Ecclosure A ARIZONA PUBLIC SERVICE COMPANY EMERGENCY RESPONSE DATA SYST M aRDS)
Ecclosure A ARIZONA PUBLIC SERVICE COMPANY EMERGENCY RESPONSE DATA SYST M aRDS)
IMPLEh''NTATION PROGRAM PLAN FOR PALO VERDE NUCLEAR GENERATING STATION 9111040115 91to2s PDR   (1 LOCK 05000r.28 F                   PDR I
IMPLEh''NTATION PROGRAM PLAN FOR PALO VERDE NUCLEAR GENERATING STATION 9111040115 91to2s PDR (1 LOCK 05000r.28 F
PDR I


i EMERGENCY RESPONS!! DATA SYSTEM (liRDS)
i EMERGENCY RESPONS!! DATA SYSTEM (liRDS)
Line 25: Line 26:


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
1 2.0 CONTACTS                                                   2 3.0 COMPUTER CONFIGURATION                                   2 3.1 liardware                                             2 3.2 Software                                             3 4.0 ERDS DATA POINTS                                         4 5.0 IMPLEMENTKrlON MILESTONES                                 5 Tabel 1: ERDS Datafeeder ikpipment List                       6 Table 2: ERDS Preliminary Point ID List (per unit)           7 Table 3: ERDS Implementation Schedule                         10 Figure 1: ERDS PRELIMINARY IMPLEMENTATION CONCEI'r           iI I
1 2.0 CONTACTS 2
3.0 COMPUTER CONFIGURATION 2
3.1 liardware 2
3.2 Software 3
4.0 ERDS DATA POINTS 4
5.0 IMPLEMENTKrlON MILESTONES 5
Tabel 1: ERDS Datafeeder ikpipment List 6
Table 2: ERDS Preliminary Point ID List (per unit) 7 Table 3: ERDS Implementation Schedule 10 Figure 1: ERDS PRELIMINARY IMPLEMENTATION CONCEI'r iI I


1.0 INTRdDUCI'lON The Emergency Response Data System (ERDS)is a direct electronic transmission system between the NRC Operations Center and licensed nuclear power facilities. The system is intended to provide to the NRC, on a near real-time basis, selected parameters from plant com-puter systems whose values indicate the condition of the plant during an emergency condition of alert or higher.
1.0 INTRdDUCI'lON The Emergency Response Data System (ERDS)is a direct electronic transmission system between the NRC Operations Center and licensed nuclear power facilities. The system is intended to provide to the NRC, on a near real-time basis, selected parameters from plant com-puter systems whose values indicate the condition of the plant during an emergency condition of alert or higher.
Line 36: Line 44:


The ERPS Datafeeder will be initially connected to the existing ERFDADS computer (s). Since no communications path exists between the PVNGS training simulator and the existing ERFDADS, simulator values, as inputs to the ERDS, will not be available during emergency drills or exercises.
The ERPS Datafeeder will be initially connected to the existing ERFDADS computer (s). Since no communications path exists between the PVNGS training simulator and the existing ERFDADS, simulator values, as inputs to the ERDS, will not be available during emergency drills or exercises.
As discussed in letter number 161-03846-WFC/MEP/KLhiC, dated Maich 29,1991, from W.                           g F. Conway, APS, to the Document Connol Desk, U. S. NRC," Generic Letter 89 Revised Implementation Schedule," APS is scheduled to seplace the existing ERFDADS with an upgraded ERFDADS (hereafter refened to in this enclosure as the new ERFDADS) during the period March 1993 through April 1994. The new ERFDADS will be installed on a unit-by unit basis, during scheduled outages, and therefore, for a period of more than a year, the front-end elements in the ERDS Datafeeder must be capable of communicating with either the existing or the new ERFDADS, depending on which generating unit the data miginates from. The liRI' : capability will be maintained by APS during the period of transition from the existing to the r w ERFDA DS. Upon complete installation of t'., new ERFDADS at PVNGS, the ERF DADS Ilost "A" /"B" path (illustrated in figure 1) will be removed. All data input to the ERDS Datafeeder will then come from the PVNGS units on the new ERFDADS local area network (LAN),illus-trated as NEW ERFDADS LAN in figure 1.
As discussed in letter number 161-03846-WFC/MEP/KLhiC, dated Maich 29,1991, from W.
2.0 CONTACTS Data Point Library, hardware and software:                     Telephone systems:
g F. Conway, APS, to the Document Connol Desk, U. S. NRC," Generic Letter 89 Revised Implementation Schedule," APS is scheduled to seplace the existing ERFDADS with an upgraded ERFDADS (hereafter refened to in this enclosure as the new ERFDADS) during the period March 1993 through April 1994. The new ERFDADS will be installed on a unit-by unit basis, during scheduled outages, and therefore, for a period of more than a year, the front-end elements in the ERDS Datafeeder must be capable of communicating with either the existing or the new ERFDADS, depending on which generating unit the data miginates from. The liRI' : capability will be maintained by APS during the period of transition from the existing to the r w ERFDA DS. Upon complete installation of t'., new ERFDADS at PVNGS, the ERF DADS Ilost "A" /"B" path (illustrated in figure 1) will be removed. All data input to the ERDS Datafeeder will then come from the PVNGS units on the new ERFDADS local area network (LAN),illus-trated as NEW ERFDADS LAN in figure 1.
Robert L. Pate                                                   Paul 11. Hott ERDS Supervising Engineer                                       Supervisor, Telecommunications ARIZONA PUBLIC SERVICE CO.                                       ARIZONA PUBLIC SERVICE CO.
2.0 CONTACTS Data Point Library, hardware and software:
P. O. Box 52034, sta.#1855                                       P. O. Box 53999, sta.#3862 Phoenix, Arizona 85072-2034                                     Phoenix, Atizona 85072-3999 f602)3404804                                                     (602)371-6301 3.0 COMPUTER CONFIGURATION 3.1 liardware The ERDS Datafeeder console will house the ERDS hantware (see table 1) and will be located in the on-site technical support center (TSC) computer room. The ERDS Datafeeder will service all three generating units (see figure 1); however, it will transmit unit-specific datasets over each of three separate modems (one for each PVNGS unit). The ERDS Datafeeder will be designated non41uality related (NQR) and will be powered from the ERFDADS umnter.uptable power supply (UPS) unit.
Telephone systems:
l l
Robert L. Pate Paul 11. Hott ERDS Supervising Engineer Supervisor, Telecommunications ARIZONA PUBLIC SERVICE CO.
ARIZONA PUBLIC SERVICE CO.
P. O. Box 52034, sta.#1855 P. O. Box 53999, sta.#3862 Phoenix, Arizona 85072-2034 Phoenix, Atizona 85072-3999 f602)3404804 (602)371-6301 3.0 COMPUTER CONFIGURATION 3.1 liardware The ERDS Datafeeder console will house the ERDS hantware (see table 1) and will be located in the on-site technical support center (TSC) computer room. The ERDS Datafeeder will service all three generating units (see figure 1); however, it will transmit unit-specific datasets over each of three separate modems (one for each PVNGS unit). The ERDS Datafeeder will be designated non41uality related (NQR) and will be powered from the ERFDADS umnter.uptable power supply (UPS) unit. l l


