In Reply Refer To:
'
'
        In Reply Refer To:
Docket: 50-298/85-25
,
,
      Docket: 50-298/85-25
;
;
;
;
  !                                                                                                 -
!
      Nebraska Public Power District
-
      ATTN:   J. M. Pilant, Manager, Technical
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
Staff-Nuclear Power Group
'
'
                  Staff-Nuclear Power Group
P. O. Box 499
      P. O. Box 499
:
:     Columbus, Nebraska 68601
Columbus, Nebraska 68601
      Gentlemen:
Gentlemen:
  i
i
      This refers to the inspection conducted by Dr. J. Blair Nicholas of this office               3
This refers to the inspection conducted by Dr. J. Blair Nicholas of this office
      during the period August 26-30, 1985, of activities authorized by NRC Operating               ,
3
        License DPR-46 for Ccoper Nuclear Station, and to the discussion of our
during the period August 26-30, 1985, of activities authorized by NRC Operating
        findings with Mr. P. V. Thomason and other members of your staff at the
,
License DPR-46 for Ccoper Nuclear Station, and to the discussion of our
findings with Mr. P. V. Thomason and other members of your staff at the
4
4
      conclusion of the inspection.
conclusion of the inspection.
      Areas examined during the inspection included transportation and solid radwaste
Areas examined during the inspection included transportation and solid radwaste
  j   activities. Within these areas, the inspection consisted of selective examina-
j
4
activities. Within these areas, the inspection consisted of selective examina-
      tion of procedures and representative records, interviews with personnel, and
tion of procedures and representative records, interviews with personnel, and
      observations by the insoector. These findings are documented in the enclosed
4
j     inspection report.
observations by the insoector. These findings are documented in the enclosed
  !
j
i     Within the scope of the inspection, no violations or deviations were
inspection report.
        identified.
!
;       In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
i
j     will be placed in the NRC Public Document Room unless you notify this office,                 I
Within the scope of the inspection, no violations or deviations were
      by telephone, within 10 days of the date of this letter, and submit written
identified.
t     application to withhold information contained therein within 30 days of the
;
      date of this letter. Such application must be consistent with the requirements
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
j     of 2.790(b)(1).
j
:      Should you have any questions concerning this inspection, we will be pleased to
will be placed in the NRC Public Document Room unless you notify this office,
;      discuss them with you.
I
!
by telephone, within 10 days of the date of this letter, and submit written
i                                                 Sincerely,
t
!                                                    8
application to withhold information contained therein within 30 days of the
                                                  ,NIIn4IEgnegfyy
date of this letter. Such application must be consistent with the requirements
                                                    .
j
                                                      E H. Joh'nson '
of 2.790(b)(1).
        B5jiog g [                B
Should you have any questions concerning this inspection, we will be pleased to
                                                  E. H. Johnson, Chief
:
                                                  Reactor Projects Branch
discuss them with you.
l        0
;
      Enclosure:
!
      Appendix - NRC Inspection Report
i
          50-298/85-25
Sincerely,
      cc w/ enclosure:      (see next page)              I s
,NIIn4IEgnegfyy
      RIV:FRPS            FRPS          SPB    RPSA                    RPB
!
          icholas/1w                REHall      JPJaudon                EJohnson
8
      Bp/)()/85
E H. Joh'nson '
      l                  lQMurrayU/gb/85
                                      j'd/ /85    \O/N85                  t0/$/85
.
.
B5jiog g [
B
E. H. Johnson, Chief
l
l
                                                                                          MO b
0
                                                                                              ll0
Reactor Projects Branch
                                                              -- . - - . -               - . . - -
Enclosure:
Appendix - NRC Inspection Report
50-298/85-25
I
cc w/ enclosure:
(see next page)
s
RIV:FRPS
FRPS
SPB
RPSA
RPB
icholas/1w
lQMurrayU/gb/85
j'd/ /85
\\O/N85
t0/$/85
REHall
JPJaudon
EJohnson
Bp/)()/85
l
.
MO b
l
ll0
-
-
-
.
-
-
.
.-
.
-- . - - . -
- . . - -


