ML20132C996: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:..
{{#Wiki_filter:..
      '
'
    ,.,       .
,.,
    f', )       *    k                                  UNITED STATES
.
                                            NUCLEAR REGULATORY COMMISSION
k
                                                                                                    *
UNITED STATES
                                                                                                          .   fjffD
f', )
    E                 ,i                                                                                     "*
NUCLEAR REGULATORY COMMISSION
                                                        WASHuseTON. D. C. 3 essa
fjffD
        'o,,
*
            e                                              APR S9 M5               f   h 85 j                       ,
*
  Dock:Et Nos. 50-206
.
                      50-361                                                       P       %' hOEy
"*
                                                                                            ,            .
E
                                                                                                                        .
,i
                                                                                                                        I
WASHuseTON. D. C. 3 essa
            end 50-362                                                                      '' .
'o,,
                                                                                                        AfG!0/dy
APR S9 M5
                                                                                '
f
                                                                                            Q GOOg
h 85 j
          MEMORANDUM FOR:                Dennis F.E   Ki rsch, Acting Director
e
                  *
,
                    .
%' hOEy
                                          Division of Reactor Safety and Projects
.
                                          Region V
Dock:Et Nos. 50-206
          FROM:                         James G. Partlow, Director
50-361
                                          Division of Inspection Programs
P
                                          Office of Inspection and Enforcement
.
          SUBJECT:                       SAN ONOFRE INSPECTION - POTENTIAL ENFORCEMENT FINDINGS
,
          The enclosed Potential Enforcement Findings (PEFs) (referred to as Unresolved
''
          Items in Inspection Report 50-206/85-12; 50-361/85-09; 50-362/85-08) were
AfG!0/dy
          found during the recent inspection at San Onofre Nuclear Generating Station
end 50-362
          (SONGS) and are provided for your followup. It is requested that
Q GOOg
          these PEFs to the SONGS Open Item List (Region V Tracking System)                   and dispose you add
.
          of them as Unresolved Items.
'
          The following is a summary of the enclosed PEFs:
Dennis F.E rsch, Acting Director
                      a.       Item 50-206/85-12-01.       Failure to correctly calculate the
MEMORANDUM FOR:
                              as-found leakage rate from containment during an integrated
Ki
                              leak rate test.
Division of Reactor Safety and Projects
                      b.       Item 50-361/85-09-03. Failuri to post radiological control
*
                              areas properly.
.
                      c.       Item 50-361/85-09-04. Failure to align properly power
Region V
,                              supply breakers for trains A and B containment spray
FROM:
:                             header isolation valves.
James G. Partlow, Director
Division of Inspection Programs
Office of Inspection and Enforcement
SUBJECT:
SAN ONOFRE INSPECTION - POTENTIAL ENFORCEMENT FINDINGS
The enclosed Potential Enforcement Findings (PEFs) (referred to as Unresolved
Items in Inspection Report 50-206/85-12; 50-361/85-09; 50-362/85-08) were
found during the recent inspection at San Onofre Nuclear Generating Station
(SONGS) and are provided for your followup.
It is requested that
these PEFs to the SONGS Open Item List (Region V Tracking System) you add
and dispose
of them as Unresolved Items.
The following is a summary of the enclosed PEFs:
a.
Item 50-206/85-12-01.
Failure to correctly calculate the
as-found leakage rate from containment during an integrated
leak rate test.
b.
Item 50-361/85-09-03. Failuri to post radiological control
areas properly.
c.
Item 50-361/85-09-04.
Failure to align properly power
supply breakers for trains A and B containment spray
,
:
header isolation valves.
!
!
                      d.       Item 50-361/85,09-07. Failure to conduct the 18-month
d.
                              battery surveillance for Class IE batteries 20007 and
Item 50-361/85,09-07. Failure to conduct the 18-month
                              2B008.         .
battery surveillance for Class IE batteries 20007 and
l                     e.       Item 50-361/85-09-08. Failure to conduct perfonnance
2B008.
                              tests on Units 2 and 3 batteries within two years of
.
                    .          being placed in service.
l
            .-
e.
                  ; f.       Item 362/85-08-01. Failure to conduct required trip te g
Item 50-361/85-09-08. Failure to conduct perfonnance
                              on the Unit 3 steam-driven AFW punp turbine.
tests on Units 2 and 3 batteries within two years of
                          *                                                                      ~
being placed in service.
                i;                                                                                "
.
                                                                                              ..     .
.- ; f.
                            ,.         .
Item 362/85-08-01.
          /                             f
Failure to conduct required trip te g
l             pTW%                                                                                                 27p
i;
*
on the Unit 3 steam-driven AFW punp turbine.
~
"
..
.
,.
.
/
f
l
pTW%
27p
' M , J gw w
'
'
            ' M , J gw w                                                vppu um               ny             mcsgw
vppu um
                                                                                                                  .
ny
mcsgw
.


      - ._
- ._
                . .. .e
. .. .e
    '
'
  .       .
.
.
-
-
              Dennis F. Kirsch                       -2-
Dennis F. Kirsch
                          g. Item 50-36,2/85-08-02. Failure to test properly the' Unit 3 AFW
-2-
                              pumps.                                                     -
g.
                                                                                                ,
Item 50-36,2/85-08-02. Failure to test properly the' Unit 3 AFW
            We tiquest that you keep us informed of your followup on the PEFs.             If you have
pumps.
            ay questions. please contact me or the team' leader. L. J. Callan.
-
                                              Y                     l
,
                  1
We tiquest that you keep us informed of your followup on the PEFs.
                                                        Jame!
If you have
                                                                          h
ay questions. please contact me or the team' leader. L. J. Callan.
                                                                  6. Partlow. Director
Y
                                                          Divil. ion of Inspection Programs
l
                                                        Office of Inspection and Enforcement
h
            Enclosure:
1
            Potential Enforcement Findings
Jame! 6. Partlow. Director
            cc w/ enclosure:
Divil. ion of Inspection Programs
            J. M. Taylor. IE
Office of Inspection and Enforcement
            J. Axelrad. IE
Enclosure:
                                          'r
Potential Enforcement Findings
                                          .
cc w/ enclosure:
                                            e
J. M. Taylor. IE
                  S
J. Axelrad. IE
            W
'r
                    e es *
.
              .. A.
e
                                                                                          ,
S
                                                                                        ..   .
W
                        e
e es
                                                            G to!938 DttlSn           GT:01     G8'91/GO
*
                            bdnn       FMb i                                         _
.. A.
                                                                                                            m- .,
,
.
..
e
G to!938 DttlSn
GT:01
G8'91/GO
bdnn
FMb i
_
m-
.,


                                                                                                        _
.-u
  -               .-u
_
                                                                    *
-
      .   .
*
        '
.
                                                                                                      :
.
    .
'
                                                                                        Enclosure
:
                                                                                  .
.
                                      .
Enclosure
                                                                                              ~
.
                  ,
.
                                            POTENTIAL ENFORCEMENT FINDING
POTENTIAL ENFORCEMENT FINDING
                                                                r
~
              FA'CILITY SAN ONOFRE UNIT 1           DOCKET NO.
,
                                              p                      _50-206         DATE 4/2/85
r
              ARdA
FA'CILITY SAN ONOFRE UNIT 1
                          CONTAINMENT INTEGRATED LEAK TEST
DOCKET NO.
                                                                            ITEM NO. 206/85-12-01
_50-206
              INSPECTOR       S.A. MCNEIL
DATE 4/2/85
                                                                      TEAM LEADER     L.J. CALLAN
p
              REQUIREMENT:
ARdA
              10 CFR Part 50. Appendix J, paragraph III.A.3, requires that all containment
CONTAINMENT INTEGRATED LEAK TEST
              integrated leak rate (Type A) tests be conducted in accordance with the provi-
ITEM NO. 206/85-12-01
            sions of ANSI N45.4-1972.
INSPECTOR
            Paragraph 4.2 of ANSI N45.41972
S.A. MCNEIL
            leak rate test (CILRT) should be conducted before any preparatory repair
TEAM LEADER
            made     in order tostructure.
L.J. CALLAN
            the containment      disclose the normal state of repair (as-found condition) of
REQUIREMENT:
            10 CFR Part 50, Appendix J, paragraph III.A.1, states that in the event of re-
10 CFR Part 50. Appendix J, paragraph III.A.3, requires that all containment
            pairs and/or adjustments (ras) being made to the containment structure prior to
integrated leak rate (Type A) tests be conducted in accordance with the provi-
            perfonning the final CILRT, the change in the local leak rate due to these ras
sions of ANSI N45.4-1972.
            shcIl be determined and that the overall integrated leakage rate shall be deter-
Paragraph 4.2 of ANSI N45.41972
            mined from the local leak rate test (LLRT) results and the CILRT result.
leak rate test (CILRT) should be conducted before any preparatory repair
            FINDING:
made in order to disclose the normal state of repair (as-found condition) of
          Contrary to the above, the licensee perfonned local leak rate tests (Type C) and
the containment structure.
          and       post-repair differential leakage rates to obtain an at-found
10 CFR Part 50, Appendix J, paragraph III.A.1, states that in the event of re-
          tainment leakage.
pairs and/or adjustments (ras) being made to the containment structure prior to
          lowing valve sets: Specifically, pre-CILRT repair work was conducted on the fol-
perfonning the final CILRT, the change in the local leak rate due to these ras
          CV-532 and GNI-102 and CV-957 and CV-962.P07-10 and EVS-313. CV-104 a
shcIl be determined and that the overall integrated leakage rate shall be deter-
                                                          The differential leakage rates for
mined from the local leak rate test (LLRT) results and the CILRT result.
          these valve sets was not factored into the CILRT to detennine the as-found
FINDING:
          dition.
Contrary to the above, the licensee perfonned local leak rate tests (Type C) and
                        Failure of the licensee to calculate the as-found leakage rate from con-
and post-repair differential leakage rates to obtain an at-found
          test in theresulted
tainment leakage.
          tainment        as-foundincondition.
lowing valve sets: Specifically, pre-CILRT repair work was conducted on the fol-
                                      the licensee not realizing that they had failed the Type A
CV-532 and GNI-102 and CV-957 and CV-962.P07-10 and EVS-313. CV-104 a
          .-
The differential leakage rates for
                  *
these valve sets was not factored into the CILRT to detennine the as-found
                                                                                    ..".
dition.
Failure of the licensee to calculate the as-found leakage rate from con-
tainment resulted in the licensee not realizing that they had failed the Type A
test in the as-found condition.
.-
*
. . " .
l
l
                        600         Eco ON             G N0193a caen             9T:01       50/9T60
600
                                                        m ,,,,m., .- w                     -
Eco ON
                                                                                                ---
G N0193a caen
9T:01
50/9T60
m
,,,,m.,
.- w
-
---


