERATIN3 CATA REPORT 00CKET NO.                 50-267 DATE             fiav 15.1991 COMPLETED BY                 M. L. Block OPERA?";3 S**TUS
OFERATIN3 CATA REPORT 00CKET NO.
                                                                                                    ?ELEPHONE                 /303) 6?O-1213 NOTES
50-267 DATE fiav 15.1991 COMPLETED BY M. L. Block
: 1.     Unit Name:           Fort St. "rnin. l'n!t Nn. 1
?ELEPHONE
: 2.       Eeoorting Perloa:         010401 thrnuch 010410
/303) 6?O-1213 OPERA?";3 S**TUS NOTES 1.
: 3.       Licensea Therinal Power (MWt):                       842 4       Nameplate Rating (Gross MWe):
Unit Name:
342 5,       :esign Electrical Rating (Net MWe):                 330
Fort St. "rnin. l'n!t Nn. 1 2.
: 6.     Maximum Ceoencable Capacity (Gross MWe):
Eeoorting Perloa:
342 Maximum Oeoendable Capacity ('.et Mwe):               330 S.
010401 thrnuch 010410 3.
                    '' :hanges Oct.ur in Capacity Ratings ,.:ets Numeer 3 Through 7) Since Last Feoort. Give fe: sont.
Licensea Therinal Power (MWt):
Mnnn
842 4
: 9.     b=er Level To nhich Restrictea. If Any Oet Mne):             0.0
Nameplate Rating (Gross MWe):
342 5,
:esign Electrical Rating (Net MWe):
330 6.
Maximum Ceoencable Capacity (Gross MWe):
342 Maximum Oeoendable Capacity ('.et Mwe):
330 S.
'' :hanges Oct.ur in Capacity Ratings,.:ets Numeer 3 Through 7) Since Last Feoort. Give fe: sont.
Mnnn 9.
b=er Level To nhich Restrictea. If Any Oet Mne):
0.0
: 10. Feasons for Festrictions. If Any:
: 10. Feasons for Festrictions. If Any:
Pntt Sr. Vrnin nwed sum onr n.s n rn r i nn an Annune                                             'O.         loRo.
Pntt Sr. Vrnin nwed sum onr n.s n rn r i nn an Annune
This Month                   Year To " te                     Cumulative
'O.
: 11. rours in Reporting Period 719   _    _.              2.879 .__                             103.728
loRo.
: 12. Numoer Of Hours Reactor was Crittcal                                         N/A                               N/A                             An 97K              7__
This Month Year To " te Cumulative
: 13. Reactor 4 serve Shutdown Nours                                               N/A                               N/A                                             N/A
: 11. rours in Reporting Period 719 2.879.__
: 14. cours Generator On-Line                                                       yf3                               yjg                             77,777,4
103.728
: 15. Lnit Reserve Shutcown Hours N/A                               N/A                                             N/A
: 12. Numoer Of Hours Reactor was Crittcal N/A N/A
: 16. iress Themal Energy Generatea (Mww)
: 13. Reactor 4 serve Shutdown Nours An 97K 7__
N/A                               N/A                       14 . 4 'io . 6 51. 2
N/A N/A N/A
        ;7. Gross Electrical Energy Generatec (MdH)
: 14. cours Generator On-Line yf3 yjg 77,777,4
N/A                               N/A                         '..R16.834.0
: 15. Lnit Reserve Shutcown Hours N/A N/A N/A 16.
iress Themal Energy Generatea (Mww)
N/A N/A 14. 4 'io. 6 51. 2
;7. Gross Electrical Energy Generatec (MdH)
N/A N/A
' R16.834.0
: 13. Net Elec*.rical Energy Generated (MWH)
: 13. Net Elec*.rical Energy Generated (MWH)
                                                                              .l.571                             -6.677                                 4.245.002
.l.571
: 19. Vnit Se vice facter N/A                               '! /A                                           N/A
-6.677 4.245.002
: 20. Lnit Avillability factor
: 19. Vnit Se vice facter N/A
'! /A N/A
: 20. Lnit Avillability factor N/L N/A N/A
: 21. Lntt Capacity Factor (Using MDC Net)
: 21. Lntt Capacity Factor (Using MDC Net)
N/L                              N/A                                              N/A N/A                               y/A                                             9 /A
N/A y/A 9 /A
: 22. Lett Capacity Factor (Using DER Net)
: 22. Lett Capacity Factor (Using DER Net)
N/A                               N/A                                             N/A
N/A N/A N/A
: 23. Lnit Forced Outage Rate y/r                               y/r
: 23. Lnit Forced Outage Rate y/r y/r y/r 24.
: 24.                                                                                                                                                                  y/r inutcowns Scheculea Over hext 6 Months (Type, Oate, and Duration of Each):Fort                                   St. Vrain ceased nuninar nnnr,tinn on Aucurt ?o. 1080 21.
inutcowns Scheculea Over hext 6 Months (Type, Oate, and Duration of Each):Fort St. Vrain ceased nuninar nnnr,tinn on Aucurt ?o. 1080 21.
:' $ nut Ocwn At End Of Report Perica. Estimated Date Of Startuo:                   N/A 26.
:' $ nut Ocwn At End Of Report Perica. Estimated Date Of Startuo:
                .ntis in Test Status (Peter To Comercial 0:eration);                                 Forecast                         Achieved INITIAL CRITICALITY N/A                                 N/A INITIAi. ELECTR1;!Ty 3f;                                 yfg COMMERCIAL 0FERAi!0N N/A                                 N/A
N/A 26.
.ntis in Test Status (Peter To Comercial 0:eration);
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAi. ELECTR1;!Ty 3f; yfg COMMERCIAL 0FERAi!0N N/A N/A


