ML20080D439: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-                  -
{{#Wiki_filter:,
Attachment B 4%
4%
1 00CKETED USNRC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION          j35529 A5:56                   )
Attachment B 1
BEFORE THE ATOMIC SAFETY AND LICENSING 40ARp SECFETAC' OCCKE' TING A SEPvir.E BRANC4 In the Matter of                             )
00CKETED USNRC UNITED STATES OF AMERICA j35529 A5:56
                                                        )   Docket Nos. 50-445 and TEXAS UTILITIES GENERATING                   )                   50-446 COMPANY, -- ~~et al.                       )
)
                                                        )     ( Application for (Comanche Peak Steam Electric               )     Operating Licenses)
NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING 40ARp SECFETAC' OCCKE' TING A SEPvir.E BRANC4 In the Matter of
Station, Units 1 and 2)                     )
)
AFFIDAVIT OF C. THOMAS BRANDT REGARDING "OPEN ISSUES" IN PROPOSED INITIAL DECISION I, C. Thomas Brandt, being first duly sworn to depose and state as follows:       I am employed as the Non-ASME QA/QC Supervisor at Comanche Peak.       As such, I am familiar with the QA Program at Comanche Peak, including the disposition of nonconforming conditions identified by QC Inspectors and the guidelines, specifications and procedures applicable to the QA Program.                   I have previously testified in this proceeding regarding the QA Program for Comanche Peak.           A statement of my educational and professional qualifications 'was received into evidence as Applicants' . Exhibit 141A.         This affidavit addresses certain "open issues" . identified by the Licensing Board in its July 29, 1983, Proposed Initial Decision.           The particular "open issues" addressed herein concern (1) protective coatings, (2) downhill welding, (3) alleged mismatched pipe hanger, (4) bolt torquing, and (5) weld quenching.
)
8308300453 830827                         s'
Docket Nos. 50-445 and TEXAS UTILITIES GENERATING
        ~ hDRADOCK 05000445
)
_    PDR     ,_
50-446 COMPANY, -- ~~et al.
)
)
( Application for (Comanche Peak Steam Electric
)
Operating Licenses)
Station, Units 1 and 2)
)
AFFIDAVIT OF C.
THOMAS BRANDT REGARDING "OPEN ISSUES" IN PROPOSED INITIAL DECISION I,
C.
Thomas Brandt, being first duly sworn to depose and state as follows:
I am employed as the Non-ASME QA/QC Supervisor at Comanche Peak.
As such, I am familiar with the QA Program at Comanche Peak, including the disposition of nonconforming conditions identified by QC Inspectors and the guidelines, specifications and procedures applicable to the QA Program.
I have previously testified in this proceeding regarding the QA Program for Comanche Peak.
A statement of my educational and professional qualifications 'was received into evidence as Applicants'. Exhibit 141A.
This affidavit addresses certain "open issues". identified by the Licensing Board in its July 29, 1983, Proposed Initial Decision.
The particular "open issues" addressed herein concern (1) protective coatings, (2) downhill welding, (3) alleged mismatched pipe hanger, (4) bolt torquing, and (5) weld quenching.
8308300453 830827 s
~
hDRADOCK 05000445 PDR


  ?
?,
  ,                                                              I. PROTECTIVE COATINGS j                       A.     Inspection Procedures l         There are four allegations which the Board identifies as l
I.
    "open issues" regarding the procedures applicable to inspection of protective coatings.     Proposed Init.ial Decision at 23. I address each of these items below.
PROTECTIVE COATINGS j
: 1. Near White Blast The Board left open a question regarding an allegation that there were no standards for determining whether near White blast (a measure of surface cleaning / preparation of cteel prior to painting or coating) had been achieved in surface preparation for application of protective coatings.       Ilowever , as provided in the attached procedure, preparation of substrate surfaces for primer application requires cleaning to an equivalent of near white blast conditions, in accordance with applicable specifications.
A.
See CCP-30, " Coating Steel Substrates Inside Reactor Building and Radiation Areas," Section 4.1.1.     (Attachment A). The referenced specification requires the use of a Keane-Tator Surface Profile Comparator (a device which utilizes a plate with various known surface roughnesses for visual comparison of surfaces) to determine near White blast.     See OI-QP-ll.4-1, " Inspection of Steel Substrate Surface Preparation" (Attachment B), Section 3.3.2.c. Accordingly, this allegation is incorrect.
Inspection Procedures l
There are four allegations which the Board identifies as l
"open issues" regarding the procedures applicable to inspection of protective coatings.
Proposed Init.ial Decision at 23.
I address each of these items below.
1.
Near White Blast The Board left open a question regarding an allegation that there were no standards for determining whether near White blast (a measure of surface cleaning / preparation of cteel prior to painting or coating) had been achieved in surface preparation for application of protective coatings.
Ilowever, as provided in the attached procedure, preparation of substrate surfaces for primer application requires cleaning to an equivalent of near white blast conditions, in accordance with applicable specifications.
See CCP-30, " Coating Steel Substrates Inside Reactor Building and Radiation Areas," Section 4.1.1. (Attachment A).
The referenced specification requires the use of a Keane-Tator Surface Profile Comparator (a device which utilizes a plate with various known surface roughnesses for visual comparison of surfaces) to determine near White blast.
See OI-QP-ll.4-1, " Inspection of Steel Substrate Surface Preparation" (Attachment B), Section 3.3.2.c.
Accordingly, this allegation is incorrect.


O
O 2.
: 2. Maximum Roughness The Board left open a question regarding an allegation that there is no maximum value for surface roughness in the specifica-tions regarding steel substrate surfaces, and that the rougher the surface, the earlier the paint will " break down."
Maximum Roughness The Board left open a question regarding an allegation that there is no maximum value for surface roughness in the specifica-tions regarding steel substrate surfaces, and that the rougher the surface, the earlier the paint will " break down."
The procedure applicable to the inspection of surface roughness does provide that "no maximum profile [a measure of surface roughness] will be specified, providing that correct millage [ coating thickness] requirements can be obtained after primer application."     See OI-QP-ll.4-1, Section 3. 3. 2.c .
The procedure applicable to the inspection of surface roughness does provide that "no maximum profile [a measure of surface roughness] will be specified, providing that correct millage [ coating thickness] requirements can be obtained after primer application."
(emphasis added) ( Attachment B) . If the millage requirements cannot be met, the coating is rejected and reworked.         Thus, the question of maximum surface roughness is procedurally addressed.
See OI-QP-ll.4-1, Section 3. 3. 2.c.
Further, the claim that a profile depth greater than the minimum specified (1.0 mil) would result in an early breakdown of the paint is wrong.     In actuality, a profile depth greater than the minimum specified would tend to increase adhesion of the coating to the substrate.     The only detrimental effect of this condition would be to create a surface on which it was dif ficult to obtain uniform coating thickness.     However, this occurrence is addressed by procedures requiring inspection utilizing dry film thickness
(emphasis added) ( Attachment B).
    - gages.
If the millage requirements cannot be met, the coating is rejected and reworked.
: 3. Adhesion Testing The Board left as an "open issue" a determination as to the l
Thus, the question of maximum surface roughness is procedurally addressed.
l     significance of the allegation that all paint inspection had been l     reduced to adhesion testing.       In fact, protective coatings inside l
Further, the claim that a profile depth greater than the minimum specified (1.0 mil) would result in an early breakdown of the paint is wrong.
In actuality, a profile depth greater than the minimum specified would tend to increase adhesion of the coating to the substrate.
The only detrimental effect of this condition would be to create a surface on which it was dif ficult to obtain uniform coating thickness.
However, this occurrence is addressed by procedures requiring inspection utilizing dry film thickness
- gages.
3.
Adhesion Testing The Board left as an "open issue" a determination as to the l
l significance of the allegation that all paint inspection had been l
reduced to adhesion testing.
In fact, protective coatings inside


containment at Comanche Peak are both visually inspected and inspected for dry film thickness following finish coat application (in addition to the procedures applicable to inspection of surface preparation and primer application).
containment at Comanche Peak are both visually inspected and inspected for dry film thickness following finish coat application (in addition to the procedures applicable to inspection of surface preparation and primer application).
Additionally, the liner plant is checked for coating continuity.
Additionally, the liner plant is checked for coating continuity.
Only if records for surface preparation and/or primer application are missing or discrepant, will destructive testing (i.e.,
Only if records for surface preparation and/or primer application are missing or discrepant, will destructive testing (i.e.,
4 adhesion tests and/or scratch tests) be performed in the area for which the records are deficient. Thus, the allegation is incorrect.
adhesion tests and/or scratch tests) be performed in the area for 4
: 4. Repair of Minor Defects Another "open issue" concerns the allegation that the repair criteria for minor defects in protective coatings are inadequate.
which the records are deficient.
Proposed Initial Decision at 24. Specifically, it is argued that numerous (i.e., minor), closely spaced defects would be classified as minor (rather than major) defects, and that a primer coat should be employed in such instances.
Thus, the allegation is incorrect.
The hypothetical situation postulated in this allegation is highly unlikely to occur in that any occurrences which would result in extensive damage to a coating are not likely to be limited to small (i.e., less than one-half inch) damage. The minor defects which are addressed by these criteria (procedures) are those in which minor chipping or cutting may have been made in the coating. If in any area, either circular or linear, a one-half inch diameter circle could be completely inscribed at any point by the defect, the defect will be classified as a major
4.
Repair of Minor Defects Another "open issue" concerns the allegation that the repair criteria for minor defects in protective coatings are inadequate.
Proposed Initial Decision at 24.
Specifically, it is argued that numerous (i.e., minor), closely spaced defects would be classified as minor (rather than major) defects, and that a primer coat should be employed in such instances.
The hypothetical situation postulated in this allegation is highly unlikely to occur in that any occurrences which would result in extensive damage to a coating are not likely to be limited to small (i.e.,
less than one-half inch) damage.
The minor defects which are addressed by these criteria (procedures) are those in which minor chipping or cutting may have been made in the coating.
If in any area, either circular or linear, a one-half inch diameter circle could be completely inscribed at any point by the defect, the defect will be classified as a major


defect and appropriate repair measures will be implemented, including application of a primer coat following surface preparation before reapplication of the final coating.       See CCP-30, Sections 4.4.2.8 and 4.4.2.9 (Attachment A).     These repair procedures have been approved by the coatings manufacturer as being appropriate for repairing defects in coating surfaces.
defect and appropriate repair measures will be implemented, including application of a primer coat following surface preparation before reapplication of the final coating.
See CCP-30, Sections 4.4.2.8 and 4.4.2.9 (Attachment A).
These repair procedures have been approved by the coatings manufacturer as being appropriate for repairing defects in coating surfaces.
Thus, the procedures address any defect likely to be identified in coatings, and the repair process for various types of defects are established / approved based on appropriate technical reviews of the processes.
Thus, the procedures address any defect likely to be identified in coatings, and the repair process for various types of defects are established / approved based on appropriate technical reviews of the processes.
B. Kelly Heaters Another open issue identified by the Board involves an allegation that the disposition of an NCR regarding the possible contamination of a painted surface by smoke from a heater being used to cure the paint was inadequate.     Proposed Initial Decision at 24. Applicants were unable to find an NCR vritten by Mr.
B.
Hamilton regarding Kelly heaters.     Applicants did find an NCR (NCR-C-903) written by his supervisor on that subject (Attachment C). The disposition of that NCR was to wipe off the coated surface with detergent or an appropriate solvent-to remove any surface deposits (soot) left by the smoking heaters.       That is the standard procedure for removing any non-embedded contamination or painted surfaces. Any contaminants that may have been embedded in the coating would be detected by the routine visual inspection in accordance with instructions for visual inspections.       If any contamination was identified, the affected area would be rejected l
Kelly Heaters Another open issue identified by the Board involves an allegation that the disposition of an NCR regarding the possible contamination of a painted surface by smoke from a heater being used to cure the paint was inadequate.
Proposed Initial Decision at 24.
Applicants were unable to find an NCR vritten by Mr.
Hamilton regarding Kelly heaters.
Applicants did find an NCR (NCR-C-903) written by his supervisor on that subject (Attachment C). The disposition of that NCR was to wipe off the coated surface with detergent or an appropriate solvent-to remove any surface deposits (soot) left by the smoking heaters.
That is the standard procedure for removing any non-embedded contamination or painted surfaces.
Any contaminants that may have been embedded in the coating would be detected by the routine visual inspection in accordance with instructions for visual inspections.
If any contamination was identified, the affected area would be rejected l
I l
I l


and repaired prior to final acceptance of the coating.             Thus, any contamination which may have been caused by the smoke would be subject to appropriate corrective action.
and repaired prior to final acceptance of the coating.
C. Westinghouse Coatings An item which the Board states it is " unable to evaluate" based on the present record concerns an allegation that coatings on Westinghouse-supplied components failed an adhesion test.
Thus, any contamination which may have been caused by the smoke would be subject to appropriate corrective action.
Proposed Initial Decision at 24.       In this regard, the Board requests an answer to the questions of whether these pieces of equipment were safety-related and whether the paint will perform satisfactorily. In the first instance, Westinghouse, as the nuclear steam supply system supplier for Comanche Peak, conducts its own QA program in accordance with 10 C.F.R. Part 50, Appendix B for all components it provides to Comanche Peak.           Coatings on safety-related (as here) Westinghouse supplied components are subject to the Westinghouse OA program.       Those coatings are identical to those applied to other steel equipment at Comanche Peak, including satisfaction of tests for performance under design basis accident conditions.
C.
II. DOWNHILL WELDING Another "open item" identified by the Board concerns the allegation that downhill welding was performed by Mr. Stiner at Comanche Peak. Proposed Initial Decision at 33-34.         The open question identified by the Board is whether this allegation was limited to root and cover passes, in that I previously testified that downhill welding was permitted by ASME Section IX for root
Westinghouse Coatings An item which the Board states it is " unable to evaluate" based on the present record concerns an allegation that coatings on Westinghouse-supplied components failed an adhesion test.
                                                  -      -    _ _ -                    __a
Proposed Initial Decision at 24.
In this regard, the Board requests an answer to the questions of whether these pieces of equipment were safety-related and whether the paint will perform satisfactorily.
In the first instance, Westinghouse, as the nuclear steam supply system supplier for Comanche Peak, conducts its own QA program in accordance with 10 C.F.R. Part 50, Appendix B for all components it provides to Comanche Peak.
Coatings on safety-related (as here) Westinghouse supplied components are subject to the Westinghouse OA program.
Those coatings are identical to those applied to other steel equipment at Comanche Peak, including satisfaction of tests for performance under design basis accident conditions.
II. DOWNHILL WELDING Another "open item" identified by the Board concerns the allegation that downhill welding was performed by Mr. Stiner at Comanche Peak.
Proposed Initial Decision at 33-34.
The open question identified by the Board is whether this allegation was limited to root and cover passes, in that I previously testified that downhill welding was permitted by ASME Section IX for root
__a


9
9
                                                  ~
~
_7_       ,
_7_
and cover passes     (Applicants'-Exhibit 141 at 22-23; Tr. 4601-02).     However, I also testified that Brown & Root welding procedures (which are applicable to the welding being performed by Mr. Stiner) do not permit downhill welding at Comanche Peak (Tr. 4601-02). Brown & Root welders are qualified to instructions and procedures which prohibit downhill welding.
and cover passes (Applicants'-Exhibit 141 at 22-23; Tr. 4601-02).
Thus, any welder who performed such welding would have to willfully violate those instruction / procedures, a practice which would be a basis for termination.           I am aware of no evidence that
However, I also testified that Brown & Root welding procedures (which are applicable to the welding being performed by Mr. Stiner) do not permit downhill welding at Comanche Peak (Tr. 4601-02).
      .such a practice has occurred at Comanche Peak.
Brown & Root welders are qualified to instructions and procedures which prohibit downhill welding.
III.     MISMATCHED HANGER Another "open question" identified by the Board concerns an allegation that a hanger which had .been QC inspected was
Thus, any welder who performed such welding would have to willfully violate those instruction / procedures, a practice which would be a basis for termination.
        " mismatched" in that an excessive fit-up gap existed between the                                       ,
I am aware of no evidence that
tube steel member and the base plate of the support.               Proposed Initial Decision at 39.         This allegation was the subject of an NRC inspection, at which time it was determined that the support in question was an ASME Code' Class 3 support.               The procedures applicable to the particular weld in question provided for a
.such a practice has occurred at Comanche Peak.
;        fit-up gap of no more than 5/32 inch. As part of the NRC's investigation, a portion of the welded material was ground out to                                 -
III.
examine the fit-up gap.         It'was determined that for at least a j                                                                                                             s portion of the welded area a gap of 1/4 inch was present.
MISMATCHED HANGER Another "open question" identified by the Board concerns an allegation that a hanger which had.been QC inspected was
1 Accordingly, Applicants 11dentified]this support on an NCR, removed the af fected portions of the~ . pipe support (for
" mismatched" in that an excessive fit-up gap existed between the tube steel member and the base plate of the support.
[                                                   .                              .      ,
Proposed Initial Decision at 39.
This allegation was the subject of an NRC inspection, at which time it was determined that the support in question was an ASME Code' Class 3 support.
The procedures applicable to the particular weld in question provided for a fit-up gap of no more than 5/32 inch.
As part of the NRC's investigation, a portion of the welded material was ground out to examine the fit-up gap.
It'was determined that for at least a j
s 1
portion of the welded area a gap of 1/4 inch was present.
Accordingly, Applicants 11dentified]this support on an NCR, removed the af fected portions of the~. pipe support (for
[
I investigative purposes) and evaluated the safety consequences of-
I investigative purposes) and evaluated the safety consequences of-
                                                                                    /
/
8 . \, -
8. \\, -
                            ..G'
..G'
    ''                                                                                .c       . _
.c
                                      .-            , ~   ,. , , , . , .              - . . ,              ,J
~
,J


the nonconforming weld.           That evaluation determined that even had the particular gap not been detected, there would have been no adverse safety consequences.           See letter to G.L. Madsen (NRC) from R.J.       Gary (TeWas Utilities Generating Company), TXX-3655
the nonconforming weld.
( April 15, 1983) ( Attachment D) .         Furthermore, we have no reason to believe that this instance is other than an isolated case.
That evaluation determined that even had the particular gap not been detected, there would have been no adverse safety consequences.
I V. BOLT TOROUING Another allegation which the Board has identified as an
See letter to G.L. Madsen (NRC) from R.J. Gary (TeWas Utilities Generating Company), TXX-3655
'            ~
( April 15, 1983) ( Attachment D).
                "open item" concerns the establishment of torque values for A490 bolts.       This allegation was that no specific torque value had been established by procedure for A490 bolts.               (Proposed Decision at 43-44.). Actually, torque values for A490 bolts had been established.         However, these values were based on an informal correlation of bolt tensicn with a particular number of turns of the bolt'to be made after ~ achieving a snug-tight condition.           As a result of'~nn NCR (which was written against a bolt that had failed during tightening) , it was decided to establish A490 torque values based on formal testing.             Consequently, a test was
Furthermore, we have no reason to believe that this instance is other than an isolated case.
  .g
I V.
        ,s-     performed to establish such values, and the actual test data were incorporated into the design specifications.             Bolts which had
BOLT TOROUING Another allegation which the Board has identified as an
!<              previously been verified by the prior torque value were
~
;              subsequently re'v erified to the new value.           In addition, samples of the CB&I(furni hed bolts were taken and independently tested to verify mater'i<31 quality.         .It should be noted that the failure
"open item" concerns the establishment of torque values for A490 bolts.
                                                            ~
This allegation was that no specific torque value had been established by procedure for A490 bolts.
(Proposed Decision at 43-44.). Actually, torque values for A490 bolts had been established.
However, these values were based on an informal correlation of bolt tensicn with a particular number of turns of the bolt'to be made after ~ achieving a snug-tight condition.
As a result of'~nn NCR (which was written against a bolt that had failed during tightening), it was decided to establish A490 torque values based on formal testing.
Consequently, a test was
.g
,s-performed to establish such values, and the actual test data were incorporated into the design specifications.
Bolts which had previously been verified by the prior torque value were subsequently re' erified to the new value.
In addition, samples v
of the CB&I(furni hed bolts were taken and independently tested to verify mater'i<31 quality.
.It should be noted that the failure
~
L
L
                        'N, t
'N, t


T~               ,        ./
T~
    ^
./
^
of the original bolt on which the NCR was written was determined to have occurred because the inspector had misread the torque value on the torquing device.
of the original bolt on which the NCR was written was determined to have occurred because the inspector had misread the torque value on the torquing device.
V. QUENCHING OF WELDS The remaining "open issue" which I address concerns an allegation that a weld had been quenched by direct application of
V.
      +
QUENCHING OF WELDS The remaining "open issue" which I address concerns an allegation that a weld had been quenched by direct application of
a water-soaked cloth.           Although this item had been identified on an NCR and df 3 positioned in accordance with applicable procedures, the Board indicates that it does not understand the technical justification for *.he disposition of the NCR.           Proposed Initial Decision at 44.
+
Rapid water quenching is a aeat treatment method utilized to harden carbon steel.           Such heat treatment may af fect the micro-structure of the steel, and may. result in an increased tensile strength and hardness and a decreased ductility of the carbon steel.       For these reasons, quenching of carbon steel welds and heat af fected zones is an undesirable practice and is prohibited bpsiteprocedures.             The quenching which was the subject of this allegation, however, invo ved an,austenitic stainless steel. Such st; eels' do not undergo the microstructural changes carbon steels 4
a water-soaked cloth.
undergo upo'n rapid quenching, and there is no similar metal-lurgical concern with such a cooling method.           In fact, this prac-e      ,
Although this item had been identified on an NCR and df 3 positioned in accordance with applicable procedures, the Board indicates that it does not understand the technical justification for *.he disposition of the NCR.
tice is quite common in welding on austenitic stainless steels.
Proposed Initial Decision at 44.
4 J
Rapid water quenching is a aeat treatment method utilized to harden carbon steel.
n
Such heat treatment may af fect the micro-structure of the steel, and may. result in an increased tensile strength and hardness and a decreased ductility of the carbon steel.
: v.               .,,m j
For these reasons, quenching of carbon steel welds and heat af fected zones is an undesirable practice and is prohibited bpsiteprocedures.
The quenching which was the subject of this allegation, however, invo ved an,austenitic stainless steel. Such st; eels' do not undergo the microstructural changes carbon steels undergo upo'n rapid quenching, and there is no similar metal-4 lurgical concern with such a cooling method.
In fact, this prac-tice is quite common in welding on austenitic stainless steels.
e 4
J n
v.
.,,m j


i   .                                      r                                                                               . . .                                  l
i r
                      -                                                                                                                                            1
'~
                          '~
-10.
                                                                            -10 .
5 Thusj-ils site procaoures pruhtbmauf quencbeg apoiy to all steels (carbon and statnte%). baly artnn atte) coula :e ditriel, afftf.m MtellurSpally by such quenchin9
5 Thusj-               ils site procaoures pruhtbmauf quencbeg apoiy to all steels (carbon and statnte%). baly artnn atte) coula :e ditriel , afftf.m MtellurSpally by such quenchin9                                                                                   /
/
C. Inomas 3rahs v County of Dallas)                                                                 subscribed and swa tg State of Texas                     )                                             before se this 26 day of August,1983.
C. Inomas 3rahs v County of Dallas) subscribed and swa tg State of Texas
E Ifotary Fublic
)
                                                                                                        ~              I 8.[dm%                   ~-
before se this 26 day of August,1983.
                              .i.                                                                                                                                 ,
E I 8.[dm%
This is a telecopy facsimile.                               The original will be transmitted under separate cover.
Ifotary Fublic
l l
~-
p                                                                                      . .U., 4 i
~
.i.
This is a telecopy facsimile.
The original will be transmitted under separate cover.
l p
..U.,
4 i
-_m_..


j''y                              :.                                                                  Amca.g:TA BROWN & ROOT, INC.                     PROCEDURE                                             EFFECTIVE IG JEXED                            l CPSES                           NUMBER               REVISION                         D&T.E -. -                       FA6e I                                                       I                                                                 DATE:
.j' Amca.g:TA
JOB 35-1195 CCP-30                       10                           1/26/82                         1 of 13
'y IG JEXED BROWN & ROOT, INC.
~I                     TITLE:                                 ORIGINATOR:                 N[e                   d2/MO                                           /-2.7N DATE 1                   COATING STEEL SUB-                                                       /g l                     STRATES INSIDE                           REVIEWED BY:                   #4           /u                                                     /15-82
PROCEDURE EFFECTIVE CPSES NUMBER REVISION D&T.E -. -
                  ~
FA6e I
REACTOR BUILDING AND                                                 /               &R A                                                     DATE RADIATION AREAS                                                                   (,         hmm_                                             f .sez TUGC0 QA                     f/ '(/                           OATE APPROVED BY                      #b0 btu M L                                                 f-24 ~f2 CONSTRUCTION PR04 eft MANAGER                                              DATE
I DATE:
JOB 35-1195 CCP-30 10 1/26/82 1 of 13
~I TITLE:
ORIGINATOR:
N[e d2/MO
/-2.7N DATE 1
COATING STEEL SUB-
/g l
STRATES INSIDE REVIEWED BY:
#4
/u
/15-82 REACTOR BUILDING AND
/
&R A DATE
~
RADIATION AREAS
(,
hmm_
f.sez TUGC0 QA f/ '(/
OATE
#b0 btu M L f-24 ~f2 APPROVED BY
}
}
1
CONSTRUCTION PR04 eft MANAGER DATE 1
  )                                                                         ods #/
)
o.i                                                                                         CPSESA I                                      TABLE OF CONTENTS D CF[J
ods #/
A I
o.i TABLE OF CONTENTS D CF[J CPSES


==1.0             INTRODUCTION==
==1.0 INTRODUCTION==
pgg#                                       35 1195 1.1                                                                                     p g TRCL i
pgg#
  +                    1.2 1.3 PURPOSE SCOPE GENERAL DISCUSSION g G,(1                  -
35 1195 1.1 PURPOSE g G,(1 p g TRCL
                                                                                                            }pyg                          ,I 1
}pyg 1.2 SCOPE
2.0             DEFINITIONS OF TERMS                                                                                                     !
+
  ,                                                                                                                                      >              -        I j
,I 1
g 3.0 3.1 SPECIAL ITEMS AND OPERATIONS QUALIFICATION OF PERSONNEL                                                     C0.,y     N                          Y 4                   3.2             SAFETY REQUIREMENTS 3.3             INSTRUMENTS AND THEIR USE i                   3.4             DOCUMENTATION 1                     3.5             RECEIVING, STORING AND DISPENSING 0F C0ATING MATERIALS l                   3.6             SPECIAL C0ATING PROCEDURE
i 1.3 GENERAL DISCUSSION 2.0 DEFINITIONS OF TERMS I
  )                   3.7             TOUCH-UP & FINISH C0ATING OF VENDOR APPLIED C0ATINGS t
C0 N Y
4.0               PROCEDURE FOR COATING
j 3.0 SPECIAL ITEMS AND OPERATIONS 3.1 QUALIFICATION OF PERSONNEL
  .                    4.1             PREPARATION OF SUBSTRATES AND C0ATING MATERIALS 4.2               SURFACE PREPARATION FOR FINISH C0AT l                     4.3             PREPARATION OF C0ATING MATERIALS
.,y g
  !                    4.4               APPLICATION OF PPIME AND FINISH C0ATING l                     4.5               FINAL ACCEPTANCE TESTING       '
4 3.2 SAFETY REQUIREMENTS 3.3 INSTRUMENTS AND THEIR USE i
.!                    4.6               HOLD POINTS
3.4 DOCUMENTATION 1
  .,                  y                SUPPORTING INFORMATION ATTACH 4E!!!S
3.5 RECEIVING, STORING AND DISPENSING 0F C0ATING MATERIALS l
.i                  '
3.6 SPECIAL C0ATING PROCEDURE
j                                    REFCRENCES s
)
3.7 TOUCH-UP & FINISH C0ATING OF VENDOR APPLIED C0ATINGS t
4.0 PROCEDURE FOR COATING 4.1 PREPARATION OF SUBSTRATES AND C0ATING MATERIALS 4.2 SURFACE PREPARATION FOR FINISH C0AT l
4.3 PREPARATION OF C0ATING MATERIALS 4.4 APPLICATION OF PPIME AND FINISH C0ATING l
4.5 FINAL ACCEPTANCE TESTING 4.6 HOLD POINTS y
SUPPORTING INFORMATION
.i ATTACH 4E!!!S j
REFCRENCES s
b f
b f
e I,                                                                               -
e w
w 1                              I
I, 1
I


