ML20141M103: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:- - _ - _ - _ _ _ _ _ _ _ _ _ - _ _ - .            . _      _
{{#Wiki_filter:.
f g                                                                                             ORIGINAL I                          UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE Texas Utilities Electric Company                                       )
f g
Comanche Peak Steam Electric                                       )   Docket No. 50-446A Station, Unit 2                                                   )
ORIGINAL UNITED STATES OF AMERICA I
t COMMENTS OF CAP ROCK ELECTRIC COOPERATIVE, INC.
BEFORE THE NUCLEAR REGULATORY COMMISSION Texas Utilities Electric Company
5              CCNCERNING SIGNIFICANT CHANGES IN THE ACTIVITY OF LICENSEE TEXAS UTILITIES ELECTRIC COMPANY I                     THAT WARRANT AN ANTITRUST REVIEW BEFORE THE ISBUANCE OF AN OPERATING LICENSE t
)
Comanche Peak Steam Electric
)
Docket No. 50-446A Station, Unit 2
)
t COMMENTS OF 5
CAP ROCK ELECTRIC COOPERATIVE, INC.
CCNCERNING SIGNIFICANT CHANGES IN THE ACTIVITY OF LICENSEE TEXAS UTILITIES ELECTRIC COMPANY I
THAT WARRANT AN ANTITRUST REVIEW BEFORE THE ISBUANCE OF AN OPERATING LICENSE t
i COUNSEL FOR CAP ROCK ELECTRIC COOPERATIVE, INC.
i COUNSEL FOR CAP ROCK ELECTRIC COOPERATIVE, INC.
John Michael Adragna I                                                                         Eric A. Dilsky Miller, Balis E O'Neil, P.C.
John Michael Adragna I
Eric A. Dilsky Miller, Balis E O'Neil, P.C.
1101 Fourteunth Street, N.W.
1101 Fourteunth Street, N.W.
4 I                                                                         Buite 1400 Washington, D.C.
I Buite 1400 Washington, D.C.
(202) 789-1450 20005 I
20005 4
i       March 25, 1992 t
(202) 789-1450 I
i March 25, 1992 t
I 4
I 4
          ;grouu888;he n
;grouu888;he n


I h                       UNITED STATES OF AMERICA BEFORE THE NUCLEAR REGULATORY COMMISSION Texas Utilities Electric Company     )
I h
Comanche Peak Stea.t Electric   )   Docket No. 50-446A Station, Unit 2 8                                      )
UNITED STATES OF AMERICA BEFORE THE NUCLEAR REGULATORY COMMISSION Texas Utilities Electric Company
COMMENTS OP
)
    =                CAP ROCK ELECTRIC COOPERATIVB, INC.
Comanche Peak Stea.t Electric
CONCERNING SIGNIFICANT CHANGES IN THE ACTIVITY OF LICEN.3EE TEXAS UTILITIES ELECTRIC COMPANY 4                  THAT WARRANT AN ANTITRUST REVIEW EIFORE.THE ISSUANCE OF AN OPERTdI}{G LICf1SE
)
    )       Pursuant to this Commission's notice, published on February 24, 1992,1/ Cap Rock Electric Cooperative. Inc.   (" Cap Rock"),
Docket No. 50-446A 8
hereby comments on - ignificant changes in the activities of licensee Texas Utilities Electric Company ("TUEC") since the antitrust operating license review associated with Comanche Peak Unit No. 1, which was completed in August, 1989. TUEC is overtly exercising its monopoly power, in violation of its existing antitrust license conditions and applicable antitrust laws, anticompetitively to injure Cap Rock and other TUEC customers and I
Station, Unit 2
competitors. Cap Rock submits that TUEC's ongoing activities create and maintain a situation inconsistent with the antitrust     i laws and warrant the institution by this Commission of an antitrust review and hearing at which the extent of TUEC's anticompetitive conduct can be established and the appropriate i
)
I remedies fixed.
COMMENTS OP CAP ROCK ELECTRIC COOPERATIVB, INC.
l1 1/   57 fed. Eqq. 6340 (February 24, 1992).
=
CONCERNING SIGNIFICANT CHANGES IN THE ACTIVITY 4
OF LICEN.3EE TEXAS UTILITIES ELECTRIC COMPANY THAT WARRANT AN ANTITRUST REVIEW EIFORE.THE ISSUANCE OF AN OPERTdI}{G LICf1SE
)
Pursuant to this Commission's notice, published on February 24, 1992,1/ Cap Rock Electric Cooperative. Inc.
(" Cap Rock"),
hereby comments on ignificant changes in the activities of licensee Texas Utilities Electric Company ("TUEC") since the antitrust operating license review associated with Comanche Peak Unit No.
1, which was completed in August, 1989.
TUEC is overtly exercising its monopoly power, in violation of its existing antitrust license conditions and applicable antitrust laws, anticompetitively to injure Cap Rock and other TUEC customers and I
competitors.
Cap Rock submits that TUEC's ongoing activities create and maintain a situation inconsistent with the antitrust i
laws and warrant the institution by this Commission of an antitrust review and hearing at which the extent of TUEC's anticompetitive conduct can be established and the appropriate I
i remedies fixed.
l1 1/
57 fed. Eqq. 6340 (February 24, 1992).
I
I


t 2
t 2
I.
I.
I ffRihRX TUEC's February 5, 1992, response to Regulatory Guide 9.3 2/ misrepresents and, through material omissions, is apparently intended intentionally to mislead this commission concerning TUEC's anticompetitive conduct toward its wholesale customers.     As the Commission is conducting this antitrust review, TUEC is actively using its monopoly power over transmission and other essential servicea to prevent Cap Rock and other TUEC wholesala customers from purchasing bulk power from
I ffRihRX TUEC's February 5, 1992, response to Regulatory Guide 9.3 2/ misrepresents and, through material omissions, is apparently intended intentionally to mislead this commission concerning TUEC's anticompetitive conduct toward its wholesale customers.
                -bulk power suppliers other than TUEC, thus forcing them to i
As the Commission is conducting this antitrust review, TUEC is actively using its monopoly power over transmission and other essential servicea to prevent Cap Rock and other TUEC wholesala customers from purchasing bulk power from
purchase higher cost TUEC power.
-bulk power suppliers other than TUEC, thus forcing them to purchase higher cost TUEC power.
TUEC has refused to wheel wholesale bulk power from West Texas Utilities Company ("WTU") to Cap Rock.         TUEC's refusal to wheel has been communicated orally to representatives of Cap Rock on several occasions, and in a {{letter dated|date=January 30, 1997|text=letter dated January 30, 1997}} 2/
i TUEC has refused to wheel wholesale bulk power from West Texas Utilities Company ("WTU") to Cap Rock.
TUEC's refusal to wheel violates Paragraph 3.D. (2) (i) of the Comanche Peak license conditions, which require TUEC, inter alia, to wheel on behalf of Entities 3/ like Cap Rock.       SS_q Section IV, infra.       TUEC's putative justification for its refusal to 2/     TU Electric Response to Regulatory Guide 9.3, dated February 5, 1992 ("TUEC Antitrust Response").
TUEC's refusal to wheel has been communicated orally to representatives of Cap Rock on several occasions, and in a {{letter dated|date=January 30, 1997|text=letter dated January 30, 1997}} 2/
2/     Attachment A at 3-4. TUFC has confirmed its refusal to wheel on page 23 of its Antitrust Response.
TUEC's refusal to wheel violates Paragraph 3.D. (2) (i) of the Comanche Peak license conditions, which require TUEC, inter alia, to wheel on behalf of Entities 3/ like Cap Rock.
3/     The term " Entity" is defined in Paragraphs 3.D. (1) (c) and (d) of the license conditions.
SS_q Section IV, infra.
  - , - - , , ,      ..'                                                        _      n
TUEC's putative justification for its refusal to 2/
TU Electric Response to Regulatory Guide 9.3, dated February 5, 1992 ("TUEC Antitrust Response").
2/
Attachment A at 3-4.
TUFC has confirmed its refusal to wheel on page 23 of its Antitrust Response.
3/
The term " Entity" is defined in Paragraphs 3.D. (1) (c) and (d) of the license conditions.
n


E I                                   >
E I
wheel is its contention that Cap Rock, which has legally terminated its 1963 full requirements contract with TUEC, nevertheless remains obligated to purchase its full recruirements from TUEC. Under TUEC's apparent reasoning, its mer~ utterance of this contention to Cap Rock somehow entitles TUEC to violate
wheel is its contention that Cap Rock, which has legally terminated its 1963 full requirements contract with TUEC, nevertheless remains obligated to purchase its full recruirements from TUEC.
  ,  its license conditions and the antitrust laws, to irreparably harm Cap Rock competitively, and to damage Cap Rock by more than
Under TUEC's apparent reasoning, its mer~ utterance of this contention to Cap Rock somehow entitles TUEC to violate its license conditions and the antitrust laws, to irreparably harm Cap Rock competitively, and to damage Cap Rock by more than
    $ 3,000,000 per year. Neither the license conditions nor the a antitrust laws permit the monopolist to engage in "self help."
$ 3,000,000 per year.
i To the contrary, the license conditions and antitrust laws are intended to prevent precisely this kind of "self help" (i.es ,
Neither the license conditions nor the a
illegal use of monopoly power to foreclose competition).
i antitrust laws permit the monopolist to engage in "self help."
TUEC has decided that TUEC may refuse to wheel (h, W violate the antitrust laws) because TUEC interprets its 1990 settlement with Car Rock'1/ as preventing Cap Rock from i   purchasing power frot TUEC competitors. This self-serving
To the contrary, the license conditions and antitrust laws are intended to prevent precisely this kind of "self help" (i.es illegal use of monopoly power to foreclose competition).
    " interpretation" is entirely baseless (Sg_q Section IV.D) . TUEC's putative interpretation is the immediate concern of, and is m currently the subject of litigation before, the District Court of I
TUEC has decided that TUEC may refuse to wheel (h, W
I .5/   Power Supply Agreement Between Texas Utilities Electric 4
violate the antitrust laws) because TUEC interprets its 1990 settlement with Car Rock'1/ as preventing Cap Rock from i
[       Company and Cap Rock Electric Cooperative, Inc., dated 3       June 8, 1990 ("1990 Settlement"). TUEC and Cap Rock entered
purchasing power frot TUEC competitors.
/         into the 1990 Settlement in settlement of, j nter aliq, the enforcement action-instituted by the filing of the Request I       of Cap Rock Electric Cooperative, Inc. For An Order Enforcing And Modifying Antitrust License Conditions, dated May 12, 1989 (" Cap Rock Request for Enforcement").
This self-serving
" interpretation" is entirely baseless (Sg_q Section IV.D).
TUEC's putative interpretation is the immediate concern of, and is m
currently the subject of litigation before, the District Court of I
I
.5/
Power Supply Agreement Between Texas Utilities Electric
[
Company and Cap Rock Electric Cooperative, Inc., dated 4
3 June 8, 1990 ("1990 Settlement").
TUEC and Cap Rock entered
/
into the 1990 Settlement in settlement of, j nter aliq, the enforcement action-instituted by the filing of the Request I
of Cap Rock Electric Cooperative, Inc. For An Order Enforcing And Modifying Antitrust License Conditions, dated May 12, 1989
(" Cap Rock Request for Enforcement").
I
I


L 4
L 4
a Midland County, Texas.h/                                   Section 105(c) of the Atomic En?rgy Act, 42 U.S.C. 5 2135(c), mandates that this Commission investigate and remedy TUEC's open and admitted exercise of monopoly power and violation of its license conditions before the Commission may grant TUEC an operating license for Comanche Peak Unit No. 2.
a Midland County, Texas.h/
It must be emphasized what TUEC has nol done.                                   TUEC has not sought legal or equitable remedies to redress what it contends would be an illegal breach of contract by Cap Rock.                                   For example, TUEC has not sought to test the merits of its " interpretation" in court by seeking a declaratory order confirming that interpretation.                   Instead, TUEC has done it the old fashlot.ed way:
Section 105(c) of the Atomic En?rgy Act, 42 U.S.C.
it has refused to wheel and physically prevented Cap Rock from buying from TUEC's competitor.                                   If TUEC did not have monopoly power over the sole transmission facilities which interconnect Cap Rcck and WTU, Cap Rock would be purchasing power from WTU.
5 2135(c), mandates that this Commission investigate and remedy TUEC's open and admitted exercise of monopoly power and violation of its license conditions before the Commission may grant TUEC an operating license for Comanche Peak Unit No.
TUEC's recourse in such a case, if it truly believed Cap Rock to be in breach of some agreement, would be to present its claim for breach of contract and damages in a court of competent jurisdiction.           TUEC instead has chosen a course of action that f/   Can Rock Electric Cooperative. Inc. v. Texas Utilit; igg Electric, District Court of Midland County, 238th Judicial District, No. B38,879.
2.
Persistence by TUEC in baseless legal claims, however, may itself be evidence or anticompetitive conduct that this Commission would be obligated to consider. See Section IV.C.3,   infra.
It must be emphasized what TUEC has nol done.
TUEC has not sought legal or equitable remedies to redress what it contends would be an illegal breach of contract by Cap Rock.
For example, TUEC has not sought to test the merits of its " interpretation" in court by seeking a declaratory order confirming that interpretation.
Instead, TUEC has done it the old fashlot.ed way:
it has refused to wheel and physically prevented Cap Rock from buying from TUEC's competitor.
If TUEC did not have monopoly power over the sole transmission facilities which interconnect Cap Rcck and WTU, Cap Rock would be purchasing power from WTU.
TUEC's recourse in such a case, if it truly believed Cap Rock to be in breach of some agreement, would be to present its claim for breach of contract and damages in a court of competent jurisdiction.
TUEC instead has chosen a course of action that f/
Can Rock Electric Cooperative. Inc. v. Texas Utilit; igg Electric, District Court of Midland County, 238th Judicial District, No. B38,879.
Persistence by TUEC in baseless legal claims, however, may itself be evidence or anticompetitive conduct that this Commission would be obligated to consider. See Section IV.C.3, infra.


t I                                   s has been recognized to violate section 2 of the Sherman Act, 15 m U.S.C. 52, since 1973 2/
t I
TUEC is also misleading the Commission as to the status of its relationships with two other wholesale customers, Tex-La Electric Cooperative, Inc. (" Tex-La") and Rayburn Country Electric Cooperative, Inc. ("Rayburn Country"). On February S, 1992, TUEC represented to this Commission that it was currently providing transmission and related scheduling services for Tex-La's and Rayburn Country's purchases of low cost hydroelectric power from the Denison Dam.jf   Those representations were true for less than two days. On February 7, 1992, TUEC informed Tex-La and Rayburn Country that it was terminating its Scheduling       .
s has been recognized to violate section 2 of the Sherman Act, 15 m
Agreements with them because TUEC asserted that each may have breached those agreements; TUEC stated that it would only consider the Scheduling Agreements effective through March 1, 1992 2/   This notice was given without prior notice of the purported breaches and without affording Tex-La and Rayburn Country opportunities to cure the purported breaches.1D/
U.S.C.
52, since 1973 2/
TUEC is also misleading the Commission as to the status of its relationships with two other wholesale customers, Tex-La Electric Cooperative, Inc.
(" Tex-La") and Rayburn Country Electric Cooperative, Inc. ("Rayburn Country").
On February S, 1992, TUEC represented to this Commission that it was currently providing transmission and related scheduling services for Tex-La's and Rayburn Country's purchases of low cost hydroelectric power from the Denison Dam.jf Those representations were true for less than two days.
On February 7, 1992, TUEC informed Tex-La and Rayburn Country that it was terminating its Scheduling Agreements with them because TUEC asserted that each may have breached those agreements; TUEC stated that it would only consider the Scheduling Agreements effective through March 1, 1992 2/
This notice was given without prior notice of the purported breaches and without affording Tex-La and Rayburn Country opportunities to cure the purported breaches.1D/
TUEC's notice was given with full recognition of the ramifications of such an action for Tex-La and Rayburn Country.
TUEC's notice was given with full recognition of the ramifications of such an action for Tex-La and Rayburn Country.
      ))   Otter Tail Power v. United States c 410 U.S. 366 (1973),
))
3/   TUEC Antitrust Response, at 27-28 and 30. The Denison Dam is a federal hydroelectric project, the electrical output of
Otter Tail Power v. United States 410 U.S.
  +I        which is marketed by the Southwestern Power Administration of the Department of Energy.
366 (1973),
2/   Attachment B.
c 3/
19/   Attachment C, at 1.
TUEC Antitrust Response, at 27-28 and 30.
The Denison Dam
+I is a federal hydroelectric project, the electrical output of which is marketed by the Southwestern Power Administration of the Department of Energy.
2/
Attachment B.
19/
Attachment C, at 1.
E
E


I e
I R
R I      As alleged by Tex-La, termination of its Scheduling Agreement with TUEC will result in Tex-La and Rayburn Country having no way to make use of the output of the Denison Dam and loss to them of the entire economic value of the recource.M/
e I
As alleged by Tex-La, termination of its Scheduling Agreement with TUEC will result in Tex-La and Rayburn Country having no way to make use of the output of the Denison Dam and loss to them of the entire economic value of the recource.M/
Notwithstanding the gravity of such actions to Tex-La and Raybu'rn Country, TUEC chose to conceal its actions from this Commission and to seek to have this Comnission believe that it cont'nued to transmit and to schedule Denison Dam power for Tex-La and Rayburn Country.
Notwithstanding the gravity of such actions to Tex-La and Raybu'rn Country, TUEC chose to conceal its actions from this Commission and to seek to have this Comnission believe that it cont'nued to transmit and to schedule Denison Dam power for Tex-La and Rayburn Country.
Cap Rock understands that after Tex-La filed suit in state court, TUEC may have agreed not to terminate scheduling soivices for an additional period time.               Cap Rock further understands that, although Rayburn Country may spbmit comments to this I   Commission on this matter, Tex-La is precluded by its earlier settlement agreement with TUEC from filing comments before the Commission. The complaint and other public documents filed by Tex-La in the District Court, however, make it clear that TUEC's
Cap Rock understands that after Tex-La filed suit in state court, TUEC may have agreed not to terminate scheduling soivices for an additional period time.
                                                                                                                                                        ~
Cap Rock further understands that, although Rayburn Country may spbmit comments to this I
representations to this commission as to its scheduling arrangements for Tex-La und Rayburn Country are plainly incorrect. As in the case of Cap Rock, TUEC has chosen to use a unilaterally asserted claim of contract right to mask a naked exercise of monopoly power.U/
Commission on this matter, Tex-La is precluded by its earlier settlement agreement with TUEC from filing comments before the Commission.
U/   Attachment D at 12.
The complaint and other public documents filed by Tex-La in the District Court, however, make it clear that TUEC's
Uf   As set forth in Attachment D, Tex-La maintains that TUEC's termination is ineffective because no breach of which Tex-La is aware occurred and, if a breach did occur, TUEC did not give Tex La the 90 day iotice and opportunity to cure that is required by the Scheduling Agreement.
~
I                                                                                                                                                   I
representations to this commission as to its scheduling arrangements for Tex-La und Rayburn Country are plainly incorrect.
As in the case of Cap Rock, TUEC has chosen to use a unilaterally asserted claim of contract right to mask a naked exercise of monopoly power.U/
U/
Attachment D at 12.
Uf As set forth in Attachment D, Tex-La maintains that TUEC's termination is ineffective because no breach of which Tex-La is aware occurred and, if a breach did occur, TUEC did not give Tex La the 90 day iotice and opportunity to cure that is required by the Scheduling Agreement.
I I


R l
R l
The antitrust license conditions are intended to prevent                       V '
V The antitrust license conditions are intended to prevent
?     TUEC from foreclosing competition through the exercise of its f
?
monopoly power to harm its competitors, like Cap Rock.                                     TUEC is activolf flouting the license conditions.                                     If TUEC is able, based ,
TUEC from foreclosing competition through the exercise of its f
upon its unilateral assertion of a contract right, to refuse to wheel for Cap Rock, it can, with impunity, refuse to wheel for any Entity with which it currently has a contract.                                     Cap Rock s'2bmits that TUEC's actions are in clear siolation of the I     antitrust license conditions.
monopoly power to harm its competitors, like Cap Rock.
Cap Rock does not ask the Commission to adjudicate the l     merits of TUEC's claims under the 1990 Settlement; that question is currently being addressed in the action brought by Cap Rock in state court in Texas.                               Cap Rock seeks two things from this Commission.                           First, Cap Rock requests that the Commission institute a full and complete investigation into the ongoing anticompetitive conduct of TUEC.                                     Cap ~ Rock does not purport to know the circumstances of all entities which may be forced to do business with TUEC.                               Only an antitrust hearing, open to the public, can present this Commission with a complete picture of the ongoing anticompetitiva conduct of TUEC.                                     Secondly, Cap Rock seeks an unequivocal determination by the Commission that TUEC is obligated by its antitrust license conditions to wheel for Cap Rock and other similarly situated entities.                                     Only such a clear pronouncement by the Conmission can hope to avoid future anticompetitive actions by TUEC.                                   It is time that TUEC is brought I
TUEC is activolf flouting the license conditions.
If TUEC is able, based upon its unilateral assertion of a contract right, to refuse to wheel for Cap Rock, it can, with impunity, refuse to wheel for any Entity with which it currently has a contract.
Cap Rock s'2bmits that TUEC's actions are in clear siolation of the I
antitrust license conditions.
Cap Rock does not ask the Commission to adjudicate the l
merits of TUEC's claims under the 1990 Settlement; that question is currently being addressed in the action brought by Cap Rock in state court in Texas.
Cap Rock seeks two things from this Commission.
First, Cap Rock requests that the Commission institute a full and complete investigation into the ongoing anticompetitive conduct of TUEC.
Cap ~ Rock does not purport to know the circumstances of all entities which may be forced to do business with TUEC.
Only an antitrust hearing, open to the public, can present this Commission with a complete picture of the ongoing anticompetitiva conduct of TUEC.
Secondly, Cap Rock seeks an unequivocal determination by the Commission that TUEC is obligated by its antitrust license conditions to wheel for Cap Rock and other similarly situated entities.
Only such a clear pronouncement by the Conmission can hope to avoid future anticompetitive actions by TUEC.
It is time that TUEC is brought I


I 8
I 8
to realize that its license conditions impose real and binding obligations on it.                                                                                                                                                                                 '
to realize that its license conditions impose real and binding obligations on it.
In its August 9, 1988, comments concerning TUEC's application for an operating license for Comanche Peak Unit No. 1, Cap Rock asked the Commission to enforce the existing antitrust license conditions to, inter alia, require TUEC to                                                                                                                                         ,
In its August 9, 1988, comments concerning TUEC's application for an operating license for Comanche Peak Unit No.
wheel and to provide other services essential to permit Cap Rock to do business with bulk power suppliers other than TUEC.                                                                     Cap Rock also asked the Commission to institute an antitrust hearing and to modify the license conditions as necessary to prevent TUEC
1, Cap Rock asked the Commission to enforce the existing antitrust license conditions to, inter alia, require TUEC to wheel and to provide other services essential to permit Cap Rock to do business with bulk power suppliers other than TUEC.
[     from maintaining a situation inconsistent with the antitrust laws. Cap Rock repeated these requests in its 1989 request for an order enforcing and modifying the license conditions.                                                           Only after this Commission indicated its willingness to act on Cap Rock's request for enforcement did TUEC first begin to take seriously ite obligations under the license conditions.                                                     Cap Rock ultimately accepted a settlement with TUEC that offered the prospect of an orderly transition off the TUEC system and which permitted TUEC to avoid final action on Cap Rock's request for enforcement by this Commission.
Cap Rock also asked the Commission to institute an antitrust hearing and to modify the license conditions as necessary to prevent TUEC
Cap Rock did not squander the opportunities presented by the 1990 Settlement. Cap Rock proceeded vigorously and expeditiously to search out and to obtain new sources of bulk power that would permit Cap Rock to become independent of TUEC.                                                   Cap Rock promised to engage in an orderly and systematic transition off the TUEC system. Cap Rock not only has kept that promise, it has bettered
[
_____._________.________m_ _ . . _ _ _ _ _ _. . - - _ . - - - - - _ - - .-    ------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - "
from maintaining a situation inconsistent with the antitrust laws.
Cap Rock repeated these requests in its 1989 request for an order enforcing and modifying the license conditions.
Only after this Commission indicated its willingness to act on Cap Rock's request for enforcement did TUEC first begin to take seriously ite obligations under the license conditions.
Cap Rock ultimately accepted a settlement with TUEC that offered the prospect of an orderly transition off the TUEC system and which permitted TUEC to avoid final action on Cap Rock's request for enforcement by this Commission.
Cap Rock did not squander the opportunities presented by the 1990 Settlement.
Cap Rock proceeded vigorously and expeditiously to search out and to obtain new sources of bulk power that would permit Cap Rock to become independent of TUEC.
Cap Rock promised to engage in an orderly and systematic transition off the TUEC system.
Cap Rock not only has kept that promise, it has bettered
_____._________.________m_


l that promise.                         Cap Rock is not only able to begin the transition off the TUEC system, but far sooner than anyone could have predicted, Cap Rock is in a position to complete that departure.
l that promise.
Cap Rock is not only able to begin the transition off the TUEC system, but far sooner than anyone could have predicted, Cap Rock is in a position to complete that departure.
=
=
In so doing, Cap Rock will require minimal coordination and cooperation from TUEC.                                                     The burden on TUEC will be virtually
In so doing, Cap Rock will require minimal coordination and cooperation from TUEC.
The burden on TUEC will be virtually
=
=
nonexistent.                     TUEC professed its villingness to assist Cap Rock in becoming an independent electric utility once Cap Rock terminated its full requirements contract with TUEC.                                                     Cap Rock has done that; TUEC cannot now legitimately complain that it did not really believe that Cap Rock could do it.
nonexistent.
Barely two years after the 1990 settlement, Cap Rock is again being subjected to TUEC's anticompetitive refusals to wheel and efforts to prevent Cap Rock from obtaining alternative I     sources of bulk power.                                                   TUEC's monopoly power, und its apparent willingness to exercise it to the anticompetitive disadvantage of its competitors, have not chanaod in two years.                                                   TUEC's anticompetitive conduct toward Cap Rock (and otherc) is clear and intentional.                       Cap Rock urges the Commission to act definitively to preclude further abuses of monopoly power by TUEC; Section 105(c) of the Atomic Energy Act requires no less.
TUEC professed its villingness to assist Cap Rock in becoming an independent electric utility once Cap Rock terminated its full requirements contract with TUEC.
Cap Rock has done that; TUEC cannot now legitimately complain that it did not really believe that Cap Rock could do it.
Barely two years after the 1990 settlement, Cap Rock is again being subjected to TUEC's anticompetitive refusals to wheel and efforts to prevent Cap Rock from obtaining alternative I
sources of bulk power.
TUEC's monopoly power, und its apparent willingness to exercise it to the anticompetitive disadvantage of its competitors, have not chanaod in two years.
TUEC's anticompetitive conduct toward Cap Rock (and otherc) is clear and intentional.
Cap Rock urges the Commission to act definitively to preclude further abuses of monopoly power by TUEC; Section 105(c) of the Atomic Energy Act requires no less.


l 10 l
l 10 l
II.                               j i                             FAMhk BA9EQBQM                           l A. CAP ROCK ELECTRIC COOPERATIVL INQ_m.
II.
Cap Rock Electric Cooperative, Inc. is a distribution cooperative incorporated under the laws of the state of Texas, with its headquartors in Stanton, Texas. Cap Rock was organized in 1939 to eerve in the counties of Howard, Martin, Midland, and Glasscock, and now provides service in those countios and eight additional counties in Nortnern Texas.13/     Cap Pock currently
j i
);       serves a peak load of approximately 100 MW vith more than 20,000
FAMhk BA9EQBQM l
,        customers in the service area of over 10,000 square miles located I
A.
in 17 counties in Texas. Located in or nnGr Cap Rock's service territory are two cities of appro::imately 90,000 to 120,00 population, one town of approximately 35,000 population, and two towns of 2,000 to 3,000 population. Cap Rock does not serve any 4
CAP ROCK ELECTRIC COOPERATIVL INQ_m.
of these municipalities, but has existing facilities around and near their corporate limits and has experienced considerable residential growth arcand municipalities such as the City of Midland, Texas.Ja/
Cap Rock Electric Cooperative, Inc. is a distribution cooperative incorporated under the laws of the state of Texas, with its headquartors in Stanton, Texas.
In 1990, Cap Rock merged with the Lone Wolf Electric Power Cooperative, Inc., formerly a wholesale customer of TUEC.     On D/     Cap Rock also provides service in Borden, Dawson, Ector, I         Upton, Reagan, Irion, Tom Green, and Sterling counties. All but Irion County are included as part of the " North Texas Area" as defined in Paragraph 3.D. (1) (b) of the antitrust license conditions.
Cap Rock was organized in 1939 to eerve in the counties of Howard, Martin, Midland, and Glasscock, and now provides service in those countios and eight additional counties in Nortnern Texas.13/
        .1A/   Cap Rock's large industrial load consist almost entirely of oil field pumps and cotton gins.
Cap Pock currently
);
serves a peak load of approximately 100 MW vith more than 20,000 customers in the service area of over 10,000 square miles located I
in 17 counties in Texas.
Located in or nnGr Cap Rock's service territory are two cities of appro::imately 90,000 to 120,00 population, one town of approximately 35,000 population, and two towns of 2,000 to 3,000 population.
Cap Rock does not serve any of these municipalities, but has existing facilities around and 4
near their corporate limits and has experienced considerable residential growth arcand municipalities such as the City of Midland, Texas.Ja/
In 1990, Cap Rock merged with the Lone Wolf Electric Power Cooperative, Inc., formerly a wholesale customer of TUEC.
On D/
Cap Rock also provides service in Borden, Dawson, Ector, I
Upton, Reagan, Irion, Tom Green, and Sterling counties.
All but Irion County are included as part of the " North Texas Area" as defined in Paragraph 3.D. (1) (b) of the antitrust license conditions.
.1A/
Cap Rock's large industrial load consist almost entirely of oil field pumps and cotton gins.
1
1


I 11 November 5, 1991, Cap Rock filed an application with the Public Utility Commission of Texas ("PUCT") to merge with Hunt-Collin Electric Cooperative, Inc. (" Hunt-Collin"), formerly a distribution cooperative member of Rayburn Country.Uf                                             Since Hunt-Collin left Rayburn Country, TUEC has sold Hunt-Collin its full power requirements, even though Hunt-Collin has no service agreement with TUEC.                                         TUEC has intervened in PUCT Docket No.
I 11 November 5, 1991, Cap Rock filed an application with the Public Utility Commission of Texas ("PUCT") to merge with Hunt-Collin Electric Cooperative, Inc.
(" Hunt-Collin"), formerly a distribution cooperative member of Rayburn Country.Uf Since Hunt-Collin left Rayburn Country, TUEC has sold Hunt-Collin its full power requirements, even though Hunt-Collin has no service agreement with TUEC.
TUEC has intervened in PUCT Docket No.
10726 and is opposing Cap Rock's proposed merger with Hunt-Collin.
10726 and is opposing Cap Rock's proposed merger with Hunt-Collin.
By {{letter dated|date=December 19, 1991|text=letter dated December 19, 1991}}, Cap Rock notified TUEC that, pursuant to the te u of the 1972 amendment to its 1963 service contract with TUEC, Cap Rock was terminating the service contract effective February 1, 1992.                                           By that letter, Cap Rock provided the identical notice of termination for the service contract of Cap Rock's Lone Wolf Division (formerly Lone wolf Electric Cooperative, Inc., a full requirements customer of TUEC with a service contract identical in all relevant respects to the 1963 Cap Rock /TUEC service contract).                                           Cap Rock also confirmed 1
By {{letter dated|date=December 19, 1991|text=letter dated December 19, 1991}}, Cap Rock notified TUEC that, pursuant to the te u of the 1972 amendment to its 1963 service contract with TUEC, Cap Rock was terminating the service contract effective February 1, 1992.
its previour informal communications with TUEC that, as of February 1, 1992, the wholesale electric power needs of Cap Rock (and its Lone Wolf Division) would be served by WTU.lbf                                           TUEC now concedes that the 1963 contract has been validly terminatec, but contends that Cap Rock remains obligated to buy its full M/   Appiication for Sale, Transfer, or Merger of Cap Rock Electric Cooperative, Inc. and Hunt-Collin Electric g       Cooperative, Inc., PUCT Docket No. 10726.
By that letter, Cap Rock provided the identical notice of termination for the service contract of Cap Rock's Lone Wolf Division (formerly Lone wolf Electric Cooperative, Inc., a full requirements customer of TUEC with a service contract identical in all relevant respects to the 1963 Cap Rock /TUEC service contract).
15/   Attachment E.
Cap Rock also confirmed 1
its previour informal communications with TUEC that, as of February 1, 1992, the wholesale electric power needs of Cap Rock (and its Lone Wolf Division) would be served by WTU.lbf TUEC now concedes that the 1963 contract has been validly terminatec, but contends that Cap Rock remains obligated to buy its full M/
Appiication for Sale, Transfer, or Merger of Cap Rock Electric Cooperative, Inc. and Hunt-Collin Electric g
Cooperative, Inc., PUCT Docket No. 10726.
15/
Attachment E.


I 11 November 5, 1991, Cap Rock filed an application with the Public Utility Commission of Texas ("PUCT") to merge with Hunt-Collin g   Llectric Cooperative, Inc. (" Hunt-Collin"), formerly a distribution cooperative member of Rayburn Country.15/     Since Hunt-Collin lett Rayburn Country, TUEC has sold Hunt-Collin its f t; 1. wower requirements, even though Hunt-Collin has no service agreement with TUEC. TUEC has intervened in PUCT Docket No.
I 11 November 5, 1991, Cap Rock filed an application with the Public Utility Commission of Texas ("PUCT") to merge with Hunt-Collin g
Llectric Cooperative, Inc.
(" Hunt-Collin"), formerly a distribution cooperative member of Rayburn Country.15/
Since Hunt-Collin lett Rayburn Country, TUEC has sold Hunt-Collin its f t; 1.
wower requirements, even though Hunt-Collin has no service agreement with TUEC.
TUEC has intervened in PUCT Docket No.
10726 and is opposing Cap Rock's proposed merger with Hunt-Collin.
10726 and is opposing Cap Rock's proposed merger with Hunt-Collin.
By {{letter dated|date=December 19, 1991|text=letter dated December 19, 1991}}, Cap Rock notified TUEC that, pursuant to the terms of the 1972 amendment to its 1963 serv 3ce contract with TUEC, Cap Rock was terminating the service contract effective February 1, 1992. By that letter, Cap Rock provided the idantical notice of termination for the service contract of Cap Rock's Lone Wolf Division (formerly Lone wolf
By {{letter dated|date=December 19, 1991|text=letter dated December 19, 1991}}, Cap Rock notified TUEC that, pursuant to the terms of the 1972 amendment to its 1963 serv 3ce contract with TUEC, Cap Rock was terminating the service contract effective February 1, 1992.
,I   Electric Cooperdtive, Inc., a full requirements customer of TUEC with a service contract identical in all relevant respects to the 1963 Cap Rock /TUEC service contract). Cap Rock also confirmed its previous informal communications with TUEC that, as of February 1, 1992, the wholesale electric power needs of Cap Rock (and its Lone Wolf Division) would be served by WTU.lff     TUEC now concedes that the 1963 contract has been validly terminated,
By that letter, Cap Rock provided the idantical notice of termination for the service contract of Cap Rock's Lone Wolf Division (formerly Lone wolf
:i     15/     Application for Sale, Transfer, or Merger of Cap Rock Electric Cooperative, Inc. and Hunt-Collin Electric Cooperative, Inc., PUCT Docket No. 10726.
,I Electric Cooperdtive, Inc., a full requirements customer of TUEC with a service contract identical in all relevant respects to the 1963 Cap Rock /TUEC service contract).
16/     su..achment E.
Cap Rock also confirmed its previous informal communications with TUEC that, as of February 1, 1992, the wholesale electric power needs of Cap Rock (and its Lone Wolf Division) would be served by WTU.lff TUEC now concedes that the 1963 contract has been validly terminated,
:i 15/
Application for Sale, Transfer, or Merger of Cap Rock Electric Cooperative, Inc. and Hunt-Collin Electric Cooperative, Inc., PUCT Docket No. 10726.
16/
su..achment E.
;5
;5


l                                                                   2 J
l 2
      -but contends that Cap Rock remains obligated to buy its full requirements from TUEC under the Settlement.
J
B. CAP _ ROCK IS IN DIRECT COMPETITION WIT 11_TH&
-but contends that Cap Rock remains obligated to buy its full requirements from TUEC under the Settlement.
Cap Rock competes with TUEC at retail and in the bulk power markets. Cap Rock's service territory is surrounded by the TUEC service territory.                                   The PUCT permits dual and ;ometimes triple certification of service torritories.                                   In other words, two or more electric utilities may be authorized to competc to serve the electrical needs of customers within a single service territory.
B.
Approximately, 30-35 percent of the service territories in the state are dually or triply certified.                                   Between 50 and 60 percent of Cap R7ck's service territory is at least dually-certified with TUEC.12/   In other words, Cap Rock in in direct retail competition with TUEC in more than half of the territory in which Cap Rock is authorized to serve.
CAP _ ROCK IS IN DIRECT COMPETITION WIT 11_TH&
The foregoing facts concerning Cap Rock's retail competition with TUEC are essentially the same as in 1988, when Cap Rock filed comments concerning the need for an antitrust review of TUEC's activities before issuance of an operating license stage                                 i E   for Comanche Peak Unit No. 1,1B/ and in 1989, when Cap Rock's filed its Request for Enforcement of the Comancho Peak antitrust 12/   Some of Cap Rock's service territory is triply certified.
Cap Rock competes with TUEC at retail and in the bulk power markets.
1Df   Comments of Cap Rock Electric Cooperative, Inc. Concerning Significant Changes In Licensee's Activity That Warrant An Antitrust Review At The Operating License Stage, dated August 9, 1988.
Cap Rock's service territory is surrounded by the TUEC service territory.
The PUCT permits dual and ;ometimes triple certification of service torritories.
In other words, two or more electric utilities may be authorized to competc to serve the electrical needs of customers within a single service territory.
Approximately, 30-35 percent of the service territories in the state are dually or triply certified.
Between 50 and 60 percent of Cap R7ck's service territory is at least dually-certified with TUEC.12/
In other words, Cap Rock in in direct retail competition with TUEC in more than half of the territory in which Cap Rock is authorized to serve.
The foregoing facts concerning Cap Rock's retail competition with TUEC are essentially the same as in 1988, when Cap Rock filed comments concerning the need for an antitrust review of TUEC's activities before issuance of an operating license stage i
E for Comanche Peak Unit No. 1,1B/ and in 1989, when Cap Rock's filed its Request for Enforcement of the Comancho Peak antitrust 12/
Some of Cap Rock's service territory is triply certified.
1Df Comments of Cap Rock Electric Cooperative, Inc. Concerning Significant Changes In Licensee's Activity That Warrant An Antitrust Review At The Operating License Stage, dated August 9, 1988.


_a 13
_a 13 license conditions.
      ..        license conditions.                         Cap Rock competition with TUEC for new J           retail load, however, has become even more direct and inmediate.
Cap Rock competition with TUEC for new J
As previounly noted, Cap Rock has merged with a former full requirementa customer of TUEC, Lone Wolf, and Cap Rock has an application pending before the PUCT to merge with another full requirements customer of TUEC, Hunt-Collin.                         Cap Rock also continues actively to seek the lowest cost sources of bulk power.                           _
retail load, however, has become even more direct and inmediate.
As previounly noted, Cap Rock has merged with a former full requirementa customer of TUEC, Lone Wolf, and Cap Rock has an application pending before the PUCT to merge with another full requirements customer of TUEC, Hunt-Collin.
Cap Rock also continues actively to seek the lowest cost sources of bulk power.
Cap Rock has executed an agreement with Southwestern Public
Cap Rock has executed an agreement with Southwestern Public
        )       Service Company ("SPS") under which Cap Rock will switch its
)
: i.              entire load from the WTU system to the SPS system beginning in                           .,
Service Company ("SPS") under which Cap Rock will switch its entire load from the WTU system to the SPS system beginning in i.
1993.                       Under the SPS agreement, SPS will construct the necessary transmission directly to interconnect the SPS and Cap Rock systems, thus obviating the need for any transmicsion or other services from TUEC.                         The SPS agreement also affords Cap Rock the flexibility to purchase bulk power resources from suppliers other than SPS.
1993.
As a valuable bridge to the SPS arrangements, Cap Rock negotiated a contract with WTU pursuant to which WTU agreed to take over control area responsibility for Cap Rock and to sell Cap Rock its full bulk power requirements, beginning 12.01 AM, February 1, 1992, the effective date of the termination of Cap Rock's full requirements contract with TUEC.                         It is estimated that this arrangement with WTU will save Cap Rock approximately
Under the SPS agreement, SPS will construct the necessary transmission directly to interconnect the SPS and Cap Rock systems, thus obviating the need for any transmicsion or other services from TUEC.
                  $250,000 per month.                       All that is required from TUEC to permit Cap Rock's contract with WTU to go forward is for TUEC: (1) to coordinate with WTU so that, when WTU " ramps up" (i.et, k
The SPS agreement also affords Cap Rock the flexibility to purchase bulk power resources from suppliers other than SPS.
As a valuable bridge to the SPS arrangements, Cap Rock negotiated a contract with WTU pursuant to which WTU agreed to take over control area responsibility for Cap Rock and to sell Cap Rock its full bulk power requirements, beginning 12.01 AM, February 1, 1992, the effective date of the termination of Cap Rock's full requirements contract with TUEC.
It is estimated that this arrangement with WTU will save Cap Rock approximately
$250,000 per month.
All that is required from TUEC to permit Cap Rock's contract with WTU to go forward is for TUEC: (1) to coordinate with WTU so that, when WTU " ramps up" (i.et, k


    .                                                                  14 increases) its generation to serve Cap Rock's load, TUEC back down its generation, and (2) to provide the necessary transmission service.                                   TUEC has refused to cooperate.               Instead, TUEC has informed Cap Rock that TUEC believes Cap Rock must continue to buy all of its bulk power needs from TUEC SY.RD after February 1, 1992, when cap Rock's full requirements contract with TUEC is lawfully terminated.12/
14 increases) its generation to serve Cap Rock's load, TUEC back down its generation, and (2) to provide the necessary transmission service.
I                                                                     III.
TUEC has refused to cooperate.
LEGAL STAHQARDR A. STANDARDS APPLICABLE TO A "BIGNIFICANT CHANGES" DXTERHJyATION.
: Instead, TUEC has informed Cap Rock that TUEC believes Cap Rock must continue to buy all of its bulk power needs from TUEC SY.RD after February 1, 1992, when cap Rock's full requirements contract with TUEC is lawfully terminated.12/
I III.
LEGAL STAHQARDR A.
STANDARDS APPLICABLE TO A "BIGNIFICANT CHANGES" DXTERHJyATION.
An antitrust review at the operating license stage is warranted if:
An antitrust review at the operating license stage is warranted if:
the Commission determines such a review is E                                     advisable on the ground that significant E                                     changes in the licensees' activities or proposed activitiee have occurred subsequent to the previous review by the Attorney General and the Commission under this subsection in connection with the construction permit for the facility.
the Commission determines such a review is E
42 U.S.C.                             52135(c)(2).     "significant changes" within the meaning of this provision have been defined by the Commission to mean:
advisable on the ground that significant E
: 1.                             Changes that have occurred since the previous antitrust review of the licensee;
changes in the licensees' activities or proposed activitiee have occurred subsequent to the previous review by the Attorney General and the Commission under this subsection in connection with the construction permit for the facility.
: 2.                               Changes that are reasonably attributable to the licensee in the sense that the licensee has sufficient causal relationship to the change that it would not be unfair to permit it to trigger a second antitrust review; and 19/   Attachment A at 1-2.
42 U.S.C. 52135(c)(2).
"significant changes" within the meaning of this provision have been defined by the Commission to mean:
1.
Changes that have occurred since the previous antitrust review of the licensee; 2.
Changes that are reasonably attributable to the licensee in the sense that the licensee has sufficient causal relationship to the change that it would not be unfair to permit it to trigger a second antitrust review; and 19/
Attachment A at 1-2.
I l
I l


is 15
is 15 3.
: 3. Changes that are "significant" in the sense that the charge has antitrust implications 5            that would likely warrant Commission remedy.
Changes that are "significant" in the sense 5
that the charge has antitrust implications that would likely warrant Commission remedy.
Eouth Carolina Electric & Gas D Epany. et al. (Virgil C. Summer Nuclear Station., Unit No. 1), 13 NRC 862, 871-72 (1981).29/
Eouth Carolina Electric & Gas D Epany. et al. (Virgil C. Summer Nuclear Station., Unit No. 1), 13 NRC 862, 871-72 (1981).29/
The Commission has stated that the third criterion requires a
The Commission has stated that the third criterion requires assessment of whether the changes would likely warrant Commin,sion a
assessment of whether the changes would likely warrant Commin,sion remedy and the type of remedy.21/
remedy and the type of remedy.21/
TUEC's conduct is inconsistent with the antitrust principles applied by this Commission and is in direct violation of TUEC's obligation under the antitrust license conditions.22/   The TUEC anticompetitive conduct here discussed has occurred since
TUEC's conduct is inconsistent with the antitrust principles applied by this Commission and is in direct violation of TUEC's obligation under the antitrust license conditions.22/
    .Novemb6r, 1991, principally within the past several months, well after the Commission completed the 1989 antitrust review associated with the grant of an operating license for Comanche Peak Unit No. 1. Moreover, TUEC's anticompetitive conduct continues unabated. Indeed, evidence of TUEC's anticompetitive conduct may be found in the misleading information which it filed with this Commission on February 5, 1992.                   -
The TUEC anticompetitive conduct here discussed has occurred since
TUEC's ability to prevent Cap Rock from purchasing power from WTU is solely attributable to TUEC's monopoly power over transmission. The remedy for TUEC's conduct is well within the I
.Novemb6r, 1991, principally within the past several months, well after the Commission completed the 1989 antitrust review associated with the grant of an operating license for Comanche Peak Unit No.
2_Q/ Egg jlLlgg, South Carolina Electric & Gas Company (Virgil C.
1.
Summer Nuclear Station, Unit No. 1), 11 NRC 817 (1980);
Moreover, TUEC's anticompetitive conduct continues unabated.
I      Central ElectrLc Power Coonerative. Inc. (Virgil C. Summer Nuclear Station, Unit No. 1), 14 NRC 787 (1981).
Indeed, evidence of TUEC's anticompetitive conduct may be found in the misleading information which it filed with this Commission on February 5, 1992.
2.1/ SCE&G, 13 NRC at 872.
TUEC's ability to prevent Cap Rock from purchasing power from WTU is solely attributable to TUEC's monopoly power over transmission.
22/ See Section IV.B, infra.
The remedy for TUEC's conduct is well within the I
2_Q/
Egg jlLlgg, South Carolina Electric & Gas Company (Virgil C.
I Summer Nuclear Station, Unit No. 1), 11 NRC 817 (1980);
Central ElectrLc Power Coonerative. Inc. (Virgil C.
Summer Nuclear Station, Unit No. 1), 14 NRC 787 (1981).
2.1/
SCE&G, 13 NRC at 872.
22/
See Section IV.B, infra.
I
I


l I                                                                       l l
I l
16 Commission's authority. The Commission should enforce the existing license conditions and impose such additional licence condition as may be necessary to compel TUEC to honor its obligations to wheel and to make available under reasonable terms and conditions the services which it ic required to make available by the licenre conditions.
16 Commission's authority.
B. APJ11Q] MILE _ ANTITRUST PRINSIPLES.
The Commission should enforce the existing license conditions and impose such additional licence condition as may be necessary to compel TUEC to honor its obligations to wheel and to make available under reasonable terms and conditions the services which it ic required to make available by the licenre conditions.
The antitrust principles to which TUEC's conduct must conform are well established. This Commission's application of those principles to licensees before it is unchanged since the Commission's previous reviews of TUEC's anticompetitive activities between 1988 and 1990.     The decisions of the Atomic i
B.
APJ11Q] MILE _ ANTITRUST PRINSIPLES.
The antitrust principles to which TUEC's conduct must conform are well established.
This Commission's application of those principles to licensees before it is unchanged since the Commission's previous reviews of TUEC's anticompetitive activities between 1988 and 1990.
The decisions of the Atomic i
Safety and Licensing Appeal Boa'd in the Midland,U/ Davis-ARSE 2,2A/ and Farlev 25f cases remain the definitive articulations by the Commission of the application of the antitrust laws to licensees under the Atomic Energy Act.
Safety and Licensing Appeal Boa'd in the Midland,U/ Davis-ARSE 2,2A/ and Farlev 25f cases remain the definitive articulations by the Commission of the application of the antitrust laws to licensees under the Atomic Energy Act.
E I
E I
Uf   ,Qppsumers Power Company (Midland Plant, Units 1 and 2), 6 NRC 892 (1977).
Uf
          '23/ The Toledo Edison Company and the Cleveland Electric Illuminatina ComDany (Davis-Besse Nuclear Power Station t
,Qppsumers Power Company (Midland Plant, Units 1 and 2), 6 NRC 892 (1977).
    .I          Units 1, 2& 3), 10 NRC 265 (1979).
'23/
25/ Alabama Power Company (Joseph M. Farley Nucle u Plant, Units 1 and 2), 13 NRC 1027 (1981), aff'd Alabama Power Company v.
The Toledo Edison Company and the Cleveland Electric
. I Illuminatina ComDany (Davis-Besse Nuclear Power Station Units 1, 2& 3), 10 NRC 265 (1979).
t 25/
Alabama Power Company (Joseph M.
Farley Nucle u Plant, Units 1 and 2), 13 NRC 1027 (1981), aff'd Alabama Power Company v.
Nuclear Becrulatory Commission, 692 F.2d 1362 (11th Cir.
Nuclear Becrulatory Commission, 692 F.2d 1362 (11th Cir.
2982), cert denied 464 U.S. 816 (1983).
2982), cert denied 464 U.S. 816 (1983).
Line 200: Line 370:


I 17 1
I 17 1
The antitrust laws embody fundamental national economio po: icy.25/   At their most basic level, the antitrust laws seek to   j prevent the unreasonable use of market power to gain additional market power;22/ they seek to dissipate the distortion that monopoly power can work on an otherwise competitive market.       In its simplest terms, monopoly power is the power to control prices or to exclude competitors.H/     Violation of the antitrust           j l
The antitrust laws embody fundamental national economio po: icy.25/
laws, however, does not require the actual exclusion of               l competitors from a market. Rather, the antitrust laws proscribe the exercise of monopoly power to disadvantage competitors. H/
At their most basic level, the antitrust laws seek to j
This Commission's authority is not limited to redressing actual violations of the antitrust laws or their underlying policies, but rather extends to remedying acts which constitute a reasonable probability of violation of those laws, or the policies underlying those laws.lQ/     The Coinmission is empowered to reach and to redress incipient anticompetitive
prevent the unreasonable use of market power to gain additional market power;22/ they seek to dissipate the distortion that monopoly power can work on an otherwise competitive market.
,    conduct, and to halt anticompetitive conduct well before it violates the antitrust laws. liidl and , 6 NRC at 912.
In its simplest terms, monopoly power is the power to control prices or to exclude competitors.H/
2k/ Midland, 6 NRC at 896; Gulf States Utilities Company v. FPC,
Violation of the antitrust j
"  I        411 U.S. 747, 759 (1973); Otter Tail Power Comntnv v. United States, 410 U.S. 366, 372-75 (1973).
l laws, however, does not require the actual exclusion of competitors from a market.
22/   Farley, 13 NRC at 1105.
Rather, the antitrust laws proscribe the exercise of monopoly power to disadvantage competitors. H/
23/ Farley, 13 NRC at 1073; United States v. Grinnell Corp., 384
This Commission's authority is not limited to redressing actual violations of the antitrust laws or their underlying policies, but rather extends to remedying acts which constitute a reasonable probability of violation of those laws, or the policies underlying those laws.lQ/
)E 3 U.S. 563, 571 (1966); United States v. E.I. du Pont de Hemourg and Co., '51 U.S. 377, 391 (1956).
The Coinmission is empowered to reach and to redress incipient anticompetitive conduct, and to halt anticompetitive conduct well before it violates the antitrust laws.
23/                                                       100, 107-08 I
liidl and, 6 NRC at 912.
Se e , hgt , United States v. Griffith, 334 U.S.
2k/
Midland, 6 NRC at 896; Gulf States Utilities Company v. FPC, I
411 U.S.
747, 759 (1973); Otter Tail Power Comntnv v. United States, 410 U.S.
366, 372-75 (1973).
22/
Farley, 13 NRC at 1105.
23/
Farley, 13 NRC at 1073; United States v.
Grinnell Corp., 384
)E U.S.
563, 571 (1966); United States v.
E.I.
du Pont de 3
Hemourg and Co.,
'51 U.S.
377, 391 (1956).
23/
Se e, hgt, United States v. Griffith, 334 U.S.
100, 107-08 I
(1948).
(1948).
1Q/ Midland, 6 NRC at 909; 926-27; Farley, 13 NRC at 1103.
1Q/
Midland, 6 NRC at 909; 926-27; Farley, 13 NRC at 1103.


t 18 TUEC is subject directly to the antitrust laws.11/ Those laws, and the policies underlying them, likewise apply to TUEC through the exercise by this Commission of its obligations pursuant to Section 105c of the Atomic Energy Act of 1954, 42 U.S.C. 5213S(c). The analytical questions posed by the structure and characteristics of the electric utility industry are now well settled. An analysis of competition in the electric utility industry generally entails inquiry into three discrete produtt markets:   the bulk power, coordination services and retail markets.12/   The relevant geographic market for the coordination and bulk power markets is limited to those areas in which the utility's smaller competitors practically can turn for alternative suppliers.12/                                                     The geographical limits of the retail market are defined by the utility's service territory .14/
t 18 TUEC is subject directly to the antitrust laws.11/ Those laws, and the policies underlying them, likewise apply to TUEC through the exercise by this Commission of its obligations pursuant to Section 105c of the Atomic Energy Act of 1954, 42 U.S.C. 5213S(c).
The analytical questions posed by the structure and characteristics of the electric utility industry are now well settled.
An analysis of competition in the electric utility industry generally entails inquiry into three discrete produtt markets:
the bulk power, coordination services and retail markets.12/
The relevant geographic market for the coordination and bulk power markets is limited to those areas in which the utility's smaller competitors practically can turn for alternative suppliers.12/
The geographical limits of the retail market are defined by the utility's service territory.14/
Cap Rock's ability to compete with TUEC in the bulk power, coordination and retail markets is dominated by one basic fact:
Cap Rock's ability to compete with TUEC in the bulk power, coordination and retail markets is dominated by one basic fact:
TUEC's dominance and control of essential transmission and coordination services.                               The Commission has recognized that the 1
TUEC's dominance and control of essential transmission and coordination services.
ability to compete effectively in these markets is dependent substantially, if not entirely, upon access to necessary 11/ Otter Tail Power Company '.. United States, suora; Cantor v.
The Commission has recognized that the 1
Detroit Edison Company, 428 U.S. 579, 596 n.35 (1976).
ability to compete effectively in these markets is dependent substantially, if not entirely, upon access to necessary 11/
12/   Hidland, 6 NRC at p. 945-990; f_arley, 13 NRC 1046-1068.
Otter Tail Power Company '.. United States, suora; Cantor v.
W     Farlqy, 13 NRC at 1058.
Detroit Edison Company, 428 U.S.
13/   liidland, 6 NRC at 978-79; Farley, 13 NRC at 1066-67.
579, 596 n.35 (1976).
12/
Hidland, 6 NRC at p. 945-990; f_arley, 13 NRC 1046-1068.
W Farlqy, 13 NRC at 1058.
13/
liidland, 6 NRC at 978-79; Farley, 13 NRC at 1066-67.
I l
I l
1
1


I 19 transmission services.     In Parley, the Board found that Alabama Power Company owned and controlled the lion's share of generating capacity in its service territory and owned all transmission lines in the market above 115 KV and all transmission facilities that provided access to utilities outside the market area.25/
I 19 transmission services.
The Board concluded that this dominance, particularly the dominance over transmission facilities, " places the applicant in a unique position to control access to the market for coordination service."     &    In liillhDsi, the Board found that, in order to engage in bulk power and coordination transactions, small utilities within the Consumers Power Company service territory had to obtain transmission wheeling services from Consumers.25/
In Parley, the Board found that Alabama Power Company owned and controlled the lion's share of generating capacity in its service territory and owned all transmission lines in the market above 115 KV and all transmission facilities that provided access to utilities outside the market area.25/
Cap Rock efforts to obtain bulk power from sources other than TUEC are most directly intended to enable Cap Rock to compete more effectively with TUEC in the retail market.       Such retail competition is entitled to full protection under the antitrust laws and by this Commission.17/       In both Midland and Farlp_y., the Board rejected arguments that, because there was little likelihood of head-to-head competition at retail, competition in the retail market was somehow entitled to less protection.     In this case, head-to-head competition is not only likely, but guaranteed by the dual certification scheme employed 15/     13 NRC at 1070.
The Board concluded that this dominance, particularly the dominance over transmission facilities, " places the applicant in a unique position to control access to the market for coordination service."
2f/     6 NRC at 998.
In liillhDsi, the Board found that, in order to engage in bulk power and coordination transactions, small utilities within the Consumers Power Company service territory had to obtain transmission wheeling services from Consumers.25/
22/   1:idland, 6 NRC at 988; Farley, 13 NRC 1064-1066.
Cap Rock efforts to obtain bulk power from sources other than TUEC are most directly intended to enable Cap Rock to compete more effectively with TUEC in the retail market.
I                                                                           i o
Such retail competition is entitled to full protection under the antitrust laws and by this Commission.17/
In both Midland and Farlp_y., the Board rejected arguments that, because there was little likelihood of head-to-head competition at retail, competition in the retail market was somehow entitled to less protection.
In this case, head-to-head competition is not only likely, but guaranteed by the dual certification scheme employed 15/
13 NRC at 1070.
2f/
6 NRC at 998.
22/
1:idland, 6 NRC at 988; Farley, 13 NRC 1064-1066.
I i
o


;I 20
;I 20 in the state of Texas.
;            in the state of Texas.         Cap Rock's merger With Lone Wolf and
Cap Rock's merger With Lone Wolf and pending application to morge with Hunt-Collin are evidence of the 1
;            pending application to morge with Hunt-Collin are evidence of the 1
viability and significance of that rota11 competition.
viability and significance of that rota11 competition.
j                   Every action taken by TUEC that discdvantages Cap Rock in the bulk power or coordinat3on servicos market has an inovitable and adverso impact on Cap Rock's ability to competo with TUEC in the retail market.         The Board acknowledgod this fact ir. Dirigy, 1
j Every action taken by TUEC that discdvantages Cap Rock in the bulk power or coordinat3on servicos market has an inovitable and adverso impact on Cap Rock's ability to competo with TUEC in the retail market.
l                             More importantly, applicant's dominanca of
The Board acknowledgod this fact ir. Dirigy, 1
* transmission and generation facilities l                             ft!rther bolsters the finding of monopoly power (in the retail market). As the Board                               4 below noted, this dominame enables applicant
l More importantly, applicant's dominanca of transmission and generation facilities l
!                            to influence its present and potential
ft!rther bolsters the finding of monopoly power (in the retail market).
;                            competitors' accesc to the S sic inputs i                            necessary for the productiari and sales of rollable and econonical firm bulk power. The i                            dominance of what in ossence conLtitutes
As the Board 4
!                            certain factors of production in tho                                     -
below noted, this dominame enables applicant to influence its present and potential competitors' accesc to the S sic inputs necessary for the productiari and sales of i
!                            Inductry, viewed in conjunction with applicant's high market sharen and the high i-j                             oconomic barriors facing now competitors, would ordinarily compel a finding of monopoly i                             power in the rotail market.
rollable and econonical firm bulk power.
1 I           13 NRC at 1072-73 (footnote omitted).
The dominance of what in ossence conLtitutes i
L                     TUEC's nurront actions violate those principios.                         TUEC   -
certain factors of production in tho Inductry, viewed in conjunction with i-applicant's high market sharen and the high j
avoidad the application of these prir.cipios to its conduct in
oconomic barriors facing now competitors, would ordinarily compel a finding of monopoly i
,            1990 by o.itoring into a settlement with Cap Rock, a settlement                           a which it now socks use as a means to excuse its illegal refusal to wheel.         This comminsjon's coligations under Section 105(c),
power in the rotail market.
I-   and the concomitant obligaticns of NRC 1.lconsoon, are foreign to TUEC.         TUEC pays attention to its licenso conditions only whsm forced to by thic Commission.                 Cap Rock submits that only by a full application of the forgoing principles in a full evidentiary hearing that will produce thc appropriate remedy will TUEC bo I             _._ _
1 I
13 NRC at 1072-73 (footnote omitted).
L TUEC's nurront actions violate those principios.
TUEC avoidad the application of these prir.cipios to its conduct in 1990 by o.itoring into a settlement with Cap Rock, a settlement a
which it now socks use as a means to excuse its illegal refusal to wheel.
This comminsjon's coligations under Section 105(c),
I-and the concomitant obligaticns of NRC 1.lconsoon, are foreign to TUEC.
TUEC pays attention to its licenso conditions only whsm forced to by thic Commission.
Cap Rock submits that only by a full application of the forgoing principles in a full evidentiary hearing that will produce thc appropriate remedy will TUEC bo I


N I
N I
21 I             made to recognize the significanco of its obligationn under the antitrust laws and the Atomic Snorgy Act as a licencoa.
21 I
l l                                                                             IV.
made to recognize the significanco of its obligationn under the antitrust laws and the Atomic Snorgy Act as a licencoa.
TUBC'N REFUDAL TO WHEEL FOR CAP ROCK VIOLATED
l l
  =                        TUEC'O CURRENT LIC2NDE CONDITIONS AND THE
IV.
_          A1T11EAISLAtiTITlWAT._LhHD.,
TUBC'N REFUDAL TO WHEEL FOR CAP ROCK VIOLATED TUEC'O CURRENT LIC2NDE CONDITIONS AND THE
The intent of '.dEC's cerrant actions, although with cortain il now twists, remains what it was in 1988, 1989 and 1990s to dony Cap Rock access to sourcos of power tie. aro lower cost than TUEC full requirements service.                                     In liis11And 23/, DaYin-Danan 22/
=
and EAlitY iQ/, the applicants sought to disable smaller utilitios in and around their servico territorios by denying them access to the benefits at th                                     relatively low cost power to be generated by nucicar projects licensed by this Commission.
A1T11EAISLAtiTITlWAT._LhHD.,
TUEC's goal in to accomplish the opposito, to disadvantago Cap Rock competitively by blocking Cap Rock's efforts to purchase lower cost supplies of bulk power, thereby forcing it to buy TUEC's much higher priced energy and capacity, which includes the costs of Comanche Peak Unit Nos. 1 and 2.                                       TUEC is exorcising its monopoly power over trhnsmission by an admitted refusal to wheel, 33/   Consumers PowqE_qQEnany (Midland Plant, Unita 1 and 2), 6 NRC 892 (1977).
The intent of '.dEC's cerrant actions, although with cortain il now twists, remains what it was in 1988, 1989 and 1990s to dony Cap Rock access to sourcos of power tie. aro lower cost than TUEC full requirements service.
22/   Tha T21&s12.ld11Lon Coitpany_ansL1hn_. Clay.cleillac.tric lllitaillAling CQEDanY. (Davis-Bosso Nucioar Power Station Unita 1, 2 & 3), 10 NRC 265 (1979).
In liis11And 23/, DaYin-Danan 22/
iq/   Alabama PQyer Comnany (Joseph M. Farley Nuclear Plant, Units 1 and 2), 13 NRC 1027 (1981), uff'd AlnkgAq Poh;gr company vt                   .
and EAlitY iQ/, the applicants sought to disable smaller utilitios in and around their servico territorios by denying them access to the benefits at th relatively low cost power to be generated by nucicar projects licensed by this Commission.
1[QGlear Rectu]ALQIy_Rommissign, 692 F.2d 1362 (lith Cir.
TUEC's goal in to accomplish the opposito, to disadvantago Cap Rock competitively by blocking Cap Rock's efforts to purchase lower cost supplies of bulk power, thereby forcing it to buy TUEC's much higher priced energy and capacity, which includes the costs of Comanche Peak Unit Nos. 1 and 2.
1982), Egr.t_110 Died 4 64 U . S . 816 (1983).
TUEC is exorcising its monopoly power over trhnsmission by an admitted refusal to wheel, 33/
Consumers PowqE_qQEnany (Midland Plant, Unita 1 and 2), 6 NRC 892 (1977).
22/
Tha T21&s12.ld11Lon Coitpany_ansL1hn_. Clay.cleillac.tric lllitaillAling CQEDanY. (Davis-Bosso Nucioar Power Station Unita 1, 2 & 3), 10 NRC 265 (1979).
iq/
Alabama PQyer Comnany (Joseph M. Farley Nuclear Plant, Units 1 and 2), 13 NRC 1027 (1981), uff'd AlnkgAq Poh;gr company vt 1[QGlear Rectu]ALQIy_Rommissign, 692 F.2d 1362 (lith Cir.
1982), Egr.t_110 Died 4 64 U. S. 816 (1983).


I l                                 22 in violation of the antitrust laws and the existing antitrust license conditions.
I l
:I A. TUEC HAE_REFERED TO WiiXEL FOR CAf_lqQL There is no factual dispute over whether TUEC has refused to
22 in violation of the antitrust laws and the existing antitrust license conditions.
.        wheel power for cap Rock from WTU. TUEC informed Cap Rock in writing of itu refusal to whoo111/ and has confirced its rei'usal to whool to this Commission in the February 5, 1992 TUEC Antatrust Rouponno.12/   The following is a brief summary or
: I A.
'C       the events which produced TUEC's refusal to whool.
TUEC HAE_REFERED TO WiiXEL FOR CAf_lqQL There is no factual dispute over whether TUEC has refused to wheel power for cap Rock from WTU.
O After oxocution of the 1990 Settlement, Cap Rock began i         intensivo efforts to obtain competitively priced sources of bulk
TUEC informed Cap Rock in writing of itu refusal to whoo111/ and has confirced its rei'usal to whool to this Commission in the February 5, 1992 TUEC Antatrust Rouponno.12/
{         power that were loss costly than TUEC full requirements servico.
The following is a brief summary or
Cap Rock roached an understanding with WTU, and negotiated an agreement with WTU, pursuant to which WTU would supply cap Rock's i         full powor requirements for the period between the tcrmination of
'C the events which produced TUEC's refusal to whool.
:I q        AJ/ Attachment A at 3-4.
O After oxocution of the 1990 Settlement, Cap Rock began i
A2/ At page 23 of the TUEC Antitrust Responso, TUEC stcted (emphasis supplied):
intensivo efforts to obtain competitively priced sources of bulk
{
power that were loss costly than TUEC full requirements servico.
Cap Rock roached an understanding with WTU, and negotiated an agreement with WTU, pursuant to which WTU would supply cap Rock's i
full powor requirements for the period between the tcrmination of
:I AJ/
Attachment A at 3-4.
q A2/
At page 23 of the TUEC Antitrust Responso, TUEC stcted (emphasis supplied):
~
~
TU Electr$c advised Cap Rock, [ sic] that (after February 1, 1992] it would . . .
TU Electr$c advised Cap Rock, [ sic] that (after February 1, 1992] it would.
supply all of Cap Rock's power and energy requirements, in accordance with the provisions of the 1990 Power Supply Agreement, at Cap Rock's points of delivery I           served by TU Electric. IU Electric also denied Cao Rock's roauest for TU Electric to wheel power from W1U to Cap Rock, beginning February 1, 1992, until the 1990 Power Supply
supply all of Cap Rock's power and energy requirements, in accordance with the provisions of the 1990 Power Supply Agreement, at Cap Rock's points of delivery I
  ,I               Agreement has been terminnted in accordance with its terms or a wheeling request is mado pursuant to the terms thereof . . . .                    ,
served by TU Electric.
I             -  -                -
IU Electric also denied Cao Rock's roauest for TU Electric to wheel power from W1U to Cap Rock, beginning February 1, 1992, until the 1990 Power Supply
:I 23 Cap Rock's 1963 rgrooment with TUEC and the physical transfer of Cap Rock's load from the TUEC to the SPS transmission system in l
,I Agreement has been terminnted in accordance with its terms or a wheeling request is mado pursuant to the terms thereof.
1993 12/     Cap Rock and krU agreed that service would begin on
I
: February 1, 1992.
: I 23 Cap Rock's 1963 rgrooment with TUEC and the physical transfer of Cap Rock's load from the TUEC to the SPS transmission system in l
On October 23, 1991, Cap Rock informed TUEU of its agreement with WTU and of its intention to terminate the 1963 agreement.AA/       TUEC's reply provided the first indication of TUEC's determination to prevent the Cap Rock /WTU purchase from being consummated.                                                         Despite the plain meaning of the 1990
1993 12/
,      Settlement, TUEC maintained that, even if the 1963 agreement were terLinated, Cap Rock could not purchase power from sources other than TUEC without giving throo years notico.15/ TUEC refused to permit Cap Rock to receive power from WTU, thereby leaving Cap Roc)' With no way to receive that power. Accordingly, on December 18, 1991, Cap Rock filed suit againe                                                                 TUEC in state court in Texas to enforce its right to purchase power from WTU.
Cap Rock and krU agreed that service would begin on February 1, 1992.
On October 23, 1991, Cap Rock informed TUEU of its agreement with WTU and of its intention to terminate the 1963 agreement.AA/
TUEC's reply provided the first indication of TUEC's determination to prevent the Cap Rock /WTU purchase from being consummated.
Despite the plain meaning of the 1990 Settlement, TUEC maintained that, even if the 1963 agreement were terLinated, Cap Rock could not purchase power from sources other than TUEC without giving throo years notico.15/ TUEC refused to permit Cap Rock to receive power from WTU, thereby leaving Cap Roc)' With no way to receive that power.
Accordingly, on December 18, 1991, Cap Rock filed suit againe TUEC in state court in Texas to enforce its right to purchase power from WTU.
On December 19, 1991, Cap Rock gave TUEC vritten notice that it was terminating the 1963 agreement as of February 1, 1992.
On December 19, 1991, Cap Rock gave TUEC vritten notice that it was terminating the 1963 agreement as of February 1, 1992.
Af/   On January 13, 1992, TUEC filed an answer and counterclaim to Cap Rock's stato court complaint.                                                                 In its counterciaim, TUEC assertod, inLqr alin, that: (1) cap Rock had failed to give proper notico of termination of the 1963 agreement Alf     Attachmentu F and G.
Af/
14/     Attachment H.
On January 13, 1992, TUEC filed an answer and counterclaim to Cap Rock's stato court complaint.
Ali/   Attachment I.
In its counterciaim, TUEC assertod, inLqr alin, that: (1) cap Rock had failed to give proper notico of termination of the 1963 agreement Alf Attachmentu F and G.
Ab/     Attachment E.
14/
a, .
Attachment H.
Ali/
Attachment I.
Ab/
Attachment E.
a,


24 and, (2) tne 1990 Settlement requires cap Rock to give three years notice before it may purchase power from any sources of bulk power other than TUEC (except with respect to cortain Points of Delivery where two years notice was purportedly sufficient).
24 and, (2) tne 1990 Settlement requires cap Rock to give three years notice before it may purchase power from any sources of bulk power other than TUEC (except with respect to cortain Points of Delivery where two years notice was purportedly sufficient).
on January 30, 1992, TUEC admitted that Cap Rock's notice of
on January 30, 1992, TUEC admitted that Cap Rock's notice of termination under the 1963 agreement was proper and that it would ig
termination under the 1963 agreement was proper and that it would ig
;g terminate on February 1, 1992. 12/
;g   terminate on February 1, 1992. 12/ TUEC made it clear,
TUEC made it clear, however, that it intended, through the exercise of its monopoly I
however, that it intended, through the exercise of its monopoly I   power over transmission, to force Cap Rock to continue to purchase from TUEC. TUEC stated:
power over transmission, to force Cap Rock to continue to purchase from TUEC.
Your requast for TV Electric to wheel power l             from West Texas Utilities Company to Cap Rock, beginning February 1, 1992, is denied until the 1990 Pcwor Supply Agreement has
TUEC stated:
,              been terminated in accordance with its terms
Your requast for TV Electric to wheel power l
!              or a wheeling request is mado pursuant to tho
from West Texas Utilities Company to Cap Rock, beginning February 1, 1992, is denied until the 1990 Pcwor Supply Agreement has been terminated in accordance with its terms or a wheeling request is mado pursuant to tho provisions thereof.
:            provisions thereof. The_1990 Power Supply Agreement does not obligate TU Electric to l             wheel power or energy from West Texas
The_1990 Power Supply Agreement does not obligate TU Electric to l
]              Utilities, as requested, for Cap Rock without at least three years' (24 months to cortain points of delivery) prior written notice.
wheel power or energy from West Texas
]
]
Attachment A at 3-4. Hence, TUEC has denied cap Rock the ability to whool power, and cut Cap Rock off from all alternativo sources of power supply.
Utilities, as requested, for Cap Rock without at least three years' (24 months to cortain
TUEC efforts to prevent Cap Rock from purchasing power from WTU have not been limited to cap Rock. As mentioned above, Cap Rock had negotiated an agreement with WTU for the purchase by Cap Rock of its full electric power requirements from WTU. On December 10, 1991, WTU mailed to Cap Rock three originals of the I
]
12/ Attachment A at 1.
points of delivery) prior written notice.
4 I                                                                           _
Attachment A at 3-4.
Hence, TUEC has denied cap Rock the ability to whool power, and cut Cap Rock off from all alternativo sources of power supply.
TUEC efforts to prevent Cap Rock from purchasing power from WTU have not been limited to cap Rock.
As mentioned above, Cap Rock had negotiated an agreement with WTU for the purchase by Cap Rock of its full electric power requirements from WTU.
On December 10, 1991, WTU mailed to Cap Rock three originals of the I
12/
Attachment A at 1.
4 I


g                                   a final contract for cap Rock's execution.       Upon return of the contracts, WTU was to execute then and return "[ojne completely executed set" to Cap Rock. 10/     Although Cap Rock rr.turnerf its copics on January 2, 1992, AS/ the contract was never executnd by WTU.
g a
TUEC's threats and deliberate efforto to mislead WTU undeniably caused WTU to forego executing the contract which it had negotiated with Cap Rock. On December 19, 1991, TUEC claimed in a letter to WTU that Cap Rock was " obligated to acquire aill of its power and energy from TU Electric.   . . .  "rd t N   'wt, TUEC clearly implied that it would sue WTU i f W. 'l d ;d 33 ' d g contract with Cap Rock. Noting that the " knowledge"     o, Chp Rock's purported duties to TUEC put "an extra burden of responsibility" on WTU, TUEC threatened to " aggressively defend" itself "against any damages or losses" caused by purported
final contract for cap Rock's execution.
  " interference" with its contract with Cap Rock. Elf As mentioned above, on January 2, 1992, Cap Rock returned its executed copies of the new contract to WTU.         On February 18, 1992, WTU responded. Noting that it stood " ready, willing, and able to begin selling electric energy to Cap Rock," WTU nonetheless declined to finalize any agreement until " Cap Rock's relationship with TU Electric han onded."         Clearly responding to
Upon return of the contracts, WTU was to execute then and return "[ojne completely executed set" to Cap Rock. 10/
  .43/ Attachment F.
Although Cap Rock rr.turnerf its copics on January 2, 1992, AS/ the contract was never executnd by WTU.
A9/   Attachment G.
TUEC's threats and deliberate efforto to mislead WTU undeniably caused WTU to forego executing the contract which it had negotiated with Cap Rock.
10/   Attachment J.
On December 19, 1991, TUEC claimed in a letter to WTU that Cap Rock was " obligated to acquire aill of its power and energy from TU Electric.
SJ/   Attachment J.
"rd t N
'wt, TUEC clearly implied that it would sue WTU i f W. 'l d ;d 33 ' d g contract with Cap Rock.
Noting that the " knowledge" o,
Chp Rock's purported duties to TUEC put "an extra burden of responsibility" on WTU, TUEC threatened to " aggressively defend" itself "against any damages or losses" caused by purported
" interference" with its contract with Cap Rock. Elf As mentioned above, on January 2, 1992, Cap Rock returned its executed copies of the new contract to WTU.
On February 18, 1992, WTU responded.
Noting that it stood " ready, willing, and able to begin selling electric energy to Cap Rock," WTU nonetheless declined to finalize any agreement until " Cap Rock's relationship with TU Electric han onded."
Clearly responding to
.43/
Attachment F.
A9/
Attachment G.
10/
Attachment J.
SJ/
Attachment J.
I
I