            _.a                                                                                                               ,
_.a
                                                                                                                              si
,
  .-     .-                                                                                                                   ll
si
                                                                                                            ,                   l
.-
                                            POTENTIAL ENFORCEMENT FINDING                                                     ,
.-
                                                                                  .
ll
            FACILITY $ANONOFREbNIT2                 DOCKET NO.     50-362           DATE_4/1/85
,
                                                                                                                        .
l
                                                                                      .
POTENTIAL ENFORCEMENT FINDING
                                                                                                                                I
,
            AR,EA       RADIOLOGICAL POSTING
.
                                                                        ITEM NO.       361/85-09-03
FACILITY $ANONOFREbNIT2
                                              P
DOCKET NO.
            INSPECTOR         S.A. MCNEIL
50-362
                                                                    TEAM LEADER     L.J. CALLAN
DATE_4/1/85
            R_EQUIREMENT:
.
                                                                                                                            I
I
            Technical Specification (TS) 6.8.1.a requires that written procedures shall
.
          be   established,
AR,EA
          Appendix             iglementedGuide
RADIOLOGICAL POSTING
                        "A" of Regulatory     and maintained
ITEM NO.
                                                  I.33.     for the procedures reconnended in
361/85-09-03
                                                                                                                          {
P
          Appendix "A" of Regulatory Guide 1.33 section 7.e states that these procedures                                 '
INSPECTOR
          shall include those necessary for radiation protection in access control to
S.A. MCNEIL
          radiation amas and in contamination contrv1.                                                                   i
TEAM LEADER
          Procedure 50121-VII-7.4 Rev 6. " Posting and Access Control," requires that all                                 I
L.J. CALLAN
          signs and/or barricades for radiological area designation be conspicuously
R_EQUIREMENT:
          displayed
I
        an    area. (generally at waist to shoulder level) at all entrance locations to
Technical Specification (TS) 6.8.1.a requires that written procedures shall
        FINDING:                                                                                                         k
be established, iglemented and maintained for the procedures reconnended in
        Contrary     to the instances:
Appendix "A" of Regulatory Guide I.33.
        in the following      above, the posting of radiological control areas was deficient
{
        a.
Appendix "A" of Regulatory Guide 1.33 section 7.e states that these procedures
                  At the storage area adjacent to the Unit 2 makeup water demineralizer, the
shall include those necessary for radiation protection in access control to
                  pieces of radioactive material were stowed outside the ama.                                             ,
'
        b.
radiation amas and in contamination contrv1.
                At the Unit 2 outfall, the radiological posting was obscured at the most
i
                aware of the potential for contamination. accessible entrance, allowing
Procedure 50121-VII-7.4 Rev 6. " Posting and Access Control," requires that all
          '
I
            .
signs and/or barricades for radiological area designation be conspicuously
      e
displayed (generally at waist to shoulder level) at all entrance locations to
                                                                                  .
an area.
                                                                                    ." .
k
              .
FINDING:
    '
Contrary to the above, the posting of radiological control areas was deficient
                      OTO           E00'0H               G WIDM Mg               Oftut       r,0'91 M
in the following instances:
_                      w             t- m Tr] ~ ~                                                     - _ _ _ _ _ _ _ ,
At the storage area adjacent to the Unit 2 makeup water demineralizer, the
a.
pieces of radioactive material were stowed outside the ama.
,
b.
At the Unit 2 outfall, the radiological posting was obscured at the most
aware of the potential for contamination. accessible entrance, allowing  
'
.
e
." .
.
.
OTO
E00'0H
G WIDM Mg
Oftut
r,0'91 M
'
w
t- m Tr] ~ ~
- _ _ _ _ _ _ _ ,


~ --                                                                                                             .- - .
~ --
        - - ~e:- -._ _ _ _ . -         .- . :. -   _ . . . . - -
- - ~e:- -._ _ _ _ . -
                                                                              ._   _--
.- . :. -
    -
_ . . . . - -
      .
._
                                                                                                              ,
_--
#%
.- - .
                                      POTENTIAL ENFORCEMENT FINDING
-
                                                                                -
.
          FACILITY SAN ONOFRE UNIT 2               DOCKET No.     50-361         DATE 4/1/85
,
        AREA         BATTERY OPERATION AND SURVEILLANCE               ITEM NO. 361/85-09-07
#%
              :.
POTENTIAL ENFORCEMENT FINDING
          INSPECTOR       D.J. SULLIVANY JR                           TEAM LEADER       _L.J. CALLAN
-
                .
FACILITY SAN ONOFRE UNIT 2
          REQUIREMENT:
DOCKET No.
        Technical Specification (TS) 3.8.2.1.d requirts that a battery service test
50-361
          be conducted on Class 1E batteries every 18 months to demonstrate that battery
DATE 4/1/85
          capacity is adequate to supply and maintain amergency loads.
AREA
          FINDING:
BATTERY OPERATION AND SURVEILLANCE
          Contrary to the above, the 18-month battery surveillance procedure
ITEM NO. 361/85-09-07
          (S023-!2-2.15) for batteries 28007 and 28008 was not conducted from the
:.
          time the batteries were placed in service (February 1982) until Decen6er
INSPECTOR
          1984 and February 1985 respectively. The approximate period for which
D.J. SULLIVANY JR
          operability remained undemonstrated was:
TEAM LEADER
                      *
_L.J. CALLAN
                          Battery 28037           August 1983 to December 1984
.
                      *
REQUIREMENT:
                          Battery 28008           August 1983 to February 1985                     ..
Technical Specification (TS) 3.8.2.1.d requirts that a battery service test
                                                                                                            .
be conducted on Class 1E batteries every 18 months to demonstrate that battery
                                    ?
capacity is adequate to supply and maintain amergency loads.
                                    .
FINDING:
                  O
Contrary to the above, the 18-month battery surveillance procedure
          e
(S023-!2-2.15) for batteries 28007 and 28008 was not conducted from the
            *   -
time the batteries were placed in service (February 1982) until Decen6er
                  ~                                                                    .,
1984 and February 1985 respectively. The approximate period for which
                                                                                      . 8
operability remained undemonstrated was:
                    e
Battery 28037
                                          _
August 1983 to December 1984
                                                                                  60           F"O M9 rMF9
*
Battery 28008
August 1983 to February 1985
*
..
.
?
.
O
e
*
-~
.,
.
8
e
_
60
F"O M9 rMF9


              -J                                                                                       L.
-J
L.
.
.
.
                                                                                                  .
POTENTIAL ENFORCEMENT FINDING
                                POTENTIAL ENFORCEMENT FINDING
' ATE
                                                              50-361_    'DATE      4/1/85
4/1/85
                                                DOCKET NO.
D
  FACILITY SAN ONOFRE UNITS 2 and 3_
FACILITY SAN ONOFRE UNITS 2 and 3_
                                                      r            ITEM NO. 361/85-09-08
DOCKET NO.
  ARIA             BATTERY OPERATION AND SURVEILLANCE
50-361_
    L
ITEM NO. 361/85-09-08
                                                                  TEAM LEADER       L.J. CALLAN _
ARIA
  INSPECTOR             -
BATTERY OPERATION AND SURVEILLANCE
                        D.J.SULLIVANfJR
r
      *
L
        .
D.J.SULLIVANfJR
  REQUIREMENT
TEAM LEADER
  The San Onofre Unit 2 Final Safety Analysis Report. Updated. (FSAR), pa
L.J. CALLAN _
  8.3.2.2.1.8.d., requirts           a perfomance test of battery capacity within the first
INSPECTOR
                                This requirement is separate from the requirement for an
-
  two years of service.                    and the data provides a baseline     for the
*
  acceptancetest(FSAR 8.3.2.2.1.88)                                         5023-1-2,16.
.
  60-month surveillance test (TS 4.8.2.1.e), described by Procedure
REQUIREMENT
    FINDING:
The San Onofre Unit 2 Final Safety Analysis Report. Updated. (FSAR), pa
    Onofre Units 2 and 3 batteries within two years of bein
8.3.2.2.1.8.d., requirts a perfomance test of battery capacity within the first
                                  If
This requirement is separate from the requirement for an
                                  '.
and the data provides a baseline for the
            S
two years of service.
                                                                                  ,
acceptancetest(FSAR 8.3.2.2.1.88)
                                                                                ..     .
5023-1-2,16.
          1. i. ~
60-month surveillance test (TS 4.8.2.1.e), described by Procedure
                  e
FINDING:
                                              . . _-
Onofre Units 2 and 3 batteries within two years of bein
                                                            '
If
                                                      -__----   - _pw a;:. --             ; = 3   -~ 3
'.
S
,
1. i. ~
..
.
e
~~
- -
- - - - - - -
. .
-
- _ _ - - - -
- _pw a;:. --
; = 3
-~ 3
'


