{{#Wiki_filter:. ..    .                . _ .
{{#Wiki_filter:...
: 3. ,
3.
6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 i                                  The Station Superintendent shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.
6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Station Superintendent shall be responsible for overall i
6.2 ORGANIZATION 8
facility operation and shall delegate in writing the succession to this responsibility during his absence.
OFFSITE                                                  .
6.2 ORGANIZATION OFFSITE 8
6.2.1 The offsite organization for facil'ity management and technical support shall be as shown on Figure 6.2.1.
6.2.1 The offsite organization for facil'ity management and technical support shall be as shown on Figure 6.2.1.
FACILITY g                                         -
FACILITY g 6.2.2 The Facility organization shall be as shown on Figure 6.2-2 and:
6.2.2 The 6.2-2Facility and: organization shall be as shown on Figure a.
Each on duty shift shall be composed of at least the a.
Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1.     -
minimum shift crew composition shown in Table 6.2-1.
b.
b.
          )                             At least one licensed Operator shall be in the control room when fuel is in the reactor.
)
c.
At least one licensed Operator shall be in the control room when fuel is in the reactor.
At least two licensed Operators shall be present in the control room during-reactor start-up, scheduled reactor shutdown and during recovery from reactor trips.
At least two licensed Operators shall be present in c.
the control room during-reactor start-up, scheduled reactor shutdown and during recovery from reactor trips.
d.
d.
An individual qualified in radiation protection procedures reactor, shall be on site when fuel is in the e.
An individual qualified in radiation protection procedures shall be on site when fuel is in the
ALL CORE ~ ALTERATIONS shall be directly supervi' sed by either a licensed Senior Reactor Operator or                       l Senior Reactor Operator limited to fuel handling who                   i has no other concurrent responsibilities during this operation.
: reactor, ALL CORE ~ ALTERATIONS shall be directly supervi' sed e.
: f.                                                                         m A fire brigade of five (5) members shall be maintained on cite at all times. This excludes two (2) members of         l 44 the minimum shif t complement necessary for safe shutdown of the plant and any ps.rsonnel required for other essential ,
by either a licensed Senior Reactor Operator or Senior Reactor Operator limited to fuel handling who i
has no other concurrent responsibilities during this operation.
f.
A fire brigade of five (5) members shall be maintained l 44 m
on cite at all times.
This excludes two (2) members of the minimum shif t complement necessary for safe shutdown of the plant and any ps.rsonnel required for other essential,
functions during a fire emergency.
functions during a fire emergency.
* be one less than the minimum requirement for a period ofThe brigad time not to exceed 2 hours in order to accomodate unexpected absences.                                                       44
be one less than the minimum requirement for a period ofThe brigad time not to exceed 2 hours in order to accomodate unexpected 44 absences.
      \
\\
      /                                                                                 -
/
8507180521 850709 PDR   ADOCK 05000213 p                     PDR-                               ,
8507180521 850709 PDR ADOCK 05000213 p
6-1 l
PDR-6-1 l
l


r
r
      ~ a *.
~ a *.
l s                                               ,                                                            ,
s
        )
)
Facility Staff g.
Facility Staff Administrative procedures shall be developed and g.
Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions. These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12).
implemented to limit the working hours of unit staff who perform safety-related functions.
These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12).
e.-
e.-
e o
e o
Line 55: Line 61:
C-la
C-la


Docket No. 50-2te5 Attachment 2 Millstone Nuclear Power Station Unit No.1 Proposed Revision to Technical Specification 1
Docket No. 50-2te5 Millstone Nuclear Power Station Unit No.1 Proposed Revision to Technical Specification 1
June 1985
June 1985


