ML20085K958: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:- - _ _ . - _ . . . - _                                                       -
{{#Wiki_filter:- - _ _. - _... - _
South Carolina Flectric & Gas Company       John L Skolds P O Box 88                                   Vice Prr+ dent
South Carolina Flectric & Gas Company John L Skolds P O Box 88 Vice Prr+ dent enkin v te SC 290%
                                        *                            ;                                                                                                    enkin v te SC 290%                       Nucle Operabons SCE&G
Nucle Operabons SCE&G OCT 2 51991 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
                                  .                                                                                                                                                OCT 2 51991 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:


==Subject:==
==Subject:==
Line 26: Line 25:
EMERGENCY RESPONSE DATA SYSTEM (ERDS)
EMERGENCY RESPONSE DATA SYSTEM (ERDS)
IMPLEMENTATION PLAN (PR 900015-0)
IMPLEMENTATION PLAN (PR 900015-0)
Pursuant to the final rule regarding the addition of the Emergency Response Data System (ERDS) to 10CFR50, South Carolina Electric & Gas Company (SCELG) is submitting its ERDS implementation program plan. A meeting was held in Atlanta, Georgia, on October 3, 1991, with Mr. Jolicoeur of the NRC to discuss the requirerrents of NL' REG-1394 (the guidance document for ERDS implementation). In this meeting, it was explained that this submittal should include the following:
Pursuant to the final rule regarding the addition of the Emergency Response Data System (ERDS) to 10CFR50, South Carolina Electric & Gas Company (SCELG) is submitting its ERDS implementation program plan. A meeting was held in Atlanta, Georgia, on October 3, 1991, with Mr. Jolicoeur of the NRC to discuss the requirerrents of NL' REG-1394 (the guidance document for ERDS implementation).
: 1.                         An implementation schedule for achieving operational status for ERDS at the Virgil C. Sufumer Nuclear Station (VCSNS).
In this meeting, it was explained that this submittal should include the following:
: 2.                         A completed list of utility contacts per Section I of Appendix B to HUREG-1394
1.
: 3.                         An overview diagram of the VCSNS computer system.
An implementation schedule for achieving operational status for ERDS at the Virgil C. Sufumer Nuclear Station (VCSNS).
: 4.                         A description of how VCSNS intends to control the Plant Attribute Library (PAL) and the Datapoint Library (DPL).
2.
The first three items are addressed by the attachments to this letter,                                                                                                                     in regard to item 4, the PAL /DPL will be maintained and controlled via Engineering Services procedures. These controls will be incorporated in the procedures prior to scheouled date for submittal of the PAL /DPL information.
A completed list of utility contacts per Section I of Appendix B to HUREG-1394 3.
An overview diagram of the VCSNS computer system.
4.
A description of how VCSNS intends to control the Plant Attribute Library (PAL) and the Datapoint Library (DPL).
The first three items are addressed by the attachments to this letter, in regard to item 4, the PAL /DPL will be maintained and controlled via Engineering Services procedures. These controls will be incorporated in the procedures prior to scheouled date for submittal of the PAL /DPL information.
Should there be any questions, please call at your convenience.
Should there be any questions, please call at your convenience.
Very truly your ,
Very truly your,
John L. Skolds DCH:JLS:1cd Attachment c:                       See Page 2                                                                                                                                                           /
John L. Skolds DCH:JLS:1cd Attachment c:
9111010160 911025 PDR ADOCK 05000395 F                                                                   PDR Il
See Page 2
/
9111010160 911025 PDR ADOCK 05000395 Il F
PDR


                                                                                        -                Document Contial Desk PR 910015-0 Page 2 of 2 c:                                               0. W. Dixon Jr.
Document Contial Desk PR 910015-0 Page 2 of 2 c:
: 0. W. Dixon Jr.
R. R. Mahan (w/o attachment)
R. R. Mahan (w/o attachment)
R. J. White S. D. Ebneter G. F. Wunder General Managers NRC Resident Inspector J. B. Knottts Jr.
R. J. White S. D. Ebneter G. F. Wunder General Managers NRC Resident Inspector J. B. Knottts Jr.
File 811.02)
File 811.02)
RTS                                                         PR 900015-0)
RTS PR 900015-0)
NUCLEAR EXCELLENCE - A SUMMER TRADITION!
NUCLEAR EXCELLENCE - A SUMMER TRADITION!


