ML20129J980: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 May 8, 2020 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 May 8, 2020 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260  


==Subject:==
==Subject:==
Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 21 Operation, Revision 1
Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 21 Operation, Revision 1  


==Reference:==
==Reference:==
Line 25: Line 25:
Unit 2, Cycle 21, Core Operating Limits Report (COLR). Revision 0 of the Unit 2 COLR includes all Modes of operation (Modes 1 through 5) (Reference). Revision 1 of the BFN, Unit 2, Cycle 21, COLR addresses operation in the Maximum Extended Load Line Limit Analysis Plus (MELLLA+) domain for the remainder of the current cycle.
Unit 2, Cycle 21, Core Operating Limits Report (COLR). Revision 0 of the Unit 2 COLR includes all Modes of operation (Modes 1 through 5) (Reference). Revision 1 of the BFN, Unit 2, Cycle 21, COLR addresses operation in the Maximum Extended Load Line Limit Analysis Plus (MELLLA+) domain for the remainder of the current cycle.
There are no new commitments contained in this letter. If you have any questions please contact Jamie L. Paul at (256) 729-2636.
There are no new commitments contained in this letter. If you have any questions please contact Jamie L. Paul at (256) 729-2636.
Respectfully, By Steven M. Bono at 6:57 am, May 08, 2020 S. M. Bono Site Vice President
Respectfully, S. M. Bono Site Vice President  


==Enclosure:==
==Enclosure:==
Core Operating Limits Report, (120% OLTP, MELLLA+), for Unit 2 Cycle 21 Operation TVA-COLR-BF2C21, Revision 1
Core Operating Limits Report, (120% OLTP, MELLLA+), for Unit 2 Cycle 21 Operation TVA-COLR-BF2C21, Revision 1 By Steven M. Bono at 6:57 am, May 08, 2020


U.S. Nuclear Regulatory Commission Page 2 May 8, 2020 cc: (w/ Enclosure)
U.S. Nuclear Regulatory Commission Page 2 May 8, 2020 cc: (w/ Enclosure)
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant  


Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 2 Core Operating Limits Report, (120% OLTP, MELLLA+), for Unit 2 Cycle 21 Operation, TVA-COLR-BF2C21, Revision 1 (See Attached)
Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 2 Core Operating Limits Report, (120% OLTP, MELLLA+), for Unit 2 Cycle 21 Operation, TVA-COLR-BF2C21, Revision 1 (See Attached)  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table of Contents Total Number of Pages = 50 (including review cover sheet)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page ii Core Operating Limits Report, (120% OLTP, MELLLA+)
List of Tables ............................................................................................................................. iii List of Figures ............................................................................................................................ iv Revision Log ............................................................................................................................... v Nomenclature ............................................................................................................................ vi References .............................................................................................................................. viii 1     Introduction ........................................................................................................................1 1.1       Purpose .......................................................................................................................1 1.2       Scope ..........................................................................................................................1 1.3       Fuel Loading ................................................................................................................1 1.4       Acceptability ................................................................................................................2 2     APLHGR Limits ..................................................................................................................3 2.1       Rated Power and Flow Limit: APLHGRRATED ...............................................................3 2.2       Off-Rated Power Dependent Limit: APLHGRP ............................................................3 2.2.1           Startup without Feedwater Heaters ..................................................................... 3 2.3       Off-Rated Flow Dependent Limit: APLHGRF ...............................................................3 2.4       Single Loop Operation Limit: APLHGRSLO ...................................................................3 2.5       Equipment Out-Of-Service Corrections ........................................................................6 3     LHGR Limits .......................................................................................................................7 3.1       Rated Power and Flow Limit: LHGRRATED....................................................................7 3.2       Off-Rated Power Dependent Limit: LHGRP .................................................................7 3.2.1           Startup without Feedwater Heaters ..................................................................... 7 3.3       Off-Rated Flow Dependent Limit: LHGRF....................................................................8 3.4       Equipment Out-Of-Service Corrections ........................................................................8 4     OLMCPR Limits................................................................................................................19 4.1       Flow Dependent MCPR Limit: MCPRF ......................................................................19 4.2       Power Dependent MCPR Limit: MCPRP ...................................................................19 4.2.1           Startup without Feedwater Heaters ....................................................................19 4.2.2           Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS) ................................20 4.2.3           Exposure Dependent Limits ...............................................................................20 4.2.4           Equipment Out-Of-Service (EOOS) Options ......................................................21 4.2.5           Single-Loop-Operation (SLO) Limits ..................................................................21 4.2.6           Below Pbypass Limits ........................................................................................21 5     Thermal-Hydraulic Stability Protection ..............................................................................33 6     APRM Flow Biased Rod Block Trip Settings.....................................................................35 7     Rod Block Monitor (RBM) Trip Setpoints and Operability .................................................36 8      Shutdown Margin Limit .....................................................................................................38 MBSP Maps ..................................................................................................... A-1 Browns Ferry Unit 2 Cycle 21                                                                                                          Page ii Core Operating Limits Report, (120% OLTP, MELLLA+)                                                    TVA-COLR-BF2C21, Revision 1 (Final)
TVA-COLR-BF2C21, Revision 1 (Final)
Table of Contents Total Number of Pages = 50 (including review cover sheet)
List of Tables............................................................................................................................. iii List of Figures............................................................................................................................ iv Revision Log............................................................................................................................... v Nomenclature............................................................................................................................ vi References.............................................................................................................................. viii 1
Introduction........................................................................................................................ 1 1.1 Purpose....................................................................................................................... 1 1.2 Scope.......................................................................................................................... 1 1.3 Fuel Loading................................................................................................................ 1 1.4 Acceptability................................................................................................................ 2 2
APLHGR Limits.................................................................................................................. 3 2.1 Rated Power and Flow Limit: APLHGRRATED............................................................... 3 2.2 Off-Rated Power Dependent Limit: APLHGRP............................................................ 3 2.2.1 Startup without Feedwater Heaters..................................................................... 3 2.3 Off-Rated Flow Dependent Limit: APLHGRF............................................................... 3 2.4 Single Loop Operation Limit: APLHGRSLO................................................................... 3 2.5 Equipment Out-Of-Service Corrections........................................................................ 6 3
LHGR Limits....................................................................................................................... 7 3.1 Rated Power and Flow Limit: LHGRRATED....................................................................7 3.2 Off-Rated Power Dependent Limit: LHGRP................................................................. 7 3.2.1 Startup without Feedwater Heaters..................................................................... 7 3.3 Off-Rated Flow Dependent Limit: LHGRF.................................................................... 8 3.4 Equipment Out-Of-Service Corrections........................................................................ 8 4
OLMCPR Limits................................................................................................................ 19 4.1 Flow Dependent MCPR Limit: MCPRF...................................................................... 19 4.2 Power Dependent MCPR Limit: MCPRP................................................................... 19 4.2.1 Startup without Feedwater Heaters....................................................................19 4.2.2 Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS)................................20 4.2.3 Exposure Dependent Limits...............................................................................20 4.2.4 Equipment Out-Of-Service (EOOS) Options......................................................21 4.2.5 Single-Loop-Operation (SLO) Limits..................................................................21 4.2.6 Below Pbypass Limits........................................................................................21 5
Thermal-Hydraulic Stability Protection.............................................................................. 33 6
APRM Flow Biased Rod Block Trip Settings..................................................................... 35 7
Rod Block Monitor (RBM) Trip Setpoints and Operability................................................. 36 8
Shutdown Margin Limit..................................................................................................... 38 MBSP Maps..................................................................................................... A-1  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 List of Tables Nuclear Fuel Types ................................................................................................................ 2 Startup Feedwater Temperature Basis ....................................................................................... 7 Nominal Scram Time Basis .......................................................................................................20 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis .............................................23 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis ...............................................24 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis ........................26 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page iii Core Operating Limits Report, (120% OLTP, MELLLA+)
Nominal Scram Time Basis ...................................................................................................28 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:
TVA-COLR-BF2C21, Revision 1 (Final)
Nominal Scram Time Basis ...................................................................................................29 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:
List of Tables Nuclear Fuel Types
Technical Specification Scram Time Basis ............................................................................30 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:
................................................................................................................ 2 Startup Feedwater Temperature Basis....................................................................................... 7 Nominal Scram Time Basis.......................................................................................................20 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis
Technical Specification Scram Time Basis ............................................................................31 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times ......................32 ABSP Setpoints for the Scram Region ......................................................................................33 Analyzed MBSP Endpoints: Nominal Feedwater Temperature.................................................34 Analyzed MBSP Endpoints: Reduced Feedwater Temperature ...............................................34 Analytical RBM Trip Setpoints ...............................................................................................36 RBM Setpoint Applicability ........................................................................................................36 Control Rod Withdrawal Error Results.......................................................................................37 Browns Ferry Unit 2 Cycle 21                                                                                                Page iii Core Operating Limits Report, (120% OLTP, MELLLA+)                                            TVA-COLR-BF2C21, Revision 1 (Final)
.............................................23 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis
...............................................24 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis
........................26 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:
Nominal Scram Time Basis
...................................................................................................28 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:
Nominal Scram Time Basis
...................................................................................................29 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:
Technical Specification Scram Time Basis
............................................................................30 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:
Technical Specification Scram Time Basis
............................................................................31 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times
......................32 ABSP Setpoints for the Scram Region......................................................................................33 Analyzed MBSP Endpoints: Nominal Feedwater Temperature.................................................34 Analyzed MBSP Endpoints: Reduced Feedwater Temperature...............................................34 Analytical RBM Trip Setpoints
...............................................................................................36 RBM Setpoint Applicability........................................................................................................36 Control Rod Withdrawal Error Results.......................................................................................37  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 List of Figures APLHGRRATED for ATRIUM-10XM Fuel....................................................................................... 4 APLHGRRATED for ATRIUM-11 Fuel ............................................................................................ 5 LHGRRATED for ATRIUM-10XM Fuel ........................................................................................... 9 LHGRRATED for ATRIUM-11 Fuel................................................................................................10 Base Operation LHGRFACP for ATRIUM-10XM Fuel ................................................................11 Base Operation LHGRFACP for ATRIUM-11 Fuel .....................................................................12 LHGRFACF for ATRIUM-10XM Fuel .........................................................................................13 LHGRFACF for ATRIUM-11 Fuel ...............................................................................................14 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 1 ........15 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 2 ........16 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 1..............17 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 2..............18 MCPRF for All Fuel Types .........................................................................................................22 MBSP Boundaries For Nominal Feedwater Temperature ........................................................ A-2 MBSP Boundaries For Reduced Feedwater Temperature ...................................................... A-3 Browns Ferry Unit 2 Cycle 21                                                                                                Page iv Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page iv Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final)
List of Figures APLHGRRATED for ATRIUM-10XM Fuel....................................................................................... 4 APLHGRRATED for ATRIUM-11 Fuel............................................................................................ 5 LHGRRATED for ATRIUM-10XM Fuel........................................................................................... 9 LHGRRATED for ATRIUM-11 Fuel................................................................................................10 Base Operation LHGRFACP for ATRIUM-10XM Fuel................................................................11 Base Operation LHGRFACP for ATRIUM-11 Fuel.....................................................................12 LHGRFACF for ATRIUM-10XM Fuel.........................................................................................13 LHGRFACF for ATRIUM-11 Fuel...............................................................................................14 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 1........15 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 2........16 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 1..............17 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 2..............18 MCPRF for All Fuel Types.........................................................................................................22 MBSP Boundaries For Nominal Feedwater Temperature........................................................ A-2 MBSP Boundaries For Reduced Feedwater Temperature...................................................... A-3  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Revision Log Number             Page                                           Description 1-R1           vi-vii     Updated nomenclature pages for new items.
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page v Core Operating Limits Report, (120% OLTP, MELLLA+)
2-R1             viii       Updated References 1 and 4 Added New Reference (26) for the DSS-CD topical report supporting 3-R1            ix-x        MELLLA+. Other References incremented by +1 for renumbering.
TVA-COLR-BF2C21, Revision 1 (Final)
Revision Log Number Page Description 1-R1 vi-vii Updated nomenclature pages for new items.
2-R1 viii Updated References 1 and 4 3-R1 ix-x Added New Reference (26) for the DSS-CD topical report supporting MELLLA+. Other References incremented by +1 for renumbering.
Updated References 27-30. Removed Reference 31.
Updated References 27-30. Removed Reference 31.
In Section 1.2, the Oscillation Power Range Monitor (OPRM) Setpoint 4-R1              1        is no longer applicable for MELLLA+ operation. This part has been more generically renamed Hydraulic Stability Protection 5-R1           11-18       Updated Figures 3.3-3.10 as needed for new information 6-R1             20         In Section 4.2.3, exposure dependent limits updated as needed.
4-R1 1
7-R1           23-32       Updated Tables 4.2-4.9 as needed.
In Section 1.2, the Oscillation Power Range Monitor (OPRM) Setpoint is no longer applicable for MELLLA+ operation. This part has been more generically renamed Hydraulic Stability Protection 5-R1 11-18 Updated Figures 3.3-3.10 as needed for new information 6-R1 20 In Section 4.2.3, exposure dependent limits updated as needed.
Re-write of Section 5 for DSS-CD stability change. Tables 5.1, 5.2, 8-R1          33-34 and 5.3 are new information supporting MELLLA+
7-R1 23-32 Updated Tables 4.2-4.9 as needed.
9-R1             35         Updated to include two loop settings, clarify definitions 10-R1             38         Updated symbol per CR 1596417 identification.
8-R1 33-34 Re-write of Section 5 for DSS-CD stability change. Tables 5.1, 5.2, and 5.3 are new information supporting MELLLA+
11-R1           A1-A3         New material supporting MELLLA+
9-R1 35 Updated to include two loop settings, clarify definitions 10-R1 38 Updated symbol per CR 1596417 identification.
0-R0             All       New document.
11-R1 A1-A3 New material supporting MELLLA+
Browns Ferry Unit 2 Cycle 21                                                                                          Page v Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
0-R0 All New document.  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Nomenclature ABSP                   Automatic Backup Stability Protection APLHGR                 Average Planar LHGR APRM                   Average Power Range Monitor AREVA NP               Vendor (Framatome, Siemens)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page vi Core Operating Limits Report, (120% OLTP, MELLLA+)
BOC                   Beginning of Cycle BSP                   Backup Stability Protection BWR                   Boiling Water Reactor CAVEX                 Core Average Exposure CD                     Coast Down CMSS                   Core Monitoring System Software COLR                   Core Operating Limits Report CPR                   Critical Power Ratio CRWE                   Control Rod Withdrawal Error CSDM                   Cold SDM DIVOM                 Delta CPR over Initial CPR vs. Oscillation Magnitude DSS-CD                 Detect and Suppress Solution - Confirmation Density EOC                   End of Cycle EOCLB                 End-of-Cycle Licensing Basis EOOS                   Equipment OOS EPU                   Extended Power Uprate (120% OLTP)
TVA-COLR-BF2C21, Revision 1 (Final)
FFTR                   Final Feedwater Temperature Reduction FFWTR                 Final Feedwater Temperature Reduction FHOOS                 Feedwater Heaters OOS ft                     Foot: English unit of measure for length GNF                   Vendor (General Electric, Global Nuclear Fuels)
Nomenclature ABSP Automatic Backup Stability Protection APLHGR Average Planar LHGR APRM Average Power Range Monitor AREVA NP Vendor (Framatome, Siemens)
GWd                   Giga Watt Day HTSP                   High TSP ICA                   Interim Corrective Action ICF                   Increased Core Flow (beyond rated)
BOC Beginning of Cycle BSP Backup Stability Protection BWR Boiling Water Reactor CAVEX Core Average Exposure CD Coast Down CMSS Core Monitoring System Software COLR Core Operating Limits Report CPR Critical Power Ratio CRWE Control Rod Withdrawal Error CSDM Cold SDM DIVOM Delta CPR over Initial CPR vs. Oscillation Magnitude DSS-CD Detect and Suppress Solution - Confirmation Density EOC End of Cycle EOCLB End-of-Cycle Licensing Basis EOOS Equipment OOS EPU Extended Power Uprate (120% OLTP)
IS                     In-Service kW                     kilo watt: SI unit of measure for power.
FFTR Final Feedwater Temperature Reduction FFWTR Final Feedwater Temperature Reduction FHOOS Feedwater Heaters OOS ft Foot: English unit of measure for length GNF Vendor (General Electric, Global Nuclear Fuels)
LCO                   License Condition of Operation LFWH                   Loss of Feedwater Heating LHGRFAC               LHGR Multiplier (Power or Flow dependent)
GWd Giga Watt Day HTSP High TSP ICA Interim Corrective Action ICF Increased Core Flow (beyond rated)
LPRM                   Low Power Range Monitor LRNB                   Generator Load Reject, No Bypass MAPFAC                 MAPLHGR multiplier (Power or Flow dependent)
IS In-Service kW kilo watt: SI unit of measure for power.
Browns Ferry Unit 2 Cycle 21                                                                                        Page vi Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
LCO License Condition of Operation LFWH Loss of Feedwater Heating LHGRFAC LHGR Multiplier (Power or Flow dependent)
LPRM Low Power Range Monitor LRNB Generator Load Reject, No Bypass MAPFAC MAPLHGR multiplier (Power or Flow dependent)  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 MBSP                   Manual Backup Stability Protection MCPR                   Minimum CPR MELLLA                 Maximum Extended Load Line Limit Analysis MELLLA+               Maximum Extended Load Line Limit Analysis Plus MSRV                   Moisture Separator Reheater Valve MSRVOOS               MSRV OOS MTU                   Metric Ton Uranium MWd/MTU               Mega Watt Day per Metric Ton Uranium NEOC                   Near EOC NRC                   United States Nuclear Regulatory Commission NSS                   Nominal Scram Speed NTSP                   Nominal TSP OLMCPR                 MCPR Operating Limit OLTP                   Original Licensed Thermal Power OOS                   Out-Of-Service OPRM                   Oscillation Power Range Monitor OSS                   Optimum Scram Speed PBDA                   Period Based Detection Algorithm Pbypass               Power, below which TSV Position and TCV Fast Closure Scrams are Bypassed PLU                   Power Load Unbalance PLUOOS                 PLU OOS PRNM                   Power Range Neutron Monitor RBM                   Rod Block Monitor RCPOOS                 Recirculation Pump OOS (SLO)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page vii Core Operating Limits Report, (120% OLTP, MELLLA+)
RDF                   Rated Drive Flow RPS                   Reactor Protection System RPT                   Recirculation Pump Trip RPTOOS                 RPT OOS RTP                   Rated Thermal Power SDM                   Shutdown Margin SLMCPR                 MCPR Safety Limit SLO                   Single Loop Operation TBV                   Turbine Bypass Valve TBVIS                 TBV IS TBVOOS                 Turbine Bypass Valves OOS TIP                   Transversing In-core Probe TIPOOS                 TIP OOS TLO                   Two Loop Operation TSP                   Trip Setpoint TSSS                   Technical Specification Scram Speed TVA                   Tennessee Valley Authority Browns Ferry Unit 2 Cycle 21                                                                                        Page vii Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
TVA-COLR-BF2C21, Revision 1 (Final)
MBSP Manual Backup Stability Protection MCPR Minimum CPR MELLLA Maximum Extended Load Line Limit Analysis MELLLA+
Maximum Extended Load Line Limit Analysis Plus MSRV Moisture Separator Reheater Valve MSRVOOS MSRV OOS MTU Metric Ton Uranium MWd/MTU Mega Watt Day per Metric Ton Uranium NEOC Near EOC NRC United States Nuclear Regulatory Commission NSS Nominal Scram Speed NTSP Nominal TSP OLMCPR MCPR Operating Limit OLTP Original Licensed Thermal Power OOS Out-Of-Service OPRM Oscillation Power Range Monitor OSS Optimum Scram Speed PBDA Period Based Detection Algorithm Pbypass Power, below which TSV Position and TCV Fast Closure Scrams are Bypassed PLU Power Load Unbalance PLUOOS PLU OOS PRNM Power Range Neutron Monitor RBM Rod Block Monitor RCPOOS Recirculation Pump OOS (SLO)
RDF Rated Drive Flow RPS Reactor Protection System RPT Recirculation Pump Trip RPTOOS RPT OOS RTP Rated Thermal Power SDM Shutdown Margin SLMCPR MCPR Safety Limit SLO Single Loop Operation TBV Turbine Bypass Valve TBVIS TBV IS TBVOOS Turbine Bypass Valves OOS TIP Transversing In-core Probe TIPOOS TIP OOS TLO Two Loop Operation TSP Trip Setpoint TSSS Technical Specification Scram Speed TVA Tennessee Valley Authority  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 References
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page viii Core Operating Limits Report, (120% OLTP, MELLLA+)
       ANP-3824, Revision , Browns Ferry Unit 2 Cycle 21 MELLLA+ Reload
TVA-COLR-BF2C21, Revision 1 (Final)
References  

ANP-3824, Revision , Browns Ferry Unit 2 Cycle 21 MELLLA+ Reload
Analysis, Framatome, Inc., March 2020.
Analysis, Framatome, Inc., March 2020.
       ANP-3031P, Revision 3, Mechanical Design Report for Browns Ferry Units 1, 2,

ANP-3031P, Revision 3, Mechanical Design Report for Browns Ferry Units 1, 2,
and 3 ATRIUM-10 Fuel Assemblies, AREVA NP, Inc., May 2014.
and 3 ATRIUM-10 Fuel Assemblies, AREVA NP, Inc., May 2014.
       ANP-3150P, Revision 4, Mechanical Design Report for Browns Ferry ATRIUM

ANP-3150P, Revision 4, Mechanical Design Report for Browns Ferry ATRIUM
10XM Fuel Assemblies, AREVA Inc., November 2017.
10XM Fuel Assemblies, AREVA Inc., November 2017.
       ANP-3706P, Revision 1, Browns Ferry Unit 2 Cycle 21 Plant Parameters

ANP-3706P, Revision 1, Browns Ferry Unit 2 Cycle 21 Plant Parameters
Document, Framatome Inc., June 2019.
Document, Framatome Inc., June 2019.
       BFE-4410, Revision 0, Browns Ferry Unit 2 Cycle 21 In Core Shuffle, Calculation

BFE-4410, Revision 0, Browns Ferry Unit 2 Cycle 21 In Core Shuffle, Calculation
File, Tennessee Valley Authority, February 2019.
File, Tennessee Valley Authority, February 2019.
Methodology References
Methodology References 6.
: 6.       XN-NF-81-58(P)(A) Revision 2 and Supplements 1 and 2, RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model, Exxon Nuclear Company, March 1984.
XN-NF-81-58(P)(A) Revision 2 and Supplements 1 and 2, RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model, Exxon Nuclear Company, March 1984.
: 7.       XN-NF-85-67(P)(A) Revision 1, Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel, Exxon Nuclear Company, September 1986.
7.
: 8.       EMF-85-74(P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model, Siemens Power Corporation, February 1998.
XN-NF-85-67(P)(A) Revision 1, Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel, Exxon Nuclear Company, September 1986.
: 9.       ANF-89-98(P)(A) Revision 1 and Supplement 1, Generic Mechanical Design Criteria for BWR Fuel Designs, Advanced Nuclear Fuels Corporation, May 1995.
8.
: 10.       XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis, Exxon Nuclear Company, March 1983.
EMF-85-74(P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model, Siemens Power Corporation, February 1998.
: 11.       XN-NF-80-19(P)(A) Volume 4 Revision 1, Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads, Exxon Nuclear Company, June 1986.
9.
: 12.       EMF-2158(P)(A) Revision 0, Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2, Siemens Power Corporation, October 1999.
ANF-89-98(P)(A) Revision 1 and Supplement 1, Generic Mechanical Design Criteria for BWR Fuel Designs, Advanced Nuclear Fuels Corporation, May 1995.
: 13.       XN-NF-80-19(P)(A) Volume 3 Revision 2, Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description, Exxon Nuclear Company, January 1987.
10.
: 14.       XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis, Exxon Nuclear Company, February 1987.
XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis, Exxon Nuclear Company, March 1983.
: 15.       ANP-10307PA, Revision 0, AREVA MCPR Safety Limit Methodology for Boiling Water Reactors, AREVA NP Inc., June 2011.
11.
Browns Ferry Unit 2 Cycle 21                                                                                        Page viii Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
XN-NF-80-19(P)(A) Volume 4 Revision 1, Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads, Exxon Nuclear Company, June 1986.
12.
EMF-2158(P)(A) Revision 0, Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2, Siemens Power Corporation, October 1999.
13.
XN-NF-80-19(P)(A) Volume 3 Revision 2, Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description, Exxon Nuclear Company, January 1987.
14.
XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis, Exxon Nuclear Company, February 1987.
15.
ANP-10307PA, Revision 0, AREVA MCPR Safety Limit Methodology for Boiling Water Reactors, AREVA NP Inc., June 2011.


