ML20137G432: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
      ^f'
^f'
,'Q     ,'                                                                                                                    'O
,'Q
  'I Cti 7 y
'O
LLE d .
'I Cti 7 y
5 It .
LLE d.
B. H. Grier, Senior Reactor Inspector                                                 July 19,1967 Division of Compliance, Headquarters                                                                   .
5 It.
                                                                                                                                      /
B. H. Grier, Senior Reactor Inspector July 19,1967 Division of Compliance, Headquarters
H. D. Thornburg, Senior Reactor Inspector Region III, Division of Compliance
/
H. D. Thornburg, Senior Reactor Inspector
[#
[#
DOW CHEMICAL CCNPANY DOCKET No. 50-264 C0:III:HDI The attached report by our reactor inspector of a visitteothbc sub-ject facility on June 30, 1967 is forwarded for information. No items of noncompliance or safety significance were noted.
Region III, Division of Compliance DOW CHEMICAL CCNPANY DOCKET No. 50-264 C0:III:HDI The attached report by our reactor inspector of a visitteothbc sub-ject facility on June 30, 1967 is forwarded for information. No items of noncompliance or safety significance were noted.
The issuance of an operating license for the subject facility was re-cowsended on June 30, 1967 following a visit to the site. Criticality was achieved at 9:55 a.m. on July 6,1%7 with a loading of 72 ele.nents.
The issuance of an operating license for the subject facility was re-cowsended on June 30, 1967 following a visit to the site. Criticality was achieved at 9:55 a.m. on July 6,1%7 with a loading of 72 ele.nents.
The loading was performed in an orderly manner, using conservative ise-thods, and was based on good experimental predictions.
The loading was performed in an orderly manner, using conservative ise-thods, and was based on good experimental predictions.


==Attachment:==
==Attachment:==
CO Rpt No. 264/67-2 by G. Fiore111 dtd 7-14-67 Distribution:
CO Rpt No. 264/67-2 by G. Fiore111 dtd 7-14-67 Distribution:
D. J. Skovholt, DEL (3)
D. J. Skovholt, DEL (3)
: 1. S. Boyd, DRL S. Levine, DEL R. Handler, CO HQ Senior Reactor Inspectors CD BQ File (2) 8508270297 850712 PDR     FOIA KOHN85-256                             PDR OFFICE >     )                                                                                         ,
: 1. S. Boyd, DRL S. Levine, DEL R. Handler, CO HQ Senior Reactor Inspectors CD BQ File (2) 8508270297 850712 PDR FOIA KOHN85-256 PDR OFFICE >
SURNAME > .                                    -
)
DATE>     . . . . . . . . . . . . . . .  .              . . . . . . . . . . . . .    .. . .-                      .
SURNAME >
Pbena AEC 319(Rev.443)                                   e. e. n.. e moi.e me.ca               is-mon-a J}}
DATE>
Pbena AEC 319(Rev.443)
: e. e.
n..
e moi.e me.ca is-mon-a J}}

Latest revision as of 23:28, 11 December 2024

Forwards Insp Rept 50-264/67-02 on 670630 & G Fiorelli 670719 Memo.No Items of Noncompliance or Safety Significance Noted.Issuance of OL Recommended on 670630.Criticality Reached on 670706 w/72 Elements Loaded
ML20137G432
Person / Time
Site: Dow Chemical Company, 05000000
Issue date: 07/19/1967
From: Thornburg H
US ATOMIC ENERGY COMMISSION (AEC)
To: Grier B
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20136D183 List: ... further results
References
FOIA-85-256, FOIA-85-258, FOIA-85-259, FOIA-85-261 NUDOCS 8508270297
Download: ML20137G432 (1)


Text

_

^f'

,'Q

'O

'I Cti 7 y

LLE d.

5 It.

B. H. Grier, Senior Reactor Inspector July 19,1967 Division of Compliance, Headquarters

/

H. D. Thornburg, Senior Reactor Inspector

[#

Region III, Division of Compliance DOW CHEMICAL CCNPANY DOCKET No. 50-264 C0:III:HDI The attached report by our reactor inspector of a visitteothbc sub-ject facility on June 30, 1967 is forwarded for information. No items of noncompliance or safety significance were noted.

The issuance of an operating license for the subject facility was re-cowsended on June 30, 1967 following a visit to the site. Criticality was achieved at 9:55 a.m. on July 6,1%7 with a loading of 72 ele.nents.

The loading was performed in an orderly manner, using conservative ise-thods, and was based on good experimental predictions.

Attachment:

CO Rpt No. 264/67-2 by G. Fiore111 dtd 7-14-67 Distribution:

D. J. Skovholt, DEL (3)

1. S. Boyd, DRL S. Levine, DEL R. Handler, CO HQ Senior Reactor Inspectors CD BQ File (2) 8508270297 850712 PDR FOIA KOHN85-256 PDR OFFICE >

)

SURNAME >

DATE>

Pbena AEC 319(Rev.443)

e. e.

n..

e moi.e me.ca is-mon-a J