The liikFDADS will be the time detennining device, with time always expressed in Mountain Stanitard Time. The ERDS Datafeeder will be a nonnally unattended system, with the user located in the phmt control room areas at ERFDADS workstations. The monitor, keyboard, and mouse at the ERDS Datafeeder console, located in the TSC computer room, will be intended for maintenance and remedial actions work only.
The liikFDADS will be the time detennining device, with time always expressed in Mountain Stanitard Time. The ERDS Datafeeder will be a nonnally unattended system, with the user located in the phmt control room areas at ERFDADS workstations. The monitor, keyboard, and mouse at the ERDS Datafeeder console, located in the TSC computer room, will be intended for maintenance and remedial actions work only.
Line 47: Line 57:
ERFDADS-SEND will reguhuly send messages along the ERFDADS-ERDS path, test for communications integrity and alarm appropriately, accept phmt control room commands to ini-tiate/tenninate transmiscions to the NRC, and provide continuous indication on the ERFDADS overview screen of the ERDS status.
ERFDADS-SEND will reguhuly send messages along the ERFDADS-ERDS path, test for communications integrity and alarm appropriately, accept phmt control room commands to ini-tiate/tenninate transmiscions to the NRC, and provide continuous indication on the ERFDADS overview screen of the ERDS status.
(b) ERDS-FRONT ERDS-FRONT is a collective tenn for the elements / modifications to be located in the ERDS Datafeeder that fonnats data from the ERFDADS and interfaces with the ERDS-SEND softwtue package (to be provided to APS by the NRC).
(b) ERDS-FRONT ERDS-FRONT is a collective tenn for the elements / modifications to be located in the ERDS Datafeeder that fonnats data from the ERFDADS and interfaces with the ERDS-SEND softwtue package (to be provided to APS by the NRC).
!                ERDS-FRONT will receive ERFDADS transmission from either:
ERDS-FRONT will receive ERFDADS transmission from either:
!                      1) The existing ERFDADS; an emergency response computer system installed in 1982. The existing ERFDADS utilizes a combined host processor serving all l                           three PYNGS units.
: 1) The existing ERFDADS; an emergency response computer system installed in 1982. The existing ERFDADS utilizes a combined host processor serving all l
: 2) The new ERFDADS; a distributed processor sysiem scheduled for installation on a unit by-unit basis.
three PYNGS units.
: 2) The new ERFDADS; a distributed processor sysiem scheduled for installation on a unit by-unit basis..


      'The connection to the existing ERFDADS computer will be over a 9600 baud asyncluonous, seria,1 mmmunications path. The connection to the new ERFDADS will be to a fiber optics LAN.
'The connection to the existing ERFDADS computer will be over a 9600 baud asyncluonous, seria,1 mmmunications path. The connection to the new ERFDADS will be to a fiber optics LAN.
In the new EHFDADS configuration, computer (s) in each PVNGS unit will be on the network.
In the new EHFDADS configuration, computer (s) in each PVNGS unit will be on the network.
Through appropriate configuration control tables, ERDS FRONT will identify imd build the data set for each unit, perform ERDS quality tagging and some calculations, and forward the datasets to the appropriate ERDS-SEND output module (if and when a transmit-initiate comnumd is presented in the meisage stream). ERDS-FRONT will be able to forward one, two, or three datasets in each 15 second transactica period. It will also acknowledge message receipts from the ERfDADS as well as alert ERFDADS when an ERDS SEND module detects a communications fault on the ERDS-NRC path (which is only detectable when ERDS transmit status is active).
Through appropriate configuration control tables, ERDS FRONT will identify imd build the data set for each unit, perform ERDS quality tagging and some calculations, and forward the datasets to the appropriate ERDS-SEND output module (if and when a transmit-initiate comnumd is presented in the meisage stream). ERDS-FRONT will be able to forward one, two, or three datasets in each 15 second transactica period. It will also acknowledge message receipts from the ERfDADS as well as alert ERFDADS when an ERDS SEND module detects a communications fault on the ERDS-NRC path (which is only detectable when ERDS transmit status is active).
Line 57: Line 68:
Initiate /renninate transmissions by ERDS-SEND will nonnally be undet programmatic con-trol from ERIE-FRONT, since the user is located in the plant control room area, a considerable distance from the TSC computer room. Diagnostic work and configurational edits, however, will be done at the ERDS Datafeeder console. ERDS-SEND will transmit ASCII messages at 2400 baud, asynchronous, serial, every 15 seconds (when activated) using the communications protocol set forth in NUREG-1374, Rev.1.
Initiate /renninate transmissions by ERDS-SEND will nonnally be undet programmatic con-trol from ERIE-FRONT, since the user is located in the plant control room area, a considerable distance from the TSC computer room. Diagnostic work and configurational edits, however, will be done at the ERDS Datafeeder console. ERDS-SEND will transmit ASCII messages at 2400 baud, asynchronous, serial, every 15 seconds (when activated) using the communications protocol set forth in NUREG-1374, Rev.1.
4.0 ERDS DKFA POINTS Table 2 provides a preliminary list of the data points which appear to best satisfy the NRC parmneter list.The PVNGS site designators assigned by NRC (see Appendix 11 to NUREG-1394, Rev.1) are:
4.0 ERDS DKFA POINTS Table 2 provides a preliminary list of the data points which appear to best satisfy the NRC parmneter list.The PVNGS site designators assigned by NRC (see Appendix 11 to NUREG-1394, Rev.1) are:
Palo Verde Unit i               PV1 Palo Verde Unit 2               PV2 Palo Verde Unit 3               PV3
Palo Verde Unit i PV1 Palo Verde Unit 2 PV2 Palo Verde Unit 3 PV3
_4
_4


