4 Procedure No.                             W-SITP-12 J. A. JONES CONSTRUCTION COMPANY SITE INSPECTION AND TEST PROCEDURE                                                               .
,y 4
FOR BACKFILL AND COMPACTION INSPECTION WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 ENGINEERING                       CONSTRUCTION                     QUALITY ASSURANCE REV.         DATE                 REVIEWED BY             DATE     REVIEWED BY     DATE           APPROVED BY                                       DATE o       iers.rs             arg . . , ,               ,o,-j n. 3dre s fns LO,L e.R //                                                            ,sc,n I       s-a-16              atf4                      $cha       AnfAd M bi (nLcill uan 2       +khc               a/R               - . v/au.U $'      d 6 4/A68%W 4s/x                                                                /
Procedure No.
      .3     '//2e/7c             at/s                     9/zojrc     Ym Y20/7/,                     &)                               0.$             y/no/u 4     'bhS/7/-               I!Gdtis6                 li/2s/1/ Um]Lbs7/                           I  'ii!:aat.:j/                 t  .            s ,i.. .
W-SITP-12 J. A. JONES CONSTRUCTION COMPANY SITE INSPECTION AND TEST PROCEDURE FOR BACKFILL AND COMPACTION INSPECTION WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 ENGINEERING CONSTRUCTION QUALITY ASSURANCE REV.
5       7/9/7e #M                                     7/r/4 ,T< #m '7/M/       //
DATE REVIEWED BY DATE REVIEWED BY DATE APPROVED BY DATE fns LO,L e.R //,sc,n o
(13 d m d 81 2/                       '-
iers.rs arg..,,
7/ci176
,o,-j n. 3dre s I
                                                                /                   f l
s-a-16atf4
ut u.aw                                               -
$cha AnfAd M bi (nLcill uan
l                U/ CC'HEES -                                                               FREEDOM OF INf0RMATdi W/0 ComCES                                               '
$' 6 4/A68%W 4s/x 2
                                                                                                        /CT EQUEST m:CT2                        -                    .                                    t4 -4 8'f j                       1300 CUALI                 10                                                       C.[M I DATE:
+khc a/R v/au.U d
                                          < anu.-
/
.3
'//2e/7c at/s 9/zojrc Ym Y20/7/,
&)
0.$
y/no/u 4
'bhS/7/- I!Gdtis6 li/2s/1/ Um]Lbs7/
'ii!:aat.:j/
s,i..
t I
5 7/9/7e #M 7/r/4,T< #m '7/M/ (13 d m d 81 2/ 7/ci176
/
f
//
l ut u.aw FREEDOM OF INf0RMATdi l
U/ CC'HEES -
/CT EQUEST W/0 ComCES t4 -4 8'f m:CT2 j
1300 CUALI 10 C.[M I
< anu.
DATE:
l l
l l
8506220092 850222 PDR           FOIA GARDE 84-455                     PDR                                                                                 ,
8506220092 850222 PDR FOIA GARDE 84-455 PDR