_ .a   _-.._- -..-                  . . _ _ . ~ . . . . _ _ _ _ . . . . . . . _ _ . . - . .   .s_. __    . . .  .  ..
_.a
.. _ _. ~.... _ _ _ _....... _ _.. -..
.s_.
I
I
  \.
\\.
4 t                                                     JOB 35-1195 Comanche Peak Steam Electric Station Construction Procacure 00CtjMENT CHAtlGE NOTICE NUMBER 7 i
4 t
f g                 This nctice applies to Construction Procedure Nc. 35-1195- CCP-30 Revision 10                             .
JOB 35-1195 Comanche Peak Steam Electric Station Construction Procacure 00CtjMENT CHAtlGE NOTICE NUMBER 7 i
1
f g
(               This change will be incorporated in the next revision of the procedure.
This nctice applies to Construction Procedure Nc. 35-1195-CCP-30 Revision 10 1
(
This change will be incorporated in the next revision of the procedure.
Change the procedure as follcws:
Change the procedure as follcws:
  ?               Please replace the following pages with the attached:
?
t               Page 10 of 13 Page 12 of 13 I
Please replace the following pages with the attached:
l I                                       .
t Page 10 of 13 Page 12 of 13 I
l I
9 Reviewed by:
9 Reviewed by:
Origin    r
/ b l$l$)
                                              / b l$l$)   Date'                    drawn (IcotQuali:yA:surance         Gate r   ,
drawn (IcotQuali:yA:surance Gate Origin r
Review   by:
Date' r
Approved'by*
Review by:
                                                                                                        #'        0'b
0'b Approved'by*
                                                                            ''""ItLCo Quality Assurance           '
''""ItLCo Quality Assurance Date
Date
}
}
D R.n % A Cbnstruct:an Projec: Manager t_u. a Cate 6Effec:1ve
D R.n % A t_u. a 6 - ll-e 5 Cbnstruct:an Projec: Manager Cate Effec:1ve Date i
                                                                                            - ll-Date   e5 i
a
a
'l                                                                     _
'l l
 
- sa.m.u. ;_. _ _....
.;._,....,__m
-s_
.1.
;1_
l
l
 
)
    -s_                -
:i JOB 35-1195 Comanche Peak Steam Electric Station
                              .1.            ;1_    - ..
                                                                - ,              - sa.m .u . ;_. _ _. . . . .;._,....,__m l
      )           -
:i                                                               JOB 35-1195 Comanche Peak Steam Electric Station
]i 1
]i 1
        !                                                Construction Procedure DOCUMENT CHANGE NOTICE NUMBER                 6
Construction Procedure DOCUMENT CHANGE NOTICE NUMBER 6
    'd This notice applies to Construction Procedure No. 35-1195- cro 1n Revision                     1n .
'd This notice applies to Construction Procedure No. 35-1195-cro 1n Revision 1n.
This change will be incorporated in the next revision of the procedure.
This change will be incorporated in the next revision of the procedure.
  .:};                         Change the procedure as follows:
.:};
Change the procedure as follows:
1
1
    ]   3 Replace the following pages with the attached:
]
l                   Page 8 of 13 Attachment 3 Page 1 of 2                                       ,
Replace the following pages with the attached:
l                    Attachment 3 Page 2 of 2
3 l
Page 8 of 13 l Page 1 of 2
, Page 2 of 2
:l
:l
'l l
'l l
ej
ej
:i 3,
: i 3,
t s
l t
l
s
  -1 2
- 1 2
i
i
:4 Reviewed by:
:4 Reviewed by:
W                           k SSbh                                     9hb     Y-N O Oate                 afown & Acc: Qualt:y Assursnce ca:e j                     artgpator
W k SSbh 9hb Y-N O Oate afown & Acc: Qualt:y Assursnce ca:e j
artgpator
<1
<1
                                                                                                  .      /                 $
/
9                     Approved by:                                                           fy Assurance       Date TUGco Q
9 Approved by:
        )
TUGco Q fy Assurance Date
i hefs         # d-2,f# k                         Acril 29.1083 i                     C5nstrue:1on Pro,1ec: Manager         Date                         Effec:1ve Cate
)
    -'.I j                                                      ...        . . _ _ _ . _ _.
hefs
# d-2,f# k Acril 29.1083 i
i C5nstrue:1on Pro,1ec: Manager Date Effec:1ve Cate
-'.Ij


        ..            ,      .        -v.                .
es.,..,:.s.
es.,..,:.s.
r
r
                                                                                    . r    - 4 ,,       ~,                 .        . ..
- 4,,
                      . ..  . w             ...-..=.w                 "w y := a
~,
                                                                                                          - - - .. .  .c- .. w ..- .. a u ..
r
,    .        . . . . .            . . . . . - . . .  . . . . .            . . . . . .        .~
-v.
w
...-..=.w "w y := a
.c-
.. w..-.. a u..
.~
l
.('
1 i.
?
JOB 35-1195 Comanche Peak Steam Electric Station i
k, Sheet 1 of 2 Construction Procedure
'j DOCUMENT CHANGE NOTICE NUMBER S
l
l
('
!.i This notice applies to Construction Procedure No. 35-1195 CCP-30 Revision 10 4
1          .
This change will be incorpcrated f a the next revision of the procedure.
i.
g y
?                                                            JOB 35-1195
.!                                        Comanche Peak Steam Electric Station i
k,                                                                                                                  Sheet 1 of 2
'j                                                  Construction Procedure
  -                                        DOCUMENT CHANGE NOTICE NUMBER                          S l
!.i                 This notice applies to Construction Procedure No. 35-1195                               CCP-30 Revision 10     .
4 g                  This change will be incorpcrated f a the next revision of the procedure.
y                                                       ..
1 Change the procedure as follows:
1 Change the procedure as follows:
A
A Replace the follo...ng page with the attached:
  !                      Replace the follo...ng page with the attached:
Page 11 of 13 4
Page 11 of 13 4
1
1
.i t
.i t
J 4
J 4
1 i :
1 i
i
i
'i i.
'i i.
I                   Reason for change:           Additional requirement.
I Reason for change:
  ?
Additional requirement.
j                                                                                   Reviewed by:
?
Am ,                 U $ u Hjd i uf Ob ts.i% pen                                                   t.tze j                   Or1ginator                               Date                       3rown & Root Quailty Assurance Oa:e
j Reviewed by:
  <                              /
Am,
                                    -                                                Rev w Mk 46 4
U $ u Hjd i uf Ob ts.i% pen t.tze j
1                     Approved by:                                                           --    ,
Or1ginator Date 3rown & Root Quailty Assurance Oa:e
ITJGCd Qual,       Assurance         Date hd._ h s,v               #        /-/ /- 3' L                                 1/17/83
/
;;                    Construction Project :4anager '           Qate                                 Effec tve Cate
Rev w Mk 46 4
1 Approved by:
ITJGCd Qual, Assurance Date hd._ h s,v
/-/ /- 3' L 1/17/83 Construction Project :4anager '
Qate Effec tve Cate
!j
!j
:i                                                                               .      .
:i s5 t
s5 t
~r
                                                            ~r


                                                                                                                                      ~
-.~....._ i~.... _ -..w.'.I...'l i O2w.u 21.. c.S. r_.. t...s..i
      ,_      _      . . . _ . . 4 .. - -.~ . . ..._ i~ .... _ - ..w.'.I...'l i O2w.u 21 .. c.S. r_.. t . . .s. .i
..... l
                                                                  .                                                               ..   .....l J08 35-1195
~
... _.. 4.. -
J08 35-1195
-l Comanche Peak Steam Electric Station Sheet 1 of 2 N
-l Comanche Peak Steam Electric Station Sheet 1 of 2 N
Construction Procedure
Construction Procedure DOCUMENT CHANGE NOTICE NUMBER 4
  .                                              DOCUMENT CHANGE NOTICE NUMBER               4 This notice applies to Construction Procedure No. 35-1195 CCP-30 Revision                         10 This change will be incorporated in the next revision of the procedure.
This notice applies to Construction Procedure No. 35-1195 CCP-30 Revision 10 This change will be incorporated in the next revision of the procedure.
Change the procedure as follows:
Change the procedure as follows:
Replace'the following page with the attached:
Replace'the following page with the attached:
Page 11 of 13 5
Page 11 of 13 5
Reason for change:       Change in requirement.
Reason for change:
:q Reviewed by:
Change in requirement.
h           l2'lf-$2             -                 '
Reviewed by:
                                                                                                              )
:q h
Brown & : Toot quality Assurance Date l                          Origpator                              Date
l2'lf-$2 -
                                                                                              /
)
.-                                                                                  Rav av         y:     e.       /M 5                        Approved by:                                            l .I/
l Origpator Date Brown & : Toot quality Assurance Date
f                l [L. -
/
IUGco Qua g' Assurar.ca             Date
/M Rav av y:
.I                                                 ~
e.
l.I f
l [L. -
/
5 Approved by:
IUGco Qua g' Assurar.ca Date
.I
~
(? (Q mv#m
(? (Q mv#m
                                                -A #   /?A >/c2                                   12/21/82 j                       Constr5c:1on Project . Manager         Cate                             Effective Cate 1
-A #
~$                                                                               .
/?A >/c2 12/21/82 j
                                                                        *1*
Constr5c:1on Project. Manager Cate Effective Cate 1
                                                            ..        - ..          .    .                                                  l l
~$
*1*


_.          ._.. . . . i -. .  ..
^.
                                                        -    - ~ ' '  ^.    :..L:...,_ $' '     L         ~
:..L:...,_ $' '
                                                                                                              ~ L. ~. : . .].
L
                                                                                                                              . ^ *.~ u. s . :.:!= ... .._.. .
~ L. ~. :..].
i i           .
. ^ *.~ u. s. :.:!=....._...
'l i                                                                 J08 35-1195 l                                                         Comanche Peak Steam Electric Station i
i -..
i                                                                                                               Sheet 1 of 4 4
- ~ ' '
Construction Procedure 00CLHENT CHANGE NOTICE NLHBER       3
~
i i
'l i
J08 35-1195 l
Comanche Peak Steam Electric Station i
i Sheet 1 of 4 4
Construction Procedure 00CLHENT CHANGE NOTICE NLHBER 3
)
)
This notice applies to Construction Procedure No. 35-1195- CCP-30 Revision                       10 .
ll This notice applies to Construction Procedure No. 35-1195-CCP-30 Revision 10.
ll
This change will be incorporated in the next revision of the pro,:edure.
  ''                                This change will be incorporated in the next revision of the pro,:edure.
1 I
1 I                               Change the procedure as follows:
Change the procedure as follows:
.j                                   Replace the following pages with the attached:
.j Replace the following pages with the attached:
j                                   Page 11 of 13 Page 12 of 13 1
-:j Page 11 of 13 1
    ,f                               Page 1 of 1 Attachment 4
Page 12 of 13
),                                                                                                                                             -
,f Page 1 of 1 Attachment 4
),
i
i
'l
'l
'j                                   Reason 'cr change:     Additional requirements 1
'j Reason 'cr change:
I i                                                                                 Reviewed by:
Additional requirements 1
4 i                                   '
I i
s v 1 luGh/ 9 Nhi                         M             ' k dx               -
Reviewed by:
                                                                                                                                  ~K Srown & Rcoe Qual 1ty Assurance cate-- ~ ~ - -
4 i
ariginator                          pte/
s v 1 luGh/ 9 Nhi M
i                                                                                 Reviewed
' k dx
[                    '
~K ariginator pte/
k.
Srown & Rcoe Qual 1ty Assurance cate-- ~ ~ - -
                                                                                                '  .. / .g/.
[
'l                     -
i Reviewed k.
Approved ' by:                                 "
.. /.g/.
i                                                                                   IUGC0 Q".alipssurance                     Data 9-20-S'V g.. # , f//f/                                       9/21/82 j                                   .o nstru m ien m ,'em s.,e,         aos                       mems e o.te
'l Approved ' by:
    = = . * .     -m         .
i IUGC0 Q".alipssurance Data g.. #, f//f/
                                                                                    =
9-20-S'V 9/21/82 j
.o nstru m ien m,'em s.,e, aos mems e o.te
= =. *.
-m
=
l' t
l' t
l
l


  ',    ..      - . . . . . . .      . - . .    : ..:.=: .: . .   . -= ..       . ~ .       =.   .2  L-  a.. :2 h ll l:
.2 L -
11 i                                                                                               hKM3 1
a.. :2 h
l,                                               JCS 35-1195                         -
:..:.=:.:..
                                                                                                /mDEXED Comanche Peak Steam Electric Station                 DA16 1
. -=..
1                                                                                        Sheet 1 of 2
. ~.
=.
ll l:
11 i
hKM3
/mDEXED 1
l, JCS 35-1195 1
Comanche Peak Steam Electric Station DA16 1
Sheet 1 of 2
'i
'i
:i                                         Construction Procedure i                               DOCUMENT CHANGE NOTICE NUMBER           2 1
:i Construction Procedure i
-4 This notice applies to Construction Procedure No. 35-1195. CCP-30 Revision                   10
DOCUMENT CHANGE NOTICE NUMBER 2
.}           This change will be incorporated in the next revision of the procedure.
1
1                                                                                           .
-4 This notice applies to Construction Procedure No. 35-1195. CCP-30 Revision 10
                                                                                              ~
.}
                                                        ~~
This change will be incorporated in the next revision of the procedure.
1
~~
~
Change the procedure as follows:
Change the procedure as follows:
  ?
?
Replace the following page with the attached:
Replace the following page with the attached:
    .          Page 6 of 13 i
Page 6 of 13 i
  }
}
4
4
~I q
~I q
'i id 1
'ii d
i
1 i
  ;          Reason for change:     Additional requirement i
Reason for change:
4 j                                                                Reviewed by:
Additional requirement i
crig ator f}h                   / $3             8!       L Srown & Root quality Assurance Ja:e fre/
4j Reviewed by:
Review f       ,
f}h
/ $3 8!
L fre/
Srown & Root quality Assurance Ja:e crig ator Review f
.Q7},'h D: k
/ W i
Approved by:
Approved by:
i    ,  ,  .Q7},'h
m cco quali yt Assurance Date j
                                                                                        ,              D: k / W m cco quali yt Assurance               Date j     '
O. b hs 56-9M 5/11/82 Construc :en Fro;ec:.wanager Cate Effective Cate l'
O. b               hs 56-9M                                 5/11/82 Construc :en Fro;ec: .wanager         Cate                   Effective Cate l'
l J
l
. vis"-
                                                            . is"-
J v


                                            . -.....--...:.~.- - =.~..       ......:.......-........~.. .
. -.....--...:.~.- - =.~..
4 2
......:.......-........~...
: s.                                                                                                __              m ANM5 l
4 2s.
1       .                                                                                  INDEXED
m l
    ,                                            JOB 35-1195                       oArt j                                 Comanche Peak Steam Electric Station i                                                                                     Sheet 1 of 2 i                                       Construction Procedure 00CtjMENT CHANGE NOTICE NtMBER   1 i                                                 ,
ANM5 INDEXED 1
    !          This notice applies to Construction Procedure No. 35-1195. CCP-30         Revision 10         .
JOB 35-1195 oArt j
j             This change will be incorporated in the next revision of the procedure.         j       ~-Mf 9                                                                                                       %+
Comanche Peak Steam Electric Station i
Sheet 1 of 2 i
Construction Procedure 00CtjMENT CHANGE NOTICE NtMBER 1
i This notice applies to Construction Procedure No. 35-1195. CCP-30 Revision 10
~-Mf j
This change will be incorporated in the next revision of the procedure.
j 9
%+
Change the procedure as follows:
Change the procedure as follows:
Replace the following page with the attached:                                   _
Replace the following page with the attached:
l           Page 5 of 13
l Page 5 of 13
)i l
)i l
ll 1
ll 1
i i           Reason for change:     Additional requirements                                         .
i i
1
Reason for change:
Additional requirements 1
)!
)!
Reviewed by:
Reviewed by:
Originator
hh 2-lb 82 D /A W
_        hh           2-lb 82 Data D /A W             .C k / /d'2 -.
.C k / /d'2 -.
Srown S-Aco: Quali y Assurance Oa:e
Originator Data Srown S-Aco: Quali y Assurance Oa:e
)                                                             Reviewed by:
)
Approved by:                                                    "A               3!/7!N-IUGC0QualityAssurp.c               ' Data S M -,e     :.eym 2 / ?- 9'O                     2/17/82 h               Ccnstruc :en Pro;ec Manager         Date                 Effec:1ve Oate i
Reviewed by:
"A 3!/7!N-Approved by:
IUGC0QualityAssurp.c
' Data S M -,e
:.eym 2 / ?- 9'O 2/17/82 h
Ccnstruc :en Pro;ec Manager Date Effec:1ve Oate i
I
I
                                                        &_"w e
&_"w e


__            a..          : a .. x - ..          .  ... - . ; a ..-.:=. u . O . A >. & .V       . v.             w..
... -. ; a..-.:=. u. O. A >. &.V v.
j~                         EROWN & ROOT, INC.
w..
PRCCEDURE      :              EFFECTIVE a                                                            NUMBER       : REVISION       DATE PAGE CPSES
a..
]                                                                                     l
: a.. x -..
,l                           JOB 35-1195                                                           ,
j~
j                                                          CCP-30             10       1/26/82   ;    2 of 13 J
PRCCEDURE EFFECTIVE EROWN & ROOT, INC.
l j                  
NUMBER
 
: REVISION DATE PAGE a
==1.0              INTRODUCTION==
CPSES l
]
,l JOB 35-1195 j
CCP-30 10 1/26/82 2 of 13 Jl j


1.1             PURPOSE 1.1.1           The purpose of this procedure is to establish the methods by which the prime and finish coats are to be applied to the con-tainment liners and radiation areas in accordance with speci-fication, drawing, and manufacturer's requirements. This pro-cedure may also be used for coating any steel substrate inside i                                   the reactor buildings scheduled to receive Carbo Zinc 11 primer
==1.0 INTRODUCTION==
.                                      and Phenoline 305 finish coat.
1.1 PURPOSE 1.1.1 The purpose of this procedure is to establish the methods by which the prime and finish coats are to be applied to the con-tainment liners and radiation areas in accordance with speci-fication, drawing, and manufacturer's requirements. This pro-cedure may also be used for coating any steel substrate inside i
1.2             SCOPE 1.2.1           The scope of this procedure covers the surface preparation and coating of Unit 1 and 2 steel substrates inside the reactor buildings and radiation areas scheduled to receive protective
the reactor buildings scheduled to receive Carbo Zinc 11 primer and Phenoline 305 finish coat.
.j                                     coatings.
1.2 SCOPE 1.2.1 The scope of this procedure covers the surface preparation and coating of Unit 1 and 2 steel substrates inside the reactor buildings and radiation areas scheduled to receive protective
4                 1.3             GENERAL DISCUSSION l
.j coatings.
i                 1.3.1           All coating materials covered by this procedure shall be as manu-i                                   factured by Carboline Corporation of St. Louis, Missouri. The i                                 coating shall consist of a prime coat of Carbo Zinc 11 with a finish coat of Phenoline 305. To protect the prime coat from prolonged ex-j                                   posure, a " seal coat" consisting of approximately one mil. of Pheno-line 305, thinned in accordance with Section 4.4.2.4, may be applied
4 1.3 GENERAL DISCUSSION l
:                                  over the prime coat. Prior to finish coating, the seal coat shall be
i 1.3.1 All coating materials covered by this procedure shall be as manu-i factured by Carboline Corporation of St. Louis, Missouri. The i
    !                                  solvent wiped with Phenoline thinner or Xylol. Finish coating shall j                                 be applied when convenient prior to ccmpletion of the building or
coating shall consist of a prime coat of Carbo Zinc 11 with a finish coat of Phenoline 305. To protect the prime coat from prolonged ex-j posure, a " seal coat" consisting of approximately one mil. of Pheno-line 305, thinned in accordance with Section 4.4.2.4, may be applied over the prime coat.
    ,                                  prior to placement of concrete, equipment. or obstructions which
Prior to finish coating, the seal coat shall be solvent wiped with Phenoline thinner or Xylol.
    !                                  would make finish coating impossible.
Finish coating shall j
In order to maintain traceability on protective coatings applied
be applied when convenient prior to ccmpletion of the building or prior to placement of concrete, equipment. or obstructions which would make finish coating impossible.
:                                  to shop coated steel cited for installation in the Reactor l                                   Building, these items shall be steel stamped with a unique coating code number. The code numbers shall be assigned by QC Paint and i                                 applied by craft personnel. Upon division of materials, this j   I unique number will be transferred along with all other unique identifying numbers.
In order to maintain traceability on protective coatings applied to shop coated steel cited for installation in the Reactor l
2.0             DEFINITIONS OF TERMS j                   2.1             TERMS i
Building, these items shall be steel stamped with a unique coating code number. The code numbers shall be assigned by QC Paint and i
j                    2.1.1           Substrate - The uncoated surface to which a coating is applied.
applied by craft personnel. Upon division of materials, this j
unique number will be transferred along with all other unique I
identifying numbers.
2.0 DEFINITIONS OF TERMS j
2.1 TERMS ij 2.1.1 Substrate - The uncoated surface to which a coating is applied.
3 4
3 4
t,
t,


                                                                            ........F....
g_-=.
g_-=.       =                                     . . ..- --. a:. w ..                   ..   ..
=
* I PROCEDURE                     l EFFECTIVE BROWN & ROOT, INC.             NUMBER         ! REVISION l    DATE.      PAGE i             CPSES I
....- --. a:. w..
JOB 35-1195 I                                       CCP-30           ,!  10     ; 1/26/82   !
........F....
3 of 13
PROCEDURE l EFFECTIVE I
! REVISION l DATE.
PAGE BROWN & ROOT, INC.
NUMBER I
i CPSES JOB 35-1195 I
CCP-30 10
; 1/26/82 3 of 13
?.
?.
)
)
j    3.0         SPECIAL ITEMS AND OPERATIONS l   3.1         QUALIFICATION OF PERSONNEL         -
3.0 SPECIAL ITEMS AND OPERATIONS j
i 3.1.1       Coating application personnel shall be qualified per previous ex-
l 3.1 QUALIFICATION OF PERSONNEL i
!'                  perience and pr,actical application. In addition, each painter shall have been instructed by the Paint Superintendent or his representa-k                   tive in the use of the products as consistent with Carboline's
3.1.1 Coating application personnel shall be qualified per previous ex-perience and pr,actical application.
!)                 training procedures, which includes both classroom instruction and a field application demonstration. This shall be verified by com-J                  pleting a form similar to Attachment 1. This form shall be 3]                 executed by the Brown & Root Paint Superintendent or his represent-a                 ative. A coating manufacturer's representative will be available
In addition, each painter shall have been instructed by the Paint Superintendent or his representa-k tive in the use of the products as consistent with Carboline's
]                   for technical supervision upon initial painting effort. Applicators
!)
;                  performing work to Attachment 2 shall be qualified for "Q" coatings
training procedures, which includes both classroom instruction and J
  '                when applicable.
a field application demonstration. This shall be verified by com-pleting a form similar to Attachment 1.
i 3.2           SAFETY REQUIREMENTS 3.2.1       All appropriate health, safety, and fire protection requirements, pertaining to surface preparation and coating application, shall
This form shall be 3]
!                  be f6110wed. It shall be the responsibility of the Site Safety
executed by the Brown & Root Paint Superintendent or his represent-a ative. A coating manufacturer's representative will be available
;                Department to establish the frequency of monitoring the coating work.
]
3.3           INSTRUMENTS AND THEIR USE 1
for technical supervision upon initial painting effort. Applicators performing work to Attachment 2 shall be qualified for "Q" coatings when applicable.
3.3.1       The painting Foreman and General Foreman shall have access to
i 3.2 SAFETY REQUIREMENTS 3.2.1 All appropriate health, safety, and fire protection requirements, pertaining to surface preparation and coating application, shall be f6110wed.
  !                and be familiar with the use of all instruments necessary to
It shall be the responsibility of the Site Safety Department to establish the frequency of monitoring the coating work.
:                insure efficiency of coating applications. This shall include surface profile comparators, holiday detectors, thermometers,
3.3 INSTRUMENTS AND THEIR USE 1
  ;                and wet and dry film gauges. Viscosity measuring devices will not be used. Wet film gauges will be randomly used during coating e                application as an aid to field personnel on Phenoline 305 only.
3.3.1 The painting Foreman and General Foreman shall have access to and be familiar with the use of all instruments necessary to insure efficiency of coating applications. This shall include surface profile comparators, holiday detectors, thermometers, and wet and dry film gauges. Viscosity measuring devices will not be used. Wet film gauges will be randomly used during coating application as an aid to field personnel on Phenoline 305 only.
}                 Readings will be limited to the minimum necessary to control
e
]                 coating thickness, i
}
* 3.4         DOCUMENTATION l
Readings will be limited to the minimum necessary to control
!    3.4.1       Records shall be maintained on Attachments 1 and 2 listed in i                 Section 5.1. After completion, each form shall be forwarded to i                 the Brown & Root Document Control Center for filing and distri-j                 bution to the various parties as listed on the distribution sheet.
]
coating thickness, i
l 3.4 DOCUMENTATION 3.4.1 Records shall be maintained on Attachments 1 and 2 listed in i
Section 5.1.
After completion, each form shall be forwarded to i
the Brown & Root Document Control Center for filing and distri-j bution to the various parties as listed on the distribution sheet.
)
)
d
d n
$                                            n     ,      ,
.-- I S~L ---
                                              .-- I S~L ---


?       7 .;,. .                    .
?
w .- v                              :    .~              .
7.;,..
                                                      .: u_.: s.x.:.=
:,&.-.: u_.: s.x.:.=
m~          u. . . .. ..- w . u.: -                                              . . . . .- . u .. .= . w . .          ; ..
.-. u...=. w..
l PROCEDURE                   EFFECTIVE 1                     BROWN & ROOT, INC.                                           -
w.-
NUMBER         REVISION !   DATE   .
v
PAGE CPSES J08 35-1195
.~
  .L CCP-30             10   t 1/26/82    1  4 of 13 4                                                                                                                                     '
l m~
I.l 3.5 RECEIVING, STORAGE AND DISPENSING OF COATING MATERIALS 3.5.1           Receiving and Storage - Upon receipt of a shipment of coating (h
: u.......- w. u.: -
1 materials, the B&R QC Representative accepting shipment shall be responsible for completing all necessary receiving inspection documentation. General receiving procedures shall be in accor-
PROCEDURE EFFECTIVE 1
                              ..adance with Brown & Root Construction Procedure CP-CPM 8.1.                         It shall F-     othen be segreg'ated from N6n "Q" materials and stored in the paint
BROWN & ROOT, INC.
        .                        '*ttorage building where temperatures will be rpaintained between
NUMBER REVISION !
                                    ~450 - 1100F. Infrequent dips in air temperature in storage . areas 3
DATE PAGE CPSES J08 35-1195 1/26/82 L
A as low as 320 F for up to 24 hours are acceptable. Temporary storage may be required at the receiving warehouse due to receiving or other problems.
CCP-30 10 t
3.5.2           Dispensing - When coating materials are needed, in the field, it shall be transferred from the controlled area to a designated l                               temporary storage area or area of intended use in the field. Due i                               to limited shelf-life of coating materials, this shall be done on j                               a "first-in", "first-out" basis. After materials have been j_                                 partially used from an individual container, the said container cannot be resealed and returned to "Q" storage area for later
1 4 of 13 4
  ]'a                                use. Containers opened and partially distributed from the "Q" paint storage area may be resealed and the remaining contents i                                 used for "Q" painting. With the exception of thinners, the con-l                               tents from partially used containers shall not be reused after j                                 a period of 7 days has elapsed from date of initial opening.
I.l 3.5 RECEIVING, STORAGE AND DISPENSING OF COATING MATERIALS (h
l                 3.6             SPECIAL C0ATING PROCEDURE                                                               -
3.5.1 Receiving and Storage - Upon receipt of a shipment of coating materials, the B&R QC Representative accepting shipment shall 1
1
be responsible for completing all necessary receiving inspection documentation. General receiving procedures shall be in accor-
  ]                 3.6.1     -
..adance with Brown & Root Construction Procedure CP-CPM 8.1.
When items require special coating not covered under the content i
It shall F-othen be segreg'ated from N6n "Q" materials and stored in the paint
'*ttorage building where temperatures will be rpaintained between
~450 - 110 F.
Infrequent dips in air temperature in storage. areas 0
3 0
as low as 32 F for up to 24 hours are acceptable. Temporary A
storage may be required at the receiving warehouse due to receiving or other problems.
3.5.2 Dispensing - When coating materials are needed, in the field, it shall be transferred from the controlled area to a designated l
temporary storage area or area of intended use in the field. Due i
to limited shelf-life of coating materials, this shall be done on j
a "first-in", "first-out" basis. After materials have been j_
partially used from an individual container, the said container
]'
cannot be resealed and returned to "Q" storage area for later use. Containers opened and partially distributed from the "Q" a
paint storage area may be resealed and the remaining contents i
used for "Q" painting. With the exception of thinners, the con-l tents from partially used containers shall not be reused after j
a period of 7 days has elapsed from date of initial opening.
l 3.6 SPECIAL C0ATING PROCEDURE 1
]
3.6.1 When items require special coating not covered under the content i
of this dccument, the appropriate Project Engineer (Mechanical,
of this dccument, the appropriate Project Engineer (Mechanical,
[,
[
Civil, Electrical) shall complete Attachment 2 and transmit it to the Paint Superintendent. A log of all procedures from t                                 Attachment 2 shall be maintained by the Site Coating Engineer.
Civil, Electrical) shall complete Attachment 2 and transmit it to the Paint Superintendent. A log of all procedures from t shall be maintained by the Site Coating Engineer.
j                                 The following information shall be completed on each procedure.
j The following information shall be completed on each procedure.
l                 3.6.2           Each procedure shall be given a unique number. The scope will 1                                 describe the working limits of the procedure with detailed work requirements being listed under the requirements sectiion.
l 3.6.2 Each procedure shall be given a unique number. The scope will 1
    ?
describe the working limits of the procedure with detailed work requirements being listed under the requirements sectiion.
The approvals section shall have signatures of the following:
The approvals section shall have signatures of the following:
Project Discipline Engineer (Mechanical, Civil, etc.), QA j                                 Manager if coating of item is safety related TUSI representative
?
:                                when required, Engineer who prepared document, and a revision 4
Project Discipline Engineer (Mechanical, Civil, etc.), QA j
number and date. Upon completion of the document, distribution
Manager if coating of item is safety related TUSI representative when required, Engineer who prepared document, and a revision 4
: j.                                 shall be made to all holders of this procedure.
number and date. Upon completion of the document, distribution j.
shall be made to all holders of this procedure.
I.
I.
h
h
 