        . . . _ .    . . - _ - . - . - .  -    - ..        .    -- - ..-        ~ .   . . ~ -     -  .
~.
  ~
.. ~ -
~
9 5.0 IMPLEMENTATION MILESTONES The milestones presented in Table 3 provide projected completion dates for activities critical to implementation of he ERDS at PVNGS on a schedule consistent with the requirements of Sec-tion VI.4a of Appendix E to 10 CFR Pan 50 (February 13,1993).
9 5.0 IMPLEMENTATION MILESTONES The milestones presented in Table 3 provide projected completion dates for activities critical to implementation of he ERDS at PVNGS on a schedule consistent with the requirements of Sec-tion VI.4a of Appendix E to 10 CFR Pan 50 (February 13,1993).
      . Also included, for information, are projected dates for implementing the new ERFDADS in the respective PVNGS units.
. Also included, for information, are projected dates for implementing the new ERFDADS in the respective PVNGS units. -


Table 1 ERDS Datafeeder Equipment List Sua #4/40FC-8-P40, SPARC-IPC workstation, including 8 Mbytes memory 207 Mbytes hard drive 1.44 Mbytes,3.5" floppy drive Two S-bus pons SunOS (UNIX) operating system Color monitor, keyboard,3-button mouse Sun #X1008Y, S-bus extender
Table 1 ERDS Datafeeder Equipment List Sua #4/40FC-8-P40, SPARC-IPC workstation, including 8 Mbytes memory 207 Mbytes hard drive 1.44 Mbytes,3.5" floppy drive Two S-bus pons SunOS (UNIX) operating system Color monitor, keyboard,3-button mouse Sun #X1008Y, S-bus extender
              - Codex #2235, modems (to be supplied by NRC)
- Codex #2235, modems (to be supplied by NRC)
Sun #X660Y,5.25" tape cartridge system .
Sun #X660Y,5.25" tape cartridge system.
Associated interconnecting cables I
Associated interconnecting cables..


Table 2                                                         '
Table 2 ERDS Preliminary Point ID List (per unit)
ERDS Preliminary Point ID List (per unit)
(a)
(a) ERDS     ERFDADS                                         (a)                         (b)
ERDS ERFDADS (a)
NRC Parsmeter     Point ID Point ID   Units         Parameter Description             Origin       Ccle Reactor Power:
(b)
N1 POWER RNG           SEIIAL   SEJ1AL       %          NI Linear Power, Train A         MODACS NIINTER RNG             SEJ1A     SFJ1A       amp         Excore Log Power, Train A         QSPDS NI SOURC RNG           SENIS1   SENISI     cps         Startup Flux, Channel 1           MODACS Core Cooling:
NRC Parsmeter Point ID Point ID Units Parameter Description Origin Ccle Reactor Power:
REAC VES LEV '         RVLEVEL   see note b inches       Reactor Vessel Water Level         calculated       1 TEMP CORE EX           RITM1     RITM1         F         Representative CETTemp., Train A QSPDS SUB MARGIN             CETMARA CETMARA         F         CET Margin to Saturation         QSPDS CORE FLOW               RX14 OW   see note b lb/hr       Total Core Flow                     calculated     2 Steam Generators:
N1 POWER RNG SEIIAL SEJ1AL NI Linear Power, Train A MODACS NIINTER RNG SEJ1A SFJ1A amp Excore Log Power, Train A QSPDS NI SOURC RNG SENIS1 SENISI cps Startup Flux, Channel 1 MODACS Core Cooling:
SG LEVEL 1             SGL113A   SGL113A       %          SG-1 Level, Wide Range. Train A   QSPDS y SG LEVEL 2             SGL123A   SGL123A       %          SG-2 level, Wide Range, Train A   QSPDS SG PRESS 1             SGP013A   SGP013A     psia         SG-1 Pressure                     QSPDS SG PRESS 2             SGP023A   SGP023A     psia         SG-2 Pressure                     QSPDS MN FD FL 1             SGF1112   SGF1112     lb/hr       SG-1 Main Feedwater Flow         MODACS MN FD FL 2             SGF1122   SGF1122     lb/hr       SG-2 Main Feedwater Flow         MODACS AX FD FL 1             AFF40A   AFF40A     gpm         SG-1 Auxiliary FW Flow           MODACS AX FD FL 2             AFF40B   AFF40B     gpm         SG-2 Auxiliary FW Flow           MODACS                       '
REAC VES LEV '
HLTEMP1                 RCT112H   RCT112H       F         Hot Leg-1 Temperature             QSPDS HLTEMP2                 RCT22H1   RCT22H1       F         Hot 1xg-2 Temperature             QSPDS CL TEMP 1A             RCT112C   RCTll2C       F         Cold leg-1 A Temperature         QSPDS CLTEMP IB               RCT12C2   RCT12C2       F         Cold Ixg-1B Temperature           QSPDS CL TEMP 2A             RCT22Cl   RCF22C1       F         Cold Leg-2A Temperature           QSPD2 CL TEMP 2B             RCT22C2   RCT22C2       F         Cold Leg-2B Temperature           QSPDS                       t RCS Integrity:
RVLEVEL see note b inches Reactor Vessel Water Level calculated 1
RCS PRESSURE           RCP102A   RCP102A     psia         Pressurizer Pressure, wi:le range QSPDS PRZR LEVEL             RCL103   RCL103       %          Pressunzer Level, wide range     MODACS RCS CHG FL-             CHF212   CHF212     gpm         Charging flow to Regen. IIX       MODACS
TEMP CORE EX RITM1 RITM1 F
Representative CETTemp., Train A QSPDS SUB MARGIN CETMARA CETMARA F
CET Margin to Saturation QSPDS CORE FLOW RX14 OW see note b lb/hr Total Core Flow calculated 2
Steam Generators:
SG LEVEL 1 SGL113A SGL113A SG-1 Level, Wide Range. Train A QSPDS
,y SG LEVEL 2 SGL123A SGL123A SG-2 level, Wide Range, Train A QSPDS SG PRESS 1 SGP013A SGP013A psia SG-1 Pressure QSPDS SG PRESS 2 SGP023A SGP023A psia SG-2 Pressure QSPDS MN FD FL 1 SGF1112 SGF1112 lb/hr SG-1 Main Feedwater Flow MODACS MN FD FL 2 SGF1122 SGF1122 lb/hr SG-2 Main Feedwater Flow MODACS AX FD FL 1 AFF40A AFF40A gpm SG-1 Auxiliary FW Flow MODACS AX FD FL 2 AFF40B AFF40B gpm SG-2 Auxiliary FW Flow MODACS HLTEMP1 RCT112H RCT112H F
Hot Leg-1 Temperature QSPDS HLTEMP2 RCT22H1 RCT22H1 F
Hot 1xg-2 Temperature QSPDS CL TEMP 1A RCT112C RCTll2C F
Cold leg-1 A Temperature QSPDS CLTEMP IB RCT12C2 RCT12C2 F
Cold Ixg-1B Temperature QSPDS CL TEMP 2A RCT22Cl RCF22C1 F
Cold Leg-2A Temperature QSPD2 CL TEMP 2B RCT22C2 RCT22C2 F
Cold Leg-2B Temperature QSPDS t
RCS Integrity:
RCS PRESSURE RCP102A RCP102A psia Pressurizer Pressure, wi:le range QSPDS PRZR LEVEL RCL103 RCL103 Pressunzer Level, wide range MODACS RCS CHG FL-CHF212 CHF212 gpm Charging flow to Regen. IIX MODACS