6 J. A. JONES CONSTRUCTION COMPANY               PAGE 1 OF 4 SITE INSPECTION AND TEST PROCEDURE:                                     PROCEDURE NO.
6 J. A. JONES CONSTRUCTION COMPANY PAGE 1 OF 4 SITE INSPECTION AND TEST PROCEDURE:
W-SITP-12 REV. NO. 5 TITLE: BACKFILL AND COMPACTION INSPECTION                               DATE: 7/9/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3     CONTRACT No. W3-NY-4 1.0   PURPOSE To specify the inspection and surveillance activities that will be per-formed by J. A. Jones Quality Assurance / Quality Verification personnel to assure that backfill is placed and compacted in accordance with approved drawings, specifications and procedures.
PROCEDURE NO.
2.0   SCOPE This procedure governs the placing and compaction of backfill material for Waterford SES Unit No. 3, Phase i Concrete Construction.
W-SITP-12 REV. NO. 5 TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 7/9/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT No. W3-NY-4 1.0 PURPOSE To specify the inspection and surveillance activities that will be per-formed by J. A. Jones Quality Assurance / Quality Verification personnel to assure that backfill is placed and compacted in accordance with approved drawings, specifications and procedures.
30     DEFINITIONS 31   Class "A" fill shall be either sand containing no more than twelve (12) percent material passing a number 200 selve or Pleistocene clay.
2.0 SCOPE This procedure governs the placing and compaction of backfill material for Waterford SES Unit No. 3, Phase i Concrete Construction.
3.2   Class "B" fill shall be selected sand, silt, clay, or~a combination thereof, selected from the excavation.
30 DEFINITIONS 31 Class "A" fill shall be either sand containing no more than twelve (12) percent material passing a number 200 selve or Pleistocene clay.
3.3   Location of Class "A" and Class "B" fill shall be as shown on Ebasco Drawing No. LOU-1564 4497 Sol," General Backfill Plan and Sections".
3.2 Class "B" fill shall be selected sand, silt, clay, or~a combination thereof, selected from the excavation.
3.3 Location of Class "A" and Class "B" fill shall be as shown on Ebasco Drawing No. LOU-1564 4497 Sol," General Backfill Plan and Sections".


==4.0   REFERENCES==
==4.0 REFERENCES==
4.1 J. A. Jones Construction Wor'k Procedure, W-WP-12, "Backfilling and Compaction".
4.2 Ebasco Services, Inc. Specification No. LOU-1564.482, " Filter and Backfill".
4.3 Ebasco Drawing No. LOU-1564-G-490, " Nuclear Plant Island Structure -
Construction Sequence."
5.0 RESPONSIBILITIES 5.1 Ebasco Services, Inc. is responsible for the furnishing of all back-fill material and for all testing of backfill material and compacted backfill.
5.2 J. A. Jones is responsible for the proper placing and compaction of backfill in accordance with approved drawings, specifications and procedures.


4.1  J. A. Jones Construction Wor'k Procedure, W-WP-12, "Backfilling and Compaction".
j t.
4.2    Ebasco Services, Inc. Specification No. LOU-1564.482, " Filter and Backfill".
J. A. JONES CONSTRUCiION COMPANY PAGE 2 OF 4 SITE INSPECTION AND TEST PROCEDURE:
4.3    Ebasco Drawing No. LOU-1564-G-490, " Nuclear Plant Island Structure - -
PROCEDURE NO.
Construction Sequence."                        .
W-SITP-12 REV. NO. 5 TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 7/9/76 i
5.0  RESPONSIBILITIES 5.1    Ebasco Services, Inc. is responsible for the furnishing of all back-fill material and for all testing of backfill material and compacted backfill.
1 i '
5.2    J. A. Jones is responsible for the proper placing and compaction of backfill in accordance with approved drawings, specifications and procedures.
PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT W3-NY-4 6.0 INSPECTION The assigned quality Verification Inspector (s) shall perform surveillance o
 
