UNITED STATES Ppa as og<>
Ppa as og<>
4 p'           t               NUCLEAR REGULATORY COMMISSION D
UNITED STATES 4p' t
REGION IV
NUCLEAR REGULATORY COMMISSION D
  %,         ,oE                      UnANIUM RECOV     FIELD OFFICE DENVER, COLORADO 90225 URF0:PWM Docket No. 50-267 HEMORANDUM 10:   L. J. Callan, Director
REGION IV E
;                          Division of Radiation Safety and Safe.prds Region IV FROM:             R. E. Hall, Director Uranium Recovery Field Office, Regiori IV
,o UnANIUM RECOV FIELD OFFICE DENVER, COLORADO 90225 URF0:PWM Docket No. 50-267 HEMORANDUM 10:
L. J. Callan, Director Division of Radiation Safety and Safe.prds Region IV FROM:
R. E. Hall, Director Uranium Recovery Field Office, Regiori IV


==SUBJECT:==
==SUBJECT:==
Line 27: Line 29:
The status of the facility, scheduled decomissioning activities, the relative need and difficulty of performing each inspection module, and a planned 8-week report frequency were considered in the allocation of these resources.
The status of the facility, scheduled decomissioning activities, the relative need and difficulty of performing each inspection module, and a planned 8-week report frequency were considered in the allocation of these resources.
The main activities for this inspection period will be associated with cutting and dismantlement of the Prestressed Concrete Reactor Vessel (PCRV) top head.
The main activities for this inspection period will be associated with cutting and dismantlement of the Prestressed Concrete Reactor Vessel (PCRV) top head.
This can not begin until the removal of the dumy fuel blocks from the PCRV has been completed, which is currently bahind schedule and not likely to be finished until February,1993. Other significant activities will include installation of the PCRV shield water system, management and transportation of radioactive waste, and design and preparation for PCRV internals dismantlement. Preparation for these activities will include training of Pete Garcia and Dana Ward so they can be integrated into inspections at Fort St. Vrain.
This can not begin until the removal of the dumy fuel blocks from the PCRV has been completed, which is currently bahind schedule and not likely to be finished until February,1993. Other significant activities will include installation of the PCRV shield water system, management and transportation of radioactive waste, and design and preparation for PCRV internals dismantlement.
We will implement the attached inspection plan as written unless you have coments or changes. Should facility status or schedules change, we will respond to these changes as necessary.
Preparation for these activities will include training of Pete Garcia and Dana Ward so they can be integrated into inspections at Fort St. Vrain.
We will implement the attached inspection plan as written unless you have coments or changes.
Should facility status or schedules change, we will respond to these changes as necessary.
A p-~
A p-~
Ramon E. Hall Director
Ramon E. Hall Director 3
000


==Attachment:==
==Attachment:==
3    000 As stated l
As stated l
9212180154 921127 PDR   ADOCK 05000267 G                   PDR                                                         \\
9212180154 921127 PDR ADOCK 05000267 G
PDR
\\ \\


1 i
1 i
i       . .
i I
I l.
l.
1 2                                            NOV 271992 cc:
1 NOV 271992 2
'                  J. Austin 1                 L. Pittiglio 7
cc:
J. Austin 1
L. Pittiglio 7
t 1
t 1
I i
I i
Line 52: Line 61:
i 1
i 1
1 r
1 r
* 4, 4
4, 4
                                                                                                                                                                                    \
\\
                                                                                                                                                                                      .?
.?
4 5
4 5
                                                                ,,          ..,,,,,-y
..,,,,,-y
                                                                                      , . .,-.-..e v . -    * , ~~- w, . , - ,, , , ,,      7,*c-,- ,,
.,-.-..e v
7+, vwy- , , - , - - , - -         ,,,,y
*, ~~-
w, 7,*c-,-
7+,
vwy-,, -, - -, - -
,,,,y


j                                                                       s i
j s
i NOV 271992                             l 3                                                                             1 i
i i
bcc:
NOV 271992 3
i bcc:
Docket No. 50-267 PDR/DCS 4
Docket No. 50-267 PDR/DCS 4
URF0 r/f LJCallan, RIV i                 LLUR Branch, LLWM
URF0 r/f LJCallan, RIV i
)                 PWMichaud j                 0:\lNSPECT\FSVINSPl. HEM J
LLUR Branch, LLWM
)
PWMichaud j
0:\\lNSPECT\\FSVINSPl. HEM J
s j
s j
i 1
i 1
Line 75: Line 92:
f i
f i
1 nd/
1 nd/
b             DD:URFO M . NR0:RIV PWMichaud/db                 EFHawkins               REHall 11/2f/92                     11/ d 92               11/27/92 f
-,.b DD:URFO M. NR0:RIV PWMichaud/db EFHawkins REHall 11/2f/92 11/ d 92 11/27/92 f
                  ,        -- -      --.r,, ,.            , , , . ~                         - - . ~ . . , , , . , ,a-a -
--.r,,
,,,. ~
-. ~..,,,.,
,a-a


