COOPER NUCLEAR STATION B(
COOPER NUCLEAR STATION
                ~
~
P.o. Box 98, BROWNVLLE. NEBRASKA 68321 Nebraska Public Power Dhtrict                                             ''M%""
P.o. Box 98, BROWNVLLE. NEBRASKA 68321 B(
NLS960156 August 15, 1996 U. S. Nuclear Regulatory Commission Attention:           Document Control Desk Washington, D.C. 20555
Nebraska Public Power Dhtrict
''M%""
NLS960156 August 15, 1996 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555


==Subject:==
==Subject:==
Monthly Operating Status Report for July 1996, Docket No. 50-298.
Monthly Operating Status Report for July 1996, Docket No. 50-298.
Gentlemen:
Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for July 1996.                   The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of July.
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for July 1996.
The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of July.
Should you have any comments, or require additional information regarding this report, please contact me.
Should you have any comments, or require additional information regarding this report, please contact me.
Sincerely, l
Sincerely, l
l l
l T. Herron Pl' ant Manager JTH:PLB:tib Enclosures cc: ANI Library R. W. Beck and Associates T. H. Black T. L. Bundy L. J. Callan J. M. Cline A. L. Dostal R. L. Gumm G. R. Horn INFO Records Center j
T. Herron                                                                                                 i Pl' ant Manager JTH:PLB:tib Enclosures cc: ANI Library R. W. Beck and Associates T. H. Black T. L. Bundy L. J . Callan J. M. Cline A. L. Dostal R. L. Gumm G. R. Horn                                                                                             l INFO Records Center                                                                                     j E. A. Lanning J. L. Long W. R. Mayben J. R. McPhail P. D. Graham NRC Senior Resident Inspector R. J . Singer                                                                                 t F. E. Yost
E. A. Lanning J. L. Long W. R. Mayben J. R. McPhail P. D. Graham NRC Senior Resident Inspector R. J. Singer t
[ h.            /
[ h.
_a                                                                                                   -
F. E. Yost
9608210051 960731                                                                                                           ,
/
PDR             ADOCK 05000298                                                                                               i R                                 PDR E[--
_a 9608210051 960731 PDR ADOCK 05000298 R
***mswa=+es is     4. -    ,.---=..m-         +   ---e.-- ia- - . -  -  ' ' - -'                            '
PDR i
                                                                                                            ,,]   " _ , ,
***mswa=+es is 4.
,.---=..m-E[--
+
---e.--
ia-
,,]
i
i