inspection as required to assure that the requirements listed below are fulfilled.
j
6.1 Material has been determined to be suitable by Ebasco and released to J. A. Jones.
: t.                          .
6.2 Backfilling is accomplished in the proper sequence in accordance with Ebasco Drawing No. LOU-1564-G490.
J. A. JONES CONSTRUCiION COMPANY                                                               PAGE 2 OF 4 SITE INSPECTION AND TEST PROCEDURE:                                                                                                                               PROCEDURE NO.
6.3 Base to receive backfill has been properly prepared and compacted to the density required by Ebasco.
W-SITP-12 REV. NO. 5                           ,
6.4 Sand for Class "A" fill is spread and leveled in layers not exceed-ing 15 inches' prior to compaction.
    !                      TITLE: BACKFILL AND COMPACTION INSPECTION                                                                                                                         DATE: 7/9/76
6.~ 5
,  i 1
' Clay for Class "A" backfill and material selected from the excavation for Class "B" backfill is placed in layers not exceeding ten inches prior to compaction.
i '
6.6 Fill material is deposited uniformly over entire area being filled to a particular stage or level.
PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT W3-NY-4 6.0       INSPECTION o                                    The assigned quality Verification Inspector (s) shall perform surveillance inspection as required to assure that the requirements listed below are fulfilled.
6.7 When required, fill material shall be disc-harrowed af ter spreading and before compaction to blend and aerate the material into a tex-ture that can be consolidated into a homogeneous mass by the com-paction operations.
    ;                                    6.1                         Material has been determined to be suitable by Ebasco and released to J. A. Jones.
6.8 Surface of each lift is kept reasonably smooth and free of ridges or grooves which would adversely affect proper compaction of subsequent.
6.2                         Backfilling is accomplished in the proper sequence in accordance with Ebasco Drawing No. LOU-1564-G490.
Ilfts.
6.3                         Base to receive backfill has been properly prepared and compacted to the density required by Ebasco.                                                                 ,
6.9 Hauling equipment uses paths different from each other in order to aid compaction of the entire area and to avoid overcompaction of any given area.
6.4                           Sand for Class                   "A" fill is spread and leveled in layers not exceed-ing 15 inches' prior to compaction.
6.~ 5                       ' Clay for Class "A" backfill and material selected from the excavation for Class "B" backfill is placed in layers not exceeding ten inches prior to compaction.
6.6                           Fill material is deposited uniformly over entire area being filled to a particular stage or level.
6.7                         When required, fill material shall be disc-harrowed af ter spreading and before compaction to blend and aerate the material into a tex-ture that can be consolidated into a homogeneous mass by the com-paction operations.
6.8                         Surface of each lift is kept reasonably smooth and free of ridges or grooves which would adversely affect proper compaction of subsequent.
Ilfts.                                             ,
6.9                         Hauling equipment uses paths different from each other in order to aid compaction of the entire area and to avoid overcompaction of any given area.
l
l


e                                                           >
e
  ~,;                       .
~,;
                        .                                J. A. JONES CONSTRUCTION COMPANY                   PAGE 3 0F k SITE INSPECTION AND TEST PROCEDURE:                                                 PROCEDURE NO.
J. A. JONES CONSTRUCTION COMPANY PAGE 3 0F k SITE INSPECTION AND TEST PROCEDURE:
W-SITP-12 REV. NO. 5
PROCEDURE NO.
      '                  TITLE:                                                                               DATE: 7/9/76 BACKFILL AND COMPACTION INSPECTION PROJECT TITLE:             WATERFORD SES UNIT NO. 3, CONTRACT NO. W3-NY-4 6.10     iftarea to receive fill is an original excavation, or com-7 pacted more than two days previously, surface shall be cleaned
W-SITP-12 REV. NO.
                                ,                of all loose debris and improperly compacted material .         in R'D       I           addition, area shall then be proof rolled and accepted before a
5 TITLE:
subsequent backfilling.
BACKFILL AND COMPACTION INSPECTION DATE: 7/9/76 PROJECT TITLE:
6.11
WATERFORD SES UNIT NO. 3, CONTRACT NO. W3-NY-4 6.10 iftarea to receive fill is an original excavation, or com-7 pacted more than two days previously, surface shall be cleaned of all loose debris and improperly compacted material.
* When two sections of fill join, fill placed first must have
in R'D I
                                            '      Its slope shaved a m'inimum of three feet to expose undisturbed compacted material.
addition, area shall then be proof rolled and accepted before subsequent backfilling.
r- !
a 6.11 When two sections of fill join, fill placed first must have Its slope shaved a m'inimum of three feet to expose undisturbed compacted material.
                                        '6.12     Compaction is achieved with proper equipment operating and
r-
* proper speed.
'6.12 Compaction is achieved with proper equipment operating and proper speed.
6.13     Compaction is reasonable uniform withir. any one layer .over entire area.              .
6.13 Compaction is reasonable uniform withir. any one layer.over entire area.
7                                                               ,
7 6.14 All layers are compacted to full width.
6.14     All layers are compacted to full width.
6.15
6.15     ~ In 4estricted areas, fill does not contain material greater than three inches in size.
~ In 4estricted areas, fill does not contain material greater than three inches in size.
                                        ;              ,                      e                                                 s 6.16     in restricted areas, fill is placed in layers no greater than six inches in depth.
e s
6.17     Reasonable care is taken to protect waterproofing membrane boa rd s .
6.16 in restricted areas, fill is placed in layers no greater than six inches in depth.
6.18     Backfill placed against waterproofing membrane boards do not contain any particle greater than i inch in size.
6.17 Reasonable care is taken to protect waterproofing membrane boa rd s.
6.19     No fill is placed during heavy rain or on top of or into a pool of water.
6.18 Backfill placed against waterproofing membrane boards do not contain any particle greater than i inch in size.
6.20     Material testing is properly performed,and does not unduly affect progress of work.                    .
6.19 No fill is placed during heavy rain or on top of or into a pool of water.
1                                                                         >.
6.20 Material testing is properly performed,and does not unduly affect progress of work.
3 6.21     Material has been compacted until the specified density is obtained and verified by in-place density testing.
1 6.21 Material has been compacted until the specified density is 3
6.22     Surface of fill areas to be s'iopped to ef fect drainage away from building and into site drainage pattern. Low areas to be pumped if required.
obtained and verified by in-place density testing.
6.22 Surface of fill areas to be s'iopped to ef fect drainage away from building and into site drainage pattern.
Low areas to be pumped if required.
e o p-d
e o p-d
                                        .-                  -                          ,    .          , ,,            - ----e.   ,-
----e.


