=Text=
=Text=
{{#Wiki_filter:. _ . - . . . - . . . .- -      _ . _ - - - . . .  ..- -- -
{{#Wiki_filter:.
4 Attachment A NPF-39-123 9204300376 920424 PDR ADOCK 05000382 P.             PDR
4 Attachment A NPF-39-123 9204300376 920424 PDR ADOCK 05000382 P.
PDR


  .~     .-        .-        . - _ . . . _ _ . -      - . - _ . _ . . -. . .          -  ..    . .. - -...-    . - ._ _ __. -...- -
.~
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION F00. OPERATION 0
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION F00. OPERATION 0
3.7.1.5 Each main steam line isolation valve shall be OPERABLE.
3.7.1.5 Each main steam line isolation valve shall be OPERABLE.
APPLICABILITY:                   H0 DES 1, 2, 3, and 4.
APPLICABILITY:
H0 DES 1, 2, 3, and 4.
ACTION:
ACTION:
9 H00E 1 With one main steam line isolation valve inoperable but open, POWER OPERATION may continue provided the inoperable valve is restored to OPERABLE status                                           .
H00E 1 9
within 4 hours; otherwise, be in at least HOT STANDBY within the next 6 hours.
With one main steam line isolation valve inoperable but open, POWER OPERATION may continue provided the inoperable valve is restored to OPERABLE status within 4 hours; otherwise, be in at least HOT STANDBY within the next 6 hours.
MODES 2, 3 and 4 With one main steam line isolation valve inoperable, subsequent operation in H00E 2, 3, or 4 may proceed provided:
MODES 2, 3 and 4 With one main steam line isolation valve inoperable, subsequent operation in H00E 2, 3, or 4 may proceed provided:
a.
a.
The isolation valve is maintained closed.
The isolation valve is maintained closed.
: b.       The provisions of Specification 3.0.4 are not applicable.
b.
The provisions of Specification 3.0.4 are not applicable.
Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE REQUIREME415 4.7.1.5 Each main steam line isolation valva shall be demonstrated OPERABLE by verifying full closure within 3.0 seconds when tested pursuant to Specification 4.0. 5.
SURVEILLANCE REQUIREME415 4.7.1.5 Each main steam line isolation valva shall be demonstrated OPERABLE by verifying full closure within 3.0 seconds when tested pursuant to Specification 4.0. 5.
b VATERFORD - UNIT 3                                             3/4 7-9
b VATERFORD - UNIT 3 3/4 7-9