: u.. s....
                              .                    u. . s ... . r: ~       .                                        ;
r: ~
    . :. .    . . - - - . . .        .    .. a a.._   = x w a       - m .. . . . .     ...-..    ..:: _ . .. ..j t                                                                                                                 l PROCEDURE                   EFFECTIVE                           l
.. a a.._
: l.            BROWN & ROOT, INC.                   NUMBER       REVISION       DATE               PAGE l                   CPSES 1
= x w a
1                   JOB 35-1195 CCP-30         10           1/26/82           5 of 13 j         3.7             TOUCH-UP AND FINISH C0ATING OF VENDOR APPLIED C0ATINGS 1
- m......
1           3.7.1           Prior to touch-up of primer or application of topcoat on vendor i                         coated items other than pipe hanger support components, an adhesion test shall be performed by the Brown & Root QC Depart-ment. If results are acceptable, work may proceed in accordance with sections 4.4.2.2 through 4.4.2.9.
..j t
3.7.2           The QC Inspector or his representative shall notify the res-F                           ponsible ares engineer and/or the Paint Superintendent as soon as possible after receipt of a nonconforming item in need of paint
PROCEDURE EFFECTIVE l.
;                          repair to allow time for Attachment 2 preparation and a planned 6
BROWN & ROOT, INC.
schedule for repair.
NUMBER REVISION DATE PAGE l
4.0             PROCEDURE FOR C0ATING 4.1             PRE?ARATI0h 0F SUBSTRATES AND C0ATING MATERIA'.S
CPSES 1
  ;        4.1.1           Surface Preparation for Primer - Final surface preparation shall i                         not begin unless ghe temperature of the surface to be blasted and/or
1 JOB 35-1195 CCP-30 10 1/26/82 5 of 13 j
{                         power tooled is 5 F above the dew point. If needed, the surface to
3.7 TOUCH-UP AND FINISH C0ATING OF VENDOR APPLIED C0ATINGS 1
:                        be primed shall then be cleaned of any heavy oil or grease deposits j         -
1 3.7.1 Prior to touch-up of primer or application of topcoat on vendor i
coated items other than pipe hanger support components, an adhesion test shall be performed by the Brown & Root QC Depart-ment.
If results are acceptable, work may proceed in accordance with sections 4.4.2.2 through 4.4.2.9.
3.7.2 The QC Inspector or his representative shall notify the res-F ponsible ares engineer and/or the Paint Superintendent as soon as possible after receipt of a nonconforming item in need of paint repair to allow time for Attachment 2 preparation and a planned schedule for repair.
6 4.0 PROCEDURE FOR C0ATING 4.1 PRE?ARATI0h 0F SUBSTRATES AND C0ATING MATERIA'.S 4.1.1 Surface Preparation for Primer - Final surface preparation shall i
not begin unless ghe temperature of the surface to be blasted and/or
{
power tooled is 5 F above the dew point.
If needed, the surface to be primed shall then be cleaned of any heavy oil or grease deposits j
in accordance with SSPC-SP-1-63 " Solvent Cleaning".
in accordance with SSPC-SP-1-63 " Solvent Cleaning".
  !                        Small amounts of grease or oil deposits may be removed by blast j                         opera tions. The surface shall then be cleaned by blast, hand or j                         power tool operations to achieve an equivalent of SSPC-SP10-63, a
Small amounts of grease or oil deposits may be removed by blast j
                              "near white" blast cleaning. Although 1-3 mil. surface profile
opera tions. The surface shall then be cleaned by blast, hand or j
:                          is preferred, a minimum of 1 mil profile is required. After the i                         above surface preparation, the surfac*e to be primed shall be air blasted and/or solvent wiped to remove dust, sand or foreign
power tool operations to achieve an equivalent of SSPC-SP10-63, a
  !                        contaminants from the surface. Air blasting shall not be performed
"near white" blast cleaning. Although 1-3 mil. surface profile is preferred, a minimum of 1 mil profile is required. After the i
  >                        where air-borne contaminants could adhere to tacky paint. Suffi-
above surface preparation, the surfac*e to be primed shall be air blasted and/or solvent wiped to remove dust, sand or foreign contaminants from the surface. Air blasting shall not be performed where air-borne contaminants could adhere to tacky paint.
  ]
Suffi-
cient time shall be provided to allow suspended particles to
]
  ;                          settle before reginning primer application. If rust forms af ter surface preparation, the rusted area shall be re-cleaned before primer application. Under no case shall a blast, hand, or power
cient time shall be provided to allow suspended particles to settle before reginning primer application.
                    .        tool cleaned surface be exposed for more than 24 hours prior to             .
If rust forms af ter surface preparation, the rusted area shall be re-cleaned before primer application. Under no case shall a blast, hand, or power tool cleaned surface be exposed for more than 24 hours prior to priming without additional cleaning of the surface. When applying coatings that will be joined together by a later coating operation, l
.                          priming without additional cleaning of the surface. When applying coatings that will be joined together by a later coating operation, l                           the interface shall be constructed as follows:
the interface shall be constructed as follows:
i
i white metal approximately 12'<Dvarblast-the steel to near Blasting using no border tape -
:                          a. Blasting using no border tape -
a.
l                                white metal approximately 12'<Dvarblast-the           steel 18" beyond the point which to near j                               will receive primer. Hold back approximately 12" - 18" from j                               edge of blasted area when' applying primer.
l 18" beyond the point which j
-l                                                                                                                   \
will receive primer. Hold back approximately 12" - 18" from j
edge of blasted area when' applying primer.
-l
\\
i
i


_ - - . ' A . - . . . .. w :. L . .. .. ..
_ - -. ' A. -..... w :. L.......
                                                                                    .-       L.2. .Ll.A               u - --.     ~ . .    .. .
.- L.2..Ll.A u - --.
h PROCEDURE                                 EFFECTIVE BROWN & ROOT, INC.                     NUMBER             REVISION             DATE               PAGE CPSES JOB 35-1195 CCP-30                     10               1/26/82             6 of 13
~..
: b.     Blast, hand or power tool cleaning using border tape - Clean
h PROCEDURE EFFECTIVE BROWN & ROOT, INC.
[                                               the steel to near white metal approximately 3" - 6" beyond the point which will receive primer. Place border tape
NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 6 of 13 b.
  .f-                                              approxi'nately 1" in from edge of cleaned area and prime.
Blast, hand or power tool cleaning using border tape - Clean
I                                                 When applying seal or finish coat on either of above methods
[
:I                                                   hold back approximately 12" - 18" from edge of primer.
the steel to near white metal approximately 3" - 6" beyond
4 4.1.2          Removal of weld spatter and other minor surface imperfections j                                        (not to exceed .031" for containment liners) - If needed, weld spatter omitted by others will be removed by Painting Personnel
.f the point which will receive primer. Place border tape approxi'nately 1" in from edge of cleaned area and prime.
  ~
I When applying seal or finish coat on either of above methods
in accordance with SSPC-SP-2 and SSPC-SP-3.                       If it is determined l                                          that surface defects are severe enough to require later repair, the area to be repaired will be blocked cut and spot painted
:I hold back approximately 12" - 18" from edge of primer.
  )J                                        at a later date. All protrusiens and peaks shall be ground l                                       to a rounded contour.
Removal of weld spatter and other minor surface imperfections 4.1.2 4j (not to exceed.031" for containment liners) - If needed, weld
3,                         4.1.3         If coating removal is required from an area or item which has pre-4                                        viously been coated in accordance with this procedure, shadows or tight residue of primer which may remain in the profile of the pre-r;       ,
~
viously prepared substrate is acceptable.
spatter omitted by others will be removed by Painting Personnel in accordance with SSPC-SP-2 and SSPC-SP-3.
t 4.2           SURFACE PREPARATION FOR FINISH C0AT                                                                   ..
If it is determined that surface defects are severe enough to require later repair, l
i                        4.2.1         Surface preparation for the finish coat shall consist of the removal,
)J the area to be repaired will be blocked cut and spot painted at a later date. All protrusiens and peaks shall be ground l
    .,                                      if needed, of any oil or grease. This shall be accomplished by the use of a manufacturer recommended cleanser or cleansing method on                                     -
to a rounded contour.
4 i                                      areas that have been seal-coated. On areas where the Carbo Zinc 11 I                                     primer is exposed, oil and grease will be removed by sand blasting, 3                                         hand, or power tool grinding, and needle scaling and then by solvent
3, 4.1.3 If coating removal is required from an area or item which has pre-viously been coated in accordance with this procedure, shadows or 4
    }                                       wiping the area prior to replacing the primer. Power tool grinding
tight residue of primer which may remain in the profile of the pre-r; viously prepared substrate is acceptable.
    ;.                                      and needle scaling should be equivalent to a near white blast SP-10
t 4.2 SURFACE PREPARATION FOR FINISH C0AT i
...                                          specification with no size limitation as long as the millage require-ments are obtained.
4.2.1 Surface preparation for the finish coat shall consist of the removal, if needed, of any oil or grease. This shall be accomplished by the use of a manufacturer recommended cleanser or cleansing method on i
1 4.2.2         The ambient temperature and relative humidity shall be measured to determine the dew point temperature. Phenoline 305 finisho ccat shall be applied unless the substrate temperature is more than 5 F above the dew point.
areas that have been seal-coated. On areas where the Carbo Zinc 11 4
4.3           PREPARATION OF C0ATING MATERIALS 4.3.1         Primer - The primer, Carbo Zinc 11, is packaged in a two component kit consisting of a tese and zinc filler.                       First the base shall be l;                                         thoroughly mixed. Zinc filler shall then be aeded under constant
I primer is exposed, oil and grease will be removed by sand blasting, 3
    !                                        agitation and mixed until free of lumps. Partial mixes shall be mixed
hand, or power tool grinding, and needle scaling and then by solvent
.J                                           by weight in a proprirtion of 10 parts base to 22 parts zinc filler l~                                           using a suitable scale to achieve a plus or minus 2 percent accuracy.
}
The mixture shall then.be strained through a 30-mesh screen. Viscosity
wiping the area prior to replacing the primer.
.;                                          shall be controlled by adding thinner, as required, but shall not exceet two quarts of thinner per gallon of Carbo Zinc 11. Pot life of CZ 11 l                                           shall' be as shown in Attachment 4.
Power tool grinding and needle scaling should be equivalent to a near white blast SP-10 specification with no size limitation as long as the millage require-ments are obtained.
L                                 CCP-30 Rev. 10 DCN #2                                               5/11/82                   Sheet 2 of 2
1 4.2.2 The ambient temperature and relative humidity shall be measured to determine the dew point temperature.
Phenoline 305 finish ccat shall o
be applied unless the substrate temperature is more than 5 F above the dew point.
4.3 PREPARATION OF C0ATING MATERIALS 4.3.1 Primer - The primer, Carbo Zinc 11, is packaged in a two component kit consisting of a tese and zinc filler.
First the base shall be l;
thoroughly mixed. Zinc filler shall then be aeded under constant agitation and mixed until free of lumps.
Partial mixes shall be mixed
.J by weight in a proprirtion of 10 parts base to 22 parts zinc filler l~
using a suitable scale to achieve a plus or minus 2 percent accuracy.
The mixture shall then.be strained through a 30-mesh screen. Viscosity shall be controlled by adding thinner, as required, but shall not exceet two quarts of thinner per gallon of Carbo Zinc 11. Pot life of CZ 11 l
shall' be as shown in Attachment 4.
L CCP-30 Rev. 10 DCN #2 5/11/82 Sheet 2 of 2


_ _ _. - . _ _ : - .- - .- ..            --- : .    -_ _        . w.   .m     .---      m.-           .    ._. m . ... .
. w.
j' 1
.m m.-
PROCEDURE         f             ! EFFECTIVE                             l f.i BROWN & ROOT, INC.
._. m j'
CPSES NUMBER         : REVISION i i
1 PROCEDURE f
OATE      :        PAGE          l JOB 35-1195                                     -
! EFFECTIVE f.
CCP-30          i      1,0 1/26/82   i       7 of 13 e
BROWN & ROOT, INC.
4.3.2         Finish Coat - The finish coat, Phenoline 305, is packaged in a two component kit consisting of Phenoline 305 base, Part A, and 1                             a Phenoline catalyst, Part B. Mixes are made by combining and
NUMBER
}                             thoroughly mixing the base and catalyst. Partial mixes may be 3                         .
: REVISION i OATE PAGE i
made by combining, in a ratio by volume, four parts base to one 3                               part catalyst. Viscosity shall be controlled by adding thinner, as required, but shall not exceed two quarts of thinner per gallon
CPSES i
[                               of Phencline 305. Pot life of Phenoline 305 shall be shown on E                               Attachment 4.                                                                   _
JOB 35-1195 1/26/82 i
4.4           APPLICATION OF PRIME AND FINISH C0ATING 1
7 of 13 CCP-30 i
:              4.4.1         Prime Coat
1,0 e
}               4.4.1.1       Coating material shall be applied using conventional spray equip-l                               ment with agitated pressure pots having a maximum hose length of 75 feet. Care must be taken to assure that air and material pressures are adjusted to compensate the additional length of
4.3.2 Finish Coat - The finish coat, Phenoline 305, is packaged in a two component kit consisting of Phenoline 305 base, Part A, and 1
: j.                             hose from 50' to 75' in length. The primer shall be allowed to
a Phenoline catalyst, Part B.
  ?                             become tack free before start of other construction operations
Mixes are made by combining and
  ,                            which could create contamination problems. Any runs or sags having
}
:                            a detrimental effect on the coating system shall be removed and re-i                             paired. The following application parameters shall also be
thoroughly mixing the base and catalyst.
  !                            followed:
Partial mixes may be 3
* l *
made by combining, in a ratio by volume, four parts base to one 3
: 1. Normaj conditions be 40 - 95 0F and 40 of ambient and surface temperature shall                           .
part catalyst. Viscosity shall be controlled by adding thinner, as required, but shall not exceed two quarts of thinner per gallon
1100F respectively;0however,   0 primer may be applied within an ambient rgnge of 0 - 130 F and a sur-face temparature range of 0 - 200 F. Carbo-Zinc 11 may be thinned up to 2 quarts per gallon for application; however,
[
!                                  when using higher thinning levels at or below normal tem-1                                 perature range, care must be taken to obtain proper film build. Above 850F it is advisable to use up to 2 quarts per gallon to minimize dry spray. In no care shall carbo-line limits be exceeded.
of Phencline 305. Pot life of Phenoline 305 shall be shown on E.
  .                            2. Humidity values vary from 10 to 95% however, coating shall not be applied to a wet or damp surface.
4.4 APPLICATION OF PRIME AND FINISH C0ATING 1
]                    '
4.4.1 Prime Coat
.j
}
: 3. Thickness of prime coat shall have a minimum dry film thickness of 2 mils and a maximum of 4.5 mils. Minimum and maximum spot j                                   test values shall be 1.5 and 5.5 mils respectively.
4.4.1.1 Coating material shall be applied using conventional spray equip-l ment with agitated pressure pots having a maximum hose length of 75 feet. Care must be taken to assure that air and material pressures are adjusted to compensate the additional length of j.
f                               4. A double regulated pot having an adequate air volume supply shall be used, l
hose from 50' to 75' in length. The primer shall be allowed to
i j                              5. As a guide, coating material may be applied using a 50% over-q                                   lap with each pass while holding a gun 8-10 inches from the i                                   surface. Cross hatch application is permissible.
?
1 s
become tack free before start of other construction operations which could create contamination problems. Any runs or sags having a detrimental effect on the coating system shall be removed and re-
T%-
:i paired. The following application parameters shall also be followed:
                                                                                                                    ~ .
l 1.
 
Normaj conditions of ambient and surface temperature shall 0
    ,  wx        :.o.       ...: .,...:...... .          4.h :   .~    >-    ~.. i . .'.:.a:M uc., . _w 1
1100F respectively;0however, primer be 40 - 95 F and 40 0
4
may be applied within an ambient rgnge of 0 - 130 F and a sur-face temparature range of 0 - 200 F.
* PROCEDURE                 EFFECTIVE BROWN & ROOT, INC.               NUMBER       REVISION     DATE           PAGE CPSES JOB 35-1195                   CCP-30         10       1/26/82         8 of 13
Carbo-Zinc 11 may be thinned up to 2 quarts per gallon for application; however, when using higher thinning levels at or below normal tem-1 perature range, care must be taken to obtain proper film build. Above 850F it is advisable to use up to 2 quarts per gallon to minimize dry spray.
: 6. Carbo Zinc 11 is sufficiently cured for topcoat wnen tne h n                            coating may be burnished rather than removed when rubbed
In no care shall carbo-line limits be exceeded.
  ?                             with the flat portion of a smooth edged coin such as a
2.
{                           nickl e. (Minor amounts of zinc dust may be removed during
Humidity values vary from 10 to 95% however, coating shall
  /                             cure verification, however, a burnished surface must be achieved). Attachment 3 may be utilized as general guide-g lines for cure to topcoat time of CZ-11 above 25% relative i                            humidity. If required, the cure of carbo zinc II may be 1
]
accelerated by the use of water spray, however, a minimum i                           of one hour must elapse between application of coating and I                             water spray. Below 25% relative humidity, water curing is i                             recommended to obtain the desired cure. Water utilized in l
not be applied to a wet or damp surface.
conjunction with water curing shall have a PH factor from 1                           5 to 9. Application of water spray for curing purposes may-bat as often as necessary to obtain the proper cure.
.j 3.
]
Thickness of prime coat shall have a minimum dry film thickness of 2 mils and a maximum of 4.5 mils. Minimum and maximum spot j
4.4.1.2     Recoating of Carbo Zinc 11 Primer - Prior to recoating, if no major defects per section 4.4.2.9 are present, the entire primed surface to be recoated shall be wiped with clean rags moistened 3
test values shall be 1.5 and 5.5 mils respectively.
with Carboline Thinner #33. Wiping shall continue until no i                      appreciable discoloration is noticed on the rags. Carbo Zinc 11 I                           shall then be thinned by using two quarts Carboline NO. 33 per
f 4.
* l                        gallon mix. This will be applied to achieve a 2.0 - 4.5 mils total DFT. Only two recoats may be applied. Special attention should be given to spray application and dry film thickness when l        -
A double regulated pot having an adequate air volume supply l
using a 50% mix. The primed surface shall not be recoated until cured per section 4.4.1.1.6.
shall be used, ij 5.
4.4.1.3     Repair of Sags and Runs - Sags or runs in excess of 5.5 mils will be adraded with an aluminum screen or sandpaper to 2.0 to 5.5 mils. Sags or runs 5.5 mils or less which show no evidence of mud-cracking will not be repaired. If coating surface is satis-factory after abrading, then finish coat may be applied; however,
As a guide, coating material may be applied using a 50% over-q lap with each pass while holding a gun 8-10 inches from the i
: d.                         if coating surface is unsatisfactory, blast, hand abrade or power         ,
surface. Cross hatch application is permissible.
tool ' grind to near white metal is required and primer coat re-applied.
1 T%
s
~.
:.o.
4.h :
~.. i..'.:.a:M uc.,. _w
.~
wx 14 PROCEDURE EFFECTIVE BROWN & ROOT, INC.
NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 8 of 13 h
6.
Carbo Zinc 11 is sufficiently cured for topcoat wnen tne coating may be burnished rather than removed when rubbed n
?
with the flat portion of a smooth edged coin such as a
{
nickl e.
(Minor amounts of zinc dust may be removed during
/
cure verification, however, a burnished surface must be achieved). Attachment 3 may be utilized as general guide-lines for cure to topcoat time of CZ-11 above 25% relative g
humidity.
If required, the cure of carbo zinc II may be i
1 accelerated by the use of water spray, however, a minimum i
of one hour must elapse between application of coating and I
water spray. Below 25% relative humidity, water curing is i
recommended to obtain the desired cure. Water utilized in l
conjunction with water curing shall have a PH factor from 1
5 to 9.
Application of water spray for curing purposes may-
]
bat as often as necessary to obtain the proper cure.
4.4.1.2 Recoating of Carbo Zinc 11 Primer - Prior to recoating, if no major defects per section 4.4.2.9 are present, the entire primed surface to be recoated shall be wiped with clean rags moistened with Carboline Thinner #33. Wiping shall continue until no 3
appreciable discoloration is noticed on the rags. Carbo Zinc 11 i
I shall then be thinned by using two quarts Carboline NO. 33 per l
gallon mix. This will be applied to achieve a 2.0 - 4.5 mils total DFT. Only two recoats may be applied. Special attention l
should be given to spray application and dry film thickness when using a 50% mix. The primed surface shall not be recoated until cured per section 4.4.1.1.6.
4.4.1.3 Repair of Sags and Runs - Sags or runs in excess of 5.5 mils will be adraded with an aluminum screen or sandpaper to 2.0 to 5.5 mils. Sags or runs 5.5 mils or less which show no evidence of mud-cracking will not be repaired.
If coating surface is satis-factory after abrading, then finish coat may be applied; however, d.
if coating surface is unsatisfactory, blast, hand abrade or power tool ' grind to near white metal is required and primer coat re-applied.
A satisfactory coating is considered one having no mud-cracking to the metal surface as visible to the unaided eye.
A satisfactory coating is considered one having no mud-cracking to the metal surface as visible to the unaided eye.
L             4.4.1.4   . Brush touch-up painting shall be done on the prime coat in accor-y                           dance with the following:
L 4.4.1.4
)                           Prime Coat:
. Brush touch-up painting shall be done on the prime coat in accor-y dance with the following:
A
)
: 1. Carboline Application Instruction (Carbo Zine 11) j Q
Prime Coat:
Bulletin - October 76-N.
A Q
l 1
1.
: 2. Carboline Product Data Sheet (Carbo Zinc 11)
Carboline Application Instruction (Carbo Zine 11) j Bulletin - October 76-N.
Bulletin - October 76-N. Brush touch-up allowed
l 2.
!.                              on areas one square foot or less.
Carboline Product Data Sheet (Carbo Zinc 11) 1 Bulletin - October 76-N.
Brush touch-up allowed on areas one square foot or less.
4
4
[ .                                        .
[
I CCP-30   Rev. 10 DCN #6                               4(29/83               Sheet 2 of 4
I CCP-30 Rev. 10 DCN #6 4(29/83 Sheet 2 of 4


                                              . - .. . u .v n #_: w.-                               l                  ....g a _c., -  o .a_.        - ._ _ .                                              _..e....... ~        . . . . . . .
.a_.
j*
. -... u.v n #_: w.-
i
_..e.......
      -                                                        PROCEDURE 1                   BROWN & ROOT, INC.                           NUMBER     l REVISION !l EFFECTIVE OATE PAGE l                            CPSES 7
l
l JOB 35-1195                                                                                         '
....g
CCP-30       l   10     ,  1/26/82   i   9 of 13 l               4.4.1.5           Embedded foreign particles shall be removed by abrading, if low j                                 millage or major defects result, recoat or repair per section 4.4.1.2 or section 4.4.2.9.
~
Y               4.4.1.6           Treatment of Rust Stains - Remove residue, though not neces-sarily the stain, with bristle brush and water or Carboline Thinner #33. Allow to dry thoroughly.
a _c.,
1 4.4.1.7           Coating Interface - Refer to Section 4.4.3.0 for coating interfacing.
o j*
)               4.4.2             Finish Coat 1               4.4.2.1           Finish coating shall be applied using conventional, airless,
i l REVISION !l EFFECTIVE PROCEDURE OATE PAGE 1
  ?                                 brush or roller. Weld seams, edges and other sharp geometrical j                                 discontinuities may receive an initial coat of I-2 mils finish j                                 coating thinsed by using two quarts Phenoline Thinner per each gallon
BROWN & ROOT, INC.
  !                                kit of Phenoline 305. To aid in continuity at edges, edges may be 4                                 " striped" with Phenoline unthinned instead of the 50% mixture as stated above. In either " striping" or initial coating of edges, I                                 welds, etc., time should be allotted for the coating to harden 3                                 sufficiently to maintain a " sealing" effect prior to continuing i
NUMBER l
CPSES 7
JOB 35-1195 l
CCP-30 l
10 1/26/82 i
9 of 13 l
4.4.1.5 Embedded foreign particles shall be removed by abrading, if low j
millage or major defects result, recoat or repair per section 4.4.1.2 or section 4.4.2.9.
Y 4.4.1.6 Treatment of Rust Stains - Remove residue, though not neces-sarily the stain, with bristle brush and water or Carboline Thinner #33. Allow to dry thoroughly.
1 4.4.1.7 Coating Interface - Refer to Section 4.4.3.0 for coating interfacing.
)
4.4.2 Finish Coat 1
4.4.2.1 Finish coating shall be applied using conventional, airless,
?
brush or roller. Weld seams, edges and other sharp geometrical j
discontinuities may receive an initial coat of I-2 mils finish j
coating thinsed by using two quarts Phenoline Thinner per each gallon kit of Phenoline 305. To aid in continuity at edges, edges may be 4
" striped" with Phenoline unthinned instead of the 50% mixture as stated above.
In either " striping" or initial coating of edges, I
welds, etc., time should be allotted for the coating to harden 3
sufficiently to maintain a " sealing" effect prior to continuing i
coating operations. The initial coating of edges, striping, etc., as stated above, shall be considered part of the total
coating operations. The initial coating of edges, striping, etc., as stated above, shall be considered part of the total
),                                 initial finish coating operation. The material shall be allowed                           *
),
{                                 to become tack free before any other construction operations
initial finish coating operation. The material shall be allowed
. .t                               proceed which could create contamination p'roblems by dust or 1                                 other foreign matter. A continuity check shall be performed in
{
  ;                                accordance with NACE T-6F-3 Condition "C". No gross discontinuities are acceptable such as holidays, voids, skips, bubbles, and misses.
to become tack free before any other construction operations
..t proceed which could create contamination p'roblems by dust or 1
other foreign matter. A continuity check shall be performed in accordance with NACE T-6F-3 Condition "C".
No gross discontinuities are acceptable such as holidays, voids, skips, bubbles, and misses.
Any runs or sags having a detrimental effect on the coating system.
Any runs or sags having a detrimental effect on the coating system.
  ,                                shall be removed and repaired. The following application parameters 1
shall be removed and repaired. The following application parameters 1
shall govern:
shall govern:
a
a
: 1. The permissible range of surface and ambient temperature for
'f 1.
'f                                      application shall be 500 - 1200F. Temperature may rise above I                                     1200 F after material has become " tack free". Phenoline 305 may be thinned up to 2 quarts of Phenoline Thinner per gallon
The permissible range of surface and ambient temperature for 0
]'t                                      mix. The ratio of thinner to Phenoline will be that which gives the best workable mix, i.e., usually advantageous to use more a                                        thinner at lower temperatures.
application shall be 500 - 120 F.
: 2. Minimum and maximum values of relative humidity shall be 0% and 85% respectively.
Temperature may rise above I
0 120 F after material has become " tack free". Phenoline 305
]'t may be thinned up to 2 quarts of Phenoline Thinner per gallon mix. The ratio of thinner to Phenoline will be that which gives
]
the best workable mix, i.e., usually advantageous to use more thinner at lower temperatures.
a 2.
Minimum and maximum values of relative humidity shall be 0% and
.]
.]
N                                   3. As a guide, coating material shall be applied using a 50% over-t                                       lap with each pass while holding the gun 8-10 inches from the
85% respectively.
  !                                      surface.                                                                               ,
N 3.
As a guide, coating material shall be applied using a 50% over-t lap with each pass while holding the gun 8-10 inches from the surface.
(.)
(.)
1                                                                                                                               :
1
{!.                                                                   y-;
{!.
1 p
y-;
l-w           +
p l-w
                                                                          ~ _ _ _
+
~ _ _ _