~--     - _
~ - -
            .
-
    . ~,.
_
                                                                                                              .
~ , .
#9
.
                                          POTENTIAL ENFORCCMENT FINDING
.
                                                                      50-362         DATE 4/2/85
.
                                                    DOCKET N0.
POTENTIAL ENFORCCMENT FINDING
            FACILITY SAN ON0FRE UNIT 3_
#9
                                                                            ITEM N0. 362/85-08-01
FACILITY SAN ON0FRE UNIT 3_
                          AUXILI ARY FEEDWATER (AFW) SURVEILLANCE REVIEW
DOCKET N0.
                                                                      TEAM LEADER     L.J. CALLAN
50-362
            INS #ECTOR
DATE 4/2/85
                                S.A. MCNEIL
ITEM N0. 362/85-08-01
            REQUIREMENT:
AUXILI ARY FEEDWATER (AFW) SURVEILLANCE REVIEW
            For operation in modes 1, 2 or 3 Technical Specification (TS) 4.7.1.2.a.4
TEAM LEADER
            quires that each AFW pump be demonstrated operable at least once ev
L.J. CALLAN
            by verifying that the AFW piping is full of water.
INS #ECTOR
              FINDING:
S.A. MCNEIL
              Contrary to the above, this monthly AN operability surveillanceThroughout      was not per-
REQUIREMENT:
              formed for the months of Novem6er, Decee6er 1984 and January 1985.
For operation in modes 1, 2 or 3 Technical Specification (TS) 4.7.1.2.a.4  
              this period Unit 3 operated in modes 1, 2, or 3.
quires that each AFW pump be demonstrated operable at least once ev
              REQUIREMENT _:
by verifying that the AFW piping is full of water.
                T.S. 6.8.1.c requires that written procedures shall be
FINDING:
                Limiting Condition of Operation (LC0) 3.7.1.2 states that at least three inde-
Contrary to the above, this monthly AN operability surveillance was not per-
                pendent AFW pumps and associated flow paths must be operable
Throughout
                2 or 3. $tep 6.1 of procedure
formed for the months of Novem6er, Decee6er 1984 and January 1985.
                requires the monthly performance of a trip test on the steam driven AFW pump
this period Unit 3 operated in modes 1, 2, or 3.
                turbine in order to comply with LCO 3.7.1.2.
REQUIREMENT _:
                FINDING:                   }
T.S. 6.8.1.c requires that written procedures shall be  
                Contrary to the above, this trip test was not performed for the months ofT
Limiting Condition of Operation (LC0) 3.7.1.2 states that at least three inde-
                Novewber 1984. Decem6er 1984, and January 198b.
pendent AFW pumps and associated flow paths must be operable  
                operated in mode 1, 2, or 3.
2 or 3.
                    *
$tep 6.1 of procedure
                        .
requires the monthly performance of a trip test on the steam driven AFW pump
                en
turbine in order to comply with LCO 3.7.1.2.
                                                                                        * e;
FINDING:
                    , J~                                                                     ,
}
                    8.. (                                                                   ..   .
Contrary to the above, this trip test was not performed for the months ofT
                          e
Novewber 1984. Decem6er 1984, and January 198b.
                                                                                          ( 0 01     r,rp91/r.o
operated in mode 1, 2, or 3.
                                            M10 'Ori           G tolo.19 Ddr71        n~w w-      - ; a u-g =
*
                              f00                          -.   -.e---n-==-..
.
* e;
en
, J~
,
8.. (
..
.
e
G tolo.19 Ddr71
( 0 01
r,rp91/r.o
f00
M10 'Ori
-.
-.e---n-==-..
n~w w-
- ; a u-g =


                  .-                                                                             <
.-
                                                                  .
<
.
'
..-
.
.
  '
_
    ..-                                                                                        _
POTENTIAL ENFORCEMENT FINDING
                                      POTENTIAL ENFORCEMENT FINDING
FACILITY SAN __0N0FRE UNIT 3
    FACILITY SAN __0N0FRE UNIT 3                 DOCKET NO.   50-362         DATE 4/2/85
DOCKET NO.
    AREA         AUXILIARY FEEDWATER (AFW) SURYEILLANCE REV_IEW       ITEM NO. 362/85-08-02
50-362
    I PECTOR             S.A. MCNEIL   "y                   TEAM LEADER     L.J. CALLAN
DATE 4/2/85
        .             __
AREA
                                                                            _
AUXILIARY FEEDWATER (AFW) SURYEILLANCE REV_IEW
        _ _
ITEM NO. 362/85-08-02
    REQU1REMENT:
I PECTOR
    Technical Specification (TS) 6.8.1.c r quires that written procedures shall be
S.A. MCNEIL
    established, implemented and maintatry' for surveillance and test activities
"y
    of safety related equipment. TS 4.7.1.L.2 requires that the AFV system shall
TEAM LEADER
    be demonstrated operable prior to entering mode 2 following each cold shutdown
L.J. CALLAN
    by performing a flow test.
.
    Surveillance test procedure $023-3-3.16.2, " Auxiliary Feedwater Flow Test",
__
    which was established to meet the requirements of TS 4.7.1.2.2, states that                 i
_
    this test shall be perfonned for all AFW pusps while in mode 3 and RCS test                 '
_ _
    temperature (no load Tavg) shall be at least 544'F prior to testing the steam
REQU1REMENT:
    driven AFW pusp.
Technical Specification (TS) 6.8.1.c r quires that written procedures shall be
                                                                                                    4
established, implemented and maintatry' for surveillance and test activities
      FINDING:
of safety related equipment. TS 4.7.1.L.2 requires that the AFV system shall
      Contrary to the above, the electrically driven AFW pumps were tested in March
be demonstrated operable prior to entering mode 2 following each cold shutdown
      and Novec6er 1984 while in mode 4 and in Decee6er 1984 the steam driven AFW
by performing a flow test.
      pump was tested with Tavg at less than 400*F.
Surveillance test procedure $023-3-3.16.2, " Auxiliary Feedwater Flow Test",
                                    *
which was established to meet the requirements of TS 4.7.1.2.2, states that
                                    ,?
i
                                      .
this test shall be perfonned for all AFW pusps while in mode 3 and RCS test
                                      e
'
            .
temperature (no load Tavg) shall be at least 544'F prior to testing the steam
      e
driven AFW pusp.
        ;  j'. .                                                             '# f
4
                                                                                    ,.
FINDING:
            i                                                                  ,
Contrary to the above, the electrically driven AFW pumps were tested in March
              .
and Novec6er 1984 while in mode 4 and in Decee6er 1984 the steam driven AFW
                                                                                            Y $
pump was tested with Tavg at less than 400*F.
*
,?
.
e
.
e j'. .
'# f
;
i
,.
,
.
Y
$


  .
.
        ,
,
    *
*
                  %q                                                                                                 .
%q
      8          i k                             UNITED STATES
.
                                                                                          '
i k
                                                                                                        , :'1
UNITED STATES
                                                                                                          , ! 8'
8
                                      NUCLEAR REGULATORY COMMISSION                              ,'
NUCLEAR REGULATORY COMMISSION
      E               :
,'
                                                WASMits0 Toes. o. C. 3esee '
, , ! 8'
          4*ese e
'
                                        '
:'1
                                                  APR 29 M5                /  .M "~        -        *
E
                                                                                                    , , ~ 3 (. ; ; , . _
:
  Dockat Nos. 50-206
WASMits0 Toes. o. C. 3esee '
                    50-361                                                   T   %' NGCy .
.M "
                                                                                      .          ..
, , ~ 3 (. ; ; , . _
                and 50-362                                                           '''       V.
APR 29 M5
                                                                          '
/
                                                                                  Q $ OMS
4*ese e
                                                                          '
~
            MEMORANDUM FOR:
-
                  *
*
                                    Dennis F # Kirsch. Acting Director
%' NGCy .
                                    Division of Reactor Safety and Pro.jects
'
                                    Region V
Dockat Nos. 50-206
            FROM:                   James G. Partlow, Director
50-361
                                    Division of Inspection Programs
T
                                    Office of Inspection and Enforcement
.
            SUBJECT:               SAN ONOFRE INSPECTION - POTENTIAL ENFORCEMENT FIN 0INGS
..
            The enclosed Potential Enforcement Findings (PEFs) (referred to as Unresolved
and 50-362
            items in Inspection Report 50-206/85-12; 50-361/85-09; 50-362/85-08) were
' ' '
            found during the recent inspection at San Onofre Nuclear Generating Station
V.
            (SONGS) and are provided for your followup. It is requested that
Q $ OMS
;            these PEFs to the SONGS Open Item List (Region V Tracking System)                   you add
'
                                                                                        and dispose
'
            of them as Unresolved Items.
MEMORANDUM FOR:
            The following is a sununary of the enclosed PEFs:
Dennis F # Kirsch. Acting Director
                    a.   Item 50-206/85-12-01.   Failure to correctly calculate the
*
                          as-found leakage rate from containment during an integrated
Division of Reactor Safety and Pro.jects
                          leak rate test.
Region V
                    b.   Item 50-361/85-09-03. Failure to post radiological cc,ntrol
FROM:
                          artas properly.
James G. Partlow, Director
                    c.   Item 50-361/85-09-04     Failure to align properly power
Division of Inspection Programs
                          supply breakers for trains A and B containment spray
Office of Inspection and Enforcement
                          header isolation valves,
SUBJECT:
                    d.   Item 50-361/85,09-07     Failure to conduct the 18-month                                       {
SAN ONOFRE INSPECTION - POTENTIAL ENFORCEMENT FIN 0INGS
                          battery surveillance for Class IE batteries 28007 and
The enclosed Potential Enforcement Findings (PEFs) (referred to as Unresolved
                          2B008.           .
items in Inspection Report 50-206/85-12; 50-361/85-09; 50-362/85-08) were
                                                                                                                        :
found during the recent inspection at San Onofre Nuclear Generating Station
                    e.   Item 50 361/85-09-08. Failure to conduct perfonnance                                           i
(SONGS) and are provided for your followup.
                          tests on Units 2 and 3 batteries within two years of
It is requested that
                  -      being placed in service.                                                                       i
these PEFs to the SONGS Open Item List (Region V Tracking System) you add
                                                                                                                        !
and dispose
              '
;
                  ; f.   Item 362/85-08-01. Failure to conduct required trip te5A
of them as Unresolved Items.
                  ;-     on the Unit 3 steam-driven AFW punp turbine.
The following is a sununary of the enclosed PEFs:
                                                                                        ,
a.
                                                                                      ..     .
Item 50-206/85-12-01.
                                                                                                              27, t
Failure to correctly calculate the
                                        wm                                          """
as-found leakage rate from containment during an integrated
                            av
leak rate test.
                                                                _
b.
                                                                  s m n w"                           y' * y
Item 50-361/85-09-03. Failure to post radiological cc,ntrol
artas properly.
c.
Item 50-361/85-09-04
Failure to align properly power
supply breakers for trains A and B containment spray
header isolation valves,
d.
Item 50-361/85,09-07
Failure to conduct the 18-month
battery surveillance for Class IE batteries 28007 and
2B008.
.
e.
Item 50 361/85-09-08. Failure to conduct perfonnance
i
tests on Units 2 and 3 batteries within two years of
i
being placed in service.
-
!
'
; f.
Item 362/85-08-01. Failure to conduct required trip te5A
;-
on the Unit 3 steam-driven AFW punp turbine.
,
..
.
27,t
_
y' * y
av
wm
s m n w"
" " "