6                                 .
6 J. A. JONES CONSTRUCTION COMPANY PACE 4 0F 4 SITE INS?ECTION AND TEST PROCEDURE:
J. A. JONES CONSTRUCTION COMPANY                         PACE 4 0F 4 SITE INS?ECTION AND TEST PROCEDURE:                                                             PROCEDURE NO.
PROCEDURE NO.
W-5ITP-12 REV. NO. 5 TITLE:         BACKFILL AND COMPACTION INSPECTION                                               DATE: 7/9/76 PROJECT TITLE:         WATERFORD SES UNIT NO. 3                 CONTRACT NO. W3-NY-4 70   DOCUMENTATION The assigned Quality Verification Inspector (s)' documents his surveillance activities by filling out the Daily Backfill inspection Report (Attachment A). This report shall be filled out for each inspector for each shi f t and fill location when inspection is performed.
W-5ITP-12 REV. NO.
8.0 ATTACHMENTS 8.1   Daily Backfill inspection Report o
5 TITLE:
BACKFILL AND COMPACTION INSPECTION DATE: 7/9/76 PROJECT TITLE:
WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 70 DOCUMENTATION The assigned Quality Verification Inspector (s)' documents his surveillance activities by filling out the Daily Backfill inspection Report (Attachment A).
This report shall be filled out for each inspector for each shi f t and fill location when inspection is performed.
8.0 ATTACHMENTS 8.1 Daily Backfill inspection Report o
e 4
e 4


