Gas Transmission Lines at Indian Point Nuclear Plant OIG Case Number: 16-024 Location:         teleconference Date:             Friday, March 20, 2020 Work Order No.:   NRC-0866                         Pages 1-50 NEAL R. GROSS AND CO., INC.
Gas Transmission Lines at Indian Point Nuclear Plant OIG Case Number: 16-024 Location:
teleconference Date:
Friday, March 20, 2020 Work Order No.:
NRC-0866 Pages 1-50 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Washington, D.C. 20005 (202) 234-4433
Washington, D.C. 20005 (202) 234-4433


1 1                    UNITED STATES OF AMERICA 2                  NUCLEAR REGULATORY COMMISSION 3                                  + + +
1 UNITED STATES OF AMERICA 1
4                          STAFF'S RESPONSE 5 ---------------------------x 6 In the Matter of:                       :
NUCLEAR REGULATORY COMMISSION 2
7 CONCERNS PERTAINING TO GAS :
+ + +
8 TRANSMISSION LINES AT                   : OIG Case No. 16-024 9 INDIAN POINT NUCLEAR POWER :
3 STAFF'S RESPONSE 4
10 PLANT                                   :
---------------------------x 5
11 ---------------------------x 12                                Friday, March 20, 2020 13 14                                 Teleconference 15 16 NRC STAFF PRESENT:
In the Matter of: :
17 DAVID SKEEN, Team Lead; Deputy Director of 18            International Programs 19 THERESA CLARK, Program Manager 20 SUZANNE DENNIS, RES/DRA/PRAB 21 DR. YUEH-LI "RENE'E" LI, Office of Nuclear Reactor 22           Regulation 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
6 CONCERNS PERTAINING TO GAS :
(202) 234-4433           WASHINGTON, D.C. 20005-3701     (202) 234-4433
7 TRANSMISSION LINES AT : OIG Case No. 16-024 8
INDIAN POINT NUCLEAR POWER :
9 PLANT :
10
---------------------------x 11 Friday, March 20, 2020 12 13 Teleconference 14 15 NRC STAFF PRESENT:
16 DAVID SKEEN, Team Lead; Deputy Director of 17 International Programs 18 THERESA CLARK, Program Manager 19 SUZANNE DENNIS, RES/DRA/PRAB 20 DR. YUEH-LI "RENE'E" LI, Office of Nuclear Reactor 21 Regulation 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


2 1 ALSO PRESENT:
2 ALSO PRESENT:
2 PAUL BLANCH, Citizen Stakeholder 3 TINA BONGAR, Resist Spectra 4 MICHEL LEE, Council on Intelligent Energy and 5            Conservation Policy 6 STEVE NANNEY, Pipeline and Hazardous Materials 7            Safety Administration, DOT 8 AMY ROSMARIN, Stop the Algonquin Pipeline Expansion 9 SUSAN VAN DOLSEN, Stop the Algonquin Pipeline 10           Expansion 11 NANCY VANN, Safe Energy Rights Group 12 ELLEN WEININGER, Grassroots Environmental Education 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
1 PAUL BLANCH, Citizen Stakeholder 2
(202) 234-4433         WASHINGTON, D.C. 20005-3701 (202) 234-4433
TINA BONGAR, Resist Spectra 3
MICHEL LEE, Council on Intelligent Energy and 4
Conservation Policy 5
STEVE NANNEY, Pipeline and Hazardous Materials 6
Safety Administration, DOT 7
AMY ROSMARIN, Stop the Algonquin Pipeline Expansion 8
SUSAN VAN DOLSEN, Stop the Algonquin Pipeline 9
Expansion 10 NANCY VANN, Safe Energy Rights Group 11 ELLEN WEININGER, Grassroots Environmental Education 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


3 1                    P R O C E E D I N G S 2                                                          1:02 p.m.
3 P R O C E E D I N G S 1
3                MR. SKEEN: Hello, this is Dave Skeen.
1:02 p.m.
4 This is the 1:00 call to discuss the evaluation team's 5 review of the IG findings with Paul Blanch.               Who else 6 do we have on the line?
2 MR. SKEEN: Hello, this is Dave Skeen.
7                MS. LI: Rene'e Li, from NRC.
3 This is the 1:00 call to discuss the evaluation team's 4
8                MS. CLARK: Theresa Clark, from NRC.
review of the IG findings with Paul Blanch. Who else 5
9                MR. BLANCH: And Paul Blanch, a citizen 10 stakeholder.
do we have on the line?
11                MR. SKEEN: Thanks, Paul.
6 MS. LI: Rene'e Li, from NRC.
12                MR. NANNEY: And Steve Nanney, US DOT, 13 PHMSA.
7 MS. CLARK: Theresa Clark, from NRC.
14                MS. DENNIS: This is --
8 MR. BLANCH: And Paul Blanch, a citizen 9
15                MR. SKEEN: Thanks, Steve.
stakeholder.
16                MS. DENNIS: -- Suzanne Dennis, with the 17 NRC.
10 MR. SKEEN: Thanks, Paul.
18                MR. SKEEN: Okay.         I don't hear others.         I 19 think with the court reporter, we should probably each 20 state our names and spell it for him, so that he, as 21 we're speaking, he'll know who to attribute comments 22 to.
11 MR. NANNEY: And Steve Nanney, US DOT, 12 PHMSA.
23                So, I'll go first.                 My name is David 24 Skeen, it's S-K-E-E-N.           And I'm the team leader for 25 the evaluation team that's looking into the Inspector NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 MS. DENNIS: This is --
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
14 MR. SKEEN: Thanks, Steve.
15 MS. DENNIS: -- Suzanne Dennis, with the 16 NRC.
17 MR. SKEEN: Okay. I don't hear others. I 18 think with the court reporter, we should probably each 19 state our names and spell it for him, so that he, as 20 we're speaking, he'll know who to attribute comments 21 to.
22 So, I'll go first. My name is David 23 Skeen, it's S-K-E-E-N. And I'm the team leader for 24 the evaluation team that's looking into the Inspector 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


4 1 General's event inquiry.
4 General's event inquiry.
2                  MS. CLARK: This is Theresa Clark, T-H-E-R-3 E-S-A, last name Clark, C-L-A-R-K.                       And I'm Dave's 4 deputy on the NRC team.
1 MS. CLARK: This is Theresa Clark, T-H-E-R-2 E-S-A, last name Clark, C-L-A-R-K. And I'm Dave's 3
5                  MS. LI: This is Rene'e Li, my official 6 name is Yueh-Li Li, spells Y-U-E-H, dash, L-I, last 7 name Li, L-I.       And I'm from NRC.
deputy on the NRC team.
8                  MR. BLANCH: You're from where?
4 MS. LI: This is Rene'e Li, my official 5
9                  MS. LI:       NRC,       Nuclear       Regulatory 10 Commission.
name is Yueh-Li Li, spells Y-U-E-H, dash, L-I, last 6
11                  MR. BLANCH: Okay.             And my name is Paul 12 Blanch,       B-L-A-N-C-H,       and     I     am   the   concerned 13 stakeholder that was discussed in the OIG report.
name Li, L-I. And I'm from NRC.
14                  MS. DENNIS: Hi, this is Suzanne Dennis, S-15 U-Z-A-N-N-E, last name Dennis, D-E-N-N-I-S.
7 MR. BLANCH: You're from where?
16                  MR. BLANCH:       And     where     are   you   from, 17 Suzanne?
8 MS.
18                  MS. DENNIS:       Oh,   I'm     from   the Nuclear 19 Regulatory Commission.             Sorry about that.
LI:
20                  MR. BLANCH: Okay.
: NRC, Nuclear Regulatory 9
21                  MR. SKEEN: So, who else do we have?                       I 22 know there's other folks.
Commission.
23                  MS. ROSMARIN: This is Amy Rosmarin, and 24 I'm just listening.             I'm with Stop the Algonquin 25 Pipeline Expansion.
10 MR. BLANCH: Okay. And my name is Paul 11
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
: Blanch, B-L-A-N-C-H, and I
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
am the concerned 12 stakeholder that was discussed in the OIG report.
13 MS. DENNIS: Hi, this is Suzanne Dennis, S-14 U-Z-A-N-N-E, last name Dennis, D-E-N-N-I-S.
15 MR. BLANCH: And where are you from, 16 Suzanne?
17 MS. DENNIS: Oh, I'm from the Nuclear 18 Regulatory Commission. Sorry about that.
19 MR. BLANCH: Okay.
20 MR. SKEEN: So, who else do we have? I 21 know there's other folks.
22 MS. ROSMARIN: This is Amy Rosmarin, and 23 I'm just listening. I'm with Stop the Algonquin 24 Pipeline Expansion.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


5 1                MR. SKEEN: Okay, thank you.
5 MR. SKEEN: Okay, thank you.
2                MS. VAN DOLSEN: This is Susan Van Dolsen, 3 I'm also with Stop the Algonquin Pipeline Expansion 4 and listening.     I'm going to go on mute.
1 MS. VAN DOLSEN: This is Susan Van Dolsen, 2
5                MR. SKEEN: Thank you.
I'm also with Stop the Algonquin Pipeline Expansion 3
6                MS. VANN: I'm Nancy Vann, I'm with Safe 7 Energy Rights Group, and also just listening.
and listening. I'm going to go on mute.
8                MR. SKEEN: Okay, thank you.
4 MR. SKEEN: Thank you.
9                MS. BONGAR: And hi, I'm Tina Bongar, and 10 I'm with United for Clean Energy/Resist Spectra.                     And 11 I'm just listening.
5 MS. VANN: I'm Nancy Vann, I'm with Safe 6
12                MR. SKEEN: Okay.         Is there anyone else on 13 the line?
Energy Rights Group, and also just listening.
14                MS. LEE: Yes, this is Michel Lee, with the 15 Council on Intelligent Energy and Conservation Policy, 16 also just listening on mute.
7 MR. SKEEN: Okay, thank you.
17                MR. SKEEN: All right, thank you.
8 MS. BONGAR: And hi, I'm Tina Bongar, and 9
18                MS. WEININGER: Ellen Weininger, and I'm 19 with Grassroots Environmental Education, and I'm just 20 listening. Thank you.
I'm with United for Clean Energy/Resist Spectra. And 10 I'm just listening.
21                MR. SKEEN: Okay.           Is that everyone?           I 22 don't hear anyone else.
11 MR. SKEEN: Okay. Is there anyone else on 12 the line?
23                MR. BLANCH: I thought we were going to 24 have someone from New York State.                 Amy, you said you 25 were going to be in contact, are they participating?
13 MS. LEE: Yes, this is Michel Lee, with the 14 Council on Intelligent Energy and Conservation Policy, 15 also just listening on mute.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MR. SKEEN: All right, thank you.
(202) 234-4433       WASHINGTON, D.C. 20005-3701           (202) 234-4433
17 MS. WEININGER: Ellen Weininger, and I'm 18 with Grassroots Environmental Education, and I'm just 19 listening. Thank you.
20 MR. SKEEN: Okay. Is that everyone? I 21 don't hear anyone else.
22 MR. BLANCH: I thought we were going to 23 have someone from New York State. Amy, you said you 24 were going to be in contact, are they participating?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


6 1                MS. ROSMARIN: I just, I sent them an 2 invitation and haven't heard back.                 I gave them the 3 call-in information. But the timing was pretty short.
6 MS. ROSMARIN: I just, I sent them an 1
4                MR. BLANCH: Yes, I know. Okay. Who wants 5 to start?
invitation and haven't heard back. I gave them the 2
6                MR. SKEEN: Okay. Well, thanks, Paul. So, 7 let me just get the thing started here.
call-in information. But the timing was pretty short.
8                So, as I said, I'm part of a special team 9 that the Nuclear Regulatory Commission put together to 10 evaluate the Inspector General findings from the event 11 inquiry related to the 42-inch gas pipeline that runs 12 near Indian Point Energy Center.
3 MR. BLANCH: Yes, I know. Okay. Who wants 4
13                I was tasked to put together a team of NRC 14 and external experts to evaluate the findings and to 15 provide a report back to the Commission within 45 days 16 on the findings, on our evaluation of the Inspector 17 General's findings.
to start?
18                And so, we have both internal experts, as 19 well as external experts, on our team that are looking 20 into the findings from the Inspector General.
5 MR. SKEEN: Okay. Well, thanks, Paul. So, 6
21                So, with that, the purpose of this call 22 was to talk with Paul Blanch today.               I know Paul was 23 the concerned individual that was involved in some of 24 the activities related to the gas pipeline and the 25 2.206 Petition that was provided to the NRC.
let me just get the thing started here.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 So, as I said, I'm part of a special team 8
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
that the Nuclear Regulatory Commission put together to 9
evaluate the Inspector General findings from the event 10 inquiry related to the 42-inch gas pipeline that runs 11 near Indian Point Energy Center.
12 I was tasked to put together a team of NRC 13 and external experts to evaluate the findings and to 14 provide a report back to the Commission within 45 days 15 on the findings, on our evaluation of the Inspector 16 General's findings.
17 And so, we have both internal experts, as 18 well as external experts, on our team that are looking 19 into the findings from the Inspector General.
20 So, with that, the purpose of this call 21 was to talk with Paul Blanch today. I know Paul was 22 the concerned individual that was involved in some of 23 the activities related to the gas pipeline and the 24 2.206 Petition that was provided to the NRC.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


7 1                And so, we want to hear his thoughts, make 2 sure that we have all of his concerns as part of our 3 efforts, as we go forward.               And so, with that, I 4 wanted to talk with Paul about, to make sure we 5 understood his concerns that he has raised thus far.
7 And so, we want to hear his thoughts, make 1
6                And I know, Paul, you had sent something 7 in to us with a draft letter that you had, and maybe 8 we should go and start with that, maybe the best thing 9 to walk through that with you.
sure that we have all of his concerns as part of our 2
10                MR. BLANCH: Yes.         That's what --
efforts, as we go forward. And so, with that, I 3
11                MR. SKEEN: And then, we have --
wanted to talk with Paul about, to make sure we 4
12                MR. BLANCH: That's what I --
understood his concerns that he has raised thus far.
13                MR. SKEEN: -- some particular questions --
5 And I know, Paul, you had sent something 6
14                MR. BLANCH: -- would like, too.
in to us with a draft letter that you had, and maybe 7
15                MR. SKEEN: -- we wanted to ask as well.
we should go and start with that, maybe the best thing 8
16 So, if that's okay with you, and the team, I have the 17 team on the line with me, so if there are specific 18 questions or clarifications we need as you go through 19 some of your concerns, we'll try to make sure we 20 capture those as we go forward.
to walk through that with you.
21                MR. BLANCH: Okay.             What I -- it was a 22 draft letter, and I know anything sent to the NRC, 23 draft or not, is going to go into ADAMS. That's fine.
9 MR. BLANCH: Yes. That's what --
24                I was just trying to give you a heads-up, 25 because there were probably editorial mistakes in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MR. SKEEN: And then, we have --
(202) 234-4433       WASHINGTON, D.C. 20005-3701       (202) 234-4433
11 MR. BLANCH: That's what I --
12 MR. SKEEN: -- some particular questions --
13 MR. BLANCH: -- would like, too.
14 MR. SKEEN: -- we wanted to ask as well.
15 So, if that's okay with you, and the team, I have the 16 team on the line with me, so if there are specific 17 questions or clarifications we need as you go through 18 some of your concerns, we'll try to make sure we 19 capture those as we go forward.
20 MR. BLANCH: Okay. What I -- it was a 21 draft letter, and I know anything sent to the NRC, 22 draft or not, is going to go into ADAMS. That's fine.
23 I was just trying to give you a heads-up, 24 because there were probably editorial mistakes in 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


8 1 there and so on and so forth.               But the concept of the 2 letter remains the same.               I do not know whether you 3 distributed it to the rest of your team.
8 there and so on and so forth. But the concept of the 1
4                  MR. SKEEN: Yes, the team has seen it.                   I 5 forwarded that to them when you sent it, because I 6 thought it would help the discussion this afternoon.
letter remains the same. I do not know whether you 2
7 So, we have at least seen it.
distributed it to the rest of your team.
8                  But if you wanted to walk us through, to 9 make sure we've got your concerns.                   I think a lot of 10 what       is in your   letter     was   already     part   of     our 11 efforts, but I just want to be sure, as we talk with 12 you, that we've captured everything.                   So --
3 MR. SKEEN: Yes, the team has seen it. I 4
13                  MR. BLANCH: Okay.
forwarded that to them when you sent it, because I 5
14                  MR. SKEEN: -- if you want to go ahead, 15 please do.
thought it would help the discussion this afternoon.
16                  MR. BLANCH: Yes, do you have anyone from 17 Sandia online?         On the line?
6 So, we have at least seen it.
18                  MR. SKEEN: I don't believe Sandia is on.
7 But if you wanted to walk us through, to 8
19 I know they were doing the computer runs, but I don't 20 believe that we have them on. Suzanne, did you notice 21 if Sandia was going to be available?
make sure we've got your concerns. I think a lot of 9
22                  MS. DENNIS: Hi, yes, I talked with our 23 experts from Sandia yesterday and they decided, since 24 today was being transcribed, they would look over the 25 notes and focus on getting the simulations done, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
what is in your letter was already part of our 10 efforts, but I just want to be sure, as we talk with 11 you, that we've captured everything. So --
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
12 MR. BLANCH: Okay.
13 MR. SKEEN: -- if you want to go ahead, 14 please do.
15 MR. BLANCH: Yes, do you have anyone from 16 Sandia online? On the line?
17 MR. SKEEN: I don't believe Sandia is on.
18 I know they were doing the computer runs, but I don't 19 believe that we have them on. Suzanne, did you notice 20 if Sandia was going to be available?
21 MS. DENNIS: Hi, yes, I talked with our 22 experts from Sandia yesterday and they decided, since 23 today was being transcribed, they would look over the 24 notes and focus on getting the simulations done, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


9 1 hopefully before this weekend.
9 hopefully before this weekend.
2                  MR. SKEEN: All right, thank you.                       So, 3 Paul, no, we don't have Sandia with us this afternoon.
1 MR. SKEEN: All right, thank you. So, 2
4                  MR. BLANCH: Okay.               Well, I sent that 5 letter just so your team could digest where I'm coming 6 from, and for those others listening to it, they have 7 not seen my draft letter, but it's my comments on a 8 official NRC document that was put out on March 18, 9 which is basically the scope of the team.
Paul, no, we don't have Sandia with us this afternoon.
10                  And I think it would be best if I just 11 read       the   letter   and     we   could       stop after     each 12 paragraph, if there are questions.                       So, if that's 13 okay, to get it into the record, I know it will be 14 part of the record anyway.
3 MR. BLANCH: Okay. Well, I sent that 4
15                  I say in my letter, it's addressed to 16 David Skeen, it appears the team's direction is to 17 have Sandia National Labs perform a risk analysis.
letter just so your team could digest where I'm coming 5
18                  I have no problem with this approach, 19 however, I question, quote, analyzing natural gas 20 pipeline rupture phenomena and consequences, which was 21 in Dave's outline, as the sole guidance, when there is 22 clear       federal law     and   regulations         as to   how     to 23 evaluate the pipeline's impact on public safety.
from, and for those others listening to it, they have 6
24                  I want a structured approach for risk 25 assessment, is basically what I'm saying.                       And the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
not seen my draft letter, but it's my comments on a 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
official NRC document that was put out on March 18, 8
which is basically the scope of the team.
9 And I think it would be best if I just 10 read the letter and we could stop after each 11 paragraph, if there are questions. So, if that's 12 okay, to get it into the record, I know it will be 13 part of the record anyway.
14 I say in my letter, it's addressed to 15 David Skeen, it appears the team's direction is to 16 have Sandia National Labs perform a risk analysis.
17 I have no problem with this approach, 18 however, I question, quote, analyzing natural gas 19 pipeline rupture phenomena and consequences, which was 20 in Dave's outline, as the sole guidance, when there is 21 clear federal law and regulations as to how to 22 evaluate the pipeline's impact on public safety.
23 I want a structured approach for risk 24 assessment, is basically what I'm saying. And the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


