ML20125D385: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
I                                                                                       l
i I
          '. i DCfNSE AUTHORITY MLE COPY 4AZARDS ANALYSIS BY THE RESEARCH
l DCfNSE AUTHORITY MLE COPY 4AZARDS ANALYSIS BY THE RESEARCH AND POWER REACTO NCH DIVISION OF REACTOR LICENSING IN THE MATTER OF NORTHERN STATES POWER COMPANY
                .                                                        NCH          AND POWER REACTO DIVISION OF REACTOR LICENSING IN THE MATTER OF NORTHERN STATES POWER COMPANY
_ PROPOSED CHANGE NO. 3
_ PROPOSED CHANGE NO. 3   ,      [
[
                                                '                '                              [
[
  .= : duction                               /
.= : duction
j          (
/j
:=ast:d authorization of a change in the 2 '1 pursuant to the provisions of 10 CTR 50.59 omp ns to Technical SP)            !
(
Specifica ense           j r_ pat:d Proposed Change No. 3, would allow NSP to re-schedulThis request, which we ha                   -
:=ast:d authorization of a change in the Technical Specifica omp SP) 2 '1 pursuant to the provisions of 10 CTR 50.59 ns to ense r_ pat:d Proposed Change No. 3, would allow NSP to re-schedulThis request, which we ha j
e the integrated
.usge rate test of the reactor building which is required each 18 months as e the integrated
.usge
::3 ad 10 the Technical Specifications.
::3 ad 10rate      test of the the Technical      reactor building which is required each 18 months as Specifications.
The last test was performed on I
.m=::er 18,1963                               The last test was performed on                            I JI.
.m=::er 18,1963 NSP proposes to re-schedule the leakage rate testing to a la JI.
NSP proposes to re-schedule the leakage                                 er date rate testing to a la
.= $3 condition that such tests will be done after completion of the low er date se t: ting program and prior to continuation of reactor operation.
.= $3 condition that such tests will be done after completion of the low se t: ting program and prior to continuation of reactor operation.
t:x: ion
t:x: ion
~:*May : currently 1965      conducting low power tests which should         ee              be compl t d b y the x2::y la preparation for continued reactor                           operation.After this test phase During this interim
~ : currently conducting low power tests which should be compl t d b
:*May 1965 x2::y la preparation for continued reactor operation.After this test phase ee y the
 
==., th] xeactor will not be operated.
==., th] xeactor will not be operated.
We believe that re-scheduling the 2 a and acceptable from a safety viewpoint =.;:st:d leak rate testa to a t
During this interim We believe that re-scheduling the 2 a and acceptable from a safety viewpoint =.;:st:d leak rate testa to a t
==:21 'Spaci f1 cations
 
    .2v cf the above, we believe that the first paragraph           .. of 3of      7 the 2(f) e.:.:.a1
==:21 'Spaci f1 cations
:m        Specifications of License No. DPR-11 may be changed                               to zwad as
.2v cf the above, we believe that the first paragraph of 3 7 2(f) e.:.:.a1 Specifications of License No. DPR-11 may be changed to zwad as of the
      .7.J(f) be perfortned at least once every 18 months except t leakage rate test required to be performed by18,      May     1965  ,
:m
plant     modifications for full power operation but befor reactor operations after the modifications."
.7.J(f) be perfortned at least once every 18 months except t leakage rate test required to be performed by May plant modifications for full power operation but befor 18, 1965,
.=:3:fif, i
reactor operations after the modifications."
                                                                                                    \
.=:3:fif,
                                                                                                                        \
\\
: asis of the foregoing, we have concluded that Proposed                       .3 Change No
i
: pre:ent significant hazards considerations not described                       c or impil it I
: asis of the foregoing, we have concluded that Proposed Change No
i 0506120340 PDR   F     050214 PAY 05 54OIA      PDR l
\\
: w. - ,         -
: pre:ent significant hazards considerations not described or impil it
.3 c
i 0506120340 050214 PDR F
PAY 05 OIA 54 PDR
: w. -,


r
r
                                                                                      ~
(
(                                          l g.
l
              ~
~
in the hazards susunary mport and that them is masonable assurance that the health and safety of the public will not be endangend.                 '
g.
                                                                                                      .t Originalsigned br.                           6 Rogers.Boyd Roger S. Boyd, Chief Research & Power Reactor Safety Branch           g Division of Reactor Licensing                     ,
~ in the hazards susunary mport and that them is masonable assurance that the health and safety of the public will not be endangend.
Date     E     4E                                                             '
.t Originalsigned br.
t 6
6 Rogers.Boyd Roger S. Boyd, Chief Research & Power Reactor Safety Branch g
9 1
Division of Reactor Licensing Date E
4E t
6 9
1 i
i i
i i
    ,                                                                                                    i l
l s}}
s}}

Latest revision as of 20:41, 12 December 2024

Hazard Analysis Supporting Change 3 to License DPR-11, Authorizing Rescheduling of Integrated Leakage Rate Testing of Reactor Bldg
ML20125D385
Person / Time
Site: 05000130
Issue date: 03/04/1965
From: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
To:
Shared Package
ML20125A538 List:
References
FOIA-85-54 NUDOCS 8506120340
Download: ML20125D385 (2)


Text

.

i I

l DCfNSE AUTHORITY MLE COPY 4AZARDS ANALYSIS BY THE RESEARCH AND POWER REACTO NCH DIVISION OF REACTOR LICENSING IN THE MATTER OF NORTHERN STATES POWER COMPANY

_ PROPOSED CHANGE NO. 3

[

[

.= : duction

/j

(

=ast:d authorization of a change in the Technical Specifica omp SP) 2 '1 pursuant to the provisions of 10 CTR 50.59 ns to ense r_ pat:d Proposed Change No. 3, would allow NSP to re-schedulThis request, which we ha j

.usge rate test of the reactor building which is required each 18 months as e the integrated

3 ad 10 the Technical Specifications.

The last test was performed on I

.m=::er 18,1963 NSP proposes to re-schedule the leakage rate testing to a la JI.

.= $3 condition that such tests will be done after completion of the low er date se t: ting program and prior to continuation of reactor operation.

t:x: ion

~ : currently conducting low power tests which should be compl t d b

  • May 1965 x2::y la preparation for continued reactor operation.After this test phase ee y the

==., th] xeactor will not be operated.

During this interim We believe that re-scheduling the 2 a and acceptable from a safety viewpoint =.;:st:d leak rate testa to a t

==:21 'Spaci f1 cations

.2v cf the above, we believe that the first paragraph of 3 7 2(f) e.:.:.a1 Specifications of License No. DPR-11 may be changed to zwad as of the

m

.7.J(f) be perfortned at least once every 18 months except t leakage rate test required to be performed by May plant modifications for full power operation but befor 18, 1965,

reactor operations after the modifications."

.=:3:fif,

\\

i

asis of the foregoing, we have concluded that Proposed Change No

\\

pre:ent significant hazards considerations not described or impil it

.3 c

i 0506120340 050214 PDR F

PAY 05 OIA 54 PDR

w. -,

r

(

l

~

g.

~ in the hazards susunary mport and that them is masonable assurance that the health and safety of the public will not be endangend.

.t Originalsigned br.

6 Rogers.Boyd Roger S. Boyd, Chief Research & Power Reactor Safety Branch g

Division of Reactor Licensing Date E

4E t

6 9

1 i

i i

l s