ML20080A574: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:f | {{#Wiki_filter:f TSP-3 A t t a ch rE n t | ||
* 33 | * 33 Issui 2 50-267 OPERATINC DATA REPORT DOCKET NO. | ||
December 12,I1983 DATE Chuck Fuller CcMPLETED BY TEl.EPHONE (303) 785-2224 OPERATINC STATLG notes 1. | |||
Unit Name: | |||
Fort St. Vrain 2. | |||
Reporting Period: | |||
831101 thru 831130 3. | |||
Licensed Thermal Power (Wt): | |||
842 4. | |||
Nameplate Rating (Cross We): | |||
342 5. | |||
Design Electrical Rating (Net We): | |||
None | 330 342 6. | ||
Maximum Dependable Capacity (Cross We): | |||
330 7. | |||
This Month | Maximu:n Dependable Capacity (Net We): | ||
8. | |||
If Changes Oc. cur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons: | |||
None 9. | |||
Power Level To Which Restricted If Any (Net We): | |||
231 10. | |||
Reasons for Restrictions, If Any: | |||
Restriction to 70% pendine recolution of contractual matters. | |||
This Month Year to Date Cu:nulative 720 8,016 38,737 11. | |||
Hours in Reporting Period 666.0 5.377.0 25,123.7 12. | |||
Number of Hours Reactor Vas Critical 0.0 0.0 0.0 13. | |||
Reactor Reserve Shutdown Hours 553.0 3,957.I 17,131.6 l | |||
14. | |||
Hours Generator on-I.ine 0.0 0.0 0.0 15. | |||
h | Unit Reserve Shutdown Hours 16. | ||
4 | Gross Thermal Energy Generated (WH) 314,465.8 2.183.434.1 9.124.419.5* | ||
17. | |||
Cross Electrical Energy Generated (WR) 100,999 696.083 3.022.987 18. | |||
CQ C 0.2 | Net Electrical Energy Generated (WR) 93,334 626,197 2,749,307 76.8 49.4 44.2 19. | ||
INITIAL EL*'CTRICITY | Unit Service Factor 20. | ||
Unit Availability Factor 76.8 _ | |||
49.4 44.2 39.3 23.7 21.5 21. | |||
Unit Capacity Factor (Using MDC Net) 39.3 23.7 21.5 y $ | |||
22. | |||
rait Capacity ractor (esing DER Net) | |||
*O 23.2 50.6 40.7 | |||
-O 23. | |||
Unit Forced Outage Rate c30 Refueling 1-15-84 24. | |||
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Lach): | |||
h through 4-13-84, 2,160 hours. | |||
MU 4 | |||
N/A 25. | |||
If Shut Down at End of Report Period. Estimated Date of Startup: | |||
O< | |||
NOT 26. | |||
Units In Test Status (Prior to Cor-ercial Opera tion): | |||
Fo r eca s t Achieved CQ N/A N/A C 0.2 INITIAL CRITICALITY INITIAL EL*'CTRICITY N/A N/A COSiERCIAL OPERATION N/A N/A l | |||
* Includes a +7.5 E.F.P.D. Cycle 3 burnup adjustment. | * Includes a +7.5 E.F.P.D. Cycle 3 burnup adjustment. | ||
r public service company e odemeda Ja' '. | r public service company e odemeda Ja' '. | ||
16805 WCR 19 1/2, Platteville, Colorado 80651 January 31, 1984 Fort St. Vrain Unit #1 P-84037 Office of Inspection and Enforcement ATTN: | |||
Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 | |||
==Reference:== | ==Reference:== | ||
| Line 59: | Line 79: | ||
==Dear Sir:== | ==Dear Sir:== | ||
Enclosed please find a revision to our Monthly Operations Report for the month of November, 1983, which reflects a correction to the monthly " Hours Generator On-Line" value previously reported. | Enclosed please find a revision to our Monthly Operations Report for the month of November, 1983, which reflects a correction to the monthly " Hours Generator On-Line" value previously reported. | ||
Very truly ycurs, b | Very truly ycurs, b ]YYb.<d q Don W. Warembourg v | ||
Manager, Nuclear Production Enclosure cc: | Manager, Nuclear Production Enclosure cc: | ||
Mr. John T. Collins DWW/dkh i/lggfWO SE@ g y r! Y | |||
. - - _..}} | |||
Latest revision as of 22:36, 14 December 2024
| ML20080A574 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/30/1983 |
| From: | Fuller C, Warembourg D PUBLIC SERVICE CO. OF COLORADO |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| P-84037, NUDOCS 8402060129 | |
| Download: ML20080A574 (2) | |
Text
f TSP-3 A t t a ch rE n t
- 33 Issui 2 50-267 OPERATINC DATA REPORT DOCKET NO.
