4 M.SAN ONOFRE NUCLEAR GENERATING STATION                                              ;) - i ,-       ;,
4 M.
OPERATING INSTRUCTION S023-3-2.7                   i UNITS 2 AND 3                                           REVISION 7                 PAGE 1 0F 4 o
;) - i,-
ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7-R                                                               ,
SAN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION S023-3-2.7 i
HPSI PUMP P-017 ALIGNMENT UNIT     2         (2 or 3)                 0 ATE \'LF'e O y             TIME Alo O PREREQUIS:ITES                       -
UNITS 2 AND 3 REVISION 7 PAGE 1 0F 4 o
                                                                      ,                                    INITIALS 1.1   Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.                                           bs $                             .
ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7-R HPSI PUMP P-017 ALIGNMENT UNIT 2
1.1.1                   List all applicable TCNs or write N.A.
(2 or 3) 0 ATE \\'LF'e O y TIME Alo O PREREQUIS:ITES INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.
TC#       ~l- 2 1.2   On-shift SRO-Operations Supervisor approval obtained.
bs $
(SRO OPS SUPV Initials) 1.3     If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service and will not be affected by the performance                                                           ,
1.1.1 List all applicable TCNs or write N.A.
of this procedure.                                                                 A               y
TC#
: t. .
~l-2 1.2 On-shift SRO-Operations Supervisor approval obtained.
2.0   PROCEDURE                                                                         INITIALS                 ~.
(SRO OPS SUPV Initials) 1.3 If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service and will not be affected by the performance of this procedure.
A y
: t..
2.0 PROCEDURE INITIALS
~.
IST / 2ND
IST / 2ND
    . .-)
..-)
      "1 l               NOTE:           (1) Not applicable if performed in conjunction                                 r with Check-Off List 10.
"1 l
2.1   Placing HPSI P-017 In Service 2.1.1           Lock Open HPSI P-017 miniflow rectre,                             f                       -
NOTE:
valve 52(3)1204MUO34                                         c4/CdN
(1) Not applicable if performed in conjunction r
                                    .1       Lock closed HPSI P017 miniflow orifice bypass valve                                      (,1. g r0 S2(3)1204MU184                                             W / U" ' it                       .
with Check-Off List 10.
2.1.2           Lock Open HPSI P-017 suction valve
2.1 Placing HPSI P-017 In Service 2.1.1 Lock Open HPSI P-017 miniflow rectre, f
* 52(3)1204MU007                                               y// D)p                       i
valve 52(3)1204MUO34 c4/CdN
                            '                                                                                .)               w .e-2.1.3           Lock Open HPSI P-017 discharge valve                         /
.1 Lock closed HPSI P017
52(3)1204MUO12 cr-~7Oh 2.1.4           Open CCW to P-017                                               7 valve 52(3)1203MU228                                         1\ /@
(,1. g r0 miniflow orifice bypass valve S2(3)1204MU184 W / U" ' it 2.1.2 Lock Open HPSI P-017 suction valve
2.1.5           Open CCW from P-017                                           f valve 52(3)1203M0013                                         6 /Om
/
, l .'                                       NOTE: Notify Health Physics before venting lb                                                     potentially radioactive water 1           .
i 52(3)1204MU007 y / D)p
!                    B500150162 050717                                                                                         ,
.)
PDR     FOIA                                                                                                   ,
w.e-2.1.3 Lock Open HPSI P-017 discharge valve
BELLBS-425             PDR
/
52(3)1204MUO12 cr-~7Oh 2.1.4 Open CCW to P-017 7
valve 52(3)1203MU228 1\\ /@
2.1.5 Open CCW from P-017 f
valve 52(3)1203M0013 6 /Om
, l.'
NOTE: Notify Health Physics before venting lb potentially radioactive water 1
B500150162 050717 PDR FOIA BELLBS-425 PDR