Table 2 (con't)
Table 2 (con't)
ERDS Preliminary Point ID List (per unit)
ERDS Preliminary Point ID List (per unit)
ERFDADS                                             (a)                           (b)
(a)
(a)        ERDS PointID         Unts       Parameter Description                 Origin     Cale NRC Parameter            Point ID Total HP Safety Injection Flow        calculated      3 HP SI FLOW                 HPSI           see note b     gpm Total LP Safety Injection Flow         calculated     4 LP SI FLOW                 LPSI           see note b     gpm RDL10         RDL10           inches     Reactor Cavity Sump Level             MODACS RX CAVITY SUMP CTMNT SMP 1               SIL706         SIL7G6         inches     ESF-A Sump Level                     QSPDS CTMNT SMP 2               SIL707         SIL707         inches     ESF-B Sump Level                     QSPDS RDL410         RDL410         inches     East Radwaste Sump Level             MODACS                   1 CTMNT SMP 3 RDL411         RDL411         inches     West Radwnte Sump Lael               MODACS CTMNT SMP 4 Radioactivity Control:
ERDS ERFDADS (a)
uci/cc     Plant Vent Gas Monitor (high range) - RMS                     i EFF GAS RAD 1              SQR144B        SQR114B SQR146B         uci/cc     Fuel Bldg. Vent Gas Monitor (high)   RMS                     .l EFF GAS RAD 2              SQR146B EFF LIQ RAD                 . (there are no liquid releases from PVNGS) .
(b)
  &'                                                                      Cond. Vac/Gind Seal Monitor (high)   RMS COND A/E RAD               SQR142B        SQR142B        uci/cc R/hr       In-Containment Area Monitor           RMS CNTMNT RAD                 SQR148        SQR148 CHR204         CHR204         cpm       Letdown Process Monitor               MODACS RCS LTDN RAD SQR139A         mR/hr     SG-1 Steam Line Radiation Level       RMS MAIN SL 1                  SQR139A mRAr       SG-2 Steam Line Radiation Level       RMS MAIN SL 2                  SQR139B        SQR139B uci/cc     SG-1 Blowdown Activity               RMS SG BD RAD 1                SQR4          SQR4 uci/cc     SG-2 Blowdown Activity               RMS SG BD RAD 2                SQR5          SQR5 Containment Conditions:
NRC Parameter Point ID PointID Unts Parameter Description Origin Cale HP SI FLOW HPSI see note b gpm Total HP Safety Injection Flow calculated 3
HCP352A       HCP352A         psig       Containment Pressure                 MODACS CTMNT PRESS HCT42A1       HCT42A1           F       Containment Temperature, West wall   MODACS CTMNT TEMP HPA10         HPA10             %        Contr.inment Hydrogen Concentration QSPDS H2 CONC Miscellaneous Parameters:
LP SI FLOW LPSI see note b gpm Total LP Safety Injection Flow calculated 4
CHL203A       CHL203A           %        Refueling WaterTank level             MODACS BWST LEVEL ARGS2AM       ARGS2AM           mph     Wind Speed at 35 ft.15 min _ average ERFDADS WIND SPEED ARGX2AM ARGX2AM                 deg. fnnn Wind Direction at 35 ft,15 min aver. ERFDAD5 WIND DIR
RX CAVITY SUMP RDL10 RDL10 inches Reactor Cavity Sump Level MODACS CTMNT SMP 1 SIL706 SIL7G6 inches ESF-A Sump Level QSPDS CTMNT SMP 2 SIL707 SIL707 inches ESF-B Sump Level QSPDS CTMNT SMP 3 RDL410 RDL410 inches East Radwaste Sump Level MODACS 1
                              -PSCLASS         see note b     STABI Pasquill Stability Class,15 min. aver. ulculated       5 STAB CLASS l                                                                             ,
CTMNT SMP 4 RDL411 RDL411 inches West Radwnte Sump Lael MODACS Radioactivity Control:
t                                                   ,
EFF GAS RAD 1 SQR144B SQR114B uci/cc Plant Vent Gas Monitor (high range) -
RMS i
EFF GAS RAD 2 SQR146B SQR146B uci/cc Fuel Bldg. Vent Gas Monitor (high)
RMS
.l EFF LIQ RAD
. (there are no liquid releases from PVNGS).
COND A/E RAD SQR142B SQR142B uci/cc Cond. Vac/Gind Seal Monitor (high)
RMS CNTMNT RAD SQR148 SQR148 R/hr In-Containment Area Monitor RMS RCS LTDN RAD CHR204 CHR204 cpm Letdown Process Monitor MODACS MAIN SL 1 SQR139A SQR139A mR/hr SG-1 Steam Line Radiation Level RMS MAIN SL 2 SQR139B SQR139B mRAr SG-2 Steam Line Radiation Level RMS SG BD RAD 1 SQR4 SQR4 uci/cc SG-1 Blowdown Activity RMS SG BD RAD 2 SQR5 SQR5 uci/cc SG-2 Blowdown Activity RMS Containment Conditions:
CTMNT PRESS HCP352A HCP352A psig Containment Pressure MODACS CTMNT TEMP HCT42A1 HCT42A1 F
Containment Temperature, West wall MODACS H2 CONC HPA10 HPA10 Contr.inment Hydrogen Concentration QSPDS Miscellaneous Parameters:
BWST LEVEL CHL203A CHL203A Refueling WaterTank level MODACS WIND SPEED ARGS2AM ARGS2AM mph Wind Speed at 35 ft.15 min _ average ERFDADS WIND DIR ARGX2AM ARGX2AM deg. fnnn Wind Direction at 35 ft,15 min aver.
ERFDAD5 STAB CLASS
-PSCLASS see note b STABI Pasquill Stability Class,15 min. aver.
ulculated 5
l t