_    . . _ _ _ _ . . . . .  .... _ ...-. ~ -            . . - . - -
.... _...-. ~ -
                                                                              ------.s=                 -
------.s=
                                                                                                            .          . u   u
u u
  .                                                                        PROCEDURE                     EFFECTIVE
PROCEDURE EFFECTIVE BROWN & RCOT, INC.
  !                              BROWN & RCOT, INC.                           NUMBER       REVISION         DATE           PAGE CPSES
NUMBER REVISION DATE PAGE
].
].
l                                 JOB 35-1195                             CCP-30             10         1/26/82         10 of 13
CPSES l
                                                                                                      ~
JOB 35-1195 CCP-30 10 1/26/82 10 of 13
~
1 4.
Curing and time to recoat Phenoline 305 shall be as shown below:
Between Coats Temperature OF Final Cure 72 hours 50 - 59 12 days 36 hours 60 - 74 8 days 18 hours 75 - 89 4 days 12 hours 90 and above 2 days J
5.
Phenoline thinned at 50% and applied as a seal coat may be 0
recoated after 4 hours of cure at or above 75 F.
j
--6.
Tack free shall be defined as the extent of cure at which
~
j foreign contaminants will not adhere to the coating.
1
1
: 4. Curing and time to recoat Phenoline 305 shall be as shown below:
]
Between Coats                          Temperature OF            Final Cure 72 hours                                50 - 59                  12 days 36 hours                                60 - 74                    8 days 18 hours                                75 - 89                    4 days 12 hours                                90 and above              2 days J                                        5. Phenoline thinned at 50% and applied as a seal coat may be recoated after 4 hours of cure at or above 750F.
7.
j                                      --6. Tack free shall be defined as the extent of cure at which                          ~
The total coating system shall have a dry film thickness range a
j                                            foreign contaminants will not adhere to the coating.
of 7 to 11 mils, with a minimum spot check of 7 mils and a i
1
maximum spot check of 11.5 mils.
]                                        7. The total coating system shall have a dry film thickness range a                                             of 7 to 11 mils, with a minimum spot check of 7 mils and a i                                             maximum spot check of 11.5 mils.
1 1
1 1                         4.4.2.2         Repair of Runs and Sags - Runs and sags will be abraded until the DFT of the Phenoline 305 is within 1.9 - 4.5 mils. If cracks
4.4.2.2 Repair of Runs and Sags - Runs and sags will be abraded until the
)j                                        are visible, then runs and sags will be removed to primer by 1                                         power tool grinding followed by solvent wiping. If no cracking i                                       occurs, top coat will be considered acceptable. Area will be                                 ''
)j DFT of the Phenoline 305 is within 1.9 - 4.5 mils.
recoated as outlined in the Repair of Pinholes and Discontinuities j                                         (Section 4.4.2.4).
If cracks are visible, then runs and sags will be removed to primer by 1
t Repair of Embedded Foreign Particles - Foreign particles shall 4.4.2.3
power tool grinding followed by solvent wiping.
  !                                      be removed by abrading and then recoated as outlined in the
If no cracking i
  !                                      repair of pinholes and discontinuities. Recoating shall not be performed until cure times stated in Section 4.4.2.1(4) have been j                                        satisfied, j                         4.4.2.4         Repair of Pinholes and Discontinuities - Llose particles shall 4                                        be removed by brushing or vacuum r compres:;ed air. The affected I                                       area shall be solvent wiped with Phenoline 305 Thinner or xylol.
occurs, top coat will be considered acceptable.
:                                      Pinholes and small discontinuities may be repaired at the time of i                                       final inspection without a later reinspection of the repair. If the repair area requires recoating, recoat the area with Phenoline 305 thinned 50%. Recoated areas require cure to final inspection
Area will be recoated as outlined in the Repair of Pinholes and Discontinuities j
;                                        time per section 4.5.1.
(Section 4.4.2.4).
i l                       4.4.2.5         Repair of Scratches and Damaged Areas - Any scratches or damaged j
t 4.4.2.3 Repair of Embedded Foreign Particles - Foreign particles shall be removed by abrading and then recoated as outlined in the repair of pinholes and discontinuities. Recoating shall not be performed until cure times stated in Section 4.4.2.1(4) have been satisfied, j
j 4.4.2.4 Repair of Pinholes and Discontinuities - Llose particles shall be removed by brushing or vacuum r compres:;ed air. The affected 4
I area shall be solvent wiped with Phenoline 305 Thinner or xylol.
Pinholes and small discontinuities may be repaired at the time of i
final inspection without a later reinspection of the repair.
If the repair area requires recoating, recoat the area with Phenoline 305 thinned 50%. Recoated areas require cure to final inspection time per section 4.5.1.
i l
4.4.2.5 Repair of Scratches and Damaged Areas - Any scratches or damaged j
areas will be abraded until loosely adherent particles are re-moved. The area shall then be solvent wiped (Carboline thinner
areas will be abraded until loosely adherent particles are re-moved. The area shall then be solvent wiped (Carboline thinner
                                          #33 for primer, Carboline Phenoline thinner or xylol for topcoat)
#33 for primer, Carboline Phenoline thinner or xylol for topcoat)
]                                         and repaired with appropriate coating, i.e. , Phenoline 305 if j                                         damage is considered a minor defect per section 4.4.2.8 and Carbo Zinc 11 and Phenoline 305 if damaged area is considered a major
]
,:                                        defect per section 4.4.2.9. All edges of existing coating around J                                         the perimeter of the cleaned area shall be " feathered" back a l                                         sufficient distance et ensure a smooth blend with existing coating, Thickness shall be as required for the pertinent coating.
and repaired with appropriate coating, i.e., Phenoline 305 if j
y l
damage is considered a minor defect per section 4.4.2.8 and Carbo Zinc 11 and Phenoline 305 if damaged area is considered a major defect per section 4.4.2.9.
CCP-30 Rev. 10 DCN #7                                                       6/11/83             Page 2 of 3
All edges of existing coating around J
the perimeter of the cleaned area shall be " feathered" back a l
sufficient distance et ensure a smooth blend with existing coating, y
Thickness shall be as required for the pertinent coating.
l CCP-30 Rev. 10 DCN #7 6/11/83 Page 2 of 3


w .- - ~. .: - .. .           :.. . . ... .a             wa: ...m.:;- . . . .
z w.- - ~..: -...
z .-. .
:........a wa:...m.:;-....
                                                                          - .. .                          . ~ . . . , . .
. ~...,..
i I
i I
I     .
I PROCEDURE l
PROCEDURE     l               EFFECTIVE     ,
EFFECTIVE BROWN & ROOT, INC.
BROWN & ROOT, INC.                 NUMBER REVISION ,     DATE     -
NUMBER REVISION,
PAGE CPSES                 _ _ _
DATE PAGE CPSES JOB 35-1195 CCP-30 e
JOB 35-1195                                   ;
10 i
CCP-30     e       10   i   1/26/82   i   11 of 13 4.4.2.6     Brush touch-up painting shall be done on the finish coat in j                         accordance with the following:
1/26/82 i
I 1                         1. Carboline Application Instruction (Phenoline 305) Bulletin
11 of 13 4.4.2.6 Brush touch-up painting shall be done on the finish coat in j
  )
accordance with the following:
775.                                                                        .
I 1
: 2. Carboline Product Data Sheet (Phenoline 305 Primer and Finish)
1.
Carboline Application Instruction (Phenoline 305) Bulletin
)
775.
2.
Carboline Product Data Sheet (Phenoline 305 Primer and Finish)
Bulletin 473. Brush touch-up and complete application is allowed with no area restrictions.
Bulletin 473. Brush touch-up and complete application is allowed with no area restrictions.
4.4.2.7     Treatment of Rust Stains - If surface is contaminated with rust
4.4.2.7 Treatment of Rust Stains - If surface is contaminated with rust
    }                       stains or minute metallic particles, then surface shall be pre-j                       pared by solvent wiping with Phenoline 305 Thinner or xylol and overcoating with a coat of Phenoline 305 prepared in accordance with Section 4.4.2.4.
}
i           4.4.2.8     Repair of Topcoat and/or CZ 11 Minor Defects - (Minor defects are defined as an area, either circular or linear, in which a diameter circle could not be completely inscribed at any point along the entire 1ength.) Blast or abrade, by machinc or hand, the Pheno-line 305 finish surrounding the damaged area and clean any exposed i                       steel to ensure contaminant free surface. Solvent wipe the sur-                             -
stains or minute metallic particles, then surface shall be pre-j pared by solvent wiping with Phenoline 305 Thinner or xylol and overcoating with a coat of Phenoline 305 prepared in accordance with Section 4.4.2.4.
1                         rounding 305 finish with Carboline's Phenoline Thinner or xylol.
i 4.4.2.8 Repair of Topcoat and/or CZ 11 Minor Defects - (Minor defects are defined as an area, either circular or linear, in which a diameter circle could not be completely inscribed at any point along the entire 1ength.) Blast or abrade, by machinc or hand, the Pheno-line 305 finish surrounding the damaged area and clean any exposed i
t                       Spray or brush Phenoline 305 finish at approximately 4 mil DFT over 1                         the damaged area. Overlap onto the surrourding coating a sufficient l                       amount to insure a smooth and continuous topcoat system, i
steel to ensure contaminant free surface.
    !          4.4.2.9     Repair of Topcoat and/or CZ 11 Major Defects - (Major defects are defined as an area, either circular or linear, in which a h" I                       diameter circle could be completely inscribed at any point or along l                     the entire length.) Spot blast or abrade, machine or hand, the i                     damaged area. Power tool or hand abrading must be very thorough in
Solvent wipe the sur-1 rounding 305 finish with Carboline's Phenoline Thinner or xylol.
    ;                      order to prepare the surface for Carbo Zinc 11 touch-up. The result-
t Spray or brush Phenoline 305 finish at approximately 4 mil DFT over 1
    .                        ing surface preparation shall be equivalent to a near white SP-10
the damaged area. Overlap onto the surrourding coating a sufficient l
    !                        Specification. A surface roughness equivalent to a minimum of one
amount to insure a smooth and continuous topcoat system, i
    !                        mil blast profile shall be obtained.                                                          .
4.4.2.9 Repair of Topcoat and/or CZ 11 Major Defects - (Major defects are defined as an area, either circular or linear, in which a h" I
    )           4.4.3.0     Coating Interface - At coating interface for finish and/or primer coat, the existing coating shall be " feathered back" a sufficient distance to ensure a smooth final coating sytem. When interfacing the 305/CZ11 system and the 305/06 system, the interface of the two l                       primers shall be no greater than 1h" in width, s
diameter circle could be completely inscribed at any point or along l
j          4.4.3.1     Cure of Minor Topcoat Repair - Minor defects, as defined in Section
the entire length.) Spot blast or abrade, machine or hand, the i
:                      4.4.2.8, which are noted in the topcoat and repaired, may be in-spected for final acceptance af ter cure to recoat time as stated 1                         in Section 4.4.2.1(4) has been satisfied. Full cure to topcoat repairs shall be satisfied prior to placement into service.
damaged area.
I noemen m               _ - w_ a s ~ ___-- -
Power tool or hand abrading must be very thorough in order to prepare the surface for Carbo Zinc 11 touch-up. The result-ing surface preparation shall be equivalent to a near white SP-10 Specification. A surface roughness equivalent to a minimum of one mil blast profile shall be obtained.
)
4.4.3.0 Coating Interface - At coating interface for finish and/or primer coat, the existing coating shall be " feathered back" a sufficient distance to ensure a smooth final coating sytem. When interfacing the 305/CZ11 system and the 305/06 system, the interface of the two l
primers shall be no greater than 1h" in width, sj 4.4.3.1 Cure of Minor Topcoat Repair - Minor defects, as defined in Section 4.4.2.8, which are noted in the topcoat and repaired, may be in-spected for final acceptance af ter cure to recoat time as stated 1
in Section 4.4.2.1(4) has been satisfied.
Full cure to topcoat repairs shall be satisfied prior to placement into service.
I noemen m
w_ a s ~ ___-- -


                                                                    - . . .. ~:.... - - ~ - - ~ . .
~..
                                                  ~..                                                        -
-.... ~. - - ~ - - ~..
                                                                                                      - - - - - - . . . . . ~ . . - - .
- - - - - -..... ~.. - -.
PROCEDURE                                 EFFECTIVE f                  BROWN & ROOT, INC.                   NUMBER               REVISION             DATE               PAGE CPSES JOB 35-1195                     CCP-30                       10           1/26/82           12 of 13 l         4.5             FINAL ACCEPTANCE TESTING 4.5.1           Final acceptance inspection may be performed after a minimum topcoat cure of 24 hours and cure for recoat time as state in section 4.4.2.1 paragraph 4 is satisfied.
f PROCEDURE EFFECTIVE BROWN & ROOT, INC.
NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 12 of 13 l
4.5 FINAL ACCEPTANCE TESTING 4.5.1 Final acceptance inspection may be performed after a minimum topcoat cure of 24 hours and cure for recoat time as state in section 4.4.2.1 paragraph 4 is satisfied.
After final inspection and resolution of all discrepancies are completed the QC inspector shall document the final acceptance by completing and signing the final acceptance record. A copy will then be transmitted to the B&R Paint Superintendent as soon as possible after final accept-ance is made.
After final inspection and resolution of all discrepancies are completed the QC inspector shall document the final acceptance by completing and signing the final acceptance record. A copy will then be transmitted to the B&R Paint Superintendent as soon as possible after final accept-ance is made.
4.6             HOLD POINTS 4.6.1           Onsite receipt of coating materials.
4.6 HOLD POINTS 4.6.1 Onsite receipt of coating materials.
4.6.2           Substrates before and following surface preparation.
4.6.2 Substrates before and following surface preparation.
4.6.3           Mixing and preparation of coating material for application.
4.6.3 Mixing and preparation of coating material for application.
4.6.4           Film characteristics after drying and curing.
4.6.4 Film characteristics after drying and curing.
4.6.5           Control of ambient conditions and surface temperatures during all phases of the coating work.                                                                             '
4.6.5 Control of ambient conditions and surface temperatures during all phases of the coating work.
5.0             SUPPORTING INFORMATION l         5.1             ATTACHMENTS
5.0 SUPPORTING INFORMATION l
    !                        1. Painter Qualification Record
5.1 ATTACHMENTS 1.
    ?
Painter Qualification Record
: 2. Special Coating Procedure
?
: 3. CZ 11 Cure to Topcoat Time
2.
: 4. Pot Life CZ 11 and Phenoline 305
Special Coating Procedure 3.
CZ 11 Cure to Topcoat Time 4.
Pot Life CZ 11 and Phenoline 305


==5.2             REFERENCES==
==5.2 REFERENCES==
: 1. Gibbs & Hill Specification 2323-SS-14,
1.
                                  " Containment Steel Liner", Latest Revision
Gibbs & Hill Specification 2323-SS-14,
: 2. Steel Structures Paint Council, Volume 2, Second Edition i                         3. Carboline Corporation " Application Instruction",
" Containment Steel Liner", Latest Revision 2.
October 76-N Revision and Bulletin Number 775 - data sheets October 76-N Revision and 473, Latest Revision
Steel Structures Paint Council, Volume 2, Second Edition i
: 4. ANSI N 101.2,
3.
                                  " Protective Coatings (Paints) for Light Water Nuclear Reactor Containment Facilities"
Carboline Corporation " Application Instruction",
: 5. Gibbs & Hill Specification 2323-AS-31,
October 76-N Revision and Bulletin Number 775 - data sheets October 76-N Revision and 473, Latest Revision 4.
                                  " Protective Coatings", Latest Revision j
ANSI N 101.2,
f           CCP-30 Rev 10 DCN #7                                                           f.M5Uuna             Pmo 3 of a
" Protective Coatings (Paints) for Light Water Nuclear Reactor Containment Facilities" 5.
Gibbs & Hill Specification 2323-AS-31,
" Protective Coatings", Latest Revision j
f CCP-30 Rev 10 DCN #7 f.M5Uuna Pmo 3 of a


                                                                                            ~^
~
                                      ~
e,
                                                                  ~
~
e,                      ,.                                      .
.n
                                                                                    .n          .
~ ^
lw t>
lw
                .. .                ....--~-.u....-.-..i..:.2.....-......,.-.:--.:....u..
....--~-.u....-.-..i..:.2.....-......,.-.:--.:....u..
:i PROCEDURE                     EFFECTIVE BROWN & ROOT, INC.               NUMBER         REVISION       DATE         PAGE CPSES JOB 35-1195 CCP-30               10     1/26/82       13 of 13   l
t>:i PROCEDURE EFFECTIVE BROWN & ROOT, INC.
+1
NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 13 of 13
  'i
+ 1
;i                           6. Gibbs & Hill Specification 2323-MS-101,
'i
    '.                          " Equipment Erection", Latest Revision
;i 6.
;j                           7. Gibbs & Hill Specification 2323-MS-438,
Gibbs & Hill Specification 2323-MS-101,
    .                            " Nuclear Piping", Latest Revision l                           8. Gibbs & Hill Specification 2323-MS-44B,
" Equipment Erection", Latest Revision
'j                           ~
;j 7.
                                "Non-Nuclear Piping"
Gibbs & Hill Specification 2323-MS-438,
                                                                ~
" Nuclear Piping", Latest Revision l
i                       9. Gibbs & Hill Specification 2323-MS-100,
8.
.i                               " Piping Erection" i
Gibbs & Hill Specification 2323-MS-44B,
  !j                         10. Gibbs & Hill Specification 2323-SS-17, 7j                               " Miscellaneous Steel", Latest Revision 1
'j
~
"Non-Nuclear Piping"
~
i 9.
Gibbs & Hill Specification 2323-MS-100,
.i
" Piping Erection" i!j
: 10. Gibbs & Hill Specification 2323-SS-17, 7j
" Miscellaneous Steel", Latest Revision 1
1
1
.t p
.t p
  , t
, t
  'i I ';
'i I ';
i l
i l 3
3 ll t
ll t
i l
i l
1 j
1j u
u
.i
.i
-k
-k


                                                                                          -    ...'.I...._....,......._,,,
...'.I...._....,......._,,,
PROCEDURE                             EFFECTIVE g
PROCEDURE EFFECTIVE BROWN & ROOT, INC.
BROWN & ROOT, INC.                 NUMBER             REVISION           DATE             PAGE                     !
NUMBER REVISION DATE PAGE g
I                                         CPSES l                                                                                                   l
I CPSES l
[                                     J08 35-1195 l                                                                   CCP-30                 10           1/26/82         1 of 1
l
                                                                                                                                ,t ATTACHMENT 1
[
  ,I s    BROWN & ROOT, INC.
J08 35-1195 l
g g                                                  COMANCHE PEAK STEAM ELECTRIC STATION
CCP-30 10 1/26/82 1 of 1
{                                                                                         '    .  :.: 24di             . _ .              ~
,t ATTACHMENT 1
I                                                         Painter Qualification Record "                 ['fi GENERAL DATA 1
,I BROWN & ROOT, INC.
s g
COMANCHE PEAK STEAM ELECTRIC STATION g
{
:.: 24di
~
I Painter Qualification Record "
['fi GENERAL DATA 1
a 9
a 9
Date                                                 Report Number                                   _
l Date Report Number l
l l
TECHNICAL DATA Name of Painter Suninary of Field Experience 41 1
TECHNICAL DATA Name of Painter Suninary of Field Experience 41 1
I                                                                                                 '
I i
i                            Experience with Following Product Types i
Experience with Following Product Types i
Application Test for Specified Substrate h                             . Additional Quai f fications (School)
Application Test for Specified Substrate h
. Additional Quai f fications (School)
L' L
L' L
Signature Applicator's Fiela Superviscr
Signature Applicator's Fiela Superviscr Distrit:ution: Painting Supt.
-                              Distrit:ution: Painting Supt.
Q.C. Depart:nent
Q.C. Depart:nent Tugco QA Vault (Original.l_
[
[
Tugco QA Vault (Original.l_
(
(
9                                                                          M. - ]
M. - ]
9


      ; i.  - - , .
i.
                                                                                                              =.a=       - a.a._
=.a=
                                                                                                                                                        -c.: u e.=:=..~.2 o
- a.a._
a PROCEDURE                                             EFFECTIVE i                  BROWN & ROOT, INC.                         NUMBER                       REVISION                 DATE                     .
-c.: u e.=:=..~.2 o
PAGE       .
a PROCEDURE EFFECTIVE BROWN & ROOT, INC.
l
NUMBER REVISION DATE
,i                            CPSES i:
,i CPSES PAGE i
: l.                       JOB 35-1195
l i:
;                                                              CCP-30                               10             1/26/82                                   1 of 2 ll "Q" Coating                             ATTACHMENT 2                                       Sheet             of Procedure #
l.
                    "Non-Q" Coating                                                                             Rev.                 Oate SPECIAL COATING PROCEDURE NO.
JOB 35-1195 CCP-30 10 1/26/82 1 of 2 ll "Q" Coating ATTACHMENT 2 Sheet of Procedure #
"Non-Q" Coating Rev.
Oate SPECIAL COATING PROCEDURE NO.
SCOPE REQUIREMENTS:
SCOPE REQUIREMENTS:
u   i 1
u i
J
1 J
~{.
~{
t 4
t 4
;)
;)
o                                                                                                   .
o REFERENCE DOCUMENTS APPROVALS POE 4
REFERENCE DOCUMENTS                                                                 APPROVALS POE 4
I QA/QC q
I QA/QC q                                                                                                       TUSI a
TUSI a
;;                                                                                                      ENGINEER
ENGINEER
'I                                                                                                       REV .                 DATE il
::'I REV.
    ;                                                                          m-             -m J
DATE il:;
i                 .          .                    _      __                  .. - ._            __
m-
-m J
i


          'h
'h
_ . . - -      .      ..._ L.       L _ -. :.         . . - . _ -    ..-......2..-                                         :.  ...._.a I
..._ L.
PROCEDURE                               EFFECTIVE !
L _ -. :.
BROWN & ROOT, INC.                 NUMBER             REVISION             DATE                                           PAGE CPSES l
..-......2..-
JOB 35-1195 I                                                                   CCP-30               10             1/26/82                                           2 of 2 4
...._.a I
1 a                                                                                                         Sheet                                           of i                                                   .
PROCEDURE EFFECTIVE !
ATTACHMENT 2 (Continued)                 Procedure #
BROWN & ROOT, INC.
u 1                                                                                               Rev.           . Date i
NUMBER REVISION DATE l
PAGE CPSES JOB 35-1195 I
CCP-30 10 1/26/82 2 of 2 4
1 a
Sheet of i
ATTACHMENT 2 (Continued)
Procedure #
u 1
Rev.
. Date i
1 REQUIREMENTS (Continued) 1 l
1 REQUIREMENTS (Continued) 1 l
4 1                                                                                         .
4 1
l t
l t
      !                                                                                                                          ~
1
1
    .i 4
~
i, l 4 1
.i 4
  .j                                                                                                             .
i, l
l
4 1
  .t 4
.j l
P   i 4
.t 4
  .3 i
P i
7N --
4
1 l 1 -.       .      ,  ,,
.3 i
__._____ _ __ _ _ _ .____.______.__ _                  _________J
7N 1
l 1 -.
_________J


                                        ....w-..~..-...-....                                                   - . - -          . ... ... ..- -          .    . . ., . . . . . ~ . - . .
....w-..~..-...-....
PROCEDURE                                       EFFECTIVE BROWN & ROOT, INC.                                   NUMBER             REVISION                     DATE                 PAGE CPSES JOB 35-1195                                   CCP-30                           10           1/26/82             1of 2 Attachment 3 CZ-11 CURE TO TOPC0AT TIME 25-50% R. H.
..,..... ~. -..
4               *
PROCEDURE EFFECTIVE BROWN & ROOT, INC.
              . .L?lmi                                 .
NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 1of 2 CZ-11 CURE TO TOPC0AT TIME 25-50% R. H.
j                .e.. -
4
                    .; g                                                                           -
..L?lmi j
                    . . .                                ,3q _
.e.. -
  %      k
.; g
  .I                                                       168 i
,3q _
W                        ,
k
8                      -
.I 168 i
E o                  m-O                     -
W8 E
H                1 11 -                                                                                         ,                    ,
m-o&
O H
1 11 -
w W
w W
M 1
M 3
3                 .-  -                                      ,.
1 m
m                                                             ,
' w-i 4
4                                   t/1
t/1 8
                                                          ' w-                                          i 8                                    M                     <
M t
t i                                   D 1                                                                                                 l 1                                                   '
i D
th                                       -
1 l
i                                     i l                                                                                                  '
1 th l
I e                                                        g _"
i i
p                   !                  t a-l i
I g _"
bA d
e t
E                                                           !
p l
Y T     r y v           v           r         . -          -          -    .      .
a-i b A d
  .i                                                             o           10       se     3a       w     to           La         70     m       94
E Y T r
* 1 I
y v v
r
.i o
10 se 3a w
to La 70 m
94 1
:}
:}
                                                                                                                                                                                                \
\\
l                                                                                                 TEMPERATURE
l TEMPERATURE
..-i                                                                                     .
..-i M
M                                Mf 8
Mf 8
* L . D s,"                                             .                                 ~~,
 
          .;. -.    -m....-            _-
>=u u '
                                            , r.
~ ~,
m-       - . c_. -- -               >=u          u '                      .      m.        ..
L. D s,"
j .. . .
, r.
r   .
-m....-
m-
-. c_. -- -
m.
j....
r
,1
,1
:j                                                                                           PROCEDURE                                                       EFFECTIVE BROWN & ROOT, INC.
:j PROCEDURE EFFECTIVE
]
BROWN & ROOT, INC.
NUMBER REVISION DATE PAGE CPSES j,
JOB 35-1195 CCP-30 10 1/26/83 2 of 2 1a il i
ATTACHMENT 3 I4 CZ-11 CURE TO TOPCOAT TIME L
50-100% R.H.
1 A,
ll 828.
3 J
]
]
CPSES NUMBER REVISION                              DATE                            PAGE j,                                  JOB 35-1195                                                CCP-30                              10                        1/26/83                          2 of 2 1
In -
a il i                                                                                              ATTACHMENT 3 I4                                                                            CZ-11 CURE TO TOPCOAT TIME L                                                                                                50-100% R.H.
I t
1 A,                                                .      .
ll 828 .
3 J                                                :
    ]                                      In -
I                                         :
t                                   *.    .
41 -
41 -
1                                         :                                                  '
1 V
                                                  -                                                                                                                                                            V 4                      H
u.
: u.     .
4 H
I o
I o
e v
e
'.: s                           s            (, o i                       o H                                                                                                                                                   -
'. s v
  .j                           P-                l                                                                                        .
(, o so i
m           W-                 -
H P-l
2 e                 .
.j 2
0 9
m W-e 0
                                                                                                                                        ~.
9
        ;                                    3       ..                                                                _.                                          -...
~.
1 l                                   y_               _ . _ . .                                              .                    ., ..._ - . . _ . .
3 1
t                                                                                     _
l y_
lo                                                                                                                                           -
t lo i.
: i.                                     ta -                                                                                                             . . .
ta -
3
3 C
:                                                                                                      C                           -
3, i 4
3,                                           ;                                                                            .
- g-
                                                    .        ;    i 4
'g-
                                                                          - g-             .      'g-           'I         '
'I 6
6          4             t                 i       'l
4 t
                                                            ,.            w            w           4           so           u       ,y               so               -a       ud I
i
'l w
w 4
so u
,y so
-a ud I
i
i
        ?
?
1 i
1 i
TEMPERATURE F
TEMPERATURE F
                                                                            ~
~
                                                                          '                                                                                ~~
~~
CCA30_ Rcm 10 DCN #6 4/E9/83                                 .            Sheet 4 nea
CCA30 Rcm 10 DCN #6 4/E9/83 Sheet 4 nea