AVERAGE DAILY UNIT POWER LEVEL         ---
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-267 4
Docket No. 50-267                                                   4 Unit Fort St. Vrain Unit No. 1 Date May 15, 1991 Completed By M. L. Block Telephone [30'11620-1313 Month   APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
Unit Fort St. Vrain Unit No. 1 Date May 15, 1991 Completed By M. L. Block Telephone [30'11620-1313 Month APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1                                 0.0                     17                               0.0 2                                 0.0                   18                                 0.0 3                                 0.0                   19                                 0.0-4                                 0.0                   20                                 0.0     -
(MWe-Net) 1 0.0 17 0.0 2
5                                  0.0                   21                                 0.0 6                                 0.0                   22                                 0.0 l                                   7                                 0.0                   23                                 0.0 8                                 0 ,0,                 24                                 0.0 9                                 0.0                   25                                 0.0                             I i
0.0 18 0.0 3
0.0 19 0.0-4 0.0 20 0.0 5
0.0 21 0.0 6
0.0 22 0.0 l
7 0.0 23 0.0 8
0,0, 24 0.0 9
0.0 25 0.0 I
i i
10 0.0 26 0.0 l
i l
i l
10                                  0.0                  26                                  0.0 l                                11                                 0.0                   27                                 0.0 i
11 0.0 27 0.0 12 0.0 i
l 12                                   0.0                   28                                 0.0 i                                                                                                                                                                !
28 0.0 l
l                                13                                   0.0     __
13 0.0 29' O.0 14 0.0 30 0.0 15 0.0 31 N/A 16 0.0 Nuclear Operations at Fort St. Vrain were terminated on August 29, 1989.
29'                                 O.0 14                                   0.0                   30                                 0.0
j t
* 15                                   0.0                   31                                 N/A                             !
1 1
16                                   0.0 j
l i
Nuclear Operations at Fort St. Vrain were terminated on August 29, 1989.                                                       '
t 1
1 l
i


