l DCfNSE AUTHORITY MLE COPY 4AZARDS ANALYSIS BY THE RESEARCH AND POWER REACTO NCH DIVISION OF REACTOR LICENSING IN THE MATTER OF NORTHERN STATES POWER COMPANY | |||
_ PROPOSED CHANGE NO. 3 | |||
_ PROPOSED CHANGE NO. 3 | [ | ||
[ | |||
.= : duction | |||
/j | |||
:=ast:d authorization of a change in the 2 '1 pursuant to the provisions of 10 CTR 50.59 | ( | ||
:=ast:d authorization of a change in the Technical Specifica omp SP) 2 '1 pursuant to the provisions of 10 CTR 50.59 ns to ense r_ pat:d Proposed Change No. 3, would allow NSP to re-schedulThis request, which we ha j | |||
.usge rate test of the reactor building which is required each 18 months as e the integrated | |||
::3 ad 10 the Technical Specifications. | |||
The last test was performed on I | |||
.m=::er 18,1963 NSP proposes to re-schedule the leakage rate testing to a la JI. | |||
NSP proposes to re-schedule the leakage | .= $3 condition that such tests will be done after completion of the low er date se t: ting program and prior to continuation of reactor operation. | ||
t:x: ion | t:x: ion | ||
~ | ~ : currently conducting low power tests which should be compl t d b | ||
:*May 1965 x2::y la preparation for continued reactor operation.After this test phase ee y the | |||
==., th] xeactor will not be operated. | ==., th] xeactor will not be operated. | ||
We believe that re-scheduling the 2 a and acceptable from a safety viewpoint =.;:st:d leak rate testa to a t | During this interim We believe that re-scheduling the 2 a and acceptable from a safety viewpoint =.;:st:d leak rate testa to a t | ||
==:21 'Spaci f1 cations | |||
.2v cf the above, we believe that the first paragraph of 3 7 2(f) e.:.:.a1 Specifications of License No. DPR-11 may be changed to zwad as of the | |||
:m | |||
plant | .7.J(f) be perfortned at least once every 18 months except t leakage rate test required to be performed by May plant modifications for full power operation but befor 18, 1965, | ||
.=:3:fif, | reactor operations after the modifications." | ||
.=:3:fif, | |||
\\ | |||
: asis of the foregoing, we have concluded that Proposed | i | ||
: pre:ent significant hazards considerations not described | : asis of the foregoing, we have concluded that Proposed Change No | ||
i 0506120340 PDR | \\ | ||
: w. - , | : pre:ent significant hazards considerations not described or impil it | ||
.3 c | |||
i 0506120340 050214 PDR F | |||
PAY 05 OIA 54 PDR | |||
: w. -, | |||
r | r | ||
( | |||
l | |||
~ | |||
in the hazards susunary mport and that them is masonable assurance that the health and safety of the public will not be endangend. | g. | ||
~ in the hazards susunary mport and that them is masonable assurance that the health and safety of the public will not be endangend. | |||
Date | .t Originalsigned br. | ||
6 Rogers.Boyd Roger S. Boyd, Chief Research & Power Reactor Safety Branch g | |||
Division of Reactor Licensing Date E | |||
4E t | |||
6 9 | |||
1 i | |||
i i | i i | ||
l s}} | |||
s}} | |||
Latest revision as of 20:41, 12 December 2024
| ML20125D385 | |
| Person / Time | |
|---|---|
| Site: | 05000130 |
| Issue date: | 03/04/1965 |
| From: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | |
| Shared Package | |
| ML20125A538 | List:
|
| References | |
| FOIA-85-54 NUDOCS 8506120340 | |
| Download: ML20125D385 (2) | |
Text
.
i I
l DCfNSE AUTHORITY MLE COPY 4AZARDS ANALYSIS BY THE RESEARCH AND POWER REACTO NCH DIVISION OF REACTOR LICENSING IN THE MATTER OF NORTHERN STATES POWER COMPANY
_ PROPOSED CHANGE NO. 3
[
[
.= : duction
/j
(
- =ast:d authorization of a change in the Technical Specifica omp SP) 2 '1 pursuant to the provisions of 10 CTR 50.59 ns to ense r_ pat:d Proposed Change No. 3, would allow NSP to re-schedulThis request, which we ha j
.usge rate test of the reactor building which is required each 18 months as e the integrated
- 3 ad 10 the Technical Specifications.
The last test was performed on I
.m=::er 18,1963 NSP proposes to re-schedule the leakage rate testing to a la JI.
.= $3 condition that such tests will be done after completion of the low er date se t: ting program and prior to continuation of reactor operation.
t:x: ion
~ : currently conducting low power tests which should be compl t d b
- May 1965 x2::y la preparation for continued reactor operation.After this test phase ee y the
==., th] xeactor will not be operated.
During this interim We believe that re-scheduling the 2 a and acceptable from a safety viewpoint =.;:st:d leak rate testa to a t
==:21 'Spaci f1 cations
.2v cf the above, we believe that the first paragraph of 3 7 2(f) e.:.:.a1 Specifications of License No. DPR-11 may be changed to zwad as of the
- m
.7.J(f) be perfortned at least once every 18 months except t leakage rate test required to be performed by May plant modifications for full power operation but befor 18, 1965,
reactor operations after the modifications."
.=:3:fif,
\\
i
- asis of the foregoing, we have concluded that Proposed Change No
\\
- pre:ent significant hazards considerations not described or impil it
.3 c
i 0506120340 050214 PDR F
PAY 05 OIA 54 PDR
- w. -,
r
(
l
~
g.
~ in the hazards susunary mport and that them is masonable assurance that the health and safety of the public will not be endangend.
.t Originalsigned br.
6 Rogers.Boyd Roger S. Boyd, Chief Research & Power Reactor Safety Branch g