ML20099M462: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:y OPERATLNG DATA REPORT DOCKET NO. 50-269 DATE _03-15-85 COMPLETED BY       J A. Reavis TELEPHONE     704-373-7567 OPERATING STATUS
{{#Wiki_filter:y OPERATLNG DATA REPORT DOCKET NO.
,                    3,- Unit Name:         Oconee'1-                                         Notes I                   2. Reporting Period: February 1. 1985-Februnrv 28. 1985                     Year-to-date and cumulative
50-269 DATE _03-15-85 COMPLETED BY J A.
:                                                              2568                            capacity factors are calcu-
Reavis TELEPHONE 704-373-7567 OPERATING STATUS 3,- Unit Name:
Oconee'1-Notes I
: 2. Reporting Period: February 1. 1985-Februnrv 28. 1985 Year-to-date and cumulative
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross'31We):               934                       lated using a weighted
2568 capacity factors are calcu-
: 5. Design Electrical Rating (Net $1We):         886                      . average for maximum
: 4. Nameplate Rating (Gross'31We):
: 6. Maximum Dependable Capacity (Gross MWe):         899                   dependable capacity.
934 lated using a weighted 886
: 7. Maximum Dependable Capacity (Net MWe):           860 8.' If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
. average for maximum
: 5. Design Electrical Rating (Net $1We):
dependable capacity.
: 6. Maximum Dependable Capacity (Gross MWe):
899
: 7. Maximum Dependable Capacity (Net MWe):
860 8.' If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
None
                  ' 9. Power Level To Which Restricted. If Any (Net MWe):         nem a
' 9. Power Level To Which Restricted. If Any (Net MWe):
nem a
: 10. Reasons For Restrictions,If Any:
: 10. Reasons For Restrictions,If Any:
1 This Month             Yr. to.Date         Cumulative
1 This Month Yr. to.Date Cumulative
                . I1. Hours In Reporting Period 672.0                 1 416.0             101 905.0
. I1. Hours In Reporting Period 672.0 1 416.0 101 905.0
: 12. Number Of Hours Reactor Was Critical                 672.0                 1 413.2               73 406.2
: 12. Number Of Hours Reactor Was Critical 672.0 1 413.2 73 406.2
: 13. Reactor Reserve Shutdown Hours                         --                    --
: 13. Reactor Reserve Shutdown Hours
$                14. Hours Generator On Line                             672.0                 1 407.6               70 111.6-
: 14. Hours Generator On Line 672.0 1 407.6 70 111.6-
: 15. Unit Reserve Shutdown Hours                         --                        ---                    ---
: 15. Unit Reserve Shutdown Hours 16c Gross Thermal Energy Generated (MWH)-
16c Gross Thermal Energy Generated (MWH)-             1 694 424'               3 591 309           16R 465 073
1 694 424' 3 591 309 16R 465 073
;                                                                          589 730
=.17. G<oss Electrical Energy Generated (MWH) 589 730 1 248 310 58 584 990
        = .17. G<oss Electrical Energy Generated (MWH) 1 248 310             58 584 990
: 18. Net Electrical Energy Generated (MWH) 564 231~
;                                                                        564 231~
1 193 476 55 525 762
: 18. Net Electrical Energy Generated (MWH)           .                          1 193 476             55 525 762
~ 19. Unit Service Factor 100.0 99.4 68.8 3
            ~ 19. Unit Service Factor                                     100.0                       99.4                 68.8 3               20. Unit Availability Factor                               100.0                       99.4-               68.8
: 20. Unit Availability Factor 100.0 99.4-68.8
: 21. Unit Capacity Factor (Using MDC Net)                     97.6                     on.n               -61.2
: 21. Unit Capacity Factor (Using MDC Net) 97.6 on.n
: 22. Unit Capacity Factor (Using DER Net)                   94.8                     95.1                 61.5
-61.2
            '23. Unit Forced Outage Rate                                     0.0                       0.6               15.8
: 22. Unit Capacity Factor (Using DER Net) 94.8 95.1 61.5
'23. Unit Forced Outage Rate 0.0 0.6 15.8
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
* 4                     None
None 4
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                       Forecast                             '
: 26. Units in Test Status (Prior to Commercial Operation):
Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION hh$
        ,              hh$
!69 ei p6 g.
g.
PDR
                                                    !69 PDR ei p6
\\
                                                                                                                            \     \
\\


  ,                                                . = -
. = -
                ,g                   ,4.'
,g
w               =
,4.'
      .ji ;                                                     AVERAGE DALLY UNIT POWER LEVEL DOCKET NO. 50-269 UNIT Oconee 1 -
w
DATE na/ts/as COMPLETED BY   J. A. Reavis TELEPHONE. 704-373-7567 -
=
1
.ji ;
                          -MONTH'-         -Febkuarv.-1985'
AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.
                          ' DAY .'-       AVERAGE DAILY )POWER LEVEL '
50-269 UNIT Oconee 1 -
DAY     AVERAGE DAILY POWER LEVEL
DATE na/ts/as COMPLETED BY J. A. Reavis TELEPHONE.
;                                              '(MWe-Net)                                 (MWa-Ne t) 1-                         '864               17                   758 L2 : ,                       864               18-                 756 3-.                         864               19'                   749 4'                           864               20                   748 L5                           863               21                   841
704-373-7567 1
                            -61                           863               22                   859 7                           863               23                   863
-MONTH'-
                  <          8.                           863               24                   863 9-                           863               25                   862
-Febkuarv.-1985'
                          '10                             g63-           . 26 -                 861
)
:' 1 1.                           863             27                   861
' DAY.'-
                        ~12L                              864              28                    861
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
'(MWe-Net)
(MWa-Ne t) 1-
'864 17 758 L2 :,
864 18-756 3-.
864 19' 749 4'
864 20 748 L5 863 21 841
-61 863 22 859 7
863 23 863 8.
863 24 863 9-863 25 862
'10 g63-
. 26 -
861
:' 1 1.
863 27 861
[
[
                      !13                                 863             29                   ---
~12L 864 28 861
: 14.                             863             30                   ---
!13 863 29 14.
                      '15 790             31'                   ---
863 30
16- -                            750
'15 790 31' 16- -
      ,              ~lNSTRUCTIONS
750
                    .On' this. format, : list the average ~ daily unit power level in HWe-Net for each day in the: reporting month.- Compute to the nearest whole megawatt.
~lNSTRUCTIONS
.On' this. format, : list the average ~ daily unit power level in HWe-Net for each day in the: reporting month.- Compute to the nearest whole megawatt.