4~e.&,s:...         -L42J-     .&  44-4.&s..L.,i.       a =                 .=.-A44.,MAI44*C.#M                                       4,.#.u&           4%SW hMA.4M,%-                         %    d_.4 s,ASW       e--
4~e.&,s:...
-L42J-44-4.&s..L.,i.
a
=
.=.-A44.,MAI44*C.#M 4,.#.u&
4%SW hMA.4M,%-
d_.4 s,ASW e--
u-T
u-T
              - G               ,
- G e
* e e
e 9
9 ese       - -                    e.                     e.                 .p. em         e. gm ., e.,                   g ,,    ,,, .      . , , , , , , , ,, , , , , , , , , , , , , , ,
ese e.
e.
.p.
em
: e. gm., e.,
g,,
O.
O.
E C
E C
                                                                  ..                                                                                                  0 I                                      M
0
                                                                                                                                                                      .v* .
.v.
                                                                  .                                      e.                                                           MC e
I M
* a        w                            m                                                          .O. o.
MC e.
'                                                                  b         h           4               e
.O. o.
                                                                  >          m             u               4
e a
                                                                                                                                                                      $o e
w m
b h
4 e
$o m
u 4
e
e
                                                                                          -C (1 o                                 2*                       v av w
-C o
                                                                  +4         i         Os. Q                                           .O.                            E k     D         f                   \                                         e C   s.,,
2*
c                 *                .          -                                U                         w efi       a                   .4             m                                 q                         +
v av e
b M e Q-                                     W                       @
(1
: 4.         El El 4
.O.
                                                                                            .          -v                               wu                             e
w
                                                                                                                                          >.*                       *e
+4 i
* W W O Kf 2
Os.
                                                                            *=
Q E
                                                                                      >.'D w C
k D
                                                                                                                                          -z t) x w
f
c.
\\
o
e C s.,,
                                                                                                                                                                      =>
c U
4                           0                               63                         **   c Q O %                                                         WU                         e, o w A                                               cc w                       i. ~
w efi a
h.*                           **
.4 m
                                                          .I N
q
enJ                              Q%                        Q oed E                       .J             w                               h. 6 Q 4 3                       6.             >=
+
O Ch
M b
                                                                                                                                        ' O2                             tw C .4                     L
Q-W
                                                                                                                                          %                         ft AJ
. e
                                                                                                                                                .>.J               for M
-v wu e
                                                                                                                                          .ad Z                   *5 Mb c                        .y @.
4.
Me                                                                                        4                       C4 2"i                                                                                       U O.
El El 4
O!                                                                              =. -                                   - ~
*ec.
                                              ~
w
* W W > w
-z o
O K
*=
.'D C
t) x
=>
2 f
4 0
63
** c Q O %
WU e, o w A cc w
: i. ~
h.*
enJ Q%
Q
.I N
oed h.
Q 4 E
.J w
6 O Ch 3
6.
>=
' O2 tw C.4 L
%.>.J ft AJ for M
.ad Z
*5 Mb U O.
.y @.
c 4
C4 Me 2"i O!
=. -
- ~
~
s.
s.
O                                                                                               E D                                                                                               w O                                                                                                C                 4 w                                                              tN                               O                 %
O E
Cr.                                                             **
w D
aw                2 C
C 4
K-                                                               <
O tN O
Ci w                                                                                                     vi
w aw 2
                                                                                                            ..,J!                             .'w.-                                    .
Cr.
                                                                                                            -k                               2 l                                                                                                                           _                                    -
CCi K-
p}.                               w I Ma s q <
.'w.-
O M                                                                                                N Cj 4                                                                                          -.M. _Ue_ _2                                                                 . .
vi w
th                                                                                                                                                                                                                                           _ _
..,J!
E w>
-k 2 l p}.
                                            =                                                                                               X                <
w Iq <
o                                                              f"                                w                 N Z                                                              k.
Ma s O
                                                                                                                                          .-                  e M
N Cj
* b                                                         .
-.M. _Ue_ _2 M
w                                     _ ___-
4 th E
e%,
w>
Of                                                                           CC 2 %
f" X
D on=. *)'
=
O                                  -
w N
                                                                                                                        = > 2 O!
oZ e
s2 D 4f                     wi lZ M
k.
_--_%I_-                                                 ~ -                       .
M b
b
w e%,
                                                                                                                                            <                w w
Of CC2 %
O =.
D*)'
on
= > 2 O!
*. D 4f s2 wi lZ M
_--_%I_-
~ -
b<
w w
4
4
                                                                                                                                            .O.               O.
.O.
4                 *""
O.
                                                                                                                                            =                 P.
4
D Q
=
b e.
P.
                                                                                                                    .hD                   e   y- e                 e. -e.s g   e.,     .g, go       aq.D 9
DQ b
* p     - e.             gi   m         .e                   .p.
e.
9 w                 D
.hD e
                                                                                                                                          >=                 7 W                                                                                                                                                                                             +
y-e
: e. -e.s g e.,
.g, go aq.D 9
p
- e.
gi m
.e
.p.
9 w
D
>=
7 W
+
Q _.
Q _.
O o                   a E                 >
O
                                                                                                                  -                                      .c.                                       -                                                      -                -                            -
.o a
m-     -ew*w'w++-.-+     w-d---ww       --w.+-,r.-+.       4   ,e--we               .cw..r-,2-,.               . , . . . . . , _                --..,,+wwm.i-,                   .,-,r-,-,--we-,wr.%                         -www - ~ ~w - v y w , r e-9, w-y                 yp-ig.r-,----re.e         ,w o- - w ,     ,w w.
E
                                                                                                                                                                                                                                                                                                                                      . y W e,a +-* T
.c.
m-
-ew*w'w++-.-+
w-d---ww
--w.+-,r.-+.
4
,e--we
.cw..r-,2-,.
--..,,+wwm.i-,
.,-,r-,-,--we-,wr.%
-www - ~ ~w - v y w, r e-9, w-y yp-ig.r-,----re.e
,w o- - w,
,w w.
y W e,a +-* T