1 i
1 i
                                                                                                                                                \
\\
1 4                 ,
1 4
* j i
j i
OPERATING DATA REPORT DOCKET NO.                 050-0298 UNIT           CNS I                                                                                                         DATE           August 15, 1996       l OPERATING STATUS                                                                           TELEPHONE                   (402) 825-5295 1
OPERATING DATA REPORT DOCKET NO.
: 1.      Unit Name:           CQopeLNuCjaar Station                                  Notes                                                l J
050-0298 UNIT CNS I
: 2.       Reporting Period:               July 1998                                                                                         j 1
DATE August 15, 1996 OPERATING STATUS TELEPHONE (402) 825-5295 C opeLNuCjaar Station Notes 1.
: 3.       Licensed Thermal Poe.mr (MWt):         73R1                                                                                       l l
Unit Name:
: 4.       Nameplate Rating (Gross MWe):           R3B
Q J
;    5.       Design Electrical Rating (Net MWe):           77R
2.
: 6.       Maximum Dependable Capacity (Gross MWe):             7R7 7,       Maximum Dependable Capacity (Net MWe):               784                                                                         )
Reporting Period:
: 8.       If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
July 1998 j
3
1 3.
: 9.       Power Level To Which Restricted, if Any (Net MWe):
Licensed Thermal Poe.mr (MWt):
f
73R1 l
: 10.       Reasons For Restriction, if Any; i
4.
Nameplate Rating (Gross MWe):
R3B 5.
Design Electrical Rating (Net MWe):
77R 6.
Maximum Dependable Capacity (Gross MWe):
7R7 7,
Maximum Dependable Capacity (Net MWe):
784
)
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
3 f
9.
Power Level To Which Restricted, if Any (Net MWe):
10.
Reasons For Restriction, if Any; i
j l
j l
This Month                 Yr.-to-Date                     Cumulative   j j
This Month Yr.-to-Date Cumulative j
: 11.       Hours in Reporting Period                                                           5~,WC0                       1 #U5U
j 11.
: 12.       Number of Hours Reactor Was Critical                                 D                'D b                      N                I G
Hours in Reporting Period 5~,WC0 1 #U5U D
                                                                                                                              ~
'D b N
: 13.       Reactor Reserve Shutdown Hours OTO;                                                      F.F
I 12.
: 14.       Hours Generator On-Line                                             b                        N
Number of Hours Reactor Was Critical OTO; G
: 15.      Unit Reserve Shutdown Hours                                    0 0'                         Ole                         0".'0 ~
F.F
fT,'ioi~,7i~1TG
~
                                                                                                                          ~
13.
: 16. . Gross Thermal Energy Generated (MWH)             ~T,7 5 7,2 0 8^.0                                       2957428 139:0^
Reactor Reserve Shutdown Hours b
: 17.       Gross Electric Energy Generated (MWH)                                                                         ^
N 14.
: 18.      Net Electric Energy Generated (MWH)                  $    ~3F6.0             3,666,41s~5                     9 2 7 B F 6 E d'
Hours Generator On-Line 0 0' Ole 0".'0 ~
: 19.       Unit Service Factor                                            n                         9 2                                 2
15.
: 20.       Unit Availability Factor                                   I b                                      -
Unit Reserve Shutdown Hours
                                                                          - gg,4-                       py ,j-                       gy77
: 16..
: 21.       Unit Capacity Factor (Using MDC Net)             y                                                                                 i 9 6.s',
Gross Thermal Energy Generated (MWH)
89.4 61.6       :
~T,7 5 7,2 0 8^.0 fT,'ioi~,7i~1TG 2957428 139:0^
: 22.       Unit Capacity Factor (Using DER Net) g.y..
~
: 23.       Unit Forced Outage Rate                         L
17.
: 24.       Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): __N!%                                                   l
Gross Electric Energy Generated (MWH)
: 25.       If Shut Down At End of Report Period, Estimated Date of Startup:       N/A
~3F6.0 3,666,41s~5 9 2 7 B F 6 E d'
: 26.       Units in Test Status (Prior to Commercial Operation):   Forecast                   Achieved l
^
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA!. OPERATION
18.
Net Electric Energy Generated (MWH) n 9 2 2
19.
Unit Service Factor I b 20.
Unit Availability Factor
- g,4-py,j-gy77 g
21.
Unit Capacity Factor (Using MDC Net) y i
9 6.s',
89.4 61.6 22.
Unit Capacity Factor (Using DER Net)
: g...
y 23.
Unit Forced Outage Rate L
24.
Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): __N!%
25.
If Shut Down At End of Report Period, Estimated Date of Startup:
N/A 26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA!. OPERATION


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0298 UNIT CNS DATE _Spgust 15, 1996 TELEPHONE   (402) 825-5295 MONTH       Uuly 1996                                                       1 1
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
DAY AVERAGE DAILY POWER LEVEL         DAY     AVERAGE DAILY POWER LEVEL (MWe-Net)                               (MWe-Net)
050-0298 UNIT CNS DATE _Spgust 15, 1996 TELEPHONE (402) 825-5295 MONTH Uuly 1996 1
;        01               751                   17               759           l 4
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
02               752                   18               761 03               752                   19               759 04               756                   20               760 05               758                   21               759           l 06               759                   22               756 07               759                   23               758 08               757                   24               759 09               758                   25               758 10               759                   26               757 11               761                   27               758 12               761                   28               758 13               741                   29               759 14               599                   30               758 15               758                   31               757 16             751 1
(MWe-Net) 01 751 17 759 4
INSTRUCTIONS                                                                 l On this format, list the average daily unit power level in MWe-Net for each day in.the reporting month. Compute to the nearest whole megawatt.
02 752 18 761 03 752 19 759 04 756 20 760 05 758 21 759 06 759 22 756 07 759 23 758 08 757 24 759 09 758 25 758 10 759 26 757 11 761 27 758 12 761 28 758 13 741 29 759 14 599 30 758 15 758 31 757 16 751 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in.the reporting month.
l
Compute to the nearest whole megawatt.


