ENS 50005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/07/2014 15:00 CDT
| event date = 04/07/2014 15:00 CDT
| last update date = 04/07/2014
| last update date = 04/07/2014
| title = Removal Of Radiation Monitors From Service For Planned Maintenance
| title = Removal of Radiation Monitors from Service for Planned Maintenance
| event text = Both Discharge Canal Radiation Monitor Sample Pumps will be removed from service to facilitate planned maintenance activities. This represents a loss of emergency assessment capability under NUREG-1022 Revision 3 since the Discharge Canal Radiation Monitors are used to assess NUE [Notification of Unusual Event] and Alert thresholds. The Sample Pumps are expected to be unavailable for approximately two hours. During this time, Chemistry will be obtaining samples every 2 hours.  As a result of the sampling, reasonable assurance exists that rising radiation levels will be able to be detected and monitored in order to protect the health and safety of the public.
| event text = Both Discharge Canal Radiation Monitor Sample Pumps will be removed from service to facilitate planned maintenance activities. This represents a loss of emergency assessment capability under NUREG-1022 Revision 3 since the Discharge Canal Radiation Monitors are used to assess NUE [Notification of Unusual Event] and Alert thresholds. The Sample Pumps are expected to be unavailable for approximately two hours. During this time, Chemistry will be obtaining samples every 2 hours.  As a result of the sampling, reasonable assurance exists that rising radiation levels will be able to be detected and monitored in order to protect the health and safety of the public.
The NRC Resident [Inspector] has been notified prior to removing the Radiation Monitors from service.
The NRC Resident [Inspector] has been notified prior to removing the Radiation Monitors from service.

Latest revision as of 20:51, 1 March 2018

ENS 50005 +/-
Where
Monticello Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-3.8 h-0.158 days <br />-0.0226 weeks <br />-0.00521 months <br />)
Opened: Brandon Callstrom
16:12 Apr 7, 2014
NRC Officer: Steve Sandin
Last Updated: Apr 7, 2014
50005 - NRC Website
Loading map...