4 UNIT SHUTDOWNS AND POWER REDUCTIONS           DOCKET NO. so-269                   ~
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. so-269
UNIT NAME oconee 1 DATE 3/1s/8s REPORT MONTH February 1985         COMPLETED BY   J. A. Reavis TELEPHONE 704-373-7567 "s_
~
O e            g ju       License               y                       Cause & Corrective 37      "c   uSE                     a         g No. Date     ~. gh           g. ,g g c       Event     ,&r,     gm,                       Action to F
UNIT NAME oconee 1 DATE 3/1s/8s REPORT MONTH February 1985 COMPLETED BY J.
R o~he       ce ta!
A.
zmo         Report #   ai No g;
Reavis TELEPHONE 704-373-7567 "s_
Prevent Recurrence uo 3-p     85-02-15   F       --
O g ju License y
A     --
Cause & Corrective e37 "c
HH     PUMPXX   Repair Leak on Heater Drain Pump 1               2                                               3                       4 Reason:                                         Method:                 Exhibit G - Instructions S Sc e led     A-Equipment Failure (Explain)                   1-Manual                 for Preparation of Data B-Maintenance or Test                           2-Manual Scram           Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram       Event Report (LER)
uSE g
D-Regulatory Restriction                       4-Other (Explain)       File (NLREG-0161)
a No.
E-Operator Training f License Examination F-Administrative                                                       5 G-Operational Error (Explain)                                           Exhibit I - Same Source II-Other (Explain)
Date
~.
gh g.
,g g c Event
,&r, gm, Action to R
he ta!
ai g;
F o~
ce zmo Report #
No uo Prevent Recurrence 3-p 85-02-15 F
A HH PUMPXX Repair Leak on Heater Drain Pump 1
2 3
4 Reason:
Method:
Exhibit G - Instructions S Sc e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator Training f License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source II-Other (Explain)
(O /7 71
(O /7 71


DOCKET NO:   50-269 UNIT: oconee 1 DATE:   3/15/85 NARRATIVE  
DOCKET NO:
50-269 UNIT:
oconee 1 DATE:
3/15/85 NARRATIVE  


==SUMMARY==
==SUMMARY==
Month: February, 1985 The unit operated at 100% during most of the month except to make repairs on a heater drain pump on February 15th.
Month: February, 1985 The unit operated at 100% during most of the month except to make repairs on a heater drain pump on February 15th.


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name: .0conee Unit 1                                                 ,
Facility name:.0conee Unit 1 2.
: 2. Scheduled next refueling shutdown:       March 1986                           ,
Scheduled next refueling shutdown:
: 3. Scheduled restart following refueling:       May 1986                         ,
March 1986 3.
: 4. Will refueling or resumption of operation thereaf:er require a technical specification change or other license amendment?         Yes    ,
Scheduled restart following refueling:
If yes, what will these be?     Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?         N/A     ,
May 1986 4.
: 5. Scheduled date(s)/Afor   submitting proposed licensing action and supporting information:     N                                                           ,
Will refueling or resumption of operation thereaf:er require a technical Yes specification change or other license amendment?
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
If yes, what will these be?
: 7. Number of fuel assemblies (a) in the core:       177       .
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
(b) in the spent fuel pool:       999*     .
N/A Scheduled date(s)/Afor submitting proposed licensing action and supporting 5.
: 8. Present licensed fuel pool capacity:       1312                               ,
information:
Size of requested or planned increase:                                       .
N 6.
: 9. Projected date of l'ast refueling which can be accommodated by present licensed capacity:     August 1991                                           ,
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Date:   March 15, 1985 DUKE POWER COMPANY                                                            ,
7.
Name of
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
999*
8.
Present licensed fuel pool capacity:
1312 Size of requested or planned increase:
9.
Projected date of l'ast refueling which can be accommodated by present licensed capacity:
August 1991 DUKE POWER COMPANY Date:
March 15, 1985 Name of


==Contact:==
==Contact:==
J. A. Reavis               Phone:   704-373-7567
J. A. Reavis Phone:
704-373-7567
* Represents the combined total for Units 1 and 2'
* Represents the combined total for Units 1 and 2'