.I
.I
,I                                                               2e I
,I 2e I
TUEC's threat, WTU disavowed any intention to "interfore with the relationship borwoon cap Rock and TU Electric." 12/
TUEC's threat, WTU disavowed any intention to "interfore with the relationship borwoon cap Rock and TU Electric." 12/
t The solo barrior to Cap hock's purchase froin WTU is TUEC.
t The solo barrior to Cap hock's purchase froin WTU is TUEC.
WTU stands " ready, willing, and ablo" to supply power to cap Rock, just as soon as the instant dispute is resolved.                                           TUEC's ro usal to whool and throats to WTU ovidence a pattern of anticompetitivo conduct intonied to provent cap Rock from purchasing bulk power from any supplier other than TUEC.                                           As   ,
WTU stands " ready, willing, and ablo" to supply power to cap Rock, just as soon as the instant dispute is resolved.
demonstrated below, the licenso conditions and the antitrust laws do not permit a licensee before this Commission to engage in such illegal conduct.
TUEC's ro usal to whool and throats to WTU ovidence a pattern of anticompetitivo conduct intonied to provent cap Rock from purchasing bulk power from any supplier other than TUEC.
.                  D. TUEC IS OBLIGATED BY ITS LICENDE CONDITIONS TO WHEEL FOR CAP BOCK.                                                                                   __
As demonstrated below, the licenso conditions and the antitrust laws do not permit a licensee before this Commission to engage in such illegal conduct.
D.
TUEC IS OBLIGATED BY ITS LICENDE CONDITIONS TO WHEEL FOR CAP BOCK.
TUEC's obligations under the licenso conditions are to
TUEC's obligations under the licenso conditions are to
                  " Entities," as defined in Paragraphs 3.D. (1) (c) and (d).
" Entities," as defined in Paragraphs 3.D. (1) (c) and (d).
Paragraph 3.D. (1) (c) defines an Entity as:
Paragraph 3.D. (1) (c) defines an Entity as:
an electric utility ... owning. operatina or I
an electric utility... owning. operatina or I
contractually contro111na, or orocosino in g ud faith to own, onorate or contractually sntrol, faciM. ties for._gqueration of.
contractually contro111na, or orocosino in g ud faith to own, onorate or contractually sntrol, faciM. ties for._gqueration of.
cicatric_ sover ..nnGLSDercty, providod, however, I                     that as used in [cortain epocified paragraphs, including Paragraph 3.D. (2) (i) ),
cicatric_ sover..nnGLSDercty, providod, however, I
                                    " Entity" means an electric utility which is a person, a private or public corporation, a govtsrnmental agency or authority, a municipality, a cooperativo, or an I                     association owning or operating, or proposing in good faith to own or operato, facilities for generation, transmission and/or I
that as used in [cortain epocified paragraphs, including Paragraph 3.D. (2) (i) ),
12/   Attachment K.
" Entity" means an electric utility which is a person, a private or public corporation, a govtsrnmental agency or authority, a municipality, a cooperativo, or an I
association owning or operating, or proposing in good faith to own or operato, facilities for generation, transmission and/or I
12/
Attachment K.


e I
e I
27 distribution of electric power and energy.
27 distribution of electric power and energy.
(emphasis suppliod)
(emphasis suppliod)
Cap Rock is a cooperative and currently owns and operates facilities for the transmission and distribution of electric power and energy. Cap Rock is an Entity under TUEC's licenso conditions.
Cap Rock is a cooperative and currently owns and operates facilities for the transmission and distribution of electric power and energy.
Paragraph 3.D. (2) (1) of the Comancb 1 peak license conditions obligates TUEC tot participate in and facilitate the exchange of bulk power-by transmission over the Applicants' transmission facilitics between I            or among two or more Entities in the North Texas Area with which the opplicants are connected, and between any such Entity (les) and any Entity (ies) outside the North Texas Area between whose facilities the Applicants'
Cap Rock is an Entity under TUEC's licenso conditions.
_I            transmir,sion line and other transmission lines . . . form a continuous electrical path cap Rock is an " Entity" as defined in Paragraph 3.D(1) (c) .
Paragraph 3.D. (2) (1) of the Comancb 1 peak license conditions obligates TUEC tot participate in and facilitate the exchange of bulk power-by transmission over the Applicants' transmission facilitics between or among two or more Entities in the North I
Cap Rock is located and does business in the " North Texas Area" as definud in Paragraph 3.D. (1) (b), and is directly interconnected TUEC. WTU is directly interconnected with TUEC.
Texas Area with which the opplicants are connected, and between any such Entity (les) and any Entity (ies) outside the North Texas
_I Area between whose facilities the Applicants' transmir,sion line and other transmission lines.
form a continuous electrical path cap Rock is an " Entity" as defined in Paragraph 3.D(1) (c).
Cap Rock is located and does business in the " North Texas Area" as definud in Paragraph 3.D. (1) (b), and is directly interconnected TUEC.
WTU is directly interconnected with TUEC.
TUEC is expressly obligated to provido the transmission services necessary to facilitate the exchange of bulk power betwoon WTU and Cap Rock.M/
TUEC is expressly obligated to provido the transmission services necessary to facilitate the exchange of bulk power betwoon WTU and Cap Rock.M/
TUEC's refusal to wheel is unequivocal and in clear violation of TUEC's obligations under Paragraph 3.D. (2) (1) . As I Uf   " Bulk Power" is defined as " electric power and/or electric energy supplied or made available at transmission or I       subtransmission voltages." Paragraph 3.D. (1) (e) . This definition clearly encompanses the purchase by Cap Rock of wholesale bulk power from WTU.
TUEC's refusal to wheel is unequivocal and in clear violation of TUEC's obligations under Paragraph 3.D. (2) (1).
I                                                                       '
As I
I
Uf
" Bulk Power" is defined as " electric power and/or electric energy supplied or made available at transmission or I
subtransmission voltages."
Paragraph 3.D. (1) (e).
This definition clearly encompanses the purchase by Cap Rock of wholesale bulk power from WTU.
I I


I 28 demonstrated in the following section, that refusal to wheel is 1
I 28 demonstrated in the following section, that refusal to wheel is 1
also in clear violation of the antitrust laws.
also in clear violation of the antitrust laws.
C.         TUEC'S REFUSAL TO WHEEL POWER FOR CAP ROCK IS INCONSISTENT KITH =TRFL.ARTITAUST LAWD-The Commission's authority and obligations under Section 105 are not limited to redressing actual violations of the antitrust laws or their underlying policies.                   The commission's authority and obligations extend to remedying acts which constitute a reasonable probability of violation of those laws, or the policies underlying those laws.M/                     As demonstrated above,
C.
TUEC's refusal to wheel for cap Rock constitutes a clear violatien of the TUEC's license conditions.                     It is equally clear that TUEC's conduct is inconsistent with the applicable antitrust laws.
TUEC'S REFUSAL TO WHEEL POWER FOR CAP ROCK IS INCONSISTENT KITH =TRFL.ARTITAUST LAWD-The Commission's authority and obligations under Section 105 are not limited to redressing actual violations of the antitrust laws or their underlying policies.
E             1. TUEC Has Denied Cap Rock Access To An Essential N                 Eap_ility.
The commission's authority and obligations extend to remedying acts which constitute a reasonable probability of violation of those laws, or the policies underlying those laws.M/
2 TUEC electrically surrounds Cap Rock (i.e., Cap Rock is electrically interconnected solely with TUEC).                           Cap Rock cannot receive power unless it in transmitted over TUEC's lines.                           Cap Rock is, therefore, entirely dependent upon the transmission i   facilities of TUEC, its principal competitor at retail, for the transmission service necessary to allow Cap Rock to purchase the I power Cap Rock needs to compete with TUEC at retail.                           The only transmission facilities between Cap Rock and WTU are TUEC transmission facilities.             It is simply not feasible for Cap Rock I
As demonstrated above, TUEC's refusal to wheel for cap Rock constitutes a clear violatien of the TUEC's license conditions.
sf         Midland, 6 NRC at 909; 926-27; Farley, 13 NRC at 1103.
It is equally clear that TUEC's conduct is inconsistent with the applicable antitrust laws.
E 1.
TUEC Has Denied Cap Rock Access To An Essential N
Eap_ility.
TUEC electrically surrounds Cap Rock (i.e., Cap Rock is 2
electrically interconnected solely with TUEC).
Cap Rock cannot receive power unless it in transmitted over TUEC's lines.
Cap Rock is, therefore, entirely dependent upon the transmission i
facilities of TUEC, its principal competitor at retail, for the transmission service necessary to allow Cap Rock to purchase the I
power Cap Rock needs to compete with TUEC at retail.
The only transmission facilities between Cap Rock and WTU are TUEC transmission facilities.
It is simply not feasible for Cap Rock I
sf Midland, 6 NRC at 909; 926-27; Farley, 13 NRC at 1103.
I
I


              -          -    _ - - .-.- . .                  -__.- = .-.   -.    .    - - - _.___ .-
-__.- =.-.
I 29 to duplicate the integrated TUEC transmission grid betwoon cap Rock and WTU.       TUEC's transmission system, therefore, is an
I 29 to duplicate the integrated TUEC transmission grid betwoon cap Rock and WTU.
        " essential facility."                   The assential ft.cility or "bottlenock I-monopoly" doctrino of antitrust law imposco upon a monopolist who controls an essential facility tno obligation to make that facility availablo to competitors on non-discriminatory terms.
TUEC's transmission system, therefore, is an
This doctrino onour                     that "a monopolist may not retaliato against a customar who is also a competitor by denying him access to a facility casential to his operations, absent legitimato business justifications."                     hug.q_ Technical __ Services, 903 P. 2d 612, 620 (9th Cir. 1990).
" essential facility."
The assential ft.cility or "bottlenock I
monopoly" doctrino of antitrust law imposco upon a monopolist who controls an essential facility tno obligation to make that facility availablo to competitors on non-discriminatory terms.
This doctrino onour that "a monopolist may not retaliato against a customar who is also a competitor by denying him access to a facility casential to his operations, absent legitimato business justifications."
hug.q_ Technical __ Services, 903 P. 2d 612, 620 (9th Cir. 1990).
A monopolist which denies a competitor access to an essential facility is liable under Section 2 of the Sherman Act for monopolizing or attempting to monopollzo trado or commerce.
A monopolist which denies a competitor access to an essential facility is liable under Section 2 of the Sherman Act for monopolizing or attempting to monopollzo trado or commerce.
A party socking to invoko the oncential facilities doctrino must show:
A party socking to invoko the oncential facilities doctrino must show:
I                 (V;   control of the essential facility by a monopolist; I                 (2)   a competitor's inability practically or reasonably to dup 1'.cate the essential facility; (3)   the denial of the use of the facility to a competitor; and I                 (4)   the feasibility of providing ascose to the facility, ligl_,S.gmmunications v.,American Tel. & Tel. Co ._ , 70b F.2d 1081 (7th Cir. 1983) (citations omitted).
I (V;
TUEC's refusal to wheel for Cap Rock is a classic examplo of
control of the essential facility by a monopolist; I
!      an abuse of monopoly power over essential facilities.                         TUEC has I _    -_                -                .
(2) a competitor's inability practically or reasonably to dup 1'.cate the essential facility; (3) the denial of the use of the facility to a competitor; and I
(4) the feasibility of providing ascose to the facility, ligl_,S.gmmunications v.,American Tel. & Tel. Co._, 70b F.2d 1081 (7th Cir. 1983) (citations omitted).
TUEC's refusal to wheel for Cap Rock is a classic examplo of an abuse of monopoly power over essential facilities.
TUEC has I


I 30 unquestioned monopoly power over all transmission to Cap Rock.
I 30 unquestioned monopoly power over all transmission to Cap Rock.
Cap Rock cannot feasibly duplicate the integrated TUEC transmission system that connects cap Rock to WTU and the rest of the Economic Rollability Council of Texas ("ERCOTH); such an undortaking is boyond the economic means of Cap Rock (and virtually overy other electric utility in Texas), inherently wastoful and inefficient and environnentally unsound. TUEC's transmission system is unique and, from Cap Rock's porspective, ossential. TUEC has denied Cap Rock the use of its transmission         '
Cap Rock cannot feasibly duplicate the integrated TUEC transmission system that connects cap Rock to WTU and the rest of the Economic Rollability Council of Texas ("ERCOTH); such an undortaking is boyond the economic means of Cap Rock (and virtually overy other electric utility in Texas), inherently wastoful and inefficient and environnentally unsound.
facilities. At no point h>as TUEC contended that it is not feasible for it to provido such transmission servico.h5/
TUEC's transmission system is unique and, from Cap Rock's porspective, ossential.
The obligations cf a monopolist controlling an essential facility to prcvide non-discriminatory access can be traced back to U.S. v. Terminal Railmd.,.luigtQh, 224 U.S. 303 (1912). In that case, a consortium of railroads had gained control of every rail route feeding into St. 1,ouis across the Mississippi River.
TUEC has denied Cap Rock the use of its transmission facilities.
The consortium had the power to exclude any competing railroad or to force that railroad to capitulate to any terms the consortium demanded. It was economically and geographically infoasible for a competitor to build another bridge. Thorofore, the Supreme l
At no point h>as TUEC contended that it is not feasible for it to provido such transmission servico.h5/
Court ruled that the consortium must allow competing railroads to
The obligations cf a monopolist controlling an essential facility to prcvide non-discriminatory access can be traced back to U.S.
!I lI 53/ Lets we loue sight of the obvious, it bears remembering that I
: v. Terminal Railmd.,.luigtQh, 224 U.S. 303 (1912).
not only is it perfectly feasible for TUEC to provide l                                                           transmission for Cap Rock, but TUEC is unequivocally i                                                            obligated by its license conditions to provide such transmissiore.
In that case, a consortium of railroads had gained control of every rail route feeding into St. 1,ouis across the Mississippi River.
The consortium had the power to exclude any competing railroad or to force that railroad to capitulate to any terms the consortium demanded.
It was economically and geographically infoasible for l
a competitor to build another bridge.
Thorofore, the Supreme Court ruled that the consortium must allow competing railroads to
!I lI 53/
Lets we loue sight of the obvious, it bears remembering that I
not only is it perfectly feasible for TUEC to provide l
transmission for Cap Rock, but TUEC is unequivocally obligated by its license conditions to provide such i
transmissiore.
lI l
lI l
l l
l l
_                _ __  ._ . _ _ _          ..,c ,, -
..,c


I I
I I
31 use its facilition on a non-discriminatory basis 411 10/                                               .
31 use its facilition on a non-discriminatory basis Id. at 411 10/
Id. at The seminal essential facilities doctrine refusal to wheel.
The seminal essential facilities doctrine ca se involves a refusal to wheel.
ca a se involves F.Supp. 54            In !1aitad_J1Atc_ v. Otter Tall Ppwor CA     , 331 (D.Minn. 1971), qLL'd 410 U . S . 366 Power Co.,                                            (1973), Otter Tail an investor owned public utility, refused to sollat wholesale or wheel electric power to coveral municipaliti I         were attempting to not up municipal power systems t es which o compete with Otter Tail in the retail sale of power       .
In !1aitad_J1Atc_ v. Otter Tall Ppwor CA F.Supp. 54
The court held that under the bottleneck monopoly theory Otter Tail had 1      section 2 of the Sherman Act,                               violated and enjoined Ottor Tail from continuing its anti-competitivo practicos     .
, 331 (D.Minn. 1971), qLL'd 410 U. S. 366 (1973), Otter Tail Power Co.,
Otter Tail'at                                     The court found that of its service area gives it substantialcontrol over trans effective   control from municipal      over potential ccmpetition ownership.
an investor owned public utility, refused to soll wholesale or wheel electric power to coveral municipaliti at I
sell or wheel power           By its refusal to competition from sur, facing. defendant prevents that lb at 61.
were attempting to not up municipal power systems t es which Otter Tail in the retail sale of power o compete with The court held that under the bottleneck monopoly theory Otter Tail had violated section 2 of the Sherman Act, 1
As the Supreme Court subsequently conclud     e  ,
and enjoined Ottor Tail from continuing its anti-competitivo practicos Otter Tail'at The court found that of its service area gives it substantialcontrol over trans effective control over potential ccmpetition from municipal ownership.
d the record made " abundantly clear that Otter Tail used it s monopoly power in the cities in its service area to forecl ose competition or to destroy a competitor, all in violation of th laws."
sell or wheel power By its refusal to competition from sur, facing. defendant prevents that lb at 61.
Q1tsr Tail h er Co. v.,_Ljix, 410 U.S.           e antitrust 366, 377 (1973).
As the Supreme Court subsequently conclud d record made " abundantly clear that Otter Tail used it e
the power in the cities in its service area to forecl s monopoly ose competition or to destroy a competitor, all in violation of th laws."
e antitrust Q1tsr Tail h er Co. v.,_Ljix, 410 U.S. 366, 377 (1973).
Like Otter Tail, TUEC has completo control over transmission to 16/
Like Otter Tail, TUEC has completo control over transmission to 16/
TUEC is already obligated to provide nondis access   by its licenso conditions.
TUEC is already obligated to provide nondis access by its licenso conditions.
TUEC to obe                                       criminctory conditions.y, or to be compelled to obey,It remains, however, for those license
criminctory TUEC to obe conditions.y, or to be compelled to obey,It remains, however, for those license
_-~                                                 -
_-~


I 32 its retail competitor and, like Otter Tail, TUEC is using that monopoly control to foreclose competition.
I 32 its retail competitor and, like Otter Tail, TUEC is using that monopoly control to foreclose competition.
In a case which bears many similarition to a refusal to whool electricity, AT&T was hold to have violated the shorman Act f by refusing to interconnect MCI's long distanco service with AT&T's local distribution facilities.         The court found that AT&T had complete control over the local distribution facilition required by MCI and that MCI could not practicably duplicato the local facilities. Relying on Qtier Tail, the court hold that AT&T's local facilities were a natural nonopoly and that AT&T was denying an essential facility to MCI.         11QI, 708 F.2d at 1132-33.
In a case which bears many similarition to a refusal to whool electricity, AT&T was hold to have violated the shorman Act f
In Moen Hichlands Skiina Coro. ,v. Apoon Skiino Co. , 730 F.2d 1509 (10th Cir. 1984), aff'd 472 U.S. 585 (1985), the defendant, Aspen Ski.ing Co., operated throo of the four skiing facilities in Aspen, while plaintiff, Aspen Highlands operated the other. In the past, Aspen Skiing and Aspen Highlands, had jointly issued a multi-day ski lift ticket good at all four mountains. Then Aspen Skiing refused to issue the four-area ticket and began to issue a three-area ticket, good only at Aspen Skiing mountains. Following ligl, the court applied the four prong test. The court hold that the four-area multi-day ticket was an essential facility controlled by the defendant.               Aspen Highlands could not issue a ticket good at the other thren Aspen areas, and week long vacationers with a choice between a multi-day three-area ticket and a one-area ticket would choose the I three-area. The Supreme Court concurred that in this case "the I
by refusing to interconnect MCI's long distanco service with AT&T's local distribution facilities.
I                                                                                 -
The court found that AT&T had complete control over the local distribution facilition required by MCI and that MCI could not practicably duplicato the local facilities.
Relying on Qtier Tail, the court hold that AT&T's local facilities were a natural nonopoly and that AT&T was denying an essential facility to MCI.
11QI, 708 F.2d at 1132-33.
In Moen Hichlands Skiina Coro.,v.
Apoon Skiino Co., 730 F.2d 1509 (10th Cir. 1984), aff'd 472 U.S.
585 (1985), the defendant, Aspen Ski.ing Co., operated throo of the four skiing facilities in Aspen, while plaintiff, Aspen Highlands operated the other. In the past, Aspen Skiing and Aspen Highlands, had jointly issued a multi-day ski lift ticket good at all four mountains.
Then Aspen Skiing refused to issue the four-area ticket and began to issue a three-area ticket, good only at Aspen Skiing mountains.
Following ligl, the court applied the four prong test.
The court hold that the four-area multi-day ticket was an essential facility controlled by the defendant.
Aspen Highlands could not issue a ticket good at the other thren Aspen areas, and week long vacationers with a choice between a multi-day three-area ticket and a one-area ticket would choose the I
three-area.
The Supreme Court concurred that in this case "the I
I


33 monopolist made a deliberato offort to discoutago its customers from doing business with its smallor rival."           Ar, pen Skiina Co. v._
33 monopolist made a deliberato offort to discoutago its customers from doing business with its smallor rival."
Mpril_111ghlando_ Skiino Cup 2, 472 U.S. S85, 610 (1985).
Ar, pen Skiina Co.
TUEC's refusal to whool is an extremo example of the kind of anticompetitivo conduct proscribed by the ossential facilities
v._
doctrino. TUEC's actions also run afoul of otner fundamental principles which underlie Section 2 of the Sherman Act, 15 U.S.C.
Mpril_111ghlando_ Skiino Cup 2, 472 U.S.
S85, 610 (1985).
TUEC's refusal to whool is an extremo example of the kind of anticompetitivo conduct proscribed by the ossential facilities doctrino.
TUEC's actions also run afoul of otner fundamental principles which underlie Section 2 of the Sherman Act, 15 U.S.C.
5 2.
5 2.
: 2. TUEC Is Illegally Leveraging Its Monopoly Power over Essential Transmission To Stifle Competition In The Bulk PowoJ_ Bale And Rotail Markets.
2.
In jicrkov Phnto. Inc. v. Eastman Kodak Co.,         603 F.2d 263 (2d Cir. 1979), the Second Circuit hold that "the uno of monopoly power attained in one market to gain a competitivo advantage in another is a violation of 52 (of the Sherman Act), even if there has not been an attempt to monopolize the second market."             This articulation of a Section 2 violation, often referred to as
TUEC Is Illegally Leveraging Its Monopoly Power over Essential Transmission To Stifle Competition In The Bulk PowoJ_ Bale And Rotail Markets.
    " monopoly loveraging," precisely describes TUEC's conduct towards Cap Rock. TUEC is exercising its monopoly power over transmission tot (1) preclude competition by Cap Rock for alternative sources of bulk power in the bulk power market, thereby forcing Cap Rock to buy TUEC's higher priced power, and thus (2) gaining an advantage over Cap Rock in the retail market.
In jicrkov Phnto. Inc. v. Eastman Kodak Co., 603 F.2d 263 (2d Cir. 1979), the Second Circuit hold that "the uno of monopoly power attained in one market to gain a competitivo advantage in another is a violation of 52 (of the Sherman Act), even if there has not been an attempt to monopolize the second market."
This articulation of a Section 2 violation, often referred to as
" monopoly loveraging," precisely describes TUEC's conduct towards Cap Rock.
TUEC is exercising its monopoly power over transmission tot (1) preclude competition by Cap Rock for alternative sources of bulk power in the bulk power market, thereby forcing Cap Rock to buy TUEC's higher priced power, and thus (2) gaining an advantage over Cap Rock in the retail market.
By denying Cap Rock access to more economical bulk power from utilities such as WTU, TUEC koops Cap Rock's retail pricos high, I
By denying Cap Rock access to more economical bulk power from utilities such as WTU, TUEC koops Cap Rock's retail pricos high, I
I                                                                                 l 1
I l
1


]
]
34 allowing TUEC to more offectively compoto at retail.12/
34 allowing TUEC to more offectively compoto at retail.12/
Moreover, TUEC gains an advantage in the market for wholesale power. By proventing WTU or other alternati'to power sources from supplying Cap Rock, TUEC levarages its control of transmission into completo domination of bulk power salon to Cap Rock.
Moreover, TUEC gains an advantage in the market for wholesale power.
By proventing WTU or other alternati'to power sources from supplying Cap Rock, TUEC levarages its control of transmission into completo domination of bulk power salon to Cap Rock.
D.oriny,_Ehats has its antecodonts in UniteLEtaten_L.
D.oriny,_Ehats has its antecodonts in UniteLEtaten_L.
Gr1111th, 3 3 4 U. S . 100 (1948).           In that caso, the Supreme Court found a Section 2 violation when a group of motion picturo exhibitors with competitors in some localition refused to exhibit movies in localition in which they had monop31y power unless the d3stributor granted them exclusivo showing rights in the contested markets. Ish at 108.
Gr1111th, 3 3 4 U. S. 100 (1948).
In Keranotes Migli. Theaters t . National AmquementS, 854             P.
In that caso, the Supreme Court found a Section 2 violation when a group of motion picturo exhibitors with competitors in some localition refused to exhibit movies in localition in which they had monop31y power unless the d3stributor granted them exclusivo showing rights in the contested markets. Ish at 108.
In Keranotes Migli. Theaters t. National AmquementS, 854 P.
2d 135 (6th Cir. 1988), National Amusements alleged that Korasotos had used its monopoly and market power in other citios to coorce distributors into providing first-run films in the Flint, Michigan area, where Korasotos competed with National.
2d 135 (6th Cir. 1988), National Amusements alleged that Korasotos had used its monopoly and market power in other citios to coorce distributors into providing first-run films in the Flint, Michigan area, where Korasotos competed with National.
The court hold this conduct violated Section 2 of the Sherman Act. Ish at 136-37.
The court hold this conduct violated Section 2 of the Sherman Act.
Ish at 136-37.
TUEC has monopoly power over transmission and is using this power to loverage a superior position for itself in the ' market for bulk power by denying bulk power sollers access to Captivo I
TUEC has monopoly power over transmission and is using this power to loverage a superior position for itself in the ' market for bulk power by denying bulk power sollers access to Captivo I
bulk power purchases such as cap Rock.               TUEC is also exploiting 4
bulk power purchases such as cap Rock.
17f   This incluctable of fect of the preclusion of competition in the bulk power market on the ability to compete at retail was expressly recognized by the Board in farley, 13 NRC 1072-73.
TUEC is also exploiting 4
17f This incluctable of fect of the preclusion of competition in the bulk power market on the ability to compete at retail was expressly recognized by the Board in farley, 13 NRC 1072-73.


. I 35 its monopoly over transmission to gain an edge in the retail market by denying its competitors, such as Cap Rock, access to economical electricity.     TUEC's conduct is inherently anticompetitivo and impermissible for a licensoo of this Commission.5ff
I 35 its monopoly over transmission to gain an edge in the retail market by denying its competitors, such as Cap Rock, access to economical electricity.
: 3. MEC's Assertion of Its Interpretation Of The 1990 teettlement Does Not Make Its Refusal To Wheel Any
TUEC's conduct is inherently anticompetitivo and impermissible for a licensoo of this Commission.5ff 3.
  <i                                                                                L9JR_Aat19DllAtililt_.QLJny Less Illgtq3L.
MEC's Assertion of Its Interpretation Of The 1990
The possessor of monopoly power may not impose its contract 1                                                                       (or any other) interpretation on its competitor through the
<i teettlement Does Not Make Its Refusal To Wheel Any L9JR_Aat19DllAtililt_.QLJny Less Illgtq3L.
,                                                                        unlawful exerciso of its monopoly power.                 The antitrust laws and this Commission's antitrust licenso conditions are intended to prevent just such an exorcise of monopoly power.                 Yet that is precisely what TUEC is doing to Cap Rock (and Tox-La and Rayburn
The possessor of monopoly power may not impose its contract 1
* Country).     With no judicial or administrativo determination that
(or any other) interpretation on its competitor through the unlawful exerciso of its monopoly power.
,                                                                        its interpretation is valid, or even colorable, TUEC is preventing Cap Rock from purchasing power from TUEC's competitor.
The antitrust laws and this Commission's antitrust licenso conditions are intended to prevent just such an exorcise of monopoly power.
TUEC benefits from its illegal actions in two wayst (1) it continues to make a sale that cap Rock otherwise would have terminated, and (2) it impairs Cap Rock's ability to compete with TUEC at retail by forcing Cap Reck to purchase TUEC's higher cost power. TUEC is, by force of the exerciso of its monopoly power over transmission service and abrogation of its obligations to wheel under the license conditions, forcing Cap Rock to purchase power from a supplier from which Cap Rock has chosen no longer to purchase.
Yet that is precisely what TUEC is doing to Cap Rock (and Tox-La and Rayburn Country).
53/ See Section III.B, aupn .
With no judicial or administrativo determination that its interpretation is valid, or even colorable, TUEC is preventing Cap Rock from purchasing power from TUEC's competitor.
I                                                                                   --          -                                                          .
TUEC benefits from its illegal actions in two wayst (1) it continues to make a sale that cap Rock otherwise would have terminated, and (2) it impairs Cap Rock's ability to compete with TUEC at retail by forcing Cap Reck to purchase TUEC's higher cost power.
TUEC is, by force of the exerciso of its monopoly power over transmission service and abrogation of its obligations to wheel under the license conditions, forcing Cap Rock to purchase power from a supplier from which Cap Rock has chosen no longer to purchase.
53/
See Section III.B, aupn.
I


l 36 L         TUec could have sought legaily to prevent Cap Rock from
l 36 L
purchasing power from WTU by seeking a judicial declaratory order that TUEC's interprctation of the 1990 Settlement was valid.
TUec could have sought legaily to prevent Cap Rock from purchasing power from WTU by seeking a judicial declaratory order that TUEC's interprctation of the 1990 Settlement was valid.
Although even a legal action may violate the antitrust laws if it is taken in furtherance of an effort to obtain or to mairitain an illegal monopoly,D/ prior judicial review of TUEC's
Although even a legal action may violate the antitrust laws if it is taken in furtherance of an effort to obtain or to mairitain an illegal monopoly,D/ prior judicial review of TUEC's
.i   interpretation could have avoided the pa,t'ontly illegal use of monopolypowertowhichTUECresorted,!ButTUEChaschosennot tovoluntarilyexposoitsinterpretakiontojudicialscrutiny.
.i interpretation could have avoided the pa,t'ontly illegal use of monopolypowertowhichTUECresorted,!ButTUEChaschosennot tovoluntarilyexposoitsinterpretakiontojudicialscrutiny.
Instead, TUEC has chosen to refuse to whool for Cap Rock and forco Cap Rock to suo TUEC.
Instead, TUEC has chosen to refuse to whool for Cap Rock and forco Cap Rock to suo TUEC.
TUEC has apparently settled on a strategy of socking to irmnize its illegal exercisos of monopoly power from antitrust scrutiny by coupling its illegal actions with specious legal contentions which it will not voluntarily subject to legal scrutiny. TUEC will physically prevent a transaction like Cap Rock's purchase from occurring and force the victim of its illegal actions to suo it in court or before an adminintrative agency while the economic bonofits of the transaction are dissipated. The linchpin of TUEC's strategy, however, romains the illegal use of monopoly power.
TUEC has apparently settled on a strategy of socking to irmnize its illegal exercisos of monopoly power from antitrust scrutiny by coupling its illegal actions with specious legal contentions which it will not voluntarily subject to legal scrutiny.
Mf   Actions taken by those with dominance in the market may not be acceptable even though they might be legitimato if undertaken by those less powerful. Earley, 13 NRC at 1068; tiltiland, 6 NRC at 913. Even an otherwiso lawful device may be used as a weapon in restraint of trado or commerco.
TUEC will physically prevent a transaction like Cap Rock's purchase from occurring and force the victim of its illegal actions to suo it in court or before an adminintrative agency while the economic bonofits of the transaction are dissipated.
SSh1De Chain _Ti1RatfIR v. ERLtEd_EtAtsa, 334 U.S. 110, 119 (1948).
The linchpin of TUEC's strategy, however, romains the illegal use of monopoly power.
Mf Actions taken by those with dominance in the market may not be acceptable even though they might be legitimato if undertaken by those less powerful.
Earley, 13 NRC at 1068; tiltiland, 6 NRC at 913.
Even an otherwiso lawful device may be used as a weapon in restraint of trado or commerco.
SSh1De Chain _Ti1RatfIR v. ERLtEd_EtAtsa, 334 U.S.
110, 119 (1948).


1 I                                   "
1 I
The antitrust licenso conditions do not contain an exception i
The antitrust licenso conditions do not contain an exception for those situations in which TUEC can conjure up an argument why it doon not believo and Entity is entitled to whooling servico.
for those situations in which TUEC can conjure up an argument why it doon not believo and Entity is entitled to whooling servico.
Nor may TUEC legally croato such an exception for itself.
Nor may TUEC legally croato such an exception for itself.       Yet that is procinoly what TUEC purports to do.
Yet that is procinoly what TUEC purports to do.
TOEC's monopoly power enables it to employ the converso of a clearPs picacribed strategy of monopolists -- the institution of basoloss litigation to harm competitors. If TUCC instituted basoloss litigation to provent Cap Rock from purchasing from WTU, TUEC would be subject to antitrust liability. When litigation is a "moro sham," betraying a pattern of "basoloss, repetitivo claims," it is subject to antitrust attack.     California Hot 9I IIJDsport,Co. v. Truckina Unlimited, 404 U.S. 508 (1972)
TOEC's monopoly power enables it to employ the converso of a clearPs picacribed strategy of monopolists -- the institution of basoloss litigation to harm competitors.
(extending Egerr-Ponnl4RtR.D antitrust immunity to administrativo and judicial actions and outlining the " sham" exception).     ftgg Eqctern Railroad Prealiqnts Confgrgnce v. N2EEr_ freight. Im.
If TUCC instituted basoloss litigation to provent Cap Rock from purchasing from WTU, TUEC would be subject to antitrust liability.
365 U.S. 127 (1961) and United Mine WoIhcrn v. Pennincton, 381 U.S. 657 (1965). Even a single basoloss lawsuit may fall within the " sham" exception to the Foerr-Pennington doctrino and subject the perpetrator to antitrust liability. JiCI_qpJnmunications v.
When litigation is a "moro sham," betraying a pattern of "basoloss, repetitivo claims," it is subject to antitrust attack.
American Telschone &_lclograph Co., 708 F.2d 1081, 1155 (7th cir.
California Hot 9I IIJDsport,Co. v. Truckina Unlimited, 404 U.S. 508 (1972)
1983) (" bringing a basoloss claim is devoid of the constitutional significance that warrants immunity from antitrust laws."     & at 1158); Clipper Exorous v. Rackv Mountain Motor Tarift nurc h Im , 6G ~l F.2d 1240 (9th cir. 1982)("If the activity is not genuine petitioning activity, the antitrust laws are not I
(extending Egerr-Ponnl4RtR.D antitrust immunity to administrativo and judicial actions and outlining the " sham" exception).
I             -    -                -          --
ftgg Eqctern Railroad Prealiqnts Confgrgnce v. N2EEr_ freight. Im.
365 U.S. 127 (1961) and United Mine WoIhcrn v.
Pennincton, 381 U.S. 657 (1965).
Even a single basoloss lawsuit may fall within the " sham" exception to the Foerr-Pennington doctrino and subject the perpetrator to antitrust liability.
JiCI_qpJnmunications v.
American Telschone &_lclograph Co.,
708 F.2d 1081, 1155 (7th cir.
1983)
(" bringing a basoloss claim is devoid of the constitutional significance that warrants immunity from antitrust laws."
& at 1158); Clipper Exorous v. Rackv Mountain Motor Tarift nurc h Im, 6G ~l F.2d 1240 (9th cir. 1982)("If the activity is not genuine petitioning activity, the antitrust laws are not I
I


38 ouspended      . . .  (and) will prohlbit sham activity, whether that activity consists of single or multiple sham suits." Id. at 1256) i EDgrgy Con:tervation, Inc . v . ((pliadyno       Ing , 698 F.2d 386 (9th Cir. 1883).         TUEC's anticompetitive conduct is even balder, es it does not even purport to employ legal process to obtain its illegal purpose.
38 (and) will prohlbit sham activity, whether that ouspended activity consists of single or multiple sham suits." Id. at 1256) i EDgrgy Con:tervation, Inc. v. ((pliadyno Ing, 698 F.2d 386 (9th Cir. 1883).
In otter Tail Power Co. v. United Staten, 410 U.S.                 366 (19'i3) gn r.cnnnd, 360 F.Supp. 451 (D.C. Minn. 1973), affld aph 417 U.S. 901 (1974), the court held that a cause of action under the sham exception to the Noorr-Pennington doctrine was made out by defendant's sponsorship of litigation against several cities to ftmotrate the sale of revenue bonds to finance municipal power systems.       The District Court in Qtipr Tail found that the ude of
TUEC's anticompetitive conduct is even balder, es it does not even purport to employ legal process to obtain its illegal purpose.
'i'.
In otter Tail Power Co. v. United Staten, 410 U.S.
litigation by Otter Tail "was designed principally to prevent the establishment of municipal electric systems and thereby to preserve defendant's monopoly .         . . . " Id. at 451-52.       Otter Tail, 331 F. Supp. at 62, and on remond from the_SupIgre_ Court, 360 F. Supp. 451 (1973).         Like Otter Tail, TUEC is deliberately forcing its competitors to engage in expensive and time consuming litigation in order to block their ability to secure alternative sources of electric power.         TUEC's efforts to prov?nt competition are no more permissible under the antitrust laws than the conduct of Otter Tail.
366 (19'i3) gn r.cnnnd, 360 F.Supp. 451 (D.C. Minn. 1973), affld aph 417 U.S.
D.       THEC' S INTEREBETATIO.N _OP TRlL191Q_GETTLIliERT_JB Dh8RLERh TUEC contends that Cap Rock must buy all of its bulk power requirements from TUEC gy_CD Altnr February 1, 1992, when Cap I
901 (1974), the court held that a cause of action under the sham exception to the Noorr-Pennington doctrine was made out by defendant's sponsorship of litigation against several cities to ftmotrate the sale of revenue bonds to finance municipal power systems.
The District Court in Qtipr Tail found that the ude of
'i' litigation by Otter Tail "was designed principally to prevent the establishment of municipal electric systems and thereby to preserve defendant's monopoly.
" Id. at 451-52.
Otter Tail, 331 F.
Supp. at 62, and on remond from the_SupIgre_ Court, 360 F.
Supp. 451 (1973).
Like Otter Tail, TUEC is deliberately forcing its competitors to engage in expensive and time consuming litigation in order to block their ability to secure alternative sources of electric power.
TUEC's efforts to prov?nt competition are no more permissible under the antitrust laws than the conduct of Otter Tail.
D.
THEC' S INTEREBETATIO.N _OP TRlL191Q_GETTLIliERT_JB Dh8RLERh TUEC contends that Cap Rock must buy all of its bulk power requirements from TUEC gy_CD Altnr February 1, 1992, when Cap I


l 39 Rock's 1963 full requirements contract with TUEC lawfully terminated. TUEC'n contentions are contrary to the plain language and obvious intent of the 1990 Settlement.
l 39 Rock's 1963 full requirements contract with TUEC lawfully terminated.
TUEC'n contentions are contrary to the plain language and obvious intent of the 1990 Settlement.
Cap Rock's request for enforcement of the Comancho Peak antitrust license conditions and related actionsip/ sought to obtain for Cap Rock, under reasonable ratos, terms and conditions, the partial requirements electric pc,wer, coordination and other essential services TUEC la obligated to provide an
Cap Rock's request for enforcement of the Comancho Peak antitrust license conditions and related actionsip/ sought to obtain for Cap Rock, under reasonable ratos, terms and conditions, the partial requirements electric pc,wer, coordination and other essential services TUEC la obligated to provide an
  " Entity" like Cap Rock under the Comancho Peak antitrust licenco conditions. Cap Rock's goal at that time was, and remains, to end its total dependence upon TUEC, Cap Rock's principal competitor at rotell and the owner of the only transmission facilities with which Cap Rock is interconnected, for all of the bulk power which Cap Rock must purchaso in order to serve its member-consumers.
" Entity" like Cap Rock under the Comancho Peak antitrust licenco conditions.
The purpose of the 1990 Settlement, as stated in its recitals,ii/ Was to facilitate Cap Rock's independence from TUEC. The 1990 Settlement, thereforo, provides for a range of services that cap Rock might need, for a limited period of from five to ten years, to facilitato Cap Rock moving its load off the TUEC system. The only terms under which TUEC was willing to dQ/   EP.2 Cao Rock Electric Cooperative. Inc. v. United Statqn Nuclear Regulatory Commission, United States Court of Appeals for the District of Columbia Circuit, Case No. 89-1735, dismissed on motion of petitioner by unpublished ordOr.
Cap Rock's goal at that time was, and remains, to end its total dependence upon TUEC, Cap Rock's principal competitor at rotell and the owner of the only transmission facilities with which Cap Rock is interconnected, for all of the bulk power which Cap Rock must purchaso in order to serve its member-consumers.
f.1/ Ex. A, p. 1 to Attachment L.
The purpose of the 1990 Settlement, as stated in its recitals,ii/ Was to facilitate Cap Rock's independence from TUEC.
The 1990 Settlement, thereforo, provides for a range of services that cap Rock might need, for a limited period of from five to ten years, to facilitato Cap Rock moving its load off the TUEC system.
The only terms under which TUEC was willing to dQ/
EP.2 Cao Rock Electric Cooperative. Inc. v. United Statqn Nuclear Regulatory Commission, United States Court of Appeals for the District of Columbia Circuit, Case No. 89-1735, dismissed on motion of petitioner by unpublished ordOr.
f.1/
Ex.
A, p. 1 to Attachment L.
1
1


            . - _ - =
. - _ - =
                                                                                                  .. l
. -. ~ -
_ _ - _ _ - _ _ -                  . - . ~ -   - . _ .
.. l 40 provide regulating, scheduling and other services, however, are so restrictivo from business and operating perspectives that the only viable option for Cap Rock was the one it as follevedt to remove its load from the TUEC system by obtainir, itc bulk power, control area and other essential services from an oloctric utility cocpany other than TUEC.
40 provide regulating, scheduling and other services, however, are so restrictivo from business and operating perspectives that the only viable option for Cap Rock was the one it                 as follevedt to remove its load from the TUEC system by obtainir , itc bulk power, control area and other essential services from an oloctric utility cocpany other than TUEC.
One of the services casential to Cap Rock's ability to
One of the services casential to Cap Rock's ability to
~
~
become independent of TUEC was the assured availability of full or partial requirements service from TUEC, to the extent required by Cap Rock, during the transition period.                   TUEC agreed to provide those wholesale power services in the amounts to be specified by Cap Rock upon termination of Cap Rock's full requirements contract with TUEC.             Cap Rock nooded such alternatives because, at the timo of the 1990 Settlement, Cap Rock had no alternative sources of power under contract.                         The real possibility existed at that timo that all or part of Cap Rock's load might have to be left on the TUEC system during the transition period, until Cap Rock finalized its alternative power supply arrangements.       The choice as to whether, or how much, power Cap Rock would purchase during the transition period, however, is clearly Cap Rock's choice.
become independent of TUEC was the assured availability of full or partial requirements service from TUEC, to the extent required by Cap Rock, during the transition period.
The plain language of the 1990 Settlement makes its clear that the election as to whether to purchase power from TUEC during the transition period, and the amount of such purchase, if any, is clearly Cap Rock's election.                   The 1990 Settlement I specifies no amount of partial requirements service that Cap Rock 4
TUEC agreed to provide those wholesale power services in the amounts to be specified by Cap Rock upon termination of Cap Rock's full requirements contract with TUEC.
Cap Rock nooded such alternatives because, at the timo of the 1990 Settlement, Cap Rock had no alternative sources of power under contract.
The real possibility existed at that timo that all or part of Cap Rock's load might have to be left on the TUEC system during the transition period, until Cap Rock finalized its alternative power supply arrangements.
The choice as to whether, or how much, power Cap Rock would purchase during the transition period, however, is clearly Cap Rock's choice.
The plain language of the 1990 Settlement makes its clear that the election as to whether to purchase power from TUEC during the transition period, and the amount of such purchase, if any, is clearly Cap Rock's election.
The 1990 Settlement I
specifies no amount of partial requirements service that Cap Rock 4


S l
S l
41                                 ,
41 must purchaso.
must purchaso.                                 Rathor, Section 1.01 of the Settlement provides that TUEC will sell Cap Rock the amount of power and energy (oxpressed as Contract Demand) that "will be specified on Attachment A."                                 Exhibit A to the 1990 Settlemont is blank.                     Cap Rock has no obligation to purchase any power or energy from TUEC.
Rathor, Section 1.01 of the Settlement provides that TUEC will sell Cap Rock the amount of power and energy (oxpressed as Contract Demand) that "will be specified on Attachment A."
All that is required from TUEC to permit Cap Rock to purchase power from WTU is for TUEC                                                   (1) to coordinato with WTU so that, when WTU " ramps up" ( h , increanos) its generation to serve cap Rock's load, TUCC will back down its generation, and (2) to provido the necessary transmission unevice.                                                   TUEC has refused to whool or otherwise to cooperato.
Exhibit A to the 1990 Settlemont is blank.
CONCLUDION I             for the reasons stated above, Cap Rock requoets that the Commission promptly institute a hearing ar.d investigation for the purpose of determining the extent to which TUEC's conduct has created a situation inconsistent with the antitrust laws and the appropriate remedy for such that situation.                                                   Cap Rock also requests that the Commission unequivocally declare TUEC's
Cap Rock has no obligation to purchase any power or energy from TUEC.
All that is required from TUEC to permit Cap Rock to purchase power from WTU is for TUEC (1) to coordinato with WTU so that, when WTU " ramps up" ( h, increanos) its generation to serve cap Rock's load, TUCC will back down its generation, and (2) to provido the necessary transmission unevice.
TUEC has refused to whool or otherwise to cooperato.
CONCLUDION I
for the reasons stated above, Cap Rock requoets that the Commission promptly institute a hearing ar.d investigation for the purpose of determining the extent to which TUEC's conduct has created a situation inconsistent with the antitrust laws and the appropriate remedy for such that situation.
Cap Rock also requests that the Commission unequivocally declare TUEC's


42 obligation to wheel for cap Rock and all similarly-situated Entities.
42 obligation to wheel for cap Rock and all similarly-situated Entities.
Roopectfully cubmitted, 1/l j? 6' 0' Ag h',lr; f!/l(f o %ps ,f i.
Roopectfully cubmitted, j? 6' 0' h',lr; f!/l(f %ps,f i.
                                                      ,s!py'?
1/l
,s!py'? Ag o
9 1
9 1
iJohn Michael Adragna/     '
iJohn Michael Adragna/
Eric A. Bilsky COUllSEL FOR CAP ROCK ELECTRIC COOPERATIVE, INC.
Eric A.
Bilsky COUllSEL FOR CAP ROCK ELECTRIC COOPERATIVE, INC.
1 2
1 2
S             Miller, Balls & O'Neil, P.C.
S Miller, Balls & O'Neil, P.C.
1101 Fourteenth Street, N.W.
1101 Fourteenth Street, N.W.
  'I Suite 1400 Washington, D.C. 20005 (202) 789-1450 t
'I Suite 1400 Washington, D.C.
20005 (202) 789-1450 t
i March 25, 1992 8
i March 25, 1992 8
    $              M \03230\hkC\032304P,001 l
M \\03230\\hkC\\032304P,001 l
1 I
1 I


I                                   -
I
                                    = = ::
-= = ::
1UELECTRIC
1UELECTRIC
      %Qg                                                 January 30, 1992 w   .
%Qg January 30, 1992 w
v n riestvit.g I
v n riestvit.g I
Mr. Szavan 1 cc.111er j   Directer of Power supply and 3   Regulatory Affairs cap kook flautric Cooparative. Inc.
Mr. Szavan 1 cc.111er j
P.O. Box 10069 I   4140 Durnet Road Austin, Texas 75766-1069 Dear Mr. Colliar This is in ramponse to your latter of Decamber 19,           1991 regarding the Agramment for Purchase of Power, dated July 2, 1963, 5   between TO Elactric and cap Rock, as amanded (*1963 Agreement"),
Directer of Power supply and 3
the Agrataant far Purchase of Power, dated July 2,1963, between TU riectric and Lona wolf Electric Cooperative, Inc., now the Lone R   Wolf Division of Cap Rock, as anandad (" Lone Wolf Agraamant#), and the Jover supply Agreement, dated June 8,1990, betvean TO Electric and Cap RocX ("19P0 Powar supply Agreament") .
Regulatory Affairs cap kook flautric Cooparative. Inc.
: 1. TO Electrio accepto your Dscomber 19, 1991 latter as notica of tarmination cr2 the 1963 Agreement and the Lens Wolf Agraament, affective at 12:01 a.m. on February 1, 1992, at which time the 1990 Power supply Agreement bacones effective, in accordance with the provisiens of section 2.01 thereof.
P.O. Box 10069 I
Thereaf ter, TU Electric will supply cap RocX's povar and anaryy requirements (including the Lona wolf requirements), in accordanos with the provistorts of the 1993 Power supply Agreement, at the points erf delivery and at the       'stract demands set forth belovt can hek Deints of Deliverv           centract Demand Pambrook                             13,000 Schwartz                               9,000 i                   Triangle                             14,000 West stanton                           9.000 Cantroll                               8,750 I
4140 Durnet Road Austin, Texas 75766-1069 Dear Mr. Colliar This is in ramponse to your latter of Decamber 19, 1991 regarding the Agramment for Purchase of Power, dated July 2,
Tata                                   6,000 St. Lawrence                         15,500 Stilas-                               13,000 I
: 1963, 5
g ...
between TO Elactric and cap Rock, as amanded (*1963 Agreement"),
the Agrataant far Purchase of Power, dated July 2,1963, between TU riectric and Lona wolf Electric Cooperative, Inc., now the Lone R
Wolf Division of Cap Rock, as anandad (" Lone Wolf Agraamant#), and the Jover supply Agreement, dated June 8,1990, betvean TO Electric and Cap RocX ("19P0 Powar supply Agreament").
1.
TO Electrio accepto your Dscomber 19, 1991 latter as notica of tarmination cr2 the 1963 Agreement and the Lens Wolf Agraament, affective at 12:01 a.m. on February 1, 1992, at which I
time the 1990 Power supply Agreement bacones effective, in accordance with the provisiens of section 2.01 thereof.
Thereaf ter, TU Electric will supply cap RocX's povar and anaryy requirements (including the Lona wolf requirements), in accordanos I
with the provistorts of the 1993 Power supply Agreement, at the points erf delivery and at the
'stract demands set forth belovt can hek Deints of Deliverv centract Demand Pambrook 13,000 Schwartz 9,000 i
Triangle 14,000 West stanton 9.000 Cantroll 8,750 I
Tata 6,000 St. Lawrence 15,500 Stilas-13,000 I
g


                                                                                                                                                                                                        )
)
                                                                                                              -2=
-2=
vaalmoer                                                                                 1.5,s00 I                                                            Eiland                                                                                   4,ooo Mcdonald            .
vaalmoer I
                                                                                                                                                      .is,000 phillips                                                                               10,500 ton = velf pahtn af Bm11very                                                                   centenet Daw nd Lake Thomas                                                                                 3.800 I                                                  '
1.5,s00 Eiland Mcdonald 4,ooo
hasooe China Crove 2,100
.is,000 phillips 10,500 ton = velf pahtn af Bm11very centenet Daw nd Lake Thomas I
                                                                                                                                                                                                        )
3.800 hasooe 2,100 China Crove 500 colorade City 2,100 I
500 colorade City                                                                             2,100                                         l Mitchell County                                                                                                                           .
Mitchell County 1,100 i
I                                                          Loraine 1,100 900 i
Loraine 900 treek-N y Morgan straat 650 j
I treek-N y Morgan straat                                                                       650                                       j scurry .ounty                                                                               2,400 E                             1.               TU Electrie is presently serving all of Cap Rock's                                                                                                     l l
scurry.ounty 2,400 E
}g                    and energy requirements at the foregoing pointa of delivery. power                                                                                   The foregoing reflects the November 8,1991 transfer of the load served                                                                                                               )
1.
'3                   by TU Electris from Cap Rock's Vinoemt                                                                                                                                             '
TU Electrie is presently serving all of Cap Rock's and energy requirements at the foregoing pointa of delivery. power l
Lone Wolf Lake Thomas point of delivery,aspoint                                                                              of dalivary to the -
}g foregoing reflects the November 8,1991 transfer of the load served
en osteber 6, 1991, which transfer is harrequested by cap Root i                   Electria. -We are not aware of any changes be agreed                                                                                       te by TO proposed in cap Rook's 1993.          points of delivery or contract demands before February 1,                                                                                                         l
)
: 3.               Me contract demands at the foregoing points of deliv g                    reflect the changes in contract demands at tem cap Reek pointe delivery, as requested in cap Reek's Cateber 8, 1991 letter to TU g                 tiestris, which changes                                     are hereby acoastable to TU Electric,
The
,                    etfestive with                                   the osteher 1991 hilling period.
'3 by TU Electris from Cap Rock's Vinoemt Lone Wolf Lake Thomas point of delivery, point of dalivary to the -
In that I
as requested by cap Root en osteber 6,
oennection, TU Eleotrio will issue a credit to Cap Rock for the 1.
1991, which transfer is har i
charges, if any, resulting from eyplication of the contract desand
Electria. -We are not aware of any changes be agreed te by TO proposed in cap l
                  - provisions in Rate Wp based on the centract danands in effect prior i
Rook's points of delivery or contract demands before February 1, 1993.
to such abances. TU Riestrie vill also issue a credit to cap RocX for any charges made under the 1943 Agreement, aseosiated with the contract demand minimune of Data Wp at the Vinosat point of L                  delivery, int of delivery on November 8,1991after Thomas         po                                                                                                                       suchwill such credits       ined bewas transf g                   refloated-in your next billing.
3.
i
Me contract demands at the foregoing points of deliv reflect the changes in contract demands at tem cap Reek pointe
: 4.               Tour h==w                         19 letter ales purports te give notice pursuant to sosties 3.03 of the 1990 power supply Agressent to remove "all 32 the power and enerTY requirements of Cap Rocks at the 1,  seven pelate-et delivery listed in your letter, as of February -
,g delivery, as requested in cap Reek's Cateber 8, 1991 letter to TU g
1994 == . namely vaalseer, West stanton, Triangle NoDenald, phillips, Tate and centre 11. 70 Electrio will only , accept your Desember 19, 1991 letter as neties to reduse load pursuant to sostica 2.05 of the 1990 power supply heroament with respect to s'he.
tiestris, which changes are hereby acoastable to TU Electric, etfestive with the osteher 1991 hilling period.
vaalmeer- and Cantrell points of delivery, offestive February 1, 1994, provided Cap Rock otherwise oesplies with the provisions of                                                                                                                   i the 1999 power Supply Agreement, including without limitation i
In that oennection, TU Eleotrio will issue a credit to Cap Rock for the I
  ~.'...-....                       .. ..                                s .   ..                                                  =
1.
_,,s_-,---,,       . . _ . . . . - . _ -              , . - . . .    .~     ...- _ - - _ . . . . , _ - - - - - _ . - _ . _ . . _ . _ .                  ..  . - . . . . ~ . . _ _ . _ _ -
- provisions in Rate Wp based on the centract danands in effect prior charges, if any, resulting from eyplication of the contract desand i
to such abances.
TU Riestrie vill also issue a credit to cap RocX for any charges made under the 1943 Agreement, aseosiated with the contract demand minimune of Data Wp at the Vinosat point of delivery, int of delivery on November 8,1991after such ined was transf L
Thomas po such credits will be g
refloated-in your next billing.
i 4.
Tour h==w 19 letter ales purports te give notice pursuant to sosties 3.03 of the 1990 power supply Agressent to remove "all 32 the power and enerTY requirements of Cap Rocks at the seven pelate-et delivery listed in your letter, as of February -
1, 1994==. namely vaalseer, West stanton, Triangle
: NoDenald, phillips, Tate and centre 11.
70 Electrio will only, accept your Desember 19, 1991 letter as neties to reduse load pursuant to sostica 2.05 of the 1990 power supply heroament with respect to s'he.
vaalmeer-and Cantrell points of delivery, offestive February 1, 1994, provided Cap Rock otherwise oesplies with the provisions of i
the 1999 power Supply Agreement, including without limitation i
~. '... -....
s.
=
_,,s_-,---,,
.~
. -.... ~..


                                                                            -3=
-3=
l i                      8 action 2.05 thereof.                     Section 2.05 does not authorise cap Rock to
l 8 action 2.05 thereof.
{E W                    and Tate points of delivery on 24 nonths' notica.tranafer load fr
Section 2.05 does not authorise cap Rock to
'a jg i
{E i
i that                Section 3.03 of the 1990 Power Supply Ayressant provides j E                                         # Subject part)            to the limitations described below, all (but not iW                                                       of the power and energy requirements of cap Rock's customers at nine Points of Delivery IE                                                             (Pembrook,
and Tate points of delivery on 24 nonths' notica.tranafer load fr W
!B                                                            st. Lavranos, i
!'a i
Btiles, Knott,
Section 3.03 of the 1990 Power Supply Ayressant provides jg that i.
-                                                            Ackerly, Vealmors (sic),
E
i3                                                           cnaus o jg,                                                           La Mesa and Schwartz) 4 i                                        may, during years one through five of this Agreement, be
# Subject to the limitations described below, all (but not j
!                                          served by another electric utility, provided cap Rock has
part) iW of the power and energy requirements of cap Rock's customers at nine Points of Delivery IE
!                                        first given TU Electrie twenty-four months'                                       advance written           notice of such service , . . .
!B (Pembrook, st. Lavranos, i
ia                                        Demand h                                                                   The contract
: Btiles, Knott,
:3                                       given (pu)rsuantat the Point (s) of Delivery for which notice in to this section 2.0s may not in the agTregate, exceed 30 MW of contract Demand (as s,pecified on
: Ackerly, Vealmors (sic),
                                          . . Ruh.ibit
i3 cnaus o jg, La Mesa and Schwartz) 4 may, during years one through five of this Agreement, be i
                                                  .*          A on the effective date of this Agreement) .
served by another electric utility, provided cap Rock has first given TU Electrie twenty-four months' advance ia written notice of such service,...
The contract Demand h
:3 given (pu)rsuantat the Point (s) of Delivery for which notice in to this section 2.0s may not in the agTregate, exceed 30 MW of contract Demand (as s,pecified on Ruh.ibit A on the effective date of this Agreement).
i
i
;g l
;g As you must know, only vealmoor and cantrell l
As you must know, only vealmoor and cantrell ig                    delivery specified in section 2.09.was farmerly coehome                                               andofLa Mesa) c oints
delivery specified in section 2.09.was farmerly coehome and La Mesa) c ig oints of In-addition. the contined contrast demand of the seven points of delivery you listed 79,750 Ew, far in excess of the 30,000 RW limitation in Section is
!                    contrast                                                      In-addition.
;5 a
demand of the seven points of delivery you listed is                        the contined            '
1 2 c5 "har*** *** ****ia**==atr*** d'=*ad ** v** 2=*** ""4 c*"tr *12 l
a
1s 24,250 MW, well within that limitation.
;5 1                    79,750 2 c5          Ew, far in excess of the 30,000 RW limitation in Section l
1s 24,250  "har***   MW,  *** well
                                                      ****ia**   ==atr***
within          d'=*ad ** v** 2=*** ""4 c*"tr *12 that limitation.
4
4
)E                             5.
)E 5.
3                  to section 3.04 of the 1990 Power supply Agreement, "to rem remaini.ng 1995,* W Elastrie    deliveryaseepts  points from yourthe h=*
to section 3.04 of the 1990 Power supply Agreement, "to rem 3
TUEC's system as of lebruary 1,                             .
remaini.ng delivery points from the TUEC's system as of lebruary 1, 1995,* W Elastrie aseepts your h=*
19 t                 that cap Reek will dissonneet all remaining, cap Rock and Lone Wolf 1991 letter am n points 1995 --of         delivery from 'rU Electrie s systaa effective February 1 i.e.,
19 t
n all of the points of delivery listed in paragraph 1 5_           ,
that cap Reek will dissonneet all remaining, cap Rock and Lone Wolf 1991 letter am points of delivery from 'rU Electrie s systaa effective February 1 n
above, of the 1990  exoept Power  Yealaeor Supply and     centre 11 ~~ pursuant to ths provisions Agreement.
1995 -- i.e., all of the points of delivery listed in paragraph 1 5_
I                            4.
above, exoept Yealaeor and centre 11 ~~ pursuant to ths provisions of the 1990 Power Supply Agreement.
Your retguest for Tir Electric to wtieel power from West Texas Utilities compeny to cap Rock, beginning February 1,1992, in denied until the 1990 Power Supply Agreement has been terminated in g               _-            _.                . . . . _      ....
4.
I Your retguest for Tir Electric to wtieel power from West Texas Utilities compeny to cap Rock, beginning February 1,1992, in denied until the 1990 Power Supply Agreement has been terminated in g


I
I
                                                                                                      =4-accordance with its taras or a whosling request is nada pursuant to I      the provisions thereof.
=4-accordance with its taras or a whosling request is nada pursuant to the provisions thereof.
                                                                  "te obligate N 11actric te wheel power or ausrgy from West Taxas utilities, as requested, for cap Rock without at least three ysars' 1990 Power supply Agramment does not prior vritten notice and does not authorise cap Rock to purchase i'     power frca anot*.Ar source without at hast three years' (24 nonths to certain pointa of delivery) prior written notice.
I obligate N 11actric te wheel power or ausrgy from West "te 1990 Power supply Agramment does not Taxas utilities, as requested, for cap Rock without at least three ysars' prior vritten notice and does not authorise cap Rock to purchase i'
Having   rasponded               to                                           the specific I                                                                                                              requests             and actions raflected Ln your Deosaber 19 1sttar, we take this opportunity to also arprass our disappointment that cap Rock has taken the I    position that the 199o Power Supply AgTasmant is somehow illusory, invalid or otherwise unanforceable. It was at your insistence that a new power eupply agreement be in place bafera you made a decision to cancel the 1963 Agreement pursuant to Section 6, as amendad. We spent months negotiating tua 1990 Power supply Agreemant and nach i     of ouragreement prior          Boards of Dirooters approved not only that contract but a in Agrasaant was based. principle upon which the 1990 Power supply At that time, TU Electric and cap RocM i   intanded to be and were fully bound by that agreement. That cap Roct vould now attempt to escape its obligations for a parceived "battar daal' is unacceptable to TU Electrio. We are utill bound by the 1990 Power Supply Agreement and Cap Rock is likewise.
power frca anot*.Ar source without at hast three years' (24 nonths to certain pointa of delivery) prior written notice.
Having rasponded to the specific requests and actions I
raflected Ln your Deosaber 19 1sttar, we take this opportunity to also arprass our disappointment that cap Rock has taken the position that the 199o Power Supply AgTasmant is somehow illusory, I
invalid or otherwise unanforceable. It was at your insistence that a new power eupply agreement be in place bafera you made a decision to cancel the 1963 Agreement pursuant to Section 6, as amendad.
We spent months negotiating tua 1990 Power supply Agreemant and nach i
of our Boards of Dirooters approved not only that contract but a prior agreement in the 1990 Power supply Agrasaant was based. principle upon which At that time, TU Electric and cap RocM i
intanded to be and were fully bound by that agreement.
That cap Roct vould now attempt to escape its obligations for a parceived "battar daal' is unacceptable to TU Electrio.
We are utill bound by the 1990 Power Supply Agreement and Cap Rock is likewise.
As you know, a key point in the negotiation of the 1990 Powar Supply Agreement was its term and the various notica periods to be '
As you know, a key point in the negotiation of the 1990 Powar Supply Agreement was its term and the various notica periods to be '
I   given to convert the contract from a full requirements contract to a partial requiramants contract er to compiately allminate the supplier /customar relationship between our two companies. cap Rock I   insistad thkt TO 11actric be committed to sell cap Rock all of its power and energy requixananta for a paried of years. TU tiectric agreed.to a ten-year tars, sut cap Rock did not want to be bound for such a long period of tina.                                                                   TO Elactric finally agreed to I   otrait cap Rock to purchase power and snargy feca anothar source if
I given to convert the contract from a full requirements contract to a partial requiramants contract er to compiately allminate the supplier /customar relationship between our two companies. cap Rock I
        'it would give TU Electrio at laast three years' notics to reduce load.
insistad thkt TO 11actric be committed to sell cap Rock all of its power and energy requixananta for a paried of years.
S                  TU tiestrio also agreed to parait Cap Rock to remove up to 30 MW of load, st specified points of delivery and parait servico of such load 1y another alactrio utility upon, two years' notice. -
TU tiectric agreed.to a ten-year tars, sut cap Rock did not want to be bound for such a long period of tina.
These provieions accommodated cap Rock's dm.re to have flexibility s
TO Elactric finally agreed to I
I to shop for alternate sources of power. TU Electric also agrand in the 1990 Pasar supply Agreement to provide a asans for Cap Rock to gain access to such alternata power sources and ultimately become a self-sufff M*Mt electric utility with its own control area or I   become part of the control area of another electric utility.                                                                             The 1990 Power supply Agreamant provided for an ordarly transitica for thase raasonable.
otrait cap Rock to purchase power and snargy feca anothar source if
goals on tarna which both parties datarmined to be fair and The orderly transition was largely based upon the sI   notica provisiens of that contract.
'it would give TU Electrio at laast three years' notics to reduce load.
Finally       the 1990 Power supply
TU tiestrio also agreed to parait Cap Rock to remove up to S
* Agreement providad for the j   conditions un, der which cap Rocx could return to 'the TU Electric a systen if its search for altarnate settrees of power failed or its B
30 MW of load, st specified points of delivery and parait servico 5
of such load 1y another alactrio utility upon, two years' notice. -
These provieions accommodated cap Rock's dm.re to have flexibility to shop for alternate sources of power.
I TU Electric also agrand in the 1990 Pasar supply Agreement to provide a asans for Cap Rock to gain access to such alternata power sources and ultimately become s
a self-sufff M*Mt electric utility with its own control area or I
become part of the control area of another electric utility.
The 1990 Power supply Agreamant provided for an ordarly transitica for thase goals on tarna which both parties datarmined to be fair and raasonable.
The orderly transition was sI notica provisiens of that contract.
largely based upon the Finally the 1990 Power supply
* Agreement providad for the
.j conditions un, der which cap Rocx could return to 'the TU Electric a
systen if its search for altarnate settrees of power failed or its B
I
I
 
: v :'c mv a. m
: v :'c mv a. m           ;.m :. . m .cn       .... . .. .m , . . - . .  ..
;.m :.. m.cn
.m
'I
'I
                                                -5~
-5~
sources became unavailable and tha circa:rataneen under which cap Rock could ptWehana emerger.cy power and related services from TU Bloctrie.
sources became unavailable and tha circa:rataneen under which cap Rock could ptWehana emerger.cy power and related services from TU Bloctrie.
The 193o Power Supply Ayrsement is unique and, according tn you, vary beneficial to Cap Rock. But it Vos not structured with the view of your finding a perceived "better deal" the day after its execution      ~~    the contract required mutual perfornance in I          accordant- " Ph its terns.
The 193o Power Supply Ayrsement is unique and, according tn you, vary beneficial to Cap Rock.
I               In adtiltion, the awacution of the 1990 Power Supply Agroonent paved the way f or the settlement of various disputes between our companies at both the Publio Utility Commionion of Texas and the Nuclear Regulatory cor. mission and provided f or the execution of mutual releases of all clains and the settlement of all other i          disputes cMit".ing between our two corpanies.
But it Vos not structured with the view of your finding a perceived "better deal" the day after I
l              Additionally, To Eloetric has acquired the necessary capacity s      to serve the cap Rock load and la required to pay the full cost of that capacity, whether or not the power is cold to Cap Rock under the 1990 Power Supply Agrannant. It is not difficult to see that had Cap Rock. not nado a contractual commitment to purchase such I         power, TU Electric would not have made the commitment to acquire the ce.pscitv to fulfill that contract.
the contract required mutual perfornance in its execution
I               To suggest that we return to square one as if nothing had occur;ed, as you now propose, to us is, at best, an example of
~~
          " buyer's remorse," which constitutes no legal justification f or the disavowal of a contractual commitment. Therefore, anything less
accordant- " Ph its terns.
;I         than full compliance with Cap Rock's obligations under both the 1963 Agreer.cnt and tho 1990 Power Supply Agroomont is unacceptable to TU E'.mtr'a.
I In adtiltion, the awacution of the 1990 Power Supply Agroonent paved the way f or the settlement of various disputes between our companies at both the Publio Utility Commionion of Texas and the Nuclear Regulatory cor. mission and provided f or the execution of i
Vary truly youro, I                                                 ' ir d / s q u a i         cct   Mr. David W. Pruitt Mr, * - " ' ' * .. Teater i
mutual releases of all clains and the settlement of all other disputes cMit".ing between our two corpanies.
Additionally, To Eloetric has acquired the necessary capacity l
to serve the cap Rock load and la required to pay the full cost of s
that capacity, whether or not the power is cold to Cap Rock under the 1990 Power Supply Agrannant.
It is not difficult to see that had Cap Rock. not nado a contractual commitment to purchase such I
power, TU Electric would not have made the commitment to acquire the ce.pscitv to fulfill that contract.
I To suggest that we return to square one as if nothing had occur;ed, as you now propose, to us is, at best, an example of
" buyer's remorse," which constitutes no legal justification f or the disavowal of a contractual commitment.
Therefore, anything less
;I than full compliance with Cap Rock's obligations under both the 1963 Agreer.cnt and tho 1990 Power Supply Agroomont is unacceptable to TU E'.mtr'a.
Vary truly youro, I
' ir d / s q u a i
cct Mr. David W.
Pruitt Mr, * - " ' '
* Teater i
I I
I I


m_ _.    - . . _  _ . . _ _ _ _ . _    _ _ _ _ _ __ _          ___ _
m_
;y                                                       em I-J 4
;y em I-J 4;l NELECTRIC Onmd arvatyne w-rah -,,..,,,,
;l                                                       NELECTRIC Onmd arvatyne
TTA_MCRIM14R
;                    w-                                                                       rah - , ,. .,,,,
'CERTIFTFD x11L t
TTA_MCRIM14R t
RETT'1tM 12ctTPf' EfetTIRTED P.r. John E. Butta Xhnager e
                'CERTIFTFD x11L RETT'1tM 12ctTPf' EfetTIRTED P.r. John E. Butta e                 Xhnager j                 Tex-La Electric Cooperative
j Tex-La Electric Cooperative
:W                   of Texas, Inc.
:W of Texas, Inc.
;                P.O. Box 631823 g                 Nacogdochas, Texas       ~ t ,5 3 =1833                                                                             ~
P.O.
!W I                 Mr. Jahr. KirklaM President Rayburn country Electric Cooperative, In@.                                                                           :
Box 631823 g
980 Sids_ Read'                                                                                                      '
Nacogdochas, Texas
'I Post offica Sox 37 Rockwall, Texas 75087 I             Gentlemen T have reviewed your lattar of Januar'y 30, 1992.                         Info m tion
~ t,5 3 =1833
:                supplied to TU Electrio indicates that the provisions of Section 1.11 (ii) and (iv) of the Tex-La Danison Da.a scheduling Agreement
~
:              -and Section 1.03 (ii) aM (iv) of the Rayburn Ccuntry Canison Das
!W I
.                Scheduling Agnsement auty nos have been satistisd since at least
Mr. Jahr. KirklaM President Rayburn country Electric Cooperative, In@.
980 Sids_ Read'
'I Post offica Sox 37 Rockwall, Texas 75087 Gentlemen I
T have reviewed your lattar of Januar'y 30, 1992.
Info m tion supplied to TU Electrio indicates that the provisions of Section 1.11 (ii) and (iv) of the Tex-La Danison Da.a scheduling Agreement
-and Section 1.03 (ii) aM (iv) of the Rayburn Ccuntry Canison Das Scheduling Agnsement auty nos have been satistisd since at least
{
{
:su Novarter 8,       1991. -If this is correct, under the previsicca of Section 3.02 (c) of the Scheduling Agreements, such,_Agreestants have,
Novarter 8, 1991.
;              - tapinLta4 -w.Vth the consequences                 being tE5se specified in subsections (c) and (d). of said section 7;02.
-If this is correct, under the previsicca of
Plasse supply TU 1D.actric with accurata and reliable written infor:ation, no later than March 1, 1993,- that the provisions of I             itsas (11)~ and -(iv) of Sections 1.1; and 1.03 of the Tax-14 Denison cam Scheduling Aeraamant,- recpectively,                     have,- i.n fast, been satisfied since at least Noveber 6, 1991 and r.ta being -satisfied at this time.
:su Section 3.02 (c) of the Scheduling Agreements, such,_Agreestants have,
For your information, it is our understanding that-trates, as the Denison cas control agent,               @ riot reporting the 70 MW of 8'
- tapinLta4 -w.Vth the consequences being tE5se specified in subsections (c) and (d). of said section 7;02.
Denison capacits as its Acad, as required by sections 1.03(iv) and-1.11(iv) , - but     rather a male of 70 MW to Tax-14 and' Rayeurn.
Plasse supply TU 1D.actric with accurata and reliable written infor:ation, no later than March 1, 1993,- that the provisions of I
itsas (11)~ and -(iv) of Sections 1.1; and 1.03 of the Tax-14 Denison cam Scheduling Aeraamant,- recpectively, have,- i.n
: fast, been satisfied since at least Noveber 6, 1991 and r.ta being -satisfied at this time.
For your information, it is our understanding that-trates, as the Denison cas control agent, @ riot reporting the 70 MW of 8'
Denison capacits as its Acad, as required by sections 1.03(iv) and-1.11(iv), - but rather a male of 70 MW to Tax-14 and' Rayeurn.
fXHISli
fXHISli
                                                                                                                      .. g ,.
.. g,.
l                                       =x     o       u u e   ~~
l f
f
= x o
u u e
~~


f Further, it appears that Braste, e.s the Denison Das cnntrol agent, has not, since at least Nove@ er 4,
f Further, it appears that Braste, e.s the Denison Das cnntrol agent, has not, since at least Nove@ er 4, 1991, he,en carrying spinning
  'I    Scheduling Agreamants, 1991, he,en carrying spinning rasarves on the 70 MW of Denis9n capacity. Either of these wenta, if true, constitutes a bys a c$, o f !setions 1.03 and 1.11 of the triggering the autetatic taraination.
'I rasarves on the 70 MW of Denis9n capacity.
Either of these wenta, if true, constitutes a bys a c$, o f !setions 1.03 and 1.11 of the Scheduling Agreamants, triggering the autetatic taraination.
; revision of Serrtion 3.03(4) at:ar a fa11urs to remedy the I
deficiancy vitas.n 90 days as required by Section 3.03(b).
(
(
I    ; revision of Serrtion 3.03(4) at:ar a fa11urs to remedy the deficiancy vitas.n 90 days as required by Section 3.03(b) .
:n addition, information available em um indicatas that i
:n addition, information available em um indicatas that Brazos, in its capeoity as the Dsnison Das control agent, any be i    uatici mt in the s.atn*.anance et. the installed servet required by sections 1.03(11) and 1.11(11) of the Schedul       Agrssaanta. Then COR containing inters.ation filed by T)"Pp in January 1992 trwiicates 1
Brazos, in its capeoity as the Dsnison Das control agent, any be uatici mt in the s.atn*.anance et. the installed servet required by sections 1.03(11) and 1.11(11) of the Schedul Agrssaanta. Then COR containing inters.ation filed by T)"Pp in January 1992 trwiicates l
l W
a reserve for 1993 of 15.04 (the mini.su:n required by the W#f 1
a reserve for 1993 of 15.04 (the mini.su:n required by the W#f Operating Guidae) without providing the required raserves on t.h:210 MW of Danison capacit't. Sinca tha 70 MW of Danison capacity is not
W Operating Guidae) without providing the required raserves on t.h:210 MW of Danison capacit't.
,        carried as Brazoa' icad, the Ctm suqqsats that, since at laa.at                     cd January 29, 1992, the Denison Dam control agent is ramarve deficient by as much as 10.5 MW, also constituting a braach of Sections 1.03(11) and 1.11(11) of the Scheduling Agressants.           A copy of the January 29, 1993 COR is anolosed for your information.
Sinca tha 70 MW of Danison capacity is not cd carried as Brazoa' icad, the Ctm suqqsats that, since at laa.at January 29,
* In any event, and without vaiving any rights, TO Electrie is v1111ng to t.: sat the scheduling Agressanta as rammini.nq   *.n ef f ect I .
: 1992, the Denison Dam control agent is ramarve deficient by as much as 10.5 MW, also constituting a braach of Sections 1.03(11) and 1.11(11) of the Scheduling Agressants.
until March 1, 1992 to give you the opportunity to damonstrate ,
A copy of the January 29, 1993 COR is anolosed for your information.
In any event, and without vaiving any rights, TO Electrie is v1111ng to t.: sat the scheduling Agressanta as rammini.nq
*.n ef f ect I
until March 1,
1992 to give you the opportunity to damonstrate,
compliance with Sections 1.03 and 1.11.
compliance with Sections 1.03 and 1.11.
3 Until the foregoing issues a.re resolved, va tre vitbholding further commant. on tha proposed Transmission Service Agreament I    relating to the 1 MW purchaas4 from ST2c. However, you should knoV that we are not preparad ta agree to the changes proposed in, I    Mienael .tocre's lattcr of January 30, 1993, except with respect to sections 6.4(b),     6.5(a) (last paragraph only), 7.1(C) (Vith
3 Until the foregoing issues a.re resolved, va tre vitbholding I
:odifications) and 10.5. Also, we vill have some further chang 6s before such agreement is ready for execution by TU tlectric.
further commant. on tha proposed Transmission Service Agreament relating to the 1 MW purchaas4 from ST2c.
Assuming for the moment that 'j ma can dasonstrata       t. hat the Scheduling Agras=ents have not tarminated, TV Elect 1*io Vill, la all likalthood, still requirs vritten assurance teca Brazoa. that it I                                     -
However, you should knoV that we are not preparad ta agree to the changes proposed in, Mienael.tocre's lattcr of January 30, 1993, except with respect to I
sections 6.4(b),
6.5(a)
(last paragraph only),
7.1(C)
(Vith
:odifications) and 10.5.
Also, we vill have some further chang 6s before such agreement is ready for execution by TU tlectric.
Assuming for the moment that 'j ma can dasonstrata
: t. hat the Scheduling Agras=ents have not tarminated, TV Elect 1*io Vill, la all likalthood, still requirs vritten assurance teca Brazoa. that it I
will, f n a mannar s4tisf actory to TU tinctrie, fully back up t.he 70 MW of 04nison capacity on babalf of Tax-ia and Raybuvn avsn af the 7 KW purchased frea STEC is not availa,ble to Brased.
will, f n a mannar s4tisf actory to TU tinctrie, fully back up t.he 70 MW of 04nison capacity on babalf of Tax-ia and Raybuvn avsn af the 7 KW purchased frea STEC is not availa,ble to Brased.
truly yours Inclosurs                                   ]d                                   .
truly yours Inclosurs
cc:
]d cc:
I          Mr. Hugh Baxar Pct, Michael Moors i
Mr. Hugh Baxar I
I g                                                           .. - nu                 . .
Pct, Michael Moors i
I               _      _
I g
.. - nu I