10 1 only one that we can fall back on is what is in the 2 federal law.
10 only one that we can fall back on is what is in the 1
3                  And then, I go on and state the PHMSA's 4 mission is to protect, is pipeline safety, no doubt 5 about that.         NRC's mission is nuclear safety and 6 providing adequate protections to the public health 7 and safety.         PHMSA does not regulate the NRC or 8 oversee the NRC, and the same way, the NRC doesn't 9 oversee PHMSA.
federal law.
10                  So, I go on to say, from the enclosed 11 direction, it appears the NRC is about to charter 12 Sandia to conduct yet one more risk assessment. We've 13 had risk assessments conducted by Entergy, Algonquin, 14 NRC, PHMSA, State of New York, myself, and then, 15 there's another one that got lost by the NRC that's on 16 a CD somewhere.
2 And then, I go on and state the PHMSA's 3
17                  We've     had     enough       attempts   on     risk 18 assessment and have everyone thinking, this is what we 19 think we need.       I go on to say, there is a regulatory 20 and       industry   consensus         of     conducting   a     risk 21 assessment, and that is specified in 49 CFR 192.917 22 and 935.
mission is to protect, is pipeline safety, no doubt 4
23                  This   is   the     only       generally accepted 24 guidance for conducting a risk assessment of gas 25 lines.         This   went     through       rulemaking,     comments, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
about that. NRC's mission is nuclear safety and 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
providing adequate protections to the public health 6
and safety. PHMSA does not regulate the NRC or 7
oversee the NRC, and the same way, the NRC doesn't 8
oversee PHMSA.
9 So, I go on to say, from the enclosed 10 direction, it appears the NRC is about to charter 11 Sandia to conduct yet one more risk assessment. We've 12 had risk assessments conducted by Entergy, Algonquin, 13 NRC, PHMSA, State of New York, myself, and then, 14 there's another one that got lost by the NRC that's on 15 a CD somewhere.
16 We've had enough attempts on risk 17 assessment and have everyone thinking, this is what we 18 think we need. I go on to say, there is a regulatory 19 and industry consensus of conducting a
risk 20 assessment, and that is specified in 49 CFR 192.917 21 and 935.
22 This is the only generally accepted 23 guidance for conducting a risk assessment of gas 24 lines. This went through rulemaking, comments, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


11 1 industry comments, this is the consensus of how one 2 does a risk assessment.
11 industry comments, this is the consensus of how one 1
3                  And I go on to say, quoting in my letter, 4 it     is     my position     that   the     risk   assessment       be 5 conducted following the Pipeline Safety Act of 2016 6 and 49 CFR 192.         The result must then be reviewed by 7 PHMSA for compliance with its regulations.
does a risk assessment.
8                  And then, the NRC, based on that risk 9 assessment,         makes     the     determination       of,   quote, 10 reasonable assurance of adequate protection of public 11 health and safety.
2 And I go on to say, quoting in my letter, 3
12                  I   have     just     gone       through the     final 13 Environmental Impact Statement and, Steve, this is 14 probably directed at you.                   Steve is from PHMSA.
it is my position that the risk assessment be 4
15 Throughout the Environmental Impact Statement, dozens 16 and dozens of times, are statement, total compliance 17 with 49 CFR 192.
conducted following the Pipeline Safety Act of 2016 5
18                  No exceptions that I have identified.
and 49 CFR 192. The result must then be reviewed by 6
19 Meaning that, FERC, PHMSA, EPA, in signing off of that 20 document are saying, the regulations of 192, amongst 21 others, have been met.
PHMSA for compliance with its regulations.
22                  I have tried, communicated, and the reason 23 Amy and Ellen are on here, they have communicated with 24 me and with Karen Gentile of PHMSA, to attempt to get 25 a copy of the risk assessment they said was done. All NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 And then, the NRC, based on that risk 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
assessment, makes the determination of, quote, 9
reasonable assurance of adequate protection of public 10 health and safety.
11 I have just gone through the final 12 Environmental Impact Statement and, Steve, this is 13 probably directed at you. Steve is from PHMSA.
14 Throughout the Environmental Impact Statement, dozens 15 and dozens of times, are statement, total compliance 16 with 49 CFR 192.
17 No exceptions that I have identified.
18 Meaning that, FERC, PHMSA, EPA, in signing off of that 19 document are saying, the regulations of 192, amongst 20 others, have been met.
21 I have tried, communicated, and the reason 22 Amy and Ellen are on here, they have communicated with 23 me and with Karen Gentile of PHMSA, to attempt to get 24 a copy of the risk assessment they said was done. All 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


12 1 I got from PHMSA, and this was all in writing and 2 PHMSA has it and I think, Dave, you may have some of 3 it, all --
12 I got from PHMSA, and this was all in writing and 1
4                    MR. SKEEN: Excuse me, Paul.
PHMSA has it and I think, Dave, you may have some of 2
5                    MR. BLANCH: -- I've gotten are --
it, all --
6                    MR. SKEEN: Excuse me, Paul.             Did someone 7 else just come on the line.
3 MR. SKEEN: Excuse me, Paul.
8                    MS. CLARK: That was Theresa.             Somehow my 9 call dropped and now I'm back, sorry.
4 MR. BLANCH: -- I've gotten are --
10                    MR. SKEEN: Okay, thank you.             I just heard 11 another beep, so I just wanted to make sure we knew 12 who was on the line.             Thank you.         Go ahead, Paul, I'm 13 sorry.
5 MR. SKEEN: Excuse me, Paul. Did someone 6
14                    MR. BLANCH: Okay.           So, what we have is a 15 document called the Environmental Impact Statement 16 certifying compliance with 49 CFR 192, which is, at 17 best, an inaccurate statement. And something that the 18 NRC's risk assessment may have been based upon.
else just come on the line.
19                    I guess my next question is directed at 20 Steve.         And by the way, Rick Kuprewicz, our common 21 associate says very good things about you.                   Has there 22 been a risk assessment done for the pipelines at 23 Indian         Point that     are     in   compliance     with   PHMSA 24 regulations?         And if so, how do we get a copy?
7 MS. CLARK: That was Theresa. Somehow my 8
25                    MR. SKEEN: So, Steve, are you on the line?
call dropped and now I'm back, sorry.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MR. SKEEN: Okay, thank you. I just heard 10 another beep, so I just wanted to make sure we knew 11 who was on the line. Thank you. Go ahead, Paul, I'm 12 sorry.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
13 MR. BLANCH: Okay. So, what we have is a 14 document called the Environmental Impact Statement 15 certifying compliance with 49 CFR 192, which is, at 16 best, an inaccurate statement. And something that the 17 NRC's risk assessment may have been based upon.
18 I guess my next question is directed at 19 Steve. And by the way, Rick Kuprewicz, our common 20 associate says very good things about you. Has there 21 been a risk assessment done for the pipelines at 22 Indian Point that are in compliance with PHMSA 23 regulations? And if so, how do we get a copy?
24 MR. SKEEN: So, Steve, are you on the line?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


13 1                MR. NANNEY: Yes, I'm listening.           Dave, do 2 you want me to answer?
13 MR. NANNEY: Yes, I'm listening. Dave, do 1
3                MR. BLANCH: Yes, I'd like to.
you want me to answer?
4                MR. SKEEN: Yes, if you could answer that, 5 that's fine. Like I say, that's more of a PHMSA than 6 an NRC question, I guess --
2 MR. BLANCH: Yes, I'd like to.
7                MR. BLANCH: Well, they're all --
3 MR. SKEEN: Yes, if you could answer that, 4
8                MR. SKEEN: -- so, if you can --
that's fine. Like I say, that's more of a PHMSA than 5
9                MR. BLANCH: -- tied together.
an NRC question, I guess --
10                MR. SKEEN: -- answer, that would be fine.
6 MR. BLANCH: Well, they're all --
11                MR. NANNEY: Well, first of all, you're 12 asking has one been done?           But I can answer you this 13 way, if you go look at Part 192, Subpart O, it has the 14 regulations of when you have to do assessments of the 15 pipeline.
7 MR. SKEEN: -- so, if you can --
16                In other words, when you've found it to be 17 a high consequence area, as defined in Part 192.                   And 18 --
8 MR. BLANCH: -- tied together.
19                MR. BLANCH: Right.
9 MR. SKEEN: -- answer, that would be fine.
20                MR. NANNEY: -- the parent company that 21 owns the same pipeline is Enbridge. And Enbridge does 22 have a compliant integrity management program.
10 MR. NANNEY: Well, first of all, you're 11 asking has one been done? But I can answer you this 12 way, if you go look at Part 192, Subpart O, it has the 13 regulations of when you have to do assessments of the 14 pipeline.
23                This   particular         line,     this particular 24 location, has Steve Nanney seen the documents?                     The 25 answer is, no.
15 In other words, when you've found it to be 16 a high consequence area, as defined in Part 192. And 17 18 MR. BLANCH: Right.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
19 MR. NANNEY: -- the parent company that 20 owns the same pipeline is Enbridge. And Enbridge does 21 have a compliant integrity management program.
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
22 This particular line, this particular 23 location, has Steve Nanney seen the documents? The 24 answer is, no.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


14 1                  And because -- I'm listening in today, 2 I've       listened   in   when     Richard       talked yesterday, 3 because my goal of listening in was to see what the 4 concerns were and to see what my takeaway would be of 5 going back and looking, since I wasn't involved in 6 this back several years ago when it was built and 7 everything.
14 And because -- I'm listening in today, 1
8                  So, that being said, yes, they would have 9 to have a risk assessment on that. A risk assessment, 10 by the code on the new pipeline, the first thing that 11 I would look for would be, did they do a hydrostatic 12 pressure test that met the code?
I've listened in when Richard talked yesterday, 2
13                  On a new pipeline, that would be the first 14 item to look at, to make sure.                 And I would be, and I 15 will be going back and asking that question.
because my goal of listening in was to see what the 3
16                  The other thing, as the pipeline is put 17 in-service       and   time     goes     by,       would be   inline 18 inspection tools run on this pipeline, plus their 19 yearly         maintenance       activities           and patrolling 20 activities.
concerns were and to see what my takeaway would be of 4
21                  So, to answer your question, yes, I will 22 go back and look at that.               What we can actually put 23 out for the public review, I can't say right at the 24 moment what I could actually give you, until I look at 25 the records and everything.
going back and looking, since I wasn't involved in 5
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
this back several years ago when it was built and 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
everything.
7 So, that being said, yes, they would have 8
to have a risk assessment on that. A risk assessment, 9
by the code on the new pipeline, the first thing that 10 I would look for would be, did they do a hydrostatic 11 pressure test that met the code?
12 On a new pipeline, that would be the first 13 item to look at, to make sure. And I would be, and I 14 will be going back and asking that question.
15 The other thing, as the pipeline is put 16 in-service and time goes by, would be inline 17 inspection tools run on this pipeline, plus their 18 yearly maintenance activities and patrolling 19 activities.
20 So, to answer your question, yes, I will 21 go back and look at that. What we can actually put 22 out for the public review, I can't say right at the 23 moment what I could actually give you, until I look at 24 the records and everything.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


15 1                    MR. SKEEN: So, I appreciate that, Steve.
15 MR. SKEEN: So, I appreciate that, Steve.
2 I appreciate that.             And maybe, Paul, when we talk 3 about a risk assessment, are we talking about two 4 different things?
1 I appreciate that. And maybe, Paul, when we talk 2
5                    From an NRC probabilistic risk assessment, 6 a risk-informed process that we have, versus the risk 7 assessment for a gas pipeline may be looking at 8 different things.
about a risk assessment, are we talking about two 3
9                    And I know we've talked about this, what's 10 in the ASME appendix and all of that, but maybe it 11 would be good to make sure we understand, when we say 12 risk assessment, what we're talking about.
different things?
13                    MR. BLANCH: Okay.           This is Paul Blanch, 14 again.         I'll try to explain it and, Steve, sorry to 15 put you on the spot here, because you're relatively 16 new to this.
4 From an NRC probabilistic risk assessment, 5
17                    But the clear requirements, Steve, in 18 Subpart O of 192 are numerous, as you know.                           And 19 192.917         and 934     require       a     very detailed     risk 20 assessment.         This should be outside of NRC space.
a risk-informed process that we have, versus the risk 6
21                    I   would       have     expected,     if   you're 22 installing or if PHMSA is approving the installation 23 of a 42-inch line in the vicinity of two nuclear power 24 plants, that they would do an adequate risk assessment 25 and those results would be presented to the NRC. They NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
assessment for a gas pipeline may be looking at 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
different things.
8 And I know we've talked about this, what's 9
in the ASME appendix and all of that, but maybe it 10 would be good to make sure we understand, when we say 11 risk assessment, what we're talking about.
12 MR. BLANCH: Okay. This is Paul Blanch, 13 again. I'll try to explain it and, Steve, sorry to 14 put you on the spot here, because you're relatively 15 new to this.
16 But the clear requirements, Steve, in 17 Subpart O of 192 are numerous, as you know. And 18 192.917 and 934 require a very detailed risk 19 assessment. This should be outside of NRC space.
20 I
would have
: expected, if you're 21 installing or if PHMSA is approving the installation 22 of a 42-inch line in the vicinity of two nuclear power 23 plants, that they would do an adequate risk assessment 24 and those results would be presented to the NRC. They 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


16 1 could take the results, here are the probabilities, 2 these are numbers.
16 could take the results, here are the probabilities, 1
3                  It shouldn't be the NRC doing this, these 4 are the numbers that PHMSA should be coming up with 5 and following the regulations of ASME B31.8, and there 6 are other references, or documents, incorporated by 7 reference.
these are numbers.
8                  And   this     is   not     inconsistent     --     has 9 everyone seen the letter from the Attorney General of 10 the State of New York this morning?
2 It shouldn't be the NRC doing this, these 3
11                  MR. SKEEN: I have seen that, yes, Paul.
are the numbers that PHMSA should be coming up with 4
12                  MR. BLANCH:       Yes.       My request   is     not 13 inconsistent with what the Attorney General of the 14 State of New York is saying.
and following the regulations of ASME B31.8, and there 5
15                  These are -- this is my immediate concern, 16 I've been working on this, as everyone knows, for five 17 or six, maybe more years, and all I get is, oh, I'm 18 going to do my risk assessment my way, and I'm going 19 to do it my way, and we don't even get to see what 20 these risk assessments, and they get lost.
are other references, or documents, incorporated by 6
21                  And my very strong position is, I want to 22 see         a risk     assessment,           which   is   PHMSA's 23 responsibility.         And I'm not -- it's just like the 24 NRC, PHMSA needs to impose that requirement on its 25 licensees or its regulated pipeline manufacturer.
reference.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 And this is not inconsistent -- has 8
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
everyone seen the letter from the Attorney General of 9
the State of New York this morning?
10 MR. SKEEN: I have seen that, yes, Paul.
11 MR. BLANCH: Yes. My request is not 12 inconsistent with what the Attorney General of the 13 State of New York is saying.
14 These are -- this is my immediate concern, 15 I've been working on this, as everyone knows, for five 16 or six, maybe more years, and all I get is, oh, I'm 17 going to do my risk assessment my way, and I'm going 18 to do it my way, and we don't even get to see what 19 these risk assessments, and they get lost.
20 And my very strong position is, I want to 21 see a
risk assessment, which is PHMSA's 22 responsibility. And I'm not -- it's just like the 23 NRC, PHMSA needs to impose that requirement on its 24 licensees or its regulated pipeline manufacturer.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


17 1                    That's the way the NRC does it, they don't 2 do -- it's not their responsibility to do the risk 3 analysis.         And it's not PHMSA's, but PHMSA should 4 assure         that   we   are     being     protected   by ensuring 5 compliance with the regulation. Which is the absolute 6 minimum to assure safety.
17 That's the way the NRC does it, they don't 1
7                    And then, NRC takes that and the NRC 8 decides, does this present a hazard to the nuclear 9 power plant?
do -- it's not their responsibility to do the risk 2
10                    MR. SKEEN: Okay.             So, appreciate that, 11 Paul.       And so, I think what we can do, we recognize 12 the concern.           Certainly, we can work with Steve and 13 his folks to verify, or confirm if there was this risk 14 assessment done under the Part 49 regulations. So, we 15 can take that.           So, appreciate that statement and I 16 think we can move on from there, then.
analysis. And it's not PHMSA's, but PHMSA should 3
17                    MR. BLANCH: Yes.           That is my number one 18 immediate concern. There's a lot of other issues, but 19 that's         my   priority       right       now. And   from       my 20 communications with PHMSA, PHMSA has dropped the ball 21 and has not done a risk assessment.
assure that we are being protected by ensuring 4
22                    MR. SKEEN: Okay.           I think we understand 23 your concern and we'll look at that to see if we can 24 verify that a risk assessment was done under Part 49.
compliance with the regulation. Which is the absolute 5
25                    MR. BLANCH: Okay.           Okay. Where would we NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
minimum to assure safety.
(202) 234-4433             WASHINGTON, D.C. 20005-3701         (202) 234-4433
6 And then, NRC takes that and the NRC 7
decides, does this present a hazard to the nuclear 8
power plant?
9 MR. SKEEN: Okay. So, appreciate that, 10 Paul. And so, I think what we can do, we recognize 11 the concern. Certainly, we can work with Steve and 12 his folks to verify, or confirm if there was this risk 13 assessment done under the Part 49 regulations. So, we 14 can take that. So, appreciate that statement and I 15 think we can move on from there, then.
16 MR. BLANCH: Yes. That is my number one 17 immediate concern. There's a lot of other issues, but 18 that's my priority right now. And from my 19 communications with PHMSA, PHMSA has dropped the ball 20 and has not done a risk assessment.
21 MR. SKEEN: Okay. I think we understand 22 your concern and we'll look at that to see if we can 23 verify that a risk assessment was done under Part 49.
24 MR. BLANCH: Okay. Okay. Where would we 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


18 1 like to go from here?
18 like to go from here?
2                MR. SKEEN: So, I think, in the rest of 3 your letter, it does talk about some other things, 4 some of which I think are covered in the IG findings, 5 but if you wanted to kind of step through those, that 6 was the bulletized issues that you had on another page 7 of your draft letter you had shared with me this 8 morning.
1 MR. SKEEN: So, I think, in the rest of 2
9                MR. BLANCH: Yes.           Yes, the -- I made a 10 complaint with the Inspector General's Office.                       And 11 you know the Inspector General does not have adequate 12 budget, personnel, they get a lot of stuff and they're 13 very selective in what they do and the scope.
your letter, it does talk about some other things, 3
14                I asked the Inspector General to look at 15 a lot of different things.                   They didn't look at 16 everything.
some of which I think are covered in the IG findings, 4
17                Now, one of the things I asked them to do, 18 and     I've asked   the     NRC   staff,       is Entergy     made 19 inaccurate,     incomplete,       I   believe,       okay, allege, 20 inaccurate, incomplete, in violation of 10 CFR 50.9, 21 and possibly 50.5.           That has never been addressed.
but if you wanted to kind of step through those, that 5
22 Let me see.
was the bulletized issues that you had on another page 6
23                MR. SKEEN: Okay.           So, could you clarify 24 just a little bit on the 50.9, where you think it 25 violated 50.9?       Just to help us understand --
of your draft letter you had shared with me this 7
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
morning.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 MR. BLANCH: Yes. Yes, the -- I made a 9
complaint with the Inspector General's Office. And 10 you know the Inspector General does not have adequate 11 budget, personnel, they get a lot of stuff and they're 12 very selective in what they do and the scope.
13 I asked the Inspector General to look at 14 a lot of different things. They didn't look at 15 everything.
16 Now, one of the things I asked them to do, 17 and I've asked the NRC staff, is Entergy made 18 inaccurate, incomplete, I believe, okay, allege, 19 inaccurate, incomplete, in violation of 10 CFR 50.9, 20 and possibly 50.5. That has never been addressed.
21 Let me see.
22 MR. SKEEN: Okay. So, could you clarify 23 just a little bit on the 50.9, where you think it 24 violated 50.9? Just to help us understand --
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