                                                                                                      ''                  W-SITP-12 Attachment A
W-SITP-12 Attachment A J.A.JOUESCONS1RUCTl0NCOMPANY
                  ~
~
J.A.JOUESCONS1RUCTl0NCOMPANY                                                                     -
WATERFORD SES UNIT NO. 3 d
        .                                            d WATERFORD SES UNIT NO. 3                                     1
1 DAILY BACKFILL INSPECTION REPORT i
!                                                DAILY BACKFILL INSPECTION REPORT i
s 1
s 1
;      Q.V. Inspector               -
Q.V. Inspector Date
Date
: 1. Fill Placement Area / Location
: 1. Fill Placement Area / Location                                                                                             +
+
                                                                                              *1 W
*1 W
: 2. Verify Engineer's release for placemen,t and compaction: ____                                                              __
2.
Ebasco Representative 3     Materials released by Engineer:                                                                         '
Verify Engineer's release for placemen,t and compaction:
Ebasco Representative
____Ebasco Representative 3
: 4. Spreading and compaction equipment satisfactory:                               Yes             No 5     Base to receive fill properly prepared and compacted:                                   Yes'_         No
Materials released by Engineer:
: 6. Backfilling done in proper sequence:                         Yes_           No 7     Fill material properly placed and spread:                             Yes             No
Ebasco Representative 4.
      . 8, . fFill material disc-harrowed, if necessary:                             Yes     f     No          ,                ,
Spreading and compaction equipment satisfactory:
: 9. Surface of each lif t re$sonably smooth and free of ridges or grooves:                                           Yes           No
Yes No 5
                                                                                                  .                    1
Base to receive fill properly prepared and compacted:
: 10. Hauling equipment using different paths:                             Yes             No
Yes'_
: 11. Surface properly treated:                 Yes           No
No 6.
: 12. Fill junctions properly treated:                 Yes                   No'
Backfilling done in proper sequence:
                                                                                      -r             f~
Yes_
13      Layers compacted to full width:                 Yes                   No'
No 7
: 14. Fill material not greatef 19an 3 inches in size in restricted areas:
Fill material properly placed and spread:
_Yes             No 15     Fill material lifts not reaterthan6Ikchesindepth-inrestrictedareas: Yes                                                           No
Yes No
: 16. Waterproofing membrane protected during back"Illi,ng operation:     <.
. 8,. fFill material disc-harrowed, if necessary:
Yes           No 17     Backfill placed against waterproofing membrane conteIns no particles larger than i inch:
Yes No f
Yes         No
9.
: 18. No fill placed during heavy rain or on top of or into standing water:                                               Yes           No 19     Material testing is properly performed.and does not unduly affect progress of work:
Surface of each lif t re$sonably smooth and free of ridges or grooves:
Yes         No       ,
Yes No 1
4    20. Comments:
10.
i                                       -
Hauling equipment using different paths:
Y i
Yes No 11.
                    -~e m                     -~--             -      ,e     -                                -            -
Surface properly treated:
                                                                                                                                      --n
Yes No 12.
Fill junctions properly treated:
Yes No' f~
-r Layers compacted to full width:
Yes No' 13 14.
Fill material not greatef 19an 3 inches in size in restricted areas:
_Yes No 15 Fill material lifts not reaterthan6Ikchesindepth-inrestrictedareas: Yes No
: 16. Waterproofing membrane protected during back"Illi,ng operation:
Yes No 17 Backfill placed against waterproofing membrane conteIns no particles larger than i inch:
Yes No
: 18. No fill placed during heavy rain or on top of or into standing water:
Yes No 19 Material testing is properly performed.and does not unduly affect progress of work:
Yes No 4
20.
Comments:
i Y
i
-~e m
n
-~--
,e m.
--n