l TABLE 3.3-5 (Continued)
TABLE 3.3-5 (Continued)
ENGINEERED SAFETY FEATURES RESPONSE TIMES                                                                       ,
ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONOS 2.
INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONOS
Pressurizer Pressure-Low a.
: 2. Pressurizer Pressure-Low
Safety injection (ECCS)
: a.           Safety injection (ECCS)                                                                                                               !
(1) High Pressure Safety Inje:ction 1 30.0*/18.5**
(1) High Pressure Safety Inje:ction                                       1 30.0*/18.5**
(2) Low Pressure Safety Injection 1 45.5*/34.0**
(2) Low Pressure Safety Injection                                         1 45.5*/34.0**                                           -I
- I b.
: b.           Containment Isolation                                                       5 23.5*/12.0**               -
Containment Isolation 5 23.5*/12.0**
: c.           Containment Cooling
c.
                                                                                                                      $ 31.0*/h.5**
Containment Cooling
: 3. Coatainment Pressure-Hich
$ 31.0*/h.5**
: a.           Safety Injection (ECCS)
3.
(1) High Pressure Safety Injection                                         1 30.0*/18.5**
Coatainment Pressure-Hich a.
(2) Low Pressure Safety Injection                                         1 45.5*/34.0**
Safety Injection (ECCS)
: b.           Containment Isolation
(1) High Pressure Safety Injection 1 30.0*/18.5**
: c.                                                                                      < 23.5*/12.0**                                             ,
(2) Low Pressure Safety Injection 1 45.5*/34.0**
Main Steam Isolation                                                       ~
b.
Containment Isolation
< 23.5*/12.0**
c.
Main Steam Isolation
~
4.0*/4.0**
4.0*/4.0**
: d.         Main Feedwater Isolation                                                   [6.0*/6.0**
d.
: e.          Containment Cooling 5 31.0*/19.5**
Main Feedwater Isolation
: 4. LContainment Pressure--High-High
[6.0*/6.0**
: a.       Conta;nment Spray Pump
Containment Cooling 5 31.0*/19.5**
: b.        Containment-Spray Valves                                                      i 15.2*/2.7**                                               -
e.
: c.         CCW to RCP Valves-                                                           1 11.0*/1L 0**
4.
LContainment Pressure--High-High a.
Conta;nment Spray Pump i 15.2*/2.7**
b.
Containment-Spray Valves c.
CCW to RCP Valves-1 11.0*/1L 0**
1 23.5*/12.0**
1 23.5*/12.0**
: 5. Containment Area _ Radiation-Hinh#     _
5.
Containment Area _ Radiation-Hinh#
Containment Purge Valves Isolation 5 6.2*/6.2**
Containment Purge Valves Isolation 5 6.2*/6.2**
: 6. Steam Generator Dressure-Low
6.
: 4.         Main Steam Isolation                                                       5 4.0*/4.0**
Steam Generator Dressure-Low 4.
: n.         Main Feedwater Isolation                                                   5 6.0*/6.0**
Main Steam Isolation 5 4.0*/4.0**
n.
Main Feedwater Isolation 5 6.0*/6.0**
7.
7.
Refuelina Water Storace-Pool.L..ow.
Refuelina Water Storace-Pool.L..ow.
                                      -Containment Sump _ Recirculation i 120.0*/108.58*
-Containment Sump _ Recirculation i 120.0*/108.58*
G. W16 kV Emergency Bus-Undervoltace (Loss of Voltace)
G.
                                        .Less of Power (0_ volts)                                                   <
W16 kV Emergency Bus-Undervoltace (Loss of Voltace)
2***
.Less of Power (0_ volts)
_ 2***
9.
9.
480V Emergency Bus Undervoltage-(Loss of-Voltagej                                                                                                   -
480V Emergency Bus Undervoltage-(Loss of-Voltagej Loss'of Power (0 'olts)
Loss'of Power (0 'olts)             -
N.A.
N.A.
10,                                                                                                                                                         ,
10, 4.16 kV Emeroency Bus undervoltace (Deciaded Voltage)
4.16 kV Emeroency Bus undervoltace (Deciaded Voltage)
Loss of Power
Loss of Power
                                                                                                                  -< 11***
-< 11***
WATERFORD - UNIT'3                                               3/4 3-23
WATERFORD - UNIT'3 3/4 3-23
  -**4   - W     w                                                   'lp-.c   w                                           s-Wg         er r* e "# *'Fly= r'''-   W {gPt- 9w'3
-**4 W
w
=t
'lp-.c w
t.rY-m A s-Wg 9ier er r*
e "#
*'Fly=
r'''-
W
{gPt-9w'3
" T


    . - - . . - - . . . - _ - ~ .- .. --- - - . - - - - - . . - - . . . . . . - . - . . - - . - . -                                                                                                  . . - - _ . . - - . . . -
. - -.. - -... - _ - ~.-.. --- - -. - - - - -.. - -...... -. -.. - -. -. -
V E
V E
e i
e i
t F
t F
k Attachment B NPF-38-123 1<
k Attachment B NPF-38-123 1 <
I F
I F
3 1
3 1
I 1
I 1
6 l
6 ll.
l.
1 t...
1
_. -., _. ~.. - -. _, _.... - _ -.. -..
                  .-    .         -          - _t...      _ . - . , _ . ~ . . - - . _ , _ . . . . - _ - . . - . .     . _ _ _ . - . _ . . - - . - - _ . . , . - . . . . . ,,..,_..~..,._- _ _ _             .,            ~ ~ . .
..,. -.....,,..,_..~..,._- _ _ _
~ ~..