                                                                                              ___
___
  , ,
- - -w
          - - -w                                                                                           ;
,
                                                                                                            i
,
      -
i
                                                                                                            \
\\
                                                                                                            l
-
          Dennis F. Kirsch                   -2-
Dennis F. Kirsch
                  g. Item 50-362/85-08-02. Failure to test properly the' Unit 3 AFW
-2-
                      Pumps.                                                     -
g.
                                                                                        ,
Item 50-362/85-08-02. Failure to test properly the' Unit 3 AFW
          We viquest that you keep us informed of your followup on the PEFs.       If you have
Pumps.
          any questions, please contact me or the team' leader L. J. Callan.
-
            I
,
                                                Jame!
We viquest that you keep us informed of your followup on the PEFs.
                                                                  k
If you have
                                                        G. Partlow Of rictor
any questions, please contact me or the team' leader
                                                Divition of Inspection Programs
L. J. Callan.
                                                Office of Inspection and Enforcement
k
        Enclosure:
I
        Potential Enforcement Findings
Jame! G. Partlow Of rictor
        cc w/ enclosure:
Divition of Inspection Programs
        J. M. Taylor. IE
Office of Inspection and Enforcement
        J. Axelrad, IE
Enclosure:
Potential Enforcement Findings
cc w/ enclosure:
J. M. Taylor. IE
J. Axelrad, IE
t
t
                                  9
9
                                  E
E
                                  ,
,
            .
.
        e
e
              *- 0
*-
            -
0
                                                                                  ,
-
                                                                                ge   #
,
                0
ge
                    gJm                            4 _tO103 J Od15f1           G110t     50 91 GO
#
                              pf0}'ff1 ~                                                         ~"~ " "
0
                                          ~T.,,
4 _tO103 J Od15f1
                                          .             .       _ _ _ _ :_ _ -$"f* M = '               -
G110t
50 91 GO
gJm
pf0}'ff1 ~
~T.,,
.
    : 
.
-$"f* M = '
-
~"~ " "


                                                                                                  ._
._
                                                                                                                        l
.
  .
.
    ,
.s
                              .    .s
,
              ,
,
                                                                                                                    .
.
                                                                                                      Enclosure
Enclosure
                                                                                            .
.
                                                                                                    -
POTENTIAL ENFORCENENT FINDING
                                                                                                          '             I
-
                            -
'
                                                        POTENTIAL ENFORCENENT FINDING
-
                                                                          ?
?
                        FA'CILITY SAN ONOFRE UNIT l     _        DOCKET NO.     50-206           DATE_4/2/85
FA'CILITY SAN ONOFRE UNIT l
                      AREA
DOCKET NO.
                                        CONTAINMENT INTEGRATED LEAK TEST
50-206
                                                                                      ITEM NO. 206/85-12-01
DATE_4/2/85
                      INSPECTOR             S.A. MCNEIL
_
                                                                                TEAM LEADER     1.J. CALLAN
AREA
                      REQUIREMENT:
CONTAINMENT INTEGRATED LEAK TEST
                      10 CFR Part 50. Appendix J. paragraph III.A.3. requires that all containment
ITEM NO. 206/85-12-01
                      sions of ANS! M45.4-1972. integrated leak rate (Type A) tests be conducted in
INSPECTOR
                      Paragraph 4.2 of ANSI N45.4-1972
S.A. MCNEIL
                      leak rate test (CILRT) should be conducted before any prestates that a period
TEAM LEADER
                    made in order to disclose the nonnel state of repair (as paratory repairs are
1.J. CALLAN
l                     the containment structure.                                       found condition) of
REQUIREMENT:
                    10 CFR Part 50. Appendix J. paragraph !!I.A.I. states that in the event of re-
10 CFR Part 50. Appendix J. paragraph III.A.3. requires that all containment
                    pairs and/or adjustments (ras) being made to the containment structure prior to
sions of ANS! M45.4-1972. integrated leak rate (Type A) tests be conducted in
                    performing the final CILRT. the change in the local leak rate due to these ras
Paragraph 4.2 of ANSI N45.4-1972
                    shall be determined and that the overall integrated leakage rate shall be deter-
leak rate test (CILRT) should be conducted before any prestates that a period
                    mined from the local leak rate test (LLRT) results and the CILRT res
made in order to disclose the nonnel state of repair (as paratory repairs are
                    FINDING:
l
i
the containment structure.
                    Contrary to the above, the licensee performed local leak rate tests (Type                   and  C
found condition) of
                  and
10 CFR Part 50. Appendix J. paragraph !!I.A.I. states that in the event of re-
                  tainment      post-repair
pairs and/or adjustments (ras) being made to the containment structure prior to
                                    leakage.        df fferential leakage rates to obtain an as-
performing the final CILRT. the change in the local leak rate due to these ras
                  lowing valve sets: Spec ffcally, pre-CILRT repair work was conducted on the fol-
shall be determined and that the overall integrated leakage rate shall be deter-
                  CV-532 and GNI-102 and CV-957                             snd CV-962.P0
mined from the local leak rate test (LLRT) results and the CILRT res
                                                                        The differential leakage rates -10 for ar.d EVS-
FINDING:
i
Contrary to the above, the licensee performed local leak rate tests (Type C
and post-repair df fferential leakage rates to obtain an as-
and
tainment leakage.
lowing valve sets: Spec ffcally, pre-CILRT repair work was conducted on the fol-
CV-532 and GNI-102 and CV-957 snd CV-962.P0 -10 ar.d EVS-
The differential leakage rates for
these valve sets was not factored into the CILRT to determine the
dition.
tainment resulted in the licensee not realizing that they h
*
*
                  these valve sets was not factored into the CILRT to determine the
test in the as-found condition.
                dition.
'
                tainment resulted in the licensee not realizing that they h
.
                test in the as-found condition.
@
                '
                        .
                          @
r
r
                    .,
.,
                                                                                              .:
.:
                          .
.
            .
.
    _ _ _ .         .. -
.
                                      .          .                  .,,,,..'_                           '
.
                  _             __           __           - - - --
. , , , , . . ' _
'
_ _ _ .
.. -
_
__
__
- - -
--