Docket No. 50-267 Unit [ortSt.VrainUnitNo.1 Date M ya15, 1991 Completed By N. L IBlock TelephoneTT03)620-1313 REFUEllNG INFOR* 0104 l                                                                             1 l-1.       Name of Facility _                                                                                                             l I                                                                            l Fort St. Vrain Unit No. 1_ _ _ l l
Docket No. 50-267 Unit [ortSt.VrainUnitNo.1 Date M ya15, 1991 Completed By N. L IBlock TelephoneTT03)620-1313 REFUEllNG INFOR* 0104 l
i 2.       Scheduled date for next                                           l Ilone, no further refueling at l
1 l
l         refueling shutdown.
l-1.
l FSV is expected.                                           l l                                                                                                                                           l l
Name of Facility _
l 3.       Scheduled date for restart                                       i N/A 1
l Fort St. Vrain Unit No. 1_ _ _ l I
l           following refueling.                                             l l
l l
                                                      }                                                                                                                                         l l
i 2.
l 4. Will refueling or resumption ofi N/A                                                                                                 1 i
Scheduled date for next l Ilone, no further refueling at l
l           operation thereafter require _a l                                                                                             l l           technical specification change l l
l refueling shutdown.
                                                    ]           or other license amendment?                                     I l                                                                                                                                           l l
l FSV is expected.
l            If answer is yes, what, in                                      l ----------------
l l
l 1
l 3.
Scheduled date for restart i N/A l
l following refueling.
l l
}
l 1
l 4.
Will refueling or resumption ofi N/A i
l operation thereafter require _a l l
l technical specification change l l
]
or other license amendment?
I l
l l
l l
                                                -l               general, will these be?                                         I l                                                                                                                                           l I
l l
l l           If answer is no, has the reload!                                                                                               ',
If answer is yes, what, in l ----------------
l           fuel design and core configura-l l
l
l           tion been reviewed by your                                       l-i           Plant Safety Review Committee l N/A                                                                                           l I
-l general, will these be?
l             to determine whether any unre- l l             viewed safety questions are                                     l
I l
{                          t l             associated with the core reloadj                                                                                             t l
l I
l             (Reference 10 CFR Section                                       l l
l l
l            50.59)?                                                         I                                                                                         '
If answer is no, has the reload!
l_
l fuel design and core configura-l l
l tion been reviewed by your l-l i
Plant Safety Review Committee l N/A I
l to determine whether any unre-l
{
l viewed safety questions are l
t t
l associated with the core reloadj l
l (Reference 10 CFR Section l
l l
50.59)?
I l_
I i
I i
1 l             If no such review has taken                                   i N/A
1 l
                                                  !            place when is it scheduled?
If no such review has taken i N/A place when is it scheduled?
l I                                                                                                                                           l                           ;
l I
I i S.         Scheduled date(s) for submit-                                   [
l I
i S.
Scheduled date(s) for submit-
[
I l
ting proposed licensing action ! ----------------
ting proposed licensing action ! ----------------
I l
l l
,                                                l              and supportino_information.                                   J.
and supportino_information.
l l                                                                             l
J.
_l l 6.           Important licensing considera- 1                                                                                             I l
_l l
l             tions associated with refuel- l
l I
                                              -l               ing, e.g., new or different                                 _l l
l 6.
l l            fue l design or supplie r, un re- l ----------------                                                                         1
Important licensing considera-1 l
                                              -l           - viewed design or performance                                     l l'             analysis methods,~significant' l                                                                                             l
l tions associated with refuel-l l
                                              -l               changes in-fuel design, new'                                                                                                 l.                            ,
-l ing, e.g.,
l l             operatino procedures.~                                                                                                     -l -
new or different
_l l
l fue l design or supplie r, un re-l ----------------
1
-l
- viewed design or performance l
l l'
analysis methods,~significant' l l.
-l changes in-fuel design, new' l
-l -
l operatino procedures.~
1 l
1 l
l                                                                             l                                                                                           i l 7.           The number of fuel assemblies                                 i I
l l
l l-(s) spent    in the fuelcore    and pool.
I i
storago              (b) in the_l a) 1024 HTGR fuel elements                                           l l
l 7.
                                                                                                                            'l b) 452 HTGR fuel elements                                   l
The number of fuel assemblies i
  - , . . . . . - . - . - - . . _ , . _ . _ .              .-_-..._._-..-c             ,_ _.- - , -. ,.-. .. ,.... ..- -. ,                      ,    _ . _ . - - . , - - , . _ - - . , . . _ , . _ - , . _ , _ . - . -
l-l (s) in the core and (b) in the_l a) 1024 HTGR fuel elements l
l spent fuel storago pool.
'l b) 452 HTGR fuel elements l
.- -.... -..-c