Y,_          k. ,- L..
k
l.'.'.. . . M
* ' ' ~ ~ "'' N :b. ".
                                                              -..'. . *      - - . . .  * ' ' ~ ~ "'' N :b . ".
. L - --. -,-..
                                                                                                                                              . L - -- . - ,-. .
.. l.... l Y,_
                                                                                                                                                                          .. l. ... l i               ;
.,- L l.'.'.. M i
PROCEDURE                                       EFFECTIVE J                                     BROWN & ROOT, INC.                                   NUMBER                   REVISION             DATE                 PAGE CPSES i                                       JOB 35-1195 l                                                                                               CCP-30                   10               1/26/82           1 of 1 t
PROCEDURE EFFECTIVE J
]                                                                                           ATTACHMENT 4
BROWN & ROOT, INC.
-} <                                                                                   POT LIFE - CZ 11 J
NUMBER REVISION DATE PAGE CPSES i
]                                              8I"n.
JOB 35-1195 l
                                                                        ~
CCP-30 10 1/26/82 1 of 1 t
G Hours Max. Pot Life il                                           %.      s m
]
a                                                                                                                                                     .
ATTACHMENT 4
2 net._                                                       ..
-} <
l                                           I w.--                                            ---        --
POT LIFE - CZ 11 J]
  .!                                          o n,                      l.....,......l..............l.                   . ........ l .. ...
G Hours Max. Pot Life 8I"n.
l                                                   o's             -is*v                 W!                 IoS*!             don;             ml I3 5'I' 1                                                                                                               -
~
il s
m a
2 net._
l I w.--
l.....,......l..............l.
......... l.....
ml 5'I' o n, l
o's
-is*v W!
IoS*!
don; I3 1
M
M
  .,~                                         .
.,~
POT LIFE PHENOLINE 305 TEMPERATURE (OF )                           UNTHINNED                         THINNED-50%
POT LIFE PHENOLINE 305 TEMPERATURE (O )
j'                                                     50 - 54 55 - 59
UNTHINNED THINNED-50%
                                                                                                    ,10 hrs                           24 hrs d
F j'
7 hrs                         24 hrs 60 - 64                                   4 hrs                             24 hrs 65 - 69                                     als hrs                         24 hrs 70 - 74                                       2 hrs                         24 hrs 75 - 79                                     1 hrs                             24 hrs 80 - 84                                     I hrs                           24 hrs
50 - 54
    ,                                                    85 - 89                                     1h hrs                           24 hrs
,10 hrs 24 hrs 55 - 59 7 hrs 24 hrs d
                ,                                        90 - 95                                       1 hr                         24 hrs                     '        *
60 - 64 4 hrs 24 hrs 65 - 69 als hrs 24 hrs 70 - 74 2 hrs 24 hrs 75 - 79 1 hrs 24 hrs 80 - 84 I hrs 24 hrs 85 - 89 1h hrs 24 hrs 90 - 95 1 hr 24 hrs Pot life for coatings thinned up to but not including max. amount
    ,              .                                        Pot life for coatings thinned up to but not including max. amount
:j of thinner allowed, use pot life for unthinned material.
:j                                                         of thinner allowed, use pot life for unthinned material.
.r For spray application, pot life as stated above is recommended maximum times and should be utilized for a basis for coating i^
.r                                                         For spray application, pot life as stated above is recommended
usage time; however, actual pt life may be longer.
    ';                                                      maximum times and should be utilized for a basis for coating i^                                                       usage time; however, actual pt life may be longer. If coating 1''                                                      when temperature is above.95 F, or if pot life as stated above j                                                           has been exceeded, the actual pot life ends when proper atomization
If coating when temperature is above.95 F, or if pot life as stated above 1''
    .,                                                    and spraying becomes difficult and the coating loses body and i                                                         begins to sag. When utilizing other than spray application methods.
j has been exceeded, the actual pot life ends when proper atomization and spraying becomes difficult and the coating loses body and i
l'                                                     pot life shall be as stated in the above table.
begins to sag. When utilizing other than spray application methods.
l' pot life shall be as stated in the above table.
ii'
ii'
                                                                      ~
~
CCP-30 Rev. 10 DCN #3 9(21/82                       Sheet 4 of 4
CCP-30 Rev. 10 DCN #3 9(21/82 Sheet 4 of 4


d
d ATTACHMENT B iNSTAUC"CN ISSUE
  .                                                                                ATTACHMENT B iNSTAUC"CN                         ISSUE TEXAS UTluT*ES GE.NESAENG CO-           NUM E E.7       .EVISIC
.EVISIC N g-g 4Gg TEXAS UTluT*ES GE.NESAENG CO-NUM E E.7 CPSES I
                                                                      -      N        g-g    4Gg CPSES I
CI-QP-11. 4-1 3
CI-QP- 11. 4- 1           3 MAY 2 9 Ic81 1 of 6 m alO                 8 Bs .
MAY 2 9 Ic81 1 of 6 m alO 8 Bs.
hb        A                              '
lb,'
lb,'
f                                            2: EPARED3(:.lg.,d .c-J G . . ., < '.
hb A
igya INSPECTION OF STEEL                                                           "
EPARED3(:.lg.,d.c-J G..., < '
SUBSTRATE SURFACE PREPARATION                                                                 ,-
igya f
APPPOVED3)       Lb b       -
2:
m-
INSPECTION OF STEEL SUBSTRATE SURFACE PREPARATION APPPOVED3)
Lb b m-


==1.0       REFERENCES==
==1.0 REFERENCES==
1-A CP-QP-11.4, " Inspection of Protective Coatings" 2.0 GENERAL 2.1 PURPOSE AND SCOPE This Instruction wil1 supplement the requi recents of Reference 1-A for inspection of steel substrate surface p repa ra ti on.
The Surface Preparation Inspecticn Checklist (Figure 1) shall be used to document inspecticns.
3.0 INSTRUCTION 3.1 PRE-BLAST CLEANING OPERATIONS 3.1.1 Mbient Conditions The inspector shell determine air temperature, relative humidity and dew point of substrate structures.
A 4
calibrated non-cortury filled dry bulb thennaneter or a i
fcalibrated temperatu're recorter (Bristol 4069 TH or i
equivalent) shall ce used for air temperature de te min-a ti on.
A calibra ted non-mercu ry wet bulb thermaneter or'a calibrated h' midi ty reccrce r (Bristol 4069 u
TH or equiva' lent) shall be used to detemine relative humidity. The dew point shall be cetemined by the i
difference in the dry and wet bulb temperatures using the U.S. Department of Canmerce Weather 3ureau Psychronetric Tables, W.B. No. 235.
The su rface temperature shall be determined t;' placing a calibrated surface tempera 5ure themameter (0mega - Mprove Fastemp, Range 10-250 F) in contact with the substrate surface to be blast cleaned.
The themometer,: robe shall remain in contact with the surface until tne temperature reading stabilizes.
*, s.
?


1-A        CP-QP-11.4, " Inspection of Protective Coatings" 2.0        GENERAL 2.1        PURPOSE AND SCOPE This Instruction wil1 supplement the requi recents of Reference 1-A for inspection of steel substrate surface p repa ra ti on. The Surface Preparation Inspecticn Checklist (Figure 1) shall be used to document inspecticns.
. _. ~ ~
3.0          INSTRUCTION 3.1        PRE-BLAST CLEANING OPERATIONS 3.1.1      Mbient Conditions The inspector shell determine air temperature, relative humidity and dew point of substrate structures. A                        4 calibrated non-cortury filled dry bulb thennaneter or a                  i fcalibrated temperatu're recorter (Bristol 4069 TH or                                    i equivalent) shall ce used for air temperature de te min-a ti on . A calibra ted non-mercu ry wet bulb thermaneter or'a calibrated h'u midi ty reccrce r (Bristol 4069 TH or equiva' lent) shall be used to detemine relative humidity. The dew point shall be cetemined by the                        i difference in the dry and wet bulb temperatures using the U.S. Department of Canmerce Weather 3ureau Psychronetric Tables, W.B. No. 235. The su rface temperature shall be determined t;' placing a calibrated surface tempera 5ure themameter (0mega - Mprove Fastemp, Range 10-250 F) in contact with the substrate surface to be blast cleaned. The themometer ,: robe shall remain in contact with the surface until tne temperature reading stabilizes.
--..,.. ~ ~. ~.
          *, s .                                        #
o INSEUCTCN i l
    ?
AEVISICN b
 
DAGE NUMBER
              ...  ._.~~                                                                   -.    -- . . , . . ~ ~ . ~ .
: f. A a..
o INSEUCTCN i     AEVISICN l
I TEXAS UT1UT1ES GENE 3ATING CC.
b       DAGE NUMBER                     f. A a ..
l lQl-QP-11.4-l' 3 MAY 2 9 1981 3 of 6 i
                                                                                      -        I TEXAS UT1UT1ES GENE 3ATING CC.
I C ri te ri a :
l                                       lQl-QP-11.4-l'             3 MAY 2 9 1981   i      3 of 6 I
i SSPC-SP10-63 i
C ri te ri a :                                                                         i SSPC-SP10-63 i
Heavy deposits of oil or grease shall te rencved by T.ethods outlined in SSPC-SP-63, " Solvent Cleanin;".
Heavy deposits of oil or grease shall te rencved by T.ethods                         !
Small quantities of oil or grease may be rencvec by blast cleaning.
outlined in SSPC-SP-63, " Solvent Cleanin;". Small                                   !
i 3.1.5 Substrate Su rface Projecti ons i
quantities of oil or grease may be rencvec by blast cleaning.                                                                             i 3.1.5     Substrate Su rface Projecti ons                                                     i The inspector shall visually examine the substrate surface (including welds) for sham projecticns that will not be blended in by sandblasting or pmer tooling.
The inspector shall visually examine the substrate surface (including welds) for sham projecticns that will not be blended in by sandblasting or pmer tooling.
I i                C ri te ri a :
I C ri te ri a :
l Edges, protrusions, and peaks shall be grounded smooth to a                         i rounded contour.                                                                   -l i
i l
l               NOTE:         a. Any mechanical surface preparaticn other                       i than sandblasting or grinding of sha m edges j                                     or weld splatter will requi re a B&R NDE i                                     visual inspector's acceptance of the work                     j l                                     pe rf o rmed.                                                 ;
Edges, protrusions, and peaks shall be grounded smooth to a i
: b. The inspector shal1 notify tne Paint Foreman i
rounded contour.
when items 3.1.1 througn 3.1.5 above a re
-l i
!                                                sa tis fact ory.
l NOTE:
l i     3.2       BLAST CLEANING OPERATIONS 3.2.1     Blast Tech,.foue is Acceotable                                                       ,
a.
I l                           During blast cleaning operations, the inspector shall spot
Any mechanical surface preparaticn other i
!                          check blasting technique. Dwell time shall be observed and                           I i                          locations noted (for future surface in-spection) where dwell time was extended to remove heavy deposits of mill                                             l scale / rus t.                                                                       l C ri te ri a .                                                                                 1 I
than sandblasting or grinding of sha m edges j
i        !
or weld splatter will requi re a B&R NDE i
          !                DwelI time wil1 depend on surface conditions (type and                               .
visual inspector's acceptance of the work j
amount of mill scale / rust). No finn time limits are i                 established for                   Longer dwell time indicates heavier depw i ts o f s .. . . . .e<.and these a reas should be identi fieu                   {
l pe rf o rmed.
QMomm '                   .n-
b.
The inspector shal1 notify tne Paint Foreman when items 3.1.1 througn 3.1.5 above a re i
sa tis fact ory.
l i
3.2 BLAST CLEANING OPERATIONS 3.2.1 Blast Tech,.foue is Acceotable I
l During blast cleaning operations, the inspector shall spot check blasting technique.
Dwell time shall be observed and I
locations noted (for future surface in-spection) where dwell i
time was extended to remove heavy deposits of mill l
scale / rus t.
l 1
C ri te ri a.
I DwelI time wil1 depend on surface conditions (type and i
amount of mill scale / rust).
No finn time limits are i
established for Longer dwell time indicates heavier
{
depw i ts o f s...... and these a reas should be identi fieu QMomm '
.n-e<.


g                                     w INSTRUCTCN ' AEVISICN Ib3N"    ,
g w
PAGE 3
INSTRUCTCN ' AEVISICN Ib3N PAGE TEXAS UT1UT1ES GENESADNG CC.
TEXAS UT1UT1ES GENESADNG CC.
3 CMES QI-QP-11.4-l!
CMES QI-QP-11.4-l!i          3 'MAY 2 9 1981 '   4 cf 6;
3 'MAY 2 9 1981 '
                                                                                ?             ;
4 cf 6; i
I 3.3       POST BLAST CLEANING OPERATIONS 3.3.1     Blast Cleanup The inspector shall visually check the blasted substrate surface and adjacent areas for removal or control of abrasive and dust prior to start of final inspecticn.                       3 l
?
C ri te ria :                                                               l I
I 3.3 POST BLAST CLEANING OPERATIONS 3.3.1 Blast Cleanup The inspector shall visually check the blasted substrate surface and adjacent areas for removal or control of 3
The surface shall be brushed or vacuumed to the extent required for final surface inspection. The adjacent areas shall be cleaned to the extent necessary to avoid contamination during subsequent coating applications.
abrasive and dust prior to start of final inspecticn.
3.3.2     Blasted or Power Tooled Surface Acceptability                               l j                 The inspector shall perfom the following inspections to i
l C ri te ria :
detennine acceptability of the blast cleaned or power tooled su rface:
l I
l,
The surface shall be brushed or vacuumed to the extent required for final surface inspection.
: a.     Absence of Foreign Matter -- A visual inspecticn shall             :
The adjacent areas shall be cleaned to the extent necessary to avoid contamination during subsequent coating applications.
be perfomed to detemine removal of foreign catter                   i fran the su rface.                                                 l, i
3.3.2 Blasted or Power Tooled Surface Acceptability l
j The inspector shall perfom the following inspections to detennine acceptability of the blast cleaned or power tooled l,
i su rface:
a.
Absence of Foreign Matter -- A visual inspecticn shall be perfomed to detemine removal of foreign catter i
fran the su rface.
l i
C ri te ria :
C ri te ria :
l l                           SSPC-SP10-63 I
l l
The surface, when viewed withcut magnificaticn, shall be free of all oil, grease, visible mill scale, rust, corrosion products, oxides, paint, or any foreign matter, except for light shadows, slignt streaks, or               l slight discolorations caused by rust stain, mill scale             I oxides, or slight, tight residues of paint.                       l 1
SSPC-SP10-63 I
: b.     Removal of Sharp Projections -- A reinspection for                 ;
The surface, when viewed withcut magnificaticn, shall be free of all oil, grease, visible mill scale, rust, corrosion products, oxides, paint, or any foreign matter, except for light shadows, slignt streaks, or l
sha rp projections that were not blended (rounded)                 g during blast cleaning or power tooling shall be                     !
slight discolorations caused by rust stain, mill scale I
pe rfomed.                                                         '
oxides, or slight, tight residues of paint.
1                         .
l 1
C ri te ria :
b.
Sharp projections (including weld splatters) are not               l acceptable. Sae note on item 3.1.5 above reganting                 ;
Removal of Sharp Projections -- A reinspection for sha rp projections that were not blended (rounded) g during blast cleaning or power tooling shall be pe rfomed.
grinding ope-     ons to r' .icve projections.                     ~
1 C ri te ria :
                                                      . m e:c ca - . ...-.
Sharp projections (including weld splatters) are not l
acceptable.
Sae note on item 3.1.5 above reganting grinding ope-ons to r'.icve projections.
~
3--
c---.
c---.
3--
. m e:c ca -....-.


N
N i
                                                                            .        i INSTRUCTICN f AEVISlCN         f^0N'*            PAGE TEXAS UT1UTIES GENERATING CC.
INSTRUCTICN f AEVISlCN f^0N PAGE TEXAS UT1UTIES GENERATING CC.
CPSES                                               i              ,
CPSES QI-QP-11. 4-1,j 3 ;MAY 2 9 1981 i S of 6i i
j QI-QP- 11. 4- 1,j       3 ;MAY 2 9 1981 i         S of 6i l         I                               ,
j l
i i
I i
: c.     Anchor Pattern Depth -- The anchor pattern depth of the blasted or power tooled surface shall be inspected at random locations using a Keane-Tator Surface Profile Camparator (model 373) or equivalent. A power tooled surface shall be inspected with use of either a roughness gage and/or canparator plate whicn has been approved by the coating manufacturer.
i c.
C ri te ria :   Blast Cleaning SSPC-SP10-63T The anchor pattern depth for a blasted surface shall not be less than 1S70 (minimum depth 1.0 mils).
Anchor Pattern Depth -- The anchor pattern depth of the blasted or power tooled surface shall be inspected at random locations using a Keane-Tator Surface Profile Camparator (model 373) or equivalent. A power tooled surface shall be inspected with use of either a roughness gage and/or canparator plate whicn has been approved by the coating manufacturer.
Powe r tooling - Power Tooling (SSPC-SP3-63) may also be used with no Area Restrictions, providing this type                   '
C ri te ria :
prepa ration produces an Acceptable Surface Canpa rable to SSPC-SP10-63T.
Blast Cleaning SSPC-SP10-63T The anchor pattern depth for a blasted surface shall not be less than 1S70 (minimum depth 1.0 mils).
The Anchor Oattern Depth for a power tooled surface I                         shall not be less than 1 nil. fio maxinun profile         will be specified, providing that correct millage l                           requirements can be obtained after priner application.                 !
Powe r tooling - Power Tooling (SSPC-SP3-63) may also be used with no Area Restrictions, providing this type prepa ration produces an Acceptable Surface Canpa rable to SSPC-SP10-63T.
l                                                                                                 l' i       3.4         FIflAL ACCEPTANCE The inspector shall detennine that all FCRs ano NCRs are canplete prior to signing and dating Final Acceptance on i
The Anchor Oattern Depth for a power tooled surface I
checklist.
shall not be less than 1 nil.
e l
fio maxinun profile will be specified, providing that correct millage l
              !                                                                                                  i I                                                                                                   !
requirements can be obtained after priner application.
t t
l l
i l                                                                                                   5   1 i                                                                                                   ;    !
i 3.4 FIflAL ACCEPTANCE The inspector shall detennine that all FCRs ano NCRs are canplete prior to signing and dating Final Acceptance on checklist.
i e
l i
I t
t i
l 5
1 i
i I
i I
                                  ~               -'                                                              f meni = ,                                       %c3 c4 -
~
f meni =,
%c3 c4 -


                                                                                                ~                                                     __
~
_ y
_ y r
* r INSTRUCTION           g g,/ISICN             ISSUE NUMBER                                     DATE     !    PAG:
INSTRUCTION ISSUE g g,/ISICN NUMBER DATE PAG:
TEXAS UTILITIES GENERATING CC.
TEXAS UTILITIES GENERATING CC.
CPSES GI-QP-11.4-1                               MAY 2 9 1981 3                               6 Of 6 FIGURE 1 QUALITY ASSURANCE DEPARTMENT i
CPSES MAY 2 9 1981 GI-QP-11.4-1 3
STEEL SUBSTRATE SURFACE PREPARATION INSPECTION CHECKLIST Location:                                                                             Building:
6 Of 6 FIGURE 1 QUALITY ASSURANCE DEPARTMENT STEEL SUBSTRATE SURFACE PREPARATION INSPECTION CHECKLIST i
Project:     CPSES, Job 35-1195                                                     Unit:
Location:
1 TIME OF                                                   TEMPERATURE                             I RELATIVE                 DEW DAY         DRY SUL3 {                                       WET SULB j     S U R F A C F.
Building:
l MUMIDITY               POINT Results             Initial       Date
Project:
: 1. Ambient Conditiona
CPSES, Job 35-1195 Unit:
: 2. Air Supply / Sand
1 TIME OF TEMPERATURE I RELATIVE DEW DAY DRY SUL3 {
: 3. Surface Projections 4     Sand 31ast Cleanup
WET SULB j S U R F A C F.
: 5. Surface & Profile Acceptable
l MUMIDITY POINT Results Initial Date 1.
: 6. Absence of Foreign Matter 7     Removal of Sharp Projections COMMENTS FINAL ACCEPTANCE:
Ambient Conditiona 2.
Inspector                                           Date t
Air Supply / Sand 3.
Surface Projections 4
Sand 31ast Cleanup 5.
Surface & Profile Acceptable 6.
Absence of Foreign Matter 7
Removal of Sharp Projections COMMENTS FINAL ACCEPTANCE:
Inspector Date t
4
4
      ,    ,,                                                                          - UGCO 04 I
- UGCO 04 I


ATTACHMENT C
ATTACHMENT C NO CONFORhhANCE hk)RT (NCR) s:
                '$-                                                    NO CONFORhhANCE hk)RT (NCR) s:
''' Q,
Q
Q
                          ,        Q
.t
                                    . . ..        . .&. . .              . .            .t   .......mt                 .........................
.......mt h
SERI AL NO.
PLANT system COMPONENT TACISPIN/lOE N T NO I DH /..'e tNC15PE CIFIC ATION NO.
h p
l SERI AL NO.
PLANT
p
              . COct system CODE COMPONENT CODE TACISPIN/lOE N T NO Al8lCl0lE lF [
. COct CODE CODE Al8lCl0lE lF [
I DH /..'e tNC15PE CIFIC ATION NO.
G ; (U n.tst l H ; (Unsul I J ! (Units)
G ; (U n.tst l l
([
H ; (Unsul I               J ! (Units) s.10             11 16                                                                       17 55
i4 s.10 11 16 17 55 g
([ i4 g                                                                g                                                                             ARMS y                  .............                             ..t INDEXED
g ARMS INDEXED
: r.                          PURCH ASE ORDE R                 VEND f                                 NUN 9BER                   CODE                                                                                                                     _
..t yr.
5669                       7473 DWs 3                                                                                                                                             C-903-g      ,021978 P        -
PURCH ASE ORDE R VEND f
,                  ,g     e ..     . . ...          . . . .... . t .                     t t t , t . . ..             t t t t t       I t t , t t                   ,t   .        I t t t T'                     p.t R R             HIR             VEN DO R'S                         COUNT l UNITS               PU R C H'S     HLS/ HOLD NO.l CODE                           INPUT N                   hust BIR         NUM9ER         H E AT/ LOT / BATCH N O.                     Q U AN 18 T Y           O R N O.             ST AT Us                             DATE nn                  6485                  8695                                  96 105              1C6 ill                112 121                            122 127
NUN 9BER CODE 5669 7473 DWs g
,021978 P 3
C-903-
,g e..
........ t.
t t t, t....
t t t t t I t t, t t
,t I t t t T'
p.t R R HIR VEN DO R'S COUNT l UNITS PU R C H'S HLS/ HOLD NO.l CODE INPUT N
hust BIR NUM9ER H E AT/ LOT / BATCH N O.
Q U AN 18 T Y O R N O.
ST AT Us DATE
]
]
nn 6485 8695 96 105 1C6 ill 112 121 122 127
{3) N ON C C M PO R *4s M G CONDS YtOMs
{3) N ON C C M PO R *4s M G CONDS YtOMs
                    @ U"IT: 1, 2,M (Circ 1T Une)
@ U"IT:
')
1, 2,M (Circ 1T Une)
-l; h           Aux. Blde. Elev. 810' (Material / Structure /Systes) g                   @          Room 197 wall E floor M                               (Componeat)
')
A      ,
h Aux.
h           N/A (Vendor)
Blde. Elev. 810'
SEE ATTACHED
-l; (Material / Structure /Systes) g Room 197 wall E floor M
                    @ LOCATION:                     Rec., Stora n.
(Componeat) h N/A A
3 J-(Circic One)
SEE ATTACHED (Vendor)
                                                                                                                              . C. Tin i "k%6 dt?l71 (3) REPORTED BY:
@ LOCATION:
2-i 7-70 $ thfllf ll4) DATES H D . u^^                                                   l2.q.,8 PREPa nto sv                                                       'isp pat E:               tvl REveE w/ APPaov AL:                                               'g,goavg.
Rec., Stora n.
A1 H. D. Hash
3 (Circic One)
* 2 117178                                 .h.t
J-C.
* S I?or 7[f D         g ,g pe Spo se TIO N ASST Gr* E 3 TO.                   It a) D' E D ATE.                    O ljCORRECTIVE ACTION REQUEST 8
Tin i "k%6 dt?l71 2-i 7-70 $ thfllf (3) REPORTED BY:
.<.                                                                                                                                                                    CARm       (4 2) oEPtC REPO R.T EnCv AtsLE U. D. Douglas                                             3 ' S '78                       Req:// red @Not Required                                           OPCs5ence IO~ o
ll4) DATES H D. u^^
%              (I 3l OtSPOStTION:
l2.q.,8 PREPa nto sv
REWORM                                   REPAIR                       USE AS B5                                     SCRAP
'isp pat E:
: 1.       The foot prints and any other irregularities such as pinholes will be touched up in accordance with construction procedure CCP-40, Sec. 4.3.1. .                                                                                   ~.
tvl REveE w/ APPaov AL:
: 2.       The soot from the Kelly heater was blown in after initial set.
'g,goavg.
It will be removed by detergent washing or solvent wiping.                                                                                        .
H. D. Hash 2 117178
t (t al CO     TR.REve         i APPROv AL:                                   ;gis) o ATEs 1
.h.t
t e s3s A RE ve E w/ APPROV AL                                                   (ST) D ATE:         (G B) CUE 44 h      Evt EW/ A P PR OV ALs 2.,2a7g g(19) D ATE:
* S I?or 7[f A1 D
s                  $dhawg                                                                   l 2192178                   Y           W 2;b.                                 7g               l       t     i t a sl E N G, M E vl E w jA PPR OV Al.                                         '(Stl O A TEs         (33) AN8 R VS EWfA PPR O V k L a                       #
g,g pe Spo se TIO N ASST Gr* E 3 TO.
                                                                                                                                                                                                '(33l OATCs y
It a) D' E D ATE O ljCORRECTIVE ACTION REQUEST 8 CARm (4 2) REPO R.T AtsLE oEPtC EnCv U. D. Douglas 3 ' S '78 Req:// red @Not Required OPCs5ence IO~ o (I 3l OtSPOStTION:
    ;                    ///AIAfB L,/-19                 <
REWORM REPAIR USE AS B5 SCRAP 1.
2 b/9'}b >l2 dt l'  .
The foot prints and any other irregularities such as pinholes will be touched up in accordance with construction procedure CCP-40, Sec. 4.3.1..
i        '    '
~.
[             ta.: vE Re n e C A TeOn s                                                                             1343 RE u AR uSi gag jy          . G Satisixtory                     D unsatisractory a
2.
Not Reg'd.
The soot from the Kelly heater was blown in after initial set.
l' QA RECORD
It will be removed by detergent washing or solvent wiping.
  ,            ~
t (t al CO TR.REve i APPROv AL:
o-ynsJ. oC9.      E NcR.
;gis) o ATEs 1
                                                .n        fin 5P. VElntPIT0l               ;o3 win tatiANsvtRerecAfsOmi                          !
44 h
ettel DATE "I"3*0W pig g' w/nessWso                                                          :        '      '
2.,2a7g t e s3s A RE ve E w/ APPROV AL (ST) D ATE:
(G B) CUE Evt EW/ A P PR OV ALs g(19) D ATE:
$dhawg l 2192178 Y
W 2;b.
7g l
t i
s t a sl E N G, M E vl E w jA PPR OV Al.
'(Stl O A TEs (33) AN8 R VS EWfA PPR O V k L a
'(33l OATCs b '}b >l2 dt l' i
///AIAfB L,/-19 2
/9
;y
[
ta.: vE Re n e C A TeOn s 1343 RE u AR uSi gag j
. G Satisixtory D unsatisractory Not Reg'd.
QA RECORD l'
y
~
o ns oC E NcR. fin 5P. VElntPIT0l
;o3 win "I"3*0W a
-y J. 9..n ettel DATE pig g' tatiANsvtRerecAfsOmi w/nessWs o