r
)
                                                                                                                  )
r 3AN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 2 0F 4 ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7-8 2.0 PROCEDURE (Continued)
3AN ONOFRE NUCLEAR GENERATING STATION                 OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3                                         REVISION 7               PAGE 2 0F 4
INITIALS IST / 2ND 2.1.6 Vent P-017 suction piping bp uncapptr3 I
-                                                            ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7-8               -
and venting'with P-017 suction vent
2.0   PROCEDURE (Continued)                                                     INITIALS IST / 2ND 2.1.6       Vent P-017 suction piping bp uncapptr3 I               and venting'with P-017 suction vent                       )
)
valve S2(3)1204MR088                                   * / raw \
valve S2(3)1204MR088
2.1.7       Close and cap P-017 suction vent                         j valve S2(3)1204MR088                                   7-/C\ ~
* / raw \\
2.1.7 Close and cap P-017 suction vent j
valve S2(3)1204MR088 7-/C\\
~
NOTE: Notify Health Physics before venting potentially radioactive water.
NOTE: Notify Health Physics before venting potentially radioactive water.
2.1.8       Vent P-017 discharge piping by uncapping and venting with P-017 miniflow vent valve 52(3)1204MR279                                   [ /CM                i 2.1.9       Close and cap P-017 miniflow vent valve S2(3)1204MR279                                   ] /Cdh 2.1.10     HPSI P-017 Breaker A0408:                                             i RACKED IN                             '
2.1.8 Vent P-017 discharge piping by uncapping
)fe                                         DC ON-W                                           CLOSING SPRINGS                               I CHG MOTOR ENERGIZED.                         h /CdA       .
[ /CM and venting with P-017 miniflow vent i
CAUTION         If P-018 is not aligned to Train A,
valve 52(3)1204MR279
                                    =======         until P-017 is declared operable per step 2.1.11, Train A HPSI is not operable. With the plant                                 ,
] /Cdh 2.1.9 Close and cap P-017 miniflow vent valve S2(3)1204MR279 2.1.10 HPSI P-017 Breaker A0408:
in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
i RACKED IN
(1)2.1.11       With an operator present at P-017 to                                     ,
)fe DC ON-W CLOSING SPRINGS I
check for abnormal operation, start                                     i P-017 and verify P-017 operable as                                       -
CHG MOTOR ENERGIZED.
                      .            follows:
h /CdA CAUTION If P-018 is not aligned to Train A, until P-017 is declared operable
                                .1 Verify P-017 starts and develops
 
      ,                            greater than 1400 psig discharge               .
=======
pressure as indicated on PI-0308 (CR-57)
per step 2.1.11, Train A HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
(1)2.1.11 With an operator present at P-017 to check for abnormal operation, start i
P-017 and verify P-017 operable as follows:
.1 Verify P-017 starts and develops greater than 1400 psig discharge pressure as indicated on PI-0308 (CR-57)
D
D
                                .2 Verify P-017 exhibits no unusual vibration or leakage while running NOTE:               (1) Not applicable if performed in
.2 Verify P-017 exhibits no unusual vibration or leakage while running
{ *.                                    conjunction with Check-Off List 10.
{ *.
l
NOTE:
(1) Not applicable if performed in l
conjunction with Check-Off List 10.


.z _    y s -
.z y
3AN ONOFRE NUCLEAR GENERATING STATION                       OPERATING INSTRUCTION 5023-3-2.7     .
s 3AN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 ONITS 2 AND 3 REVIS10N 7 PAGE 3 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN _7 - 6 2.0 PROCEDURE (Contimued)
ONITS 2 AND 3                                               REVIS10N 7           PAGE 3 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN _7 - 6 2.0   PROCEDURE (Contimued)                                                         INITIALS IST / 2ND (1)2.1.12 Stop P-017.                             ,
INITIALS IST / 2ND (1)2.1.12 Stop P-017.
52/L_
52/L_
v
[
[         .
v NOTE:
NOTE:           P-017 is now operable 2.2     Ren.oving P-017 from Service CAUTION     If P-018 is not aligned to Train A,
P-017 is now operable 2.2 Ren.oving P-017 from Service CAUTION If P-018 is not aligned to Train A, completing the following steps will
                    ----- r     completing the following steps will make Train A HPSI inoperable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
----- r make Train A HPSI inoperable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
A 2.2.1       Turn DC Off and Rack Out HPSI                                           /ie P-017 breaker A0408                                           /       V' e~
A 2.2.1 Turn DC Off and Rack Out HPSI
A-                 2.2.2       Lock Closed HPSI P-017 miniflow recirc valve S2(3)1204MUO34                                   /
/ie P-017 breaker A0408
2.2.3       Lock Closed HPSI P-017 discharge valve 52(3)1204MUO12                                         /
/
2.2.4       Lock Closed HPSI P-017 suction valve 52(3)1204MU007                                         /
V' e~
2.2.5       If isolation of CCW to P-017 is desired, proceed as follows:
A-2.2.2 Lock Closed HPSI P-017 miniflow recirc valve S2(3)1204MUO34
/
2.2.3 Lock Closed HPSI P-017 discharge valve 52(3)1204MUO12
/
2.2.4 Lock Closed HPSI P-017 suction valve 52(3)1204MU007
/
2.2.5 If isolation of CCW to P-017 is desired, proceed as follows:
otherwise, N/A these steps:
otherwise, N/A these steps:
                            .1 Close CCW to P-017 valve 52(3)1203MU228                                               /
.1 Close CCW to P-017 valve 52(3)1203MU228
2 Close CCW from P-017 valve                                                     !
/
S2(3)1203MU013
2 Close CCW from P-017 valve S2(3)1203MU013