9
9
                                                                                                                                                                                                ~
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.               .050-0298 UNIT NAME               _CoopetNucleaEStation_
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
DATE                   _ August _15J996 COMPLETED BY             P. L Rallinger REPORT MONTH _ July _1996__                   TELEPHONE                 _1402LB25-5295 Method             Licensee                                         Cause & Corrective Duration                       Of                 Event System
.050-0298 UNIT NAME
* Cornponent'                         Action to 8
_CoopetNucleaEStation_
No.           Date         Type'           (Hours)       Reason         Shutting             Report   Coda   Code                           Prevent necurrence Down Reactor 8 l
DATE
_ August _15J996 COMPLETED BY P. L Rallinger REPORT MONTH _ July _1996__
TELEPHONE
_1402LB25-5295 Method Licensee Cause & Corrective Duration Of Event System
* Cornponent' Action to 8
No.
Date Type' (Hours)
Reason Shutting Report Coda Code Prevent necurrence Down Reactor 8 l
None i
None i
1 i
1 i
1 F: Forced         2 Reason:                                               3     Method:                       4 Exhibit G - Irstructions for S: Scheduled       A - Equepment Failure (Explam)                             1 - Manual                       Preparation of Data Entry B - Mantenance or Test                                     2 - Manual Scram                 Sheets for Licensee Event                                                                   !
1 F: Forced 2 Reason:
C - Refuehng                                               3 - Automatic Scram             Report (LER) File (NUREG-0161)
3 Method:
D - Regulatory Restnction                                   4 - Continued E - Operator Traming & License Examination                 5 - Reduced Load             5 Exhibit 1 Same Source F - Administrative                                         6 - Other G - Operational Error (Explain)
4 Exhibit G - Irstructions for S: Scheduled A - Equepment Failure (Explam) 1 - Manual Preparation of Data Entry
)
B - Mantenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuehng 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restnction 4 - Continued E - Operator Traming & License Examination 5 - Reduced Load 5 Exhibit 1 Same Source F - Administrative 6 - Other G - Operational Error (Explain)
H - Other (Explam)
H - Other (Explam)


Line 102: Line 158:
OPERATIONS NARRATIVE COOPER NUCLEAR STATION July 1996 The plant operated near full power for most of the month. Scram time testing was performed July 13-14,1996.
OPERATIONS NARRATIVE COOPER NUCLEAR STATION July 1996 The plant operated near full power for most of the month. Scram time testing was performed July 13-14,1996.
A capacity factor of 96.6% was achieved for the month.
A capacity factor of 96.6% was achieved for the month.
: l.                     LIST OF NRC COMMITMENTS                       l ATTACHMENT 3   l Correspondence No: NLS960156 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
 
COMMITTED DATE COMMITMENT                                 OR OUTAGE None l
l.
                                                                                                )
LIST OF NRC COMMITMENTS l ATTACHMENT 3 l
l l
Correspondence No: NLS960156 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.
I l
They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None
)
l l
l l
l l
l l
i l       PROCEDURE NUMBER 0.42         l   REVISION NUMBER 1.1   l     PAGE 9 OF 11   l 1
l i
l}}
l PROCEDURE NUMBER 0.42 l
REVISION NUMBER 1.1 l
PAGE 9 OF 11 l
1 l}}

Latest revision as of 22:12, 12 December 2024

Monthly Operating Rept for Jul 1996 for Cooper Nuclear Station
ML20116M739
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/31/1996
From: Ballinger P, Herron J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS960156, NUDOCS 9608210051
Download: ML20116M739 (6)


Text

_

COOPER NUCLEAR STATION

~

P.o. Box 98, BROWNVLLE. NEBRASKA 68321 B(

Nebraska Public Power Dhtrict

M%""

NLS960156 August 15, 1996 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Subject:

Monthly Operating Status Report for July 1996, Docket No. 50-298.

Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for July 1996.

The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of July.

Should you have any comments, or require additional information regarding this report, please contact me.

Sincerely, l

l T. Herron Pl' ant Manager JTH:PLB:tib Enclosures cc: ANI Library R. W. Beck and Associates T. H. Black T. L. Bundy L. J. Callan J. M. Cline A. L. Dostal R. L. Gumm G. R. Horn INFO Records Center j

E. A. Lanning J. L. Long W. R. Mayben J. R. McPhail P. D. Graham NRC Senior Resident Inspector R. J. Singer t

[ h.