RAYBURN ELECTRIC                                                                                     i Cooperative                                                                           ,
RAYBURN ELECTRIC i
i I                                                                                        C***h                       g l
Cooperative C***
i I
h g
l February 13, 1992
^
^
February 13, 1992                                                      A   4 VIA FACs:KILE A.WD CERT TIED ''
A 4
MAIL RITt'PS RICIIPT RIQUIST Mr. Darryl Bevelhyzar                                                                                             '
MAIL RITt'PS RICIIPT RIQUIST VIA FACs:KILE A.WD CERT TIED ''
Director of Bulk Pove.r Transactions Texas Utilitias Electric Cczpany 400 North olive street, L.B. 81
Mr. Darryl Bevelhyzar Director of Bulk Pove.r Transactions Texas Utilitias Electric Cczpany 400 North olive street, L.B.
;        callas, Texas 75201 RE       Danison/ Whitney Da.a saheduling AgTeaments Outr Mr. Bevelhymart i
81 callas, Texas 75201 RE Danison/ Whitney Da.a saheduling AgTeaments Outr Mr. Bevelhymart i
We have received your letter dated Tabruary 7, 1992 stating
We have received your letter dated Tabruary 7, 1992 stating your concerns over the Denison/ Whitney scheduling Agreszent
,        your concerns over the Denison/ Whitney scheduling Agreszent
,'I concerning the perfor=ance of the Denison Dam control Agent, (SAs).
'I         (SAs). Your lattar declares that, if TU Iloctric's allegations concerning the perfor=ance of the Denison Dam control Agent, Brazos Electric Power cooperative, Inc. (Brazos), are correct, than TU 01actric considers the SAs " terminated" pursuant to
Your lattar declares that, if TU Iloctric's allegations Brazos Electric Power cooperative, Inc. (Brazos), are correct, than TU 01actric considers the SAs " terminated" pursuant to
          $ 3.02 (c) of the SAs.
$ 3.02 (c) of the SAs.
                '."U Electric has not complied with 5 3.04(b) of the SAs which repaire ""J       Electric to provide Tax-La and Rayburn notics and 90
'."U Electric has not complied with 5 3.04(b) of the SAs which
:I        days uo cure an alleged failure to perfons by Brazos. only aftar the 90 day period has run withcut a cure by Tax-La a,nd Rayburn
:I repaire ""J Electric to provide Tax-La and Rayburn notics and 90 days uo cure an alleged failure to perfons by Brazos.
'        nay TU Ilectric ter=insta the SAs undar 5 3.02(c) . TU Elagtric notica     of a 5 3.02(c) tartination is not notica of a $ 3.02 W ~
only aftar the 90 day period has run withcut a cure by Tax-La a,nd Rayburn nay TU Ilectric ter=insta the SAs undar 5 3.02(c).
alleged Brazos breach and is thus ineffective as notice of
TU Elagtric notica of a 5 3.02(c) tartination is not notica of a $ 3.02 W ~
;        anything.         Therefore, the SAs remain in effect and no notice of default has been providad.                  .
alleged Brazos breach and is thus ineffective as notice of anything.
Given TU Electric's statament that it =ay cease to parfcru the SAs on March 1, 1992, Tax-La and Rayburn country demand I     writtkn assurances from TU Ilactric, whether or not the allegations prove true, that (i) the SAs are currently effective, (ii) the SAs vill remain effectiva as of March 1, 1992 and                                   until I     such ti=e as properly ter=inated in acccreance vita their provisions, and (iii) TU Electric vill fully parform its obligations under the SAs including specifically the $ 3.02(b) l         notica provisions of the contracts.
Therefore, the SAs remain in effect and no notice of default has been providad.
If TU Ilsetric believes that Brazos has not fully performad its cbligation, than TU I;6ctric should notify Tex-La and Rayburn to that affect under S 3.02(b) of tha SAs. :f TU Ilactric vishes a speedy resolution of the allagations, than it =ust supply Tax-1 SSC $;44 M048 8 o. Ses 37 4068*414, I4au ?$047 . (114) 722,133$ . F AI(214) P12+lf 1       EXhGli 8,     .,  n I
Given TU Electric's statament that it =ay cease to parfcru the SAs on March 1, 1992, Tax-La and Rayburn country demand I
writtkn assurances from TU Ilactric, whether or not the allegations prove true, that (i) the SAs are currently effective, (ii) the SAs vill remain effectiva as of March 1, 1992 and until I
such ti=e as properly ter=inated in acccreance vita their provisions, and (iii) TU Electric vill fully parform its obligations under the SAs including specifically the $ 3.02(b) l notica provisions of the contracts.
If TU Ilsetric believes that Brazos has not fully performad its cbligation, than TU I;6ctric should notify Tex-La and Rayburn to that affect under S 3.02(b) of tha SAs.
:f TU Ilactric vishes a speedy resolution of the allagations, than it =ust supply Tax-1 SSC $;44 M048 8 o. Ses 37 4068*414, I4au ?$047. (114) 722,133$. F AI(214) P12+lf 1
EXhGli 8,
n I


!        Kr. Darr/1 Sovc1hyatr l       Tabruary 13, 1992
Kr. Darr/1 Sovc1hyatr l
    . page 2 La and Rayburn more detailed information explaining tha substance I    of the allegations. TU Ilectric's reliance upon unspecified
Tabruary 13, 1992 page 2 La and Rayburn more detailed information explaining tha substance of the allegations.
        " infer =ation supplied to TU Electrica and ERCCT CDR tables does not provide Tax-La and Rayburn sufficiant information to deter =ine the truth of the allagations. M is not a goed faith effort to resolve a dispute. Tharatore, Tax-La and Rayburn I-  request that TU tlectric promptly provide all facts kncvn to TU Ilactric which support the allegations. In particular, l
TU Ilectric's reliance upon unspecified I
(1) Please provide records of all varbal and vritten ec=.=unications betvana TU Ilectric and Branos personnel since Neves.ber 6, 1991 concerning all or any of TU Ilectric's allegations; (2)                       Tor all hours during which TU Ilectric seneduled capacity pursuant to either the tax-La or Rayburn I                                     SAs, please provide specific quantifiable evidance that Brancs did not have enough spanning reserves to cover both its native lead and its obligations to Tax-La and ?.ayburn.           ,
" infer =ation supplied to TU Electrica and ERCCT CDR tables does not provide Tax-La and Rayburn sufficiant information to deter =ine the truth of the allagations.
If TU Zlactric vill be f orthcomirg with this infor=ation, then Tex-La and Rayburn will be able to work speedily and cooperatively vith TU Ilectric to resolve this dispute, whether I- or not TV Electric chooses to giva $ 3.02(b) notice.                             Although Tex-La and Rayburn vill work as diligently as possible, the March 1, 1992 cut-off data in TU Ilectric's February 7 latter is both arbitrary and not based on any provision of the 5As. Therefore, Tax-La and Rayburn vill not be bound by this date.
M is not a goed faith I-effort to resolve a dispute.
I         Tha Tehrtary 7 latter states that TU Electric vill pr bably require written assurance frca Brazes that is vill back-up the 70 hV in a manner satisf act. cry to TU Ilectric.                         Considerabia time and affert was expanded by all parties in reaching the agreements I   embodied in the Pooling Agraecant and the SAs.
Tharatore, Tax-La and Rayburn request that TU tlectric promptly provide all facts kncvn to TU Ilactric which support the allegations.
no right to unilaterally renegotiata these arrangatants.
In particular, l
TU Electric has I         Tinally, TU Ilectric's refusal to negotiate wheeling for the 7 MW reserve ce.pacity until af ter the resolution of its allega-
(1)
        -tiens concarning the 70 MW of Oenison cas capacity has no basis.
Please provide records of all varbal and vritten ec=.=unications betvana TU Ilectric and Branos personnel since Neves.ber 6, 1991 concerning all or any of TU Ilectric's allegations; (2)
Tor all hours during which TU Ilectric seneduled capacity pursuant to either the tax-La or Rayburn I
SAs, please provide specific quantifiable evidance that Brancs did not have enough spanning reserves to cover both its native lead and its obligations to Tax-La and ?.ayburn.
If TU Zlactric vill be f orthcomirg with this infor=ation, then Tex-La and Rayburn will be able to work speedily and I-cooperatively vith TU Ilectric to resolve this dispute, whether or not TV Electric chooses to giva $ 3.02(b) notice.
Although Tex-La and Rayburn vill work as diligently as possible, the March 1, 1992 cut-off data in TU Ilectric's February 7 latter is both I
arbitrary and not based on any provision of the 5As.
Therefore, Tax-La and Rayburn vill not be bound by this date.
I Tha Tehrtary 7 latter states that TU Electric vill pr bably require written assurance frca Brazes that is vill back-up the 70 hV in a manner satisf act. cry to TU Ilectric.
Considerabia time and affert was expanded by all parties in reaching the agreements I
embodied in the Pooling Agraecant and the SAs.
TU Electric has no right to unilaterally renegotiata these arrangatants.
I Tinally, TU Ilectric's refusal to negotiate wheeling for the 7 MW reserve ce.pacity until af ter the resolution of its allega-
-tiens concarning the 70 MW of Oenison cas capacity has no basis.
These issuna are independent.
These issuna are independent.
I                                                          Tax-La and Rayburn pretast the unjustified linkage og the issues and urges TU Ilectric to reconsidar. If TU Electric has a substantive respensa to Tax-La's and Rayburn's draft wheeling agreement, nov is the time to provide it.
Tax-La and Rayburn pretast the I
Tax-La and Rayburn avait assuranca of "U Ilectric's future perfor:ance of the SAs, the provision of all relevant infer:ation about TU Ilectric's allegations, and a countar-proposal fres TV I
unjustified linkage og the issues and urges TU Ilectric to reconsidar.
If TU Electric has a substantive respensa to Tax-La's and Rayburn's draft wheeling agreement, nov is the time to provide it.
Tax-La and Rayburn avait assuranca of "U Ilectric's future perfor:ance of the SAs, the provision of all relevant infer:ation I
about TU Ilectric's allegations, and a countar-proposal fres TV I
I 1
I 1
g                                                                                           i
g i


Mr. Darryl Revolh ace
Mr. Darryl Revolh ace
        ,. m . , ,,. ... f page 3 Ilactric ter Wheeling of thm sTEC 7 MW reserve purchase.
,. m.,,,.... f page 3 Ilactric ter Wheeling of thm sTEC 7 MW reserve purchase.
I   Sincerely,
I Sincerely, U
                    $                U u.
u.
J             H. Butts Kanager, Tax-La I b b**              ""
J H. Butts b b**
John Kirklar.d I   cc Prasidant, Aayburn TU 21ectric Manager-Inter Utility services I                                                                         4 Richard McCasx111, Brazos Jaka C&ga, 57PA William X. Burchette, Esquire Iarnest Casstavans, Esquire                       [M I                 Michael Moore Hugh D. BOter, Jr.
Kanager, Tax-La I John Kirklar.d I
                                                                              '    l 1
Prasidant, Aayburn TU 21ectric Manager-Inter Utility services cc 4
1 I
I Richard McCasx111, Brazos Jaka C&ga, 57PA
[M William X. Burchette, Esquire Iarnest Casstavans, Esquire l
I Michael Moore Hugh D. BOter, Jr.
1 1
I l
\\
\\
~
 
,w n
,t uc.
TEX-LA ELECTRIC COOPERATIVE S
IN THE DISTRICT COURT OF TEXAS, INC.,
S
-l S
Plaintiff, S
S DALLAS COUNTY. TEXAS v.
TEXAS UTILITIES ELECTRIC S
CCMPA!W.
S Defendant.
S M ICIAL DISTRICT 7
l
l
                                                                                  \
{I PLAINTIFF'S ORIGINAL PETITION FOR TEMPORARY AND PERMANENT INJUNCTION. DECLARATORY JUDQ h fM G k M
                                                                                  \
_ , , , _ , , . . . , . ,          . - -      -        ~
 
I uc.
w n ,t-TEX-LA ELECTRIC COOPERATIVE        S    IN THE DISTRICT COURT OF TEXAS, INC.,                    S S
-l                  Plaintiff,              S S
: v.                                        DALLAS COUNTY. TEXAS TEXAS UTILITIES ELECTRIC            S CCMPA!W.                            S 7
Defendant.              S          M ICIAL DISTRICT l
{
I             PLAINTIFF'S ORIGINAL PETITION FOR TEMPORARY AND PERMANENT INJUNCTION. DECLARATORY JUDQ h fM G, k-M TO THE HONORABLE JUDGE OF SAID COURT:
r
[
[
7 Plaintiff Tex-La Electric Cooperative of Texas       .Inc. 2 JR
r TO THE HONORABLE JUDGE OF SAID COURT:
                                                                        ~
7 Plaintiff Tex-La Electric Cooperative of Texas
C
.Inc. 2 C
(" Tex-La"), complainsofdefendantTexasUtili[ie'sElectyc I   Company ("TU Electric") for the following reasons:
JR
~
(" Tex-La"), complainsofdefendantTexasUtili[ie'sElectyc
.N I
Company ("TU Electric") for the following reasons:
PARTIE$
PARTIE$
                                                                        .N
1.
: 1. Plaintiff Tex-La is a rural electric cooperative Incorporated under the Texas Electric Cooperative Corporation Act, Tex. Rev. Civ. Stat. ' san. art. 1528b, with its principal place   f business in Nacogdoches, Nacogdoches County, Texas.
Plaintiff Tex-La is a rural electric cooperative Incorporated under the Texas Electric Cooperative Corporation Act, Tex. Rev. Civ. Stat. ' san. art. 1528b, with its principal place f business in Nacogdoches, Nacogdoches County, Texas.
: 2. Defendant TU Electric is a Texas corporation with its principal place of business in Dallas, Dallas County, Texas.
2.
Service can be had on defendent TU Electric by serving its regiscered agent for process: Peter B. Tinkham, Texas
Defendant TU Electric is a Texas corporation with its principal place of business in Dallas, Dallas County, Texas.
'      Utilities Electric Company, 2001 Bryan Tower, Suite 1900, Dallas, Texas 75201.
Service can be had on defendent TU Electric by serving its regiscered agent for process: Peter B. Tinkham, Texas Utilities Electric Company, 2001 Bryan Tower, Suite 1900, Dallas, Texas 75201.
        "^= = """"^"                 =" ""
"^= = """"^"
IP 5
=" ""
I P
5


9ACKGROUND
9ACKGROUND 3.
: 3. Ter-Li purchases wholesale electric power and energy for resale to its members, consisting of seven rural electric
Ter-Li purchases wholesale electric power and energy for resale to its members, consisting of seven rural electric
~
~
distribution cooperatives located in the State of Texas.
distribution cooperatives located in the State of Texas.
Tex-La's members sell the electricity acquired from Tex-ca         and other suppliers to their approximately 159,000 totail customers /nembers in a 34 county region of northeast and east Texas.
and Tex-La's members sell the electricity acquired from Tex-ca other suppliers to their approximately 159,000 totail customers /nembers in a 34 county region of northeast and east Texas.
: 4. TU Electric is engaged in the generation, purchase, transmission, distribution and sale of electric energy to approximately 91 counties in the north-central, eastern and western parts of Texas, providing retail service in 350 incorporated municipalities, the largest of which are Dallas, Fort Worth, Arlington. Irving and Waco.           TU Electric also sells electricity at the wholesale level to Tex-La and others, including Rayburn Country Electric Cooperative Inc. ("Rayburn Country"), a rural electric cooperative headquartered in Rockwall     Texas.
4.
: 5. TU Electric is part of a network of interconnected utilities operating in an area which covers most of Texas but which is electrically separate from the rest of the United States. These utilities have formed the Elec'.ric Reliability Council of Texas ("ERCOT") to facilitate coorvinated operations within their area of operation. Utilities commonly refer to being located inside or outside of ERCOT.
TU Electric is engaged in the generation, purchase, transmission, distribution and sale of electric energy to approximately 91 counties in the north-central, eastern and western parts of Texas, providing retail service in 350 incorporated municipalities, the largest of which are Dallas, Fort Worth, Arlington. Irving and Waco.
TU Electric operates entirely within ERCOT. Tex-La's member PLAINTIFF'S ORIGINAL PETITION - page 2 l
TU Electric also sells electricity at the wholesale level to Tex-La and others, including Rayburn Country Electric Cooperative Inc. ("Rayburn Country"), a rural electric cooperative headquartered in Rockwall Texas.
5.
TU Electric is part of a network of interconnected but utilities operating in an area which covers most of Texas which is electrically separate from the rest of the United States.
These utilities have formed the Elec'.ric Reliability Council of Texas ("ERCOT") to facilitate coorvinated operations within their area of operation.
Utilities commonly refer to being located inside or outside of ERCOT.
TU Electric operates entirely within ERCOT.
Tex-La's member PLAINTIFF'S ORIGINAL PETITION - page 2 l


cooperativos operate electrically split systems partly within and partly outside of ERCOT-,
cooperativos operate electrically split systems partly within and partly outside of ERCOT-,
: 6.               Since 1958, Tex-La and Rayburn Country have purchased from the Southwestern Power Administration ("SRPA") power I           generated at the Denis'on Dam Hydroelectric Project ("Denison                       s Dam"), a federal project located at Lake Tezoma at the SWPA, a northern edge of ERCOT on the Texas-Oklahoma border.
6.
regional pow 3r marketing agency under the jurisdiction of the United States Department of Energy, markets power generated at federal hydroelectric projects in Arkansas, Kansas, Louisiana, Missouri, Oklahoma and Texas pursuant to the requirements of the Flood Control Act of 19f4, 16 U.S.C. S 8253                     SWPA also markets the output of Whitney Dam Hydroelectric Project
Since 1958, Tex-La and Rayburn Country have purchased from the Southwestern Power Administration ("SRPA") power I
generated at the Denis'on Dam Hydroelectric Project ("Denison s
Dam"), a federal project located at Lake Tezoma at the northern edge of ERCOT on the Texas-Oklahoma border.
SWPA, a regional pow 3r marketing agency under the jurisdiction of the United States Department of Energy, markets power generated at federal hydroelectric projects in Arkansas, Kansas, Louisiana, Missouri, Oklahoma and Texas pursuant to the requirements of the Flood Control Act of 19f4, 16 U.S.C. S 8253 SWPA also markets the output of Whitney Dam Hydroelectric Project
(* Whitney Dam"), located at Lake Whitney, on the Braros River, to Brazos Electric Power Cooperative. Inc. ("Brazos").
(* Whitney Dam"), located at Lake Whitney, on the Braros River, to Brazos Electric Power Cooperative. Inc. ("Brazos").
: 7.                   Outside of ERCOT, SWPA typically markets power from federal hydroelectric projects on a " firm" basis,                 i.e.,
7.
purchasers of the power are guaranteed delivery of the power purchased from SWPA on demand.                 SWPA is able to guarantee delivery of the power on a firm basis because: a) SWPA is able to assemble and coordinate the output of its hydroelectric project and purchases of thermal generation (e.g. coal, gas, or oil-fired generation) from other utilities te provide a dcpendable source of energy, b) SWPA owns transmission lines which can celiver the power to its customers, and c) SWPA is able to continuously and instantaneously match its electrical i   PLAINTIFF's ORIGINAL PETITION - Page 3 I
Outside of ERCOT, SWPA typically markets power from federal hydroelectric projects on a " firm" basis, i.e.,
I                                                               _          _
purchasers of the power are guaranteed delivery of the power purchased from SWPA on demand.
SWPA is able to guarantee delivery of the power on a firm basis because: a) SWPA is able to assemble and coordinate the output of its hydroelectric project and purchases of thermal generation (e.g. coal, gas, or oil-fired generation) from other utilities te provide a dcpendable source of energy, b) SWPA owns transmission lines which can celiver the power to its customers, and c) SWPA is able to continuously and instantaneously match its electrical i
PLAINTIFF's ORIGINAL PETITION - Page 3 I
I


I supply with the electrical demands of its customers, operating what is commonly referred to in the industry as a " load control area."
I supply with the electrical demands of its customers, operating is commonly referred to in the industry as a " load what Because of the electrical separation of ERCOT control area."
Because of the electrical separation of ERCOT from the remainder of the United States electrical grid, ShTA must    sell the output of Denison Dam to Tex-La and Rayburn Country on an " isolated project basis," because SWPA is unable             ,
from the remainder of the United States electrical grid, ShTA sell the output of Denison Dam to Tex-La and Rayburn must Country on an " isolated project basis," because SWPA is unable to guarantee delivery of the power from Denison Dam on a firm q
to guarantee delivery of the power from Denison Dam on a firm q
basis since it cannot coordinate the output of Denison Dam Additionally, SWPA awns o
basis since it cannot coordinate the output of Denison Dam o
with its other generating resources, no tranrmission lines in ERCOT, and thus is unable to deliver Denison Dam power directly to Tex-La and Rayburn Country.
Additionally, SWPA awns with its other generating resources, no tranrmission lines in ERCOT, and thus is unable to deliver Denison Dam power directly to Tex-La and Rayburn Country.
Finally, SWPA does not operate a load control area in ERCOT.
Finally, SWPA does not operate a load control area in ERCOT.
SWPA also markets the output of Whitney Dam on an isolated project basis.
SWPA also markets the output of Whitney Dam on an isolated project basis.
B.        TU Electric owns the only electric transmission lines connecting Denison Dam (located at the edge of ERCOT) to I   ERCOT.          Also, TU Electric operates the only load control     area currently capable of scheduling power and energy to continuously match the loads of Tex-La and Rayburn Country.
TU Electric owns the only electric transmission lines B.
Tex-La and Rayburn Country do not operate their own load control areas, but operate within the load control area of TU Electric.       Tex-La and Rayburn Country own no transmission or Therefore, Tex-La and generation facilities within ERCOT.
connecting Denison Dam (located at the edge of ERCOT) to I
Also, TU Electric operates the only load control area ERCOT.
currently capable of scheduling power and energy to continuously match the loads of Tex-La and Rayburn Country.
Tex-La and Rayburn Country do not operate their own load control areas, but operate within the load control area of TU Electric.
Tex-La and Rayburn Country own no transmission or Therefore, Tex-La and generation facilities within ERCOT.
Rayburn Country must rely on other utilities in ERCOT.
Rayburn Country must rely on other utilities in ERCOT.
including TU Electric, to provide firming, transmission and
transmission and including TU Electric, to provide firming, scheduling.
      ^
^
scheduling.
PLAINTIFF'S ORIGINAL PETITION - Page 4
PLAINTIFF'S ORIGINAL PETITION - Page 4


I
.I 9.
  .        9. Beginning in 1958, tho individual distribution cooperatives now comprising Tex-La and Rayburn Country entered into contracts with SWFA uhich provided for the delivery of
Beginning in 1958, tho individual distribution cooperatives now comprising Tex-La and Rayburn Country entered into contracts with SWFA uhich provided for the delivery of firm power by one of TU Electric's predecessor companies to Tex-La and Rayburn Country in exchange for Denison Dam power provided to TU Electric by SWPA.
    - firm power by one of TU Electric's predecessor companies to Tex-La and Rayburn Country in exchange for Denison Dam power provided to TU Electric by SWPA.     (For ease of r e.f e r e nce , TU Electric and its predecessor companies are referred to herein as *TU Electric.") Separate scheduling agent agreements set forth arrangements for scheduling, transmitting and firming of the Denison Dam power.
(For ease of r e.f e r e nce, TU Electric and its predecessor companies are referred to herein as *TU Electric.")
: 10. On February 1,   1990, in connection with their settlement of litigation relating to their joint ownership of the Cemanche Peak nuclear power project, Tex-La and TU Electric entered into an Amended and Restated Power Supply
Separate scheduling agent agreements set forth arrangements for scheduling, transmitting and firming of the Denison Dam power.
* Agreement (the "PSA") gos:rning the sale of wholesale power by TU Electric to Tex-La. Section 4.8 of the pSA provides in 4
10.
On February 1, 1990, in connection with their settlement of litigation relating to their joint ownership of the Cemanche Peak nuclear power project, Tex-La and TU Electric entered into an Amended and Restated Power Supply Agreement (the "PSA") gos:rning the sale of wholesale power by TU Electric to Tex-La.
Section 4.8 of the pSA provides in 4
relevant part:
relevant part:
If Tex-La desires. TU E12ctric hereby agrees
If Tex-La desires. TU E12ctric hereby agrees
.g               to negotiate in good faith an appropriate scheduling agent agreement pursuant to which y               TU Electric will serve as Tex-La's Scheduling
.g to negotiate in good faith an appropriate scheduling agent agreement pursuant to which y
;g Agent with respect to capacity and/or energy g               from Tex-La's entitlements from the Denison
TU Electric will serve as Tex-La's Scheduling Agent with respect to capacity and/or energy
;g from Tex-La's entitlements from the Denison g
Dam Hydroelectric Project and/or the Whitney Dam Hydroelectric Project (to which Tex-La
?
?
Dam Hydroelectric Project and/or the Whitney Dam Hydroelectric Project (to which Tex-La also has certain rights - inta paragraph 13, y              below) following the termination of tho (scheduling agent} agreement of October 30,
also has certain rights - inta paragraph 13, below) following the termination of tho (scheduling agent} agreement of October 30, y
;g                1984 among TU Electric, Tex-La and Rayburn country Electric cooperative, Inc., wnich
1984 among TU Electric, Tex-La and Rayburn
:5                 scheduling agent agreement will contain no less benefits to Tex-La than those provided for in said agreement of October 30, 1984.
;g country Electric cooperative, Inc., wnich
Any such scheduling agreement will contain provisions which fully compensate TU Electric
:5 agreement will contain no scheduling agent less benefits to Tex-La than those provided 1984.
  "      ELAINTIFF'S_ ORIGINAL PETITIOl{ - Page 5 I
for in said agreement of October 30, Any such scheduling agreement will contain provisions which fully compensate TU Electric ELAINTIFF'S_ ORIGINAL PETITIOl{ - Page 5 I


in accordance with the provisions of Soctiong
in accordance with the provisions of Soctiong 4.2, 4.3 and 4.4 hereof for serving as Tex-La's said Scheduling Agent and for i
  ,            4.2, 4.3 and 4.4 hereof for serving as Tex-La's said Scheduling Agent and for delivering such capacity and/or energy to i            Tex-La, and shall specify the amount of capacity and energy from such resources to be applied under the terms of this Agreement.
delivering such capacity and/or energy to Tex-La, and shall specify the amount of capacity and energy from such resources to be applied under the terms of this Agreement.
The settion further provides thar, in return for Tex-La's providing firmed power from Denison Dam and/or Whitney Dam to TU Electric, to be scheduled by TU Electric to meet the electrical demands of the TU Electric system. TU Electric would provide a fixed 27.5 megawatts ( 27.5 MW") of demand credit and an associated energy credit on TU Electric's power surply bills to Tex-La.
The settion further provides thar, in return for Tex-La's providing firmed power from Denison Dam and/or Whitney Dam to TU Electric, to be scheduled by TU Electric to meet the electrical demands of the TU Electric system. TU Electric would provide a fixed 27.5 megawatts ( 27.5 MW") of demand credit and an associated energy credit on TU Electric's power surply bills to Tex-La.
: 11. pursuant to Section 4.8 of the pSA, Tex-La and TU Electric entered into a new scheduling agreement dated June 27, 1990 (the " Scheduling Agreement"), under which, subject to certain terms and conditions, TU Electric agreed to schedule the Denison Dam power into its system based an TU Electric's system need. A copy of the Scheduling Agreement is attached as Exhibit "A,"   and is incorporated by reference.
11.
: 12. Section 1.11 of the Scheduling Agreement requires that Tex.La's 27.5 MW of capacity and associated energy from Denison Dam and/or Whitney Dam be delivered to TU Electric on a firm basis, I           waaning that 27.5 MW (i) is available to BJ Electric at all times, irrespective of hydrological conditions, upon demand by TU j             Electric in accordance with Section 3.03 hereof, (ii) is fully backed up by the 3            Denison Dam Control Agent through the maintenance of the minimum installed and I             spinning generation reserves required by the ERCOT Operating Guides, (iii) is of a level pLAIEIFF' S ORIGINAL PETITION - page 6 9
pursuant to Section 4.8 of the pSA, Tex-La and TU Electric entered into a new scheduling agreement dated June 27, 1990 (the " Scheduling Agreement"), under which, subject to certain terms and conditions, TU Electric agreed to schedule the Denison Dam power into its system based an TU Electric's system need.
I I               _                                      -
A copy of the Scheduling Agreement is attached as Exhibit "A,"
and is incorporated by reference.
12.
Section 1.11 of the Scheduling Agreement requires that Tex.La's 27.5 MW of capacity and associated energy from Denison Dam and/or Whitney Dam be delivered to TU Electric on a firm basis, I
waaning that 27.5 MW (i) is available to BJ Electric at all times, irrespective of hydrological conditions, upon demand by TU j
Electric in accordance with Section 3.03 3
hereof, (ii) is fully backed up by the Denison Dam Control Agent through the maintenance of the minimum installed and I
spinning generation reserves required by the ERCOT Operating Guides, (iii) is of a level pLAIEIFF' S ORIGINAL PETITION - page 6 9
I I


of firmnoss not loss than that furnished by the Denison Dam Control Agent to its native load customerst . . .                and (iv) is recognized by the Denison Dam Control Agent as its firm load obligation in all planning information furnished to ERCOT.
of firmnoss not loss than that furnished by the Denison Dam Control Agent to its native load customerst and (iv) is recognized by the Denison Dam Control Agent as its firm load obligation in all planning information furnished to ERCOT.
: 13. On June 28, 1990, Tex-La, Rayburn Country and Brazos entered into a Denison Dam / Whitney Dam Pooling Agreement (the
13.
    " Pooling Agreement") under which Brazos pooled its entitlement to power sold by SWPA from Whitney Dam with Tex-La's and                                       3 Rayburn Country's entitlements to power sold by SWPA from Denison Dam. A copy of the Pooling Agreement is attached as Brazos agreed Exhibit *B," and is incorporated by reference.
On June 28, 1990, Tex-La, Rayburn Country and Brazos entered into a Denison Dam / Whitney Dam Pooling Agreement (the
to act as Pooling Agent for the pooled Denison/ Whitney hydropower, firm Tex-La and Rayburn Country's allocated share of the pooled power (27.5 MW for Tez-LP), and deliver the firmed power to TU Electric, the Scheduling Agent of Tex-La and Rayburn Country.             In connection with the firming of the pooled power, Brazos agreed in Section 3.5 of the Poo.ing Agreement to provide the ERCOT required minimum installed reserve capacity and spinning I              reserves to support the Firm Capacity Allocations to pool Members, provided however, this responsibility shall only be in I
" Pooling Agreement") under which Brazos pooled its entitlement to power sold by SWPA from Whitney Dam with Tex-La's and 3
effect if Rayburn and Tex-La have made arrangements for the delivery of seven (7) g               megawatts of capstity to the System of Brazos Electric .      . . .
Rayburn Country's entitlements to power sold by SWPA from Denison Dam.
: 14. Tex-La and Rayburn Country made arrangements for the delivery of 7 megawatts of capacity to Brazos and have delivered such capacity as required.                             The Denison/ Whitney Fool began operation on July 1, 1990 and, effective that date, P__AINTIFF'S L            ORIGIMAL PETITION - Page 7
A copy of the Pooling Agreement is attached as Exhibit
*B,"
and is incorporated by reference.
Brazos agreed to act as Pooling Agent for the pooled Denison/ Whitney hydropower, firm Tex-La and Rayburn Country's allocated share of the pooled power (27.5 MW for Tez-LP), and deliver the firmed power to TU Electric, the Scheduling Agent of Tex-La and Rayburn Country.
In connection with the firming of the pooled power, Brazos agreed in Section 3.5 of the Poo.ing Agreement to provide the ERCOT required minimum I
installed reserve capacity and spinning reserves to support the Firm Capacity Allocations to pool Members, provided however, this responsibility shall only be in I
effect if Rayburn and Tex-La have made arrangements for the delivery of seven (7) g megawatts of capstity to the System of Brazos Electric.
14.
Tex-La and Rayburn Country made arrangements for the delivery of 7 megawatts of capacity to Brazos and have delivered such capacity as required.
The Denison/ Whitney Fool began operation on July 1, 1990 and, effective that date, P__AINTIFF'S ORIGIMAL PETITION - Page 7 L


u Tex-La began receiving its billing credit from TU Electric for Tex-La's share of Denison/ Whitney power delivered to TU j
u Tex-La began receiving its billing credit from TU Electric for Tex-La's share of Denison/ Whitney power delivered to TU j
Electric's system.                 Since July 1, 1990, TU Electric has, in every hour it requested such, received an uninterrupted and continuous supply of generating capacity pursuant to the Scheduling Agreement and the pooling Agreement.
Electric's system.
: 15. Section 3.02 of the Scheduling Agreement provides in relevant part:
Since July 1, 1990, TU Electric has, in every hour it requested such, received an uninterrupted and continuous supply of generating capacity pursuant to the Scheduling Agreement and the pooling Agreement.
(a) In the event the Denison Dam Cont ol Agent fails, for any reason, in the l                                                                                                           undertakings provided for in (ii), (iii) or 3                                                                                                           (iv) of Section 1.11 hereof, Tex-Ls agrees to make other arrangements tc fully back up the Tex-La capacity with Brazos or a successor Denison Dam Control Agent, in a manner and under such conditions as are satisfactory to TU Electric and as are otherwise consistent with this Agreement.
15.
(b) Tex-La shall be permitted up to 90 days to fully back up the Tex-La Capacity should I'                                                                                                           the same fail to meet the criteria provided for in Section 1.11(11), (iii) and (i")
Section 3.02 of the Scheduling Agreement provides in relevant part:
hereof, and Tex-La shall nevertheless be entitled to receive the demand credit in accordance with Section 3.01(c) hereof to the extent the Tex-La Capacity is actually lB                                                                                                          delivered to TU Electric when scheduled in accordance with Section 3.03 hereof                                                                             . . . .
(a)
(c) In the event Tex-La fails to make the I                                                                                                          arrangements provided for in (b) above within such 90 day period:                           (i) this Agreement shall thereupon terminate and be of no further force or effect and Tex-La agrees that all of TU Electric's obligations with respect to any demand credits for the Tex-La Capacity, including its obligations under Section 4.8 of the Tex-La pSA, shall be deemed to be fully satisfied and of no further force or effect . . . .
In the event the Denison Dam Cont ol Agent fails, for any reason, in the l
PLAINT 1IF'S ORIGINAL PETITION - page 8 i
undertakings provided for in (ii), (iii) or 3
    . _ _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ - - - - - - - - - - - - - - - - - "                                                       - " - - " - - - - - - - - - - - - - - - - - - - - - - - - - -        ' " - ~ - -
(iv) of Section 1.11 hereof, Tex-Ls agrees to make other arrangements tc fully back up the Tex-La capacity with Brazos or a successor Denison Dam Control Agent, in a manner and under such conditions as are satisfactory to TU Electric and as are otherwise consistent with this Agreement.
(b)
Tex-La shall be permitted up to 90 days to fully back up the Tex-La Capacity should I'
the same fail to meet the criteria provided for in Section 1.11(11), (iii) and (i")
hereof, and Tex-La shall nevertheless be entitled to receive the demand credit in accordance with Section 3.01(c) hereof to the extent the Tex-La Capacity is actually l
delivered to TU Electric when scheduled in B
accordance with Section 3.03 hereof I
(c)
In the event Tex-La fails to make the arrangements provided for in (b) above within such 90 day period:
(i) this Agreement shall thereupon terminate and be of no further force or effect and Tex-La agrees that all of TU Electric's obligations with respect to any demand credits for the Tex-La Capacity, including its obligations under Section 4.8 of the Tex-La pSA, shall be deemed to be fully satisfied and of no further force or effect PLAINT 1IF'S ORIGINAL PETITION - page 8 i
- ~ -
:I 16.
Section 8.03 of the Scheduling Agreement provides:
A party shall give uritten notice of a Default to the party in Default.
The party in Default shall have thirty (30) days from I-the date of receipt of such notice in which to cure such Default.
If the Default is cured within the applicable period, the Default specified in such notice shall cease I
to exist.
17.
By letter of February 7, 1992, a copy of which is attached as Exhibit "C" and incorporated by reference, TU Electric purported t o terminate the Scheduling Agreement because of an alleged failure of Brazos, at least 93 days crier to February 7, in certain undertakings provided for in Section 1.11 of the Scheduling Agreement.
18.
By letter of February 13, 1992, a copy of which is and incorporated by ref eren:.'e, Tex-La attached as Exhibit "D*
and Rayburn Country advised TU Electric that such notice of termination was ineffective, that TU Electric's attempted notice of breach was in default of the Scheduling Agreement, and demanded adequate assurance of TU Electric's performance of Section 3.02 of the Scheduling Agreement.
19.
By letter of February 18, 1992, e copy of which is attached as Exhibit "E" and incorporated by reference, TV Electric reiterated its notice of termination and failed to address Tex-La's and Rayburn Country's demand for adequate assurance of TU Electric's performance of Section 3.02 of the Scheduling Agreement.
20.
By letter of February 26, 1992, a copy of which is attached as Exhibit "F" and incorporated by reference, TU PLAINTIFF'S ORIGINAL PETI *f1ON - page 9 I
i


I '
Electric again stated that the Scheduling Agreement was terminated and that on March 1 it would cease scheduling and giving credit for the Denison Dam power, subject only to a possible 16 day voluntary extension by TU Electric conditioned upon Tex-La's agreeing to renegotiate the Denison Dam arrangements.
: 16. Section 8.03 of the Scheduling Agreement provides:
21.
A party shall give uritten notice of a Default to the party in Default. The party in Default shall have thirty (30) days from the date of receipt of such notice in which I-              to cure such Default. If the Default is cured within the applicable period, the Default specified in such notice shall cease I                to exist.
At a meeting with Tex-La on February 28, 1992, TU Electric reiterated its position that the Scheduling Agreement was terminated.
1992, a copy of which is
TU Electric agreed to postpone, from March 1 to March 17, 1992, the date on which it would cease scheduling and giving credit for the Denison Dam power in accordance with the Scheduling Agreement.
: 17. By letter of February 7, attached as Exhibit "C" and incorporated by reference, TU Electric purported t o terminate the Scheduling Agreement
*URISDICTION E
>          because of an alleged failure of Brazos, at least 93 days crier to February 7, in certain undertakings provided for in Section 1.11 of the Scheduling Agreement.
has jurisdiction over plaintiff's claim 22.
: 18. By letter of February 13, 1992, a copy of which is attached as Exhibit "D* and incorporated by ref eren:.'e, Tex-La and Rayburn Country advised TU Electric that such notice of termination was ineffective, that TU Electric's attempted notice of breach was in default of the Scheduling Agreement, and demanded adequate assurance of TU Electric's performance of Section 3.02 of the Scheduling Agreement.
This Court for declaratory and protective relief pursuant to the general jurisdiction and powers of district courts and by virtue of Chapter 37 of the Civil practice and Remedies Code.
: 19. By letter of February 18, 1992, e copy of which is attached as Exhibit      "E"  and incorporated by reference, TV Electric reiterated its notice of termination and failed to address Tex-La's and Rayburn Country's demand for adequate assurance of TU Electric's performance of Section 3.02 of the Scheduling Agreement.
23.
: 20. By letter of February 26, 1992, a copy of which is attached as Exhibit      "F" and incorporated by reference, TU PLAINTIFF'S ORIGINAL PETI *f1ON - page 9 I                                                                    i
This Court has jurisdiction to grant such ancillary I
 
Electric again stated that the Scheduling Agreement was
* terminated and that on March 1 it would cease scheduling and giving credit for the Denison Dam power, subject only to a possible 16 day voluntary extension by TU Electric conditioned upon Tex-La's agreeing to renegotiate the Denison Dam arrangements.
: 21.         At a meeting with Tex-La on February 28, 1992, TU Electric reiterated its position that the Scheduling Agreement was terminated.                                             TU Electric agreed to postpone, from March 1 __
to March 17, 1992, the date on which it would cease scheduling and giving credit for the Denison Dam power in accordance with the Scheduling Agreement.
                                                                            *URISDICTION E           22.        This Court                                  has jurisdiction over plaintiff's claim       ,
for declaratory and protective relief pursuant to the general jurisdiction and powers of district courts and by virtue of Chapter 37 of the Civil practice and Remedies Code.
: 23.         This Court has jurisdiction to grant such ancillary I
injunctive relief as is necessary and appropriate to preserve the status quo, to prevent irreparable harm to plaintiff and the public, and to preserve the subject matter of this suit.
injunctive relief as is necessary and appropriate to preserve the status quo, to prevent irreparable harm to plaintiff and the public, and to preserve the subject matter of this suit.
VENUE
VENUE 24.
: 24.         Venue in Dallas County is proper t.acause TU Electric's principal office is situated there.
Venue in Dallas County is proper t.acause TU Electric's principal office is situated there.
I I
I I
PLAINTIFF'S ORIGINAL PETITION - page 10 5
PLAINTIFF'S ORIGINAL PETITION - page 10 5


REOt'IST FOR TIM,ORARY !!UttNCT ION
REOt'IST FOR TIM,ORARY !!UttNCT ION 25.
: 25. Tex-La repeats and realleges par graphs 1 through 24 as though set forth here in full.
Tex-La repeats and realleges par graphs 1 through 24 as though set forth here in full.
: 26. In its February 7, 18, and 26 letters and at the February 28, 1992 meeting, W Electric stated its intention to terminato its scheduling of the Denison/ Whitney hydropower i
26.
against TU Electric system loads, offered to consider allowing Tex-La to schedule the hydropower against Tex-La loads under the PSA, or, if the hydropewer failed to qualify under the PSA in TU Electric's opinion, ' hen to terminate scheduling the x
In its February 7, 18, and 26 letters and at the February 28, 1992 meeting, W Electric stated its intention to terminato its scheduling of the Denison/ Whitney hydropower against TU Electric system loads, offered to consider allowing i
1 hydropower entirely.     TU Electric indicated at the February 28, 1992 meeting that it would not schedule the Denison/ Whitney power in accordance with the Scheduling Agreement beyond March 16, 1992.     Tu Electric's actions constitute a flagrant breach of the Scheduling Agreement. and
Tex-La to schedule the hydropower against Tex-La loads under the PSA, or, if the hydropewer failed to qualify under the PSA in TU Electric's opinion, ' hen to terminate scheduling the 1
  ]                                     will cause Tex-La and Rayeurn Country to suffer irreparable harm.
hydropower entirely.
: 27. Hydropowet is particularly valuable to electrical utilities since it is both low in cost and, unlike thermal generation, instantaneously available to meet electrical l
TU Electric indicated at the February x
loads. Because of W Electric's contrnl over the resources necessary to firm, transmit, and schedule the output of generating resources, the arrangements governed by the Pooling Agreement and the Scheduling Agreement constitute the most efficient use of the output of Denison Darti and Whitney Dam.
28, 1992 meeting that it would not schedule the Denison/ Whitney power in accordance with the Scheduling Agreement beyond March 16, 1992.
If M Electric refuses to schedule the Denison Dam / Whitney Data
Tu Electric's actions constitute a flagrant breach of the Scheduling Agreement. and
  ;                                      . - ,., _ ,,, -                    p... 1i
]
  )
will cause Tex-La and Rayeurn Country to suffer irreparable harm.
27.
Hydropowet is particularly valuable to electrical utilities since it is both low in cost and, unlike thermal l
generation, instantaneously available to meet electrical loads.
Because of W Electric's contrnl over the resources necessary to firm, transmit, and schedule the output of generating resources, the arrangements governed by the Pooling Agreement and the Scheduling Agreement constitute the most efficient use of the output of Denison Darti and Whitney Dam.
If M Electric refuses to schedule the Denison Dam / Whitney Data p...
1i
)


hydrepewer against its own loads (which includes Tex-La's loads) pursuant to the Scheduling Agreement, and forces Tex-La to scredule the prwer against Tez+La loads, then part of the economic value of the resource will be lost.                                                                         If TU Electric terminates scheduling of the hydropower from Denison Dam / Whitney Dam hydropower entirely, then Tex-La and Rayburn country will have no way to make use of the output of Denison j                   Dam / Whitney Dam and the entire economic value of the resource will bc lost.                             If TU Electric terminates scheduling of the hydropower from Denison Dam / Whitney Dam entirely and refuses to transmit the output to Ter-La and Ptyburn Country (or their I                   agent), then water will fall from the dam without generating power and the energy that could have been generated will be irreparably lost forever antecoverable, 4nd available to no one.
hydrepewer against its own loads (which includes Tex-La's loads) pursuant to the Scheduling Agreement, and forces Tex-La to scredule the prwer against Tez+La loads, then part of the economic value of the resource will be lost.
: 28.           Moreover, if TU Electric refuses to schedule the Denison/ Whitney hydropower against its own loads, the publi interest, as defined by the Flood Control Act of 1944, 16 U.S.C. 5 825s, for preference customers to receive low-cost hydropower will have been thwarted.
If TU Electric terminates scheduling of the hydropower from Denison Dam / Whitney Dam hydropower entirely, then Tex-La and Rayburn country will have no way to make use of the output of Denison j
: 29.               Finally, Tez-La and TU Electric explicitly recognized and agreed in section 8.05 of the Scheduling Agreement                                                                                                   that damages caused by a breach may be impossible to measure in terms of morey the damages which may or will accrue by ';eason of a Default under this Agreement and for that reason, among others, TU Electric and Tex-La agree that, in case of any such Dc. ult, the non-defaulting Party will be irreparably PLAINTIFF'S ORIGINAL PETITION - Page 12
Dam / Whitney Dam and the entire economic value of the resource will bc lost.
If TU Electric terminates scheduling of the hydropower from Denison Dam / Whitney Dam entirely and refuses to transmit the output to Ter-La and Ptyburn Country (or their I
agent), then water will fall from the dam without generating power and the energy that could have been generated will be irreparably lost forever antecoverable, 4nd available to no one.
28.
Moreover, if TU Electric refuses to schedule the Denison/ Whitney hydropower against its own loads, the publi interest, as defined by the Flood Control Act of 1944, 16 U.S.C. 5 825s, for preference customers to receive low-cost hydropower will have been thwarted.
29.
Finally, Tez-La and TU Electric explicitly recognized that and agreed in section 8.05 of the Scheduling Agreement damages caused by a breach may be impossible to measure in terms of morey the damages which may or will accrue by ';eason of a Default under this Agreement and for that reason, among others, TU Electric and Tex-La agree that, in case of any such Dc. ult, the non-defaulting Party will be irreparably PLAINTIFF'S ORIGINAL PETITION - Page 12


1 I
1 I
damaged if this Agreement is not specifically enforceable and further no adequate remedy at law-will exist. Accordingly, TU Electric and Tex-La agree that the non-defaulting Party shall be entitled to specific performance and/or injunctive relief, in addition to any other remedies which may erist at law or in equity. If the non-defaultine Party institutes any ereceedines in accordance with lI           this section. the d3faultino Party hereby waives spy claim er_ defense that an adeuunte remedy at law exists.
damaged if this Agreement is not specifically enforceable and further no adequate remedy at law-will exist.
(Emphasis added.)   TU Electric's refusal to schedule tae h nison/ Whitney hydropower as required by the Scheduling Agreement constitutes a default under said agreement.
Accordingly, TU Electric and Tex-La agree that the non-defaulting Party shall be entitled to specific performance and/or injunctive relief, in addition to any other remedies which may erist at law or in equity.
: 30. As described above, Tex-La's rights are in imminent danger of harm by defendant's conduct and irreparable injury will result to Tex-La unless an injunction is issued. No adeyuate remedy at law exists. An injunction is necessary in order to preserve the status quo.
If the non-defaultine Party institutes any ereceedines in accordance with lI this section. the d3faultino Party hereby waives spy claim er_ defense that an adeuunte remedy at law exists.
: 31. Tex-La requests that upon a hearing, a temporary injunction be issued, enjoining TU Electric, its agents, servants and employees, from terminating the scheduling of Cenison/ Whitney power and energy by TU Electric against TU Electric's system load, or denying Tex-La a credit for supplying such power to TU Eleccric.
(Emphasis added.)
F1RST CAUSe eF ACTIeN E       32. This is a cause of action for anticipatory repudiation and bpeach of the Scheduling Agreement.     TLx-La repeats and realleges paragraphs 1 through 23 and 26 through 28 hereof as though set forth here in full.
TU Electric's refusal to schedule tae h nison/ Whitney hydropower as required by the Scheduling Agreement constitutes a default under said agreement.
I   .m 1 s11,. . s e _ .e11=1. - ea,e a I
30.
As described above, Tex-La's rights are in imminent danger of harm by defendant's conduct and irreparable injury will result to Tex-La unless an injunction is issued.
No adeyuate remedy at law exists.
An injunction is necessary in order to preserve the status quo.
31.
Tex-La requests that upon a hearing, a temporary injunction be issued, enjoining TU Electric, its agents, servants and employees, from terminating the scheduling of Cenison/ Whitney power and energy by TU Electric against TU Electric's system load, or denying Tex-La a credit for supplying such power to TU Eleccric.
F1RST CAUSe eF ACTIeN E
32.
This is a cause of action for anticipatory TLx-La repudiation and bpeach of the Scheduling Agreement.
repeats and realleges paragraphs 1 through 23 and 26 through 28 hereof as though set forth here in full.
I
.m 1 s11,.. s e _.e11=1. - ea,e a I


r
r 33.
: 33. Upon information and belief, Brazos has fully carried out all undertakings provided for in Section 1.11 of the l
Upon information and belief, Brazos has fully carried out all undertakings provided for in Section 1.11 of the l
Scheduling Agreenent to back up the Denison Dam power.
Scheduling Agreenent to back up the Denison Dam power.
: 34. TU Electric's purported termination of the Scheduling Agreement without cause c.1d notwithstanding the full performance by Tex-La of all undertakings provided thereunder constitutes an anticipatory repudiation and breach of the Scheduling Agreement.
34.
I,
TU Electric's purported termination of the Scheduling Agreement without cause c.1d notwithstanding the full performance by Tex-La of all undertakings provided thereunder constitutes an anticipatory repudiation and breach of the Scheduling Agreement.
  -        35. By reason of the breach Tex-La has been damaged in an amount in excess of the jurisdictional limits of this Court.
I, By reason of the breach Tex-La has been damaged in an 35.
E OllD CAUSE__OF ACTION
amount in excess of the jurisdictional limits of this Court.
: 36. This is a cause of action for anticipatory repudiation and breach of the Scheduling Agreement.         Tex-La repeats and realleges paragraphs 1 through 23 and 26 through 28 as though set forth here in full.
E OllD CAUSE__OF ACTION 36.
: 37. TU Electric's purported termination of the Scheduling Agreement without notifying Tex-La of the alleged default         or permitting Tex-La the 90 days provided in the Scheduling Agreement to make other arrangements to fully back up the Denison Dam power constitutes an ane.icipatory repudiation and breacn of Sections 3.02 and 8.03 of the Scheduling Agreement.
This is a cause of action for anticipatory repudiation and breach of the Scheduling Agreement.
: 38. By reason of the breach Tex-La has been damaged in an amount in excess of the jurisdictional limits of this Court.
Tex-La repeats and realleges paragraphs 1 through 23 and 26 through 28 as though set forth here in full.
THIRO_CAUSF OF ACTION
37.
: 39. This is a cause of action, in the alternative, for equitable estoppel.         Tex-La repeats and realleges paragraphs 1 PLAINTIFF'S ORIGINAL PETITION - Page 14
TU Electric's purported termination of the Scheduling Agreement without notifying Tex-La of the alleged default or permitting Tex-La the 90 days provided in the Scheduling Agreement to make other arrangements to fully back up the Denison Dam power constitutes an ane.icipatory repudiation and breacn of Sections 3.02 and 8.03 of the Scheduling Agreement.
38.
By reason of the breach Tex-La has been damaged in an amount in excess of the jurisdictional limits of this Court.
THIRO_CAUSF OF ACTION 39.
This is a cause of action, in the alternative, for equitable estoppel.
Tex-La repeats and realleges paragraphs 1 PLAINTIFF'S ORIGINAL PETITION - Page 14


through 22 and 25 through 27 hereof as though set forth here in full.
through 22 and 25 through 27 hereof as though set forth here in full.
: 40. Until its {{letter dated|date=February 7, 1992|text=February 7, 1992 letter}} to Tex-La, Tex-La reasonably relied upon TV Electric's representations to Tex-La by word and conduct that (1) Tex-La could resolve TU Electric's concerns with the performance of Braton by informal consultation with Brazos and TU Electric rather than by formal i
40.
notice of default and invocation of the 90 day period under Section 3.02(b) of the Schrduling Agreement, and that (2) TJ Electric hed not decided that the performance of Brazos was insufficient.
Until its {{letter dated|date=February 7, 1992|text=February 7, 1992 letter}} to Tex-La, Tex-La reasonably relied upon TV Electric's representations to Tex-La by word and conduct that (1) Tex-La could resolve TU Electric's concerns with the performance of Braton by informal consultation with Brazos and TU Electric rather than by formal notice of default and invocation of the 90 day period under i
: 41. TU Electric first raised the issue of reserves for the Denison/ Whitney power in a December 23, 1591 TU for the 7 megawatts Electric-proposed transmission agreement of capacity Tex-La and Rayburn Country delivered to Brazos.
Section 3.02(b) of the Schrduling Agreement, and that (2) TJ Electric hed not decided that the performance of Brazos was insufficient.
Section 10.15 of that proposal demanded that Brazos sign the transmission services agreement warranting that Brazos will supply the reserves                    required by Section 3.5 of the Pooling Agreement and that Brazos will back up the backup power.
41.
: 42. In a December 27, 1991 conference call among Brazos, TJ Electric. Tex-La and Rayburn Country, Brazos explained to TJ Electric that Tex-La and Rayburn Country had satistied their Section 3.5 obligations and that Brazos would honor its reserve obligation.               In a {{letter dated|date=January 24, 1992|text=January 24, 1992 letter}} from TU Electric to Tex-La and Rayburn Country, TU Elactric raised its
TU Electric first raised the issue of reserves for the Denison/ Whitney power in a December 23, 1591 TU for the 7 megawatts Electric-proposed transmission agreement of capacity Tex-La and Rayburn Country delivered to Brazos.
                    " strong concerns" with the ERCOT reporting of Brazos.
Section 10.15 of that proposal demanded that Brazos sign the Brazos will transmission services agreement warranting that required by Section 3.5 of the Pooling supply the reserves Agreement and that Brazos will back up the backup power.
42.
In a December 27, 1991 conference call among Brazos, TJ Electric. Tex-La and Rayburn Country, Brazos explained to TJ Electric that Tex-La and Rayburn Country had satistied their Section 3.5 obligations and that Brazos would honor its reserve obligation.
In a {{letter dated|date=January 24, 1992|text=January 24, 1992 letter}} from TU Electric to Tex-La and Rayburn Country, TU Elactric raised its
" strong concerns" with the ERCOT reporting of Brazos.
PLAINTIFF'S ORIGINAL PETITION - page 15
PLAINTIFF'S ORIGINAL PETITION - page 15
(
(
l l
l l


f
f requested that Tex-La and Rayburn Country "provido sufficient
?    requested that Tex-La and Rayburn Country "provido sufficient evidence to TU Electric that will clearly demonstrate that the necessary installed rererves are being provided in accordance with the Denison Dam Scheduling agent agreements,* and the Denison Dam capacity to suggested how Brazos should report ERCOT.
?
: 43.              In a January 30 telephone call between TV Electri:
the evidence to TU Electric that will clearly demonstrate that necessary installed rererves are being provided in accordance with the Denison Dam Scheduling agent agreements,* and the Denison Dam capacity to suggested how Brazos should report ERCOT.
and Tex-La, TU Electric advised that it was not sure if Brazos I     was complying with its Denison Dam obligations. Not until TU Electric's February 7 termination letter did TU Electric i
In a January 30 telephone call between TV Electri:
advise Tex-La that this on-going process of investigation and TU discussion was unacceptable to TU Electric and that Electric had reached a Cecision on Brazos' compliance with the Pooling Agreement.
43.
: 44.          Even if TU Electric had no affirmative obligation to notify Tex-La of Brazos' alleged failure of performance prior for to tho 90 day period provided in the Scheduling Agreement curing                  any such fsilure, ~U Electric is equitably estopped from                  claiming that any such failure occurred prior to February 7,        1992 because of TV Electric's affirmative representations to Tex-La, by word and conduct prior to such date, that TU Electric had not determined that Brazos' perfo;mance was informal consultation was an acceptable deficient and that means to TU Electric to resolve any possible deficiency.
and Tex-La, TU Electric advised that it was not sure if Brazos I
        .                    45. By reason of Tex-La's reasonable reliance upon TU performance, Electric's represantations concerning Brazos' PLATNTIFF'S ORIGINAL PETITION - Fage 16
was complying with its Denison Dam obligations.
  ._                                                          - - - - - " -~"---.____m_ _ , , _ _ _ _
Not until TU Electric's February 7 termination letter did TU Electric advise Tex-La that this on-going process of investigation and i
TU discussion was unacceptable to TU Electric and that Electric had reached a Cecision on Brazos' compliance with the Pooling Agreement.
Even if TU Electric had no affirmative obligation to 44.
notify Tex-La of Brazos' alleged failure of performance prior for to tho 90 day period provided in the Scheduling Agreement any such fsilure, ~U Electric is equitably estopped curing any such failure occurred prior to February from claiming that 1992 because of TV Electric's affirmative representations 7,
that TU to Tex-La, by word and conduct prior to such date, Electric had not determined that Brazos' perfo;mance was informal consultation was an acceptable deficient and that means to TU Electric to resolve any possible deficiency.
By reason of Tex-La's reasonable reliance upon TU 45.
performance, Electric's represantations concerning Brazos' PLATNTIFF'S ORIGINAL PETITION - Fage 16
-~"---.____m_


Tex-La has been damaged in an amount in excnas of the jurisdictional limits of this Court.
Tex-La has been damaged in an amount in excnas of the jurisdictional limits of this Court.
FOURTH CAUSE OF ACTION                                         ,
FOURTH CAUSE OF ACTION 5
5              46. This is a cause of action for a declaratory judgement pursuant to Sections 37.001 .011 of the Texas Civil practice
46.
/           and. Remedies Code. Tex-La repeats and realleges paragraphs 1 through 23, 26 through 28 and 40 through 44 hereof as though set forth here in full.
This is a cause of action for a declaratory judgement pursuant to Sections 37.001.011 of the Texas Civil practice
I
/
: 47. Actual controversies exist between Tex-La and TU Electric with respect to the matters set forth in this petition. Tex-La contends and requests the court to declare (a) that Brazos has fully carried out all undertskings provided for Tex-La in Section 1.11 of the Scheduling Agreement to arrange back up Denison Dam power; (b) that the 4
and. Remedies Code.
Scheduling Agreement requires TU Electric to give notice :o Tex-La of any failure of the Denison Dam Control Agent ( LA ,
Tex-La repeats and realleges paragraphs 1 through 23, 26 through 28 and 40 through 44 hereof as though set forth here in full.
Brazos) to perform the undertakings provided for in StecP io:t 1.11 of the Scheduling Agreement; (c) that the Sched. hng Agreement provides Tex-La 90 days from such notice Oc r*'tolve or cure any such alleged failure by the Denieot Dam Cen*rol I   Agent, and prohibits TU Ele::tric f rom terminating the agreement if such failure can be resolved or cured by Tex-La within such 90 day period; (d) th_                         TU Electric's February 7, 18 and 26, 1992 notices of terminatiin of the Scheduling Agreement under Section 3.02(c) dt not constitute a notice of
I 47.
        .i   a Tex-La default of its obligations under Section 1.11, nor do I , _ m s.s _ 1 m ,s m . - page 1, I
Actual controversies exist between Tex-La and TU Electric with respect to the matters set forth in this petition.
Tex-La contends and requests the court to declare (a) that Brazos has fully carried out all undertskings provided for Tex-La in Section 1.11 of the Scheduling Agreement to arrange back up Denison Dam power; (b) that the 4
Scheduling Agreement requires TU Electric to give notice :o Tex-La of any failure of the Denison Dam Control Agent ( LA,
Brazos) to perform the undertakings provided for in StecP io:t 1.11 of the Scheduling Agreement; (c) that the Sched. hng Agreement provides Tex-La 90 days from such notice Oc r*'tolve or cure any such alleged failure by the Denieot Dam Cen*rol I
Agent, and prohibits TU Ele::tric f rom terminating the agreement if such failure can be resolved or cured by Tex-La within such 90 day period; (d) th_
TU Electric's February 7,
18 and 26, 1992 notices of terminatiin of the Scheduling Agreement under Section 3.02(c) dt not constitute a notice of
.i a Tex-La default of its obligations under Section 1.11, nor do I
, _ m s.s _ 1 m,s m. - page 1, I


they cause the 90 day period under Sc? tion 3.02(b) to begin 5   running; (e) that to provide an effective notice of default, TU Electric must stato the basis of its allegation with sufficient particularity and provide sufficient supporting information to enable Tex-La to refute or cure the alleged default; (f) that TU Electric has not stated the basis of its allegation with sufficient particularity and provided sufficient supporting information to enable Tex-La to refute or cure the alleged default; and (g) in the alternative, that TU Electric is equitably estopped from claiming that Brazos' alleged failure of performance in backing up Denison m mower occurred prior to February 7, 1992.
they cause the 90 day period under Sc? tion 3.02(b) to begin 5
WHEREFORE Tex-La requests that W Electric be cited to appeat      herein and that Tex-La be awarded judgment:
running; (e) that to provide an effective notice of default, TU Electric must stato the basis of its allegation with sufficient particularity and provide sufficient supporting information to enable Tex-La to refute or cure the alleged default; (f) that TU Electric has not stated the basis of its allegation with sufficient particularity and provided sufficient supporting information to enable Tex-La to refute or cure the alleged default; and (g) in the alternative, that Brazos' TU Electric is equitably estopped from claiming that alleged failure of performance in backing up Denison m mower occurred prior to February 7, 1992.
: 1.                         for a temporaty and permanent injunction enjoining TU Electric, its agents, servants and employees, from terminating
WHEREFORE Tex-La requests that W Electric be cited to herein and that Tex-La be awarded judgment:
    '      its scheduling of Denison/ Whitney power and energy against TU Electric's system load and terminating its obligation to I     provide Tex-La a credit for supplying the powar to TU Electric;
appeat 1.
: 2.                            for damages suffered by Tex-Lai by reason of TU Electric's anticipatory repudiation and breach of the Scheduling Agreement:
for a temporaty and permanent injunction enjoining TU Electric, its agents, servants and employees, from terminating its scheduling of Denison/ Whitney power and energy against TU Electric's system load and terminating its obligation to I
: 3.                               declaring the matters set forth in paragraph 47 8     above; interest,
provide Tex-La a credit for supplying the powar to TU Electric; for damages suffered by Tex-Lai by reason of TU 2.
: 4.                                 awarding to Tex-La pre- and post-judgment costs of court and Tex-La's reasonable attotneys' fees PLAINTIFF'S_ ORIGINAL PETITION - Fage 18 I                                                                                                       i
Electric's anticipatory repudiation and breach of the Scheduling Agreement:
3.
declaring the matters set forth in paragraph 47 8
above;
: interest, 4.
awarding to Tex-La pre-and post-judgment costs of court and Tex-La's reasonable attotneys' fees PLAINTIFF'S_ ORIGINAL PETITION - Fage 18 I
i


I pursuant to Sect.:fons 37.009 and 38,011 of the Texas Civil Fractice and Remedies Code: and l
I pursuant to Sect.:fons 37.009 and 38,011 of the Texas Civil Fractice and Remedies Code: and l
S.           awarding to Tex-La such other and further relief to which it is justly entitled.
S.
Respectfully submitted, William H. Burchette I                                                         Foster De Reitzes A. Hewitt Rose JORDEN SCHULTE & BURCHETTE 1025 Thomas Jefferson St., N.W.
awarding to Tex-La such other and further relief to which it is justly entitled.
Suite 400 East Washington, D.C. 20007 (202) 965-8100 (202) 965-8104 (Telecepy)
Respectfully submitted, William H.
Fernando Rodriguez State Bar No. 17145300
Burchette I
  '                                                          Mark C. Davis State Bar No. 05525050 JORDEN SCHULTE & BURCHETTE teos con 9r==s ^veau=
Foster De Reitzes A.
E W                                                          Suite 1050 Austin, Texas         78701 (512) 472-1081 (512) 472-7473 (Telecopy) 8 Jarnes S. Ramsey State Bar No. 16527000 David C. Godbey State Bar No. 08049500 of HUGHES & LUCE, L.L.P.
Hewitt Rose JORDEN SCHULTE & BURCHETTE 1025 Thomas Jefferson St.,
1717 Main Street, Suite 2S00 Dallas, Texas         75201
N.W.
                                                                  .,14)
Suite 400 East Washington, D.C.
                                                                  '    939-5500 I                                                            (214) 939-6100 (Telecepy)
20007 (202) 965-8100 (202) 965-8104 (Telecepy)
Original si--ea ey CAVID C. GCD8EY By:     .
Fernando Rodriguez State Bar No. 17145300 Mark C. Davis State Bar No. 05525050 JORDEN SCHULTE & BURCHETTE teos con 9r==s ^veau=
E Suite 1050 W
Austin, Texas 78701 (512) 472-1081 8
(512) 472-7473 (Telecopy)
Jarnes S. Ramsey State Bar No. 16527000 David C. Godbey State Bar No. 08049500 of HUGHES & LUCE, L.L.P.
1717 Main Street, Suite 2S00 Dallas, Texas 75201 I
.,14) 939-5500 (214) 939-6100 (Telecepy)
Original si--ea ey CAVID C. GCD8EY By:
ATTORNEYS FOR PLAINTIFF TEX-LA ELECTRIC COOPERATIVE OF TEXAS, INC.
ATTORNEYS FOR PLAINTIFF TEX-LA ELECTRIC COOPERATIVE OF TEXAS, INC.
I             PLAINTIFF'S ORIGINAL PETITION - Page 19                                           j 1
I PLAINTIFF'S ORIGINAL PETITION - Page 19 j
5
1 5


VeRlTICAllON h.
VeRlTICAllON h.
I STATE OF GEORGIA                             )
I STATE OF GEORGIA
col;bTY OF COBB I                                                    )
)
I       BEFORE SE, the undusigned Notary Public, on this day personally appeared Hugh D.
I col;bTY OF COBB
Baker, Jr., who being by me duly sworn on oath deposed and said that he is the duly I     authorizd agent for plaintiff Tex La Electric Cooperative of Texas, Inc., in the above enutled and numbered cause: that he has read the above and foregoing Plainoff's Original Pention For Temporary and Permanent Injunction, Declaratcry Judgement and Damages; and that every i     statement contained therein is within his personal owledge an is 1 rue and correct.
)
1                                                                 ..v (                  v SUBSCRIBED AND SWORN TO BEFORE ME on the 3rd day of March,1992, . cernfy which witness my rand and official seal.
I BEFORE SE, the undusigned Notary Public, on this day personally appeared Hugh D.
                                                              !        U.
Baker, Jr., who being by me duly sworn on oath deposed and said that he is the duly I
authorizd agent for plaintiff Tex La Electric Cooperative of Texas, Inc., in the above enutled and numbered cause: that he has read the above and foregoing Plainoff's Original Pention For Temporary and Permanent Injunction, Declaratcry Judgement and Damages; and that every i
statement contained therein is within his personal owledge an is 1rue and correct.
(
1
..v v
SUBSCRIBED AND SWORN TO BEFORE ME on the 3rd day of March,1992,. cernfy which witness my rand and official seal.
U.
I
I
[ Seal)
[ Seal)
Notary Public in and for the State of Georgia My Commission expires W a2.r1;/3           ,19f5~
Notary Public in and for the State of Georgia My Commission expires W a2.r1;/3
,19f5~
l I
l I
I I
I I
I 8
I 8
I eu errso -                                          -
I I
e   a I
eu errso -
e a
5
5


r.
r.
CAP ROCK                                             ELECTRIC l
CAP ROCK ELECTRIC l
* o. Box 100eg                                                     8140 eUANET ACAD . AUSTIN. tex AS 787f 61069. $121516077 B                                                     '
* o. Box 100eg 8140 eUANET ACAD. AUSTIN. tex AS 787f 61069. $121516077 B
LAW OFFICES T21E(EDn ni77 4 DEC 2 j 199l                           December 19, 1991
LAW OFFICES T21E(EDn ni77 4
                                                            ~
DEC 2 j 199l December 19, 1991
1%50 u gw WLLER, BAUS & 0 MIL, P c Darrell Bevelhyser Texas Utilities Electric Company Skyway Tower 400 N. Olive Street, LB-B1 Dallas, Texas 75201
~ 1%50 u gw WLLER, BAUS & 0 MIL, P c Darrell Bevelhyser Texas Utilities Electric Company Skyway Tower 400 N. Olive Street, LB-B1 Dallas, Texas 75201


==SUBJECT:==
==SUBJECT:==
Line 920: Line 1,548:


==Dear Darrell:==
==Dear Darrell:==
 
Pursuant to the 1972 amendment to the Texas Electric Service Company contracts with Cap Rock Electric Cooperative, Inc.
Pursuant to the 1972 amendment to the Texas Electric Service Company contracts with Cap Rock Electric Cooperative, Inc.                                                         (" Cap Rock") and Lone Wolf Elect:*ic Cooperative, Inc. (now the Lone Wolf Division of Cap Rock) , Cap Rock does hereby notify you of the cancellation of both contracts.                                         The cancellation for both the Cap Rock and Lone Wolf contracts is to be effective at 12:01 a.m. on February                               1,   1992. As of that date, Cap Rock and its Lone Wolf Division will purchase all of its wholesale power requirements fros West Texas Utilities Company ("WTU").
(" Cap Rock") and Lone Wolf Elect:*ic Cooperative, Inc. (now the Lone Wolf Division of Cap Rock), Cap Rock does hereby notify you of the cancellation of both contracts.
As you know, and as it is explained in detail in a lawsuit entitled Cap Rock Electric Cooperative, Inc. v. Texas Utilities Electric Company, it is Cap Rock's position that TU Electric has no right to prevent or delay the WTU transaction. Without waiving any rights under the lawsuit, in the unlikely event that a court should agree with your interpretation that the 1990 document is ir any way binding, Cap Rock does hereby give notice to remove as of 'tcruary 1,                     1994 under Section 2.05 of the 1990 document, all of u power and energy requirements of Cap Rock at the following delivery points:
The cancellation for both the Cap Rock and Lone Wolf contracts is to be effective at 12:01 a.m. on February 1,
1992.
As of that date, Cap Rock and its Lone Wolf Division will purchase all of its wholesale power requirements fros West Texas Utilities Company ("WTU").
As you know, and as it is explained in detail in a lawsuit entitled Cap Rock Electric Cooperative, Inc.
v.
Texas Utilities Electric Company, it is Cap Rock's position that TU Electric has no right to prevent or delay the WTU transaction. Without waiving any rights under the lawsuit, in the unlikely event that a court should agree with your interpretation that the 1990 document is ir any way
: binding, Cap Rock does hereby give notice to remove as of 'tcruary 1,
1994 under Section 2.05 of the 1990 document, all of u power and energy requirements of Cap Rock at the following delivery points:
Vealaoor West Stanton (Grady) - NE/4 S 24 B Triangle Substation - Martin Co.
Vealaoor West Stanton (Grady) - NE/4 S 24 B Triangle Substation - Martin Co.
Mcdonald Substation - 1 S FM 715 Phillips Substation - 1140/250 E Tata Substation, Andrews Hwy.
Mcdonald Substation - 1 S FM 715 Phillips Substation - 1140/250 E Tata Substation, Andrews Hwy.
Cantrell Meter PT. Salem Rd.
Cantrell Meter PT. Salem Rd.


