ML20100B043: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:_ | {{#Wiki_filter:_ | ||
i!ECEiVED m | i!ECEiVED m | ||
Sout'rern California Edison Co8t072I E D 33 gE | |||
$AN ONCFRE NUCLE AR GENER ATING ST ATION P.O. BO X 12 8 SAN CLEMENTE, C ALIFORNI A 92672 STOTION MANAGER (714)492 7700 November 16, 1984 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. J. B. Martin, Regional Administrator | |||
STOTION MANAGER (714)492 7700 November 16, 1984 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. J. B. Martin, Regional Administrator | |||
==Dear Sir:== | ==Dear Sir:== | ||
==Subject:== | ==Subject:== | ||
Docket Nos. 50-361 and 50-362 Follow-up Report, Inoperable Fire Doors - October 1984 San Onofre Nuclear Generating Station, Units 2 and 3 | Docket Nos. 50-361 and 50-362 Follow-up Report, Inoperable Fire Doors - October 1984 San Onofre Nuclear Generating Station, Units 2 and 3 | ||
| Line 30: | Line 28: | ||
Letter, J. G. Haynes (SCE) to J. B. Martin (NRC), | Letter, J. G. Haynes (SCE) to J. B. Martin (NRC), | ||
dated October 15, 1984 In accordance with our referenced letter, this submittal provides the | dated October 15, 1984 In accordance with our referenced letter, this submittal provides the | ||
'ollow-up report of fire-rated assemblies (specifically fire doors) found | |||
;9 operable during routine surveillances in October 1984. | |||
Fire doors found inoperable during.the October routine surveillances are identified in the Attachment and include: 4 latching mechanism failures; 6 closure mechanism failures; and 5 doors blocked open typically for construction or maintenance activities. An investigation was conducted to determine the person or persons responsible for the blocked open fire doors, however, results were inconclusive. As each of these deficiencies was identified, compensatory fire watches, pursuant to Technical Specification 3.7.9, Action Statement 'a', were established. | Fire doors found inoperable during.the October routine surveillances are identified in the Attachment and include: 4 latching mechanism failures; 6 closure mechanism failures; and 5 doors blocked open typically for construction or maintenance activities. An investigation was conducted to determine the person or persons responsible for the blocked open fire doors, however, results were inconclusive. As each of these deficiencies was identified, compensatory fire watches, pursuant to Technical Specification 3.7.9, Action Statement 'a', were established. | ||
We are continuing the corrective actions to upgrade door latches and closure mechanisms. A disciplinary action policy was implemented August 15, 1984, by Station Management, in order to eliminate occurrences of blocked open fire doors without the required Fire Barrier Removal and Reinsta11ation Request. | We are continuing the corrective actions to upgrade door latches and closure mechanisms. A disciplinary action policy was implemented August 15, 1984, by Station Management, in order to eliminate occurrences of blocked open fire doors without the required Fire Barrier Removal and Reinsta11ation Request. | ||
This monthly follow-up report and those sent previously provide updated information associated with an ongoing condition initially reported in 1983. The follow-up report covering inoperable fire doors identified in November 1984 will be submitted by December 20, 1984. | This monthly follow-up report and those sent previously provide updated information associated with an ongoing condition initially reported in 1983. The follow-up report covering inoperable fire doors identified in November 1984 will be submitted by December 20, 1984. | ||
8412040171 841116 | 8412040171 841116 PDR ADOCK 05000361 S | ||
PDR S | PDR Y' | ||
( | |||
( | |||
''~ | |||
1: | 1: | ||
Mr. J. B. Martin | Mr. J. B. Martin i If you require any' additional information, please so advise. | ||
Sincerely, Yht | Sincerely, Yht W | ||
Enclosure. | |||
F.'R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3) cc: | |||
J. P. Stewart (USNRC Resident Inspector, Units 2 and 3) | J. P. Stewart (USNRC Resident Inspector, Units 2 and 3) | ||
U. S. Nuclear ~ Regulatory Commission Document Control Desk Institute of Nuclear Power Operations (INPO) l l | U. S. Nuclear ~ Regulatory Commission Document Control Desk Institute of Nuclear Power Operations (INPO) l l | ||
| Line 50: | Line 48: | ||
+ | + | ||
ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY-INOPERABLE FIRE DOORS FOR THE MONTH OF 0CTOBER 1984 SAN ONOFRE NUCLEAR GENERATING STATION UNITS N0. 2 AND 3, DOCKET NOS. 50-361 and 50-362 I. Latching Mechanism Failures: | ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY-INOPERABLE FIRE DOORS FOR THE MONTH OF 0CTOBER 1984 SAN ONOFRE NUCLEAR GENERATING STATION UNITS N0. 2 AND 3, DOCKET NOS. 50-361 and 50-362 I. | ||
Latching Mechanism Failures: | |||
Number of doors inoperable - 4, as follows: | Number of doors inoperable - 4, as follows: | ||
Door Number | Door Number Inoperable Operable AC-225 10/15 10/19 AC-233 10/06 10/13 | ||
^ | ^ | ||
AC-236 10/18-10/19 AC-442 10/17 10/19 l | |||
3 5 | 3 5 | ||
4 11 4 | 4 11 4. | ||
ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY-INOPERABLE FIRE DOORS FOR THE MONTH OF OCTOBER 1984 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued) | ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY-INOPERABLE FIRE DOORS FOR THE MONTH OF OCTOBER 1984 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued) | ||
II. Closure Mechanism Failures: | II. Closure Mechanism Failures: | ||
Number of doors inoperable - 6, as follows: | Number of doors inoperable - 6, as follows: | ||
Door Number | Door Number Inoperable Operable AC-233 10/01 10/05 FH3-302 | ||
-10/16 10/19 FH2-303 10/18 10/20 FH2-304 10/08 10/18 C2-403 10/08 10/14 AR-501 10/14 10/16 i | |||
a a | a a | ||
i 4 | i 4 | ||
4 1 | 4 1 | ||
~ _ _. _ - _ | |||
-l-ATTACHMENT SOUTHERN CALIFORNIA EDIS0N COMPANY INOPERABLE-FIRE D0 ORS.FOR THE MONTH OF OCTOBER 1984 SAN ON0FRE NUCLEAR GENERATING STATION UNITS N0. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued) | |||
III. Doors Blocked Open: | III. Doors Blocked Open: | ||
Number of doors inoperable - 5, as follows: | Number of doors inoperable - 5, as follows: | ||
Date Found Inoperable (fire watches established Door Number | Date Found Inoperable (fire watches established Door Number within one hour) | ||
FH2-101 10/08 | |||
-i 10/26 C2-403 10/05 10/15 C2-405 10/09 AC-442 10/05 AR-501 10/03 4 | |||
4 i | 4 i | ||
4286u | 4286u. -. - _ _ -.- -. _. - _ - - -.. _, - _ -. - | ||
_. - -}} | |||
Latest revision as of 06:08, 13 December 2024
| ML20100B043 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/16/1984 |
| From: | Haynes J SOUTHERN CALIFORNIA EDISON CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| NUDOCS 8412040171 | |
| Download: ML20100B043 (5) | |
Text
_
i!ECEiVED m
Sout'rern California Edison Co8t072I E D 33 gE
$AN ONCFRE NUCLE AR GENER ATING ST ATION P.O. BO X 12 8 SAN CLEMENTE, C ALIFORNI A 92672 STOTION MANAGER (714)492 7700 November 16, 1984 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. J. B. Martin, Regional Administrator
Dear Sir:
Subject:
Docket Nos. 50-361 and 50-362 Follow-up Report, Inoperable Fire Doors - October 1984 San Onofre Nuclear Generating Station, Units 2 and 3
Reference:
Letter, J. G. Haynes (SCE) to J. B. Martin (NRC),
dated October 15, 1984 In accordance with our referenced letter, this submittal provides the
'ollow-up report of fire-rated assemblies (specifically fire doors) found
- 9 operable during routine surveillances in October 1984.
Fire doors found inoperable during.the October routine surveillances are identified in the Attachment and include: 4 latching mechanism failures; 6 closure mechanism failures; and 5 doors blocked open typically for construction or maintenance activities. An investigation was conducted to determine the person or persons responsible for the blocked open fire doors, however, results were inconclusive. As each of these deficiencies was identified, compensatory fire watches, pursuant to Technical Specification 3.7.9, Action Statement 'a', were established.
We are continuing the corrective actions to upgrade door latches and closure mechanisms. A disciplinary action policy was implemented August 15, 1984, by Station Management, in order to eliminate occurrences of blocked open fire doors without the required Fire Barrier Removal and Reinsta11ation Request.
This monthly follow-up report and those sent previously provide updated information associated with an ongoing condition initially reported in 1983. The follow-up report covering inoperable fire doors identified in November 1984 will be submitted by December 20, 1984.
8412040171 841116 PDR ADOCK 05000361 S
PDR Y'
(
~
1:
Mr. J. B. Martin i If you require any' additional information, please so advise.
Sincerely, Yht W
Enclosure.
F.'R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3) cc:
J. P. Stewart (USNRC Resident Inspector, Units 2 and 3)
U. S. Nuclear ~ Regulatory Commission Document Control Desk Institute of Nuclear Power Operations (INPO) l l
L E
+
ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY-INOPERABLE FIRE DOORS FOR THE MONTH OF 0CTOBER 1984 SAN ONOFRE NUCLEAR GENERATING STATION UNITS N0. 2 AND 3, DOCKET NOS. 50-361 and 50-362 I.
Latching Mechanism Failures:
Number of doors inoperable - 4, as follows:
Door Number Inoperable Operable AC-225 10/15 10/19 AC-233 10/06 10/13
^
AC-236 10/18-10/19 AC-442 10/17 10/19 l
3 5
4 11 4.
ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY-INOPERABLE FIRE DOORS FOR THE MONTH OF OCTOBER 1984 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued)
II. Closure Mechanism Failures:
Number of doors inoperable - 6, as follows:
Door Number Inoperable Operable AC-233 10/01 10/05 FH3-302
-10/16 10/19 FH2-303 10/18 10/20 FH2-304 10/08 10/18 C2-403 10/08 10/14 AR-501 10/14 10/16 i
a a
i 4
4 1
~ _ _. _ - _
-l-ATTACHMENT SOUTHERN CALIFORNIA EDIS0N COMPANY INOPERABLE-FIRE D0 ORS.FOR THE MONTH OF OCTOBER 1984 SAN ON0FRE NUCLEAR GENERATING STATION UNITS N0. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued)
III. Doors Blocked Open:
Number of doors inoperable - 5, as follows:
Date Found Inoperable (fire watches established Door Number within one hour)
FH2-101 10/08
-i 10/26 C2-403 10/05 10/15 C2-405 10/09 AC-442 10/05 AR-501 10/03 4