/YM C cic)3
}
}
        '  ''                                                                                      /YM C cic)3 20hb k.
20hb k.
t i,.
t i,.
s
s
  ?
?
I ATTACHMENT TO                               C-903 t
I ATTACHMENT TO C-903 t
e4eW TECH 1tii6                             I,
e4eW TECH 1tii6 I,
                                                                                  ;;23 surfacer may be CCP-40Rev.Ostatesinpart"Ni subjected to personnel foot tr                    ly after 24 hours cure."
;;23 surfacer may be CCP-40Rev.Ostatesinpart"Ni ly after 24 hours cure."
l..
subjected to personnel foot tr l..
: 1. In Upper Auxiliary Room 197 E1. 810' partial floor the 115 surfacer has foot prints in evidence within the first 24 k                               hours cure. Hold tag will be placed on door entrance.
1.
: 2. Kelly heaters deposited contamination (soot) on 11S surfacer
In Upper Auxiliary Room 197 E1. 810' partial floor the 115 surfacer has foot prints in evidence within the first 24 k
},                               on floor.
hours cure. Hold tag will be placed on door entrance.
2.
Kelly heaters deposited contamination (soot) on 11S surfacer
},
on floor.
y l
y l
n 1
n 1
L
L
\ - \'l:
\\ - \\'l:
W a
W a
1
1
.i. .~
.i..~
18 3
18 3
e s
e s
Line 1,111: Line 1,628:
s F
s F
h
h
              - - - - - - ,                ~ - . - .. _ . , _ , , , _          _ . _ . , _        . . _ . _  _    _
~ -. -


r _. - - - - . - - _ . _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _
r _. - - - -. - - _. _ _ _ _ _ _ _ _ -. _ _ _ _ _ _ _ -. _ _ _ _ _ _ _ _ _ _ _ _ -. _ _ _ _ _ _
ff OQ I
ff OQ
                      '3( v--- #                                                                                           INSPECTION R EPORT
'3( v--- #
      <                          '                                                                                                                                                      PAGE ,1__ Or _ [
INSPECTION R EPORT I
                                                              $.n.s.p r.x PLANT SYSTEM              COMPONENT 4     . . . . , , , m j.3.2 3. .n.u.
PAGE,1__ Or _ [
1 AG/ SPIN /tDE N T NO
$.n.s.p r.x 4
                                                                                                                                                              .71,,..             .X ,,,..... ~
....,,, m j.3.2 3..n.u..71,,..
CODE 14 CODE 5 to CODE                           A l 8[C[OIElF lj                         OR AWING / SPECIFICATION NO l G; tuneul I Hi IUneal l SF RI A L NO J ; IUneal 15 16 17 56
.X,,,..... ~
                      . . . , ,,                ,s       .s       ,a       m         . .,
PLANT SYSTEM COMPONENT 1 AG/ SPIN /tDE N T NO CODE CODE CODE A l 8[C[OIElF lj OR AWING / SPECIFICATION NO l SF RI A L NO G; tuneul I Hi IUneal l J ; IUneal 14 5 to 15 16 17 56
PURCH ASE ORDER                                       VEND                                                                                                               y*
,s
NUMSER                                       CODE                                                                                                                 ,
.s
5649                                     7473 MRR N..... RIR 5,,,,,,,,                                     , , , , )OC, , ,       4....           . , , , ,,,,,            #,J,@#
,a m
NUMSER                    NUM8ER V EN DO R'S                             COUNT l UNITS     PURCH's       RLS/ HOLD NO.l CODE HE AT/ LOT /8ATCH NO,                                   OUANTITY       OR NO.                                     INPUT 74 79                    8085                                                                                                              ST AT US           DA TE 86 95                                   96 105       106 111                 112 121         172 127 PURPOSE AND TYPE OF INSPECTION / SURVEILLANCE: To O/T M[Is /N                                                                                                   ME AIM VnAM osv Aux. GLD6. Eb 8IC' 1% 00M )4 7 w AM. + f/ oo s?
PURCH ASE ORDER VEND y*
I QA IESULTSOF INSPECTION / SURVEILLANCE:[O FOOT /A /NTS 'T- N                                                                                                         TNE A/u rec. *//r Swfua                                     w ue                         n .w see. 4 . 1.1 1            a a edo           1    blY     sess;<
NUMSER CODE 5649 7473
r e   di se - ces-90 62 500+ desoG/s                             f w e e e.                       <e moved b/ v solve ni n ,'s, 'n o I
$,... N..... 5,,,,,,,,
oee                 c c.p- so .                                                                                                                               /       v w
,,,, )OC,,,
NC3NO&9 0.3 N . 0. Y Y 0.
4....
OC ENGINEER /lNSPECTOR #
#,J,@#
[        / 7/7a
MRR RIR V EN DO R'S COUNT l UNITS PURCH's RLS/ HOLD NO.l CODE INPUT NUMSER NUM8ER HE AT/ LOT /8ATCH NO, OUANTITY OR NO.
_ __                                                                                                      (en
ST AT US DA TE 74 79 8085 86 95 96 105 106 111 112 121 172 127 PURPOSE AND TYPE OF INSPECTION / SURVEILLANCE: To O/T M[Is /N ME AIM VnAM osv Aux. GLD6. Eb 8IC' 1% 00M )4 7 w AM. + f/ oo ?
s I
QA IESULTSOF INSPECTION / SURVEILLANCE:[O FOOT /A /NTS
'T-N TNE A/u rec. *//r Swfua w ue n.w a a edo blY sess;< e d se - ces-90 1
1 r
i see. 4. 1.1 62 500+ desoG/s w e e e.
<e moved b v solve ni n,'s, 'n o f
oee c c.p-so.
/
/
v I
w NC3NO&9 0.3 N. 0. Y Y 0.
[
/ 7/7a OC ENGINEER /lNSPECTOR #
(en


e ATTACIIMENT D i
e ATTACIIMENT D i
    .                              TEXAfl.TII.ITIES GENERATING CO.TIFTNY                                                   l n . . . . , wn .s, . . m u . .v .m u . .. .> .                           1
TEXAfl.TII.ITIES GENERATING CO.TIFTNY n...., wn.s,.. m u..v.m u....>.
                                .    !.4     .,
!.4
                                                                    //                         April 15,1983 TXX-3655 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000                                               Docket Nos.:   50-445 Arlington, Texas 75012                                                                       50-446 COMANCHE PEAX STEAM ELECTRIC STATION RESPONSE TO NRC NOTICE OF VIOLATION INSPECTION REPORT NO. 83-07/04 FILE NO.: 10130
//
April 15,1983 TXX-3655 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Docket Nos.:
50-445 50-446 Arlington, Texas 75012 COMANCHE PEAX STEAM ELECTRIC STATION RESPONSE TO NRC NOTICE OF VIOLATION INSPECTION REPORT NO. 83-07/04 FILE NO.:
10130


==Dear Mr. Madsen:==
==Dear Mr. Madsen:==
 
This will serve to document our telephone conversation with T. F. Westeman on April 12, 1983, wherein we requested an extension of the due date for responding to the Notice of Violation contained in NRC Inspection Report No. 83-07/04.
This will serve to document our telephone conversation with T. F. Westeman on April 12, 1983, wherein we requested an extension of the due date for responding to the Notice of Violation contained in NRC Inspection Report No. 83-07/04. An extension of three working days, until April 18, 1983, was granted.
An extension of three working days, until April 18, 1983, was granted.
i We have reviewed your {{letter dated|date=March 14, 1983|text=letter dated March 14, 1983}} on the inspection conducted by Messrs. L. D. Gilbert and C. E. Johnson of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for Comanche Peak, Units 1 and 2.
We have reviewed your {{letter dated|date=March 14, 1983|text=letter dated March 14, 1983}} on the inspection conducted i
by Messrs. L. D. Gilbert and C. E. Johnson of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for Comanche Peak, Units 1 and 2.
We have responded to the finding listed in Appendix A of that letter.
We have responded to the finding listed in Appendix A of that letter.
To aid in the understanding of our response, we have repeated the requirement and your firiding followed by our corrective action. We feel the enclosed infor-mation to be responsive to the Inspector's finding. If you have any questions, please advise.
To aid in the understanding of our response, we have repeated the requirement and your firiding followed by our corrective action.
We feel the enclosed infor-mation to be responsive to the Inspector's finding.
If you have any questions, please advise.
Very truly yours,
Very truly yours,
                                                                                                      'k f~
'k f~
RJG:aq Enclosures cc:  NRC Region IV - (0 + 1 copy)
RJG:aq Enclosures NRC Region IV - (0 + 1 copy) cc:
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, DC 20555
U. S. Nuclear Regulatory Commission Washington, DC 20555


-                        --                --'- ~                         -      -
--'- ~
l l
i APPENDIX A fv0TICE OF VIOLATION Texas Utilities Generating Company Docket:
i APPENDIX A fv0TICE OF VIOLATION Texas Utilities Generating Company                       Docket: 50-445/83-07 Comanche Peak Unit 1                                     Permit: CPPR-126 Based on the results of an NRC inspection conducted during the period January 27-28 and February 1-2, 1983, and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C), 47 FR 9987, dated March 9, 1982, the following violation was identified.
50-445/83-07 Comanche Peak Unit 1 Permit: CPPR-126 Based on the results of an NRC inspection conducted during the period January 27-28 and February 1-2, 1983, and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C), 47 FR 9987, dated March 9, 1982, the following violation was identified.
Failure to Follow Procedure                                             ,
Failure to Follow Procedure Criterion V of Appendix 8 to 10 CFR Part 50 requires that activities affecting quality shall be prescribed by documented procedures of a type appropriate to the circumstances, and shall be accomplished in accordance with the procedures.
Criterion V of Appendix 8 to 10 CFR Part 50 requires that activities affecting quality shall be prescribed by documented procedures of a type appropriate to the circumstances, and shall be accomplished in accordance with the procedures.
Brown & Root, Inc., Construction Procedure CP-cpl 4 9.10, Revision 8, paragraph 3.2.4, specifies that the fit-up gap for "T" fillet joints should not exceed 1/16"; however, if the gap is in excess of 1/16", but not exceed-ing 5/32", this condition will be considered acceptable provided the leg of the fillet weld is increased by the amount of separation in excess of 1/16".
Brown & Root, Inc. , Construction Procedure CP-cpl 4 9.10, Revision 8, paragraph 3.2.4, specifies that the fit-up gap for "T" fillet joints should not exceed 1/16"; however, if the gap is in excess of 1/16", but not exceed-ing 5/32", this condition will be considered acceptable provided the leg of the fillet weld is increased by the amount of separation in excess of 1/16".
Contrary to the above, on January 28, 1983, the NRC inspector determined that Pipe Support Mark No. SW-1-102-105-Y33K had been welded with a fit-up gap of 1/4" at one end of the "T" fillet joint which attached piece 7 to piece 4.
Contrary to the above, on January 28, 1983, the NRC inspector determined that Pipe Support Mark No. SW-1-102-105-Y33K had been welded with a fit-up gap of 1/4" at one end of the "T" fillet joint which attached piece 7 to piece 4.
The 1/4" fit-up gap exceeds the 5/32" maximum allowable fit-up gap require-ment of Procedure CP-CMP 9.10.
The 1/4" fit-up gap exceeds the 5/32" maximum allowable fit-up gap require-ment of Procedure CP-CMP 9.10.
This is a Severity Level V Violation.         (Supplement 11.E) (445/8307-01)
This is a Severity Level V Violation.
(Supplement 11.E) (445/8307-01)
CORRECTIVE, STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED Corrective actions have included the following:
CORRECTIVE, STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED Corrective actions have included the following:
        ' 1)     Identification of the procedural violation as a nonconfoming condition (NCR-51235);
' 1)
Identification of the procedural violation as a nonconfoming condition (NCR-51235);
: 2) Removal of the affected portions of the pipe support (for investi-gative reasons) and replacement with new materials;
: 2) Removal of the affected portions of the pipe support (for investi-gative reasons) and replacement with new materials;
: 3) Engineering evaluation of the total weld for purposes of evaluating safety consequences, if any.
: 3) Engineering evaluation of the total weld for purposes of evaluating safety consequences, if any.


[
[
Notice of Violation                                                           TXX-3655 As noted above, the pipe support was reworked to comply with design and procedural requirements. Engineering evaluation of the original as-built conditions revealed the following:
Notice of Violation TXX-3655 As noted above, the pipe support was reworked to comply with design and procedural requirements.
: 1) The excessive gap occurred at the toe of the skewed angle, and for a distance of six inches tcward the heel on one side and seven inches on the other. No design cregit isg taken for the weld at the toe of the angle, as it exceeds 135 (157 ). Additionally, to account for the corner effect caused by the radius of the tube steel, 2.56 inches of the weld on each side at both the toe and heel is excluded from design consideration. This results in a total eld length (for which design credit is taken) of 10.24 inches on ach side.
Engineering evaluation of the original as-built conditions revealed the following:
: 2)   Taking no credit for the weld where gap is in excess of 5/32, and excluding 2.56 inches at both the toe and heel, the remaining weld which is within acceptance criteria is 6.8 inches on one side and 5.8 inches on the other.
: 1) The excessive gap occurred at the toe of the skewed angle, and for a distance of six inches tcward the heel on one side and seven inches on the other.
: 3) Design calculaticns based on as-built piping loads indicate a total of 1.6 inches of fillet weld is reauired on both sides to meet structural design requirements.
No design cregit is taken for the weld at the g
toe of the angle, as it exceeds 135 (157 ).
Additionally, to account for the corner effect caused by the radius of the tube steel, 2.56 inches of the weld on each side at both the toe and heel is excluded from design consideration. This results in a total eld length (for which design credit is taken) of 10.24 inches on ach side.
2)
Taking no credit for the weld where gap is in excess of 5/32, and excluding 2.56 inches at both the toe and heel, the remaining weld which is within acceptance criteria is 6.8 inches on one side and 5.8 inches on the other.
3)
Design calculaticns based on as-built piping loads indicate a total of 1.6 inches of fillet weld is reauired on both sides to meet structural design requirements.
In summary, had the gap conditicn not been detected, there would be no adverse results.
In summary, had the gap conditicn not been detected, there would be no adverse results.
CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS Affected construction personnel will be reinstructes in the necessity for rigid compliance with design'and procedural requirenents.
CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS Affected construction personnel will be reinstructes in the necessity for rigid compliance with design'and procedural requirenents.
DATE OF FULL COMPLIANCE Corrective actions are complete.                   Preventive maasures are scheduled to be completed by April 22, 1983.
DATE OF FULL COMPLIANCE Corrective actions are complete.
l   -}}
Preventive maasures are scheduled to be completed by April 22, 1983.
l
-}}

Latest revision as of 22:23, 14 December 2024

Affidavit of CT Brandt Re Open Issues in ASLB 830729 Proposed Initial Decision Including Protective Coating, Downhill Welding,Alleged Mismatched Pipe Hanger,Bolt Torquing & Weld Quenching
ML20080D439
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/26/1983
From: Brandt C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20080D427 List:
References
NUDOCS 8308300453
Download: ML20080D439 (47)


Text

,

4%

Attachment B 1

00CKETED USNRC UNITED STATES OF AMERICA j35529 A5:56

)

NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING 40ARp SECFETAC' OCCKE' TING A SEPvir.E BRANC4 In the Matter of

)

)

Docket Nos. 50-445 and TEXAS UTILITIES GENERATING

)

50-446 COMPANY, -- ~~et al.

)

)

( Application for (Comanche Peak Steam Electric

)

Operating Licenses)

Station, Units 1 and 2)

)

AFFIDAVIT OF C.

THOMAS BRANDT REGARDING "OPEN ISSUES" IN PROPOSED INITIAL DECISION I,

C.

Thomas Brandt, being first duly sworn to depose and state as follows:

I am employed as the Non-ASME QA/QC Supervisor at Comanche Peak.

As such, I am familiar with the QA Program at Comanche Peak, including the disposition of nonconforming conditions identified by QC Inspectors and the guidelines, specifications and procedures applicable to the QA Program.

I have previously testified in this proceeding regarding the QA Program for Comanche Peak.

A statement of my educational and professional qualifications 'was received into evidence as Applicants'. Exhibit 141A.

This affidavit addresses certain "open issues". identified by the Licensing Board in its July 29, 1983, Proposed Initial Decision.

The particular "open issues" addressed herein concern (1) protective coatings, (2) downhill welding, (3) alleged mismatched pipe hanger, (4) bolt torquing, and (5) weld quenching.

8308300453 830827 s

~

hDRADOCK 05000445 PDR

?,

I.

PROTECTIVE COATINGS j

A.

Inspection Procedures l

There are four allegations which the Board identifies as l

"open issues" regarding the procedures applicable to inspection of protective coatings.

Proposed Init.ial Decision at 23.

I address each of these items below.

1.

Near White Blast The Board left open a question regarding an allegation that there were no standards for determining whether near White blast (a measure of surface cleaning / preparation of cteel prior to painting or coating) had been achieved in surface preparation for application of protective coatings.

Ilowever, as provided in the attached procedure, preparation of substrate surfaces for primer application requires cleaning to an equivalent of near white blast conditions, in accordance with applicable specifications.

See CCP-30, " Coating Steel Substrates Inside Reactor Building and Radiation Areas," Section 4.1.1. (Attachment A).

The referenced specification requires the use of a Keane-Tator Surface Profile Comparator (a device which utilizes a plate with various known surface roughnesses for visual comparison of surfaces) to determine near White blast.

See OI-QP-ll.4-1, " Inspection of Steel Substrate Surface Preparation" (Attachment B), Section 3.3.2.c.

Accordingly, this allegation is incorrect.

O 2.

Maximum Roughness The Board left open a question regarding an allegation that there is no maximum value for surface roughness in the specifica-tions regarding steel substrate surfaces, and that the rougher the surface, the earlier the paint will " break down."

The procedure applicable to the inspection of surface roughness does provide that "no maximum profile [a measure of surface roughness] will be specified, providing that correct millage [ coating thickness] requirements can be obtained after primer application."

See OI-QP-ll.4-1, Section 3. 3. 2.c.

(emphasis added) ( Attachment B).

If the millage requirements cannot be met, the coating is rejected and reworked.

Thus, the question of maximum surface roughness is procedurally addressed.

Further, the claim that a profile depth greater than the minimum specified (1.0 mil) would result in an early breakdown of the paint is wrong.

In actuality, a profile depth greater than the minimum specified would tend to increase adhesion of the coating to the substrate.

The only detrimental effect of this condition would be to create a surface on which it was dif ficult to obtain uniform coating thickness.

However, this occurrence is addressed by procedures requiring inspection utilizing dry film thickness

- gages.

3.

Adhesion Testing The Board left as an "open issue" a determination as to the l

l significance of the allegation that all paint inspection had been l

reduced to adhesion testing.

In fact, protective coatings inside

containment at Comanche Peak are both visually inspected and inspected for dry film thickness following finish coat application (in addition to the procedures applicable to inspection of surface preparation and primer application).

Additionally, the liner plant is checked for coating continuity.

Only if records for surface preparation and/or primer application are missing or discrepant, will destructive testing (i.e.,

adhesion tests and/or scratch tests) be performed in the area for 4

which the records are deficient.

Thus, the allegation is incorrect.

4.

Repair of Minor Defects Another "open issue" concerns the allegation that the repair criteria for minor defects in protective coatings are inadequate.

Proposed Initial Decision at 24.

Specifically, it is argued that numerous (i.e., minor), closely spaced defects would be classified as minor (rather than major) defects, and that a primer coat should be employed in such instances.

The hypothetical situation postulated in this allegation is highly unlikely to occur in that any occurrences which would result in extensive damage to a coating are not likely to be limited to small (i.e.,

less than one-half inch) damage.

The minor defects which are addressed by these criteria (procedures) are those in which minor chipping or cutting may have been made in the coating.

If in any area, either circular or linear, a one-half inch diameter circle could be completely inscribed at any point by the defect, the defect will be classified as a major

defect and appropriate repair measures will be implemented, including application of a primer coat following surface preparation before reapplication of the final coating.

See CCP-30, Sections 4.4.2.8 and 4.4.2.9 (Attachment A).

These repair procedures have been approved by the coatings manufacturer as being appropriate for repairing defects in coating surfaces.

Thus, the procedures address any defect likely to be identified in coatings, and the repair process for various types of defects are established / approved based on appropriate technical reviews of the processes.

B.

Kelly Heaters Another open issue identified by the Board involves an allegation that the disposition of an NCR regarding the possible contamination of a painted surface by smoke from a heater being used to cure the paint was inadequate.

Proposed Initial Decision at 24.

Applicants were unable to find an NCR vritten by Mr.

Hamilton regarding Kelly heaters.

Applicants did find an NCR (NCR-C-903) written by his supervisor on that subject (Attachment C). The disposition of that NCR was to wipe off the coated surface with detergent or an appropriate solvent-to remove any surface deposits (soot) left by the smoking heaters.

That is the standard procedure for removing any non-embedded contamination or painted surfaces.

Any contaminants that may have been embedded in the coating would be detected by the routine visual inspection in accordance with instructions for visual inspections.

If any contamination was identified, the affected area would be rejected l

I l

and repaired prior to final acceptance of the coating.

Thus, any contamination which may have been caused by the smoke would be subject to appropriate corrective action.

C.

Westinghouse Coatings An item which the Board states it is " unable to evaluate" based on the present record concerns an allegation that coatings on Westinghouse-supplied components failed an adhesion test.

Proposed Initial Decision at 24.

In this regard, the Board requests an answer to the questions of whether these pieces of equipment were safety-related and whether the paint will perform satisfactorily.

In the first instance, Westinghouse, as the nuclear steam supply system supplier for Comanche Peak, conducts its own QA program in accordance with 10 C.F.R. Part 50, Appendix B for all components it provides to Comanche Peak.

Coatings on safety-related (as here) Westinghouse supplied components are subject to the Westinghouse OA program.

Those coatings are identical to those applied to other steel equipment at Comanche Peak, including satisfaction of tests for performance under design basis accident conditions.

II. DOWNHILL WELDING Another "open item" identified by the Board concerns the allegation that downhill welding was performed by Mr. Stiner at Comanche Peak.

Proposed Initial Decision at 33-34.

The open question identified by the Board is whether this allegation was limited to root and cover passes, in that I previously testified that downhill welding was permitted by ASME Section IX for root

__a

9

~

_7_

and cover passes (Applicants'-Exhibit 141 at 22-23; Tr. 4601-02).

However, I also testified that Brown & Root welding procedures (which are applicable to the welding being performed by Mr. Stiner) do not permit downhill welding at Comanche Peak (Tr. 4601-02).

Brown & Root welders are qualified to instructions and procedures which prohibit downhill welding.

Thus, any welder who performed such welding would have to willfully violate those instruction / procedures, a practice which would be a basis for termination.

I am aware of no evidence that

.such a practice has occurred at Comanche Peak.

III.

MISMATCHED HANGER Another "open question" identified by the Board concerns an allegation that a hanger which had.been QC inspected was

" mismatched" in that an excessive fit-up gap existed between the tube steel member and the base plate of the support.

Proposed Initial Decision at 39.

This allegation was the subject of an NRC inspection, at which time it was determined that the support in question was an ASME Code' Class 3 support.

The procedures applicable to the particular weld in question provided for a fit-up gap of no more than 5/32 inch.

As part of the NRC's investigation, a portion of the welded material was ground out to examine the fit-up gap.

It'was determined that for at least a j

s 1

portion of the welded area a gap of 1/4 inch was present.

Accordingly, Applicants 11dentified]this support on an NCR, removed the af fected portions of the~. pipe support (for

[

I investigative purposes) and evaluated the safety consequences of-

/

8. \\, -

..G'

.c

~

,J

the nonconforming weld.

That evaluation determined that even had the particular gap not been detected, there would have been no adverse safety consequences.

See letter to G.L. Madsen (NRC) from R.J. Gary (TeWas Utilities Generating Company), TXX-3655

( April 15, 1983) ( Attachment D).

Furthermore, we have no reason to believe that this instance is other than an isolated case.

I V.

BOLT TOROUING Another allegation which the Board has identified as an

~

"open item" concerns the establishment of torque values for A490 bolts.

This allegation was that no specific torque value had been established by procedure for A490 bolts.

(Proposed Decision at 43-44.). Actually, torque values for A490 bolts had been established.

However, these values were based on an informal correlation of bolt tensicn with a particular number of turns of the bolt'to be made after ~ achieving a snug-tight condition.

As a result of'~nn NCR (which was written against a bolt that had failed during tightening), it was decided to establish A490 torque values based on formal testing.

Consequently, a test was

.g

,s-performed to establish such values, and the actual test data were incorporated into the design specifications.

Bolts which had previously been verified by the prior torque value were subsequently re' erified to the new value.

In addition, samples v

of the CB&I(furni hed bolts were taken and independently tested to verify mater'i<31 quality.

.It should be noted that the failure

~

L

'N, t

T~

./

^

of the original bolt on which the NCR was written was determined to have occurred because the inspector had misread the torque value on the torquing device.

V.

QUENCHING OF WELDS The remaining "open issue" which I address concerns an allegation that a weld had been quenched by direct application of

+

a water-soaked cloth.

Although this item had been identified on an NCR and df 3 positioned in accordance with applicable procedures, the Board indicates that it does not understand the technical justification for *.he disposition of the NCR.

Proposed Initial Decision at 44.

Rapid water quenching is a aeat treatment method utilized to harden carbon steel.

Such heat treatment may af fect the micro-structure of the steel, and may. result in an increased tensile strength and hardness and a decreased ductility of the carbon steel.

For these reasons, quenching of carbon steel welds and heat af fected zones is an undesirable practice and is prohibited bpsiteprocedures.

The quenching which was the subject of this allegation, however, invo ved an,austenitic stainless steel. Such st; eels' do not undergo the microstructural changes carbon steels undergo upo'n rapid quenching, and there is no similar metal-4 lurgical concern with such a cooling method.

In fact, this prac-tice is quite common in welding on austenitic stainless steels.

e 4

J n

v.

.,,m j

i r

'~

-10.

5 Thusj-ils site procaoures pruhtbmauf quencbeg apoiy to all steels (carbon and statnte%). baly artnn atte) coula :e ditriel, afftf.m MtellurSpally by such quenchin9

/

C. Inomas 3rahs v County of Dallas) subscribed and swa tg State of Texas

)

before se this 26 day of August,1983.

E I 8.[dm%

Ifotary Fublic

~-

~

.i.

This is a telecopy facsimile.

The original will be transmitted under separate cover.

l p

..U.,

4 i

-_m_..

.j' Amca.g:TA

'y IG JEXED BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION D&T.E -. -

FA6e I

I DATE:

JOB 35-1195 CCP-30 10 1/26/82 1 of 13

~I TITLE:

ORIGINATOR:

N[e d2/MO

/-2.7N DATE 1

COATING STEEL SUB-

/g l

STRATES INSIDE REVIEWED BY:

  1. 4

/u

/15-82 REACTOR BUILDING AND

/

&R A DATE

~

RADIATION AREAS

(,

hmm_

f.sez TUGC0 QA f/ '(/

OATE

  1. b0 btu M L f-24 ~f2 APPROVED BY

}

CONSTRUCTION PR04 eft MANAGER DATE 1

)

ods #/

A I

o.i TABLE OF CONTENTS D CF[J CPSES

1.0 INTRODUCTION

pgg#

35 1195 1.1 PURPOSE g G,(1 p g TRCL

}pyg 1.2 SCOPE

+

,I 1

i 1.3 GENERAL DISCUSSION 2.0 DEFINITIONS OF TERMS I

C0 N Y

j 3.0 SPECIAL ITEMS AND OPERATIONS 3.1 QUALIFICATION OF PERSONNEL

.,y g

4 3.2 SAFETY REQUIREMENTS 3.3 INSTRUMENTS AND THEIR USE i

3.4 DOCUMENTATION 1

3.5 RECEIVING, STORING AND DISPENSING 0F C0ATING MATERIALS l

3.6 SPECIAL C0ATING PROCEDURE

)

3.7 TOUCH-UP & FINISH C0ATING OF VENDOR APPLIED C0ATINGS t

4.0 PROCEDURE FOR COATING 4.1 PREPARATION OF SUBSTRATES AND C0ATING MATERIALS 4.2 SURFACE PREPARATION FOR FINISH C0AT l

4.3 PREPARATION OF C0ATING MATERIALS 4.4 APPLICATION OF PPIME AND FINISH C0ATING l

4.5 FINAL ACCEPTANCE TESTING 4.6 HOLD POINTS y

SUPPORTING INFORMATION

.i ATTACH 4E!!!S j

REFCRENCES s

b f

e w

I, 1

I

_.a

.. _ _. ~.... _ _ _ _....... _ _.. -..

.s_.

I

\\.

4 t

JOB 35-1195 Comanche Peak Steam Electric Station Construction Procacure 00CtjMENT CHAtlGE NOTICE NUMBER 7 i

f g

This nctice applies to Construction Procedure Nc. 35-1195-CCP-30 Revision 10 1

(

This change will be incorporated in the next revision of the procedure.

Change the procedure as follcws:

?