l 1
l 1
INSTRUCTION FOR COMPLETING DAILY BACKFILL INIPECTION REPORT
INSTRUCTION FOR COMPLETING DAILY BACKFILL INIPECTION REPORT 1.
: 1.       Area / Location shall be recorded as coordinates from centerline of Reactor Vessel.
Area / Location shall be recorded as coordinates from centerline of Reactor Vessel.
: 2.       Verify Engineer's Release for placement and compaction; have Engineer's representative initial report for this item.
2.
3       Verify Engineer's Release of materials; have Engineer's representative initial report for this item.
Verify Engineer's Release for placement and compaction; have Engineer's representative initial report for this item.
: 4.       Items 4-19 inclusive are self-explanatory and reflect requirements of this procedure J. A. Jones Construction Work Procedure W-WP-12, and Ebasco Speci fication LOU-1564.482.
3 Verify Engineer's Release of materials; have Engineer's representative initial report for this item.
I 5.         If comments are required or further explanation of an item is needed, the comments are
4.
      .,              to be entered in the space provided (ltem 20 ). Any comment or explanation should be Y               preceded by the item number, e.g. Item 18 - light rain during fill operations, item -
Items 4-19 inclusive are self-explanatory and reflect requirements of this procedure J. A. Jones Construction Work Procedure W-WP-12, and Ebasco Speci fication LOU-1564.482.
I 5.
If comments are required or further explanation of an item is needed, the comments are to be entered in the space provided (ltem 20 ).
Any comment or explanation should be Y
preceded by the item number, e.g. Item 18 - light rain during fill operations, item -
19 - testing operations slowing down compaction due to malfunction of test equipment.
19 - testing operations slowing down compaction due to malfunction of test equipment.
Additional sheets may be used, if required.
Additional sheets may be used, if required.
: 6.       In the event that a "No" is checked for any one of items 2-19 inclusive, a "Stop Work Order" will be issued and the following information recorded under item 19:
6.
(1) Stop Work Order Number (2) Date issued (3) Individual notified (Name and title)
In the event that a "No" is checked for any one of items 2-19 inclusive, a "Stop Work Order" will be issued and the following information recorded under item 19:
(4) Date deficiency corrected (5) Date Stop Work Order rescinded i                                   .
(1)
Stop Work Order Number (2)
Date issued (3)
Individual notified (Name and title)
(4) Date deficiency corrected (5) Date Stop Work Order rescinded i
l e
l e
l}}
l}}

Latest revision as of 17:34, 12 December 2024

Rev 5 to Site Insp & Test Procedure W-SITP-12, Backfill & Compaction Insp
ML20127B921
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/09/1976
From:
J.A. JONES CONSTRUCTION CO.
To:
Shared Package
ML17198A241 List: ... further results
References
FOIA-84-455 W-SITP-12, NUDOCS 8506220092
Download: ML20127B921 (7)


Text

.

\\

,y 4

Procedure No.

W-SITP-12 J. A. JONES CONSTRUCTION COMPANY SITE INSPECTION AND TEST PROCEDURE FOR BACKFILL AND COMPACTION INSPECTION WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 ENGINEERING CONSTRUCTION QUALITY ASSURANCE REV.

DATE REVIEWED BY DATE REVIEWED BY DATE APPROVED BY DATE fns LO,L e.R //,sc,n o

iers.rs arg..,,

,o,-j n. 3dre s I

s-a-16atf4

$cha AnfAd M bi (nLcill uan

$' 6 4/A68%W 4s/x 2

+khc a/R v/au.U d

/

.3

'//2e/7c at/s 9/zojrc Ym Y20/7/,

&)

0.$

y/no/u 4

'bhS/7/- I!Gdtis6 li/2s/1/ Um]Lbs7/

'ii!:aat.:j/

s,i..

t I

5 7/9/7e #M 7/r/4,T< #m '7/M/ (13 d m d 81 2/ 7/ci176

/

f

//

l ut u.aw FREEDOM OF INf0RMATdi l

U/ CC'HEES -

/CT EQUEST W/0 ComCES t4 -4 8'f m:CT2 j

1300 CUALI 10 C.[M I

< anu.

DATE:

l l

8506220092 850222 PDR FOIA GARDE 84-455 PDR

6 J. A. JONES CONSTRUCTION COMPANY PAGE 1 OF 4 SITE INSPECTION AND TEST PROCEDURE:

PROCEDURE NO.

W-SITP-12 REV. NO. 5 TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 7/9/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT No. W3-NY-4 1.0 PURPOSE To specify the inspection and surveillance activities that will be per-formed by J. A. Jones Quality Assurance / Quality Verification personnel to assure that backfill is placed and compacted in accordance with approved drawings, specifications and procedures.

2.0 SCOPE This procedure governs the placing and compaction of backfill material for Waterford SES Unit No. 3, Phase i Concrete Construction.