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page ix Core Operating Limits Report, (120% OLTP, MELLLA+)
: 16.       ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3 and 4, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses, Advanced Nuclear Fuels Corporation, August 1990.
TVA-COLR-BF2C21, Revision 1 (Final)
: 17.       ANF-1358(P)(A) Revision 3, The Loss of Feedwater Heating Transient in Boiling Water Reactors, Advanced Nuclear Fuels Corporation, September 2005.
: 16.
: 18.       EMF-2209(P)(A) Revision 3, SPCB Critical Power Correlation, AREVA NP Inc.,
ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3 and 4, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses, Advanced Nuclear Fuels Corporation, August 1990.
: 17.
ANF-1358(P)(A) Revision 3, The Loss of Feedwater Heating Transient in Boiling Water Reactors, Advanced Nuclear Fuels Corporation, September 2005.
: 18.
EMF-2209(P)(A) Revision 3, SPCB Critical Power Correlation, AREVA NP Inc.,
September 2009.
September 2009.
: 19.       EMF-2361(P)(A) Revision 0, EXEM BWR-2000 ECCS Evaluation Model, Framatome ANP Inc., May 2001, as supplemented by the site specific approval in NRC safety evaluation dated February 15, 2013 and July 31, 2014.
: 19.
: 20.       EMF-2292(P)(A) Revision 0, ATRIUM'-10: Appendix K Spray Heat Transfer Coefficients, Siemens Power Corporation, September 2000.
EMF-2361(P)(A) Revision 0, EXEM BWR-2000 ECCS Evaluation Model, Framatome ANP Inc., May 2001, as supplemented by the site specific approval in NRC safety evaluation dated February 15, 2013 and July 31, 2014.
: 21.       EMF-CC-074(P)(A), Volume 4, Revision 0, BWR Stability Analysis: Assessment of STAIF with Input from MICROBURN-B2, Siemens Power Corporation, August 2000.
: 20.
: 22.       BAW-10255(P)(A), Revision 2, Cycle-Specific DIVOM Methodology Using the RAMONA5-FA Code, AREVA NP Inc., May 2008.
EMF-2292(P)(A) Revision 0, ATRIUM'-10: Appendix K Spray Heat Transfer Coefficients, Siemens Power Corporation, September 2000.
: 23.       BAW-10247PA, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, AREVA NP Inc., April 2008.
: 21.
: 24.       ANP-10298PA, Revision 0, ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc., March 2010.
EMF-CC-074(P)(A), Volume 4, Revision 0, BWR Stability Analysis: Assessment of STAIF with Input from MICROBURN-B2, Siemens Power Corporation, August 2000.
: 25.       ANP-3140(P), Revision 0, Browns Ferry Units 1, 2, and 3 Improved K-factor Model for ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc.,
: 22.
BAW-10255(P)(A), Revision 2, Cycle-Specific DIVOM Methodology Using the RAMONA5-FA Code, AREVA NP Inc., May 2008.
: 23.
BAW-10247PA, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, AREVA NP Inc., April 2008.
: 24.
ANP-10298PA, Revision 0, ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc., March 2010.
: 25.
ANP-3140(P), Revision 0, Browns Ferry Units 1, 2, and 3 Improved K-factor Model for ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc.,
August 2012.
August 2012.
: 26.       NEDC-33075P-A, Revision 8, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density, GE Hitachi, November 2013.
: 26.
NEDC-33075P-A, Revision 8, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density, GE Hitachi, November 2013.
Setpoint References
Setpoint References
: 27.       EDQ2092900118, R35, Setpoint and Scaling Calculation for Neutron Monitoring &
: 27.
EDQ2092900118, R35, Setpoint and Scaling Calculation for Neutron Monitoring &
Recirculation Flow Loops, Calculation File, Tennessee Valley Authority, August 9, 2019.
Recirculation Flow Loops, Calculation File, Tennessee Valley Authority, August 9, 2019.
: 28.       Task T0500, Revision 0, Neutron Monitoring System w/RBM, Project Task Report, GE Hitachi Nuclear Energy, June 2017.
: 28.
: 29.       Task T0506, Revision 0, TS Instrument Setpoints, Project Task Report, Tennessee Valley Authority, August, 2017.
Task T0500, Revision 0, Neutron Monitoring System w/RBM, Project Task Report, GE Hitachi Nuclear Energy, June 2017.
: 30.       NEDC-33006P-A, Revision 3, General Electric Boiling Water Reactor Maximum Extended Load Line Limit Analysis Plus, GE Energy Nuclear, June 2009.
: 29.
Browns Ferry Unit 2 Cycle 21                                                                                        Page ix Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
Task T0506, Revision 0, TS Instrument Setpoints, Project Task Report, Tennessee Valley Authority, August, 2017.
: 30.
NEDC-33006P-A, Revision 3, General Electric Boiling Water Reactor Maximum Extended Load Line Limit Analysis Plus, GE Energy Nuclear, June 2009.  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1 Introduction In anticipation of cycle startup, it is necessary to describe the expected limits of operation.
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 1 Core Operating Limits Report, (120% OLTP, MELLLA+)
1.1     Purpose The primary purpose of this document is to satisfy requirements identified by unit technical specification section 5.6.5. This document may be provided, upon final approval, to the NRC.
TVA-COLR-BF2C21, Revision 1 (Final) 1 Introduction In anticipation of cycle startup, it is necessary to describe the expected limits of operation.
1.2     Scope This document will discuss the following areas:
1.1 Purpose The primary purpose of this document is to satisfy requirements identified by unit technical specification section 5.6.5. This document may be provided, upon final approval, to the NRC.
1.2 Scope This document will discuss the following areas:
3/4 Average Planar Linear Heat Generation Rate (APLHGR) Limit (Technical Specifications 3.2.1 and 3.7.5)
3/4 Average Planar Linear Heat Generation Rate (APLHGR) Limit (Technical Specifications 3.2.1 and 3.7.5)
Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Linear Heat Generation Rate (LHGR) Limit (Technical Specification 3.2.3, 3.3.4.1, and 3.7.5)
Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Linear Heat Generation Rate (LHGR) Limit (Technical Specification 3.2.3, 3.3.4.1, and 3.7.5)
Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Minimum Critical Power Ratio Operating Limit (OLMCPR)
Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Minimum Critical Power Ratio Operating Limit (OLMCPR)
(Technical Specifications 3.2.2, 3.3.4.1, 3.7.5 and Table 3.3.2.1-1)
(Technical Specifications 3.2.2, 3.3.4.1, 3.7.5 and Table 3.3.2.1-1)
Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Thermal-Hydraulic Stability Protection (Technical Specification Table 3.3.1.1)
Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Thermal-Hydraulic Stability Protection (Technical Specification Table 3.3.1.1)
Applicability: Mode 1, (as specified in Technical Specifications Table 3.3.1.1-1) 3/4 Average Power Range Monitor (APRM) Flow Biased Rod Block Trip Setting (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)
Applicability: Mode 1, (as specified in Technical Specifications Table 3.3.1.1-1) 3/4 Average Power Range Monitor (APRM) Flow Biased Rod Block Trip Setting (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)
Applicability: Mode 1, (as specified in Technical Requirements Manuals Table 3.3.4-1) 3/4 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)
Applicability: Mode 1, (as specified in Technical Requirements Manuals Table 3.3.4-1) 3/4 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)
Applicability: Mode 1, % RTP as specified in Table 3.3.2.1-1 (TS definition of RTP) 3/4 Shutdown Margin (SDM) Limit (Technical Specification 3.1.1)
Applicability: Mode 1, % RTP as specified in Table 3.3.2.1-1 (TS definition of RTP) 3/4 Shutdown Margin (SDM) Limit (Technical Specification 3.1.1)
Applicability: All Modes 1.3     Fuel Loading The core will contain fresh and exposed ATRIUM-10XM, as well as a limited number of ATRIUM-11 lead fuel assemblies. Nuclear fuel types used in the core loading are shown in Table 1.1. The core shuffle and final loading were explicitly evaluated for BOC cold shutdown margin performance as documented per Reference 5.
Applicability: All Modes 1.3 Fuel Loading The core will contain fresh and exposed ATRIUM-10XM, as well as a limited number of ATRIUM-11 lead fuel assemblies. Nuclear fuel types used in the core loading are shown in Table 1.1. The core shuffle and final loading were explicitly evaluated for BOC cold shutdown margin performance as documented per Reference 5.  
Browns Ferry Unit 2 Cycle 21                                                                                          Page 1 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 1.1 Nuclear Fuel Types
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 2 Core Operating Limits Report, (120% OLTP, MELLLA+)
* Nuclear Original         Number of                             Fuel Names Fuel Description                                                              Fuel Type Cycle          Assemblies                                  (Range)
TVA-COLR-BF2C21, Revision 1 (Final)
(NFT)
Table 1.1 Nuclear Fuel Types
ATRIUM 10XM XMLC-3904B-15GV80-FBF                                 19                 93               15           FBF401-FBF572 ATRIUM 10XM XMLC-4035B-13GV80-FBF                                 19                 58               16           FBF573-FBF652 ATRIUM 11 A11-3693B-13GV80-FBF                                   19                   6               17           FBF653-FBF660 ATRIUM 10XM XMLC-4102B-11GV70-FBG-B                               20                 48               18         FBG701-FBG748 ATRIUM 10XM XMLC-4062B-13GV80-FBG-C                               20               151                 19         FBG749-FBG900 ATRIUM 10XM XMLC-3948B-13GV70-FBG-B                               20                 88               20         FBG901-FBG988 ATRIUM-10XM XMLC-4087B-15GV80-FBH                                 21               176                 21         FBH001-FBH176 ATRIUM-10XM XMLC-4036B-15GV80-FBH                                 21                 88               22         FBH177-FBH264 ATRIUM-10XM XMLC-4093B-10GV80-FBH                                 21                 56               23         FBH265-FBH320 1.4     Acceptability Limits discussed in this document were generated based on NRC approved methodologies per References 6 through 26.
* Fuel Description Original Cycle Number of Assemblies Nuclear Fuel Type (NFT)
* The table identifies the expected fuel type breakdown in anticipation of final core loading. The final composition of the core depends upon uncertainties during the outage such as discovering a failed fuel bundle, or other bundle damage. Minor core loading changes, due to unforeseen events, will conform to the safety and monitoring requirements identified in this document.
Fuel Names (Range)
Browns Ferry Unit 2 Cycle 21                                                                                                            Page 2 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                          TVA-COLR-BF2C21, Revision 1 (Final)
ATRIUM 10XM XMLC-3904B-15GV80-FBF 19 93 15 FBF401-FBF572 ATRIUM 10XM XMLC-4035B-13GV80-FBF 19 58 16 FBF573-FBF652 ATRIUM 11 A11-3693B-13GV80-FBF 19 6
17 FBF653-FBF660 ATRIUM 10XM XMLC-4102B-11GV70-FBG-B 20 48 18 FBG701-FBG748 ATRIUM 10XM XMLC-4062B-13GV80-FBG-C 20 151 19 FBG749-FBG900 ATRIUM 10XM XMLC-3948B-13GV70-FBG-B 20 88 20 FBG901-FBG988 ATRIUM-10XM XMLC-4087B-15GV80-FBH 21 176 21 FBH001-FBH176 ATRIUM-10XM XMLC-4036B-15GV80-FBH 21 88 22 FBH177-FBH264 ATRIUM-10XM XMLC-4093B-10GV80-FBH 21 56 23 FBH265-FBH320 1.4 Acceptability Limits discussed in this document were generated based on NRC approved methodologies per References 6 through 26.
* The table identifies the expected fuel type breakdown in anticipation of final core loading. The final composition of the core depends upon uncertainties during the outage such as discovering a failed fuel bundle, or other bundle damage. Minor core loading changes, due to unforeseen events, will conform to the safety and monitoring requirements identified in this document.  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 2 APLHGR Limits (Technical Specifications 3.2.1 & 3.7.5)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 3 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final) 2 APLHGR Limits (Technical Specifications 3.2.1 & 3.7.5)
The APLHGR limit is determined by adjusting the rated power APLHGR limit for off-rated power, off-rated flow, and SLO conditions. The most limiting of these is then used as follows:
The APLHGR limit is determined by adjusting the rated power APLHGR limit for off-rated power, off-rated flow, and SLO conditions. The most limiting of these is then used as follows:
APLHGR limit = MIN ( APLHGRP , APLHGRF, APLHGRSLO )
APLHGR limit = MIN ( APLHGRP, APLHGRF, APLHGRSLO )
where:
where:
APLHGRP                 off-rated power APLHGR limit                   [APLHGRRATED
APLHGRP off-rated power APLHGR limit
[APLHGRRATED
* MAPFACP]
* MAPFACP]
APLHGRF                 off-rated flow APLHGR limit                   [APLHGRRATED
APLHGRF off-rated flow APLHGR limit
[APLHGRRATED
* MAPFACF]
* MAPFACF]
APLHGRSLO               SLO APLHGR limit                               [APLHGRRATED
APLHGRSLO SLO APLHGR limit
[APLHGRRATED
* SLO Multiplier]
* SLO Multiplier]
2.1     Rated Power and Flow Limit: APLHGRRATED The rated conditions APLHGR for all fuel are identified per Reference 1. The rated conditions APLHGR for ATRIUM-10XM fuel are shown in Figure 2.1. The rated conditions APLHGR for ATRIUM-11 are shown in Figure 2.2.
2.1 Rated Power and Flow Limit: APLHGRRATED The rated conditions APLHGR for all fuel are identified per Reference 1. The rated conditions APLHGR for ATRIUM-10XM fuel are shown in Figure 2.1. The rated conditions APLHGR for ATRIUM-11 are shown in Figure 2.2.
2.2     Off-Rated Power Dependent Limit: APLHGRP Reference 1 does not specify a power dependent APLHGR. Therefore, MAPFACP is set to a value of 1.0.
2.2 Off-Rated Power Dependent Limit: APLHGRP Reference 1 does not specify a power dependent APLHGR. Therefore, MAPFACP is set to a value of 1.0.
2.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. No additional power dependent limitation is required.
2.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. No additional power dependent limitation is required.
2.3     Off-Rated Flow Dependent Limit: APLHGRF Reference 1 does not specify a flow dependent APLHGR. Therefore, MAPFACF is set to a value of 1.0.
2.3 Off-Rated Flow Dependent Limit: APLHGRF Reference 1 does not specify a flow dependent APLHGR. Therefore, MAPFACF is set to a value of 1.0.
2.4     Single Loop Operation Limit: APLHGRSLO The single loop operation multiplier for ATRIUM-10XM and ATRIUM-11 fuel is 0.85, per Reference 1.
2.4 Single Loop Operation Limit: APLHGRSLO The single loop operation multiplier for ATRIUM-10XM and ATRIUM-11 fuel is 0.85, per Reference 1.  
Browns Ferry Unit 2 Cycle 21                                                                                          Page 3 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 15 12 APLHGR (kW/ft) 9 6
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 4 Core Operating Limits Report, (120% OLTP, MELLLA+)
3 0
TVA-COLR-BF2C21, Revision 1 (Final) 0 3
0          20                     40                   60                       80 Planar Average Exposure (GWd/MTU)
6 9
Planar Avg.         APLHGR Exposure           Limit (GWd/MTU)           (kW/ft) 0.0             13.0 15.0             13.0 67.0               7.6 Figure 2.1 APLHGRRATED for ATRIUM-10XM Fuel Browns Ferry Unit 2 Cycle 21                                                                                              Page 4 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
12 15 0
20 40 60 80 APLHGR (kW/ft)
Planar Average Exposure (GWd/MTU)
Planar Avg.
APLHGR Exposure Limit (GWd/MTU)
(kW/ft) 0.0 13.0 15.0 13.0 67.0 7.6 Figure 2.1 APLHGRRATED for ATRIUM-10XM Fuel  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 15 12 APLHGR (kW/ft) 9 6
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 5 Core Operating Limits Report, (120% OLTP, MELLLA+)
3 0
TVA-COLR-BF2C21, Revision 1 (Final) 0 3
0          20                       40                   60                       80 Planar Average Exposure (GWd/MTU)
6 9
Planar Avg.         APLHGR Exposure             Limit (GWd/MTU)           (kW/ft) 0.0               10 10.0               10 67.0               5.9 Figure 2.2 APLHGRRATED for ATRIUM-11 Fuel Browns Ferry Unit 2 Cycle 21                                                                                              Page 5 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
12 15 0
20 40 60 80 APLHGR (kW/ft)
Planar Average Exposure (GWd/MTU)
Planar Avg.
APLHGR Exposure Limit (GWd/MTU)
(kW/ft) 0.0 10 10.0 10 67.0 5.9 Figure 2.2 APLHGRRATED for ATRIUM-11 Fuel  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 2.5       Equipment Out-Of-Service Corrections The limits shown in Figure 2.1 and Figure 2.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 6 Core Operating Limits Report, (120% OLTP, MELLLA+)
In-Service                             All equipment In-Service
TVA-COLR-BF2C21, Revision 1 (Final) 2.5 Equipment Out-Of-Service Corrections The limits shown in Figure 2.1 and Figure 2.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.
* RPTOOS                                 EOC-Recirculation Pump Trip Out-Of-Service TBVOOS                                   Turbine Bypass Valve(s) Out-Of-Service PLUOOS                                 Power Load Unbalance Out-Of-Service FHOOS (or FFWTR)                       Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS                                   One Recirculation Pump Out-Of-Service
In-Service All equipment In-Service
* All equipment service conditions assume 1 SRVOOS.
* RPTOOS EOC-Recirculation Pump Trip Out-Of-Service TBVOOS Turbine Bypass Valve(s) Out-Of-Service PLUOOS Power Load Unbalance Out-Of-Service FHOOS (or FFWTR)
Browns Ferry Unit 2 Cycle 21                                                                                          Page 6 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS One Recirculation Pump Out-Of-Service
* All equipment service conditions assume 1 SRVOOS.  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 3 LHGR Limits (Technical Specification 3.2.3, 3.3.4.1, & 3.7.5)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 7 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final) 3 LHGR Limits (Technical Specification 3.2.3, 3.3.4.1, & 3.7.5)
The LHGR limit is determined by adjusting the rated power LHGR limit for off-rated power and off-rated flow conditions. The most limiting of these is then used as follows:
The LHGR limit is determined by adjusting the rated power LHGR limit for off-rated power and off-rated flow conditions. The most limiting of these is then used as follows:
LHGR limit = MIN ( LHGRP, LHGRF )
LHGR limit = MIN ( LHGRP, LHGRF )
where:
where:
LHGRP                   off-rated power LHGR limit                     [LHGRRATED
LHGRP off-rated power LHGR limit
[LHGRRATED
* LHGRFACP]
* LHGRFACP]
LHGRF                   off-rated flow LHGR limit                     [LHGRRATED
LHGRF off-rated flow LHGR limit
[LHGRRATED
* LHGRFACF]
* LHGRFACF]
3.1     Rated Power and Flow Limit: LHGRRATED The rated conditions LHGR for all fuel are identified per Reference 1. The rated conditions LHGR for ATRIUM-10XM are shown in Figure 3.1. The rated conditions LHGR for ATRIUM-11 fuel is shown in Figure 3.2. The LHGR limit is consistent with References 2 and 3.
3.1 Rated Power and Flow Limit: LHGRRATED The rated conditions LHGR for all fuel are identified per Reference 1. The rated conditions LHGR for ATRIUM-10XM are shown in Figure 3.1. The rated conditions LHGR for ATRIUM-11 fuel is shown in Figure 3.2. The LHGR limit is consistent with References 2 and 3.
3.2     Off-Rated Power Dependent Limit: LHGRP LHGR limits are adjusted for off-rated power conditions using the LHGRFACP multiplier provided in Reference 1. The multiplier is split into two sub cases: turbine bypass valves in and out-of-service. The base case multipliers are shown in Figure 3.3 and Figure 3.4.
3.2 Off-Rated Power Dependent Limit: LHGRP LHGR limits are adjusted for off-rated power conditions using the LHGRFACP multiplier provided in Reference 1. The multiplier is split into two sub cases: turbine bypass valves in and out-of-service. The base case multipliers are shown in Figure 3.3 and Figure 3.4.
3.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional limits are shown in Figure 3.7 through Figure 3.10, based on temperature conditions identified in Table 3.1.
3.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional limits are shown in Figure 3.7 through Figure 3.10, based on temperature conditions identified in Table 3.1.
Table 3.1 Startup Feedwater Temperature Basis Temperature Power               Range 1               Range 2
Table 3.1 Startup Feedwater Temperature Basis Power Range 1 Range 2
(% Rated)               (°F)                 (°F) 23                 155.0                 150.0 30                 162.0                 157.0 40                 172.0                 167.0 50                 182.0                 177.0 Browns Ferry Unit 2 Cycle 21                                                                                          Page 7 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
(% Rated)
(°F)
(°F) 23 155.0 150.0 30 162.0 157.0 40 172.0 167.0 50 182.0 177.0 Temperature