AttahmentI -
AttahmentI -
Page 1 of 2 SOUTH CAROLINA ELECTRIC & GAS COMPANY                                 .
Page 1 of 2 SOUTH CAROLINA ELECTRIC & GAS COMPANY V.C. SUMMER NUCLEAR STATION ERDS IMPLEMENTATION PLAN OCT NOV DEC JAN HB MAR APR MAY JUN JUL AUG s!P oCT NOV DEC 91 91 91 92 92 92 92 42 92 92 92 92 92 92 92 ERDS Implementation Plan l
V.C. SUMMER NUCLEAR STATION                                               ,
not Submittal to NRC SCE&G (NCS) Identifies ERDS Pio2 DPL Points SCE&G (NCS, DE, SPE) Prepares PAllDPL PIO3 Information & ES Procedures NRC (HalliburtJn-NUS) Devc! ops input / Output Communication Sof tware SCE&G (NCS) Develops Application gios Design Specificction NRCinstalls dedicated ERDS p,06 Telephone Line to Plant Demarkation Point SCE&G Installs dedicated ERDS P'OI Telephone Line to Computer Location SCE&G ERDS Application P!o8 Transmission Testing
ERDS IMPLEMENTATION PLAN OCT   NOV DEC     JAN HB   MAR   APR   MAY JUN JUL AUG s!P oCT NOV           DEC 91     91 91       92 92   92   92   42   92   92 92   92 92   92             92 ERDS Implementation Plan
~109 SCE&G FST with El mio SCEEG S AT with NRC an au SCE&G ERDS Online
___________________                                                                                    not l
Submittal to NRC SCE&G (NCS) Identifies ERDS Pio2 DPL Points SCE&G (NCS, DE, SPE) Prepares PAllDPL PIO3 Information & ES Procedures NRC (HalliburtJn-NUS) Devc! ops input / Output Communication Sof tware SCE&G (NCS) Develops Application
.-_________________                                                                                                                                    gios Design Specificction NRCinstalls dedicated ERDS p,06 Telephone Line to Plant Demarkation Point SCE&G Installs dedicated ERDS
.            _______                                                      _______                                                                              P'OI Telephone Line to Computer Location SCE&G ERDS Application P!o8 Transmission Testing
                                                                                                                                                                        ~109 SCE&G FST with El mio SCEEG S AT with NRC                                                                                                                                                   -
. - _ _              _  _ .                                                      _ _ _  _ .                                                                                        an au SCE&G ERDS Online                                                                                                                                                               -