Texas Utilities Electric Company I   December 19, 1991 Page 2 Please note that the names and configurations of our delivery                                                                                                                             ,
Texas Utilities Electric Company I
I    points and substations have changed substantially since certain points were named in Section 2.05 of the 1990 document.
December 19, 1991 Page 2 Please note that the names and configurations of our delivery I
points and substations have changed substantially since certain points were named in Section 2.05 of the 1990 document.
Cap Rock by this letter further gives notice under Section
Cap Rock by this letter further gives notice under Section
.I     2.04 of the 1990 document to remove all remaining delivery points from the TUEC's system as of February 1, 1995.
.I 2.04 of the 1990 document to remove all remaining delivery points from the TUEC's system as of February 1, 1995.
I         Since beginning on February 1, 1992, WTU will be wheeling power to Cap Rock over TUEC's system, we will need to execute with you a wheeling agreement.                                                                                                                                 While you have thus f ar refused our request for a wheeling contract, you indicated at our meeting on I     December 12, 1991, that a wheeling agreement would substantially take the form of the Tex-La agreement. Unless you first provide a
I Since beginning on February 1,
                                                                                                                                                                                                        ~
1992, WTU will be wheeling power to Cap Rock over TUEC's system, we will need to execute with you a wheeling agreement.
wheeling agreement, Cap Rock wi?,1 prepare a wheeling agreement for your signature using the Tex-La agreement as a guide.                                                                                                                             I expect you to sign the agreement prior to February 1, 1992 when the wheeling Sincerely, 3                                                                                                                                                                           & c' G%~
While you have thus f ar refused our request for a wheeling contract, you indicated at our meeting on I
December 12, 1991, that a wheeling agreement would substantially
~
take the form of the Tex-La agreement.
Unless you first provide a wheeling agreement, Cap Rock wi?,1 prepare a wheeling agreement for your signature using the Tex-La agreement as a guide.
I expect you to sign the agreement prior to February 1, 1992 when the wheeling Sincerely, 3
& c' G%~
Steven E. Collier, P.E.
Steven E. Collier, P.E.
Director of Power Supply and Regulatory Affairs SEC/ REC:taa/mja I
Director of Power Supply and Regulatory Affairs SEC/ REC:taa/mja I
I I
I I
8 I
8 I
I                                                                                                                                                                                                     l l
I l
I -
l I


WEST TEXAS UTillTIES COMPANY CENERAL OFFICE: P.O. BOX 641 / ABILENE. TEXA5 796o4 / (915) 674 7fi63 Davd L. Teewr, P.E.                                                               December 10,1991 lJ     -
WEST TEXAS UTillTIES COMPANY CENERAL OFFICE: P.O. BOX 641 / ABILENE. TEXA5 796o4 / (915) 674 7fi63 Davd L. Teewr, P.E.
ouector Operauors Servres Mr. Steven E. Collier, P.E.
December 10,1991 lJ ouector Operauors Servres Mr. Steven E. Collier, P.E.
  ]             Director of Power Supply and Regulatory Affairs DEC 11 rgg, Cap Rock Electric Cooperative, Inc.
]
l P. O. Box 9589 l     Austin, Texas 78766
Director of Power Supply DEC 11 rgg, and Regulatory Affairs Cap Rock Electric Cooperative, Inc.
l P. O. Box 9589 l
Austin, Texas 78766


==Dear Steven:==
==Dear Steven:==
Enclosed are three originals of the Cap Rock Electric Cooperative and West Texas Utilities " Service Agreement" for Rate Schedule TR 1 that have been prepared for your execution. These Service Agreements contain all the changes y
we have discussed and agreed upon in my letters of October 9 and l
November 5,1991.
g Please have these Service Agreements signed by the appropriate Cap Rock I
representative and returned to my attention. Upon receipt and execution by WTU I will attach to the Service Agreement the Rate Schedule TR 1 " Terms l
and Conditions" currently on file at the FERC. One completely executed set B
will be returned for Cap Rock's internal use.
]
Once wo have completed the final review and execution of the Exhibit A's, E
these can be distributed along with the Exhibit B and made a part of the total agreement between Cap Rock and WTU to be filed with the FERC. Currently
.l we continue to work closely with both John Edwards and Mark Sullivan to finalize this agreement.
l If you have any questions concerning these Service Agreements, please let me know.
)
Sincerely,
/,
David eeter DT/pw enclosures (3) r A MEMBER OF THE CENTRAL AND SOUTH WEST SYSTEM Central Pow?r and Ught Pubhc Semce Company of Oklahoma Southwestern Electne Power West Texas Utilities Camus O mto. Teus hiu OUahoma Shreveport. Lowsonna Abdene te us


Enclosed are three originals of the Cap Rock Electric Cooperative and West Texas Utilities " Service Agreement" for Rate Schedule TR 1 that have been prepared for your execution. These Service Agreements contain all the changes y      we have discussed and agreed upon in my letters of October 9 and l      November 5,1991.
l Rate Schedule TR-1
g      Please have these Service Agreements signed by the appropriate Cap Rock I       representative and returned to my attention. Upon receipt and execution by WTU I will attach to the Service Agreement the Rate Schedule TR 1 " Terms l      and Conditions" currently on file at the FERC. One completely executed set B      will be returned for Cap Rock's internal use.
" SERVICE AGREEMENT" bbb 1 ] lggl BETWCEN l
        ]        Once wo have completed the final review and execution of the Exhibit A's, E      these can be distributed along with the Exhibit B and made a part of the total agreement between Cap Rock and WTU to be filed with the FERC. Currently we continue to work closely with both John Edwards and Mark Sullivan to
WEST TEXAS UTILITIES Col 4PANY l
          .l      finalize this agreement.
AND I
If you have any questions concerning these Service Agreements, please let me l        know.
This agreement made and entered into this 1st day of
  )                                                                              Sincerely,
, I January, 1992, by and betwoon WEST TfXAS UTILITIES COMPANY (hereinafter referred to as " Company,") and CAP ROCK ELECTRIC j
                                                                                                  /,
COOPERATIVE, IHO. (hereinafter referred to as " Customer"),
David eeter DT/pw enclosures (3) r A MEMBER OF THE CENTRAL AND SOUTH WEST SYSTEM Central Pow?r and Ught  Pubhc Semce Company of Oklahoma        Southwestern Electne Power West Texas Utilities Camus O mto. Teus        hiu OUahoma                            Shreveport. Lowsonna      Abdene te us
l E l l E I 1 1 1 1 R8 Thac in consideration of the mutual covenants and agree-ments herein contained, the partien hereto covenant and agree with each other as follows:
ARTICLE I company shall sell and deliver to Customer, and Custcr. nee a
shall purchase and receive from Company, all the electric power and energy that customer may require during the term of
;g this agreement for the operation of those portions of its electric systom that are or shall be connected to any point
,I of delivery spacified in Exhibit A attached hereto and made a part-hereof, or on any sumessor or supplementary sheets to Exhibit A which shall be tached hereto and made a part of
{g Exhibit A by agreement o, is partion hereto.
A DELIVERY g
POINT AND SERVICE SPECIF1, tIONS sheet shall be executed for each such point of delivery and each such shoest shall become a part of Exhibit A attached hereto.
Cuutomer shall operate I
the points of delivery dsscribed on Exhibit A as part of Company's control area by mahna of telematering.
Exhibit B attached hereto and made a part hereof describes the respec-t I tive obligations of Company and Customer as to the installa-tion and maintenance of such telematering equipment and sets forth the procedures to'be followed by company in preparing billings for service.
ARTICLE II l
Electric service she.ll be furnished to Customer in 4
accordance with Company's " Terms and conditions" and the applicahle rata schedule.
Said " Terms and Conditions" and applicable rate schedule are attached hereto and made a part of this Service Agreement to the same extent as if fully set 4
out herein.
The Company reserve the right, under this Ser-vice Agreemt.nt, unilaterally to file with t.he Federal Energy Effactivt Dates iTanuary 1, 1992 I


l                                                                            Rate Schedule TR-1
, Rate Schedule TR-1 I
                                        " SERVICE AGREEMENT" BETWCEN                        bbb 1 ] lggl l                                  WEST TEXAS UTILITIES Col 4PANY l                                                      AND I              This agreement made and entered into this 1st day of j
Regulatory Commission, or any successor or other agency j
I        January, 1992, by and betwoon WEST TfXAS UTILITIES COMPANY (hereinafter referred to as " Company,") and CAP ROCK ELECTRIC COOPERATIVE, IHO. (hereinafter referred to as " Customer"),
having jurisdiction (" Commission"), for a change in rates and I
l E l l E I 1 1 1 1 R8
charges, pursuant to Section 205 of the Faderal Power Act
! ,-                Thac in consideration of the mutual covenants and agree-
("Act"), and the commission's rules and regulations promul-gated thereunder.
;            ments herein contained, the partien hereto covenant and agree with each other as follows:
In addition, changes made in Exhibit A 3
                                      -            ARTICLE I company shall sell and deliver to Customer, and Custcr. nee a        shall purchase and receive from Company, all the electric power and energy that customer may require during the term of
herato pursuant to the provisions of paragraphs 1(b) and 9 of g
;g            this agreement for the operation of those portions of its electric systom that are or shall be connected to any point of delivery spacified in Exhibit A attached hereto and made a
said " Terns ar.d conditians" and changes in " Terms and condi-tions" mutually agrecd upon by customer and company may be similarly filed by company with the Commission pursuant to I
,I           part- hereof, or on any sumessor or supplementary sheets to
Section 205 of the Act.
.            Exhibit A which shall be              tached hereto and made a part of
Otherwise, either party to this Service Agreement thall have the right to make application to the Comnission pursuant to Section 206 of the Act for a I
{g            Exhibit A by agreement o,              is partion hereto. A DELIVERY g        POINT AND SERVICE SPECIF1, tIONS sheet shall be executed for each such point of delivery and each such shoest shall become a part of Exhibit A attached hereto. Cuutomer shall operate t
change in other " Terms and Conditions.*
I        the points of delivery dsscribed on Exhibit A as part of Company's control area by mahna of telematering. Exhibit B attached hereto and made a part hereof describes the respec-I        tive obligations of Company and Customer as to the installa-tion and maintenance of such telematering equipment and sets forth the procedures to'be followed by company in preparing billings for service.
In the envent rehear-ing is sought of the commission's disposition of such appli-cation, any change acught pursuant to application under Section 206 shall not become effnetive until issuance of the I
ARTICLE II l              Electric service she.ll be furnished to Customer in 4
final coaanission order on Rehearing or the time for the issuance of such an order has passed.
accordance with Company's " Terms and conditions" and the applicahle rata schedule. Said " Terms and Conditions" and applicable rate schedule are attached hereto and made a part 4            of this Service Agreement to the same extent as if fully set out herein. The Company reserve the right, under this Ser-vice Agreemt.nt, unilaterally to file with t.he Federal Energy Effactivt Dates          iTanuary 1, 1992 I -.  .                      -            .          _          - -
ARTICLE III Bills shall be rendered monthly for power and energy N
 
supplied hereunder and such bills shall be payable at B
  ,                                                                                  Rate Schedule TR-1 I                Regulatory Commission, or any successor or other agency                                                 j having jurisdiction (" Commission"), for a change in rates and I                 charges, pursuant to Section 205 of the Faderal Power Act
Company's General Office in Abilene, Texas, within fifteen (15) days from the date thereof, or the date of mailing, whichever is later.
("Act"), and the commission's rules and regulations promul-gated thereunder.       In addition, changes made in Exhibit A 3
All billing and payments shall be in I
g herato pursuant to the provisions of paragraphs 1(b) and 9 of said " Terns ar.d conditians" and changes in " Terms and condi-tions" mutually agrecd upon by customer and company may be similarly filed by company with the Commission pursuant to I                 Section 205 of the Act. Otherwise, either party to this Service Agreement thall have the right to make application to the Comnission pursuant to Section 206 of the Act for a I                 change in other " Terms and Conditions.*
accordance with the provisions of paragraph 7 of the " Terms and conditions" and the applicable rate schnule.
ing is sought of the commission's disposition of such appli-cation, any change acught pursuant to application under In the envent rehear-I                Section 206 shall not become effnetive until issuance of the final coaanission order on Rehearing or the time for the issuance of such an order has passed.
l ARTIC12 IV This Service Agreement shall become effective when I
ARTICLE III Bills shall be rendered monthly for power and energy N                 supplied hereunder and such bills shall be payable at B                 Company's General Office in Abilene, Texas, within fifteen (15) days from the date thereof, or the date of mailing, I                whichever is later. All billing and payments shall be in accordance with the provisions of paragraph 7 of the " Terms and conditions" and the applicable rate schnule.
signed and approved by the authorized representatives of the Customer and Company, and, unless otherwise agroed, shsil remain in effect until five (5) years after written notice of termination is given by either party.
l                                                   ARTIC12 IV This Service Agreement shall become effective when I                 signed and approved by the authorized representatives of the Customer and Company, and, unless otherwise agroed, shsil remain in effect until five (5) years after written notice of termination is given by either party. If customer is termi-I                 naring total regt.irements service to participate in genera-tira facilities owned by company, the five (5) year notice period shall not apply. Deliveries under this service Agree-l                 ment shall commenco upon a date agreed upon by customer and Company provided the customer shall have made all arrange -
If customer is termi-I naring total regt.irements service to participate in genera-tira facilities owned by company, the five (5) year notice period shall not apply.
ments with Texas Utilities Electric Company and other Elec-I                 tric Reliability Couhcil of Texas ("ERCOT") utilities neces-sary for the performanco of this Servica Agreement on terms that are acceptable to company.
Deliveries under this service Agree-l ment shall commenco upon a date agreed upon by customer and Company provided the customer shall have made all arrange -
ments with Texas Utilities Electric Company and other Elec-I tric Reliability Couhcil of Texas ("ERCOT") utilities neces-sary for the performanco of this Servica Agreement on terms that are acceptable to company.
If customer gives such notice of termin ation of this Service Agreement and thereafter requests partial require-ments and transmission wheeling service, the customir and l
If customer gives such notice of termin ation of this Service Agreement and thereafter requests partial require-ments and transmission wheeling service, the customir and l
t l
Company shall, upon request of the Cuetomer, enter into t
Company shall, upon request of the Cuetomer, enter into negotiations regarding the rates, terms and conditions for such services. Any request of Customer for partial require-ments and transmis ion wheeling services sha i specify the Effective Date:         January 1, 1992
l negotiations regarding the rates, terms and conditions for such services.
Any request of Customer for partial require-ments and transmis ion wheeling services sha i specify the Effective Date:
January 1, 1992


3 Ratn schedulo TR21 F                                                                                 nature of the services roquested including, without lLaita-l         tion, the date on which such services are to commence and in the case of transmission wheeling service, spe:ification of I.
3 Ratn schedulo TR21 F nature of the services roquested including, without lLaita-l tion, the date on which such services are to commence and in the case of transmission wheeling service, spe:ification of I.
the quantities of power to be wheeled, the times at which such power is to be wheeled, the points on company's trans-mission system where company in to taka delivon of such E         power and the points to which Company is to deliver such 5       power.
the quantities of power to be wheeled, the times at which such power is to be wheeled, the points on company's trans-mission system where company in to taka delivon of such E
I             Cc5pany and Customer agree to providu each other during the course of negotiations, with such relevant data and other information as may be reasonably requested by the other for purposes of preparing or evaluating discussion drafts of I       ratos, terms and conditions for the transmission whoeling and partial requirements services requested by Customor; provid-ed, however, that neither Company nor customer still be I       required under the terma of this Service Agreemcat to provido the other with data, documents or information of (1) a kind to which a privilege would attach under Texas law or under Rule 501 of the Federal Rules of Evidence, (2) the kind 5       described in Rule 26(b) (3) or (4) of the Federal Ruloa of Civil Procedure, (3) a kind constituting trade secrets, (4) a kind constituting commercial of financial infenution ob-tained from a third person on a privileged or confidential basis, or (5) the kind of information, commonly kr.own as
power and the points to which Company is to deliver such 5
          " insider information," including without limitation, any I     forecast financial or operating information not then general-ly available to the public, the selective release of which could result in a violation of the Securities Act of 1933, as amended, of the Securities Exchange Act of 1934, as amendud, I   or the rules and regulations of the Securities and Exchange Commission promulgated under such acts.
power.
l l           After receipt of Customer's request to negotiate ratos, l     terms and conditions for partial requirements and transmis-sion wheeling service s and upon receipt from customer of all I   information necessary for the formulation thereof, company will present to customer the methodology which Company be-lieves to be the a provided, however,ppropriate                                 basis for developing   suchtoraten:
I Cc5pany and Customer agree to providu each other during the course of negotiations, with such relevant data and other information as may be reasonably requested by the other for purposes of preparing or evaluating discussion drafts of I
I                                                        that Company prosent to Customer such methodology any earlier than 30 months prior to the proposed commencement date of the re-shall not be required quested services.
ratos, terms and conditions for the transmission whoeling and partial requirements services requested by Customor; provid-ed, however, that neither Company nor customer still be I
required under the terma of this Service Agreemcat to provido the other with data, documents or information of (1) a kind to which a privilege would attach under Texas law or under Rule 501 of the Federal Rules of Evidence, (2) the kind 5
described in Rule 26(b) (3) or (4) of the Federal Ruloa of Civil Procedure, (3) a kind constituting trade secrets, (4) a kind constituting commercial of financial infenution ob-tained from a third person on a privileged or confidential basis, or (5) the kind of information, commonly kr.own as
" insider information," including without limitation, any I
forecast financial or operating information not then general-ly available to the public, the selective release of which could result in a violation of the Securities Act of 1933, as amended, of the Securities Exchange Act of 1934, as amendud, I
or the rules and regulations of the Securities and Exchange Commission promulgated under such acts.
l l
After receipt of Customer's request to negotiate ratos, l
terms and conditions for partial requirements and transmis-sion wheeling service s and upon receipt from customer of all I
information necessary for the formulation thereof, company will present to customer the methodology which Company be-lieves to be the a provided, however,ppropriate basis for developing such raten:
that Company shall not be required to I
prosent to Customer such methodology any earlier than 30 months prior to the proposed commencement date of the re-quested services.
Company agrees to join with Customer, at customer's request, in seeking an informal conference with the Staff of the regulatory body having jurisdiction 18 months prior to such commencement date for purposes of discussing the design of ratos for the requested services.
Company agrees to join with Customer, at customer's request, in seeking an informal conference with the Staff of the regulatory body having jurisdiction 18 months prior to such commencement date for purposes of discussing the design of ratos for the requested services.
Company further agrees to file as a change in rata 12 months prior to the proposed commencement date of the servic-es requested by Customer the rates, terms and conditions l
Company further agrees to file as a change in rata 12 months prior to the proposed commencement date of the servic-es requested by Customer the rates, terms and conditions l
Effective Date:     January 1,   1992 1
Effective Date:
January 1, 1992 1


    - - __- _ -      .-- - -- - - -            ~ ^
~ ^
;r 4                                                                    Rato Schedule TR-1 lE
;r Rato Schedule TR-1 4 lE under which Company is willing and able to commence providing
;E                under which Company is willing and able to commence providing partial requi' cements and transmission wheeling services to
;E partial requi' cements and transmission wheeling services to Customer with the re ulatory body having jurisdiction, and Company shall join w th Customer in seeking expeditious treatment of such filing.
;                  Customer with the re ulatory body having jurisdiction, and Company shall join w th Customer in seeking expeditious
Nothing in this Article IV shall be construed to prohibit Company from unilaterally filing supergoding changer in such rates, terms or conditions.
;                  treatment of such filing. Nothing in this Article IV shall
!I tst:ciq V
!                  be construed to prohibit Company from unilaterally filing supergoding changer in such rates, terms or conditions.
-l This Service Agreement w wt be assigned by either a
!I                                                 tst:ciq V
-l a                          This Service Agreement w     wt be assigned by either 4
party without the prior writtoa consent of the other party.
party without the prior writtoa consent of the other party.
4 Consent to aenionment shall not be unreasonably withheld.
]
]
Consent to aenionment shall not be unreasonably withheld.
Nothing exptassed or mentioned or to which reference is made j
j                Nothing exptassed or mentioned or to which reference is made
in this Service Agreement is intended or shall be construed to give any person or corporation other than Company or 1
;                in this Service Agreement is intended or shall be construed 1                to give any person or corporation other than Company or j                Customer any legal or equitable right, remedy or claim under l
Customer any legal or equitable right, remedy or claim under j
or in respect e,f this Service Agreement or any provision herein centained, expressly or by reference, this Service Agreement and all conditione and provisions hereof being I             intended to be and being for the sole at.d excluaive benefit of. Company and Customer, and for the benefit of no other person or corporation.
or in respect e,f this Service Agreement or any provision l
IN WITNESS WHEREOP, Company and Customer have caused this Service Agreement to be executed in duplicate in their names by their respective duly authorized representativery as of the date of year first above writton.
herein centained, expressly or by reference, this Service Agreement and all conditione and provisions hereof being I
CAP ROCK ELECTRIC COOPERATIVE, INC..
intended to be and being for the sole at.d excluaive benefit of. Company and Customer, and for the benefit of no other person or corporation.
ATTEST                                                             '
IN WITNESS WHEREOP, Company and Customer have caused this Service Agreement to be executed in duplicate in their names by their respective duly authorized representativery of the date of year first above writton.
                    )                           By:           -
as CAP ROCK ELECTRIC COOPERATIVE, INC..
Chief Executive Of'icer and General Manager
ATTEST
                                                                  " Customer" WEST TEXAS UTILITIES COHPANY ATTESTt By:
)
By:
Chief Executive Of'icer and General Manager
" Customer" WEST TEXAS UTILITIES COHPANY ATTESTt By:
Vice President
Vice President
                                                                        " Company" I
" Company" I
Effective Date:     January 1, 1992 8
Effective Date:
January 1, 1992 8


CAP ROCK               ELECTRIC I # o 00R 10069                     4140 BUAN[T ACAD + AU$ TIN. TEX AS 767061069. $12 45160f 7 J
CAP ROCK ELECTRIC I
I                                                                                                                                                 :
# o 00R 10069 J
January 2,                   1992
4140 BUAN[T ACAD + AU$ TIN. TEX AS 767061069. $12 45160f 7 I
                                                                                                .ni.~"?'
January 2, 1992
                                                                              ; .'? ,                                        ".,
.ni.~"?'
Mr. David Teater                                                                 M!3Y h ';
;.'?,
I         West Texas Utilities Company P.O. Box 841 Abilenes, Texas 79604 Q/ '' ._. ..
Mr. David Teater M!3Y h ';
d ,' ' N T~^                             ..
I West Texas Utilities Company Q/
                                                                                                                              ;s1 A.r .
;s1 P.O. Box 841 d,' ' N T~^
I SUBJECT     Executed Service Agrensent Daar Davidt on behalf of Cap Rock Electric, I am pleased to enclose three
Abilenes, Texas 79604 A.r.
;              executed copies of the Servic, Agreement for Rate Schedule TR-1.                                                                        .
I SUBJECT Executed Service Agrensent Daar Davidt on behalf of Cap Rock Electric, I am pleased to enclose three executed copies of the Servic, Agreement for Rate Schedule TR-1.
,              you will notice that we had to do some editing of the signature
you will notice that we had to do some editing of the signature page since David Pruitt is CEO and General Manager, not Executive Vice President.
!              page since David Pruitt is CEO and General Manager, not Executive Vice President.       If thAs is a problem, we would be happy to re-execute new signature pr;$s.
If thAs is a problem, we would be happy to re-execute new signature pr;$s.
I have forwarded the exhibits A to David Pruitt. He will
I have forwarded the exhibits A to David Pruitt. He will execute them and forvard them directly to you.
:            execute them and forvard them directly to you.
)'
)'                   As we have previously discussed, I an including in this cover letter confirmation of certain matters that we have discussed with regard to the implementation of the Service Agreement. Given the nature of our wholesale power purchase arrangement, we understood and concurred with your desire to hvoid, as much as possible, the complexities and delays that would be caused by extensive deviations from your standerd Service Agreement and rate schedule language.         If any of the         following items are incorrect or unacceptable, please contact me at your earliest convenience.
As we have previously discussed, I an including in this cover letter confirmation of certain matters that we have discussed with regard to the implementation of the Service Agreement.
(1) Exhibit B lE                         It is my understanding that language for Exhibit B is 5                     still being finalized.             Because of the nature of this exhibit (i.e., a standard operating procedure), it does not seem to be a problem to exchange executed copies of I                     the contract without this exhibit finalized.
Given the nature of our wholesale power purchase arrangement, we understood and concurred with your desire to hvoid, as much as possible, the complexities and delays that would be caused by extensive deviations from your standerd Service Agreement and rate schedule language.
event, this exhibit may need to be modified from time to time     as In any operating arrangements,                               ERCOT                 guidelines, meterir.g requirements, etc. dictate.
If any of the following items are incorrect or unacceptable, please contact me at your earliest convenience.
(1)
Exhibit B lE It is my understanding that language for Exhibit B is 5
still being finalized.
Because of the nature of this exhibit (i.e., a standard operating procedure), it does not seem to be a problem to exchange executed copies of I
the contract without this exhibit finalized.
In any event, this exhibit may need to be modified from time to time as operating arrangements, ERCOT guidelines, meterir.g requirements, etc. dictate.
l I
l I


l Mr. David Teater i           January 2, 1992 page 2 I                 (2) commencement of Deliveries As we discussed on the telephone today, we have given official, written notice to TU Electric of cancellation of     our full-requirements wholesale power contract i
'l Mr. David Teater i
effective February 1, 1992.                       In that notice, we inform them of our intent to begin purchasing all of our wholesale power requirements from WTU. However, as you know, TU Electric is disputing our right to do this.
January 2, 1992 page 2 I
We have filed a contract dispute action in state district court in Midland, Texas. Since we probably cannot begin I                       deliveries from the Vr0 control area through the TU Electric transmission system until they agree to do so, commencement of deliveries under our WTU Service I                     Agreement will likely be contingent upon the outcome of this state district court case or negotiation with TU
(2) commencement of Deliveries As we discussed on the telephone today, we have given official, written notice to TU Electric of cancellation of our full-requirements wholesale power contract
                        -Electric.                     It is my understanding that cap Rock Electric g                     vill have no obligations to make any payments under the g                     Service Agreement until such time as deliveries actually commance.
!i effective February 1, 1992.
In that notice, we inform them of our intent to begin purchasing all of our wholesale power requirements from WTU.
However, as you know, TU Electric is disputing our right to do this.
We have filed a contract dispute action in state district court in Midland, Texas.
Since we probably cannot begin I
deliveries from the Vr0 control area through the TU Electric transmission system until they agree to do so, commencement of deliveries under our WTU Service I
Agreement will likely be contingent upon the outcome of this state district court case or negotiation with TU
-Electric.
It is my understanding that cap Rock Electric g
vill have no obligations to make any payments under the g
Service Agreement until such time as deliveries actually commance.
We would be interested in visiting with you about any actiorus that WTU might be willing to take to assist us in forciny TU Electric to allow the deliveries to commence.
We would be interested in visiting with you about any actiorus that WTU might be willing to take to assist us in forciny TU Electric to allow the deliveries to commence.
I                     We are proceeding to negotiate contracts for wheeling with the impacted third-party utilities.
I We are proceeding to negotiate contracts for wheeling with the impacted third-party utilities.
drafting a whos11ng agreement after the fashion of Tex-We are Mao La's wheeling agreement with TU Electric to sign and I                     submit to TU Electric so that they cannot claim that the lack of a whe111ng contract prevents them from beginning wheeling. Nonetheless, until TU Electreic is willing to I     .
We are Mao drafting a whos11ng agreement after the fashion of Tex-La's wheeling agreement with TU Electric to sign and I
ramp its generation down to allow WTU to ramp its generation up to serve our load, deliveries cannot commence undsr our WTU Service Agreement.
submit to TU Electric so that they cannot claim that the lack of a whe111ng contract prevents them from beginning wheeling.
(3)   Term of Service Agreement and Exhibits A og                       The Service Agreement, on Page 2, Article IV, states that g                       the Servies Agreement shall remain in effect until fivo (5) years af ter written notice of termination is given by either party.                       Most of the Exhibits A provide for the possibility of taraination earlier than five years, and without advance written notice.                     It is my understanding that, even though the Service Agreament may have a term of five years, the terms stated in each Exhibit A has I                      precedence to the extent that it allows for a term of less than five years.
Nonetheless, until TU Electreic is willing to I
I   __                                                _____
ramp its generation down to allow WTU to ramp its generation up to serve our
: load, deliveries cannot commence undsr our WTU Service Agreement.
(3)
Term of Service Agreement and Exhibits A og The Service Agreement, on Page 2, Article IV, states that g
the Servies Agreement shall remain in effect until fivo (5) years af ter written notice of termination is given by either party.
Most of the Exhibits A provide for the possibility of taraination earlier than five years, and without advance written notice.
It is my understanding that, even though the Service Agreament may have a term I
of five years, the terms stated in each Exhibit A has precedence to the extent that it allows for a term of less than five years.
I


l Mr. David Teater January 2, )992 Page 3 l
l Mr. David Teater January 2,
l                         (4)                 Interconnection Between WTU and TU Electric
)992 Page 3 l
    .                                          It is my understanding that WTU currently has aufficient interconnaccion capacity with TU Electric to accommodate the wholesale power purchases contesplated under the I                                             Service additions or improvosents will not be required by TU Agreement.                              That is,  transmission    system Electric or WTU to facilitate the wholesale power purchases contemplated in the Service Agreement.
l (4)
(5)                     "Up and Down Cost" Does Hot Apply The terms and conditions in Rate Schedule TR-1, Sheet No.
Interconnection Between WTU and TU Electric It is my understanding that WTU currently has aufficient interconnaccion capacity with TU Electric to accommodate the wholesale power purchases contesplated under the I
22               Item 9.(b), references up and down costs associated with termination of service at a delivery point. It is I                                               my understanding as per our discussions, that since WrU is not constructing or dedicating any trcnsmission or Rock Electric distribution facilities to serve Cap delivery points, that such up and down charges do not apply.
Service Agreement.
(6)                     Miscellaneous Additional Matters We have discussed with you several additional matters which did not seen appropriate to include in the Service I                                                 Agreement, but which we will want to continue to discusn with you.
That is, transmission system additions or improvosents will not be required by TU Electric or WTU to facilitate the wholesale power purchases contemplated in the Service Agreement.
negotiate appropriate terms and conditions for the When the time is right, we wi!I want to following items:
(5)
(a)                 Substitution of Hunt-Collin Load In the event that it proves to be possible for WT'J to serve the load at what will be our Hunt-Collin division we will want to substitute that load for a portion of the "20 magawatt minimum" that is currently made up by our Lone Wolf division delivery points and the Stanton division Schwarts and Eiland delivery pointa.
"Up and Down Cost" Does Hot Apply The terms and conditions in Rate Schedule TR-1, Sheet No.
(b)                 Lease Assignment As we have discussed, we have executed a lease-back of certain transmission f acilities and other system improvement. expenses that we havo incurred in order to                             facilitate                   our alternative power supply arrangements.                                               We negotiated the loase to be assignable so                                             that we might assign it to a l
22 Item 9.(b), references up and down costs associated with termination of service at a delivery point.
It is I
my understanding as per our discussions, that since WrU is not constructing or dedicating any trcnsmission or distribution facilities to serve Cap Rock Electric delivery points, that such up and down charges do not apply.
(6)
Miscellaneous Additional Matters We have discussed with you several additional matters which did not seen appropriate to include in the Service I
Agreement, but which we will want to continue to discusn with you.
When the time is right, we wi!I want to negotiate appropriate terms and conditions for the following items:
(a)
Substitution of Hunt-Collin Load In the event that it proves to be possible for WT'J to serve the load at what will be our Hunt-Collin division we will want to substitute that load for a portion of the "20 magawatt minimum" that is currently made up by our Lone Wolf division delivery points and the Stanton division Schwarts and Eiland delivery pointa.
(b)
Lease Assignment As we have discussed, we have executed a lease-back of certain transmission f acilities and other system improvement. expenses that we havo incurred in order to facilitate our alternative power supply arrangements.
We negotiated the loase to be assignable so that we might assign it to a
l


          . _      . _ _ - - - -            _ - _ _ -        _          -      _  _ . _    - _    . = . _ .
. =
1 E                                                                                                          '
E 1
Mr. David Teeter 4
Mr. David Teeter k
-    k      January 2, 1992 Page 4
January 2, 1992 4
:I wholesale supplier.             This would enable us to pass                 ,
Page 4
the lease cost through in our PCRF as they are
:I wholesale supplier.
:                                charged to um by our wholesale uupplier rather than having to go through a full rate case at the PUC to
This would enable us to pass the lease cost through in our PCRF as they are charged to um by our wholesale uupplier rather than having to go through a full rate case at the PUC to obtain rate base treatment for these expenses.
:                              obtain rate base treatment for these expenses. Our l                                 Chief Financial officer, John Parker, will be contacting you to further discuss this matter, and ve would like to pursue the assignment of this I
Our l
i lease to WTU at such time as deliveries commence ur. der the Service Agreement.             of course, we would expect to hold WTU harmless for any liability or ll' oconomic or other risk under this lease pass-through arrangement.
Chief Financial
(c) WTU Assistance Thic Service Agreement pretty clearly makes all of the wheeling and other arrangements solely cap Rock Electric's responsibility. However, we have taken
: officer, John Parker, will be contacting you to further discuss this matter, and ve would like to pursue the assignment of this i I lease to WTU at such time as deliveries commence ur. der the Service Agreement.
;                                comfort from your verbal assurance that WTU will e
of course, we would expect to hold WTU harmless for any liability or ll' oconomic or other risk under this lease pass-through arrangement.
exert significant effort to assist us in making the necessary arrangements.               Given the unusual nature
(c)
:9 of   the       control         area   arrangement       that   we contemplate,             and givta     the   likely       continued interference and obstruction by TU Electric, this                             "
WTU Assistance Thic Service Agreement pretty clearly makes all of the wheeling and other arrangements solely cap Rock Electric's responsibility.
assistance will undoubtedly be needed if deliveries are to cousence under the Service Agreement.
However, we have taken comfort from your verbal assurance that WTU will exert significant effort to assist us in making the e
necessary arrangements.
Given the unusual nature
:9 of the control area arrangement that we contemplate, and givta the likely continued interference and obstruction by TU Electric, this assistance will undoubtedly be needed if deliveries are to cousence under the Service Agreement.
Again, if any of the above items is incorrect or unacceptable,
Again, if any of the above items is incorrect or unacceptable,
'I           please let me know at your earliest convenience.                       We are surely looking forward to our business relationship with West Taxr,s Utilities company. Again, thank you for all of your efforts in our behalf.
'I please let me know at your earliest convenience.
We are surely looking forward to our business relationship with West Taxr,s Utilities company.
Again, thank you for all of your efforts in our behalf.
c Sincerely,
c Sincerely,
(
(
Steven E. Collier, P.F..
Steven E.
: Collier, P.F..
Director of Power Supply and Regulatory Affairs 1
Director of Power Supply and Regulatory Affairs 1
1 SEC:ma Enclosure cc   David Pruitt I
SEC:ma 1
Enclosure cc David Pruitt I
sg
sg


i
i
            .\P RUCK                                                                                 ELECTRW pXXIBli8 t
.\\P RUCK ELECTRW pXXIBli8 t
t
t
                                                                                                                                                              ;::: o .: r 2;. 3-B Mr. Darrell Seve:nyuer Director of Bulk Power Transactions TU Electric
;::: o.: r 2;.
                                              !.ock Box 01 Dallas, Texas 75201
3-B Mr. Darrell Seve:nyuer Director of Bulk Power Transactions TU Electric
!.ock Box 01 Dallas, Texas 75201


==Dear carrell:==
==Dear carrell:==
 
Thank you for taking the time to meet wLth me in your offica yesterday.
Thank you for taking the time to meet wLth me in your offica yesterday.                                     I was glad to have the opportunity to discuss with you and Henry Bunting the plans that we are making at Cap Rock Electric for new power supply arrangements.
I was glad to have the opportunity to discuss with you and Henry Bunting the plans that we are making at Cap Rock Electric for new power supply arrangements.
When we fizet executed the new power supply agreement with TU Electric in May,1390, we expected that the TU Electric rates would escome final and that the special 120 day window for termination L                                           vould come and go before we would be able to finish our alternative power supply arrangements.                                                                     At that time, we thought it might be necessary to provide notice to terminate our existing all-requirements agreement and begin serving load under the new power supply agreement before we would be in a position to begin to serve load with alternative power supply resources.                                                                       However, we have oeen able to complete our power supply arrangements more quickly tnan we chought, and the 120 day window will open and close muen later than we thought due to repeated delays an the final cnange of tne TU Electric rates.                                                         As a result, we now anticipate being acle to take advantage of the 120 day vindow to provide notice to terminate our existing all-requirements agreement without having to serve any wholesale load temporarily under the new power supply agreement.
When we fizet executed the new power supply agreement with TU Electric in May,1390, we expected that the TU Electric rates would escome final and that the special 120 day window for termination L
As we discussed, C&p Rock Electric has entered into a contract wLth Southwestern Public Service Company to transf er most or all of our system load requirements out of ERCOT into the Southwest Power Pool beginning in June,1993.                                                             This will require both completion of new transmission lines by                                                               SPSCO   and completion of internal transmission system integration improvements by Cap Rock Electric.
vould come and go before we would be able to finish our alternative power supply arrangements.
    ---a-- __ - ~ _ _ _ _ _ _ - - - - _ _ _ _ _ _ _ _ _ , , , _ . , _ , _ _
At that time, we thought it might be necessary to provide notice to terminate our existing all-requirements agreement and begin serving load under the new power supply agreement before we would be in a position to begin to serve load with alternative power supply resources.
However, we have oeen able to complete our power supply arrangements more quickly tnan we chought, and the 120 day window will open and close muen later than we thought due to repeated delays an the final cnange of tne TU Electric rates.
As a result, we now anticipate being acle to take advantage of the 120 day vindow to provide notice to terminate our existing all-requirements agreement without having to serve any wholesale load temporarily under the new power supply agreement.
As we discussed, C&p Rock Electric has entered into a contract wLth Southwestern Public Service Company to transf er most or all of our system load requirements out of ERCOT into the Southwest Power Pool beginning in June,1993.
This will require both completion of new transmission lines by SPSCO and completion of internal transmission system integration improvements by Cap Rock Electric.
---a--
__ - ~ _ _ _ _ _ _ - - - - _ _ _ _ _ _ _ _ _,,, _., _, _ _


b, Mr. Carreil Beveinymer October 23, 1991
b, Mr. Carreil Beveinymer October 23, 1991
      'm' I
'm' I
g          ''e nave also entered :,nto a letter of intent vtta vest Texas g    Utilattes tempany, and we anticipate completion and execution of a definitive contract within the next few weeks, to begin purchasing all of our vnolesale power requirements                                                     from WTU as early as I     Januarf, 1992.                     WTU has agreed to electronically incorporate our load into their control area, and we vill be served under Onear standard wholesale tariff.
''e nave also entered :,nto a letter of intent vtta vest Texas gg Utilattes tempany, and we anticipate completion and execution of a definitive contract within the next few weeks, to begin purchasing all of our vnolesale power requirements from WTU as early as I
As ve further discussed, the new TU Electric rates became final on September 19, 1991, providing Cap Rock Electri                                                       s ),tn a vindow of 120 days beginning that same date to provide .vuce of I   termination of our existing all-requirements wholesale power contract.       We expect to be providing such notAce before the end of the 120 day vindow. We are currently attempting to ascertain the exact requirements and timing of the telemetry and control area i    arrangements as well as the wheeling arrangements.                                                         This vill enable us to provide notice with an effective date that is as soon as practical.
Januarf, 1992.
Finally, as.we discussed, there are a couple of action iteme that we would like to pursue.                                   First, Scott Moore of WTU will be b y   contacting TU Electric representatives                                                       for the   appropriate telemetry and control area coordination. Second, we would like to receive a draft wheeling contract from TU Electric so that we can begin     to make the necessary wheeling arrangements.                                                       VN is currently performing the                                   load flow   studies             to assess   vneeling
WTU has agreed to electronically incorporate our load into their control area, and we vill be served under Onear standard wholesale tariff.
As ve further discussed, the new TU Electric rates became final on September 19, 1991, providing Cap Rock Electri s ),tn a vindow of 120 days beginning that same date to provide
.vuce of I
termination of our existing all-requirements wholesale power contract.
We expect to be providing such notAce before the end of the 120 day vindow.
We are currently attempting to ascertain the i
exact requirements and timing of the telemetry and control area arrangements as well as the wheeling arrangements.
This vill enable us to provide notice with an effective date that is as soon as practical.
Finally, as.we discussed, there are a couple of action iteme b
that we would like to pursue.
First, Scott Moore of WTU will be y
contacting TU Electric representatives for the appropriate telemetry and control area coordination.
Second, we would like to receive a draft wheeling contract from TU Electric so that we can begin to make the necessary wheeling arrangements.
VN is currently performing the load flow studies to assess vneeling
:= pacts on utilities other than TU Electric and WTU, and we vill pursue any other vneeling contracts that prove necessary as a result of those assessments.
:= pacts on utilities other than TU Electric and WTU, and we vill pursue any other vneeling contracts that prove necessary as a result of those assessments.
One additional item which I failed to discussed with you but which we should pursue has to do with the coordination of our construction of the nece.ssary transnis:sion ft:ilities.                                                       As you know,       cap Rock Elactric has, for some time, been actively proceeding with transmission improvements and additions with the ultimate goal                           of           integrating our       various substations                   and transmission facilities.                                   Not only vill we continue with these activities in order to facilitate the SPS contract, but SPS will also be constructing two transmission lines to our area. Sometime in the next few weeks it would be helpful if representatives of SPSCO, Cap Rock Electric and TU Electric could meet to discuss our transmission construction plans and arrange for any coordination that may be necessary, especially as regards any line crossings or terversal of any TU Electric service area.
One additional item which I failed to discussed with you but which we should pursue has to do with the coordination of our construction of the nece.ssary transnis:sion ft:ilities.
As you
: know, cap Rock Elactric
: has, for some
: time, been actively proceeding with transmission improvements and additions with the ultimate goal of integrating our various substations and transmission facilities.
Not only vill we continue with these activities in order to facilitate the SPS contract, but SPS will also be constructing two transmission lines to our area.
Sometime in the next few weeks it would be helpful if representatives of SPSCO, Cap Rock Electric and TU Electric could meet to discuss our transmission construction plans and arrange for any coordination that may be necessary, especially as regards any line crossings or terversal of any TU Electric service area.


b
b]
]
Mr. Darrell Bovalhymor l
l Mr. Darrell Bovalhymor October 23, 1991 Page 3 I               : am looking forvard to working vien you as Cap Rock Electric Please call takes this oig stop in its power supply arrangements.
October 23, 1991 Page 3 I
se if you have any questions or if I can provide any additional infur=ation.
: am looking forvard to working vien you as Cap Rock Electric takes this oig stop in its power supply arrangements.
Sincerely, n                 .
Please call se if you have any questions or if I can provide any additional infur=ation.
                                                                                . ~
Sincerely, n
.t                                                            Stavan E. Collier, P.E.
.t
Director of Power Supply and Regulatory Atf airs SEC:=a cc   David Pruitt I             Marx Sullivan Gary Gibson-SPSCO Don Welch - WTU l,
. ~
Stavan E.
: Collier, P.E.
Director of Power Supply and Regulatory Atf airs SEC:=a cc David Pruitt I
Marx Sullivan Gary Gibson-SPSCO Don Welch - WTU l,
_-______________-_-_-_______-_-_-_____-_________________________________-_a
_-______________-_-_-_______-_-_-_____-_________________________________-_a


          , ; ,, p   ,E     . ji           . 't . tN- . . *                                              * *'      '    '  "
p
E 4
,E
. ji
. 't. tN-E 4
a I
a I
                                                                                                      .=
.=
NELECTP!C Hurt t Bastet. F1                                                                                     Novanter  4, 199i ea,        n, we sn >
NELECTP!C Hurt t Bastet. F1 e a,
Mr. Steven E. Collior Director of pover Supply and Regulatory Af teirs Cap Re % Electrle Cucperative, Inc.
n, we sn >
B140 Burnet Road Auntin, Toxas               70766-106)
Novanter 4,
199i Mr. Steven E.
Collior Director of pover Supply and Regulatory Af teirs Cap Re % Electrle Cucperative, Inc.
B140 Burnet Road Auntin, Toxas 70766-106)
Dear Stevat This is in response to your letter of October 23, 1991, in which you indicated that Cap Rock anti.:ipates cancelling its current contract with TU Electric, dated July 2, 1963, as n.anded, "without having to serve any wholcoale lead toccorarily under the new power supply agroanent."
Dear Stevat This is in response to your letter of October 23, 1991, in which you indicated that Cap Rock anti.:ipates cancelling its current contract with TU Electric, dated July 2, 1963, as n.anded, "without having to serve any wholcoale lead toccorarily under the new power supply agroanent."
kF                :torning.
k we attenpted to reach you by phone on Friday and sgain this F
we attenpted to reach you by phone on Friday and sgain this Af ter moeting with you on october 22 and af ter reviewing your     October         23 letter, va reviewed our power supply agroonontc I                 with Cap Rock in dotail.
:torning.
calls for cap Rock requiror. ento from TU Electric.
Af ter moeting with you on october 22 and af ter reviewing your October 23 letter, va reviewed our power supply agroonontc I
Agreenent executed on June As you are svare, the 1963 agroeecnt to purchase                                       its   full   pouer   and The new cap Rock 2cver Supply anorgy 8,                             1900, itself a full-rcquircrents contract initially, automatically bacones effoetivo for s tern of I                10 years, upon cancellation of the 1963 ful2-roquiremonta contract.
with Cap Rock in dotail.
Under the 1990 agreement, Cap Rock may supply a part of its power and its energy       requirerents from other sourceo or usy purchase all of requirocents elsewhere by complete tornination I                agreement -- in either case, upon threc years' notice during yearn of that one through five and upon five years' notice thereafter.                                                           Upon 2t.
As you are svare, the 1963 agroeecnt calls for cap Rock to purchase its full pouer and anorgy requiror. ento from TU Electric.
nenths' notica during years one through five of the 1990 agreGment, Il               Cap Rock r,ay purchaso up to 30 MW of power and energy frem other                                                                 '
The new cap Rock 2cver Supply Agreenent executed on June 8,
ocurcas at nine specif td points of delivery. All purchasos by Cap Rock of power and enecy from sources other than 'IU Electric are subject to other provisione of the 1990 Power Supply Arpleoment and the negotiation of satisfactory wheeling agreements.
1900, itself a full-rcquircrents I
Wo wish to advios you that TU Electric expects cap Rcck to I                 fully comply with the 1963 and 1990 pcVer supply agroo:tenta. To comply wich thoso agreer.cnts, it will not be possir,le for you to purchase power cloewhere, including Cap Rock's propcsed purchase from West Texas Utilities Company "ao eady as January, 1992,"
contract initially, automatically bacones effoetivo for s tern of 10 years, upon cancellation of the 1963 ful2-roquiremonta contract.
8                                         - - - ----
Under the 1990 agreement, Cap Rock may supply a part of its power and energy requirerents from other sourceo or usy purchase all of I
its requirocents elsewhere by complete tornination of that agreement -- in either case, upon threc years' notice during yearn one through five and upon five years' notice thereafter.
Upon 2t.
nenths' notica during years one through five of the 1990 agreGment, Il Cap Rock r,ay purchaso up to 30 MW of power and energy frem other ocurcas at nine specif td points of delivery. All purchasos by Cap Rock of power and enecy from sources other than 'IU Electric are subject to other provisione of the 1990 Power Supply Arpleoment and the negotiation of satisfactory wheeling agreements.
Wo wish to advios you that TU Electric expects cap Rcck to I
fully comply with the 1963 and 1990 pcVer supply agroo:tenta.
To comply wich thoso agreer.cnts, it will not be possir,le for you to purchase power cloewhere, including Cap Rock's propcsed purchase from West Texas Utilities Company "ao eady as January, 1992,"
8


                                                  ~2-until the cancellation of the 1963 agroenont and ;nly then open expiration of the foregoing notices provided for in the 1393 agroenent and the cenpliance with all other tens of that contract.
~2-until the cancellation of the 1963 agroenont and ;nly then open expiration of the foregoing notices provided for in the 1393 agroenent and the cenpliance with all other tens of that contract.
power Please supply alot gr oua know or.e nt , the cal. cella tion date of Cap Pcek's 1963 cal 1.                             cheuld yea have any Ta u s t i c ns , please
Please lot ua know the cal. cella tion date of Cap Pcek's 1963 power supply a gr o or.e nt,
                                                '!e ry t r u l y 7 ar c ,
cheuld yea have any Ta u s t i c ns, please cal 1.
                                                          ,h]+'kl(H Henry A.       83Jnting HAD/mkm cc:     Carrell Bevolhycer
'!e ry t r u l y 7 ar c,
;3             David Fruitt
,h]+'kl(H Henry A.
:g j
83Jnting HAD/mkm Carrell Bevolhycer cc:
Mark Sullivan Cary Gibnon - SPSCO 2
;3 David Fruitt
Oon 'inlch - '#rU 1
:g Mark Sullivan j
Cary Gibnon - SPSCO Oon 'inlch 2
'#rU 1
lE l
lE l
!I iE lI 1
!I iE lI 1
!B l
!B l


_ _ = _ _ .     ._ -                . . - - .
_ _ = _ _.
JM.17..9.2..F,RI           5 es 14 :ve{ ao w No. 1 51P 41 t619              h@
ve{ ao SifVEN E COL (IER w No. 1 51P 41 t619 h@
SifVEN u N 'rs E COL too   (IER    vru tize, orc,                         gootioot g .. O /
JM.17..9.2..F,RI 14 : 5 u N 'rs too vru tize, orc, gootioot es g.. O /
6 i                                                              __
i 6
WELECTRIC December 19     19 .'
WELECTRIC December 19 19.'
t4ms seweir w pu.a.- q e.n tm aa.m Kr. Davic .oetor West Texas Utilities
t4ms seweir w pu.a.- q e.n tm aa.m Kr. Davic.oetor West Texas Utilities p.
: p. O. Dox 641 1,b ile ne , TX 79604 Coar David:
O.
I have recently received a copy of an inquiry rogaroinq wheeling servicos Cap Rock seeka from other F.RCDT control area I                      utilition       for power supplied to Cap Rock by Vr0 beginning January 1992. I feel that it is important to clearly cor.muninate to you and your managenent that Cap Rock is obligated to acquiro all of 5                       its power and energy from TU Electric under ono of two existing contracts which I have enclosed for your review.
Dox 641 1,b ile ne, TX 79604 Coar David:
I must apologize that with knowledge of the existence of thoco l                        agreer.ents , this obviously puts an extra burden of responsibility on you and your company to avoid any interference with this contracitual relationship.           As I'm sure you vould do in a similar I                       situation, we vill aggressively defend TU Electrie again.it nny damages or losses incurred from any type of interference.
I have recently received a copy of an inquiry rogaroinq I
wheeling servicos Cap Rock seeka from other F.RCDT control area utilition for power supplied to Cap Rock by Vr0 beginning January 1992.
I feel that it is important to clearly cor.muninate to you and your managenent that Cap Rock is obligated to acquiro all of 5
its power and energy from TU Electric under ono of two existing contracts which I have enclosed for your review.
l I must apologize that with knowledge of the existence of thoco agreer.ents, this obviously puts an extra burden of responsibility on you and your company to avoid any interference with this contracitual relationship.
As I'm sure you vould do in a similar I
situation, we vill aggressively defend TU Electrie again.it nny damages or losses incurred from any type of interference.
please font froa to give no a call at any time on t.his issue.
please font froa to give no a call at any time on t.his issue.
c Yours very truly,-
Yours very truly,-
                                                                                        $td     W'   NW I
c
c:       Terry Dennic I
$td W'
NW I
c:
Terry Dennic I
I
I
?8
?8
  -esme   ew         ese   e   e+ w
-esme ew ese e
e+ w


a su re .h. 4.va   a va       w e . w.t . ww w . L.s       6 no av. 6 s e a. %a w4sJ           r. v4 l I
a su re
l                                     WEST TEXAS UTILITIES COVJ%NY CEN(RAL Ofitet PO 60x en / *Bu (NI,13x 4 19f04 i mH 674 7613 I                                                                                 February 18,1992 Dori Wekh vice PreodeN Mr. Steven E. Collier, P.E, Director of Power Supply                                       fEB 201992 l                    and Regulatory Affairs Cup Rock Electric Cooperative, Inc.
.h.
8140 Durnet Road l            Austin, Texas 78766 Re: Cap Rock's Proposed Purchase of Electric Energy from WTU
4.va a va w e. w.t. ww w. L.s 6 no av.
6 s e a.
%a w4sJ
: r. v4 I
l WEST TEXAS UTILITIES COVJ%NY CEN(RAL Ofitet PO 60x en / *Bu (NI,13x 4 19f04 i mH 674 7613 I
February 18,1992 Dori Wekh vice PreodeN Mr. Steven E. Collier, P.E, l
Director of Power Supply fEB 201992 and Regulatory Affairs Cup Rock Electric Cooperative, Inc.
l 8140 Durnet Road Austin, Texas 78766 Re: Cap Rock's Proposed Purchase of Electric Energy from WTU


==Dear Steven:==
==Dear Steven:==
 
8 in response to your letters of January 2, 6, and 10,1992, please be assured that WTU stands ready, willing, and able to begin selling nloctric onorgy to l
8             in response to your letters of January 2, 6, and 10,1992, please be assured that WTU stands ready, willing, and able to begin selling nloctric onorgy to Cap Rock. As you know, however, unless and until Cap Rock has validly l            terminated its relationship with TU Eloetric and has fulalled all of its l                 contractual obilgacions to TU Electric and TU Electric has agrood to the necessary v hooling and scheduling agreements, on terms acceptable to WTU, WTU cannot finalize any agreement to soll electricity to Cap Rock.
Cap Rock. As you know, however, unless and until Cap Rock has validly terminated its relationship with TU Eloetric and has fulalled all of its l
'l
contractual obilgacions to TU Electric and TU Electric has agrood to the necessary v hooling and scheduling agreements, on terms acceptable to WTU, WTU cannot finalize any agreement to soll electricity to Cap Rock.
  ,              WTU's negotiations with Cap Rock, which have not resulted in a centract between WTU and Cap Rock, have proceeded based upon the promiso that Cap Rock had the intention and the legal right to terminato its relationship with il               TU Electric while obtaining TU Electric's cooperation in the wheeling and transmission of electric energy. Whilo WTU has expressed its willingness to sell electricity to Cap Rock once Cap Pock's relationship with TU Electric has I
'l WTU's negotiations with Cap Rock, which have not resulted in a centract between WTU and Cap Rock, have proceeded based upon the promiso that Cap Rock had the intention and the legal right to terminato its relationship with il TU Electric while obtaining TU Electric's cooperation in the wheeling and transmission of electric energy. Whilo WTU has expressed its willingness to sell electricity to Cap Rock once Cap Pock's relationship with TU Electric has I
* ended, WTU has avoided and must continuo to avoid any activities that would Interfore with the relationship between Cap Rock and TU Electric. WTU is interested in establishing a relationship with Cap Rock, but WTU has not and
ended, WTU has avoided and must continuo to avoid any activities that would Interfore with the relationship between Cap Rock and TU Electric. WTU is interested in establishing a relationship with Cap Rock, but WTU has not and
'I               cannot provide any assistance or support to Cap Rock in connection with Cap Rock's termination ofits relationahlp with TU Electile.
'I cannot provide any assistance or support to Cap Rock in connection with Cap Rock's termination ofits relationahlp with TU Electile.
h             We hope that Cap Rock will be able to proceed with the establishment of a relationship between WTU and Cap Rock. Please let us know when Cap Rock has obtained TU Electric's ec .peration in this proposed venture.
h We hope that Cap Rock will be able to proceed with the establishment of a relationship between WTU and Cap Rock. Please let us know when Cap Rock has obtained TU Electric's ec.peration in this proposed venture.
Yours very truly i               e DW/plw B                             A MEMBER OF THE CENTRAL AND SOUTH wf 5T SYSTfM
Yours very truly i
                                    .$, o b$         ~    "*
e DW/plw B
                                                                  ?.Ne , N$ n'!
A MEMBER OF THE CENTRAL AND SOUTH wf 5T SYSTfM
                                                                                            $$netoN,
$$a$n cNsYro'.$
            $$a$n cNsYro'.$
.$, o b$
?.Ne, N$ n'!
$$netoN,
~


X ",
X ",
I                                               /
I
NO. b l                                                                               9$$cm l      CAP ROCK ELECITUC COOPERATIVE, INC.,
/
I i
NO. b l
IN TIIE DISUUCr COUIh               /2P Plaintiff,                         6 I           '
9$$cm CAP ROCK ELECITUC I
5 l     vs.                                         I     OF SilDLAND, COUNTY I
IN TIIE DISUUCr COUIh /2P l
I                                                   I I               '
COOPERATIVE, INC.,
l TEXAS UTILnTES ELECDUC                       6 l     CO3fPANY                                     l   .,<
i Plaintiff, 6
Defendant.                           I//           JUDICIAL DISTRICT PLAINTIFPS ORIGINAL PINITION TO THE HONORABLE JUDGE OF THIS COURT:
I 5
Cep Rock Electric Cooperative, Inc., (Cap Rock) complains of Texas Utilities Electric Company (TUEC) as follows:                                                         l L Pnrties and Venue Cap Rock is an electric cooperative corporation, incorporated under the Texas Electrie Cooperative Corporation Act, Tex, Rev. Civ. Stat. Ann, art. 1528b.       Its headquarters is in Stanton, Martin County, Texas.
l vs.
I OF SilDLAND, COUNTY I
I I
I l
TEXAS UTILnTES ELECDUC 6
l CO3fPANY l
Defendant.
I//
JUDICIAL DISTRICT PLAINTIFPS ORIGINAL PINITION TO THE HONORABLE JUDGE OF THIS COURT:
Cep Rock Electric Cooperative, Inc., (Cap Rock) complains of Texas Utilities Electric Company (TUEC) as follows:
l L Pnrties and Venue Cap Rock is an electric cooperative corporation, incorporated under the Texas Electrie Cooperative Corporation Act, Tex, Rev. Civ. Stat. Ann, art. 1528b.
Its headquarters is in Stanton, Martin County, Texas.
I I
I I
I                                                             --            -
I


    .I           .
.I TUEC is a Texas Corporation. It has a divisior ' ofUce in 511dland. Texu, located in hildland County.
TUEC is a Texas Corporation. It has a divisior ' ofUce in 511dland. Texu, located in hildland County.
I
I l
, TUEC's registered agent for service is $1r. Peter B. Tinkham, at 2001 Bryan I
I                          , TUEC's registered agent for service is $1r. Peter B. Tinkham, at 2001 Bryan Tower, Suite 1900, Dallas, Texas,75201.
1 Tower, Suite 1900, Dallas, Texas,75201.
1 l
I Venue is proper in hiidland County under Texas Chril Practice & Remedies Code
I                             Venue is proper in hiidland County under Texas Chril Practice & Remedies Code
:I Sec.15.036.
:I                   Sec.15.036.
I H. Factual Backamund I
I                                                             H. Factual Backamund I
Cap Rock is an electne distribution cooperative. Cap Rock currently owns no electric generating facilities. It buys electncity at wholesale and resells the electricity to itt end use, member customers. Cap Rock serves over 20,710 meters. Its service area covers 10,000 square miles in all or parts of Andrews, Borden, Dawson, Ector, Fisher, Glasscock, Howard, Irion, Startin, Slidland, hiltchell, Nolan, Reagan, Scurry, Upton, Sterling and Tom Green counties. As a cooperative corporation, Cap Rock is owned by its consumer members. Any profit made oy the cooperative ultimately is either invested in the cooperative or returned as cash or lower rates to its consumer members. Cap Rock's annual electric revenues are about $35 millivn. Over 70 per cent of these revenues goe. to pay its wholesale power supplier. Cap Rock's net plant investment is about $75 million.
Cap Rock is an electne distribution cooperative. Cap Rock currently owns no                                 ,
I TUEC is the fifth largest electrie utility company in the United States, it is a wholly owned subsidiary of Texas Utilities. TUEC, by any means of measurement, is by far and away the largest electric utility in Texas. TUEC serves a vast portion of Texas. Its service area covers 87 counties ranging from Tyler on the east, to Vah llorn on the west, Oklahoma on the north and Austin on the south. TUEC serves over 5.2 million custerners, Cao Rock Electre Cooperatrve. Inc. vs. Texas utsttes Electre Comoany. inc.
electric generating facilities. It buys electncity at wholesale and resells the electricity to itt end use, member customers. Cap Rock serves over 20,710 meters. Its service area covers 10,000 square miles in all or parts of Andrews, Borden, Dawson, Ector, Fisher, Glasscock, Howard, Irion, Startin, Slidland, hiltchell, Nolan, Reagan, Scurry, Upton, Sterling and Tom Green counties. As a cooperative corporation, Cap Rock is owned by its consumer members. Any profit made oy the cooperative ultimately is either invested in the cooperative or returned as cash or lower rates to its consumer members. Cap Rock's annual electric revenues are about $35 millivn. Over 70 per cent of these revenues goe. to pay its wholesale power supplier. Cap Rock's net plant investment is about $75 million.
I                           TUEC is the fifth largest electrie utility company in the United States, it is a wholly owned subsidiary of Texas Utilities. TUEC, by any means of measurement, is by far and away the largest electric utility in Texas. TUEC serves a vast portion of Texas. Its service area covers 87 counties ranging from Tyler on the east, to Vah llorn on the west, Oklahoma on the north and Austin on the south. TUEC serves over 5.2 million custerners, Cao Rock Electre Cooperatrve . Inc. vs. Texas utsttes Electre Comoany. inc.
Pisumere ortgM Pettuan Pago 2
Pisumere ortgM Pettuan Pago 2
                  -                                                                                                                    ~
~


I' '
I' another utility builds transmission lines into Cap Rock's service area, any new power supplier for Cap Rock initially must wheel over TUEC's system.
another utility builds transmission lines into Cap Rock's service area, any new power supplier for Cap Rock initially must wheel over TUEC's system.
, TUEC's costs of constructing and operating Comanche Peak have increased TUEC's costs, including rates TUEC charges Cap Rock. Any future increase in TUEC's rates hkewise will increase the cost of power for Cap Rock and its retail customers. To keep its rates low and to remain competitive,in the late 1980s Cap Rock began to seek other sources of wholesale electricity. Cap Rock found short term sources of power other than TUEC at a cost lower than TUEC's rates. One such source was a ecgeneration pro,iect. Cap Rock was unable to complete the arrangement with the cogenerator due to TUEC's unwillingness to oiTer stand by power and scheduling services. Another source was the purchase of " economy energy
                                  , TUEC's costs of constructing and operating Comanche Peak have increased TUEC's costs, including rates TUEC charges Cap Rock. Any future increase in TUEC's rates hkewise will increase the cost of power for Cap Rock and its retail customers. To keep its rates low and to remain competitive,in the late 1980s Cap Rock began to seek other sources of wholesale electricity. Cap Rock found short term sources of power other than TUEC at a cost lower than TUEC's rates. One such source was a ecgeneration pro,iect. Cap Rock was unable to complete the arrangement with the cogenerator due to TUEC's unwillingness to oiTer stand by power and scheduling services. Another source was the purchase of " economy energy
* from Houston Lighting & Power Co. Cap Rock requested I
* from Houston Lighting & Power Co. Cap Rock requested I                 that TUEC wheel this economy energy under similar terms and conditions that TUEC was wheeling economy energy for other TUEC customers. TUEC refused to wheel. thereby denying Cap Rock's customers lower cost electricity.
that TUEC wheel this economy energy under similar terms and conditions that TUEC was wheeling economy energy for other TUEC customers. TUEC refused to wheel. thereby denying Cap Rock's customers lower cost electricity.
I Because of TUEC's failure to wheel and because of TUEC's ,6crimination, Cap I                 Rock started two separate actions at the NRC. The Grst was in 1988. Cap Rock Gled comments with the NRC concerning whether there had been signincant changes in TUEC's activities that would warrant a new antitrust review. The NRC declined to and a change in conditions under Cap Rock's 1988 Oling Cap Rock appealed this decision to the U.S. Court of Appeata in Washington, D.C. Second, in 1989, Cap Rock requested an order from the NRC enforcing and modifying TUEC's nuclear license antitrust conditions.
I Because of TUEC's failure to wheel and because of TUEC's,6crimination, Cap I
Rock started two separate actions at the NRC. The Grst was in 1988. Cap Rock Gled comments with the NRC concerning whether there had been signincant changes in TUEC's activities that would warrant a new antitrust review. The NRC declined to and a change in conditions under Cap Rock's 1988 Oling Cap Rock appealed this decision to the U.S. Court of Appeata in Washington, D.C. Second, in 1989, Cap Rock requested an order from the NRC enforcing and modifying TUEC's nuclear license antitrust conditions.
While these uctions were pending, Cap Rock and TUEC negotiated a resolution of the disputes in 1190. The settlement allows Cap Rock to get a new power supplier. Italso allows Cap Rock to determine, what, if any, services Cap Rock would purchase from TUEC.
While these uctions were pending, Cap Rock and TUEC negotiated a resolution of the disputes in 1190. The settlement allows Cap Rock to get a new power supplier. Italso allows Cap Rock to determine, what, if any, services Cap Rock would purchase from TUEC.
Cap Rock Electre Cooperstrve , Inc. vs. Tenas UtMties Electre Comoany inc.
Cap Rock Electre Cooperstrve, Inc. vs. Tenas UtMties Electre Comoany inc.
Pian,ters oryne Pesm Pop 4 I     -
Pian,ters oryne Pesm Pop 4 I


e                                       .
e L
L
[
[                                                                                             Cap Rock and TUEC signed a document entitled " Power Supply Agreement Between Texas 1ltilities Electne Company and Cap Rock Electne Cooperative, Inc., dated as of kne 3,1990* tthe 1990 Document). A copy is attached to this Petition av Ethibit "A" I                                                                                     and incorporated hereir.. The 1990 Document purports to govern the relationship between Cap Rock and TUEC while Cap Rock gained access to other power suppliers. In fact, the 1990 Document is a menu of semees that TUEC is to offer Cap Rock. The terms and conditions for the menu remain open. For example:
Cap Rock and TUEC signed a document entitled " Power Supply Agreement Between Texas 1ltilities Electne Company and Cap Rock Electne Cooperative, Inc., dated as of kne 3,1990* tthe 1990 Document). A copy is attached to this Petition av Ethibit "A" I
I                                                                                             1. The 1990 Document allows Cap Rock to buy eleetneity at certain " Points of Delivery
and incorporated hereir.. The 1990 Document purports to govern the relationship between Cap Rock and TUEC while Cap Rock gained access to other power suppliers. In fact, the 1990 Document is a menu of semees that TUEC is to offer Cap Rock. The terms and conditions for the menu remain open. For example:
* with TUEC " existing on the effective date hereof, each of which , oints of Delivery shall be specified on Exhibit A hereto. . ." Exhibit "A" also required the listing of the amount of
I 1.
The 1990 Document allows Cap Rock to buy eleetneity at certain " Points of Delivery
* with TUEC " existing on the effective date hereof, each of which, oints of Delivery shall be specified on Exhibit A hereto..." Exhibit "A" also required the listing of the amount of
* Contract Demand"; that is, the amount of power and energy to be bought.
* Contract Demand"; that is, the amount of power and energy to be bought.
Exhibit "A" of the 1990 Document states: *!nformatiou to be Speci6ed on the Effective date of this Arreement." Exhihit 'A' remains blank and to be negotiated. Without further negotistion and agreement, there is no way of knowing what, if any, are the Points of Deliven nor what is the " Contract Demand,"
Exhibit "A" of the 1990 Document states: *!nformatiou to be Speci6ed on the Effective date of this Arreement." Exhihit 'A' remains blank and to be negotiated. Without further negotistion and agreement, there is no way of knowing what, if any, are the Points of Deliven nor what is the " Contract Demand,"
: 2. The 1990 Document allows for Cap Rock to have other
: 2. The 1990 Document allows for Cap Rock to have other
* Power Supply Resources" for electricity. These resources "shall be identified on Exhibit 'B'' of the 1990 Document.
* Power Supply Resources" for electricity. These resources "shall be identified on Exhibit 'B'' of the 1990 Document.
Section 2.03. Exhibit "B" of the si;;ned 1990 Document states:"To be speci6ed pursuant to Section 2.03 of this Agreement." Exhibit "B" is blank and remains to be negotiated.
Section 2.03.
Exhibit "B" of the si;;ned 1990 Document states:"To be speci6ed pursuant to Section 2.03 of this Agreement." Exhibit "B" is blank and remains to be negotiated.
Without further negotiation and agreement, there is no way of knowing which third party power sources are covered by the 1990 Documert.
Without further negotiation and agreement, there is no way of knowing which third party power sources are covered by the 1990 Documert.
: 3. Cap Rock is to develop "a mutually acceptable curtailment plan" at least ux months prior to Cap Rock taking power froin a firm power resource via TUEC's scheduling Cao Rock Electre Cooperatrve , Inc. vs Tuas Ut* ties E!ectre Comoany. Inc.
: 3. Cap Rock is to develop "a mutually acceptable curtailment plan" at least ux months prior to Cap Rock taking power froin a firm power resource via TUEC's scheduling Cao Rock Electre Cooperatrve, Inc. vs Tuas Ut* ties E!ectre Comoany. Inc.
Pw.rt : Ogrud Penen Page i
Pw.rt : Ogrud Penen Page i


as provided in the 1990 Document. Section 4.03. This curtailment plan will then become Exhibit "D" ta the 1990 Document. Exhibit "D" is blank.
as provided in the 1990 Document. Section 4.03. This curtailment plan will then become Exhibit "D" ta the 1990 Document. Exhibit "D" is blank.
I
I
                , 4. TUEC is to provide to Cap Rock regulation power and energy " pursuant to a mutually acceptaole regulation serv ces agreement.' Section 6.01 (a).                 This agreement remains to be negotiated.
, 4. TUEC is to provide to Cap Rock regulation power and energy " pursuant to a mutually acceptaole regulation serv ces agreement.' Section 6.01 (a).
I               5. TUEC is to provide on a transaction specine basis wheeling services to Cap Rock
This agreement remains to be negotiated.
I
: 5. TUEC is to provide on a transaction specine basis wheeling services to Cap Rock
* pursuant to a mutually acceptable wheeling apeement(s)." Section 7.0L Cap Rock has requested a draft agreement and TUEC be refused to provide one. This agreement remains to be negotiated.
* pursuant to a mutually acceptable wheeling apeement(s)." Section 7.0L Cap Rock has requested a draft agreement and TUEC be refused to provide one. This agreement remains to be negotiated.
W               6. When Cap Rock becomes a " control aren", TUEC is to provide Orm wheeling services "for a term and in accordance with mutually acceptable interconnection and transmission wheeling agreement (s)." Section 7.02(a).               This agreement remains to be negotiated.
W
I               After signing the 1990 Document and consistent with Cap Rock's understanding of the document, Cap Rock sc.ght alternate power suppliers. As a result ofits search, Cap Rock entered into a contract with West Texas Utilities (WTU). Under the WTU contract, Cap Rock will buy its full requirements for electricity for its entire system from WTU.
: 6. When Cap Rock becomes a " control aren", TUEC is to provide Orm wheeling services "for a term and in accordance with mutually acceptable interconnection and transmission wheeling agreement (s)." Section 7.02(a).
This agreement remains to be negotiated.
I After signing the 1990 Document and consistent with Cap Rock's understanding of the document, Cap Rock sc.ght alternate power suppliers. As a result ofits search, Cap Rock entered into a contract with West Texas Utilities (WTU). Under the WTU contract, Cap Rock will buy its full requirements for electricity for its entire system from WTU.
Cap Rock will save about 20 per cent by buying the electricity from WTU. The savings averages about $2bO,000 per month. Cap Rock's end use erstomers will receive these savings immediately after Cap Rock begins buying WTU electncity. The WTU purchase will begin on 12:01 a.m. February 1,1992.
Cap Rock will save about 20 per cent by buying the electricity from WTU. The savings averages about $2bO,000 per month. Cap Rock's end use erstomers will receive these savings immediately after Cap Rock begins buying WTU electncity. The WTU purchase will begin on 12:01 a.m. February 1,1992.
I I                                 Cap Rock Electre Cooperstrve , Inc. vs. Tomas LMrties Electre comoany. Inc.
I I
Cap Rock Electre Cooperstrve, Inc. vs. Tomas LMrties Electre comoany. Inc.
Phraff 3 (MgrW Pettuun Pagt i I
Phraff 3 (MgrW Pettuun Pagt i I


l Cap Rock has timely told TUEC that Cap Rock will and the 19o3 Contract as of 12.01 a.m., February 1.1992.
l Cap Rock has timely told TUEC that Cap Rock will and the 19o3 Contract as of 12.01 a.m., February 1.1992.
I
I
                , TUEC electrically surrounds Cap Rock. At present, any electncity from a utihty other than TUEC must Oow on TUEC's transminion lines connected to Cap Rock's substations.
, TUEC electrically surrounds Cap Rock. At present, any electncity from a utihty other than TUEC must Oow on TUEC's transminion lines connected to Cap Rock's substations.
Electncity must be used at the instant it is generated. It can not be stored. TUEC's cooperation is essential for the WTU purchase since TUEC can physically prevens WTU's electneity from reaching Cap Rock. TUEC must reduce its generation to the same degree and at the same instant that WTU increases its generation to meet Cap Rock's requirements. Otherwise, WTU cannot cause electricity to be delivered to Cap Rock and that incremental electricity will be disbursed throughout the other electric systems in Texas.
Electncity must be used at the instant it is generated. It can not be stored. TUEC's cooperation is essential for the WTU purchase since TUEC can physically prevens WTU's electneity from reaching Cap Rock. TUEC must reduce its generation to the same degree and at the same instant that WTU increases its generation to meet Cap Rock's requirements. Otherwise, WTU cannot cause electricity to be delivered to Cap Rock and that incremental electricity will be disbursed throughout the other electric systems in Texas.
I TUEC has informed Cap Rock that TUEC expects to continue as Cap Rock's full requirernents supplier aRer the termination date of the 1963 Contract. TUEC has refused to negotiate as to the content of Exhibits "A" and "B" as well as the other agreements contemplated in the 1990 Document. TUEC has refused to cooperate in providing metenng and telemetry for third party suppliers, and other normal control area procedures to allow the tranuetion to occur. TUEC also has stated it will not back down its generation to allow WTU to Atrnish electricity to Cap Rock.
I TUEC has informed Cap Rock that TUEC expects to continue as Cap Rock's full requirernents supplier aRer the termination date of the 1963 Contract. TUEC has refused to negotiate as to the content of Exhibits "A" and "B" as well as the other agreements contemplated in the 1990 Document. TUEC has refused to cooperate in providing metenng and telemetry for third party suppliers, and other normal control area procedures to allow the tranuetion to occur. TUEC also has stated it will not back down its generation to allow WTU to Atrnish electricity to Cap Rock.
I lI 1                                                 Cap Rock Electre Cooperatra inc. vs. Texas Utat>*s Electre Comoany. inc.
I lI 1
Pwmars OW Pomm Page 7 I                                                                   _                    .                    _
Cap Rock Electre Cooperatra inc. vs. Texas Utat>*s Electre Comoany. inc.
Pwmars OW Pomm Page 7 I


i ,
i IIL Request fur Declaratory Judstnent Fhwt enuw of Actinn Under the Uniform Declaratory Judgments Au (Declaratory Judgments Act;.
IIL Request fur Declaratory Judstnent Fhwt enuw of Actinn Under the Uniform Declaratory Judgments Au (Declaratory Judgments Act;.
Chapter 37 of the Texas Civil Practice and Remedies Code, Cap Rock requests that the eeurt Gnd the 1990 dticument is not enforceable not binding since essential condition precedents required to make the document complete have not been negotiated and executed The execution of Exhibits "A" and *B* are essenual to the formation of a complete and binding agreement between Cap Rock and TUEC. The 1990 Document is incomplete we.hout these exhibits. There is no way to determine the Points of Deaivery and the Contract Demand within the four corners of the document without completed Exhibits *A" and 'B.*
Chapter 37 of the Texas Civil Practice and Remedies Code, Cap Rock requests that the eeurt Gnd the 1990 dticument is not enforceable not binding since essential condition precedents required to make the document complete have not been negotiated and executed The execution of Exhibits "A" and *B* are essenual to the formation of a complete and binding agreement between Cap Rock and TUEC. The 1990 Document is incomplete we.hout these exhibits. There is no way to determine the Points of Deaivery and the Contract Demand within the four corners of the document without completed Exhibits *A" and 'B.*
Since the exhibits remain to be negotiated and executed, there is no binding or enforceable contract.
Since the exhibits remain to be negotiated and executed, there is no binding or enforceable contract.
I                 Therefore, Cap Rock requests an order from this court Onding the 1990 Document is neither binding nor enforceable.
I Therefore, Cap Rock requests an order from this court Onding the 1990 Document is neither binding nor enforceable.
I                                                 Semnd Caume of Action in the alternative, without waiving the above, but .nsisting on the same, Cap Rock requests under the Declaratory Judgments Act that the 1990 Document is not a valid or binding contract. On its face, the 1990 Document is illusory. It lacks the necessary and essential terms and conditions required for its enforcement.
I Semnd Caume of Action in the alternative, without waiving the above, but.nsisting on the same, Cap Rock requests under the Declaratory Judgments Act that the 1990 Document is not a valid or binding contract. On its face, the 1990 Document is illusory. It lacks the necessary and essential terms and conditions required for its enforcement.
I The facts stated above show, at best, the 1990 Document is an " agreement to agree" in the future on a serits of material issues. Such agreements are neither binding nor enforceable in Texas. Therefore, Cap Rock requests an order from this court finding the I                                         can _ _ _ .t~.. m e..                                                                 -.a,=g,
I The facts stated above show, at best, the 1990 Document is an " agreement to agree" in the future on a serits of material issues. Such agreements are neither binding nor enforceable in Texas. Therefore, Cap Rock requests an order from this court finding the I
can _ _ _.t~.. m e.. -. a, = g,


                                                                        . _ _ - -        _ -              ~     . . -
~
1990 Document is neither a binding contract nor does it have any force and etTect between l       Cap Rock and TUEC.
1990 Document is neither a binding contract nor does it have any force and etTect between l
Thini Cniiw of Actinn i               in the alternative, without waiving the above, but insisting on the same, Cap Rock requests under the Declarstory Judgments Act that the court find the 1990 Document n not                       ,
Cap Rock and TUEC.
enforceable since it vtolates the Statute of Frauds.
Thini Cniiw of Actinn i
I rotuh Cnitw of Action I             In the alternative, without waiving the above, but insisting on the same, Cap Rock requests under the Declaratory Judgments Act that the court find the 1990 Document not to be a binding contract. There was no meeting of the minds of the parties to the essential terms of the document.
in the alternative, without waiving the above, but insisting on the same, Cap Rock requests under the Declarstory Judgments Act that the court find the 1990 Document n not enforceable since it vtolates the Statute of Frauds.
I             As explained above, the 1990 Document Exhibits "A" and "B" are to be specified on the effective date, Cap Rock informed TUEC that for Exhibit "A," Cap Rock will spec >if no Points of Delivery and will only require wheeling services from TUEC. The purchase Contract Demand will be zero. TUEC's interpretation is that all of the Points of Delivery under the 1963 Contract shall be incorporated onto Exhibit "A" an of the effective date. This is contrary to the 1990 Document itself which in Section 10.02 that states the 1963 Contract will
I rotuh Cnitw of Action I
        " continue until terminated in accordance with their respective terms, at which time said agreen ents shall have no force or effect whatsoever." TUEC's interpretation would make the contract a full requirements contract. The ability of Cap Rock to specify the Points of l     Delivery, if any, on Exhibit "A" is a material term and condition of the 1990 Document.
In the alternative, without waiving the above, but insisting on the same, Cap Rock requests under the Declaratory Judgments Act that the court find the 1990 Document not to be a binding contract. There was no meeting of the minds of the parties to the essential terms of the document.
I As explained above, the 1990 Document Exhibits "A" and "B" are to be specified on the effective date, Cap Rock informed TUEC that for Exhibit "A," Cap Rock will spec >if no Points of Delivery and will only require wheeling services from TUEC. The purchase Contract Demand will be zero. TUEC's interpretation is that all of the Points of Delivery under the 1963 Contract shall be incorporated onto Exhibit "A" an of the effective date. This is contrary to the 1990 Document itself which in Section 10.02 that states the 1963 Contract will
" continue until terminated in accordance with their respective terms, at which time said agreen ents shall have no force or effect whatsoever." TUEC's interpretation would make the contract a full requirements contract. The ability of Cap Rock to specify the Points of l
Delivery, if any, on Exhibit "A" is a material term and condition of the 1990 Document.
Without this option, Cap Rock would not have signed the 1990 Document.
Without this option, Cap Rock would not have signed the 1990 Document.
I                               Cao Rock Electre Cooperatrve , Inc. vs. Texas utmos Electre comoany. Inc.
I Cao Rock Electre Cooperatrve, Inc. vs. Texas utmos Electre comoany. Inc.
PWraffs 0,1 gem PetMen Page 9 I
PWraffs 0,1 gem PetMen Page 9 I