1
1
  .~ '..
.~ '..
        ..                                                    0 REFUELINGINFORMATIONIC0NTINUED}
REFUELINGINFORMATIONIC0NTINUED}
l                                         l                                   l l 8. The present licensed spent fuell Current capacity is limited in       l l     pool storage capacity and the l size to about one-third of core,       l l     size of any increase in           1 504 HTGR elements. Construction l l     licensed storage capacity that l of an Independent Spent Fuel         l l     has been requested or is         l Storage Installation (ISFSI)       l l     planned, in number of fuel       I with a capacity of 1620 FSV HTGR l l     assemblies.
0 l
l l
l 8.
The present licensed spent fuell Current capacity is limited in l
l pool storage capacity and the l size to about one-third of core, l
l size of any increase in 1 504 HTGR elements.
Construction l
l licensed storage capacity that l of an Independent Spent Fuel l
l has been requested or is l Storage Installation (ISFSI) l l
planned, in number of fuel I with a capacity of 1620 FSV HTGR l l
assemblies.
1 element's is proceeding
1 element's is proceeding
* l l                                       l                 .
* l l
l-l 9. The projected date of the last l No further refueling is               l l     refueling that can be dis-       l anticipated at Fort St. Vrain. ** l l     charged to the spent fuel pool l                                       l l     assuming the present licensed l                                       l l     capacity.                         l
l l-l 9.
_    l The Independent Spent Fuel Storage Installation (ISFSI) will be capable of storing the entire FSV core (1482 HTGR elements) with storage sphce for an additional 138 HTGR elements.
The projected date of the last l No further refueling is l
Under Agreements AT(04-3)-633 and DE-SC07-791001370 between Public Service Company of Colorado, General Atomic Company, and DOE, spent fuel discharged during the defueling process will be stored by DOE at the Idaho Chemical Processing Plant. The storage capacity is presently sized to' accommodate eight fuel segments. It is estimated that the eighth fuel _ segment will be discharged in 1992. Discussions concerning the disposition of ninth fuel segment are in_ progress with DOE.- Nuclear Operations at Fort St. Vrain were terminated August 29, 1989.
l refueling that can be dis-l anticipated at Fort St. Vrain. ** l l
charged to the spent fuel pool l l
l assuming the present licensed l l
l capacity.
l l
The Independent Spent Fuel Storage Installation (ISFSI) will be capable of storing the entire FSV core (1482 HTGR elements) with storage sphce for an additional 138 HTGR elements.
Under Agreements AT(04-3)-633 and DE-SC07-791001370 between Public Service Company of Colorado, General Atomic Company, and DOE, spent fuel discharged during the defueling process will be stored by DOE at the Idaho Chemical Processing Plant.
The storage capacity is presently sized to' accommodate eight fuel segments.
It is estimated that the eighth fuel _ segment will be discharged in 1992.
Discussions concerning the disposition of ninth fuel segment are in_ progress with DOE.- Nuclear Operations at Fort St. Vrain were terminated August 29, 1989.
l l}}
l l}}