19 1                    MR. BLANCH: Sure.
19 MR. BLANCH: Sure.
2                    MR. SKEEN: -- it, please.
1 MR. SKEEN: -- it, please.
3                    MR. BLANCH:       Well,         in   their     50.59 4 evaluation, they clearly stated three-minute closure 5 time.         That is an inaccurate statement, inaccurate, 6 incomplete statement.             I got better words for it, but 7 I'm going to be nice.             It's never been looked at by 8 anyone within the NRC.
2 MR.
9                    MR. SKEEN: Okay.           I -- just stop right 10 there just a sec, Paul.               So, I can tell you, as part 11 of our team, we are looking at that, trying to find 12 out where that one to three minutes came from, as 13 well. So, that will be part of what our report covers 14 when we do that.           So, we can certainly look at that 15 one.
BLANCH:
16                    MR. BLANCH: You and I have talked about 17 that, and we think we might know where it is.                             But 18 getting back to the root cause of the problem.
: Well, in their 50.59 3
19                    The NRC     is   allowing,         and accepts       and 20 defends,       A, inaccurate       information         provided     by   a 21 licensee,       which   has   just     cost       us   so much     time, 22 trouble, cost the State of New York over a quarter of 23 a million dollars to have their own analysis done.
evaluation, they clearly stated three-minute closure 4
24 And the NRC won't do anything.
time. That is an inaccurate statement, inaccurate, 5
25                    And you have laws against providing false NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
incomplete statement. I got better words for it, but 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
I'm going to be nice. It's never been looked at by 7
anyone within the NRC.
8 MR. SKEEN: Okay. I -- just stop right 9
there just a sec, Paul. So, I can tell you, as part 10 of our team, we are looking at that, trying to find 11 out where that one to three minutes came from, as 12 well. So, that will be part of what our report covers 13 when we do that. So, we can certainly look at that 14 one.
15 MR. BLANCH: You and I have talked about 16 that, and we think we might know where it is. But 17 getting back to the root cause of the problem.
18 The NRC is allowing, and accepts and 19 defends, A, inaccurate information provided by a 20 licensee, which has just cost us so much time, 21 trouble, cost the State of New York over a quarter of 22 a million dollars to have their own analysis done.
23 And the NRC won't do anything.
24 And you have laws against providing false 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


20 1 information, deliberate misconduct, and inaccurate and 2 incomplete information.               But you seem not to be 3 willing to ever enforce those laws.                   And then, let me 4 see what else.
20 information, deliberate misconduct, and inaccurate and 1
5                  MR. SKEEN: Okay. Just so I understand, so 6 you're saying that the fact that they reported this 7 one to three minutes, that is a violation of the 50.9, 8 that's your concern?
incomplete information. But you seem not to be 2
9                  MR. BLANCH: Yes, it is.
willing to ever enforce those laws. And then, let me 3
10                  MR. SKEEN: Okay.
see what else.
11                  MR. BLANCH: Unless you --
4 MR. SKEEN: Okay. Just so I understand, so 5
12                  MR. SKEEN: That makes --
you're saying that the fact that they reported this 6
13                  (Simultaneous speaking.)
one to three minutes, that is a violation of the 50.9, 7
14                  MR. BLANCH:         --    a     message,     with       a 15 violation, intentional, criminal, I don't care what, 16 but anyway.
that's your concern?
17                  One of my things was fuel in the diesel 18 slurries       tank. Dave,     you   and       I, I think,       I'm 19 satisfied, if Brian told you that those tanks are 20 empty, that's just fine.
8 MR. BLANCH: Yes, it is.
21                  MR. SKEEN:     And     for     those   that   aren't 22 aware, we're talking about the storage, the diesel 23 storage tanks that was for Unit 1, that has been shut 24 down for many years.
9 MR. SKEEN: Okay.
25                  When   they   shut     down       that unit,     they NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MR. BLANCH: Unless you --
(202) 234-4433         WASHINGTON, D.C. 20005-3701             (202) 234-4433
11 MR. SKEEN: That makes --
12 (Simultaneous speaking.)
13 MR.
BLANCH:
a
: message, with a
14 violation, intentional, criminal, I don't care what, 15 but anyway.
16 One of my things was fuel in the diesel 17 slurries tank. Dave, you and I, I think, I'm 18 satisfied, if Brian told you that those tanks are 19 empty, that's just fine.
20 MR. SKEEN: And for those that aren't 21 aware, we're talking about the storage, the diesel 22 storage tanks that was for Unit 1, that has been shut 23 down for many years.
24 When they shut down that unit, they 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


21 1 abandoned those tanks, they drained them, they cleaned 2 them out, and they valved them off, so that there's 3 nothing in those tanks any more.                   We did verify that 4 with the Senior Resident Inspector at the site.                       So, 5 thanks, Paul, I appreciate that.
21 abandoned those tanks, they drained them, they cleaned 1
6                  MR. BLANCH: Yes. But my, as we've talked, 7 Dave, my biggest concern is the existing pipelines.
them out, and they valved them off, so that there's 2
8 Okay. We have two pipelines, one of them's idle right 9 now and the 30-inch is active.
nothing in those tanks any more. We did verify that 3
10                  They run very close to the switchgear room 11 and the control room.           A leak in one of those pipes 12 could cause unignited methane to migrate into the 13 control room, just a few hundred feet away.
with the Senior Resident Inspector at the site. So, 4
14                  If that occurs, and I'm talking a gas 15 leak, like we've all seen in our neighborhoods, but a 16 sizeable       one, two-inch       or   greater,     and that     gas 17 migrates into, especially the control room and the 18 electrical switchgear room, if that gets in there, we 19 are in big trouble.
thanks, Paul, I appreciate that.
20                  If you take out the switchgear room, then 21 the danger of core damage, spent fuel pool damage, and 22 all your post-Fukushima fixes would not be available.
5 MR. BLANCH: Yes. But my, as we've talked, 6
23 And that's something that absolutely, that is my 24 number one concern, and that has been conveyed many 25 times to the NRC and ignored.
Dave, my biggest concern is the existing pipelines.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 Okay. We have two pipelines, one of them's idle right 8
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
now and the 30-inch is active.
9 They run very close to the switchgear room 10 and the control room. A leak in one of those pipes 11 could cause unignited methane to migrate into the 12 control room, just a few hundred feet away.
13 If that occurs, and I'm talking a gas 14 leak, like we've all seen in our neighborhoods, but a 15 sizeable one, two-inch or greater, and that gas 16 migrates into, especially the control room and the 17 electrical switchgear room, if that gets in there, we 18 are in big trouble.
19 If you take out the switchgear room, then 20 the danger of core damage, spent fuel pool damage, and 21 all your post-Fukushima fixes would not be available.
22 And that's something that absolutely, that is my 23 number one concern, and that has been conveyed many 24 times to the NRC and ignored.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


22 1                  So, the risk assessment not only applies 2 to the AIM pipeline, it also applies to existing 3 pipelines, and that's effective in the year 2004. So, 4 I don't think PHMSA has assured that that has been 5 done.         And I don't mean to pick on PHMSA, but I've 6 never been able to get a straight answer from them.
22 So, the risk assessment not only applies 1
7                  MR. SKEEN: Okay.         Well, thanks for that, 8 Paul, appreciate that.           Now, let me understand just a 9 little bit more.           So, when you're talking about the 10 existing lines, would the leak be from the underground 11 part?       Because there's not -- it's mostly underground 12 it runs on the site, right? It only comes aboveground 13 --
to the AIM pipeline, it also applies to existing 2
14                  MR. BLANCH: Correct.
pipelines, and that's effective in the year 2004. So, 3
15                  MR. SKEEN: -- just before it gets to the 16 river, is that correct?
I don't think PHMSA has assured that that has been 4
17                  MR. BLANCH: Yes.             It's underground, it 18 comes up out of the ground by the river and that's 19 where the pig station is.                 And then, from the pig 20 station, it goes across the site, within the owner 21 controlled area, comes within 300 or 400 feet of the 22 control room, switchgear room, and then goes out. And 23 then, it ties into the AIM pipeline.
done. And I don't mean to pick on PHMSA, but I've 5
24                  MR. SKEEN: Okay.           So, but your concern 25 would be where the aboveground portion of the piping NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
never been able to get a straight answer from them.
(202) 234-4433           WASHINGTON, D.C. 20005-3701       (202) 234-4433
6 MR. SKEEN: Okay. Well, thanks for that, 7
Paul, appreciate that. Now, let me understand just a 8
little bit more. So, when you're talking about the 9
existing lines, would the leak be from the underground 10 part? Because there's not -- it's mostly underground 11 it runs on the site, right? It only comes aboveground 12 13 MR. BLANCH: Correct.
14 MR. SKEEN: -- just before it gets to the 15 river, is that correct?
16 MR. BLANCH: Yes. It's underground, it 17 comes up out of the ground by the river and that's 18 where the pig station is. And then, from the pig 19 station, it goes across the site, within the owner 20 controlled area, comes within 300 or 400 feet of the 21 control room, switchgear room, and then goes out. And 22 then, it ties into the AIM pipeline.
23 MR. SKEEN: Okay. So, but your concern 24 would be where the aboveground portion of the piping 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


23 1 is?       Is that what you're concerned about, a gas leak 2 --
23 is? Is that what you're concerned about, a gas leak 1
3                  MR. BLANCH: Well, it's --
2 MR. BLANCH: Well, it's --
4                  MR. SKEEN: -- from a --
3 MR. SKEEN: -- from a --
5                  MR. BLANCH:         --    primarily     the     one, 6 aboveground, whatever could cause gas to leak into 7 those       areas. Aboveground,         below     ground,   doesn't 8 matter where the source is.                 But certainly, this is 9 not something that would be acceptable in today's 10 environment, for being built today.
4 MR.
11                  MR. SKEEN: Okay.           All right. I --
BLANCH:
12                  MR. BLANCH: And that --
primarily the
13                  MR. SKEEN: -- think I understand your 14 concern. I'm not sure that was one of the findings of 15 the IG report, but like I say, I want to hear all of 16 your concerns one way or the other, to make sure we're 17 addressing what we need to address and if there's 18 things outside of our scope, I want to make sure that 19 those get addressed as well.               So, I don't mind at all 20 pursuing this a little bit --
: one, 5
21                  MR. BLANCH: Yes.
aboveground, whatever could cause gas to leak into 6
22                  MR. SKEEN: -- with you.
those areas. Aboveground, below ground, doesn't 7
23                  MR. BLANCH: Again, when I wrote to the IG, 24 and I think I gave you this letter, all those concerns 25 were outlined in my letter to the IG dated, it was NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
matter where the source is. But certainly, this is 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
not something that would be acceptable in today's 9
environment, for being built today.
10 MR. SKEEN: Okay. All right. I --
11 MR. BLANCH: And that --
12 MR. SKEEN: -- think I understand your 13 concern. I'm not sure that was one of the findings of 14 the IG report, but like I say, I want to hear all of 15 your concerns one way or the other, to make sure we're 16 addressing what we need to address and if there's 17 things outside of our scope, I want to make sure that 18 those get addressed as well. So, I don't mind at all 19 pursuing this a little bit --
20 MR. BLANCH: Yes.
21 MR. SKEEN: -- with you.
22 MR. BLANCH: Again, when I wrote to the IG, 23 and I think I gave you this letter, all those concerns 24 were outlined in my letter to the IG dated, it was 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


24 1 2016, I believe, February somewhere.                 Those are my 2 concerns, they weren't all addressed by the IG, so 3 that means they're back with the staff.
24 2016, I believe, February somewhere. Those are my 1
4                MR. SKEEN: Okay.         Okay. I understand, I 5 appreciate that.
concerns, they weren't all addressed by the IG, so 2
6                MR. BLANCH: Okay.         Dave, you do have that 7 letter, or I could send it again to you.
that means they're back with the staff.
8                MR. SKEEN: Well, I think we have that.
3 MR. SKEEN: Okay. Okay. I understand, I 4
9 That was your 2016 letter, right, that you sent in?
appreciate that.
10                MR. BLANCH: 2016?
5 MR. BLANCH: Okay. Dave, you do have that 6
11                MR. SKEEN: Is that -- which one were you 12 referring to?
letter, or I could send it again to you.
13                MR. BLANCH: My initial -- yes, 2016, yes.
7 MR. SKEEN: Well, I think we have that.
14                MR. SKEEN: Yes.
8 That was your 2016 letter, right, that you sent in?
15                MR. BLANCH: I think --
9 MR. BLANCH: 2016?
16                MR. SKEEN: Yes, we --
10 MR. SKEEN: Is that -- which one were you 11 referring to?
17                MR. BLANCH: -- February --
12 MR. BLANCH: My initial -- yes, 2016, yes.
18                MR. SKEEN: -- have that.
13 MR. SKEEN: Yes.
19                MR. BLANCH: -- of 2016.
14 MR. BLANCH: I think --
20                MR. SKEEN: Yes, we have that one.
15 MR. SKEEN: Yes, we --
21                MR. BLANCH: Okay.           Those are the issues.
16 MR. BLANCH: -- February --
22 If the IG didn't address them, then I think the NRC 23 staff needs to close it out.               And my final comment 24 here is I have -- this is in my -- you haven't even 25 seen this, Steve, is why I didn't make that a draft.
17 MR. SKEEN: -- have that.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 MR. BLANCH: -- of 2016.
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
19 MR. SKEEN: Yes, we have that one.
20 MR. BLANCH: Okay. Those are the issues.
21 If the IG didn't address them, then I think the NRC 22 staff needs to close it out. And my final comment 23 here is I have -- this is in my -- you haven't even 24 seen this, Steve, is why I didn't make that a draft.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


25 1                I have extensive experience at Millstone, 2 as you know, Maine Yankee, Indian Point, and other 3 places, and worked with the NRC on safety culture.
25 I have extensive experience at Millstone, 1
4 And I have a limited knowledge of root cause analysis.
as you know, Maine Yankee, Indian Point, and other 2
5                And if the NRC identified these type of 6 problems at a licensee, they would give them the 7 normal chilling effect letter and they may impose 8 Inspection Procedure 95003 for a total assessment.
places, and worked with the NRC on safety culture.
9 That's going to be in my final letter to you.
3 And I have a limited knowledge of root cause analysis.
10                And I believe that the NRC has a cultural 11 problem and I think that this definitely needs a root 12 cause assessment, and I know NRC has done these, 13 they've been trained on them.             This is a deep rooted 14 cultural problem within the NRC, such as the backward 15 engineering.
4 And if the NRC identified these type of 5
16                And I've done it, I will admit, if my boss 17 tells me this is the result that I want, I can go find 18 information     supporting       that   result.       That   is     a 19 cultural problem, I've been a victim of that myself, 20 I've done it.
problems at a licensee, they would give them the 6
21                We   used     to   have     a   document the     NRC 22 approved, which is a justification for operations, its 23 name has been changed to something else now.                     It's 24 basically saying, go find me a solution that I want.
normal chilling effect letter and they may impose 7
25 Unacceptable.
Inspection Procedure 95003 for a total assessment.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 That's going to be in my final letter to you.
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
9 And I believe that the NRC has a cultural 10 problem and I think that this definitely needs a root 11 cause assessment, and I know NRC has done these, 12 they've been trained on them. This is a deep rooted 13 cultural problem within the NRC, such as the backward 14 engineering.
15 And I've done it, I will admit, if my boss 16 tells me this is the result that I want, I can go find 17 information supporting that result. That is a 18 cultural problem, I've been a victim of that myself, 19 I've done it.
20 We used to have a document the NRC 21 approved, which is a justification for operations, its 22 name has been changed to something else now. It's 23 basically saying, go find me a solution that I want.
24 Unacceptable.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


26 1                    And I believe that the NRC has a severe 2 cultural problem and that needs to be looked at.                       And 3 you need to look at that Inspection Procedure 95003, 4 see if the NRC fits into that.
26 And I believe that the NRC has a severe 1
5                    I know this was not a part of the OIG 6 findings, but from my assessments, somewhat as an 7 expert, even written, Dave, I shared it with you, my 8 paper on safety culture, NRC has a problem.
cultural problem and that needs to be looked at. And 2
9                    And   finally,         I   support   just     about 10 everything that was in the letter from the Attorney 11 General from the State of New York dated yesterday, 12 March 19.
you need to look at that Inspection Procedure 95003, 3
13                    MR. SKEEN: Okay.           I appreciate that.         I 14 know we had talked about that, you had mentioned 15 before         that you   had   supported         what the Attorney 16 General was sending in, so I appreciate that.                           And 17 certainly, we can take a look at that and make sure we 18 understand that.           Anything else?
see if the NRC fits into that.
19                    MR. BLANCH: That's all I have.               I will 20 follow up, I'll give you a final copy of that letter, 21 whether you want to keep your draft or not doesn't 22 matter to me.
4 I know this was not a part of the OIG 5
23                    But I will -- before, well, by Monday or 24 Monday night, I will have my final letter out to you.
findings, but from my assessments, somewhat as an 6
25 It goes over all these things and what I think the NRC NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
expert, even written, Dave, I shared it with you, my 7
(202) 234-4433             WASHINGTON, D.C. 20005-3701         (202) 234-4433
paper on safety culture, NRC has a problem.
8 And
: finally, I
support just about 9
everything that was in the letter from the Attorney 10 General from the State of New York dated yesterday, 11 March 19.
12 MR. SKEEN: Okay. I appreciate that. I 13 know we had talked about that, you had mentioned 14 before that you had supported what the Attorney 15 General was sending in, so I appreciate that. And 16 certainly, we can take a look at that and make sure we 17 understand that. Anything else?
18 MR. BLANCH: That's all I have. I will 19 follow up, I'll give you a final copy of that letter, 20 whether you want to keep your draft or not doesn't 21 matter to me.
22 But I will -- before, well, by Monday or 23 Monday night, I will have my final letter out to you.
24 It goes over all these things and what I think the NRC 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


27 1 needs to do.
27 needs to do.
2                And obviously, what Steve said and, not 3 picking on Steve, but I think Steve is going to go 4 back       and see if   a   risk     assessment   was done       in 5 compliance with the regulations. Do I understand that 6 correctly, Steve?
1 And obviously, what Steve said and, not 2
7                MR. SKEEN: Well, we can certainly do that 8 as part of our efforts.           I mean --
picking on Steve, but I think Steve is going to go 3
9                MR. BLANCH: Okay.
back and see if a risk assessment was done in 4
10                MR. SKEEN: -- Steve's on the team with us, 11 so we'll make sure that we address that, Paul, because 12 we had been looking at that ourselves, surely there 13 must have been a Part 49 risk assessment done.
compliance with the regulations. Do I understand that 5
14                And we're just trying to uncover that 15 ourselves, to make sure that that was done anyway.
correctly, Steve?
16 So, appreciate your concerns on that, we were kind of 17 heading that direction anyway.               So, we'll see what we 18 can find out on that one.
6 MR. SKEEN: Well, we can certainly do that 7
19                MR. BLANCH: Okay.           Your job becomes much 20 easier if you can find one that meets the requirement.
as part of our efforts. I mean --
21                MR. SKEEN: Yes, I understand, certainly.
8 MR. BLANCH: Okay.
22                MR. BLANCH: And -- yes.
9 MR. SKEEN: -- Steve's on the team with us, 10 so we'll make sure that we address that, Paul, because 11 we had been looking at that ourselves, surely there 12 must have been a Part 49 risk assessment done.
23                MR. SKEEN: Go ahead.
13 And we're just trying to uncover that 14 ourselves, to make sure that that was done anyway.
24                MR. BLANCH: And I just want to say this, 25 Sandia is involved. I have no problem whatsoever with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 So, appreciate your concerns on that, we were kind of 16 heading that direction anyway. So, we'll see what we 17 can find out on that one.
(202) 234-4433         WASHINGTON, D.C. 20005-3701       (202) 234-4433
18 MR. BLANCH: Okay. Your job becomes much 19 easier if you can find one that meets the requirement.
20 MR. SKEEN: Yes, I understand, certainly.
21 MR. BLANCH: And -- yes.
22 MR. SKEEN: Go ahead.
23 MR. BLANCH: And I just want to say this, 24 Sandia is involved. I have no problem whatsoever with 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


28 1 Sandia.       If Sandia is directed to go out and do a risk 2 assessment in accordance with the requirements, I have 3 no problem with that, as long as they're in compliance 4 with the requirements.
28 Sandia. If Sandia is directed to go out and do a risk 1
5                    MR. SKEEN: Okay.           Thank you for that, I 6 appreciate that too.             We did want to talk about some 7 of the NRC process issues.
assessment in accordance with the requirements, I have 2
8                    MR. BLANCH: Sure.
no problem with that, as long as they're in compliance 3
9                    MR. SKEEN: That's one I think that we can 10 -- we need to have a good understanding of that as we 11 go forward, if the agency is going to try to do 12 something about some of our processes.                 So, I do want 13 to touch on that with you as well.
with the requirements.
14                    MR. BLANCH: Yes.           Well -- yes. There's 15 one other technical thing I need to address, do you 16 mind, Dave?
4 MR. SKEEN: Okay. Thank you for that, I 5
17                    MR. SKEEN: No, please, go ahead.
appreciate that too. We did want to talk about some 6
18                    MR. BLANCH: Okay.           The -- I had sent you 19 our calculations done by Dave Lochbaum and a few other 20 people.       And they're the calculations that were done 21 based on the equation provided in Regulatory Guide 22 1.91.
of the NRC process issues.
23                    And I asked four different people and we 24 all came up with similar results, that go out greater, 25 the blast pressure greater than one pound going out NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 MR. BLANCH: Sure.
(202) 234-4433           WASHINGTON, D.C. 20005-3701       (202) 234-4433
8 MR. SKEEN: That's one I think that we can 9
-- we need to have a good understanding of that as we 10 go forward, if the agency is going to try to do 11 something about some of our processes. So, I do want 12 to touch on that with you as well.
13 MR. BLANCH: Yes. Well -- yes. There's 14 one other technical thing I need to address, do you 15 mind, Dave?
16 MR. SKEEN: No, please, go ahead.
17 MR. BLANCH: Okay. The -- I had sent you 18 our calculations done by Dave Lochbaum and a few other 19 people. And they're the calculations that were done 20 based on the equation provided in Regulatory Guide 21 1.91.
22 And I asked four different people and we 23 all came up with similar results, that go out greater, 24 the blast pressure greater than one pound going out 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


