B. H. Grier, Senior Reactor Inspector | 5 It. | ||
B. H. Grier, Senior Reactor Inspector July 19,1967 Division of Compliance, Headquarters | |||
H. D. Thornburg, Senior Reactor Inspector | / | ||
H. D. Thornburg, Senior Reactor Inspector | |||
[# | [# | ||
DOW CHEMICAL CCNPANY DOCKET No. 50-264 C0:III:HDI The attached report by our reactor inspector of a visitteothbc sub-ject facility on June 30, 1967 is forwarded for information. No items of noncompliance or safety significance were noted. | Region III, Division of Compliance DOW CHEMICAL CCNPANY DOCKET No. 50-264 C0:III:HDI The attached report by our reactor inspector of a visitteothbc sub-ject facility on June 30, 1967 is forwarded for information. No items of noncompliance or safety significance were noted. | ||
The issuance of an operating license for the subject facility was re-cowsended on June 30, 1967 following a visit to the site. Criticality was achieved at 9:55 a.m. on July 6,1%7 with a loading of 72 ele.nents. | The issuance of an operating license for the subject facility was re-cowsended on June 30, 1967 following a visit to the site. Criticality was achieved at 9:55 a.m. on July 6,1%7 with a loading of 72 ele.nents. | ||
The loading was performed in an orderly manner, using conservative ise-thods, and was based on good experimental predictions. | The loading was performed in an orderly manner, using conservative ise-thods, and was based on good experimental predictions. | ||
==Attachment:== | ==Attachment:== | ||
CO Rpt No. 264/67-2 by G. Fiore111 dtd 7-14-67 Distribution: | CO Rpt No. 264/67-2 by G. Fiore111 dtd 7-14-67 Distribution: | ||
D. J. Skovholt, DEL (3) | D. J. Skovholt, DEL (3) | ||
: 1. S. Boyd, DRL S. Levine, DEL R. Handler, CO HQ Senior Reactor Inspectors CD BQ File (2) 8508270297 850712 PDR | : 1. S. Boyd, DRL S. Levine, DEL R. Handler, CO HQ Senior Reactor Inspectors CD BQ File (2) 8508270297 850712 PDR FOIA KOHN85-256 PDR OFFICE > | ||
SURNAME > | ) | ||
DATE> | SURNAME > | ||
Pbena AEC 319(Rev.443) | DATE> | ||
Pbena AEC 319(Rev.443) | |||
: e. e. | |||
n.. | |||
e moi.e me.ca is-mon-a J}} | |||
Latest revision as of 23:28, 11 December 2024
Text
_
^f'
,'Q
'O
'I Cti 7 y
LLE d.
5 It.
B. H. Grier, Senior Reactor Inspector July 19,1967 Division of Compliance, Headquarters
/
H. D. Thornburg, Senior Reactor Inspector
[#
Region III, Division of Compliance DOW CHEMICAL CCNPANY DOCKET No. 50-264 C0:III:HDI The attached report by our reactor inspector of a visitteothbc sub-ject facility on June 30, 1967 is forwarded for information. No items of noncompliance or safety significance were noted.
The issuance of an operating license for the subject facility was re-cowsended on June 30, 1967 following a visit to the site. Criticality was achieved at 9:55 a.m. on July 6,1%7 with a loading of 72 ele.nents.
The loading was performed in an orderly manner, using conservative ise-thods, and was based on good experimental predictions.
Attachment:
CO Rpt No. 264/67-2 by G. Fiore111 dtd 7-14-67 Distribution:
D. J. Skovholt, DEL (3)
- 1. S. Boyd, DRL S. Levine, DEL R. Handler, CO HQ Senior Reactor Inspectors CD BQ File (2) 8508270297 850712 PDR FOIA KOHN85-256 PDR OFFICE >
)