ML20137M890: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:_ _ . .                   ._ -              __                                  _            _ __          _ _    __ _  _ _ _ _ _
{{#Wiki_filter:_ _..
            ,      o N Commonwe lth Edison
o N Commonwe lth Edison O ) One First National Plaza, Chicago, Illinois O*
                                ,  O ) One First National Plaza, Chicago, Illinois O*     Address Reply to: Post Office Box 767 Chicago, litinois 60690 January 20, 1986 I
Address Reply to: Post Office Box 767 Chicago, litinois 60690 January 20, 1986 I
4                       Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 1
4 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 1


==Subject:==
==Subject:==
Quad Cities Station Units 1 and 2
Quad Cities Station Units 1 and 2 Supplement to Proposed Amendment to l
,                                                      Supplement to Proposed Amendment to l                                                     Section 6 of the Technical Specifications NRC Docket Nos. 50-254 and 50-265 References (a): Letter from T. J. Rausch to H. R. Denton dated February 17, 1983.
Section 6 of the Technical Specifications NRC Docket Nos. 50-254 and 50-265 References (a): Letter from T. J. Rausch to H. R. Denton dated February 17, 1983.
(b):       Letter from B. Rybak to H. R. Denton dated 1                                                            August 23, 1984.
(b):
Letter from B. Rybak to H. R. Denton dated August 23, 1984.
1
}
}


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
i The reference (a) letter proposed to amend Section 6 of the Technical Specifications for Facility Operating Licenses DPR-29 and 30 for Quad Cities Units 1 and 2, respectively.
i The reference (a) letter proposed to amend Section 6 of the Technical Specifications for Facility Operating Licenses DPR-29 and 30 for Quad Cities Units 1 and 2, respectively. Reference (b) provided additional l                     supplemental chan5es to Section 6 resulting in part from the issuance of revised reporting requirements in 10 CFR 50.72 and 50.73.                       As a result of organizational changes in our corporate and station managenent structure,                                         '
Reference (b) provided additional l
this transmittal provides adelitional changes to Section 6 of the Technical Specifications which supplement those previously submitted. Pursuant to 10 i                       CFR 50.90, we request your review and approval of these amendments.
supplemental chan5es to Section 6 resulting in part from the issuance of revised reporting requirements in 10 CFR 50.72 and 50.73.
The proposed amendmento for Quad cities Units 1 and 2 are provided in Attachments 1 and 2, respectively. To facilitate your review, these amendments incorporate all changes previously submitted in addition to the                                         i new organisational changes. Therefore, these proposed amendments entirely
As a result of organizational changes in our corporate and station managenent structure, this transmittal provides adelitional changes to Section 6 of the Technical Specifications which supplement those previously submitted. Pursuant to 10 i
!                      supercede the references (a) and (b) submittals. The additional changes                                             !
CFR 50.90, we request your review and approval of these amendments.
a                      beyond those previously submitted are sutunarized in Attachment 3. The                                             !
The proposed amendmento for Quad cities Units 1 and 2 are provided in Attachments 1 and 2, respectively. To facilitate your review, these amendments incorporate all changes previously submitted in addition to the i
revision bars in Attachments 1 and 2 reflect all changes relative to the currently approved Quad Cities Technical Specifications.                                                           l The proposed chan5es have been On-Site and Off-Site reviewed and                                   ,
new organisational changes. Therefore, these proposed amendments entirely supercede the references (a) and (b) submittals. The additional changes a
4                    approved. We have reviewed the additional Technical Specification
beyond those previously submitted are sutunarized in Attachment 3.
_                      amendments included in this transmittal and determincd that no significant hasards consideration exists. Our review is documented in Attachment 4.
The revision bars in Attachments 1 and 2 reflect all changes relative to the currently approved Quad Cities Technical Specifications.
Conunonwealth Edison is notifying the State of Illinou of this supplemental request by transmittal of a copy of this letter and its attachments to the l                     designated State Official.
l The proposed chan5es have been On-Site and Off-Site reviewed and approved. We have reviewed the additional Technical Specification 4
amendments included in this transmittal and determincd that no significant hasards consideration exists. Our review is documented in Attachment 4.
Conunonwealth Edison is notifying the State of Illinou of this supplemental request by transmittal of a copy of this letter and its attachments to the l
designated State Official.
l
l
{                             0601290096ADOCK h54 DR                         PDR Sh
{
0601290096 h54 Sh DR ADOCK PDR