6.0 ADMINISTR ATTVE CONTROLS N.           6.1 RESPONSIBILITY
6.0 ADMINISTR ATTVE CONTROLS N.
: 6. i .1   *he Station Superintendent shall be responsible for overall cperation of the Mi!! stone Station Site while the Unit Superintendent shall be rerpensible for operation of the unit. The Station Superintendent and Unit Superintendent shall each delegate in writing the succession to these re:ponsibilities during their ab sence.
6.1 RESPONSIBILITY
: 6. i.1
*he Station Superintendent shall be responsible for overall cperation of the Mi!! stone Station Site while the Unit Superintendent shall be rerpensible for operation of the unit. The Station Superintendent and Unit Superintendent shall each delegate in writing the succession to these re:ponsibilities during their ab sence.
6.2 ORG ANIZATION OFFSITE 6.2.1 The Offsite organization for ' facility management and technical support shall be as shown on Figure 6.2-1.
6.2 ORG ANIZATION OFFSITE 6.2.1 The Offsite organization for ' facility management and technical support shall be as shown on Figure 6.2-1.
FACILITY STAFF 6.2.2 The Facility organization shallbe as shown on Figure 6.2-2 and:
FACILITY STAFF 6.2.2 The Facility organization shallbe as shown on Figure 6.2-2 and:
: a. . Each on dutf shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1.
: a..
                          ~
Each on dutf shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1.
: b. At least one licensed Operator shall be in the control room when' fuel is in the reactor.
~
    ^.                        c.  'At least two licensed Operators shall be present in the control room
b.
      ")                           during reactor start-up, scheduled react 6r shutdown and during recovery from reactor trips.
At least one licensed Operator shall be in the control room when' fuel is in the reactor.
: d. An individual qualified in radiation protection procedures shall be on site when fuelis'in the reactor.#
'At least two licensed Operators shall be present in the control room
: e. ALL CORE Al ERATIONS after the initial fuel loading shall be directly supervised by either a licens'ed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other
^.
                                                                            ~
c.
")
during reactor start-up, scheduled react 6r shutdown and during recovery from reactor trips.
d.
An individual qualified in radiation protection procedures shall be on site when fuelis'in the reactor.#
e.
ALL CORE Al ERATIONS after the initial fuel loading shall be directly supervised by either a licens'ed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other
~
concurrent responsibilities during this operation.
concurrent responsibilities during this operation.
: f. A site Fire Brigade of at least 5 meh.bers shall be maintained onsite at all times.# The Fire Brigade shall not include 2 members of the minimum shift ' crew necessary ter safe shutdown of the unit or any personnel required .for other es.t-ntial functions during a fire emergency.           ,
A site Fire Brigade of at least 5 meh.bers shall be maintained onsite f.
: g. Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions. These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic
at all times.# The Fire Brigade shall not include 2 members of the minimum shift ' crew necessary ter safe shutdown of the unit or any personnel required.for other es.t-ntial functions during a fire emergency.
* Letter No. 82-12).                    .
g.
(( g h   hh     h   .
Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions. These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12).
(( g h hh h
6-1
6-1


6.3 FACILITY STAFF OUALIFICATIONS 6.3.1 Each mernber of the facility staff shall meet or exceed the minimum qualifications of ANSI NIE.1-1971 for comparable positions, except for (1) the
6.3 FACILITY STAFF OUALIFICATIONS 6.3.1 Each mernber of the facility staff shall meet or exceed the minimum qualifications of ANSI NIE.1-1971 for comparable positions, except for (1) the Radiation Protection Manager who shall meet or exceed the qualifications of Regulatory Guide 1.2, Revision 1, and (2) the Shift Technical Advisor who shall have a Bachelor Degree or equivalent in a scientific or engineering discipline wim specific training in plant design, and response and analysis of -Ae plant for j
* Radiation Protection Manager who shall meet or exceed the qualifications of Regulatory Guide 1.2, Revision 1, and (2) the Shift Technical Advisor who shall have a Bachelor Degree or equivalent in a scientific or engineering discipline wim specific training in plant design, and response and analysis of -Ae plant for j                       transients and accidents.                                                        .
transients and accidents.
6-la
6-la