    *
*
  .
.
                                                                      l
Nebraska Public Power District
                                                                      l
cc w/ enclosure:
    Nebraska Public Power District
Paul V. Thomason, Division Manager
    cc w/ enclosure:
of Nuclear Operations
      Paul V. Thomason, Division Manager
Cooper Nuclear Station
        of Nuclear Operations
P. O. Box 98
    Cooper Nuclear Station
Brownville, Nebraska 68321
    P. O. Box 98
Kansas Radiation Control Program Director
    Brownville, Nebraska 68321
Nebraska Radiation Control Program Director
      Kansas Radiation Control Program Director
bec to DMB (IE06)
    Nebraska Radiation Control Program Director
bcc distrib. by RIV:
    bec to DMB (IE06)
*RPB
    bcc distrib. by RIV:
R. P. Denise, DRSP
      *RPB                         R. P. Denise, DRSP
* Resident Inspector
      * Resident Inspector         R. D. Martin, RA
R. D. Martin, RA
l     *Section Chief (RPB/A)       *D. Weiss, LFMB (AR-2015
l
*Section Chief (RPB/A)
*D. Weiss, LFMB (AR-2015
!
!
      *R&SPB                       *B. Murray, FRPS
*R&SPB
      * MIS System                 *B. Nicholas, FRPS
*B. Murray, FRPS
      *RIV File                     R. Bangart, DRS&S
* MIS System
      *RSTS Operator
*B. Nicholas, FRPS
      *w/766
*RIV File
                                                            _ - _ _ .
R. Bangart, DRS&S
*RSTS Operator
*w/766
- - - _ .
_ - _ _ .
}}
}}

Latest revision as of 07:12, 12 December 2024

Forwards Insp Rept 50-298/85-25 on 850826-30.No Violations or Deviations Noted
ML20133P620
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/21/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20133P624 List:
References
NUDOCS 8511010088
Download: ML20133P620 (2)


See also: IR 05000298/1985025

Text

.-

-

-

-

- .._ _

_.

__

-_

.

-

--

- _ _ -

-

S.

4

In Reply Refer To:

'

Docket: 50-298/85-25

,

!

-

Nebraska Public Power District

ATTN:

J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

'

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

i

This refers to the inspection conducted by Dr. J. Blair Nicholas of this office

3

during the period August 26-30, 1985, of activities authorized by NRC Operating

,

License DPR-46 for Ccoper Nuclear Station, and to the discussion of our

findings with Mr. P. V. Thomason and other members of your staff at the

4

conclusion of the inspection.

Areas examined during the inspection included transportation and solid radwaste

j

activities. Within these areas, the inspection consisted of selective examina-

tion of procedures and representative records, interviews with personnel, and

4

observations by the insoector. These findings are documented in the enclosed

j

inspection report.

!

i

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

j

will be placed in the NRC Public Document Room unless you notify this office,

I

by telephone, within 10 days of the date of this letter, and submit written

t

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the requirements

j

of 2.790(b)(1).

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

!

i

Sincerely,

,NIIn4IEgnegfyy

!

8

E H. Joh'nson '

.

B5jiog g [

B

E. H. Johnson, Chief

l

0

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-298/85-25

I

cc w/ enclosure:

(see next page)

s

RIV:FRPS

FRPS

SPB

RPSA

RPB

icholas/1w

lQMurrayU/gb/85

j'd/ /85

\\O/N85

t0/$/85

REHall

JPJaudon

EJohnson

Bp/)()/85

l

.

MO b

l

ll0

-

-

-

.

-

-

.

.-

.

-- . - - . -

- . . - -

.

Nebraska Public Power District

cc w/ enclosure:

Paul V. Thomason, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE06)

bcc distrib. by RIV:

  • RPB

R. P. Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

l

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015

!

  • R&SPB
  • B. Murray, FRPS
  • MIS System
  • B. Nicholas, FRPS
  • RIV File

R. Bangart, DRS&S

  • RSTS Operator
  • w/766

- - - _ .

_ - _ _ .