29 1 beyond 4,000 feet, or whatever the number, you got the 2 information.
29 beyond 4,000 feet, or whatever the number, you got the 1
3                  But the ASME document that is incorporated 4 by reference also has an equation for calculating the 5 impact radius.         Okay.       It's a different equation, 6 comes up with a completely different result.
information.
7                  The purpose of the PIR equation in ASME 8 B31.8S is to determine the high consequence area. You 9 come up with a number, it could be 660 feet, it could 10 be a thousand feet.
2 But the ASME document that is incorporated 3
11                  Its only purpose is to calculate the area 12 that is covered by high consequence area requirements.
by reference also has an equation for calculating the 4
13 It's not meant to say that if you're at more than 14 that, you're not going to be in danger, which is what 15 the NRC equation is.
impact radius. Okay. It's a different equation, 5
16                  The intent of both equations, I thought 17 was the same thing, but it's not.                   So, just be aware 18 of that.       I have no problem with the NRC's equation.
comes up with a completely different result.
19                  MR. SKEEN: Well, I appreciate that, Paul.
6 The purpose of the PIR equation in ASME 7
20 That's one thing we were looking at, was the Reg Guide 21 1.91, to see if it was clear or if there's things that 22 maybe it needs to be clarified in some way in how to 23 apply that.       So, appreciate that information that you 24 provided to us.
B31.8S is to determine the high consequence area. You 8
25                  MR. BLANCH: Okay.         Sorry to interrupt you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
come up with a number, it could be 660 feet, it could 9
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
be a thousand feet.
10 Its only purpose is to calculate the area 11 that is covered by high consequence area requirements.
12 It's not meant to say that if you're at more than 13 that, you're not going to be in danger, which is what 14 the NRC equation is.
15 The intent of both equations, I thought 16 was the same thing, but it's not. So, just be aware 17 of that. I have no problem with the NRC's equation.
18 MR. SKEEN: Well, I appreciate that, Paul.
19 That's one thing we were looking at, was the Reg Guide 20 1.91, to see if it was clear or if there's things that 21 maybe it needs to be clarified in some way in how to 22 apply that. So, appreciate that information that you 23 provided to us.
24 MR. BLANCH: Okay. Sorry to interrupt you 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


30 1 there.
30 there.
2                  MR. SKEEN: Oh, no, that's fine.             That's 3 okay.       So, those are the kinds of things we want to 4 hear, right?         Because to me, that is process, if 5 you're telling me that some of our procedures may not 6 be clear or appropriate.                   So, that's what we're 7 looking at as well, as part of our effort.
1 MR. SKEEN: Oh, no, that's fine. That's 2
8                  MR. BLANCH: Yes, I'm saying Reg Guide 1.91 9 equation is very clear.             You just have to plug in the 10 numbers and go.         I haven't had a problem with it.
okay. So, those are the kinds of things we want to 3
11                  MR. SKEEN: Okay.           So, you think 1.91 is 12 okay the way it is?
hear, right? Because to me, that is process, if 4
13                  MR. BLANCH: I think so, unless you guys 14 see something wrong with it.
you're telling me that some of our procedures may not 5
15                  MR. SKEEN: Well, we'll look into that and 16 see.       That was one that we wanted to make sure we 17 understood.         So, I appreciate your input on that, 18 that's good.
be clear or appropriate. So, that's what we're 6
19                  What if we turn to the 2.206 process now?
looking at as well, as part of our effort.
20 I know that you've had some concerns with that over 21 the years, so if you could kind of enlighten us a 22 little bit more on some of the concerns with that 23 process?
7 MR. BLANCH: Yes, I'm saying Reg Guide 1.91 8
24                  MR. BLANCH: Yes.         That process, and I've 25 probably filed five, over my lifetime.               And the first NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
equation is very clear. You just have to plug in the 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701       (202) 234-4433
numbers and go. I haven't had a problem with it.
10 MR. SKEEN: Okay. So, you think 1.91 is 11 okay the way it is?
12 MR. BLANCH: I think so, unless you guys 13 see something wrong with it.
14 MR. SKEEN: Well, we'll look into that and 15 see. That was one that we wanted to make sure we 16 understood. So, I appreciate your input on that, 17 that's good.
18 What if we turn to the 2.206 process now?
19 I know that you've had some concerns with that over 20 the years, so if you could kind of enlighten us a 21 little bit more on some of the concerns with that 22 process?
23 MR. BLANCH: Yes. That process, and I've 24 probably filed five, over my lifetime. And the first 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


31 1 thing we get is a, we've rejected because, or we don't 2 see any immediate problem.               I've got one in the works 3 out at Southern Cal Edison right now.
31 thing we get is a, we've rejected because, or we don't 1
4                  So, we get an immediate response from the 5 NRC, we don't see any problem.                 And this gets back to 6 the       culture,   okay?         They've         already   made       a 7 determination, there's no problem, and then, the NRC 8 sends its Petition Review Board out, okay, come and 9 support my conclusion I've already done here.
see any immediate problem. I've got one in the works 2
10                  It's, again, getting back to the IG's 11 statement about backward engineering.                       It's a real 12 problem and we've faced it time and time again. I had 13 a very well thought out petition, well, not only this 14 one on the pipeline, but we had one that I filed with 15 Arnie Gunderson on Vermont Yankee and tritium leaks.
out at Southern Cal Edison right now.
16                  And it's just that if we look historically 17 at 2.206 petitions, the number of them in the last 20-18 30 years has been 400, either -- many of them may be 19 not valid, but many of them are valid, but they've all 20 been rejected.         There might have been two that have 21 been partially accepted.
3 So, we get an immediate response from the 4
22                  So,   one's     chances       of   getting a   2.206 23 petition granted, even though it comes from people 24 with credibility, and I say credibility, Dave Lochbaum 25 has credibility, I have credibility, Arnie Gunderson NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
NRC, we don't see any problem. And this gets back to 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
the
: culture, okay?
They've already made a
6 determination, there's no problem, and then, the NRC 7
sends its Petition Review Board out, okay, come and 8
support my conclusion I've already done here.
9 It's, again, getting back to the IG's 10 statement about backward engineering. It's a real 11 problem and we've faced it time and time again. I had 12 a very well thought out petition, well, not only this 13 one on the pipeline, but we had one that I filed with 14 Arnie Gunderson on Vermont Yankee and tritium leaks.
15 And it's just that if we look historically 16 at 2.206 petitions, the number of them in the last 20-17 30 years has been 400, either -- many of them may be 18 not valid, but many of them are valid, but they've all 19 been rejected. There might have been two that have 20 been partially accepted.
21 So, one's chances of getting a 2.206 22 petition granted, even though it comes from people 23 with credibility, and I say credibility, Dave Lochbaum 24 has credibility, I have credibility, Arnie Gunderson 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


32 1 has some credibility, everything's always rejected.
32 has some credibility, everything's always rejected.
2 Something's wrong with it.
1 Something's wrong with it.
3                  If a licensee comes in and makes a request 4 to change something, to reduce safety margin, it's 5 always, it's never rejected.               We just get the feeling 6 that the NRC is not protecting the public by not 7 listening to our 2.206 petitions.
2 If a licensee comes in and makes a request 3
8                  I mean, how many years did we spend on 9 this one that I put in?             And no one has pointed out 10 why it was wrong.             Something is wrong within the 11 agency that essentially they automatically find a way 12 to reject petitions from the public on safety issues.
to change something, to reduce safety margin, it's 4
13                  And   sometimes,         these     members of     the 14 public, like myself, have as much, if not more, 15 expertise than the NRC staff has.                 So, anyway, that's 16 the general complaint I have.                   I'm not sure how we 17 address that.
always, it's never rejected. We just get the feeling 5
18                  MR. SKEEN: Okay.           No, I appreciate that, 19 Paul, it's good feedback.             And that's something we're 20 looking at too, is how does the NRC handle the 2.206 21 petitions that we get in and are we being true to our 22 processes?       And so, I do appreciate your input on 23 that.
that the NRC is not protecting the public by not 6
24                  MR. BLANCH: Yes, and that goes back a long 25 way,       to 1993, when     I   was   working     with Senator NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
listening to our 2.206 petitions.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
7 I mean, how many years did we spend on 8
this one that I put in? And no one has pointed out 9
why it was wrong. Something is wrong within the 10 agency that essentially they automatically find a way 11 to reject petitions from the public on safety issues.
12 And sometimes, these members of the 13 public, like myself, have as much, if not more, 14 expertise than the NRC staff has. So, anyway, that's 15 the general complaint I have. I'm not sure how we 16 address that.
17 MR. SKEEN: Okay. No, I appreciate that, 18 Paul, it's good feedback. And that's something we're 19 looking at too, is how does the NRC handle the 2.206 20 petitions that we get in and are we being true to our 21 processes? And so, I do appreciate your input on 22 that.
23 MR. BLANCH: Yes, and that goes back a long 24 way, to 1993, when I was working with Senator 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


33 1 Lieberman and Dan Berkovitz, who was his chief of 2 staff on the committee, and we were working on the 3 2.206 process and should that have the ability to 4 appeal the NRR director's decision?
33 Lieberman and Dan Berkovitz, who was his chief of 1
5                    And because of the politics at the time, 6 there's no legal appeal to a director's decision on 7 that.         So, when a director says, no, this is not a 8 problem, we have no way to appeal.
staff on the committee, and we were working on the 2
9                    I know that's a Congressional issue, it's 10 part of the Atomic Energy Act, but it's obviously 11 something that irks me.                 But on a positive side, 12 you're one of the few agencies that does have a 13 petition process.           Okay.
2.206 process and should that have the ability to 3
14                    I think those are big issues.             I don't 15 think we need to get into specific, but the culture is 16 bad,       and   I understand       that,     we've seen cultural 17 problems in a lot of regulated industries. We've seen 18 the Boeing recently.               We've seen airline industry.
appeal the NRR director's decision?
19 You look at NTSB studies and stuff, you see cultural 20 problems identified.
4 And because of the politics at the time, 5
21                    So, those are my concerns, you know where 22 my priorities are and you know what I think has to be 23 addressed.
there's no legal appeal to a director's decision on 6
24                    MR. SKEEN: Yes, no, I appreciate that.
that. So, when a director says, no, this is not a 7
25 But another thing I wanted to raise with you as well, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
problem, we have no way to appeal.
(202) 234-4433           WASHINGTON, D.C. 20005-3701       (202) 234-4433
8 I know that's a Congressional issue, it's 9
part of the Atomic Energy Act, but it's obviously 10 something that irks me. But on a positive side, 11 you're one of the few agencies that does have a 12 petition process. Okay.
13 I think those are big issues. I don't 14 think we need to get into specific, but the culture is 15 bad, and I understand that, we've seen cultural 16 problems in a lot of regulated industries. We've seen 17 the Boeing recently. We've seen airline industry.
18 You look at NTSB studies and stuff, you see cultural 19 problems identified.
20 So, those are my concerns, you know where 21 my priorities are and you know what I think has to be 22 addressed.
23 MR. SKEEN: Yes, no, I appreciate that.
24 But another thing I wanted to raise with you as well, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


34 1 Paul,       is what   about     the     interactions     among     the 2 different agencies, the government, and dealing with 3 the different agencies?               As far as communication or 4 understanding the roles and responsibilities of the 5 various agencies, did you see any issues with that in 6 your --
34 Paul, is what about the interactions among the 1
7                  MR. BLANCH: No, I don't.               I don't know 8 what it is between PHMSA and FERC and EPA, but I can 9 say I think the interactions on a subject like this, 10 of putting a 42-inch gas line next to a nuclear power 11 plant, from an outsider's observation, there was no 12 communication with PHMSA, with the licensee.
different agencies, the government, and dealing with 2
13                  Now, there's a big problem. It's probably 14 very       rare that   two   agencies       are   facing such       an 15 overlapping problem.           But on something like this, my 16 God, there has to be some good communication and open 17 communication.         What is the risk of this line?               What 18 harm's it going to do?
the different agencies? As far as communication or 3
19                  And NRC, I'm not saying it's all NRC, but 20 NRC should have been communicating with PHMSA all 21 along on this thing, to assure that the public is 22 adequately protected, not only from gas lines, but 23 from its impact on nuclear plants, or potential impact 24 on nuclear plants. You could have gotten ahead of the 25 curve with proper communication back in 2014, I think.
understanding the roles and responsibilities of the 4
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
various agencies, did you see any issues with that in 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
your --
6 MR. BLANCH: No, I don't. I don't know 7
what it is between PHMSA and FERC and EPA, but I can 8
say I think the interactions on a subject like this, 9
of putting a 42-inch gas line next to a nuclear power 10 plant, from an outsider's observation, there was no 11 communication with PHMSA, with the licensee.
12 Now, there's a big problem. It's probably 13 very rare that two agencies are facing such an 14 overlapping problem. But on something like this, my 15 God, there has to be some good communication and open 16 communication. What is the risk of this line? What 17 harm's it going to do?
18 And NRC, I'm not saying it's all NRC, but 19 NRC should have been communicating with PHMSA all 20 along on this thing, to assure that the public is 21 adequately protected, not only from gas lines, but 22 from its impact on nuclear plants, or potential impact 23 on nuclear plants. You could have gotten ahead of the 24 curve with proper communication back in 2014, I think.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


35 1                And   the     fact     that     you just   blindly 2 accepted Entergy's 50.59 analysis, without question, 3 is inexcusable.       And that question could have gone 4 from the NRC to PHMSA, hey, is this three minutes 5 really possible?
35 And the fact that you just blindly 1
6                You, Dave, as an engineer, and me, as an 7 engineer, and every other engineer, including Rick 8 Kuprewicz, and I'm not sure that Steve will even 9 disagree, that the time to identify a leak at a 10 minimum is 30 minutes, from 920 documents I've looked 11 at from PHMSA.
accepted Entergy's 50.59 analysis, without question, 2
12                And someone not being able to recognize 13 that false statement by Entergy is unforgivable.                   And 14 they --
is inexcusable. And that question could have gone 3
15                MR. SKEEN: Okay.
from the NRC to PHMSA, hey, is this three minutes 4
16                MR. BLANCH: -- ought to pay a price.
really possible?
17                MR. SKEEN: No, I understand, I understand 18 your concern there.           But, I guess, as far as the 19 communications,     was     it     --   apparently,     from       the 20 outside, it looks like there were no communications 21 among the agencies at all.
5 You, Dave, as an engineer, and me, as an 6
22                And so, that's what I'm wondering, is it 23 a public communication issue, that we're not doing 24 enough to communicate with the public?                 Or is it an 25 internal interagency issue of communications between NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
engineer, and every other engineer, including Rick 7
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
Kuprewicz, and I'm not sure that Steve will even 8
disagree, that the time to identify a leak at a 9
minimum is 30 minutes, from 920 documents I've looked 10 at from PHMSA.
11 And someone not being able to recognize 12 that false statement by Entergy is unforgivable. And 13 they --
14 MR. SKEEN: Okay.
15 MR. BLANCH: -- ought to pay a price.
16 MR. SKEEN: No, I understand, I understand 17 your concern there. But, I guess, as far as the 18 communications, was it -- apparently, from the 19 outside, it looks like there were no communications 20 among the agencies at all.
21 And so, that's what I'm wondering, is it 22 a public communication issue, that we're not doing 23 enough to communicate with the public? Or is it an 24 internal interagency issue of communications between 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


36 1 agencies?
36 agencies?
2                    MR. BLANCH:       Well,       I   don't   know       the 3 interactions         between       agencies,         I   have   --     that 4 information is never made public or I never see it.
1 MR. BLANCH: Well, I don't know the 2
5 I've never seen any formal communication between the 6 NRC and PHMSA or FERC or anything like that. So, yes, 7 our perception, there is none.                   And believe me, we've 8 tried to get it.
interactions between agencies, I have -- that 3
9                    MR. SKEEN:       Okay.           That's     helpful 10 information too, so I appreciate that piece as well.
information is never made public or I never see it.
11                    MR. BLANCH: Okay.           Anyone else?
4 I've never seen any formal communication between the 5
12                    MR. SKEEN: Well, I want to make sure that 13 the team, because I'm doing all the talking here, but 14 a     lot     of the   team     has     a   lot     of   the   technical 15 capabilities, so I want to make sure I leave a chance 16 for other folks to, if they have clarifying questions 17 or maybe something that they've been working on that 18 they want to make sure they understand from you.
NRC and PHMSA or FERC or anything like that. So, yes, 6
19                    So, if you're okay, I'll open it up and 20 let Theresa go first.               And then, ask if other team 21 members might have questions or explanations for you.
our perception, there is none. And believe me, we've 7
22 Let's do that.           Theresa?
tried to get it.
23                    MS. CLARK:     Hi,     Paul,       this   is   Theresa 24 Clark.         Thanks again for taking the time to talk to 25 us, I think this has been really helpful to hear in-NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 MR.
(202) 234-4433             WASHINGTON, D.C. 20005-3701             (202) 234-4433
SKEEN:
Okay.
That's helpful 9
information too, so I appreciate that piece as well.
10 MR. BLANCH: Okay. Anyone else?
11 MR. SKEEN: Well, I want to make sure that 12 the team, because I'm doing all the talking here, but 13 a lot of the team has a lot of the technical 14 capabilities, so I want to make sure I leave a chance 15 for other folks to, if they have clarifying questions 16 or maybe something that they've been working on that 17 they want to make sure they understand from you.
18 So, if you're okay, I'll open it up and 19 let Theresa go first. And then, ask if other team 20 members might have questions or explanations for you.
21 Let's do that. Theresa?
22 MS. CLARK: Hi, Paul, this is Theresa 23 Clark. Thanks again for taking the time to talk to 24 us, I think this has been really helpful to hear in-25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


37 1 person, or virtually in-person at least --
37 person, or virtually in-person at least --
2                  MR. BLANCH: Right.
1 MR. BLANCH: Right.
3                  MS. CLARK: -- what some of your concerns 4 are.         I have a couple of questions, a couple of 5 process ones, I think, and then, technical ones.
2 MS. CLARK: -- what some of your concerns 3
6 We're quite interested in both angles of this, it's 7 what the Chairman asked us to look at.
are. I have a couple of questions, a couple of 4
8                  One thing that you just mentioned about 9 proper communications that we could have had back in 10 2014, one of the things I've been struggling with in 11 putting together the documents that we might include 12 in our report is that some of the analyses that were 13 done had security related information in them, when we 14 were talking about specific distances from here to 15 there, for example.
process ones, I think, and then, technical ones.
16                  And   it     seems       like     that may     have 17 complicated       some   of   our   communications     on   these 18 issues.       Do you have a perspective on that?
5 We're quite interested in both angles of this, it's 6
19                  MR. BLANCH: Yes, I do, because I have 20 received from FERC, over Algonquin's objections, I 21 have received CEII clearance from FERC. I've conveyed 22 that to the NRC.           So, that should not have been a 23 problem with those people. I know Rick Kuprewicz also 24 has CEII clearance.
what the Chairman asked us to look at.
25                  So, I agree there may be some issues, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 One thing that you just mentioned about 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
proper communications that we could have had back in 9
2014, one of the things I've been struggling with in 10 putting together the documents that we might include 11 in our report is that some of the analyses that were 12 done had security related information in them, when we 13 were talking about specific distances from here to 14 there, for example.
15 And it seems like that may have 16 complicated some of our communications on these 17 issues. Do you have a perspective on that?
18 MR. BLANCH: Yes, I do, because I have 19 received from FERC, over Algonquin's objections, I 20 have received CEII clearance from FERC. I've conveyed 21 that to the NRC. So, that should not have been a 22 problem with those people. I know Rick Kuprewicz also 23 has CEII clearance.
24 So, I agree there may be some issues, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