      .      _ - ~ _ _ _ . _ _ _ _ _ _ _ . . _ . _ _                               m..     - . _ . - ._-.._._.-.__m..~._..                 - . _ . _ . _ _ _ . . _ . . .
_ - ~ _ _ _. _ _ _ _ _ _ _.. _. _ _
              ,=                             .                                                                                          Attachment !
m..
Page ; of 2 l
._-.._._.-.__m..~._..
i
Attachment !
                                .                                  South Carolina Electric & Gas Company                                                                     ;
,=
                                                                      -Virgil C. Summer Nuclear Station                                                                     i ERDS Implementation Milestones                                                                         I Project item         Description                                                   Completion Date Pl01                 ERDS Implementation plan                                     October 24,1991 P102                 SCEG (NCS) Identifies DPL                                     January 31,1992 points to be transmitted.
Page ; of 2 South Carolina Electric & Gas Company
Pl03                 SCEG (NCS, DE, SPE) prepares                                 May 31,1992 PAIJDPL information and ES procedure changes.
-Virgil C. Summer Nuclear Station i
April 30,1992 Pl04                 NRC(Halliburton-NUS) develops input / Output Communication Software. Note (1)
ERDS Implementation Milestones Project item Description Completion Date Pl01 ERDS Implementation plan October 24,1991 P102 SCEG (NCS) Identifies DPL January 31,1992 points to be transmitted.
PIOS                 SCEG (NCS) davelops ERDS                                     July 31,1992 Application Design Specification.
Pl03 SCEG (NCS, DE, SPE) prepares May 31,1992 PAIJDPL information and ES procedure changes.
                                      - P106                   NRC Installs dedicated ERDS phone                             July 31,1992 line to demarkation point. Note (1)
Pl04 NRC(Halliburton-NUS) develops April 30,1992 input / Output Communication Software. Note (1)
P107                 SCEG installs dedicated ERDS phone                           September 30,1992 line from demarkation point to ERDS Computer location in plant.
PIOS SCEG (NCS) davelops ERDS July 31,1992 Application Design Specification.
P108                 SCEG ERDS Application Development.                           - October 31,1992 Pl09                 Preliminary Application and                                   November 6,1992 transmission testing.
- P106 NRC Installs dedicated ERDS phone July 31,1992 line to demarkation point. Note (1)
Pl10                 SCEG Factory Test with El                                     November 20,1992 (Halliburton-NUS).
P107 SCEG installs dedicated ERDS phone September 30,1992 line from demarkation point to ERDS Computer location in plant.
Pill                 SCEG Site Acceptance Test with                               December 4,1992 NRC.
P108 SCEG ERDS Application Development.
Pl12                 SCEG ERDS Online.                                             December 10,1992 Notes:     (1) SCEG implementation Schedule is based on the NRC meeting the associated completion date. A one day for one day schedule slippage will occur should this completion date not be met.
- October 31,1992 Pl09 Preliminary Application and November 6,1992 transmission testing.
Pl10 SCEG Factory Test with El November 20,1992 (Halliburton-NUS).
Pill SCEG Site Acceptance Test with December 4,1992 NRC.
Pl12 SCEG ERDS Online.
December 10,1992 Notes:
(1)
SCEG implementation Schedule is based on the NRC meeting the associated completion date. A one day for one day schedule slippage will occur should this completion date not be met.
p 1-
p 1-


A
A Attachment ll Page 1 of 1
        ,                                                                          Attachment ll Page 1 of 1
: l. Contacts Note:
: l. Contacts Note:   Please provide name, title, mailing address, and phone number.
Please provide name, title, mailing address, and phone number.
A. Survey Coordinator (i.e., contact for later clarification of questionnaire answers):
A.
David Haile Nuclear Licensing Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville,5. C. 29065 (803)345-4322 B. Computer Hardware Specialist (s):
Survey Coordinator (i.e., contact for later clarification of questionnaire answers):
David Haile Nuclear Licensing Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville,5. C. 29065 (803)345-4322 B.
Computer Hardware Specialist (s):
Al Barton -
Al Barton -
,                        Nuclear Computer Services Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, S. C. 29065 (803)345 4263 C. Systems Sof tware Specialist (s):
Nuclear Computer Services Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, S. C. 29065 (803)345 4263 C.
Al Barton Nuclear Computer Services Virgil C Summer Nuclear Station P. O. Box 88 Jenkinsville, S. C. 29065 (803)345-4263 D. Application-level Software Specialist (s):
Systems Sof tware Specialist (s):
Al Barton Nuclear Computer Services Virgil C Summer Nuclear Station P. O. Box 88 Jenkinsville, S. C. 29065 (803)345-4263 D.
Application-level Software Specialist (s):
Al Barton Nuclear Computer Services Virgil C. Summer Nuclear Station P. O. Box 88 Jerkinsville, S.C 29065 (803)345-4263 i
Al Barton Nuclear Computer Services Virgil C. Summer Nuclear Station P. O. Box 88 Jerkinsville, S.C 29065 (803)345-4263 i
E. Telephone Systems Specialist (s):
E.
Telephone Systems Specialist (s):
Clyde Coleman Facilities Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville,S.C. 29065 (803)345-4008 NUREG-1394, Rev.1
Clyde Coleman Facilities Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville,S.C. 29065 (803)345-4008 NUREG-1394, Rev.1
                                                                                                  =
=