I,   <
I, H-
H-          -
' j.jg n.-
        ' j.jg                                                                                 .
l' l'
n .-
OPERATING DATA REPORT DOCKET NO.
    .:  l' l'
50-270 DATE 03-15-55 COMPLETED BY JA-Reavis TELEPHONE 704-373-7567 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 50-270 DATE 03-15-55 COMPLETED BY   JA- Reavis TELEPHONE   704-373-7567 OPERATING STATUS
: 1. Unit Name:~
: 1. Unit Name:~           OC "*
OC "*
* 2                                 ' '''
* 2
: 2. Reporting Period: February 1. 1985-February 28, 1985             Year-to-date and cumulative
: 2. Reporting Period: February 1. 1985-February 28, 1985 Year-to-date and cumulative
: 3. Licensed Thermal Power (MW ):         2568                       capacity factors are calcu-4.' Nameplate Rating (Gross MWe):             934                   lated using a weighted S. : Design Electrical Rating (Net MWeI:     886                   average for ma & um                     .
: 3. Licensed Thermal Power (MW ):
2568 capacity factors are calcu-4.' Nameplate Rating (Gross MWe):
934 lated using a weighted S. : Design Electrical Rating (Net MWeI:
886 average for ma & um
: 6. Maximum Dependable Capacity (Gross MWe):
899
_ dependable capacity.
1
1
: 6. Maximum Dependable Capacity (Gross MWe):        899              _ dependable capacity.
- 7. Maximum Dependable Capacity (Net MWe):
                    - 7. Maximum Dependable Capacity (Net MWe):   _
860
860
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
None
: 9. Power Level To Which Restricted,if Any (Net MWe):-           M=
: 9. Power Level To Which Restricted,if Any (Net MWe):-
                  = 10. k<asons For Restrictions,if Any:
M=
                                                                            .. This Month       Yr..to Date       Cumulative
= 10. k<asons For Restrictions,if Any:
                  ' i1. Hours In Reporting Period .                             672.0             1 416.0         91 825.0
.. This Month Yr..to Date Cumulative
                - 12. Number Of Hours Reactor Was Critical                     490.8             1 234.8         67 332.2
' i1. Hours In Reporting Period.
: 13. Reactor Reserve Shutdown Hours                         ---                  ---                ---
672.0 1 416.0 91 825.0
: 14. Hours Generator On.Line                                 485.7             1 229.7         66 173.9
- 12. Number Of Hours Reactor Was Critical 490.8 1 234.8 67 332.2
: 15. Unit Reserve Shutdown Hours -                          ---                  ---                ---
: 13. Reactor Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)             - 1 096 727               2 990 901 -     157 759 206~
: 14. Hours Generator On.Line 485.7 1 229.7 66 173.9
            .L 17. Gross Electrical Energy Generated (MWH)                    qui 77n           -1 005 030       53 732 946
: 15. Unit Reserve Shutdown Hours -
: 18. Net Electrical Energy Generated (MWH)                     345 026             958 683       51 068 216
: 16. Gross Thermal Energy Generated (MWH)
: 19. Unit Service Factor                                       72.3                 86.9               72.1
.L 17. Gross Electrical Energy Generated (MWH)
: 20. Unit Availability Factor                                   72.3 86.9               72.1
- 1 096 727 2 990 901 -
              ' 21. Unit Capacity Factor (Using MDC Net)                         59.7                 78.7             64.5 22.' Unit Capacity Factcr (Using DER Net)                       58.0                 76.4
157 759 206~
: 23. Unit Forced Outage Rate 62.8 0.0                 0.0             14.4 24.' Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht:
qui 77n
                        ' Currently Refueling
-1 005 030 53 732 946
: 25. If Shut Down At End Of Report Perind. Estimated Date of Startup:       April 24, 1985
: 18. Net Electrical Energy Generated (MWH) 345 026 958 683 51 068 216
: 19. Unit Service Factor 72.3 86.9 72.1
: 20. Unit Availability Factor 72.3 86.9 72.1
' 21. Unit Capacity Factor (Using MDC Net) 59.7 78.7 64.5 22.' Unit Capacity Factcr (Using DER Net) 58.0 76.4 62.8
: 23. Unit Forced Outage Rate 0.0 0.0 14.4 24.' Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht:
' Currently Refueling
: 25. If Shut Down At End Of Report Perind. Estimated Date of Startup:
April 24, 1985
: 26. Units in Test StatunPrior to Commercial Operationi:
: 26. Units in Test StatunPrior to Commercial Operationi:
Forecast           Achiewd INITIA L CRIT'CA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forecast Achiewd INITIA L CRIT'CA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION (0/771
                                                        .                                                                  (0/771


                                          . AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-270 UNIT   Ocnnee 2 DATE   nt /1 s /As COMPLETED BY     .J.A. Reavis TELEPHONE   -704-373-7567-MONTH   February, 1985 DAY AVERAGE DAILY POWER. LEVEL         DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-270 UNIT Ocnnee 2 DATE nt /1 s /As COMPLETED BY
.J.A. Reavis TELEPHONE
-704-373-7567-MONTH February, 1985 DAY AVERAGE DAILY POWER. LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Ne t)
(MWe-Ne t)
                'l               701                     17                 701 2 .~             700-                   18                 701 3               701                   19                 697 4'               698                   20                 699 5                 729                   21                   75 6                 822                   22                 ---
'l 701 17 701 2.~
              -7                 821                   23                 ---
700-18 701 3
8                769                   24                 ---
701 19 697 4'
9                702                   25                 ---
698 20 699 5
10                   7nt                   26                 ---
729 21 75 6
          ;11 702                   27                 ---
822 22
          -12                   701                   28                 ---
-7 821 23 8
13                 700                   29                 ---
769 24 9
14                   701                   30                 ---
702 25 10 7nt 26
15                   701                   31                 ---
;11 702 27
16 701 lNSTRUCTIONS On this format, -Ilst the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
-12 701 28 13 700 29 14 701 30 15 701 31 16 701 lNSTRUCTIONS On this format, -Ilst the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.