n .- w w.                      .
n.- w w.
        ~ 3AN ONOFRE NUCLEAR GENERATING STATION                                                       '
~ 3AN ONOFRE NUCLEAR GENERATING STATION UNITS 2 ANO 3 OPERATING INSTRUCTION 5023-3-2.7 REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN _]- A PERFORMED BY:
UNITS 2 ANO 3                                       OPERATING INSTRUCTION 5023-3-2.7 REVISION 7             PAGE 4 0F 4
fu
,                                                              ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN _]- A PERFORMED BY:                 fu     .
/M_4 DATE/ TIME 13 Fa (<
                                                        /M_4           DATE/ TIME 13 Fa (<   rn7d OpeT(Wr           Iriitia1                                 /
rn7d OpeT(Wr Iriitia1
PERFORMED BY:           //     c, ,        [#             DATE/ TIME / M6th 02,7 7
/
                      .            ~ OpWaTpV.            Initial                                   '
PERFORMED BY:
VERIFI'ED BY:                     ,h       / C 3 ty\
//
Q)per to r            Initi 1 DATE/ TIME     12.Yeh.Y6[t'L71
~ OpWaTpV.
                                                                                              /
[#
VERIFIED BY:             ._
DATE/ TIME / M6th 02,7 7 c,,
dha /                     DATE/ TIME '2-II- fr !t 2. 7 7 O-lh-8$ OWf NOTE:
Initial VERIFI'ED BY:
,h
/ C 3 ty\\
DATE/ TIME 12.Yeh.Y6[t'L71 Q)per to r Initi 1
/
VERIFIED BY:
dha /
DATE/ TIME '2-II-fr !t 2. 7 7 O-lh-8$
OWf NOTE:
SRO Ops. Supv. shall not sign " Reviewed By" until all coments in relation to this Check-Of f List have beeri resolved f.e.:
SRO Ops. Supv. shall not sign " Reviewed By" until all coments in relation to this Check-Of f List have beeri resolved f.e.:
TCNs written and incorporated, caps and flanges installed, locks and chains in place, etc.
TCNs written and incorporated, caps and flanges installed, locks and chains in place, etc.
REVIEWED BY:           l             J                                             0
REVIEWED BY:
                                '(     00     Supv.) 8 DATE/ TIME _    7 55
l J
                                                                                    //
DATE/ TIME _
FILE DISPOSITION:   File per 5023-0-28
7 55 0
                                                                                                          ,k7 COMMENTS:
'(
00 Supv.)
//
8 FILE DISPOSITION:
File per 5023-0-28
,k7 COMMENTS:
i II94g
i II94g
(                       -
(