December 12,I1983 DATE Chuck Fuller CcMPLETED BY TEl.EPHONE (303) 785-2224 OPERATINC STATLG notes 1.
Unit Name:
Fort St. Vrain 2.
Reporting Period:
831101 thru 831130 3.
Licensed Thermal Power (Wt):
842 4.
Nameplate Rating (Cross We):
342 5.
Design Electrical Rating (Net We):
330 342 6.
Maximum Dependable Capacity (Cross We):
330 7.
Maximu:n Dependable Capacity (Net We):
8.
If Changes Oc. cur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:
None 9.
Power Level To Which Restricted If Any (Net We):
231 10.
Reasons for Restrictions, If Any:
Restriction to 70% pendine recolution of contractual matters.
This Month Year to Date Cu:nulative 720 8,016 38,737 11.
Hours in Reporting Period 666.0 5.377.0 25,123.7 12.
Number of Hours Reactor Vas Critical 0.0 0.0 0.0 13.
Reactor Reserve Shutdown Hours 553.0 3,957.I 17,131.6 l
14.
Hours Generator on-I.ine 0.0 0.0 0.0 15.
Unit Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (WH) 314,465.8 2.183.434.1 9.124.419.5*
17.
Cross Electrical Energy Generated (WR) 100,999 696.083 3.022.987 18.
Net Electrical Energy Generated (WR) 93,334 626,197 2,749,307 76.8 49.4 44.2 19.
Unit Service Factor 20.
Unit Availability Factor 76.8 _
49.4 44.2 39.3 23.7 21.5 21.
Unit Capacity Factor (Using MDC Net) 39.3 23.7 21.5 y $
22.
rait Capacity ractor (esing DER Net)
- O 23.2 50.6 40.7
-O 23.
Unit Forced Outage Rate c30 Refueling 1-15-84 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Lach):
h through 4-13-84, 2,160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />.
MU 4
N/A 25.
If Shut Down at End of Report Period. Estimated Date of Startup:
O<
NOT 26.
Units In Test Status (Prior to Cor-ercial Opera tion):
Fo r eca s t Achieved CQ N/A N/A C 0.2 INITIAL CRITICALITY INITIAL EL*'CTRICITY N/A N/A COSiERCIAL OPERATION N/A N/A l
- Includes a +7.5 E.F.P.D. Cycle 3 burnup adjustment.
r public service company e odemeda Ja' '.
16805 WCR 19 1/2, Platteville, Colorado 80651 January 31, 1984 Fort St. Vrain Unit #1 P-84037 Office of Inspection and Enforcement ATTN:
Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Reference:
Facility Operating License No. DPR-34 Docket No. 50-267
Dear Sir:
Enclosed please find a revision to our Monthly Operations Report for the month of November, 1983, which reflects a correction to the monthly " Hours Generator On-Line" value previously reported.
Very truly ycurs, b ]YYb.<d q Don W. Warembourg v
Manager, Nuclear Production Enclosure cc:
Mr. John T. Collins DWW/dkh i/lggfWO SE@ g y r! Y
. - - _..