38 1 security issues, terrorism issues, and so on, that may 2 contain CEII, but not most of it.                 And as I say, I 3 have that clearance.
38 security issues, terrorism issues, and so on, that may 1
4                MS. CLARK: Thanks, Paul, that's helpful.
contain CEII, but not most of it. And as I say, I 2
5 What about how we communicate these issues to the 6 broader public, who don't have those clearances?                   Are 7 there ways that we could communicate better on these 8 topics without getting into details that we shouldn't?
have that clearance.
9                MR. BLANCH: Sure, I think that you could 10 hold public meetings and say, hey, we've addressed 11 terrorism, we've addressed EMP, whatever else might be 12 considered CEII information.
3 MS. CLARK: Thanks, Paul, that's helpful.
13                And if you got before the public and said, 14 hey, we've looked at these, it's security related or 15 CEII related, but I provide you my assurance that we 16 have looked at it and we're satisfied with it, that's 17 never been done.
4 What about how we communicate these issues to the 5
18                MS. CLARK: Okay.         That's fair, thank you.
broader public, who don't have those clearances? Are 6
19 So, you mentioned a couple minutes ago about documents 20 that you had looked at from PHMSA, I think you said a 21 number of 920, I didn't know if that was a number of 22 documents or a specific document, on valve closure 23 times. Are there specific references that you want to 24 offer to us?
there ways that we could communicate better on these 7
25                MR. BLANCH:       Sure,       I've sent Dave       a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
topics without getting into details that we shouldn't?
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
8 MR. BLANCH: Sure, I think that you could 9
hold public meetings and say, hey, we've addressed 10 terrorism, we've addressed EMP, whatever else might be 11 considered CEII information.
12 And if you got before the public and said, 13 hey, we've looked at these, it's security related or 14 CEII related, but I provide you my assurance that we 15 have looked at it and we're satisfied with it, that's 16 never been done.
17 MS. CLARK: Okay. That's fair, thank you.
18 So, you mentioned a couple minutes ago about documents 19 that you had looked at from PHMSA, I think you said a 20 number of 920, I didn't know if that was a number of 21 documents or a specific document, on valve closure 22 times. Are there specific references that you want to 23 offer to us?
24 MR. BLANCH: Sure, I've sent Dave a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


39 1 spreadsheet.     Correct, Dave?
39 spreadsheet. Correct, Dave?
2                MR. SKEEN: Yes, we have the spreadsheet 3 that you sent on the pipe rupture data.
1 MR. SKEEN: Yes, we have the spreadsheet 2
4                MR. BLANCH: Yes.           That is, I'm not sure 5 how far it goes back, but I think there were 921 6 events identified by PHMSA and it provides location, 7 latitude,     longitude,     size     of     the leak, did       it 8 explode?, did it not explode?, time identified, time 9 event occurred.       You've got it all.             And that is not 10 Paul Blanch's data, that is on PHMSA's website.
that you sent on the pipe rupture data.
11                MS. CLARK: Okay, Paul, I was confused 12 about that. Yes, we definitely have that spreadsheet.
3 MR. BLANCH: Yes. That is, I'm not sure 4
13 I couldn't remember whether that spreadsheet included 14 data that would let us calculate how long it took to 15 detect and isolate these issues.
how far it goes back, but I think there were 921 5
16                MR. BLANCH: Yes, it does.
events identified by PHMSA and it provides location, 6
17                MS. CLARK:     Okay,     thanks.     We'll     take 18 another look at that.         And then, I guess --
latitude, longitude, size of the leak, did it 7
19                MR. BLANCH: There's so --
explode?, did it not explode?, time identified, time 8
20                MS. CLARK: -- my last --
event occurred. You've got it all. And that is not 9
21                MR. BLANCH: -- many columns --
Paul Blanch's data, that is on PHMSA's website.
22                MS. CLARK: Go ahead, please.
10 MS. CLARK: Okay, Paul, I was confused 11 about that. Yes, we definitely have that spreadsheet.
23                MR. BLANCH: -- of data, so many columns of 24 data, you're going to have to parse it and sort it and 25 everything, which I've done, and that's how I found NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
12 I couldn't remember whether that spreadsheet included 13 data that would let us calculate how long it took to 14 detect and isolate these issues.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
15 MR. BLANCH: Yes, it does.
16 MS. CLARK: Okay, thanks. We'll take 17 another look at that. And then, I guess --
18 MR. BLANCH: There's so --
19 MS. CLARK: -- my last --
20 MR. BLANCH: -- many columns --
21 MS. CLARK: Go ahead, please.
22 MR. BLANCH: -- of data, so many columns of 23 data, you're going to have to parse it and sort it and 24 everything, which I've done, and that's how I found 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


40 1 out there's --
40 out there's --
2                MS. CLARK: Okay.
1 MS. CLARK: Okay.
3                MR. BLANCH: -- anywhere from 30 minutes to 4 30 hours --
2 MR. BLANCH: -- anywhere from 30 minutes to 3
5                MS. CLARK: Okay.
30 hours --
6                MR. BLANCH: -- for a response time.
4 MS. CLARK: Okay.
7                MS. CLARK: Understand.             Thank you. And I 8 guess, I want to give other folks some air time here, 9 but you mentioned a few minutes ago about the Reg 10 Guide 1.91 equations and the calculations that you and 11 some of the others had done using those.
5 MR. BLANCH: -- for a response time.
12                And I think the number that you mentioned, 13 knowing that it wasn't necessarily the exact number, 14 was something like a 4,000-foot radius.
6 MS. CLARK: Understand. Thank you. And I 7
15                I wanted to clarify, is that -- your point 16 was that this was the number that you got using our 17 equation, so it raised some questions in your mind, or 18 were you concerned that that was, perhaps I'm not 19 saying this the right way, but the radius of concern 20 for the plant?
guess, I want to give other folks some air time here, 8
21                MR. BLANCH: I didn't --
but you mentioned a few minutes ago about the Reg 9
22                MS. CLARK: Am I making sense?
Guide 1.91 equations and the calculations that you and 10 some of the others had done using those.
23                MR. BLANCH: -- look into the derivation of 24 the equation in Reg Guide 1.91.                 I'm ex-Navy reactor 25 operator and degreed electrical engineer, understand NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 And I think the number that you mentioned, 12 knowing that it wasn't necessarily the exact number, 13 was something like a 4,000-foot radius.
(202) 234-4433       WASHINGTON, D.C. 20005-3701           (202) 234-4433
14 I wanted to clarify, is that -- your point 15 was that this was the number that you got using our 16 equation, so it raised some questions in your mind, or 17 were you concerned that that was, perhaps I'm not 18 saying this the right way, but the radius of concern 19 for the plant?
20 MR. BLANCH: I didn't --
21 MS. CLARK: Am I making sense?
22 MR. BLANCH: -- look into the derivation of 23 the equation in Reg Guide 1.91. I'm ex-Navy reactor 24 operator and degreed electrical engineer, understand 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


41 1 all that stuff.
41 all that stuff.
2                  But when I did the calculations, given the 3 gas flow through that line, assuming that comes out, 4 I did a plot, as Dave Lochbaum did and Joe Carson, 5 Larry Criscione, we all came up with the same numbers 6 and they all go out thousands of thousands of feet.
1 But when I did the calculations, given the 2
7 And that's just for the pressure pulse.
gas flow through that line, assuming that comes out, 3
8                  We   did     not   use   ALOHA,     we used     your 9 numbers, and we all came up with a similar thing.                       Is 10 that right?       I don't know, but that's the only thing 11 we could go by, we're not gas experts.
I did a plot, as Dave Lochbaum did and Joe Carson, 4
12                  MS. CLARK: Okay.         I think I understand, I 13 just wanted to clarify that.               So, do you have a feel 14 for whether you think there would be impacts at that 15 distance?       Or is the point that you're making more 16 specific to how the equation works?
Larry Criscione, we all came up with the same numbers 5
17                  MR. BLANCH: Well, the equation works such 18 that it predicts the impact going out, based on the 19 gas flow and time.
and they all go out thousands of thousands of feet.
20                  And   that's       what     the     results of     the 21 equation say, that the impact, depending on the amount 22 of time it takes to isolate the leak, goes out this 23 far.       And I would assume it includes pressure pulses, 24 heat flux, vapor clouds, and so on and so forth.                         I 25 don't know the derivation of your equation in 1.91.
6 And that's just for the pressure pulse.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 We did not use ALOHA, we used your 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
numbers, and we all came up with a similar thing. Is 9
that right? I don't know, but that's the only thing 10 we could go by, we're not gas experts.
11 MS. CLARK: Okay. I think I understand, I 12 just wanted to clarify that. So, do you have a feel 13 for whether you think there would be impacts at that 14 distance? Or is the point that you're making more 15 specific to how the equation works?
16 MR. BLANCH: Well, the equation works such 17 that it predicts the impact going out, based on the 18 gas flow and time.
19 And that's what the results of the 20 equation say, that the impact, depending on the amount 21 of time it takes to isolate the leak, goes out this 22 far. And I would assume it includes pressure pulses, 23 heat flux, vapor clouds, and so on and so forth. I 24 don't know the derivation of your equation in 1.91.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


42 1                MS. CLARK: Okay.               Thanks, Paul.       And 2 that's why I have smart people helping us out, because 3 I don't think I do either, at this point.                 But I'm 4 learning a lot.
42 MS. CLARK: Okay. Thanks, Paul. And 1
5                MR. BLANCH: I'm not the only dumb one 6 here, huh?
that's why I have smart people helping us out, because 2
7                MS. CLARK: Hey, I didn't say I was dumb.
I don't think I do either, at this point. But I'm 3
8                (Laughter.)
learning a lot.
9                MR. BLANCH: I'm saying I am.
4 MR. BLANCH: I'm not the only dumb one 5
10                MS. CLARK: Just kidding.             Okay. I think 11 that's everything I have this second.               Dave, you want 12 to call the next person?
here, huh?
13                MR. SKEEN: Yes.           Suzanne, did you have 14 anything that you wanted to raise?
6 MS. CLARK: Hey, I didn't say I was dumb.
15                MS. DENNIS:       Yes.       Hi, Paul, this       is 16 Suzanne Dennis.     I was looking over the calculations 17 that you had sent to Dave about what other people had 18 seen using those Reg Guide 1.91 calculations.
7 (Laughter.)
19                MR. BLANCH: Yes.
8 MR. BLANCH: I'm saying I am.
20                MS. DENNIS: The minutes that were used 21 differed.     And so, I was just wondering how the 22 timings were chosen for those expert evaluations, or 23 if you just had asked, hey, take an independent look 24 at this and let me know, and each expert kind of 25 picked?
9 MS. CLARK: Just kidding. Okay. I think 10 that's everything I have this second. Dave, you want 11 to call the next person?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
12 MR. SKEEN: Yes. Suzanne, did you have 13 anything that you wanted to raise?
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
14 MS. DENNIS: Yes. Hi, Paul, this is 15 Suzanne Dennis. I was looking over the calculations 16 that you had sent to Dave about what other people had 17 seen using those Reg Guide 1.91 calculations.
18 MR. BLANCH: Yes.
19 MS. DENNIS: The minutes that were used 20 differed. And so, I was just wondering how the 21 timings were chosen for those expert evaluations, or 22 if you just had asked, hey, take an independent look 23 at this and let me know, and each expert kind of 24 picked?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


43 1                  MR. BLANCH: Well, what I did, I told Dave 2 and Larry and Joe to, hey, here's the equation, here's 3 the flow rate, what's the impact radius, based on the 4 1.91 equation?         And we all came up with numbers that 5 are plus or minus 20-30 percent. So, they're ballpark 6 numbers.
43 MR. BLANCH: Well, what I did, I told Dave 1
7                  MS. DENNIS: Okay. All right. Yes, that's 8 very helpful, thank you.               And then, as our resident 9 risk analysis expert, I just wanted to, one, ask for 10 some         clarification       and       maybe       provide       some 11 clarification too.
and Larry and Joe to, hey, here's the equation, here's 2
12                  So, at the NRC, when we talk about risk 13 assessment, we're usually talking about probabilistic 14 risk assessment, so not only the consequence, but also 15 the frequency of the event occurring.
the flow rate, what's the impact radius, based on the 3
16                  And I think, and Steve can correct me if 17 I'm wrong here, but the PHMSA risk assessment that is 18 in the regulations isn't quite that. It's more making 19 sure that the pipeline operators have taken steps to 20 ensure that there is limited risk.
1.91 equation? And we all came up with numbers that 4
21                  So, essentially, trying to lower that 22 probability portion of the equation.                   And I think at 23 NRC,       we're kind     of   looking         at   risk   a   little 24 differently.         So,   I   didn't     know     if you   had     any 25 thoughts on that or Steve had any thoughts on that.
are plus or minus 20-30 percent. So, they're ballpark 5
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
numbers.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
6 MS. DENNIS: Okay. All right. Yes, that's 7
very helpful, thank you. And then, as our resident 8
risk analysis expert, I just wanted to, one, ask for 9
some clarification and maybe provide some 10 clarification too.
11 So, at the NRC, when we talk about risk 12 assessment, we're usually talking about probabilistic 13 risk assessment, so not only the consequence, but also 14 the frequency of the event occurring.
15 And I think, and Steve can correct me if 16 I'm wrong here, but the PHMSA risk assessment that is 17 in the regulations isn't quite that. It's more making 18 sure that the pipeline operators have taken steps to 19 ensure that there is limited risk.
20 So, essentially, trying to lower that 21 probability portion of the equation. And I think at 22 NRC, we're kind of looking at risk a little 23 differently. So, I didn't know if you had any 24 thoughts on that or Steve had any thoughts on that.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


44 1                MR. BLANCH:       I   briefly     looked   at     the 2 regulation 917, 935, and I briefly looked at the ASME 3 B31.8 document.
44 MR. BLANCH: I briefly looked at the 1
4                And what I got out of the ASME document 5 is, here are 22 scenarios that you must evaluate, from 6 tornado to flooding to ice age to global warming to 7 vandalism, didn't use the word terrorism.                 And those 8 are probabilistic, more than consequences, I think.
regulation 917, 935, and I briefly looked at the ASME 2
9                I don't know how -- I mean, that damn 10 document is 800-page long, but that's the document 11 that was approved by the industry.
B31.8 document.
12                MS. DENNIS: Got it, understood.
3 And what I got out of the ASME document 4
13                MR. SKEEN: Any other questions, Suzanne?
is, here are 22 scenarios that you must evaluate, from 5
14                MS. DENNIS:       No,   that's     all I   have.
tornado to flooding to ice age to global warming to 6
15 Thanks, Dave.
vandalism, didn't use the word terrorism. And those 7
16                MR. SKEEN:     Rene'e,       did you have     any 17 questions?
are probabilistic, more than consequences, I think.
18                MS. LI: Yes.         Paul, I would like to get 19 some clarification on the calculation that we got, or 20 I got, today, if they are thorough calculation.
8 I don't know how -- I mean, that damn 9
21                And I noted that, in one of the table, 22 that you calculate, it's a table that lists for the 23 Indian Point blast radius calculation.               And then, the 24 first column is time in minutes.               And then, there's a 25 column that describe the mass of vapor.                 So --
document is 800-page long, but that's the document 10 that was approved by the industry.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 MS. DENNIS: Got it, understood.
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
12 MR. SKEEN: Any other questions, Suzanne?
13 MS. DENNIS: No, that's all I have.
14 Thanks, Dave.
15 MR. SKEEN: Rene'e, did you have any 16 questions?
17 MS. LI: Yes. Paul, I would like to get 18 some clarification on the calculation that we got, or 19 I got, today, if they are thorough calculation.
20 And I noted that, in one of the table, 21 that you calculate, it's a table that lists for the 22 Indian Point blast radius calculation. And then, the 23 first column is time in minutes. And then, there's a 24 column that describe the mass of vapor. So --
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


45 1                  MR. BLANCH: Correct.
45 MR. BLANCH: Correct.
2                  MS. LI:   --   like     the     first   minute       is 3 376,000 kilogram.             And then, for the two minutes, 4 because the increase by 200,000 kilogram, so it become 5 576,000.       And then, the next minute, it increase by 6 100,000, resulting in 676,000. And there, after that, 7 every minute, you would increase by 100,000.
1 MS. LI: -- like the first minute is 2
8                  So, that's this table and it's consistent 9 with the number that in the calculation by Dave that 10 use this and then, used the Reg Guide 1.91 equation to 11 calculate the radius.
376,000 kilogram. And then, for the two minutes, 3
12                  But   I   noticed       that       in   Joe   Carson's 13 calculation, I think that use a different approach, 14 assuming average flow rate of 1,877 kilograms per 15 second and last for six minutes.                         So, that's 360 16 seconds.       And times this two number, it come up with 17 approximately same as the three minutes in the other 18 two calculation, it's about 676,000.
because the increase by 200,000 kilogram, so it become 4
19                  And therefore, all the calculation using 20 the     Reg   Guide   1.91     equation       result     in a   pretty 21 consistent radius, blast radius.
576,000. And then, the next minute, it increase by 5
22                  And I'm just wondering, the two different 23 assumption, one is the average flow rate times the six 24 minutes and the other one just has for one minute, 25 what's the release of mass, and the three minutes, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
100,000, resulting in 676,000. And there, after that, 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
every minute, you would increase by 100,000.
7 So, that's this table and it's consistent 8
with the number that in the calculation by Dave that 9
use this and then, used the Reg Guide 1.91 equation to 10 calculate the radius.
11 But I noticed that in Joe Carson's 12 calculation, I think that use a different approach, 13 assuming average flow rate of 1,877 kilograms per 14 second and last for six minutes. So, that's 360 15 seconds. And times this two number, it come up with 16 approximately same as the three minutes in the other 17 two calculation, it's about 676,000.
18 And therefore, all the calculation using 19 the Reg Guide 1.91 equation result in a pretty 20 consistent radius, blast radius.
21 And I'm just wondering, the two different 22 assumption, one is the average flow rate times the six 23 minutes and the other one just has for one minute, 24 what's the release of mass, and the three minutes, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


46 1 after three minutes, it come up with a pretty same 2 mass of vapor. Do you have some thought about what's 3 behind these two consideration?
46 after three minutes, it come up with a pretty same 1
4                MR. BLANCH: Yes, I do.             It was from a 5 document, an email from Dave Bellio, who's NRC staff, 6 and it should have been redacted. It was redacted one 7 FOIA request, but unredacted in another.
mass of vapor. Do you have some thought about what's 2
8                And Dave Bellio actually gave the flow 9 rate in dekatherms for minute for various times.                   So, 10 I used those numbers from Dave Bellio.               If you don't 11 have them, I could probably find them with a little 12 bit of effort.
behind these two consideration?
13                But those are the numbers that I used when 14 I calculated it.         I can't say for sure that Dave 15 Lochbaum and Larry and Joe used the same numbers, but 16 I would suspect they did.               So, those numbers were 17 given to me by the staff.
3 MR. BLANCH: Yes, I do. It was from a 4
18                MS. LI: I see.         Thank you. Yes, I just 19 wondering,     because     one     is   accounting   for     three 20 minutes, the other is six minutes, but somehow it come 21 out with the same mass of vapor.
document, an email from Dave Bellio, who's NRC staff, 5
22                MR. BLANCH: Yes, I didn't go over the 23 details of the other engineers' calculations.                     So, 24 sorry, but I can't give you a definitive answer, other 25 than we used David Bellio's numbers.
and it should have been redacted. It was redacted one 6
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
FOIA request, but unredacted in another.
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
7 And Dave Bellio actually gave the flow 8
rate in dekatherms for minute for various times. So, 9
I used those numbers from Dave Bellio. If you don't 10 have them, I could probably find them with a little 11 bit of effort.
12 But those are the numbers that I used when 13 I calculated it. I can't say for sure that Dave 14 Lochbaum and Larry and Joe used the same numbers, but 15 I would suspect they did. So, those numbers were 16 given to me by the staff.
17 MS. LI: I see. Thank you. Yes, I just 18 wondering, because one is accounting for three 19 minutes, the other is six minutes, but somehow it come 20 out with the same mass of vapor.
21 MR. BLANCH: Yes, I didn't go over the 22 details of the other engineers' calculations. So, 23 sorry, but I can't give you a definitive answer, other 24 than we used David Bellio's numbers.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