2-t,         ;
2-t, SA'N ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION S023-3-2.7 UN'ITS 2 AND 3 REVISION 7 PAGE 1 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN 7 R HPSI PUMP P-017 ALIGNMENT UNIT 1
SA'N ONOFRE NUCLEAR GENERATING STATION                   OPERATING INSTRUCTION S023-3-2.7 UN'ITS 2 AND 3                                           REVISION 7
(2 or 3)
* PAGE 1 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN 7 R HPSI PUMP P-017 ALIGNMENT UNIT     1       (2 or 3)                     DATE \ 1 F 6Ir r           TIME _c~llo O PREREQUIS:ITES     -
DATE \\ 1 F 6Ir r TIME _c~llo O PREREQUIS:ITES INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.
INITIALS 1.1   Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.                                         bOI 1.1.1                     List all applicable TCNs or write N.A.
bOI 1.1.1 List all applicable TCNs or write N.A.
Tc# 7-R 1.2   On-shif t SRO-Operations Supervisor approval obtained.
Tc# 7-R 1.2 On-shif t SRO-Operations Supervisor approval obtained.
(SRO OPS SUPV Initials) 1.3   If in Mode 4 (write N/A if not), at least i
(SRO OPS SUPV Initials) 1.3 If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service i
one train of HPSI is operable and in service and will not be affected by the performance of this procedure.                                                                             -
and will not be affected by the performance of this procedure.
A             y 2.0   PROCEDURE                                                                       INITIALS             ~.
A y
2.0 PROCEDURE INITIALS
~.
IST / 2ND
IST / 2ND
          . f l               NOTE:           (1) Not applicable if performed in conjunction                           /-
. f l
J                               with Check-Off List 10.
NOTE:
2.1   Placing HPSI P-017 In Service 2.1.1             Lock Open HPSI P-017 miniflow rectre.                                          .
(1) Not applicable if performed in conjunction
f valve 52(3)1204MUO34                                     c4/CdD
/-
                                      .1       Lock closed HPSI P017 miniflow orifice bypass valve                                  L,hr/\
J with Check-Off List 10.
52(3)1204MU184                                         -s / trig                 ,
2.1 Placing HPSI P-017 In Service 2.1.1 Lock Open HPSI P-017 miniflow rectre.
2.1.2             Lock Open HPSI P-017 suction valve
f valve 52(3)1204MUO34 c4/CdD
* S2(3)1204MU007                                           1/ / 0)p                 i-2.1.3             Lock Open HPSI P-017 discharge valve                     s
.1 Lock closed HPSI P017
                                                                                                          )
,hr/\\
52(3)1204MUO12 cr-70-h 2.1.4             Open CCW to P-017 7
L miniflow orifice bypass valve 52(3)1204MU184
valve 52(3)1203MU228                                     B/U" 2.1.5             Open CCW from P-017
-s
                                                                                                          )
/ trig 2.1.2 Lock Open HPSI P-017 suction valve
valve $2(3)1203MUO13                                     A /Om
/
,    l.'
S2(3)1204MU007 1 / 0)p i-2.1.3 Lock Open HPSI P-017 discharge valve
    '                                          NOTE: Notify Health Physics before venting potentially radioactive water 11
)
s 52(3)1204MUO12 cr-70-h 2.1.4 Open CCW to P-017 7
valve 52(3)1203MU228 B/U" 2.1.5 Open CCW from P-017
)
valve $2(3)1203MUO13 A /Om l.'
NOTE: Notify Health Physics before venting potentially radioactive water 11


:- '                                                                                                      )
)
s                                       ~
s
3AN ONOFRE NUCLEAR GENERATING STATION                                                         ''
~
OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3                                         REVISION 7             PAGE 2 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN 7-8 2.0   PROCEDURE (Continued)                                                       INITIALS IST / 2NO 2.1.6       Vent P-017 suction piping bp uncapping and venting'with P-017 suction vent I
3AN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 2 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN 7-8 2.0 PROCEDURE (Continued)
valve 52(3)1204MR088                                   } / RAW \
INITIALS IST / 2NO 2.1.6 Vent P-017 suction piping bp uncapping I
2.1.7       Close and cap P-017 suction vent                         j valve 52(3)1204MR088                                 _7__ M y/
and venting'with P-017 suction vent valve 52(3)1204MR088
NOTE: Notify Health Physics before venting potentially radioactive water.
} / RAW \\
2.1.8       Vent P-017 discharge piping by uncapping and venting with P-017 miniflow vent                                         -
2.1.7 Close and cap P-017 suction vent
valve 52(3)1204MR279                                   [ /C)b            i 2.1.9       Close and cap P-017 miniflow vent valve 52(3)1204MR279                                 ] /Cdh 2.1.10     HPSI P-017 Breaker A0408:
_7__ M y/
f RACKED IN
j valve 52(3)1204MR088 NOTE: Notify Health Physics before venting potentially radioactive water.
:f::                                         OC ON g
2.1.8 Vent P-017 discharge piping by uncapping
y                                           CLOSING SPRINGS                             J CHG MOTOR ENERGIZED.
[ /C)b and venting with P-017 miniflow vent valve 52(3)1204MR279 i
A. /OM\       .
] /Cdh 2.1.9 Close and cap P-017 miniflow vent valve 52(3)1204MR279 f
CAUTION         If P-018 is not aligned to Train A,
2.1.10 HPSI P-017 Breaker A0408:
                                  ------=         untti P-017 is declared operable per step 2.1.11, Train A HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
RACKED IN
(1)2.1.11       With an operator present at P-017 to                                     ,
:f::
check for abnormal operation, start                                       l P-017 and verify P-017 operable as                                       *
OC ON g
                    .            follows:
y CLOSING SPRINGS J
                                .1 Verify P-017 starts and develops
CHG MOTOR ENERGIZED.
      ,                            greater than 1400 psig~ discharge             ,
A. /OM\\
pressure as indicated on PI-0308 (CR-57)                                               M
CAUTION If P-018 is not aligned to Train A, untti P-017 is declared operable
                                .2 Verify P-017 exhibits no unusual vibration or leakage while running NOTE:               (1) Not applicable if performed in
------=
{'l                                    conjunction with Check-Off List 10.
per step 2.1.11, Train A HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
(1)2.1.11 With an operator present at P-017 to check for abnormal operation, start l
P-017 and verify P-017 operable as follows:
.1 Verify P-017 starts and develops greater than 1400 psig~ discharge pressure as indicated on PI-0308 (CR-57)
M
.2 Verify P-017 exhibits no unusual vibration or leakage while running
{'l NOTE:
(1) Not applicable if performed in conjunction with Check-Off List 10.