Attachment 111      .
_ _ _ 11 Page 1 Gf 1 South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station ERDS System Overview El -
Page 1 Gf 1   -
South Carolina Electric & Gas Company                                                   -
Virgil C. Summer Nuclear Station ERDS System Overview El -
Field input Q
Field input Q
roints
roints integrated Plant Computer System (IPCS)
                                                  @                integrated Plant Computer System (IPCS)
From Plant Encore 3219780
From Plant
=_
                                                  $                Encore 3219780
                                                  =_
High Speed Proprietary Communications Link MicroVAX 3300 I/O Server ETHERNET 802.3 ERDS Communications Computer PJRC Supplied Codex Modem
High Speed Proprietary Communications Link MicroVAX 3300 I/O Server ETHERNET 802.3 ERDS Communications Computer PJRC Supplied Codex Modem
                                                                                                      /   Dedicated ERDS Telephone Link V}}
/
Dedicated ERDS Telephone Link V}}

Latest revision as of 03:12, 14 December 2024

Forwards Implementation Plan for Installation of Emergency Response Data Sys & Sys Implementation Milestones,Per 911003 Meeting W/Nrc in Atlanta,Ga to Discuss Requirements of NUREG-1394
ML20085K958
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/25/1991
From: Skolds J
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1394 NUDOCS 9111010160
Download: ML20085K958 (6)


Text

- - _ _. - _... - _

South Carolina Flectric & Gas Company John L Skolds P O Box 88 Vice Prr+ dent enkin v te SC 290%

Nucle Operabons SCE&G OCT 2 51991 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

Subject:

VIRGIL C. SUf1MER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO NPF l?

EMERGENCY RESPONSE DATA SYSTEM (ERDS)

IMPLEMENTATION PLAN (PR 900015-0)

Pursuant to the final rule regarding the addition of the Emergency Response Data System (ERDS) to 10CFR50, South Carolina Electric & Gas Company (SCELG) is submitting its ERDS implementation program plan. A meeting was held in Atlanta, Georgia, on October 3, 1991, with Mr. Jolicoeur of the NRC to discuss the requirerrents of NL' REG-1394 (the guidance document for ERDS implementation).

In this meeting, it was explained that this submittal should include the following:

1.

An implementation schedule for achieving operational status for ERDS at the Virgil C. Sufumer Nuclear Station (VCSNS).

2.

A completed list of utility contacts per Section I of Appendix B to HUREG-1394 3.

An overview diagram of the VCSNS computer system.

4.

A description of how VCSNS intends to control the Plant Attribute Library (PAL) and the Datapoint Library (DPL).

The first three items are addressed by the attachments to this letter, in regard to item 4, the PAL /DPL will be maintained and controlled via Engineering Services procedures. These controls will be incorporated in the procedures prior to scheouled date for submittal of the PAL /DPL information.

Should there be any questions, please call at your convenience.

Very truly your,

John L. Skolds DCH:JLS:1cd Attachment c:

See Page 2

/

9111010160 911025 PDR ADOCK 05000395 Il F

PDR

Document Contial Desk PR 910015-0 Page 2 of 2 c:

0. W. Dixon Jr.

R. R. Mahan (w/o attachment)

R. J. White S. D. Ebneter G. F. Wunder General Managers NRC Resident Inspector J. B. Knottts Jr.

File 811.02)

RTS PR 900015-0)

NUCLEAR EXCELLENCE - A SUMMER TRADITION!