UNIT SHUTDOWS AND POWER REDUCTIONS           DOCKET NO. 50-270                       -
UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO. 50-270 UNIT NAME oconee 2 DATE 3/1s/85 REPORT N) NTH February 1985 COMPLETED BY J. ' A. Reavis TELEPHONE 704-373-7567 i
UNIT NAME oconee 2 DATE 3/1s/85 REPORT N) NTH February 1985         COMPLETED BY   J. ' A. Reavis
O o my License y
___                                                TELEPHONE 704-373-7567 iO c                o my     License               y                       Cause & Corrective
Cause & Corrective c
                        .       32     "a       m3E
No.
* g No. Date        %
Date 32 "a
                            $ o-
m3E g
                                  %h 5E
%h
                                          -S E
-S yye Event h
yye
g Action to 5E E
                                                    %5$
%5$
Event h
Ei 53 H
Ei g
o-cr zeo Report #
53 Action to H             cr     zeo       Report #     mo       uo                     Prevent Recurrence 2-p     85-02-01     S     -
mo uo Prevent Recurrence 2-p 85-02-01 S
H       -
H RC FUELXX Core Conservation 3p 85-02-05 S
RC     FUELXX   Core Conservation 3p       85-02-05     S     --
A CH HTEXCH Steam Generator High Level 4-p 85-02-08 S
A       -
H RC FUELXX Core Conservation 1
CH     HTEXCH   Steam Generator High Level 4-p     85-02-08     S     --
85-02-21 S
H       -
186.27 C
RC     FUELXX   Core Conservation 1       85-02-21     S   186.27     C       1                   RC     FUELXX   End of Cycle 7 Refueling Outage 1               2                                                 3                       4 Reason:                                           Method:                 Exhibit G - Instructions SS e uled       A-Equipment Failure (Explain)                     1-Manual                 for Preparation of Data B-Maintenance or Test                             2-Manual Scram           Entry Sheets for Licensee C-Refueling                                       3-Automatic Scram       Event Report (LER)
1 RC FUELXX End of Cycle 7 Refueling Outage 1
D-Regulatory Restriction                           4-Other (Explain)       File (NLREG-0161)
2 3
E-Operator Training G License Examination F-Administrative                                                         5 G-Operational Error (Explain)                                               Exhibit I - Same Source Il-Other (Explain)
4 Reason:
Method:
Exhibit G - Instructions SS e uled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator Training G License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source Il-Other (Explain)
- (Q /77)
- (Q /77)


b DOCKET NO:     50-270 UNIT:     Oconee 2 DATE:     3/15/85 NARRATIVE  
b DOCKET NO:
50-270 UNIT:
Oconee 2 DATE:
3/15/85 NARRATIVE  


==SUMMARY==
==SUMMARY==
Month:
F=hrnarv iges The unit ran most of the month at 854 to extend core life in order to bring the unit out for its and of cycle 7 refueling outage on a weekend. The unit began its refueling outage on February 21, following 439 days of continuous operation, establishing a world record.


Month: F=hrnarv iges The unit ran most of the month at 854 to extend core life in order to bring the unit out for its and of cycle 7 refueling outage on a weekend. The unit began its refueling outage on February 21, following 439 days of continuous operation, establishing a world record.                      .
MONTHLY REFITELING INFORMATION REQUEST Oconee Unit 2 1.
 
Facility name:
MONTHLY REFITELING INFORMATION REQUEST
2.
: 1. Facility name:                       Oconee Unit 2                                                                          ,
Scheduled next refueling shutdown:
: 2. Scheduled next refueling shutdown:                                                   Currently Refueling                   .
Currently Refueling 3.
: 3. Scheduled restart following refueling:                                                                                     .
Scheduled restart following refueling:
          - 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?                                                       Yes       ,
- 4.
If yes, what will these be?                                         Technical                 Specification   Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?                                                         N/A   ,
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information:                       N/A                                                                                     ,
Yes If yes, what will these be?
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 7. Number of fuel assemblies (a) in the core:                                                       177         .
N/A 5.
4, (b) in the spent fuel pool:                                         999     .
Scheduled date(s) for submitting proposed licensing action and supporting information:
l
N/A 6.
: 8. Present licensed fuel pool capacity:                                                     1312                             .
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
.                Size of requested or planned increase:                                                                                     .
4, 7.
          . 9. Projected date of last refueling which can be accommodated by present licensed capacity:                 August 1991                                                                             .
Number of fuel assemblies (a) in the core:
                                                                                                                                                      , i DUKE POWER COMPANY                                                                             Date:   March 15, 1985     .
177 l
i Name of
(b) in the spent fuel pool:
999 8.
Present licensed fuel pool capacity:
1312 Size of requested or planned increase:
. 9.
Projected date of last refueling which can be accommodated by present licensed capacity:
August 1991 i
DUKE POWER COMPANY Date:
March 15, 1985 i
Name of


==Contact:==
==Contact:==
J. A. Reavis                                                   Phone: 704-373-7567 s we,   - ,  e- - ,n , ,. ,- ,,---,.,,.rvc.,       ,,.,,,,,,_g--,,-,,..,,v,,,,,,.ww.e-n.,.,_mm.,,,mn,
J. A. Reavis Phone: 704-373-7567 s
we, e- -,n
,,---,.,,.rvc.,
,,.,,,,,,_g--,,-,,..,,v,,,,,,.ww.e-n.,.,_mm.,,,mn,
,m,,-_,,,._,..-,-,,n,,
- -., -, - -e,.