                                              _ _                                 - _ .           __         .   _ . .               __                                                             - _ _ _ _ _           _ _ _ _____   __
_ _
            , ..
- _ .
                            . ... a                                                                                                         *                                                                                                         ,
__
                    .     .
.
                            .
_ . .
                                                                                                                                                                                                                                            e       t
__
              ~
- _ _ _ _ _
                                                                                                        POTENTIAL ENFORCEMENT FINDING
_ _ _ _____
                                                                                                                                                                                            -
__
                                  FACILITY SAN ONOFRE UNIT 2                                                         DOCKET NO.
, ..
.
. ... a
                                                                                                                                          50-362                                                     DATE_4/1/85
*
                                                                                                                                                                                                                                                  .
,
                                AREA
.
i                                      -
.
                                        -
.
                                                                          RADIOLOGICAL POSTING
e
'                                                                                                                                              ITEM NO.                                             361/85-09-03
t
!
~
                                                                                                            P
POTENTIAL ENFORCEMENT FINDING
                                INSPECTOR                                               5.A. MCNEIL
-
                                                                                                                                          TEAM LEADER                                               L.J. CALLAN
FACILITY SAN ONOFRE UNIT 2
DOCKET NO.
50-362
DATE_4/1/85
.
.
AREA
RADIOLOGICAL POSTING
i
ITEM NO.
361/85-09-03
--
'
P
!
INSPECTOR
5.A. MCNEIL
TEAM LEADER
L.J. CALLAN
'
'
  i
i
                                REQUIREMENT:
REQUIREMENT:
1
1
                              Technical Specification (TS) 6.8.1.a requires that written procedures shall
Technical Specification (TS) 6.8.1.a requires that written procedures shall
                              be
be established. implemented and maintained for the procedures reconsnended in
                              Appendix     established.            "A" of Regulatory     implemented  Guide and 1.33.maintained for the procedures reconsnended in
Appendix "A" of Regulatory Guide 1.33.
  ,
Appendix "A" of Regulatory Guide 1.33 section 7.e states that these procedures
  '
,
                              Appendix "A" of Regulatory Guide 1.33 section 7.e states that these procedures'
'
                              radiation areas and in contamination control.shall include those neces
radiation areas and in contamination control.shall include those neces
                            signs and/or barricades for radiological area designatio                                                                                                                                                              I
'
                            displayed
signs and/or barricades for radiological area designati
                            an          area,                              (generally at waist to shoulder level) at all entrance locations to
I
f
displayed (generally at waist to shoulder level) at all entrance locations to
1                                                                                                                                                                                                                                                 .
an area,
                            FINO!NG:                 _
f
                                                                                                                                                                                                                                                    6
1
;
.
                          Contrary
FINO!NG:
                          in the following                            to theinstances:    above, the posting of radiological control areas was deficient
6
                          a.
_
                                              At the storage area adjacent to the Unit 2 makeup w
Contrary to the above, the posting of radiological control areas was deficient
                                                                                                                                                                                                                                                        t
;
;
in the following instances:
                                                                                                                                                                                                                                                        i
At the storage area adjacent to the Unit 2 makeup w
                                              pieces of radioactive material were stowed outside the arva.                                                                                                                                         ,
a.
,
t
                          b.
i
                                            At the Unit 2 outfall, the radiological posting was obscured at the most
pieces of radioactive material were stowed outside the arva.
;
,
,
b.
At the Unit 2 outfall, the radiological posting was obscured at the most
#
#
                                            aware of the potential for contamination. accessible entrancq, allowin
aware of the potential for contamination. accessible entrancq, allowin
j
j
,                                .
.
,                       .~
,
                          .?.
.~
                          .. i
,
                                                                                                                                                                                          ,1                                                        .
.?.
                                                                                                                                                                                              .'           .
,1
                                                                                                                                                                                            ,
.. i
'
.
                                      .
.'
!
.
,
'
.
!
i
i
t
t
                                                                                                                                                                                                                                                        !
i
i
,                                                                                                                                                                                                                                                       1
,
                                                              010                             E00 *Cra                     G t401033 parn
010
                      ,
E00 *Cra
                                                                                                                                                                                    O!r01                                 %0 '91 El
G t401033 parn
                                                                                                      , -..--.-
O!r01
                                                                                                                            w,,yw msm---                                       -             - -
%0 '91 El
                                                                                                                                                                                                        ,
,
                                                                                                                                                                                                                              --                   ,
-..--.-
    - - _ _ _ _ _ . .-       - - _ _ , _ _ _.-.- - - - - _., .-.-. - - _ - ~. _ - ____                                         - - - _
w,,yw msm---
                                                                                                                                              _ - - _ _ - _ - , . - . . _ _ _ _ . - , - - . - . - . - _ . - - - _ _ - . _ -
,
,
-
- -
--
,
- -
. .-
- - _ _ , _ _ _.-.- - - - - _., .-.-. - - _ - ~. _ - ____
-
- - _
_ - - _ _ - _ - , . - . . _ _ _ _ . - , - - . - . - . - _ . - - - _ _ - . _ -


      . ----- e - -             -
.
                                                    . . .
----- e - -
                                                                    --
-
                                                                                                  . . . . . . . . . _ . _ .
. . .
                                                                                                                          .
. . . . . . . . . _ . _ .
    _
--
                                        POTENTIAL ENFORCEMENT FINDING
.
                                                                                        .
_
                                    .                                                                                         I
POTENTIAL ENFORCEMENT FINDING
        FACILITY SAN ON0FRE UNIT 2                       DOCKET No.     50-361         DATE _4/1/85                       l
.
                                                                                            .
.
                                                                                                                              l
I
                                                                        ?                .
FACILITY SAN ON0FRE UNIT 2
        AREA       8ATTERY OPERATION AND SURVEILLANCE                         ITEM NO. 361/85-09-07
DOCKET No.
            :.
50-361
        INSPECTOR           0.J. SULLIVANY JR                                 TEAM LEADER       L.J. CALLAN
DATE _4/1/85
              .
.
        REQUIREMENT:
?
        Technical Specification (TS) 3.8.2.1.d requires that a battery service test
.
        be conducted on Class 1E batteries every 18 sonths to demonstrate that battery
AREA
        capacity is adequate to supply and maintain emergency loads.
8ATTERY OPERATION AND SURVEILLANCE
  ,
ITEM NO. 361/85-09-07
        FIN 0!NG:
:.
  !     Contrary to the above. the 18-month battery surveillance procedure
INSPECTOR
_'    (5023-!.2-2.15) for batteries 28007 and 28008 was not conducted from the
0.J. SULLIVANY JR
        time the batteries were placed in service (February 1982) until Deceneer
TEAM LEADER
        1984 and Febrvary 1985 rispectively. The approximate period for which
L.J. CALLAN
        operability remained undemonstrated was:
.
                    *
REQUIREMENT:
                            Battery 28007                 August 1983 to December 1984
Technical Specification (TS) 3.8.2.1.d requires that a battery service test
                    *
be conducted on Class 1E batteries every 18 sonths to demonstrate that battery
                            Battery 28008                 August 1983 to February 1985                           .
capacity is adequate to supply and maintain emergency loads.
,
,
FIN 0!NG:
!
Contrary to the above. the 18-month battery surveillance procedure
(5023-!.2-2.15) for batteries 28007 and 28008 was not conducted from the
_'
time the batteries were placed in service (February 1982) until Deceneer
1984 and Febrvary 1985 rispectively. The approximate period for which
operability remained undemonstrated was:
Battery 28007
August 1983 to December 1984
*
*
Battery 28008
August 1983 to February 1985
.
,
l
l
                                                                                                                        e
e
                                      ?
?
                                      .
.
                .
.
        e
e
              '
'
                                                                                            ,:
'
          '
,:
                                                                                              .
.
'
'
                  .
.
                                                                                                                              I
i
i
l
l
                                                                                                                            l
l
                      _ _ .       .z -       . _ .         . r . ~ me.           um                 rr rw
_ _ .
.z -
. _ .
. r . ~ me.
um
rr rw


                                _   _   _
_
  * *
_
                                                                                              .
_
                              POTENTIAL ENFORCEMENT FINDING
*
                                                            50-361       DATE       4/1/85
*
                                              DOCKET NO.
.
      FACILITY SAN ONOFRE UNITS 2 and 3_
POTENTIAL ENFORCEMENT FINDING
                                                      <          ITEM NO. 361/85-09-08
FACILITY SAN ONOFRE UNITS 2 and 3_
      ARfA         BATTERY OPERATION AND SURVEILLANCE
DOCKET NO.
          L
50-361
                                                                TEAN LEADER     L.J. CALLAN _
DATE
      INSPECTOR       D.J.$ULLIVANfJR
4/1/85
            *
ITEM NO. 361/85-09-08
            .
ARfA
      REQUIREMENT
BATTERY OPERATION AND SURVEILLANCE
      The San Onofre Unit 2 Final Safety Analysis Report. Updated. (FSAR), paragrap
<
      8.3.2.2.1.8.d., requires a perfonnance test of battery capacity within the first
L
      two years of service.  This requirement is separate from the requirement for an
D.J.$ULLIVANfJR
      scceptance test (FSAR 8.3.2.2.1.88) and the data provides5023-1-2.16, a baseline for the
TEAN LEADER
      60-month surveillance test (TS 4.8.2.1.e), described by Procedure
L.J. CALLAN _
INSPECTOR
*
.
REQUIREMENT
The San Onofre Unit 2 Final Safety Analysis Report. Updated. (FSAR), paragrap
8.3.2.2.1.8.d., requires a perfonnance test of battery capacity within the first
This requirement is separate from the requirement for an
scceptance test (FSAR 8.3.2.2.1.88) and the data provides a baseline for the
two years of service.
5023-1-2.16,
60-month surveillance test (TS 4.8.2.1.e), described by Procedure
i
i
        FINDING:
FINDING:
        In deviation from the above, performnce tests were not conducted on the San
In deviation from the above, performnce tests were not conducted on the San
        Onofre Units 2 and 3 batteries within two years of being placed in service.
Onofre Units 2 and 3 batteries within two years of being placed in service.
i
i
1
1
                                  .
.
                .
.
I             *
I
!           .                                                               #5
*
              'k.
#5
                ''                                                            .:   .
!
        s
.
                                                                                          8'
'k.
                                                                              N
.:
                      gk          I   l             .fb   N
.
''
s
8'
gk
I
l
.fb
N
N
-
-
-------- --- -
--
-
--
-
--
-