AttahmentI -

Page 1 of 2 SOUTH CAROLINA ELECTRIC & GAS COMPANY V.C. SUMMER NUCLEAR STATION ERDS IMPLEMENTATION PLAN OCT NOV DEC JAN HB MAR APR MAY JUN JUL AUG s!P oCT NOV DEC 91 91 91 92 92 92 92 42 92 92 92 92 92 92 92 ERDS Implementation Plan l

not Submittal to NRC SCE&G (NCS) Identifies ERDS Pio2 DPL Points SCE&G (NCS, DE, SPE) Prepares PAllDPL PIO3 Information & ES Procedures NRC (HalliburtJn-NUS) Devc! ops input / Output Communication Sof tware SCE&G (NCS) Develops Application gios Design Specificction NRCinstalls dedicated ERDS p,06 Telephone Line to Plant Demarkation Point SCE&G Installs dedicated ERDS P'OI Telephone Line to Computer Location SCE&G ERDS Application P!o8 Transmission Testing

~109 SCE&G FST with El mio SCEEG S AT with NRC an au SCE&G ERDS Online

_ - ~ _ _ _. _ _ _ _ _ _ _.. _. _ _

m..

._-.._._.-.__m..~._..

Attachment !

,=

Page ; of 2 South Carolina Electric & Gas Company

-Virgil C. Summer Nuclear Station i

ERDS Implementation Milestones Project item Description Completion Date Pl01 ERDS Implementation plan October 24,1991 P102 SCEG (NCS) Identifies DPL January 31,1992 points to be transmitted.

Pl03 SCEG (NCS, DE, SPE) prepares May 31,1992 PAIJDPL information and ES procedure changes.

Pl04 NRC(Halliburton-NUS) develops April 30,1992 input / Output Communication Software. Note (1)

PIOS SCEG (NCS) davelops ERDS July 31,1992 Application Design Specification.

- P106 NRC Installs dedicated ERDS phone July 31,1992 line to demarkation point. Note (1)

P107 SCEG installs dedicated ERDS phone September 30,1992 line from demarkation point to ERDS Computer location in plant.

P108 SCEG ERDS Application Development.

- October 31,1992 Pl09 Preliminary Application and November 6,1992 transmission testing.

Pl10 SCEG Factory Test with El November 20,1992 (Halliburton-NUS).

Pill SCEG Site Acceptance Test with December 4,1992 NRC.

Pl12 SCEG ERDS Online.

December 10,1992 Notes:

(1)

SCEG implementation Schedule is based on the NRC meeting the associated completion date. A one day for one day schedule slippage will occur should this completion date not be met.

p 1-

A Attachment ll Page 1 of 1

l. Contacts Note:

Please provide name, title, mailing address, and phone number.

A.

Survey Coordinator (i.e., contact for later clarification of questionnaire answers):

David Haile Nuclear Licensing Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville,5. C. 29065 (803)345-4322 B.

Computer Hardware Specialist (s):

Al Barton -

Nuclear Computer Services Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, S. C. 29065 (803)345 4263 C.

Systems Sof tware Specialist (s):

Al Barton Nuclear Computer Services Virgil C Summer Nuclear Station P. O. Box 88 Jenkinsville, S. C. 29065 (803)345-4263 D.

Application-level Software Specialist (s):

Al Barton Nuclear Computer Services Virgil C. Summer Nuclear Station P. O. Box 88 Jerkinsville, S.C 29065 (803)345-4263 i

E.

Telephone Systems Specialist (s):

Clyde Coleman Facilities Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville,S.C. 29065 (803)345-4008 NUREG-1394, Rev.1

=

_ _ _ 11 Page 1 Gf 1 South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station ERDS System Overview El -

Field input Q

roints integrated Plant Computer System (IPCS)

From Plant Encore 3219780

=_

High Speed Proprietary Communications Link MicroVAX 3300 I/O Server ETHERNET 802.3 ERDS Communications Computer PJRC Supplied Codex Modem

/

Dedicated ERDS Telephone Link V