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 3.3     Off-Rated Flow Dependent Limit: LHGRF LHGR limits are adjusted for off-rated flow conditions using the LHGRFACF multiplier provided in Reference 1. Multipliers are shown in Figure 3.5 through Figure 3.6.
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 8 Core Operating Limits Report, (120% OLTP, MELLLA+)
3.4     Equipment Out-Of-Service Corrections The limits shown in Figure 3.1 and Figure 3.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.
TVA-COLR-BF2C21, Revision 1 (Final) 3.3 Off-Rated Flow Dependent Limit: LHGRF LHGR limits are adjusted for off-rated flow conditions using the LHGRFACF multiplier provided in Reference 1. Multipliers are shown in Figure 3.5 through Figure 3.6.
* In-Service                               All equipment In-Service RPTOOS                                   EOC-Recirculation Pump Trip Out-Of-Service TBVOOS                                   Turbine Bypass Valve(s) Out-Of-Service PLUOOS                                   Power Load Unbalance Out-Of-Service FHOOS (or FFWTR)                         Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS                                   One Recirculation Pump Out-Of-Service Off-rated power corrections shown in Figure 3.3 and Figure 3.4 are dependent on operation of the Turbine Bypass Valve system. For this reason, separate limits are to be applied for TBVIS or TBVOOS operation. The limits have no dependency on RPTOOS, PLUOOS, FHOOS/FFWTR, or SLO.
3.4 Equipment Out-Of-Service Corrections The limits shown in Figure 3.1 and Figure 3.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.
* In-Service All equipment In-Service RPTOOS EOC-Recirculation Pump Trip Out-Of-Service TBVOOS Turbine Bypass Valve(s) Out-Of-Service PLUOOS Power Load Unbalance Out-Of-Service FHOOS (or FFWTR)
Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS One Recirculation Pump Out-Of-Service Off-rated power corrections shown in Figure 3.3 and Figure 3.4 are dependent on operation of the Turbine Bypass Valve system. For this reason, separate limits are to be applied for TBVIS or TBVOOS operation. The limits have no dependency on RPTOOS, PLUOOS, FHOOS/FFWTR, or SLO.
Off-rated flow corrections shown in Figure 3.5 and Figure 3.6 are bounding for all EOOS conditions.
Off-rated flow corrections shown in Figure 3.5 and Figure 3.6 are bounding for all EOOS conditions.
Off-rated power corrections shown in Figure 3.7 through Figure 3.10 are also dependent on operation of the Turbine Bypass Valve system. In this case, limits support FHOOS operation during startup. These limits have no dependency on RPTOOS, PLUOOS, or SLO.
Off-rated power corrections shown in Figure 3.7 through Figure 3.10 are also dependent on operation of the Turbine Bypass Valve system. In this case, limits support FHOOS operation during startup. These limits have no dependency on RPTOOS, PLUOOS, or SLO.
* All equipment service conditions assume 1 SRVOOS.
* All equipment service conditions assume 1 SRVOOS.  
Browns Ferry Unit 2 Cycle 21                                                                                          Page 8 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 15 12 9
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 9 Core Operating Limits Report, (120% OLTP, MELLLA+)
LHGR (kW/ft) 6 3
TVA-COLR-BF2C21, Revision 1 (Final) 0 3
0 0            20                       40                   60                       80 Pellet Exposure (GWd/MTU)
6 9
Pellet             LHGR Exposure             Limit (GWd/MTU)           (kW/ft) 0.0             14.1 18.9             14.1 74.4               7.4 Figure 3.1 LHGRRATED for ATRIUM-10XM Fuel Browns Ferry Unit 2 Cycle 21                                                                                              Page 9 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
12 15 0
20 40 60 80 LHGR (kW/ft)
Pellet Exposure (GWd/MTU)
Pellet LHGR Exposure Limit (GWd/MTU)
(kW/ft) 0.0 14.1 18.9 14.1 74.4 7.4 Figure 3.1 LHGRRATED for ATRIUM-10XM Fuel  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 15 12 9
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 10 Core Operating Limits Report, (120% OLTP, MELLLA+)
LHGR (kW/ft) 6 3
TVA-COLR-BF2C21, Revision 1 (Final) 0 3
0 0            20                       40                   60                       80 Pellet Exposure (GWd/MTU)
6 9
Pellet             LHGR Exposure             Limit (GWd/MTU)           (kW/ft) 0.0             12.2 18.9             12.2 74.4               6.4 Figure 3.2 LHGRRATED for ATRIUM-11 Fuel Browns Ferry Unit 2 Cycle 21                                                                                            Page 10 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
12 15 0
20 40 60 80 LHGR (kW/ft)
Pellet Exposure (GWd/MTU)
Pellet LHGR Exposure Limit (GWd/MTU)
(kW/ft) 0.0 12.2 18.9 12.2 74.4 6.4 Figure 3.2 LHGRRATED for ATRIUM-11 Fuel  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 Turbine Bypass Valve In-Service, TBVIS 0.80 LHGRFACP 0.70 Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 7%9,6 &RUH)ORZ 0.50 7%9226 &RUH)ORZ TBVIS, > 50% Core Flow 0.40          TBVOOS, > 50% Core Flow 0.30 0.20 20        30        40            50        60      70        80        90        100        110 Core Power (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 11 Core Operating Limits Report, (120% OLTP, MELLLA+)
Turb ine Bypass In-Service              Turb ine Bypass Out-of-Service Core                                      Core Power           LHGRFACP                 Power           LHGRFACP
TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)
(% Rated)                                 (% Rated) 100.0         1.00                         100.0         1.00 26.0         0.61                         26.0         0.60 Core Flow > 50% Rated                      Core Flow > 50% Rated 26.0         0.44                         26.0         0.38 23.0         0.42                         23.0         0.34
Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP
                                &RUH)ORZ5DWHG                     &RUH)ORZ5DWHG 26.0        0.48                          26.0        0.48 23.0        0.45                          23.0        0.43 Figure 3.3 Base Operation LHGRFACP for ATRIUM-10XM Fuel (Independent of other EOOS conditions)
(% Rated)
Browns Ferry Unit 2 Cycle 21                                                                                            Page 11 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
(% Rated) 100.0 1.00 100.0 1.00 26.0 0.61 26.0 0.60 26.0 0.44 26.0 0.38 23.0 0.42 23.0 0.34 26.0 0.48 26.0 0.48 23.0 0.45 23.0 0.43 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated
&RUH)ORZ5DWHG
&RUH)ORZ5DWHG Figure 3.3 Base Operation LHGRFACP for ATRIUM-10XM Fuel (Independent of other EOOS conditions)  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 Turbine Bypass Valve In-Service, TBVIS 0.80 LHGRFACP 0.70 Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50         7%9,6 &RUH)ORZ 7%9226 &RUH)ORZ TBVIS, > 50% Core Flow 0.40          TBVOOS, > 50% Core Flow 0.30 0.20 20      30          40            50        60        70        80        90        100        110 Core Power (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 12 Core Operating Limits Report, (120% OLTP, MELLLA+)
Turb ine Bypass In-Service                Turb ine Bypass Out-of-Service Core                                        Core Power           LHGRFACP                   Power           LHGRFACP
TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)
(% Rated)                                     (% Rated) 100.0         1.00                           100.0         1.00 26.0         0.61                           26.0         0.60 Core Flow > 50% Rated                        Core Flow > 50% Rated 26.0         0.44                           26.0         0.38 23.0         0.42                           23.0         0.34
Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP
                              &RUH)ORZ5DWHG                       &RUH)ORZ5DWHG 26.0        0.48                            26.0        0.48 23.0        0.45                            23.0        0.43 Figure 3.4 Base Operation LHGRFACP for ATRIUM-11 Fuel (Independent of other EOOS conditions)
(% Rated)
Browns Ferry Unit 2 Cycle 21                                                                                            Page 12 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
(% Rated) 100.0 1.00 100.0 1.00 26.0 0.61 26.0 0.60 26.0 0.44 26.0 0.38 23.0 0.42 23.0 0.34 26.0 0.48 26.0 0.48 23.0 0.45 23.0 0.43 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated
&RUH)ORZ5DWHG
&RUH)ORZ5DWHG Figure 3.4 Base Operation LHGRFACP for ATRIUM-11 Fuel (Independent of other EOOS conditions)  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1.10 1.05 1.00 0.95 0.90 LHGRFACF 0.85 0.80 0.75 0.70 0.65 0.60 25     35         45             55       65           75       85         95         105 Core Flow (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 13 Core Operating Limits Report, (120% OLTP, MELLLA+)
Core Flow         LHGRFACF
TVA-COLR-BF2C21, Revision 1 (Final) 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10 25 35 45 55 65 75 85 95 105 LHGRFACF Core Flow (% Rated)
(% Rated) 0.0             0.62 30.0             0.62 76.7             1.00 107.0             1.00 Figure 3.5 LHGRFACF for ATRIUM-10XM Fuel (Values bound all EOOS conditions)
Core Flow LHGRFACF
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)
(% Rated) 0.0 0.62 30.0 0.62 76.7 1.00 107.0 1.00 Figure 3.5 LHGRFACF for ATRIUM-10XM Fuel (Values bound all EOOS conditions)
Browns Ferry Unit 2 Cycle 21                                                                                            Page 13 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1.10 1.05 1.00 0.95 0.90 LHGRFACF 0.85 0.80 0.75 0.70 0.65 0.60 25     35         45             55       65           75       85         95         105 Core Flow (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 14 Core Operating Limits Report, (120% OLTP, MELLLA+)
Core Flow         LHGRFACF
TVA-COLR-BF2C21, Revision 1 (Final) 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10 25 35 45 55 65 75 85 95 105 LHGRFACF Core Flow (% Rated)
(% Rated) 0.0             0.66 30.0             0.66 73.7             1.00 107.0             1.00 Figure 3.6 LHGRFACF for ATRIUM-11 Fuel (Values bound all EOOS conditions)
Core Flow LHGRFACF
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)
(% Rated) 0.0 0.66 30.0 0.66 73.7 1.00 107.0 1.00 Figure 3.6 LHGRFACF for ATRIUM-11 Fuel (Values bound all EOOS conditions)
Browns Ferry Unit 2 Cycle 21                                                                                            Page 14 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80         Turbine Bypass Valve In-Service, TBVIS LHGRFACP 0.70 Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 7%9,6 &RUH)ORZ 0.40        7%9226 &RUH)ORZ TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20    30          40            50        60        70        80        90        100        110 Core Power (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 15 Core Operating Limits Report, (120% OLTP, MELLLA+)
Turb ine Bypass In-Service                Turb ine Bypass Out-of-Service Core                                          Core Power            LHGRFACP                     Power           LHGRFACP
TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)
(% Rated)                                     (% Rated) 100.0         1.00                           100.0         1.00 26.0         0.51                           26.0         0.51 Core Flow > 50% Rated                        Core Flow > 50% Rated 26.0         0.39                           26.0         0.34 23.0         0.36                           23.0         0.31
Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP
                            &RUH)ORZ5DWHG                       &RUH)ORZ5DWHG 26.0        0.41                            26.0        0.41 23.0        0.41                            23.0        0.38 Figure 3.7 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:
(% Rated)
(% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 26.0 0.39 26.0 0.34 23.0 0.36 23.0 0.31 26.0 0.41 26.0 0.41 23.0 0.41 23.0 0.38 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated
&RUH)ORZ5DWHG
&RUH)ORZ5DWHG Figure 3.7 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:
Table 3.1 Temperature Range 1 (no Feedwater heating during startup)
Table 3.1 Temperature Range 1 (no Feedwater heating during startup)
(Limits valid at and below 50% power)
(Limits valid at and below 50% power)  
Browns Ferry Unit 2 Cycle 21                                                                                            Page 15 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80         Turbine Bypass Valve In-Service, TBVIS LHGRFACP 0.70 Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 7%9,6 &RUH)ORZ 0.40        7%9226 &RUH)ORZ TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20    30          40            50        60        70        80        90        100        110 Core Power (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 16 Core Operating Limits Report, (120% OLTP, MELLLA+)
Turb ine Bypass In-Service                Turb ine Bypass Out-of-Service Core                                          Core Power            LHGRFACP                     Power           LHGRFACP
TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)
(% Rated)                                     (% Rated) 100.0         1.00                           100.0         1.00 26.0         0.51                           26.0         0.51 Core Flow > 50% Rated                        Core Flow > 50% Rated 26.0         0.39                           26.0         0.34 23.0         0.35                           23.0         0.30
Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP
                            &RUH)ORZ5DWHG                       &RUH)ORZ5DWHG 26.0        0.41                            26.0        0.41 23.0        0.40                            23.0        0.38 Figure 3.8 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:
(% Rated)
(% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 26.0 0.39 26.0 0.34 23.0 0.35 23.0 0.30 26.0 0.41 26.0 0.41 23.0 0.40 23.0 0.38 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated
&RUH)ORZ5DWHG
&RUH)ORZ5DWHG Figure 3.8 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:
Table 3.1 Temperature Range 2 (no Feedwater heating during startup)
Table 3.1 Temperature Range 2 (no Feedwater heating during startup)
(Limits valid at and below 50% power)
(Limits valid at and below 50% power)  
Browns Ferry Unit 2 Cycle 21                                                                                            Page 16 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80             Turbine Bypass Valve In-Service, TBVIS LHGRFACP 0.70 Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 7%9,6 &RUH)ORZ 0.40          7%9226 &RUH)ORZ TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20      30          40            50        60        70        80        90        100        110 Core Power (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 17 Core Operating Limits Report, (120% OLTP, MELLLA+)
Turb ine Bypass In-Service                Turb ine Bypass Out-of-Service Core                                        Core Power            LHGRFACP                   Power           LHGRFACP
TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)
(% Rated)                                   (% Rated) 100.0         1.00                           100.0         1.00 26.0         0.51                             26.0         0.51 Core Flow > 50% Rated                        Core Flow > 50% Rated 26.0         0.39                             26.0         0.34 23.0         0.36                             23.0         0.31
Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP
                              &RUH)ORZ5DWHG                         &RUH)ORZ5DWHG 26.0        0.41                            26.0        0.41 23.0        0.41                            23.0        0.38 Figure 3.9 Startup Operation LHGRFACP for ATRIUM-11 Fuel:
(% Rated)
(% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 26.0 0.39 26.0 0.34 23.0 0.36 23.0 0.31 26.0 0.41 26.0 0.41 23.0 0.41 23.0 0.38 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated
&RUH)ORZ5DWHG
&RUH)ORZ5DWHG Figure 3.9 Startup Operation LHGRFACP for ATRIUM-11 Fuel:
Table 3.1 Temperature Range 1 (no Feedwater heating during startup)
Table 3.1 Temperature Range 1 (no Feedwater heating during startup)
(Limits valid at and below 50% power)
(Limits valid at and below 50% power)  
Browns Ferry Unit 2 Cycle 21                                                                                              Page 17 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80           Turbine Bypass Valve In-Service, TBVIS LHGRFACP 0.70 Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 7%9,6 &RUH)ORZ 0.40          7%9226 &RUH)ORZ TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20      30          40            50        60        70        80        90        100        110 Core Power (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 18 Core Operating Limits Report, (120% OLTP, MELLLA+)
Turb ine Bypass In-Service              Turb ine Bypass Out-of-Service Core                                        Core Power            LHGRFACP                   Power           LHGRFACP
TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)
(% Rated)                                   (% Rated) 100.0         1.00                         100.0         1.00 26.0         0.51                           26.0         0.51 Core Flow > 50% Rated                      Core Flow > 50% Rated 26.0         0.39                           26.0         0.34 23.0         0.35                           23.0         0.30
Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP
                                &RUH)ORZ5DWHG                       &RUH)ORZ5DWHG 26.0        0.41                          26.0        0.41 23.0        0.40                          23.0        0.38 Figure 3.10 Startup Operation LHGRFACP for ATRIUM-11 Fuel:
(% Rated)
(% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 26.0 0.39 26.0 0.34 23.0 0.35 23.0 0.30 26.0 0.41 26.0 0.41 23.0 0.40 23.0 0.38 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated
&RUH)ORZ5DWHG
&RUH)ORZ5DWHG Figure 3.10 Startup Operation LHGRFACP for ATRIUM-11 Fuel:
Table 3.1 Temperature Range 2 (no Feedwater heating during startup)
Table 3.1 Temperature Range 2 (no Feedwater heating during startup)
(Limits valid at and below 50% power)
(Limits valid at and below 50% power)  
Browns Ferry Unit 2 Cycle 21                                                                                            Page 18 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 4 OLMCPR Limits (Technical Specification 3.2.2, 3.3.4.1, & 3.7.5)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 19 Core Operating Limits Report, (120% OLTP, MELLLA+)
OLMCPR is calculated to be the most limiting of the flow or power dependent values OLMCPR limit = MAX ( MCPRF , MCPRP )
TVA-COLR-BF2C21, Revision 1 (Final) 4 OLMCPR Limits (Technical Specification 3.2.2, 3.3.4.1, & 3.7.5)
OLMCPR is calculated to be the most limiting of the flow or power dependent values OLMCPR limit = MAX ( MCPRF, MCPRP )
where:
where:
MCPRF               core flow-dependent MCPR limit MCPRP               power-dependent MCPR limit 4.1     Flow Dependent MCPR Limit: MCPRF MCPRF limits are dependent upon core flow (% of Rated), and the max core flow limit, (Rated or Increased Core Flow, ICF). MCPRF limits are shown in Figure 4.1, per Reference 1. Limits are valid for all EOOS combinations. No adjustment is required for SLO conditions.
MCPRF core flow-dependent MCPR limit MCPRP power-dependent MCPR limit 4.1 Flow Dependent MCPR Limit: MCPRF MCPRF limits are dependent upon core flow (% of Rated), and the max core flow limit, (Rated or Increased Core Flow, ICF). MCPRF limits are shown in Figure 4.1, per Reference 1. Limits are valid for all EOOS combinations. No adjustment is required for SLO conditions.
4.2     Power Dependent MCPR Limit: MCPRP MCPRP limits are dependent upon:
4.2 Power Dependent MCPR Limit: MCPRP MCPRP limits are dependent upon:
Core Power Level (% of Rated)
Core Power Level (% of Rated)
Technical Specification Scram Speed (TSSS), Nominal Scram Speed (NSS), or Optimum Scram Speed (OSS)
Technical Specification Scram Speed (TSSS), Nominal Scram Speed (NSS), or Optimum Scram Speed (OSS)
Line 268: Line 371:
The MCPRP limits are provided in Table 4.2 through Table 4.9, where each table contains the limits for all fuel types and EOOS options (for a specified scram speed and exposure range).
The MCPRP limits are provided in Table 4.2 through Table 4.9, where each table contains the limits for all fuel types and EOOS options (for a specified scram speed and exposure range).
The CMSS determines MCPRP limits, from these tables, based on linear interpolation between the specified powers.
The CMSS determines MCPRP limits, from these tables, based on linear interpolation between the specified powers.
4.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional power dependent limits are shown in Table 4.5 through Table 4.8 based on temperature conditions identified in Table 3.1.
4.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional power dependent limits are shown in Table 4.5 through Table 4.8 based on temperature conditions identified in Table 3.1.  
Browns Ferry Unit 2 Cycle 21                                                                                        Page 19 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 4.2.2     Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 20 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final) 4.2.2 Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS)
MCPRP limits are provided for three different sets of assumed scram speeds. The Technical Specification Scram Speed (TSSS) MCPRP limits are applicable at all times, as long as the scram time surveillance demonstrates the times in Technical Specification Table 3.1.4-1 are met. Both Nominal Scram Speeds (NSS) and/or Optimum Scram Speeds (OSS) may be used, as long as the scram time surveillance demonstrates Table 4.1 times are applicable.
MCPRP limits are provided for three different sets of assumed scram speeds. The Technical Specification Scram Speed (TSSS) MCPRP limits are applicable at all times, as long as the scram time surveillance demonstrates the times in Technical Specification Table 3.1.4-1 are met. Both Nominal Scram Speeds (NSS) and/or Optimum Scram Speeds (OSS) may be used, as long as the scram time surveillance demonstrates Table 4.1 times are applicable.
* Table 4.1 Nominal Scram Time Basis Notch                   Nominal               Optimum Position           Scram Timing           Scram Timing (index)                 (seconds)             (seconds) 46                       0.420                 0.380 36                       0.980                 0.875 26                       1.600                 1.465 6                       2.900                 2.900 In demonstrating compliance with the NSS and/or OSS scram time basis, surveillance requirements from Technical Specification 3.1.4 apply; accepting the definition of SLOW rods should conform to scram speeds shown in Table 4.1. If conformance is not demonstrated, TSSS based MCPRP limits are applied.
* Table 4.1 Nominal Scram Time Basis Notch Nominal Optimum Position Scram Timing Scram Timing (index)
(seconds)
(seconds) 46 0.420 0.380 36 0.980 0.875 26 1.600 1.465 6
2.900 2.900 In demonstrating compliance with the NSS and/or OSS scram time basis, surveillance requirements from Technical Specification 3.1.4 apply; accepting the definition of SLOW rods should conform to scram speeds shown in Table 4.1. If conformance is not demonstrated, TSSS based MCPRP limits are applied.
On initial cycle startup, TSSS limits are used until the successful completion of scram timing confirms NSS and/or OSS based limits are applicable.
On initial cycle startup, TSSS limits are used until the successful completion of scram timing confirms NSS and/or OSS based limits are applicable.
4.2.3     Exposure Dependent Limits Exposures are tracked on a Core Average Exposure basis (CAVEX, not Cycle Exposure).
4.2.3 Exposure Dependent Limits Exposures are tracked on a Core Average Exposure basis (CAVEX, not Cycle Exposure).
Higher exposure MCPRP limits are always more limiting and may be used for any Core Average Exposure up to the ending exposure. Per Reference 1, MCPRP limits are provided for the following exposure ranges:
Higher exposure MCPRP limits are always more limiting and may be used for any Core Average Exposure up to the ending exposure. Per Reference 1, MCPRP limits are provided for the following exposure ranges:
BOC to NEOC                                 NEOC corresponds to                         29,301.9 MWd / MTU BOC to EOCLB                               EOCLB corresponds to                       34,230.7 MWd / MTU BOC to End of Coast                         End of Coast                               35,897.6 MWd / MTU NEOC refers to a Near EOC exposure point.
BOC to NEOC NEOC corresponds to 29,301.9 MWd / MTU BOC to EOCLB EOCLB corresponds to 34,230.7 MWd / MTU BOC to End of Coast End of Coast 35,897.6 MWd / MTU NEOC refers to a Near EOC exposure point.
* Reference 1 analysis results are based on information identified in Reference 4.
* Reference 1 analysis results are based on information identified in Reference 4.
Drop out times consistent with method used to perform actual timing measurements (i.e., including pickup/dropout effects).
Drop out times consistent with method used to perform actual timing measurements (i.e., including pickup/dropout effects).  
Browns Ferry Unit 2 Cycle 21                                                                                                    Page 20 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                      TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 The EOCLB exposure point is not the true End-Of-Cycle exposure. Instead it corresponds to a licensing exposure window exceeding expected end-of-full-power-life.
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 21 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final)
The EOCLB exposure point is not the true End-Of-Cycle exposure. Instead it corresponds to a licensing exposure window exceeding expected end-of-full-power-life.
The End of Coast exposure point represents a licensing exposure point exceeding the expected end-of-cycle exposure including cycle extension options.
The End of Coast exposure point represents a licensing exposure point exceeding the expected end-of-cycle exposure including cycle extension options.
4.2.4     Equipment Out-Of-Service (EOOS) Options EOOS options
4.2.4 Equipment Out-Of-Service (EOOS) Options EOOS options
* covered by MCPRP limits are given by the following:
* covered by MCPRP limits are given by the following:
In-Service                                         All equipment In-Service RPTOOS                                             EOC-Recirculation Pump Trip Out-Of-Service TBVOOS                                             Turbine Bypass Valve(s) Out-Of-Service RPTOOS+TBVOOS                                       Combined RPTOOS and TBVOOS PLUOOS                                             Power Load Unbalance Out-Of-Service PLUOOS+RPTOOS                                       Combined PLUOOS and RPTOOS PLUOOS+TBVOOS                                       Combined PLUOOS and TBVOOS PLUOOS+TBVOOS+RPTOOS                               Combined PLUOOS, RPTOOS, and TBVOOS FHOOS (or FFWTR)                                   Feedwater Heaters Out-Of-Service (or Final Feedwater Temperature Reduction)
In-Service All equipment In-Service RPTOOS EOC-Recirculation Pump Trip Out-Of-Service TBVOOS Turbine Bypass Valve(s) Out-Of-Service RPTOOS+TBVOOS Combined RPTOOS and TBVOOS PLUOOS Power Load Unbalance Out-Of-Service PLUOOS+RPTOOS Combined PLUOOS and RPTOOS PLUOOS+TBVOOS Combined PLUOOS and TBVOOS PLUOOS+TBVOOS+RPTOOS Combined PLUOOS, RPTOOS, and TBVOOS FHOOS (or FFWTR)
RCPOOS                                             One Recirculation Pump Out-Of-Service For exposure ranges up to NEOC and EOCLB, additional combinations of MCPRP limits are also provided including FHOOS. The coast down exposure range assumes application of FFWTR. FHOOS based MCPRP limits for the coast down exposure are redundant because the temperature setdown assumption is identical with FFWTR.
Feedwater Heaters Out-Of-Service (or Final Feedwater Temperature Reduction)
4.2.5     Single-Loop-Operation (SLO) Limits When operating in RCPOOS conditions, MCPRp limits are constructed differently from the normal operating RCP conditions. The limiting event for RCPOOS is a pump seizure scenario, which sets the upper bound for allowed core power and flow . This event is not impacted by scram time assumptions. Specific MCPRP limits are shown in Table 4.9.
RCPOOS One Recirculation Pump Out-Of-Service For exposure ranges up to NEOC and EOCLB, additional combinations of MCPRP limits are also provided including FHOOS. The coast down exposure range assumes application of FFWTR. FHOOS based MCPRP limits for the coast down exposure are redundant because the temperature setdown assumption is identical with FFWTR.
4.2.6     Below Pbypass Limits Below Pbypass (26% rated power), MCPRP limits depend upon core flow. One set of MCPRP limits applies for core flow above 50% of rated; a second set applies if the core flow is less than or equal to 50% rated.
4.2.5 Single-Loop-Operation (SLO) Limits When operating in RCPOOS conditions, MCPRp limits are constructed differently from the normal operating RCP conditions. The limiting event for RCPOOS is a pump seizure scenario, which sets the upper bound for allowed core power and flow. This event is not impacted by scram time assumptions. Specific MCPRP limits are shown in Table 4.9.
4.2.6 Below Pbypass Limits Below Pbypass (26% rated power), MCPRP limits depend upon core flow. One set of MCPRP limits applies for core flow above 50% of rated; a second set applies if the core flow is less than or equal to 50% rated.
* All equipment service conditions assume 1 SRVOOS.
* All equipment service conditions assume 1 SRVOOS.
RCPOOS limits are only valid up to 43.75% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.
RCPOOS limits are only valid up to 43.75% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.  
Browns Ferry Unit 2 Cycle 21                                                                                                        Page 21 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                    TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 2.00 1.80 1.60 MCPRF 1.40 1.20 1.00 30       40           50           60         70         80         90       100         110 Core Flow (% Rated)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 22 Core Operating Limits Report, (120% OLTP, MELLLA+)
Core Flow           MCPRF
TVA-COLR-BF2C21, Revision 1 (Final) 1.00 1.20 1.40 1.60 1.80 2.00 30 40 50 60 70 80 90 100 110 MCPRF Core Flow (% Rated)
(% Rated) 30.0               1.58 84.0               1.34 107.0               1.34 Figure 4.1 MCPRF for All Fuel Types (Values bound all EOOS conditions)
Core Flow MCPRF
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)
(% Rated) 30.0 1.58 84.0 1.34 107.0 1.34 Figure 4.1 MCPRF for All Fuel Types (Values bound all EOOS conditions)
Browns Ferry Unit 2 Cycle 21                                                                                            Page 22 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.2 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 23 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                                  ATRIUM-11 BOC           BOC           BOC           BOC           BOC       BOC Pow er             to           to         to End of         to             to   to End of Operating Condition        (% of rated)       NEOC         EOCLB           Coast         NEOC         EOCLB     Coast 100           1.37           1.41           1.43         1.37         1.43       1.43 90           1.42           1.45           1.48         1.42         1.46       1.48 65           1.59           1.59           1.64         1.59         1.59       1.64
TVA-COLR-BF2C21, Revision 1 (Final)
                                    > 50           1.70           1.70           1.77         1.73         1.73       1.81 50           1.81           1.81           1.81         1.91         1.91       1.91 Base Case                    40           1.88           1.88           1.94         1.99         1.99       2.03 26           2.30           2.30           2.42         2.51         2.51       2.66 26 at > 50%F         2.54           2.54           2.65         2.68         2.68       2.81 23 at > 50%F         2.69           2.69           2.81         2.93         2.93       3.05
Table 4.2 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis
                              DW)         2.42           2.42           2.51         2.63         2.63       2.72
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                              DW)         2.55           2.55           2.67         2.93         2.93       3.05 100           1.42           1.43           ---          1.42         1.43       ---
(% of rated)
90           1.48           1.48           ---          1.48         1.48       ---
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.37 1.41 1.43 1.37 1.43 1.43 90 1.42 1.45 1.48 1.42 1.46 1.48 65 1.59 1.59 1.64 1.59 1.59 1.64
65           1.64           1.64           ---          1.64         1.64       ---
> 50 1.70 1.70 1.77 1.73 1.73 1.81 50 1.81 1.81 1.81 1.91 1.91 1.91 40 1.88 1.88 1.94 1.99 1.99 2.03 26 2.30 2.30 2.42 2.51 2.51 2.66 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05
                                    > 50           1.77           1.77           ---          1.81         1.81       ---
DW)
50           1.81           1.81           ---          1.91         1.91       ---
2.42 2.42 2.51 2.63 2.63 2.72
FHOOS                        40           1.94           1.94           ---          2.03         2.03       ---
DW)
26           2.42           2.42           ---          2.66         2.66       ---
2.55 2.55 2.67 2.93 2.93 3.05 100 1.42 1.43 1.42 1.43 90 1.48 1.48 1.48 1.48 65 1.64 1.64 1.64 1.64
26 at > 50%F         2.65           2.65           ---          2.81         2.81       ---
> 50 1.77 1.77 1.81 1.81 50 1.81 1.81 1.91 1.91 40 1.94 1.94 2.03 2.03 26 2.42 2.42 2.66 2.66 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05
23 at > 50%F         2.81           2.81           ---          3.05         3.05       ---
DW)
                              DW)         2.51           2.51           ---          2.72         2.72       ---
2.51 2.51 2.72 2.72
                              DW)         2.67           2.67           ---          3.05         3.05       ---
DW)
2.67 2.67 3.05 3.05 ATRIUM-11 Operating Condition Base Case FHOOS ATRIUM-10XM
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR/FHOOS is supported for the BOC to End of Coast limits.
FFWTR/FHOOS is supported for the BOC to End of Coast limits.  
Browns Ferry Unit 2 Cycle 21                                                                                                    Page 23 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                    TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 24 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                              ATRIUM-11 BOC         BOC         BOC           BOC         BOC       BOC Pow er             to         to       to End of         to         to     to End of Operating Condition      (% of rated)     NEOC       EOCLB         Coast       NEOC       EOCLB       Coast 100           1.41       1.42         1.50         1.41       1.44       1.50 90           1.46       1.46         1.55         1.46       1.47       1.55 65           1.61       1.61         1.72         1.61       1.61       1.72
TVA-COLR-BF2C21, Revision 1 (Final)
                                        > 50           1.73       1.73         1.84         1.76       1.76       1.84 50           1.81       1.81         1.85         1.92       1.92       1.92 Base Case                40           1.88       1.88         2.00         2.00       2.00       2.06 26           2.33       2.33         2.45         2.55       2.55       2.69 26 at > 50%F       2.54       2.54         2.65         2.68       2.68       2.81 23 at > 50%F       2.69       2.69         2.81         2.93       2.93       3.05
Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis
                                    DW)       2.42       2.42         2.51         2.63       2.63       2.72
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                                    DW)       2.55       2.55         2.67         2.93       2.93       3.05 100           1.45       1.48         1.54         1.46       1.49       1.54 90           1.50       1.51         1.59         1.50       1.52       1.59 65           1.65       1.65         1.75         1.65       1.65       1.75
(% of rated)
                                        > 50           1.76       1.76           ---        1.78       1.78       1.87 50           1.82       1.82         1.87         1.92       1.92       1.92 TBVOOS                  40           1.90       1.90         2.03         2.00       2.00       2.06 26           2.33       2.33         2.45         2.55       2.55       2.69 26 at > 50%F       3.11       3.11         3.23         3.28       3.28       3.38 23 at > 50%F       3.35       3.35         3.47         3.57       3.57       3.69
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.41 1.42 1.50 1.41 1.44 1.50 90 1.46 1.46 1.55 1.46 1.47 1.55 65 1.61 1.61 1.72 1.61 1.61 1.72
                                    DW)       2.78       2.78         2.90         3.04       3.04       3.16
> 50 1.73 1.73 1.84 1.76 1.76 1.84 50 1.81 1.81 1.85 1.92 1.92 1.92 40 1.88 1.88 2.00 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05
                                    DW)       3.04       3.04         3.18         3.32       3.32       3.56 100           1.50       1.50           ---        1.50       1.50         ---
DW)
90           1.55       1.55           ---        1.55       1.55         ---
2.42 2.42 2.51 2.63 2.63 2.72
65           1.72       1.72           ---        1.72       1.72         ---
DW)
                                        > 50           1.84       1.84           ---        1.84       1.84         ---
2.55 2.55 2.67 2.93 2.93 3.05 100 1.45 1.48 1.54 1.46 1.49 1.54 90 1.50 1.51 1.59 1.50 1.52 1.59 65 1.65 1.65 1.75 1.65 1.65 1.75
50           1.85       1.85           ---        1.92       1.92         ---
> 50 1.76 1.76 1.78 1.78 1.87 50 1.82 1.82 1.87 1.92 1.92 1.92 40 1.90 1.90 2.03 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69
FHOOS                    40           2.00       2.00           ---        2.06       2.06         ---
DW)
26           2.45       2.45           ---        2.69       2.69         ---
2.78 2.78 2.90 3.04 3.04 3.16
26 at > 50%F       2.65       2.65           ---        2.81       2.81         ---
DW)
23 at > 50%F       2.81       2.81           ---        3.05       3.05         ---
3.04 3.04 3.18 3.32 3.32 3.56 100 1.50 1.50 1.50 1.50 90 1.55 1.55 1.55 1.55 65 1.72 1.72 1.72 1.72
                                    DW)       2.51       2.51           ---        2.72       2.72         ---
> 50 1.84 1.84 1.84 1.84 50 1.85 1.85 1.92 1.92 40 2.00 2.00 2.06 2.06 26 2.45 2.45 2.69 2.69 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05
                                    DW)       2.67       2.67           ---        3.05       3.05         ---
DW)
100           1.41       1.42         1.50         1.41       1.44       1.50 90           1.46       1.46         1.55         1.46       1.47       1.55 65           1.73       1.73         1.77         1.83       1.83       1.83
2.51 2.51 2.72 2.72
                                        > 50             ---        ---          ---          ---        ---        ---
DW)
50           1.81       1.81         1.85         1.92       1.92       1.92 PLUOOS                  40           1.88       1.88         2.00         2.00       2.00       2.06 26           2.33       2.33         2.45         2.55       2.55       2.69 26 at > 50%F       2.54       2.54         2.65         2.68       2.68       2.81 23 at > 50%F       2.69       2.69         2.81         2.93       2.93       3.05
2.67 2.67 3.05 3.05 100 1.41 1.42 1.50 1.41 1.44 1.50 90 1.46 1.46 1.55 1.46 1.47 1.55 65 1.73 1.73 1.77 1.83 1.83 1.83
                                    DW)       2.42       2.42         2.51         2.63       2.63       2.72
> 50 50 1.81 1.81 1.85 1.92 1.92 1.92 40 1.88 1.88 2.00 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05
                                    DW)       2.55       2.55         2.67         2.93       2.93       3.05
DW)
2.42 2.42 2.51 2.63 2.63 2.72
DW)
2.55 2.55 2.67 2.93 2.93 3.05 ATRIUM-10XM ATRIUM-11 Operating Condition Base Case TBVOOS FHOOS PLUOOS
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.  
Browns Ferry Unit 2 Cycle 21                                                                                                    Page 24 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                    TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis (continued)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 25 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                              ATRIUM-11 BOC         BOC         BOC         BOC         BOC       BOC Pow er             to         to       to End of         to         to     to End of Operating Condition      (% of rated)       NEOC     EOCLB         Coast       NEOC       EOCLB       Coast 100             1.54       1.54           ---        1.54       1.54         ---
TVA-COLR-BF2C21, Revision 1 (Final)
90           1.59       1.59           ---        1.59       1.59         ---
Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis (continued)
65           1.75       1.75           ---        1.75       1.75         ---
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                                        > 50             ---        ---          ---        1.87       1.87         ---
(% of rated)
50           1.87       1.87           ---        1.92       1.92         ---
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.54 1.54 1.54 1.54 90 1.59 1.59 1.59 1.59 65 1.75 1.75 1.75 1.75
TBVOOS 40           2.03       2.03           ---        2.06       2.06         ---
> 50 1.87 1.87 50 1.87 1.87 1.92 1.92 40 2.03 2.03 2.06 2.06 26 2.45 2.45 2.69 2.69 26 at > 50%F 3.23 3.23 3.38 3.38 23 at > 50%F 3.47 3.47 3.69 3.69
FHOOS 26           2.45       2.45           ---        2.69       2.69         ---
DW)
26 at > 50%F         3.23       3.23           ---        3.38       3.38         ---
2.90 2.90 3.16 3.16
23 at > 50%F         3.47       3.47           ---        3.69       3.69         ---
DW)
                                  DW)         2.90       2.90           ---        3.16       3.16         ---
3.18 3.18 3.56 3.56 100 1.45 1.48 1.54 1.46 1.49 1.54 90 1.50 1.51 1.59 1.50 1.52 1.59 65 1.74 1.74 1.79 1.83 1.83 1.83
                                  DW)         3.18       3.18           ---        3.56       3.56         ---
> 50 50 1.82 1.82 1.87 1.92 1.92 1.92 40 1.90 1.90 2.03 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69
100             1.45       1.48         1.54         1.46       1.49       1.54 90           1.50       1.51         1.59         1.50       1.52       1.59 65           1.74       1.74         1.79         1.83       1.83       1.83
DW)
                                        > 50             ---        ---          ---          ---        ---        ---
2.78 2.78 2.90 3.04 3.04 3.16
50           1.82       1.82         1.87         1.92       1.92       1.92 TBVOOS 40           1.90       1.90         2.03         2.00       2.00       2.06 PLUOOS 26           2.33       2.33         2.45         2.55       2.55       2.69 26 at > 50%F         3.11       3.11         3.23         3.28       3.28       3.38 23 at > 50%F         3.35       3.35         3.47         3.57       3.57       3.69
DW)
                                  DW)         2.78       2.78         2.90         3.04       3.04       3.16
3.04 3.04 3.18 3.32 3.32 3.56 100 1.50 1.50 1.50 1.50 90 1.55 1.55 1.55 1.55 65 1.77 1.77 1.83 1.83
                                  DW)         3.04       3.04         3.18         3.32       3.32       3.56 100             1.50       1.50           ---        1.50       1.50         ---
> 50 50 1.85 1.85 1.92 1.92 40 2.00 2.00 2.06 2.06 26 2.45 2.45 2.69 2.69 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05
90           1.55       1.55           ---        1.55       1.55         ---
DW)
65           1.77       1.77           ---        1.83       1.83         ---
2.51 2.51 2.72 2.72
                                        > 50             ---        ---          ---          ---        ---        ---
DW)
50           1.85       1.85           ---        1.92       1.92         ---
2.67 2.67 3.05 3.05 100 1.54 1.54 1.54 1.54 90 1.59 1.59 1.59 1.59 65 1.79 1.79 1.83 1.83
FHOOS 40           2.00       2.00           ---        2.06       2.06         ---
> 50 50 1.87 1.87 1.92 1.92 40 2.03 2.03 2.06 2.06 26 2.45 2.45 2.69 2.69 26 at > 50%F 3.23 3.23 3.38 3.38 23 at > 50%F 3.47 3.47 3.69 3.69
PLUOOS 26           2.45       2.45           ---        2.69       2.69         ---
DW)
26 at > 50%F         2.65       2.65           ---        2.81       2.81         ---
2.90 2.90 3.16 3.16
23 at > 50%F         2.81       2.81           ---        3.05       3.05         ---
DW)
                                  DW)         2.51       2.51           ---        2.72       2.72         ---
3.18 3.18 3.56 3.56 ATRIUM-10XM ATRIUM-11 TBVOOS FHOOS TBVOOS PLUOOS FHOOS PLUOOS TBVOOS FHOOS PLUOOS Operating Condition
                                  DW)         2.67       2.67           ---        3.05       3.05         ---
100             1.54       1.54           ---        1.54       1.54         ---
90           1.59       1.59           ---        1.59       1.59         ---
65           1.79       1.79           ---        1.83       1.83         ---
                                        > 50             ---        ---          ---          ---        ---        ---
TBVOOS                  50           1.87       1.87           ---        1.92       1.92         ---
FHOOS                    40           2.03       2.03           ---        2.06       2.06         ---
PLUOOS                    26           2.45       2.45           ---        2.69       2.69         ---
26 at > 50%F         3.23       3.23           ---        3.38       3.38         ---
23 at > 50%F         3.47       3.47           ---        3.69       3.69         ---
                                  DW)         2.90       2.90           ---        3.16       3.16         ---
                                  DW)         3.18       3.18           ---        3.56       3.56         ---
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.  
Browns Ferry Unit 2 Cycle 21                                                                                                    Page 25 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                    TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 26 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                              ATRIUM-11 BOC         BOC         BOC         BOC         BOC       BOC Pow er             to         to       to End of         to         to     to End of Operating Condition      (% of rated)       NEOC     EOCLB         Coast       NEOC       EOCLB       Coast 100             1.47       1.47         1.56         1.47       1.47       1.56 90           1.52       1.52         1.61         1.52       1.52       1.61 65           1.67       1.67         1.78         1.67       1.67       1.78
TVA-COLR-BF2C21, Revision 1 (Final)
                                        > 50           1.78       1.78           ---        1.79       1.79       1.90 50           1.84       1.84         1.90         1.93       1.93       1.93 Base Case                40           1.93       1.93         2.06         2.01       2.01       2.08 26           2.35       2.35         2.47         2.57       2.57       2.72 26 at > 50%F         2.54       2.54         2.65         2.68       2.68       2.81 23 at > 50%F         2.69       2.69         2.81         2.93       2.93       3.05
Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis
                                  DW)         2.42       2.42         2.51         2.63       2.63       2.72
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                                  DW)         2.55       2.55         2.67         2.93       2.93       3.05 100             1.53       1.53         1.60         1.53       1.53       1.60 90           1.57       1.57         1.65         1.57       1.57       1.65 65           1.74       1.74         1.82         1.74       1.74       1.82
(% of rated)
                                        > 50           1.83       1.83           ---        1.83       1.83         ---
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.47 1.47 1.56 1.47 1.47 1.56 90 1.52 1.52 1.61 1.52 1.52 1.61 65 1.67 1.67 1.78 1.67 1.67 1.78
50           1.87       1.87         1.93         1.93       1.93       1.93 TBVOOS                    40           1.97       1.97         2.08         2.01       2.01       2.09 26           2.36       2.36         2.49         2.57       2.57       2.72 26 at > 50%F         3.11       3.11         3.23         3.28       3.28       3.38 23 at > 50%F         3.35       3.35         3.47         3.57       3.57       3.69
> 50 1.78 1.78 1.79 1.79 1.90 50 1.84 1.84 1.90 1.93 1.93 1.93 40 1.93 1.93 2.06 2.01 2.01 2.08 26 2.35 2.35 2.47 2.57 2.57 2.72 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05
                                  DW)         2.78       2.78         2.90         3.04       3.04       3.16
DW)
                                  DW)         3.04       3.04         3.18         3.32       3.32       3.56 100             1.56       1.56           ---        1.56       1.56         ---
2.42 2.42 2.51 2.63 2.63 2.72
90           1.61       1.61           ---        1.61       1.61         ---
DW)
65           1.78       1.78           ---        1.78       1.78         ---
2.55 2.55 2.67 2.93 2.93 3.05 100 1.53 1.53 1.60 1.53 1.53 1.60 90 1.57 1.57 1.65 1.57 1.57 1.65 65 1.74 1.74 1.82 1.74 1.74 1.82
                                        > 50             ---        ---          ---        1.90       1.90         ---
> 50 1.83 1.83 1.83 1.83 50 1.87 1.87 1.93 1.93 1.93 1.93 40 1.97 1.97 2.08 2.01 2.01 2.09 26 2.36 2.36 2.49 2.57 2.57 2.72 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69
50           1.90       1.90           ---        1.93       1.93         ---
DW)
FHOOS                    40           2.06       2.06           ---        2.08       2.08         ---
2.78 2.78 2.90 3.04 3.04 3.16
26           2.47       2.47           ---        2.72       2.72         ---
DW)
26 at > 50%F         2.65       2.65           ---        2.81       2.81         ---
3.04 3.04 3.18 3.32 3.32 3.56 100 1.56 1.56 1.56 1.56 90 1.61 1.61 1.61 1.61 65 1.78 1.78 1.78 1.78
23 at > 50%F         2.81       2.81           ---        3.05       3.05         ---
> 50 1.90 1.90 50 1.90 1.90 1.93 1.93 40 2.06 2.06 2.08 2.08 26 2.47 2.47 2.72 2.72 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05
                                  DW)         2.51       2.51           ---        2.72       2.72         ---
DW)
                                  DW)         2.67       2.67           ---        3.05       3.05         ---
2.51 2.51 2.72 2.72
100             1.47       1.47         1.56         1.47       1.47       1.56 90           1.52       1.52         1.61         1.52       1.52       1.61 65           1.76       1.76         1.81         1.84       1.84       1.84
DW)
                                        > 50             ---        ---          ---          ---        ---        ---
2.67 2.67 3.05 3.05 100 1.47 1.47 1.56 1.47 1.47 1.56 90 1.52 1.52 1.61 1.52 1.52 1.61 65 1.76 1.76 1.81 1.84 1.84 1.84
50           1.84       1.84         1.90         1.93       1.93       1.93 PLUOOS                    40           1.93       1.93         2.06         2.01       2.01       2.08 26           2.35       2.35         2.47         2.57       2.57       2.72 26 at > 50%F         2.54       2.54         2.65         2.68       2.68       2.81 23 at > 50%F         2.69       2.69         2.81         2.93       2.93       3.05
> 50 50 1.84 1.84 1.90 1.93 1.93 1.93 40 1.93 1.93 2.06 2.01 2.01 2.08 26 2.35 2.35 2.47 2.57 2.57 2.72 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05
                                  DW)         2.42       2.42         2.51         2.63       2.63       2.72
DW)
                                  DW)         2.55       2.55         2.67         2.93       2.93       3.05
2.42 2.42 2.51 2.63 2.63 2.72
DW)
2.55 2.55 2.67 2.93 2.93 3.05 ATRIUM-10XM ATRIUM-11 Operating Condition Base Case TBVOOS FHOOS PLUOOS
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.  
Browns Ferry Unit 2 Cycle 21                                                                                                    Page 26 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                    TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis (continued)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 27 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                              ATRIUM-11 BOC         BOC         BOC         BOC         BOC       BOC Pow er             to         to       to End of         to         to     to End of Operating Condition      (% of rated)       NEOC     EOCLB         Coast       NEOC       EOCLB       Coast 100             1.60       1.60           ---        1.60       1.60         ---
TVA-COLR-BF2C21, Revision 1 (Final)
90           1.65       1.65           ---        1.65       1.65         ---
Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis (continued)
65           1.82       1.82           ---        1.82       1.82         ---
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                                        > 50             ---        ---          ---          ---        ---        ---
(% of rated)
50           1.93       1.93           ---        1.93       1.93         ---
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.60 1.60 1.60 1.60 90 1.65 1.65 1.65 1.65 65 1.82 1.82 1.82 1.82
TBVOOS 40           2.08       2.08           ---        2.09       2.09         ---
> 50 50 1.93 1.93 1.93 1.93 40 2.08 2.08 2.09 2.09 26 2.49 2.49 2.72 2.72 26 at > 50%F 3.23 3.23 3.38 3.38 23 at > 50%F 3.47 3.47 3.69 3.69
FHOOS 26           2.49       2.49           ---        2.72       2.72         ---
DW)
26 at > 50%F         3.23       3.23           ---        3.38       3.38         ---
2.90 2.90 3.16 3.16
23 at > 50%F         3.47       3.47           ---        3.69       3.69         ---
DW)
                                    DW)         2.90       2.90           ---        3.16       3.16         ---
3.18 3.18 3.56 3.56 100 1.53 1.53 1.60 1.53 1.53 1.60 90 1.57 1.57 1.65 1.57 1.57 1.65 65 1.79 1.79 1.83 1.84 1.84 1.84
                                    DW)         3.18       3.18           ---        3.56       3.56         ---
> 50 50 1.87 1.87 1.93 1.93 1.93 1.93 40 1.97 1.97 2.08 2.01 2.01 2.09 26 2.36 2.36 2.49 2.57 2.57 2.72 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69
100             1.53       1.53         1.60         1.53       1.53       1.60 90           1.57       1.57         1.65         1.57       1.57       1.65 65           1.79       1.79         1.83         1.84       1.84       1.84
DW)
                                        > 50             ---        ---          ---          ---        ---        ---
2.78 2.78 2.90 3.04 3.04 3.16
50           1.87       1.87         1.93         1.93       1.93       1.93 TBVOOS 40           1.97       1.97         2.08         2.01       2.01       2.09 PLUOOS 26           2.36       2.36         2.49         2.57       2.57       2.72 26 at > 50%F         3.11       3.11         3.23         3.28       3.28       3.38 23 at > 50%F         3.35       3.35         3.47         3.57       3.57       3.69
DW)
                                    DW)         2.78       2.78         2.90         3.04       3.04       3.16
3.04 3.04 3.18 3.32 3.32 3.56 100 1.56 1.56 1.56 1.56 90 1.61 1.61 1.61 1.61 65 1.81 1.81 1.84 1.84
                                    DW)         3.04       3.04         3.18         3.32       3.32       3.56 100             1.56       1.56           ---        1.56       1.56         ---
> 50 50 1.90 1.90 1.93 1.93 40 2.06 2.06 2.08 2.08 26 2.47 2.47 2.72 2.72 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05
90           1.61       1.61           ---        1.61       1.61         ---
DW)
65           1.81       1.81           ---        1.84       1.84         ---
2.51 2.51 2.72 2.72
                                        > 50             ---        ---          ---          ---        ---        ---
DW)
50           1.90       1.90           ---        1.93       1.93         ---
2.67 2.67 3.05 3.05 100 1.60 1.60 1.60 1.60 90 1.65 1.65 1.65 1.65 65 1.83 1.83 1.84 1.84
FHOOS 40           2.06       2.06           ---        2.08       2.08         ---
> 50 50 1.93 1.93 1.93 1.93 40 2.08 2.08 2.09 2.09 26 2.49 2.49 2.72 2.72 26 at > 50%F 3.23 3.23 3.38 3.38 23 at > 50%F 3.47 3.47 3.69 3.69
PLUOOS 26           2.47       2.47           ---        2.72       2.72         ---
DW)
26 at > 50%F         2.65       2.65           ---        2.81       2.81         ---
2.90 2.90 3.16 3.16
23 at > 50%F         2.81       2.81           ---        3.05       3.05         ---
DW)
                                    DW)         2.51       2.51           ---        2.72       2.72         ---
3.18 3.18 3.56 3.56 ATRIUM-10XM ATRIUM-11 TBVOOS FHOOS TBVOOS PLUOOS FHOOS PLUOOS TBVOOS FHOOS PLUOOS Operating Condition
                                    DW)         2.67       2.67           ---        3.05       3.05         ---
100             1.60       1.60           ---        1.60       1.60         ---
90           1.65       1.65           ---        1.65       1.65         ---
65           1.83       1.83           ---        1.84       1.84         ---
                                        > 50             ---        ---          ---          ---        ---        ---
TBVOOS                  50           1.93       1.93           ---        1.93       1.93         ---
FHOOS                    40           2.08       2.08           ---        2.09       2.09         ---
PLUOOS                    26           2.49       2.49           ---        2.72       2.72         ---
26 at > 50%F         3.23       3.23           ---        3.38       3.38         ---
23 at > 50%F         3.47       3.47           ---        3.69       3.69         ---
                                    DW)         2.90       2.90           ---        3.16       3.16         ---
                                    DW)         3.18       3.18           ---        3.56       3.56         ---
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.  
Browns Ferry Unit 2 Cycle 21                                                                                                    Page 27 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                    TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.5 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Nominal Scram Time Basis
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 28 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                        ATRIUM-11 BOC         BOC       BOC       BOC         BOC         BOC Pow er           to           to   to End of     to           to       to End of Operating Condition          (% of rated)     NEOC       EOCLB     Coast     NEOC         EOCLB       Coast 100           1.50       1.50       1.50     1.50         1.50         1.50 90           1.55       1.55       1.55     1.55         1.55         1.55 65           1.77       1.77       1.77     1.83         1.83         1.83
TVA-COLR-BF2C21, Revision 1 (Final)
                                        > 50             ---          ---      ---      ---          ---          ---
Table 4.5 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Nominal Scram Time Basis
50           1.98       1.98       1.98     2.02         2.02         2.02 TBVIS                        40           2.18       2.18       2.18     2.29         2.29         2.29 26           2.77       2.77       2.77     3.07         3.07         3.07 26 at > 50%F       3.06       3.06       3.06     3.12         3.12         3.12 23 at > 50%F       3.15       3.15       3.15     3.42         3.42         3.42
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                                    DW)       2.79       2.79       2.79     3.07         3.07         3.07
(% of rated)
                                    DW)       3.01       3.01       3.01     3.37         3.37         3.37 100           1.54       1.54       1.54     1.54         1.54         1.54 90           1.59       1.59       1.59     1.59         1.59         1.59 65           1.79       1.79       1.79     1.83         1.83         1.83
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.50 1.50 1.50 1.50 1.50 1.50 90 1.55 1.55 1.55 1.55 1.55 1.55 65 1.77 1.77 1.77 1.83 1.83 1.83
                                        > 50             ---          ---      ---      ---          ---          ---
> 50 50 1.98 1.98 1.98 2.02 2.02 2.02 40 2.18 2.18 2.18 2.29 2.29 2.29 26 2.77 2.77 2.77 3.07 3.07 3.07 26 at > 50%F 3.06 3.06 3.06 3.12 3.12 3.12 23 at > 50%F 3.15 3.15 3.15 3.42 3.42 3.42
50           2.00       2.00       2.00     2.02         2.02         2.02 TBVOOS                        40           2.20       2.20       2.20     2.29         2.29         2.29 26           2.77       2.77       2.77     3.07         3.07         3.07 26 at > 50%F       3.55       3.55       3.55     3.60         3.60         3.60 23 at > 50%F       3.71       3.71       3.71     4.00         4.00         4.00
DW)
                                    DW)       3.14       3.14       3.14     3.39         3.39         3.39
2.79 2.79 2.79 3.07 3.07 3.07
                                    DW)       3.45       3.45       3.45     3.89         3.89         3.89
DW)
3.01 3.01 3.01 3.37 3.37 3.37 100 1.54 1.54 1.54 1.54 1.54 1.54 90 1.59 1.59 1.59 1.59 1.59 1.59 65 1.79 1.79 1.79 1.83 1.83 1.83
> 50 50 2.00 2.00 2.00 2.02 2.02 2.02 40 2.20 2.20 2.20 2.29 2.29 2.29 26 2.77 2.77 2.77 3.07 3.07 3.07 26 at > 50%F 3.55 3.55 3.55 3.60 3.60 3.60 23 at > 50%F 3.71 3.71 3.71 4.00 4.00 4.00
DW)
3.14 3.14 3.14 3.39 3.39 3.39
DW)
3.45 3.45 3.45 3.89 3.89 3.89 ATRIUM-11 Operating Condition TBVIS TBVOOS ATRIUM-10XM
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are only valid up to 50% rated core power.
Limits are only valid up to 50% rated core power.  
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 28 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.6 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Nominal Scram Time Basis
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 29 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                        ATRIUM-11 BOC         BOC       BOC       BOC         BOC         BOC Pow er           to           to   to End of     to           to       to End of Operating Condition          (% of rated)     NEOC       EOCLB     Coast     NEOC         EOCLB       Coast 100           1.50       1.50       1.50     1.50         1.50         1.50 90           1.55       1.55       1.55     1.55         1.55         1.55 65           1.77       1.77       1.77     1.83         1.83         1.83
TVA-COLR-BF2C21, Revision 1 (Final)
                                        > 50             ---          ---      ---      ---          ---          ---
Table 4.6 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Nominal Scram Time Basis
50           1.99       1.99       1.99     2.02         2.02         2.02 TBVIS                        40           2.19       2.19       2.19     2.30         2.30         2.30 26           2.79       2.79       2.79     3.09         3.09         3.09 26 at > 50%F       3.09       3.09       3.09     3.14         3.14         3.14 23 at > 50%F       3.17       3.17       3.17     3.44         3.44         3.44
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                                    DW)       2.81       2.81       2.81     3.09         3.09         3.09
(% of rated)
                                    DW)       3.03       3.03       3.03     3.39         3.39         3.39 100           1.54       1.54       1.54     1.54         1.54         1.54 90           1.59       1.59       1.59     1.59         1.59         1.59 65           1.79       1.79       1.79     1.83         1.83         1.83
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.50 1.50 1.50 1.50 1.50 1.50 90 1.55 1.55 1.55 1.55 1.55 1.55 65 1.77 1.77 1.77 1.83 1.83 1.83
                                        > 50             ---          ---      ---      ---          ---          ---
> 50 50 1.99 1.99 1.99 2.02 2.02 2.02 40 2.19 2.19 2.19 2.30 2.30 2.30 26 2.79 2.79 2.79 3.09 3.09 3.09 26 at > 50%F 3.09 3.09 3.09 3.14 3.14 3.14 23 at > 50%F 3.17 3.17 3.17 3.44 3.44 3.44
50           2.01       2.01       2.01     2.02         2.02         2.02 TBVOOS                        40           2.21       2.21       2.21     2.30         2.30         2.30 26           2.79       2.79       2.79     3.09         3.09         3.09 26 at > 50%F       3.58       3.58       3.58     3.62         3.62         3.62 23 at > 50%F       3.73       3.73       3.73     4.02         4.02         4.02
DW)
                                    DW)       3.15       3.15       3.15     3.40         3.40         3.40
2.81 2.81 2.81 3.09 3.09 3.09
                                    DW)       3.46       3.46       3.46     3.90         3.90         3.90
DW)
3.03 3.03 3.03 3.39 3.39 3.39 100 1.54 1.54 1.54 1.54 1.54 1.54 90 1.59 1.59 1.59 1.59 1.59 1.59 65 1.79 1.79 1.79 1.83 1.83 1.83
> 50 50 2.01 2.01 2.01 2.02 2.02 2.02 40 2.21 2.21 2.21 2.30 2.30 2.30 26 2.79 2.79 2.79 3.09 3.09 3.09 26 at > 50%F 3.58 3.58 3.58 3.62 3.62 3.62 23 at > 50%F 3.73 3.73 3.73 4.02 4.02 4.02
DW)
3.15 3.15 3.15 3.40 3.40 3.40
DW)
3.46 3.46 3.46 3.90 3.90 3.90 ATRIUM-11 Operating Condition TBVIS TBVOOS ATRIUM-10XM
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are only valid up to 50% rated core power.
Limits are only valid up to 50% rated core power.  
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 29 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.7 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Technical Specification Scram Time Basis
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 30 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                        ATRIUM-11 BOC         BOC       BOC       BOC         BOC         BOC Pow er           to           to   to End of     to           to       to End of Operating Condition          (% of rated)     NEOC       EOCLB     Coast     NEOC         EOCLB       Coast 100           1.56       1.56       1.56     1.56         1.56         1.56 90           1.61       1.61       1.61     1.61         1.61         1.61 65           1.81       1.81       1.81     1.84         1.84         1.84
TVA-COLR-BF2C21, Revision 1 (Final)
                                        > 50             ---          ---      ---      ---          ---          ---
Table 4.7 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Technical Specification Scram Time Basis
50           2.03       2.03       2.03     2.04         2.04         2.04 TBVIS                        40           2.23       2.23       2.23     2.32         2.32         2.32 26           2.79       2.79       2.79     3.10         3.10         3.10 26 at > 50%F       3.06       3.06       3.06     3.12         3.12         3.12 23 at > 50%F       3.15       3.15       3.15     3.42         3.42         3.42
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                                    DW)       2.79       2.79       2.79     3.10         3.10         3.10
(% of rated)
                                    DW)       3.01       3.01       3.01     3.40         3.40         3.40 100           1.60       1.60       1.60     1.60         1.60         1.60 90           1.65       1.65       1.65     1.65         1.65         1.65 65           1.83       1.83       1.83     1.84         1.84         1.84
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.56 1.56 1.56 1.56 1.56 1.56 90 1.61 1.61 1.61 1.61 1.61 1.61 65 1.81 1.81 1.81 1.84 1.84 1.84
                                        > 50             ---          ---      ---      ---          ---          ---
> 50 50 2.03 2.03 2.03 2.04 2.04 2.04 40 2.23 2.23 2.23 2.32 2.32 2.32 26 2.79 2.79 2.79 3.10 3.10 3.10 26 at > 50%F 3.06 3.06 3.06 3.12 3.12 3.12 23 at > 50%F 3.15 3.15 3.15 3.42 3.42 3.42
50           2.05       2.05       2.05     2.05         2.05         2.05 TBVOOS                        40           2.25       2.25       2.25     2.32         2.32         2.32 26           2.79       2.79       2.79     3.10         3.10         3.10 26 at > 50%F       3.55       3.55       3.55     3.60         3.60         3.60 23 at > 50%F       3.71       3.71       3.71     4.00         4.00         4.00
DW)
                                    DW)       3.14       3.14       3.14     3.39         3.39         3.39
2.79 2.79 2.79 3.10 3.10 3.10
                                    DW)       3.45       3.45       3.45     3.89         3.89         3.89
DW)
3.01 3.01 3.01 3.40 3.40 3.40 100 1.60 1.60 1.60 1.60 1.60 1.60 90 1.65 1.65 1.65 1.65 1.65 1.65 65 1.83 1.83 1.83 1.84 1.84 1.84
> 50 50 2.05 2.05 2.05 2.05 2.05 2.05 40 2.25 2.25 2.25 2.32 2.32 2.32 26 2.79 2.79 2.79 3.10 3.10 3.10 26 at > 50%F 3.55 3.55 3.55 3.60 3.60 3.60 23 at > 50%F 3.71 3.71 3.71 4.00 4.00 4.00
DW)
3.14 3.14 3.14 3.39 3.39 3.39
DW)
3.45 3.45 3.45 3.89 3.89 3.89 ATRIUM-11 Operating Condition TBVIS TBVOOS ATRIUM-10XM
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are only valid up to 50% rated core power.
Limits are only valid up to 50% rated core power.  
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 30 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.8 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Technical Specification Scram Time Basis
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 31 Core Operating Limits Report, (120% OLTP, MELLLA+)
* ATRIUM-10XM                        ATRIUM-11 BOC         BOC       BOC       BOC         BOC         BOC Pow er           to           to   to End of     to           to       to End of Operating Condition          (% of rated)     NEOC       EOCLB     Coast     NEOC         EOCLB       Coast 100           1.56       1.56       1.56     1.56         1.56         1.56 90           1.61       1.61       1.61     1.61         1.61         1.61 65           1.81       1.81       1.81     1.84         1.84         1.84
TVA-COLR-BF2C21, Revision 1 (Final)
                                        > 50             ---          ---      ---      ---          ---          ---
Table 4.8 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Technical Specification Scram Time Basis
50           2.04       2.04       2.04     2.05         2.05         2.05 TBVIS                        40           2.24       2.24       2.24     2.33         2.33         2.33 26           2.81       2.81       2.81     3.12         3.12         3.12 26 at > 50%F       3.09       3.09       3.09     3.14         3.14         3.14 23 at > 50%F       3.17       3.17       3.17     3.44         3.44         3.44
* BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of
                                    DW)       2.81       2.81       2.81     3.12         3.12         3.12
(% of rated)
                                    DW)       3.03       3.03       3.03     3.42         3.42         3.42 100           1.60       1.60       1.60     1.60         1.60         1.60 90           1.65       1.65       1.65     1.65         1.65         1.65 65           1.83       1.83       1.83     1.84         1.84         1.84
NEOC EOCLB Coast NEOC EOCLB Coast 100 1.56 1.56 1.56 1.56 1.56 1.56 90 1.61 1.61 1.61 1.61 1.61 1.61 65 1.81 1.81 1.81 1.84 1.84 1.84
                                        > 50             ---          ---      ---      ---          ---          ---
> 50 50 2.04 2.04 2.04 2.05 2.05 2.05 40 2.24 2.24 2.24 2.33 2.33 2.33 26 2.81 2.81 2.81 3.12 3.12 3.12 26 at > 50%F 3.09 3.09 3.09 3.14 3.14 3.14 23 at > 50%F 3.17 3.17 3.17 3.44 3.44 3.44
50           2.06       2.06       2.06     2.06         2.06         2.06 TBVOOS                        40           2.26       2.26       2.26     2.33         2.33         2.33 26           2.81       2.81       2.81     3.12         3.12         3.12 26 at > 50%F       3.58       3.58       3.58     3.62         3.62         3.62 23 at > 50%F       3.73       3.73       3.73     4.02         4.02         4.02
DW)
                                    DW)       3.15       3.15       3.15     3.40         3.40         3.40
2.81 2.81 2.81 3.12 3.12 3.12
                                    DW)       3.46       3.46       3.46     3.90         3.90         3.90
DW)
3.03 3.03 3.03 3.42 3.42 3.42 100 1.60 1.60 1.60 1.60 1.60 1.60 90 1.65 1.65 1.65 1.65 1.65 1.65 65 1.83 1.83 1.83 1.84 1.84 1.84
> 50 50 2.06 2.06 2.06 2.06 2.06 2.06 40 2.26 2.26 2.26 2.33 2.33 2.33 26 2.81 2.81 2.81 3.12 3.12 3.12 26 at > 50%F 3.58 3.58 3.58 3.62 3.62 3.62 23 at > 50%F 3.73 3.73 3.73 4.02 4.02 4.02
DW)
3.15 3.15 3.15 3.40 3.40 3.40
DW)
3.46 3.46 3.46 3.90 3.90 3.90 ATRIUM-11 Operating Condition TBVIS TBVOOS ATRIUM-10XM
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are only valid up to 50% rated core power.
Limits are only valid up to 50% rated core power.  
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 31 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 4.9 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 32 Core Operating Limits Report, (120% OLTP, MELLLA+)
* Pow er               All Cycle Exposures Operating Condition      (% of rated)     ATRIUM-10XM       ATRIUM-11 100               2.02             2.05 43.75               2.02             2.05 40               2.08             2.10 RCPOOS                  26               2.49             2.74 FHOOS            26 at > 50%F           2.67             2.83 23 at > 50%F           2.83             3.07
TVA-COLR-BF2C21, Revision 1 (Final)
                                                      DW)           2.53             2.74
Table 4.9 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times
                                                      DW)           2.69             3.07 100               2.05             2.05 43.75               2.05             2.05 RCPOOS                  40               2.10             2.11 TBVOOS                  26               2.51             2.74 PLUOOS            26 at > 50%F           3.25             3.40 FHOOS            23 at > 50%F           3.49             3.71
* Pow er
                                                      DW)           2.92             3.18
(% of rated)
                                                      DW)           3.20             3.58 100               2.20             2.24 43.75               2.20             2.24 40               2.27             2.34 RCPOOS 26               2.81             3.12 TBVOOS 26 at > 50%F           3.57             3.62 FHOOS1 23 at > 50%F           3.73             4.02
ATRIUM-10XM ATRIUM-11 100 2.02 2.05 43.75 2.02 2.05 40 2.08 2.10 26 2.49 2.74 26 at > 50%F 2.67 2.83 23 at > 50%F 2.83 3.07
                                                      DW)           3.16             3.41
DW)
                                                      DW)           3.47             3.91 100               2.21             2.25 43.75               2.21             2.25 40               2.28             2.35 RCPOOS 26               2.83             3.14 TBVOOS 26 at > 50%F           3.60             3.64 FHOOS2 23 at > 50%F           3.75             4.04
2.53 2.74
                                                      DW)           3.17             3.42
DW)
                                                      DW)           3.48             3.92
2.69 3.07 100 2.05 2.05 43.75 2.05 2.05 40 2.10 2.11 26 2.51 2.74 26 at > 50%F 3.25 3.40 23 at > 50%F 3.49 3.71
DW)
2.92 3.18
DW)
3.20 3.58 100 2.20 2.24 43.75 2.20 2.24 40 2.27 2.34 26 2.81 3.12 26 at > 50%F 3.57 3.62 23 at > 50%F 3.73 4.02
DW)
3.16 3.41
DW)
3.47 3.91 100 2.21 2.25 43.75 2.21 2.25 40 2.28 2.35 26 2.83 3.14 26 at > 50%F 3.60 3.64 23 at > 50%F 3.75 4.04
DW)
3.17 3.42
DW)
3.48 3.92 RCPOOS TBVOOS FHOOS2 All Cycle Exposures Operating Condition RCPOOS FHOOS RCPOOS TBVOOS PLUOOS FHOOS RCPOOS TBVOOS FHOOS1
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR and FHOOS assume the same value of temperature drop.
FFWTR and FHOOS assume the same value of temperature drop.
RCPOOS limits are only valid up to 50% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.
RCPOOS limits are only valid up to 50% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.  
Browns Ferry Unit 2 Cycle 21                                                                                                      Page 32 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                    TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 5     Thermal-Hydraulic Stability Protection (Technical Specification 3.3.1.1)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 33 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final) 5 Thermal-Hydraulic Stability Protection (Technical Specification 3.3.1.1)
Technical Specification Table 3.3.1.1-1, Function 2f, identifies the function.
Technical Specification Table 3.3.1.1-1, Function 2f, identifies the function.
Instrument setpoints are established, such that the reactor will be tripped before an oscillation can grow to the point where the SLMCPR is exceeded. With application of Reference 30, the DSS-CD stability solution will be used per Reference 26. The DSS-CD SAD setpoint is 1.10 for TLO and SLO.
Instrument setpoints are established, such that the reactor will be tripped before an oscillation can grow to the point where the SLMCPR is exceeded. With application of Reference 30, the DSS-CD stability solution will be used per Reference 26. The DSS-CD SAD setpoint is 1.10 for TLO and SLO.
New analyses have been developed based on Reference 26. With the implementation of the MELLLA+ operating domain expansion, an ABSP trip is required when the OPRM is out-of-service. The ABSP trip settings define a region of the power to flow map within which an automatic reactor scram occurs. The ABSP trip settings are provided in Table 5.1. If both the OPRM and ABSP are out-of-service, operation within the MELLLA+ domain is not allowed and the MBSP Regions provide stability protection. Table 5.2 and Table 5.3 provide the endpoints for the MBSP regions for nominal and reduced feedwater temperature conditions.
New analyses have been developed based on Reference 26. With the implementation of the MELLLA+ operating domain expansion, an ABSP trip is required when the OPRM is out-of-service. The ABSP trip settings define a region of the power to flow map within which an automatic reactor scram occurs. The ABSP trip settings are provided in Table 5.1. If both the OPRM and ABSP are out-of-service, operation within the MELLLA+ domain is not allowed and the MBSP Regions provide stability protection. Table 5.2 and Table 5.3 provide the endpoints for the MBSP regions for nominal and reduced feedwater temperature conditions.
Table 5.1 ABSP Setpoints for the Scram Region Parameter               Symbol           Setting Value (unit)                       Comments Slope of ABSP APRM low Flow Biased Slope for Trip               mTRIP           2.00 (% RTP/% RDF)
Table 5.1 ABSP Setpoints for the Scram Region Parameter Symbol Setting Value (unit)
Trip Linear Segment ABSP APRM Flow Biased Trip Setpoint Constant Power                                                            Power Intercept. Constant Power Line PBSP-TRIP           35.0 (% RTP)
Comments Slope for Trip mTRIP 2.00 (% RTP/% RDF)
Line for Trip                                                          for Trip from Zero Drive Flow to Flow Breakpoint Value ABSP APRM Flow Biased Trip Setpoint Constant Flow Line W BSP-TRIP             49 (% RDF)             Drive Flow Intercept. Constant Flow for Trip Line for Trip       (see Note 1 below)
Slope of ABSP APRM low Flow Biased Trip Linear Segment Constant Power Line for Trip PBSP-TRIP 35.0 (% RTP)
Flow Breakpoint             W BSP-BREAK           30.0 (% RDF)           Flow Breakpoint Value Note 1: WBSP-TRIP can be set to 49.0 % RDF or any higher value up to the intersection of the ABSP sloped line with the APRM Flow Biased STP scram line.
ABSP APRM Flow Biased Trip Setpoint Power Intercept. Constant Power Line for Trip from Zero Drive Flow to Flow Breakpoint Value Constant Flow Line for Trip WBSP-TRIP 49 (% RDF)
Browns Ferry Unit 2 Cycle 21                                                                                              Page 33 Core Operating Limits Report, (120% OLTP, MELLLA+)                                              TVA-COLR-BF2C21, Revision 1 (Final)
ABSP APRM Flow Biased Trip Setpoint Drive Flow Intercept. Constant Flow Line for Trip (see Note 1 below)
Flow Breakpoint WBSP-BREAK 30.0 (% RDF)
Flow Breakpoint Value Note 1: WBSP-TRIP can be set to 49.0 % RDF or any higher value up to the intersection of the ABSP sloped line with the APRM Flow Biased STP scram line.