                                                                                              ~
~
I             There is no meeting of the minds on this and other material and essential matters f the 1990 Document, it cannot be a binding contract. Cap Rock requests the Court to enter an order Onding the 1990 Documerit not to be a contract because of the failure to reach agreement on materlak matters.
I There is no meeting of the minds on this and other material and essential matters f the 1990 Document, it cannot be a binding contract. Cap Rock requests the Court to enter an order Onding the 1990 Documerit not to be a contract because of the failure to reach agreement on materlak matters.
I Fifth Cayr of Acdnn In the alternative, without waiving the above, but insisting on the snme. Cap Rock requests under the Declaratory Judgments Act, that if the court Ands the 1990 Document to be a binding contract, that the court declare it not to be a full requirements contract.
I Fifth Cayr of Acdnn In the alternative, without waiving the above, but insisting on the snme. Cap Rock requests under the Declaratory Judgments Act, that if the court Ands the 1990 Document to be a binding contract, that the court declare it not to be a full requirements contract.
I As explained above, TUEC has taken the position that the 1990 Document is a full reqmrements contract. Cap Rock believes the 1990 Document allows Cap Rock to specify the number,if any, of the Points of Delivery and the amount,if any, of Contract Demand.
I As explained above, TUEC has taken the position that the 1990 Document is a full reqmrements contract. Cap Rock believes the 1990 Document allows Cap Rock to specify the number,if any, of the Points of Delivery and the amount,if any, of Contract Demand.
I             Cap Rock requests the Court to enter an order Onding that if the 1996 Document is a binding contract, that Cap Rock can enter any, or none, of its Delivery Points on Exhibit l
I Cap Rock requests the Court to enter an order Onding that if the 1996 Document is a l
      "A" and can enter another resource to meet all of Cap Rock's needs on Exhibit "B."
binding contract, that Cap Rock can enter any, or none, of its Delivery Points on Exhibit "A" and can enter another resource to meet all of Cap Rock's needs on Exhibit "B."
I I
I I
I I
I I
I                               :.n.- -..~...:mi m ;a, I -
I
:.n.- -..~...:mi m ;a, I


s ,
s IV. Raquest forTemporary Restmining Onler Tempomry and Permanent injunction Cap Rock has timely notified TUEC of Cap Rock's intent to terminate the 1963 Contract. Cap Rock informed TUEC of Cap Rock's intent to take all of its electric I
IV. Raquest forTemporary Restmining Onler Tempomry and Permanent injunction Cap Rock has timely notified TUEC of Cap Rock's intent to terminate the 1963 Contract. Cap Rock informed TUEC of Cap Rock's intent to take all of its electric I                 reqturements from WTU at the end of the 1963 Contract. TUEC told Cap Rock that TUEC will not provide metenng and telemetry points, will not provide normal control area services, will not reduce its generation to allow WTU to increase to serve Cap Rock and will not allow WTU to wheel its eleetncity over TUEC's transmission lines.
reqturements from WTU at the end of the 1963 Contract. TUEC told Cap Rock that TUEC will not provide metenng and telemetry points, will not provide normal control area services, will not reduce its generation to allow WTU to increase to serve Cap Rock and will not allow WTU to wheel its eleetncity over TUEC's transmission lines.
TUEC's refusal to back down its generation and to prohibit wheeling violates the last peaceable status quo..the termination of the 1963 Contract. TUEC's action will cause irreparable harm to Cap Rock and its end use customvis. Cap Rock, and, in turn, its member customers, will pay more for electricity than what it would pay if WTU provides the electiicity. Cap Rock also faces the possibility that the Public Utility Commission of Texas will disallow the pass through to Cap Rock's customers of TUEC's excessive cost of power. This excessive TUEC power cost places .'ap Rock at a disadvantage to compete for customers in the dually certified areas. It also places Cap Rock at a disadvantage to attract new customers to its service area. Cap Rock has no adequate remedy at law. The damages are continuing and incalculable.
TUEC's refusal to back down its generation and to prohibit wheeling violates the last peaceable status quo..the termination of the 1963 Contract. TUEC's action will cause irreparable harm to Cap Rock and its end use customvis. Cap Rock, and, in turn, its member customers, will pay more for electricity than what it would pay if WTU provides the electiicity. Cap Rock also faces the possibility that the Public Utility Commission of Texas will disallow the pass through to Cap Rock's customers of TUEC's excessive cost of power. This excessive TUEC power cost places.'ap Rock at a disadvantage to compete for customers in the dually certified areas. It also places Cap Rock at a disadvantage to attract new customers to its service area. Cap Rock has no adequate remedy at law. The damages are continuing and incalculable.
I Cap Ruk requests the court to gratit Cap Rock a temporary rotraining order without notice to TUEC. The crder (i) would restrain TUEC, its agents, servants and l g u                   employees, from directly or indirectly interfering with the contract between WTU and Cap Rock,(ii) would require TUEC to reduce its generation to allow WTU to provide electricity to Cap Rock and (iii) would require TUEC to wheel WTU's electricity to Cap Rock. - Cap l                   Rock shall,in turn, pay TUEC a proper wheeling fee.
I Cap Ruk requests the court to gratit Cap Rock a temporary rotraining order without notice to TUEC. The crder (i) would restrain TUEC, its agents, servants and g
\i                                             Cap Rock EIectre Cooperatwo , he. vs. Tenas Utilities Electre Company. (*:.
l u
PWnef t Orrgrad Petun Pope ti LI
employees, from directly or indirectly interfering with the contract between WTU and Cap Rock,(ii) would require TUEC to reduce its generation to allow WTU to provide electricity to Cap Rock and (iii) would require TUEC to wheel WTU's electricity to Cap Rock. - Cap l
        - . . , - .-    ,    _.        c
Rock shall,in turn, pay TUEC a proper wheeling fee.
\\i Cap Rock EIectre Cooperatwo, he. vs. Tenas Utilities Electre Company. (*:.
PWnef t Orrgrad Petun Pope ti LI c
.. 2


e     ,
e Upon hearing, Cap Rock requests the court to enter an order making the temporary restraining order and injunction permanent.
Upon hearing, Cap Rock requests the court to enter an order making the temporary restraining order and injunction permanent.
V.1%yer for Relief Cap Rock requests that TUEC be cited to appear and answer and aner final heanng the court enter s.n order:
V.1%yer for Relief
.                          Cap Rock requests that TUEC be cited to appear and answer and aner final heanng the court enter s.n order:
: 1. Finding that essential conditions precedent to the 1990 Document havr at been met and that there in no binding contract.
: 1. Finding that essential conditions precedent to the 1990 Document havr at been met and that there in no binding contract.
: 2. In the alternative, finding that the 1990 Document is illusory and not a binding I           rentract and is of no force and effect on either Cap Rock or TUEC.
: 2. In the alternative, finding that the 1990 Document is illusory and not a binding I
rentract and is of no force and effect on either Cap Rock or TUEC.
: 3. In the alternative, finding that the 1990 Document is not enforceable since it violates the Statute of Frauds.
: 3. In the alternative, finding that the 1990 Document is not enforceable since it violates the Statute of Frauds.
: 4. In the alternative, Onding that the 1990 Document fails to set forth sufficient matenal and essential tenns and conditions and that the 1990 Document is not a binding contract and is of no force and effect on eith.or Cap Rock or TUEC.
: 4. In the alternative, Onding that the 1990 Document fails to set forth sufficient matenal and essential tenns and conditions and that the 1990 Document is not a binding contract and is of no force and effect on eith.or Cap Rock or TUEC.
: 5. In the alternative, nnding that if the 1990 Document is a binding contract, that Cap Rock can enter any number, including none, as the Delivery Points on Exhibit "A' and can enter WTU as another resource to meet all of Cap Rock's electric requirements on Exhibit "B".
: 5. In the alternative, nnding that if the 1990 Document is a binding contract, that Cap Rock can enter any number, including none, as the Delivery Points on Exhibit "A' and can enter WTU as another resource to meet all of Cap Rock's electric requirements on Exhibit "B".
I Cap Rock further tcquests this court to anter an order granting Cap Rock's request for temporsry restraining order, temporary injunction and permanent injunction to prevent TUEC from taking any actica to interfere or prevent Cap Rock from receiving electricity from WTU, Cap Rock further requests this court grant such other and further relief to which Cap Rock shows itself entitled to receive either at law or in equity.
I Cap Rock further tcquests this court to anter an order granting Cap Rock's request for temporsry restraining order, temporary injunction and permanent injunction to prevent TUEC from taking any actica to interfere or prevent Cap Rock from receiving electricity from WTU, Cap Rock further requests this court grant such other and further relief to which Cap Rock shows itself entitled to receive either at law or in equity.
I                                       Cap Rocx Electre Cooperatrve , Inc. vs. Texas Utdmes Electre Company. Inc.
I Cap Rocx Electre Cooperatrve, Inc. vs. Texas Utdmes Electre Company. Inc.
Ptsersef's orieust Pettum Page 12 I                                             _
Ptsersef's orieust Pettum Page 12 I


. g-pedully submitted, I                                             ,.    /
g-pedully submitted, I
m '-
m '-
                    ' vfA6K+_t'J__8J.4cc.' \ ;
/
                                                                      ~
' vfA6K+_t'J__8J.4cc.' \\ ;
Richard C. Balough                                   !
Richard C. Balough
163 West Sixth Street                               j A'ustin, Texas 78703                               '
~
I                                                                       //
163 West Sixth Street j
(512)477 7896 Fax:($12) 477 8657                       V Ststa Bar No. 0165S500 I                                           <                        -
A'ustin, Texas 78703 I
I                                           /       __,.____x___
(512)477 7896
f Morgan, Ward, Leeton & Martin I                             Suite 700,306 Wo.t Wall P. O. Box 1271 Midland Texas 79702 I                              (915)683 0803 Fax:(512) 682 0502 State Bar No. 13064500 Tom W. Oregg, Jr.
//
P. O. Drawer 1032 I                             San Angelo, Texas 76902 (915) 655 9188 Fax:(915)655 9180 State Bar No. 0&t30000 Of Counsel:
Fax:($12) 477 8657 V
I                             Mark J. Yudof 6302 Shadow Mountain Drive Austin, Texas 78731 I                             (512)345 2669 State Bar No. 22232500 I
Ststa Bar No. 0165S500 I
I
/
__,.____x___
f Morgan, Ward, Leeton & Martin I
Suite 700,306 Wo.t Wall P. O. Box 1271 Midland Texas 79702 (915)683 0803 I
Fax:(512) 682 0502 State Bar No. 13064500 Tom W. Oregg, Jr.
P. O. Drawer 1032 I
San Angelo, Texas 76902 (915) 655 9188 Fax:(915)655 9180 State Bar No. 0&t30000 Of Counsel:
I Mark J. Yudof 6302 Shadow Mountain Drive Austin, Texas 78731 I
(512)345 2669 State Bar No. 22232500 I
I I
I I
I I       can e m e. _ c - - a....                 e.1..a. - . a g g e e ,
I I
I               -                                        -
can e m e. _ c - - a.... e.1..a. -. a g g e e,
I


I   '
I VFRIFICATION I
I                                                            VFRIFICATION STATE OF TEXAS                                   l I     COUNTY OF TRAVIS i
STATE OF TEXAS l
i BEFORE SIE, the undersigned Notary Public, on this day personally appeared Steven E. Collier, who, being by me duly sworn on oath deoosed and said that he is the director of power supply and regulatorv afTalrs for Cap Rock Electrie Cooperative and that he has been duly authonted by Cap Rock Electric Cooperative, Inc., to be its agent in the above styled and numbered cause; that he has read the above and foregoing PlaintitTs Original Petition; and that every statement contained therein is with.n his personal knowledge and is true and correct.
I i
l       l/t-4                   ri      .
COUNTY OF TRAVIS i
STEVEN E. COLLIER SUBSCRIBED AND SWORN TO BEFORE StE, on the                                       day of December.
BEFORE SIE, the undersigned Notary Public, on this day personally appeared Steven E. Collier, who, being by me duly sworn on oath deoosed and said that he is the director of power supply and regulatorv afTalrs for Cap Rock Electrie Cooperative and that he has been duly authonted by Cap Rock Electric Cooperative, Inc., to be its agent in the above styled and numbered cause; that he has read the above and foregoing PlaintitTs Original Petition; and that every statement contained therein is with.n his personal knowledge and is true and correct.
I   1991, to certify which witness my and and otTicial seal.
l l/t-4 i
                                                                                              ?               ,/~
r STEVEN E. COLLIER SUBSCRIBED AND SWORN TO BEFORE StE, on the day of December.
i     '! N&% N
I 1991, to certify which witness my and and otTicial seal.
{J \,,
?
                    .\.
,/~
THERESA ANN ALBA 6.w, N= so. e i.
LL R
                    / vita ==mmelsema,4 titte(
.A k.
t LL R        ,  .A k .          %' %
i
                                                                    -Notary Public in and for the Sta,te, of Texas Sly commission expires: 9.
'! N&%
N
.\\.
6.w, N= so. e i.
THERESA ANN ALBA
-Notary Public in and for the Sta,te, of Texas
{ \\,,
Sly commission expires: 9.
* 2 a $-
* 2 a $-
t J
/ vita==mmelsema,4 titte(
3' e
3' e
I I
I I
I I
I I
l Cap Rock Electre Cooperatrve , Inc. vs. Texas utdities Electre Comaany lac.
l Cap Rock Electre Cooperatrve, Inc. vs. Texas utdities Electre Comaany lac.
mecott e Ongr.W Penen Page 14 i
mecott e Ongr.W Penen Page 14 i


CXHIBIT "A#
CXHIBIT "A#
l t
l t
I                           -
I a
a 5
5 s
s                                                              POWER SUPPLY AGREEMENT DE7 FEEN g                                                         Tens cTzI.zTzEs EI.Ec Rze coxeun 9                                                                                                 '
POWER SUPPLY AGREEMENT DE7 FEEN g
Tens cTzI.zTzEs EI.Ec Rze coxeun 9
AND CAP ROCK ELECTRIC COOPERATIVE,. INC.
AND CAP ROCK ELECTRIC COOPERATIVE,. INC.
I                                                             o m o A   e, ,m., . 1,,,
I o m o A e,,m.,
1,,,
1 I
1 I
e 1
e 1
0
0
  ;I I
;I I
i
i


1 POWER CUPPLY AGREEMENT g                                     BETWEEN 5-                   TEXA5 UTIL2 TIES ELECTRIC COMPAN'.t CAP ROCK ELECTRIC COOPERATIVE, INC.
1 POWER CUPPLY AGREEMENT g
TABLE OF CONTENTS ARTICLE I.       DEFINITIONS 1.01     " Contract Danand"         . . . . . . . . . . . . . .                    2 1.02     " Control Area" . . . . . . . . . . . . . . . .                          2
BETWEEN 5-TEXA5 UTIL2 TIES ELECTRIC COMPAN'.t CAP ROCK ELECTRIC COOPERATIVE, INC.
'              1.03     " Cost of Service Study"           . . . .            . . . . .  . 2 l       1.04     " Default"     . . . . . . . . . . . . . . . . . .                        :
TABLE OF CONTENTS ARTICLE I.
4        1.05     "ERCOT"     . . . . . . . . . . - . . . . . . . . .                      3 1.06     "ERCOT Operating Guidhs" . . . . . . . . . . .                            3 1.07     " Firm capability"         . . . . . . . . . . . . . .                    3 1.08     " Firm Power Resource"           . . . . . . . . . . . .                  3 1.09     " Metered Demand"       . . . . . . . . . . . . . . .                    3
DEFINITIONS 1.01
      $        1.10     " Metered Energy" . . . . . . . . . . . . . . .                          3 5       1.11     " Points of Delivery" . . . . . . . . . . . . .                          4 1.12     " Points of Interconnection"               . . . , . . . . .            4 g        ' .13     " Power Supply Resources" . . . . . . . . . , .                          4 g                 " Schedule Period" 1.14                                . . . . . . . . . . . . . .                    4 4              1.15     "TU Electric Capacity"           . . . . . .. . . . . . ..                4
" Contract Danand" 2
      ~
1.02
1.16     "TU Electric Energy" .           . . . . . . . . . . . .                  4
" Control Area" 2
-              1.17     " Working Day"       . .- . . . . . . . . . . . . . .                    4 ARTICLE II. EFFECTIVE DATE, TERM AND NOTICES l.
i 1.03
2.01     Effective Date . . . . . . . . . . . . . . . .                            5 2.02     Tarn     . . . . . . . . . . . . . . . . . . . .                          5 2.03     Power Supply Resources . . . . . . . . , , . .                            6 2.04     Ncticas - for Changes in Purchases of Fuer
" Cost of Service Study" 2
!    I, _              and Energy . . . . . . . . . . . . . . . . . .                            7 g'             2.05     Removal of Specified Points of Delivery . . .                            8 ARTICLE III. SAL 3 0F POWER AND ENERGY SY TU ELECTRIC AND PURCHASE BY CAP ROCK 3.01     Full Requirements Power and Energy . .                        . . . . 9 3.02     Partial Requirements Power and Energy                           . . . 10 3.03     Load Growth       . . . . . . . . . . . . . . . .                      '4 3.04     Unintentional Energy . . . . . . . . . . . .                            14 3.05     Rate Schedulu . . . . . . . . . . . . . . .                            15 3.06     Charactoristics of Power and Energy                         . . . . 15 3.07     Points of Dalivery . . . . . . . . . . . . .                            15 3.08     Contract Demand . . . . . . . . . . . . . .                            17 i                                                   ,
l 1.04
" Default" 4
1.05 "ERCOT" 3
1.06 "ERCOT Operating Guidhs".
3 1.07
" Firm capability" 3
1.08
" Firm Power Resource" 3
1.09
" Metered Demand" 3
1.10
" Metered Energy".
3 5
1.11
" Points of Delivery".
4 1.12
" Points of Interconnection" 4
'.13
" Power Supply Resources" 4
g
' g 1.14
" Schedule Period" 4
1.15 "TU Electric Capacity" 4
4 1.16 "TU Electric Energy".
~
4 1.17
" Working Day" 4
ARTICLE II.
EFFECTIVE DATE, l.
TERM AND NOTICES 2.01 Effective Date.
5 2.02 Tarn 5
2.03 Power Supply Resources 6
I, _
2.04 Ncticas - for Changes in Purchases of Fuer and Energy.
7 g'
2.05 Removal of Specified Points of Delivery 8
ARTICLE III.
SAL 3 0F POWER AND ENERGY SY TU ELECTRIC AND PURCHASE BY CAP ROCK 3.01 Full Requirements Power and Energy.
9 3.02 Partial Requirements Power and Energy 10 3.03 Load Growth
'4 3.04 Unintentional Energy.
14 3.05 Rate Schedulu 15 3.06 Charactoristics of Power and Energy 15 3.07 Points of Dalivery.
15 3.08 Contract Demand 17 i
~l
~l


l 3.09 ,                                 Idicd Focilitics .                                       . . . . . . . . . . . . ,                                3 3.10,                                 Change of Voltage                                       . . . . . . . . . , . , ,                              ;9 3.11                                   Facilities at Points of Delivery .                                                         . . . . .            :o 3.12                                   Interconnection or Parallel Operations with l                                                                   Other Suppliers . . . . . . .                                                    . . . . . , ,                  ;o
l 3.09,
[                           3.13                                   Forecasts                         . . . . . . . . .                              . . . . . . . .              ::
Idicd Focilitics.
y                            3.14                                   Right of Access . . . . . .                                                      . . . . . . . .              ;;
3 3.10, Change of Voltage
}                           3.15                                   Changes in the P ro'.'is i o n                                                   of   Power and
;9 3.11 Facilities at Points of Delivery.
_                                        Energy .                     . . . . . . . . . . . . . . .                                            . ,    ;2 ARTICLE IV.                         BACKUP, STANDBY, EMERGENCY AND SCHEDULED KAINTENANCE POWER 4.01                                   Loss of Firm Power Resource                                                       . . . . . . . .              ;4 4.02                                   Emergency Power                                       . . . . . . . . . . . . . .                              ;5 l                         4.03                                   Curtailment Plan . . . . . . . . . . . . . .                                                                    26 7                           4.04                                   SchNduled Maintenance Power                                                       . . . . . . . .              27 4.05                                   Limitations                           on               Emergency                 and     Scheduled
:o 3.12 Interconnection or Parallel Operations with l
Other Suppliers
;o
[
3.13 Forecasts y
3.14 Right of Access
}
3.15 Changes in the P ro'.'is i o n of Power and Energy.
;2 ARTICLE IV.
BACKUP, STANDBY, EMERGENCY AND SCHEDULED KAINTENANCE POWER 4.01 Loss of Firm Power Resource
;4 4.02 Emergency Power
;5 l
4.03 Curtailment Plan.
26 7
4.04 SchNduled Maintenance Power 27 4.05 Limitations on Emergency and Scheduled
(
(
W                         4.06 Maintenance Power Ner and Energy .
Maintenance Power
                                                                                                                              . . . . . . . . . . . . .                              ;7
;7 W
                                                                                                                                                . . . . . . . . , ,                  27 49fCLE V.                     SCHEDULING 5.01                                       a                           . of Power Supply Resources                                                     ;S 5.02                                                     '
4.06 Ner and Energy.
Notice                 of             Schedulec to                 TU
27 49fCLE V.
        !                                                                a       *
SCHEDULING 5.01 a
                                                                                                    . . . . . . . . . . . . . . . . . .                                              23 5.03                                                               in Delivery Rate . . . . . . . . . .                                                  9 5.04                                   Baunup Resources . . . . . . . . . . . . . .
. of Power Supply Resources
;S 5.02 Notice of Schedulec to TU 23 a
5.03 in Delivery Rate.
9 5.04 Baunup Resources.
I
I
                                                                                                                                                                                      ;9 5.05                                   TU Electric Execution of Schedules . . . .                                                          .          29 5.06                                   Scheduling and System Modification Charges                                                                 . 30 5.07                                   Term of Scheduling . . . . . . . . . . . . .                                                                    22 5.08                                   Full Requirements Points of Delivery af ter 1,                                                                  Scheduling . . . . . . . . . . . . . . . . .                                                                    23 ARTICLE VI.                                     REGULATI N SERVICES, AVAILABILITY OF EMERGENCY AND SCHEr.ULED MAINTENANCE BULK PO1rER AND DELIVERY OF POWER AND ENERGY 6.01                                   Regulation Services . . . . . . . . . . . .                                                                    33 6.02                                   Availability of Emergency and Scheduled Maintenance Bulk Power .                                                   . . . . . . . . . .                  34 ARTICLE VII.                                     TRANSMIS8ICN WHEELING AND DISTRIBUTION SERVICES
;9 5.05 TU Electric Execution of Schedules 29 5.06 Scheduling and System Modification Charges 30 5.07 Term of Scheduling.
22 1,
5.08 Full Requirements Points of Delivery af ter Scheduling.
23 ARTICLE VI.
REGULATI N SERVICES, AVAILABILITY OF EMERGENCY AND SCHEr.ULED MAINTENANCE BULK PO1rER AND DELIVERY OF POWER AND ENERGY 6.01 Regulation Services 33 6.02 Availability of Emergency and Scheduled Maintenance Bulk Power.
34 ARTICLE VII.
TRANSMIS8ICN WHEELING AND DISTRIBUTION SERVICES
[
[
7.01                                   Wheeling in Connection with Scheduling . . .                                                                    25 7.02                                   Wheeling Af tur Can Rock Becomes a Control Area .                   . . . . . . . . . . . . . . . . . . .                                                  25 7.03                                 Transmission                                       Arrangements                     with       Third Parties                       . . . . . . . .. . . . . . . . . .                                              37 ARTICLE VIII.                                     BILLING 8 AND DEFAULT ii l
7.01 Wheeling in Connection with Scheduling 25 7.02 Wheeling Af tur Can Rock Becomes a Control Area.
      .      .-_____.___m   -    _____-______ , _ . _ _ _ _ _ _ _                                -~       - - - - _ _          -  - - - - _ _ _                      -          -
25 7.03 Transmission Arrangements with Third Parties 37 ARTICLE VIII.
BILLING 8 AND DEFAULT ii l
.-_____.___m
-~


8.01 ,                       billings and Paymonto           . . . . . . . . . . .          37 8.02                         Billings       and     Payments           Subject     to I     8.03 8.04 Correction . . . . . . . . . . . . . . . . .
8.01,
Notice of Default . . . . . . . . . . . . .
billings and Paymonto 37 8.02 Billings and Payments Subject to Correction.
Failure to Cure Def ault           . . . . . . . . . .
I 37 8.03 Notice of Default 23 8.04 Failure to Cure Def ault 8
37 23 8
8.05 Specific Pertermance and Injunctive Relief 35 8.06 No Waiver 39 8.07 Indemnification 39
8.05                         Specific Pertermance and Injunctive Relief                   . 35 8.06                         No Waiver     . . . . . . . . . . . . . . . , ,              39 8.07                         Indemnification . . . . . . . . . . . . . .                    39
. 8.08 Bankruptcy.
      . 8.08                         Bankruptcy . . . . . . . . . . . . . . . . .
I 42 8.09 Non-Exclusive Remedy.
I 42 8.09                         Non-Exclusive Remedy . . . . . . . . . . . .                  43 ARTICLE II.       INTRASTATE OPERATIONS
43 ARTICLE II.
.g 8     9.01                         Interstate Commercs         . . . . . . . . . . . .          43 9.02                         Failure to Comply . . . . . . . . . . . . .                    44 9.03                         Specific Performance . . . . . . . . . . . .                  45 8      9.04                         Bona Fide Emergencies           . . . . . . . . . . .          45 ARTICLE Z.     MISCELLANZOUS PROVISIONS I}
INTRASTATE OPERATIONS
10.01                       Amendment . . . . . . . . . . . . . . . . .                    45 10.02                       Entirety of Agreement and Prior Agreements Superseded . . . . . . . . . . . . . . . . .                  45 10.03                         Successors and AsAigns         . . . . . . . . . . .          46 10.04                       Taxes     . . . . . . . . . . . . . . . . . . .                47 10.05                       Agreement to Control . . . . . . . . . . . .                    48 10.06                       Servica Regulations         . . . . . . . . . . . .            48 10.07                       Governing Law and Venue . . . . . . . . . .                    48 h
. g 8
10.08 10.09 Notices . . . . . . . . . . . . . . . . . .
9.01 Interstate Commercs 43 9.02 Failure to Comply 44 8
Interruption of Service             . . . . . . . . . .
9.03 Specific Performance 45 9.04 Bona Fide Emergencies 45 I}
49 50 10.10                       No Third-Party Beneficiaries . . . . . . . .                  50 l     10.11                       Multiple Counterparts           . . . . . . . . . . .          5C W     10.12                       Headings . . . . . . . . . . . . . . . . . .                  51 10.13                       Severability . . . . . . . . . . . . . . . .                  51 hy      10.14                       Agreements       to   be     Negotiated Faith . . . . . . . . . . . . . . . . . . .
ARTICLE Z.
in Good 51 10.16                       Mutual Release . . . . . . . . . . . . . . .                  52 g     10.17                       Withdrawal of Participation and Dismissal of g~                                 Litigation . . . . . . . . . . . . . . . . .                  52 10.18                     Conditions Precedent         . . . . . . . . . . . .            53 I
MISCELLANZOUS PROVISIONS 10.01 Amendment 45 10.02 Entirety of Agreement and Prior Agreements Superseded.
45 10.03 Successors and AsAigns 46 10.04 Taxes 47 10.05 Agreement to Control 48 10.06 Servica Regulations 48 10.07 Governing Law and Venue 48 h
10.08 Notices 49 10.09 Interruption of Service 50 10.10 No Third-Party Beneficiaries.
50 l
10.11 Multiple Counterparts 5C W
10.12 Headings.
51 10.13 Severability.
51 h
10.14 Agreements to be Negotiated in Good y
Faith 51 10.16 Mutual Release.
52 g
10.17 Withdrawal of Participation and Dismissal of g~
Litigation.
52 10.18 Conditions Precedent 53 I
I I
I I
I                                                       111 i
111 I
i


LIST OF EIHIBITS
LIST OF EIHIBITS
(                                                                                                       Exhibit A                                     --
(
Points of Delivery Exhibit B                                     --
Exhibit A Points of Delivery Exhibit B Power supply Resources xhibit C E
Power supply Resources E xhibit                                   C --
' css Facters Exhibit D Cap Rock Curtail.ent P'.an Exhibit E Mutual Release Exhibit F Notice of h'ithdrawal I
_ css Facters Exhibit D                                     --
Cap Rock Curtail.ent P'.an Exhibit E                                                 Mutual Release Exhibit F                                     --
Notice of h'ithdrawal I
i l-i l
i l-i l
i l
i l
1 I
1 I
  }1                                                                                                                                                                 iv
}
iv 1
_ _ _ _ _ _ _ _ - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - ~
_ _ _ _ _ _ _ _ - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - ~
_                                                                                                                                                            ~~~       ~
~ ~ ~
~


POWER J.RFPLY AGREEMENT BETWZRE TEXA8 UTILITIES ELECTRIC CO)iEMD(
POWER J.RFPLY AGREEMENT BETWZRE TEXA8 UTILITIES ELECTRIC CO)iEMD(
W
W CAP ROCK ELECTRIC COOPERATIVE, !NC4 This Power Supply Agreement
              .                        CAP ROCK ELECTRIC COOPERATIVE, !NC4 This       Power Supply   Agreement   (" Agreement")   :. s made and l
(" Agreement")
entered into as of the 8th day of June, 1990, by and between Texas Utilities Electric Company ("TU Electric") , a Texas corpcrati:n, and cap Rock Electric Cooperative,                       Inc.   (" Cap Rock"),   a Texas coeperative corporation,                     (each hereinafter so=etimes referred Oc individually as " Party" or both referred to collectively as the
:. s made and l
      " Parties").
entered into as of the 8th day of June, 1990, by and between Texas Utilities Electric Company ("TU Electric"), a Texas corpcrati:n, and cap Rock Electric Cooperative, Inc.
(" Cap Rock"),
a Texas coeperative corporation, (each hereinafter so=etimes referred Oc individually as " Party" or both referred to collectively as the
" Parties").
WITNESSETH:
WITNESSETH:
hHEREAS, Cap Rock is a full requirerents wholesale cust:mer of TU Ilectric; and WHEREAS,     Cap Rock desires to develop alternative power suppiy arrangements, including the purchase of power from suppliers other than TU Electric, as well as construction of Cap Reck's own I genere. tion and transmission, and obtaining the necessary regulatory approvals in connection therewith; and tTHIREAS , Cap Rock intends to pursue development of control area arrangements; and WHEREAS,     Cap Rock   expects to   make   such   power   supply arrangements f or Lone Wolf Elr.ctric Cooperative, Inc.                     (" Lone Wolf")
hHEREAS, Cap Rock is a full requirerents wholesale cust:mer of TU Ilectric; and
: WHEREAS, Cap Rock desires to develop alternative power suppiy arrangements, including the purchase of power from suppliers other than TU Electric, as well as construction of Cap Reck's own I
genere. tion and transmission, and obtaining the necessary regulatory approvals in connection therewith; and tTHIREAS, Cap Rock intends to pursue development of control area arrangements; and
: WHEREAS, Cap Rock expects to make such power supply arrangements f or Lone Wolf Elr.ctric Cooperative, Inc.
(" Lone Wolf")
dalivery points in the avant that cap Rock and Lone Wolf =erge or otherwise consolidate; g
dalivery points in the avant that cap Rock and Lone Wolf =erge or otherwise consolidate; g


NOW, THEREFORE, in reccgnition of tho f orogoing, the Parties hereby agree as follows:
NOW, THEREFORE, in reccgnition of tho f orogoing, the Parties hereby agree as follows:
:                                                                          ARTICLE I. DEFINITIONS
ARTICLE I.
                                                      . The following terms, when used herein and in the Exhibits attached hereto, shall have the neaning specified below, except as may :thervise be expressly set f:rth :.n this Agreement:
DEFINITIONS The following terms, when used herein and in the Exhibits attached hereto, shall have the neaning specified below, except as may :thervise be expressly set f:rth :.n this Agreement:
1.01     " Contract Demand" shall mean the maximum amount of power and I                                           energy expressed in kilowatts (0:ntract Kw) that Oap Rock projects
1.01
" Contract Demand" shall mean the maximum amount of power and I
energy expressed in kilowatts (0:ntract Kw) that Oap Rock projects
* TU Ilectric will be required to provide at cach Point of Delivery.
* TU Ilectric will be required to provide at cach Point of Delivery.
:.                                          Contract Demand will be specified on Exhibit             A,   which may be changed from time to time as provided in Section 3.08 hereof.
Contract Demand will be specified on Exhibit A,
1.02     " Control Area" shall mean an area within ERCOT which has contractually       ar6d   electrically     prescribed   boundaries   at transmission voltages whose nominal operating voltage is at leas:
which may be changed from time to time as provided in Section 3.08 hereof.
60,000     volts   when     n.easured   phase-to-phase,   is   capable of instantaneously matching generation and load within such area and
1.02
                                                                                                                          ~
" Control Area" shall mean an area within ERCOT which has contractually ar6d electrically prescribed boundaries at transmission voltages whose nominal operating voltage is at leas:
is established and operated in accordance with prudent electric utility practices, including all provisions of the ERCOT Operating Guides.
60,000 volts when n.easured phase-to-phase, is capable of instantaneously matching generation and load within such area and is established and operated in accordance with prudent electric
1.o3     " cont of servico study" shall mean that study undertaken by TU Electric to allocate its system cost to its rate classes as mest recently     approved by     the   Public Utility Commission   of Texas
~
utility practices, including all provisions of the ERCOT Operating Guides.
1.o3
" cont of servico study" shall mean that study undertaken by TU Electric to allocate its system cost to its rate classes as mest recently approved by the Public Utility Commission of Texas
( "PUCT") in a general rate case.
( "PUCT") in a general rate case.
1.04     "Def ault" shall mean the f ailure of Cap Rock or TU Electric
1.04 "Def ault" shall mean the f ailure of Cap Rock or TU Electric to make any payment or perform any obligation in the time and I
      !                                        to make any payment or perform any obligation in the time and I                                                                                 2 1
2 1


mannor providCd in this Agrocm:nt.
mannor providCd in this Agrocm:nt.
1.03 "YRCOT" shall mean the Electric Reliability Council of Texas l                                                 cr its successor (s).
"YRCOT" shall mean the Electric Reliability Council of Texas 1.03 l
1.06 "ERCOT operating Guides" shall :sean these operating guides prepared and adopted by the operating Subcommi: tee of ERCOT and approved by tha Technical Advisory C:=mittee of ERCOT, the purpose of wn ch is to outline the mutually agreed upon practices to ':e followed in operation of the interconnected systems of the re=cer utilities of ERCOT.
cr its successor (s).
1.07
"ERCOT operating Guides" shall :sean these operating guides 1.06 prepared and adopted by the operating Subcommi: tee of ERCOT and approved by tha Technical Advisory C:=mittee of ERCOT, the purpose of wn ch is to outline the mutually agreed upon practices to ':e followed in operation of the interconnected systems of the re=cer utilities of ERCOT.
                                                                    " Firm capability" shall mean the maxi =um capacity expressed in negawatts (exclusive of installed and spinning reserves) for sach Firm Power Resource specified on Exhibit B.
" Firm capability" shall mean the maxi =um capacity expressed 1.07 in negawatts (exclusive of installed and spinning reserves) for sach Firm Power Resource specified on Exhibit B.
1.os "Fira Power Resource" shall mean a Power Supply Resource fully backed up by an electric utility member of ERCOT, other than Tc Electric which (1) is available at all times, even under adverse conditions, (ii) includes both installed and spinning reserves, and (iii) is of a level of firmnesa not less than the ERCOT utility's firm native load customers.
1.os "Fira Power Resource" shall mean a Power Supply Resource fully backed up by an electric utility member of ERCOT, other than Tc Electric which (1) is available at all times, even under adverse conditions, (ii) includes both installed and spinning reserves, and (iii) is of a level of firmnesa not less than the ERCOT utility's firm native load customers.
1.09
1.09
                                                                    " Metered Demand" shall mean the total metered demand at                                           a Point of Delivery                       (adjusted for                         losses, if any,           bet. ween One metering point and the Point of Delivery), excluding demand at subtract mater pointa. if any, serving TU Electric customers.
" Metered Demand" shall mean the total metered demand at a
1.10               " Metered Energy" unall mean the total metered energy at                                         a Point of Delivery                         (adjusted for                         losses, if       any,     between the metering point and the Point of Delivery), excluding enorgy at subtract matar points, if any, serving TU Electric custo=ers.
Point of Delivery (adjusted for
: losses, if any, bet. ween One metering point and the Point of Delivery), excluding demand at subtract mater pointa. if any, serving TU Electric customers.
1.10
" Metered Energy" unall mean the total metered energy at a
Point of Delivery (adjusted for
: losses, if
: any, between the metering point and the Point of Delivery), excluding enorgy at subtract matar points, if any, serving TU Electric custo=ers.
3 l
3 l
      . _ - - _ _ - - - - _ - - - - - - - - - - - - - - -                                  - - - ' - - - - - - - - - - - ^       -    - - - ~     '-- ~
- - - ' - - - - - - - - - - - ^
- - - ~
'-- ~


1.11                                     "Pointo of                                                                             Dolivory"         shall scan all points within TU f                                                                                                                                                   Area Electric's                                                                   Control                                                             at which TU Electric         maintains                                                         an electrical connection with Cap Rock existing on the effective date                                                                                                                                                                                                       >
1.11 "Pointo of Dolivory" shall scan all points within TU f
hereof, each of which Points of Delivery shall be specified On
Electric's Control Area at which TU Electric maintains an electrical connection with Cap Rock existing on the effective date hereof, each of which Points of Delivery shall be specified On Exhibit A hereto, which shall be amended fr:m time to ti:e in acecrdance with Section 3.07'b) hereof.
.,      Exhibit A hereto, which shall be amended fr:m time to ti:e in acecrdance with Section 3.07'b) hereof.
1.12
1.12                                       " Points of Interconnection" shall mean each P0 int at vnich                                                                                                                                                                 4 TU Electric maintains an electrical connection with Cap Rock 's 0:ntrol Area, at a nominal voltage level of at least 60,000 volts when measured phase-to phase (except at such points and *:r such I     periods as provided in Section 7.02 hereof).
" Points of Interconnection" shall mean each P0 int at vnich 4
1.13                                       " Power supply Resources" shall mean Cap Rock's Firm Power Resources and/or economy energy resources specified frog. ti=e to time on Exhibit B hereto pursuant to the provisions of this Agreement.
TU Electric maintains an electrical connection with Cap Rock 's 0:ntrol Area, at a nominal voltage level of at least 60,000 volts when measured phase-to phase (except at such points and *:r such I
1.14                                       " Schedule Period" shall mean a period of one (1) calundar day unless such day is not a working Day,                                                                                                                           in which evera the Schedule Period shr,ll be all :ensecutive days which are not Working Days plus the first following Working Day.
periods as provided in Section 7.02 hereof).
1.15                                         "TU Electric Capacity" shall mean that amount of capac:.ty which TU Electric will provide to cap Rock as defined in Section 3.02(a) hereto pursuant to the provisions of this Agreement.
1.13
1.16                                           "TU Electric Energy" shall mean that amount of energy which TU Electric will provide to Cap Rock as defined in Section 3.02 (b) hereto pursuant'to the provisions of this Agreement.
" Power supply Resources" shall mean Cap Rock's Firm Power Resources and/or economy energy resources specified frog. ti=e to time on Exhibit B hereto pursuant to the provisions of this Agreement.
1.17                                           " Working Day" shall mean any day from Monday through Friday 4
1.14
                                                                                                                                                                                                                                                                                    \
" Schedule Period" shall mean a period of one (1) calundar day unless such day is not a working Day, in which evera the Schedule Period shr,ll be all :ensecutive days which are not Working Days plus the first following Working Day.
1.15 "TU Electric Capacity" shall mean that amount of capac:.ty which TU Electric will provide to cap Rock as defined in Section 3.02(a) hereto pursuant to the provisions of this Agreement.
1.16 "TU Electric Energy" shall mean that amount of energy which TU Electric will provide to Cap Rock as defined in Section 3.02 (b) hereto pursuant'to the provisions of this Agreement.
1.17
" Working Day" shall mean any day from Monday through Friday 4
\\
l
l


thich is not a holiday rccognized by TU Eloctric which holidays shall be specified by TU Electric within       30   days
thich is not a holiday rccognized by TU Eloctric which holidays shall be specified by TU Electric within 30 days after the execution of this Agreement, such holidays to be subject to en3nge by TU Electric upon reasonable advance written notica.
'                                                                                after the execution of this Agreement, such holidays to be subject to en3nge by TU Electric upon reasonable advance written notica.
ARTICLE II.
t                            ARTICLE II. EFFECTI7E DATE, TERM AND NOTICES 2.01     Effective Date This Agreement shall become affactive, with respect to tap Rock,   frcm and after Cap Rock's termination of its full require =ents Agreement for Purchase of Power, dated June 2,       1963, y       as amended, in accordance with its terms.
EFFECTI7E DATE, t
8 This Agreement shall become effective, with respect to Lone Wolf,   from and after the termination of Lone Wolf's full requirements Agreement for Purchase of Power dated July 2, 1963, as amended, in accordance with its terms; provided, however, that in the event Cap Rock and Lone Wolf do not consolidate within the time specified in Section 3.07(b)(iv) hereof, all Cap Rock's rignts and TU Electric's obligations with respect to Lone Wolf provided for herein shall terminate and be of no further force or effect.
TERM AND NOTICES 2.01 Effective Date This Agreement shall become affactive, with respect to tap
2.02   Tara l                 The torn of this Agreement will be 10 years. Cap Rock will have the right to terminate this Agreement on three years' written notice in years one through five and on five years' written notice thereafter.
: Rock, frcm and after Cap Rock's termination of its full require =ents Agreement for Purchase of Power, dated June 2,
: 1963, y
as amended, in accordance with its terms.
8 This Agreement shall become effective, with respect to Lone
: Wolf, from and after the termination of Lone Wolf's full requirements Agreement for Purchase of Power dated July 2,
: 1963, as amended, in accordance with its terms; provided, however, that in the event Cap Rock and Lone Wolf do not consolidate within the time specified in Section 3.07(b)(iv) hereof, all Cap Rock's rignts and TU Electric's obligations with respect to Lone Wolf provided for herein shall terminate and be of no further force or effect.
2.02 Tara l
The torn of this Agreement will be 10 years.
Cap Rock will have the right to terminate this Agreement on three years' written notice in years one through five and on five years' written notice thereafter.
TJ Electric will have the right to terminate this Agreement s
TJ Electric will have the right to terminate this Agreement s
I
I


ott notico aquel to tho balanco of tho ton-yoor term in years eno through five, and on five years' notice thereafter, Af ter the expiration of the fif th full year, this Agree =ent will be automatically extended fr== year to year unless terminated as provided above.
ott notico aquel to tho balanco of tho ton-yoor term in years eno through five, and on five years' notice thereafter, Af ter the expiration of the fif th full year, this Agree =ent will be automatically extended fr== year to year unless terminated as provided above.
2.03-                                                               Power Supply Resources l-All Power Supply Resources shall be identified on Exhibit l
2.03-Power Supply Resources l-l All Power Supply Resources shall be identified on Exhibit B,
B,                               which shall                                   include,   in addition to the other infcrmation specified therein, the Fi= Capability of each Firm Power Resource.
which shall
: include, in addition to the other infcrmation specified therein, the Fi= Capability of each Firm Power Resource.
None of the characteristi:s of the Power Supply Resources may be changed, nor shall any Pcwer Supply Resource be added or deleted from Exhibit B, except as specifically authorized by this Section 2.03, or Sections 2.04, 3.15 ( a) ( i) or 5.01(b) heroof.
None of the characteristi:s of the Power Supply Resources may be changed, nor shall any Pcwer Supply Resource be added or deleted from Exhibit B, except as specifically authorized by this Section 2.03, or Sections 2.04, 3.15 ( a) ( i) or 5.01(b) heroof.
l                                                                                             Cap Rock may, notwithstanding the notice requirements of Section 2.04, replace a Fir: Power Resource with another Firm Pcwer i
l Cap Rock may, notwithstanding the notice requirements of Section 2.04, replace a Fir: Power Resource with another Firm Pcwer i
Resource so long as the replacement has a term no longer than the remaining term of the replaced Tim Power Resource, has the same Firm capability                                                               as the Firm Po'ver Resource                     so   replaced, is substantially identical with respect to, among other things, the direction and pattern of flow of the power and energy, loadings on TU                                         Electric's                       transmission   facilities,   and                     i= pacts   en its
Resource so long as the replacement has a term no longer than the remaining term of the replaced Tim Power Resource, has the same Firm capability as the Firm Po'ver Resource so
  ;                            generation dispatch, and such replacement is otherwise satisf actory to TU Electric.                                                             The Firm Pcwer Resource so replaced shall be deleted from Exhibit B.                                                             Cap Rock may not, without the notices required by Section 2.04 hereof, substitute Firm Power Resources or increase the Firm capability to be taken under each such Firm 6
: replaced, is substantially identical with respect to, among other things, the direction and pattern of flow of the power and energy, loadings on TU Electric's transmission facilities, and i= pacts en its generation dispatch, and such replacement is otherwise satisf actory to TU Electric.
The Firm Pcwer Resource so replaced shall be deleted from Exhibit B.
Cap Rock may not, without the notices required by Section 2.04 hereof, substitute Firm Power Resources or increase the Firm capability to be taken under each such Firm 6
l l
l l


i             powcr Recourco.
i powcr Recourco.
The nu::tber of Power Supply Resources shall never excaad six at any one time and shall not be scheduled or delivered vinhout ene giving of the notices provided for in Section 2.04.
The nu::tber of Power Supply Resources shall never excaad six at any one time and shall not be scheduled or delivered vinhout ene giving of the notices provided for in Section 2.04.
                              , cap Rock shall provide a copy of all Firs Power Resource agreenent(s) or generation ownership / entitlement agreement (s) to i
, cap Rock shall provide a copy of all Firs Power Resource agreenent(s) or generation ownership / entitlement agreement (s) to i
TU Electric no less than 60 days prior to the date it wishes to begin receiving power from such Firm Power Resource.           Oap R:ok =ay redact such portions of the foregoing agreements as is necessary to avoid the disclosure of confidential infor=ation,                 if any; provided,         however,   that such redaction shall   not prevent TU
TU Electric no less than 60 days prior to the date it wishes to begin receiving power from such Firm Power Resource.
* Electric         from having   access to such information   as it   may reasonably require to insure that the power being purchased and/or generation ownership /entitleeent agreement (s) meat the require =ents of this Agreement;           provided further that   if such   inf:rmati:;n includes confidential infor=& tion, TU Electric will agret not to use f.he same for any other purpose and not to disclose such confidentinl information to any other person without Cap Rock's consent,       unless required to do     so by a court     or regulatory I               authority of competent jurisdiction.                                       ,
Oap R:ok =ay redact such portions of the foregoing agreements as is necessary to avoid the disclosure of confidential infor=ation, if any;
2.04       Notices for changes in Purchasec of Power and Energy Cap Rock will have the right to reduce load supplied by TU Electric under this Agreement on three years' advance written notice in years one through five, inclusive, and on five years' advance written notice thereaf ter.     Af ter year five, Cap Rock =ay, upcn the giving of three years' advance written notice, reduce or i
: provided, however, that such redaction shall not prevent TU Electric from having access to such information as it may reasonably require to insure that the power being purchased and/or generation ownership /entitleeent agreement (s) meat the require =ents of this Agreement; provided further that if such inf:rmati:;n includes confidential infor=& tion, TU Electric will agret not to use f.he same for any other purpose and not to disclose such confidentinl information to any other person without Cap Rock's
  ,g                                                                                           l
: consent, unless required to do so by a court or regulatory I
authority of competent jurisdiction.
2.04 Notices for changes in Purchasec of Power and Energy Cap Rock will have the right to reduce load supplied by TU Electric under this Agreement on three years' advance written notice in years one through five, inclusive, and on five years' advance written notice thereaf ter.
Af ter year five, Cap Rock =ay, upcn the giving of three years' advance written notice, reduce or i
,g l


increase, by not more than plus or =inus lot,   ,                                      the Firm Capability h     supplied by a Firm Power Resource (and thereby increase or reduce respectively its lead supplied by TU Electric) , under a previously given notice.                                       All de=and determinat:cns under TU Electric's Rate WP Whelesale Power, or its successor, associated with and resulting from usage prior to the date upon which such reduction is ef f ective will be waived for each load reduction at each such Point of celivery associated with and following the expiration of the foregoing                             cap           Rock   notice (s); otherwise such billing derand determinations shall apply.
increase, by not more than plus or =inus lot, the Firm Capability h
l TU Electric will have the                                       right to reduce   load to be
supplied by a Firm Power Resource (and thereby increase or reduce respectively its lead supplied by TU Electric), under a previously given notice.
    ~
All de=and determinat:cns under TU Electric's Rate WP Whelesale Power, or its successor, associated with and resulting from usage prior to the date upon which such reduction is ef f ective will be waived for each load reduction at each such Point of celivery associated with and following the expiration of the foregoing cap Rock notice (s);
supplied under this Agreement upon advance written notice equal to the balance of the ten-year term                                           in years one through five, inclusive, of this Agreement and upcn five years' advance written notice thereafter.
otherwise such billing derand determinations shall apply.
TU Electric will have the right to reduce load to be l
~
supplied under this Agreement upon advance written notice equal to the balance of the ten-year term in years one through five, inclusive, of this Agreement and upcn five years' advance written notice thereafter.
All notice (s) not associated with the addition of a Fir =
All notice (s) not associated with the addition of a Fir =
Power Resource given by either Party to the other pursuant to this section shall specify the Point (s)                                       of Delivery at which such reduction is to occur and, for each such Point (s) of Delivery, the I     amount of such reduction.
Power Resource given by either Party to the other pursuant to this section shall specify the Point (s) of Delivery at which such reduction is to occur and, for each such Point (s) of Delivery, the I
  --g       2.05   Reisoval of Specified Points of Delivery Subject to the limitations described below, all (but not part) of the power and energy requirements of Cap Rock's customers at nine Points of Delivery (Pembrook, St. Lawrence, stiles, Knott, Ackerly, Vealmore, Coahoma, La Mesa and Schwartz) may, during years one through five of this Agreement, be served by another electric 8
amount of such reduction.
--g 2.05 Reisoval of Specified Points of Delivery Subject to the limitations described below, all (but not part) of the power and energy requirements of Cap Rock's customers at nine Points of Delivery (Pembrook, St. Lawrence, stiles, Knott, Ackerly, Vealmore, Coahoma, La Mesa and Schwartz) may, during years one through five of this Agreement, be served by another electric 8


1 utility, provided cap Rock has first given TU Electric twenty-four nonths' advance written notice of such service to one or core of the Points of Delivery identified above by such other electric utility and such service at any such Point (s) of Delivery has com=enced prior to June 1 in the year of such notice, in which                               j event   the   demand             determinations   from             TU Electric's Rate WP Wholesale Power, or its successor, shall not be i= posed from and af ter the commencement of such 9ervice at the Point (s) of Delivery for which Cap Rock has given the required notice.                               The Contr.ct Demand (s) at the Point (s) of Delivery for which notice is given pursuant to this Section 2.05 may not, in the aggregate, exceed 30 MW of Contract Demand (as specifiad on Exhibit A on the effective date of this Agreement) . If required by the provisions of Section 3.12 or Article IX hereof, Cap Rock will disconnect each such Point
1 utility, provided cap Rock has first given TU Electric twenty-four nonths' advance written notice of such service to one or core of the Points of Delivery identified above by such other electric utility and such service at any such Point (s) of Delivery has com=enced prior to June 1 in the year of such notice, in which j
      -of Delivery from TU Electric.
event the demand determinations from TU Electric's Rate WP Wholesale Power, or its successor, shall not be i= posed from and af ter the commencement of such 9ervice at the Point (s) of Delivery for which Cap Rock has given the required notice.
ARTIOLE III.             SALE OP POWER AND ENERGY BY TU ELECTRIC AND PURCHABE BY CAP ROCK
The Contr.ct Demand (s) at the Point (s) of Delivery for which notice is given pursuant to this Section 2.05 may not, in the aggregate, exceed 30 MW of Contract Demand (as specifiad on Exhibit A on the effective date of this Agreement).
    . 3.ol Full Requirements Power and Energy Except as otherwise permitted by this Agreement, Cap Rock shall purchase frea TU Electric and TU Electric will sell to Cap Rock all of Cap Rock's power and energy requirements, including normal load growth, at each of the Points of Delivery for resale to Cap Rock's customers.                 Cap Rock may, upon reasonable advance written notice,     elect to retain one or more of its Points of Delivery (having voltage levels of less than 60,000 volts) which 9
If required by the provisions of Section 3.12 or Article IX hereof, Cap Rock will disconnect each such Point
-of Delivery from TU Electric.
ARTIOLE III.
SALE OP POWER AND ENERGY BY TU ELECTRIC AND PURCHABE BY CAP ROCK
. 3.ol Full Requirements Power and Energy Except as otherwise permitted by this Agreement, Cap Rock shall purchase frea TU Electric and TU Electric will sell to Cap Rock all of Cap Rock's power and energy requirements, including normal load growth, at each of the Points of Delivery for resale to Cap Rock's customers.
Cap Rock may, upon reasonable advance written notice, elect to retain one or more of its Points of Delivery (having voltage levels of less than 60,000 volts) which 9


l l
l l
axist on tho offcctivo dato of this AgroomOnt as full requirenents points of Delivery pursuant to this Section 3.01 (notwithstanding the purchase of partial requirements power pursuant to Sect:.on 3.02 bel:w at Cap Rock's remaining Points of Delivery), in which event, upon the giving of the n0tices required by Secti:n 2. 04 hereof, Cap Rock may, from time to time, convert :pe or more of such Points of Delivery to partial requirements Points of Delivery                                                                     u. der the provisions of Section 3.02 hereof.
axist on tho offcctivo dato of this AgroomOnt as full requirenents points of Delivery pursuant to this Section 3.01 (notwithstanding the purchase of partial requirements power pursuant to Sect:.on 3.02 bel:w at Cap Rock's remaining Points of Delivery), in which event, upon the giving of the n0tices required by Secti:n 2. 04 hereof, Cap Rock may, from time to time, convert :pe or more of such Points of Delivery to partial requirements Points of Delivery
3.02   Partial Requirements Power and Energy
: u. der the provisions of Section 3.02 hereof.
              !n the event and to the extent Cap Rock gives tM requisite notice pursuant ;o Section 2.04 hereof and during the peri:d(s) that TU Electric may be required to schedule under Article v hereof, Cap Rock shall purchase from TU Electric and TU Ele :rie will sell to Cap Rock, at each of the Points of Delivery (except Points of Delivery which are retained as full requirements Points of Delivery pursuant to Section 3.01 above (the "Rotained Tull Requirements Points of Delivery"), unless and until such Points of Delivery   become                             partial                                 requirements   Points   of Delivery   as permitted therein),                                                   partial requirements power and energy for resale to Cap Rock's customers.                                                                 Paruial requirements power and energy shall be determined as fellows:
3.02 Partial Requirements Power and Energy
(a)             "TU Electric Capacity" shall mean capacity equal to the   difference between                                                             the Metered   Demand during   the billing interval on each of the metering points at each I           Point of Delivery (except the Retained Full Require =ents Points of Delivery) delivering power and energy to Cap Rock g                                                                                                 10
!n the event and to the extent Cap Rock gives tM requisite notice pursuant ;o Section 2.04 hereof and during the peri:d(s) that TU Electric may be required to schedule under Article v hereof, Cap Rock shall purchase from TU Electric and TU Ele :rie will sell to Cap Rock, at each of the Points of Delivery (except Points of Delivery which are retained as full requirements Points of Delivery pursuant to Section 3.01 above (the "Rotained Tull Requirements Points of Delivery"), unless and until such Points of Delivery become partial requirements Points of Delivery as permitted therein),
partial requirements power and energy for resale to Cap Rock's customers.
Paruial requirements power and energy shall be determined as fellows:
(a)
"TU Electric Capacity" shall mean capacity equal to the difference between the Metered Demand during the billing interval on each of the metering points at each I
Point of Delivery (except the Retained Full Require =ents Points of Delivery) delivering power and energy to Cap Rock g
10


B for rocolo cnd a portion (CP,) of ;ho Firm Capability of Cap Rock's Firm Power Resources, if any.
B for rocolo cnd a portion (CP,) of ;ho Firm Capability of Cap Rock's Firm Power Resources, if any.
The quantity CP, shall have the following definition:
The quantity CP, shall have the following definition:
CP,  =
AF, x FPSR. x [ (1/TL,) g ( 1 / D L,) J '
AF, x FPSR. x [ (1/TL,) g ( 1 / D L ,) J '
CP,
              .Where, AF,   =    The Metered Energy       for each Point of l
=
I                                Delivery     (except   the   Retained Requirements Points of Delivery) during each hour of the current billing conth Tull l divided by the sum of the Metered Energy for all cap Rock's Points of D61ivery l                                   (except the Ratained Full Require = ants r
.Where, AF, The Metered Energy for each Point of
Points of Delivery) during said hour.
=
FPSR.  =  The capacity (MW) of Cap Rock's Firm Power Resources actually scheduled and l
Delivery (except the Retained Tull I
I                                delivered to TU Electric's transmission system   during a given clock hour on behalf of Cap Rock, in accordance with j
Requirements Points of Delivery) during l
I                                .he terms of this Agreement, coincident with the Metered Demand at the Point of Delivery during the same hour of the billing month.
each hour of the current billing conth divided by the sum of the Metered Energy for all cap Rock's Points of D61ivery l
l                       TL,     =  The   TU   Electric   transmission     system demand loss factor as contained in TU Electric's Cost of Service Study =ost
(except the Ratained Full Require = ants Points of Delivery) during said hour.
(                                   recently approved by the PUCT.           At the
r The capacity (MW) of Cap Rock's Firm FPSR.
!                                    time of execution of this Agreement, this I                                 factor is 1.03063139 as shown in Exhibit C attached hereto and made a part hereof.
=
l DL,    =  The TU Electric primary system demand
Power Resources actually scheduled and I
;                                    loss f actor as contained in TU Electric's l                                   Cost   of   Service   Study most recently approved by the PUCT.         At the time of
delivered to TU Electric's transmission system during a given clock hour on l
,I                                  execution of this Agreement, this factor l                                   is 1.05802362 as shown in Exhibit C attached hereto and made a part hereof.
behalf of Cap Rock, in accordance with I
l                   (b) "TU Electric Energy" shall mean energy, at each I
.he terms of this Agreement, coincident with the Metered Demand at the Point of j
            'The f actor "(1/TL,)" shall be used for Points of Delivery at nominal voltages greater than or equal to 60 Kv.                   The factor
Delivery during the same hour of the billing month.
      " ( 1/ DL,) " shall be used for Points of Delivery at voltages less
l TL, The TU Electric transmission system
=
demand loss factor as contained in TU Electric's Cost of Service Study =ost
(
recently approved by the PUCT.
At the time of execution of this Agreement, this I
factor is 1.03063139 as shown in Exhibit C attached hereto and made a part hereof.
l The TU Electric primary system demand DL,
=
loss f actor as contained in TU Electric's l
Cost of Service Study most recently
,I approved by the PUCT.
At the time of execution of this Agreement, this factor l
is 1.05802362 as shown in Exhibit C
attached hereto and made a part hereof.
l (b)
"TU Electric Energy" shall mean energy, at each I
'The f actor "(1/TL,)" shall be used for Points of Delivery at nominal voltages greater than or equal to 60 Kv.
The factor
" ( 1/ DL,) " shall be used for Points of Delivery at voltages less
[
[
than 60 Kv.
than 60 Kv.
Line 1,522: Line 2,524:


Point of Dolivory (excopt tho Full Rcquiremonts Points of Delivery), equal to hourly Metered Energy less the sum of:
Point of Dolivory (excopt tho Full Rcquiremonts Points of Delivery), equal to hourly Metered Energy less the sum of:
1                   (i) a portion (IPH --             ta )   f the energy scheduled and delivered g                   pursuant to any economy energy scheduling agent agreenents entered into between the Parties and (ii) a porti:n (Ipg,)
1 (i) a portion (IPH -- )
of the energy fr:= cap Reck's Firm Power c oscurces, if any, The quantities EPH. , and EPH, shall have the f ell wing g
f the energy scheduled and delivered ta g
pursuant to any economy energy scheduling agent agreenents entered into between the Parties and (ii) a porti:n (Ipg,)
of the energy fr:= cap Reck's Firm Power oscurces, if any, c
The quantities EPH., and EPH, shall have the f ell wing g
definitions:
definitions:
EPH ta      =
EPHta AT, x ECONHt
AT, x ECONHt   X 5 (1/Il ) E (1/Ul ) 3 e           e EPH,         =
=
AF, x FPSRH   1  X [ (1/IL ) C (1/ DL,) )
X 5 (1/Il ) E (1/Ul ) 3 e
* e 1                                    where, AF, shall have the same meaning as such factor in 8                                  the preceding sub-section 3.02 (a).
e
I                                  TL,          =      The average transmission energy less f actor as used in the determination by the PUCT of TU Electric's fuel factors 3                                                     then currently in ef fect f or transsission 5                                                     voltava lina lo8585-         At the ti== of the execution of this Agreement, this factor is equal to 1.024789 as shown in Exhibit I                                                     C attached hereto and made a part hereof.
: EPH, AF, x FPSRH X [ (1/IL ) C (1/ DL,) ) *
;                                    DL,          =    The average distribution energy l'os s
=
                                                          ! actor used in the determination by the PUCT of TU Electric's fuel f acters then currently in effect for primary voltage line     losses.     At the time of       the execution of this Agreement, this factor is equal to 1.051741 as shown in Exhibit C attached hereto and made a part hereof.
1 1
ECONHg        =    The scheduled generation (MWH) actually scheduled and delivered on behalf of Cap I                                                       Rock, as providad in any economy energy
e
              *For Points of Delivery at nominal voltages equal to or greater than 60 Kv, the f actor "(1/TL,)" shall be used.                               For Points of Delivery at nominal voltages                                 less than 60 Kv,     the factor
: where, 8
      "(1/DL,)" shall be used.
AF, shall have the same meaning as such factor in the preceding sub-section 3.02 (a).
12 I                                                                                                       ,
The average transmission energy less I
TL,
=
f actor as used in the determination by the PUCT of TU Electric's fuel factors 3
then currently in ef fect f or transsission 5
voltava lina lo8585-At the ti== of the execution of this Agreement, this factor is equal to 1.024789 as shown in Exhibit I
C attached hereto and made a part hereof.
The average distribution energy l'os s DL,
=
! actor used in the determination by the PUCT of TU Electric's fuel f acters then currently in effect for primary voltage line losses.
At the time of the execution of this Agreement, this factor is equal to 1.051741 as shown in Exhibit C attached hereto and made a part hereof.
The scheduled generation (MWH) actually ECONH
=
g scheduled and delivered on behalf of Cap I
Rock, as providad in any economy energy
*For Points of Delivery at nominal voltages equal to or greater than 60 Kv, the f actor "(1/TL,)" shall be used.
For Points of Delivery at nominal voltages less than 60 Kv, the factor
"(1/DL,)" shall be used.
12 I
l 5
l 5


scheduling agent agreements entered into between the Parties, during said hour.
scheduling agent agreements entered into between the Parties, during said hour.
FPSRHt    =          The                             energy   (MWH)   asscciated with Cap Rock's Firm                                 Pcwer Resources actually scheduled and delivered on behal* of Cap Rock in accordance with the terms of this Agreecent during said hour.
FPSRH The energy (MWH) asscciated with Cap
=
t Rock's Firm Pcwer Resources actually scheduled and delivered on behal* of Cap Rock in accordance with the terms of this Agreecent during said hour.
When Cap Rock becomes a control Area pursuant to Section 6.01 l
When Cap Rock becomes a control Area pursuant to Section 6.01 l
hereof, the partial requirements power and energy to be purchased by cap Rock and sold by TU Electric shall be all of Cap Rock's power and energy requirements as provided in this Agreement, less the a=ounts being supplied from a source other than TU Electric f or which notice has been given pursuant to Section 2.04 hereof, the accounting for which shall be determined pursuant to a mutually satisfactory procedure.                         Such power and energy shall be delivered by TU Electric to Points of Interconnection under a mutually acceptabla schedule, at such times and at such capacity factors, ramp rates,                   and other       factors as are mutually agrecable and consistant with good utility practices within ERCOT. The foregoing shall not apply to regulation power and energy provided by TU Electric pursuant to the provisions of Section 6.01 hereof or to the full                   quirements power and energy delivered to Cap Rock Points of Delivary, if any, remaining in TU Electric's Control Area.
hereof, the partial requirements power and energy to be purchased by cap Rock and sold by TU Electric shall be all of Cap Rock's power and energy requirements as provided in this Agreement, less the a=ounts being supplied from a source other than TU Electric f or which notice has been given pursuant to Section 2.04 hereof, the accounting for which shall be determined pursuant to a mutually satisfactory procedure.
Such power and energy shall be delivered by TU Electric to Points of Interconnection under a mutually acceptabla schedule, at such times and at such capacity factors, ramp rates, and other factors as are mutually agrecable and consistant with good utility practices within ERCOT. The foregoing shall not apply to regulation power and energy provided by TU Electric pursuant to the provisions of Section 6.01 hereof or to the full quirements power and energy delivered to Cap Rock Points of Delivary, if any, remaining in TU Electric's Control Area.
In the event Cap Rock movas one or more of its Points of Delivery (other than a former Point of Delivery served by another electric utility pursuant to Section 2.05 hereof) from the control x
In the event Cap Rock movas one or more of its Points of Delivery (other than a former Point of Delivery served by another electric utility pursuant to Section 2.05 hereof) from the control x
Area of TU Electric to the control Area of another electric utility, TU Electric will (if there is no load reduction as a consequence thereof), upon reasonable advance notice, continue to 13                               ,
Area of TU Electric to the control Area of another electric utility, TU Electric will (if there is no load reduction as a consequence thereof), upon reasonable advance notice, continue to 13 1
1


t sell such wholesale power and energy to Cap Rock for such Point (s) l           of   Delivery     in accordance with the provisions of                                     a mutually acceptable power supply agreement at Rate WP Wholesale Power, or I          its successor, notwithstanding the provisions of special Condition
t sell such wholesale power and energy to Cap Rock for such Point (s) l of Delivery in accordance with the provisions of a mutually acceptable power supply agreement at Rate WP Wholesale Power, I
              !!o . 1,   or   its equivalent,             of TU Electric's preposed Rate WP Wholesale Power pending bef oro the PUCT in Docket tio. 9300 on the I           date hereof.
or its successor, notwithstanding the provisions of special Condition
3.03     Load Growth
!!o.
                        '"U   Electric             Capacity       and                 TU Electric   Energy supplied hereunder shall include normal load growth                                           !or each Point of Delivery specified in Exhibit A hereto.
1, or its equivalent, of TU Electric's preposed Rate WP Wholesale Power pending bef oro the PUCT in Docket tio. 9300 on the I
3.04     UnintentioneA Energy In the event that, in any hour, the total energy scheduled and delivered to TU Electric f r== cap Rock's Power Supply Resources is in excens of the Metered Energy at any Point of Delivery in that hour, TU Electric shall c =pensate Cap Rock f or said excess, up to but not = ore than three percent (31) of the Metered Energy in that hour, by way of credit, in TU Electric's sola discretion:
date hereof.
(a)   as a direct replacement of                                   TU Electric   Energy I                 purchased by cap Rock under Rate WP Wholesale Power during the monthly billing period in which said hour occurs, or (b) in an amount equal to ninety-five percent (95%) cf TU Electric's actual avoided enerQy cost in that hour, against Cap Rock's bill for TU Electric Energy purchased by iI Cap Rock under Rate WP Wholesale Power during the conthly period in which isaid hour occurs, g                                                                           u I
3.03 Load Growth
'"U Electric Capacity and TU Electric Energy supplied hereunder shall include normal load growth
!or each Point of Delivery specified in Exhibit A hereto.
3.04 UnintentioneA Energy In the event that, in any hour, the total energy scheduled and delivered to TU Electric f r== cap Rock's Power Supply Resources is in excens of the Metered Energy at any Point of Delivery in that hour, TU Electric shall c =pensate Cap Rock f or said excess, up to but not = ore than three percent (31) of the Metered Energy in that hour, by way of credit, in TU Electric's sola discretion:
(a) as a direct replacement of TU Electric Energy I
purchased by cap Rock under Rate WP Wholesale Power during the monthly billing period in which said hour occurs, or (b) in an amount equal to ninety-five percent (95%) cf TU Electric's actual avoided enerQy cost in that hour, iI against Cap Rock's bill for TU Electric Energy purchased by Cap Rock under Rate WP Wholesale Power during the conthly period in which isaid hour occurs, g
u I


E otherv100 TU Electric shall have no rooponoibility or obligation to pay or otherwise compensate Cap Rock, directly or indirectly,
E otherv100 TU Electric shall have no rooponoibility or obligation to pay or otherwise compensate Cap Rock, directly or indirectly, for any energy scheduled to any Point of Delivery during any hour
)            for any energy scheduled to any Point of Delivery during any hour which is in excess of the Metered Energy c such Point of Delivery l             during such hour.
)
3.05                           Rate schedule l
which is in excess of the Metered Energy c such Point of Delivery l
It is distinctly understood and agreed that the conthly rate of charge (including any charges for power and energy in excess of l           Contract Demand and any demand determinations aff acting billing demand) for all power and energy whien Cap Rock shall purchase from TU Electric and TU Electric is required to sell to Cap Rock under this Agreement; shall be pursuant to TU Electric's Rate WP Wholesale Power, or its successor, as the same may from time to time be fixed and approved by the PUCr.
during such hour.
3.06                         Characteristics of Power and Energy The power and enargy TU Electric is required to deliver to Cap Rock under this Agreement will be of the character connonly described as three-phase, 60 herc , at a voltage for each Point of Delivery as specified on Exhibit A, and with reasonable variation in voltage and frequency to be allowed.
3.05 Rate schedule l
3.07                           Points of Delivery (a)                       Power and energy will be sold by TU Electric and purchased by Cap Rock under this Agreement at the Points of Delivery identified on Exhibit A hereto in the amounts specified in Sections 3.01, 3.02 and 3.03 hereof.
It is distinctly understood and agreed that the conthly rate of charge (including any charges for power and energy in excess of l
(b)                       Subject to the provisions of Section 3.11 hereof, 15
Contract Demand and any demand determinations aff acting billing demand) for all power and energy whien Cap Rock shall purchase from TU Electric and TU Electric is required to sell to Cap Rock under this Agreement; shall be pursuant to TU Electric's Rate WP Wholesale Power, or its successor, as the same may from time to time be fixed and approved by the PUCr.
      -_      - __-- -__-____ - ---- - -- _                                                                ~~
3.06 Characteristics of Power and Energy The power and enargy TU Electric is required to deliver to Cap Rock under this Agreement will be of the character connonly described as three-phase, 60 herc, at a voltage for each Point of Delivery as specified on Exhibit A, and with reasonable variation in voltage and frequency to be allowed.
3.07 Points of Delivery (a)
Power and energy will be sold by TU Electric and purchased by Cap Rock under this Agreement at the Points of Delivery identified on Exhibit A hereto in the amounts specified in Sections 3.01, 3.02 and 3.03 hereof.
(b)
Subject to the provisions of Section 3.11 hereof, 15
~~


t   Exhibit A shall ba emonded from timo to timo (upon tho oxocution of the supplemental agreement provided for in Section 3.08)                             to :
t Exhibit A shall ba emonded from timo to timo (upon tho oxocution of the supplemental agreement provided for in Section 3.08) to :
(i) add new points of delivery required by reason of normal load gr:vth in the certificated service areas of Cap Rock (and Lcne Wolf,_if Cap Rock and Lone Wolf are consolidated within the ti.y spr,cified in Section 3. 07 (b) (iv) below) , as established by the PUC-as of June B,             1990;   (ii) add and/cr delete Points of Delivery resulting from the consolidation of existing Cap Rock Points of I   Delivery and/or those new points of delivery, if any, added to Exhibit A pursuant to (i) above; (iii) delete Points of Delivery moved to the Control Area of Cap Rock or another electric utility; (iv) add points of delivery served by Lone Wolf on the date hereof provided that all corporate action necessary to apprsva such consolidation has been taken by Lone Wolf and cap Rock within 90 l   days after May 15, 1990, applications are filed for approval by One FUCT and the Rural Electrification Administration ("REA") within 120 days after May 15,                               1990, and the transaction is finally consummated             and   approved                 by all   regalatory agencias having jurisdiction thereover within one year from the date of filing of the   af:rementioned             applications                 (unless   extended by mutual agreement of the Parties); provided, however, that if approved by the PUCT and otherwise consummated within 12 months f allowing such h   filing date, failure of the REA to approve the consolidation, if otherwise             consurs.atect,                 shall not constitute a breach of   the I     foregoing provision; e.d (v) add Points of Delivery permitted by Section 3.15 (a) (ii) .             Any load reductions or increases resulting I                                                                 "
(i) add new points of delivery required by reason of normal load gr:vth in the certificated service areas of Cap Rock (and Lcne Wolf,_if Cap Rock and Lone Wolf are consolidated within the ti.y spr,cified in Section 3. 07 (b) (iv) below), as established by the PUC-as of June B,
l I                   -
1990; (ii) add and/cr delete Points of Delivery resulting from the consolidation of existing Cap Rock Points of I
Delivery and/or those new points of delivery, if any, added to Exhibit A pursuant to (i) above; (iii) delete Points of Delivery moved to the Control Area of Cap Rock or another electric utility; (iv) add points of delivery served by Lone Wolf on the date hereof provided that all corporate action necessary to apprsva such consolidation has been taken by Lone Wolf and cap Rock within 90 l
days after May 15, 1990, applications are filed for approval by One FUCT and the Rural Electrification Administration ("REA") within 120 days after May 15,
: 1990, and the transaction is finally consummated and approved by all regalatory agencias having jurisdiction thereover within one year from the date of filing of the af:rementioned applications (unless extended by mutual agreement of the Parties); provided, however, that if approved by the PUCT and otherwise consummated within 12 months f allowing such h
filing date, failure of the REA to approve the consolidation, if otherwise consurs.atect, shall not constitute a breach of the I
foregoing provision; e.d (v) add Points of Delivery permitted by Section 3.15 (a) (ii).
Any load reductions or increases resulting I
l I