Q     ,
Q 4
4 OPERATLNG DATA REPORT DOCKET NO.     50-287 DATE _ 03-15-85 CO31PLETED BY       J.A. Reavis TELEPHONE . 704-373-7567 OPERATING STATUS L
OPERATLNG DATA REPORT DOCKET NO.
: 1. Unit Name:               oconee 3.                                 Notes
50-287 DATE _ 03-15-85 CO31PLETED BY J.A. Reavis TELEPHONE. 704-373-7567 OPERATING STATUS L
: 2. Reporting Period: Fahrunrv 1. 19R5-Fahrtinrv 9R. tor 5               Year-to-date and cumulative
: 1. Unit Name:
: 3. Licensed Thermal Power (31Wt):             2568                       capacity factors are calcu-
oconee 3.
              ' 4. Nameplate Rating (Grosi31We):
Notes
                              ~
: 2. Reporting Period: Fahrunrv 1.
934                   lated.using a weighted
19R5-Fahrtinrv 9R. tor 5 Year-to-date and cumulative
              . 5. Design Electrical Rating (Net alWe):           886                   average for maximum 6.'.\taximum Dependable Capacity (Gross 31We):             899           dependable capacity.
: 3. Licensed Thermal Power (31Wt):
: 7. Slaximum De'pendable Capacity (Net alwe):               860
2568 capacity factors are calcu-
' 4. Nameplate Rating (Grosi31We):
934 lated.using a weighted
~
. 5. Design Electrical Rating (Net alWe):
886 average for maximum 6.'.\\taximum Dependable Capacity (Gross 31We):
899 dependable capacity.
: 7. Slaximum De'pendable Capacity (Net alwe):
860
: 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
None
None
: 9. Power Level To Which Restricted. lf Any (Net alwel:
: 9. Power Level To Which Restricted. lf Any (Net alwel:
;            10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:
This .\lonth         Yr..to.Date         Cumulative
This.\\lonth Yr..to.Date Cumulative
            - II. Hours In Reporting Period                               672.0               1 416.0             89 472.0 12.' Number Of Hours Reactor Was Critical                   672.0               1 416.0             64 646.6
- II. Hours In Reporting Period 672.0 1 416.0 89 472.0 12.' Number Of Hours Reactor Was Critical 672.0 1 416.0 64 646.6
: 13. Reactor Reserve Shutdown Hours .                                                                     ---
: 13. Reactor Reserve Shutdown Hours.
            .14. Hours Generator On.Line                                 672.0               1 416.0             63 474.1
.14. Hours Generator On.Line 672.0 1 416.0 63 474.1
: 15. Unit Reserve Shutdown Hours                             -~
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (31WH) .             1 713 930               3 626 399         155 423 440
-~
: 17. Gross Electrical Energy Generated (31WH) '             593 420             1 249 250           53 674 184
: 16. Gross Thermal Energy Generated (31WH).
: 18. Net Electrical Energy Generated (31WH)                 569 560             1 198 505           51 119 878
1 713 930 3 626 399 155 423 440
: 19. Unit Service Factor                                     100.0                   100.0                   70.9
: 17. Gross Electrical Energy Generated (31WH) '
: 20. Unit Availability Factor.                               100.0                   100.0                   70.9
593 420 1 249 250 53 674 184
: 21. Unit Capacity Factor (Using .\lDC Net)                     98.6                   98.4                 66.3
: 18. Net Electrical Energy Generated (31WH) 569 560 1 198 505 51 119 878
          . 22. Unit Capacity Factor (Using DER Net)                       95.7                   95.5                 64.5
: 19. Unit Service Factor 100.0 100.0 70.9
: 23. Unit Forced Outage Rate                                     0.0                   0.0                 14.1
: 20. Unit Availability Factor.
100.0 100.0 70.9
: 21. Unit Capacity Factor (Using.\\lDC Net) 98.6 98.4 66.3
. 22. Unit Capacity Factor (Using DER Net) 95.7 95.5 64.5
: 23. Unit Forced Outage Rate 0.0 0.0 14.1
: 24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date,and Duration of Each):
: 24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date,and Duration of Each):
Refueling - August 16, 1985 - 9 Weeks
Refueling - August 16, 1985 - 9 Weeks
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status t Prior to Commercial Operation):                       Forecast
: 26. Units in Test Status t Prior to Commercial Operation):
* Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY CO.\l%1ERCIA L OPER A TION 9
Forecast Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY CO.\\l%1ERCIA L OPER A TION 9
(9/77)
(9/77)


                .M AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-287 UNIT 'Oconee 3 DATE   n1/is/8s COMPLETED BY   _J.A. Reavis TELEPHONE _ 704-373-7567 MONTH           February -1985 l'                           DAY l         AVERAGE DAILY POWER LEVEL           DAY l-                                                                                                              AVERAGE DAILY POWER LEVEL (MWe-Ne t)
.M AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
(MWe-Ne t) 1 848                   17                                                                         849
50-287 UNIT 'Oconee 3 DATE n1/is/8s COMPLETED BY
                              '2 -                       sag                   18                                                                         849 3                         aan                   19                                                                         na9 4
_J.A. Reavis TELEPHONE _ 704-373-7567 MONTH February -1985 l'
a49                   20                                                                         aag 5                         'naa                   21                                                                         nan 6                         848                   22                                                                         846 7                         848                   23                                                                         847 8                           848                   24                                                                         848
DAY l AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l-(MWe-Ne t)
                            -9                           848                   25                                                                         847 to                           ato                   26                                                                         a4g 11 849                   27                                                                         848 12                           849                   28                                                                         848
(MWe-Ne t) 1 848 17 849
                        ' 13 .                         848                   29                                                                         ---
'2 -
14 849                   30                                                                         ---
sag 18 849 3
15                           829                   31                                                                         ---
aan 19 na9 4
                        . 16'                         gag
a49 20 aag 5
                        - INSTRUCTIONS On this format, in the reporting month. list the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.
'naa 21 nan 6
O ii.,..-,. -   - .            ..      .
848 22 846 7
848 23 847 8
848 24 848
-9 848 25 847 to ato 26 a4g 11 849 27 848 12 849 28 848
' 13.
848 29 14 849 30 15 829 31
. 16' gag
- INSTRUCTIONS On this format, in the reporting month. list the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.
O ii.,..-,. -


                                            . UNIT SHUTDOWNS AND POWER REDUCTIONS           DOCKET NO. 50-287               .
. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME   oconee 3 DATE   3/is/8s REPORT MONTH rownmrv ions         COMPLETED BY   J. A. neavis TELEPHONE   704-373-7567 "s_
50-287 UNIT NAME oconee 3 DATE 3/is/8s REPORT MONTH rownmrv ions COMPLETED BY J. A.
O e              gj         License             y                        cause & Corrective 32 gy "cg    n  c&                   *
neavis TELEPHONE 704-373-7567 "s_
* Action to flo. Date     .                ;y           Event     ,&r,     g F
O gj License cause & Corrective y
EE R o-         8 a:
e32 "c
                                            %2b zmo         Report #   RE mo      SE                    Prevent Recurrence uo 3-p   85-02-1s   S   --
c&
B       --
n flo.
CC   VALVEX     Turbine Coetrol & Stop Valve Movement pts 1           2                                               3                       4 Reason:                                         Method:                 Exhibit G - Instructions F c g     A-Equipnent Failure (Explain)                   1-Manual                 for Preparation of Data B-Maintenance or Test                           2-Manual Scram           Entry Sheets for Licensee C-Refueling                                     3-Autanatic Scram       Event Report (LER)
Date gy g
D-Regulatory Restriction                       4-Other (Explain)       File (NLREG-0161)
;y Event
E-Operator Training f iLicense Examination F-Adninistrative                                                       5 G-Operational Error (Explain)                                           Exhibit I - Same Source H-Other (Explain)
,&r, g
Action to R
EE 8
%2b RE SE F
o-a:
zmo Report #
Prevent Recurrence mo uo 3-p 85-02-1s S
B CC VALVEX Turbine Coetrol & Stop Valve Movement pts 1
2 3
4 Reason:
Method:
Exhibit G - Instructions F
c g
A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator Training f License Examination i
F-Adninistrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)