t D H. R. Denton                                               January 20, 1986 Please direct any further questions you may have regarding this matter to this office.
t D
H. R. Denton January 20, 1986 Please direct any further questions you may have regarding this matter to this office.
Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are provided for your use.
Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are provided for your use.
Very truly yours, s
Very truly yours, s
7 J. R. Wojnarowski Nuclear Licensing Administrator im Attachments 1: Technical Specification Changes to DPR-29 2: Technical Specification Changes to DPR-30 3:   Summary of Supplemental Changes 4:   Evaluation of Significant Hazards Consideration ec: R. Bevan - NRR P. Eng - Region III NRC Resident Inspector - Quad Cities M. C. Parker - State of IL SUBSC HED AND S R to befo e me this         ' day of       11 hAAl- , 1986
7 J. R. Wojnarowski Nuclear Licensing Administrator im Attachments 1: Technical Specification Changes to DPR-29 2: Technical Specification Changes to DPR-30 3:
                    ,        Nh-Notary Public h
Summary of Supplemental Changes 4:
Evaluation of Significant Hazards Consideration ec:
R. Bevan - NRR P. Eng - Region III NRC Resident Inspector - Quad Cities M. C. Parker - State of IL SUBSC HED AND S R to befo e me this
' day of 11 hAAl-, 1986 Nh-Notary Public h
1119K}}
1119K}}

Latest revision as of 22:43, 11 December 2024

Supplemental Application for Amends to Licenses DPR-29 & DPR-30,revising Section 6 Re Organizational Changes in Corporate & Station Mgt Structure
ML20137M890
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 01/20/1986
From: Wojnarowski J
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20137M895 List:
References
1119K, NUDOCS 8601290096
Download: ML20137M890 (2)


Text

_ _..

o N Commonwe lth Edison O ) One First National Plaza, Chicago, Illinois O*

Address Reply to: Post Office Box 767 Chicago, litinois 60690 January 20, 1986 I

4 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 1

Subject:

Quad Cities Station Units 1 and 2 Supplement to Proposed Amendment to l

Section 6 of the Technical Specifications NRC Docket Nos. 50-254 and 50-265 References (a): Letter from T. J. Rausch to H. R. Denton dated February 17, 1983.

(b):

Letter from B. Rybak to H. R. Denton dated August 23, 1984.

1

}

Dear Mr. Denton:

i The reference (a) letter proposed to amend Section 6 of the Technical Specifications for Facility Operating Licenses DPR-29 and 30 for Quad Cities Units 1 and 2, respectively.

Reference (b) provided additional l

supplemental chan5es to Section 6 resulting in part from the issuance of revised reporting requirements in 10 CFR 50.72 and 50.73.

As a result of organizational changes in our corporate and station managenent structure, this transmittal provides adelitional changes to Section 6 of the Technical Specifications which supplement those previously submitted. Pursuant to 10 i

CFR 50.90, we request your review and approval of these amendments.

The proposed amendmento for Quad cities Units 1 and 2 are provided in Attachments 1 and 2, respectively. To facilitate your review, these amendments incorporate all changes previously submitted in addition to the i

new organisational changes. Therefore, these proposed amendments entirely supercede the references (a) and (b) submittals. The additional changes a

beyond those previously submitted are sutunarized in Attachment 3.

The revision bars in Attachments 1 and 2 reflect all changes relative to the currently approved Quad Cities Technical Specifications.

l The proposed chan5es have been On-Site and Off-Site reviewed and approved. We have reviewed the additional Technical Specification 4

amendments included in this transmittal and determincd that no significant hasards consideration exists. Our review is documented in Attachment 4.

Conunonwealth Edison is notifying the State of Illinou of this supplemental request by transmittal of a copy of this letter and its attachments to the l

designated State Official.

l

{

0601290096 h54 Sh DR ADOCK PDR

t D

H. R. Denton January 20, 1986 Please direct any further questions you may have regarding this matter to this office.

Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are provided for your use.

Very truly yours, s

7 J. R. Wojnarowski Nuclear Licensing Administrator im Attachments 1: Technical Specification Changes to DPR-29 2: Technical Specification Changes to DPR-30 3:

Summary of Supplemental Changes 4:

Evaluation of Significant Hazards Consideration ec:

R. Bevan - NRR P. Eng - Region III NRC Resident Inspector - Quad Cities M. C. Parker - State of IL SUBSC HED AND S R to befo e me this

' day of 11 hAAl-, 1986 Nh-Notary Public h

1119K