ENS 50125: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/20/2014 08:53 EDT
| event date = 05/20/2014 08:53 EDT
| last update date = 05/20/2014
| last update date = 05/20/2014
| title = Loss Of Assessment Capability  Due To Pre-Planned Maintenance On Stack Radiation Monitor
| title = Loss of Assessment Capability  Due to Pre-Planned Maintenance on Stack Radiation Monitor
| event text = At 0853 EDT, Millstone Station Unit 2 removed the Stack Radiation Monitor RM-8169 from service for planned maintenance.  Maintenance and testing were completed and the Stack Radiation Monitor returned to service at 1100 EDT.
| event text = At 0853 EDT, Millstone Station Unit 2 removed the Stack Radiation Monitor RM-8169 from service for planned maintenance.  Maintenance and testing were completed and the Stack Radiation Monitor returned to service at 1100 EDT.
The licensee informed both State and local agencies and the NRC Resident Inspector.
The licensee informed both State and local agencies and the NRC Resident Inspector.

Latest revision as of 20:50, 1 March 2018

ENS 50125 +/-
Where
Millstone Dominion icon.png
Connecticut (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+1.62 h0.0675 days <br />0.00964 weeks <br />0.00222 months <br />)
Opened: Vince Wessling
14:30 May 20, 2014
NRC Officer: Steve Sandin
Last Updated: May 20, 2014
50125 - NRC Website
Loading map...