                ~
_y,.
_y,.
9 DOCKET NO:   50-287
~
                                                                            ' UNIT: Oconee 3 DATE: 3/15/85 NARRATIVE  
9 DOCKET NO:
50-287
' UNIT:
Oconee 3 DATE:
3/15/85 NARRATIVE  


==SUMMARY==
==SUMMARY==
Month: February 1985 The unit ran at 1004 throughout most of the month except to perform Turbine Control and stop valve movement PT's on February 15th.
Month: February 1985 The unit ran at 1004 throughout most of the month except to perform Turbine Control and stop valve movement PT's on February 15th.
I' l
I' l
l
l
  ~
~
i
i


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name:     Oconee Unit 3                                         ,
Facility name:
2.= Scheduled next refueling shutdown:       August 1985                     ,
Oconee Unit 3 2.= Scheduled next refueling shutdown:
: 3. Scheduled restart following refueling:       October 1985                 ,
August 1985 3.
: 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?         Yes      ,
Scheduled restart following refueling:
If yes, what will these be?     Technical Specification Revision a
October 1985 4.
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?         N/A   ,
Will refueling or resumption of operation thereaf ter require a technical Yes specification change or other license amendment?
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information:       N/A                                                   .
If yes, what will these be?
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures) .
Technical Specification Revision a
: 7. Number of fuel assemblies (a) in the core: 177               ,
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
(b) in the spent fuel pool:       255     .
N/A 5.
          ~8. Present licensed fuel pool capacity:       875                           ,
Scheduled date(s) for submitting proposed licensing action and supporting information:
Size of requested or planned increase:                                   .
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
255
~8.
Present licensed fuel pool capacity:
875 Size of requested or planned increase:
^
^
: 9. Projected date of last refueling which can be accommodated by present licensed capacity:     August 1991                                       .
9.
DUKE POWER COMPANY                               Date:   March 15, 1985   ,
Projected date of last refueling which can be accommodated by present licensed capacity:
                                                                          ~   ~
August 1991 DUKE POWER COMPANY Date:
March 15, 1985
~
~
Name of
Name of


==Contact:==
==Contact:==
J. A. Reavis                 Phone:
J. A. Reavis Phone:


                                                                                                  'I t                                                                                                 t OCONEE NUCLEAR STATION Monthly Operating Status Report
'I t
            ~ 1 '. . Personnel Exposure:
t OCONEE NUCLEAR STATION Monthly Operating Status Report
~ 1 '.. Personnel Exposure:
For the' month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
For the' month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.-   The total l station liquid. release for January has been compared with the Technical Specifications maximum annual dose commitment and-wasiless than 10 percent of this limit.
2.-
The total l station liquid. release for January has been compared with the Technical Specifications maximum annual dose commitment and-wasiless than 10 percent of this limit.
The total station gaseous release for January has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for January has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
V
V
_ _ - -_______ _ _._ _ _ _ -  .}}
.}}

Latest revision as of 06:13, 13 December 2024

Monthly Operating Repts for Feb 1985
ML20099M462
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/28/1985
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20099M460 List:
References
NUDOCS 8503250230
Download: ML20099M462 (16)


Text

y OPERATLNG DATA REPORT DOCKET NO.

50-269 DATE _03-15-85 COMPLETED BY J A.

Reavis TELEPHONE 704-373-7567 OPERATING STATUS 3,- Unit Name:

Oconee'1-Notes I

2. Reporting Period: February 1. 1985-Februnrv 28. 1985 Year-to-date and cumulative
3. Licensed Thermal Power (MWt):

2568 capacity factors are calcu-

4. Nameplate Rating (Gross'31We):

934 lated using a weighted 886

. average for maximum

5. Design Electrical Rating (Net $1We):

dependable capacity.

6. Maximum Dependable Capacity (Gross MWe):

899

7. Maximum Dependable Capacity (Net MWe):

860 8.' If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

' 9. Power Level To Which Restricted. If Any (Net MWe):

nem a

10. Reasons For Restrictions,If Any:

1 This Month Yr. to.Date Cumulative

. I1. Hours In Reporting Period 672.0 1 416.0 101 905.0

12. Number Of Hours Reactor Was Critical 672.0 1 413.2 73 406.2
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 672.0 1 407.6 70 111.6-
15. Unit Reserve Shutdown Hours 16c Gross Thermal Energy Generated (MWH)-

1 694 424' 3 591 309 16R 465 073

=.17. G<oss Electrical Energy Generated (MWH) 589 730 1 248 310 58 584 990

18. Net Electrical Energy Generated (MWH) 564 231~

1 193 476 55 525 762

~ 19. Unit Service Factor 100.0 99.4 68.8 3

20. Unit Availability Factor 100.0 99.4-68.8
21. Unit Capacity Factor (Using MDC Net) 97.6 on.n

-61.2

22. Unit Capacity Factor (Using DER Net) 94.8 95.1 61.5

'23. Unit Forced Outage Rate 0.0 0.6 15.8

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:

None 4

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION hh$

!69 ei p6 g.