t Tal'e 2 (con'0 ERDS Preliminary Foint ID List (per unit)
t Tal'e 2 (con'0 ERDS Preliminary Foint ID List (per unit)
NOTES:
NOTES:
                                                                                                                          )
)
(a) refer to Appendix E to NUREG-1394, Rev. I (b) calculations by ERDS-FRONT:
(a) refer to Appendix E to NUREG-1394, Rev. I (b) calculations by ERDS-FRONT:
where [xxxxx] are Point ID's received from ERFDADS used to compose the ERDS result (1)           RVLEVEL = '242 * [RCXLIA] + 61 * [R.CXL2A]
where [xxxxx] are Point ID's received from ERFDADS used to compose the ERDS result (1)
(2)           RXFLOW = 5.57E6 * ( PX1 + PX2 + PX3 + PX4) where PX1 = SQRT([RCPD24W])                 or
RVLEVEL = '242 * [RCXLIA] + 61 * [R.CXL2A]
          .j,                                                 PX1 = -SQRT(ABS ([RCPD24W]))         if [RCPD24W] < 0
(2)
          '                                            and   PX2 = SQRT([RCPD24X])               or PX2 = -SQRT(ABS ([RCPD24X]))         if [RCPD24X] < 0 where PX3 = SQRT([RCPD24Y])               or PX3 = -SQRT(ABS ([RCPD24Y]))         if [RCPD24Y] < 0 and   PX4 = SQRT([RCPD24Z])               or l
RXFLOW = 5.57E6 * ( PX1 + PX2 + PX3 + PX4) where PX1 = SQRT([RCPD24W])
PX4 = -SQRT(ABS ([RCPD24Z]))         if [RCPD24Z] <0 l
or
(3)             HPSI = [SIF311] + [SIF321] + [SIF331] + [SIF341]
.j, PX1 = -SQRT(ABS ([RCPD24W]))
(4)             LPSI= [SIF306] + [SIF307]
if [RCPD24W] < 0 and PX2 = SQRT([RCPD24X])
(5)             PSCLASS = a function of[ARGTDIAM]           ...(details to be dete2 mined) ..
or PX2 = -SQRT(ABS ([RCPD24X]))
if [RCPD24X] < 0 where PX3 = SQRT([RCPD24Y])
or PX3 = -SQRT(ABS ([RCPD24Y]))
if [RCPD24Y] < 0 l
and PX4 = SQRT([RCPD24Z])
or PX4 = -SQRT(ABS ([RCPD24Z]))
if [RCPD24Z] <0 l
(3)
HPSI = [SIF311] + [SIF321] + [SIF331] + [SIF341]
(4)
LPSI= [SIF306] + [SIF307]
(5)
PSCLASS = a function of[ARGTDIAM]
...(details to be dete2 mined)..
l l
l l
l L_ .___ _       . . . . . . . . . . . . . . . . .
l L_.___ _


ll t _-
ll t _-
d Table 3 ERDS Implementation Schedule 9/11/91                                                     Kickoff Meeting, Region V 10/28SI                                                       implementation Plan to NRC 3/13N2                                                       Provide ERDS Data Point Library to NRC 3/31N2                                                       NRC install modems and I<TS 2000 lines at site 5/31N2                                                     . Receive ERDS SEND from NRC
d Table 3 ERDS Implementation Schedule 9/11/91 Kickoff Meeting, Region V 10/28SI implementation Plan to NRC 3/13N2 Provide ERDS Data Point Library to NRC 3/31N2 NRC install modems and I<TS 2000 lines at site 5/31N2
* 12/3182                                                       Complete software development / testing by APS 1/10N3.                                                     Full scale test with the NRC ERDS Contractor 2/05N3                                                       Operability demonstration with NRC 2/13N3                                                       Operational (with existing ERFDADS) x v   -:
. Receive ERDS SEND from NRC 12/3182 Complete software development / testing by APS 1/10N3.
For Information Apr. 93                                                       Unit-2 swi.pover (to new ERFDADS)
Full scale test with the NRC ERDS Contractor 2/05N3 Operability demonstration with NRC 2/13N3 Operational (with existing ERFDADS) x v
Nov. 93                                                     - Unit-1 swapover (to new ERFDADS)
For Information Apr. 93 Unit-2 swi.pover (to new ERFDADS)
                                      - Apr. 94                                                     Unit-3 swapover (to new ERFDADS)
Nov. 93
The nbove are projected dates for individual unit swapovers from the existing ERFDADS to the new ERFDADS. Each swapover will be handled as a configuration change, with appropriate notice to the NRC, in accordance with Appendix E to 10 CFR Part 50, Section VI.3. These dates
- Unit-1 swapover (to new ERFDADS)
                  .- are provided for information only and reflect the projected completions of refueling outages.
- Apr. 94 Unit-3 swapover (to new ERFDADS)
The nbove are projected dates for individual unit swapovers from the existing ERFDADS to the new ERFDADS. Each swapover will be handled as a configuration change, with appropriate notice to the NRC, in accordance with Appendix E to 10 CFR Part 50, Section VI.3. These dates are provided for information only and reflect the projected completions of refueling outages.
These dates are subject to adjustment.
These dates are subject to adjustment.
(
(
I
- I


1 Figure i ERDS PRELIMINARY IMPLEMENTATION CONCEPT
1 Figure i ERDS PRELIMINARY IMPLEMENTATION CONCEPT
(               3
(
                                                                                                                          >          NEW PVNGS           -
3 NEW PVNGS UNIT 2
PVNGS                          ~
~
PVNGS UNIT I                                   UNIT 2                              " NIT 3           ERFDADS l
PVNGS PVNGS UNIT I
u                                                   y                           1.AN EXISTING               l       EXISTING ERFDADS                        ERFDADS 3...........................
" NIT 3 ERFDADS l
u y
1.AN EXISTING l
EXISTING 3........................... &
ERFDADS i
ERFDADS
(
IIOST "A" i
IIOST "A" i
i        iIOST "11"
iIOST "11" i
(                #
i i
i i
i
U Develop Software to Obtain this Data from the Data Base on.............. w.
                  !                                                            U Develop Software to Obtain this Data from the Data Base on ............ .. w.               ERDS DATA FEEDER ERFDADS to the ERDS.
ERDS DATA FEEDER ERFDADS to the ERDS.
APS NRC DEVELOPED ERDS                                         Responsibility SOFTWARE INTERFACE                                               n
APS NRC DEVELOPED ERDS Responsibility SOFTWARE INTERFACE n
  .......................................................[............... .............. h ...................................
.......................................................[............................. h...................................
N                         ...................
N V
V                        w MODEM                       MODEM                         MODEM NRC l             Respansibility i
w MODEM MODEM MODEM NRC l
MODEM                       MODEM                         MODEM 1
Respansibility i
                                                          .w.~
MODEM MODEM MODEM 1
NRC OPERATIONS CENTER l                                                                     INTERFACE i
.w.~
1 l
NRC OPERATIONS CENTER INTERFACE l
i 1
l l
l l
!                                                                           l}}
l
! l
--}}