r y- , :A                 ,
r y-
SAN ONOFRE NUCLEAR GENERATING STATION ON1TS 2 AND 3                                            OPERAThNGINSTRUCTIONS023-3-2.7               :
, :A SAN ONOFRE NUCLEAR GENERATING STATION OPERAThNGINSTRUCTIONS023-3-2.7 ON1TS 2 AND 3 REVISION 7 PAGE 3 0F 4
* REVISION 7               PAGE 3 0F 4
~
'    ~                                                             ATTACHMENT 8.7 CHECK-OFF LIST 7
ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN _7 - 8 2.0 PROCEDURE (Continued)
    .                                                                TCN _7 - 8 2.0   PROCEDURE (Continued)                           ,                                INITIALS IST / 2ND
INITIALS IST / 2ND
                      ,1)2.1.12
(,1)2.1.12 Stop P-017.
(            Stop P-017.                         ',            ,  'l -     *5[c__
'l -
g       .                                                          -
*5[c__
* NOTE:     P-017 is now operable 2.2     Removing P-017 from Service t
g NOTE:
CAUTION       If P-018 is n.ot aligned to Train A,
P-017 is now operable 2.2 Removing P-017 from Service t
                          ---- ==
CAUTION If P-018 is n.ot aligned to Train A, completing the following steps will j
j completing the following steps will make Train A HPSI inoperable. With the plant in Modes.1-3, comply we'h       e the action requirements of Technical                                                       s' Specification 3.5.2.
----==
2.2.1         Turn DC Off and Rack Out HPSI                                                     A>
make Train A HPSI inoperable. With the plant in Modes.1-3, comply we'h e
P-017 breaker A0408                                               /             Y; e
the action requirements of Technical s'
>  :; ' -                2.2.2
Specification 3.5.2.
        '                              Lock Closed HPSI P-017 miniflow recirc valve 52(3)1204MUO34                                       /
2.2.1 Turn DC Off and Rack Out HPSI A>
2.2.3       Lock Closed HPSI P-017 discharge valve S2(3)1204MUO12                                             /
P-017 breaker A0408
2.2.4       Lock Closed HPSI P-017 suction valve 52(3)1204MU007                                             /
/
2.2.5       If isolation of CCW to P-017 is desired, proceed as follows:
Y; e
f otherwise, N/A these steps:
2.2.2 Lock Closed HPSI P-017 miniflow recirc valve 52(3)1204MUO34
                                  .1 Close CCW to P-017 valve                                                                         !
/
S2(3)1203MU228                                             _
2.2.3 Lock Closed HPSI P-017 discharge valve S2(3)1204MUO12
                                                                                                        /                             !
/
                                  .2   Close CCW from P-017 valve                                                               !
2.2.4 Lock Closed HPSI P-017 suction valve 52(3)1204MU007
S2(3)1203MU013
/
* 1 i
2.2.5 If isolation of CCW to P-017 is desired, proceed as follows:
P i                           *
otherwise, N/A these steps:
: i.                                                                                                                                   l t
f
i i                                                                                                                                       f
.1 Close CCW to P-017 valve S2(3)1203MU228
: 7. aw.                      .
/
s
.2 Close CCW from P-017 valve S2(3)1203MU013 1
* AN ONOFRE NUCLEAR GENERATING STATION UN!TS 2 AND 3                                               OPERATING INSTRUCTION 5023-3-2.7
i P
* REVISION 7                   PAGE 4 0F 4 ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7 - @
i i.
PERFORMED BY:                 1/w Ope (t(r
l t
                                                                    /b In~1 t t a l OATE/ TIME 13Few W mfd
i i
                                                                                                                                /
f
PERFORMED BY:               /     c, ,     .
: 7. aw.
[4r       d DATE/ TIME /_M     E o, 02,97 OpWalgV                 Inttial                                                   '
* AN ONOFRE NUCLEAR GENERATING STATION s
VERIFI'ED BY:
UN!TS 2 AND 3 OPERATING INSTRUCTION 5023-3-2.7 REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7 - @
M)per
PERFORMED BY:
                                                                  / O$#\                 DATE/ TIME _}J.kb.Y5 tt'3')
1/w
Initi 1 atof VERIFIED BY:                           - Aa /                           DATE/ TIME T-II- fr !r. U7 NOTE:
/b OATE/ TIME 13Few W mfd Ope (t(r In~1 t t a l
                                    &'                                '"'f.                             .2-t3-3'.f &Y'f SRO Ops. Supv. shall not sign " Reviewed By" until all coments in relation to this Check-Off List have been resolved i.e.:
/
TCNs and    written chains  in and place,incorporated, etc.        caps and flanges installed, locks REVIEWED BY:                           _)
PERFORMED BY:
f(  00       Tupv.)   '                    DATE/ TIME _
/
                                                                                                        / /
c,,
7 55 0 FILE DISPOSITION: Flie per 5023-0-28                                                                                     %.
[4r d
COMMENTS:
DATE/ TIME /_M o, 02,97 E
OpWalgV Inttial VERIFI'ED BY:
/ O$#\\
DATE/ TIME _}J.kb.Y5 tt'3')
M)per atof Initi 1 VERIFIED BY:
- Aa /
DATE/ TIME T-II-fr !r. U7
'"'f.
.2-t3-3'.f &Y'f NOTE:
SRO Ops. Supv. shall not sign " Reviewed By" until all coments in relation to this Check-Off List have been resolved i.e.:
TCNs written and incorporated, caps and flanges installed, locks and chains in place, etc.
f(
REVIEWED BY:
_)
DATE/ TIME _
7 55 0 00 Tupv.)
/ /
FILE DISPOSITION: Flie per 5023-0-28 COMMENTS:
I I194g 9
I I194g 9
                                                                                    .-c. _ - _ _ - .          _.
.-c.
                                                                                                                            , . - - , _}}
,. - -, _}}