                                            - - -          ~ . . - . ~ - - -                 -          . . - - ~ ~ . - . . -       .
~.. -. ~ - - -
l
. - - ~ ~. -.. -
* 1
)
                  '.                                                                                                                      )
PLANT SYSTEMS HAIN STEAM LINE ISOLATIO'l VALVES I
PLANT SYSTEMS HAIN STEAM LINE ISOLATIO'l VALVES I
LIMITING CONDITION FOR OPERATION J
LIMITING CONDITION FOR OPERATION J
o 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.                                                  .
o 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3, and 4.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
ACTION:
H00E 1.
H00E 1.
With one main steam line isolation valve inoperable but open, POWER OPERATION may continue provided the inoperable valve is restored to OPErtABLE status                               .
With one main steam line isolation valve inoperable but open, POWER OPERATION may continue provided the inoperable valve is restored to OPErtABLE status within 4 hours; otherwise, be in at least HOT STANDBY within the next G hours.
within 4 hours; otherwise, be in at least HOT STANDBY within the next G hours.
MODES 2, 3, and 4
MODES 2, 3, and 4
                      -With one main steam line isolation valve ino9erable, subsequent operation in H0DE 2. 3, or 4 may proceed provided:
-With one main steam line isolation valve ino9erable, subsequent operation in H0DE 2. 3, or 4 may proceed provided:
: a. The isolation valve is maintained closed.                                                             '
a.
: b. The provisiv.ts of Specification 3.0.4 are not applicable.
The isolation valve is maintained closed.
Otherwise, be in at least HOT STANDBY within the next 6 hours and in
b.
* COLD. SHUTDOWN within the following 30 hours.
The provisiv.ts of Specification 3.0.4 are not applicable.
SURVEILLLCE REQUlHEMENTS 4.7.1.5 Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full closure within     .      seconds when tested pursuant to Speci fication 4.0.5.
Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD. SHUTDOWN within the following 30 hours.
a REPLhlE VYlTH 4.0 o
SURVEILLLCE REQUlHEMENTS 4.7.1.5 Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full closure within seconds when tested pursuant to Speci fication 4.0.5.
i:
a REPLhlE VYlTH 4.0 oi:
I L                   ,
I L
WATERFORD - UNIT 3                         3/4 7-9 L         . - . .                    2                                               _ _ . - . __. _.._.        _~ .             u_
WATERFORD - UNIT 3 3/4 7-9 L
2
_~.
u


O'
O' i
* i TABLE 3.3-5 (Continued)                                                                 {
TABLE 3.3-5 (Continued)
l ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING 5:GNAL AND FUNCTION                                         RESPONSE TTME IN SECONOS
{
: 2.       Pressurizer Dressure-tow                                                                                                   I
ENGINEERED SAFETY FEATURES RESPONSE TIMES l
: a. Safety Injection (ECCS)                                                                                               I (1) High Pressure Safety injection                                   5 30.0*/18.5**
INITIATING 5:GNAL AND FUNCTION RESPONSE TTME IN SECONOS 2.
(2) Low Prtssure Safety Injection                                   5 45.5*/34.0**
Pressurizer Dressure-tow a.
: h. Containment Isolation                                                 < 23.5*/12.0**
Safety Injection (ECCS)
: c. Containment Cooling i 31.C*/19.5**
(1) High Pressure Safety injection 5 30.0*/18.5**
: 3.       Containment Pressure-Hinn                                                                                                 !
(2) Low Prtssure Safety Injection 5 45.5*/34.0**
: a. Safety Injection (ECCS)
h.
(1) High Pressure Safety Injection                                 1 30 0*/18.S**
Containment Isolation
(2) Low Pressure Safety Iajection                                   5 45.5*/34.0**
< 23.5*/12.0**
: b. Containment Isolation                                                 < 23.5*/12.0** I~)Sfi# 4CE 4.0 c,   Main Steam Isolation                                                 [i4.0^/4.0t*__;       WilH 50
c.
: d. Main Feedwater Isolation                                             1 6.0*/6.0**
Containment Cooling i 31.C*/19.5**
: e. Containment Cocling                                                 $ 31.0*/19.5**
3.
: 4.       Containment Pressure--Hign-High
Containment Pressure-Hinn a.
: a. Containment Spray Pump                                                 < 15.2*/2.7**
Safety Injection (ECCS)
: b. Containesnt Spray Valves                                             511.0*/11.0**
(1) High Pressure Safety Injection 1 30 0*/18.S**
: c. CCW to RCP Valves                                                     1 23.5a/12.0**
(2) Low Pressure Safety Iajection 5 45.5*/34.0**
: 5.     -Containment Area Radiatior-Hloh#
b.
Containment Purge Val'.es Isolation                                 1 6.2*/6.2**
Containment Isolation
Steam Generator Pressure-Low                                                                }REPL ACE 4,0 WITH 5.0
< 23.5*/12.0** I~)Sfi# 4CE 4.0 c,
: a. Main Steam Isolation                                                 5 _4. 0 * /4. 0
Main Steam Isolation
: o. Main Feedwater Isolation                                             i 6.0*/6.0**
[i4.0^/4.0t*__;
: 7.       Refueling Water Storage Pool Low Containment Sump Recirculation                                       5 120.0*/108.5**
WilH 50 d.
: 8.       4.16 kV Emergency Bus Undervoltage (Loss of Voltage)
Main Feedwater Isolation 1 6.0*/6.0**
Loss of Power (0 volts)                                               <
e.
                                                                                                    ,2***
Containment Cocling
: 9.       480V-Emergency Bus Undervoltage (Loss of Voltage)-                                                                       ^
$ 31.0*/19.5**
Loss of Power (0 volts)                                             N.A.
4.
: 10.     4.16 kV creroency Bus undervoltage (Degraded Voltage)                                                                   '
Containment Pressure--Hign-High a.
Loss of Power                                                       _
Containment Spray Pump
11***
< 15.2*/2.7**
WATERFORD - UNIT 3                                 3/4 3-23
b.
  ,                              , __        -- _ . - - __              _ _ _ _      ._.                __      _ ~ -  -  _ . -
Containesnt Spray Valves 511.0*/11.0**
__ _ ,_,}}
c.
CCW to RCP Valves 1 23.5a/12.0**
5.
-Containment Area Radiatior-Hloh#
Containment Purge Val'.es Isolation 1 6.2*/6.2**
}REPL ACE 4,0 Steam Generator Pressure-Low WITH 5.0 a.
Main Steam Isolation 5 _4. 0 * /4. 0 "
o.
Main Feedwater Isolation i 6.0*/6.0**
7.
Refueling Water Storage Pool Low Containment Sump Recirculation 5 120.0*/108.5**
8.
4.16 kV Emergency Bus Undervoltage (Loss of Voltage)
Loss of Power (0 volts)
,2***
9.
480V-Emergency Bus Undervoltage (Loss of Voltage)-
^
Loss of Power (0 volts)
N.A.
10.
4.16 kV creroency Bus undervoltage (Degraded Voltage)
Loss of Power
_ 11***
WATERFORD - UNIT 3 3/4 3-23
_ ~ -
__ _,_,}}