                                                                          _ _.
_ _.
  '. -.           ~
'.
                                                                                                      .
-.
                                    POTENTIAL EMFORCCPENT FIN 0!NG
~
.
POTENTIAL EMFORCCPENT FIN 0!NG
'
'
                                                                                                        i
i
                                                                50-362           DATE 4/2/85_
SANON0FRENIT3_
                                              D0CKET N0.
D0CKET N0.
        FACILITY      SANON0FRENIT3_
50-362
                                                                      ITEM NO. _362/85-08-01
DATE 4/2/85_
        AREA       AUXILIARY FEEDWATER (AFW) SURVEILLANCE REVIEW
FACILITY
                                                                TEAM LEADER     L.J. CALLAN _
AUXILIARY FEEDWATER (AFW) SURVEILLANCE REVIEW
        1     ECTOR       $.A. MCNEIL
ITEM NO. _362/85-08-01
            .
AREA
          REQUIREMENT _:
TEAM LEADER
          Fce operation in modes 1. 2. or 3 Technical Specification (TS) 4.7.1.2.a.4 re-
L.J. CALLAN _
          quires that each AFW pump be demonstrated operable at least once every 31
1
          by verifying that the AFW piping is full of water.
ECTOR
          FINDING:
$.A. MCNEIL
          Contrary to the above, this monthly AFW operability surveillance was not per-Throughou
.
          formed for the months of Noveder. Deceder 1984 and January 1985.
REQUIREMENT _:
          this period. Unit 3 operated in modes 1. 2. or 3.
Fce operation in modes 1. 2. or 3 Technical Specification (TS) 4.7.1.2.a.4 re-
          REQUIREMENT:
quires that each AFW pump be demonstrated operable at least once every 31  
          T.S. 6.8.1.c requirus that written procedures shall be estabitshed implemented
by verifying that the AFW piping is full of water.
            and maintained for surveillance and test activities of safety related equipment.
FINDING:
            Limiting condition of Operation (LC0) 3.7.3.2 states that at least three inde-
Contrary to the above, this monthly AFW operability surveillance was not per-Throughou
            pendent AFW pumps and associated flow paths must be operable wh
formed for the months of Noveder. Deceder 1984 and January 1985.
            2 or 3. Step 6.1 of Procedure
this period. Unit 3 operated in modes 1. 2. or 3.
            requires the monthly performance of a trip test on the steam driven AFW pump
REQUIREMENT:
            turbine in order to comply with LC0 3.7.1.2.
T.S. 6.8.1.c requirus that written procedures shall be estabitshed implemented
            FINDING:                 f
and maintained for surveillance and test activities of safety related equipment.
            Contrary to the above, this trip test was not performed for the months ofT
Limiting condition of Operation (LC0) 3.7.3.2 states that at least three inde-
,
pendent AFW pumps and associated flow paths must be operable wh
'          Noveder 1984. Deceder 1984. and January 1985.
2 or 3.
            operated in mode 1, 2, or 3.
Step 6.1 of Procedure
              *
requires the monthly performance of a trip test on the steam driven AFW pump
                  .
turbine in order to comply with LC0 3.7.1.2.
            .
FINDING:
                '':                                                                   ..'     .
f
                      .
Contrary to the above, this trip test was not performed for the months ofT
Noveder 1984. Deceder 1984. and January 1985.
,
'
operated in mode 1, 2, or 3.
*
.
.
:
. . '
.
''
.
I
I
                                                                                                M! /bl
A. 5 N $
                          (b         UN l             h !b o.     -         -   -
M! /bl
                                                                                      A. 5 N $
(b
                                                                                                  .
UN
                                              - . -        -
l
h !b o.
- . -
-
-
-
-
.


                                __ _ -     --                       -       -                   -
__
  '
_
    .
-
                                                                                                      q
--
-
-
-
'
q
.
<
<
                                                                                                .
.
)
)
                                          POTENTIAL ENFORCEMENT FINDING
POTENTIAL ENFORCEMENT FINDING
      FACILITY SAN _0NOFRE UNIT 3                   DOCKET NO.     50-362         MTE 4/2/85
FACILITY SAN _0NOFRE UNIT 3
      AREA         AUXILIARY FEEDWATER (AFW) SURYEILLANCE REVIEW         ITEMNO.N2/85-08-02
DOCKET NO.
          L
50-362
      INSPECTOR             $.A. MCNEIL       ''y                 TEAM LEADER     L.J. CALLAN
MTE 4/2/85
            *
AREA
:             .
AUXILIARY FEEDWATER (AFW) SURYEILLANCE REVIEW
                                                                                                  '
ITEMNO.N2/85-08-02
      REQUIREMENT:
L
      Technical Specification (TS) 6.8.1.c requires that written procedures shall be
INSPECTOR
      established implemented and maintained for surveillance and test activities
$.A. MCNEIL
      of safety related equipment. TS 4.7.1.2.2               uires that the AFV system shall
''y
;
TEAM LEADER
      be demonstrated operable prior to entering               e 2 following each cold shutdown
L.J. CALLAN
      by performing a flow test.
*
      Surveillance test procedurn $023-3-3.16.2, " Auxiliary Feedwater Flow Test",
:
      which was established to meet the requirements of TS 4.7.1.2.2, states that
.
      this test shall be perfonned for all AFV pumps while in mode 3 and RCS test
'
      temperature (no load Tavg) shall be at least 544'F prior to testing the steam
REQUIREMENT:
      driven AFW pump.
Technical Specification (TS) 6.8.1.c requires that written procedures shall be
      FINDING:
established implemented and maintained for surveillance and test activities
      Contrary to the above, the electrically driven AFW pumps were tested in March
of safety related equipment. TS 4.7.1.2.2
      and Novenber 1984 while in mode 4 and in December 1984 the steam driven AFW
uires that the AFV system shall
      pump was tested with Tavg at less than 400*F.
be demonstrated operable prior to entering
                                      *
e 2 following each cold shutdown
                                      ,,
;
                                        .
by performing a flow test.
                                        e
Surveillance test procedurn $023-3-3.16.2, " Auxiliary Feedwater Flow Test",
                .
which was established to meet the requirements of TS 4.7.1.2.2, states that
        e
this test shall be perfonned for all AFV pumps while in mode 3 and RCS test
            ;    i.
temperature (no load Tavg) shall be at least 544'F prior to testing the steam
                                                                                    '' f
driven AFW pump.
            *
FINDING:
                                                                                      , ,' .
Contrary to the above, the electrically driven AFW pumps were tested in March
                  '
and Novenber 1984 while in mode 4 and in December 1984 the steam driven AFW
4
pump was tested with Tavg at less than 400*F.
l
*,,
                                                                                    L
.
e
.
e
i.
'' f
;
.
*
,'
,
.
'
4
l
L
}}
}}

Latest revision as of 10:05, 12 December 2024

Forwards Potential Enforcement Findings Documented in Insp Repts 50-206/85-12,50-361/85-09 & 50-362/85-08 for Inclusion in Open Items List.Violations Include Failure to Calculate as-found Leakage Rate from Containment
ML20132C996
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/29/1985
From: Partlow J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Kirsch D, Kirsch O
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20132C709 List:
References
FOIA-85-425 NUDOCS 8505030485
Download: ML20132C996 (9)


See also: IR 05000206/1985012

Text

..

'

,.,

.

k

UNITED STATES

f', )

NUCLEAR REGULATORY COMMISSION

fjffD

.

"*

E

,i

WASHuseTON. D. C. 3 essa

'o,,

APR S9 M5

f

h 85 j

e

,

%' hOEy

.

Dock:Et Nos. 50-206

50-361

P

.

,

AfG!0/dy

end 50-362

Q GOOg

.

'

Dennis F.E rsch, Acting Director

MEMORANDUM FOR:

Ki

Division of Reactor Safety and Projects

.

Region V

FROM:

James G. Partlow, Director

Division of Inspection Programs

Office of Inspection and Enforcement

SUBJECT:

SAN ONOFRE INSPECTION - POTENTIAL ENFORCEMENT FINDINGS

The enclosed Potential Enforcement Findings (PEFs) (referred to as Unresolved

Items in Inspection Report 50-206/85-12; 50-361/85-09; 50-362/85-08) were

found during the recent inspection at San Onofre Nuclear Generating Station

(SONGS) and are provided for your followup.

It is requested that

these PEFs to the SONGS Open Item List (Region V Tracking System) you add

and dispose

of them as Unresolved Items.

The following is a summary of the enclosed PEFs:

a.

Item 50-206/85-12-01.

Failure to correctly calculate the

as-found leakage rate from containment during an integrated

leak rate test.

b.

Item 50-361/85-09-03. Failuri to post radiological control

areas properly.

c.

Item 50-361/85-09-04.

Failure to align properly power

supply breakers for trains A and B containment spray

,

header isolation valves.

!

d.

Item 50-361/85,09-07. Failure to conduct the 18-month

battery surveillance for Class IE batteries 20007 and

2B008.

.

l

e.

Item 50-361/85-09-08. Failure to conduct perfonnance

tests on Units 2 and 3 batteries within two years of

being placed in service.

.

.- ; f.

Item 362/85-08-01.

Failure to conduct required trip te g

i;

on the Unit 3 steam-driven AFW punp turbine.

~

"

..

.

,.

.

/

f

l

pTW%

27p

' M , J gw w

'

vppu um

ny

mcsgw

.

- ._

. .. .e

'

.

.

-

Dennis F. Kirsch

-2-

g.

Item 50-36,2/85-08-02. Failure to test properly the' Unit 3 AFW

pumps.

-

,

We tiquest that you keep us informed of your followup on the PEFs.

If you have

ay questions. please contact me or the team' leader. L. J. Callan.

Y

l

h

1

Jame! 6. Partlow. Director

Divil. ion of Inspection Programs

Office of Inspection and Enforcement

Enclosure:

Potential Enforcement Findings

cc w/ enclosure:

J. M. Taylor. IE

J. Axelrad. IE

'r

.

e

S

W

e es

.. A.

,

.

..

e

G to!938 DttlSn

GT:01

G8'91/GO

bdnn

FMb i

_

m-

.,

.-u

_

-

.

.

'

.

Enclosure

.

.

POTENTIAL ENFORCEMENT FINDING

~

,

r

FA'CILITY SAN ONOFRE UNIT 1

DOCKET NO.

_50-206

DATE 4/2/85

p

ARdA

CONTAINMENT INTEGRATED LEAK TEST

ITEM NO. 206/85-12-01

INSPECTOR

S.A. MCNEIL

TEAM LEADER

L.J. CALLAN

REQUIREMENT:

10 CFR Part 50. Appendix J, paragraph III.A.3, requires that all containment

integrated leak rate (Type A) tests be conducted in accordance with the provi-

sions of ANSI N45.4-1972.

Paragraph 4.2 of ANSI N45.41972

leak rate test (CILRT) should be conducted before any preparatory repair

made in order to disclose the normal state of repair (as-found condition) of

the containment structure.

10 CFR Part 50, Appendix J, paragraph III.A.1, states that in the event of re-

pairs and/or adjustments (ras) being made to the containment structure prior to

perfonning the final CILRT, the change in the local leak rate due to these ras

shcIl be determined and that the overall integrated leakage rate shall be deter-

mined from the local leak rate test (LLRT) results and the CILRT result.