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 5.2 Analyzed MBSP Endpoints: Nominal Feedwater Temperature Power       Core Flow Endpoint                                                Definition
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 34 Core Operating Limits Report, (120% OLTP, MELLLA+)
(% Rated) (% Rated)
TVA-COLR-BF2C21, Revision 1 (Final)
Scram Region (Region I)
Table 5.2 Analyzed MBSP Endpoints: Nominal Feedwater Temperature Endpoint Power
A1          75.9        52.7          Boundary Intercept on MELLLA+ Line Scram Region (Region I)
(% Rated)
B1          35.5          29          Boundary Intercept on Natural Circulation Line (NCL)
Core Flow
Controlled Entry Region (Region A2          66.1          52          II) Boundary Intercept on MELLLA Line Controlled Entry Region (Region B2          25.5          29          II) Boundary Intercept on Natural Circulation Line (NCL)
(% Rated)
Table 5.3 Analyzed MBSP Endpoints: Reduced Feedwater Temperature Power       Core Flow Endpoint                                                Definition
Definition A1 75.9 52.7 Scram Region (Region I)
(% Rated) (% Rated)
Boundary Intercept on MELLLA+ Line B1 35.5 29 Scram Region (Region I)
Scram Region (Region I)
Boundary Intercept on Natural Circulation Line (NCL)
A1          64.9        50.5          Boundary Intercept on MELLLA Line Scram Region (Region I)
A2 66.1 52 Controlled Entry Region (Region II) Boundary Intercept on MELLLA Line B2 25.5 29 Controlled Entry Region (Region II) Boundary Intercept on Natural Circulation Line (NCL)
B1          29.4          29          Boundary Intercept on Natural Circulation Line (NCL)
Table 5.3 Analyzed MBSP Endpoints: Reduced Feedwater Temperature Endpoint Power
Controlled Entry Region (Region A2           68.3         54.9         II) Boundary Intercept on MELLLA Line Controlled Entry Region (Region B2          24.5          29          II) Boundary Intercept on Natural Circulation Line (NCL)
(% Rated)
Browns Ferry Unit 2 Cycle 21                                                                                          Page 34 Core Operating Limits Report, (120% OLTP, MELLLA+)                                            TVA-COLR-BF2C21, Revision 1 (Final)
Core Flow
(% Rated)
Definition A1 64.9 50.5 Scram Region (Region I)
Boundary Intercept on MELLLA Line B1 29.4 29 Scram Region (Region I)
Boundary Intercept on Natural Circulation Line (NCL)
A2 68.3 54.9 Controlled Entry Region (Region II) Boundary Intercept on MELLLA Line B2 24.5 29 Controlled Entry Region (Region II) Boundary Intercept on Natural Circulation Line (NCL)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 6 APRM Flow Biased Rod Block Trip Settings (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 35 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final) 6 APRM Flow Biased Rod Block Trip Settings (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)
The APRM rod block trip setting is based upon References 27 & 29, and is defined by the following:
The APRM rod block trip setting is based upon References 27 & 29, and is defined by the following:
for two loop operation:
for two loop operation:
SRB d (0.61Wd + 63.3)                             Allowable Value SRB d (0.61Wd + 62.0)                             Nominal Trip Setpoint (NTSP) where:
SRB d (0.61Wd + 63.3)
SRB         =         Rod Block setting in percent of rated thermal power (3952 MWt)
Allowable Value SRB d (0.61Wd + 62.0)
Wd           =         Recirculation drive flow rate in percent of rated (100% drive flow required to achieve 100% core power and flow) and for single loop operation:
Nominal Trip Setpoint (NTSP) where:
SRB d (0.55(Wd-'W) + 60.5)                                   Allowable Value SRB d (0.55(Wd-'W) + 58.5)                                   Nominal Trip Setpoint (NTSP) where:
SRB  
SRB         =         Rod Block setting in percent of rated thermal power (3952 MWt)
=
Wd           =         Recirculation drive flow rate in percent of rated (100% drive flow required to achieve 100% core power and flow)
Rod Block setting in percent of rated thermal power (3952 MWt)
          'W           =         Difference between two-loop and single-loop effective recirculation flow at the same core flow ('W=0.0 for two-loop operation)
Wd  
=
Recirculation drive flow rate in percent of rated (100% drive flow required to achieve 100% core power and flow) and for single loop operation:
SRB d (0.55(Wd-'W) + 60.5)
Allowable Value SRB d (0.55(Wd-'W) + 58.5)
Nominal Trip Setpoint (NTSP) where:
SRB  
=
Rod Block setting in percent of rated thermal power (3952 MWt)
Wd  
=
Recirculation drive flow rate in percent of rated (100% drive flow required to achieve 100% core power and flow)  
'W  
=
Difference between two-loop and single-loop effective recirculation flow at the same core flow ('W=0.0 for two-loop operation)
The APRM rod block trip setting is clamped at a maximum allowable value of 115%
The APRM rod block trip setting is clamped at a maximum allowable value of 115%
(corresponding to a NTSP of 113%).
(corresponding to a NTSP of 113%).  
Browns Ferry Unit 2 Cycle 21                                                                                        Page 35 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 7 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 36 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final) 7 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)
The RBM trip setpoints and applicable power ranges, based on References 27 & 28, are shown in Table 7.1. Setpoints are based on an HTSP, unfiltered analytical limit of 114%. Unfiltered setpoints are consistent with a nominal RBM filter setting of 0.0 seconds; filtered setpoints are consistent with a nominal RBM filter setting less than 0.5 seconds. Cycle specific CRWE analyses of OLMCPR are documented in Reference 1, superseding values reported in References 27, 28, and 29.
The RBM trip setpoints and applicable power ranges, based on References 27 & 28, are shown in Table 7.1. Setpoints are based on an HTSP, unfiltered analytical limit of 114%. Unfiltered setpoints are consistent with a nominal RBM filter setting of 0.0 seconds; filtered setpoints are consistent with a nominal RBM filter setting less than 0.5 seconds. Cycle specific CRWE analyses of OLMCPR are documented in Reference 1, superseding values reported in References 27, 28, and 29.
Table 7.1 Analytical RBM Trip Setpoints
Table 7.1 Analytical RBM Trip Setpoints
* Allowable              Nominal Trip RBM                             Value                Setpoint Trip Setpoint                         (AV)                 (NTSP)
* RBM Trip Setpoint Allowable Value (AV)
LPSP                                     27%                     25%
Nominal Trip Setpoint (NTSP)
IPSP                                     62%                     60%
LPSP 27%
HPSP                                     82%                     80%
25%
LTSP - unfiltered                     121.7%                 120.0%
IPSP 62%
                                          - filtered                    120.7%                 119.0%
60%
ITSP   - unfiltered                 116.7%                 115.0%
HPSP 82%
                                          - filtered                    115.7%                 114.0%
80%
HTSP - unfiltered                     111.7%                 110.0%
LTSP - unfiltered  
                                          - filtered                    110.9%                 109.2%
- filtered 121.7%
DTSP                                     90%                     92%
120.7%
120.0%
119.0%
ITSP - unfiltered  
- filtered 116.7%
115.7%
115.0%
114.0%
HTSP - unfiltered  
- filtered 111.7%
110.9%
110.0%
109.2%
DTSP 90%
92%
As a result of cycle specific CRWE analyses, RBM setpoints in Technical Specification Table 3.3.2.1-1 are applicable as shown in Table 7.2. Cycle specific setpoint analysis results are shown in Table 7.3, per Reference 1.
As a result of cycle specific CRWE analyses, RBM setpoints in Technical Specification Table 3.3.2.1-1 are applicable as shown in Table 7.2. Cycle specific setpoint analysis results are shown in Table 7.3, per Reference 1.
Table 7.2 RBM Setpoint Applicability Thermal Power                       Applicable                Notes from
Table 7.2 RBM Setpoint Applicability Thermal Power
(% Rated)                         MCPR                 Table 3.3.2.1-1               Comment
(% Rated)
                                                        < 1.66               (a), (b), (f), (h)     two loop operation 27% and < 90%
Applicable MCPR Notes from Table 3.3.2.1-1 Comment 27% and < 90%
                                                        < 1.70               (a), (b), (f), (h)     single loop operation 90%                                     < 1.36                     (g)             two loop operation
< 1.66 (a), (b), (f), (h) two loop operation  
< 1.70 (a), (b), (f), (h) single loop operation 90%  
< 1.36 (g) two loop operation
* Values are considered maximums. Using lower values, due to RBM system hardware/software limitations, is conservative, and acceptable.
* Values are considered maximums. Using lower values, due to RBM system hardware/software limitations, is conservative, and acceptable.
MCPR values shown correspond with, (support), SLMPCR values identified in Reference 1.
MCPR values shown correspond with, (support), SLMPCR values identified in Reference 1.
Greater than 90% rated power is not attainable in single loop operation.
Greater than 90% rated power is not attainable in single loop operation.  
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 36 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                  TVA-COLR-BF2C21, Revision 1 (Final)


