Arizona Public Service Company P.o. BOX 21666. PHOENIX, ARIZONA 85036 February 28, 1984 ANPP-28966-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Caks Office Park 1450 Maria Lane - Suite 210 Walnut. Creek,. CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Arizona Public Service Company P.o. BOX 21666 . PHOENIX, ARIZONA 85036 February 28, 1984 ANPP-28966-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Caks Office Park 1450 Maria Lane - Suite 210 Walnut. Creek,. CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs


==Subject:==
==Subject:==
Time Extension For Report - DER 83-64 A 50.55(e) Potentially Reportable Deficiency Relating Tc Pressure Relief Valves By Target Rock Failed To' Meet Pre-Requisite Tests.
Time Extension For Report - DER 83-64 A 50.55(e) Potentially Reportable Deficiency Relating Tc Pressure Relief Valves By Target Rock Failed To' Meet Pre-Requisite Tests.
File:   84-019-026; D.4.33.2
File:
84-019-026; D.4.33.2


==Reference:==
==Reference:==
Line 31: Line 32:


==Dear Sir:==
==Dear Sir:==
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B),
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B),
and.a Time Extension requested by Reference (C). At that time, it was estimated that a Final-Report would be available by March 5, 1984.
and.a Time Extension requested by Reference (C). At that time, it was estimated that a Final-Report would be available by March 5, 1984.
                      - Due to the extensive ' investigation and evaluation required, it is now expected that this information will be finalized by April 2, 1984, at which-time a complete report will be submitted.
- Due to the extensive ' investigation and evaluation required, it is now expected that this information will be finalized by April 2, 1984, at which-time a complete report will be submitted.
There is no-new -information or ' change to the Interim Report at this time.
There is no-new -information or ' change to the Interim Report at this time.
Very truly yours, 4
Very truly yours, 4
I$ nom E. E. Van Brunt, Jr.
I$ nom E. E. Van Brunt, Jr.
APS Vice President, Nuclear
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db
* ANPP Project Director EEVB/TRB:db
.cc:.See Page Two i
                      .cc: .See Page Two i 8403130449 840228
8403130449 840228 PDR ADOCK 05000528
        -                      ! PDR ADOCK 05000528 8                    PDR .
-L -
                            -L -                                                                         / L7-2) ll
PDR.
/ L7-2) 8 ll


1:
1:
1 W
1 W
                        .Mr. T. W. Bih      s op DER 83-64 Page Two-
ih
                        - cc:             Richard DeYoung, Director
.Mr. T. W. B s op DER 83-64 Page Two-
                                          - Office of Inspection and Enforcement U. - S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
- cc:
W. E. Ide
Richard DeYoung, Director
                                  ._ ,    D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza
- Office of Inspection and Enforcement U. - S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
                                          . J.-Vorees J. R. Bynum       -
W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza
P. P. Klute
. J.-Vorees J. R. Bynum P. P. Klute A. C. Gehr'
                                        ,  A. C. Gehr' KW. J. Stubblefield W. G. Bingham-R. L. Patterson R. W. Welcher H. D. Foster
,KW. J. Stubblefield W. G. Bingham-R. L. Patterson R. W. Welcher H. D. Foster
                                          - D.'R. Hawkinson
- D.'R. Hawkinson
                                        - L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost
- L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost
                                        - J. Self
- J. Self
'                                      - D. Canady 1
- D. Canady 1
Records Center Institute of Nuclear Power Operations
Records Center Institute of Nuclear Power Operations
                                        - 1100 Circle 75 Parkway, Suite 1500
- 1100 Circle 75 Parkway, Suite 1500
                                        - Atlanta, CA 30339.
- Atlanta, CA 30339.
5 i
5 i
O 1
O 1
* y   .                                  -  -                    , r - ---m - . - _-}}
y r
---m
-}}

Latest revision as of 23:15, 13 December 2024

Potential Deficiency Rept DER 83-64 Re Target Rock Pressure Relief Valves Failing to Meet Prerequisite Tests.Final Rept Delayed Until 840402
ML20087D577
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/28/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28966-BSK, DER-83-64, NUDOCS 8403130449
Download: ML20087D577 (2)


Text

,

t

_t."

_ p. -

Arizona Public Service Company P.o. BOX 21666. PHOENIX, ARIZONA 85036 February 28, 1984 ANPP-28966-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Caks Office Park 1450 Maria Lane - Suite 210 Walnut. Creek,. CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-64 A 50.55(e) Potentially Reportable Deficiency Relating Tc Pressure Relief Valves By Target Rock Failed To' Meet Pre-Requisite Tests.

File:

84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Johnson and R. Tucker on September 28, 1983 (B) ANPP-28096, dated, October 26, 1983 (Interim Report)

(C) ANPP-28096, dated, January 26,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B),

and.a Time Extension requested by Reference (C). At that time, it was estimated that a Final-Report would be available by March 5, 1984.

- Due to the extensive ' investigation and evaluation required, it is now expected that this information will be finalized by April 2, 1984, at which-time a complete report will be submitted.

There is no-new -information or ' change to the Interim Report at this time.

Very truly yours, 4

I$ nom E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db

.cc:.See Page Two i

8403130449 840228 PDR ADOCK 05000528

-L -

PDR.

/ L7-2) 8 ll

1:

1 W

ih

.Mr. T. W. B s op DER 83-64 Page Two-

- cc:

Richard DeYoung, Director

- Office of Inspection and Enforcement U. - S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza

. J.-Vorees J. R. Bynum P. P. Klute A. C. Gehr'

,KW. J. Stubblefield W. G. Bingham-R. L. Patterson R. W. Welcher H. D. Foster

- D.'R. Hawkinson

- L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost

- J. Self

- D. Canady 1

Records Center Institute of Nuclear Power Operations

- 1100 Circle 75 Parkway, Suite 1500

- Atlanta, CA 30339.

5 i

O 1

y r

---m

-