30 DEFINITIONS 31 Class "A" fill shall be either sand containing no more than twelve (12) percent material passing a number 200 selve or Pleistocene clay.

3.2 Class "B" fill shall be selected sand, silt, clay, or~a combination thereof, selected from the excavation.

3.3 Location of Class "A" and Class "B" fill shall be as shown on Ebasco Drawing No. LOU-1564 4497 Sol," General Backfill Plan and Sections".

4.0 REFERENCES

4.1 J. A. Jones Construction Wor'k Procedure, W-WP-12, "Backfilling and Compaction".

4.2 Ebasco Services, Inc. Specification No. LOU-1564.482, " Filter and Backfill".

4.3 Ebasco Drawing No. LOU-1564-G-490, " Nuclear Plant Island Structure -

Construction Sequence."

5.0 RESPONSIBILITIES 5.1 Ebasco Services, Inc. is responsible for the furnishing of all back-fill material and for all testing of backfill material and compacted backfill.

5.2 J. A. Jones is responsible for the proper placing and compaction of backfill in accordance with approved drawings, specifications and procedures.

j t.

J. A. JONES CONSTRUCiION COMPANY PAGE 2 OF 4 SITE INSPECTION AND TEST PROCEDURE:

PROCEDURE NO.

W-SITP-12 REV. NO. 5 TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 7/9/76 i

1 i '

PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT W3-NY-4 6.0 INSPECTION The assigned quality Verification Inspector (s) shall perform surveillance o

inspection as required to assure that the requirements listed below are fulfilled.

6.1 Material has been determined to be suitable by Ebasco and released to J. A. Jones.

6.2 Backfilling is accomplished in the proper sequence in accordance with Ebasco Drawing No. LOU-1564-G490.

6.3 Base to receive backfill has been properly prepared and compacted to the density required by Ebasco.

6.4 Sand for Class "A" fill is spread and leveled in layers not exceed-ing 15 inches' prior to compaction.

6.~ 5

' Clay for Class "A" backfill and material selected from the excavation for Class "B" backfill is placed in layers not exceeding ten inches prior to compaction.

6.6 Fill material is deposited uniformly over entire area being filled to a particular stage or level.

6.7 When required, fill material shall be disc-harrowed af ter spreading and before compaction to blend and aerate the material into a tex-ture that can be consolidated into a homogeneous mass by the com-paction operations.

6.8 Surface of each lift is kept reasonably smooth and free of ridges or grooves which would adversely affect proper compaction of subsequent.

Ilfts.

6.9 Hauling equipment uses paths different from each other in order to aid compaction of the entire area and to avoid overcompaction of any given area.

l

e

~,;

J. A. JONES CONSTRUCTION COMPANY PAGE 3 0F k SITE INSPECTION AND TEST PROCEDURE:

PROCEDURE NO.

W-SITP-12 REV. NO.

5 TITLE:

BACKFILL AND COMPACTION INSPECTION DATE: 7/9/76 PROJECT TITLE:

WATERFORD SES UNIT NO. 3, CONTRACT NO. W3-NY-4 6.10 iftarea to receive fill is an original excavation, or com-7 pacted more than two days previously, surface shall be cleaned of all loose debris and improperly compacted material.

in R'D I

addition, area shall then be proof rolled and accepted before subsequent backfilling.

a 6.11 When two sections of fill join, fill placed first must have Its slope shaved a m'inimum of three feet to expose undisturbed compacted material.

r-

'6.12 Compaction is achieved with proper equipment operating and proper speed.

6.13 Compaction is reasonable uniform withir. any one layer.over entire area.

7 6.14 All layers are compacted to full width.

6.15

~ In 4estricted areas, fill does not contain material greater than three inches in size.

e s

6.16 in restricted areas, fill is placed in layers no greater than six inches in depth.