I fro 3 tiho forO90ing shall bo cubjoct to tho applicablo notico provisions'o'f this Agreement.
I fro 3 tiho forO90ing shall bo cubjoct to tho applicablo notico provisions'o'f this Agreement.
4 3.os     contract Demand contract Demand shall be     specified   for each Point of I
3.os contract Demand 4
celivery identified on Exhibit A. centract Demand at any Point of l         Delivery may be changed from time to time on Exhibit A,         upon 12 months' prior written notice to TU Electric (but no more frequently I
contract Demand shall be specified for each Point of I
than once every 12 months), as the result of nor=al lead growth or normal lead reductions (which, in either case, does not include
celivery identified on Exhibit A.
]             load transferred to or from anothar source, including Cap Rock) at each such Point of Delivery.
centract Demand at any Point of l
Delivery may be changed from time to time on Exhibit A, upon 12 I
months' prior written notice to TU Electric (but no more frequently than once every 12 months), as the result of nor=al lead growth or normal lead reductions (which, in either case, does not include
]
load transferred to or from anothar source, including Cap Rock) at each such Point of Delivery.
Contract Demand at any Point of Delivery may be decreased on Exhibit A by Cap Rock contemporaneously with the expiration of the notice period provided for in Section 2.04.
Contract Demand at any Point of Delivery may be decreased on Exhibit A by Cap Rock contemporaneously with the expiration of the notice period provided for in Section 2.04.
Contract Demand at any Point of Delivery may be increased
Contract Demand at any Point of Delivery may be increased
!I i
!I on Exhibit A as a result of purchases of power and energy pursuant i
4 on Exhibit A as a result of purchases of power and energy pursuant g         to   the   provisions   of Section   3.15 (a) (1)   or (iii) hereof, conte =poraneously with   the expiration   of   the notice periods provided for therein.
4 g
Contract Decand may be established on Exhibit A for a Point
to the provisions of Section 3.15 (a) (1) or (iii)
,            of Delivery which has been added pursuant to Section 3.07 (b) (v) hereof at the expiration of the notice period provided for in Section 3.15 (a) (ii)   hereof and for   Points   of Delivery added pursuant to Section 3.07 (b) (iv) hereof.
: hereof, conte =poraneously with the expiration of the notice periods provided for therein.
Contract Demand at any Point of Delivery may, if there is no load reduction, be enanged simultaneously with the addition or 17 I
Contract Decand may be established on Exhibit A for a Point of Delivery which has been added pursuant to Section 3.07 (b) (v) hereof at the expiration of the notice period provided for in Section 3.15 (a) (ii) hereof and for Points of Delivery added pursuant to Section 3.07 (b) (iv) hereof.
I
Contract Demand at any Point of Delivery may, if there is no load reduction, be enanged simultaneously with the addition or 17
, I I


dolction of a Point of Delivery as pe_ itted by Section 3,07(b) (ii) hereof.
dolction of a Point of Delivery as pe_ itted by Section 3,07(b) (ii) hereof.
f         Each change in Contract Demand on Exhibit A as provided above shall be subject to the execution of a supplecent to this Agreement containing mutually satisfactory provisions, including l any necessary changes in facilities at each Point of relivery 6
f Each change in Contract Demand on Exhibit A as provided above shall be subject to the execution of a supplecent to this Agreement containing mutually satisfactory provisions, including l
resulting tnerefrom as required by Section 3.M hereof.
any necessary changes in facilities at each Point of relivery resulting tnerefrom as required by Section 3.M hereof.
3.09   Idled Facilities j         Cap Rock will pay TU Electric for each transmission and i
6 3.09 Idled Facilities j
distribution-related f acility(ies) which is rendered idle by reason
Cap Rock will pay TU Electric for each transmission and i
! of the reduction in any       load covered by this Agreement.       A facility (ies) is rendered idle if such facility (ies)       (i) is no l
distribution-related f acility(ies) which is rendered idle by reason of the reduction in any load covered by this Agreement.
A facility (ies) is rendered idle if such facility (ies)
(i) is no l
longer being used for the delivery of powar and energy on behalf of Cap Rock and is not, or no longer has any reasonable pr:spect of, being used on behalf of any other TU Electric customer for the l
longer being used for the delivery of powar and energy on behalf of Cap Rock and is not, or no longer has any reasonable pr:spect of, being used on behalf of any other TU Electric customer for the l
delivary of power and energy; er (ii) is so underutili:ed by an l existing TU Electric     customer (s)   (including Cap Rock)   as to require, using prudent utility practices,       its re= oval for use elsewhere on the TU Electric system.       Cap Rock agrees to psy TU l
delivary of power and energy; er (ii) is so underutili:ed by an l
existing TU Electric customer (s)
(including Cap Rock) as to require, using prudent utility practices, its re= oval for use elsewhere on the TU Electric system.
Cap Rock agrees to psy TU l
Electric for each idled facility (ies) the replace =ent c:st new (RCN) less an allowance for age and condition, plus removal ecsts, less salvage value; provided, however, f or a f acility(ies) removed for use elsewhere on the TU Electric system pursuant to (ii) above, l
Electric for each idled facility (ies) the replace =ent c:st new (RCN) less an allowance for age and condition, plus removal ecsts, less salvage value; provided, however, f or a f acility(ies) removed for use elsewhere on the TU Electric system pursuant to (ii) above, l
Cap Rock agrees, to pay only the costs of removal and the costs of l insta.llation   of   any facility (ies)   replacing   said   removed facility (ies). Such charges shall be reduced by the amounts, if l
Cap Rock agrees, to pay only the costs of removal and the costs of l
insta.llation of any facility (ies) replacing said removed facility (ies).
Such charges shall be reduced by the amounts, if l
)
)


g '
g any, previously paid by Cap Rock (pursucnt to thG provisionc of Section 3.ll' hereof and the provisions of any wheeling agreecent(s) executed by the Parties as provided in Section 7.01 hereof) for such idled facilities.
any, previously paid by Cap Rock (pursucnt to thG provisionc of Section 3.ll' hereof and the provisions of any wheeling agreecent(s) executed by the Parties as provided in Section 7.01 hereof) for such idled facilities. In lieu of paying TU Electric f or the idled A
In lieu of paying TU Electric f or the idled A
facilities as required above, Cap Rock =ay, at the sole option of TU El'ectric, purchase the idled facilities or pay TU Ilectric jg     annually the reasonable carrying cost of the idled f acilities; Cap
facilities as required above, Cap Rock =ay, at the sole option of TU El'ectric, purchase the idled facilities or pay TU Ilectric jg annually the reasonable carrying cost of the idled f acilities; Cap
:5 Rock     shall not   be   required   to purchase or lease the idled
:5 Rock shall not be required to purchase or lease the idled facility (les).
;      facility (les).
3.10 change of voltage TU Electri: vill provide power and energy to Cap Rcck at each Point of Delivery at the delivery voltage specified in Exhibit A as long as such delivery voltage is available.
3.10     change of voltage TU Electri:   vill provide power and energy to Cap Rcck at each Point of Delivery at the delivery voltage specified in Exhibit A as long as such delivery voltage is available. If TU Electric converts its facilities providing power and energy at any Point of Delivery to a different operating voltage, Cap Rock agrees to take power and energy at the changed voltage then available or bear all costs to transform the voltage from the changed voltage to that which Cap Rock stiy require. TU Electric will give Cap Rock written notice at least     two years in advance of such voltage change. TU Electric will support Cap Rock in obtaining any Certificate of Convenience and Necessity ("CCN") necessary for Cap Rock to effect such conversion, and will not terminate service at the existing voltage to Cap Rock at the Point of Delivery until the CCN is           .
If TU Electric converts its facilities providing power and energy at any Point of Delivery to a different operating voltage, Cap Rock agrees to take power and energy at the changed voltage then available or bear all costs to transform the voltage from the changed voltage to that which Cap Rock stiy require.
granted and Cap Rock's conversion can be completed.
TU Electric will give Cap Rock written notice at least two years in advance of such voltage change.
TU Electric will support Cap Rock in obtaining any Certificate of Convenience and Necessity ("CCN") necessary for Cap Rock to effect such conversion, and will not terminate service at the existing voltage to Cap Rock at the Point of Delivery until the CCN is granted and Cap Rock's conversion can be completed.
Cap Rock may, at its option, upgrade its facilities at any Point of Delivery to a higher delivery voltage than available from 19 I
Cap Rock may, at its option, upgrade its facilities at any Point of Delivery to a higher delivery voltage than available from 19 I
.,,r


TU Electric at cuch Point of Dolivory; providcd, hovcVer, that: (i) g       Cap Rock pays f or all =edifications to TU Electric's facilities that are necessary to provide power and energy to Cap Rock at such higher delivery voltage, (ii) Cap Rock gives TU Electric reasonable written notice of its desire to take delivery at such higher voltage, and (iii) TU Electric vill not be required to provide delivery at such higher voltage until all required modificatiens to TU Electric's facilities can be co=pleted.
TU Electric at cuch Point of Dolivory; providcd, hovcVer, that: (i) g Cap Rock pays f or all =edifications to TU Electric's facilities that are necessary to provide power and energy to Cap Rock at such higher delivery voltage, (ii) Cap Rock gives TU Electric reasonable written notice of its desire to take delivery at such higher voltage, and (iii) TU Electric vill not be required to provide delivery at such higher voltage until all required modificatiens to TU Electric's facilities can be co=pleted.
I       3.11                           Facilities at Points of Dslivery Any new or upgraded transmission and distribution-related f acilities reasonably rsquired by TU Electric in connection with servica to Cap Rock shall be at Cap Rock's sole cost and expense.
I 3.11 Facilities at Points of Dslivery Any new or upgraded transmission and distribution-related f acilities reasonably rsquired by TU Electric in connection with servica to Cap Rock shall be at Cap Rock's sole cost and expense.
3.12                           Interconnection er Parallel Operations with Other Suppliers cap Rock agrees that no portion of its transmission and l       distribution                                                                                     system interconnected with TU Electric vill be electrically interconnected or operated in parallel with any part or parts of a system being supplied through connection with any
3.12 Interconnection er Parallel Operations with Other Suppliers cap Rock agrees that no portion of its transmission and l
                                                                                                                                                                      ~
distribution system interconnected with TU Electric vill be electrically interconnected or operated in parallel with any part or parts of a system being supplied through connection with any other supplier of electric energy, nor shall any Points of Delivery
other supplier of electric energy, nor shall any Points of Delivery be interconnected by such transmission and distribution system; provided, however, that, subject to the execution of a sutually acceptable interconnection agreement,                                                                                   the foregoing limitation shall not apply to any Point of Delivery which is moved to Cap Rock's Control Area or the Control Area of another electric utility.
~
3.13                               Forecasts on January 15 of each year during the time this Agreement I                                                                                                                                                                 l 8
be interconnected by such transmission and distribution system; provided, however, that, subject to the execution of a sutually acceptable interconnection agreement, the foregoing limitation shall not apply to any Point of Delivery which is moved to Cap Rock's Control Area or the Control Area of another electric utility.
3.13 Forecasts on January 15 of each year during the time this Agreement I
l 8


rcmcino in offcct, Ccp Rock vill provido TU Eloctric by point                                       og Delivery and otherwish l                                    with such forecast (s) (in such foro as TU Electric may reasonably require) of (i) total power and energy requirements,     (ii)
rcmcino in offcct, Ccp Rock vill provido TU Eloctric by point og Delivery and otherwish with such forecast (s) (in such foro as TU l
I-                               power and energy required from TU Ilectrie, (iii)   changes   in Power       Supply Resources, (iv)   changes     in transmission     and   distribution       facilities,                             (v)     changes     in transmission service arrangements and (vi) such other information as may be reasonably required by TU Electric.
Electric may reasonably require) of (i) total power and energy requirements, (ii)
Upon the furnishing of any such inf ormation, Cap Rock will appropriately designate                               -
I-power and energy required from TU Ilectrie, (iii) changes in Power Supply Resources, (iv) changes in transmission and distribution facilities, (v) changes in transmission service arrangements and (vi) such other information as may be reasonably required by TU Electric.
those portions thereof which it considers to be confidential TU                                   .
Upon the furnishing of any such inf ormation, Cap Rock will appropriately designate those portions thereof which it considers to be confidential TU Ilectric will use reasonable diligence to maintain in confidence all such designated information which has not otberwise becoce publicly available.
Ilectric will use reasonable diligence to maintain in confidence all such designated information which has not otberwise becoce publicly available.         TU Electric may furnish                     the   foregoing g       information to the PUCT or to any other person if ordered to do so by any court or regulatory agency having jurisdiction and, to the extent required, to ERCOT for planning purposes only.                                       Information supplied to TU Electric pursuant to this Section 3.13 shall be for planning purposes only and shall not constitute a notice of load h     reduction or load increase by Cap Rock under any provision of this Agreement.
TU Electric may furnish the foregoing g
3.14       Right of Access g               Each Party shall give all necessary per:sission to the other to enable the agents of the other Party to carry out this Agreement and shall give the other the right by its fully authorized agents and employees to enter the premises of the other at all reasonable times     for the   purposes   of     reading   or           checking                   meters,     for 21 I                                                                                                                     t
information to the PUCT or to any other person if ordered to do so by any court or regulatory agency having jurisdiction and, to the extent required, to ERCOT for planning purposes only.
Information supplied to TU Electric pursuant to this Section 3.13 shall be for planning purposes only and shall not constitute a notice of h
reduction or load increase by Cap Rock under any provision of this load Agreement.
3.14 Right of Access g
Each Party shall give all necessary per:sission to the other to enable the agents of the other Party to carry out this Agreement and shall give the other the right by its fully authorized agents and employees to enter the premises of the other at all reasonable times for the purposes of reading or checking
: meters, for 21 I
t


incpacting, tocting, ropciring, roncwing or exchanging any or all of its equipment which may be located on the propierty of the other, I   and for performing any ot."er work         incident to rendering the services provided for in this Agreement; provided, hcwever, that neither Party hereto shall have any duty to inspect the equipcent, I
incpacting, tocting, ropciring, roncwing or exchanging any or all of its equipment which may be located on the propierty of the other, I
and for performing any ot."er work incident to rendering the services provided for in this Agreement; provided, hcwever, that neither Party hereto shall have any duty to inspect the equipcent, I
lines and facilities of the other.
lines and facilities of the other.
3.15     Changes in the Provision of Power and Energy (a)   If, during the tern hereof, Cap Rock wishes to: (i) purchase power and energy from 37 Electric previously supplied from a Firm Power Resource;     (ii) add a Point of Delivery previously i
3.15 Changes in the Provision of Power and Energy (a)
        =oved from the TU Electric Control Area to the Control Area of l       another electric utility cther than Cap Rock; or (iii) otherwise increase the amount of power and energy to be supplied by TU Electric at any Point of Delivery specified on Exhibit A hereto (other than normal load growth at such Points of Delivery or increases occasioned by the consolidation of two or = ore existing
If, during the tern hereof, Cap Rock wishes to: (i) purchase power and energy from 37 Electric previously supplied from a Firm Power Resource; (ii) add a Point of Delivery previously i
.      and/or new Points of Delivery), 31 Electric will, on three years' advance written notice, subject to the limitations of Sections 5.07 I   and 5.08 hereof, sell to cap Rock full and partial require =ents l   power in accordance with Rate WP Wholesale Power, or its successor, pursuant to the provisions of this Agreement.
=oved from the TU Electric Control Area to the Control Area of l
(b)   If Cap Rock or TU Electric cancels this Agreement pursuant to Section 2.02 hereof, or if Cap Rock causes one or = ore of its Points of Delivery (other than a former Point of Delivery I       served by another electric utility pursuant to Section 2.05 hereof)
another electric utility cther than Cap Rock; or (iii) otherwise increase the amount of power and energy to be supplied by TU Electric at any Point of Delivery specified on Exhibit A hereto (other than normal load growth at such Points of Delivery or increases occasioned by the consolidation of two or = ore existing and/or new Points of Delivery), 31 Electric will, on three years' advance written notice, subject to the limitations of Sections 5.07 I
:      to become a part of another Control Area (other than Cap Rock's 1
and 5.08 hereof, sell to cap Rock full and partial require =ents l
power in accordance with Rate WP Wholesale Power, or its successor, pursuant to the provisions of this Agreement.
(b)
If Cap Rock or TU Electric cancels this Agreement pursuant to Section 2.02 hereof, or if Cap Rock causes one or = ore of its Points of Delivery (other than a former Point of Delivery I
served by another electric utility pursuant to Section 2.05 hereof) to become a part of another Control Area (other than Cap Rock's 1
;I
;I


I ,
I control Arca) and, if thoro 10 o lead reduction in connection j _
control Arca) and, if thoro 10 o lead reduction in connection j_  therewith, gives the notice required by section 2.04 hereof, TU Electric will: (i) on three years' (or five years' in the case of those Points of Delivery becoming full requirements points of delivery in accordance with Sections 5.08 and
therewith, gives the notice required by section 2.04 hereof, TU Electric will: (i) on three years' (or five years' in the case of those Points of Delivery becoming full requirements points of delivery in accordance with Sections 5.08 and
: 7. 02 (b) hereof) advance   vritten     notice,   sell       to   Cap Rock   full   and partial requirements wholesale power in accordance with the provisions of Rate WP ' Wholesale Power, or its successor, pursuant to a =utually
: 7. 02 (b) hereof) advance vritten
  'I 1
: notice, sell to Cap Rock full and partial requirements wholesale power in accordance with the provisions of
acceptable agreement f or electric service (which shall not include l   the sale of scheduling or regulation services), provided that TU Electric has suf*icient bulk power available and provided the sale would not impair its ability to render adequate and reliable                     .
' I Rate WP ' Wholesale Power, or its successor, pursuant to a =utually 1
service to   its     customers   er       its   ability to   discharge prior cor.mit=ents ; and (ii) provide firm transmission wheeling, on a transaction specific basis, in accorduce with mutually acceptable interconnection and transmission wheeling agreement (s) on ter=s that fully compensate TU Electric for its costs p'"5 a reasonable return on investment, together with all costs fo;                 .y additions or modifications necessary to accommodate each whee. .ng transaction, 4
acceptable agreement f or electric service (which shall not include l
provided TU Electric has adequate transmission and distribution g   capacity available (if distribution wheeling services are then 1      being offered) and the transaction would not unreasonably i= pair TU   Electric's   systaa     reliability         or   emergency   transmission capacity.
the sale of scheduling or regulation services), provided that TU Electric has suf*icient bulk power available and provided the sale would not impair its ability to render adequate and reliable service to its customers er its ability to discharge prior cor.mit=ents ; and (ii) provide firm transmission wheeling, on a transaction specific basis, in accorduce with mutually acceptable interconnection and transmission wheeling agreement (s) on ter=s that fully compensate TU Electric for its costs p'"5 a reasonable return on investment, together with all costs fo;
  ;I                 -Im m.           oc         , .mm, ---
.y additions or modifications necessary to accommodate each whee..ng transaction, provided TU Electric has adequate transmission and distribution 4
g capacity available (if distribution wheeling services are then being offered) and the transaction would not unreasonably i= pair 1
TU Electric's systaa reliability or emergency transmission capacity.
; I
-Im m.
oc
,.mm, ---
AND SCREDULED MAINTENANCR POWER 23 I
AND SCREDULED MAINTENANCR POWER 23 I


4.01     Loss of Pirm Power Resource
4.01 Loss of Pirm Power Resource
.I                 TU Electric vill not provide any backup or standby service, l       includ!.nq installed or spinning reserves, nor will it plan for or shall it be obligated to serve any of Cap Rock's requirements not I             ,
.I TU Electric vill not provide any backup or standby service, l
expressly specified or provided for in this Agreement, including j         the sale of power previously supplied from a Fin Power Resour:n.
includ!.nq installed or spinning reserves, nor will it plan for or shall it be obligated to serve any of Cap Rock's requirements not I
In the event a Fi n Power Resource being scheduled as prov:,ded in Arti:le V hereof is not delivered for any reason, Cap Rock shall, subject to the sale of emergancy power provided in i,ection 4.01 hereof, immediately curtail load (in accordance with a curtailcent l     plan reasonably acceptable to TU Electric), in amounts equal to such undelivered                                       Firm Power   Resource unless cap   Rock =akes arrangements                                       (satisfactory   to   TU Electric) to replace such
expressly specified or provided for in this Agreement, including j
  ;        undeliverad Firm Power Resource with another Firm Power Resource (which shall be deemed to be a sourca or resource for the purposes of sections A.08, 5 . 'P. , 5.04 and 5.06 hereof); provided, however, that in instances where the Firs Power Resourca is not delivered due solely to an emergency ceased by the failure of TU Electric's transmis#cn faullities or an eoergency caused by the fallure of transmission facilitias of another member system of ERCOT (other than the supplier of the undelivered Firm Power Resource), Cap Rock l     may (if satisfactory to TU Electric) use a source to replace suen undelivered Firn Sover Rescurce other than that provided for in section 5.01,(a) at a level of firmness other than that required by Section 5.01(b), provided Cap Rock agrees in advance to execura a I
the sale of power previously supplied from a Fin Power Resour:n.
I                                                                                                 _
In the event a Fi n Power Resource being scheduled as prov:,ded in Arti:le V hereof is not delivered for any reason, Cap Rock shall, subject to the sale of emergancy power provided in i,ection 4.01 hereof, immediately curtail load (in accordance with a curtailcent l
plan reasonably acceptable to TU Electric), in amounts equal to such undelivered Firm Power Resource unless cap Rock
=akes arrangements (satisfactory to TU Electric) to replace such undeliverad Firm Power Resource with another Firm Power Resource (which shall be deemed to be a sourca or resource for the purposes of sections A.08, 5. 'P., 5.04 and 5.06 hereof); provided, however, that in instances where the Firs Power Resourca is not delivered due solely to an emergency ceased by the failure of TU Electric's transmis#cn faullities or an eoergency caused by the fallure of transmission facilitias of another member system of ERCOT (other than the supplier of the undelivered Firm Power Resource), Cap Rock l
may (if satisfactory to TU Electric) use a source to replace suen undelivered Firn Sover Rescurce other than that provided for in section 5.01,(a) at a level of firmness other than that required by Section 5.01(b), provided Cap Rock agrees in advance to execura a I
I


j r.cnodulutg agent agroccant on tho torms provided for in section 5.06 and a mutually datisfactory short-term wheeling agreement.               l Anything in this Agreement to the contrary netvithstanding, TU l     Electric shall not be required to deliver any power replacing such           l l
j r.cnodulutg agent agroccant on tho torms provided for in section 5.06 and a mutually datisfactory short-term wheeling agreement.
undelivered Firm Power Resource for a period of = ore than f ur consecutive days or the length of the emergency, whichever is less, g     and in any evegt for more than three such emergencies during any 12-month period, except in cases where the emergency is due solely to an eoergency caused by the f ailure of TU Electric's transmission
Anything in this Agreement to the contrary netvithstanding, TU l
'g se   facilities,     in which event the period of such delivery shall continue for the entire length of the emergency and the nurler of
Electric shall not be required to deliver any power replacing such undelivered Firm Power Resource for a period of = ore than f ur consecutive days or the length of the emergency, whichever is less, g
)l       such smergencies for which such delivery shall be made will not be limited.
and in any evegt for more than three such emergencies during any 12-month period, except in cases where the emergency is due solely to an eoergency caused by the f ailure of TU Electric's transmission se facilities, in which event the period of such delivery shall
>I
'g continue for the entire length of the emergency and the nurler of
;        4.02     Emergency Powe" fg                 Before Cap Rock becomes a Control Area and during the I
)l such smergencies for which such delivery shall be made will not be limited.
period (s) in which TU Electric may be required tc schedule Firs Power Resources pursuant to Article V hereof, and in the event a Firm Power Resource being scheduled as provided under Article V
>I 4.02 Emergency Powe" fg Before Cap Rock becomes a Control Area and during the I
;        hereof is not delivered due to no fault of Cap Rock, and TV
period (s) in which TU Electric may be required tc schedule Firs Power Resources pursuant to Article V hereof, and in the event a Firm Power Resource being scheduled as provided under Article V hereof is not delivered due to no fault of Cap Rock, and TV
-l       Electric has power and energy available therefor, TU Electric will sell emergency power to Cap Rock in an amount equal to such I   undelivnrad Fira Power Resource for a period not to exceed tan hours at the rate specified in Rate WP Wholesale Power, or its successor,     including the           demand determinations under Rate VP Wholesale Power specified therein; provided, however, if the Tirn Power Resource is not delivered due solely to an emergency caused
-l Electric has power and energy available therefor, TU Electric will sell emergency power to Cap Rock in an amount equal to such I
  .I                                                                                  .
undelivnrad Fira Power Resource for a period not to exceed tan hours at the rate specified in Rate WP Wholesale Power, or its successor, including the demand determinations under Rate VP Wholesale Power specified therein; provided, however, if the Tirn
25
.I Power Resource is not delivered due solely to an emergency caused 25


by tho failuro of TU Electric's transmission f acilitico or the f ailure of f acilities at Texas Utilities System operating Centar
by tho failuro of TU Electric's transmission f acilitico or the f ailure of f acilities at Texas Utilities System operating Centar
("TUSoca), TU Electric vill sell or continue to sell such emergency l     power to Cap Rock for an additicnal f our-day peried at the sace rate as aforesaid, including the demand determinations.
("TUSoca), TU Electric vill sell or continue to sell such emergency l
I     4.03         Cu.rtailment Plan l                   No later than six c:nths prior to the date cap ttock first begins taking power frem a Tirm Power Resource in accordance with                                             ,
power to Cap Rock for an additicnal f our-day peried at the sace rate as aforesaid, including the demand determinations.
the provisions of this Agreement,                                               Cap Rock shall develop and deliver to TU Electric a mutually etcaptable curtail =ent plan, and TU Electric agrees to coeperate with Cap Rock in the development of said curtailment pian, :,dentifying lead equal to tne capacity of such Firm Power Resource to be curtailed and the =eans by which I
I 4.03 Cu.rtailment Plan l
l said curtailment plan is to be i=plemented in accordance with the ar=vi *="- =' " =**=" '                       2 " r               '-              '"- =""" * " "" v2 = =" t 5
No later than six c:nths prior to the date cap ttock first begins taking power frem a Tirm Power Resource in accordance with the provisions of this Agreement, Cap Rock shall develop and deliver to TU Electric a mutually etcaptable curtail =ent plan, and TU Electric agrees to coeperate with Cap Rock in the development of said curtailment pian, :,dentifying lead equal to tne capacity of such Firm Power Resource to be curtailed and the =eans by which l I said curtailment plan is to be i=plemented in accordance with the 5
thereupon be added as an amanciment to this Agreement and set f orth in Exhibit D hereto.
ar=vi *="- =' " =**=" '
The curtailment plan may be amended from time to time by mutual agreement of the Parties, provided that, upon the addition of, ol' any increase or reduction in Firs capability of, any Firm Power Resource pursuant to Section 2.04 hereof and by no 1.1ter than ten (10) Working Days prior to the date upon which Cap Rock desires l     to begin taking power from such Firm Power Resouren , Cap Rock shall develop,         in cooperation with TU                                 Electric,       and deliver to TU Einctriic a mutually acceptable revised curtailrant plan,                                             to be added to this Agreement as an a:nendment to Exhibit o herato, 26 4
2 " r
'"- =""" * " "" v2 = =" t thereupon be added as an amanciment to this Agreement and set f orth in Exhibit D hereto.
The curtailment plan may be amended from time to time by mutual agreement of the Parties, provided that, upon the addition of, ol' any increase or reduction in Firs capability of, any Firm Power Resource pursuant to Section 2.04 hereof and by no 1.1ter than ten (10) Working Days prior to the date upon which Cap Rock desires l
to begin taking power from such Firm Power Resouren, Cap Rock shall
: develop, in cooperation with TU
: Electric, and deliver to TU Einctriic a mutually acceptable revised curtailrant plan, to be added to this Agreement as an a:nendment to Exhibit o herato, 26 4


identifying ,lood equoi to tho ecpacity of such Pirm Power Resource g     and the means by which the amended curtailment plan is to be imple=ented.
identifying,lood equoi to tho ecpacity of such Pirm Power Resource g
4.04         scheduled Maintenance Power                                                                 .
and the means by which the amended curtailment plan is to be imple=ented.
                    .Before cap Rock becosts a control Area                       ind du:*ina the peried t s) in which TU Electric nay to required to schedule Firm l     Power Resources pursuant to Article V hereof, and if Cap Rock owns or controls           its own generation             (located within TU Electric's interconnected             system),     TU       Electric   shall   sell         scheduled maintenance           power     to   Cap   Rock,       if available,         on     =utually satisf actory terms and conditions, at P. ate WP Wholesale Power or its       successor,       including     the       demand deturminations           specific 1 therein.
4.04 scheduled Maintenance Power
4.05         Limitations on Envrgency and scheduled Maintenance Pavar l                 TU Electric shall not be required to sell amargency or scheduled maintenance power if to do so would result in the                                               '
.Before cap Rock becosts a control Area ind du:*ina the peried t s) in which TU Electric nay to required to schedule Firm l
I    curtail =ent         of     its   native   load       customers,   the     inability                 to l     discharge prior commit =ents or otherwise impair its ability to rreder adequate and reliable electric service.
Power Resources pursuant to Article V hereof, and if Cap Rock owns or controls its own generation (located within TU Electric's interconnected system),
4.06         other Power and Energy Any power and energy taken by Cap Rock from TU Electric as a result of Cap Rock's presence in the TU Electric Control Area, not permitted           by     this   Agreement       and not   resulting           frem           TU Electric's interruption of firm transmission service, will, among
TU Electric shall sell scheduled maintenance power to Cap
      -all other consequences provided for herein, including the Default                                         .
: Rock, if available, on
l    provisions hereof, be paid for by cap Rock at TU Electric's Rate g                                                       n I                                           -                                .-        -                ..
=utually satisf actory terms and conditions, at P. ate WP Wholesale Power or its successor, including the demand deturminations specific 1 therein.
4.05 Limitations on Envrgency and scheduled Maintenance Pavar l
TU Electric shall not be required to sell amargency or scheduled maintenance power if to do so would result in the I
curtail =ent of its native load customers, the inability to l
discharge prior commit =ents or otherwise impair its ability to rreder adequate and reliable electric service.
4.06 other Power and Energy Any power and energy taken by Cap Rock from TU Electric as a result of Cap Rock's presence in the TU Electric Control Area, not permitted by this Agreement and not resulting frem TU Electric's interruption of firm transmission service, will, among
-all other consequences provided for herein, including the Default l
provisions hereof, be paid for by cap Rock at TU Electric's Rate g
n I


a WP   Wholconlo   Powcr, or     ito   succossor,   pluo     the   demand determinations specified therein.
a WP Wholconlo
I                             ARTICLE V. SCHEDULING 5.01     Scheduling of Power Supply Resources (a)
: Powcr, or ito succossor, pluo the demand determinations specified therein.
TU Electric vill schedule power from up to six Power Supply Resources (determined by source and not control area i.e., ,
I ARTICLE V.
an electric utility generating plant, an electric utility ee:.pany (other than TU Electric) or a qualifying f acility) specified en Exhibit B horeto so long as not more than three of which resources (at least one of which shall be a Firn Power Resource)           are scheduled during any 24-hour period.
SCHEDULING 5.01 Scheduling of Power Supply Resources (a)
TU Electric vill schedule power from up to six Power Supply Resources (determined by source and not control area i.e.,
an electric utility generating plant, an electric utility ee:.pany (other than TU Electric) or a qualifying f acility) specified en Exhibit B horeto so long as not more than three of which resources (at least one of which shall be a Firn Power Resource) are scheduled during any 24-hour period.
(b)
(b)
TU Electric's obligation to schedule will be limited I    to Firs Power Resources (except when it has elected to schedule econcmy energy and a mutually satisfactory scheduling agent I   agreement has been executed).
TU Electric's obligation to schedule will be limited to Firs Power Resources (except when it has elected to schedule I
econcmy energy and a
mutually satisfactory scheduling agent I
agreement has been executed).
In the event TU Electric agrees to schedule economy energy, any such scheduling agent agreement (s) shall be subject to cancellation by either Party on 30 days' written notica and shall provide for charges in the same menner as set forth in Section 5.05 hereof.
In the event TU Electric agrees to schedule economy energy, any such scheduling agent agreement (s) shall be subject to cancellation by either Party on 30 days' written notica and shall provide for charges in the same menner as set forth in Section 5.05 hereof.
h 5.02 Cap Rock Hotice of Schedules to TU Flectric Cap Rock shall notify W Electric in yriting by f acsimile communication to TUSOC, at the number set forth in Section 10.07 l hereof, no later than 12:00 noon on the Working Day prior to the Schedule Period during which Cap Rock desires to receive power and 28 I                                                                                   \
h 5.02 Cap Rock Hotice of Schedules to TU Flectric Cap Rock shall notify W Electric in yriting by f acsimile communication to TUSOC, at the number set forth in Section 10.07 l
hereof, no later than 12:00 noon on the Working Day prior to the Schedule Period during which Cap Rock desires to receive power and 28
\\
I


onergy frca .cny tira Power Roccurco, which writton notico snall sper:ify the amount of energy (MWH) that Cap Rock desires TU i
onergy frca.cny tira Power Roccurco, which writton notico snall sper:ify the amount of energy (MWH) that Cap Rock desires TU i
Electric to schedule on its behalf during each hour of the schedule l     Period from each Firm Power Resource.
Electric to schedule on its behalf during each hour of the schedule l
5.03   changes in Delivery Rate I             Unless TU Electric agreed otherwise, no notice given by Osp l     Rock pursuant to Section 5.02 hereof shall con *:ain more than tour changen in the delivery rate (two up and two down) in any twenty-f eur hour period for each Tirm Power Resource being scheduled pursuant to the provisions of this article, it being understood and agreed by the Parties that such changes will be acce=plished at a ramp rate of not less than two megawatts / minute nor more than ten
Period from each Firm Power Resource.
* magavatts/ minute.
5.03 changes in Delivery Rate I
I   5.04   Backup Resources Any backup resource scheduled through the Control Area (excluding the TU Electric Control Area) in which the original Firm Power Resource is located and in lieu of the original Firs Power 3       Resource, toyether with such original Tir:s Power Resource, shall be considered a single resource.                                                         In all- other cases, a backup resource shall be considered a separate resource.
Unless TU Electric agreed otherwise, no notice given by Osp l
5.05   TU Electric Execution of schedules I           subject   to the                                                   provisions   of this Agreement   and the l   execution of mutually acceptable wheeling agreement (s) as provided in Section 7.01 hureof, TU Electric will execute the schedules in accordance with the notices received by TU Electric pursuant to Section 5.02 hereof. The scheduling of power replaced by Cap Rock 29 I             __                                                                      _                        __      __
Rock pursuant to Section 5.02 hereof shall con *:ain more than tour changen in the delivery rate (two up and two down) in any twenty-f eur hour period for each Tirm Power Resource being scheduled pursuant to the provisions of this article, it being understood and agreed by the Parties that such changes will be acce=plished at a ramp rate of not less than two megawatts / minute nor more than ten magavatts/ minute.
I 5.04 Backup Resources Any backup resource scheduled through the Control Area (excluding the TU Electric Control Area) in which the original Firm Power Resource is located and in lieu of the original Firs Power 3
Resource, toyether with such original Tir:s Power Resource, shall be considered a single resource.
In all-other cases, a backup resource shall be considered a separate resource.
5.05 TU Electric Execution of schedules I
subject to the provisions of this Agreement and the l
execution of mutually acceptable wheeling agreement (s) as provided in Section 7.01 hureof, TU Electric will execute the schedules in accordance with the notices received by TU Electric pursuant to Section 5.02 hereof.
The scheduling of power replaced by Cap Rock 29 I
l
l


pursucnt to tho provisiens of section 4.01 shall, to the extent practicable, be scheduled withcut such notice period.                                         :n additi:n to any other remedies provided for in this Agreement, ?U Elaetr:c l   shall not be obligated to execute such schedules in the events
pursucnt to tho provisiens of section 4.01 shall, to the extent practicable, be scheduled withcut such notice period.
{a)     Orp Rock does not give TU Electric advance notice of its schedule in accordance with Secti:n 5.02 hereof; (b)     Cap Rock's Firs Power Resource supplier fails, far ary reason, to deliver during all or any pertion of any schedule period the amount of power and energy f or Cap Rock's account that TU Electric attempts to l                   schedule on behalf of Cap Rock; (c)     service   cannot   be functionally   or                                     technically accommodated; (d)     TU   Electric   is prevented   from   providing                                     such service by any cause beyond its reasonable centrol, including,   but not limited   to,         storm,                               fleed, lightning, earthquaxe, fire, explosion # failure or threat cf f ailure of f acilities, civil disturbance, l                   strike or other labor disturbance, sabotage, var, or restraint by court er public authority; or I           (e)     Cap Rock is in Default of any material obligation under this Agreement.
:n additi:n to any other remedies provided for in this Agreement, ?U Elaetr:c l
5.06   scheduling and Systna Modification Charges Cap Rock Will pay TU Electric for scheduling services for each Firm Power Resource a scheduling charge of $1.00/Hvh, but in I                                     30 l
shall not be obligated to execute such schedules in the events
l I                                                       -
{a)
Orp Rock does not give TU Electric advance notice of its schedule in accordance with Secti:n 5.02 hereof; (b)
Cap Rock's Firs Power Resource supplier fails, far ary reason, to deliver during all or any pertion of any schedule period the amount of power and energy f or Cap Rock's account that TU Electric attempts to l
schedule on behalf of Cap Rock; (c) service cannot be functionally or technically accommodated; (d)
TU Electric is prevented from providing such service by any cause beyond its reasonable centrol, including, but not limited to,
: storm, fleed, lightning, earthquaxe, fire, explosion # failure or threat cf f ailure of f acilities, civil disturbance, l
strike or other labor disturbance, sabotage, var, or restraint by court er public authority; or I
(e)
Cap Rock is in Default of any material obligation under this Agreement.
5.06 scheduling and Systna Modification Charges Cap Rock Will pay TU Electric for scheduling services for each Firm Power Resource a scheduling charge of $1.00/Hvh, but in 30 I
l l
I


    ~
~
i 1
i 1
no ovont loss then $10,000 nor more than $20,000 per month per rir:
no ovont loss then $10,000 nor more than $20,000 per month per rir:
Power Resource; provided, howaver, that such charges shall not te applicable to a Firm Power Resource not schaduled during any calendar month. The aforesaid sums shall be increased beginning         i January.1, 1991, in accordance with the following:                     r (a) the percentage inflation which cecurred during the calendar year preceding Jenuary 1 of each year that thin Agreement is in effect shall be determined from the Bureau I       of Leor Statistics       ,
Power Resource; provided, howaver, that such charges shall not te applicable to a Firm Power Resource not schaduled during any calendar month. The aforesaid sums shall be increased beginning i
the UnAted States Depart =ent of or Transportation and Public Utilities Electric Services average   hourly   earnings,   said   average hourly earnings numbers to be taken from SIC Code 491 (or if said SIC Code 491 is discontinued,     from such other statistics of the 4
January.1, 1991, in accordance with the following:
e.
r (a) the percentage inflation which cecurred during the calendar year preceding Jenuary 1 of each year that thin Agreement is in effect shall be determined from the Bureau I
Bureau of Labor Statistics of the United Staten Department of Labor that are most nearly comparable to SIC Oade 491 and as agreed by TU Electric and Cap Rock);
of Leor Statistics the UnAted States Depart =ent of or Transportation and Public Utilities Electric Services average hourly
(b) The   sum of   the   integer 1 plus the percentage inflation expressed as a decimal determined in accordance with (a) abovs shall be multiplied by each of the aforesaid sums (i.e. , $1.00/Mwh, $10,000 anJ $20,000) and the product of that multiplication shall be the sums applicable during the calendar year 1991, except that the period to be used for calculation of the percentage of inflation for 1990 shall be from July 1,   1990, through December 31, 1990.
: earnings, said average hourly earnings numbers to be taken from SIC Code 491 (or if said SIC Code 491 is discontinued, from such other statistics of the 4
Bureau of Labor Statistics of the United Staten Department e.
of Labor that are most nearly comparable to SIC Oade 491 and as agreed by TU Electric and Cap Rock);
(b)
The sum of the integer 1
plus the percentage inflation expressed as a decimal determined in accordance with (a) abovs shall be multiplied by each of the aforesaid sums (i.e., $1.00/Mwh, $10,000 anJ $20,000) and the product of that multiplication shall be the sums applicable during the calendar year 1991, except that the period to be used for calculation of the percentage of inflation for 1990 shall be from July 1, 1990, through December 31, 1990.
I 31 1
I 31 1


__ _ _ _ . ~ _
__ _ _ _. ~
(c)   for years sucacquant to colondar yoor 1991, the l
(c) for years sucacquant to colondar yoor 1991, the percentage inflation expressed as a decimal determined in accordance with (a) above for the preceding calendar year
percentage inflation expressed as a decimal determined in accordance with (a) above for the preceding calendar year                       l
)
)                             shall be summed with the integer 1, and that num multiplied by the sums applicable during the preceding year to derive I
shall be summed with the integer 1, and that num multiplied by the sums applicable during the preceding year to derive I
l i                             the sums applicable for the           following year,               and so en i .
l i
during the ters of this Agreement.                                             ,
the sums applicable for the following year, and so en i.
during the ters of this Agreement.
In addition, so long as any Firs Power Resource is being scheduled by TU Electric pursuant to this Agreement, Cap Rock will pay to TU Elcetric the cost of additional or replacement ::: puter hardware and software :henges or the additien of personnel and ether costs incident to the implementation and administration of schedules and the continuation of scheduling services under this
In addition, so long as any Firs Power Resource is being scheduled by TU Electric pursuant to this Agreement, Cap Rock will pay to TU Elcetric the cost of additional or replacement ::: puter hardware and software :henges or the additien of personnel and ether costs incident to the implementation and administration of schedules and the continuation of scheduling services under this
;I Agreement,         not to exceed $150,000 during any 36-month period.
;I Agreement, not to exceed $150,000 during any 36-month period.
g             Charges imposed upon cap Rock pursuant to the foregoing sentence 1
g Charges imposed upon cap Rock pursuant to the foregoing sentence 1
shall be made with reasonable written notice specifying the reasons therefor.
shall be made with reasonable written notice specifying the reasons therefor.
5.07         Term of scheduling Scheduling will be limited to two years from the date TU Electric is first required to ecm=ence the scheduling of a Firm Power Resource.             In the event Cap Rock, due to no f ault of its cwn, fails to become a Control Area within said two-year period, TU Electric will, subject to the provisions of Section 6.01 hereof, schedule power and energy f or a maxi =um of five years from the date it is first required to commence the scheduling of a Firs Power Resoutce as aforesaid.
5.07 Term of scheduling Scheduling will be limited to two years from the date TU Electric is first required to ecm=ence the scheduling of a Firm Power Resource.
32 I-                          -_
In the event Cap Rock, due to no f ault of its cwn, fails to become a Control Area within said two-year period, TU Electric will, subject to the provisions of Section 6.01 hereof, schedule power and energy f or a maxi =um of five years from the date it is first required to commence the scheduling of a Firs Power Resoutce as aforesaid.
32 I


5.08                   Full.Requirem nts Points of Dolivory ofter Sch0duling After the expiration of the period (s) provided in Section 5.07 hereof, all points of Delivery remaining in TU Electric's
5.08 Full.Requirem nts Points of Dolivory ofter Sch0duling After the expiration of the period (s) provided in Section 5.07 hereof, all points of Delivery remaining in TU Electric's
:ntrol Area vill ce full requirements Points of Delivery pursuant to section 3.01 hereof, and TU Electric will .;t be required to achedule power and anergy to any such Points of Delivery in the future.
:ntrol Area vill ce full requirements Points of Delivery pursuant to section 3.01 hereof, and TU Electric will.;t be required to achedule power and anergy to any such Points of Delivery in the future.
Cap Rock may terminate full requirements service at any such Point of Delivery upon the same five-year notice as provided in Sections 2.02 and/or 2.04 hereof, in which event TU Electric shall not,       subject to the provisions of                 Section 3 .15 ( b)                 hereof,   be obligated to provide any servics to Cap Rock at any such Points of Delivery.
Cap Rock may terminate full requirements service at any such Point of Delivery upon the same five-year notice as provided in Sections 2.02 and/or 2.04 hereof, in which event TU Electric shall
l                                       ARTICLE VI. REGULATION SERVICE 8, AVAILABILITY OF EXERGENCY AND SCKEDULED MAINTENANCE BULE POWER mfd DELIVIRY OF POWER mfd ENERGY 6.01                   Regulation Services (a)     TU Electric will provide cap Rock not = ore than 15 MW of regulation power and energy,                       plus associated                   services, pursuant to a mutually acceptable regulation sc; vices agreement (which shall contain mutually acceptable terms and conditions consistent with good utility practices within ERCOT)                                           for the purpose of f acilitating the creation of a cap Rock Control Area; i
: not, subject to the provisions of Section 3.15 ( b)
previded,                 however,   that should   Cap   Rock   elect                 to purchase regulation services and baconna a control Area, all scheduling 33
: hereof, be obligated to provide any servics to Cap Rock at any such Points of Delivery.
l ARTICLE VI.
REGULATION SERVICE 8, AVAILABILITY OF EXERGENCY AND SCKEDULED MAINTENANCE BULE POWER mfd DELIVIRY OF POWER mfd ENERGY 6.01 Regulation Services (a)
TU Electric will provide cap Rock not = ore than 15 MW of regulation power and energy, plus associated
: services, pursuant to a mutually acceptable regulation sc; vices agreement (which shall contain mutually acceptable terms and conditions consistent with good utility practices within ERCOT) for the purpose of f acilitating the creation of a cap Rock Control Area; i
: previded, however, that should Cap Rock elect to purchase regulation services and baconna a control Area, all scheduling 33


arrang stnto,       if any, in a f f of.: at that timo shall thereupon                     '
arrang stnto, if any, in a f f of.: at that timo shall thereupon terminate and provided, further, that TU Electric shall not be required to furnish regulation services f or a total of core than five years less such nur.ber of years TU Electric has scheduled Fir =
terminate and provided, further, that TU Electric shall not be required to furnish regulation services f or a total of core than five years less such nur.ber of years TU Electric has scheduled Fir =
Power Resources pur.suant to Article V hereof.
Power Resources pur.suant to Article V hereof.                                               Charges (plus the initial :cplementation fee) for the sale of regulation services,
Charges (plus the initial :cplementation fee) for the sale of regulation services,
::gether with the power and energy included therewith, snall be mutually satisfactory.                                   Cap Reck shall be solely responsible for securing Control Area status f ran the = ember utilities of ERCOT (which shall include all costs associated with bact=ing a Control Area), failing in which TU Electric shall not be re.sponsible f or the sale of any regulation services to Cap Rock.                                                   Within the context of this Agreement, TU Electric will support Cap Rock's discussions with the ER00T se=ber utilities.
::gether with the power and energy included therewith, snall be mutually satisfactory.
(b)       If, due to no fault of Cnp Rock, unanticipated delays     in   the       construction                                 or   certification   of   generation facilities       dalay       Cap                   Rock             in   its   efforts   to centinue   its Taalification as a Control Area af ter the ti=a within which TU Electric is required to provide regulation services under the x
Cap Reck shall be solely responsible for securing Control Area status f ran the = ember utilities of ERCOT (which shall include all costs associated with bact=ing a Control Area), failing in which TU Electric shall not be re.sponsible f or the sale of any regulation services to Cap Rock.
provisions       of   this       section,                               TU   Electric   will provide   such regulation aarvices for the period of such unanticipatad delay, but in no event for more than le =enths.
Within the context of this Agreement, TU Electric will support Cap Rock's discussions with the ER00T se=ber utilities.
6.02       Availability of Emergency and scheduled Maintenance aulk Power TU Electric will, when Cap Rock becomes a Control Area,
(b)
cooperate,       in its capacity                                     as a = ember of       ERCOT,   in making available to Cap Rock emergency and scheduled maintenance bulk 34
If, due to no fault of Cnp Rock, unanticipated delays in the construction or certification of generation facilities dalay Cap Rock in its efforts to centinue its Taalification as a Control Area af ter the ti=a within which TU Electric is required to provide regulation services under the x
provisions of this
: section, TU Electric will provide such regulation aarvices for the period of such unanticipatad delay, but in no event for more than le =enths.
6.02 Availability of Emergency and scheduled Maintenance aulk Power TU Electric will, when Cap Rock becomes a Control Area, cooperate, in its capacity as a = ember of
: ERCOT, in making available to Cap Rock emergency and scheduled maintenance bulk 34
(
(
l l
l l


powcr in accordanco with tho previolone of the ERCOT Cperating Guides.
powcr in accordanco with tho previolone of the ERCOT Cperating Guides.
l                                   ARTICLE VII.                                                                       TRANSHISSION WHEELING AND CISTRIBUTION SERVICE 8 7.01   ~ Wheeling in Connection with scheduling TU Electric will, on a transacticn specific basis, provide wheeling services to both transmission and distribution Points of Calivery in connection with the scheduling of a Firm Power Rescur:e pursuant to mutually acceptable wheeling agreement (s).                                                                                     Such wheeling service will be provided at fully allocated embedded ecsts plus a reasenkble return on investment; together with the payment of all costs for any additions or modifications necessary to accommodate each wheeling transaction which can be f orecested by TU Electric at the '%e such wheeling agreement (s) are executed.
l ARTICLE VII.
Upon the payment of the forogoing costs, Cap Rock shal?. be entitled to firm transuission service for the entire term of such wheeling agreecent(s).           A Firu Power Resource which has replaced a Tirm Power Resource pursuant to Section 2.03 hereof may be wheeled pursuant to the wheeling agreement covering the Firs Power Nscurce so replaced.
TRANSHISSION WHEELING AND CISTRIBUTION SERVICE 8 7.01
7.02         neelfug After Cap Rock Becomes a Control Area (a)     At such time as Cap Rock becomes a Control Area pursuant to the provisions of Section 6.01 hereof or otherwise, TU Electric will, during the term of this Agreements                                                                               (i) provide firs transmission wheeling (for firm power and energy purchased oy Cap Rock from other sources)                                                                                 to Points   of Interconnection,   on a 35 l
~ Wheeling in Connection with scheduling TU Electric will, on a transacticn specific basis, provide wheeling services to both transmission and distribution Points of Calivery in connection with the scheduling of a Firm Power Rescur:e pursuant to mutually acceptable wheeling agreement (s).
Such wheeling service will be provided at fully allocated embedded ecsts plus a reasenkble return on investment; together with the payment of all costs for any additions or modifications necessary to accommodate each wheeling transaction which can be f orecested by TU Electric at the '%e such wheeling agreement (s) are executed.
Upon the payment of the forogoing costs, Cap Rock shal?. be entitled to firm transuission service for the entire term of such wheeling agreecent(s).
A Firu Power Resource which has replaced a Tirm Power Resource pursuant to Section 2.03 hereof may be wheeled pursuant to the wheeling agreement covering the Firs Power Nscurce so replaced.
7.02 neelfug After Cap Rock Becomes a Control Area (a)
At such time as Cap Rock becomes a Control Area pursuant to the provisions of Section 6.01 hereof or otherwise, TU Electric will, during the term of this Agreements (i) provide firs transmission wheeling (for firm power and energy purchased oy Cap Rock from other sources) to Points of Interconnection, on a 35 l


transaction specific basis, for o term and in accordanco with mutually     acceptable     inter ennection                 and   transmission wheeling
transaction specific basis, for o term and in accordanco with mutually acceptable inter ennection and transmission wheeling agree =ent(s); and (ii) for a period of two years af ter Cap Roex beco=es a Control Area pursuant to the provisions of Section 6.01 hereof or otherwise, TU Electric will provide distribution whealing servi:e pursuant to a mutually acceptable distribution service agree:ent only to those Points of Interconnection (notwithstanding that the voltage at such Points of Interconnection is less than 60,000 volts) for which Cap Rock has demonstrable plans to supply 4;g at trans=ission voltages within said two-year period, the identity E
,      agree =ent(s); and (ii) for a period of two years af ter Cap Roex beco=es a Control Area pursuant to the provisions of Section 6.01 hereof or otherwise, TU Electric will provide distribution whealing servi:e pursuant to a mutually acceptable distribution service agree:ent only to those Points of Interconnection (notwithstanding
;      that the voltage at such Points of Interconnection is less than 60,000 volts) for which Cap Rock has demonstrable plans to supply 4
;g     at trans=ission voltages within said two-year period, the identity E
and plano for which shall be furnished to TU Electric within a reasonable period of ti=o prior to the date Cap Rock becomes a control Area.
and plano for which shall be furnished to TU Electric within a reasonable period of ti=o prior to the date Cap Rock becomes a control Area.
.ig
.ig
;W               (b)     All     Points         of         Interconnection       receiving       such distribution services will be supplied by cap Rock at transmiscion voltages on or before the expiration of said two-year peri:d, f ailing in which said Points of Interconnection shall revert to TU Eiactric full requirements Points of Delivery pursuant to Section 3,01 hereof.
;W (b)
(c)     Whooling         services             vill     be   provided   at fully
All Points of Interconnection receiving such distribution services will be supplied by cap Rock at transmiscion voltages on or before the expiration of said two-year peri:d, f ailing in which said Points of Interconnection shall revert to TU Eiactric full requirements Points of Delivery pursuant to Section 3,01 hereof.
;      allocated ambedded cost, plus a reasonable return an invast=ent;
(c)
    . together with     all   costs     for           any     additions   or   =edifications reasonably necessary to accommodate each wheeling transaction Iwhich can be forecasted by TU Electric at the time such whosling 5 I-   agreement (s)   aru made)       over the term of any such agreement.
Whooling services vill be provided at fully allocated ambedded cost, plus a reasonable return an invast=ent; together with all costs for any additions or
=edifications reasonably necessary to accommodate each wheeling transaction Iwhich can be forecasted by TU Electric at the time such whosling 5 I-agreement (s) aru made) over the term of any such agreement.
Subject to the execution of such interconnection and transmission 36 I
Subject to the execution of such interconnection and transmission 36 I


_.,.m a         .m _.        .-~a am . .s --.a 3_A .-A   *-+-.a--     ,l. J. L .;_AJ2_   m. - ,     _._m. . _ . _ . __4_34,%.m     -
_.,.m a
.m
.-~a am.
.s
--.a 3_A
.-A
*-+-.a--
,l.
J.
L
.;_AJ2_
: m. -,
_._m.. _. _.
__4_34,%.m
_a______,&.__Ao whooling agrooment(o)
_a______,&.__Ao whooling agrooment(o)
Cap Rock shall bo entitled to firm trancnd upon                                                                                                 ,
Cap Rock shall bo entitled to firm trancnd upon smission service term of the wheeling agreement (s).
smission service for tho term of the wheeling agreement (s).
for tho 7.02 Transmission Arrangements with Third Partie l
7.02 l
s TU Electric's obligations to schedule or wheel pcVer and energrr shall be subject to Cap Rock's making and 1
Transmission Arrangements with Third Partie                                                   s TU Electric's obligations to schedule or wh eel pcVer and 1                    energrr shall be subject to Cap Rock's making and
maintaining arrangements, including third party transmission arra ngements, for the delivery of all resources; with respect t o Firm Powe: Resources such transmission arrangements vill be for ! irs
:                                                                                                                                      maintaining arrangements, including third party transmission arra ngements, for the delivery of all resources; with respect t such transmission                                                                        o Firm Powe: Resources arrangements vill be for ! irs service,                                                                                                     transmisston i
: service, transmisston i
AR".'ICLE VIII.
AR".'ICLE VIII.
BILLINos AND DEFAULT i
BILLINos AND DEFAULT i
j s.01 i
j s.01 Billings and Payments i
Billings and Payments Bills     for   sums           due         hereunder             shall               be     rendered             on approximate 30 day intervals, monthly or upon occurre                                                                                                 d nce, as may be convenient for TU Electric.
Bills for sums due hereunder shall be rendered on approximate 30 day intervals, monthly or upon occurre d
4 All bills rendered shall be due and i                  payable within sixteen (16) days after the invoice date.The f allure of Cap Rock to pay the total amount of any bill within such 16-day perior! shall constitute a Default hereunder                                                         .
nce, as may be convenient for TU Electric.
If not paid within thirty (30) days after the invoice date, interest shall accrue on the amount due from the due date until paid                                                                           at th e rate of nine and one-half percent (9-1/2%)           per annum,                   compounded g
All bills rendered shall be due and 4
monthly, but not to exceed the maximum rate which charged.                                                                                                               u y be may lawf l s.02 Billings and Payasnts Subject to Correction 1
payable within sixteen (16) days after the invoice date.The i
f allure of Cap Rock to pay the total amount of any bill within such 16-day perior! shall constitute a Default hereunder If not paid within thirty (30) days after the invoice date, interest shall accrue on the amount due from the due date until paid at th of nine and one-half e rate percent (9-1/2%)
per annum, compounded g
monthly, but not to exceed the maximum rate which may lawf l charged.
u y be s.02 Billings and Payasnts Subject to Correction 1
37 I
37 I
. E
E


Billingo and payuanto will be subject to correction, for a period not to exceed three years from the date thereof, as cay be l
Billingo and payuanto will be subject to correction, for a period not to exceed three years from the date thereof, as cay be l
appr:priate as a result of reviews or audits made for the purpose of verification or othervise.
appr:priate as a result of reviews or audits made for the purpose of verification or othervise.
l s.03   .Not.!,ce of Default
l s.03
[                       A Party shall give written notice of a Def ault to the Part'/
.Not.!,ce of Default
in Default. The Party in Def ault shall have thirty (30) days from the date of receipt of such notice in which to cure such Default.
[
A Party shall give written notice of a Def ault to the Part'/
in Default.
The Party in Def ault shall have thirty (30) days from the date of receipt of such notice in which to cure such Default.
If the Default is cured within the applicable pericd, the Def ault specified in such notice shall cease to exist.
If the Default is cured within the applicable pericd, the Def ault specified in such notice shall cease to exist.
8.04       Failure to cure Default A Def ault which is not cured as provided in Section 8.03 1
8.04 Failure to cure Default A Def ault which is not cured as provided in Section 8.03 1
above shall entitle the Party not in Def ault to im=ediately cancel th2s Agreement and be relieved of any further obligation hereunder and to recover from the Party in Def ault twice all amounts due hereunder, including all other damages to which it is entitled at
above shall entitle the Party not in Def ault to im=ediately cancel th2s Agreement and be relieved of any further obligation hereunder and to recover from the Party in Def ault twice all amounts due hereunder, including all other damages to which it is entitled at law or in aquity.
    .        law or in aquity.
8.05 specific Performance and Injunctive Relief TU Electric and cap Rock agree that it may be i=possible to measure in terms of money the damages which may or will accrue by reason of a Def ault under this Agreement and f or that reason, a=eng others, Ttt Electric and cap Rock agree that, in case of any such L
8.05       specific Performance and Injunctive Relief TU Electric and cap Rock agree that it may be i=possible to measure in terms of money the damages which may or will accrue by reason of a Def ault under this Agreement and f or that reason, a=eng others, Ttt Electric and cap Rock agree that, in case of any such L   Default, the non-dsfaulting Party will be irreparably damaged if this Agreement is not specifically enforceable and further r.o adequate remedy at law will ewist.                 Accordingly, TU Electric and cap Rock agree that the non~ defaulting Party shall be entitled to 38 l
Default, the non-dsfaulting Party will be irreparably damaged if this Agreement is not specifically enforceable and further r.o adequate remedy at law will ewist.
Accordingly, TU Electric and cap Rock agree that the non~ defaulting Party shall be entitled to 38 l
l
l


specific performance and/or injunctive relief, in addition to any other remedies which may exist at law or in equity. If the 5       non-defaulting Party institutes any proceedings in accordance with this section, the defaulting Party hereby vaivas any claim or dnf ense- that an adequate remedy at law exists.
specific performance and/or injunctive relief, in addition to any other remedies which may exist at law or in equity.
l       3.06     No Waiver The failure of a Party to this Agrescent to insist, on any occasion, upon strict performance of any provision of this Agree-ment, including, without limitation, the provisions of this article l       pertaining to Default,                                             shall not be   considered to valve the obligations, rights and/or duties imposed upon the Partian hereto.
If the 5
8.07     Indemnification It is understood that cap Rock assu=es full responsibility for electric energy furnished or delivered to cap Rock at and p,ast the Points of Delivery or Points of Interconnection (as the case may be) and vili indemnify and hold TU Electric, its affiliates, and   its   or their directors,                                         officers, e=p.oyees, agents and independent contractors harmless from and against all claims for damages including but not limited to injuries to any persons, including death resulting                                             therefrom,   and damages to property occurring upon the precises of Cap Rock arising from electric power and energy delivered by TU Electric whether or not caused by the negligence of TU Electric except when the negligence of TU Electric or its agent or agents was the sole proxi= ate cause of such injuries, death of persons or damages to property.
non-defaulting Party institutes any proceedings in accordance with this section, the defaulting Party hereby vaivas any claim or dnf ense-that an adequate remedy at law exists.
l 3.06 No Waiver The failure of a Party to this Agrescent to insist, on any occasion, upon strict performance of any provision of this Agree-ment, including, without limitation, the provisions of this article l
pertaining to Default, shall not be considered to valve the obligations, rights and/or duties imposed upon the Partian hereto.
8.07 Indemnification It is understood that cap Rock assu=es full responsibility for electric energy furnished or delivered to cap Rock at and p,ast the Points of Delivery or Points of Interconnection (as the case may be) and vili indemnify and hold TU Electric, its affiliates, and its or their directors,
: officers, e=p.oyees, agents and independent contractors harmless from and against all claims for damages including but not limited to injuries to any persons, including death resulting therefrom, and damages to property occurring upon the precises of Cap Rock arising from electric power and energy delivered by TU Electric whether or not caused by the negligence of TU Electric except when the negligence of TU Electric or its agent or agents was the sole proxi= ate cause of such injuries, death of persons or damages to property.
Without limiting the foregoing, TU Electric is not and shkil 39
Without limiting the foregoing, TU Electric is not and shkil 39
_      __              _ _ _ . _ _ _ _                                    -  -  --          ^
^


-                  _                                    ~ ~ ~ ~ - - - - - --~_____________ _________
~ ~ ~ ~ - - - - - --~_____________ _________
not     to licblo to Cop Rock for daoogos occasioned by:
not to licblo to Cop Rock for daoogos occasioned by:
(A) trregularities or interruptions (of any duration),
(A) trregularities or interruptions (of any duration), or failure to ec=mence electric or other service, caused in whole or in part oy (1) govern = ental or municipal action or authority, litigati:n, public enemies, strikes, acts of God (including weather.=nd resuit:.ngconsequences),
or failure to ec=mence electric or other service, caused in whole or in part oy (1) govern = ental or municipal action or authority,                                     litigati:n, public enemies, strikes, acts of God (including weather .=nd                                           its resuit:.ngconsequences), ( :,
its
an crder of any Court or Judge granted in any bona fide adverse legal proceeding or action or anyerOrd of any commission or tribunal having jurisdiction in the pre =ises (3)                                                                                                                ,
( :, an crder of any Court or Judge granted in any bona fide adverse legal proceeding or action or any Ord er of any commission or tribunal having jurisdiction in the pre =ises
[
[
interruptions in electric or other service to cap Rock when                                                 ,
(3) interruptions in electric or other service to cap Rock when in TU Electric's sole judgment, such interruption:
in TU Electric's sole judgment, such interruption:
(a) vill prevent or alleviate an emergency thr,aatening to disrupt the Operation of TU Electric's syste=, or (b) will lesson or remove possible danger to life or pceperty, or (c) will aid in the l
(a)   vill prevent or alleviate an emergency thr,aatening to disrupt the Operation of TU Electric's syste=,
restoration of electric service, or (d) is required to make necessary repairs to, tests of, or changes in TV Electrir's f acilician, or (e) whun such interruption is authori:ed elsewhere in TU Electric's Tariff for Electric service; (4) the absence, inadequacy er failure of protective devices which are the responsibility of Cap Rock, (3) inadequacy or f ailure of ganaratien or transmission facilities, or (6) any other act or thing reasonably beyond the control of
or (b) will lesson or remove possible danger to life or pceperty, or (c) l     restoration of electric service,           or   (d) will aid in the is required   to make necessary repairs         to, tests of,   or changes f acilician, or (e)                                                                             in TV Electrir's whun such interruption is authori:ed elsewhere in TU Electric's Tariff for Electric service; (4) the absence, inadequacy       er failure of protective             devices                               which   are     the responsibility of Cap Rock, (3) inadequacy or f ailure of ganaratien or     transmission facilities, or (6) any                                       other     act   or   thing reasonably       beyond the control   of   *U       Electric or as =ay be authorized elsewhere in TU Electric's Tariff for Electric Service; i   or (B) any interruption of electric or other service not occasiened by situations or conditions described in (A) above that has not l   existed continuously for beyond a reasonable period of ti=a after notice to TU Electric, which reasonable period shall under no l
*U Electric or as
e I
=ay be authorized elsewhere in TU Electric's Tariff for Electric Service; i
or (B) any interruption of electric or other service not occasiened by situations or conditions described in (A) above that has not l
existed continuously for beyond a reasonable period of ti=a after notice to TU Electric, which reasonable period shall under no l
I e
I
I


circumstances     be less   than twenty-four (24)         hours or any
circumstances be less than twenty-four (24) hours or any
]
]
l c
interruption of service of greater than a reasonable duration if l
interruption of service of greater than a reasonable duration if TU Electric has used reasonable diligence in attempts to restore d
TU Electric has used reasonable diligence in attempts to restore c
L        electric or other service af ter TU E16ctric is notified of suen interruption.
d electric or other service af ter TU E16ctric is notified of suen L
interruption.
TU Electric may perf or= voluntary or emergency acts ::
TU Electric may perf or= voluntary or emergency acts ::
electric facilities which are the responsibility of cap Rock Out shall have no liability for damages or injurien resulting from said acts except to the extent that said damages or                 injuries are prox 1=ately caused by acts or omissions of TU Electric vnich are found to be vnnten or villful with the intant to cause injury.
electric facilities which are the responsibility of cap Rock Out shall have no liability for damages or injurien resulting from said acts except to the extent that said damages or injuries are prox 1=ately caused by acts or omissions of TU Electric vnich are found to be vnnten or villful with the intant to cause injury.
r
r Cap Rock may perform voluntary cr emergency acts to electric facilities which are the responsibility of TU Electrie but shall have no liability for dumages or injuries resulting from said acts except to the extent that said damages or injuries are proximately caused by acts or omissions of Cap Rock which are !=und to me l
  ,              Cap Rock may perform voluntary cr emergency acts to electric facilities which are the responsibility of TU Electrie but shall have no liability for dumages or injuries resulting from said acts except to the extent that said damages or injuries are proximately caused by acts or omissions of Cap Rock which are !=und to me l     vanton er willful vitit the intent to cause injury.
vanton er willful vitit the intent to cause injury.
In any claim or cause of action relating to the provis;:n of electric or other service assarted by cap Rock or any other person against TU Electric, TU Electric sht.11 not be liable f or any consequential, special, or non-direct damages, including but not limited to loss of use of equipment, extra expensa due to the use of temporary or replacement equipment, loss of electronic data or program, loss of business revenue, costs of capital, or any cost not part of necessary repair to or reasonabla replacement of electric equipment whether the claim or cause of action is based 41
In any claim or cause of action relating to the provis;:n of electric or other service assarted by cap Rock or any other person against TU Electric, TU Electric sht.11 not be liable f or any consequential, special, or non-direct damages, including but not limited to loss of use of equipment, extra expensa due to the use of temporary or replacement equipment, loss of electronic data or program, loss of business revenue, costs of capital, or any cost not part of necessary repair to or reasonabla replacement of electric equipment whether the claim or cause of action is based 41


7     .
7 f
f p       upon contract, tort, negligence, preducts liability, or any other theory of recovery.
p upon contract, tort, negligence, preducts liability, or any other theory of recovery.
TU flectric makes no warranties whatsoever with regard to d
TU flectric makes no warranties whatsoever with regard to d
the provision of electric or 9ther service and disclaims any and all warranties, express or implied, including but not limited to warranties of merchantability or fitness f or a particular purpose.
the provision of electric or 9ther service and disclaims any and all warranties, express or implied, including but not limited to warranties of merchantability or fitness f or a particular purpose.
8.08   Bankruptcy
8.08 Bankruptcy
'l Either Party shall have the right to cancel a.id terminate this Agreateent, upon written notice to the other- Party, if the other Party shall (a)     apply   for                                     or consent     to the   appointment   of a B                     receiver,                                       trustee,   or   liquidator   of   all   or
'l Either Party shall have the right to cancel a.id terminate this Agreateent, upon written notice to the other-Party, if the other Party shall (a) apply for or consent to the appointment of a
{                     substantially all of its assets, or (b)     be adjudicated bankrupt or insolvent or file a voluntary                                       petitlen     in bankruptcy   or   admit   in writing its inability to psy its debts as they become due, or (c)     make a for=al assignment for the benefit of its creditors, or 1
B
(d)     file a petition or answer seeking reorgani:ation or arrangement with creditors or taking advantage of any insolvency law, or (e)     file an answer admitting the material allegations of or consenting to, or default in answering, a petition                                       filed   against   it in any   bankruptcy, reorganization, or insolvency proceeding, or 42
: receiver, trustee, or liquidator of all or
{
substantially all of its assets, or (b) be adjudicated bankrupt or insolvent or file a voluntary petitlen in bankruptcy or admit in writing its inability to psy its debts as they become due, or (c) make a for=al assignment for the benefit of its creditors, or (d) file a petition or answer seeking reorgani:ation or 1
arrangement with creditors or taking advantage of any insolvency law, or (e) file an answer admitting the material allegations of or consenting to, or default in answering, a petition filed against it in any bankruptcy, reorganization, or insolvency proceeding, or 42


                    'f) if, in any legal action instituted in a court of competent jurisdiction by so=eena other than the
'f) if, in any legal action instituted in a court of competent jurisdiction by so=eena other than the
[                           other Party, an order, judgment, or decree shall te entered approving a petition seeking reorganization of such Party or appointine a receiver, trustee, or liquidator of such Party or of all or substantially all   of such   Party's     assets   and such   order, judgment, or decree shall continue unstayed for a i
[
other Party, an order, judgment, or decree shall te entered approving a petition seeking reorganization of such Party or appointine a receiver, trustee, or liquidator of such Party or of all or substantially all of such Party's assets and such
: order, judgment, or decree shall continue unstayed for a i
period of one hundred twenty (120) days.
period of one hundred twenty (120) days.
8.09   Non-Exclusive Remedy The remedies set forth in this article are in addition to any other right or retady provided in this Agreement or now or hereafter existing at law or in equity or by statute and the exercise       of said   remedies   shall     not be   deemed a valver , or g     relinquishment by said nondefaulting Party of its right to recover any damages resulting from the other Party's breach.
8.09 Non-Exclusive Remedy The remedies set forth in this article are in addition to any other right or retady provided in this Agreement or now or hereafter existing at law or in equity or by statute and the exercise of said remedies shall not be deemed a
1 ARTICLE II. INTRA 8TATh OPERATIONN 9.01   Interstate Conunerce Except in compliance with the orders of the Federal Energy Regulatory Commission (the "TERC") in TERC Dockets Nos. EL-79-8 and E-9558 issued on October 28, 1981, November 5, 1981, and January 29, 1982, and the Order issued in FERC Docket No. EL-79-8-002 en July 23, 1987, TU Electric and Cap Rock represent and warrant to each other that they do not, eithnr directly or through connections a
valver, or g
y L
relinquishment by said nondefaulting Party of its right to recover any damages resulting from the other Party's breach.
1 ARTICLE II.
INTRA 8TATh OPERATIONN 9.01 Interstate Conunerce Except in compliance with the orders of the Federal Energy Regulatory Commission (the "TERC") in TERC Dockets Nos. EL-79-8 and E-9558 issued on October 28, 1981, November 5, 1981, and January 29, 1982, and the Order issued in FERC Docket No. EL-79-8-002 en July 23, 1987, TU Electric and Cap Rock represent and warrant to each other that they do not, eithnr directly or through connections y
a L


t +
t
vith                                 othor er.titico       (who       are     either   directly   or L                                                                                                                             indirectly interconnected with facilities owned or operated by TU tiectric)                                                           ,
+
p transmit electric energy in interstate c =erce or sell electr::
vith othor er.titico (who are either directly or indirectly L
energy in interstate ce=erce or own or operate any facilities theref or and TU Ilectric and Osp Rock each agrees tnat it vill not                                                         ,
interconnected with facilities owned or operated by TU tiectric) p transmit electric energy in interstate c =erce or sell electr::
except
energy in interstate ce=erce or own or operate any facilities theref or and TU Ilectric and Osp Rock each agrees tnat it vill not except :n ec=pliance with such orders, hereafter engage, directly or thrcugh other entities, in any such interstate activities or
:n ec=pliance with such orders, hereafter engage,                       directly or thrcugh other entities, in any such interstate activities or operate,                                       establish,     =aintain,               modify,   or utilize,     directly   r through cther entities, any connection or f aci'.ity used or to be used for the sale or transmission of electric energy in interstate ce=erce uithcut one year's prier written notice to the other Party; provided further, that such Party desiring to ec=ence interstate operation agrees to file an application with, and use its best efforts to obtain an order
: operate, establish,
* rem, the FGC, applicable to the other Party (unless such other Party agrees in writing that such application nee.d not be filed), under Sections 210, :11 and 212                     of                       the   Federal   Power           Act,     requiring   the   establishment, maintenance, modification, or utilization of any such connecti:n which may be involved; provided, however, that compliance with such orders                                             shall   not   require             further     notice   to   the   Parties   or application to the FGC pursuant to this article.
=aintain,
9.02                                         Failure to Comply It is understood and agreed that the f ailure of the Party electing to commence interstate operations to comply with any provision of this article or said orders chan entitle the other Party to disconnect its facilities.
: modify, or utilize, directly r
through cther entities, any connection or f aci'.ity used or to be used for the sale or transmission of electric energy in interstate ce=erce uithcut one year's prier written notice to the other Party; provided further, that such Party desiring to ec=ence interstate operation agrees to file an application with, and use its best efforts to obtain an order
* rem, the FGC, applicable to the other Party (unless such other Party agrees in writing that such application nee.d not be filed), under Sections 210, :11 and 212 of the Federal Power
: Act, requiring the establishment, maintenance, modification, or utilization of any such connecti:n which may be involved; provided, however, that compliance with such orders shall not require further notice to the Parties or application to the FGC pursuant to this article.
9.02 Failure to Comply It is understood and agreed that the f ailure of the Party electing to commence interstate operations to comply with any provision of this article or said orders chan entitle the other Party to disconnect its facilities.
44
44
______                                                                _ - - - - - ~ ~
_ - - - - - ~ ~


9,03 8700ifio P0rfC: man 30 TU Electric and cap Rock agree that it will be i=pegsidia to measure in terms of money the damages which may or will accrue ey reason of any breach of the representation and warranty above set forth,   or any failure in the performance of any Of the obligati:ns contained in this article and, for that others,                                                                                                                  reason, among TU Electric and Cap Rock agree that, in case of any such breach or failure, the non-breaching Party will be irreparably da= aged if this Agreement is not specifically enforceable, and acc rdingly, TU Electric and cap Rock agree that the non-breaching Party is entitled to specific performance of the previsions of thi s article, in addition to any other remedies which may exist.
9,03 8700ifio P0rfC: man 30 TU Electric and cap Rock agree that it will be i=pegsidia to measure in terms of money the damages which may or willaccrue ey reason of any breach of the representation and warranty above set forth, or any failure in the performance of any Of the obligati:ns contained in this article and, for that reason, among others, TU Electric and Cap Rock agree that, in case of any such breach or failure, the non-breaching Party will be irreparably da= aged if this Agreement is not specifically enforceable, and acc rdingly, TU Electric and cap Rock agree that the non-breaching Party is entitled to specific performance of the previsions of thi s article, in addition to any other remedies which may exist.
9.04     Bona Fide Emergencies Nothing   contained                                   in this                             article shall   preclude               One utili:ation of connections for the transmission of electric energy in interstate commerce under bona fide emergancies pursuar t to the provisions of Section 202(d) of the Federal Power Act.
9.04 Bona Fide Emergencies Nothing contained in this article shall preclude One utili:ation of connections for the transmission of electric energy in interstate commerce under bona fide emergancies pursuar t to the provisions of Section 202(d) of the Federal Power Act.
ARTICLE I.                                   MIDCELLANEOUS PROVISIONS 10.01   Amendment This Agreement may be amended only upon mutual agree =ent of the Parties hereto, which amendment shall not ba effective until reduced to writing and executed by the Parties.
ARTICLE I.
MIDCELLANEOUS PROVISIONS 10.01 Amendment This Agreement may be amended only upon mutual agree =ent of the Parties hereto, which amendment shall not ba effective until reduced to writing and executed by the Parties.
10.02 Entirety of Agreement and Prior Agreements Superseded This Actreament, including all Exhibits attached hereto which 45
10.02 Entirety of Agreement and Prior Agreements Superseded This Actreament, including all Exhibits attached hereto which 45
-                                                                              __ __ _ __ - - - - - ----- ~                                               ~
__ __ _ __ - - - - - ----- ~
~