Latest revision as of 07:02, 12 December 2024

Rev 7 to Operating Instruction SO23-3-2.7, HPSI Pump P-017 Alignment
ML20134A045
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 02/12/1985
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20132C709 List:
References
FOIA-85-425 SO23-3-2.7-01, SO23-3-2.7-1, NUDOCS 8508150162
Download: ML20134A045 (8)


Text

,

4 M.

) - i,-

SAN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION S023-3-2.7 i

UNITS 2 AND 3 REVISION 7 PAGE 1 0F 4 o

ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7-R HPSI PUMP P-017 ALIGNMENT UNIT 2

(2 or 3) 0 ATE \\'LF'e O y TIME Alo O PREREQUIS:ITES INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.

bs $

1.1.1 List all applicable TCNs or write N.A.

TC#

~l-2 1.2 On-shift SRO-Operations Supervisor approval obtained.

(SRO OPS SUPV Initials) 1.3 If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service and will not be affected by the performance of this procedure.

A y

t..

2.0 PROCEDURE INITIALS

~.

IST / 2ND

..-)

"1 l

NOTE:

(1) Not applicable if performed in conjunction r

with Check-Off List 10.

2.1 Placing HPSI P-017 In Service 2.1.1 Lock Open HPSI P-017 miniflow rectre, f

valve 52(3)1204MUO34 c4/CdN

.1 Lock closed HPSI P017

(,1. g r0 miniflow orifice bypass valve S2(3)1204MU184 W / U" ' it 2.1.2 Lock Open HPSI P-017 suction valve

/

i 52(3)1204MU007 y / D)p

.)

w.e-2.1.3 Lock Open HPSI P-017 discharge valve

/

52(3)1204MUO12 cr-~7Oh 2.1.4 Open CCW to P-017 7

valve 52(3)1203MU228 1\\ /@

2.1.5 Open CCW from P-017 f

valve 52(3)1203M0013 6 /Om

, l.'

NOTE: Notify Health Physics before venting lb potentially radioactive water 1

B500150162 050717 PDR FOIA BELLBS-425 PDR

)

r 3AN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 2 0F 4 ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7-8 2.0 PROCEDURE (Continued)

INITIALS IST / 2ND 2.1.6 Vent P-017 suction piping bp uncapptr3 I

and venting'with P-017 suction vent

)

valve S2(3)1204MR088

  • / raw \\

2.1.7 Close and cap P-017 suction vent j

valve S2(3)1204MR088 7-/C\\

~

NOTE: Notify Health Physics before venting potentially radioactive water.