FINDING:

Contrary to the above, the licensee perfonned local leak rate tests (Type C) and

and post-repair differential leakage rates to obtain an at-found

tainment leakage.

lowing valve sets: Specifically, pre-CILRT repair work was conducted on the fol-

CV-532 and GNI-102 and CV-957 and CV-962.P07-10 and EVS-313. CV-104 a

The differential leakage rates for

these valve sets was not factored into the CILRT to detennine the as-found

dition.

Failure of the licensee to calculate the as-found leakage rate from con-

tainment resulted in the licensee not realizing that they had failed the Type A

test in the as-found condition.

.-

. . " .

l

600

Eco ON

G N0193a caen

9T:01

50/9T60

m

,,,,m.,

.- w

-

---

_.a

,

si

.-

.-

ll

,

l

POTENTIAL ENFORCEMENT FINDING

,

.

FACILITY $ANONOFREbNIT2

DOCKET NO.

50-362

DATE_4/1/85

.

I

.

AR,EA

RADIOLOGICAL POSTING

ITEM NO.

361/85-09-03

P

INSPECTOR

S.A. MCNEIL

TEAM LEADER

L.J. CALLAN

R_EQUIREMENT:

I

Technical Specification (TS) 6.8.1.a requires that written procedures shall

be established, iglemented and maintained for the procedures reconnended in

Appendix "A" of Regulatory Guide I.33.

{

Appendix "A" of Regulatory Guide 1.33 section 7.e states that these procedures

shall include those necessary for radiation protection in access control to

'

radiation amas and in contamination contrv1.

i

Procedure 50121-VII-7.4 Rev 6. " Posting and Access Control," requires that all

I

signs and/or barricades for radiological area designation be conspicuously

displayed (generally at waist to shoulder level) at all entrance locations to

an area.

k

FINDING:

Contrary to the above, the posting of radiological control areas was deficient

in the following instances:

At the storage area adjacent to the Unit 2 makeup water demineralizer, the

a.

pieces of radioactive material were stowed outside the ama.

,

b.

At the Unit 2 outfall, the radiological posting was obscured at the most

aware of the potential for contamination. accessible entrance, allowing

'

.

e

." .

.

.

OTO

E00'0H

G WIDM Mg

Oftut

r,0'91 M

'

w

t- m Tr] ~ ~

- _ _ _ _ _ _ _ ,

~ --

- - ~e:- -._ _ _ _ . -

.- . :. -

_ . . . . - -

._

_--

.- - .

-

.

,

  1. %

POTENTIAL ENFORCEMENT FINDING

-

FACILITY SAN ONOFRE UNIT 2

DOCKET No.

50-361

DATE 4/1/85

AREA

BATTERY OPERATION AND SURVEILLANCE

ITEM NO. 361/85-09-07

.

INSPECTOR

D.J. SULLIVANY JR

TEAM LEADER

_L.J. CALLAN

.

REQUIREMENT:

Technical Specification (TS) 3.8.2.1.d requirts that a battery service test

be conducted on Class 1E batteries every 18 months to demonstrate that battery

capacity is adequate to supply and maintain amergency loads.

FINDING:

Contrary to the above, the 18-month battery surveillance procedure

(S023-!2-2.15) for batteries 28007 and 28008 was not conducted from the

time the batteries were placed in service (February 1982) until Decen6er

1984 and February 1985 respectively. The approximate period for which

operability remained undemonstrated was:

Battery 28037

August 1983 to December 1984

Battery 28008

August 1983 to February 1985

..

.

?

.

O

e

-~

.,

.

8

e

_

60

F"O M9 rMF9

-J

L.

.

.

POTENTIAL ENFORCEMENT FINDING

' ATE

4/1/85

D

FACILITY SAN ONOFRE UNITS 2 and 3_

DOCKET NO.

50-361_

ITEM NO. 361/85-09-08

ARIA

BATTERY OPERATION AND SURVEILLANCE

r

L

D.J.SULLIVANfJR

TEAM LEADER

L.J. CALLAN _

INSPECTOR

-

.

REQUIREMENT

The San Onofre Unit 2 Final Safety Analysis Report. Updated. (FSAR), pa

8.3.2.2.1.8.d., requirts a perfomance test of battery capacity within the first

This requirement is separate from the requirement for an

and the data provides a baseline for the

two years of service.

acceptancetest(FSAR 8.3.2.2.1.88)

5023-1-2,16.

60-month surveillance test (TS 4.8.2.1.e), described by Procedure

FINDING:

Onofre Units 2 and 3 batteries within two years of bein

If

'.

S

,

1. i. ~

..

.

e

~~

- -

- - - - - - -

. .

-

- _ _ - - - -

- _pw a;:. --

= 3

-~ 3

'

~ - -

-

_

~ , .

.

.

.

POTENTIAL ENFORCCMENT FINDING

  1. 9

FACILITY SAN ON0FRE UNIT 3_

DOCKET N0.

50-362

DATE 4/2/85

ITEM N0. 362/85-08-01

AUXILI ARY FEEDWATER (AFW) SURVEILLANCE REVIEW

TEAM LEADER

L.J. CALLAN

INS #ECTOR

S.A. MCNEIL

REQUIREMENT:

For operation in modes 1, 2 or 3 Technical Specification (TS) 4.7.1.2.a.4

quires that each AFW pump be demonstrated operable at least once ev

by verifying that the AFW piping is full of water.

FINDING:

Contrary to the above, this monthly AN operability surveillance was not per-

Throughout

formed for the months of Novem6er, Decee6er 1984 and January 1985.

this period Unit 3 operated in modes 1, 2, or 3.

REQUIREMENT _:

T.S. 6.8.1.c requires that written procedures shall be

Limiting Condition of Operation (LC0) 3.7.1.2 states that at least three inde-

pendent AFW pumps and associated flow paths must be operable

2 or 3.

$tep 6.1 of procedure

requires the monthly performance of a trip test on the steam driven AFW pump

turbine in order to comply with LCO 3.7.1.2.

FINDING:

}

Contrary to the above, this trip test was not performed for the months ofT

Novewber 1984. Decem6er 1984, and January 198b.

operated in mode 1, 2, or 3.

.

  • e;

en

, J~

,

8.. (

..

.

e

G tolo.19 Ddr71

( 0 01

r,rp91/r.o

f00

M10 'Ori

-.

-.e---n-==-..

n~w w-

- ; a u-g =

.-

<

.

'

..-

.

_

POTENTIAL ENFORCEMENT FINDING

FACILITY SAN __0N0FRE UNIT 3

DOCKET NO.

50-362

DATE 4/2/85

AREA

AUXILIARY FEEDWATER (AFW) SURYEILLANCE REV_IEW

ITEM NO. 362/85-08-02

I PECTOR

S.A. MCNEIL

"y

TEAM LEADER

L.J. CALLAN

.

__

_

_ _

REQU1REMENT:

Technical Specification (TS) 6.8.1.c r quires that written procedures shall be

established, implemented and maintatry' for surveillance and test activities

of safety related equipment. TS 4.7.1.L.2 requires that the AFV system shall

be demonstrated operable prior to entering mode 2 following each cold shutdown

by performing a flow test.

Surveillance test procedure $023-3-3.16.2, " Auxiliary Feedwater Flow Test",

which was established to meet the requirements of TS 4.7.1.2.2, states that

i

this test shall be perfonned for all AFW pusps while in mode 3 and RCS test

'

temperature (no load Tavg) shall be at least 544'F prior to testing the steam

driven AFW pusp.

4

FINDING:

Contrary to the above, the electrically driven AFW pumps were tested in March

and Novec6er 1984 while in mode 4 and in Decee6er 1984 the steam driven AFW

pump was tested with Tavg at less than 400*F.

,?

.

e

.

e j'. .

'# f

i

,.

,

.

Y

$

.

,

%q

.

i k

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

,'

, , ! 8'

'

'1

E

WASMits0 Toes. o. C. 3esee '

.M "

, , ~ 3 (. ; ; , . _

APR 29 M5

/

4*ese e

~

-

%' NGCy .

'

Dockat Nos. 50-206

50-361

T

.

..

and 50-362

' ' '

V.

Q $ OMS

'

'

MEMORANDUM FOR:

Dennis F # Kirsch. Acting Director

Division of Reactor Safety and Pro.jects

Region V

FROM:

James G. Partlow, Director

Division of Inspection Programs

Office of Inspection and Enforcement

SUBJECT:

SAN ONOFRE INSPECTION - POTENTIAL ENFORCEMENT FIN 0INGS

The enclosed Potential Enforcement Findings (PEFs) (referred to as Unresolved

items in Inspection Report 50-206/85-12; 50-361/85-09; 50-362/85-08) were

found during the recent inspection at San Onofre Nuclear Generating Station

(SONGS) and are provided for your followup.

It is requested that

these PEFs to the SONGS Open Item List (Region V Tracking System) you add

and dispose

of them as Unresolved Items.

The following is a sununary of the enclosed PEFs:

a.

Item 50-206/85-12-01.

Failure to correctly calculate the

as-found leakage rate from containment during an integrated

leak rate test.

b.

Item 50-361/85-09-03. Failure to post radiological cc,ntrol

artas properly.

c.

Item 50-361/85-09-04

Failure to align properly power

supply breakers for trains A and B containment spray

header isolation valves,

d.

Item 50-361/85,09-07

Failure to conduct the 18-month

battery surveillance for Class IE batteries 28007 and

2B008.

.

e.

Item 50 361/85-09-08. Failure to conduct perfonnance

i

tests on Units 2 and 3 batteries within two years of

i

being placed in service.

-

!

'

f.

Item 362/85-08-01. Failure to conduct required trip te5A

-

on the Unit 3 steam-driven AFW punp turbine.

,

..

.

27,t

_

y' * y

av

wm

s m n w"

" " "

___

- - -w

,

,

i

\\

-

Dennis F. Kirsch

-2-

g.

Item 50-362/85-08-02. Failure to test properly the' Unit 3 AFW

Pumps.