PDR

\\

\\

. = -

,g

,4.'

w

=

.ji ;

AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.

50-269 UNIT Oconee 1 -

DATE na/ts/as COMPLETED BY J. A. Reavis TELEPHONE.

704-373-7567 1

-MONTH'-

-Febkuarv.-1985'

)

' DAY.'-

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

'(MWe-Net)

(MWa-Ne t) 1-

'864 17 758 L2 :,

864 18-756 3-.

864 19' 749 4'

864 20 748 L5 863 21 841

-61 863 22 859 7

863 23 863 8.

863 24 863 9-863 25 862

'10 g63-

. 26 -

861

' 1 1.

863 27 861

[

~12L 864 28 861

!13 863 29 14.

863 30

'15 790 31' 16- -

750

~lNSTRUCTIONS

.On' this. format, : list the average ~ daily unit power level in HWe-Net for each day in the: reporting month.- Compute to the nearest whole megawatt.

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. so-269

~

UNIT NAME oconee 1 DATE 3/1s/8s REPORT MONTH February 1985 COMPLETED BY J.

A.

Reavis TELEPHONE 704-373-7567 "s_

O g ju License y

Cause & Corrective e37 "c

uSE g

a No.

Date

~.

gh g.

,g g c Event

,&r, gm, Action to R

he ta!

ai g;

F o~

ce zmo Report #

No uo Prevent Recurrence 3-p 85-02-15 F

A HH PUMPXX Repair Leak on Heater Drain Pump 1

2 3

4 Reason:

Method:

Exhibit G - Instructions S Sc e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NLREG-0161)

E-Operator Training f License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source II-Other (Explain)

(O /7 71

DOCKET NO:

50-269 UNIT:

oconee 1 DATE:

3/15/85 NARRATIVE

SUMMARY

Month: February, 1985 The unit operated at 100% during most of the month except to make repairs on a heater drain pump on February 15th.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:.0conee Unit 1 2.

Scheduled next refueling shutdown:

March 1986 3.

Scheduled restart following refueling:

May 1986 4.

Will refueling or resumption of operation thereaf:er require a technical Yes specification change or other license amendment?

If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A Scheduled date(s)/Afor submitting proposed licensing action and supporting 5.

information:

N 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

999*

8.

Present licensed fuel pool capacity:

1312 Size of requested or planned increase:

9.

Projected date of l'ast refueling which can be accommodated by present licensed capacity:

August 1991 DUKE POWER COMPANY Date:

March 15, 1985 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

  • Represents the combined total for Units 1 and 2'

I, H-

' j.jg n.-

l' l'

OPERATING DATA REPORT DOCKET NO.

50-270 DATE 03-15-55 COMPLETED BY JA-Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name:~

OC "*

  • 2
2. Reporting Period: February 1. 1985-February 28, 1985 Year-to-date and cumulative
3. Licensed Thermal Power (MW ):

2568 capacity factors are calcu-4.' Nameplate Rating (Gross MWe):

934 lated using a weighted S. : Design Electrical Rating (Net MWeI:

886 average for ma & um

6. Maximum Dependable Capacity (Gross MWe):

899

_ dependable capacity.

1

- 7. Maximum Dependable Capacity (Net MWe):

860

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe):-

M=

= 10. k<asons For Restrictions,if Any:

.. This Month Yr..to Date Cumulative

' i1. Hours In Reporting Period.

672.0 1 416.0 91 825.0

- 12. Number Of Hours Reactor Was Critical 490.8 1 234.8 67 332.2

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 485.7 1 229.7 66 173.9
15. Unit Reserve Shutdown Hours -
16. Gross Thermal Energy Generated (MWH)

.L 17. Gross Electrical Energy Generated (MWH)

- 1 096 727 2 990 901 -

157 759 206~

qui 77n

-1 005 030 53 732 946

18. Net Electrical Energy Generated (MWH) 345 026 958 683 51 068 216
19. Unit Service Factor 72.3 86.9 72.1
20. Unit Availability Factor 72.3 86.9 72.1

' 21. Unit Capacity Factor (Using MDC Net) 59.7 78.7 64.5 22.' Unit Capacity Factcr (Using DER Net) 58.0 76.4 62.8

23. Unit Forced Outage Rate 0.0 0.0 14.4 24.' Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht:

' Currently Refueling

25. If Shut Down At End Of Report Perind. Estimated Date of Startup:

April 24, 1985

26. Units in Test StatunPrior to Commercial Operationi:

Forecast Achiewd INITIA L CRIT'CA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION (0/771

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-270 UNIT Ocnnee 2 DATE nt /1 s /As COMPLETED BY

.J.A. Reavis TELEPHONE

-704-373-7567-MONTH February, 1985 DAY AVERAGE DAILY POWER. LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t)

'l 701 17 701 2.~

700-18 701 3

701 19 697 4'

698 20 699 5

729 21 75 6

822 22

-7 821 23 8

769 24 9

702 25 10 7nt 26

11 702 27

-12 701 28 13 700 29 14 701 30 15 701 31 16 701 lNSTRUCTIONS On this format, -Ilst the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO. 50-270 UNIT NAME oconee 2 DATE 3/1s/85 REPORT N) NTH February 1985 COMPLETED BY J. ' A. Reavis TELEPHONE 704-373-7567 i

O o my License y

Cause & Corrective c

No.

Date 32 "a

m3E g

%h

-S yye Event h

g Action to 5E E

%5$

Ei 53 H

o-cr zeo Report #

mo uo Prevent Recurrence 2-p 85-02-01 S

H RC FUELXX Core Conservation 3p 85-02-05 S

A CH HTEXCH Steam Generator High Level 4-p 85-02-08 S

H RC FUELXX Core Conservation 1

85-02-21 S

186.27 C

1 RC FUELXX End of Cycle 7 Refueling Outage 1

2 3

4 Reason:

Method:

Exhibit G - Instructions SS e uled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NLREG-0161)

E-Operator Training G License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source Il-Other (Explain)

- (Q /77)

b DOCKET NO:

50-270 UNIT:

Oconee 2 DATE:

3/15/85 NARRATIVE

SUMMARY

Month:

F=hrnarv iges The unit ran most of the month at 854 to extend core life in order to bring the unit out for its and of cycle 7 refueling outage on a weekend. The unit began its refueling outage on February 21, following 439 days of continuous operation, establishing a world record.