FORT ST. VRAIN INSPECTION PLAN
FORT ST. VRAIN INSPECTION PLAN
                                              ~
~
Program: MC 2560, Decommission 1ng Inspection Program inspection Period: December 1, 1992 to September 30, 1993 Responsibility: URF0 PROCEDURE                                     TITLE                                             FREQUENCY EST, HRS, Core inspection Proaram 64704     Fire Protection / Prevention Program                                                     SA       16 71707     Operationel Safety Verification                                                           H       120 80721     Radiological Environmental Monitoring                                                   SA       16 81018     Security Plan & Implementing Procedures                                                   M       10 82701     Operational Status of Emergency                                                           A         8 Preparedness Program 86700     Spent Fuel Pool Activities                                                               M       10 86?50     Solid Radioactive Waste Management and                                                   M       90 Transportation of Radioactive Materials Reaional Initiative Inspection Proaram 30703     Hanagement Meetings                                                                       M       10 35701     Quality Assurance Annual Review                                                           A       8 368008     Organization                                                                             A         8
Program: MC 2560, Decommission 1ng Inspection Program inspection Period: December 1, 1992 to September 30, 1993 Responsibility: URF0 PROCEDURE TITLE FREQUENCY EST, HRS, Core inspection Proaram 64704 Fire Protection / Prevention Program SA 16 71707 Operationel Safety Verification H
120 80721 Radiological Environmental Monitoring SA 16 81018 Security Plan & Implementing Procedures M
10 82701 Operational Status of Emergency A
8 Preparedness Program 86700 Spent Fuel Pool Activities M
10 86?50 Solid Radioactive Waste Management and M
90 Transportation of Radioactive Materials Reaional Initiative Inspection Proaram 30703 Hanagement Meetings M
10 35701 Quality Assurance Annual Review A
8 368008 Organization A
8


1                                                                                       2 PROCEDURE                               TITLE             FRE0VENCY                   EST. HRS.
1 2
I                                                     Core inspection Program i
PROCEDURE TITLE FRE0VENCY EST. HRS.
!                                              39701   Records Program                                     A                               8
I Core inspection Program i
39701 Records Program A
8
)
40702 Audit Program M
64 41400 Non-Licensed Staff Training A
8 42700 Plant Procedures SA 16
)
)
40702  Audit Program                                        M                            64 41400  Non-Licensed Staff Training                          A                              8 42700  Plant Procedures                                    SA                              16
54834B Housekeeping Controls SA 16 i
)                                            54834B   Housekeeping Controls                               SA                             16 i
61700 Surveillance Procedures and Records SA 16 62702 Maintenance Program SA 16 e
61700   Surveillance Procedures and Records                 SA                             16
t 81020 Hanagement Effectiveness - Security A
.                                              62702   Maintenance Program                                 SA                             16 e
8 l
t 81020   Hanagement Effectiveness - Security                 A                               8 l                                                     Program i
Program i
83100   Occupational Exposure During DECON                 SA                             16 i
83100 Occupational Exposure During DECON SA 16 i
83722   Radiation Protection, Plant Chemistry,-             A                               8 and Radwaste: Organization and Management Controls 83723   Training and Qualifications:       General         A                               8 Employee Training, Radiation Safety, Plant Chemistry, Radwaste and Transportation 83890 Closcout inspection and Survey                     AR                               0 84101 Radioactive Waste Management                       SA                             16
83722 Radiation Protection, Plant Chemistry,-
                                                                                                    .,,~r .,--------.,,-,.-m           - ,                    , - , ,
A 8
and Radwaste: Organization and Management Controls 83723 Training and Qualifications:
General A
8 Employee Training, Radiation Safety, Plant Chemistry, Radwaste and Transportation 83890 Closcout inspection and Survey AR 0
84101 Radioactive Waste Management SA 16
.,,~r
.,--------.,,-,.-m


3 PROCEDURE                       TITLE                 FRE0VENCY   EST. HRS.
3 PROCEDURE TITLE FRE0VENCY EST. HRS.
                                              ~
~
Core inspection Proaram 86721     Transportation                                 A       Note 1 92701     Followup                                       AR         8 92720     Corrective Action                             AR         8 93001     OSHA Interface Activities                     AR           8 Total Inspection Hours                                   520 M - HONTHLY SA - SEMIANNUALLY A - ANNUALLY AR - AS REQUIRED Note 1:   Inspection of Transportation Activities to be conducted December 1 to 3,1992, by the Transportation Branch, Division of Safety and Transportation.
Core inspection Proaram 86721 Transportation A
Note 1 92701 Followup AR 8
92720 Corrective Action AR 8
93001 OSHA Interface Activities AR 8
Total Inspection Hours 520 M - HONTHLY SA - SEMIANNUALLY A - ANNUALLY AR - AS REQUIRED Note 1:
Inspection of Transportation Activities to be conducted December 1 to 3,1992, by the Transportation Branch, Division of Safety and Transportation.
l l
l l
l
l
    . . , ,}}
..,,}}

Latest revision as of 20:25, 12 December 2024

Forwards Insp Plan for Fsv,Developed for Current Fiscal Yr Ending 930930.Plan Based on Mc 2560,Decommissioning Insp Program
ML20126A314
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/27/1992
From: Randy Hall
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9212180154
Download: ML20126A314 (6)