Please replace the following pages with the attached:

t Page 10 of 13 Page 12 of 13 I

l I

9 Reviewed by:

/ b l$l$)

drawn (IcotQuali:yA:surance Gate Origin r

Date' r

Review by:

0'b Approved'by*

""ItLCo Quality Assurance Date

}

D R.n % A t_u. a 6 - ll-e 5 Cbnstruct:an Projec: Manager Cate Effec:1ve Date i

a

'l l

- sa.m.u. ;_. _ _....

.;._,....,__m

-s_

.1.

1_

l

)

i JOB 35-1195 Comanche Peak Steam Electric Station

]i 1

Construction Procedure DOCUMENT CHANGE NOTICE NUMBER 6

'd This notice applies to Construction Procedure No. 35-1195-cro 1n Revision 1n.

This change will be incorporated in the next revision of the procedure.

.:};

Change the procedure as follows:

1

]

Replace the following pages with the attached:

3 l

Page 8 of 13 l Page 1 of 2

, Page 2 of 2

l

'l l

ej

i 3,

l t

s

- 1 2

i

4 Reviewed by:

W k SSbh 9hb Y-N O Oate afown & Acc: Qualt:y Assursnce ca:e j

artgpator

<1

/

9 Approved by:

TUGco Q fy Assurance Date

)

hefs

  1. d-2,f# k Acril 29.1083 i

i C5nstrue:1on Pro,1ec: Manager Date Effec:1ve Cate

-'.Ij

es.,..,:.s.

r

- 4,,

~,

r

-v.

w

...-..=.w "w y := a

.c-

.. w..-.. a u..

.~

l

.('

1 i.

?

JOB 35-1195 Comanche Peak Steam Electric Station i

k, Sheet 1 of 2 Construction Procedure

'j DOCUMENT CHANGE NOTICE NUMBER S

l

!.i This notice applies to Construction Procedure No. 35-1195 CCP-30 Revision 10 4

This change will be incorpcrated f a the next revision of the procedure.

g y

1 Change the procedure as follows:

A Replace the follo...ng page with the attached:

Page 11 of 13 4

1

.i t

J 4

1 i

i

'i i.

I Reason for change:

Additional requirement.

?

j Reviewed by:

Am,

U $ u Hjd i uf Ob ts.i% pen t.tze j

Or1ginator Date 3rown & Root Quailty Assurance Oa:e

/

Rev w Mk 46 4

1 Approved by:

ITJGCd Qual, Assurance Date hd._ h s,v

/-/ /- 3' L 1/17/83 Construction Project :4anager '

Qate Effec tve Cate

!j

i s5 t

~r

-.~....._ i~.... _ -..w.'.I...'l i O2w.u 21.. c.S. r_.. t...s..i

..... l

~

... _.. 4.. -

J08 35-1195

-l Comanche Peak Steam Electric Station Sheet 1 of 2 N

Construction Procedure DOCUMENT CHANGE NOTICE NUMBER 4

This notice applies to Construction Procedure No. 35-1195 CCP-30 Revision 10 This change will be incorporated in the next revision of the procedure.

Change the procedure as follows:

Replace'the following page with the attached:

Page 11 of 13 5

Reason for change:

Change in requirement.

Reviewed by:

q h

l2'lf-$2 -

)

l Origpator Date Brown & : Toot quality Assurance Date

/

/M Rav av y:

e.

l.I f

l [L. -

/

5 Approved by:

IUGco Qua g' Assurar.ca Date

.I

~

(? (Q mv#m

-A #

/?A >/c2 12/21/82 j

Constr5c:1on Project. Manager Cate Effective Cate 1

~$

  • 1*

^.

..L:...,_ $' '

L

~ L. ~. :..].

. ^ *.~ u. s. :.:!=....._...

i -..

- ~ ' '

~

i i

'l i

J08 35-1195 l

Comanche Peak Steam Electric Station i

i Sheet 1 of 4 4

Construction Procedure 00CLHENT CHANGE NOTICE NLHBER 3

)

ll This notice applies to Construction Procedure No. 35-1195-CCP-30 Revision 10.

This change will be incorporated in the next revision of the pro,:edure.

1 I

Change the procedure as follows:

.j Replace the following pages with the attached:

-:j Page 11 of 13 1

Page 12 of 13

,f Page 1 of 1 Attachment 4

),

i

'l

'j Reason 'cr change:

Additional requirements 1

I i

Reviewed by:

4 i

s v 1 luGh/ 9 Nhi M

' k dx

~K ariginator pte/

Srown & Rcoe Qual 1ty Assurance cate-- ~ ~ - -

[

i Reviewed k.

.. /.g/.

'l Approved ' by:

i IUGC0 Q".alipssurance Data g.. #, f//f/

9-20-S'V 9/21/82 j

.o nstru m ien m,'em s.,e, aos mems e o.te

= =. *.

-m

=

l' t

l

.2 L -

a.. :2 h

..:.=:.:..

. -=..

. ~.

=.

ll l:

11 i

hKM3

/mDEXED 1

l, JCS 35-1195 1

Comanche Peak Steam Electric Station DA16 1

Sheet 1 of 2

'i

i Construction Procedure i

DOCUMENT CHANGE NOTICE NUMBER 2

1

-4 This notice applies to Construction Procedure No. 35-1195. CCP-30 Revision 10

.}

This change will be incorporated in the next revision of the procedure.

1

~~

~

Change the procedure as follows:

?

Replace the following page with the attached:

Page 6 of 13 i

}

4

~I q

'ii d

1 i

Reason for change:

Additional requirement i

4j Reviewed by:

f}h

/ $3 8!

L fre/

Srown & Root quality Assurance Ja:e crig ator Review f

.Q7},'h D: k

/ W i

Approved by:

m cco quali yt Assurance Date j

O. b hs 56-9M 5/11/82 Construc :en Fro;ec:.wanager Cate Effective Cate l'

l J

. vis"-

. -.....--...:.~.- - =.~..

......:.......-........~...

4 2s.

m l

ANM5 INDEXED 1

JOB 35-1195 oArt j

Comanche Peak Steam Electric Station i

Sheet 1 of 2 i

Construction Procedure 00CtjMENT CHANGE NOTICE NtMBER 1

i This notice applies to Construction Procedure No. 35-1195. CCP-30 Revision 10

~-Mf j

This change will be incorporated in the next revision of the procedure.

j 9

%+

Change the procedure as follows:

Replace the following page with the attached:

l Page 5 of 13

)i l

ll 1

i i

Reason for change:

Additional requirements 1

)!

Reviewed by:

hh 2-lb 82 D /A W

.C k / /d'2 -.

Originator Data Srown S-Aco: Quali y Assurance Oa:e

)

Reviewed by:

"A 3!/7!N-Approved by:

IUGC0QualityAssurp.c

' Data S M -,e

.eym 2 / ?- 9'O 2/17/82 h

Ccnstruc :en Pro;ec Manager Date Effec:1ve Oate i

I

&_"w e

... -. ; a..-.:=. u. O. A >. &.V v.

w..

a..

a.. x -..

j~

PRCCEDURE EFFECTIVE EROWN & ROOT, INC.

NUMBER

REVISION DATE PAGE a

CPSES l

]

,l JOB 35-1195 j

CCP-30 10 1/26/82 2 of 13 Jl j

1.0 INTRODUCTION

1.1 PURPOSE 1.1.1 The purpose of this procedure is to establish the methods by which the prime and finish coats are to be applied to the con-tainment liners and radiation areas in accordance with speci-fication, drawing, and manufacturer's requirements. This pro-cedure may also be used for coating any steel substrate inside i

the reactor buildings scheduled to receive Carbo Zinc 11 primer and Phenoline 305 finish coat.

1.2 SCOPE 1.2.1 The scope of this procedure covers the surface preparation and coating of Unit 1 and 2 steel substrates inside the reactor buildings and radiation areas scheduled to receive protective

.j coatings.

4 1.3 GENERAL DISCUSSION l

i 1.3.1 All coating materials covered by this procedure shall be as manu-i factured by Carboline Corporation of St. Louis, Missouri. The i

coating shall consist of a prime coat of Carbo Zinc 11 with a finish coat of Phenoline 305. To protect the prime coat from prolonged ex-j posure, a " seal coat" consisting of approximately one mil. of Pheno-line 305, thinned in accordance with Section 4.4.2.4, may be applied over the prime coat.

Prior to finish coating, the seal coat shall be solvent wiped with Phenoline thinner or Xylol.

Finish coating shall j

be applied when convenient prior to ccmpletion of the building or prior to placement of concrete, equipment. or obstructions which would make finish coating impossible.

In order to maintain traceability on protective coatings applied to shop coated steel cited for installation in the Reactor l

Building, these items shall be steel stamped with a unique coating code number. The code numbers shall be assigned by QC Paint and i

applied by craft personnel. Upon division of materials, this j

unique number will be transferred along with all other unique I

identifying numbers.

2.0 DEFINITIONS OF TERMS j

2.1 TERMS ij 2.1.1 Substrate - The uncoated surface to which a coating is applied.

3 4

t,

g_-=.

=

....- --. a:. w..

........F....

PROCEDURE l EFFECTIVE I

! REVISION l DATE.

PAGE BROWN & ROOT, INC.

NUMBER I

i CPSES JOB 35-1195 I

CCP-30 10

1/26/82 3 of 13

?.

)

3.0 SPECIAL ITEMS AND OPERATIONS j

l 3.1 QUALIFICATION OF PERSONNEL i

3.1.1 Coating application personnel shall be qualified per previous ex-perience and pr,actical application.

In addition, each painter shall have been instructed by the Paint Superintendent or his representa-k tive in the use of the products as consistent with Carboline's

!)

training procedures, which includes both classroom instruction and J

a field application demonstration. This shall be verified by com-pleting a form similar to Attachment 1.

This form shall be 3]

executed by the Brown & Root Paint Superintendent or his represent-a ative. A coating manufacturer's representative will be available

]

for technical supervision upon initial painting effort. Applicators performing work to Attachment 2 shall be qualified for "Q" coatings when applicable.

i 3.2 SAFETY REQUIREMENTS 3.2.1 All appropriate health, safety, and fire protection requirements, pertaining to surface preparation and coating application, shall be f6110wed.

It shall be the responsibility of the Site Safety Department to establish the frequency of monitoring the coating work.

3.3 INSTRUMENTS AND THEIR USE 1

3.3.1 The painting Foreman and General Foreman shall have access to and be familiar with the use of all instruments necessary to insure efficiency of coating applications. This shall include surface profile comparators, holiday detectors, thermometers, and wet and dry film gauges. Viscosity measuring devices will not be used. Wet film gauges will be randomly used during coating application as an aid to field personnel on Phenoline 305 only.

e

}

Readings will be limited to the minimum necessary to control

]

coating thickness, i

l 3.4 DOCUMENTATION 3.4.1 Records shall be maintained on Attachments 1 and 2 listed in i

Section 5.1.

After completion, each form shall be forwarded to i

the Brown & Root Document Control Center for filing and distri-j bution to the various parties as listed on the distribution sheet.

)

d n

.-- I S~L ---

?

7.;,..

,&.-.: u_.: s.x.:.=

.-. u...=. w..

w.-

v

.~

l m~

u.......- w. u.: -

PROCEDURE EFFECTIVE 1

BROWN & ROOT, INC.

NUMBER REVISION !

DATE PAGE CPSES J08 35-1195 1/26/82 L

CCP-30 10 t

1 4 of 13 4

I.l 3.5 RECEIVING, STORAGE AND DISPENSING OF COATING MATERIALS (h

3.5.1 Receiving and Storage - Upon receipt of a shipment of coating materials, the B&R QC Representative accepting shipment shall 1

be responsible for completing all necessary receiving inspection documentation. General receiving procedures shall be in accor-

..adance with Brown & Root Construction Procedure CP-CPM 8.1.

It shall F-othen be segreg'ated from N6n "Q" materials and stored in the paint

'*ttorage building where temperatures will be rpaintained between

~450 - 110 F.

Infrequent dips in air temperature in storage. areas 0

3 0

as low as 32 F for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are acceptable. Temporary A

storage may be required at the receiving warehouse due to receiving or other problems.

3.5.2 Dispensing - When coating materials are needed, in the field, it shall be transferred from the controlled area to a designated l

temporary storage area or area of intended use in the field. Due i

to limited shelf-life of coating materials, this shall be done on j

a "first-in", "first-out" basis. After materials have been j_

partially used from an individual container, the said container

]'

cannot be resealed and returned to "Q" storage area for later use. Containers opened and partially distributed from the "Q" a

paint storage area may be resealed and the remaining contents i

used for "Q" painting. With the exception of thinners, the con-l tents from partially used containers shall not be reused after j

a period of 7 days has elapsed from date of initial opening.

l 3.6 SPECIAL C0ATING PROCEDURE 1

]

3.6.1 When items require special coating not covered under the content i

of this dccument, the appropriate Project Engineer (Mechanical,

[

Civil, Electrical) shall complete Attachment 2 and transmit it to the Paint Superintendent. A log of all procedures from t shall be maintained by the Site Coating Engineer.

j The following information shall be completed on each procedure.

l 3.6.2 Each procedure shall be given a unique number. The scope will 1

describe the working limits of the procedure with detailed work requirements being listed under the requirements sectiion.

The approvals section shall have signatures of the following:

?

Project Discipline Engineer (Mechanical, Civil, etc.), QA j

Manager if coating of item is safety related TUSI representative when required, Engineer who prepared document, and a revision 4

number and date. Upon completion of the document, distribution j.

shall be made to all holders of this procedure.

I.

h

u.. s....

r: ~

.. a a.._

= x w a

- m......

..j t

PROCEDURE EFFECTIVE l.

BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE l

CPSES 1

1 JOB 35-1195 CCP-30 10 1/26/82 5 of 13 j

3.7 TOUCH-UP AND FINISH C0ATING OF VENDOR APPLIED C0ATINGS 1

1 3.7.1 Prior to touch-up of primer or application of topcoat on vendor i

coated items other than pipe hanger support components, an adhesion test shall be performed by the Brown & Root QC Depart-ment.

If results are acceptable, work may proceed in accordance with sections 4.4.2.2 through 4.4.2.9.

3.7.2 The QC Inspector or his representative shall notify the res-F ponsible ares engineer and/or the Paint Superintendent as soon as possible after receipt of a nonconforming item in need of paint repair to allow time for Attachment 2 preparation and a planned schedule for repair.

6 4.0 PROCEDURE FOR C0ATING 4.1 PRE?ARATI0h 0F SUBSTRATES AND C0ATING MATERIA'.S 4.1.1 Surface Preparation for Primer - Final surface preparation shall i

not begin unless ghe temperature of the surface to be blasted and/or

{

power tooled is 5 F above the dew point.

If needed, the surface to be primed shall then be cleaned of any heavy oil or grease deposits j

in accordance with SSPC-SP-1-63 " Solvent Cleaning".

Small amounts of grease or oil deposits may be removed by blast j

opera tions. The surface shall then be cleaned by blast, hand or j

power tool operations to achieve an equivalent of SSPC-SP10-63, a

"near white" blast cleaning. Although 1-3 mil. surface profile is preferred, a minimum of 1 mil profile is required. After the i

above surface preparation, the surfac*e to be primed shall be air blasted and/or solvent wiped to remove dust, sand or foreign contaminants from the surface. Air blasting shall not be performed where air-borne contaminants could adhere to tacky paint.

Suffi-

]

cient time shall be provided to allow suspended particles to settle before reginning primer application.

If rust forms af ter surface preparation, the rusted area shall be re-cleaned before primer application. Under no case shall a blast, hand, or power tool cleaned surface be exposed for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to priming without additional cleaning of the surface. When applying coatings that will be joined together by a later coating operation, l

the interface shall be constructed as follows:

i white metal approximately 12'<Dvarblast-the steel to near Blasting using no border tape -

a.

l 18" beyond the point which j

will receive primer. Hold back approximately 12" - 18" from j

edge of blasted area when' applying primer.

-l

\\

i

_ - -. ' A. -..... w :. L.......

.- L.2..Ll.A u - --.

~..

h PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 6 of 13 b.

Blast, hand or power tool cleaning using border tape - Clean

[

the steel to near white metal approximately 3" - 6" beyond

.f the point which will receive primer. Place border tape approxi'nately 1" in from edge of cleaned area and prime.

I When applying seal or finish coat on either of above methods

I hold back approximately 12" - 18" from edge of primer.

Removal of weld spatter and other minor surface imperfections 4.1.2 4j (not to exceed.031" for containment liners) - If needed, weld

~

spatter omitted by others will be removed by Painting Personnel in accordance with SSPC-SP-2 and SSPC-SP-3.

If it is determined that surface defects are severe enough to require later repair, l

)J the area to be repaired will be blocked cut and spot painted at a later date. All protrusiens and peaks shall be ground l

to a rounded contour.

3, 4.1.3 If coating removal is required from an area or item which has pre-viously been coated in accordance with this procedure, shadows or 4

tight residue of primer which may remain in the profile of the pre-r; viously prepared substrate is acceptable.

t 4.2 SURFACE PREPARATION FOR FINISH C0AT i

4.2.1 Surface preparation for the finish coat shall consist of the removal, if needed, of any oil or grease. This shall be accomplished by the use of a manufacturer recommended cleanser or cleansing method on i

areas that have been seal-coated. On areas where the Carbo Zinc 11 4

I primer is exposed, oil and grease will be removed by sand blasting, 3

hand, or power tool grinding, and needle scaling and then by solvent

}

wiping the area prior to replacing the primer.

Power tool grinding and needle scaling should be equivalent to a near white blast SP-10 specification with no size limitation as long as the millage require-ments are obtained.

1 4.2.2 The ambient temperature and relative humidity shall be measured to determine the dew point temperature.

Phenoline 305 finish ccat shall o

be applied unless the substrate temperature is more than 5 F above the dew point.

4.3 PREPARATION OF C0ATING MATERIALS 4.3.1 Primer - The primer, Carbo Zinc 11, is packaged in a two component kit consisting of a tese and zinc filler.

First the base shall be l;

thoroughly mixed. Zinc filler shall then be aeded under constant agitation and mixed until free of lumps.

Partial mixes shall be mixed

.J by weight in a proprirtion of 10 parts base to 22 parts zinc filler l~

using a suitable scale to achieve a plus or minus 2 percent accuracy.

The mixture shall then.be strained through a 30-mesh screen. Viscosity shall be controlled by adding thinner, as required, but shall not exceet two quarts of thinner per gallon of Carbo Zinc 11. Pot life of CZ 11 l

shall' be as shown in Attachment 4.

L CCP-30 Rev. 10 DCN #2 5/11/82 Sheet 2 of 2

. w.

.m m.-

._. m j'

1 PROCEDURE f

! EFFECTIVE f.

BROWN & ROOT, INC.

NUMBER

REVISION i OATE PAGE i

CPSES i

JOB 35-1195 1/26/82 i

7 of 13 CCP-30 i

1,0 e

4.3.2 Finish Coat - The finish coat, Phenoline 305, is packaged in a two component kit consisting of Phenoline 305 base, Part A, and 1

a Phenoline catalyst, Part B.

Mixes are made by combining and

}

thoroughly mixing the base and catalyst.

Partial mixes may be 3

made by combining, in a ratio by volume, four parts base to one 3

part catalyst. Viscosity shall be controlled by adding thinner, as required, but shall not exceed two quarts of thinner per gallon

[

of Phencline 305. Pot life of Phenoline 305 shall be shown on E.

4.4 APPLICATION OF PRIME AND FINISH C0ATING 1

4.4.1 Prime Coat

}

4.4.1.1 Coating material shall be applied using conventional spray equip-l ment with agitated pressure pots having a maximum hose length of 75 feet. Care must be taken to assure that air and material pressures are adjusted to compensate the additional length of j.

hose from 50' to 75' in length. The primer shall be allowed to

?

become tack free before start of other construction operations which could create contamination problems. Any runs or sags having a detrimental effect on the coating system shall be removed and re-

i paired. The following application parameters shall also be followed:

l 1.

Normaj conditions of ambient and surface temperature shall 0

1100F respectively;0however, primer be 40 - 95 F and 40 0

may be applied within an ambient rgnge of 0 - 130 F and a sur-face temparature range of 0 - 200 F.

Carbo-Zinc 11 may be thinned up to 2 quarts per gallon for application; however, when using higher thinning levels at or below normal tem-1 perature range, care must be taken to obtain proper film build. Above 850F it is advisable to use up to 2 quarts per gallon to minimize dry spray.

In no care shall carbo-line limits be exceeded.

2.

Humidity values vary from 10 to 95% however, coating shall

]

not be applied to a wet or damp surface.

.j 3.

Thickness of prime coat shall have a minimum dry film thickness of 2 mils and a maximum of 4.5 mils. Minimum and maximum spot j

test values shall be 1.5 and 5.5 mils respectively.

f 4.

A double regulated pot having an adequate air volume supply l

shall be used, ij 5.

As a guide, coating material may be applied using a 50% over-q lap with each pass while holding a gun 8-10 inches from the i

surface. Cross hatch application is permissible.

1 T%

s

~.

.o.

4.h :

~.. i..'.:.a:M uc.,. _w

.~

wx 14 PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 8 of 13 h

6.

Carbo Zinc 11 is sufficiently cured for topcoat wnen tne coating may be burnished rather than removed when rubbed n

?

with the flat portion of a smooth edged coin such as a

{

nickl e.

(Minor amounts of zinc dust may be removed during

/

cure verification, however, a burnished surface must be achieved). Attachment 3 may be utilized as general guide-lines for cure to topcoat time of CZ-11 above 25% relative g

humidity.

If required, the cure of carbo zinc II may be i

1 accelerated by the use of water spray, however, a minimum i

of one hour must elapse between application of coating and I

water spray. Below 25% relative humidity, water curing is i

recommended to obtain the desired cure. Water utilized in l

conjunction with water curing shall have a PH factor from 1

5 to 9.

Application of water spray for curing purposes may-

]

bat as often as necessary to obtain the proper cure.

4.4.1.2 Recoating of Carbo Zinc 11 Primer - Prior to recoating, if no major defects per section 4.4.2.9 are present, the entire primed surface to be recoated shall be wiped with clean rags moistened with Carboline Thinner #33. Wiping shall continue until no 3

appreciable discoloration is noticed on the rags. Carbo Zinc 11 i

I shall then be thinned by using two quarts Carboline NO. 33 per l

gallon mix. This will be applied to achieve a 2.0 - 4.5 mils total DFT. Only two recoats may be applied. Special attention l

should be given to spray application and dry film thickness when using a 50% mix. The primed surface shall not be recoated until cured per section 4.4.1.1.6.

4.4.1.3 Repair of Sags and Runs - Sags or runs in excess of 5.5 mils will be adraded with an aluminum screen or sandpaper to 2.0 to 5.5 mils. Sags or runs 5.5 mils or less which show no evidence of mud-cracking will not be repaired.

If coating surface is satis-factory after abrading, then finish coat may be applied; however, d.

if coating surface is unsatisfactory, blast, hand abrade or power tool ' grind to near white metal is required and primer coat re-applied.

A satisfactory coating is considered one having no mud-cracking to the metal surface as visible to the unaided eye.

L 4.4.1.4

. Brush touch-up painting shall be done on the prime coat in accor-y dance with the following:

)

Prime Coat:

A Q

1.

Carboline Application Instruction (Carbo Zine 11) j Bulletin - October 76-N.

l 2.

Carboline Product Data Sheet (Carbo Zinc 11) 1 Bulletin - October 76-N.

Brush touch-up allowed on areas one square foot or less.

4

[

I CCP-30 Rev. 10 DCN #6 4(29/83 Sheet 2 of 4

.a_.

. -... u.v n #_: w.-

_..e.......

l

....g

~

a _c.,

o j*

i l REVISION !l EFFECTIVE PROCEDURE OATE PAGE 1

BROWN & ROOT, INC.

NUMBER l

CPSES 7

JOB 35-1195 l

CCP-30 l

10 1/26/82 i

9 of 13 l

4.4.1.5 Embedded foreign particles shall be removed by abrading, if low j

millage or major defects result, recoat or repair per section 4.4.1.2 or section 4.4.2.9.

Y 4.4.1.6 Treatment of Rust Stains - Remove residue, though not neces-sarily the stain, with bristle brush and water or Carboline Thinner #33. Allow to dry thoroughly.

1 4.4.1.7 Coating Interface - Refer to Section 4.4.3.0 for coating interfacing.

)

4.4.2 Finish Coat 1

4.4.2.1 Finish coating shall be applied using conventional, airless,

?

brush or roller. Weld seams, edges and other sharp geometrical j

discontinuities may receive an initial coat of I-2 mils finish j

coating thinsed by using two quarts Phenoline Thinner per each gallon kit of Phenoline 305. To aid in continuity at edges, edges may be 4

" striped" with Phenoline unthinned instead of the 50% mixture as stated above.

In either " striping" or initial coating of edges, I

welds, etc., time should be allotted for the coating to harden 3

sufficiently to maintain a " sealing" effect prior to continuing i

coating operations. The initial coating of edges, striping, etc., as stated above, shall be considered part of the total

),

initial finish coating operation. The material shall be allowed

{

to become tack free before any other construction operations

..t proceed which could create contamination p'roblems by dust or 1

other foreign matter. A continuity check shall be performed in accordance with NACE T-6F-3 Condition "C".

No gross discontinuities are acceptable such as holidays, voids, skips, bubbles, and misses.

Any runs or sags having a detrimental effect on the coating system.

shall be removed and repaired. The following application parameters 1

shall govern:

a

'f 1.

The permissible range of surface and ambient temperature for 0

application shall be 500 - 120 F.

Temperature may rise above I

0 120 F after material has become " tack free". Phenoline 305

]'t may be thinned up to 2 quarts of Phenoline Thinner per gallon mix. The ratio of thinner to Phenoline will be that which gives

]

the best workable mix, i.e., usually advantageous to use more thinner at lower temperatures.

a 2.

Minimum and maximum values of relative humidity shall be 0% and

.]

85% respectively.

N 3.

As a guide, coating material shall be applied using a 50% over-t lap with each pass while holding the gun 8-10 inches from the surface.

(.)

1

{!.

y-;

p l-w

+

~ _ _ _

.... _...-. ~ -


.s=

u u

PROCEDURE EFFECTIVE BROWN & RCOT, INC.

NUMBER REVISION DATE PAGE

].

CPSES l

JOB 35-1195 CCP-30 10 1/26/82 10 of 13

~

1 4.

Curing and time to recoat Phenoline 305 shall be as shown below:

Between Coats Temperature OF Final Cure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 50 - 59 12 days 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 60 - 74 8 days 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> 75 - 89 4 days 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 90 and above 2 days J

5.

Phenoline thinned at 50% and applied as a seal coat may be 0

recoated after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of cure at or above 75 F.

j

--6.

Tack free shall be defined as the extent of cure at which

~

j foreign contaminants will not adhere to the coating.

1

]

7.

The total coating system shall have a dry film thickness range a

of 7 to 11 mils, with a minimum spot check of 7 mils and a i

maximum spot check of 11.5 mils.

1 1

4.4.2.2 Repair of Runs and Sags - Runs and sags will be abraded until the

)j DFT of the Phenoline 305 is within 1.9 - 4.5 mils.

If cracks are visible, then runs and sags will be removed to primer by 1

power tool grinding followed by solvent wiping.

If no cracking i

occurs, top coat will be considered acceptable.

Area will be recoated as outlined in the Repair of Pinholes and Discontinuities j

(Section 4.4.2.4).

t 4.4.2.3 Repair of Embedded Foreign Particles - Foreign particles shall be removed by abrading and then recoated as outlined in the repair of pinholes and discontinuities. Recoating shall not be performed until cure times stated in Section 4.4.2.1(4) have been satisfied, j

j 4.4.2.4 Repair of Pinholes and Discontinuities - Llose particles shall be removed by brushing or vacuum r compres:;ed air. The affected 4

I area shall be solvent wiped with Phenoline 305 Thinner or xylol.

Pinholes and small discontinuities may be repaired at the time of i

final inspection without a later reinspection of the repair.

If the repair area requires recoating, recoat the area with Phenoline 305 thinned 50%. Recoated areas require cure to final inspection time per section 4.5.1.

i l

4.4.2.5 Repair of Scratches and Damaged Areas - Any scratches or damaged j

areas will be abraded until loosely adherent particles are re-moved. The area shall then be solvent wiped (Carboline thinner

  1. 33 for primer, Carboline Phenoline thinner or xylol for topcoat)

]

and repaired with appropriate coating, i.e., Phenoline 305 if j

damage is considered a minor defect per section 4.4.2.8 and Carbo Zinc 11 and Phenoline 305 if damaged area is considered a major defect per section 4.4.2.9.