3.
3.
l     are   hereby ,
l are hereby expressly made a
expressly     made                         a       part       hereof   for   all purposes, constitutes the entire agreement and understanding between                                                   ne l
part hereof for all
Parties with regard to the subject matter hereof.                                                 The Parties shall not be bound by or liable f or any statement, representation, promise, inducement, understanding or undertaking of any kind or nature (whether written or oral) with regard to the sut]ect matter hereof not set forth or provided for herein.
: purposes, constitutes the entire agreement and understanding between ne l
l             This   Agreement                             replaces         all       prior   agreements     and undertakings, oral or written, between the Parties with regard to
Parties with regard to the subject matter hereof.
        ;a   subject   matter hereof,                                   including       without   limitation   the Principles of Agreement, dated May 15, 1990, between the Parties and all such agreements and undertakings are agreed by the Parties l   to no longer be of any force or effect; provided, however, that this Agreement shall not replace, superande or otherwise af f act tap Rock's Agreement for Purchase of Power dated June 2,                                                   1963,   as a= ended, or the Agreement for Purchase of Power between Lone Wolf and TU Electric, dated July 2, 1963, as amended, such agreements to continue until terminated in artcordance with their respective terms, at which tima said agreements shall have no f orce or af f act whatsoever.
The Parties shall not be bound by or liable f or any statement, representation, promise, inducement, understanding or undertaking of any kind or nature (whether written or oral) with regard to the sut]ect matter hereof not set forth or provided for herein.
10.03     kuccessors and Ansigns This Agreement shall be binding upon and inure to the benefit of the Parties and their respective successors and assigns, each of whom shall agree to be bound by all ter=n and conditions of this Agreement and the Mutual Release executed contemporaneously herewith, provided that this Agreement may be assigned by either 46
l This Agreement replaces all prior agreements and undertakings, oral or written, between the Parties with regard to
;a subject matter hereof, including without limitation the Principles of Agreement, dated May 15, 1990, between the Parties and all such agreements and undertakings are agreed by the Parties l
to no longer be of any force or effect; provided, however, that this Agreement shall not replace, superande or otherwise af f act tap Rock's Agreement for Purchase of Power dated June 2,
: 1963, as a= ended, or the Agreement for Purchase of Power between Lone Wolf and TU Electric, dated July 2, 1963, as amended, such agreements to continue until terminated in artcordance with their respective terms, at which tima said agreements shall have no f orce or af f act whatsoever.
10.03 kuccessors and Ansigns This Agreement shall be binding upon and inure to the benefit of the Parties and their respective successors and assigns, each of whom shall agree to be bound by all ter=n and conditions of this Agreement and the Mutual Release executed contemporaneously herewith, provided that this Agreement may be assigned by either 46


Party only upon the written consent of the other and provided further that any such assignment shall not relieve either Party of their respective obligations nor shall TU Electric's obligations be enlarged, in whole or in part, by reason thereof.                                     Such consent   I will not be unreasonably withheld, provided that either Party will not be required to consent to any assign =ent which                                       'uld in its sole judgment,           among other reasons,                               subject it to addit:,onal f ederal or state regulation, subject it to the plenary jurisdiction of   the   Federal                     Energy               Regulatory Commission,   result   in the imposition of additional costs of administration which Cap Rocs does not agree to reimburse, or in any way diminish the reliabilny of its system,             enlarge its obligations or otherwise create or l     maintain an unacceptable condition.                                     The respective obligations of TU Electric and cap Rock under this Agreement may not bb enanged, modified, amended or enlarged, in whole or in part, by reason of g     the sale, merger or other business combination of either Party with any other person or entity (other than Lone Wolf), nor say. !"
Party only upon the written consent of the other and provided further that any such assignment shall not relieve either Party of their respective obligations nor shall TU Electric's obligations be enlarged, in whole or in part, by reason thereof.
Electric be required to sell power and energy by reason thereof
Such consent I
  ,I    ether than that specifically provided f or in Sections 3.01 and 3.02 hereof.
will not be unreasonably withheld, provided that either Party will not be required to consent to any assign =ent which
10.04   Taxes All present or future federal, state, municipal or other lawful taxes (other than f ederal income taxes) applicable by reason g     of the sale of power and energy, the services performed by TU Electric, or the compensation paid to TU Electric hereunder shall be paid by cap Rock.
'uld in its sole judgment, among other reasons, subject it to addit:,onal f ederal or state regulation, subject it to the plenary jurisdiction of the Federal Energy Regulatory Commission, result in the imposition of additional costs of administration which Cap Rocs does not agree to reimburse, or in any way diminish the reliabilny of its system, enlarge its obligations or otherwise create or l
  's                                                                       c 8
maintain an unacceptable condition.
The respective obligations of TU Electric and cap Rock under this Agreement may not bb enanged, modified, amended or enlarged, in whole or in part, by reason of g
the sale, merger or other business combination of either Party with any other person or entity (other than Lone Wolf), nor say. !"
Electric be required to sell power and energy by reason thereof ether than that specifically provided f or in Sections 3.01 and 3.02
,I hereof.
10.04 Taxes All present or future federal, state, municipal or other lawful taxes (other than f ederal income taxes) applicable by reason g
of the sale of power and energy, the services performed by TU Electric, or the compensation paid to TU Electric hereunder shall be paid by cap Rock.
's c
8


,                                  10.05       Agreement to Control It is distinctly understood and agreed that the full and partial requirements power and energy sold to Cap Rock pursuant to this Agreement vill be at Rate WP Wholesale Power as approved by the PL'CT.     It is expressly underste d and agreed that all other ter=s and conditions of sale and the terms, conditions and charges for all other services (including but not limited to regulation power and energy and associated services) provided by TU nectri:
10.05 Agreement to Control It is distinctly understood and agreed that the full and partial requirements power and energy sold to Cap Rock pursuant to this Agreement vill be at Rate WP Wholesale Power as approved by the PL'CT.
to   cap Rock hereunder       shall be governed by   this Agree =ent, notwithstanding the provisions of said Rate WP Wholesale Power or g                                 any other tariff of TU Electric which may hereafter be fixed and approved by the PUCT.
It is expressly underste d and agreed that all other ter=s and conditions of sale and the terms, conditions and charges for all other services (including but not limited to regulation power and energy and associated services) provided by TU nectri:
to cap Rock hereunder shall be governed by this Agree =ent, notwithstanding the provisions of said Rate WP Wholesale Power or g
any other tariff of TU Electric which may hereafter be fixed and approved by the PUCT.
TU Electric and Cap Rock agree that neither of them shall petition uny regulatory cuthority to review the ter=s of this Agreement or to change the charges established from time to ti=a pursuant to this Agreement or the accounting set forth herein.
TU Electric and Cap Rock agree that neither of them shall petition uny regulatory cuthority to review the ter=s of this Agreement or to change the charges established from time to ti=a pursuant to this Agreement or the accounting set forth herein.
10.06     service Regulations Except as otherwise specifically provided in this Agree =ent, the sale of power and energy by TU Electric to Cap Rock under this Agreement     shall be subject   to the service   regulations of TU Electric's Tariff for E.lectric Service as same may f rom ti=e to time be fixed and approved by the PUCT.
10.06 service Regulations Except as otherwise specifically provided in this Agree =ent, the sale of power and energy by TU Electric to Cap Rock under this Agreement shall be subject to the service regulations of TU Electric's Tariff for E.lectric Service as same may f rom ti=e to time be fixed and approved by the PUCT.
10.07     Governing Law and venus This Agreement was executed in the state of Texas and shall in all respects be governed by, interpreted, construed and enf orced in accordance with the laws thereof.         Tha venue of any legal 48
10.07 Governing Law and venus This Agreement was executed in the state of Texas and shall in all respects be governed by, interpreted, construed and enf orced in accordance with the laws thereof.
Tha venue of any legal 48


j       proceeding relative to this Agreement shall be in Dallas County, Texas.
j proceeding relative to this Agreement shall be in Dallas County, Texas.
10.os   Notices i               Notices of an administrative nature,                             including but not limited to notice of termination, limitation on access or request for a=end=ent shall be given as provided herein to the designates listed below and shall be deemed to have been duly delivered '!
10.os Notices i
hand delivered or cent by United States certified mail, return receipt requested, postage prepaid, tot (a)       If to TJ Electrict                                                       ;
Notices of an administrative nature, including but not limited to notice of termination, limitation on access or request for a=end=ent shall be given as provided herein to the designates listed below and shall be deemed to have been duly delivered hand delivered or cent by United States certified mail, return receipt requested, postage prepaid, tot (a)
Texas Utilities Electric company l                       Attnt Pitt Pittman, Vice President Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 (b)       If to Cap Rock Cap Rock Electric Cooperative, Inc.
If to TJ Electrict Texas Utilities Electric company l
Attnt Steve Collier, Director of Power Supply P. O. Box 9589 Austin, Texas 78765-9589 All other notices required to be given by Cap Rock to TU Electric under this Agreement shall be in writing and telecopied to:
Attnt Pitt Pittman, Vice President Skyway Tower 400 North Olive Street, L.B.
81 Dallas, Texas 75201 (b)
If to Cap Rock Cap Rock Electric Cooperative, Inc.
Attnt Steve Collier, Director of Power Supply P.
O.
Box 9589 Austin, Texas 78765-9589 All other notices required to be given by Cap Rock to TU Electric under this Agreement shall be in writing and telecopied to:
Texas Utilities System operating Center at 214/330-4598, and sent by United States mail, postage prepaid, to:
Texas Utilities System operating Center at 214/330-4598, and sent by United States mail, postage prepaid, to:
Texas Utilities Electric Company Attnt   Manager, Inter-Utility Services 31st Floor, Skyway Tovar 400 North Olive Street, L.B. 81 Dallas, Texas 75201 49
Texas Utilities Electric Company Attnt Manager, Inter-Utility Services 31st Floor, Skyway Tovar 400 North Olive Street, L.B.
81 Dallas, Texas 75201 49


i All othi,r notices required to be given by TU Electric to cap neeg i   under this Agreement shall be in vriting and telecopied to:
i All othi,r notices required to be given by TU Electric to cap neeg i
under this Agreement shall be in vriting and telecopied to:
Cap Rock Electric Cooperative, Inc.
Cap Rock Electric Cooperative, Inc.
at (512) 454-4221, Attnt Steve Collier, and sent by United States mail, postage prepaid, to:
at (512) 454-4221, Attnt Steve Collier, and sent by United States mail, postage prepaid, to:
Cap Rock Electric Cooperative, Inc.
Cap Rock Electric Cooperative, Inc.
Attn Steve Collier, Director of Power                                               Supply P. C. Box 9589                                                                                       :
Attn Steve Collier, Director of Power Supply P. C. Box 9589 Austin, Texas 78765-9589 The abra-listed names, titles, addresses, and telephone nusters of either Party may be changed by written notification to tha I
Austin, Texas                                                         78765-9589                       '
ether.
The abra-listed names, titles, addresses, and telephone nusters of either Party may be changed by written notification to tha I   ether.
10.09 Interruption of service The Parties agree that TU Electric may interrupt any service it is required to provide under this Agreement to make repairs, tc change equipment or to install new equipment, but only for suen periods as =ay be reasonably unavoidable.
10.09   Interruption of service The Parties agree that TU Electric may interrupt any service it is required to provide under this Agreement to make repairs, tc change equipment or to install new equipment, but only for suen periods as =ay be reasonably unavoidable.                                                                             TU Electric a-rees to provide reasonable advance notice of such interruptions to cap Rock if, in TU Electric's sole discretion, the nature of the situati:n I   permits.
TU Electric a-rees to provide reasonable advance notice of such interruptions to cap Rock if, in TU Electric's sole discretion, the nature of the situati:n I
~
permits.
10.10   No Third-Party Beneficiaries This Agreement is not . intended to and shall not create rights, remedies or benefits of any character whatsoever in favor of any persons, corporations, associations or entities other than the Parties hereto, and the obligations herein assumed are solely for the use and benefit of the Parties hereto, their successors in interest and, where permitted as provided herein, their assigns.
~
10.11   Multiple counterparts 50
10.10 No Third-Party Beneficiaries This Agreement is not. intended to and shall not create rights, remedies or benefits of any character whatsoever in favor of any persons, corporations, associations or entities other than the Parties hereto, and the obligations herein assumed are solely for the use and benefit of the Parties hereto, their successors in interest and, where permitted as provided herein, their assigns.
10.11 Multiple counterparts 50


l' This Agreement m&y be executed in two or = ore counterparts, each of which shall be desced an original but all shall constitute one and the same instrument.
l' This Agreement m&y be executed in two or = ore counterparts, each of which shall be desced an original but all shall constitute one and the same instrument.
10.12     Headings I         _
10.12 Headings I
The     descriptive       headings     of the varicun articles and l sections of this Agreement have been inserted for convenience of reference only and shall be afforded no significance                       in the intaiTretation or construction of this Agreement.
The descriptive headings of the varicun articles and l
10.13     Dev?-ability In .ao event any of the terms, covenants, or conditions of this Agreement, or any application therno!, is finally determined to be invalid, illegal or unenforceable by any court or regulatory I authority having jurisdiction.                 all other terms, covenants, and conditions of this Agreement shall not be af f ected thereby and shall remain in full force and effect; provided, however, that if either Party determines, in its sole discretion, that there is a material change in this Agreement by reason of any provision or application being finally determined to be invalid, illegal or unenforceable that Party may terminat2 this Agreement on three (3) days' prior written notice to the other Pt.rty.
sections of this Agreement have been inserted for convenience of reference only and shall be afforded no significance in the intaiTretation or construction of this Agreement.
10.14       Agreements to be Negotiated in Good faith l               All mutually acceptable agreements and procedure required or permitted by this Agreement shall be negotiated by the Parties in good faith.         The inability to reach a mutually acceptable g    agreement or procedure shall not itself constitute any evidence that either Party failed to negotiate in good faith.
10.13 Dev?-ability In.ao event any of the terms, covenants, or conditions of this Agreement, or any application therno!, is finally determined to be invalid, illegal or unenforceable by any court or regulatory I
I                                                 51
authority having jurisdiction.
all other terms, covenants, and conditions of this Agreement shall not be af f ected thereby and g
shall remain in full force and effect; provided, however, that if either Party determines, in its sole discretion, that there is a material change in this Agreement by reason of any provision or application being finally determined to be invalid, illegal or unenforceable that Party may terminat2 this Agreement on three (3) days' prior written notice to the other Pt.rty.
10.14 Agreements to be Negotiated in Good faith l
All mutually acceptable agreements and procedure required or permitted by this Agreement shall be negotiated by the Parties in good faith.
The inability to reach a mutually acceptable agreement or procedure shall not itself constitute any evidence g
that either Party failed to negotiate in good faith.
I 51


K. M a
K. M a
Line 1,892: Line 3,103:
(b)
(b)
Subject to the provisions of Section 10.18 hereof,
Subject to the provisions of Section 10.18 hereof,
_3
_3 Cap Rock will, on the basis of the settlement ptovided for herein move for dismissal of its appeal in can Reck Electric Coegative,
'            Cap Rock will, on the basis of the settlement ptovided for herein               ,
: Inc, v.- United States Muclear Fefru'agorv Co nission, and t!yt tfnited States of M erica No. 89-1735, pending in the United Stat.es Court I
move for dismissal of its appeal in can Reck Electric Coegative, Inc, v.- United States Muclear Fefru'agorv Co nission, and t!yt tfnited States of M erica
]
]    I                            No. 89-1735, pending in the United Stat.es Court of Appeals for the District of Columbia Circuit,                 and   ove to trithdraw     its "Requent   for an   order       Enforcing and Modifying Antitrust     License Conditions,"     filed May       12, 1989,   in Texas Utilities Electric CcecAng (Comtnehe Paak Staam Electric Station)               .
of Appeals for the District of Columbia Circuit, and ove to trithdraw its "Requent for an order Enforcing and Modifying Antitrust License Conditions,"
Cap Rock and TU Electric agree that any order of dismissal say refer to the Agreement and this Mutual Release providad that in no event will TO Electric be required to admit or indica.te, nor shall Cap Rock assert,
filed May 12,
<    g                          that TU Electric has at any ti=e or in any =anner s
: 1989, in Texas Utilities Electric CcecAng (Comtnehe Paak Staam Electric Station)
been in violation of the License Conditions for Comanche Peak Steam                 a
Cap Rock and TU Electric agree that any order of dismissal say refer to the Agreement and this Mutual Release providad that in no event will TO Electric be required to admit or indica.te, nor shall Cap Rock assert, g
      ~
that TU Electric has at any ti=e or in any =anner been in violation of the License Conditions for Comanche Peak Steam s
Electric Station Units 1 and 2 (" License conditions") or any other i
a Electric Station Units 1 and 2 i
1aw or regulaticn promulgated by any government a.gency or entity, er taken any action inconsistent the swith.           Nor shall     the Agreement       constitute     any amendment         of,   addition     to   n interpretation of the License conditions and Cap Rock and TU Electric agran that the Nuclear Regulatury Cc==ission shall have no jurisdiction to enforce, directly or indirectly, any provision of the Agreement, its enf atcament jurisdiction being limited to the License Conditions.
~
10.18   Conditions Precedent This Agreement is subject to approval by the respective a
(" License conditions") or any other 1aw or regulaticn promulgated by any government a.gency or entity, er taken any action inconsistent the swith.
53
Nor shall the Agreement constitute any amendment of, addition to n
_ am" "-" " ^
interpretation of the License conditions and Cap Rock and TU Electric agran that the Nuclear Regulatury Cc==ission shall have no jurisdiction to enforce, directly or indirectly, any provision of the Agreement, its enf atcament jurisdiction being limited to the License Conditions.
10.18 Conditions Precedent This Agreement is subject to approval by the respective a
53 am"
"-" " ^


d
d Boards of Directors of Cap Rock, TU Electric and Lone Wolf on or
,              Boards of Directors of Cap Rock, TU Electric and Lone Wolf on or
~
~
cefore         Thursday, June   21r   1990,   pursuant   to     resolutions
cefore
: f.               satisfacCCOY M f or::t and substance to the Parties hereto, ft.iling in which the same shall, in all things, terminate and be of no force oi effact.
: Thursday, June 21r
g                     EXECUTED on the date and year first above written, 45 i
: 1990, pursuant to resolutions f.
TEXAS UTILITIES ELECTRIC COMPANY
satisfacCCOY M f or::t and substance to the Parties hereto, ft.iling in which the same shall, in all things, terminate and be of no force oi effact.
. I ig                                                   LY   h         =_     .
g EXECUTED on the date and year first above written, 45 i
                                                                            ~ ~ '
TEXAS UTILITIES ELECTRIC COMPANY I
jW                                                        Pitt Pittman TITLE: Vit .'
ig LY h
=_
~ ~ '
j W Pitt Pittman TITLE: Vit.'
* Midenw ATTEST:
* Midenw ATTEST:
i    S               /    ~
S
E              / ),c       A[vtu Secretary CAP ROCK ELECTRIC COOPERATIVE, IN'C.
/ ),c A [ v t u
ATTEST:                               BY:           M g,                >          David Prus.tt
/
                'SAcretary '               V       TITLE:   President and Chief I           /                                             Executive Officer
i
              .''                                  BYI                   n   Jx Russell Jones T1rLE: President of the Board BY:                         /
~
Steven E. Collier TITLE:   Director of Power Supply ii I                                               e4
E Secretary CAP ROCK ELECTRIC COOPERATIVE, IN'C.
    .I --  .
ATTEST:
BY:
M David Prus.tt g,
'SAcretary '
V TITLE:
President and Chief I
/
Executive Officer BYI n
Jx Russell Jones T1rLE: President of the Board BY:
/
Steven E. Collier TITLE:
Director of Power Supply ii I
e4
.I


s              ,,
LONE k'OM' ELECTRIC COOPERATIVE, INC.
LONE k'OM' ELECTRIC COOPERATIVE, INC.
BY:         w     r m ~e ./,
s BY:
TITLE:   President of the Board
w r
              ~
m ~e./,
TITLE:
President of the Board
~
AtrEST:
AtrEST:
!I       ,;;f&p -
!I
: s. .n, is 18 8
,;;f&p -
s.
.n, is 18 8
;3 I
;3 I
I 8
I 8
I:
I:
I
I
  .I                         ss
.I ss
  'I
'I


EXHIDIT A Cap Rock Electric Cooperative, Inc.
EXHIDIT A Cap Rock Electric Cooperative, Inc.
Points of Delivery I
Points of Delivery I
Q t rset Demand t v.W ) '.'eitsee (v.m
Q t rset Demand t v.W )
.I                           h                .
'.'eitsee (v.m h
.I I
I I
I I
I I
I I
I                                              (Information to be specified on the Effectiva 9 ate of this Agreement) i I
(Information to be specified on the Effectiva 9 ate of this Agreement) i I
I I
I I
I B
I B
I I
: I I
I
I


I E;GIBIT Cao Rock Power,.,sunelv Resour es I         Name and Location                     Firs of            Control                              Ters (Years)
I E;GIBIT Cao Rock Power,.,sunelv Resour es I
Lower suco1v Resource Capability    Beginning            Ending Area           DDi).             Date           One 1, .
Name and Location Firs Ters (Years) of Control Capability Beginning Ending Lower suco1v Resource Area DDi).
(To be specified pursuant to Section 2.03 of this Agreement]                       '
Date One 1,.
I 2.     [To be specified pursuant to section 2.03 of this Agreement]
(To be specified pursuant to Section 2.03 of this Agreement]
I 2.
[To be specified pursuant to section 2.03 of this Agreement]
8 3.
8 3.
[To be specified pursuant to Section 2.03 of this Agreement)
[To be specified pursuant to Section 2.03 of this Agreement)
I 4.
I 4.
[To be specified pursuant to section 2.03 of this Agreement]               '
[To be specified pursuant to section 2.03 of this Agreement]
E 5.
E 5.
[To be specified pursuant to Section 2.03 of this Agreement) 6.
[To be specified pursuant to Section 2.03 of this Agreement) 6.
I       [O be specified pursuant to section 2.03 of this Agreement) i I                                                                   .
I
[O be specified pursuant to section 2.03 of this Agreement) i I
I I
I I
I
I


a-   - ~_-.s ..m.A_** - 4.> d a_,a.4 - . *r s.e,w   & 4A_   --------
a-
I-u_-
~_-.s
av I
..m.A_**
E-                                                                                 a E.                                                                                 E
4.>
      &            e is I
d a_,a.4
        -  l II                                                                       l I   sg,                                                                       a Ei_
*r s.e,w 4A_
l II
I-u_
              ~
I
.-av E-a E.
E e
I l
II is l
I sg, a
Ei_ l II i
~
His 31 3
at 8is lt lEE E
53
!sa I
E if i
E li 5
g as 3
i
i
          - His 31                                                                            3 at  8is lt lEE
$ail!
_ 53 E
I E
E
E!
            !sa                                                                        I if i
hnI I
E li i 3
5 g as
            $a il!                                                         -
I E E!
hnI
                                                                  .                    I


EXHIBIT C (Page 2 ot 2) l
EXHIBIT C (Page 2 ot 2) l
(         TU Electric Fuel Ccst Factor Fill 1D9 l         PUCT Docket No. 72C9 TU ELECTRIC 1'IS CALCULATIOWS
(
                .                                          Bb3 OR l
TU Electric Fuel Ccst Factor Fill 1D9 l
l ESTI3tRTED kWh SALBf AfD SITER INFUT BY TULTASE LETRL I
PUCT Docket No. 72C9 TU ELECTRIC 1'IS CALCULATIOWS Bb3 OR l
l                                                                                                                                l I                                                                                                                               I l                                 RMLNEtt           IIffER_INE           19fEERfit       IREft* LIB                             l l
ESTI3tRTED kWh SALBf AfD SITER INFUT BY TULTASE LETRL l
i                    misser       it/3ss,3n,9ee     tr,ase,ssT.ses       1.estMt         e.sensa tene merstes   e,3se,3es, set   9 set.142,v M       s. spree       e.,snes l
I l
l I
I l
RMLNEtt IIffER_INE 19fEERfit IREft* LIB l
l i
misser it/3ss,3n,9ee tr,ase,ssT.ses 1.estMt e.sensa tene merstes e,3se,3es, set 9 set.142,v M
: s. spree e.,snes l
l l
l l
l c                                                                   .. .                -,
l c


l l
l l
Cao Rock Curtail:nent Plan lI I  -
Cao Rock Curtail:nent Plan lII (This Exhibit to be developed as provided in Section 4.03)
(This Exhibit to be developed as provided in Section 4.03)
I
I
;I I
;I I
:I
:I
;l                                   -
;l
:I B
:I B
B
B
:I I
:I I
il i
il i
1 1
5
5


Ie                       .
Ie EXHIBIT E Mutual Release For and in consideration of the premises and mutual agreements forth herein and the agreements, undertakings, premises, and set covenants set I
EXHIBIT E Mutual Release For and in consideration of the premises and mutual agreements set forth herein and the agreements, undertakings, premises, and covenants set forth in the power Supply Agree =ent, I
forth in the power Supply Agree =ent, of even date
of even date herewith, (hereinaf ter referred to as the " Agraement")               by and between CJ.P ROCK ELECTRIC COOPCRATIVE, INC. , (" Cap Rock") and TEXA5 UTILITIES ELECTR2C CCMPANY ("TU Electric"), Cap Rock, Lone Wolf Electric Cooperative, Inc.
: herewith, (hereinaf ter referred to as the " Agraement")
by and between CJ.P ROCK ELECTRIC COOPCRATIVE, INC.,
(" Cap Rock") and TEXA5 UTILITIES ELECTR2C CCMPANY ("TU Electric"), Cap Rock, Lone Wolf Electric Cooperative, Inc.
(" Lone Wolf") and TU Electric do hereby covenant and agres as follows:
(" Lone Wolf") and TU Electric do hereby covenant and agres as follows:
Cap Rock, Lone Wolf and TU Electric, each on behalf of itself and on behalf of any person or entity, private or governmentul, claiming by, through or under it, including without limitation, to I
Cap Rock, Lone Wolf and TU Electric, each on behalf of itself and on behalf of any person or entity, private or governmentul, claiming by, through or under it, including without limitation, to I
the extent it has the standing and right under law to do so, ,its present and past customers, predecessorn, parents, shareholders, officers,     directors,       agents       servants,   employees,     insurers,
the extent it has the standing and right under law to do so,,its present and past customers, predecessorn, parents, shareholders,
;          subsidiaries,         affiliates,     divis'ons, i      consultants,     attorneys, su:cessors, assigns and legal representatives (which, together with Cap Rock,       Lone Wolf and TU Electric are referred to herain collectively           as   " Releasing   Parties"),       hereby   absolutely, unconditionally and completely releases and discharges forever and for all purpoems and in all respects, the other and' the other's prasent and past customers, predecessors, parents, shareholders, officers, I  subsidiaries, directors,         agents, affiliates, servants, divisions, employees, consultants, insurers, attorneys, successors, assigns and legal representatives (which, together with Cap Rock, Lone Wolf and TU Electric are referred to herein I
: officers, directors, agents
I _    -  - -  -      -
: servants, employees,
: insurers, subsidiaries, affiliates, divis'ons, consultants, attorneys, i
su:cessors, assigns and legal representatives (which, together with Cap Rock, Lone Wolf and TU Electric are referred to herain collectively as
" Releasing Parties"),
hereby absolutely, unconditionally and completely releases and discharges forever and for all purpoems and in all respects, the other and' the other's prasent and past customers, predecessors, parents, shareholders,
: officers, directors,
: agents, servants, employees,
: insurers, I
subsidiaries, affiliates, divisions, consultants, attorneys, successors, assigns and legal representatives (which, together with Cap Rock, Lone Wolf and TU Electric are referred to herein I
I


o E'
E' o
collectively,as " Released Parties"), or any of them, jointly and severally, from any and all claims, demands, actions, causes of action, suits, and damages, including attorneys' feen and related disbursements,     of any kind         or     nature whatsoever,   direct   or consequ'enti al, fixed or contingent, and the consequences thereof, existing at,     or at any ti=a prior to and including, the date hereof, arising out of or in any way incident to any allegation
collectively,as " Released Parties"), or any of them, jointly and severally, from any and all claims, demands, actions, causes of action, suits, and damages, including attorneys' feen and related disbursements, of any kind or nature whatsoever, direct or consequ'enti al, fixed or contingent, and the consequences thereof, existing at, or at any ti=a prior to and including, the date hereof, arising out of or in any way incident to any allegation
            =ade,     or   which   could       have     been   made,   in any   judicial, administrative (except Federal Energy Regulatory Commission Occket I     Nos. EL79-8, ER82-545-000, at al. and EL79-B-002) or legislative procaeding (federal, state, municipal or otherwise) in which Cap Rock is,   was or could have been a party,                 an intervenor or a witness,   or has,   had or could have had               any other   interest, including, but not limited to, PUCT Docket Nos. 9300 and 5540, l
=ade, or which could have been
Nuclear Regulatory Commission Dot:ket Nos. 50-445A and 50-446A, and
: made, in any
  .        Cause No. 89-1735 pending in the United States Court of Appeals f or the District of Columbia Circuit, except, however,                   any claims, lI           liabilities or obligations arising after the date hereof out of or in any way relating to the Agreement or any agreement or instru=ent executed and delivered pursuant thereto; that certain Agreement f or
: judicial, administrative (except Federal Energy Regulatory Commission Occket I
      .      Purchase of Power between Cap Rock and TU Electric, dated June 2, 1963, as amended; that certain Agreement for' Purchase of Power between Lone Wolf and TU Electric, dated July 2, 1963, as amended; or this Mutual Release (hereinaf ter collt:tively ref erred to as the
Nos. EL79-8, ER82-545-000, at al. and EL79-B-002) or legislative procaeding (federal, state, municipal or otherwise) in which Cap Rock is, was or could have been a party, an intervenor or a
              " Released Claim 3");   provided,         however,   that nothing herein is intended to be, or shall constitute, a release, waiver or discharge I                                                 2 l
: witness, or has, had or could have had any other
: interest, including, but not limited to, PUCT Docket Nos. 9300 and 5540, l
Nuclear Regulatory Commission Dot:ket Nos. 50-445A and 50-446A, and Cause No. 89-1735 pending in the United States Court of Appeals f or the District of Columbia Circuit, except, however, any claims, lI liabilities or obligations arising after the date hereof out of or in any way relating to the Agreement or any agreement or instru=ent executed and delivered pursuant thereto; that certain Agreement f or Purchase of Power between Cap Rock and TU Electric, dated June 2, 1963, as amended; that certain Agreement for' Purchase of Power between Lone Wolf and TU Electric, dated July 2, 1963, as amended; or this Mutual Release (hereinaf ter collt:tively ref erred to as the
" Released Claim 3");
: provided, however, that nothing herein is intended to be, or shall constitute, a release, waiver or discharge I
2 l


of cny claim, dcfcnco or counterclaim assertad, or which eculd 'ca assertad, by any of the respective Releasing Partise against any person, firm, corporation or other entity other than any of                                                         the respective Released Parties.
of cny claim, dcfcnco or counterclaim assertad, or which eculd 'ca assertad, by any of the respective Releasing Partise againstany person, firm, corporation or other entity other than any of the respective Released Parties.
I                                Cap Rock, Lone Wolf and TU Electric each hereby agrees to indemnity, datand and hold harmless the other and its resent                                                          p          and past customers,                       predacassers,   parents,                               shareholders,             officers, directors,                     agents,   servants, employaas, insurers, subsidiaries, affiliates, divisions, consultants, attorneys, successors, assigns and legal representatives, or any of them, jointly and severally, from and against and with respect to any and all past, present and future obligations, liabilities, claims, losses, demands actions,                                                         ,
Cap Rock, Lone Wolf and TU I
causes                         of   action,   suits, damages,                                 interest,             penalties, deficiencies,                         judgments (and costs and expenses in connection therewith,                         including, without limitation, attorneys' fees and ralated disbursements) in any way arising out of or othe.m/ise relating to any of the Released Claims.
Electric each hereby agrees to indemnity, datand and hold harmless the other and its present and past customers, predacassers,
Cap Rock, Lone Wolf and TU Electric aach hereby covenants and agrees that it will forsvar refrain frem instituting, maintaining, pres.acuting or continuing to prosecuta or maintain any suit, action I v. proceeding of any kind, or collecting from or proceeding against the othat or the ether's present and past customers, predecessors                                                                               ,
: parents, shareholders,
parents,                         shareholders,     officars,       directors,                             agents,             servants, employees,                           insurers,     subsidiaries,                                   affiliates,             divisions, consultants,                           attorneys,     successors,                                   assigns             and         legal representatives, or any of them, jointly or severally, or any other I                                                           3
: officers, directors,
____  _ _ - - _ - - - ~ - - - - - -           - - - - - -        - - -    -~~ -
: agents, servants, employaas,
: insurers, subsidiaries, affiliates, divisions, consultants, attorneys, successors, assigns and legal representatives, or any of them, jointly and severally, from and against and with respect to any and all past, present and future obligations, liabilities, claims, losses, demands
: actions, causes of
: action, suits,
: damages, interest, penalties, deficiencies, judgments (and costs and expenses in connection therewith, including, without limitation, attorneys' fees and ralated disbursements) in any way arising out of or othe.m/ise relating to any of the Released Claims.
Cap Rock, Lone Wolf and TU Electric aach hereby covenants and agrees that it will forsvar refrain frem instituting, maintaining, pres.acuting or continuing to prosecuta or maintain any suit, action I
: v. proceeding of any kind, or collecting from or proceeding against the othat or the ether's present and past customers, predecessors
: parents, shareholders,
: officars, directors,
: agents, servants, employees,
: insurers, subsidiaries, affiliates, divisions, consultants, attorneys, successors, assigns and legal representatives, or any of them, jointly or severally, or any other I
3
_ _ - - _ - - - ~ - - - - - -
-~~ -


Person, firm or corporation, based upon any of the Released Claims.
Person, firm or corporation, based upon any of the Released Claims.
EXECUTID in multiple counterparts on this, the                 date of
EXECUTID in multiple counterparts on this, the date of 1990.
                                      , 1990.
~
                                ~
TEXAS UTILITIES ELECTRIC COMPANY I
TEXAS UTILITIES ELECTRIC COMPANY I                                                       BY:
BY:
Pitt Pit *aan
Pitt Pit *aan
-I                                                     TITLE: Vice President ATTEST:
-I TITLE: Vice President ATTEST:
Secretary CAP ROCK ELECTRIC COOPERATIVE, INC.
Secretary CAP ROCK ELECTRIC COOPERATIVE, INC.
ATTEST:                                           BY:
ATTEST:
David PYuitt I   Sacrata.7                                         TITLE:   President and Chief Executive Officer BY:
BY:
Russell Jones TITLE: President of the Board I                                                     BY:
David PYuitt
I                                                          Steven E. Collier TITLE:   Director of Power Sucply I
.I Sacrata.7 TITLE:
I I                                                       4 I                                                                                         1
President and Chief Executive Officer BY:
Russell Jones TITLE: President of the Board I
BY:
Steven E. Collier I
TITLE:
Director of Power Sucply I
I I
4 1
I


1 P
P LONE WOLF ELECTRIC COOPERATIVE, INC.
LONE WOLF ELECTRIC COOPERATIVE, INC.
g j
g                       ..
BY:
j BY:                                         .
.I TITLE:
l
:.I                                     TITLE:
l-ATTEST:-
l-ATTEST:-
lI Secretary
lI Secretary
Line 2,061: Line 3,345:
!I 4
!I 4
i 5
i 5
lI.
lI
il i
.il i
l
l
  )
)
        =                                   5
=
5


                        =     . _ _ ..
=
t
t
                        .....-                                                    EXHIBIT F
:I EXHIBIT F DOCKET No. 9300 I
:I:
APPLICATION OF TEXA3 UTILITIES 5
DOCKET No. 9300 I     APPLICATION OF TEXA3 UTILITIES                 5               BEFORE THE
BEFORE THE ELECTRIC COMPANY FOR AUTHORITY S
:            ELECTRIC COMPANY FOR AUTHORITY                 S     PUBLIC UTILITY COMMISSIcN
PUBLIC UTILITY COMMISSIcN TO CHANGE RATES S
!          TO CHANGE RATES                                 S               OF TEXAS NOTICE CAP ROCK ELECTRIC COOPERATIVE, INC. (" Cap Rock") and LONE WOLF ELECTRIC COOPERATIVE, INC.             (" Lone Wolf"), by and through their attorney of record, hereby give notice that they (i) have reached a settlement of their disputes with TEXAS UTILITIES ELECTRIC COMPANY ("TU Electric") in this proceeding; (ii) hereby cease all participation, directly or indirectly, in this proceeding; (iii) no
OF TEXAS NOTICE CAP ROCK ELECTRIC COOPERATIVE, INC.
;          longer  desire,           directly or   indirectly,   to   prosecute   their
(" Cap Rock") and LONE WOLF ELECTRIC COOPERATIVE, INC.
}           intervention or take any position adverse to the position of TU l     Electric in this proceeding; (iv) hereby withdraw all testimony,
(" Lone Wolf"), by and through their attorney of record, hereby give notice that they (i) have reached a settlement of their disputes with TEXAS UTILITIES ELECTRIC COMPANY ("TU Electric") in this proceeding; (ii) hereby cease all participation, directly or indirectly, in this proceeding; (iii) no longer
;          motions, objections and other pleadings haretofore filed in this           ,
: desire, directly or indirectly, to prosecute their
proceeding on behalf of Cap Rock cnd Lone Wolf; and (v) hereby support TU Electric's proposed cost allocation and rate design in this proceeding.
}
Respectfally submitted, E                                               EARNEST CASSTEVENS
intervention or take any position adverse to the position of TU l
  ;5                                                 901 hopac South 400 Barton Oaks Plaza Two 13                                                 Austin, Texas 78746 l3                                                 (512) 318-361.
Electric in this proceeding; (iv) hereby withdraw all testimony, motions, objections and other pleadings haretofore filed in this proceeding on behalf of Cap Rock cnd Lone Wolf; and (v) hereby support TU Electric's proposed cost allocation and rate design in this proceeding.
  !I i
Respectfally submitted, E
EARNEST CASSTEVENS
;5 901 hopac South 400 Barton Oaks Plaza Two 13 Austin, Texas 78746 l3 (512) 318-361.
!I i
By:
By:
EARNEST CASSTEVENS State Bar No. 03980400
EARNEST CASSTEVENS State Bar No. 03980400
Line 2,086: Line 3,374:


CERTIFICATE OF SERYTCE l
CERTIFICATE OF SERYTCE l
I hereby certify that a true and correct copy of the above and foregoing has been served upon all parties of record to this l                                 proceeding by ma!.1 or hand delivey on this the           day of June, 1990.
I hereby certify that a true and correct copy of the above and foregoing has been served upon all parties of record to this l
I                                         -
proceeding by ma!.1 or hand delivey on this the day of June, 1990.
EARNEST CASSTEVENS I
I EARNEST CASSTEVENS I
I I
I I
I I
I I
                                                                                                      ~
~
I                                                                                                         .
I I
I I
I I
I I
I I
I                                                                                                     .
I I I
I I                                                                       I                                                                                              -}}
-}}

Latest revision as of 14:17, 11 December 2024

Comments of Cap Rock Electric Cooperative,Inc Re Significant Changes in Activity of Licensee Texas Utilities Electric Co That Warrant Antritrust Review Before Issuance of Ol
ML20141M103
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/25/1992
From: Adragna J, Bilsky E
MILLER, BALIS & O'NEIL
To:
Shared Package
ML20141M100 List:
References
NUDOCS 9204010112
Download: ML20141M103 (176)


Text

.

f g

ORIGINAL UNITED STATES OF AMERICA I

BEFORE THE NUCLEAR REGULATORY COMMISSION Texas Utilities Electric Company

)

Comanche Peak Steam Electric

)

Docket No. 50-446A Station, Unit 2

)

t COMMENTS OF 5

CAP ROCK ELECTRIC COOPERATIVE, INC.

CCNCERNING SIGNIFICANT CHANGES IN THE ACTIVITY OF LICENSEE TEXAS UTILITIES ELECTRIC COMPANY I

THAT WARRANT AN ANTITRUST REVIEW BEFORE THE ISBUANCE OF AN OPERATING LICENSE t

i COUNSEL FOR CAP ROCK ELECTRIC COOPERATIVE, INC.

John Michael Adragna I

Eric A. Dilsky Miller, Balis E O'Neil, P.C.

1101 Fourteunth Street, N.W.

I Buite 1400 Washington, D.C.

20005 4

(202) 789-1450 I

i March 25, 1992 t

I 4

grouu888;he n

I h

UNITED STATES OF AMERICA BEFORE THE NUCLEAR REGULATORY COMMISSION Texas Utilities Electric Company

)

Comanche Peak Stea.t Electric

)

Docket No. 50-446A 8

Station, Unit 2

)

COMMENTS OP CAP ROCK ELECTRIC COOPERATIVB, INC.

=

CONCERNING SIGNIFICANT CHANGES IN THE ACTIVITY 4

OF LICEN.3EE TEXAS UTILITIES ELECTRIC COMPANY THAT WARRANT AN ANTITRUST REVIEW EIFORE.THE ISSUANCE OF AN OPERTdI}{G LICf1SE

)

Pursuant to this Commission's notice, published on February 24, 1992,1/ Cap Rock Electric Cooperative. Inc.

(" Cap Rock"),

hereby comments on ignificant changes in the activities of licensee Texas Utilities Electric Company ("TUEC") since the antitrust operating license review associated with Comanche Peak Unit No.

1, which was completed in August, 1989.

TUEC is overtly exercising its monopoly power, in violation of its existing antitrust license conditions and applicable antitrust laws, anticompetitively to injure Cap Rock and other TUEC customers and I

competitors.

Cap Rock submits that TUEC's ongoing activities create and maintain a situation inconsistent with the antitrust i

laws and warrant the institution by this Commission of an antitrust review and hearing at which the extent of TUEC's anticompetitive conduct can be established and the appropriate I

i remedies fixed.

l1 1/

57 fed. Eqq. 6340 (February 24, 1992).

I

t 2

I.

I ffRihRX TUEC's February 5, 1992, response to Regulatory Guide 9.3 2/ misrepresents and, through material omissions, is apparently intended intentionally to mislead this commission concerning TUEC's anticompetitive conduct toward its wholesale customers.

As the Commission is conducting this antitrust review, TUEC is actively using its monopoly power over transmission and other essential servicea to prevent Cap Rock and other TUEC wholesala customers from purchasing bulk power from

-bulk power suppliers other than TUEC, thus forcing them to purchase higher cost TUEC power.

i TUEC has refused to wheel wholesale bulk power from West Texas Utilities Company ("WTU") to Cap Rock.

TUEC's refusal to wheel has been communicated orally to representatives of Cap Rock on several occasions, and in a letter dated January 30, 1997 2/

TUEC's refusal to wheel violates Paragraph 3.D. (2) (i) of the Comanche Peak license conditions, which require TUEC, inter alia, to wheel on behalf of Entities 3/ like Cap Rock.

SS_q Section IV, infra.

TUEC's putative justification for its refusal to 2/

TU Electric Response to Regulatory Guide 9.3, dated February 5, 1992 ("TUEC Antitrust Response").

2/

Attachment A at 3-4.

TUFC has confirmed its refusal to wheel on page 23 of its Antitrust Response.

3/

The term " Entity" is defined in Paragraphs 3.D. (1) (c) and (d) of the license conditions.

n

E I

wheel is its contention that Cap Rock, which has legally terminated its 1963 full requirements contract with TUEC, nevertheless remains obligated to purchase its full recruirements from TUEC.

Under TUEC's apparent reasoning, its mer~ utterance of this contention to Cap Rock somehow entitles TUEC to violate its license conditions and the antitrust laws, to irreparably harm Cap Rock competitively, and to damage Cap Rock by more than

$ 3,000,000 per year.

Neither the license conditions nor the a

i antitrust laws permit the monopolist to engage in "self help."

To the contrary, the license conditions and antitrust laws are intended to prevent precisely this kind of "self help" (i.es illegal use of monopoly power to foreclose competition).

TUEC has decided that TUEC may refuse to wheel (h, W

violate the antitrust laws) because TUEC interprets its 1990 settlement with Car Rock'1/ as preventing Cap Rock from i

purchasing power frot TUEC competitors.

This self-serving

" interpretation" is entirely baseless (Sg_q Section IV.D).

TUEC's putative interpretation is the immediate concern of, and is m

currently the subject of litigation before, the District Court of I

I

.5/

Power Supply Agreement Between Texas Utilities Electric

[

Company and Cap Rock Electric Cooperative, Inc., dated 4

3 June 8, 1990 ("1990 Settlement").

TUEC and Cap Rock entered

/

into the 1990 Settlement in settlement of, j nter aliq, the enforcement action-instituted by the filing of the Request I

of Cap Rock Electric Cooperative, Inc. For An Order Enforcing And Modifying Antitrust License Conditions, dated May 12, 1989

(" Cap Rock Request for Enforcement").

I

L 4

a Midland County, Texas.h/

Section 105(c) of the Atomic En?rgy Act, 42 U.S.C.

5 2135(c), mandates that this Commission investigate and remedy TUEC's open and admitted exercise of monopoly power and violation of its license conditions before the Commission may grant TUEC an operating license for Comanche Peak Unit No.

2.

It must be emphasized what TUEC has nol done.

TUEC has not sought legal or equitable remedies to redress what it contends would be an illegal breach of contract by Cap Rock.

For example, TUEC has not sought to test the merits of its " interpretation" in court by seeking a declaratory order confirming that interpretation.

Instead, TUEC has done it the old fashlot.ed way:

it has refused to wheel and physically prevented Cap Rock from buying from TUEC's competitor.

If TUEC did not have monopoly power over the sole transmission facilities which interconnect Cap Rcck and WTU, Cap Rock would be purchasing power from WTU.

TUEC's recourse in such a case, if it truly believed Cap Rock to be in breach of some agreement, would be to present its claim for breach of contract and damages in a court of competent jurisdiction.

TUEC instead has chosen a course of action that f/

Can Rock Electric Cooperative. Inc. v. Texas Utilit; igg Electric, District Court of Midland County, 238th Judicial District, No. B38,879.

Persistence by TUEC in baseless legal claims, however, may itself be evidence or anticompetitive conduct that this Commission would be obligated to consider. See Section IV.C.3, infra.

t I

s has been recognized to violate section 2 of the Sherman Act, 15 m

U.S.C.

52, since 1973 2/

TUEC is also misleading the Commission as to the status of its relationships with two other wholesale customers, Tex-La Electric Cooperative, Inc.

(" Tex-La") and Rayburn Country Electric Cooperative, Inc. ("Rayburn Country").

On February S, 1992, TUEC represented to this Commission that it was currently providing transmission and related scheduling services for Tex-La's and Rayburn Country's purchases of low cost hydroelectric power from the Denison Dam.jf Those representations were true for less than two days.

On February 7, 1992, TUEC informed Tex-La and Rayburn Country that it was terminating its Scheduling Agreements with them because TUEC asserted that each may have breached those agreements; TUEC stated that it would only consider the Scheduling Agreements effective through March 1, 1992 2/

This notice was given without prior notice of the purported breaches and without affording Tex-La and Rayburn Country opportunities to cure the purported breaches.1D/

TUEC's notice was given with full recognition of the ramifications of such an action for Tex-La and Rayburn Country.

))

Otter Tail Power v. United States 410 U.S.

366 (1973),

c 3/

TUEC Antitrust Response, at 27-28 and 30.

The Denison Dam

+I is a federal hydroelectric project, the electrical output of which is marketed by the Southwestern Power Administration of the Department of Energy.

2/

Attachment B.

19/

Attachment C, at 1.

E

I R

e I

As alleged by Tex-La, termination of its Scheduling Agreement with TUEC will result in Tex-La and Rayburn Country having no way to make use of the output of the Denison Dam and loss to them of the entire economic value of the recource.M/

Notwithstanding the gravity of such actions to Tex-La and Raybu'rn Country, TUEC chose to conceal its actions from this Commission and to seek to have this Comnission believe that it cont'nued to transmit and to schedule Denison Dam power for Tex-La and Rayburn Country.

Cap Rock understands that after Tex-La filed suit in state court, TUEC may have agreed not to terminate scheduling soivices for an additional period time.

Cap Rock further understands that, although Rayburn Country may spbmit comments to this I

Commission on this matter, Tex-La is precluded by its earlier settlement agreement with TUEC from filing comments before the Commission.

The complaint and other public documents filed by Tex-La in the District Court, however, make it clear that TUEC's

~

representations to this commission as to its scheduling arrangements for Tex-La und Rayburn Country are plainly incorrect.

As in the case of Cap Rock, TUEC has chosen to use a unilaterally asserted claim of contract right to mask a naked exercise of monopoly power.U/

U/

Attachment D at 12.

Uf As set forth in Attachment D, Tex-La maintains that TUEC's termination is ineffective because no breach of which Tex-La is aware occurred and, if a breach did occur, TUEC did not give Tex La the 90 day iotice and opportunity to cure that is required by the Scheduling Agreement.

I I

R l

V The antitrust license conditions are intended to prevent

?

TUEC from foreclosing competition through the exercise of its f

monopoly power to harm its competitors, like Cap Rock.

TUEC is activolf flouting the license conditions.

If TUEC is able, based upon its unilateral assertion of a contract right, to refuse to wheel for Cap Rock, it can, with impunity, refuse to wheel for any Entity with which it currently has a contract.

Cap Rock s'2bmits that TUEC's actions are in clear siolation of the I

antitrust license conditions.

Cap Rock does not ask the Commission to adjudicate the l

merits of TUEC's claims under the 1990 Settlement; that question is currently being addressed in the action brought by Cap Rock in state court in Texas.

Cap Rock seeks two things from this Commission.

First, Cap Rock requests that the Commission institute a full and complete investigation into the ongoing anticompetitive conduct of TUEC.

Cap ~ Rock does not purport to know the circumstances of all entities which may be forced to do business with TUEC.

Only an antitrust hearing, open to the public, can present this Commission with a complete picture of the ongoing anticompetitiva conduct of TUEC.

Secondly, Cap Rock seeks an unequivocal determination by the Commission that TUEC is obligated by its antitrust license conditions to wheel for Cap Rock and other similarly situated entities.

Only such a clear pronouncement by the Conmission can hope to avoid future anticompetitive actions by TUEC.

It is time that TUEC is brought I

I 8

to realize that its license conditions impose real and binding obligations on it.

In its August 9, 1988, comments concerning TUEC's application for an operating license for Comanche Peak Unit No.

1, Cap Rock asked the Commission to enforce the existing antitrust license conditions to, inter alia, require TUEC to wheel and to provide other services essential to permit Cap Rock to do business with bulk power suppliers other than TUEC.

Cap Rock also asked the Commission to institute an antitrust hearing and to modify the license conditions as necessary to prevent TUEC

[

from maintaining a situation inconsistent with the antitrust laws.

Cap Rock repeated these requests in its 1989 request for an order enforcing and modifying the license conditions.

Only after this Commission indicated its willingness to act on Cap Rock's request for enforcement did TUEC first begin to take seriously ite obligations under the license conditions.

Cap Rock ultimately accepted a settlement with TUEC that offered the prospect of an orderly transition off the TUEC system and which permitted TUEC to avoid final action on Cap Rock's request for enforcement by this Commission.

Cap Rock did not squander the opportunities presented by the 1990 Settlement.

Cap Rock proceeded vigorously and expeditiously to search out and to obtain new sources of bulk power that would permit Cap Rock to become independent of TUEC.

Cap Rock promised to engage in an orderly and systematic transition off the TUEC system.

Cap Rock not only has kept that promise, it has bettered

_____._________.________m_

l that promise.

Cap Rock is not only able to begin the transition off the TUEC system, but far sooner than anyone could have predicted, Cap Rock is in a position to complete that departure.

=

In so doing, Cap Rock will require minimal coordination and cooperation from TUEC.

The burden on TUEC will be virtually

=

nonexistent.

TUEC professed its villingness to assist Cap Rock in becoming an independent electric utility once Cap Rock terminated its full requirements contract with TUEC.

Cap Rock has done that; TUEC cannot now legitimately complain that it did not really believe that Cap Rock could do it.

Barely two years after the 1990 settlement, Cap Rock is again being subjected to TUEC's anticompetitive refusals to wheel and efforts to prevent Cap Rock from obtaining alternative I

sources of bulk power.

TUEC's monopoly power, und its apparent willingness to exercise it to the anticompetitive disadvantage of its competitors, have not chanaod in two years.

TUEC's anticompetitive conduct toward Cap Rock (and otherc) is clear and intentional.

Cap Rock urges the Commission to act definitively to preclude further abuses of monopoly power by TUEC; Section 105(c) of the Atomic Energy Act requires no less.

l 10 l

II.

j i

FAMhk BA9EQBQM l

A.

CAP ROCK ELECTRIC COOPERATIVL INQ_m.

Cap Rock Electric Cooperative, Inc. is a distribution cooperative incorporated under the laws of the state of Texas, with its headquartors in Stanton, Texas.

Cap Rock was organized in 1939 to eerve in the counties of Howard, Martin, Midland, and Glasscock, and now provides service in those countios and eight additional counties in Nortnern Texas.13/

Cap Pock currently

);

serves a peak load of approximately 100 MW vith more than 20,000 customers in the service area of over 10,000 square miles located I

in 17 counties in Texas.

Located in or nnGr Cap Rock's service territory are two cities of appro::imately 90,000 to 120,00 population, one town of approximately 35,000 population, and two towns of 2,000 to 3,000 population.

Cap Rock does not serve any of these municipalities, but has existing facilities around and 4

near their corporate limits and has experienced considerable residential growth arcand municipalities such as the City of Midland, Texas.Ja/

In 1990, Cap Rock merged with the Lone Wolf Electric Power Cooperative, Inc., formerly a wholesale customer of TUEC.

On D/

Cap Rock also provides service in Borden, Dawson, Ector, I

Upton, Reagan, Irion, Tom Green, and Sterling counties.

All but Irion County are included as part of the " North Texas Area" as defined in Paragraph 3.D. (1) (b) of the antitrust license conditions.

.1A/

Cap Rock's large industrial load consist almost entirely of oil field pumps and cotton gins.

1

I 11 November 5, 1991, Cap Rock filed an application with the Public Utility Commission of Texas ("PUCT") to merge with Hunt-Collin Electric Cooperative, Inc.

(" Hunt-Collin"), formerly a distribution cooperative member of Rayburn Country.Uf Since Hunt-Collin left Rayburn Country, TUEC has sold Hunt-Collin its full power requirements, even though Hunt-Collin has no service agreement with TUEC.

TUEC has intervened in PUCT Docket No.

10726 and is opposing Cap Rock's proposed merger with Hunt-Collin.

By letter dated December 19, 1991, Cap Rock notified TUEC that, pursuant to the te u of the 1972 amendment to its 1963 service contract with TUEC, Cap Rock was terminating the service contract effective February 1, 1992.

By that letter, Cap Rock provided the identical notice of termination for the service contract of Cap Rock's Lone Wolf Division (formerly Lone wolf Electric Cooperative, Inc., a full requirements customer of TUEC with a service contract identical in all relevant respects to the 1963 Cap Rock /TUEC service contract).

Cap Rock also confirmed 1

its previour informal communications with TUEC that, as of February 1, 1992, the wholesale electric power needs of Cap Rock (and its Lone Wolf Division) would be served by WTU.lbf TUEC now concedes that the 1963 contract has been validly terminatec, but contends that Cap Rock remains obligated to buy its full M/

Appiication for Sale, Transfer, or Merger of Cap Rock Electric Cooperative, Inc. and Hunt-Collin Electric g

Cooperative, Inc., PUCT Docket No. 10726.

15/

Attachment E.

I 11 November 5, 1991, Cap Rock filed an application with the Public Utility Commission of Texas ("PUCT") to merge with Hunt-Collin g

Llectric Cooperative, Inc.

(" Hunt-Collin"), formerly a distribution cooperative member of Rayburn Country.15/

Since Hunt-Collin lett Rayburn Country, TUEC has sold Hunt-Collin its f t; 1.

wower requirements, even though Hunt-Collin has no service agreement with TUEC.

TUEC has intervened in PUCT Docket No.

10726 and is opposing Cap Rock's proposed merger with Hunt-Collin.

By letter dated December 19, 1991, Cap Rock notified TUEC that, pursuant to the terms of the 1972 amendment to its 1963 serv 3ce contract with TUEC, Cap Rock was terminating the service contract effective February 1, 1992.

By that letter, Cap Rock provided the idantical notice of termination for the service contract of Cap Rock's Lone Wolf Division (formerly Lone wolf

,I Electric Cooperdtive, Inc., a full requirements customer of TUEC with a service contract identical in all relevant respects to the 1963 Cap Rock /TUEC service contract).

Cap Rock also confirmed its previous informal communications with TUEC that, as of February 1, 1992, the wholesale electric power needs of Cap Rock (and its Lone Wolf Division) would be served by WTU.lff TUEC now concedes that the 1963 contract has been validly terminated,

i 15/

Application for Sale, Transfer, or Merger of Cap Rock Electric Cooperative, Inc. and Hunt-Collin Electric Cooperative, Inc., PUCT Docket No. 10726.

16/

su..achment E.

5

l 2

J

-but contends that Cap Rock remains obligated to buy its full requirements from TUEC under the Settlement.

B.

CAP _ ROCK IS IN DIRECT COMPETITION WIT 11_TH&

Cap Rock competes with TUEC at retail and in the bulk power markets.

Cap Rock's service territory is surrounded by the TUEC service territory.

The PUCT permits dual and ;ometimes triple certification of service torritories.

In other words, two or more electric utilities may be authorized to competc to serve the electrical needs of customers within a single service territory.

Approximately, 30-35 percent of the service territories in the state are dually or triply certified.

Between 50 and 60 percent of Cap R7ck's service territory is at least dually-certified with TUEC.12/

In other words, Cap Rock in in direct retail competition with TUEC in more than half of the territory in which Cap Rock is authorized to serve.

The foregoing facts concerning Cap Rock's retail competition with TUEC are essentially the same as in 1988, when Cap Rock filed comments concerning the need for an antitrust review of TUEC's activities before issuance of an operating license stage i

E for Comanche Peak Unit No. 1,1B/ and in 1989, when Cap Rock's filed its Request for Enforcement of the Comancho Peak antitrust 12/

Some of Cap Rock's service territory is triply certified.

1Df Comments of Cap Rock Electric Cooperative, Inc. Concerning Significant Changes In Licensee's Activity That Warrant An Antitrust Review At The Operating License Stage, dated August 9, 1988.

_a 13 license conditions.

Cap Rock competition with TUEC for new J

retail load, however, has become even more direct and inmediate.

As previounly noted, Cap Rock has merged with a former full requirementa customer of TUEC, Lone Wolf, and Cap Rock has an application pending before the PUCT to merge with another full requirements customer of TUEC, Hunt-Collin.

Cap Rock also continues actively to seek the lowest cost sources of bulk power.

Cap Rock has executed an agreement with Southwestern Public

)

Service Company ("SPS") under which Cap Rock will switch its entire load from the WTU system to the SPS system beginning in i.

1993.

Under the SPS agreement, SPS will construct the necessary transmission directly to interconnect the SPS and Cap Rock systems, thus obviating the need for any transmicsion or other services from TUEC.

The SPS agreement also affords Cap Rock the flexibility to purchase bulk power resources from suppliers other than SPS.

As a valuable bridge to the SPS arrangements, Cap Rock negotiated a contract with WTU pursuant to which WTU agreed to take over control area responsibility for Cap Rock and to sell Cap Rock its full bulk power requirements, beginning 12.01 AM, February 1, 1992, the effective date of the termination of Cap Rock's full requirements contract with TUEC.

It is estimated that this arrangement with WTU will save Cap Rock approximately

$250,000 per month.

All that is required from TUEC to permit Cap Rock's contract with WTU to go forward is for TUEC: (1) to coordinate with WTU so that, when WTU " ramps up" (i.et, k

14 increases) its generation to serve Cap Rock's load, TUEC back down its generation, and (2) to provide the necessary transmission service.

TUEC has refused to cooperate.

Instead, TUEC has informed Cap Rock that TUEC believes Cap Rock must continue to buy all of its bulk power needs from TUEC SY.RD after February 1, 1992, when cap Rock's full requirements contract with TUEC is lawfully terminated.12/

I III.

LEGAL STAHQARDR A.

STANDARDS APPLICABLE TO A "BIGNIFICANT CHANGES" DXTERHJyATION.

An antitrust review at the operating license stage is warranted if:

the Commission determines such a review is E

advisable on the ground that significant E

changes in the licensees' activities or proposed activitiee have occurred subsequent to the previous review by the Attorney General and the Commission under this subsection in connection with the construction permit for the facility.

42 U.S.C. 52135(c)(2).

"significant changes" within the meaning of this provision have been defined by the Commission to mean:

1.

Changes that have occurred since the previous antitrust review of the licensee; 2.

Changes that are reasonably attributable to the licensee in the sense that the licensee has sufficient causal relationship to the change that it would not be unfair to permit it to trigger a second antitrust review; and 19/

Attachment A at 1-2.

I l

is 15 3.

Changes that are "significant" in the sense 5

that the charge has antitrust implications that would likely warrant Commission remedy.

Eouth Carolina Electric & Gas D Epany. et al. (Virgil C. Summer Nuclear Station., Unit No. 1), 13 NRC 862, 871-72 (1981).29/

The Commission has stated that the third criterion requires assessment of whether the changes would likely warrant Commin,sion a

remedy and the type of remedy.21/

TUEC's conduct is inconsistent with the antitrust principles applied by this Commission and is in direct violation of TUEC's obligation under the antitrust license conditions.22/

The TUEC anticompetitive conduct here discussed has occurred since

.Novemb6r, 1991, principally within the past several months, well after the Commission completed the 1989 antitrust review associated with the grant of an operating license for Comanche Peak Unit No.

1.

Moreover, TUEC's anticompetitive conduct continues unabated.

Indeed, evidence of TUEC's anticompetitive conduct may be found in the misleading information which it filed with this Commission on February 5, 1992.

TUEC's ability to prevent Cap Rock from purchasing power from WTU is solely attributable to TUEC's monopoly power over transmission.

The remedy for TUEC's conduct is well within the I

2_Q/

Egg jlLlgg, South Carolina Electric & Gas Company (Virgil C.

I Summer Nuclear Station, Unit No. 1), 11 NRC 817 (1980);

Central ElectrLc Power Coonerative. Inc. (Virgil C.

Summer Nuclear Station, Unit No. 1), 14 NRC 787 (1981).

2.1/

SCE&G, 13 NRC at 872.

22/

See Section IV.B, infra.

I

I l

16 Commission's authority.

The Commission should enforce the existing license conditions and impose such additional licence condition as may be necessary to compel TUEC to honor its obligations to wheel and to make available under reasonable terms and conditions the services which it ic required to make available by the licenre conditions.

B.

APJ11Q] MILE _ ANTITRUST PRINSIPLES.

The antitrust principles to which TUEC's conduct must conform are well established.

This Commission's application of those principles to licensees before it is unchanged since the Commission's previous reviews of TUEC's anticompetitive activities between 1988 and 1990.

The decisions of the Atomic i

Safety and Licensing Appeal Boa'd in the Midland,U/ Davis-ARSE 2,2A/ and Farlev 25f cases remain the definitive articulations by the Commission of the application of the antitrust laws to licensees under the Atomic Energy Act.

E I

Uf

,Qppsumers Power Company (Midland Plant, Units 1 and 2), 6 NRC 892 (1977).

'23/

The Toledo Edison Company and the Cleveland Electric

. I Illuminatina ComDany (Davis-Besse Nuclear Power Station Units 1, 2& 3), 10 NRC 265 (1979).

t 25/

Alabama Power Company (Joseph M.

Farley Nucle u Plant, Units 1 and 2), 13 NRC 1027 (1981), aff'd Alabama Power Company v.

Nuclear Becrulatory Commission, 692 F.2d 1362 (11th Cir.

2982), cert denied 464 U.S. 816 (1983).

I

I 17 1

The antitrust laws embody fundamental national economio po: icy.25/

At their most basic level, the antitrust laws seek to j

prevent the unreasonable use of market power to gain additional market power;22/ they seek to dissipate the distortion that monopoly power can work on an otherwise competitive market.

In its simplest terms, monopoly power is the power to control prices or to exclude competitors.H/

Violation of the antitrust j

l laws, however, does not require the actual exclusion of competitors from a market.

Rather, the antitrust laws proscribe the exercise of monopoly power to disadvantage competitors. H/

This Commission's authority is not limited to redressing actual violations of the antitrust laws or their underlying policies, but rather extends to remedying acts which constitute a reasonable probability of violation of those laws, or the policies underlying those laws.lQ/

The Coinmission is empowered to reach and to redress incipient anticompetitive conduct, and to halt anticompetitive conduct well before it violates the antitrust laws.

liidl and, 6 NRC at 912.

2k/

Midland, 6 NRC at 896; Gulf States Utilities Company v. FPC, I

411 U.S.

747, 759 (1973); Otter Tail Power Comntnv v. United States, 410 U.S.

366, 372-75 (1973).

22/

Farley, 13 NRC at 1105.

23/

Farley, 13 NRC at 1073; United States v.

Grinnell Corp., 384

)E U.S.

563, 571 (1966); United States v.

E.I.

du Pont de 3

Hemourg and Co.,

'51 U.S.

377, 391 (1956).

23/

Se e, hgt, United States v. Griffith, 334 U.S.

100, 107-08 I

(1948).

1Q/

Midland, 6 NRC at 909; 926-27; Farley, 13 NRC at 1103.

t 18 TUEC is subject directly to the antitrust laws.11/ Those laws, and the policies underlying them, likewise apply to TUEC through the exercise by this Commission of its obligations pursuant to Section 105c of the Atomic Energy Act of 1954, 42 U.S.C. 5213S(c).

The analytical questions posed by the structure and characteristics of the electric utility industry are now well settled.

An analysis of competition in the electric utility industry generally entails inquiry into three discrete produtt markets:

the bulk power, coordination services and retail markets.12/

The relevant geographic market for the coordination and bulk power markets is limited to those areas in which the utility's smaller competitors practically can turn for alternative suppliers.12/

The geographical limits of the retail market are defined by the utility's service territory.14/

Cap Rock's ability to compete with TUEC in the bulk power, coordination and retail markets is dominated by one basic fact:

TUEC's dominance and control of essential transmission and coordination services.

The Commission has recognized that the 1

ability to compete effectively in these markets is dependent substantially, if not entirely, upon access to necessary 11/

Otter Tail Power Company '.. United States, suora; Cantor v.

Detroit Edison Company, 428 U.S.

579, 596 n.35 (1976).

12/

Hidland, 6 NRC at p. 945-990; f_arley, 13 NRC 1046-1068.

W Farlqy, 13 NRC at 1058.

13/

liidland, 6 NRC at 978-79; Farley, 13 NRC at 1066-67.

I l

1

I 19 transmission services.

In Parley, the Board found that Alabama Power Company owned and controlled the lion's share of generating capacity in its service territory and owned all transmission lines in the market above 115 KV and all transmission facilities that provided access to utilities outside the market area.25/

The Board concluded that this dominance, particularly the dominance over transmission facilities, " places the applicant in a unique position to control access to the market for coordination service."

In liillhDsi, the Board found that, in order to engage in bulk power and coordination transactions, small utilities within the Consumers Power Company service territory had to obtain transmission wheeling services from Consumers.25/

Cap Rock efforts to obtain bulk power from sources other than TUEC are most directly intended to enable Cap Rock to compete more effectively with TUEC in the retail market.

Such retail competition is entitled to full protection under the antitrust laws and by this Commission.17/

In both Midland and Farlp_y., the Board rejected arguments that, because there was little likelihood of head-to-head competition at retail, competition in the retail market was somehow entitled to less protection.

In this case, head-to-head competition is not only likely, but guaranteed by the dual certification scheme employed 15/

13 NRC at 1070.

2f/

6 NRC at 998.

22/

1:idland, 6 NRC at 988; Farley, 13 NRC 1064-1066.

I i

o

I 20 in the state of Texas.

Cap Rock's merger With Lone Wolf and pending application to morge with Hunt-Collin are evidence of the 1

viability and significance of that rota11 competition.

j Every action taken by TUEC that discdvantages Cap Rock in the bulk power or coordinat3on servicos market has an inovitable and adverso impact on Cap Rock's ability to competo with TUEC in the retail market.

The Board acknowledgod this fact ir. Dirigy, 1

l More importantly, applicant's dominanca of transmission and generation facilities l

ft!rther bolsters the finding of monopoly power (in the retail market).

As the Board 4

below noted, this dominame enables applicant to influence its present and potential competitors' accesc to the S sic inputs necessary for the productiari and sales of i

rollable and econonical firm bulk power.

The dominance of what in ossence conLtitutes i

certain factors of production in tho Inductry, viewed in conjunction with i-applicant's high market sharen and the high j

oconomic barriors facing now competitors, would ordinarily compel a finding of monopoly i

power in the rotail market.

1 I

13 NRC at 1072-73 (footnote omitted).

L TUEC's nurront actions violate those principios.

TUEC avoidad the application of these prir.cipios to its conduct in 1990 by o.itoring into a settlement with Cap Rock, a settlement a

which it now socks use as a means to excuse its illegal refusal to wheel.

This comminsjon's coligations under Section 105(c),

I-and the concomitant obligaticns of NRC 1.lconsoon, are foreign to TUEC.

TUEC pays attention to its licenso conditions only whsm forced to by thic Commission.

Cap Rock submits that only by a full application of the forgoing principles in a full evidentiary hearing that will produce thc appropriate remedy will TUEC bo I

N I

21 I

made to recognize the significanco of its obligationn under the antitrust laws and the Atomic Snorgy Act as a licencoa.

l l

IV.

TUBC'N REFUDAL TO WHEEL FOR CAP ROCK VIOLATED TUEC'O CURRENT LIC2NDE CONDITIONS AND THE

=

A1T11EAISLAtiTITlWAT._LhHD.,

The intent of '.dEC's cerrant actions, although with cortain il now twists, remains what it was in 1988, 1989 and 1990s to dony Cap Rock access to sourcos of power tie. aro lower cost than TUEC full requirements service.

In liis11And 23/, DaYin-Danan 22/

and EAlitY iQ/, the applicants sought to disable smaller utilitios in and around their servico territorios by denying them access to the benefits at th relatively low cost power to be generated by nucicar projects licensed by this Commission.

TUEC's goal in to accomplish the opposito, to disadvantago Cap Rock competitively by blocking Cap Rock's efforts to purchase lower cost supplies of bulk power, thereby forcing it to buy TUEC's much higher priced energy and capacity, which includes the costs of Comanche Peak Unit Nos. 1 and 2.

TUEC is exorcising its monopoly power over trhnsmission by an admitted refusal to wheel, 33/

Consumers PowqE_qQEnany (Midland Plant, Unita 1 and 2), 6 NRC 892 (1977).

22/

Tha T21&s12.ld11Lon Coitpany_ansL1hn_. Clay.cleillac.tric lllitaillAling CQEDanY. (Davis-Bosso Nucioar Power Station Unita 1, 2 & 3), 10 NRC 265 (1979).

iq/

Alabama PQyer Comnany (Joseph M. Farley Nuclear Plant, Units 1 and 2), 13 NRC 1027 (1981), uff'd AlnkgAq Poh;gr company vt 1[QGlear Rectu]ALQIy_Rommissign, 692 F.2d 1362 (lith Cir.

1982), Egr.t_110 Died 4 64 U. S. 816 (1983).

I l

22 in violation of the antitrust laws and the existing antitrust license conditions.

I A.

TUEC HAE_REFERED TO WiiXEL FOR CAf_lqQL There is no factual dispute over whether TUEC has refused to wheel power for cap Rock from WTU.

TUEC informed Cap Rock in writing of itu refusal to whoo111/ and has confirced its rei'usal to whool to this Commission in the February 5, 1992 TUEC Antatrust Rouponno.12/

The following is a brief summary or

'C the events which produced TUEC's refusal to whool.

O After oxocution of the 1990 Settlement, Cap Rock began i

intensivo efforts to obtain competitively priced sources of bulk

{

power that were loss costly than TUEC full requirements servico.

Cap Rock roached an understanding with WTU, and negotiated an agreement with WTU, pursuant to which WTU would supply cap Rock's i

full powor requirements for the period between the tcrmination of

I AJ/

Attachment A at 3-4.

q A2/

At page 23 of the TUEC Antitrust Responso, TUEC stcted (emphasis supplied):

~

TU Electr$c advised Cap Rock, [ sic] that (after February 1, 1992] it would.

supply all of Cap Rock's power and energy requirements, in accordance with the provisions of the 1990 Power Supply Agreement, at Cap Rock's points of delivery I

served by TU Electric.

IU Electric also denied Cao Rock's roauest for TU Electric to wheel power from W1U to Cap Rock, beginning February 1, 1992, until the 1990 Power Supply

,I Agreement has been terminnted in accordance with its terms or a wheeling request is mado pursuant to the terms thereof.

I

I 23 Cap Rock's 1963 rgrooment with TUEC and the physical transfer of Cap Rock's load from the TUEC to the SPS transmission system in l

1993 12/

Cap Rock and krU agreed that service would begin on February 1, 1992.

On October 23, 1991, Cap Rock informed TUEU of its agreement with WTU and of its intention to terminate the 1963 agreement.AA/

TUEC's reply provided the first indication of TUEC's determination to prevent the Cap Rock /WTU purchase from being consummated.

Despite the plain meaning of the 1990 Settlement, TUEC maintained that, even if the 1963 agreement were terLinated, Cap Rock could not purchase power from sources other than TUEC without giving throo years notico.15/ TUEC refused to permit Cap Rock to receive power from WTU, thereby leaving Cap Roc)' With no way to receive that power.

Accordingly, on December 18, 1991, Cap Rock filed suit againe TUEC in state court in Texas to enforce its right to purchase power from WTU.

On December 19, 1991, Cap Rock gave TUEC vritten notice that it was terminating the 1963 agreement as of February 1, 1992.

Af/

On January 13, 1992, TUEC filed an answer and counterclaim to Cap Rock's stato court complaint.

In its counterciaim, TUEC assertod, inLqr alin, that: (1) cap Rock had failed to give proper notico of termination of the 1963 agreement Alf Attachmentu F and G.

14/

Attachment H.

Ali/

Attachment I.

Ab/

Attachment E.

a,

24 and, (2) tne 1990 Settlement requires cap Rock to give three years notice before it may purchase power from any sources of bulk power other than TUEC (except with respect to cortain Points of Delivery where two years notice was purportedly sufficient).

on January 30, 1992, TUEC admitted that Cap Rock's notice of termination under the 1963 agreement was proper and that it would ig

g terminate on February 1, 1992. 12/

TUEC made it clear, however, that it intended, through the exercise of its monopoly I

power over transmission, to force Cap Rock to continue to purchase from TUEC.

TUEC stated:

Your requast for TV Electric to wheel power l

from West Texas Utilities Company to Cap Rock, beginning February 1, 1992, is denied until the 1990 Pcwor Supply Agreement has been terminated in accordance with its terms or a wheeling request is mado pursuant to tho provisions thereof.

The_1990 Power Supply Agreement does not obligate TU Electric to l

wheel power or energy from West Texas

]

Utilities, as requested, for Cap Rock without at least three years' (24 months to cortain

]

points of delivery) prior written notice.

Attachment A at 3-4.

Hence, TUEC has denied cap Rock the ability to whool power, and cut Cap Rock off from all alternativo sources of power supply.

TUEC efforts to prevent Cap Rock from purchasing power from WTU have not been limited to cap Rock.

As mentioned above, Cap Rock had negotiated an agreement with WTU for the purchase by Cap Rock of its full electric power requirements from WTU.

On December 10, 1991, WTU mailed to Cap Rock three originals of the I

12/

Attachment A at 1.

4 I

g a

final contract for cap Rock's execution.

Upon return of the contracts, WTU was to execute then and return "[ojne completely executed set" to Cap Rock. 10/

Although Cap Rock rr.turnerf its copics on January 2, 1992, AS/ the contract was never executnd by WTU.

TUEC's threats and deliberate efforto to mislead WTU undeniably caused WTU to forego executing the contract which it had negotiated with Cap Rock.

On December 19, 1991, TUEC claimed in a letter to WTU that Cap Rock was " obligated to acquire aill of its power and energy from TU Electric.

"rd t N

'wt, TUEC clearly implied that it would sue WTU i f W. 'l d ;d 33 ' d g contract with Cap Rock.

Noting that the " knowledge" o,

Chp Rock's purported duties to TUEC put "an extra burden of responsibility" on WTU, TUEC threatened to " aggressively defend" itself "against any damages or losses" caused by purported

" interference" with its contract with Cap Rock. Elf As mentioned above, on January 2, 1992, Cap Rock returned its executed copies of the new contract to WTU.

On February 18, 1992, WTU responded.

Noting that it stood " ready, willing, and able to begin selling electric energy to Cap Rock," WTU nonetheless declined to finalize any agreement until " Cap Rock's relationship with TU Electric han onded."

Clearly responding to

.43/

Attachment F.

A9/

Attachment G.

10/

Attachment J.

SJ/

Attachment J.

I

.I

,I 2e I

TUEC's threat, WTU disavowed any intention to "interfore with the relationship borwoon cap Rock and TU Electric." 12/

t The solo barrior to Cap hock's purchase froin WTU is TUEC.

WTU stands " ready, willing, and ablo" to supply power to cap Rock, just as soon as the instant dispute is resolved.

TUEC's ro usal to whool and throats to WTU ovidence a pattern of anticompetitivo conduct intonied to provent cap Rock from purchasing bulk power from any supplier other than TUEC.

As demonstrated below, the licenso conditions and the antitrust laws do not permit a licensee before this Commission to engage in such illegal conduct.

D.

TUEC IS OBLIGATED BY ITS LICENDE CONDITIONS TO WHEEL FOR CAP BOCK.