Text

1 d

Ppa as og<>

UNITED STATES 4p' t

NUCLEAR REGULATORY COMMISSION D

REGION IV E

,o UnANIUM RECOV FIELD OFFICE DENVER, COLORADO 90225 URF0:PWM Docket No. 50-267 HEMORANDUM 10:

L. J. Callan, Director Division of Radiation Safety and Safe.prds Region IV FROM:

R. E. Hall, Director Uranium Recovery Field Office, Regiori IV

SUBJECT:

FORT ST. VRAIN INSPECTION PLAN The inspection plan for Fort St. Vrain, which Paul Michaud has developed for the current fiscal year, ending on September 30, 1993, is attached. This plan is based on MC 2560, Decomissioning Inspection Program. The frequency and estimated hours for performing each inspection module were based on an allocation of approximately one-half an FTE for all inspection activities.

The status of the facility, scheduled decomissioning activities, the relative need and difficulty of performing each inspection module, and a planned 8-week report frequency were considered in the allocation of these resources.

The main activities for this inspection period will be associated with cutting and dismantlement of the Prestressed Concrete Reactor Vessel (PCRV) top head.

This can not begin until the removal of the dumy fuel blocks from the PCRV has been completed, which is currently bahind schedule and not likely to be finished until February,1993. Other significant activities will include installation of the PCRV shield water system, management and transportation of radioactive waste, and design and preparation for PCRV internals dismantlement.

Preparation for these activities will include training of Pete Garcia and Dana Ward so they can be integrated into inspections at Fort St. Vrain.

We will implement the attached inspection plan as written unless you have coments or changes.

Should facility status or schedules change, we will respond to these changes as necessary.

A p-~

Ramon E. Hall Director 3

000

Attachment:

As stated l

9212180154 921127 PDR ADOCK 05000267 G

PDR

\\ \\

1 i

i I

l.

1 NOV 271992 2

cc:

J. Austin 1

L. Pittiglio 7

t 1

I i

i, 9

4 i

1 i

4 i

i i

1 e

i i

i 1

1 r

4, 4

\\

.?

4 5

..,,,,,-y

.,-.-..e v

  • , ~~-

w, 7,*c-,-

7+,

vwy-,, -, - -, - -

,,,,y

j s

i i

NOV 271992 3

i bcc:

Docket No. 50-267 PDR/DCS 4

URF0 r/f LJCallan, RIV i

LLUR Branch, LLWM

)

PWMichaud j

0:\\lNSPECT\\FSVINSPl. HEM J

s j

i 1

i i

i i

i 4

1 1

1 1

f i

1 nd/

-,.b DD:URFO M. NR0:RIV PWMichaud/db EFHawkins REHall 11/2f/92 11/ d 92 11/27/92 f

--.r,,

,,,. ~

-. ~..,,,.,

,a-a

FORT ST. VRAIN INSPECTION PLAN

~

Program: MC 2560, Decommission 1ng Inspection Program inspection Period: December 1, 1992 to September 30, 1993 Responsibility: URF0 PROCEDURE TITLE FREQUENCY EST, HRS, Core inspection Proaram 64704 Fire Protection / Prevention Program SA 16 71707 Operationel Safety Verification H

120 80721 Radiological Environmental Monitoring SA 16 81018 Security Plan & Implementing Procedures M

10 82701 Operational Status of Emergency A

8 Preparedness Program 86700 Spent Fuel Pool Activities M

10 86?50 Solid Radioactive Waste Management and M

90 Transportation of Radioactive Materials Reaional Initiative Inspection Proaram 30703 Hanagement Meetings M

10 35701 Quality Assurance Annual Review A

8 368008 Organization A

8

1 2

PROCEDURE TITLE FRE0VENCY EST. HRS.

I Core inspection Program i

39701 Records Program A

8

)

40702 Audit Program M

64 41400 Non-Licensed Staff Training A

8 42700 Plant Procedures SA 16

)

54834B Housekeeping Controls SA 16 i

61700 Surveillance Procedures and Records SA 16 62702 Maintenance Program SA 16 e

t 81020 Hanagement Effectiveness - Security A

8 l

Program i

83100 Occupational Exposure During DECON SA 16 i

83722 Radiation Protection, Plant Chemistry,-

A 8

and Radwaste: Organization and Management Controls 83723 Training and Qualifications:

General A

8 Employee Training, Radiation Safety, Plant Chemistry, Radwaste and Transportation 83890 Closcout inspection and Survey AR 0

84101 Radioactive Waste Management SA 16

.,,~r

.,--------.,,-,.-m

3 PROCEDURE TITLE FRE0VENCY EST. HRS.

~

Core inspection Proaram 86721 Transportation A

Note 1 92701 Followup AR 8

92720 Corrective Action AR 8

93001 OSHA Interface Activities AR 8

Total Inspection Hours 520 M - HONTHLY SA - SEMIANNUALLY A - ANNUALLY AR - AS REQUIRED Note 1:

Inspection of Transportation Activities to be conducted December 1 to 3,1992, by the Transportation Branch, Division of Safety and Transportation.