Latest revision as of 01:56, 15 December 2024

Monthly Operating Rept for Apr 1991 for Fort St Vrain
ML20077C259
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/30/1991
From: Block M, Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
P-91165, NUDOCS 9105210131
Download: ML20077C259 (8)


Text

v 1

Q Publ e Service'

"J J' "L.

16805 WCR 19 1/2, Platteville, Colorado 80651 May 15,' 1991 Fort St. Vrain Unit No. 1 P-91165 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Docket No. 50-267

SUBJECT:

APRIL, 1991, MONTHLY DEFUELING OPERATIONS REPORT

REFERENCE:

Facility Operating License Number DPR-34

Dear Sirs:

Enclosed, please find the Monthly Defueling Operations report for the month of April, 1991, submitted per the requirements of Fort St.

Vrain Technical Specification AC 7.5.1.

If you have any questions, please contact Mr.

M. H. Holmes at (303) 480-6960.

Sincerely,

/

Cha/

J,Xu//x.

rles H. Fuller Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station CHF:DLW/bh Enclosure cc: Regional Administrator, Region IV Mr;-J. B. Baird Senior Resident Inspector Fort St. Vrain 9105210131 910430 1

PDR ADOCK 05000267 R

FDR

$$hY lit L,.

t g

PUBLIC SERVICE COMPANY OF COLORADO FORT ST. VRAIN NUCLEAR GENERATING STATION i

I l

MONTHLY DEFUELING OPERATIONS REPORT NO. 207 April, 1991 I

l-

.-,_.mm__.-~~-.-

.._,__.__-_;.__.~._.

i

1-Ibis report contains the highlights of the Fort St. Vrain, Unit No. 1, activities operated under the provisions of the Nuclear Regulatory Commission Operating License No. OPR-34.

This report is for the month of April, 1991.

1.0 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE AND MAJOR SAFETY fiEUTEDIfRTEW9M The reactor remained shutdown the entire month of April, 1991, following Public Service Company of Colorado's decision to. end nuclear operation at Fort St. Vrain.

Preparations for shipping spent fuel are proceeding.

Construction of the Independent Spent Fuel Storage Installation (ISFSI) is proceeding.

-2.0 SINGLE-RELEASES OF RADI0 ACTIVITY OR RADIATION EXPOSURE IN EXCESS 6P 10*; 0F THE ALLodABLE ANNUAL VALUE i

None P

3.0 INDICATION OF FAILED FUEL' RESULTING FROM IRRADIATED FUEL EXAM [NXfl0N5 None 4.0 MONTHLY OPERATING DATA REPORT Attached l

.-r,..~....

3.--.-

,.,._..y-.,.*w-wC+

rn+

+-,=ve-Fw--ww-+h's

-w,--e w

- ' m v -w w -~ wt w =irw-y-m--y'ven vvr'w-*=rvet w q< m y"<v'w--=-

v m - e-~m n g+ w w w y"'r

-_ ~ - _.. _ _..

+

OFERATIN3 CATA REPORT 00CKET NO.

50-267 DATE fiav 15.1991 COMPLETED BY M. L. Block

?ELEPHONE

/303) 6?O-1213 OPERA?";3 S**TUS NOTES 1.

Unit Name:

Fort St. "rnin. l'n!t Nn. 1 2.

Eeoorting Perloa:

010401 thrnuch 010410 3.

Licensea Therinal Power (MWt):

842 4

Nameplate Rating (Gross MWe):

342 5,

esign Electrical Rating (Net MWe):

330 6.