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Table 7.3 Control Rod Withdrawal Error Results RBM                         CRWE HTSP Analytical Limit               OLMCPR Unfiltered 107                           1.29 111                           1.32 114                           1.33 117                           1.34 Results, compared against the base case OLMCPR results of Table 4.2, indicate SLMCPR remains protected for RBM inoperable conditions (i.e., 114% unblocked).
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 37 Core Operating Limits Report, (120% OLTP, MELLLA+)
Browns Ferry Unit 2 Cycle 21                                                                                        Page 37 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
TVA-COLR-BF2C21, Revision 1 (Final)
Table 7.3 Control Rod Withdrawal Error Results RBM CRWE HTSP Analytical Limit OLMCPR Unfiltered 107 1.29 111 1.32 114 1.33 117 1.34 Results, compared against the base case OLMCPR results of Table 4.2, indicate SLMCPR remains protected for RBM inoperable conditions (i.e., 114% unblocked).  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 8 Shutdown Margin Limit (Technical Specification 3.1.1)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 38 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final) 8 Shutdown Margin Limit (Technical Specification 3.1.1)
Assuming the strongest OPERABLE control blade is fully withdrawn, and all other OPERABLE control blades are fully inserted, the core shall be sub-critical and meet the following minimum shutdown margin:
Assuming the strongest OPERABLE control blade is fully withdrawn, and all other OPERABLE control blades are fully inserted, the core shall be sub-critical and meet the following minimum shutdown margin:
SDM       0.38% dk/k Browns Ferry Unit 2 Cycle 21                                                                                        Page 38 Core Operating Limits Report, (120% OLTP, MELLLA+)                                          TVA-COLR-BF2C21, Revision 1 (Final)
SDM 0.38% dk/k  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 MBSP Maps Browns Ferry Unit 2 Cycle 21                                                                                       Page A-1 Core Operating Limits Report, (120% OLTP, MELLLA+)                                         TVA-COLR-BF2C21, Revision 1 (Final)
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page A-1 Core Operating Limits Report, (120% OLTP, MELLLA+)
TVA-COLR-BF2C21, Revision 1 (Final)
MBSP Maps