-

,

We viquest that you keep us informed of your followup on the PEFs.

If you have

any questions, please contact me or the team' leader

L. J. Callan.

k

I

Jame! G. Partlow Of rictor

Divition of Inspection Programs

Office of Inspection and Enforcement

Enclosure:

Potential Enforcement Findings

cc w/ enclosure:

J. M. Taylor. IE

J. Axelrad, IE

t

9

E

,

.

e

  • -

0

-

,

ge

0

4 _tO103 J Od15f1

G110t

50 91 GO

gJm

pf0}'ff1 ~

~T.,,

.

.

-$"f* M = '

-

~"~ " "

._

.

.

.s

,

,

.

Enclosure

.

POTENTIAL ENFORCENENT FINDING

-

'

-

?

FA'CILITY SAN ONOFRE UNIT l

DOCKET NO.

50-206

DATE_4/2/85

_

AREA

CONTAINMENT INTEGRATED LEAK TEST

ITEM NO. 206/85-12-01

INSPECTOR

S.A. MCNEIL

TEAM LEADER

1.J. CALLAN

REQUIREMENT:

10 CFR Part 50. Appendix J. paragraph III.A.3. requires that all containment

sions of ANS! M45.4-1972. integrated leak rate (Type A) tests be conducted in

Paragraph 4.2 of ANSI N45.4-1972

leak rate test (CILRT) should be conducted before any prestates that a period

made in order to disclose the nonnel state of repair (as paratory repairs are

l

the containment structure.

found condition) of

10 CFR Part 50. Appendix J. paragraph !!I.A.I. states that in the event of re-

pairs and/or adjustments (ras) being made to the containment structure prior to

performing the final CILRT. the change in the local leak rate due to these ras

shall be determined and that the overall integrated leakage rate shall be deter-

mined from the local leak rate test (LLRT) results and the CILRT res

FINDING:

i

Contrary to the above, the licensee performed local leak rate tests (Type C

and post-repair df fferential leakage rates to obtain an as-

and

tainment leakage.

lowing valve sets: Spec ffcally, pre-CILRT repair work was conducted on the fol-

CV-532 and GNI-102 and CV-957 snd CV-962.P0 -10 ar.d EVS-

The differential leakage rates for

these valve sets was not factored into the CILRT to determine the

dition.

tainment resulted in the licensee not realizing that they h

test in the as-found condition.

'

.

@

r

.,

.:

.

.

.

.

. , , , , . . ' _

'

_ _ _ .

.. -

_

__

__

- - -

--

_ _

- _ .

__

.

_ . .

__

- _ _ _ _ _

_ _ _ _____

__

, ..

. ... a

,

.

.

.

e

t

~

POTENTIAL ENFORCEMENT FINDING

-

FACILITY SAN ONOFRE UNIT 2

DOCKET NO.

50-362

DATE_4/1/85

.

.

AREA

RADIOLOGICAL POSTING

i

ITEM NO.

361/85-09-03

--

'

P

!

INSPECTOR

5.A. MCNEIL

TEAM LEADER

L.J. CALLAN

'

i

REQUIREMENT:

1

Technical Specification (TS) 6.8.1.a requires that written procedures shall

be established. implemented and maintained for the procedures reconsnended in

Appendix "A" of Regulatory Guide 1.33.

Appendix "A" of Regulatory Guide 1.33 section 7.e states that these procedures

,

'

radiation areas and in contamination control.shall include those neces

'

signs and/or barricades for radiological area designati

I

displayed (generally at waist to shoulder level) at all entrance locations to

an area,

f

1

.

FINO!NG:

6

_

Contrary to the above, the posting of radiological control areas was deficient

in the following instances:

At the storage area adjacent to the Unit 2 makeup w

a.

t

i

pieces of radioactive material were stowed outside the arva.

,

,

b.

At the Unit 2 outfall, the radiological posting was obscured at the most

aware of the potential for contamination. accessible entrancq, allowin

j

.

,

.~

,

.?.

,1

.. i

.

.'

.

,

'

.

!

i

t

i

,

010

E00 *Cra

G t401033 parn

O!r01

%0 '91 El

,

-..--.-

w,,yw msm---

,

,

-

- -

--

,

- -

. .-

- - _ _ , _ _ _.-.- - - - - _., .-.-. - - _ - ~. _ - ____

-

- - _

_ - - _ _ - _ - , . - . . _ _ _ _ . - , - - . - . - . - _ . - - - _ _ - . _ -

.


e - -

-

. . .

. . . . . . . . . _ . _ .

--

.

_

POTENTIAL ENFORCEMENT FINDING

.

.

I

FACILITY SAN ON0FRE UNIT 2

DOCKET No.

50-361

DATE _4/1/85

.

?

.

AREA

8ATTERY OPERATION AND SURVEILLANCE

ITEM NO. 361/85-09-07

.

INSPECTOR

0.J. SULLIVANY JR

TEAM LEADER

L.J. CALLAN

.

REQUIREMENT:

Technical Specification (TS) 3.8.2.1.d requires that a battery service test

be conducted on Class 1E batteries every 18 sonths to demonstrate that battery

capacity is adequate to supply and maintain emergency loads.

,

FIN 0!NG:

!

Contrary to the above. the 18-month battery surveillance procedure

(5023-!.2-2.15) for batteries 28007 and 28008 was not conducted from the

_'

time the batteries were placed in service (February 1982) until Deceneer

1984 and Febrvary 1985 rispectively. The approximate period for which

operability remained undemonstrated was:

Battery 28007

August 1983 to December 1984

Battery 28008

August 1983 to February 1985

.

,

l

e

?

.

.

e

'

'

,:

.

'

.

i

l

l

_ _ .

.z -

. _ .

. r . ~ me.

um

rr rw

_

_

_

.

POTENTIAL ENFORCEMENT FINDING

FACILITY SAN ONOFRE UNITS 2 and 3_

DOCKET NO.

50-361

DATE

4/1/85

ITEM NO. 361/85-09-08

ARfA

BATTERY OPERATION AND SURVEILLANCE

<

L

D.J.$ULLIVANfJR

TEAN LEADER

L.J. CALLAN _

INSPECTOR

.

REQUIREMENT

The San Onofre Unit 2 Final Safety Analysis Report. Updated. (FSAR), paragrap

8.3.2.2.1.8.d., requires a perfonnance test of battery capacity within the first

This requirement is separate from the requirement for an

scceptance test (FSAR 8.3.2.2.1.88) and the data provides a baseline for the

two years of service.

5023-1-2.16,

60-month surveillance test (TS 4.8.2.1.e), described by Procedure

i

FINDING:

In deviation from the above, performnce tests were not conducted on the San

Onofre Units 2 and 3 batteries within two years of being placed in service.

i

1

.

.

I

  1. 5

!

.

'k.

.:

.

s

8'

gk

I

l

.fb

N

N

-

-


--- -

--

-

--

-

--

-

_ _.

'.

-.

~

.

POTENTIAL EMFORCCPENT FIN 0!NG

'

i

SANON0FRENIT3_

D0CKET N0.

50-362

DATE 4/2/85_

FACILITY

AUXILIARY FEEDWATER (AFW) SURVEILLANCE REVIEW

ITEM NO. _362/85-08-01

AREA

TEAM LEADER

L.J. CALLAN _

1

ECTOR

$.A. MCNEIL

.

REQUIREMENT _:

Fce operation in modes 1. 2. or 3 Technical Specification (TS) 4.7.1.2.a.4 re-

quires that each AFW pump be demonstrated operable at least once every 31

by verifying that the AFW piping is full of water.

FINDING:

Contrary to the above, this monthly AFW operability surveillance was not per-Throughou

formed for the months of Noveder. Deceder 1984 and January 1985.

this period. Unit 3 operated in modes 1. 2. or 3.

REQUIREMENT:

T.S. 6.8.1.c requirus that written procedures shall be estabitshed implemented

and maintained for surveillance and test activities of safety related equipment.

Limiting condition of Operation (LC0) 3.7.3.2 states that at least three inde-

pendent AFW pumps and associated flow paths must be operable wh

2 or 3.

Step 6.1 of Procedure

requires the monthly performance of a trip test on the steam driven AFW pump

turbine in order to comply with LC0 3.7.1.2.

FINDING:

f

Contrary to the above, this trip test was not performed for the months ofT

Noveder 1984. Deceder 1984. and January 1985.

,

'

operated in mode 1, 2, or 3.

.

.

. . '

.

.

I

A. 5 N $

M! /bl

(b

UN

l

h !b o.

- . -

-

-

-

-

.

__

_

-

--

-

-

-

'

q

.

<

.

)

POTENTIAL ENFORCEMENT FINDING

FACILITY SAN _0NOFRE UNIT 3

DOCKET NO.

50-362

MTE 4/2/85

AREA

AUXILIARY FEEDWATER (AFW) SURYEILLANCE REVIEW

ITEMNO.N2/85-08-02

L

INSPECTOR

$.A. MCNEIL

y

TEAM LEADER

L.J. CALLAN

.

'

REQUIREMENT:

Technical Specification (TS) 6.8.1.c requires that written procedures shall be

established implemented and maintained for surveillance and test activities

of safety related equipment. TS 4.7.1.2.2

uires that the AFV system shall

be demonstrated operable prior to entering

e 2 following each cold shutdown

by performing a flow test.

Surveillance test procedurn $023-3-3.16.2, " Auxiliary Feedwater Flow Test",

which was established to meet the requirements of TS 4.7.1.2.2, states that

this test shall be perfonned for all AFV pumps while in mode 3 and RCS test

temperature (no load Tavg) shall be at least 544'F prior to testing the steam

driven AFW pump.

FINDING:

Contrary to the above, the electrically driven AFW pumps were tested in March

and Novenber 1984 while in mode 4 and in December 1984 the steam driven AFW

pump was tested with Tavg at less than 400*F.

  • ,,

.