LD-92-010, Forwards Draft Rev 0 to Reliability Assurance Program Plan for Sys 80+ Nuclear Power Plant: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
7-o ggg ASE A BROWN BOVE Al 1 | 7-o ggg ASE A BROWN BOVE Al 1 | ||
January 31,1992 LD 92-010 Docket No. 52-002.- | January 31,1992 LD 92-010 Docket No. 52-002.- | ||
U. S. Nuclear Regulatory Commission | U. S. Nuclear Regulatory Commission | ||
' Attn:- Document Control Desk Washington, DC 20555 | |||
==Subject:== | ==Subject:== | ||
Reliability Assurance Program | |||
-Referenceu (A) Letter LD 91054, E. II. Kennedy (C-E) to D. M. Crutchfield- | |||
-(NRC), dated October 22,1991 (B)' Letter, Division of Licensee Performance and Quality Evaluation l | |||
RAls,- T. V. Wambach (NRC) to E. H. Kennedy (C-E), dated - | |||
; October 10,1991 | |||
==Dear Sirs:== | ==Dear Sirs:== | ||
Submittal of th'e enclosed report,' " Reliability Assurance Program for the System 80+* | Submittal of th'e enclosed report,' " Reliability Assurance Program for the System 80+* | ||
Nuclear Power Plant," fulfills the commitment of Reference (A), item 6, to provide a | Nuclear Power Plant," fulfills the commitment of Reference (A), item 6, to provide a | ||
- reliability assurance program description.' Enclasure I provides brief descriptions of how the | |||
; report responds to each_ question of Reference (B). | |||
ShoUld you have any' questions en the enclosed material, please contact me or Mr. Stan | ShoUld you have any' questions en the enclosed material, please contact me or Mr. Stan Ritterbusch of my staff at (203) 285-5206. | ||
Ritterbusch of my staff at (203) 285-5206. | |||
Very truly yours, COMBUSTION, ENGINEERING, INC. | Very truly yours, COMBUSTION, ENGINEERING, INC. | ||
Y | |||
/ | |||
3 l | |||
f'.ym[d e l | |||
E. H. Kennedy | |||
~ | |||
Director Nuclear Systems Licensing | Director Nuclear Systems Licensing | ||
- gdh:lw L | |||
==Enclosures:== | ==Enclosures:== | ||
- As Stated cci J. Trotter (EPRI) | - As Stated cci J. Trotter (EPRI) | ||
- T. Wambach (NRC) : | |||
ABB_ Combustion Engineering Nuclear Power-QD | ABB_ Combustion Engineering Nuclear Power-QD | ||
-. _.--4 ;- --. | |||
e m .w m En9d wfWg inc g) PrgH | Ocm3 Tc era e 203 f(41911 e m.w m En9d wfWg inc g) PrgH 9202110166 920131 o | ||
wnnu, cmnecmut cans esco Tew ww ca.mn wson PDR. ADOCK 05200002:- | |||
PDR- | -A-PDR- | ||
-. ~. | |||
Enclosure I to LD 92 010 RESPONSE TO NRC REQUESTS FOR ADDITIONAL INFORMATION | Enclosure I to LD 92 010 RESPONSE TO NRC REQUESTS FOR ADDITIONAL INFORMATION DIVISION OF LICENSEE PERFORMANCE AND QUAlIIY EVALUATION | ||
DIVISION OF LICENSEE PERFORMANCE AND QUAlIIY EVALUATION | |||
(' | (' | ||
i | i h | ||
Ouestion 1 4 | 6 Ouestion 1 4 | ||
Describe the' basic framework of the RAP including the scope, objective, basic definitions | Describe the' basic framework of the RAP including the scope, objective, basic definitions and elements.- | ||
and elements.- | |||
_ Response 1 The RAP. Plan describes the basic framework, scope, definitions, and elements of the RAP. | _ Response 1 The RAP. Plan describes the basic framework, scope, definitions, and elements of the RAP. | ||
Questloa.2 Describe the performance goals / targets, problem prediction and correction, and corrective actions program.- | Questloa.2 Describe the performance goals / targets, problem prediction and correction, and corrective actions program.- | ||
Response 2 The actual goals fot the performance of systems important to safety are given in the PRA. | Response 2 The actual goals fot the performance of systems important to safety are given in the PRA. | ||
.Sprem goals for production will be given in the RAMI when it is performed. The RAP Plan describes how these goals are to be met but does not repeat the goals themselves. | |||
Section 3.3 of the RAP plan describes the Corrective Actions Program. | Section 3.3 of the RAP plan describes the Corrective Actions Program. | ||
Question 3 Describe how the RA" will address plant aging concerns. | Question 3 Describe how the RA" will address plant aging concerns. | ||
| Line 71: | Line 72: | ||
Response 4 The organization and administration aspect if the RAP are generally described in the RAP Plan. | Response 4 The organization and administration aspect if the RAP are generally described in the RAP Plan. | ||
.. -.. - -- -.~ | |||
Question S Describe the approach for- providing feedback to the designers when actual plant performance data consistently differs from the designers PRA/ RAP assumptions. | ..-... - - - ~.. | ||
EtEnomel | Question S Describe the approach for-providing feedback to the designers when actual plant performance data consistently differs from the designers PRA/ RAP assumptions. | ||
EtEnomel | |||
- The PRA will be kept current with the plant operation by the use of a common data base for both the PRA and the RCM programs. If the designers are responsible to maintain the PRA then the feedback will be automatic. If the Utility elects to maintain the PRA themselves, the feedback will be through the Combustion Engineering Owners Group | |||
- (CEOG). | |||
] | |||
) | |||