MONTHLY REFITELING INFORMATION REQUEST Oconee Unit 2 1.

Facility name:

2.

Scheduled next refueling shutdown:

Currently Refueling 3.

Scheduled restart following refueling:

- 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

4, 7.

Number of fuel assemblies (a) in the core:

177 l

(b) in the spent fuel pool:

999 8.

Present licensed fuel pool capacity:

1312 Size of requested or planned increase:

. 9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 i

DUKE POWER COMPANY Date:

March 15, 1985 i

Name of

Contact:

J. A. Reavis Phone: 704-373-7567 s

we, e- -,n

,,---,.,,.rvc.,

,,.,,,,,,_g--,,-,,..,,v,,,,,,.ww.e-n.,.,_mm.,,,mn,

,m,,-_,,,._,..-,-,,n,,

- -., -, - -e,.

Q 4

OPERATLNG DATA REPORT DOCKET NO.

50-287 DATE _ 03-15-85 CO31PLETED BY J.A. Reavis TELEPHONE. 704-373-7567 OPERATING STATUS L

1. Unit Name:

oconee 3.

Notes

2. Reporting Period: Fahrunrv 1.

19R5-Fahrtinrv 9R. tor 5 Year-to-date and cumulative

3. Licensed Thermal Power (31Wt):

2568 capacity factors are calcu-

' 4. Nameplate Rating (Grosi31We):

934 lated.using a weighted

~

. 5. Design Electrical Rating (Net alWe):

886 average for maximum 6.'.\\taximum Dependable Capacity (Gross 31We):

899 dependable capacity.

7. Slaximum De'pendable Capacity (Net alwe):

860

8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net alwel:
10. Reasons For Restrictions. If Any:

This.\\lonth Yr..to.Date Cumulative

- II. Hours In Reporting Period 672.0 1 416.0 89 472.0 12.' Number Of Hours Reactor Was Critical 672.0 1 416.0 64 646.6

13. Reactor Reserve Shutdown Hours.

.14. Hours Generator On.Line 672.0 1 416.0 63 474.1

15. Unit Reserve Shutdown Hours

-~

16. Gross Thermal Energy Generated (31WH).

1 713 930 3 626 399 155 423 440

17. Gross Electrical Energy Generated (31WH) '

593 420 1 249 250 53 674 184

18. Net Electrical Energy Generated (31WH) 569 560 1 198 505 51 119 878
19. Unit Service Factor 100.0 100.0 70.9
20. Unit Availability Factor.

100.0 100.0 70.9

21. Unit Capacity Factor (Using.\\lDC Net) 98.6 98.4 66.3

. 22. Unit Capacity Factor (Using DER Net) 95.7 95.5 64.5

23. Unit Forced Outage Rate 0.0 0.0 14.1
24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date,and Duration of Each):

Refueling - August 16, 1985 - 9 Weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status t Prior to Commercial Operation):

Forecast Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY CO.\\l%1ERCIA L OPER A TION 9

(9/77)

.M AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-287 UNIT 'Oconee 3 DATE n1/is/8s COMPLETED BY

_J.A. Reavis TELEPHONE _ 704-373-7567 MONTH February -1985 l'

DAY l AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l-(MWe-Ne t)

(MWe-Ne t) 1 848 17 849

'2 -

sag 18 849 3

aan 19 na9 4

a49 20 aag 5

'naa 21 nan 6

848 22 846 7

848 23 847 8

848 24 848

-9 848 25 847 to ato 26 a4g 11 849 27 848 12 849 28 848

' 13.

848 29 14 849 30 15 829 31

. 16' gag

- INSTRUCTIONS On this format, in the reporting month. list the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.

O ii.,..-,. -

. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-287 UNIT NAME oconee 3 DATE 3/is/8s REPORT MONTH rownmrv ions COMPLETED BY J. A.

neavis TELEPHONE 704-373-7567 "s_

O gj License cause & Corrective y

e32 "c

c&

n flo.

Date gy g

y Event

,&r, g

Action to R

EE 8

%2b RE SE F

o-a:

zmo Report #

Prevent Recurrence mo uo 3-p 85-02-1s S

B CC VALVEX Turbine Coetrol & Stop Valve Movement pts 1

2 3

4 Reason:

Method:

Exhibit G - Instructions F

c g

A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NLREG-0161)

E-Operator Training f License Examination i

F-Adninistrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

_y,.

~

9 DOCKET NO:

50-287

' UNIT:

Oconee 3 DATE:

3/15/85 NARRATIVE

SUMMARY

Month: February 1985 The unit ran at 1004 throughout most of the month except to perform Turbine Control and stop valve movement PT's on February 15th.

I' l

l

~

i

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

Oconee Unit 3 2.= Scheduled next refueling shutdown:

August 1985 3.

Scheduled restart following refueling:

October 1985 4.

Will refueling or resumption of operation thereaf ter require a technical Yes specification change or other license amendment?

If yes, what will these be?

Technical Specification Revision a

i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

255

~8.

Present licensed fuel pool capacity:

875 Size of requested or planned increase:

^

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 DUKE POWER COMPANY Date:

March 15, 1985

~

~

Name of

Contact:

J. A. Reavis Phone:

'I t

t OCONEE NUCLEAR STATION Monthly Operating Status Report

~ 1 '.. Personnel Exposure:

For the' month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.-

The total l station liquid. release for January has been compared with the Technical Specifications maximum annual dose commitment and-wasiless than 10 percent of this limit.

The total station gaseous release for January has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

V

.