F. E. Yost

/

_a 9608210051 960731 PDR ADOCK 05000298 R

PDR i

      • mswa=+es is 4.

,.---=..m-E[--

+

---e.--

ia-

,,]

i

1 i

\\

1 4

j i

OPERATING DATA REPORT DOCKET NO.

050-0298 UNIT CNS I

DATE August 15, 1996 OPERATING STATUS TELEPHONE (402) 825-5295 C opeLNuCjaar Station Notes 1.

Unit Name:

Q J

2.

Reporting Period:

July 1998 j

1 3.

Licensed Thermal Poe.mr (MWt):

73R1 l

4.

Nameplate Rating (Gross MWe):

R3B 5.

Design Electrical Rating (Net MWe):

77R 6.

Maximum Dependable Capacity (Gross MWe):

7R7 7,

Maximum Dependable Capacity (Net MWe):

784

)

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

3 f

9.

Power Level To Which Restricted, if Any (Net MWe):

10.

Reasons For Restriction, if Any; i

j l

This Month Yr.-to-Date Cumulative j

j 11.

Hours in Reporting Period 5~,WC0 1 #U5U D

'D b N

I 12.

Number of Hours Reactor Was Critical OTO; G

F.F

~

13.

Reactor Reserve Shutdown Hours b

N 14.

Hours Generator On-Line 0 0' Ole 0".'0 ~

15.

Unit Reserve Shutdown Hours

16..

Gross Thermal Energy Generated (MWH)

~T,7 5 7,2 0 8^.0 fT,'ioi~,7i~1TG 2957428 139:0^

~

17.

Gross Electric Energy Generated (MWH)

~3F6.0 3,666,41s~5 9 2 7 B F 6 E d'

^

18.

Net Electric Energy Generated (MWH) n 9 2 2

19.

Unit Service Factor I b 20.

Unit Availability Factor

- g,4-py,j-gy77 g

21.

Unit Capacity Factor (Using MDC Net) y i

9 6.s',

89.4 61.6 22.

Unit Capacity Factor (Using DER Net)

g...

y 23.

Unit Forced Outage Rate L

24.

Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): __N!%

25.

If Shut Down At End of Report Period, Estimated Date of Startup:

N/A 26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA!. OPERATION

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-0298 UNIT CNS DATE _Spgust 15, 1996 TELEPHONE (402) 825-5295 MONTH Uuly 1996 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 01 751 17 759 4

02 752 18 761 03 752 19 759 04 756 20 760 05 758 21 759 06 759 22 756 07 759 23 758 08 757 24 759 09 758 25 758 10 759 26 757 11 761 27 758 12 761 28 758 13 741 29 759 14 599 30 758 15 758 31 757 16 751 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in.the reporting month.

Compute to the nearest whole megawatt.

9

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

.050-0298 UNIT NAME

_CoopetNucleaEStation_

DATE

_ August _15J996 COMPLETED BY P. L Rallinger REPORT MONTH _ July _1996__

TELEPHONE

_1402LB25-5295 Method Licensee Cause & Corrective Duration Of Event System

  • Cornponent' Action to 8

No.

Date Type' (Hours)

Reason Shutting Report Coda Code Prevent necurrence Down Reactor 8 l

None i

1 i

1 F: Forced 2 Reason:

3 Method:

4 Exhibit G - Irstructions for S: Scheduled A - Equepment Failure (Explam) 1 - Manual Preparation of Data Entry

)

B - Mantenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuehng 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restnction 4 - Continued E - Operator Traming & License Examination 5 - Reduced Load 5 Exhibit 1 Same Source F - Administrative 6 - Other G - Operational Error (Explain)

H - Other (Explam)

l l

OPERATIONS NARRATIVE COOPER NUCLEAR STATION July 1996 The plant operated near full power for most of the month. Scram time testing was performed July 13-14,1996.

A capacity factor of 96.6% was achieved for the month.

l.

LIST OF NRC COMMITMENTS l ATTACHMENT 3 l

Correspondence No: NLS960156 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None

)

l l

l l

l i

l PROCEDURE NUMBER 0.42 l

REVISION NUMBER 1.1 l

PAGE 9 OF 11 l

1 l