{{#Wiki_filter:. .            -
{{#Wiki_filter:.
        *  ~t "'    '"  =g                                                             GPU Nuclear Corporation
=g GPU Nuclear Corporation
            " J-'r,"[ " (gQQ i
~t "'
" J-'r [
(gQQ gf pest Office Ecz 450 f
i~
i~
f            gf pest Office Ecz 450 Route 441 South Middletown. Pennsylvania 17057 019 717 944 7621
i Route 441 South Middletown. Pennsylvania 17057 019 717 944 7621 TELEX 64 2386
:                                                                                        TELEX 64 2386
. Writer's Direct Dial Number:
.                                                                                        . Writer's Direct Dial Number:
i Se?: caber 9,1983 3211-83-247 Dr. T. E. Murley Region I, Regional Administrator U. S. Nuclear Regulatory Co==ission 631 Park Avenue
i                                                                         Se?: caber 9,1983                                 <
~
3211-83-247 Dr. T. E. Murley
King of Prussia, PA 19406
:                  Region I, Regional Administrator U. S. Nuclear Regulatory Co==ission
~
631 Park Avenue King of Prussia, PA 19406


==Dear Sir:==
==Dear Sir:==
 
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Three Mile Island Nuclear Station, Unit 1 (TMI-1)                                   *
Operating License No. DPR-50 l
  -                                            Operating License No. DPR-50                                           l Docket No. 50-289 Inspection Report 50-289/83-17 This is in, response to the subject Inspection Report issued July 28, 1983,
Docket No. 50-289 Inspection Report 50-289/83-17 This is in, response to the subject Inspection Report issued July 28, 1983, in which two apparent items of noncompliance were presented.
  ;                in which two apparent items of noncompliance were presented.                 GPUNC concurs with the viela: ions as evidenced in the Inspection Report.
GPUNC concurs with the viela: ions as evidenced in the Inspection Report.
The citations are repeated below followed by GPUNC's response to each of the violations.
The citations are repeated below followed by GPUNC's response to each of the violations.
As a result of the inspection conducted on June 15.19E3, through June 29,                             -
As a result of the inspection conducted on June 15.19E3, through June 29, 1953, and in acccrdance with 10 CFR 2 Appendix C. the following viole.:iens were identified.
1953, and in acccrdance with 10 CFR 2 Appendix C. the following viole.:iens were identified.
A: PARENT VIOLATION A.
A: PARENT VIOLATION A. (Severity Level V)
(Severity Level V)
Secticn 6. 8.1.1 ef the '; nit 1 Technical Specificc:i:ns re:;; ires , in par:,
Secticn 6. 8.1.1 ef the '; nit 1 Technical Specificc:i:ns re:;; ires, in par:,
: hat writ:en procedures i pertant :o saf ety (I!5; ':e es:a'rlished. irpleren:ed                   .
: hat writ:en procedures i pertant :o saf ety (I!5; ':e es:a'rlished. irpleren:ed and =ain:ained ccvering the activities referenced in the :uality Assurance Progra for effluen and envircnnental renitorin; using guidance in Regula: cry Guide 4.15.
and =ain:ained ccvering the activities referenced in the :uality Assurance Progra for effluen and envircnnental renitorin; using guidance in Regula: cry Guide 4.15.
[
[               Centrary to the above, an approved, cen: rolled ; r::edure has not been                               -
Centrary to the above, an approved, cen: rolled ; r::edure has not been inplemented regarding :he operation of the tenpert ure. pressure ccr.pensa:ed environ = ental air samplers fro: the date of their installa: ion, March.1953,
inplemented regarding :he operation of the tenpert ure. pressure ccr.pensa:ed environ = ental air samplers fro: the date of their installa: ion, March.1953,
:hrough the da:e of this in'spection.
:hrough the da:e of this in'spection.
8309300228 830923 PDR ADOCK 05000289 G                     PDR                         .
8309300228 830923 PDR ADOCK 05000289 G
GFU Nuciear Corporation is a subsidiary of.the Ge .n   utii: U:ilities Corpora icn
PDR GFU Nuciear Corporation is a subsidiary of.the Ge.n utii: U:ilities Corpora icn