47 1                MS. LI: Okay, thank you.
47 MS. LI: Okay, thank you.
2                MR. BLANCH: You're welcome.
1 MR. BLANCH: You're welcome.
3                MR. SKEEN: Yes, thanks for that, Paul.                 I 4 know it was fairly technical for other folks to hear, 5 but I know Rene'e was looking at the calculations that 6 you had provided.         So, we thought this was a good 7 opportunity to ask a question of that, too.                   So, I 8 appreciate you being able to answer that for us.
2 MR. SKEEN: Yes, thanks for that, Paul. I 3
9                Anyone else?         Steve, did you have any 10 questions you wanted to raise?
know it was fairly technical for other folks to hear, 4
11                MR. NANNEY: I just have one clarification 12 I'd like to know.       I kept hearing Regulation 1.92 and 13 1.91, and I just wanted to make sure, when I was 14 hearing the 1.92, you weren't by mistake meaning the 15 DOT Part 192?
but I know Rene'e was looking at the calculations that 5
16                MR. BLANCH: Oh, no, let me clarify.                 I'm 17 looking at PHMSA Regulation 49.192.               Now, under there 18 are subregulations --
you had provided. So, we thought this was a good 6
19                MR. NANNEY: There isn't a DOT Regulation 20 0.192, there is --
opportunity to ask a question of that, too. So, I 7
21                MR. BLANCH: No.
appreciate you being able to answer that for us.
22                MR. NANNEY: -- DOT Regulation 192, that's 23 what my clarification was.
8 Anyone else? Steve, did you have any 9
24                MR. BLANCH: No, the --
questions you wanted to raise?
25                MR. NANNEY: Were you --
10 MR. NANNEY: I just have one clarification 11 I'd like to know. I kept hearing Regulation 1.92 and 12 1.91, and I just wanted to make sure, when I was 13 hearing the 1.92, you weren't by mistake meaning the 14 DOT Part 192?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 MR. BLANCH: Oh, no, let me clarify. I'm 16 looking at PHMSA Regulation 49.192. Now, under there 17 are subregulations --
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
18 MR. NANNEY: There isn't a DOT Regulation 19 0.192, there is --
20 MR. BLANCH: No.
21 MR. NANNEY: -- DOT Regulation 192, that's 22 what my clarification was.
23 MR. BLANCH: No, the --
24 MR. NANNEY: Were you --
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


48 1                  MR. BLANCH:       The   regulation       is   49     CFR 2 192.917 and 192.935.
48 MR. BLANCH: The regulation is 49 CFR 1
3                  MR. NANNEY: Okay.         And you also mentioned 4 a calculation you were doing for blast radius of some 5 equation. What equation was that that you were using?
192.917 and 192.935.
6                  MR. BLANCH: I was using the NRC's equation 7 for external threats, including gas lines.                     NRC will 8 be able to give you them, they're in Regulatory Guide 9 1.91.       But you need input to that too.
2 MR. NANNEY: Okay. And you also mentioned 3
10                  MR. NANNEY: Okay.           Thank you.
a calculation you were doing for blast radius of some 4
11                  MR. SKEEN: Yes, and we can discuss that, 12 Steve.         That's in our own Reg Guide, so we can 13 certainly discuss that with you.
equation. What equation was that that you were using?
14                  MR. NANNEY: Okay.           Thank you.
5 MR. BLANCH: I was using the NRC's equation 6
15                  MR. SKEEN: So, no other questions?
for external threats, including gas lines. NRC will 7
16                  MR. BLANCH: For an old man, I can remember 17 all those numbers.           Been around them long enough.
be able to give you them, they're in Regulatory Guide 8
18                  MR. SKEEN: You did very well.
1.91. But you need input to that too.
19                  MR. BLANCH: Thank you.
9 MR. NANNEY: Okay. Thank you.
20                  MR. SKEEN: So, again, Paul, we appreciate 21 you taking the time to talk to us.                   As you know, we're 22 on this time line to try to get this report to the 23 Commission.
10 MR. SKEEN: Yes, and we can discuss that, 11 Steve. That's in our own Reg Guide, so we can 12 certainly discuss that with you.
24                  I thought it was very important to talk 25 with you today, and with Rick Kuprewicz as well, to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 MR. NANNEY: Okay. Thank you.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
14 MR. SKEEN: So, no other questions?
15 MR. BLANCH: For an old man, I can remember 16 all those numbers. Been around them long enough.
17 MR. SKEEN: You did very well.
18 MR. BLANCH: Thank you.
19 MR. SKEEN: So, again, Paul, we appreciate 20 you taking the time to talk to us. As you know, we're 21 on this time line to try to get this report to the 22 Commission.
23 I thought it was very important to talk 24 with you today, and with Rick Kuprewicz as well, to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


49 1 make sure we understand the concerns coming in from 2 you.
49 make sure we understand the concerns coming in from 1
3                And we'll certainly take this forward in 4 our considerations as we get ready to write our report 5 and get something to the Commission.
you.
6                MR. BLANCH: I don't envy you guys.
2 And we'll certainly take this forward in 3
7                MR. SKEEN: I appreciate that, but we've 8 got a good team here.         So, between our internal and 9 external folks, we've got some really good experts 10 that we're working on this.
our considerations as we get ready to write our report 4
11                MR. BLANCH: Especially the letter from the 12 State of New York, it went to the world.
and get something to the Commission.
13                MR. SKEEN: Yes.
5 MR. BLANCH: I don't envy you guys.
14                MR. BLANCH: So, you are --
6 MR. SKEEN: I appreciate that, but we've 7
15                MR. SKEEN: I think, we're aware of that, 16 I think.
got a good team here. So, between our internal and 8
17                MR. BLANCH: Thank you, Dave, for your 18 consideration, obviously.
external folks, we've got some really good experts 9
19                MR. SKEEN: Yes, I understand.
that we're working on this.
20                MR. BLANCH: Okay.           I have --
10 MR. BLANCH: Especially the letter from the 11 State of New York, it went to the world.
21                MR. SKEEN: Okay.         We --
12 MR. SKEEN: Yes.
22                MR. BLANCH: -- spoken my piece.
13 MR. BLANCH: So, you are --
23                MR. SKEEN: Well, we certainly appreciate 24 your time and this gives us some more information to 25 consider as we go forward.
14 MR. SKEEN: I think, we're aware of that, 15 I think.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MR. BLANCH: Thank you, Dave, for your 17 consideration, obviously.
(202) 234-4433       WASHINGTON, D.C. 20005-3701   (202) 234-4433
18 MR. SKEEN: Yes, I understand.
19 MR. BLANCH: Okay. I have --
20 MR. SKEEN: Okay. We --
21 MR. BLANCH: -- spoken my piece.
22 MR. SKEEN: Well, we certainly appreciate 23 your time and this gives us some more information to 24 consider as we go forward.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


50 1                And if you have any other issues, I know 2 you're not shy about letting me know if you have other 3 issues coming along or concerns.                 So, certainly feel 4 free to pass anything along that you do have.
50 And if you have any other issues, I know 1
5                We do have a few weeks before we have to 6 get the report to the Commission, so if there's 7 anything we can factor in, we'll certainly try to do 8 that.
you're not shy about letting me know if you have other 2
9                MR. BLANCH: I've never been shy, never 10 been accused of it.
issues coming along or concerns. So, certainly feel 3
11                MR. SKEEN: Well, thank you --
free to pass anything along that you do have.
12                MR. BLANCH: I will do it.               I appreciate 13 everyone's time.
4 We do have a few weeks before we have to 5
14                MR. SKEEN: All right.               We appreciate you 15 talking with us.       So, you have a good afternoon and 16 I'm sure we'll be talking with you.
get the report to the Commission, so if there's 6
17                MR. BLANCH: You too, ladies and gentlemen, 18 thank you.
anything we can factor in, we'll certainly try to do 7
19                (Whereupon, the above-entitled matter went 20 off the record at 2:12 p.m.)
that.
21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 MR. BLANCH: I've never been shy, never 9
(202) 234-4433       WASHINGTON, D.C. 20005-3701           (202) 234-4433}}
been accused of it.
10 MR. SKEEN: Well, thank you --
11 MR. BLANCH: I will do it. I appreciate 12 everyone's time.
13 MR. SKEEN: All right. We appreciate you 14 talking with us. So, you have a good afternoon and 15 I'm sure we'll be talking with you.
16 MR. BLANCH: You too, ladies and gentlemen, 17 thank you.
18 (Whereupon, the above-entitled matter went 19 off the record at 2:12 p.m.)
20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433}}

Latest revision as of 14:03, 13 December 2024

Official Transcript, Interview with Paul Blanch
ML20087M178
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/20/2020
From: Blanch P
- No Known Affiliation
To:
NRC/EDO/AO, Office of Nuclear Material Safety and Safeguards
Clark T
References
NRC-0866, OIG 16-024
Download: ML20087M178 (51)


Text

Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

Gas Transmission Lines at Indian Point Nuclear Plant OIG Case Number: 16-024 Location:

teleconference Date:

Friday, March 20, 2020 Work Order No.:

NRC-0866 Pages 1-50 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005 (202) 234-4433

1 UNITED STATES OF AMERICA 1

NUCLEAR REGULATORY COMMISSION 2

+ + +

3 STAFF'S RESPONSE 4


x 5

In the Matter of: :

6 CONCERNS PERTAINING TO GAS :

7 TRANSMISSION LINES AT : OIG Case No.16-024 8

INDIAN POINT NUCLEAR POWER :

9 PLANT :

10


x 11 Friday, March 20, 2020 12 13 Teleconference 14 15 NRC STAFF PRESENT:

16 DAVID SKEEN, Team Lead; Deputy Director of 17 International Programs 18 THERESA CLARK, Program Manager 19 SUZANNE DENNIS, RES/DRA/PRAB 20 DR. YUEH-LI "RENE'E" LI, Office of Nuclear Reactor 21 Regulation 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

2 ALSO PRESENT:

1 PAUL BLANCH, Citizen Stakeholder 2

TINA BONGAR, Resist Spectra 3

MICHEL LEE, Council on Intelligent Energy and 4

Conservation Policy 5

STEVE NANNEY, Pipeline and Hazardous Materials 6

Safety Administration, DOT 7

AMY ROSMARIN, Stop the Algonquin Pipeline Expansion 8

SUSAN VAN DOLSEN, Stop the Algonquin Pipeline 9

Expansion 10 NANCY VANN, Safe Energy Rights Group 11 ELLEN WEININGER, Grassroots Environmental Education 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

3 P R O C E E D I N G S 1

1:02 p.m.

2 MR. SKEEN: Hello, this is Dave Skeen.

3 This is the 1:00 call to discuss the evaluation team's 4

review of the IG findings with Paul Blanch. Who else 5

do we have on the line?

6 MS. LI: Rene'e Li, from NRC.

7 MS. CLARK: Theresa Clark, from NRC.

8 MR. BLANCH: And Paul Blanch, a citizen 9

stakeholder.

10 MR. SKEEN: Thanks, Paul.

11 MR. NANNEY: And Steve Nanney, US DOT, 12 PHMSA.

13 MS. DENNIS: This is --

14 MR. SKEEN: Thanks, Steve.

15 MS. DENNIS: -- Suzanne Dennis, with the 16 NRC.

17 MR. SKEEN: Okay. I don't hear others. I 18 think with the court reporter, we should probably each 19 state our names and spell it for him, so that he, as 20 we're speaking, he'll know who to attribute comments 21 to.

22 So, I'll go first. My name is David 23 Skeen, it's S-K-E-E-N. And I'm the team leader for 24 the evaluation team that's looking into the Inspector 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

4 General's event inquiry.

1 MS. CLARK: This is Theresa Clark, T-H-E-R-2 E-S-A, last name Clark, C-L-A-R-K. And I'm Dave's 3

deputy on the NRC team.

4 MS. LI: This is Rene'e Li, my official 5

name is Yueh-Li Li, spells Y-U-E-H, dash, L-I, last 6

name Li, L-I. And I'm from NRC.

7 MR. BLANCH: You're from where?

8 MS.

LI:

NRC, Nuclear Regulatory 9

Commission.

10 MR. BLANCH: Okay. And my name is Paul 11

Blanch, B-L-A-N-C-H, and I

am the concerned 12 stakeholder that was discussed in the OIG report.

13 MS. DENNIS: Hi, this is Suzanne Dennis, S-14 U-Z-A-N-N-E, last name Dennis, D-E-N-N-I-S.

15 MR. BLANCH: And where are you from, 16 Suzanne?

17 MS. DENNIS: Oh, I'm from the Nuclear 18 Regulatory Commission. Sorry about that.

19 MR. BLANCH: Okay.

20 MR. SKEEN: So, who else do we have? I 21 know there's other folks.

22 MS. ROSMARIN: This is Amy Rosmarin, and 23 I'm just listening. I'm with Stop the Algonquin 24 Pipeline Expansion.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

5 MR. SKEEN: Okay, thank you.

1 MS. VAN DOLSEN: This is Susan Van Dolsen, 2

I'm also with Stop the Algonquin Pipeline Expansion 3

and listening. I'm going to go on mute.

4 MR. SKEEN: Thank you.

5 MS. VANN: I'm Nancy Vann, I'm with Safe 6

Energy Rights Group, and also just listening.

7 MR. SKEEN: Okay, thank you.

8 MS. BONGAR: And hi, I'm Tina Bongar, and 9

I'm with United for Clean Energy/Resist Spectra. And 10 I'm just listening.

11 MR. SKEEN: Okay. Is there anyone else on 12 the line?

13 MS. LEE: Yes, this is Michel Lee, with the 14 Council on Intelligent Energy and Conservation Policy, 15 also just listening on mute.

16 MR. SKEEN: All right, thank you.

17 MS. WEININGER: Ellen Weininger, and I'm 18 with Grassroots Environmental Education, and I'm just 19 listening. Thank you.

20 MR. SKEEN: Okay. Is that everyone? I 21 don't hear anyone else.

22 MR. BLANCH: I thought we were going to 23 have someone from New York State. Amy, you said you 24 were going to be in contact, are they participating?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

6 MS. ROSMARIN: I just, I sent them an 1

invitation and haven't heard back. I gave them the 2

call-in information. But the timing was pretty short.

3 MR. BLANCH: Yes, I know. Okay. Who wants 4

to start?

5 MR. SKEEN: Okay. Well, thanks, Paul. So, 6

let me just get the thing started here.

7 So, as I said, I'm part of a special team 8

that the Nuclear Regulatory Commission put together to 9

evaluate the Inspector General findings from the event 10 inquiry related to the 42-inch gas pipeline that runs 11 near Indian Point Energy Center.

12 I was tasked to put together a team of NRC 13 and external experts to evaluate the findings and to 14 provide a report back to the Commission within 45 days 15 on the findings, on our evaluation of the Inspector 16 General's findings.

17 And so, we have both internal experts, as 18 well as external experts, on our team that are looking 19 into the findings from the Inspector General.

20 So, with that, the purpose of this call 21 was to talk with Paul Blanch today. I know Paul was 22 the concerned individual that was involved in some of 23 the activities related to the gas pipeline and the 24 2.206 Petition that was provided to the NRC.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

7 And so, we want to hear his thoughts, make 1

sure that we have all of his concerns as part of our 2

efforts, as we go forward. And so, with that, I 3

wanted to talk with Paul about, to make sure we 4

understood his concerns that he has raised thus far.

5 And I know, Paul, you had sent something 6

in to us with a draft letter that you had, and maybe 7

we should go and start with that, maybe the best thing 8

to walk through that with you.

9 MR. BLANCH: Yes. That's what --

10 MR. SKEEN: And then, we have --

11 MR. BLANCH: That's what I --

12 MR. SKEEN: -- some particular questions --

13 MR. BLANCH: -- would like, too.

14 MR. SKEEN: -- we wanted to ask as well.

15 So, if that's okay with you, and the team, I have the 16 team on the line with me, so if there are specific 17 questions or clarifications we need as you go through 18 some of your concerns, we'll try to make sure we 19 capture those as we go forward.

20 MR. BLANCH: Okay. What I -- it was a 21 draft letter, and I know anything sent to the NRC, 22 draft or not, is going to go into ADAMS. That's fine.

23 I was just trying to give you a heads-up, 24 because there were probably editorial mistakes in 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

8 there and so on and so forth. But the concept of the 1

letter remains the same. I do not know whether you 2

distributed it to the rest of your team.

3 MR. SKEEN: Yes, the team has seen it. I 4

forwarded that to them when you sent it, because I 5

thought it would help the discussion this afternoon.

6 So, we have at least seen it.

7 But if you wanted to walk us through, to 8

make sure we've got your concerns. I think a lot of 9

what is in your letter was already part of our 10 efforts, but I just want to be sure, as we talk with 11 you, that we've captured everything. So --

12 MR. BLANCH: Okay.

13 MR. SKEEN: -- if you want to go ahead, 14 please do.

15 MR. BLANCH: Yes, do you have anyone from 16 Sandia online? On the line?

17 MR. SKEEN: I don't believe Sandia is on.

18 I know they were doing the computer runs, but I don't 19 believe that we have them on. Suzanne, did you notice 20 if Sandia was going to be available?

21 MS. DENNIS: Hi, yes, I talked with our 22 experts from Sandia yesterday and they decided, since 23 today was being transcribed, they would look over the 24 notes and focus on getting the simulations done, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

9 hopefully before this weekend.

1 MR. SKEEN: All right, thank you. So, 2

Paul, no, we don't have Sandia with us this afternoon.

3 MR. BLANCH: Okay. Well, I sent that 4

letter just so your team could digest where I'm coming 5

from, and for those others listening to it, they have 6

not seen my draft letter, but it's my comments on a 7

official NRC document that was put out on March 18, 8

which is basically the scope of the team.

9 And I think it would be best if I just 10 read the letter and we could stop after each 11 paragraph, if there are questions. So, if that's 12 okay, to get it into the record, I know it will be 13 part of the record anyway.

14 I say in my letter, it's addressed to 15 David Skeen, it appears the team's direction is to 16 have Sandia National Labs perform a risk analysis.

17 I have no problem with this approach, 18 however, I question, quote, analyzing natural gas 19 pipeline rupture phenomena and consequences, which was 20 in Dave's outline, as the sole guidance, when there is 21 clear federal law and regulations as to how to 22 evaluate the pipeline's impact on public safety.

23 I want a structured approach for risk 24 assessment, is basically what I'm saying. And the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

10 only one that we can fall back on is what is in the 1

federal law.

2 And then, I go on and state the PHMSA's 3

mission is to protect, is pipeline safety, no doubt 4

about that. NRC's mission is nuclear safety and 5

providing adequate protections to the public health 6

and safety. PHMSA does not regulate the NRC or 7

oversee the NRC, and the same way, the NRC doesn't 8

oversee PHMSA.

9 So, I go on to say, from the enclosed 10 direction, it appears the NRC is about to charter 11 Sandia to conduct yet one more risk assessment. We've 12 had risk assessments conducted by Entergy, Algonquin, 13 NRC, PHMSA, State of New York, myself, and then, 14 there's another one that got lost by the NRC that's on 15 a CD somewhere.

16 We've had enough attempts on risk 17 assessment and have everyone thinking, this is what we 18 think we need. I go on to say, there is a regulatory 19 and industry consensus of conducting a

risk 20 assessment, and that is specified in 49 CFR 192.917 21 and 935.

22 This is the only generally accepted 23 guidance for conducting a risk assessment of gas 24 lines. This went through rulemaking, comments, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

11 industry comments, this is the consensus of how one 1

does a risk assessment.

2 And I go on to say, quoting in my letter, 3

it is my position that the risk assessment be 4

conducted following the Pipeline Safety Act of 2016 5

and 49 CFR 192. The result must then be reviewed by 6

PHMSA for compliance with its regulations.

7 And then, the NRC, based on that risk 8

assessment, makes the determination of, quote, 9

reasonable assurance of adequate protection of public 10 health and safety.

11 I have just gone through the final 12 Environmental Impact Statement and, Steve, this is 13 probably directed at you. Steve is from PHMSA.

14 Throughout the Environmental Impact Statement, dozens 15 and dozens of times, are statement, total compliance 16 with 49 CFR 192.

17 No exceptions that I have identified.

18 Meaning that, FERC, PHMSA, EPA, in signing off of that 19 document are saying, the regulations of 192, amongst 20 others, have been met.

21 I have tried, communicated, and the reason 22 Amy and Ellen are on here, they have communicated with 23 me and with Karen Gentile of PHMSA, to attempt to get 24 a copy of the risk assessment they said was done. All 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

12 I got from PHMSA, and this was all in writing and 1

PHMSA has it and I think, Dave, you may have some of 2

it, all --

3 MR. SKEEN: Excuse me, Paul.

4 MR. BLANCH: -- I've gotten are --

5 MR. SKEEN: Excuse me, Paul. Did someone 6

else just come on the line.

7 MS. CLARK: That was Theresa. Somehow my 8

call dropped and now I'm back, sorry.

9 MR. SKEEN: Okay, thank you. I just heard 10 another beep, so I just wanted to make sure we knew 11 who was on the line. Thank you. Go ahead, Paul, I'm 12 sorry.