Ouestion 6 Describe the major programmatic interfaces between the RAP and other areas. | Ouestion 6 Describe the major programmatic interfaces between the RAP and other areas. | ||
Besconse 6 The programmatic interfaces are descr" 1in the RAP Plan. | Besconse 6 The programmatic interfaces are descr" 1in the RAP Plan. | ||
| Line 83: | Line 86: | ||
Ouestion 8' Will the C E RAP differ from the EPRI Requirements Document description of a RAP?- | Ouestion 8' Will the C E RAP differ from the EPRI Requirements Document description of a RAP?- | ||
Response 8 The RAP Plan is generally consistent with the EPRI description. The EPRI description | Response 8 The RAP Plan is generally consistent with the EPRI description. The EPRI description | ||
-repeated many of the RAMI goals in the plan but the C-E plan only refers to the goals that are in the PRA and RAMI reports. | |||
i. | i. | ||
P | P | ||
+.r.<- | |||
en- | ,,., ~ - -. | ||
---e n,- | |||
en- | |||
-}} | |||
Latest revision as of 11:32, 13 December 2024
| ML20092B876 | |
| Person / Time | |
|---|---|
| Site: | 05200002 |
| Issue date: | 01/31/1992 |
| From: | Erin Kennedy ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20092B879 | List: |
| References | |
| LD-92-010, LD-92-10, NUDOCS 9202110166 | |
| Download: ML20092B876 (4) | |
Text
,
7-o ggg ASE A BROWN BOVE Al 1
January 31,1992 LD 92-010 Docket No.52-002.-
U. S. Nuclear Regulatory Commission
' Attn:- Document Control Desk Washington, DC 20555
Subject:
Reliability Assurance Program
-Referenceu (A) Letter LD 91054, E. II. Kennedy (C-E) to D. M. Crutchfield-
-(NRC), dated October 22,1991 (B)' Letter, Division of Licensee Performance and Quality Evaluation l
RAls,- T. V. Wambach (NRC) to E. H. Kennedy (C-E), dated -
- October 10,1991
Dear Sirs:
Submittal of th'e enclosed report,' " Reliability Assurance Program for the System 80+*
Nuclear Power Plant," fulfills the commitment of Reference (A), item 6, to provide a
- reliability assurance program description.' Enclasure I provides brief descriptions of how the
- report responds to each_ question of Reference (B).
ShoUld you have any' questions en the enclosed material, please contact me or Mr. Stan Ritterbusch of my staff at (203) 285-5206.
Very truly yours, COMBUSTION, ENGINEERING, INC.
Y
/
3 l
f'.ym[d e l
E. H. Kennedy
~
Director Nuclear Systems Licensing
- gdh:lw L
Enclosures:
- As Stated cci J. Trotter (EPRI)
- T. Wambach (NRC) :
ABB_ Combustion Engineering Nuclear Power-QD
-. _.--4 ;- --.
Ocm3 Tc era e 203 f(41911 e m.w m En9d wfWg inc g) PrgH 9202110166 920131 o
wnnu, cmnecmut cans esco Tew ww ca.mn wson PDR. ADOCK 05200002:-
-A-PDR-
-. ~.
Enclosure I to LD 92 010 RESPONSE TO NRC REQUESTS FOR ADDITIONAL INFORMATION DIVISION OF LICENSEE PERFORMANCE AND QUAlIIY EVALUATION
('
i h
6 Ouestion 1 4
Describe the' basic framework of the RAP including the scope, objective, basic definitions and elements.-
_ Response 1 The RAP. Plan describes the basic framework, scope, definitions, and elements of the RAP.
Questloa.2 Describe the performance goals / targets, problem prediction and correction, and corrective actions program.-
Response 2 The actual goals fot the performance of systems important to safety are given in the PRA.
.Sprem goals for production will be given in the RAMI when it is performed. The RAP Plan describes how these goals are to be met but does not repeat the goals themselves.
Section 3.3 of the RAP plan describes the Corrective Actions Program.
Question 3 Describe how the RA" will address plant aging concerns.
Etspwse 3 The RAP addressed the plant aging concerns as part of the Reliability Centered Maintenance Program (Section 4). Equipment repairs are tracked and repair frequencies higher than expected are investigated.
Question 4 Describe the organization and administration aspects of the RAP.
Response 4 The organization and administration aspect if the RAP are generally described in the RAP Plan.
.. -.. - -- -.~
..-... - - - ~..
Question S Describe the approach for-providing feedback to the designers when actual plant performance data consistently differs from the designers PRA/ RAP assumptions.
EtEnomel
- The PRA will be kept current with the plant operation by the use of a common data base for both the PRA and the RCM programs. If the designers are responsible to maintain the PRA then the feedback will be automatic. If the Utility elects to maintain the PRA themselves, the feedback will be through the Combustion Engineering Owners Group
- (CEOG).
]
)
Ouestion 6 Describe the major programmatic interfaces between the RAP and other areas.
Besconse 6 The programmatic interfaces are descr" 1in the RAP Plan.
Question 7 Provide one example.
Response 7 No example was given in the RAP Plan, but one will be added in a future update.
Ouestion 8' Will the C E RAP differ from the EPRI Requirements Document description of a RAP?-
Response 8 The RAP Plan is generally consistent with the EPRI description. The EPRI description
-repeated many of the RAMI goals in the plan but the C-E plan only refers to the goals that are in the PRA and RAMI reports.
i.
P
+.r.<-
,,., ~ - -.
---e n,-
en-
-