Latest revision as of 03:10, 14 December 2024

Emergency Response Data Sys (ERDS) Implementation Program Plan for Palo Verde Nuclear Generating Station
ML20085L367
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/28/1991
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML20085L371 List:
References
PROC-911028, NUDOCS 9111040115
Download: ML20085L367 (13)


Text

,

Ecclosure A ARIZONA PUBLIC SERVICE COMPANY EMERGENCY RESPONSE DATA SYST M aRDS)

IMPLEhNTATION PROGRAM PLAN FOR PALO VERDE NUCLEAR GENERATING STATION 9111040115 91to2s PDR (1 LOCK 05000r.28 F

PDR I

i EMERGENCY RESPONS!! DATA SYSTEM (liRDS)

IMPLliMENTKrlON PROGRAM PLAN FOR PALO VERDE NUCLEAR Gl!NERATING STATION Page

1.0 INTRODUCTION

1 2.0 CONTACTS 2

3.0 COMPUTER CONFIGURATION 2

3.1 liardware 2

3.2 Software 3

4.0 ERDS DATA POINTS 4

5.0 IMPLEMENTKrlON MILESTONES 5

Tabel 1: ERDS Datafeeder ikpipment List 6

Table 2: ERDS Preliminary Point ID List (per unit) 7 Table 3: ERDS Implementation Schedule 10 Figure 1: ERDS PRELIMINARY IMPLEMENTATION CONCEI'r iI I

1.0 INTRdDUCI'lON The Emergency Response Data System (ERDS)is a direct electronic transmission system between the NRC Operations Center and licensed nuclear power facilities. The system is intended to provide to the NRC, on a near real-time basis, selected parameters from plant com-puter systems whose values indicate the condition of the plant during an emergency condition of alert or higher.

At the Palo Venle Nuclear Generating Station (PVNGS), the emergency response facility data acquisition and display system (ERFDADS) will be used to transmit selected parameters to the NRC Upon initiation, by command from an ERFI) ADS workstation, an ERDS Datafeeder will auto-dhd the appropriate phone at the NRC Operation Center computer facility, and, following connection, will begin regular transmission of the selected ERFDADS data until the transmission is tenninated. The locations of ERFDADS weskstations are delineated in section 7.3.1.7 of the PVNGS Emergency Plan, and include both the contml room and satellite technical suppon center of each unit.

PVNGS Emergency Plan Implementing Procedures will be revised to address activation of the ERDS. Configuration management of the ERDS will be established and maintained through pro-cedural control to ensure the integrity of the associated hardware and software. Procedural control will also be estal-!ished to ensure that changes to the ERDS, that affect transmission fonnat and/or communication protocol, as well as changes to the ERDS Data Point Library will be noticed to the NRC in accordance with Appendix E to 10 CPR Part 50,Section VI.3.

At PVNGS, the ERFDADS maintains a common database for all three units, arising from its own modular data acquisition and control subsystem (MODACS), as well as inter-processor links to other plant systems: radiation monitoring system (RMS), qualified safety parameter display system (QSPDS), and meteorological data tnmsmission subsystem (MDTP A generalized software package, ERDS-SEND, to be ptovided by the NRC, will be used to ensure standardized transmissions to the NRC computer facility, in addition to EftDS-SEND, two other software elements will be required to implement ERDS at PVNGS, and will be devc' ped by Arizona Public Service Company (APS):

1. Those elements, to be added/ modified in the existing ERFDADS system, that are needed to provide the ERFDADS-ERDS communications end data inmsfer initiation.
2. Those software elements, to be located in the ERDS Datafeeder, that tre needed to format data from the ERFDADS for the ERDS-SEND package.

1-

The ERPS Datafeeder will be initially connected to the existing ERFDADS computer (s). Since no communications path exists between the PVNGS training simulator and the existing ERFDADS, simulator values, as inputs to the ERDS, will not be available during emergency drills or exercises.

As discussed in letter number 161-03846-WFC/MEP/KLhiC, dated Maich 29,1991, from W.

g F. Conway, APS, to the Document Connol Desk, U. S. NRC," Generic Letter 89 Revised Implementation Schedule," APS is scheduled to seplace the existing ERFDADS with an upgraded ERFDADS (hereafter refened to in this enclosure as the new ERFDADS) during the period March 1993 through April 1994. The new ERFDADS will be installed on a unit-by unit basis, during scheduled outages, and therefore, for a period of more than a year, the front-end elements in the ERDS Datafeeder must be capable of communicating with either the existing or the new ERFDADS, depending on which generating unit the data miginates from. The liRI' : capability will be maintained by APS during the period of transition from the existing to the r w ERFDA DS. Upon complete installation of t'., new ERFDADS at PVNGS, the ERF DADS Ilost "A" /"B" path (illustrated in figure 1) will be removed. All data input to the ERDS Datafeeder will then come from the PVNGS units on the new ERFDADS local area network (LAN),illus-trated as NEW ERFDADS LAN in figure 1.

2.0 CONTACTS Data Point Library, hardware and software:

Telephone systems:

Robert L. Pate Paul 11. Hott ERDS Supervising Engineer Supervisor, Telecommunications ARIZONA PUBLIC SERVICE CO.

ARIZONA PUBLIC SERVICE CO.

P. O. Box 52034, sta.#1855 P. O. Box 53999, sta.#3862 Phoenix, Arizona 85072-2034 Phoenix, Atizona 85072-3999 f602)3404804 (602)371-6301 3.0 COMPUTER CONFIGURATION 3.1 liardware The ERDS Datafeeder console will house the ERDS hantware (see table 1) and will be located in the on-site technical support center (TSC) computer room. The ERDS Datafeeder will service all three generating units (see figure 1); however, it will transmit unit-specific datasets over each of three separate modems (one for each PVNGS unit). The ERDS Datafeeder will be designated non41uality related (NQR) and will be powered from the ERFDADS umnter.uptable power supply (UPS) unit. l l

The liikFDADS will be the time detennining device, with time always expressed in Mountain Stanitard Time. The ERDS Datafeeder will be a nonnally unattended system, with the user located in the phmt control room areas at ERFDADS workstations. The monitor, keyboard, and mouse at the ERDS Datafeeder console, located in the TSC computer room, will be intended for maintenance and remedial actions work only.