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Core Power (% Rated: 100% = 3952MWt) 110 100 MELLLA+ Region 90 80                                                                                  BSP Boundary Manual 70                                    Scram Region I 60 MELLLA Region    ICF Region MELLLA Upper Boundary 50 87.5% Rod Line 40                                                        Controlled Entry Region II 30                                                              Min. Flow Control 20 Natural                                Min. Pow er Line Circulation 10                                           20% Pump Speed Line 0
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page A-2 Core Operating Limits Report, (120% OLTP, MELLLA+)
0          10         20       30       40       50       60       70     80       90     100     110         120 Core Flow (% Rated: 100% =102.5 MLbm/hr)
TVA-COLR-BF2C21, Revision 1 (Final) 0 10 20 30 40 50 60 70 80 90 100 110 0
Figure A.1 MBSP Boundaries For Nominal Feedwater Temperature (Operation in the MELLLA+ Region Prohibited for Feedwater Temperature greater than 10 degrees F below the Nominal Feedwater Temperature)
10 20 30 40 50 60 70 80 90 100 110 120 Core Flow (% Rated: 100% =102.5 MLbm/hr)
Browns Ferry Unit 2 Cycle 21                                                                                            Page A-2 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                TVA-COLR-BF2C21, Revision 1 (Final)
Core Power (% Rated: 100% = 3952MWt)
Natural Circulation MELLLA Region ICF Region 20% Pump Speed Line Min. Pow er Line Min. Flow Control 87.5% Rod Line MELLLA Upper Boundary MELLLA+ Region Manual Scram Region I Controlled Entry Region II BSP Boundary Figure A.1 MBSP Boundaries For Nominal Feedwater Temperature (Operation in the MELLLA+ Region Prohibited for Feedwater Temperature greater than 10 degrees F below the Nominal Feedwater Temperature)  


EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE Date: April 7, 2020 1101 Market Street, Chattanooga TN 37402 Core Power (% Rated: 100% = 3952MWt) 110 100 MELLLA+ Region 90 80 BSP Boundary 70 Manual Scram 60                                    Region I MELLLA Region MELLLA Upper Boundary                                            ICF Region 50 87.5% Rod Line Controlled Entry 40                                                                  Region II 30                                                              Min. Flow Control 20 Natural                              Min. Pow er Line Circulation 10                                           20% Pump Speed Line 0
EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page A-3 Core Operating Limits Report, (120% OLTP, MELLLA+)
0          10         20       30       40       50     60       70     80     90     100     110         120 Core Flow (% Rated: 100% =102.5 MLbm/hr)
TVA-COLR-BF2C21, Revision 1 (Final) 0 10 20 30 40 50 60 70 80 90 100 110 0
Figure A.2 MBSP Boundaries For Reduced Feedwater Temperature (Operation in the MELLLA+ Region Prohibited for a Reduced Feedwater Temperature greater than 10 degrees F below the Nominal Feedwater Temperature)
10 20 30 40 50 60 70 80 90 100 110 120 Core Flow (% Rated: 100% =102.5 MLbm/hr)
Browns Ferry Unit 2 Cycle 21                                                                                            Page A-3 Core Operating Limits Report, (120% OLTP, MELLLA+)                                                TVA-COLR-BF2C21, Revision 1 (Final)}}
Core Power (% Rated: 100% = 3952MWt)
Natural Circulation MELLLA Region ICF Region 20% Pump Speed Line Min. Pow er Line Min. Flow Control 87.5% Rod Line MELLLA Upper Boundary MELLLA+ Region Controlled Entry Region II Manual Scram Region I BSP Boundary Figure A.2 MBSP Boundaries For Reduced Feedwater Temperature (Operation in the MELLLA+ Region Prohibited for a Reduced Feedwater Temperature greater than 10 degrees F below the Nominal Feedwater Temperature)}}

Latest revision as of 10:42, 12 December 2024

Core Operating Limits Report for Cycle 21 Operation, Revision 1
ML20129J980
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 05/08/2020
From: Bono S
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML20129J980 (53)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 May 8, 2020 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260

Subject:

Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 21 Operation, Revision 1

Reference:

Letter from TVA to NRC, Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 21 Operation, Revision 0, dated March 5, 2019.

In accordance with the requirements of Technical Specification (TS) 5.6.5.d, the Tennessee Valley Authority is submitting the Browns Ferry Nuclear Plant (BFN),

Unit 2, Cycle 21, Core Operating Limits Report (COLR). Revision 0 of the Unit 2 COLR includes all Modes of operation (Modes 1 through 5) (Reference). Revision 1 of the BFN, Unit 2, Cycle 21, COLR addresses operation in the Maximum Extended Load Line Limit Analysis Plus (MELLLA+) domain for the remainder of the current cycle.

There are no new commitments contained in this letter. If you have any questions please contact Jamie L. Paul at (256) 729-2636.

Respectfully, S. M. Bono Site Vice President

Enclosure:

Core Operating Limits Report, (120% OLTP, MELLLA+), for Unit 2 Cycle 21 Operation TVA-COLR-BF2C21, Revision 1 By Steven M. Bono at 6:57 am, May 08, 2020

U.S. Nuclear Regulatory Commission Page 2 May 8, 2020 cc: (w/ Enclosure)

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant

Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 2 Core Operating Limits Report, (120% OLTP, MELLLA+), for Unit 2 Cycle 21 Operation, TVA-COLR-BF2C21, Revision 1 (See Attached)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page ii Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table of Contents Total Number of Pages = 50 (including review cover sheet)

List of Tables............................................................................................................................. iii List of Figures............................................................................................................................ iv Revision Log............................................................................................................................... v Nomenclature............................................................................................................................ vi References.............................................................................................................................. viii 1

Introduction........................................................................................................................ 1 1.1 Purpose....................................................................................................................... 1 1.2 Scope.......................................................................................................................... 1 1.3 Fuel Loading................................................................................................................ 1 1.4 Acceptability................................................................................................................ 2 2

APLHGR Limits.................................................................................................................. 3 2.1 Rated Power and Flow Limit: APLHGRRATED............................................................... 3 2.2 Off-Rated Power Dependent Limit: APLHGRP............................................................ 3 2.2.1 Startup without Feedwater Heaters..................................................................... 3 2.3 Off-Rated Flow Dependent Limit: APLHGRF............................................................... 3 2.4 Single Loop Operation Limit: APLHGRSLO................................................................... 3 2.5 Equipment Out-Of-Service Corrections........................................................................ 6 3

LHGR Limits....................................................................................................................... 7 3.1 Rated Power and Flow Limit: LHGRRATED....................................................................7 3.2 Off-Rated Power Dependent Limit: LHGRP................................................................. 7 3.2.1 Startup without Feedwater Heaters..................................................................... 7 3.3 Off-Rated Flow Dependent Limit: LHGRF.................................................................... 8 3.4 Equipment Out-Of-Service Corrections........................................................................ 8 4

OLMCPR Limits................................................................................................................ 19 4.1 Flow Dependent MCPR Limit: MCPRF...................................................................... 19 4.2 Power Dependent MCPR Limit: MCPRP................................................................... 19 4.2.1 Startup without Feedwater Heaters....................................................................19 4.2.2 Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS)................................20 4.2.3 Exposure Dependent Limits...............................................................................20 4.2.4 Equipment Out-Of-Service (EOOS) Options......................................................21 4.2.5 Single-Loop-Operation (SLO) Limits..................................................................21 4.2.6 Below Pbypass Limits........................................................................................21 5

Thermal-Hydraulic Stability Protection.............................................................................. 33 6

APRM Flow Biased Rod Block Trip Settings..................................................................... 35 7

Rod Block Monitor (RBM) Trip Setpoints and Operability................................................. 36 8

Shutdown Margin Limit..................................................................................................... 38 MBSP Maps..................................................................................................... A-1

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page iii Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

List of Tables Nuclear Fuel Types

................................................................................................................ 2 Startup Feedwater Temperature Basis....................................................................................... 7 Nominal Scram Time Basis.......................................................................................................20 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis

.............................................23 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis

...............................................24 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis

........................26 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:

Nominal Scram Time Basis

...................................................................................................28 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:

Nominal Scram Time Basis

...................................................................................................29 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:

Technical Specification Scram Time Basis

............................................................................30 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:

Technical Specification Scram Time Basis

............................................................................31 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times

......................32 ABSP Setpoints for the Scram Region......................................................................................33 Analyzed MBSP Endpoints: Nominal Feedwater Temperature.................................................34 Analyzed MBSP Endpoints: Reduced Feedwater Temperature...............................................34 Analytical RBM Trip Setpoints

...............................................................................................36 RBM Setpoint Applicability........................................................................................................36 Control Rod Withdrawal Error Results.......................................................................................37

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page iv Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

List of Figures APLHGRRATED for ATRIUM-10XM Fuel....................................................................................... 4 APLHGRRATED for ATRIUM-11 Fuel............................................................................................ 5 LHGRRATED for ATRIUM-10XM Fuel........................................................................................... 9 LHGRRATED for ATRIUM-11 Fuel................................................................................................10 Base Operation LHGRFACP for ATRIUM-10XM Fuel................................................................11 Base Operation LHGRFACP for ATRIUM-11 Fuel.....................................................................12 LHGRFACF for ATRIUM-10XM Fuel.........................................................................................13 LHGRFACF for ATRIUM-11 Fuel...............................................................................................14 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 1........15 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 2........16 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 1..............17 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 2..............18 MCPRF for All Fuel Types.........................................................................................................22 MBSP Boundaries For Nominal Feedwater Temperature........................................................ A-2 MBSP Boundaries For Reduced Feedwater Temperature...................................................... A-3

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page v Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Revision Log Number Page Description 1-R1 vi-vii Updated nomenclature pages for new items.

2-R1 viii Updated References 1 and 4 3-R1 ix-x Added New Reference (26) for the DSS-CD topical report supporting MELLLA+. Other References incremented by +1 for renumbering.

Updated References 27-30. Removed Reference 31.

4-R1 1

In Section 1.2, the Oscillation Power Range Monitor (OPRM) Setpoint is no longer applicable for MELLLA+ operation. This part has been more generically renamed Hydraulic Stability Protection 5-R1 11-18 Updated Figures 3.3-3.10 as needed for new information 6-R1 20 In Section 4.2.3, exposure dependent limits updated as needed.

7-R1 23-32 Updated Tables 4.2-4.9 as needed.

8-R1 33-34 Re-write of Section 5 for DSS-CD stability change. Tables 5.1, 5.2, and 5.3 are new information supporting MELLLA+

9-R1 35 Updated to include two loop settings, clarify definitions 10-R1 38 Updated symbol per CR 1596417 identification.

11-R1 A1-A3 New material supporting MELLLA+

0-R0 All New document.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page vi Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Nomenclature ABSP Automatic Backup Stability Protection APLHGR Average Planar LHGR APRM Average Power Range Monitor AREVA NP Vendor (Framatome, Siemens)

BOC Beginning of Cycle BSP Backup Stability Protection BWR Boiling Water Reactor CAVEX Core Average Exposure CD Coast Down CMSS Core Monitoring System Software COLR Core Operating Limits Report CPR Critical Power Ratio CRWE Control Rod Withdrawal Error CSDM Cold SDM DIVOM Delta CPR over Initial CPR vs. Oscillation Magnitude DSS-CD Detect and Suppress Solution - Confirmation Density EOC End of Cycle EOCLB End-of-Cycle Licensing Basis EOOS Equipment OOS EPU Extended Power Uprate (120% OLTP)

FFTR Final Feedwater Temperature Reduction FFWTR Final Feedwater Temperature Reduction FHOOS Feedwater Heaters OOS ft Foot: English unit of measure for length GNF Vendor (General Electric, Global Nuclear Fuels)

GWd Giga Watt Day HTSP High TSP ICA Interim Corrective Action ICF Increased Core Flow (beyond rated)

IS In-Service kW kilo watt: SI unit of measure for power.

LCO License Condition of Operation LFWH Loss of Feedwater Heating LHGRFAC LHGR Multiplier (Power or Flow dependent)

LPRM Low Power Range Monitor LRNB Generator Load Reject, No Bypass MAPFAC MAPLHGR multiplier (Power or Flow dependent)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page vii Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

MBSP Manual Backup Stability Protection MCPR Minimum CPR MELLLA Maximum Extended Load Line Limit Analysis MELLLA+

Maximum Extended Load Line Limit Analysis Plus MSRV Moisture Separator Reheater Valve MSRVOOS MSRV OOS MTU Metric Ton Uranium MWd/MTU Mega Watt Day per Metric Ton Uranium NEOC Near EOC NRC United States Nuclear Regulatory Commission NSS Nominal Scram Speed NTSP Nominal TSP OLMCPR MCPR Operating Limit OLTP Original Licensed Thermal Power OOS Out-Of-Service OPRM Oscillation Power Range Monitor OSS Optimum Scram Speed PBDA Period Based Detection Algorithm Pbypass Power, below which TSV Position and TCV Fast Closure Scrams are Bypassed PLU Power Load Unbalance PLUOOS PLU OOS PRNM Power Range Neutron Monitor RBM Rod Block Monitor RCPOOS Recirculation Pump OOS (SLO)

RDF Rated Drive Flow RPS Reactor Protection System RPT Recirculation Pump Trip RPTOOS RPT OOS RTP Rated Thermal Power SDM Shutdown Margin SLMCPR MCPR Safety Limit SLO Single Loop Operation TBV Turbine Bypass Valve TBVIS TBV IS TBVOOS Turbine Bypass Valves OOS TIP Transversing In-core Probe TIPOOS TIP OOS TLO Two Loop Operation TSP Trip Setpoint TSSS Technical Specification Scram Speed TVA Tennessee Valley Authority

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page viii Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

References



ANP-3824, Revision , Browns Ferry Unit 2 Cycle 21 MELLLA+ Reload

Analysis, Framatome, Inc., March 2020.



ANP-3031P, Revision 3, Mechanical Design Report for Browns Ferry Units 1, 2,

and 3 ATRIUM-10 Fuel Assemblies, AREVA NP, Inc., May 2014.