Latest revision as of 05:16, 13 December 2024

Proposed Tech Specs 4.7.1.5, MSIVs & Tech Specs Table 3.3-5, ESF Response Time
ML20101A822
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/24/1992
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20101A820 List:
References
NUDOCS 9204300376
Download: ML20101A822 (6)


Text

.

4 Attachment A NPF-39-123 9204300376 920424 PDR ADOCK 05000382 P.

PDR

.~

PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION F00. OPERATION 0

3.7.1.5 Each main steam line isolation valve shall be OPERABLE.

APPLICABILITY:

H0 DES 1, 2, 3, and 4.

ACTION:

H00E 1 9

With one main steam line isolation valve inoperable but open, POWER OPERATION may continue provided the inoperable valve is restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

MODES 2, 3 and 4 With one main steam line isolation valve inoperable, subsequent operation in H00E 2, 3, or 4 may proceed provided:

a.

The isolation valve is maintained closed.

b.

The provisions of Specification 3.0.4 are not applicable.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREME415 4.7.1.5 Each main steam line isolation valva shall be demonstrated OPERABLE by verifying full closure within 3.0 seconds when tested pursuant to Specification 4.0. 5.

b VATERFORD - UNIT 3 3/4 7-9

TABLE 3.3-5 (Continued)

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONOS 2.

Pressurizer Pressure-Low a.

Safety injection (ECCS)

(1) High Pressure Safety Inje:ction 1 30.0*/18.5**

(2) Low Pressure Safety Injection 1 45.5*/34.0**

- I b.

Containment Isolation 5 23.5*/12.0**

c.

Containment Cooling

$ 31.0*/h.5**

3.

Coatainment Pressure-Hich a.

Safety Injection (ECCS)

(1) High Pressure Safety Injection 1 30.0*/18.5**

(2) Low Pressure Safety Injection 1 45.5*/34.0**

b.

Containment Isolation

< 23.5*/12.0**

c.

Main Steam Isolation

~

4.0*/4.0**

d.

Main Feedwater Isolation

[6.0*/6.0**

Containment Cooling 5 31.0*/19.5**

e.

4.

LContainment Pressure--High-High a.

Conta;nment Spray Pump i 15.2*/2.7**

b.

Containment-Spray Valves c.

CCW to RCP Valves-1 11.0*/1L 0**

1 23.5*/12.0**

5.

Containment Area _ Radiation-Hinh#

Containment Purge Valves Isolation 5 6.2*/6.2**

6.