Maximum Ceoencable Capacity (Gross MWe):

342 Maximum Oeoendable Capacity ('.et Mwe):

330 S.

:hanges Oct.ur in Capacity Ratings,.:ets Numeer 3 Through 7) Since Last Feoort. Give fe: sont.

Mnnn 9.

b=er Level To nhich Restrictea. If Any Oet Mne):

0.0

10. Feasons for Festrictions. If Any:

Pntt Sr. Vrnin nwed sum onr n.s n rn r i nn an Annune

'O.

loRo.

This Month Year To " te Cumulative

11. rours in Reporting Period 719 2.879.__

103.728

12. Numoer Of Hours Reactor was Crittcal N/A N/A
13. Reactor 4 serve Shutdown Nours An 97K 7__

N/A N/A N/A

14. cours Generator On-Line yf3 yjg 77,777,4
15. Lnit Reserve Shutcown Hours N/A N/A N/A 16.

iress Themal Energy Generatea (Mww)

N/A N/A 14. 4 'io. 6 51. 2

7. Gross Electrical Energy Generatec (MdH)

N/A N/A

' R16.834.0

13. Net Elec*.rical Energy Generated (MWH)

.l.571

-6.677 4.245.002

19. Vnit Se vice facter N/A

'! /A N/A

20. Lnit Avillability factor N/L N/A N/A
21. Lntt Capacity Factor (Using MDC Net)

N/A y/A 9 /A

22. Lett Capacity Factor (Using DER Net)

N/A N/A N/A

23. Lnit Forced Outage Rate y/r y/r y/r 24.

inutcowns Scheculea Over hext 6 Months (Type, Oate, and Duration of Each):Fort St. Vrain ceased nuninar nnnr,tinn on Aucurt ?o. 1080 21.

' $ nut Ocwn At End Of Report Perica. Estimated Date Of Startuo:

N/A 26.

.ntis in Test Status (Peter To Comercial 0:eration);

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAi. ELECTR1;!Ty 3f; yfg COMMERCIAL 0FERAi!0N N/A N/A

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-267 4

Unit Fort St. Vrain Unit No. 1 Date May 15, 1991 Completed By M. L. Block Telephone [30'11620-1313 Month APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0.0 17 0.0 2

0.0 18 0.0 3

0.0 19 0.0-4 0.0 20 0.0 5

0.0 21 0.0 6

0.0 22 0.0 l

7 0.0 23 0.0 8

0,0, 24 0.0 9

0.0 25 0.0 I

i i

10 0.0 26 0.0 l

i l

11 0.0 27 0.0 12 0.0 i

28 0.0 l

13 0.0 29' O.0 14 0.0 30 0.0 15 0.0 31 N/A 16 0.0 Nuclear Operations at Fort St. Vrain were terminated on August 29, 1989.

j t

1 1

l i

4~e.&,s:...

-L42J-44-4.&s..L.,i.

a

=

.=.-A44.,MAI44*C.#M 4,.#.u&

4%SW hMA.4M,%-

d_.4 s,ASW e--

u-T

- G e

e 9

ese e.

e.

.p.

em

e. gm., e.,

g,,

O.

E C

0

.v.

I M

MC e.

.O. o.

e a

w m

b h

4 e

$o m

u 4

e

-C o

2*

v av e

(1

.O.

w

+4 i

Os.

Q E

k D

f

\\

e C s.,,

c U

w efi a

.4 m

q

+

M b

Q-W

. e

-v wu e

4.

El El 4

  • ec.

w

  • W W > w

-z o

O K

  • =

.'D C

t) x

=>

2 f

4 0

63

    • c Q O %

WU e, o w A cc w

i. ~

h.*

enJ Q%

Q

.I N

oed h.

Q 4 E

.J w

6 O Ch 3

6.

>=

' O2 tw C.4 L

%.>.J ft AJ for M

.ad Z

  • 5 Mb U O.

.y @.

c 4

C4 Me 2"i O!

=. -

- ~

~

s.

O E

w D

C 4

O tN O

w aw 2

Cr.

CCi K-

.'w.-

vi w

..,J!

-k 2 l p}.

w Iq <

Ma s O

N Cj

-.M. _Ue_ _2 M

4 th E

w>

f" X

=

w N

oZ e

k.