All edges of existing coating around J

the perimeter of the cleaned area shall be " feathered" back a l

sufficient distance et ensure a smooth blend with existing coating, y

Thickness shall be as required for the pertinent coating.

l CCP-30 Rev. 10 DCN #7 6/11/83 Page 2 of 3

z w.- - ~..: -...

........a wa:...m.:;-....

. ~...,..

i I

I PROCEDURE l

EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION,

DATE PAGE CPSES JOB 35-1195 CCP-30 e

10 i

1/26/82 i

11 of 13 4.4.2.6 Brush touch-up painting shall be done on the finish coat in j

accordance with the following:

I 1

1.

Carboline Application Instruction (Phenoline 305) Bulletin

)

775.

2.

Carboline Product Data Sheet (Phenoline 305 Primer and Finish)

Bulletin 473. Brush touch-up and complete application is allowed with no area restrictions.

4.4.2.7 Treatment of Rust Stains - If surface is contaminated with rust

}

stains or minute metallic particles, then surface shall be pre-j pared by solvent wiping with Phenoline 305 Thinner or xylol and overcoating with a coat of Phenoline 305 prepared in accordance with Section 4.4.2.4.

i 4.4.2.8 Repair of Topcoat and/or CZ 11 Minor Defects - (Minor defects are defined as an area, either circular or linear, in which a diameter circle could not be completely inscribed at any point along the entire 1ength.) Blast or abrade, by machinc or hand, the Pheno-line 305 finish surrounding the damaged area and clean any exposed i

steel to ensure contaminant free surface.

Solvent wipe the sur-1 rounding 305 finish with Carboline's Phenoline Thinner or xylol.

t Spray or brush Phenoline 305 finish at approximately 4 mil DFT over 1

the damaged area. Overlap onto the surrourding coating a sufficient l

amount to insure a smooth and continuous topcoat system, i

4.4.2.9 Repair of Topcoat and/or CZ 11 Major Defects - (Major defects are defined as an area, either circular or linear, in which a h" I

diameter circle could be completely inscribed at any point or along l

the entire length.) Spot blast or abrade, machine or hand, the i

damaged area.

Power tool or hand abrading must be very thorough in order to prepare the surface for Carbo Zinc 11 touch-up. The result-ing surface preparation shall be equivalent to a near white SP-10 Specification. A surface roughness equivalent to a minimum of one mil blast profile shall be obtained.

)

4.4.3.0 Coating Interface - At coating interface for finish and/or primer coat, the existing coating shall be " feathered back" a sufficient distance to ensure a smooth final coating sytem. When interfacing the 305/CZ11 system and the 305/06 system, the interface of the two l

primers shall be no greater than 1h" in width, sj 4.4.3.1 Cure of Minor Topcoat Repair - Minor defects, as defined in Section 4.4.2.8, which are noted in the topcoat and repaired, may be in-spected for final acceptance af ter cure to recoat time as stated 1

in Section 4.4.2.1(4) has been satisfied.

Full cure to topcoat repairs shall be satisfied prior to placement into service.

I noemen m

w_ a s ~ ___-- -

~..

-.... ~. - - ~ - - ~..

- - - - - -..... ~.. - -.

f PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 12 of 13 l

4.5 FINAL ACCEPTANCE TESTING 4.5.1 Final acceptance inspection may be performed after a minimum topcoat cure of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and cure for recoat time as state in section 4.4.2.1 paragraph 4 is satisfied.

After final inspection and resolution of all discrepancies are completed the QC inspector shall document the final acceptance by completing and signing the final acceptance record. A copy will then be transmitted to the B&R Paint Superintendent as soon as possible after final accept-ance is made.

4.6 HOLD POINTS 4.6.1 Onsite receipt of coating materials.

4.6.2 Substrates before and following surface preparation.

4.6.3 Mixing and preparation of coating material for application.

4.6.4 Film characteristics after drying and curing.

4.6.5 Control of ambient conditions and surface temperatures during all phases of the coating work.

5.0 SUPPORTING INFORMATION l

5.1 ATTACHMENTS 1.

Painter Qualification Record

?

2.

Special Coating Procedure 3.

CZ 11 Cure to Topcoat Time 4.

Pot Life CZ 11 and Phenoline 305

5.2 REFERENCES

1.

Gibbs & Hill Specification 2323-SS-14,

" Containment Steel Liner", Latest Revision 2.

Steel Structures Paint Council, Volume 2, Second Edition i

3.

Carboline Corporation " Application Instruction",

October 76-N Revision and Bulletin Number 775 - data sheets October 76-N Revision and 473, Latest Revision 4.

ANSI N 101.2,

" Protective Coatings (Paints) for Light Water Nuclear Reactor Containment Facilities" 5.

Gibbs & Hill Specification 2323-AS-31,

" Protective Coatings", Latest Revision j

f CCP-30 Rev 10 DCN #7 f.M5Uuna Pmo 3 of a

~

e,

~

.n

~ ^

lw

....--~-.u....-.-..i..:.2.....-......,.-.:--.:....u..

t>:i PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 13 of 13

+ 1

'i

i 6.

Gibbs & Hill Specification 2323-MS-101,

" Equipment Erection", Latest Revision

j 7.

Gibbs & Hill Specification 2323-MS-438,

" Nuclear Piping", Latest Revision l

8.

Gibbs & Hill Specification 2323-MS-44B,

'j

~

"Non-Nuclear Piping"

~

i 9.

Gibbs & Hill Specification 2323-MS-100,

.i

" Piping Erection" i!j

10. Gibbs & Hill Specification 2323-SS-17, 7j

" Miscellaneous Steel", Latest Revision 1

1

.t p

, t

'i I ';

i l 3

ll t

i l

1j u

.i

-k

...'.I...._....,......._,,,

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE g

I CPSES l

l

[

J08 35-1195 l

CCP-30 10 1/26/82 1 of 1

,t ATTACHMENT 1

,I BROWN & ROOT, INC.

s g

COMANCHE PEAK STEAM ELECTRIC STATION g

{

.: 24di

~

I Painter Qualification Record "

['fi GENERAL DATA 1

a 9

l Date Report Number l

TECHNICAL DATA Name of Painter Suninary of Field Experience 41 1

I i

Experience with Following Product Types i

Application Test for Specified Substrate h

. Additional Quai f fications (School)

L' L

Signature Applicator's Fiela Superviscr Distrit:ution: Painting Supt.

Q.C. Depart:nent

[

Tugco QA Vault (Original.l_

(

M. - ]

9

i.

.a

- a.a._

-c.: u e.=:=..~.2 o

a PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE

,i CPSES PAGE i

l i:

l.

JOB 35-1195 CCP-30 10 1/26/82 1 of 2 ll "Q" Coating ATTACHMENT 2 Sheet of Procedure #

"Non-Q" Coating Rev.

Oate SPECIAL COATING PROCEDURE NO.

SCOPE REQUIREMENTS:

u i

1 J

~{

t 4

)

o REFERENCE DOCUMENTS APPROVALS POE 4

I QA/QC q

TUSI a

ENGINEER

'I REV.

DATE il:;

m-

-m J

i

'h

..._ L.

L _ -. :.

..-......2..-

...._.a I

PROCEDURE EFFECTIVE !

BROWN & ROOT, INC.

NUMBER REVISION DATE l

PAGE CPSES JOB 35-1195 I

CCP-30 10 1/26/82 2 of 2 4

1 a

Sheet of i

ATTACHMENT 2 (Continued)

Procedure #

u 1

Rev.

. Date i

1 REQUIREMENTS (Continued) 1 l

4 1

l t

1

~

.i 4

i, l

4 1

.j l

.t 4

P i

4

.3 i

7N 1

l 1 -.

_________J

....w-..~..-...-....

..,..... ~. -..

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30 10 1/26/82 1of 2 CZ-11 CURE TO TOPC0AT TIME 25-50% R. H.

4

..L?lmi j

.e.. -

.; g

,3q _

k

.I 168 i

W8 E

m-o&

O H

1 11 -

w W

M 3

1 m

' w-i 4

t/1 8

M t

i D

1 l

1 th l

i i

I g _"

e t

p l

a-i b A d

E Y T r

y v v

r

.i o

10 se 3a w

to La 70 m

94 1

}

\\

l TEMPERATURE

..-i M

Mf 8

>=u u '

~ ~,

L. D s,"

, r.

-m....-

m-

-. c_. -- -

m.

j....

r

,1

j PROCEDURE EFFECTIVE

]

BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES j,

JOB 35-1195 CCP-30 10 1/26/83 2 of 2 1a il i

ATTACHMENT 3 I4 CZ-11 CURE TO TOPCOAT TIME L

50-100% R.H.

1 A,

ll 828.

3 J

]

In -

I t

41 -

1 V

u.

4 H

I o

e

'. s v

(, o so i

H P-l

.j 2

m W-e 0

9

~.

3 1

l y_

t lo i.

ta -

3 C

3, i 4

- g-

'g-

'I 6

4 t

i

'l w

w 4

so u

,y so

-a ud I

i

?

1 i

TEMPERATURE F

~

~~

CCA30 Rcm 10 DCN #6 4/E9/83 Sheet 4 nea

k

  • ' ' ~ ~ " N :b. ".

. L - --. -,-..

.. l.... l Y,_

.,- L l.'.'.. M i

PROCEDURE EFFECTIVE J

BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES i

JOB 35-1195 l

CCP-30 10 1/26/82 1 of 1 t

]

ATTACHMENT 4

-} <

POT LIFE - CZ 11 J]

G Hours Max. Pot Life 8I"n.

~

il s

m a

2 net._

l I w.--

l.....,......l..............l.

......... l.....

ml 5'I' o n, l

o's

-is*v W!

IoS*!

don; I3 1

M

.,~

POT LIFE PHENOLINE 305 TEMPERATURE (O )

UNTHINNED THINNED-50%

F j'

50 - 54

,10 hrs 24 hrs 55 - 59 7 hrs 24 hrs d

60 - 64 4 hrs 24 hrs 65 - 69 als hrs 24 hrs 70 - 74 2 hrs 24 hrs 75 - 79 1 hrs 24 hrs 80 - 84 I hrs 24 hrs 85 - 89 1h hrs 24 hrs 90 - 95 1 hr 24 hrs Pot life for coatings thinned up to but not including max. amount

j of thinner allowed, use pot life for unthinned material.

.r For spray application, pot life as stated above is recommended maximum times and should be utilized for a basis for coating i^

usage time; however, actual pt life may be longer.

If coating when temperature is above.95 F, or if pot life as stated above 1

j has been exceeded, the actual pot life ends when proper atomization and spraying becomes difficult and the coating loses body and i

begins to sag. When utilizing other than spray application methods.

l' pot life shall be as stated in the above table.

ii'

~

CCP-30 Rev. 10 DCN #3 9(21/82 Sheet 4 of 4

d ATTACHMENT B iNSTAUC"CN ISSUE

.EVISIC N g-g 4Gg TEXAS UTluT*ES GE.NESAENG CO-NUM E E.7 CPSES I

CI-QP-11. 4-1 3

MAY 2 9 Ic81 1 of 6 m alO 8 Bs.

lb,'

hb A

EPARED3(:.lg.,d.c-J G..., < '

igya f

2:

INSPECTION OF STEEL SUBSTRATE SURFACE PREPARATION APPPOVED3)

Lb b m-

1.0 REFERENCES

1-A CP-QP-11.4, " Inspection of Protective Coatings" 2.0 GENERAL 2.1 PURPOSE AND SCOPE This Instruction wil1 supplement the requi recents of Reference 1-A for inspection of steel substrate surface p repa ra ti on.

The Surface Preparation Inspecticn Checklist (Figure 1) shall be used to document inspecticns.

3.0 INSTRUCTION 3.1 PRE-BLAST CLEANING OPERATIONS 3.1.1 Mbient Conditions The inspector shell determine air temperature, relative humidity and dew point of substrate structures.

A 4

calibrated non-cortury filled dry bulb thennaneter or a i

fcalibrated temperatu're recorter (Bristol 4069 TH or i

equivalent) shall ce used for air temperature de te min-a ti on.

A calibra ted non-mercu ry wet bulb thermaneter or'a calibrated h' midi ty reccrce r (Bristol 4069 u

TH or equiva' lent) shall be used to detemine relative humidity. The dew point shall be cetemined by the i

difference in the dry and wet bulb temperatures using the U.S. Department of Canmerce Weather 3ureau Psychronetric Tables, W.B. No. 235.

The su rface temperature shall be determined t;' placing a calibrated surface tempera 5ure themameter (0mega - Mprove Fastemp, Range 10-250 F) in contact with the substrate surface to be blast cleaned.

The themometer,: robe shall remain in contact with the surface until tne temperature reading stabilizes.

  • , s.

?

. _. ~ ~

--..,.. ~ ~. ~.

o INSEUCTCN i l

AEVISICN b

DAGE NUMBER

f. A a..

I TEXAS UT1UT1ES GENE 3ATING CC.

l lQl-QP-11.4-l' 3 MAY 2 9 1981 3 of 6 i

I C ri te ri a :

i SSPC-SP10-63 i

Heavy deposits of oil or grease shall te rencved by T.ethods outlined in SSPC-SP-63, " Solvent Cleanin;".

Small quantities of oil or grease may be rencvec by blast cleaning.

i 3.1.5 Substrate Su rface Projecti ons i

The inspector shall visually examine the substrate surface (including welds) for sham projecticns that will not be blended in by sandblasting or pmer tooling.

I C ri te ri a :

i l

Edges, protrusions, and peaks shall be grounded smooth to a i

rounded contour.

-l i

l NOTE:

a.

Any mechanical surface preparaticn other i

than sandblasting or grinding of sha m edges j

or weld splatter will requi re a B&R NDE i

visual inspector's acceptance of the work j

l pe rf o rmed.

b.

The inspector shal1 notify tne Paint Foreman when items 3.1.1 througn 3.1.5 above a re i

sa tis fact ory.

l i

3.2 BLAST CLEANING OPERATIONS 3.2.1 Blast Tech,.foue is Acceotable I

l During blast cleaning operations, the inspector shall spot check blasting technique.

Dwell time shall be observed and I

locations noted (for future surface in-spection) where dwell i

time was extended to remove heavy deposits of mill l

scale / rus t.

l 1

C ri te ri a.

I DwelI time wil1 depend on surface conditions (type and i

amount of mill scale / rust).

No finn time limits are i

established for Longer dwell time indicates heavier

{

depw i ts o f s...... and these a reas should be identi fieu QMomm '

.n-e<.

g w

INSTRUCTCN ' AEVISICN Ib3N PAGE TEXAS UT1UT1ES GENESADNG CC.

3 CMES QI-QP-11.4-l!

3 'MAY 2 9 1981 '

4 cf 6; i

?

I 3.3 POST BLAST CLEANING OPERATIONS 3.3.1 Blast Cleanup The inspector shall visually check the blasted substrate surface and adjacent areas for removal or control of 3

abrasive and dust prior to start of final inspecticn.

l C ri te ria :

l I

The surface shall be brushed or vacuumed to the extent required for final surface inspection.

The adjacent areas shall be cleaned to the extent necessary to avoid contamination during subsequent coating applications.

3.3.2 Blasted or Power Tooled Surface Acceptability l

j The inspector shall perfom the following inspections to detennine acceptability of the blast cleaned or power tooled l,

i su rface:

a.

Absence of Foreign Matter -- A visual inspecticn shall be perfomed to detemine removal of foreign catter i

fran the su rface.

l i

C ri te ria :

l l

SSPC-SP10-63 I

The surface, when viewed withcut magnificaticn, shall be free of all oil, grease, visible mill scale, rust, corrosion products, oxides, paint, or any foreign matter, except for light shadows, slignt streaks, or l

slight discolorations caused by rust stain, mill scale I

oxides, or slight, tight residues of paint.

l 1

b.

Removal of Sharp Projections -- A reinspection for sha rp projections that were not blended (rounded) g during blast cleaning or power tooling shall be pe rfomed.

1 C ri te ria :

Sharp projections (including weld splatters) are not l

acceptable.

Sae note on item 3.1.5 above reganting grinding ope-ons to r'.icve projections.

~

3--

c---.

. m e:c ca -....-.

N i

INSTRUCTICN f AEVISlCN f^0N PAGE TEXAS UT1UTIES GENERATING CC.

CPSES QI-QP-11. 4-1,j 3 ;MAY 2 9 1981 i S of 6i i

j l

I i

i c.

Anchor Pattern Depth -- The anchor pattern depth of the blasted or power tooled surface shall be inspected at random locations using a Keane-Tator Surface Profile Camparator (model 373) or equivalent. A power tooled surface shall be inspected with use of either a roughness gage and/or canparator plate whicn has been approved by the coating manufacturer.

C ri te ria :

Blast Cleaning SSPC-SP10-63T The anchor pattern depth for a blasted surface shall not be less than 1S70 (minimum depth 1.0 mils).

Powe r tooling - Power Tooling (SSPC-SP3-63) may also be used with no Area Restrictions, providing this type prepa ration produces an Acceptable Surface Canpa rable to SSPC-SP10-63T.

The Anchor Oattern Depth for a power tooled surface I

shall not be less than 1 nil.

fio maxinun profile will be specified, providing that correct millage l

requirements can be obtained after priner application.

l l

i 3.4 FIflAL ACCEPTANCE The inspector shall detennine that all FCRs ano NCRs are canplete prior to signing and dating Final Acceptance on checklist.

i e

l i

I t

t i

l 5

1 i

i I

~

f meni =,

%c3 c4 -

~

_ y r

INSTRUCTION ISSUE g g,/ISICN NUMBER DATE PAG:

TEXAS UTILITIES GENERATING CC.

CPSES MAY 2 9 1981 GI-QP-11.4-1 3

6 Of 6 FIGURE 1 QUALITY ASSURANCE DEPARTMENT STEEL SUBSTRATE SURFACE PREPARATION INSPECTION CHECKLIST i

Location:

Building:

Project:

CPSES, Job 35-1195 Unit:

1 TIME OF TEMPERATURE I RELATIVE DEW DAY DRY SUL3 {

WET SULB j S U R F A C F.

l MUMIDITY POINT Results Initial Date 1.

Ambient Conditiona 2.

Air Supply / Sand 3.

Surface Projections 4

Sand 31ast Cleanup 5.

Surface & Profile Acceptable 6.

Absence of Foreign Matter 7

Removal of Sharp Projections COMMENTS FINAL ACCEPTANCE:

Inspector Date t

4

- UGCO 04 I

ATTACHMENT C NO CONFORhhANCE hk)RT (NCR) s:

Q,

Q

.t

.......mt h

PLANT system COMPONENT TACISPIN/lOE N T NO I DH /..'e tNC15PE CIFIC ATION NO.

l SERI AL NO.

p

. COct CODE CODE Al8lCl0lE lF [

G ; (U n.tst l H ; (Unsul I J ! (Units)

([

i4 s.10 11 16 17 55 g

g ARMS INDEXED

..t yr.

PURCH ASE ORDE R VEND f

NUN 9BER CODE 5669 7473 DWs g

,021978 P 3

C-903-

,g e..

........ t.

t t t, t....

t t t t t I t t, t t

,t I t t t T'

p.t R R HIR VEN DO R'S COUNT l UNITS PU R C H'S HLS/ HOLD NO.l CODE INPUT N

hust BIR NUM9ER H E AT/ LOT / BATCH N O.

Q U AN 18 T Y O R N O.

ST AT Us DATE

]

nn 6485 8695 96 105 1C6 ill 112 121 122 127

{3) N ON C C M PO R *4s M G CONDS YtOMs

@ U"IT:

1, 2,M (Circ 1T Une)

')

h Aux.

Blde. Elev. 810'

-l; (Material / Structure /Systes) g Room 197 wall E floor M

(Componeat) h N/A A

SEE ATTACHED (Vendor)

@ LOCATION:

Rec., Stora n.

3 (Circic One)

J-C.

Tin i "k%6 dt?l71 2-i 7-70 $ thfllf (3) REPORTED BY:

ll4) DATES H D. u^^

l2.q.,8 PREPa nto sv

'isp pat E:

tvl REveE w/ APPaov AL:

'g,goavg.

H. D. Hash 2 117178

.h.t

  • S I?or 7[f A1 D

g,g pe Spo se TIO N ASST Gr* E 3 TO.

It a) D' E D ATE O ljCORRECTIVE ACTION REQUEST 8 CARm (4 2) REPO R.T AtsLE oEPtC EnCv U. D. Douglas 3 ' S '78 Req:// red @Not Required OPCs5ence IO~ o (I 3l OtSPOStTION:

REWORM REPAIR USE AS B5 SCRAP 1.

The foot prints and any other irregularities such as pinholes will be touched up in accordance with construction procedure CCP-40, Sec. 4.3.1..

~.

2.

The soot from the Kelly heater was blown in after initial set.

It will be removed by detergent washing or solvent wiping.

t (t al CO TR.REve i APPROv AL:

gis) o ATEs 1

44 h

2.,2a7g t e s3s A RE ve E w/ APPROV AL (ST) D ATE:

(G B) CUE Evt EW/ A P PR OV ALs g(19) D ATE:

$dhawg l 2192178 Y

W 2;b.

7g l

t i

s t a sl E N G, M E vl E w jA PPR OV Al.

'(Stl O A TEs (33) AN8 R VS EWfA PPR O V k L a

'(33l OATCs b '}b >l2 dt l' i

///AIAfB L,/-19 2

/9

y

[

ta.: vE Re n e C A TeOn s 1343 RE u AR uSi gag j

. G Satisixtory D unsatisractory Not Reg'd.

QA RECORD l'

y

~

o ns oC E NcR. fin 5P. VElntPIT0l

o3 win "I"3*0W a

-y J. 9..n ettel DATE pig g' tatiANsvtRerecAfsOmi w/nessWs o

/YM C cic)3

}

20hb k.

t i,.

s

?

I ATTACHMENT TO C-903 t

e4eW TECH 1tii6 I,

23 surfacer may be CCP-40Rev.Ostatesinpart"Ni ly after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> cure."

subjected to personnel foot tr l..

1.

In Upper Auxiliary Room 197 E1. 810' partial floor the 115 surfacer has foot prints in evidence within the first 24 k

hours cure. Hold tag will be placed on door entrance.

2.

Kelly heaters deposited contamination (soot) on 11S surfacer

},

on floor.

y l

n 1

L

\\ - \\'l:

W a

1

.i..~

18 3

e s

r *,

s F

h

~ -. -

r _. - - - -. - - _. _ _ _ _ _ _ _ _ -. _ _ _ _ _ _ _ -. _ _ _ _ _ _ _ _ _ _ _ _ -. _ _ _ _ _ _

ff OQ

'3( v--- #

INSPECTION R EPORT I

PAGE,1__ Or _ [

$.n.s.p r.x 4

....,,, m j.3.2 3..n.u..71,,..

.X,,,..... ~

PLANT SYSTEM COMPONENT 1 AG/ SPIN /tDE N T NO CODE CODE CODE A l 8[C[OIElF lj OR AWING / SPECIFICATION NO l SF RI A L NO G; tuneul I Hi IUneal l J ; IUneal 14 5 to 15 16 17 56

,s

.s

,a m

PURCH ASE ORDER VEND y*

NUMSER CODE 5649 7473

$,... N..... 5,,,,,,,,

,,,, )OC,,,

4....

  1. ,J,@#

MRR RIR V EN DO R'S COUNT l UNITS PURCH's RLS/ HOLD NO.l CODE INPUT NUMSER NUM8ER HE AT/ LOT /8ATCH NO, OUANTITY OR NO.

ST AT US DA TE 74 79 8085 86 95 96 105 106 111 112 121 172 127 PURPOSE AND TYPE OF INSPECTION / SURVEILLANCE: To O/T M[Is /N ME AIM VnAM osv Aux. GLD6. Eb 8IC' 1% 00M )4 7 w AM. + f/ oo ?

s I

QA IESULTSOF INSPECTION / SURVEILLANCE:[O FOOT /A /NTS

'T-N TNE A/u rec. *//r Swfua w ue n.w a a edo blY sess;< e d se - ces-90 1

1 r

i see. 4. 1.1 62 500+ desoG/s w e e e.

<e moved b v solve ni n,'s, 'n o f

oee c c.p-so.

/

/

v I

w NC3NO&9 0.3 N. 0. Y Y 0.

[

/ 7/7a OC ENGINEER /lNSPECTOR #

(en

e ATTACIIMENT D i

TEXAfl.TII.ITIES GENERATING CO.TIFTNY n...., wn.s,.. m u..v.m u....>.

!.4

//

April 15,1983 TXX-3655 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Docket Nos.:

50-445 50-446 Arlington, Texas 75012 COMANCHE PEAX STEAM ELECTRIC STATION RESPONSE TO NRC NOTICE OF VIOLATION INSPECTION REPORT NO. 83-07/04 FILE NO.:

10130

Dear Mr. Madsen:

This will serve to document our telephone conversation with T. F. Westeman on April 12, 1983, wherein we requested an extension of the due date for responding to the Notice of Violation contained in NRC Inspection Report No. 83-07/04.

An extension of three working days, until April 18, 1983, was granted.

We have reviewed your letter dated March 14, 1983 on the inspection conducted i

by Messrs. L. D. Gilbert and C. E. Johnson of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for Comanche Peak, Units 1 and 2.

We have responded to the finding listed in Appendix A of that letter.

To aid in the understanding of our response, we have repeated the requirement and your firiding followed by our corrective action.

We feel the enclosed infor-mation to be responsive to the Inspector's finding.

If you have any questions, please advise.

Very truly yours,

'k f~

RJG:aq Enclosures NRC Region IV - (0 + 1 copy) cc:

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, DC 20555

--'- ~

i APPENDIX A fv0TICE OF VIOLATION Texas Utilities Generating Company Docket:

50-445/83-07 Comanche Peak Unit 1 Permit: CPPR-126 Based on the results of an NRC inspection conducted during the period January 27-28 and February 1-2, 1983, and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C), 47 FR 9987, dated March 9, 1982, the following violation was identified.

Failure to Follow Procedure Criterion V of Appendix 8 to 10 CFR Part 50 requires that activities affecting quality shall be prescribed by documented procedures of a type appropriate to the circumstances, and shall be accomplished in accordance with the procedures.

Brown & Root, Inc., Construction Procedure CP-cpl 4 9.10, Revision 8, paragraph 3.2.4, specifies that the fit-up gap for "T" fillet joints should not exceed 1/16"; however, if the gap is in excess of 1/16", but not exceed-ing 5/32", this condition will be considered acceptable provided the leg of the fillet weld is increased by the amount of separation in excess of 1/16".

Contrary to the above, on January 28, 1983, the NRC inspector determined that Pipe Support Mark No. SW-1-102-105-Y33K had been welded with a fit-up gap of 1/4" at one end of the "T" fillet joint which attached piece 7 to piece 4.

The 1/4" fit-up gap exceeds the 5/32" maximum allowable fit-up gap require-ment of Procedure CP-CMP 9.10.

This is a Severity Level V Violation.

(Supplement 11.E) (445/8307-01)

CORRECTIVE, STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED Corrective actions have included the following:

' 1)

Identification of the procedural violation as a nonconfoming condition (NCR-51235);

2) Removal of the affected portions of the pipe support (for investi-gative reasons) and replacement with new materials;
3) Engineering evaluation of the total weld for purposes of evaluating safety consequences, if any.

[

Notice of Violation TXX-3655 As noted above, the pipe support was reworked to comply with design and procedural requirements.

Engineering evaluation of the original as-built conditions revealed the following:

1) The excessive gap occurred at the toe of the skewed angle, and for a distance of six inches tcward the heel on one side and seven inches on the other.

No design cregit is taken for the weld at the g

toe of the angle, as it exceeds 135 (157 ).

Additionally, to account for the corner effect caused by the radius of the tube steel, 2.56 inches of the weld on each side at both the toe and heel is excluded from design consideration. This results in a total eld length (for which design credit is taken) of 10.24 inches on ach side.

2)

Taking no credit for the weld where gap is in excess of 5/32, and excluding 2.56 inches at both the toe and heel, the remaining weld which is within acceptance criteria is 6.8 inches on one side and 5.8 inches on the other.

3)

Design calculaticns based on as-built piping loads indicate a total of 1.6 inches of fillet weld is reauired on both sides to meet structural design requirements.

In summary, had the gap conditicn not been detected, there would be no adverse results.

CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS Affected construction personnel will be reinstructes in the necessity for rigid compliance with design'and procedural requirenents.

DATE OF FULL COMPLIANCE Corrective actions are complete.

Preventive maasures are scheduled to be completed by April 22, 1983.

l

-