Steam Generator Dressure-Low 4.

Main Steam Isolation 5 4.0*/4.0**

n.

Main Feedwater Isolation 5 6.0*/6.0**

7.

Refuelina Water Storace-Pool.L..ow.

-Containment Sump _ Recirculation i 120.0*/108.58*

G.

W16 kV Emergency Bus-Undervoltace (Loss of Voltace)

.Less of Power (0_ volts)

_ 2***

9.

480V Emergency Bus Undervoltage-(Loss of-Voltagej Loss'of Power (0 'olts)

N.A.

10, 4.16 kV Emeroency Bus undervoltace (Deciaded Voltage)

Loss of Power

-< 11***

WATERFORD - UNIT'3 3/4 3-23

-**4 W

w

=t

'lp-.c w

t.rY-m A s-Wg 9ier er r*

e "#

  • 'Fly=

r-

W

{gPt-9w'3

" T

. - -.. - -... - _ - ~.-.. --- - -. - - - - -.. - -...... -. -.. - -. -. -

V E

e i

t F

k Attachment B NPF-38-123 1 <

I F

3 1

I 1

6 ll.

1 t...

_. -., _. ~.. - -. _, _.... - _ -.. -..

..,. -.....,,..,_..~..,._- _ _ _

~ ~..

~.. -. ~ - - -

. - - ~ ~. -.. -

)

PLANT SYSTEMS HAIN STEAM LINE ISOLATIO'l VALVES I

LIMITING CONDITION FOR OPERATION J

o 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

H00E 1.

With one main steam line isolation valve inoperable but open, POWER OPERATION may continue provided the inoperable valve is restored to OPErtABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, be in at least HOT STANDBY within the next G hours.

MODES 2, 3, and 4

-With one main steam line isolation valve ino9erable, subsequent operation in H0DE 2. 3, or 4 may proceed provided:

a.

The isolation valve is maintained closed.

b.

The provisiv.ts of Specification 3.0.4 are not applicable.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD. SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLLCE REQUlHEMENTS 4.7.1.5 Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full closure within seconds when tested pursuant to Speci fication 4.0.5.

a REPLhlE VYlTH 4.0 oi:

I L

WATERFORD - UNIT 3 3/4 7-9 L

2

_~.

u

O' i

TABLE 3.3-5 (Continued)

{

ENGINEERED SAFETY FEATURES RESPONSE TIMES l

INITIATING 5:GNAL AND FUNCTION RESPONSE TTME IN SECONOS 2.

Pressurizer Dressure-tow a.

Safety Injection (ECCS)

(1) High Pressure Safety injection 5 30.0*/18.5**

(2) Low Prtssure Safety Injection 5 45.5*/34.0**

h.

Containment Isolation

< 23.5*/12.0**

c.

Containment Cooling i 31.C*/19.5**

3.

Containment Pressure-Hinn a.

Safety Injection (ECCS)

(1) High Pressure Safety Injection 1 30 0*/18.S**

(2) Low Pressure Safety Iajection 5 45.5*/34.0**

b.

Containment Isolation

< 23.5*/12.0** I~)Sfi# 4CE 4.0 c,

Main Steam Isolation

[i4.0^/4.0t*__;

WilH 50 d.

Main Feedwater Isolation 1 6.0*/6.0**

e.

Containment Cocling

$ 31.0*/19.5**

4.

Containment Pressure--Hign-High a.

Containment Spray Pump

< 15.2*/2.7**

b.

Containesnt Spray Valves 511.0*/11.0**

c.

CCW to RCP Valves 1 23.5a/12.0**

5.

-Containment Area Radiatior-Hloh#

Containment Purge Val'.es Isolation 1 6.2*/6.2**

}REPL ACE 4,0 Steam Generator Pressure-Low WITH 5.0 a.

Main Steam Isolation 5 _4. 0 * /4. 0 "

o.

Main Feedwater Isolation i 6.0*/6.0**

7.

Refueling Water Storage Pool Low Containment Sump Recirculation 5 120.0*/108.5**

8.

4.16 kV Emergency Bus Undervoltage (Loss of Voltage)

Loss of Power (0 volts)

,2***

9.

480V-Emergency Bus Undervoltage (Loss of Voltage)-

^

Loss of Power (0 volts)

N.A.

10.

4.16 kV creroency Bus undervoltage (Degraded Voltage)

Loss of Power

_ 11***

WATERFORD - UNIT 3 3/4 3-23

_ ~ -

__ _,_,