            .. Th :as I. Murley                                                 52'1-S1-22
Th :as I. Murley 52'1-S1-22


===Response===
===Response===
This proble: vas previously identified by the licensee. The air samplers were installed in Ebrch 1983 as a result of concerns expressed by the NRC                       !
This proble: vas previously identified by the licensee.
in this area.     As noted in the Inspection Report, a draft procedure for                     ;
The air samplers were installed in Ebrch 1983 as a result of concerns expressed by the NRC in this area.
operation of the recently installed pressure / temperature compensated environ-mental air samplers had been prepared by licensee personnel by the time of the inspection.     The inspector reviewed the draft procedure and determined that it provided appropriate guidance to perfor: sa:ple change outs and routine operational checks of the equipment.
As noted in the Inspection Report, a draft procedure for operation of the recently installed pressure / temperature compensated environ-mental air samplers had been prepared by licensee personnel by the time of the inspection.
As of August 5, 1983, an approved controlled procedure (9420-OPS-4522.05) for operation of the air samplers has been implemented.         This procedure is con-sistent in content with the draft procedure.
The inspector reviewed the draft procedure and determined that it provided appropriate guidance to perfor: sa:ple change outs and routine operational checks of the equipment.
As of August 5, 1983, an approved controlled procedure (9420-OPS-4522.05) for operation of the air samplers has been implemented.
This procedure is con-sistent in content with the draft procedure.
Licensee takes exception to the implied classification of the environmental air samplers as i=portant to safety (See response to Violation B).
Licensee takes exception to the implied classification of the environmental air samplers as i=portant to safety (See response to Violation B).
Additionally, Environmental Controls personnel have been trained in the need for operational procedures to carry out Technical Specification requirements.               l At?ARENT VIOLATION B.     (Severity Level IV)
Additionally, Environmental Controls personnel have been trained in the need for operational procedures to carry out Technical Specification requirements.
~        Section 6.8.1 of the Unit 1 Technical Specifications requires, in part, that critten procedures i=portant to safety be established, implemented and maintained covering the activities referenced in the Quality Assurance Program for effluent and environnental monitoring using the guidance in Regularory Guide 4.15.
l At?ARENT VIOLATION B.
(Severity Level IV)
Section 6.8.1 of the Unit 1 Technical Specifications requires, in part, that
~
critten procedures i=portant to safety be established, implemented and maintained covering the activities referenced in the Quality Assurance Program for effluent and environnental monitoring using the guidance in Regularory Guide 4.15.
Contrary to the above, a calitration program has not been established regarding the operation of the envirennental water compositing sanplers from the date of their ins:allation in 1979 through the date of this inspection.
Contrary to the above, a calitration program has not been established regarding the operation of the envirennental water compositing sanplers from the date of their ins:allation in 1979 through the date of this inspection.


===Response===
===Response===
This proble= had been previously identified by GPUNC.       The environmental water cc= positing saeplers were acquired under licensee initiative to eliminate hand grab sa:pling cf the environment. These samplers shculd not be construed as importan: to safe:y. Per H. R. Denton guidance cf 11/20/S1. :hese envircnnental samplers are not                              cf plan: features covered in the encorpassed General Design Criteria.          in the class {23pgg a ,}           g
This proble= had been previously identified by GPUNC.
                                                                                >-t G?rNC. agrecs that a procedure should be promulgated to calibrate samplers used to i=plement Technical Specifications. A procedure has been draf ted (July 1953) and is currently in the review and ap;reval process. Approval and implementation of the procedure is expected in October, 1983. Calibra-tion vill be performed semiannually whereas caintenance vill be performed as needed. The initial calibration is anticipated to cc ence in Novenber 1983.
The environmental water cc= positing saeplers were acquired under licensee initiative to eliminate hand grab sa:pling cf the environment.
:: should be ncted that the use of icpreved samplin; means , automatic ec positors, was initiated by the licensee beycnd Technical Specification
These samplers shculd not be construed as importan: to safe:y.
                                    \s         beke %N~m h             .
Per H. R. Denton guidance cf 11/20/S1. :hese envircnnental cf plan: features covered in the encorpassed in the class {23 samplers are not pgg a
,}
g General Design Criteria.
>-t G?rNC. agrecs that a procedure should be promulgated to calibrate samplers used to i=plement Technical Specifications.
A procedure has been draf ted (July 1953) and is currently in the review and ap;reval process.
Approval and implementation of the procedure is expected in October, 1983.
Calibra-tion vill be performed semiannually whereas caintenance vill be performed as needed.
The initial calibration is anticipated to cc ence in Novenber 1983.
:: should be ncted that the use of icpreved samplin; means, automatic ec positors, was initiated by the licensee beycnd Technical Specification
\\s beke %N~m h