2.1.8 Vent P-017 discharge piping by uncapping

[ /CM and venting with P-017 miniflow vent i

valve 52(3)1204MR279

] /Cdh 2.1.9 Close and cap P-017 miniflow vent valve S2(3)1204MR279 2.1.10 HPSI P-017 Breaker A0408:

i RACKED IN

)fe DC ON-W CLOSING SPRINGS I

CHG MOTOR ENERGIZED.

h /CdA CAUTION If P-018 is not aligned to Train A, until P-017 is declared operable

=

per step 2.1.11, Train A HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.

(1)2.1.11 With an operator present at P-017 to check for abnormal operation, start i

P-017 and verify P-017 operable as follows:

.1 Verify P-017 starts and develops greater than 1400 psig discharge pressure as indicated on PI-0308 (CR-57)

D

.2 Verify P-017 exhibits no unusual vibration or leakage while running

{ *.

NOTE:

(1) Not applicable if performed in l

conjunction with Check-Off List 10.

.z y

s 3AN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 ONITS 2 AND 3 REVIS10N 7 PAGE 3 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN _7 - 6 2.0 PROCEDURE (Contimued)

INITIALS IST / 2ND (1)2.1.12 Stop P-017.

52/L_

[

v NOTE:

P-017 is now operable 2.2 Ren.oving P-017 from Service CAUTION If P-018 is not aligned to Train A, completing the following steps will


r make Train A HPSI inoperable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.

A 2.2.1 Turn DC Off and Rack Out HPSI

/ie P-017 breaker A0408

/

V' e~

A-2.2.2 Lock Closed HPSI P-017 miniflow recirc valve S2(3)1204MUO34

/

2.2.3 Lock Closed HPSI P-017 discharge valve 52(3)1204MUO12

/

2.2.4 Lock Closed HPSI P-017 suction valve 52(3)1204MU007

/

2.2.5 If isolation of CCW to P-017 is desired, proceed as follows:

otherwise, N/A these steps:

.1 Close CCW to P-017 valve 52(3)1203MU228

/

2 Close CCW from P-017 valve S2(3)1203MU013

n.- w w.

~ 3AN ONOFRE NUCLEAR GENERATING STATION UNITS 2 ANO 3 OPERATING INSTRUCTION 5023-3-2.7 REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN _]- A PERFORMED BY:

fu

/M_4 DATE/ TIME 13 Fa (<

rn7d OpeT(Wr Iriitia1

/

PERFORMED BY:

//

~ OpWaTpV.

[#

DATE/ TIME / M6th 02,7 7 c,,

Initial VERIFI'ED BY:

,h

/ C 3 ty\\

DATE/ TIME 12.Yeh.Y6[t'L71 Q)per to r Initi 1

/

VERIFIED BY:

dha /

DATE/ TIME '2-II-fr !t 2. 7 7 O-lh-8$

OWf NOTE:

SRO Ops. Supv. shall not sign " Reviewed By" until all coments in relation to this Check-Of f List have beeri resolved f.e.:

TCNs written and incorporated, caps and flanges installed, locks and chains in place, etc.

REVIEWED BY:

l J

DATE/ TIME _

7 55 0

'(

00 Supv.)

//

8 FILE DISPOSITION:

File per 5023-0-28

,k7 COMMENTS:

i II94g

(

2-t, SA'N ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION S023-3-2.7 UN'ITS 2 AND 3 REVISION 7 PAGE 1 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN 7 R HPSI PUMP P-017 ALIGNMENT UNIT 1

(2 or 3)

DATE \\ 1 F 6Ir r TIME _c~llo O PREREQUIS:ITES INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.

bOI 1.1.1 List all applicable TCNs or write N.A.

Tc# 7-R 1.2 On-shif t SRO-Operations Supervisor approval obtained.

(SRO OPS SUPV Initials) 1.3 If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service i

and will not be affected by the performance of this procedure.

A y

2.0 PROCEDURE INITIALS

~.

IST / 2ND

. f l

NOTE:

(1) Not applicable if performed in conjunction

/-

J with Check-Off List 10.

2.1 Placing HPSI P-017 In Service 2.1.1 Lock Open HPSI P-017 miniflow rectre.

f valve 52(3)1204MUO34 c4/CdD

.1 Lock closed HPSI P017

,hr/\\

L miniflow orifice bypass valve 52(3)1204MU184

-s

/ trig 2.1.2 Lock Open HPSI P-017 suction valve

/

S2(3)1204MU007 1 / 0)p i-2.1.3 Lock Open HPSI P-017 discharge valve

)

s 52(3)1204MUO12 cr-70-h 2.1.4 Open CCW to P-017 7

valve 52(3)1203MU228 B/U" 2.1.5 Open CCW from P-017

)

valve $2(3)1203MUO13 A /Om l.'