p-                                                                                                                                             l I
p-I I
I Docket No. 50-336
Docket No. 50-336
                                                                          . Attachment 3 Millstone Nuclear Power Station Unit No. 2 Proposed Revision to Technical Specification _
. Attachment 3 Millstone Nuclear Power Station Unit No. 2 Proposed Revision to Technical Specification _
a 2
a 2
i k
i k
f                                                                                                                                               t' l.
f t'
l.
i i
i i
t i                                                                                                                                               h i
t i
j"                                                                                                                                             I, r
h i
i                                                                                                                                               !
j "
t
I, r
,                                                                                                                                              i g                                                                                                                                               i.
i t
I
i g
!                                                                                                          June 1985                           ;
i.
(                                                                                                                                               j t                                                                                                                                               '
I June 1985
(
j t
i
i
\'
\\'
7
7
+
+
i a
i a
1 e -- % ,smm e .w se w-, -e e s erw s ,e ,=-,.i,,e-wmme       . . , - , _ -
1
_ _ e ,w ow%
.e-evr-4e w=weee e -- %,smm e.w
                                                                                                                            .__,w_   . eww-ygw
- merese,. e i se w-,
-e e s erw s,e,=-,.i,,e-wmme
_ _ e,w ow%
.__,w_
. eww-ygw


r 6.0 ADMINISTRATIVE CONTROLS 6.1       RESPONSIBILITY 6.1.1        The Station Superintendent shall be responsible for overall operation of the Millstone Station Site while the Unit Superintendent shall be responsible for operation of the unit. The Station Superintendent and Unit Superintendent shall each delegate in writing the succession to these responsibilities during their absence.
r 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY The Station Superintendent shall be responsible for overall operation of 6.1.1 the Millstone Station Site while the Unit Superintendent shall be responsible for operation of the unit. The Station Superintendent and Unit Superintendent shall each delegate in writing the succession to these responsibilities during their absence.
6.2 ORGANIZATION                                                         .
6.2 ORGANIZATION OFFSITE The offsite organization for facility management and technical support 6.2.1 shall be as shown on Figure 6.2-1.
OFFSITE 6.2.1        The offsite organization for facility management and technical support         .
FACILITY STAFF 6.~2.2 The Facility organization shall be as.shown on Figure 6.2-2 and:
shall be as shown on Figure 6.2-1.
Each on duty shift shall be composed of at least the. minimum shift a.
FACILITY STAFF 6.~2.2       The Facility organization shall be as.shown on Figure 6.2-2 and:
crew composition shown in Table 6.2-1.
: a. Each on duty shift shall be composed of at least the. minimum shift crew composition shown in Table 6.2-1.
b.
: b. At least one licensed Operatgr shfll be in the control room when fuel is in the reactor.                           t
At least one licensed Operatgr shfll be in the control room when fuel is in the reactor.
: c. At least two licensed Operatch shall be present in the control room during reactor start-up, scheduled reactor shutdown and during, recovery from reactor trips.
t At least two licensed Operatch shall be present in the control room c.
: d. An Mndividual qualified in radiation protection procedures shall be
during reactor start-up, scheduled reactor shutdown and during, recovery from reactor trips.
  !                                        on site when fuel is in the reactor.f
d.
: e. All CORE. ALTERATIONS after the initial fuel loading shall be directly supervised by either it licensed Senior Reactor Operator or Senior Reactor Ooerator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
An Mndividual qualified in radiation protection procedures shall be on site when fuel is in the reactor.f All CORE. ALTERATIONS after the initial fuel loading shall be directly e.
: f. A site Fire Brigade of at least 5 members shall be maintained onsite .at all times.f The Fire Brigade shall not include 2 members of the minimum shift crew necessary for safe shutdown of the. unit or any personnel required for other essential functions during a fire emergency.
supervised by either it licensed Senior Reactor Operator or Senior Reactor Ooerator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
: g. Administrative procedures shall be developed and i
f.
implemented to limit the working hours of unit
A site Fire Brigade of at least 5 members shall be maintained onsite.at all times.f The Fire Brigade shall not include 2 members of the minimum shift crew necessary for safe shutdown of the. unit or any personnel required for other essential functions during a fire emergency.
      !                                    staff who perform safety-related functions. These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12),
g.
Administrative procedures shall be developed and implemented to limit the working hours of unit i
staff who perform safety-related functions. These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12),
i l
i l
i g
g i
                            # See Note on Page 6-4.
# See Note on Page 6-4.
MILLSTONE - UNIT 2                                             6-1
MILLSTONE - UNIT 2 6-1