13 MR. BLANCH: Okay. So, what we have is a 14 document called the Environmental Impact Statement 15 certifying compliance with 49 CFR 192, which is, at 16 best, an inaccurate statement. And something that the 17 NRC's risk assessment may have been based upon.

18 I guess my next question is directed at 19 Steve. And by the way, Rick Kuprewicz, our common 20 associate says very good things about you. Has there 21 been a risk assessment done for the pipelines at 22 Indian Point that are in compliance with PHMSA 23 regulations? And if so, how do we get a copy?

24 MR. SKEEN: So, Steve, are you on the line?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

13 MR. NANNEY: Yes, I'm listening. Dave, do 1

you want me to answer?

2 MR. BLANCH: Yes, I'd like to.

3 MR. SKEEN: Yes, if you could answer that, 4

that's fine. Like I say, that's more of a PHMSA than 5

an NRC question, I guess --

6 MR. BLANCH: Well, they're all --

7 MR. SKEEN: -- so, if you can --

8 MR. BLANCH: -- tied together.

9 MR. SKEEN: -- answer, that would be fine.

10 MR. NANNEY: Well, first of all, you're 11 asking has one been done? But I can answer you this 12 way, if you go look at Part 192, Subpart O, it has the 13 regulations of when you have to do assessments of the 14 pipeline.

15 In other words, when you've found it to be 16 a high consequence area, as defined in Part 192. And 17 18 MR. BLANCH: Right.

19 MR. NANNEY: -- the parent company that 20 owns the same pipeline is Enbridge. And Enbridge does 21 have a compliant integrity management program.

22 This particular line, this particular 23 location, has Steve Nanney seen the documents? The 24 answer is, no.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

14 And because -- I'm listening in today, 1

I've listened in when Richard talked yesterday, 2

because my goal of listening in was to see what the 3

concerns were and to see what my takeaway would be of 4

going back and looking, since I wasn't involved in 5

this back several years ago when it was built and 6

everything.

7 So, that being said, yes, they would have 8

to have a risk assessment on that. A risk assessment, 9

by the code on the new pipeline, the first thing that 10 I would look for would be, did they do a hydrostatic 11 pressure test that met the code?

12 On a new pipeline, that would be the first 13 item to look at, to make sure. And I would be, and I 14 will be going back and asking that question.

15 The other thing, as the pipeline is put 16 in-service and time goes by, would be inline 17 inspection tools run on this pipeline, plus their 18 yearly maintenance activities and patrolling 19 activities.

20 So, to answer your question, yes, I will 21 go back and look at that. What we can actually put 22 out for the public review, I can't say right at the 23 moment what I could actually give you, until I look at 24 the records and everything.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

15 MR. SKEEN: So, I appreciate that, Steve.

1 I appreciate that. And maybe, Paul, when we talk 2

about a risk assessment, are we talking about two 3

different things?

4 From an NRC probabilistic risk assessment, 5

a risk-informed process that we have, versus the risk 6

assessment for a gas pipeline may be looking at 7

different things.

8 And I know we've talked about this, what's 9

in the ASME appendix and all of that, but maybe it 10 would be good to make sure we understand, when we say 11 risk assessment, what we're talking about.

12 MR. BLANCH: Okay. This is Paul Blanch, 13 again. I'll try to explain it and, Steve, sorry to 14 put you on the spot here, because you're relatively 15 new to this.

16 But the clear requirements, Steve, in 17 Subpart O of 192 are numerous, as you know. And 18 192.917 and 934 require a very detailed risk 19 assessment. This should be outside of NRC space.

20 I

would have

expected, if you're 21 installing or if PHMSA is approving the installation 22 of a 42-inch line in the vicinity of two nuclear power 23 plants, that they would do an adequate risk assessment 24 and those results would be presented to the NRC. They 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

16 could take the results, here are the probabilities, 1

these are numbers.

2 It shouldn't be the NRC doing this, these 3

are the numbers that PHMSA should be coming up with 4

and following the regulations of ASME B31.8, and there 5

are other references, or documents, incorporated by 6

reference.

7 And this is not inconsistent -- has 8

everyone seen the letter from the Attorney General of 9

the State of New York this morning?

10 MR. SKEEN: I have seen that, yes, Paul.

11 MR. BLANCH: Yes. My request is not 12 inconsistent with what the Attorney General of the 13 State of New York is saying.

14 These are -- this is my immediate concern, 15 I've been working on this, as everyone knows, for five 16 or six, maybe more years, and all I get is, oh, I'm 17 going to do my risk assessment my way, and I'm going 18 to do it my way, and we don't even get to see what 19 these risk assessments, and they get lost.

20 And my very strong position is, I want to 21 see a

risk assessment, which is PHMSA's 22 responsibility. And I'm not -- it's just like the 23 NRC, PHMSA needs to impose that requirement on its 24 licensees or its regulated pipeline manufacturer.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

17 That's the way the NRC does it, they don't 1

do -- it's not their responsibility to do the risk 2

analysis. And it's not PHMSA's, but PHMSA should 3

assure that we are being protected by ensuring 4

compliance with the regulation. Which is the absolute 5

minimum to assure safety.

6 And then, NRC takes that and the NRC 7

decides, does this present a hazard to the nuclear 8

power plant?

9 MR. SKEEN: Okay. So, appreciate that, 10 Paul. And so, I think what we can do, we recognize 11 the concern. Certainly, we can work with Steve and 12 his folks to verify, or confirm if there was this risk 13 assessment done under the Part 49 regulations. So, we 14 can take that. So, appreciate that statement and I 15 think we can move on from there, then.

16 MR. BLANCH: Yes. That is my number one 17 immediate concern. There's a lot of other issues, but 18 that's my priority right now. And from my 19 communications with PHMSA, PHMSA has dropped the ball 20 and has not done a risk assessment.

21 MR. SKEEN: Okay. I think we understand 22 your concern and we'll look at that to see if we can 23 verify that a risk assessment was done under Part 49.

24 MR. BLANCH: Okay. Okay. Where would we 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

18 like to go from here?

1 MR. SKEEN: So, I think, in the rest of 2

your letter, it does talk about some other things, 3

some of which I think are covered in the IG findings, 4

but if you wanted to kind of step through those, that 5

was the bulletized issues that you had on another page 6

of your draft letter you had shared with me this 7

morning.

8 MR. BLANCH: Yes. Yes, the -- I made a 9

complaint with the Inspector General's Office. And 10 you know the Inspector General does not have adequate 11 budget, personnel, they get a lot of stuff and they're 12 very selective in what they do and the scope.

13 I asked the Inspector General to look at 14 a lot of different things. They didn't look at 15 everything.

16 Now, one of the things I asked them to do, 17 and I've asked the NRC staff, is Entergy made 18 inaccurate, incomplete, I believe, okay, allege, 19 inaccurate, incomplete, in violation of 10 CFR 50.9, 20 and possibly 50.5. That has never been addressed.

21 Let me see.

22 MR. SKEEN: Okay. So, could you clarify 23 just a little bit on the 50.9, where you think it 24 violated 50.9? Just to help us understand --

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

19 MR. BLANCH: Sure.

1 MR. SKEEN: -- it, please.

2 MR.

BLANCH:

Well, in their 50.59 3

evaluation, they clearly stated three-minute closure 4

time. That is an inaccurate statement, inaccurate, 5

incomplete statement. I got better words for it, but 6

I'm going to be nice. It's never been looked at by 7

anyone within the NRC.

8 MR. SKEEN: Okay. I -- just stop right 9

there just a sec, Paul. So, I can tell you, as part 10 of our team, we are looking at that, trying to find 11 out where that one to three minutes came from, as 12 well. So, that will be part of what our report covers 13 when we do that. So, we can certainly look at that 14 one.

15 MR. BLANCH: You and I have talked about 16 that, and we think we might know where it is. But 17 getting back to the root cause of the problem.

18 The NRC is allowing, and accepts and 19 defends, A, inaccurate information provided by a 20 licensee, which has just cost us so much time, 21 trouble, cost the State of New York over a quarter of 22 a million dollars to have their own analysis done.

23 And the NRC won't do anything.

24 And you have laws against providing false 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

20 information, deliberate misconduct, and inaccurate and 1

incomplete information. But you seem not to be 2

willing to ever enforce those laws. And then, let me 3

see what else.

4 MR. SKEEN: Okay. Just so I understand, so 5

you're saying that the fact that they reported this 6

one to three minutes, that is a violation of the 50.9, 7

that's your concern?

8 MR. BLANCH: Yes, it is.

9 MR. SKEEN: Okay.

10 MR. BLANCH: Unless you --

11 MR. SKEEN: That makes --

12 (Simultaneous speaking.)

13 MR.

BLANCH:

a

message, with a

14 violation, intentional, criminal, I don't care what, 15 but anyway.

16 One of my things was fuel in the diesel 17 slurries tank. Dave, you and I, I think, I'm 18 satisfied, if Brian told you that those tanks are 19 empty, that's just fine.

20 MR. SKEEN: And for those that aren't 21 aware, we're talking about the storage, the diesel 22 storage tanks that was for Unit 1, that has been shut 23 down for many years.

24 When they shut down that unit, they 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

21 abandoned those tanks, they drained them, they cleaned 1

them out, and they valved them off, so that there's 2

nothing in those tanks any more. We did verify that 3

with the Senior Resident Inspector at the site. So, 4

thanks, Paul, I appreciate that.

5 MR. BLANCH: Yes. But my, as we've talked, 6

Dave, my biggest concern is the existing pipelines.

7 Okay. We have two pipelines, one of them's idle right 8

now and the 30-inch is active.

9 They run very close to the switchgear room 10 and the control room. A leak in one of those pipes 11 could cause unignited methane to migrate into the 12 control room, just a few hundred feet away.

13 If that occurs, and I'm talking a gas 14 leak, like we've all seen in our neighborhoods, but a 15 sizeable one, two-inch or greater, and that gas 16 migrates into, especially the control room and the 17 electrical switchgear room, if that gets in there, we 18 are in big trouble.

19 If you take out the switchgear room, then 20 the danger of core damage, spent fuel pool damage, and 21 all your post-Fukushima fixes would not be available.

22 And that's something that absolutely, that is my 23 number one concern, and that has been conveyed many 24 times to the NRC and ignored.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

22 So, the risk assessment not only applies 1

to the AIM pipeline, it also applies to existing 2

pipelines, and that's effective in the year 2004. So, 3

I don't think PHMSA has assured that that has been 4

done. And I don't mean to pick on PHMSA, but I've 5

never been able to get a straight answer from them.

6 MR. SKEEN: Okay. Well, thanks for that, 7

Paul, appreciate that. Now, let me understand just a 8

little bit more. So, when you're talking about the 9

existing lines, would the leak be from the underground 10 part? Because there's not -- it's mostly underground 11 it runs on the site, right? It only comes aboveground 12 13 MR. BLANCH: Correct.

14 MR. SKEEN: -- just before it gets to the 15 river, is that correct?

16 MR. BLANCH: Yes. It's underground, it 17 comes up out of the ground by the river and that's 18 where the pig station is. And then, from the pig 19 station, it goes across the site, within the owner 20 controlled area, comes within 300 or 400 feet of the 21 control room, switchgear room, and then goes out. And 22 then, it ties into the AIM pipeline.

23 MR. SKEEN: Okay. So, but your concern 24 would be where the aboveground portion of the piping 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

23 is? Is that what you're concerned about, a gas leak 1

2 MR. BLANCH: Well, it's --

3 MR. SKEEN: -- from a --

4 MR.

BLANCH:

primarily the

one, 5

aboveground, whatever could cause gas to leak into 6

those areas. Aboveground, below ground, doesn't 7

matter where the source is. But certainly, this is 8

not something that would be acceptable in today's 9

environment, for being built today.

10 MR. SKEEN: Okay. All right. I --

11 MR. BLANCH: And that --

12 MR. SKEEN: -- think I understand your 13 concern. I'm not sure that was one of the findings of 14 the IG report, but like I say, I want to hear all of 15 your concerns one way or the other, to make sure we're 16 addressing what we need to address and if there's 17 things outside of our scope, I want to make sure that 18 those get addressed as well. So, I don't mind at all 19 pursuing this a little bit --

20 MR. BLANCH: Yes.

21 MR. SKEEN: -- with you.

22 MR. BLANCH: Again, when I wrote to the IG, 23 and I think I gave you this letter, all those concerns 24 were outlined in my letter to the IG dated, it was 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

24 2016, I believe, February somewhere. Those are my 1

concerns, they weren't all addressed by the IG, so 2

that means they're back with the staff.

3 MR. SKEEN: Okay. Okay. I understand, I 4

appreciate that.

5 MR. BLANCH: Okay. Dave, you do have that 6

letter, or I could send it again to you.

7 MR. SKEEN: Well, I think we have that.

8 That was your 2016 letter, right, that you sent in?

9 MR. BLANCH: 2016?

10 MR. SKEEN: Is that -- which one were you 11 referring to?

12 MR. BLANCH: My initial -- yes, 2016, yes.

13 MR. SKEEN: Yes.

14 MR. BLANCH: I think --

15 MR. SKEEN: Yes, we --

16 MR. BLANCH: -- February --

17 MR. SKEEN: -- have that.

18 MR. BLANCH: -- of 2016.

19 MR. SKEEN: Yes, we have that one.

20 MR. BLANCH: Okay. Those are the issues.

21 If the IG didn't address them, then I think the NRC 22 staff needs to close it out. And my final comment 23 here is I have -- this is in my -- you haven't even 24 seen this, Steve, is why I didn't make that a draft.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

25 I have extensive experience at Millstone, 1

as you know, Maine Yankee, Indian Point, and other 2

places, and worked with the NRC on safety culture.

3 And I have a limited knowledge of root cause analysis.

4 And if the NRC identified these type of 5

problems at a licensee, they would give them the 6

normal chilling effect letter and they may impose 7

Inspection Procedure 95003 for a total assessment.

8 That's going to be in my final letter to you.

9 And I believe that the NRC has a cultural 10 problem and I think that this definitely needs a root 11 cause assessment, and I know NRC has done these, 12 they've been trained on them. This is a deep rooted 13 cultural problem within the NRC, such as the backward 14 engineering.

15 And I've done it, I will admit, if my boss 16 tells me this is the result that I want, I can go find 17 information supporting that result. That is a 18 cultural problem, I've been a victim of that myself, 19 I've done it.

20 We used to have a document the NRC 21 approved, which is a justification for operations, its 22 name has been changed to something else now. It's 23 basically saying, go find me a solution that I want.

24 Unacceptable.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

26 And I believe that the NRC has a severe 1

cultural problem and that needs to be looked at. And 2

you need to look at that Inspection Procedure 95003, 3

see if the NRC fits into that.

4 I know this was not a part of the OIG 5

findings, but from my assessments, somewhat as an 6

expert, even written, Dave, I shared it with you, my 7

paper on safety culture, NRC has a problem.

8 And

finally, I

support just about 9

everything that was in the letter from the Attorney 10 General from the State of New York dated yesterday, 11 March 19.

12 MR. SKEEN: Okay. I appreciate that. I 13 know we had talked about that, you had mentioned 14 before that you had supported what the Attorney 15 General was sending in, so I appreciate that. And 16 certainly, we can take a look at that and make sure we 17 understand that. Anything else?

18 MR. BLANCH: That's all I have. I will 19 follow up, I'll give you a final copy of that letter, 20 whether you want to keep your draft or not doesn't 21 matter to me.

22 But I will -- before, well, by Monday or 23 Monday night, I will have my final letter out to you.

24 It goes over all these things and what I think the NRC 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

27 needs to do.

1 And obviously, what Steve said and, not 2

picking on Steve, but I think Steve is going to go 3

back and see if a risk assessment was done in 4

compliance with the regulations. Do I understand that 5

correctly, Steve?

6 MR. SKEEN: Well, we can certainly do that 7

as part of our efforts. I mean --

8 MR. BLANCH: Okay.

9 MR. SKEEN: -- Steve's on the team with us, 10 so we'll make sure that we address that, Paul, because 11 we had been looking at that ourselves, surely there 12 must have been a Part 49 risk assessment done.

13 And we're just trying to uncover that 14 ourselves, to make sure that that was done anyway.

15 So, appreciate your concerns on that, we were kind of 16 heading that direction anyway. So, we'll see what we 17 can find out on that one.

18 MR. BLANCH: Okay. Your job becomes much 19 easier if you can find one that meets the requirement.

20 MR. SKEEN: Yes, I understand, certainly.

21 MR. BLANCH: And -- yes.

22 MR. SKEEN: Go ahead.

23 MR. BLANCH: And I just want to say this, 24 Sandia is involved. I have no problem whatsoever with 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

28 Sandia. If Sandia is directed to go out and do a risk 1

assessment in accordance with the requirements, I have 2

no problem with that, as long as they're in compliance 3

with the requirements.

4 MR. SKEEN: Okay. Thank you for that, I 5

appreciate that too. We did want to talk about some 6

of the NRC process issues.

7 MR. BLANCH: Sure.

8 MR. SKEEN: That's one I think that we can 9

-- we need to have a good understanding of that as we 10 go forward, if the agency is going to try to do 11 something about some of our processes. So, I do want 12 to touch on that with you as well.

13 MR. BLANCH: Yes. Well -- yes. There's 14 one other technical thing I need to address, do you 15 mind, Dave?

16 MR. SKEEN: No, please, go ahead.

17 MR. BLANCH: Okay. The -- I had sent you 18 our calculations done by Dave Lochbaum and a few other 19 people. And they're the calculations that were done 20 based on the equation provided in Regulatory Guide 21 1.91.

22 And I asked four different people and we 23 all came up with similar results, that go out greater, 24 the blast pressure greater than one pound going out 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

29 beyond 4,000 feet, or whatever the number, you got the 1

information.

2 But the ASME document that is incorporated 3

by reference also has an equation for calculating the 4

impact radius. Okay. It's a different equation, 5

comes up with a completely different result.

6 The purpose of the PIR equation in ASME 7

B31.8S is to determine the high consequence area. You 8

come up with a number, it could be 660 feet, it could 9

be a thousand feet.

10 Its only purpose is to calculate the area 11 that is covered by high consequence area requirements.

12 It's not meant to say that if you're at more than 13 that, you're not going to be in danger, which is what 14 the NRC equation is.

15 The intent of both equations, I thought 16 was the same thing, but it's not. So, just be aware 17 of that. I have no problem with the NRC's equation.

18 MR. SKEEN: Well, I appreciate that, Paul.

19 That's one thing we were looking at, was the Reg Guide 20 1.91, to see if it was clear or if there's things that 21 maybe it needs to be clarified in some way in how to 22 apply that. So, appreciate that information that you 23 provided to us.

24 MR. BLANCH: Okay. Sorry to interrupt you 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

30 there.

1 MR. SKEEN: Oh, no, that's fine. That's 2

okay. So, those are the kinds of things we want to 3

hear, right? Because to me, that is process, if 4

you're telling me that some of our procedures may not 5

be clear or appropriate. So, that's what we're 6

looking at as well, as part of our effort.

7 MR. BLANCH: Yes, I'm saying Reg Guide 1.91 8

equation is very clear. You just have to plug in the 9

numbers and go. I haven't had a problem with it.

10 MR. SKEEN: Okay. So, you think 1.91 is 11 okay the way it is?

12 MR. BLANCH: I think so, unless you guys 13 see something wrong with it.

14 MR. SKEEN: Well, we'll look into that and 15 see. That was one that we wanted to make sure we 16 understood. So, I appreciate your input on that, 17 that's good.

18 What if we turn to the 2.206 process now?

19 I know that you've had some concerns with that over 20 the years, so if you could kind of enlighten us a 21 little bit more on some of the concerns with that 22 process?

23 MR. BLANCH: Yes. That process, and I've 24 probably filed five, over my lifetime. And the first 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

31 thing we get is a, we've rejected because, or we don't 1

see any immediate problem. I've got one in the works 2

out at Southern Cal Edison right now.

3 So, we get an immediate response from the 4

NRC, we don't see any problem. And this gets back to 5

the

culture, okay?

They've already made a

6 determination, there's no problem, and then, the NRC 7

sends its Petition Review Board out, okay, come and 8

support my conclusion I've already done here.

9 It's, again, getting back to the IG's 10 statement about backward engineering. It's a real 11 problem and we've faced it time and time again. I had 12 a very well thought out petition, well, not only this 13 one on the pipeline, but we had one that I filed with 14 Arnie Gunderson on Vermont Yankee and tritium leaks.