ANP-3150P, Revision 4, Mechanical Design Report for Browns Ferry ATRIUM

10XM Fuel Assemblies, AREVA Inc., November 2017.



ANP-3706P, Revision 1, Browns Ferry Unit 2 Cycle 21 Plant Parameters

Document, Framatome Inc., June 2019.



BFE-4410, Revision 0, Browns Ferry Unit 2 Cycle 21 In Core Shuffle, Calculation

File, Tennessee Valley Authority, February 2019.

Methodology References 6.

XN-NF-81-58(P)(A) Revision 2 and Supplements 1 and 2, RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model, Exxon Nuclear Company, March 1984.

7.

XN-NF-85-67(P)(A) Revision 1, Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel, Exxon Nuclear Company, September 1986.

8.

EMF-85-74(P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model, Siemens Power Corporation, February 1998.

9.

ANF-89-98(P)(A) Revision 1 and Supplement 1, Generic Mechanical Design Criteria for BWR Fuel Designs, Advanced Nuclear Fuels Corporation, May 1995.

10.

XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis, Exxon Nuclear Company, March 1983.

11.

XN-NF-80-19(P)(A) Volume 4 Revision 1, Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads, Exxon Nuclear Company, June 1986.

12.

EMF-2158(P)(A) Revision 0, Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2, Siemens Power Corporation, October 1999.

13.

XN-NF-80-19(P)(A) Volume 3 Revision 2, Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description, Exxon Nuclear Company, January 1987.

14.

XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis, Exxon Nuclear Company, February 1987.

15.

ANP-10307PA, Revision 0, AREVA MCPR Safety Limit Methodology for Boiling Water Reactors, AREVA NP Inc., June 2011.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page ix Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

16.

ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3 and 4, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses, Advanced Nuclear Fuels Corporation, August 1990.

17.

ANF-1358(P)(A) Revision 3, The Loss of Feedwater Heating Transient in Boiling Water Reactors, Advanced Nuclear Fuels Corporation, September 2005.

18.

EMF-2209(P)(A) Revision 3, SPCB Critical Power Correlation, AREVA NP Inc.,

September 2009.

19.

EMF-2361(P)(A) Revision 0, EXEM BWR-2000 ECCS Evaluation Model, Framatome ANP Inc., May 2001, as supplemented by the site specific approval in NRC safety evaluation dated February 15, 2013 and July 31, 2014.

20.

EMF-2292(P)(A) Revision 0, ATRIUM'-10: Appendix K Spray Heat Transfer Coefficients, Siemens Power Corporation, September 2000.

21.

EMF-CC-074(P)(A), Volume 4, Revision 0, BWR Stability Analysis: Assessment of STAIF with Input from MICROBURN-B2, Siemens Power Corporation, August 2000.

22.

BAW-10255(P)(A), Revision 2, Cycle-Specific DIVOM Methodology Using the RAMONA5-FA Code, AREVA NP Inc., May 2008.

23.

BAW-10247PA, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, AREVA NP Inc., April 2008.

24.

ANP-10298PA, Revision 0, ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc., March 2010.

25.

ANP-3140(P), Revision 0, Browns Ferry Units 1, 2, and 3 Improved K-factor Model for ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc.,

August 2012.

26.

NEDC-33075P-A, Revision 8, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density, GE Hitachi, November 2013.

Setpoint References

27.

EDQ2092900118, R35, Setpoint and Scaling Calculation for Neutron Monitoring &

Recirculation Flow Loops, Calculation File, Tennessee Valley Authority, August 9, 2019.

28.

Task T0500, Revision 0, Neutron Monitoring System w/RBM, Project Task Report, GE Hitachi Nuclear Energy, June 2017.

29.

Task T0506, Revision 0, TS Instrument Setpoints, Project Task Report, Tennessee Valley Authority, August, 2017.

30.

NEDC-33006P-A, Revision 3, General Electric Boiling Water Reactor Maximum Extended Load Line Limit Analysis Plus, GE Energy Nuclear, June 2009.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 1 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 1 Introduction In anticipation of cycle startup, it is necessary to describe the expected limits of operation.

1.1 Purpose The primary purpose of this document is to satisfy requirements identified by unit technical specification section 5.6.5. This document may be provided, upon final approval, to the NRC.

1.2 Scope This document will discuss the following areas:

3/4 Average Planar Linear Heat Generation Rate (APLHGR) Limit (Technical Specifications 3.2.1 and 3.7.5)

Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Linear Heat Generation Rate (LHGR) Limit (Technical Specification 3.2.3, 3.3.4.1, and 3.7.5)

Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Minimum Critical Power Ratio Operating Limit (OLMCPR)

(Technical Specifications 3.2.2, 3.3.4.1, 3.7.5 and Table 3.3.2.1-1)

Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP) 3/4 Thermal-Hydraulic Stability Protection (Technical Specification Table 3.3.1.1)

Applicability: Mode 1, (as specified in Technical Specifications Table 3.3.1.1-1) 3/4 Average Power Range Monitor (APRM) Flow Biased Rod Block Trip Setting (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)

Applicability: Mode 1, (as specified in Technical Requirements Manuals Table 3.3.4-1) 3/4 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)

Applicability: Mode 1, % RTP as specified in Table 3.3.2.1-1 (TS definition of RTP) 3/4 Shutdown Margin (SDM) Limit (Technical Specification 3.1.1)

Applicability: All Modes 1.3 Fuel Loading The core will contain fresh and exposed ATRIUM-10XM, as well as a limited number of ATRIUM-11 lead fuel assemblies. Nuclear fuel types used in the core loading are shown in Table 1.1. The core shuffle and final loading were explicitly evaluated for BOC cold shutdown margin performance as documented per Reference 5.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 2 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 1.1 Nuclear Fuel Types

  • Fuel Description Original Cycle Number of Assemblies Nuclear Fuel Type (NFT)

Fuel Names (Range)

ATRIUM 10XM XMLC-3904B-15GV80-FBF 19 93 15 FBF401-FBF572 ATRIUM 10XM XMLC-4035B-13GV80-FBF 19 58 16 FBF573-FBF652 ATRIUM 11 A11-3693B-13GV80-FBF 19 6

17 FBF653-FBF660 ATRIUM 10XM XMLC-4102B-11GV70-FBG-B 20 48 18 FBG701-FBG748 ATRIUM 10XM XMLC-4062B-13GV80-FBG-C 20 151 19 FBG749-FBG900 ATRIUM 10XM XMLC-3948B-13GV70-FBG-B 20 88 20 FBG901-FBG988 ATRIUM-10XM XMLC-4087B-15GV80-FBH 21 176 21 FBH001-FBH176 ATRIUM-10XM XMLC-4036B-15GV80-FBH 21 88 22 FBH177-FBH264 ATRIUM-10XM XMLC-4093B-10GV80-FBH 21 56 23 FBH265-FBH320 1.4 Acceptability Limits discussed in this document were generated based on NRC approved methodologies per References 6 through 26.

  • The table identifies the expected fuel type breakdown in anticipation of final core loading. The final composition of the core depends upon uncertainties during the outage such as discovering a failed fuel bundle, or other bundle damage. Minor core loading changes, due to unforeseen events, will conform to the safety and monitoring requirements identified in this document.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 3 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 2 APLHGR Limits (Technical Specifications 3.2.1 & 3.7.5)

The APLHGR limit is determined by adjusting the rated power APLHGR limit for off-rated power, off-rated flow, and SLO conditions. The most limiting of these is then used as follows:

APLHGR limit = MIN ( APLHGRP, APLHGRF, APLHGRSLO )

where:

APLHGRP off-rated power APLHGR limit

[APLHGRRATED

  • MAPFACP]

APLHGRF off-rated flow APLHGR limit

[APLHGRRATED

  • MAPFACF]

APLHGRSLO SLO APLHGR limit

[APLHGRRATED

  • SLO Multiplier]

2.1 Rated Power and Flow Limit: APLHGRRATED The rated conditions APLHGR for all fuel are identified per Reference 1. The rated conditions APLHGR for ATRIUM-10XM fuel are shown in Figure 2.1. The rated conditions APLHGR for ATRIUM-11 are shown in Figure 2.2.

2.2 Off-Rated Power Dependent Limit: APLHGRP Reference 1 does not specify a power dependent APLHGR. Therefore, MAPFACP is set to a value of 1.0.

2.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. No additional power dependent limitation is required.

2.3 Off-Rated Flow Dependent Limit: APLHGRF Reference 1 does not specify a flow dependent APLHGR. Therefore, MAPFACF is set to a value of 1.0.

2.4 Single Loop Operation Limit: APLHGRSLO The single loop operation multiplier for ATRIUM-10XM and ATRIUM-11 fuel is 0.85, per Reference 1.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 4 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0 3

6 9

12 15 0

20 40 60 80 APLHGR (kW/ft)

Planar Average Exposure (GWd/MTU)

Planar Avg.

APLHGR Exposure Limit (GWd/MTU)

(kW/ft) 0.0 13.0 15.0 13.0 67.0 7.6 Figure 2.1 APLHGRRATED for ATRIUM-10XM Fuel

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 5 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0 3

6 9

12 15 0

20 40 60 80 APLHGR (kW/ft)

Planar Average Exposure (GWd/MTU)

Planar Avg.

APLHGR Exposure Limit (GWd/MTU)

(kW/ft) 0.0 10 10.0 10 67.0 5.9 Figure 2.2 APLHGRRATED for ATRIUM-11 Fuel

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 6 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 2.5 Equipment Out-Of-Service Corrections The limits shown in Figure 2.1 and Figure 2.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.

In-Service All equipment In-Service

Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS One Recirculation Pump Out-Of-Service

  • All equipment service conditions assume 1 SRVOOS.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 7 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 3 LHGR Limits (Technical Specification 3.2.3, 3.3.4.1, & 3.7.5)

The LHGR limit is determined by adjusting the rated power LHGR limit for off-rated power and off-rated flow conditions. The most limiting of these is then used as follows:

LHGR limit = MIN ( LHGRP, LHGRF )

where:

LHGRP off-rated power LHGR limit

[LHGRRATED

  • LHGRFACP]

LHGRF off-rated flow LHGR limit

[LHGRRATED

  • LHGRFACF]

3.1 Rated Power and Flow Limit: LHGRRATED The rated conditions LHGR for all fuel are identified per Reference 1. The rated conditions LHGR for ATRIUM-10XM are shown in Figure 3.1. The rated conditions LHGR for ATRIUM-11 fuel is shown in Figure 3.2. The LHGR limit is consistent with References 2 and 3.

3.2 Off-Rated Power Dependent Limit: LHGRP LHGR limits are adjusted for off-rated power conditions using the LHGRFACP multiplier provided in Reference 1. The multiplier is split into two sub cases: turbine bypass valves in and out-of-service. The base case multipliers are shown in Figure 3.3 and Figure 3.4.

3.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional limits are shown in Figure 3.7 through Figure 3.10, based on temperature conditions identified in Table 3.1.

Table 3.1 Startup Feedwater Temperature Basis Power Range 1 Range 2

(% Rated)

(°F)

(°F) 23 155.0 150.0 30 162.0 157.0 40 172.0 167.0 50 182.0 177.0 Temperature

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 8 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 3.3 Off-Rated Flow Dependent Limit: LHGRF LHGR limits are adjusted for off-rated flow conditions using the LHGRFACF multiplier provided in Reference 1. Multipliers are shown in Figure 3.5 through Figure 3.6.

3.4 Equipment Out-Of-Service Corrections The limits shown in Figure 3.1 and Figure 3.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.

Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS One Recirculation Pump Out-Of-Service Off-rated power corrections shown in Figure 3.3 and Figure 3.4 are dependent on operation of the Turbine Bypass Valve system. For this reason, separate limits are to be applied for TBVIS or TBVOOS operation. The limits have no dependency on RPTOOS, PLUOOS, FHOOS/FFWTR, or SLO.

Off-rated flow corrections shown in Figure 3.5 and Figure 3.6 are bounding for all EOOS conditions.

Off-rated power corrections shown in Figure 3.7 through Figure 3.10 are also dependent on operation of the Turbine Bypass Valve system. In this case, limits support FHOOS operation during startup. These limits have no dependency on RPTOOS, PLUOOS, or SLO.

  • All equipment service conditions assume 1 SRVOOS.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 9 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0 3

6 9

12 15 0

20 40 60 80 LHGR (kW/ft)

Pellet Exposure (GWd/MTU)

Pellet LHGR Exposure Limit (GWd/MTU)

(kW/ft) 0.0 14.1 18.9 14.1 74.4 7.4 Figure 3.1 LHGRRATED for ATRIUM-10XM Fuel

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 10 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0 3

6 9

12 15 0

20 40 60 80 LHGR (kW/ft)

Pellet Exposure (GWd/MTU)

Pellet LHGR Exposure Limit (GWd/MTU)

(kW/ft) 0.0 12.2 18.9 12.2 74.4 6.4 Figure 3.2 LHGRRATED for ATRIUM-11 Fuel

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 11 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)

Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP

(% Rated)

(% Rated) 100.0 1.00 100.0 1.00 26.0 0.61 26.0 0.60 26.0 0.44 26.0 0.38 23.0 0.42 23.0 0.34 26.0 0.48 26.0 0.48 23.0 0.45 23.0 0.43 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated

&RUH)ORZ5DWHG

&RUH)ORZ5DWHG Figure 3.3 Base Operation LHGRFACP for ATRIUM-10XM Fuel (Independent of other EOOS conditions)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 12 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)

Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP

(% Rated)

(% Rated) 100.0 1.00 100.0 1.00 26.0 0.61 26.0 0.60 26.0 0.44 26.0 0.38 23.0 0.42 23.0 0.34 26.0 0.48 26.0 0.48 23.0 0.45 23.0 0.43 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated

&RUH)ORZ5DWHG

&RUH)ORZ5DWHG Figure 3.4 Base Operation LHGRFACP for ATRIUM-11 Fuel (Independent of other EOOS conditions)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 13 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10 25 35 45 55 65 75 85 95 105 LHGRFACF Core Flow (% Rated)

Core Flow LHGRFACF

(% Rated) 0.0 0.62 30.0 0.62 76.7 1.00 107.0 1.00 Figure 3.5 LHGRFACF for ATRIUM-10XM Fuel (Values bound all EOOS conditions)

(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 14 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10 25 35 45 55 65 75 85 95 105 LHGRFACF Core Flow (% Rated)

Core Flow LHGRFACF

(% Rated) 0.0 0.66 30.0 0.66 73.7 1.00 107.0 1.00 Figure 3.6 LHGRFACF for ATRIUM-11 Fuel (Values bound all EOOS conditions)

(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 15 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)

Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP

(% Rated)

(% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 26.0 0.39 26.0 0.34 23.0 0.36 23.0 0.31 26.0 0.41 26.0 0.41 23.0 0.41 23.0 0.38 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated

&RUH)ORZ5DWHG

&RUH)ORZ5DWHG Figure 3.7 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:

Table 3.1 Temperature Range 1 (no Feedwater heating during startup)

(Limits valid at and below 50% power)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 16 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)

Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP

(% Rated)

(% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 26.0 0.39 26.0 0.34 23.0 0.35 23.0 0.30 26.0 0.41 26.0 0.41 23.0 0.40 23.0 0.38 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated

&RUH)ORZ5DWHG

&RUH)ORZ5DWHG Figure 3.8 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:

Table 3.1 Temperature Range 2 (no Feedwater heating during startup)

(Limits valid at and below 50% power)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 17 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)

Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP

(% Rated)

(% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 26.0 0.39 26.0 0.34 23.0 0.36 23.0 0.31 26.0 0.41 26.0 0.41 23.0 0.41 23.0 0.38 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated

&RUH)ORZ5DWHG

&RUH)ORZ5DWHG Figure 3.9 Startup Operation LHGRFACP for ATRIUM-11 Fuel:

Table 3.1 Temperature Range 1 (no Feedwater heating during startup)

(Limits valid at and below 50% power)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 18 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 20 30 40 50 60 70 80 90 100 110 LHGRFACP Core Power (% Rated)

Turbine Bypass Valve Out-of-Service, TBVOOS Turbine Bypass Valve In-Service, TBVIS TBVIS, > 50% Core Flow 7%9,6 &RUH)ORZ TBVOOS, > 50% Core Flow 7%9226 &RUH)ORZ Core Core Power LHGRFACP Power LHGRFACP

(% Rated)

(% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 26.0 0.39 26.0 0.34 23.0 0.35 23.0 0.30 26.0 0.41 26.0 0.41 23.0 0.40 23.0 0.38 Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Flow > 50% Rated Core Flow > 50% Rated

&RUH)ORZ5DWHG

&RUH)ORZ5DWHG Figure 3.10 Startup Operation LHGRFACP for ATRIUM-11 Fuel:

Table 3.1 Temperature Range 2 (no Feedwater heating during startup)

(Limits valid at and below 50% power)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 19 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 4 OLMCPR Limits (Technical Specification 3.2.2, 3.3.4.1, & 3.7.5)

OLMCPR is calculated to be the most limiting of the flow or power dependent values OLMCPR limit = MAX ( MCPRF, MCPRP )

where:

MCPRF core flow-dependent MCPR limit MCPRP power-dependent MCPR limit 4.1 Flow Dependent MCPR Limit: MCPRF MCPRF limits are dependent upon core flow (% of Rated), and the max core flow limit, (Rated or Increased Core Flow, ICF). MCPRF limits are shown in Figure 4.1, per Reference 1. Limits are valid for all EOOS combinations. No adjustment is required for SLO conditions.

4.2 Power Dependent MCPR Limit: MCPRP MCPRP limits are dependent upon:

Core Power Level (% of Rated)

Technical Specification Scram Speed (TSSS), Nominal Scram Speed (NSS), or Optimum Scram Speed (OSS)

Cycle Operating Exposure (NEOC, EOC, and CD - as defined in this section)

Equipment Out-Of-Service Options Two or Single recirculation Loop Operation (TLO vs. SLO)

The MCPRP limits are provided in Table 4.2 through Table 4.9, where each table contains the limits for all fuel types and EOOS options (for a specified scram speed and exposure range).

The CMSS determines MCPRP limits, from these tables, based on linear interpolation between the specified powers.

4.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional power dependent limits are shown in Table 4.5 through Table 4.8 based on temperature conditions identified in Table 3.1.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 20 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 4.2.2 Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS)

MCPRP limits are provided for three different sets of assumed scram speeds. The Technical Specification Scram Speed (TSSS) MCPRP limits are applicable at all times, as long as the scram time surveillance demonstrates the times in Technical Specification Table 3.1.4-1 are met. Both Nominal Scram Speeds (NSS) and/or Optimum Scram Speeds (OSS) may be used, as long as the scram time surveillance demonstrates Table 4.1 times are applicable.

  • Table 4.1 Nominal Scram Time Basis Notch Nominal Optimum Position Scram Timing Scram Timing (index)

(seconds)

(seconds) 46 0.420 0.380 36 0.980 0.875 26 1.600 1.465 6

2.900 2.900 In demonstrating compliance with the NSS and/or OSS scram time basis, surveillance requirements from Technical Specification 3.1.4 apply; accepting the definition of SLOW rods should conform to scram speeds shown in Table 4.1. If conformance is not demonstrated, TSSS based MCPRP limits are applied.

On initial cycle startup, TSSS limits are used until the successful completion of scram timing confirms NSS and/or OSS based limits are applicable.

4.2.3 Exposure Dependent Limits Exposures are tracked on a Core Average Exposure basis (CAVEX, not Cycle Exposure).

Higher exposure MCPRP limits are always more limiting and may be used for any Core Average Exposure up to the ending exposure. Per Reference 1, MCPRP limits are provided for the following exposure ranges:

BOC to NEOC NEOC corresponds to 29,301.9 MWd / MTU BOC to EOCLB EOCLB corresponds to 34,230.7 MWd / MTU BOC to End of Coast End of Coast 35,897.6 MWd / MTU NEOC refers to a Near EOC exposure point.

  • Reference 1 analysis results are based on information identified in Reference 4.

Drop out times consistent with method used to perform actual timing measurements (i.e., including pickup/dropout effects).

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 21 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

The EOCLB exposure point is not the true End-Of-Cycle exposure. Instead it corresponds to a licensing exposure window exceeding expected end-of-full-power-life.

The End of Coast exposure point represents a licensing exposure point exceeding the expected end-of-cycle exposure including cycle extension options.

4.2.4 Equipment Out-Of-Service (EOOS) Options EOOS options

  • covered by MCPRP limits are given by the following:

In-Service All equipment In-Service RPTOOS EOC-Recirculation Pump Trip Out-Of-Service TBVOOS Turbine Bypass Valve(s) Out-Of-Service RPTOOS+TBVOOS Combined RPTOOS and TBVOOS PLUOOS Power Load Unbalance Out-Of-Service PLUOOS+RPTOOS Combined PLUOOS and RPTOOS PLUOOS+TBVOOS Combined PLUOOS and TBVOOS PLUOOS+TBVOOS+RPTOOS Combined PLUOOS, RPTOOS, and TBVOOS FHOOS (or FFWTR)

Feedwater Heaters Out-Of-Service (or Final Feedwater Temperature Reduction)

RCPOOS One Recirculation Pump Out-Of-Service For exposure ranges up to NEOC and EOCLB, additional combinations of MCPRP limits are also provided including FHOOS. The coast down exposure range assumes application of FFWTR. FHOOS based MCPRP limits for the coast down exposure are redundant because the temperature setdown assumption is identical with FFWTR.

4.2.5 Single-Loop-Operation (SLO) Limits When operating in RCPOOS conditions, MCPRp limits are constructed differently from the normal operating RCP conditions. The limiting event for RCPOOS is a pump seizure scenario, which sets the upper bound for allowed core power and flow. This event is not impacted by scram time assumptions. Specific MCPRP limits are shown in Table 4.9.

4.2.6 Below Pbypass Limits Below Pbypass (26% rated power), MCPRP limits depend upon core flow. One set of MCPRP limits applies for core flow above 50% of rated; a second set applies if the core flow is less than or equal to 50% rated.

  • All equipment service conditions assume 1 SRVOOS.

