ML20136E072: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:- __ _ _ _ _ . _ _ , .             --
{{#Wiki_filter:- _ _ _ _ _. _ _,.
_ _ _ . -              . ...m   . __      _. ___  _,  __    _ _ .  . _ __  _
...m
                ;(g n.cNm                                                                               . WDM
;(g n.cNm WDM jo, UNITED STATES 8;
  '-                                jo, UNITED STATES 8;               .s ,     g                     NUCLEAR REGULATORY COMMISSION g                       : E                             WASHINGTON. D. C. 20555
.s,
              ..                      s s- s              /                                                                                                's
g NUCLEAR REGULATORY COMMISSION g
                            *****                                            FEB 11198:
: E WASHINGTON. D. C. 20555 s
Docket No. 50-361/362 MEMORANDUM FOR: Robert L. Tedesco, Assistant Director for Licensing Division of Licensing FROM:                     Vincent S. Noonan, Assistant Director for Materials & Qualifications Engineering Division of Engineering
/
s-FEB 11198:
's s
Docket No. 50-361/362 MEMORANDUM FOR: Robert L. Tedesco, Assistant Director for Licensing Division of Licensing FROM:
Vincent S. Noonan, Assistant Director for Materials & Qualifications Engineering Division of Engineering


==SUBJECT:==
==SUBJECT:==
FIRE PROTECTION SAFETY EVALUATION REPORT -
FIRE PROTECTION SAFETY EVALUATION REPORT -
SAN ONOFRE NUCLEAR GENERATING STATIONS Plant Name: San Onofre Nuclear Generating Stations, Units 2 and 3 Docket Numbers: 50-361/362 Licensing Stage: OL Milestone Number: N/A Responsible Branch: LB-3 Project Manager: H. Rood Chemical Engineering Reviewer: G. Harrison Requested Completion Date: N/A Review Status: Complete Enclosed is the fire protection section of the Safety Evaluation Report' of the San Onofre Nuclear Generating Station Units 2 and 3. The Fire Protection Program was reviewed in accordance with Appendix.A to Branch Technical Position ASB 9.5-1.
SAN ONOFRE NUCLEAR GENERATING STATIONS Plant Name: San Onofre Nuclear Generating Stations, Units 2 and 3 Docket Numbers: 50-361/362 Licensing Stage: OL Milestone Number: N/A Responsible Branch: LB-3 Project Manager:
The Fire Protection Program will be implemented prior to initial fuel load-ing. The applicant has installed alternate shutdown panels to assure safe cold shutdown without reliance on the cable spreading room, the control room, the zone 5 cable riser gallery or the ESF Switchgear Room. Based on our review, we find that the applicant's fire protection program with
H. Rood Chemical Engineering Reviewer:
                                ' improvements to be made before fuel load will meet the guidelines of Appendix A to Branch Technical Position APCSB 9.5-1, meets General Design Criterion 3, and is, therefore, acceptable.
G. Harrison Requested Completion Date: N/A Review Status: Complete Enclosed is the fire protection section of the Safety Evaluation Report' of the San Onofre Nuclear Generating Station Units 2 and 3.
j                           W p Vincent S. Noonan, Assittant Director for Materials & Qualifications Engineering Division of Engineering Encicsure: As stated
The Fire Protection Program was reviewed in accordance with Appendix.A to Branch Technical Position ASB 9.5-1.
The Fire Protection Program will be implemented prior to initial fuel load-ing. The applicant has installed alternate shutdown panels to assure safe cold shutdown without reliance on the cable spreading room, the control room, the zone 5 cable riser gallery or the ESF Switchgear Room.
Based on our review, we find that the applicant's fire protection program with
' improvements to be made before fuel load will meet the guidelines of Appendix A to Branch Technical Position APCSB 9.5-1, meets General Design Criterion 3, and is, therefore, acceptable.
W j
p Vincent S. Noonan, Assittant Director for Materials & Qualifications Engineering Division of Engineering Encicsure: As stated


==Contact:==
==Contact:==
G. Harrison cc: Next page                               ,
G. Harrison cc: Next page 3
3
\\
                                                        \
Q') o 3u %0L7] m q
Q') o 3u %0L7] m                                                                                                       q           :
~. -
                    ~. -             J                                                             .
J I
I.


                        ......__2.__.       -
.......__2.__.
j     .
j m ~? 1 *~B?
m~~~? 1 *~B?
~~
j                  Rcbert L. Tedesco                         .
Rcbert L. Tedesco j e
e cc:   R. Vollmer V. Noonan V. Benaroya R. Ferguson S. Hudson       '
cc:
H. Rood G. Harrison O
R. Vollmer V. Noonan V. Benaroya R. Ferguson S. Hudson H. Rood G. Harrison O
9 0
9 0
4 e}}
4 e}}

Latest revision as of 01:08, 12 December 2024

Forwards Fire Protection Safety Evaluation Supporting Program W/Improvements to Be Made Prior to Fuel Loading
ML20136E072
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/11/1981
From: Noonan V
Office of Nuclear Reactor Regulation
To: Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML20136D968 List:
References
FOIA-85-425 NUDOCS 8103030027
Download: ML20136E072 (2)


Text

- _ _ _ _ _. _ _,.

...m

(g n.cNm WDM jo, UNITED STATES 8;

.s,

g NUCLEAR REGULATORY COMMISSION g

E WASHINGTON. D. C. 20555 s

/

s-FEB 11198:

's s

Docket No. 50-361/362 MEMORANDUM FOR: Robert L. Tedesco, Assistant Director for Licensing Division of Licensing FROM:

Vincent S. Noonan, Assistant Director for Materials & Qualifications Engineering Division of Engineering

SUBJECT:

FIRE PROTECTION SAFETY EVALUATION REPORT -

SAN ONOFRE NUCLEAR GENERATING STATIONS Plant Name: San Onofre Nuclear Generating Stations, Units 2 and 3 Docket Numbers: 50-361/362 Licensing Stage: OL Milestone Number: N/A Responsible Branch: LB-3 Project Manager:

H. Rood Chemical Engineering Reviewer:

G. Harrison Requested Completion Date: N/A Review Status: Complete Enclosed is the fire protection section of the Safety Evaluation Report' of the San Onofre Nuclear Generating Station Units 2 and 3.

The Fire Protection Program was reviewed in accordance with Appendix.A to Branch Technical Position ASB 9.5-1.

The Fire Protection Program will be implemented prior to initial fuel load-ing. The applicant has installed alternate shutdown panels to assure safe cold shutdown without reliance on the cable spreading room, the control room, the zone 5 cable riser gallery or the ESF Switchgear Room.

Based on our review, we find that the applicant's fire protection program with

' improvements to be made before fuel load will meet the guidelines of Appendix A to Branch Technical Position APCSB 9.5-1, meets General Design Criterion 3, and is, therefore, acceptable.

W j

p Vincent S. Noonan, Assittant Director for Materials & Qualifications Engineering Division of Engineering Encicsure: As stated

Contact:

G. Harrison cc: Next page 3

\\

Q') o 3u %0L7] m q

~. -

J I

.......__2.__.

j m ~? 1 *~B?

~~

Rcbert L. Tedesco j e

cc:

R. Vollmer V. Noonan V. Benaroya R. Ferguson S. Hudson H. Rood G. Harrison O

9 0

4 e