NOTE: Notify Health Physics before venting potentially radioactive water 11

)

s

~

3AN ONOFRE NUCLEAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 2 0F 4 ATTACHMENT 8.7 CHECK-0FF LIST 7 TCN 7-8 2.0 PROCEDURE (Continued)

INITIALS IST / 2NO 2.1.6 Vent P-017 suction piping bp uncapping I

and venting'with P-017 suction vent valve 52(3)1204MR088

} / RAW \\

2.1.7 Close and cap P-017 suction vent

_7__ M y/

j valve 52(3)1204MR088 NOTE: Notify Health Physics before venting potentially radioactive water.

2.1.8 Vent P-017 discharge piping by uncapping

[ /C)b and venting with P-017 miniflow vent valve 52(3)1204MR279 i

] /Cdh 2.1.9 Close and cap P-017 miniflow vent valve 52(3)1204MR279 f

2.1.10 HPSI P-017 Breaker A0408:

RACKED IN

f::

OC ON g

y CLOSING SPRINGS J

CHG MOTOR ENERGIZED.

A. /OM\\

CAUTION If P-018 is not aligned to Train A, untti P-017 is declared operable


=

per step 2.1.11, Train A HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.

(1)2.1.11 With an operator present at P-017 to check for abnormal operation, start l

P-017 and verify P-017 operable as follows:

.1 Verify P-017 starts and develops greater than 1400 psig~ discharge pressure as indicated on PI-0308 (CR-57)

M

.2 Verify P-017 exhibits no unusual vibration or leakage while running

{'l NOTE:

(1) Not applicable if performed in conjunction with Check-Off List 10.

r y-

, :A SAN ONOFRE NUCLEAR GENERATING STATION OPERAThNGINSTRUCTIONS023-3-2.7 ON1TS 2 AND 3 REVISION 7 PAGE 3 0F 4

~

ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN _7 - 8 2.0 PROCEDURE (Continued)

INITIALS IST / 2ND

(,1)2.1.12 Stop P-017.

'l -

  • 5[c__

g NOTE:

P-017 is now operable 2.2 Removing P-017 from Service t

CAUTION If P-018 is n.ot aligned to Train A, completing the following steps will j


==

make Train A HPSI inoperable. With the plant in Modes.1-3, comply we'h e

the action requirements of Technical s'

Specification 3.5.2.

2.2.1 Turn DC Off and Rack Out HPSI A>

P-017 breaker A0408

/

Y; e

2.2.2 Lock Closed HPSI P-017 miniflow recirc valve 52(3)1204MUO34

/

2.2.3 Lock Closed HPSI P-017 discharge valve S2(3)1204MUO12

/

2.2.4 Lock Closed HPSI P-017 suction valve 52(3)1204MU007

/

2.2.5 If isolation of CCW to P-017 is desired, proceed as follows:

otherwise, N/A these steps:

f

.1 Close CCW to P-017 valve S2(3)1203MU228

/

.2 Close CCW from P-017 valve S2(3)1203MU013 1

i P

i i.

l t

i i

f

7. aw.
  • AN ONOFRE NUCLEAR GENERATING STATION s

UN!TS 2 AND 3 OPERATING INSTRUCTION 5023-3-2.7 REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.7 CHECK-OFF LIST 7 TCN 7 - @

PERFORMED BY:

1/w

/b OATE/ TIME 13Few W mfd Ope (t(r In~1 t t a l

/

PERFORMED BY:

/

c,,

[4r d

DATE/ TIME /_M o, 02,97 E

OpWalgV Inttial VERIFI'ED BY:

/ O$#\\

DATE/ TIME _}J.kb.Y5 tt'3')

M)per atof Initi 1 VERIFIED BY:

- Aa /

DATE/ TIME T-II-fr !r. U7

'"'f.

.2-t3-3'.f &Y'f NOTE:

SRO Ops. Supv. shall not sign " Reviewed By" until all coments in relation to this Check-Off List have been resolved i.e.:

TCNs written and incorporated, caps and flanges installed, locks and chains in place, etc.

f(

REVIEWED BY:

_)

DATE/ TIME _

7 55 0 00 Tupv.)

/ /

FILE DISPOSITION: Flie per 5023-0-28 COMMENTS:

I I194g 9