RCPOOS limits are only valid up to 43.75% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 22 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 1.00 1.20 1.40 1.60 1.80 2.00 30 40 50 60 70 80 90 100 110 MCPRF Core Flow (% Rated)

Core Flow MCPRF

(% Rated) 30.0 1.58 84.0 1.34 107.0 1.34 Figure 4.1 MCPRF for All Fuel Types (Values bound all EOOS conditions)

(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 23 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.2 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.37 1.41 1.43 1.37 1.43 1.43 90 1.42 1.45 1.48 1.42 1.46 1.48 65 1.59 1.59 1.64 1.59 1.59 1.64

> 50 1.70 1.70 1.77 1.73 1.73 1.81 50 1.81 1.81 1.81 1.91 1.91 1.91 40 1.88 1.88 1.94 1.99 1.99 2.03 26 2.30 2.30 2.42 2.51 2.51 2.66 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05

DW)

2.42 2.42 2.51 2.63 2.63 2.72

DW)

2.55 2.55 2.67 2.93 2.93 3.05 100 1.42 1.43 1.42 1.43 90 1.48 1.48 1.48 1.48 65 1.64 1.64 1.64 1.64

> 50 1.77 1.77 1.81 1.81 50 1.81 1.81 1.91 1.91 40 1.94 1.94 2.03 2.03 26 2.42 2.42 2.66 2.66 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05

DW)

2.51 2.51 2.72 2.72

DW)

2.67 2.67 3.05 3.05 ATRIUM-11 Operating Condition Base Case FHOOS ATRIUM-10XM

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR/FHOOS is supported for the BOC to End of Coast limits.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 24 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.41 1.42 1.50 1.41 1.44 1.50 90 1.46 1.46 1.55 1.46 1.47 1.55 65 1.61 1.61 1.72 1.61 1.61 1.72

> 50 1.73 1.73 1.84 1.76 1.76 1.84 50 1.81 1.81 1.85 1.92 1.92 1.92 40 1.88 1.88 2.00 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05

DW)

2.42 2.42 2.51 2.63 2.63 2.72

DW)

2.55 2.55 2.67 2.93 2.93 3.05 100 1.45 1.48 1.54 1.46 1.49 1.54 90 1.50 1.51 1.59 1.50 1.52 1.59 65 1.65 1.65 1.75 1.65 1.65 1.75

> 50 1.76 1.76 1.78 1.78 1.87 50 1.82 1.82 1.87 1.92 1.92 1.92 40 1.90 1.90 2.03 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69

DW)

2.78 2.78 2.90 3.04 3.04 3.16

DW)

3.04 3.04 3.18 3.32 3.32 3.56 100 1.50 1.50 1.50 1.50 90 1.55 1.55 1.55 1.55 65 1.72 1.72 1.72 1.72

> 50 1.84 1.84 1.84 1.84 50 1.85 1.85 1.92 1.92 40 2.00 2.00 2.06 2.06 26 2.45 2.45 2.69 2.69 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05

DW)

2.51 2.51 2.72 2.72

DW)

2.67 2.67 3.05 3.05 100 1.41 1.42 1.50 1.41 1.44 1.50 90 1.46 1.46 1.55 1.46 1.47 1.55 65 1.73 1.73 1.77 1.83 1.83 1.83

> 50 50 1.81 1.81 1.85 1.92 1.92 1.92 40 1.88 1.88 2.00 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05

DW)

2.42 2.42 2.51 2.63 2.63 2.72

DW)

2.55 2.55 2.67 2.93 2.93 3.05 ATRIUM-10XM ATRIUM-11 Operating Condition Base Case TBVOOS FHOOS PLUOOS

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 25 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis (continued)

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.54 1.54 1.54 1.54 90 1.59 1.59 1.59 1.59 65 1.75 1.75 1.75 1.75

> 50 1.87 1.87 50 1.87 1.87 1.92 1.92 40 2.03 2.03 2.06 2.06 26 2.45 2.45 2.69 2.69 26 at > 50%F 3.23 3.23 3.38 3.38 23 at > 50%F 3.47 3.47 3.69 3.69

DW)

2.90 2.90 3.16 3.16

DW)

3.18 3.18 3.56 3.56 100 1.45 1.48 1.54 1.46 1.49 1.54 90 1.50 1.51 1.59 1.50 1.52 1.59 65 1.74 1.74 1.79 1.83 1.83 1.83

> 50 50 1.82 1.82 1.87 1.92 1.92 1.92 40 1.90 1.90 2.03 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69

DW)

2.78 2.78 2.90 3.04 3.04 3.16

DW)

3.04 3.04 3.18 3.32 3.32 3.56 100 1.50 1.50 1.50 1.50 90 1.55 1.55 1.55 1.55 65 1.77 1.77 1.83 1.83

> 50 50 1.85 1.85 1.92 1.92 40 2.00 2.00 2.06 2.06 26 2.45 2.45 2.69 2.69 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05

DW)

2.51 2.51 2.72 2.72

DW)

2.67 2.67 3.05 3.05 100 1.54 1.54 1.54 1.54 90 1.59 1.59 1.59 1.59 65 1.79 1.79 1.83 1.83

> 50 50 1.87 1.87 1.92 1.92 40 2.03 2.03 2.06 2.06 26 2.45 2.45 2.69 2.69 26 at > 50%F 3.23 3.23 3.38 3.38 23 at > 50%F 3.47 3.47 3.69 3.69

DW)

2.90 2.90 3.16 3.16

DW)

3.18 3.18 3.56 3.56 ATRIUM-10XM ATRIUM-11 TBVOOS FHOOS TBVOOS PLUOOS FHOOS PLUOOS TBVOOS FHOOS PLUOOS Operating Condition

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 26 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.47 1.47 1.56 1.47 1.47 1.56 90 1.52 1.52 1.61 1.52 1.52 1.61 65 1.67 1.67 1.78 1.67 1.67 1.78

> 50 1.78 1.78 1.79 1.79 1.90 50 1.84 1.84 1.90 1.93 1.93 1.93 40 1.93 1.93 2.06 2.01 2.01 2.08 26 2.35 2.35 2.47 2.57 2.57 2.72 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05

DW)

2.42 2.42 2.51 2.63 2.63 2.72

DW)

2.55 2.55 2.67 2.93 2.93 3.05 100 1.53 1.53 1.60 1.53 1.53 1.60 90 1.57 1.57 1.65 1.57 1.57 1.65 65 1.74 1.74 1.82 1.74 1.74 1.82

> 50 1.83 1.83 1.83 1.83 50 1.87 1.87 1.93 1.93 1.93 1.93 40 1.97 1.97 2.08 2.01 2.01 2.09 26 2.36 2.36 2.49 2.57 2.57 2.72 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69

DW)

2.78 2.78 2.90 3.04 3.04 3.16

DW)

3.04 3.04 3.18 3.32 3.32 3.56 100 1.56 1.56 1.56 1.56 90 1.61 1.61 1.61 1.61 65 1.78 1.78 1.78 1.78

> 50 1.90 1.90 50 1.90 1.90 1.93 1.93 40 2.06 2.06 2.08 2.08 26 2.47 2.47 2.72 2.72 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05

DW)

2.51 2.51 2.72 2.72

DW)

2.67 2.67 3.05 3.05 100 1.47 1.47 1.56 1.47 1.47 1.56 90 1.52 1.52 1.61 1.52 1.52 1.61 65 1.76 1.76 1.81 1.84 1.84 1.84

> 50 50 1.84 1.84 1.90 1.93 1.93 1.93 40 1.93 1.93 2.06 2.01 2.01 2.08 26 2.35 2.35 2.47 2.57 2.57 2.72 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05

DW)

2.42 2.42 2.51 2.63 2.63 2.72

DW)

2.55 2.55 2.67 2.93 2.93 3.05 ATRIUM-10XM ATRIUM-11 Operating Condition Base Case TBVOOS FHOOS PLUOOS

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 27 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis (continued)

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.60 1.60 1.60 1.60 90 1.65 1.65 1.65 1.65 65 1.82 1.82 1.82 1.82

> 50 50 1.93 1.93 1.93 1.93 40 2.08 2.08 2.09 2.09 26 2.49 2.49 2.72 2.72 26 at > 50%F 3.23 3.23 3.38 3.38 23 at > 50%F 3.47 3.47 3.69 3.69

DW)

2.90 2.90 3.16 3.16

DW)

3.18 3.18 3.56 3.56 100 1.53 1.53 1.60 1.53 1.53 1.60 90 1.57 1.57 1.65 1.57 1.57 1.65 65 1.79 1.79 1.83 1.84 1.84 1.84

> 50 50 1.87 1.87 1.93 1.93 1.93 1.93 40 1.97 1.97 2.08 2.01 2.01 2.09 26 2.36 2.36 2.49 2.57 2.57 2.72 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69

DW)

2.78 2.78 2.90 3.04 3.04 3.16

DW)

3.04 3.04 3.18 3.32 3.32 3.56 100 1.56 1.56 1.56 1.56 90 1.61 1.61 1.61 1.61 65 1.81 1.81 1.84 1.84

> 50 50 1.90 1.90 1.93 1.93 40 2.06 2.06 2.08 2.08 26 2.47 2.47 2.72 2.72 26 at > 50%F 2.65 2.65 2.81 2.81 23 at > 50%F 2.81 2.81 3.05 3.05

DW)

2.51 2.51 2.72 2.72

DW)

2.67 2.67 3.05 3.05 100 1.60 1.60 1.60 1.60 90 1.65 1.65 1.65 1.65 65 1.83 1.83 1.84 1.84

> 50 50 1.93 1.93 1.93 1.93 40 2.08 2.08 2.09 2.09 26 2.49 2.49 2.72 2.72 26 at > 50%F 3.23 3.23 3.38 3.38 23 at > 50%F 3.47 3.47 3.69 3.69

DW)

2.90 2.90 3.16 3.16

DW)

3.18 3.18 3.56 3.56 ATRIUM-10XM ATRIUM-11 TBVOOS FHOOS TBVOOS PLUOOS FHOOS PLUOOS TBVOOS FHOOS PLUOOS Operating Condition

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 28 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.5 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Nominal Scram Time Basis

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.50 1.50 1.50 1.50 1.50 1.50 90 1.55 1.55 1.55 1.55 1.55 1.55 65 1.77 1.77 1.77 1.83 1.83 1.83

> 50 50 1.98 1.98 1.98 2.02 2.02 2.02 40 2.18 2.18 2.18 2.29 2.29 2.29 26 2.77 2.77 2.77 3.07 3.07 3.07 26 at > 50%F 3.06 3.06 3.06 3.12 3.12 3.12 23 at > 50%F 3.15 3.15 3.15 3.42 3.42 3.42

DW)

2.79 2.79 2.79 3.07 3.07 3.07

DW)

3.01 3.01 3.01 3.37 3.37 3.37 100 1.54 1.54 1.54 1.54 1.54 1.54 90 1.59 1.59 1.59 1.59 1.59 1.59 65 1.79 1.79 1.79 1.83 1.83 1.83

> 50 50 2.00 2.00 2.00 2.02 2.02 2.02 40 2.20 2.20 2.20 2.29 2.29 2.29 26 2.77 2.77 2.77 3.07 3.07 3.07 26 at > 50%F 3.55 3.55 3.55 3.60 3.60 3.60 23 at > 50%F 3.71 3.71 3.71 4.00 4.00 4.00

DW)

3.14 3.14 3.14 3.39 3.39 3.39

DW)

3.45 3.45 3.45 3.89 3.89 3.89 ATRIUM-11 Operating Condition TBVIS TBVOOS ATRIUM-10XM

  • Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

Limits are applicable for all other EOOS scenarios, apart from TBV.

Limits are only valid up to 50% rated core power.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 29 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.6 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Nominal Scram Time Basis

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.50 1.50 1.50 1.50 1.50 1.50 90 1.55 1.55 1.55 1.55 1.55 1.55 65 1.77 1.77 1.77 1.83 1.83 1.83

> 50 50 1.99 1.99 1.99 2.02 2.02 2.02 40 2.19 2.19 2.19 2.30 2.30 2.30 26 2.79 2.79 2.79 3.09 3.09 3.09 26 at > 50%F 3.09 3.09 3.09 3.14 3.14 3.14 23 at > 50%F 3.17 3.17 3.17 3.44 3.44 3.44

DW)

2.81 2.81 2.81 3.09 3.09 3.09

DW)

3.03 3.03 3.03 3.39 3.39 3.39 100 1.54 1.54 1.54 1.54 1.54 1.54 90 1.59 1.59 1.59 1.59 1.59 1.59 65 1.79 1.79 1.79 1.83 1.83 1.83

> 50 50 2.01 2.01 2.01 2.02 2.02 2.02 40 2.21 2.21 2.21 2.30 2.30 2.30 26 2.79 2.79 2.79 3.09 3.09 3.09 26 at > 50%F 3.58 3.58 3.58 3.62 3.62 3.62 23 at > 50%F 3.73 3.73 3.73 4.02 4.02 4.02

DW)

3.15 3.15 3.15 3.40 3.40 3.40

DW)

3.46 3.46 3.46 3.90 3.90 3.90 ATRIUM-11 Operating Condition TBVIS TBVOOS ATRIUM-10XM

  • Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

Limits are applicable for all other EOOS scenarios, apart from TBV.

Limits are only valid up to 50% rated core power.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 30 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.7 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Technical Specification Scram Time Basis

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.56 1.56 1.56 1.56 1.56 1.56 90 1.61 1.61 1.61 1.61 1.61 1.61 65 1.81 1.81 1.81 1.84 1.84 1.84

> 50 50 2.03 2.03 2.03 2.04 2.04 2.04 40 2.23 2.23 2.23 2.32 2.32 2.32 26 2.79 2.79 2.79 3.10 3.10 3.10 26 at > 50%F 3.06 3.06 3.06 3.12 3.12 3.12 23 at > 50%F 3.15 3.15 3.15 3.42 3.42 3.42

DW)

2.79 2.79 2.79 3.10 3.10 3.10

DW)

3.01 3.01 3.01 3.40 3.40 3.40 100 1.60 1.60 1.60 1.60 1.60 1.60 90 1.65 1.65 1.65 1.65 1.65 1.65 65 1.83 1.83 1.83 1.84 1.84 1.84

> 50 50 2.05 2.05 2.05 2.05 2.05 2.05 40 2.25 2.25 2.25 2.32 2.32 2.32 26 2.79 2.79 2.79 3.10 3.10 3.10 26 at > 50%F 3.55 3.55 3.55 3.60 3.60 3.60 23 at > 50%F 3.71 3.71 3.71 4.00 4.00 4.00

DW)

3.14 3.14 3.14 3.39 3.39 3.39

DW)

3.45 3.45 3.45 3.89 3.89 3.89 ATRIUM-11 Operating Condition TBVIS TBVOOS ATRIUM-10XM

  • Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

Limits are applicable for all other EOOS scenarios, apart from TBV.

Limits are only valid up to 50% rated core power.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 31 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.8 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Technical Specification Scram Time Basis

  • BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of

(% of rated)

NEOC EOCLB Coast NEOC EOCLB Coast 100 1.56 1.56 1.56 1.56 1.56 1.56 90 1.61 1.61 1.61 1.61 1.61 1.61 65 1.81 1.81 1.81 1.84 1.84 1.84

> 50 50 2.04 2.04 2.04 2.05 2.05 2.05 40 2.24 2.24 2.24 2.33 2.33 2.33 26 2.81 2.81 2.81 3.12 3.12 3.12 26 at > 50%F 3.09 3.09 3.09 3.14 3.14 3.14 23 at > 50%F 3.17 3.17 3.17 3.44 3.44 3.44

DW)

2.81 2.81 2.81 3.12 3.12 3.12

DW)

3.03 3.03 3.03 3.42 3.42 3.42 100 1.60 1.60 1.60 1.60 1.60 1.60 90 1.65 1.65 1.65 1.65 1.65 1.65 65 1.83 1.83 1.83 1.84 1.84 1.84

> 50 50 2.06 2.06 2.06 2.06 2.06 2.06 40 2.26 2.26 2.26 2.33 2.33 2.33 26 2.81 2.81 2.81 3.12 3.12 3.12 26 at > 50%F 3.58 3.58 3.58 3.62 3.62 3.62 23 at > 50%F 3.73 3.73 3.73 4.02 4.02 4.02

DW)

3.15 3.15 3.15 3.40 3.40 3.40

DW)

3.46 3.46 3.46 3.90 3.90 3.90 ATRIUM-11 Operating Condition TBVIS TBVOOS ATRIUM-10XM

  • Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

Limits are applicable for all other EOOS scenarios, apart from TBV.

Limits are only valid up to 50% rated core power.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 32 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 4.9 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times

  • Pow er

(% of rated)

ATRIUM-10XM ATRIUM-11 100 2.02 2.05 43.75 2.02 2.05 40 2.08 2.10 26 2.49 2.74 26 at > 50%F 2.67 2.83 23 at > 50%F 2.83 3.07

DW)

2.53 2.74

DW)

2.69 3.07 100 2.05 2.05 43.75 2.05 2.05 40 2.10 2.11 26 2.51 2.74 26 at > 50%F 3.25 3.40 23 at > 50%F 3.49 3.71

DW)

2.92 3.18

DW)

3.20 3.58 100 2.20 2.24 43.75 2.20 2.24 40 2.27 2.34 26 2.81 3.12 26 at > 50%F 3.57 3.62 23 at > 50%F 3.73 4.02

DW)

3.16 3.41

DW)

3.47 3.91 100 2.21 2.25 43.75 2.21 2.25 40 2.28 2.35 26 2.83 3.14 26 at > 50%F 3.60 3.64 23 at > 50%F 3.75 4.04

DW)

3.17 3.42

DW)

3.48 3.92 RCPOOS TBVOOS FHOOS2 All Cycle Exposures Operating Condition RCPOOS FHOOS RCPOOS TBVOOS PLUOOS FHOOS RCPOOS TBVOOS FHOOS1

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop.

RCPOOS limits are only valid up to 50% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 33 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 5 Thermal-Hydraulic Stability Protection (Technical Specification 3.3.1.1)

Technical Specification Table 3.3.1.1-1, Function 2f, identifies the function.

Instrument setpoints are established, such that the reactor will be tripped before an oscillation can grow to the point where the SLMCPR is exceeded. With application of Reference 30, the DSS-CD stability solution will be used per Reference 26. The DSS-CD SAD setpoint is 1.10 for TLO and SLO.

New analyses have been developed based on Reference 26. With the implementation of the MELLLA+ operating domain expansion, an ABSP trip is required when the OPRM is out-of-service. The ABSP trip settings define a region of the power to flow map within which an automatic reactor scram occurs. The ABSP trip settings are provided in Table 5.1. If both the OPRM and ABSP are out-of-service, operation within the MELLLA+ domain is not allowed and the MBSP Regions provide stability protection. Table 5.2 and Table 5.3 provide the endpoints for the MBSP regions for nominal and reduced feedwater temperature conditions.

Table 5.1 ABSP Setpoints for the Scram Region Parameter Symbol Setting Value (unit)

Comments Slope for Trip mTRIP 2.00 (% RTP/% RDF)

Slope of ABSP APRM low Flow Biased Trip Linear Segment Constant Power Line for Trip PBSP-TRIP 35.0 (% RTP)

ABSP APRM Flow Biased Trip Setpoint Power Intercept. Constant Power Line for Trip from Zero Drive Flow to Flow Breakpoint Value Constant Flow Line for Trip WBSP-TRIP 49 (% RDF)

ABSP APRM Flow Biased Trip Setpoint Drive Flow Intercept. Constant Flow Line for Trip (see Note 1 below)

Flow Breakpoint WBSP-BREAK 30.0 (% RDF)

Flow Breakpoint Value Note 1: WBSP-TRIP can be set to 49.0 % RDF or any higher value up to the intersection of the ABSP sloped line with the APRM Flow Biased STP scram line.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 34 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 5.2 Analyzed MBSP Endpoints: Nominal Feedwater Temperature Endpoint Power

(% Rated)

Core Flow

(% Rated)

Definition A1 75.9 52.7 Scram Region (Region I)

Boundary Intercept on MELLLA+ Line B1 35.5 29 Scram Region (Region I)

Boundary Intercept on Natural Circulation Line (NCL)

A2 66.1 52 Controlled Entry Region (Region II) Boundary Intercept on MELLLA Line B2 25.5 29 Controlled Entry Region (Region II) Boundary Intercept on Natural Circulation Line (NCL)

Table 5.3 Analyzed MBSP Endpoints: Reduced Feedwater Temperature Endpoint Power

(% Rated)

Core Flow

(% Rated)

Definition A1 64.9 50.5 Scram Region (Region I)

Boundary Intercept on MELLLA Line B1 29.4 29 Scram Region (Region I)

Boundary Intercept on Natural Circulation Line (NCL)

A2 68.3 54.9 Controlled Entry Region (Region II) Boundary Intercept on MELLLA Line B2 24.5 29 Controlled Entry Region (Region II) Boundary Intercept on Natural Circulation Line (NCL)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 35 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 6 APRM Flow Biased Rod Block Trip Settings (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)

The APRM rod block trip setting is based upon References 27 & 29, and is defined by the following:

for two loop operation:

SRB d (0.61Wd + 63.3)

Allowable Value SRB d (0.61Wd + 62.0)

Nominal Trip Setpoint (NTSP) where:

SRB

=

Rod Block setting in percent of rated thermal power (3952 MWt)

Wd

=

Recirculation drive flow rate in percent of rated (100% drive flow required to achieve 100% core power and flow) and for single loop operation:

SRB d (0.55(Wd-'W) + 60.5)

Allowable Value SRB d (0.55(Wd-'W) + 58.5)

Nominal Trip Setpoint (NTSP) where:

SRB

=

Rod Block setting in percent of rated thermal power (3952 MWt)

Wd

=

Recirculation drive flow rate in percent of rated (100% drive flow required to achieve 100% core power and flow)

'W

=

Difference between two-loop and single-loop effective recirculation flow at the same core flow ('W=0.0 for two-loop operation)

The APRM rod block trip setting is clamped at a maximum allowable value of 115%

(corresponding to a NTSP of 113%).

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 36 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 7 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)

The RBM trip setpoints and applicable power ranges, based on References 27 & 28, are shown in Table 7.1. Setpoints are based on an HTSP, unfiltered analytical limit of 114%. Unfiltered setpoints are consistent with a nominal RBM filter setting of 0.0 seconds; filtered setpoints are consistent with a nominal RBM filter setting less than 0.5 seconds. Cycle specific CRWE analyses of OLMCPR are documented in Reference 1, superseding values reported in References 27, 28, and 29.

Table 7.1 Analytical RBM Trip Setpoints

  • RBM Trip Setpoint Allowable Value (AV)

Nominal Trip Setpoint (NTSP)

LPSP 27%

25%

IPSP 62%

60%

HPSP 82%

80%

LTSP - unfiltered

- filtered 121.7%

120.7%

120.0%

119.0%

ITSP - unfiltered

- filtered 116.7%

115.7%

115.0%

114.0%

HTSP - unfiltered

- filtered 111.7%

110.9%

110.0%

109.2%

DTSP 90%

92%

As a result of cycle specific CRWE analyses, RBM setpoints in Technical Specification Table 3.3.2.1-1 are applicable as shown in Table 7.2. Cycle specific setpoint analysis results are shown in Table 7.3, per Reference 1.

Table 7.2 RBM Setpoint Applicability Thermal Power

(% Rated)

Applicable MCPR Notes from Table 3.3.2.1-1 Comment 27% and < 90%

< 1.66 (a), (b), (f), (h) two loop operation

< 1.70 (a), (b), (f), (h) single loop operation 90%

< 1.36 (g) two loop operation

  • Values are considered maximums. Using lower values, due to RBM system hardware/software limitations, is conservative, and acceptable.

MCPR values shown correspond with, (support), SLMPCR values identified in Reference 1.

Greater than 90% rated power is not attainable in single loop operation.

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 37 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

Table 7.3 Control Rod Withdrawal Error Results RBM CRWE HTSP Analytical Limit OLMCPR Unfiltered 107 1.29 111 1.32 114 1.33 117 1.34 Results, compared against the base case OLMCPR results of Table 4.2, indicate SLMCPR remains protected for RBM inoperable conditions (i.e., 114% unblocked).

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page 38 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 8 Shutdown Margin Limit (Technical Specification 3.1.1)

Assuming the strongest OPERABLE control blade is fully withdrawn, and all other OPERABLE control blades are fully inserted, the core shall be sub-critical and meet the following minimum shutdown margin:

SDM 0.38% dk/k

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page A-1 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final)

MBSP Maps

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page A-2 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0 10 20 30 40 50 60 70 80 90 100 110 0

10 20 30 40 50 60 70 80 90 100 110 120 Core Flow (% Rated: 100% =102.5 MLbm/hr)

Core Power (% Rated: 100% = 3952MWt)

Natural Circulation MELLLA Region ICF Region 20% Pump Speed Line Min. Pow er Line Min. Flow Control 87.5% Rod Line MELLLA Upper Boundary MELLLA+ Region Manual Scram Region I Controlled Entry Region II BSP Boundary Figure A.1 MBSP Boundaries For Nominal Feedwater Temperature (Operation in the MELLLA+ Region Prohibited for Feedwater Temperature greater than 10 degrees F below the Nominal Feedwater Temperature)

EDMS: L94 200405 800 Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga TN 37402 Date: April 7, 2020 Browns Ferry Unit 2 Cycle 21 Page A-3 Core Operating Limits Report, (120% OLTP, MELLLA+)

TVA-COLR-BF2C21, Revision 1 (Final) 0 10 20 30 40 50 60 70 80 90 100 110 0

10 20 30 40 50 60 70 80 90 100 110 120 Core Flow (% Rated: 100% =102.5 MLbm/hr)

Core Power (% Rated: 100% = 3952MWt)

Natural Circulation MELLLA Region ICF Region 20% Pump Speed Line Min. Pow er Line Min. Flow Control 87.5% Rod Line MELLLA Upper Boundary MELLLA+ Region Controlled Entry Region II Manual Scram Region I BSP Boundary Figure A.2 MBSP Boundaries For Reduced Feedwater Temperature (Operation in the MELLLA+ Region Prohibited for a Reduced Feedwater Temperature greater than 10 degrees F below the Nominal Feedwater Temperature)