      ,            .    -ncr.as E. Murley                                                     5:11- E 3-:_
-ncr.as E. Murley 5:11-E 3-:_
requirements.                   However, Environmental Controls 'perse .nel have been trained in the need for appropriate procedures to carry out Technical Specification requirements.
requirements.
GPUNC believes that the above actions should avoid s                     .er occur:ences of this type.
However, Environmental Controls 'perse.nel have been trained in the need for appropriate procedures to carry out Technical Specification requirements.
Sig c       ,
GPUNC believes that the above actions should avoid s
l l-   .
.er occur:ences of this type.
L
Sig c l
* e    2 r.
l-L e
t; Eg\D.
2 r.
                                                                                        ~;ill ~W Diret     ,    DfI-l HDH: RAS: vj f ec:       J. Van Vlie I
t;
Sworn and Subscribed to                                                                           '
~ ~W Eg\\
Before me this taA_ day ef g M @ , 1983.                                         -
D.
              ._h4ct.uJ   Notary Fuhlic 41% v~         '
;ill Diret DfI-l HDH: RAS: vj f ec:
                      *;kJ
J. Van Vlie I
                      ;    JiAf. GiEP) hCI!.h FUi:UC WIDDLETCrn E0:0 CAUPNih COUh'T)
Sworn and Subscribed to Before me this taA_ day ef g M @, 1983.
V' CC.WW!!$i~ h i:F.iE* Jen! p ipp s' m .. . F e n e n to r.., . w.:m,r r. e . . ....
._h4ct.uJ 41% v~
Notary Fuhlic
*;kJ JiAf. GiEP) hCI!.h FUi:UC WIDDLETCrn E0:0 CAUPNih COUh'T)
V' CC.WW!!$i~ h i:F.iE* Jen! p ipp s' m... F e n e n to r..,
. w.:m,r r. e......
9}}
9}}

Latest revision as of 09:06, 14 December 2024

Responds to NRC Re Violations Noted in IE Insp Rept 50-289/83-17.Corrective Actions:Procedure 9420-OPS-4522.0 Re Operation of Air Samplers Implemented
ML20080L293
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/09/1983
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20080L290 List:
References
5211-83-247, NUDOCS 8309300228
Download: ML20080L293 (3)


Text

.

=g GPU Nuclear Corporation

~t "'

" J-'r [

(gQQ gf pest Office Ecz 450 f

i~

i Route 441 South Middletown. Pennsylvania 17057 019 717 944 7621 TELEX 64 2386

. Writer's Direct Dial Number:

i Se?: caber 9,1983 3211-83-247 Dr. T. E. Murley Region I, Regional Administrator U. S. Nuclear Regulatory Co==ission 631 Park Avenue

~

King of Prussia, PA 19406

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 l

Docket No. 50-289 Inspection Report 50-289/83-17 This is in, response to the subject Inspection Report issued July 28, 1983, in which two apparent items of noncompliance were presented.

GPUNC concurs with the viela: ions as evidenced in the Inspection Report.

The citations are repeated below followed by GPUNC's response to each of the violations.

As a result of the inspection conducted on June 15.19E3, through June 29, 1953, and in acccrdance with 10 CFR 2 Appendix C. the following viole.:iens were identified.

A: PARENT VIOLATION A.

