ML20140E205: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:T | {{#Wiki_filter:T | ||
. | |||
. | |||
# N 2 9 79gg | |||
Docket No. 50-352 | |||
Philadelphia Electric Company | |||
ATTN: | |||
Mr. S. L. Daltro'f | |||
Vice President, liectric Production | |||
2301 Market Street | |||
Philadelphia, Pennsylvania 19101 | |||
Gentlemen: | |||
Subject: | |||
Inspection Report No. 50-352/85-48 | |||
, | |||
This refers to the routine safety inspection conducted by Mr. D. Florek of this | |||
office on December 16, 1985 - January 3,1986, at Limerick Nuclear Generating | |||
Station, Limerick, Pennsylvania, of activities authorized by NRC License No. | |||
NPF-39 and to the discussions of our findings held by Mr. Florek with Mr. G. | |||
Leitch and other members of your staff at the conclusion of the inspection. | |||
Areas examined during this inspection are described in the NRC Region I Inspec- | |||
tion Report which is enclosed with this letter. Within these areas, the inspec- | |||
tion consisted of selective examinations of procedures and representative records, | |||
interviews with personnel, and observations by the inspector. | |||
Within the scope of this inspection, no violations were observed. | |||
No reply to this letter is required. Your cooperation with us in this matter | |||
is appreciated. | |||
Sincerely, | |||
0r181081SiEA N W | |||
:,.,a,settenh n38 | |||
6 Stewart D. Ebneter, Director | |||
Division of Reactor Safety | |||
j | |||
Enclosure: NRC Region I Inspection Report No. 50-352/85-48 | |||
0 | |||
8602030202GQ$352 | |||
I | |||
1 | |||
PDR | |||
ADOCK O | |||
PDR | |||
G | |||
OFFICIAL RECORD COPY | |||
IR LIMERICK 1 85-48 - 0001.0.0 | |||
01/27/86 | |||
. | |||
Philadelphia Electric Co. | |||
2 | |||
- | |||
cc w/ encl: | |||
V. S. Boyer, Senior Vice President, Nuclear Power | |||
John S. Kemper, Vice President, Engineering and Research | |||
G. Leitch, Station Manager | |||
Troy B. Conner, Jr. , Esquire (Receives All 2.790 Information) | |||
Eugene J. Bradley,-Esquire, Assistant General Counsel | |||
W. M. Alden, Engineer in Charge, Licensing Section | |||
Limerick Hearing Service List | |||
Public Document Room (PDR) | |||
local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident Inspector | |||
Commonwealth of Pennsylvania | |||
1 | |||
bcc w/ encl: | |||
Region I Docket Room (with concurrences) | |||
Management Assistant, DRMA (w/o encl) | |||
Section Chief, DRP | |||
Shoreham, SRI | |||
Section Chief, TPS, DRS | |||
I | |||
RI | |||
RI | |||
S _._ | |||
, | |||
l | F1 | ||
L | /fi | ||
Es | |||
Bettenhausen | |||
01/24/86 | |||
01/ | |||
86 | |||
01/24/86 | |||
, | |||
OFFICIAL RECORD COPY | |||
IR LIMERICK 1 85-48 - 0002.0.0 | |||
l | |||
01/27/86 | |||
L | |||
_ | |||
__ | |||
- | |||
}} | }} | ||
Latest revision as of 16:44, 11 December 2024
| ML20140E205 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 01/29/1986 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20140E209 | List: |
| References | |
| CON-#186-939 OL, NUDOCS 8602030202 | |
| Download: ML20140E205 (2) | |
See also: IR 05000352/1985048
Text
T
.
.
- N 2 9 79gg
Docket No. 50-352
Philadelphia Electric Company
ATTN:
Mr. S. L. Daltro'f
Vice President, liectric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection Report No. 50-352/85-48
,
This refers to the routine safety inspection conducted by Mr. D. Florek of this
office on December 16, 1985 - January 3,1986, at Limerick Nuclear Generating
Station, Limerick, Pennsylvania, of activities authorized by NRC License No.
NPF-39 and to the discussions of our findings held by Mr. Florek with Mr. G.
Leitch and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter. Within these areas, the inspec-
tion consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
0r181081SiEA N W
- ,.,a,settenh n38
6 Stewart D. Ebneter, Director
Division of Reactor Safety
j
Enclosure: NRC Region I Inspection Report No. 50-352/85-48
0
8602030202GQ$352
I
1
ADOCK O
G
OFFICIAL RECORD COPY
IR LIMERICK 1 85-48 - 0001.0.0
01/27/86
.
Philadelphia Electric Co.
2
-
cc w/ encl:
V. S. Boyer, Senior Vice President, Nuclear Power
John S. Kemper, Vice President, Engineering and Research
G. Leitch, Station Manager
Troy B. Conner, Jr. , Esquire (Receives All 2.790 Information)
Eugene J. Bradley,-Esquire, Assistant General Counsel
W. M. Alden, Engineer in Charge, Licensing Section
Limerick Hearing Service List
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
1
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
Shoreham, SRI
Section Chief, TPS, DRS
I
RI
RI
S _._
,
F1
/fi
Es
Bettenhausen
01/24/86
01/
86
01/24/86
,
OFFICIAL RECORD COPY
IR LIMERICK 1 85-48 - 0002.0.0
l
01/27/86
L
_
__
-