3.2 Software Three packages compriae the ERDS software:

(a) HRFDADS-SEND ERFDADS-SEND is a collective tenn for the elements / modifications to the existing ERFDADS software associated with implementation of ERDS. 'lhe existing ERFDADS utilizes Modcomp 7870 processors running in primary / backup posture. The system was supplied by Energy Incorporated in 1982, is prognunmed principally in FORTRAN IV, and la currently run-ning operating system M AX IV Rev E Two Elf FDADS serial pons, located in physically separate Universal Communications Chas-sis, will be used to communicate with the ERDS Datafeeder. These pmts will operate at 9600 baud asynchronous. 'Ihe transmissions will be every 15 seconds, and wdl include the data sets for all three units.

ERFDADS-SEND will reguhuly send messages along the ERFDADS-ERDS path, test for communications integrity and alarm appropriately, accept phmt control room commands to ini-tiate/tenninate transmiscions to the NRC, and provide continuous indication on the ERFDADS overview screen of the ERDS status.

(b) ERDS-FRONT ERDS-FRONT is a collective tenn for the elements / modifications to be located in the ERDS Datafeeder that fonnats data from the ERFDADS and interfaces with the ERDS-SEND softwtue package (to be provided to APS by the NRC).

ERDS-FRONT will receive ERFDADS transmission from either:

1) The existing ERFDADS; an emergency response computer system installed in 1982. The existing ERFDADS utilizes a combined host processor serving all l

three PYNGS units.

2) The new ERFDADS; a distributed processor sysiem scheduled for installation on a unit by-unit basis..

'The connection to the existing ERFDADS computer will be over a 9600 baud asyncluonous, seria,1 mmmunications path. The connection to the new ERFDADS will be to a fiber optics LAN.

In the new EHFDADS configuration, computer (s) in each PVNGS unit will be on the network.

Through appropriate configuration control tables, ERDS FRONT will identify imd build the data set for each unit, perform ERDS quality tagging and some calculations, and forward the datasets to the appropriate ERDS-SEND output module (if and when a transmit-initiate comnumd is presented in the meisage stream). ERDS-FRONT will be able to forward one, two, or three datasets in each 15 second transactica period. It will also acknowledge message receipts from the ERfDADS as well as alert ERFDADS when an ERDS SEND module detects a communications fault on the ERDS-NRC path (which is only detectable when ERDS transmit status is active).

(c)ERDS SEND ERDS-SEND, to be provided by the NRC, is a generalized multiple input / multiple output pro-gram intended to standardire ERDS transmissions to the computer facility at the NRC Operations Center. ERDS SEND composes the communications messages, controls the modems, monitors the phone links, and conducts communications with the computer (s) at the NRC Operations Cen-ter, it also provides an errcr logger and a configuration editor. ERDS SEND is an Open Desktop-based program. Open Desktop is a graphical operating system based on the Santa Cruz Operations UNIX system V/386. A windows-basco OSF/ Motif operator interface facility is included. Ilow-ever the ERDS Datafeeder at PVNGS will be a Sun Sparc station and the program will be ported to ru.t under SunOS (UNIX).

Initiate /renninate transmissions by ERDS-SEND will nonnally be undet programmatic con-trol from ERIE-FRONT, since the user is located in the plant control room area, a considerable distance from the TSC computer room. Diagnostic work and configurational edits, however, will be done at the ERDS Datafeeder console. ERDS-SEND will transmit ASCII messages at 2400 baud, asynchronous, serial, every 15 seconds (when activated) using the communications protocol set forth in NUREG-1374, Rev.1.

4.0 ERDS DKFA POINTS Table 2 provides a preliminary list of the data points which appear to best satisfy the NRC parmneter list.The PVNGS site designators assigned by NRC (see Appendix 11 to NUREG-1394, Rev.1) are:

Palo Verde Unit i PV1 Palo Verde Unit 2 PV2 Palo Verde Unit 3 PV3

_4

~.

.. ~ -

~

9 5.0 IMPLEMENTATION MILESTONES The milestones presented in Table 3 provide projected completion dates for activities critical to implementation of he ERDS at PVNGS on a schedule consistent with the requirements of Sec-tion VI.4a of Appendix E to 10 CFR Pan 50 (February 13,1993).

. Also included, for information, are projected dates for implementing the new ERFDADS in the respective PVNGS units. -

Table 1 ERDS Datafeeder Equipment List Sua #4/40FC-8-P40, SPARC-IPC workstation, including 8 Mbytes memory 207 Mbytes hard drive 1.44 Mbytes,3.5" floppy drive Two S-bus pons SunOS (UNIX) operating system Color monitor, keyboard,3-button mouse Sun #X1008Y, S-bus extender

- Codex #2235, modems (to be supplied by NRC)

Sun #X660Y,5.25" tape cartridge system.

Associated interconnecting cables..

Table 2 ERDS Preliminary Point ID List (per unit)

(a)

ERDS ERFDADS (a)

(b)

NRC Parsmeter Point ID Point ID Units Parameter Description Origin Ccle Reactor Power:

N1 POWER RNG SEIIAL SEJ1AL NI Linear Power, Train A MODACS NIINTER RNG SEJ1A SFJ1A amp Excore Log Power, Train A QSPDS NI SOURC RNG SENIS1 SENISI cps Startup Flux, Channel 1 MODACS Core Cooling:

REAC VES LEV '

RVLEVEL see note b inches Reactor Vessel Water Level calculated 1

TEMP CORE EX RITM1 RITM1 F

Representative CETTemp., Train A QSPDS SUB MARGIN CETMARA CETMARA F

CET Margin to Saturation QSPDS CORE FLOW RX14 OW see note b lb/hr Total Core Flow calculated 2

Steam Generators:

SG LEVEL 1 SGL113A SGL113A SG-1 Level, Wide Range. Train A QSPDS

,y SG LEVEL 2 SGL123A SGL123A SG-2 level, Wide Range, Train A QSPDS SG PRESS 1 SGP013A SGP013A psia SG-1 Pressure QSPDS SG PRESS 2 SGP023A SGP023A psia SG-2 Pressure QSPDS MN FD FL 1 SGF1112 SGF1112 lb/hr SG-1 Main Feedwater Flow MODACS MN FD FL 2 SGF1122 SGF1122 lb/hr SG-2 Main Feedwater Flow MODACS AX FD FL 1 AFF40A AFF40A gpm SG-1 Auxiliary FW Flow MODACS AX FD FL 2 AFF40B AFF40B gpm SG-2 Auxiliary FW Flow MODACS HLTEMP1 RCT112H RCT112H F

Hot Leg-1 Temperature QSPDS HLTEMP2 RCT22H1 RCT22H1 F

Hot 1xg-2 Temperature QSPDS CL TEMP 1A RCT112C RCTll2C F

Cold leg-1 A Temperature QSPDS CLTEMP IB RCT12C2 RCT12C2 F

Cold Ixg-1B Temperature QSPDS CL TEMP 2A RCT22Cl RCF22C1 F

Cold Leg-2A Temperature QSPD2 CL TEMP 2B RCT22C2 RCT22C2 F

Cold Leg-2B Temperature QSPDS t

RCS Integrity:

RCS PRESSURE RCP102A RCP102A psia Pressurizer Pressure, wi:le range QSPDS PRZR LEVEL RCL103 RCL103 Pressunzer Level, wide range MODACS RCS CHG FL-CHF212 CHF212 gpm Charging flow to Regen. IIX MODACS

Table 2 (con't)

ERDS Preliminary Point ID List (per unit)

(a)

ERDS ERFDADS (a)

(b)

NRC Parameter Point ID PointID Unts Parameter Description Origin Cale HP SI FLOW HPSI see note b gpm Total HP Safety Injection Flow calculated 3

LP SI FLOW LPSI see note b gpm Total LP Safety Injection Flow calculated 4

RX CAVITY SUMP RDL10 RDL10 inches Reactor Cavity Sump Level MODACS CTMNT SMP 1 SIL706 SIL7G6 inches ESF-A Sump Level QSPDS CTMNT SMP 2 SIL707 SIL707 inches ESF-B Sump Level QSPDS CTMNT SMP 3 RDL410 RDL410 inches East Radwaste Sump Level MODACS 1

CTMNT SMP 4 RDL411 RDL411 inches West Radwnte Sump Lael MODACS Radioactivity Control:

EFF GAS RAD 1 SQR144B SQR114B uci/cc Plant Vent Gas Monitor (high range) -

RMS i

EFF GAS RAD 2 SQR146B SQR146B uci/cc Fuel Bldg. Vent Gas Monitor (high)

RMS

.l EFF LIQ RAD

. (there are no liquid releases from PVNGS).

COND A/E RAD SQR142B SQR142B uci/cc Cond. Vac/Gind Seal Monitor (high)

RMS CNTMNT RAD SQR148 SQR148 R/hr In-Containment Area Monitor RMS RCS LTDN RAD CHR204 CHR204 cpm Letdown Process Monitor MODACS MAIN SL 1 SQR139A SQR139A mR/hr SG-1 Steam Line Radiation Level RMS MAIN SL 2 SQR139B SQR139B mRAr SG-2 Steam Line Radiation Level RMS SG BD RAD 1 SQR4 SQR4 uci/cc SG-1 Blowdown Activity RMS SG BD RAD 2 SQR5 SQR5 uci/cc SG-2 Blowdown Activity RMS Containment Conditions:

CTMNT PRESS HCP352A HCP352A psig Containment Pressure MODACS CTMNT TEMP HCT42A1 HCT42A1 F

Containment Temperature, West wall MODACS H2 CONC HPA10 HPA10 Contr.inment Hydrogen Concentration QSPDS Miscellaneous Parameters:

BWST LEVEL CHL203A CHL203A Refueling WaterTank level MODACS WIND SPEED ARGS2AM ARGS2AM mph Wind Speed at 35 ft.15 min _ average ERFDADS WIND DIR ARGX2AM ARGX2AM deg. fnnn Wind Direction at 35 ft,15 min aver.

ERFDAD5 STAB CLASS

-PSCLASS see note b STABI Pasquill Stability Class,15 min. aver.

ulculated 5

l t

t Tal'e 2 (con'0 ERDS Preliminary Foint ID List (per unit)

NOTES:

)

(a) refer to Appendix E to NUREG-1394, Rev. I (b) calculations by ERDS-FRONT:

where [xxxxx] are Point ID's received from ERFDADS used to compose the ERDS result (1)

RVLEVEL = '242 * [RCXLIA] + 61 * [R.CXL2A]

(2)

RXFLOW = 5.57E6 * ( PX1 + PX2 + PX3 + PX4) where PX1 = SQRT([RCPD24W])

or

.j, PX1 = -SQRT(ABS ([RCPD24W]))

if [RCPD24W] < 0 and PX2 = SQRT([RCPD24X])

or PX2 = -SQRT(ABS ([RCPD24X]))

if [RCPD24X] < 0 where PX3 = SQRT([RCPD24Y])

or PX3 = -SQRT(ABS ([RCPD24Y]))

if [RCPD24Y] < 0 l

and PX4 = SQRT([RCPD24Z])

or PX4 = -SQRT(ABS ([RCPD24Z]))

if [RCPD24Z] <0 l

(3)

HPSI = [SIF311] + [SIF321] + [SIF331] + [SIF341]

(4)

LPSI= [SIF306] + [SIF307]

(5)

PSCLASS = a function of[ARGTDIAM]

...(details to be dete2 mined)..

l l

l L_.___ _

ll t _-

d Table 3 ERDS Implementation Schedule 9/11/91 Kickoff Meeting, Region V 10/28SI implementation Plan to NRC 3/13N2 Provide ERDS Data Point Library to NRC 3/31N2 NRC install modems and I<TS 2000 lines at site 5/31N2

. Receive ERDS SEND from NRC 12/3182 Complete software development / testing by APS 1/10N3.

Full scale test with the NRC ERDS Contractor 2/05N3 Operability demonstration with NRC 2/13N3 Operational (with existing ERFDADS) x v

For Information Apr. 93 Unit-2 swi.pover (to new ERFDADS)

Nov. 93

- Unit-1 swapover (to new ERFDADS)

- Apr. 94 Unit-3 swapover (to new ERFDADS)

The nbove are projected dates for individual unit swapovers from the existing ERFDADS to the new ERFDADS. Each swapover will be handled as a configuration change, with appropriate notice to the NRC, in accordance with Appendix E to 10 CFR Part 50, Section VI.3. These dates are provided for information only and reflect the projected completions of refueling outages.

These dates are subject to adjustment.

(

- I

1 Figure i ERDS PRELIMINARY IMPLEMENTATION CONCEPT

(

3 NEW PVNGS UNIT 2

~

PVNGS PVNGS UNIT I

" NIT 3 ERFDADS l

u y

1.AN EXISTING l

EXISTING 3........................... &

ERFDADS i

ERFDADS

(

IIOST "A" i

iIOST "11" i

i i

U Develop Software to Obtain this Data from the Data Base on.............. w.

ERDS DATA FEEDER ERFDADS to the ERDS.

APS NRC DEVELOPED ERDS Responsibility SOFTWARE INTERFACE n

.......................................................[............................. h...................................

N V

w MODEM MODEM MODEM NRC l

Respansibility i

MODEM MODEM MODEM 1

.w.~

NRC OPERATIONS CENTER INTERFACE l

i 1

l l

l

! l

--