6.17 Reasonable care is taken to protect waterproofing membrane boa rd s.

6.18 Backfill placed against waterproofing membrane boards do not contain any particle greater than i inch in size.

6.19 No fill is placed during heavy rain or on top of or into a pool of water.

6.20 Material testing is properly performed,and does not unduly affect progress of work.

1 6.21 Material has been compacted until the specified density is 3

obtained and verified by in-place density testing.

6.22 Surface of fill areas to be s'iopped to ef fect drainage away from building and into site drainage pattern.

Low areas to be pumped if required.

e o p-d


e.

6 J. A. JONES CONSTRUCTION COMPANY PACE 4 0F 4 SITE INS?ECTION AND TEST PROCEDURE:

PROCEDURE NO.

W-5ITP-12 REV. NO.

5 TITLE:

BACKFILL AND COMPACTION INSPECTION DATE: 7/9/76 PROJECT TITLE:

WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 70 DOCUMENTATION The assigned Quality Verification Inspector (s)' documents his surveillance activities by filling out the Daily Backfill inspection Report (Attachment A).

This report shall be filled out for each inspector for each shi f t and fill location when inspection is performed.

8.0 ATTACHMENTS 8.1 Daily Backfill inspection Report o

e 4

W-SITP-12 Attachment A J.A.JOUESCONS1RUCTl0NCOMPANY

~

WATERFORD SES UNIT NO. 3 d

1 DAILY BACKFILL INSPECTION REPORT i

s 1

Q.V. Inspector Date

1. Fill Placement Area / Location

+

  • 1 W

2.

Verify Engineer's release for placemen,t and compaction:

____Ebasco Representative 3

Materials released by Engineer:

Ebasco Representative 4.

Spreading and compaction equipment satisfactory:

Yes No 5

Base to receive fill properly prepared and compacted:

Yes'_

No 6.

Backfilling done in proper sequence:

Yes_

No 7

Fill material properly placed and spread:

Yes No

. 8,. fFill material disc-harrowed, if necessary:

Yes No f

9.

Surface of each lif t re$sonably smooth and free of ridges or grooves:

Yes No 1

10.

Hauling equipment using different paths:

Yes No 11.

Surface properly treated:

Yes No 12.

Fill junctions properly treated:

Yes No' f~

-r Layers compacted to full width:

Yes No' 13 14.

Fill material not greatef 19an 3 inches in size in restricted areas:

_Yes No 15 Fill material lifts not reaterthan6Ikchesindepth-inrestrictedareas: Yes No

16. Waterproofing membrane protected during back"Illi,ng operation:

Yes No 17 Backfill placed against waterproofing membrane conteIns no particles larger than i inch:

Yes No

18. No fill placed during heavy rain or on top of or into standing water:

Yes No 19 Material testing is properly performed.and does not unduly affect progress of work:

Yes No 4

20.

Comments:

i Y

i

-~e m

n

-~--

,e m.

--n

l 1

INSTRUCTION FOR COMPLETING DAILY BACKFILL INIPECTION REPORT 1.

Area / Location shall be recorded as coordinates from centerline of Reactor Vessel.

2.

Verify Engineer's Release for placement and compaction; have Engineer's representative initial report for this item.

3 Verify Engineer's Release of materials; have Engineer's representative initial report for this item.

4.

Items 4-19 inclusive are self-explanatory and reflect requirements of this procedure J. A. Jones Construction Work Procedure W-WP-12, and Ebasco Speci fication LOU-1564.482.

I 5.

If comments are required or further explanation of an item is needed, the comments are to be entered in the space provided (ltem 20 ).

Any comment or explanation should be Y

preceded by the item number, e.g. Item 18 - light rain during fill operations, item -

19 - testing operations slowing down compaction due to malfunction of test equipment.

Additional sheets may be used, if required.

6.

In the event that a "No" is checked for any one of items 2-19 inclusive, a "Stop Work Order" will be issued and the following information recorded under item 19:

(1)

Stop Work Order Number (2)

Date issued (3)

Individual notified (Name and title)

(4) Date deficiency corrected (5) Date Stop Work Order rescinded i

l e

l