t; 6.3 FACILITY STAFF OUALIFICATIONS 6.3.1   Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI H18.1 .1971 for comparable positions, except for (1) the Radiation Protection Manager-who shall. meet or . exceed the qualifications of               !
t; 6.3 FACILITY STAFF OUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI H18.1.1971 for comparable positions, except for (1) the Radiation Protection Manager-who shall. meet or. exceed the qualifications of Regulatory Guide 1.8, Revision 1, and (2) the Shift Technical Advisor who shcIl have a Bachelor Degree or equivalent in a scientific or engineering discipline with specific training in plant design and response and analysis of the plant for transients and, accidents.
Regulatory Guide 1.8, Revision 1, and (2) the Shift Technical Advisor who shcIl have a Bachelor Degree or equivalent in a scientific or engineering discipline with specific training in plant design and response and analysis of the plant for transients and, accidents.
O O
O O
                                                                                                      /
/
6-la                                               /
6-la
                                                                                                  /
/
                                        .-- .      ._--          . _ _ _ _ _ .    -_ __. .. ._.    - _ _ .}}
/
- _ _.}}

Latest revision as of 09:37, 12 December 2024

Proposed Tech Spec Changes,Providing Administrative Procedures to Develop & Implement Limited Working Hours for Staff Performing safety-related Functions,Per Generic Ltr 82-12
ML20132F561
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 07/09/1985
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20132F558 List:
References
GL-82-12, TAC-55328, TAC-59258, NUDOCS 8507180521
Download: ML20132F561 (8)


Text

...

3.

6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Station Superintendent shall be responsible for overall i

facility operation and shall delegate in writing the succession to this responsibility during his absence.

6.2 ORGANIZATION OFFSITE 8

6.2.1 The offsite organization for facil'ity management and technical support shall be as shown on Figure 6.2.1.

FACILITY g 6.2.2 The Facility organization shall be as shown on Figure 6.2-2 and:

Each on duty shift shall be composed of at least the a.

minimum shift crew composition shown in Table 6.2-1.

b.

)

At least one licensed Operator shall be in the control room when fuel is in the reactor.

At least two licensed Operators shall be present in c.

the control room during-reactor start-up, scheduled reactor shutdown and during recovery from reactor trips.

d.

An individual qualified in radiation protection procedures shall be on site when fuel is in the

reactor, ALL CORE ~ ALTERATIONS shall be directly supervi' sed e.

by either a licensed Senior Reactor Operator or Senior Reactor Operator limited to fuel handling who i

has no other concurrent responsibilities during this operation.

f.

A fire brigade of five (5) members shall be maintained l 44 m

on cite at all times.

This excludes two (2) members of the minimum shif t complement necessary for safe shutdown of the plant and any ps.rsonnel required for other essential,

functions during a fire emergency.

be one less than the minimum requirement for a period ofThe brigad time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accomodate unexpected 44 absences.

\\

/

8507180521 850709 PDR ADOCK 05000213 p

PDR-6-1 l

r

~ a *.

s

)

Facility Staff Administrative procedures shall be developed and g.

implemented to limit the working hours of unit staff who perform safety-related functions.

These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12).

e.-

e o

D e

C-la

Docket No. 50-2te5 Millstone Nuclear Power Station Unit No.1 Proposed Revision to Technical Specification 1

June 1985

6.0 ADMINISTR ATTVE CONTROLS N.

6.1 RESPONSIBILITY

6. i.1
  • he Station Superintendent shall be responsible for overall cperation of the Mi!! stone Station Site while the Unit Superintendent shall be rerpensible for operation of the unit. The Station Superintendent and Unit Superintendent shall each delegate in writing the succession to these re:ponsibilities during their ab sence.

6.2 ORG ANIZATION OFFSITE 6.2.1 The Offsite organization for ' facility management and technical support shall be as shown on Figure 6.2-1.