M b

w e%,

Of CC2 %

O =.

D*)'

on

= > 2 O!

  • . D 4f s2 wi lZ M

_--_%I_-

~ -

b<

w w

4

.O.

O.

4

=

P.

DQ b

e.

.hD e

y-e

e. -e.s g e.,

.g, go aq.D 9

p

- e.

gi m

.e

.p.

9 w

D

>=

7 W

+

Q _.

O

.o a

E

.c.

m-

-ew*w'w++-.-+

w-d---ww

--w.+-,r.-+.

4

,e--we

.cw..r-,2-,.

--..,,+wwm.i-,

.,-,r-,-,--we-,wr.%

-www - ~ ~w - v y w, r e-9, w-y yp-ig.r-,----re.e

,w o- - w,

,w w.

y W e,a +-* T

Docket No. 50-267 Unit [ortSt.VrainUnitNo.1 Date M ya15, 1991 Completed By N. L IBlock TelephoneTT03)620-1313 REFUEllNG INFOR* 0104 l

1 l

l-1.

Name of Facility _

l Fort St. Vrain Unit No. 1_ _ _ l I

l l

i 2.

Scheduled date for next l Ilone, no further refueling at l

l refueling shutdown.

l FSV is expected.

l l

l 1

l 3.

Scheduled date for restart i N/A l

l following refueling.

l l

}

l 1

l 4.

Will refueling or resumption ofi N/A i

l operation thereafter require _a l l

l technical specification change l l

]

or other license amendment?

I l

l l

l l

If answer is yes, what, in l ----------------

l

-l general, will these be?

I l

l I

l l

If answer is no, has the reload!

l fuel design and core configura-l l

l tion been reviewed by your l-l i

Plant Safety Review Committee l N/A I

l to determine whether any unre-l

{

l viewed safety questions are l

t t

l associated with the core reloadj l

l (Reference 10 CFR Section l

l l

50.59)?

I l_

I i

1 l

If no such review has taken i N/A place when is it scheduled?

l I

l I

i S.

Scheduled date(s) for submit-

[

I l

ting proposed licensing action ! ----------------

l l

and supportino_information.

J.

_l l

l I

l 6.

Important licensing considera-1 l

l tions associated with refuel-l l

-l ing, e.g.,

new or different

_l l

l fue l design or supplie r, un re-l ----------------

1

-l

- viewed design or performance l

l l'

analysis methods,~significant' l l.

-l changes in-fuel design, new' l

-l -

l operatino procedures.~

1 l

l l

I i

l 7.

The number of fuel assemblies i

l-l (s) in the core and (b) in the_l a) 1024 HTGR fuel elements l

l spent fuel storago pool.

'l b) 452 HTGR fuel elements l

.- -.... -..-c

1

.~ '..

REFUELINGINFORMATIONIC0NTINUED}

0 l

l l

l 8.

The present licensed spent fuell Current capacity is limited in l

l pool storage capacity and the l size to about one-third of core, l

l size of any increase in 1 504 HTGR elements.

Construction l

l licensed storage capacity that l of an Independent Spent Fuel l

l has been requested or is l Storage Installation (ISFSI) l l

planned, in number of fuel I with a capacity of 1620 FSV HTGR l l

assemblies.

1 element's is proceeding

  • l l

l l-l 9.

The projected date of the last l No further refueling is l

l refueling that can be dis-l anticipated at Fort St. Vrain. ** l l

charged to the spent fuel pool l l

l assuming the present licensed l l

l capacity.

l l

The Independent Spent Fuel Storage Installation (ISFSI) will be capable of storing the entire FSV core (1482 HTGR elements) with storage sphce for an additional 138 HTGR elements.

Under Agreements AT(04-3)-633 and DE-SC07-791001370 between Public Service Company of Colorado, General Atomic Company, and DOE, spent fuel discharged during the defueling process will be stored by DOE at the Idaho Chemical Processing Plant.

The storage capacity is presently sized to' accommodate eight fuel segments.

It is estimated that the eighth fuel _ segment will be discharged in 1992.

Discussions concerning the disposition of ninth fuel segment are in_ progress with DOE.- Nuclear Operations at Fort St. Vrain were terminated August 29, 1989.

l l