15 And it's just that if we look historically 16 at 2.206 petitions, the number of them in the last 20-17 30 years has been 400, either -- many of them may be 18 not valid, but many of them are valid, but they've all 19 been rejected. There might have been two that have 20 been partially accepted.

21 So, one's chances of getting a 2.206 22 petition granted, even though it comes from people 23 with credibility, and I say credibility, Dave Lochbaum 24 has credibility, I have credibility, Arnie Gunderson 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

32 has some credibility, everything's always rejected.

1 Something's wrong with it.

2 If a licensee comes in and makes a request 3

to change something, to reduce safety margin, it's 4

always, it's never rejected. We just get the feeling 5

that the NRC is not protecting the public by not 6

listening to our 2.206 petitions.

7 I mean, how many years did we spend on 8

this one that I put in? And no one has pointed out 9

why it was wrong. Something is wrong within the 10 agency that essentially they automatically find a way 11 to reject petitions from the public on safety issues.

12 And sometimes, these members of the 13 public, like myself, have as much, if not more, 14 expertise than the NRC staff has. So, anyway, that's 15 the general complaint I have. I'm not sure how we 16 address that.

17 MR. SKEEN: Okay. No, I appreciate that, 18 Paul, it's good feedback. And that's something we're 19 looking at too, is how does the NRC handle the 2.206 20 petitions that we get in and are we being true to our 21 processes? And so, I do appreciate your input on 22 that.

23 MR. BLANCH: Yes, and that goes back a long 24 way, to 1993, when I was working with Senator 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

33 Lieberman and Dan Berkovitz, who was his chief of 1

staff on the committee, and we were working on the 2

2.206 process and should that have the ability to 3

appeal the NRR director's decision?

4 And because of the politics at the time, 5

there's no legal appeal to a director's decision on 6

that. So, when a director says, no, this is not a 7

problem, we have no way to appeal.

8 I know that's a Congressional issue, it's 9

part of the Atomic Energy Act, but it's obviously 10 something that irks me. But on a positive side, 11 you're one of the few agencies that does have a 12 petition process. Okay.

13 I think those are big issues. I don't 14 think we need to get into specific, but the culture is 15 bad, and I understand that, we've seen cultural 16 problems in a lot of regulated industries. We've seen 17 the Boeing recently. We've seen airline industry.

18 You look at NTSB studies and stuff, you see cultural 19 problems identified.

20 So, those are my concerns, you know where 21 my priorities are and you know what I think has to be 22 addressed.

23 MR. SKEEN: Yes, no, I appreciate that.

24 But another thing I wanted to raise with you as well, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

34 Paul, is what about the interactions among the 1

different agencies, the government, and dealing with 2

the different agencies? As far as communication or 3

understanding the roles and responsibilities of the 4

various agencies, did you see any issues with that in 5

your --

6 MR. BLANCH: No, I don't. I don't know 7

what it is between PHMSA and FERC and EPA, but I can 8

say I think the interactions on a subject like this, 9

of putting a 42-inch gas line next to a nuclear power 10 plant, from an outsider's observation, there was no 11 communication with PHMSA, with the licensee.

12 Now, there's a big problem. It's probably 13 very rare that two agencies are facing such an 14 overlapping problem. But on something like this, my 15 God, there has to be some good communication and open 16 communication. What is the risk of this line? What 17 harm's it going to do?

18 And NRC, I'm not saying it's all NRC, but 19 NRC should have been communicating with PHMSA all 20 along on this thing, to assure that the public is 21 adequately protected, not only from gas lines, but 22 from its impact on nuclear plants, or potential impact 23 on nuclear plants. You could have gotten ahead of the 24 curve with proper communication back in 2014, I think.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

35 And the fact that you just blindly 1

accepted Entergy's 50.59 analysis, without question, 2

is inexcusable. And that question could have gone 3

from the NRC to PHMSA, hey, is this three minutes 4

really possible?

5 You, Dave, as an engineer, and me, as an 6

engineer, and every other engineer, including Rick 7

Kuprewicz, and I'm not sure that Steve will even 8

disagree, that the time to identify a leak at a 9

minimum is 30 minutes, from 920 documents I've looked 10 at from PHMSA.

11 And someone not being able to recognize 12 that false statement by Entergy is unforgivable. And 13 they --

14 MR. SKEEN: Okay.

15 MR. BLANCH: -- ought to pay a price.

16 MR. SKEEN: No, I understand, I understand 17 your concern there. But, I guess, as far as the 18 communications, was it -- apparently, from the 19 outside, it looks like there were no communications 20 among the agencies at all.

21 And so, that's what I'm wondering, is it 22 a public communication issue, that we're not doing 23 enough to communicate with the public? Or is it an 24 internal interagency issue of communications between 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

36 agencies?

1 MR. BLANCH: Well, I don't know the 2

interactions between agencies, I have -- that 3

information is never made public or I never see it.

4 I've never seen any formal communication between the 5

NRC and PHMSA or FERC or anything like that. So, yes, 6

our perception, there is none. And believe me, we've 7

tried to get it.

8 MR.

SKEEN:

Okay.

That's helpful 9

information too, so I appreciate that piece as well.

10 MR. BLANCH: Okay. Anyone else?

11 MR. SKEEN: Well, I want to make sure that 12 the team, because I'm doing all the talking here, but 13 a lot of the team has a lot of the technical 14 capabilities, so I want to make sure I leave a chance 15 for other folks to, if they have clarifying questions 16 or maybe something that they've been working on that 17 they want to make sure they understand from you.

18 So, if you're okay, I'll open it up and 19 let Theresa go first. And then, ask if other team 20 members might have questions or explanations for you.

21 Let's do that. Theresa?

22 MS. CLARK: Hi, Paul, this is Theresa 23 Clark. Thanks again for taking the time to talk to 24 us, I think this has been really helpful to hear in-25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

37 person, or virtually in-person at least --

1 MR. BLANCH: Right.

2 MS. CLARK: -- what some of your concerns 3

are. I have a couple of questions, a couple of 4

process ones, I think, and then, technical ones.

5 We're quite interested in both angles of this, it's 6

what the Chairman asked us to look at.

7 One thing that you just mentioned about 8

proper communications that we could have had back in 9

2014, one of the things I've been struggling with in 10 putting together the documents that we might include 11 in our report is that some of the analyses that were 12 done had security related information in them, when we 13 were talking about specific distances from here to 14 there, for example.

15 And it seems like that may have 16 complicated some of our communications on these 17 issues. Do you have a perspective on that?

18 MR. BLANCH: Yes, I do, because I have 19 received from FERC, over Algonquin's objections, I 20 have received CEII clearance from FERC. I've conveyed 21 that to the NRC. So, that should not have been a 22 problem with those people. I know Rick Kuprewicz also 23 has CEII clearance.

24 So, I agree there may be some issues, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

38 security issues, terrorism issues, and so on, that may 1

contain CEII, but not most of it. And as I say, I 2

have that clearance.

3 MS. CLARK: Thanks, Paul, that's helpful.

4 What about how we communicate these issues to the 5

broader public, who don't have those clearances? Are 6

there ways that we could communicate better on these 7

topics without getting into details that we shouldn't?

8 MR. BLANCH: Sure, I think that you could 9

hold public meetings and say, hey, we've addressed 10 terrorism, we've addressed EMP, whatever else might be 11 considered CEII information.

12 And if you got before the public and said, 13 hey, we've looked at these, it's security related or 14 CEII related, but I provide you my assurance that we 15 have looked at it and we're satisfied with it, that's 16 never been done.

17 MS. CLARK: Okay. That's fair, thank you.

18 So, you mentioned a couple minutes ago about documents 19 that you had looked at from PHMSA, I think you said a 20 number of 920, I didn't know if that was a number of 21 documents or a specific document, on valve closure 22 times. Are there specific references that you want to 23 offer to us?

24 MR. BLANCH: Sure, I've sent Dave a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

39 spreadsheet. Correct, Dave?

1 MR. SKEEN: Yes, we have the spreadsheet 2

that you sent on the pipe rupture data.

3 MR. BLANCH: Yes. That is, I'm not sure 4

how far it goes back, but I think there were 921 5

events identified by PHMSA and it provides location, 6

latitude, longitude, size of the leak, did it 7

explode?, did it not explode?, time identified, time 8

event occurred. You've got it all. And that is not 9

Paul Blanch's data, that is on PHMSA's website.

10 MS. CLARK: Okay, Paul, I was confused 11 about that. Yes, we definitely have that spreadsheet.

12 I couldn't remember whether that spreadsheet included 13 data that would let us calculate how long it took to 14 detect and isolate these issues.

15 MR. BLANCH: Yes, it does.

16 MS. CLARK: Okay, thanks. We'll take 17 another look at that. And then, I guess --

18 MR. BLANCH: There's so --

19 MS. CLARK: -- my last --

20 MR. BLANCH: -- many columns --

21 MS. CLARK: Go ahead, please.

22 MR. BLANCH: -- of data, so many columns of 23 data, you're going to have to parse it and sort it and 24 everything, which I've done, and that's how I found 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

40 out there's --

1 MS. CLARK: Okay.

2 MR. BLANCH: -- anywhere from 30 minutes to 3

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> --

4 MS. CLARK: Okay.

5 MR. BLANCH: -- for a response time.

6 MS. CLARK: Understand. Thank you. And I 7

guess, I want to give other folks some air time here, 8

but you mentioned a few minutes ago about the Reg 9

Guide 1.91 equations and the calculations that you and 10 some of the others had done using those.

11 And I think the number that you mentioned, 12 knowing that it wasn't necessarily the exact number, 13 was something like a 4,000-foot radius.

14 I wanted to clarify, is that -- your point 15 was that this was the number that you got using our 16 equation, so it raised some questions in your mind, or 17 were you concerned that that was, perhaps I'm not 18 saying this the right way, but the radius of concern 19 for the plant?

20 MR. BLANCH: I didn't --

21 MS. CLARK: Am I making sense?

22 MR. BLANCH: -- look into the derivation of 23 the equation in Reg Guide 1.91. I'm ex-Navy reactor 24 operator and degreed electrical engineer, understand 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

41 all that stuff.

1 But when I did the calculations, given the 2

gas flow through that line, assuming that comes out, 3

I did a plot, as Dave Lochbaum did and Joe Carson, 4

Larry Criscione, we all came up with the same numbers 5

and they all go out thousands of thousands of feet.

6 And that's just for the pressure pulse.

7 We did not use ALOHA, we used your 8

numbers, and we all came up with a similar thing. Is 9

that right? I don't know, but that's the only thing 10 we could go by, we're not gas experts.

11 MS. CLARK: Okay. I think I understand, I 12 just wanted to clarify that. So, do you have a feel 13 for whether you think there would be impacts at that 14 distance? Or is the point that you're making more 15 specific to how the equation works?

16 MR. BLANCH: Well, the equation works such 17 that it predicts the impact going out, based on the 18 gas flow and time.

19 And that's what the results of the 20 equation say, that the impact, depending on the amount 21 of time it takes to isolate the leak, goes out this 22 far. And I would assume it includes pressure pulses, 23 heat flux, vapor clouds, and so on and so forth. I 24 don't know the derivation of your equation in 1.91.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

42 MS. CLARK: Okay. Thanks, Paul. And 1

that's why I have smart people helping us out, because 2

I don't think I do either, at this point. But I'm 3

learning a lot.

4 MR. BLANCH: I'm not the only dumb one 5

here, huh?

6 MS. CLARK: Hey, I didn't say I was dumb.

7 (Laughter.)

8 MR. BLANCH: I'm saying I am.

9 MS. CLARK: Just kidding. Okay. I think 10 that's everything I have this second. Dave, you want 11 to call the next person?

12 MR. SKEEN: Yes. Suzanne, did you have 13 anything that you wanted to raise?

14 MS. DENNIS: Yes. Hi, Paul, this is 15 Suzanne Dennis. I was looking over the calculations 16 that you had sent to Dave about what other people had 17 seen using those Reg Guide 1.91 calculations.

18 MR. BLANCH: Yes.

19 MS. DENNIS: The minutes that were used 20 differed. And so, I was just wondering how the 21 timings were chosen for those expert evaluations, or 22 if you just had asked, hey, take an independent look 23 at this and let me know, and each expert kind of 24 picked?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

43 MR. BLANCH: Well, what I did, I told Dave 1

and Larry and Joe to, hey, here's the equation, here's 2

the flow rate, what's the impact radius, based on the 3

1.91 equation? And we all came up with numbers that 4

are plus or minus 20-30 percent. So, they're ballpark 5

numbers.

6 MS. DENNIS: Okay. All right. Yes, that's 7

very helpful, thank you. And then, as our resident 8

risk analysis expert, I just wanted to, one, ask for 9

some clarification and maybe provide some 10 clarification too.

11 So, at the NRC, when we talk about risk 12 assessment, we're usually talking about probabilistic 13 risk assessment, so not only the consequence, but also 14 the frequency of the event occurring.

15 And I think, and Steve can correct me if 16 I'm wrong here, but the PHMSA risk assessment that is 17 in the regulations isn't quite that. It's more making 18 sure that the pipeline operators have taken steps to 19 ensure that there is limited risk.

20 So, essentially, trying to lower that 21 probability portion of the equation. And I think at 22 NRC, we're kind of looking at risk a little 23 differently. So, I didn't know if you had any 24 thoughts on that or Steve had any thoughts on that.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

44 MR. BLANCH: I briefly looked at the 1

regulation 917, 935, and I briefly looked at the ASME 2

B31.8 document.

3 And what I got out of the ASME document 4

is, here are 22 scenarios that you must evaluate, from 5

tornado to flooding to ice age to global warming to 6

vandalism, didn't use the word terrorism. And those 7

are probabilistic, more than consequences, I think.

8 I don't know how -- I mean, that damn 9

document is 800-page long, but that's the document 10 that was approved by the industry.

11 MS. DENNIS: Got it, understood.

12 MR. SKEEN: Any other questions, Suzanne?

13 MS. DENNIS: No, that's all I have.

14 Thanks, Dave.

15 MR. SKEEN: Rene'e, did you have any 16 questions?

17 MS. LI: Yes. Paul, I would like to get 18 some clarification on the calculation that we got, or 19 I got, today, if they are thorough calculation.

20 And I noted that, in one of the table, 21 that you calculate, it's a table that lists for the 22 Indian Point blast radius calculation. And then, the 23 first column is time in minutes. And then, there's a 24 column that describe the mass of vapor. So --

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

45 MR. BLANCH: Correct.

1 MS. LI: -- like the first minute is 2

376,000 kilogram. And then, for the two minutes, 3

because the increase by 200,000 kilogram, so it become 4

576,000. And then, the next minute, it increase by 5

100,000, resulting in 676,000. And there, after that, 6

every minute, you would increase by 100,000.

7 So, that's this table and it's consistent 8

with the number that in the calculation by Dave that 9

use this and then, used the Reg Guide 1.91 equation to 10 calculate the radius.

11 But I noticed that in Joe Carson's 12 calculation, I think that use a different approach, 13 assuming average flow rate of 1,877 kilograms per 14 second and last for six minutes. So, that's 360 15 seconds. And times this two number, it come up with 16 approximately same as the three minutes in the other 17 two calculation, it's about 676,000.

18 And therefore, all the calculation using 19 the Reg Guide 1.91 equation result in a pretty 20 consistent radius, blast radius.

21 And I'm just wondering, the two different 22 assumption, one is the average flow rate times the six 23 minutes and the other one just has for one minute, 24 what's the release of mass, and the three minutes, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

46 after three minutes, it come up with a pretty same 1

mass of vapor. Do you have some thought about what's 2

behind these two consideration?

3 MR. BLANCH: Yes, I do. It was from a 4

document, an email from Dave Bellio, who's NRC staff, 5

and it should have been redacted. It was redacted one 6

FOIA request, but unredacted in another.

7 And Dave Bellio actually gave the flow 8

rate in dekatherms for minute for various times. So, 9

I used those numbers from Dave Bellio. If you don't 10 have them, I could probably find them with a little 11 bit of effort.

12 But those are the numbers that I used when 13 I calculated it. I can't say for sure that Dave 14 Lochbaum and Larry and Joe used the same numbers, but 15 I would suspect they did. So, those numbers were 16 given to me by the staff.

17 MS. LI: I see. Thank you. Yes, I just 18 wondering, because one is accounting for three 19 minutes, the other is six minutes, but somehow it come 20 out with the same mass of vapor.

21 MR. BLANCH: Yes, I didn't go over the 22 details of the other engineers' calculations. So, 23 sorry, but I can't give you a definitive answer, other 24 than we used David Bellio's numbers.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

47 MS. LI: Okay, thank you.

1 MR. BLANCH: You're welcome.

2 MR. SKEEN: Yes, thanks for that, Paul. I 3

know it was fairly technical for other folks to hear, 4

but I know Rene'e was looking at the calculations that 5

you had provided. So, we thought this was a good 6

opportunity to ask a question of that, too. So, I 7

appreciate you being able to answer that for us.

8 Anyone else? Steve, did you have any 9

questions you wanted to raise?

10 MR. NANNEY: I just have one clarification 11 I'd like to know. I kept hearing Regulation 1.92 and 12 1.91, and I just wanted to make sure, when I was 13 hearing the 1.92, you weren't by mistake meaning the 14 DOT Part 192?

15 MR. BLANCH: Oh, no, let me clarify. I'm 16 looking at PHMSA Regulation 49.192. Now, under there 17 are subregulations --

18 MR. NANNEY: There isn't a DOT Regulation 19 0.192, there is --

20 MR. BLANCH: No.

21 MR. NANNEY: -- DOT Regulation 192, that's 22 what my clarification was.

23 MR. BLANCH: No, the --

24 MR. NANNEY: Were you --

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

48 MR. BLANCH: The regulation is 49 CFR 1

192.917 and 192.935.

2 MR. NANNEY: Okay. And you also mentioned 3

a calculation you were doing for blast radius of some 4

equation. What equation was that that you were using?

5 MR. BLANCH: I was using the NRC's equation 6

for external threats, including gas lines. NRC will 7

be able to give you them, they're in Regulatory Guide 8

1.91. But you need input to that too.

9 MR. NANNEY: Okay. Thank you.

10 MR. SKEEN: Yes, and we can discuss that, 11 Steve. That's in our own Reg Guide, so we can 12 certainly discuss that with you.

13 MR. NANNEY: Okay. Thank you.

14 MR. SKEEN: So, no other questions?

15 MR. BLANCH: For an old man, I can remember 16 all those numbers. Been around them long enough.

17 MR. SKEEN: You did very well.

18 MR. BLANCH: Thank you.

19 MR. SKEEN: So, again, Paul, we appreciate 20 you taking the time to talk to us. As you know, we're 21 on this time line to try to get this report to the 22 Commission.

23 I thought it was very important to talk 24 with you today, and with Rick Kuprewicz as well, to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

49 make sure we understand the concerns coming in from 1

you.

2 And we'll certainly take this forward in 3

our considerations as we get ready to write our report 4

and get something to the Commission.

5 MR. BLANCH: I don't envy you guys.

6 MR. SKEEN: I appreciate that, but we've 7

got a good team here. So, between our internal and 8

external folks, we've got some really good experts 9

that we're working on this.

10 MR. BLANCH: Especially the letter from the 11 State of New York, it went to the world.

12 MR. SKEEN: Yes.

13 MR. BLANCH: So, you are --

14 MR. SKEEN: I think, we're aware of that, 15 I think.

16 MR. BLANCH: Thank you, Dave, for your 17 consideration, obviously.

18 MR. SKEEN: Yes, I understand.

19 MR. BLANCH: Okay. I have --

20 MR. SKEEN: Okay. We --

21 MR. BLANCH: -- spoken my piece.

22 MR. SKEEN: Well, we certainly appreciate 23 your time and this gives us some more information to 24 consider as we go forward.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

50 And if you have any other issues, I know 1

you're not shy about letting me know if you have other 2

issues coming along or concerns. So, certainly feel 3

free to pass anything along that you do have.

4 We do have a few weeks before we have to 5

get the report to the Commission, so if there's 6

anything we can factor in, we'll certainly try to do 7

that.

8 MR. BLANCH: I've never been shy, never 9

been accused of it.

10 MR. SKEEN: Well, thank you --

11 MR. BLANCH: I will do it. I appreciate 12 everyone's time.

13 MR. SKEEN: All right. We appreciate you 14 talking with us. So, you have a good afternoon and 15 I'm sure we'll be talking with you.

16 MR. BLANCH: You too, ladies and gentlemen, 17 thank you.

18 (Whereupon, the above-entitled matter went 19 off the record at 2:12 p.m.)

20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433