FACILITY STAFF 6.2.2 The Facility organization shallbe as shown on Figure 6.2-2 and:

a..

Each on dutf shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1.

~

b.

At least one licensed Operator shall be in the control room when' fuel is in the reactor.

'At least two licensed Operators shall be present in the control room

^.

c.

")

during reactor start-up, scheduled react 6r shutdown and during recovery from reactor trips.

d.

An individual qualified in radiation protection procedures shall be on site when fuelis'in the reactor.#

e.

ALL CORE Al ERATIONS after the initial fuel loading shall be directly supervised by either a licens'ed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other

~

concurrent responsibilities during this operation.

A site Fire Brigade of at least 5 meh.bers shall be maintained onsite f.

at all times.# The Fire Brigade shall not include 2 members of the minimum shift ' crew necessary ter safe shutdown of the unit or any personnel required.for other es.t-ntial functions during a fire emergency.

g.

Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions. These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12).

(( g h hh h

6-1

6.3 FACILITY STAFF OUALIFICATIONS 6.3.1 Each mernber of the facility staff shall meet or exceed the minimum qualifications of ANSI NIE.1-1971 for comparable positions, except for (1) the Radiation Protection Manager who shall meet or exceed the qualifications of Regulatory Guide 1.2, Revision 1, and (2) the Shift Technical Advisor who shall have a Bachelor Degree or equivalent in a scientific or engineering discipline wim specific training in plant design, and response and analysis of -Ae plant for j

transients and accidents.

6-la

p-I I

Docket No. 50-336

. Attachment 3 Millstone Nuclear Power Station Unit No. 2 Proposed Revision to Technical Specification _

a 2

i k

f t'

l.

i i

t i

h i

j "

I, r

i t

i g

i.

I June 1985

(

j t

i

\\'

7

+

i a

1

.e-evr-4e w=weee e -- %,smm e.w

- merese,. e i se w-,

-e e s erw s,e,=-,.i,,e-wmme

_ _ e,w ow%

.__,w_

. eww-ygw

r 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY The Station Superintendent shall be responsible for overall operation of 6.1.1 the Millstone Station Site while the Unit Superintendent shall be responsible for operation of the unit. The Station Superintendent and Unit Superintendent shall each delegate in writing the succession to these responsibilities during their absence.

6.2 ORGANIZATION OFFSITE The offsite organization for facility management and technical support 6.2.1 shall be as shown on Figure 6.2-1.

FACILITY STAFF 6.~2.2 The Facility organization shall be as.shown on Figure 6.2-2 and:

Each on duty shift shall be composed of at least the. minimum shift a.

crew composition shown in Table 6.2-1.

b.

At least one licensed Operatgr shfll be in the control room when fuel is in the reactor.

t At least two licensed Operatch shall be present in the control room c.

during reactor start-up, scheduled reactor shutdown and during, recovery from reactor trips.

d.

An Mndividual qualified in radiation protection procedures shall be on site when fuel is in the reactor.f All CORE. ALTERATIONS after the initial fuel loading shall be directly e.

supervised by either it licensed Senior Reactor Operator or Senior Reactor Ooerator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.

f.

A site Fire Brigade of at least 5 members shall be maintained onsite.at all times.f The Fire Brigade shall not include 2 members of the minimum shift crew necessary for safe shutdown of the. unit or any personnel required for other essential functions during a fire emergency.

g.

Administrative procedures shall be developed and implemented to limit the working hours of unit i

staff who perform safety-related functions. These procedures should follow the general guidance of the NRC Policy Statement on working hours (Generic Letter No. 82-12),

i l

g i

  1. See Note on Page 6-4.

MILLSTONE - UNIT 2 6-1

t; 6.3 FACILITY STAFF OUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI H18.1.1971 for comparable positions, except for (1) the Radiation Protection Manager-who shall. meet or. exceed the qualifications of Regulatory Guide 1.8, Revision 1, and (2) the Shift Technical Advisor who shcIl have a Bachelor Degree or equivalent in a scientific or engineering discipline with specific training in plant design and response and analysis of the plant for transients and, accidents.