(Severity Level V)

Secticn 6. 8.1.1 ef the '; nit 1 Technical Specificc:i:ns re:;; ires, in par:,

hat writ:en procedures i pertant :o saf ety (I!5; ':e es:a'rlished. irpleren:ed and =ain:ained ccvering the activities referenced in the :uality Assurance Progra for effluen and envircnnental renitorin; using guidance in Regula: cry Guide 4.15.

[

Centrary to the above, an approved, cen: rolled ; r::edure has not been inplemented regarding :he operation of the tenpert ure. pressure ccr.pensa:ed environ = ental air samplers fro: the date of their installa: ion, March.1953,

hrough the da:e of this in'spection.

8309300228 830923 PDR ADOCK 05000289 G

PDR GFU Nuciear Corporation is a subsidiary of.the Ge.n utii: U:ilities Corpora icn

Th :as I. Murley 52'1-S1-22

Response

This proble: vas previously identified by the licensee.

The air samplers were installed in Ebrch 1983 as a result of concerns expressed by the NRC in this area.

As noted in the Inspection Report, a draft procedure for operation of the recently installed pressure / temperature compensated environ-mental air samplers had been prepared by licensee personnel by the time of the inspection.

The inspector reviewed the draft procedure and determined that it provided appropriate guidance to perfor: sa:ple change outs and routine operational checks of the equipment.

As of August 5, 1983, an approved controlled procedure (9420-OPS-4522.05) for operation of the air samplers has been implemented.

This procedure is con-sistent in content with the draft procedure.

Licensee takes exception to the implied classification of the environmental air samplers as i=portant to safety (See response to Violation B).

Additionally, Environmental Controls personnel have been trained in the need for operational procedures to carry out Technical Specification requirements.

l At?ARENT VIOLATION B.

(Severity Level IV)

Section 6.8.1 of the Unit 1 Technical Specifications requires, in part, that

~

critten procedures i=portant to safety be established, implemented and maintained covering the activities referenced in the Quality Assurance Program for effluent and environnental monitoring using the guidance in Regularory Guide 4.15.

Contrary to the above, a calitration program has not been established regarding the operation of the envirennental water compositing sanplers from the date of their ins:allation in 1979 through the date of this inspection.

Response

This proble= had been previously identified by GPUNC.

The environmental water cc= positing saeplers were acquired under licensee initiative to eliminate hand grab sa:pling cf the environment.

These samplers shculd not be construed as importan: to safe:y.

Per H. R. Denton guidance cf 11/20/S1. :hese envircnnental cf plan: features covered in the encorpassed in the class {23 samplers are not pgg a

,}

g General Design Criteria.

>-t G?rNC. agrecs that a procedure should be promulgated to calibrate samplers used to i=plement Technical Specifications.

A procedure has been draf ted (July 1953) and is currently in the review and ap;reval process.

Approval and implementation of the procedure is expected in October, 1983.

Calibra-tion vill be performed semiannually whereas caintenance vill be performed as needed.

The initial calibration is anticipated to cc ence in Novenber 1983.

should be ncted that the use of icpreved samplin; means, automatic ec positors, was initiated by the licensee beycnd Technical Specification

\\s beke %N~m h

-ncr.as E. Murley 5:11-E 3-:_

requirements.

However, Environmental Controls 'perse.nel have been trained in the need for appropriate procedures to carry out Technical Specification requirements.

GPUNC believes that the above actions should avoid s

.er occur:ences of this type.

Sig c l

l-L e

2 r.

t;

~ ~W Eg\\

D.

ill Diret DfI-l HDH
RAS: vj f ec:

J. Van Vlie I

Sworn and Subscribed to Before me this taA_ day ef g M @, 1983.

._h4ct.uJ 41% v~

Notary Fuhlic

  • kJ JiAf. GiEP) hCI!.h FUi
    UC WIDDLETCrn E0:0 CAUPNih COUh'T)

V' CC.WW!!$i~ h i:F.iE* Jen! p ipp s' m... F e n e n to r..,

. w.:m,r r. e......

9