TUEC's obligations under the licenso conditions are to

" Entities," as defined in Paragraphs 3.D. (1) (c) and (d).

Paragraph 3.D. (1) (c) defines an Entity as:

an electric utility... owning. operatina or I

contractually contro111na, or orocosino in g ud faith to own, onorate or contractually sntrol, faciM. ties for._gqueration of.

cicatric_ sover..nnGLSDercty, providod, however, I

that as used in [cortain epocified paragraphs, including Paragraph 3.D. (2) (i) ),

" Entity" means an electric utility which is a person, a private or public corporation, a govtsrnmental agency or authority, a municipality, a cooperativo, or an I

association owning or operating, or proposing in good faith to own or operato, facilities for generation, transmission and/or I

12/

Attachment K.

e I

27 distribution of electric power and energy.

(emphasis suppliod)

Cap Rock is a cooperative and currently owns and operates facilities for the transmission and distribution of electric power and energy.

Cap Rock is an Entity under TUEC's licenso conditions.

Paragraph 3.D. (2) (1) of the Comancb 1 peak license conditions obligates TUEC tot participate in and facilitate the exchange of bulk power-by transmission over the Applicants' transmission facilitics between or among two or more Entities in the North I

Texas Area with which the opplicants are connected, and between any such Entity (les) and any Entity (ies) outside the North Texas

_I Area between whose facilities the Applicants' transmir,sion line and other transmission lines.

form a continuous electrical path cap Rock is an " Entity" as defined in Paragraph 3.D(1) (c).

Cap Rock is located and does business in the " North Texas Area" as definud in Paragraph 3.D. (1) (b), and is directly interconnected TUEC.

WTU is directly interconnected with TUEC.

TUEC is expressly obligated to provido the transmission services necessary to facilitate the exchange of bulk power betwoon WTU and Cap Rock.M/

TUEC's refusal to wheel is unequivocal and in clear violation of TUEC's obligations under Paragraph 3.D. (2) (1).

As I

Uf

" Bulk Power" is defined as " electric power and/or electric energy supplied or made available at transmission or I

subtransmission voltages."

Paragraph 3.D. (1) (e).

This definition clearly encompanses the purchase by Cap Rock of wholesale bulk power from WTU.

I I

I 28 demonstrated in the following section, that refusal to wheel is 1

also in clear violation of the antitrust laws.

C.

TUEC'S REFUSAL TO WHEEL POWER FOR CAP ROCK IS INCONSISTENT KITH =TRFL.ARTITAUST LAWD-The Commission's authority and obligations under Section 105 are not limited to redressing actual violations of the antitrust laws or their underlying policies.

The commission's authority and obligations extend to remedying acts which constitute a reasonable probability of violation of those laws, or the policies underlying those laws.M/

As demonstrated above, TUEC's refusal to wheel for cap Rock constitutes a clear violatien of the TUEC's license conditions.

It is equally clear that TUEC's conduct is inconsistent with the applicable antitrust laws.

E 1.

TUEC Has Denied Cap Rock Access To An Essential N

Eap_ility.

TUEC electrically surrounds Cap Rock (i.e., Cap Rock is 2

electrically interconnected solely with TUEC).

Cap Rock cannot receive power unless it in transmitted over TUEC's lines.

Cap Rock is, therefore, entirely dependent upon the transmission i

facilities of TUEC, its principal competitor at retail, for the transmission service necessary to allow Cap Rock to purchase the I

power Cap Rock needs to compete with TUEC at retail.

The only transmission facilities between Cap Rock and WTU are TUEC transmission facilities.

It is simply not feasible for Cap Rock I

sf Midland, 6 NRC at 909; 926-27; Farley, 13 NRC at 1103.

I

-__.- =.-.

I 29 to duplicate the integrated TUEC transmission grid betwoon cap Rock and WTU.

TUEC's transmission system, therefore, is an

" essential facility."

The assential ft.cility or "bottlenock I

monopoly" doctrino of antitrust law imposco upon a monopolist who controls an essential facility tno obligation to make that facility availablo to competitors on non-discriminatory terms.

This doctrino onour that "a monopolist may not retaliato against a customar who is also a competitor by denying him access to a facility casential to his operations, absent legitimato business justifications."

hug.q_ Technical __ Services, 903 P. 2d 612, 620 (9th Cir. 1990).

A monopolist which denies a competitor access to an essential facility is liable under Section 2 of the Sherman Act for monopolizing or attempting to monopollzo trado or commerce.

A party socking to invoko the oncential facilities doctrino must show:

I (V;

control of the essential facility by a monopolist; I

(2) a competitor's inability practically or reasonably to dup 1'.cate the essential facility; (3) the denial of the use of the facility to a competitor; and I

(4) the feasibility of providing ascose to the facility, ligl_,S.gmmunications v.,American Tel. & Tel. Co._, 70b F.2d 1081 (7th Cir. 1983) (citations omitted).

TUEC's refusal to wheel for Cap Rock is a classic examplo of an abuse of monopoly power over essential facilities.

TUEC has I

I 30 unquestioned monopoly power over all transmission to Cap Rock.

Cap Rock cannot feasibly duplicate the integrated TUEC transmission system that connects cap Rock to WTU and the rest of the Economic Rollability Council of Texas ("ERCOTH); such an undortaking is boyond the economic means of Cap Rock (and virtually overy other electric utility in Texas), inherently wastoful and inefficient and environnentally unsound.

TUEC's transmission system is unique and, from Cap Rock's porspective, ossential.

TUEC has denied Cap Rock the use of its transmission facilities.

At no point h>as TUEC contended that it is not feasible for it to provido such transmission servico.h5/

The obligations cf a monopolist controlling an essential facility to prcvide non-discriminatory access can be traced back to U.S.

v. Terminal Railmd.,.luigtQh, 224 U.S. 303 (1912).

In that case, a consortium of railroads had gained control of every rail route feeding into St. 1,ouis across the Mississippi River.

The consortium had the power to exclude any competing railroad or to force that railroad to capitulate to any terms the consortium demanded.

It was economically and geographically infoasible for l

a competitor to build another bridge.

Thorofore, the Supreme Court ruled that the consortium must allow competing railroads to

!I lI 53/

Lets we loue sight of the obvious, it bears remembering that I

not only is it perfectly feasible for TUEC to provide l

transmission for Cap Rock, but TUEC is unequivocally obligated by its license conditions to provide such i

transmissiore.

lI l

l l

..,c

I I

31 use its facilition on a non-discriminatory basis Id. at 411 10/

The seminal essential facilities doctrine ca se involves a refusal to wheel.

In !1aitad_J1Atc_ v. Otter Tall Ppwor CA F.Supp. 54

, 331 (D.Minn. 1971), qLL'd 410 U. S. 366 (1973), Otter Tail Power Co.,

an investor owned public utility, refused to soll wholesale or wheel electric power to coveral municipaliti at I

were attempting to not up municipal power systems t es which Otter Tail in the retail sale of power o compete with The court held that under the bottleneck monopoly theory Otter Tail had violated section 2 of the Sherman Act, 1

and enjoined Ottor Tail from continuing its anti-competitivo practicos Otter Tail'at The court found that of its service area gives it substantialcontrol over trans effective control over potential ccmpetition from municipal ownership.

sell or wheel power By its refusal to competition from sur, facing. defendant prevents that lb at 61.

As the Supreme Court subsequently conclud d record made " abundantly clear that Otter Tail used it e

the power in the cities in its service area to forecl s monopoly ose competition or to destroy a competitor, all in violation of th laws."

e antitrust Q1tsr Tail h er Co. v.,_Ljix, 410 U.S. 366, 377 (1973).

Like Otter Tail, TUEC has completo control over transmission to 16/

TUEC is already obligated to provide nondis access by its licenso conditions.

criminctory TUEC to obe conditions.y, or to be compelled to obey,It remains, however, for those license

_-~

I 32 its retail competitor and, like Otter Tail, TUEC is using that monopoly control to foreclose competition.

In a case which bears many similarition to a refusal to whool electricity, AT&T was hold to have violated the shorman Act f

by refusing to interconnect MCI's long distanco service with AT&T's local distribution facilities.

The court found that AT&T had complete control over the local distribution facilition required by MCI and that MCI could not practicably duplicato the local facilities.

Relying on Qtier Tail, the court hold that AT&T's local facilities were a natural nonopoly and that AT&T was denying an essential facility to MCI.

11QI, 708 F.2d at 1132-33.

In Moen Hichlands Skiina Coro.,v.

Apoon Skiino Co., 730 F.2d 1509 (10th Cir. 1984), aff'd 472 U.S.

585 (1985), the defendant, Aspen Ski.ing Co., operated throo of the four skiing facilities in Aspen, while plaintiff, Aspen Highlands operated the other. In the past, Aspen Skiing and Aspen Highlands, had jointly issued a multi-day ski lift ticket good at all four mountains.

Then Aspen Skiing refused to issue the four-area ticket and began to issue a three-area ticket, good only at Aspen Skiing mountains.

Following ligl, the court applied the four prong test.

The court hold that the four-area multi-day ticket was an essential facility controlled by the defendant.

Aspen Highlands could not issue a ticket good at the other thren Aspen areas, and week long vacationers with a choice between a multi-day three-area ticket and a one-area ticket would choose the I

three-area.

The Supreme Court concurred that in this case "the I

I

33 monopolist made a deliberato offort to discoutago its customers from doing business with its smallor rival."

Ar, pen Skiina Co.

v._

Mpril_111ghlando_ Skiino Cup 2, 472 U.S.

S85, 610 (1985).

TUEC's refusal to whool is an extremo example of the kind of anticompetitivo conduct proscribed by the ossential facilities doctrino.

TUEC's actions also run afoul of otner fundamental principles which underlie Section 2 of the Sherman Act, 15 U.S.C.

5 2.

2.

TUEC Is Illegally Leveraging Its Monopoly Power over Essential Transmission To Stifle Competition In The Bulk PowoJ_ Bale And Rotail Markets.

In jicrkov Phnto. Inc. v. Eastman Kodak Co., 603 F.2d 263 (2d Cir. 1979), the Second Circuit hold that "the uno of monopoly power attained in one market to gain a competitivo advantage in another is a violation of 52 (of the Sherman Act), even if there has not been an attempt to monopolize the second market."

This articulation of a Section 2 violation, often referred to as

" monopoly loveraging," precisely describes TUEC's conduct towards Cap Rock.

TUEC is exercising its monopoly power over transmission tot (1) preclude competition by Cap Rock for alternative sources of bulk power in the bulk power market, thereby forcing Cap Rock to buy TUEC's higher priced power, and thus (2) gaining an advantage over Cap Rock in the retail market.

By denying Cap Rock access to more economical bulk power from utilities such as WTU, TUEC koops Cap Rock's retail pricos high, I

I l

1

]

34 allowing TUEC to more offectively compoto at retail.12/

Moreover, TUEC gains an advantage in the market for wholesale power.

By proventing WTU or other alternati'to power sources from supplying Cap Rock, TUEC levarages its control of transmission into completo domination of bulk power salon to Cap Rock.

D.oriny,_Ehats has its antecodonts in UniteLEtaten_L.

Gr1111th, 3 3 4 U. S. 100 (1948).

In that caso, the Supreme Court found a Section 2 violation when a group of motion picturo exhibitors with competitors in some localition refused to exhibit movies in localition in which they had monop31y power unless the d3stributor granted them exclusivo showing rights in the contested markets. Ish at 108.

In Keranotes Migli. Theaters t. National AmquementS, 854 P.

2d 135 (6th Cir. 1988), National Amusements alleged that Korasotos had used its monopoly and market power in other citios to coorce distributors into providing first-run films in the Flint, Michigan area, where Korasotos competed with National.

The court hold this conduct violated Section 2 of the Sherman Act.

Ish at 136-37.

TUEC has monopoly power over transmission and is using this power to loverage a superior position for itself in the ' market for bulk power by denying bulk power sollers access to Captivo I

bulk power purchases such as cap Rock.

TUEC is also exploiting 4

17f This incluctable of fect of the preclusion of competition in the bulk power market on the ability to compete at retail was expressly recognized by the Board in farley, 13 NRC 1072-73.

I 35 its monopoly over transmission to gain an edge in the retail market by denying its competitors, such as Cap Rock, access to economical electricity.

TUEC's conduct is inherently anticompetitivo and impermissible for a licensoo of this Commission.5ff 3.

MEC's Assertion of Its Interpretation Of The 1990

Novanter 4,

199i Mr. Steven E.

Collior Director of pover Supply and Regulatory Af teirs Cap Re % Electrle Cucperative, Inc.

B140 Burnet Road Auntin, Toxas 70766-106)

Dear Stevat This is in response to your letter of October 23, 1991, in which you indicated that Cap Rock anti.:ipates cancelling its current contract with TU Electric, dated July 2, 1963, as n.anded, "without having to serve any wholcoale lead toccorarily under the new power supply agroanent."

k we attenpted to reach you by phone on Friday and sgain this F

torning.

Af ter moeting with you on october 22 and af ter reviewing your October 23 letter, va reviewed our power supply agroonontc I

with Cap Rock in dotail.

As you are svare, the 1963 agroeecnt calls for cap Rock to purchase its full pouer and anorgy requiror. ento from TU Electric.

The new cap Rock 2cver Supply Agreenent executed on June 8,

1900, itself a full-rcquircrents I

contract initially, automatically bacones effoetivo for s tern of 10 years, upon cancellation of the 1963 ful2-roquiremonta contract.

Under the 1990 agreement, Cap Rock may supply a part of its power and energy requirerents from other sourceo or usy purchase all of I

its requirocents elsewhere by complete tornination of that agreement -- in either case, upon threc years' notice during yearn one through five and upon five years' notice thereafter.

Upon 2t.

nenths' notica during years one through five of the 1990 agreGment, Il Cap Rock r,ay purchaso up to 30 MW of power and energy frem other ocurcas at nine specif td points of delivery. All purchasos by Cap Rock of power and enecy from sources other than 'IU Electric are subject to other provisione of the 1990 Power Supply Arpleoment and the negotiation of satisfactory wheeling agreements.

Wo wish to advios you that TU Electric expects cap Rcck to I

fully comply with the 1963 and 1990 pcVer supply agroo:tenta.

To comply wich thoso agreer.cnts, it will not be possir,le for you to purchase power cloewhere, including Cap Rock's propcsed purchase from West Texas Utilities Company "ao eady as January, 1992,"

8

~2-until the cancellation of the 1963 agroenont and ;nly then open expiration of the foregoing notices provided for in the 1393 agroenent and the cenpliance with all other tens of that contract.

Please lot ua know the cal. cella tion date of Cap Pcek's 1963 power supply a gr o or.e nt,

cheuld yea have any Ta u s t i c ns, please cal 1.

'!e ry t r u l y 7 ar c,

,h]+'kl(H Henry A.

83Jnting HAD/mkm Carrell Bevolhycer cc:

3 David Fruitt
g Mark Sullivan j

Cary Gibnon - SPSCO Oon 'inlch 2

'#rU 1

lE l

!I iE lI 1

!B l

_ _ = _ _.

ve{ ao SifVEN E COL (IER w No. 1 51P 41 t619 h@

JM.17..9.2..F,RI 14 : 5 u N 'rs too vru tize, orc, gootioot es g.. O /

i 6

WELECTRIC December 19 19.'

t4ms seweir w pu.a.- q e.n tm aa.m Kr. Davic.oetor West Texas Utilities p.

O.

Dox 641 1,b ile ne, TX 79604 Coar David:

I have recently received a copy of an inquiry rogaroinq I

wheeling servicos Cap Rock seeka from other F.RCDT control area utilition for power supplied to Cap Rock by Vr0 beginning January 1992.

I feel that it is important to clearly cor.muninate to you and your managenent that Cap Rock is obligated to acquiro all of 5

its power and energy from TU Electric under ono of two existing contracts which I have enclosed for your review.

l I must apologize that with knowledge of the existence of thoco agreer.ents, this obviously puts an extra burden of responsibility on you and your company to avoid any interference with this contracitual relationship.

As I'm sure you vould do in a similar I

situation, we vill aggressively defend TU Electrie again.it nny damages or losses incurred from any type of interference.

please font froa to give no a call at any time on t.his issue.

Yours very truly,-

c

$td W'

NW I

c:

Terry Dennic I

I

?8

-esme ew ese e

e+ w

a su re

.h.

4.va a va w e. w.t. ww w. L.s 6 no av.

6 s e a.

%a w4sJ

r. v4 I

l WEST TEXAS UTILITIES COVJ%NY CEN(RAL Ofitet PO 60x en / *Bu (NI,13x 4 19f04 i mH 674 7613 I

February 18,1992 Dori Wekh vice PreodeN Mr. Steven E. Collier, P.E, l

Director of Power Supply fEB 201992 and Regulatory Affairs Cup Rock Electric Cooperative, Inc.

l 8140 Durnet Road Austin, Texas 78766 Re: Cap Rock's Proposed Purchase of Electric Energy from WTU

Dear Steven:

8 in response to your letters of January 2, 6, and 10,1992, please be assured that WTU stands ready, willing, and able to begin selling nloctric onorgy to l

Cap Rock. As you know, however, unless and until Cap Rock has validly terminated its relationship with TU Eloetric and has fulalled all of its l

contractual obilgacions to TU Electric and TU Electric has agrood to the necessary v hooling and scheduling agreements, on terms acceptable to WTU, WTU cannot finalize any agreement to soll electricity to Cap Rock.

'l WTU's negotiations with Cap Rock, which have not resulted in a centract between WTU and Cap Rock, have proceeded based upon the promiso that Cap Rock had the intention and the legal right to terminato its relationship with il TU Electric while obtaining TU Electric's cooperation in the wheeling and transmission of electric energy. Whilo WTU has expressed its willingness to sell electricity to Cap Rock once Cap Pock's relationship with TU Electric has I

ended, WTU has avoided and must continuo to avoid any activities that would Interfore with the relationship between Cap Rock and TU Electric. WTU is interested in establishing a relationship with Cap Rock, but WTU has not and

'I cannot provide any assistance or support to Cap Rock in connection with Cap Rock's termination ofits relationahlp with TU Electile.

h We hope that Cap Rock will be able to proceed with the establishment of a relationship between WTU and Cap Rock. Please let us know when Cap Rock has obtained TU Electric's ec.peration in this proposed venture.

Yours very truly i

e DW/plw B

A MEMBER OF THE CENTRAL AND SOUTH wf 5T SYSTfM

$$a$n cNsYro'.$

.$, o b$

?.Ne, N$ n'!

$$netoN,

~

X ",

I

/

NO. b l

9$$cm CAP ROCK ELECITUC I

IN TIIE DISUUCr COUIh /2P l

COOPERATIVE, INC.,

i Plaintiff, 6

I 5

l vs.

I OF SilDLAND, COUNTY I

I I

I l

TEXAS UTILnTES ELECDUC 6

l CO3fPANY l

Defendant.

I//

JUDICIAL DISTRICT PLAINTIFPS ORIGINAL PINITION TO THE HONORABLE JUDGE OF THIS COURT:

Cep Rock Electric Cooperative, Inc., (Cap Rock) complains of Texas Utilities Electric Company (TUEC) as follows:

l L Pnrties and Venue Cap Rock is an electric cooperative corporation, incorporated under the Texas Electrie Cooperative Corporation Act, Tex, Rev. Civ. Stat. Ann, art. 1528b.

Its headquarters is in Stanton, Martin County, Texas.

I I

I

.I TUEC is a Texas Corporation. It has a divisior ' ofUce in 511dland. Texu, located in hildland County.

I

, TUEC's registered agent for service is $1r. Peter B. Tinkham, at 2001 Bryan I

1 Tower, Suite 1900, Dallas, Texas,75201.

I Venue is proper in hiidland County under Texas Chril Practice & Remedies Code

I Sec.15.036.

I H. Factual Backamund I

Cap Rock is an electne distribution cooperative. Cap Rock currently owns no electric generating facilities. It buys electncity at wholesale and resells the electricity to itt end use, member customers. Cap Rock serves over 20,710 meters. Its service area covers 10,000 square miles in all or parts of Andrews, Borden, Dawson, Ector, Fisher, Glasscock, Howard, Irion, Startin, Slidland, hiltchell, Nolan, Reagan, Scurry, Upton, Sterling and Tom Green counties. As a cooperative corporation, Cap Rock is owned by its consumer members. Any profit made oy the cooperative ultimately is either invested in the cooperative or returned as cash or lower rates to its consumer members. Cap Rock's annual electric revenues are about $35 millivn. Over 70 per cent of these revenues goe. to pay its wholesale power supplier. Cap Rock's net plant investment is about $75 million.

I TUEC is the fifth largest electrie utility company in the United States, it is a wholly owned subsidiary of Texas Utilities. TUEC, by any means of measurement, is by far and away the largest electric utility in Texas. TUEC serves a vast portion of Texas. Its service area covers 87 counties ranging from Tyler on the east, to Vah llorn on the west, Oklahoma on the north and Austin on the south. TUEC serves over 5.2 million custerners, Cao Rock Electre Cooperatrve. Inc. vs. Texas utsttes Electre Comoany. inc.

Pisumere ortgM Pettuan Pago 2

~

I' another utility builds transmission lines into Cap Rock's service area, any new power supplier for Cap Rock initially must wheel over TUEC's system.

, TUEC's costs of constructing and operating Comanche Peak have increased TUEC's costs, including rates TUEC charges Cap Rock. Any future increase in TUEC's rates hkewise will increase the cost of power for Cap Rock and its retail customers. To keep its rates low and to remain competitive,in the late 1980s Cap Rock began to seek other sources of wholesale electricity. Cap Rock found short term sources of power other than TUEC at a cost lower than TUEC's rates. One such source was a ecgeneration pro,iect. Cap Rock was unable to complete the arrangement with the cogenerator due to TUEC's unwillingness to oiTer stand by power and scheduling services. Another source was the purchase of " economy energy

  • from Houston Lighting & Power Co. Cap Rock requested I

that TUEC wheel this economy energy under similar terms and conditions that TUEC was wheeling economy energy for other TUEC customers. TUEC refused to wheel. thereby denying Cap Rock's customers lower cost electricity.

I Because of TUEC's failure to wheel and because of TUEC's,6crimination, Cap I

Rock started two separate actions at the NRC. The Grst was in 1988. Cap Rock Gled comments with the NRC concerning whether there had been signincant changes in TUEC's activities that would warrant a new antitrust review. The NRC declined to and a change in conditions under Cap Rock's 1988 Oling Cap Rock appealed this decision to the U.S. Court of Appeata in Washington, D.C. Second, in 1989, Cap Rock requested an order from the NRC enforcing and modifying TUEC's nuclear license antitrust conditions.

While these uctions were pending, Cap Rock and TUEC negotiated a resolution of the disputes in 1190. The settlement allows Cap Rock to get a new power supplier. Italso allows Cap Rock to determine, what, if any, services Cap Rock would purchase from TUEC.

Cap Rock Electre Cooperstrve, Inc. vs. Tenas UtMties Electre Comoany inc.

Pian,ters oryne Pesm Pop 4 I

e L

[

Cap Rock and TUEC signed a document entitled " Power Supply Agreement Between Texas 1ltilities Electne Company and Cap Rock Electne Cooperative, Inc., dated as of kne 3,1990* tthe 1990 Document). A copy is attached to this Petition av Ethibit "A" I

and incorporated hereir.. The 1990 Document purports to govern the relationship between Cap Rock and TUEC while Cap Rock gained access to other power suppliers. In fact, the 1990 Document is a menu of semees that TUEC is to offer Cap Rock. The terms and conditions for the menu remain open. For example:

I 1.

The 1990 Document allows Cap Rock to buy eleetneity at certain " Points of Delivery

  • with TUEC " existing on the effective date hereof, each of which, oints of Delivery shall be specified on Exhibit A hereto..." Exhibit "A" also required the listing of the amount of
  • Contract Demand"; that is, the amount of power and energy to be bought.

Exhibit "A" of the 1990 Document states: *!nformatiou to be Speci6ed on the Effective date of this Arreement." Exhihit 'A' remains blank and to be negotiated. Without further negotistion and agreement, there is no way of knowing what, if any, are the Points of Deliven nor what is the " Contract Demand,"

2. The 1990 Document allows for Cap Rock to have other
  • Power Supply Resources" for electricity. These resources "shall be identified on Exhibit 'B of the 1990 Document.

Section 2.03.

Exhibit "B" of the si;;ned 1990 Document states:"To be speci6ed pursuant to Section 2.03 of this Agreement." Exhibit "B" is blank and remains to be negotiated.

Without further negotiation and agreement, there is no way of knowing which third party power sources are covered by the 1990 Documert.

3. Cap Rock is to develop "a mutually acceptable curtailment plan" at least ux months prior to Cap Rock taking power froin a firm power resource via TUEC's scheduling Cao Rock Electre Cooperatrve, Inc. vs Tuas Ut* ties E!ectre Comoany. Inc.

Pw.rt : Ogrud Penen Page i

as provided in the 1990 Document. Section 4.03. This curtailment plan will then become Exhibit "D" ta the 1990 Document. Exhibit "D" is blank.

I

, 4. TUEC is to provide to Cap Rock regulation power and energy " pursuant to a mutually acceptaole regulation serv ces agreement.' Section 6.01 (a).

This agreement remains to be negotiated.

I

5. TUEC is to provide on a transaction specine basis wheeling services to Cap Rock
  • pursuant to a mutually acceptable wheeling apeement(s)." Section 7.0L Cap Rock has requested a draft agreement and TUEC be refused to provide one. This agreement remains to be negotiated.

W

6. When Cap Rock becomes a " control aren", TUEC is to provide Orm wheeling services "for a term and in accordance with mutually acceptable interconnection and transmission wheeling agreement (s)." Section 7.02(a).

This agreement remains to be negotiated.

I After signing the 1990 Document and consistent with Cap Rock's understanding of the document, Cap Rock sc.ght alternate power suppliers. As a result ofits search, Cap Rock entered into a contract with West Texas Utilities (WTU). Under the WTU contract, Cap Rock will buy its full requirements for electricity for its entire system from WTU.

Cap Rock will save about 20 per cent by buying the electricity from WTU. The savings averages about $2bO,000 per month. Cap Rock's end use erstomers will receive these savings immediately after Cap Rock begins buying WTU electncity. The WTU purchase will begin on 12:01 a.m. February 1,1992.

I I

Cap Rock Electre Cooperstrve, Inc. vs. Tomas LMrties Electre comoany. Inc.

Phraff 3 (MgrW Pettuun Pagt i I

l Cap Rock has timely told TUEC that Cap Rock will and the 19o3 Contract as of 12.01 a.m., February 1.1992.

I

, TUEC electrically surrounds Cap Rock. At present, any electncity from a utihty other than TUEC must Oow on TUEC's transminion lines connected to Cap Rock's substations.

Electncity must be used at the instant it is generated. It can not be stored. TUEC's cooperation is essential for the WTU purchase since TUEC can physically prevens WTU's electneity from reaching Cap Rock. TUEC must reduce its generation to the same degree and at the same instant that WTU increases its generation to meet Cap Rock's requirements. Otherwise, WTU cannot cause electricity to be delivered to Cap Rock and that incremental electricity will be disbursed throughout the other electric systems in Texas.

I TUEC has informed Cap Rock that TUEC expects to continue as Cap Rock's full requirernents supplier aRer the termination date of the 1963 Contract. TUEC has refused to negotiate as to the content of Exhibits "A" and "B" as well as the other agreements contemplated in the 1990 Document. TUEC has refused to cooperate in providing metenng and telemetry for third party suppliers, and other normal control area procedures to allow the tranuetion to occur. TUEC also has stated it will not back down its generation to allow WTU to Atrnish electricity to Cap Rock.

I lI 1

Cap Rock Electre Cooperatra inc. vs. Texas Utat>*s Electre Comoany. inc.

Pwmars OW Pomm Page 7 I

i IIL Request fur Declaratory Judstnent Fhwt enuw of Actinn Under the Uniform Declaratory Judgments Au (Declaratory Judgments Act;.

Chapter 37 of the Texas Civil Practice and Remedies Code, Cap Rock requests that the eeurt Gnd the 1990 dticument is not enforceable not binding since essential condition precedents required to make the document complete have not been negotiated and executed The execution of Exhibits "A" and *B* are essenual to the formation of a complete and binding agreement between Cap Rock and TUEC. The 1990 Document is incomplete we.hout these exhibits. There is no way to determine the Points of Deaivery and the Contract Demand within the four corners of the document without completed Exhibits *A" and 'B.*

Since the exhibits remain to be negotiated and executed, there is no binding or enforceable contract.

I Therefore, Cap Rock requests an order from this court Onding the 1990 Document is neither binding nor enforceable.

I Semnd Caume of Action in the alternative, without waiving the above, but.nsisting on the same, Cap Rock requests under the Declaratory Judgments Act that the 1990 Document is not a valid or binding contract. On its face, the 1990 Document is illusory. It lacks the necessary and essential terms and conditions required for its enforcement.

I The facts stated above show, at best, the 1990 Document is an " agreement to agree" in the future on a serits of material issues. Such agreements are neither binding nor enforceable in Texas. Therefore, Cap Rock requests an order from this court finding the I

can _ _ _.t~.. m e.. -. a, = g,

~

1990 Document is neither a binding contract nor does it have any force and etTect between l

Cap Rock and TUEC.

Thini Cniiw of Actinn i

in the alternative, without waiving the above, but insisting on the same, Cap Rock requests under the Declarstory Judgments Act that the court find the 1990 Document n not enforceable since it vtolates the Statute of Frauds.

I rotuh Cnitw of Action I

In the alternative, without waiving the above, but insisting on the same, Cap Rock requests under the Declaratory Judgments Act that the court find the 1990 Document not to be a binding contract. There was no meeting of the minds of the parties to the essential terms of the document.

I As explained above, the 1990 Document Exhibits "A" and "B" are to be specified on the effective date, Cap Rock informed TUEC that for Exhibit "A," Cap Rock will spec >if no Points of Delivery and will only require wheeling services from TUEC. The purchase Contract Demand will be zero. TUEC's interpretation is that all of the Points of Delivery under the 1963 Contract shall be incorporated onto Exhibit "A" an of the effective date. This is contrary to the 1990 Document itself which in Section 10.02 that states the 1963 Contract will

" continue until terminated in accordance with their respective terms, at which time said agreen ents shall have no force or effect whatsoever." TUEC's interpretation would make the contract a full requirements contract. The ability of Cap Rock to specify the Points of l

Delivery, if any, on Exhibit "A" is a material term and condition of the 1990 Document.

Without this option, Cap Rock would not have signed the 1990 Document.

I Cao Rock Electre Cooperatrve, Inc. vs. Texas utmos Electre comoany. Inc.

PWraffs 0,1 gem PetMen Page 9 I

~

I There is no meeting of the minds on this and other material and essential matters f the 1990 Document, it cannot be a binding contract. Cap Rock requests the Court to enter an order Onding the 1990 Documerit not to be a contract because of the failure to reach agreement on materlak matters.

I Fifth Cayr of Acdnn In the alternative, without waiving the above, but insisting on the snme. Cap Rock requests under the Declaratory Judgments Act, that if the court Ands the 1990 Document to be a binding contract, that the court declare it not to be a full requirements contract.

I As explained above, TUEC has taken the position that the 1990 Document is a full reqmrements contract. Cap Rock believes the 1990 Document allows Cap Rock to specify the number,if any, of the Points of Delivery and the amount,if any, of Contract Demand.

I Cap Rock requests the Court to enter an order Onding that if the 1996 Document is a l

binding contract, that Cap Rock can enter any, or none, of its Delivery Points on Exhibit "A" and can enter another resource to meet all of Cap Rock's needs on Exhibit "B."

I I

I I

I

.n.- -..~...:mi m ;a, I

s IV. Raquest forTemporary Restmining Onler Tempomry and Permanent injunction Cap Rock has timely notified TUEC of Cap Rock's intent to terminate the 1963 Contract. Cap Rock informed TUEC of Cap Rock's intent to take all of its electric I

reqturements from WTU at the end of the 1963 Contract. TUEC told Cap Rock that TUEC will not provide metenng and telemetry points, will not provide normal control area services, will not reduce its generation to allow WTU to increase to serve Cap Rock and will not allow WTU to wheel its eleetncity over TUEC's transmission lines.

TUEC's refusal to back down its generation and to prohibit wheeling violates the last peaceable status quo..the termination of the 1963 Contract. TUEC's action will cause irreparable harm to Cap Rock and its end use customvis. Cap Rock, and, in turn, its member customers, will pay more for electricity than what it would pay if WTU provides the electiicity. Cap Rock also faces the possibility that the Public Utility Commission of Texas will disallow the pass through to Cap Rock's customers of TUEC's excessive cost of power. This excessive TUEC power cost places.'ap Rock at a disadvantage to compete for customers in the dually certified areas. It also places Cap Rock at a disadvantage to attract new customers to its service area. Cap Rock has no adequate remedy at law. The damages are continuing and incalculable.

I Cap Ruk requests the court to gratit Cap Rock a temporary rotraining order without notice to TUEC. The crder (i) would restrain TUEC, its agents, servants and g

l u

employees, from directly or indirectly interfering with the contract between WTU and Cap Rock,(ii) would require TUEC to reduce its generation to allow WTU to provide electricity to Cap Rock and (iii) would require TUEC to wheel WTU's electricity to Cap Rock. - Cap l

Rock shall,in turn, pay TUEC a proper wheeling fee.

\\i Cap Rock EIectre Cooperatwo, he. vs. Tenas Utilities Electre Company. (*:.

PWnef t Orrgrad Petun Pope ti LI c

.. 2

e Upon hearing, Cap Rock requests the court to enter an order making the temporary restraining order and injunction permanent.

V.1%yer for Relief Cap Rock requests that TUEC be cited to appear and answer and aner final heanng the court enter s.n order:

1. Finding that essential conditions precedent to the 1990 Document havr at been met and that there in no binding contract.
2. In the alternative, finding that the 1990 Document is illusory and not a binding I

rentract and is of no force and effect on either Cap Rock or TUEC.

3. In the alternative, finding that the 1990 Document is not enforceable since it violates the Statute of Frauds.
4. In the alternative, Onding that the 1990 Document fails to set forth sufficient matenal and essential tenns and conditions and that the 1990 Document is not a binding contract and is of no force and effect on eith.or Cap Rock or TUEC.
5. In the alternative, nnding that if the 1990 Document is a binding contract, that Cap Rock can enter any number, including none, as the Delivery Points on Exhibit "A' and can enter WTU as another resource to meet all of Cap Rock's electric requirements on Exhibit "B".

I Cap Rock further tcquests this court to anter an order granting Cap Rock's request for temporsry restraining order, temporary injunction and permanent injunction to prevent TUEC from taking any actica to interfere or prevent Cap Rock from receiving electricity from WTU, Cap Rock further requests this court grant such other and further relief to which Cap Rock shows itself entitled to receive either at law or in equity.

I Cap Rocx Electre Cooperatrve, Inc. vs. Texas Utdmes Electre Company. Inc.

Ptsersef's orieust Pettum Page 12 I

g-pedully submitted, I

m '-

/

' vfA6K+_t'J__8J.4cc.' \\ ;

Richard C. Balough

~

163 West Sixth Street j

A'ustin, Texas 78703 I

(512)477 7896

//

Fax:($12) 477 8657 V

Ststa Bar No. 0165S500 I

I

/

__,.____x___

f Morgan, Ward, Leeton & Martin I

Suite 700,306 Wo.t Wall P. O. Box 1271 Midland Texas 79702 (915)683 0803 I

Fax:(512) 682 0502 State Bar No. 13064500 Tom W. Oregg, Jr.

P. O. Drawer 1032 I

San Angelo, Texas 76902 (915) 655 9188 Fax:(915)655 9180 State Bar No. 0&t30000 Of Counsel:

I Mark J. Yudof 6302 Shadow Mountain Drive Austin, Texas 78731 I

(512)345 2669 State Bar No. 22232500 I

I I

I I

can e m e. _ c - - a.... e.1..a. -. a g g e e,

I

I VFRIFICATION I

STATE OF TEXAS l

I i

COUNTY OF TRAVIS i

BEFORE SIE, the undersigned Notary Public, on this day personally appeared Steven E. Collier, who, being by me duly sworn on oath deoosed and said that he is the director of power supply and regulatorv afTalrs for Cap Rock Electrie Cooperative and that he has been duly authonted by Cap Rock Electric Cooperative, Inc., to be its agent in the above styled and numbered cause; that he has read the above and foregoing PlaintitTs Original Petition; and that every statement contained therein is with.n his personal knowledge and is true and correct.

l l/t-4 i

r STEVEN E. COLLIER SUBSCRIBED AND SWORN TO BEFORE StE, on the day of December.

I 1991, to certify which witness my and and otTicial seal.

?

,/~

LL R

.A k.

i

'! N&%

N

.\\.

6.w, N= so. e i.

THERESA ANN ALBA

-Notary Public in and for the Sta,te, of Texas

{ \\,,

Sly commission expires: 9.

  • 2 a $-

t J

/ vita==mmelsema,4 titte(

3' e

I I

I I

l Cap Rock Electre Cooperatrve, Inc. vs. Texas utdities Electre Comaany lac.

mecott e Ongr.W Penen Page 14 i

CXHIBIT "A#

l t

I a

5 s

POWER SUPPLY AGREEMENT DE7 FEEN g

Tens cTzI.zTzEs EI.Ec Rze coxeun 9

AND CAP ROCK ELECTRIC COOPERATIVE,. INC.

I o m o A e,,m.,

1,,,

1 I

e 1

0

I I

i

1 POWER CUPPLY AGREEMENT g

BETWEEN 5-TEXA5 UTIL2 TIES ELECTRIC COMPAN'.t CAP ROCK ELECTRIC COOPERATIVE, INC.

TABLE OF CONTENTS ARTICLE I.

DEFINITIONS 1.01

" Contract Danand" 2

1.02

" Control Area" 2

i 1.03

" Cost of Service Study" 2

l 1.04

" Default" 4

1.05 "ERCOT" 3

1.06 "ERCOT Operating Guidhs".

3 1.07

" Firm capability" 3

1.08

" Firm Power Resource" 3

1.09

" Metered Demand" 3

1.10

" Metered Energy".

3 5

1.11

" Points of Delivery".

4 1.12

" Points of Interconnection" 4

'.13

" Power Supply Resources" 4

g

' g 1.14

" Schedule Period" 4

1.15 "TU Electric Capacity" 4

4 1.16 "TU Electric Energy".

~

4 1.17

" Working Day" 4

ARTICLE II.

EFFECTIVE DATE, l.

TERM AND NOTICES 2.01 Effective Date.

5 2.02 Tarn 5

2.03 Power Supply Resources 6

I, _

2.04 Ncticas - for Changes in Purchases of Fuer and Energy.

7 g'

2.05 Removal of Specified Points of Delivery 8

ARTICLE III.

SAL 3 0F POWER AND ENERGY SY TU ELECTRIC AND PURCHASE BY CAP ROCK 3.01 Full Requirements Power and Energy.

9 3.02 Partial Requirements Power and Energy 10 3.03 Load Growth

'4 3.04 Unintentional Energy.

14 3.05 Rate Schedulu 15 3.06 Charactoristics of Power and Energy 15 3.07 Points of Dalivery.

15 3.08 Contract Demand 17 i

~l

l 3.09,

Idicd Focilitics.

3 3.10, Change of Voltage

9 3.11 Facilities at Points of Delivery.
o 3.12 Interconnection or Parallel Operations with l

Other Suppliers

o

[

3.13 Forecasts y

3.14 Right of Access

}

3.15 Changes in the P ro'.'is i o n of Power and Energy.

2 ARTICLE IV.

BACKUP, STANDBY, EMERGENCY AND SCHEDULED KAINTENANCE POWER 4.01 Loss of Firm Power Resource

4 4.02 Emergency Power
5 l

4.03 Curtailment Plan.

26 7

4.04 SchNduled Maintenance Power 27 4.05 Limitations on Emergency and Scheduled

(

Maintenance Power

7 W

4.06 Ner and Energy.

27 49fCLE V.

SCHEDULING 5.01 a

. of Power Supply Resources

S 5.02 Notice of Schedulec to TU 23 a

5.03 in Delivery Rate.

9 5.04 Baunup Resources.

I

9 5.05 TU Electric Execution of Schedules 29 5.06 Scheduling and System Modification Charges 30 5.07 Term of Scheduling.

22 1,

5.08 Full Requirements Points of Delivery af ter Scheduling.

23 ARTICLE VI.

REGULATI N SERVICES, AVAILABILITY OF EMERGENCY AND SCHEr.ULED MAINTENANCE BULK PO1rER AND DELIVERY OF POWER AND ENERGY 6.01 Regulation Services 33 6.02 Availability of Emergency and Scheduled Maintenance Bulk Power.

34 ARTICLE VII.

TRANSMIS8ICN WHEELING AND DISTRIBUTION SERVICES

[

7.01 Wheeling in Connection with Scheduling 25 7.02 Wheeling Af tur Can Rock Becomes a Control Area.

25 7.03 Transmission Arrangements with Third Parties 37 ARTICLE VIII.

BILLING 8 AND DEFAULT ii l

.-_____.___m

-~

8.01,

billings and Paymonto 37 8.02 Billings and Payments Subject to Correction.

I 37 8.03 Notice of Default 23 8.04 Failure to Cure Def ault 8

8.05 Specific Pertermance and Injunctive Relief 35 8.06 No Waiver 39 8.07 Indemnification 39

. 8.08 Bankruptcy.

I 42 8.09 Non-Exclusive Remedy.

43 ARTICLE II.

INTRASTATE OPERATIONS

. g 8

9.01 Interstate Commercs 43 9.02 Failure to Comply 44 8

9.03 Specific Performance 45 9.04 Bona Fide Emergencies 45 I}

ARTICLE Z.

MISCELLANZOUS PROVISIONS 10.01 Amendment 45 10.02 Entirety of Agreement and Prior Agreements Superseded.

45 10.03 Successors and AsAigns 46 10.04 Taxes 47 10.05 Agreement to Control 48 10.06 Servica Regulations 48 10.07 Governing Law and Venue 48 h

10.08 Notices 49 10.09 Interruption of Service 50 10.10 No Third-Party Beneficiaries.

50 l

10.11 Multiple Counterparts 5C W

10.12 Headings.

51 10.13 Severability.

51 h

10.14 Agreements to be Negotiated in Good y

Faith 51 10.16 Mutual Release.

52 g

10.17 Withdrawal of Participation and Dismissal of g~

Litigation.

52 10.18 Conditions Precedent 53 I

I I

111 I

i

LIST OF EIHIBITS

(

Exhibit A Points of Delivery Exhibit B Power supply Resources xhibit C E

' css Facters Exhibit D Cap Rock Curtail.ent P'.an Exhibit E Mutual Release Exhibit F Notice of h'ithdrawal I

i l-i l

i l

1 I

}

iv 1

_ _ _ _ _ _ _ _ - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - ~

~ ~ ~

~

POWER J.RFPLY AGREEMENT BETWZRE TEXA8 UTILITIES ELECTRIC CO)iEMD(

W CAP ROCK ELECTRIC COOPERATIVE, !NC4 This Power Supply Agreement

(" Agreement")

. s made and l

entered into as of the 8th day of June, 1990, by and between Texas Utilities Electric Company ("TU Electric"), a Texas corpcrati:n, and cap Rock Electric Cooperative, Inc.

(" Cap Rock"),

a Texas coeperative corporation, (each hereinafter so=etimes referred Oc individually as " Party" or both referred to collectively as the

" Parties").

WITNESSETH:

hHEREAS, Cap Rock is a full requirerents wholesale cust:mer of TU Ilectric; and

WHEREAS, Cap Rock desires to develop alternative power suppiy arrangements, including the purchase of power from suppliers other than TU Electric, as well as construction of Cap Reck's own I

genere. tion and transmission, and obtaining the necessary regulatory approvals in connection therewith; and tTHIREAS, Cap Rock intends to pursue development of control area arrangements; and

WHEREAS, Cap Rock expects to make such power supply arrangements f or Lone Wolf Elr.ctric Cooperative, Inc.

(" Lone Wolf")

dalivery points in the avant that cap Rock and Lone Wolf =erge or otherwise consolidate; g

NOW, THEREFORE, in reccgnition of tho f orogoing, the Parties hereby agree as follows:

ARTICLE I.

DEFINITIONS The following terms, when used herein and in the Exhibits attached hereto, shall have the neaning specified below, except as may :thervise be expressly set f:rth :.n this Agreement:

1.01

" Contract Demand" shall mean the maximum amount of power and I

energy expressed in kilowatts (0:ntract Kw) that Oap Rock projects

  • TU Ilectric will be required to provide at cach Point of Delivery.

Contract Demand will be specified on Exhibit A,

which may be changed from time to time as provided in Section 3.08 hereof.

1.02

" Control Area" shall mean an area within ERCOT which has contractually ar6d electrically prescribed boundaries at transmission voltages whose nominal operating voltage is at leas:

60,000 volts when n.easured phase-to-phase, is capable of instantaneously matching generation and load within such area and is established and operated in accordance with prudent electric

~

utility practices, including all provisions of the ERCOT Operating Guides.

1.o3

" cont of servico study" shall mean that study undertaken by TU Electric to allocate its system cost to its rate classes as mest recently approved by the Public Utility Commission of Texas

( "PUCT") in a general rate case.

1.04 "Def ault" shall mean the f ailure of Cap Rock or TU Electric to make any payment or perform any obligation in the time and I

2 1

mannor providCd in this Agrocm:nt.

"YRCOT" shall mean the Electric Reliability Council of Texas 1.03 l

cr its successor (s).

"ERCOT operating Guides" shall :sean these operating guides 1.06 prepared and adopted by the operating Subcommi: tee of ERCOT and approved by tha Technical Advisory C:=mittee of ERCOT, the purpose of wn ch is to outline the mutually agreed upon practices to ':e followed in operation of the interconnected systems of the re=cer utilities of ERCOT.

" Firm capability" shall mean the maxi =um capacity expressed 1.07 in negawatts (exclusive of installed and spinning reserves) for sach Firm Power Resource specified on Exhibit B.

1.os "Fira Power Resource" shall mean a Power Supply Resource fully backed up by an electric utility member of ERCOT, other than Tc Electric which (1) is available at all times, even under adverse conditions, (ii) includes both installed and spinning reserves, and (iii) is of a level of firmnesa not less than the ERCOT utility's firm native load customers.

1.09

" Metered Demand" shall mean the total metered demand at a

Point of Delivery (adjusted for

losses, if any, bet. ween One metering point and the Point of Delivery), excluding demand at subtract mater pointa. if any, serving TU Electric customers.

1.10

" Metered Energy" unall mean the total metered energy at a

Point of Delivery (adjusted for

losses, if
any, between the metering point and the Point of Delivery), excluding enorgy at subtract matar points, if any, serving TU Electric custo=ers.

3 l

- - - ' - - - - - - - - - - - ^

- - - ~

'-- ~

1.11 "Pointo of Dolivory" shall scan all points within TU f

Electric's Control Area at which TU Electric maintains an electrical connection with Cap Rock existing on the effective date hereof, each of which Points of Delivery shall be specified On Exhibit A hereto, which shall be amended fr:m time to ti:e in acecrdance with Section 3.07'b) hereof.

1.12

" Points of Interconnection" shall mean each P0 int at vnich 4

TU Electric maintains an electrical connection with Cap Rock 's 0:ntrol Area, at a nominal voltage level of at least 60,000 volts when measured phase-to phase (except at such points and *:r such I

periods as provided in Section 7.02 hereof).

1.13

" Power supply Resources" shall mean Cap Rock's Firm Power Resources and/or economy energy resources specified frog. ti=e to time on Exhibit B hereto pursuant to the provisions of this Agreement.

1.14

" Schedule Period" shall mean a period of one (1) calundar day unless such day is not a working Day, in which evera the Schedule Period shr,ll be all :ensecutive days which are not Working Days plus the first following Working Day.

1.15 "TU Electric Capacity" shall mean that amount of capac:.ty which TU Electric will provide to cap Rock as defined in Section 3.02(a) hereto pursuant to the provisions of this Agreement.

1.16 "TU Electric Energy" shall mean that amount of energy which TU Electric will provide to Cap Rock as defined in Section 3.02 (b) hereto pursuant'to the provisions of this Agreement.

1.17

" Working Day" shall mean any day from Monday through Friday 4

\\

l

thich is not a holiday rccognized by TU Eloctric which holidays shall be specified by TU Electric within 30 days after the execution of this Agreement, such holidays to be subject to en3nge by TU Electric upon reasonable advance written notica.

ARTICLE II.

EFFECTI7E DATE, t

TERM AND NOTICES 2.01 Effective Date This Agreement shall become affactive, with respect to tap

Rock, frcm and after Cap Rock's termination of its full require =ents Agreement for Purchase of Power, dated June 2,
1963, y

as amended, in accordance with its terms.

8 This Agreement shall become effective, with respect to Lone

Wolf, from and after the termination of Lone Wolf's full requirements Agreement for Purchase of Power dated July 2,
1963, as amended, in accordance with its terms; provided, however, that in the event Cap Rock and Lone Wolf do not consolidate within the time specified in Section 3.07(b)(iv) hereof, all Cap Rock's rignts and TU Electric's obligations with respect to Lone Wolf provided for herein shall terminate and be of no further force or effect.

2.02 Tara l

The torn of this Agreement will be 10 years.

Cap Rock will have the right to terminate this Agreement on three years' written notice in years one through five and on five years' written notice thereafter.

TJ Electric will have the right to terminate this Agreement s

I

ott notico aquel to tho balanco of tho ton-yoor term in years eno through five, and on five years' notice thereafter, Af ter the expiration of the fif th full year, this Agree =ent will be automatically extended fr== year to year unless terminated as provided above.

2.03-Power Supply Resources l-l All Power Supply Resources shall be identified on Exhibit B,

which shall

include, in addition to the other infcrmation specified therein, the Fi= Capability of each Firm Power Resource.

None of the characteristi:s of the Power Supply Resources may be changed, nor shall any Pcwer Supply Resource be added or deleted from Exhibit B, except as specifically authorized by this Section 2.03, or Sections 2.04, 3.15 ( a) ( i) or 5.01(b) heroof.

l Cap Rock may, notwithstanding the notice requirements of Section 2.04, replace a Fir: Power Resource with another Firm Pcwer i

Resource so long as the replacement has a term no longer than the remaining term of the replaced Tim Power Resource, has the same Firm capability as the Firm Po'ver Resource so

replaced, is substantially identical with respect to, among other things, the direction and pattern of flow of the power and energy, loadings on TU Electric's transmission facilities, and i= pacts en its generation dispatch, and such replacement is otherwise satisf actory to TU Electric.

The Firm Pcwer Resource so replaced shall be deleted from Exhibit B.

Cap Rock may not, without the notices required by Section 2.04 hereof, substitute Firm Power Resources or increase the Firm capability to be taken under each such Firm 6

l l

i powcr Recourco.

The nu::tber of Power Supply Resources shall never excaad six at any one time and shall not be scheduled or delivered vinhout ene giving of the notices provided for in Section 2.04.

, cap Rock shall provide a copy of all Firs Power Resource agreenent(s) or generation ownership / entitlement agreement (s) to i

TU Electric no less than 60 days prior to the date it wishes to begin receiving power from such Firm Power Resource.

Oap R:ok =ay redact such portions of the foregoing agreements as is necessary to avoid the disclosure of confidential infor=ation, if any;

provided, however, that such redaction shall not prevent TU Electric from having access to such information as it may reasonably require to insure that the power being purchased and/or generation ownership /entitleeent agreement (s) meat the require =ents of this Agreement; provided further that if such inf:rmati:;n includes confidential infor=& tion, TU Electric will agret not to use f.he same for any other purpose and not to disclose such confidentinl information to any other person without Cap Rock's
consent, unless required to do so by a court or regulatory I

authority of competent jurisdiction.

2.04 Notices for changes in Purchasec of Power and Energy Cap Rock will have the right to reduce load supplied by TU Electric under this Agreement on three years' advance written notice in years one through five, inclusive, and on five years' advance written notice thereaf ter.

Af ter year five, Cap Rock =ay, upcn the giving of three years' advance written notice, reduce or i

,g l

increase, by not more than plus or =inus lot, the Firm Capability h

supplied by a Firm Power Resource (and thereby increase or reduce respectively its lead supplied by TU Electric), under a previously given notice.

All de=and determinat:cns under TU Electric's Rate WP Whelesale Power, or its successor, associated with and resulting from usage prior to the date upon which such reduction is ef f ective will be waived for each load reduction at each such Point of celivery associated with and following the expiration of the foregoing cap Rock notice (s);

otherwise such billing derand determinations shall apply.

TU Electric will have the right to reduce load to be l

~

supplied under this Agreement upon advance written notice equal to the balance of the ten-year term in years one through five, inclusive, of this Agreement and upcn five years' advance written notice thereafter.

All notice (s) not associated with the addition of a Fir =

Power Resource given by either Party to the other pursuant to this section shall specify the Point (s) of Delivery at which such reduction is to occur and, for each such Point (s) of Delivery, the I

amount of such reduction.

--g 2.05 Reisoval of Specified Points of Delivery Subject to the limitations described below, all (but not part) of the power and energy requirements of Cap Rock's customers at nine Points of Delivery (Pembrook, St. Lawrence, stiles, Knott, Ackerly, Vealmore, Coahoma, La Mesa and Schwartz) may, during years one through five of this Agreement, be served by another electric 8

1 utility, provided cap Rock has first given TU Electric twenty-four nonths' advance written notice of such service to one or core of the Points of Delivery identified above by such other electric utility and such service at any such Point (s) of Delivery has com=enced prior to June 1 in the year of such notice, in which j

event the demand determinations from TU Electric's Rate WP Wholesale Power, or its successor, shall not be i= posed from and af ter the commencement of such 9ervice at the Point (s) of Delivery for which Cap Rock has given the required notice.

The Contr.ct Demand (s) at the Point (s) of Delivery for which notice is given pursuant to this Section 2.05 may not, in the aggregate, exceed 30 MW of Contract Demand (as specifiad on Exhibit A on the effective date of this Agreement).

If required by the provisions of Section 3.12 or Article IX hereof, Cap Rock will disconnect each such Point

-of Delivery from TU Electric.

ARTIOLE III.

SALE OP POWER AND ENERGY BY TU ELECTRIC AND PURCHABE BY CAP ROCK

. 3.ol Full Requirements Power and Energy Except as otherwise permitted by this Agreement, Cap Rock shall purchase frea TU Electric and TU Electric will sell to Cap Rock all of Cap Rock's power and energy requirements, including normal load growth, at each of the Points of Delivery for resale to Cap Rock's customers.

Cap Rock may, upon reasonable advance written notice, elect to retain one or more of its Points of Delivery (having voltage levels of less than 60,000 volts) which 9

l l

axist on tho offcctivo dato of this AgroomOnt as full requirenents points of Delivery pursuant to this Section 3.01 (notwithstanding the purchase of partial requirements power pursuant to Sect:.on 3.02 bel:w at Cap Rock's remaining Points of Delivery), in which event, upon the giving of the n0tices required by Secti:n 2. 04 hereof, Cap Rock may, from time to time, convert :pe or more of such Points of Delivery to partial requirements Points of Delivery

u. der the provisions of Section 3.02 hereof.

3.02 Partial Requirements Power and Energy

!n the event and to the extent Cap Rock gives tM requisite notice pursuant ;o Section 2.04 hereof and during the peri:d(s) that TU Electric may be required to schedule under Article v hereof, Cap Rock shall purchase from TU Electric and TU Ele :rie will sell to Cap Rock, at each of the Points of Delivery (except Points of Delivery which are retained as full requirements Points of Delivery pursuant to Section 3.01 above (the "Rotained Tull Requirements Points of Delivery"), unless and until such Points of Delivery become partial requirements Points of Delivery as permitted therein),

partial requirements power and energy for resale to Cap Rock's customers.

Paruial requirements power and energy shall be determined as fellows:

(a)

"TU Electric Capacity" shall mean capacity equal to the difference between the Metered Demand during the billing interval on each of the metering points at each I

Point of Delivery (except the Retained Full Require =ents Points of Delivery) delivering power and energy to Cap Rock g

10

B for rocolo cnd a portion (CP,) of ;ho Firm Capability of Cap Rock's Firm Power Resources, if any.

The quantity CP, shall have the following definition:

AF, x FPSR. x [ (1/TL,) g ( 1 / D L,) J '

CP,

=

.Where, AF, The Metered Energy for each Point of

=

Delivery (except the Retained Tull I

Requirements Points of Delivery) during l

each hour of the current billing conth divided by the sum of the Metered Energy for all cap Rock's Points of D61ivery l

(except the Ratained Full Require = ants Points of Delivery) during said hour.

r The capacity (MW) of Cap Rock's Firm FPSR.

=

Power Resources actually scheduled and I

delivered to TU Electric's transmission system during a given clock hour on l

behalf of Cap Rock, in accordance with I

.he terms of this Agreement, coincident with the Metered Demand at the Point of j

Delivery during the same hour of the billing month.

l TL, The TU Electric transmission system

=

demand loss factor as contained in TU Electric's Cost of Service Study =ost

(

recently approved by the PUCT.

At the time of execution of this Agreement, this I

factor is 1.03063139 as shown in Exhibit C attached hereto and made a part hereof.

l The TU Electric primary system demand DL,

=

loss f actor as contained in TU Electric's l

Cost of Service Study most recently

,I approved by the PUCT.

At the time of execution of this Agreement, this factor l

is 1.05802362 as shown in Exhibit C

attached hereto and made a part hereof.

l (b)

"TU Electric Energy" shall mean energy, at each I

'The f actor "(1/TL,)" shall be used for Points of Delivery at nominal voltages greater than or equal to 60 Kv.

The factor

" ( 1/ DL,) " shall be used for Points of Delivery at voltages less

[

than 60 Kv.

I l

Point of Dolivory (excopt tho Full Rcquiremonts Points of Delivery), equal to hourly Metered Energy less the sum of:

1 (i) a portion (IPH -- )

f the energy scheduled and delivered ta g

pursuant to any economy energy scheduling agent agreenents entered into between the Parties and (ii) a porti:n (Ipg,)

of the energy fr:= cap Reck's Firm Power oscurces, if any, c

The quantities EPH., and EPH, shall have the f ell wing g

definitions:

EPHta AT, x ECONHt

=

X 5 (1/Il ) E (1/Ul ) 3 e

e

EPH, AF, x FPSRH X [ (1/IL ) C (1/ DL,) ) *

=

1 1

e

where, 8

AF, shall have the same meaning as such factor in the preceding sub-section 3.02 (a).

The average transmission energy less I

TL,

=

f actor as used in the determination by the PUCT of TU Electric's fuel factors 3

then currently in ef fect f or transsission 5

voltava lina lo8585-At the ti== of the execution of this Agreement, this factor is equal to 1.024789 as shown in Exhibit I

C attached hereto and made a part hereof.

The average distribution energy l'os s DL,

=

! actor used in the determination by the PUCT of TU Electric's fuel f acters then currently in effect for primary voltage line losses.

At the time of the execution of this Agreement, this factor is equal to 1.051741 as shown in Exhibit C attached hereto and made a part hereof.

The scheduled generation (MWH) actually ECONH

=

g scheduled and delivered on behalf of Cap I

Rock, as providad in any economy energy

  • For Points of Delivery at nominal voltages equal to or greater than 60 Kv, the f actor "(1/TL,)" shall be used.

For Points of Delivery at nominal voltages less than 60 Kv, the factor

"(1/DL,)" shall be used.

12 I

l 5

scheduling agent agreements entered into between the Parties, during said hour.

FPSRH The energy (MWH) asscciated with Cap

=

t Rock's Firm Pcwer Resources actually scheduled and delivered on behal* of Cap Rock in accordance with the terms of this Agreecent during said hour.

When Cap Rock becomes a control Area pursuant to Section 6.01 l

hereof, the partial requirements power and energy to be purchased by cap Rock and sold by TU Electric shall be all of Cap Rock's power and energy requirements as provided in this Agreement, less the a=ounts being supplied from a source other than TU Electric f or which notice has been given pursuant to Section 2.04 hereof, the accounting for which shall be determined pursuant to a mutually satisfactory procedure.

Such power and energy shall be delivered by TU Electric to Points of Interconnection under a mutually acceptabla schedule, at such times and at such capacity factors, ramp rates, and other factors as are mutually agrecable and consistant with good utility practices within ERCOT. The foregoing shall not apply to regulation power and energy provided by TU Electric pursuant to the provisions of Section 6.01 hereof or to the full quirements power and energy delivered to Cap Rock Points of Delivary, if any, remaining in TU Electric's Control Area.

In the event Cap Rock movas one or more of its Points of Delivery (other than a former Point of Delivery served by another electric utility pursuant to Section 2.05 hereof) from the control x

Area of TU Electric to the control Area of another electric utility, TU Electric will (if there is no load reduction as a consequence thereof), upon reasonable advance notice, continue to 13 1

t sell such wholesale power and energy to Cap Rock for such Point (s) l of Delivery in accordance with the provisions of a mutually acceptable power supply agreement at Rate WP Wholesale Power, I

or its successor, notwithstanding the provisions of special Condition

!!o.

1, or its equivalent, of TU Electric's preposed Rate WP Wholesale Power pending bef oro the PUCT in Docket tio. 9300 on the I

date hereof.

3.03 Load Growth

'"U Electric Capacity and TU Electric Energy supplied hereunder shall include normal load growth

!or each Point of Delivery specified in Exhibit A hereto.

3.04 UnintentioneA Energy In the event that, in any hour, the total energy scheduled and delivered to TU Electric f r== cap Rock's Power Supply Resources is in excens of the Metered Energy at any Point of Delivery in that hour, TU Electric shall c =pensate Cap Rock f or said excess, up to but not = ore than three percent (31) of the Metered Energy in that hour, by way of credit, in TU Electric's sola discretion:

(a) as a direct replacement of TU Electric Energy I

purchased by cap Rock under Rate WP Wholesale Power during the monthly billing period in which said hour occurs, or (b) in an amount equal to ninety-five percent (95%) cf TU Electric's actual avoided enerQy cost in that hour, iI against Cap Rock's bill for TU Electric Energy purchased by Cap Rock under Rate WP Wholesale Power during the conthly period in which isaid hour occurs, g

u I

E otherv100 TU Electric shall have no rooponoibility or obligation to pay or otherwise compensate Cap Rock, directly or indirectly, for any energy scheduled to any Point of Delivery during any hour

)

which is in excess of the Metered Energy c such Point of Delivery l

during such hour.

3.05 Rate schedule l

It is distinctly understood and agreed that the conthly rate of charge (including any charges for power and energy in excess of l

Contract Demand and any demand determinations aff acting billing demand) for all power and energy whien Cap Rock shall purchase from TU Electric and TU Electric is required to sell to Cap Rock under this Agreement; shall be pursuant to TU Electric's Rate WP Wholesale Power, or its successor, as the same may from time to time be fixed and approved by the PUCr.

3.06 Characteristics of Power and Energy The power and enargy TU Electric is required to deliver to Cap Rock under this Agreement will be of the character connonly described as three-phase, 60 herc, at a voltage for each Point of Delivery as specified on Exhibit A, and with reasonable variation in voltage and frequency to be allowed.

3.07 Points of Delivery (a)

Power and energy will be sold by TU Electric and purchased by Cap Rock under this Agreement at the Points of Delivery identified on Exhibit A hereto in the amounts specified in Sections 3.01, 3.02 and 3.03 hereof.

(b)

Subject to the provisions of Section 3.11 hereof, 15

~~

t Exhibit A shall ba emonded from timo to timo (upon tho oxocution of the supplemental agreement provided for in Section 3.08) to :

(i) add new points of delivery required by reason of normal load gr:vth in the certificated service areas of Cap Rock (and Lcne Wolf,_if Cap Rock and Lone Wolf are consolidated within the ti.y spr,cified in Section 3. 07 (b) (iv) below), as established by the PUC-as of June B,

1990; (ii) add and/cr delete Points of Delivery resulting from the consolidation of existing Cap Rock Points of I

Delivery and/or those new points of delivery, if any, added to Exhibit A pursuant to (i) above; (iii) delete Points of Delivery moved to the Control Area of Cap Rock or another electric utility; (iv) add points of delivery served by Lone Wolf on the date hereof provided that all corporate action necessary to apprsva such consolidation has been taken by Lone Wolf and cap Rock within 90 l

days after May 15, 1990, applications are filed for approval by One FUCT and the Rural Electrification Administration ("REA") within 120 days after May 15,

1990, and the transaction is finally consummated and approved by all regalatory agencias having jurisdiction thereover within one year from the date of filing of the af:rementioned applications (unless extended by mutual agreement of the Parties); provided, however, that if approved by the PUCT and otherwise consummated within 12 months f allowing such h

filing date, failure of the REA to approve the consolidation, if otherwise consurs.atect, shall not constitute a breach of the I

foregoing provision; e.d (v) add Points of Delivery permitted by Section 3.15 (a) (ii).

Any load reductions or increases resulting I

l I

I fro 3 tiho forO90ing shall bo cubjoct to tho applicablo notico provisions'o'f this Agreement.

3.os contract Demand 4

contract Demand shall be specified for each Point of I

celivery identified on Exhibit A.

centract Demand at any Point of l

Delivery may be changed from time to time on Exhibit A, upon 12 I

months' prior written notice to TU Electric (but no more frequently than once every 12 months), as the result of nor=al lead growth or normal lead reductions (which, in either case, does not include

]

load transferred to or from anothar source, including Cap Rock) at each such Point of Delivery.

Contract Demand at any Point of Delivery may be decreased on Exhibit A by Cap Rock contemporaneously with the expiration of the notice period provided for in Section 2.04.

Contract Demand at any Point of Delivery may be increased

!I on Exhibit A as a result of purchases of power and energy pursuant i

4 g

to the provisions of Section 3.15 (a) (1) or (iii)

hereof, conte =poraneously with the expiration of the notice periods provided for therein.

Contract Decand may be established on Exhibit A for a Point of Delivery which has been added pursuant to Section 3.07 (b) (v) hereof at the expiration of the notice period provided for in Section 3.15 (a) (ii) hereof and for Points of Delivery added pursuant to Section 3.07 (b) (iv) hereof.

Contract Demand at any Point of Delivery may, if there is no load reduction, be enanged simultaneously with the addition or 17

, I I

dolction of a Point of Delivery as pe_ itted by Section 3,07(b) (ii) hereof.

f Each change in Contract Demand on Exhibit A as provided above shall be subject to the execution of a supplecent to this Agreement containing mutually satisfactory provisions, including l

any necessary changes in facilities at each Point of relivery resulting tnerefrom as required by Section 3.M hereof.

6 3.09 Idled Facilities j

Cap Rock will pay TU Electric for each transmission and i

distribution-related f acility(ies) which is rendered idle by reason of the reduction in any load covered by this Agreement.

A facility (ies) is rendered idle if such facility (ies)

(i) is no l

longer being used for the delivery of powar and energy on behalf of Cap Rock and is not, or no longer has any reasonable pr:spect of, being used on behalf of any other TU Electric customer for the l

delivary of power and energy; er (ii) is so underutili:ed by an l

existing TU Electric customer (s)

(including Cap Rock) as to require, using prudent utility practices, its re= oval for use elsewhere on the TU Electric system.

Cap Rock agrees to psy TU l

Electric for each idled facility (ies) the replace =ent c:st new (RCN) less an allowance for age and condition, plus removal ecsts, less salvage value; provided, however, f or a f acility(ies) removed for use elsewhere on the TU Electric system pursuant to (ii) above, l

Cap Rock agrees, to pay only the costs of removal and the costs of l

insta.llation of any facility (ies) replacing said removed facility (ies).

Such charges shall be reduced by the amounts, if l

)

g any, previously paid by Cap Rock (pursucnt to thG provisionc of Section 3.ll' hereof and the provisions of any wheeling agreecent(s) executed by the Parties as provided in Section 7.01 hereof) for such idled facilities.

In lieu of paying TU Electric f or the idled A

facilities as required above, Cap Rock =ay, at the sole option of TU El'ectric, purchase the idled facilities or pay TU Ilectric jg annually the reasonable carrying cost of the idled f acilities; Cap

5 Rock shall not be required to purchase or lease the idled facility (les).

3.10 change of voltage TU Electri: vill provide power and energy to Cap Rcck at each Point of Delivery at the delivery voltage specified in Exhibit A as long as such delivery voltage is available.

If TU Electric converts its facilities providing power and energy at any Point of Delivery to a different operating voltage, Cap Rock agrees to take power and energy at the changed voltage then available or bear all costs to transform the voltage from the changed voltage to that which Cap Rock stiy require.

TU Electric will give Cap Rock written notice at least two years in advance of such voltage change.

TU Electric will support Cap Rock in obtaining any Certificate of Convenience and Necessity ("CCN") necessary for Cap Rock to effect such conversion, and will not terminate service at the existing voltage to Cap Rock at the Point of Delivery until the CCN is granted and Cap Rock's conversion can be completed.

Cap Rock may, at its option, upgrade its facilities at any Point of Delivery to a higher delivery voltage than available from 19 I

.,,r

TU Electric at cuch Point of Dolivory; providcd, hovcVer, that: (i) g Cap Rock pays f or all =edifications to TU Electric's facilities that are necessary to provide power and energy to Cap Rock at such higher delivery voltage, (ii) Cap Rock gives TU Electric reasonable written notice of its desire to take delivery at such higher voltage, and (iii) TU Electric vill not be required to provide delivery at such higher voltage until all required modificatiens to TU Electric's facilities can be co=pleted.

I 3.11 Facilities at Points of Dslivery Any new or upgraded transmission and distribution-related f acilities reasonably rsquired by TU Electric in connection with servica to Cap Rock shall be at Cap Rock's sole cost and expense.

3.12 Interconnection er Parallel Operations with Other Suppliers cap Rock agrees that no portion of its transmission and l

distribution system interconnected with TU Electric vill be electrically interconnected or operated in parallel with any part or parts of a system being supplied through connection with any other supplier of electric energy, nor shall any Points of Delivery

~

be interconnected by such transmission and distribution system; provided, however, that, subject to the execution of a sutually acceptable interconnection agreement, the foregoing limitation shall not apply to any Point of Delivery which is moved to Cap Rock's Control Area or the Control Area of another electric utility.

3.13 Forecasts on January 15 of each year during the time this Agreement I

l 8

rcmcino in offcct, Ccp Rock vill provido TU Eloctric by point og Delivery and otherwish with such forecast (s) (in such foro as TU l

Electric may reasonably require) of (i) total power and energy requirements, (ii)

I-power and energy required from TU Ilectrie, (iii) changes in Power Supply Resources, (iv) changes in transmission and distribution facilities, (v) changes in transmission service arrangements and (vi) such other information as may be reasonably required by TU Electric.

Upon the furnishing of any such inf ormation, Cap Rock will appropriately designate those portions thereof which it considers to be confidential TU Ilectric will use reasonable diligence to maintain in confidence all such designated information which has not otberwise becoce publicly available.

TU Electric may furnish the foregoing g

information to the PUCT or to any other person if ordered to do so by any court or regulatory agency having jurisdiction and, to the extent required, to ERCOT for planning purposes only.

Information supplied to TU Electric pursuant to this Section 3.13 shall be for planning purposes only and shall not constitute a notice of h

reduction or load increase by Cap Rock under any provision of this load Agreement.

3.14 Right of Access g

Each Party shall give all necessary per:sission to the other to enable the agents of the other Party to carry out this Agreement and shall give the other the right by its fully authorized agents and employees to enter the premises of the other at all reasonable times for the purposes of reading or checking

meters, for 21 I

t

incpacting, tocting, ropciring, roncwing or exchanging any or all of its equipment which may be located on the propierty of the other, I

and for performing any ot."er work incident to rendering the services provided for in this Agreement; provided, hcwever, that neither Party hereto shall have any duty to inspect the equipcent, I

lines and facilities of the other.

3.15 Changes in the Provision of Power and Energy (a)

If, during the tern hereof, Cap Rock wishes to: (i) purchase power and energy from 37 Electric previously supplied from a Firm Power Resource; (ii) add a Point of Delivery previously i

=oved from the TU Electric Control Area to the Control Area of l

another electric utility cther than Cap Rock; or (iii) otherwise increase the amount of power and energy to be supplied by TU Electric at any Point of Delivery specified on Exhibit A hereto (other than normal load growth at such Points of Delivery or increases occasioned by the consolidation of two or = ore existing and/or new Points of Delivery), 31 Electric will, on three years' advance written notice, subject to the limitations of Sections 5.07 I

and 5.08 hereof, sell to cap Rock full and partial require =ents l

power in accordance with Rate WP Wholesale Power, or its successor, pursuant to the provisions of this Agreement.

(b)

If Cap Rock or TU Electric cancels this Agreement pursuant to Section 2.02 hereof, or if Cap Rock causes one or = ore of its Points of Delivery (other than a former Point of Delivery I

served by another electric utility pursuant to Section 2.05 hereof) to become a part of another Control Area (other than Cap Rock's 1

I

I control Arca) and, if thoro 10 o lead reduction in connection j _

therewith, gives the notice required by section 2.04 hereof, TU Electric will: (i) on three years' (or five years' in the case of those Points of Delivery becoming full requirements points of delivery in accordance with Sections 5.08 and

7. 02 (b) hereof) advance vritten
notice, sell to Cap Rock full and partial requirements wholesale power in accordance with the provisions of

' I Rate WP ' Wholesale Power, or its successor, pursuant to a =utually 1

acceptable agreement f or electric service (which shall not include l

the sale of scheduling or regulation services), provided that TU Electric has suf*icient bulk power available and provided the sale would not impair its ability to render adequate and reliable service to its customers er its ability to discharge prior cor.mit=ents ; and (ii) provide firm transmission wheeling, on a transaction specific basis, in accorduce with mutually acceptable interconnection and transmission wheeling agreement (s) on ter=s that fully compensate TU Electric for its costs p'"5 a reasonable return on investment, together with all costs fo;

.y additions or modifications necessary to accommodate each whee..ng transaction, provided TU Electric has adequate transmission and distribution 4

g capacity available (if distribution wheeling services are then being offered) and the transaction would not unreasonably i= pair 1

TU Electric's systaa reliability or emergency transmission capacity.

I

-Im m.

oc

,.mm, ---

AND SCREDULED MAINTENANCR POWER 23 I

4.01 Loss of Pirm Power Resource

.I TU Electric vill not provide any backup or standby service, l

includ!.nq installed or spinning reserves, nor will it plan for or shall it be obligated to serve any of Cap Rock's requirements not I

expressly specified or provided for in this Agreement, including j

the sale of power previously supplied from a Fin Power Resour:n.

In the event a Fi n Power Resource being scheduled as prov:,ded in Arti:le V hereof is not delivered for any reason, Cap Rock shall, subject to the sale of emergancy power provided in i,ection 4.01 hereof, immediately curtail load (in accordance with a curtailcent l

plan reasonably acceptable to TU Electric), in amounts equal to such undelivered Firm Power Resource unless cap Rock

=akes arrangements (satisfactory to TU Electric) to replace such undeliverad Firm Power Resource with another Firm Power Resource (which shall be deemed to be a sourca or resource for the purposes of sections A.08, 5. 'P., 5.04 and 5.06 hereof); provided, however, that in instances where the Firs Power Resourca is not delivered due solely to an emergency ceased by the failure of TU Electric's transmis#cn faullities or an eoergency caused by the fallure of transmission facilitias of another member system of ERCOT (other than the supplier of the undelivered Firm Power Resource), Cap Rock l

may (if satisfactory to TU Electric) use a source to replace suen undelivered Firn Sover Rescurce other than that provided for in section 5.01,(a) at a level of firmness other than that required by Section 5.01(b), provided Cap Rock agrees in advance to execura a I

I

j r.cnodulutg agent agroccant on tho torms provided for in section 5.06 and a mutually datisfactory short-term wheeling agreement.

Anything in this Agreement to the contrary netvithstanding, TU l

Electric shall not be required to deliver any power replacing such undelivered Firm Power Resource for a period of = ore than f ur consecutive days or the length of the emergency, whichever is less, g

and in any evegt for more than three such emergencies during any 12-month period, except in cases where the emergency is due solely to an eoergency caused by the f ailure of TU Electric's transmission se facilities, in which event the period of such delivery shall

'g continue for the entire length of the emergency and the nurler of

)l such smergencies for which such delivery shall be made will not be limited.

>I 4.02 Emergency Powe" fg Before Cap Rock becomes a Control Area and during the I

period (s) in which TU Electric may be required tc schedule Firs Power Resources pursuant to Article V hereof, and in the event a Firm Power Resource being scheduled as provided under Article V hereof is not delivered due to no fault of Cap Rock, and TV

-l Electric has power and energy available therefor, TU Electric will sell emergency power to Cap Rock in an amount equal to such I

undelivnrad Fira Power Resource for a period not to exceed tan hours at the rate specified in Rate WP Wholesale Power, or its successor, including the demand determinations under Rate VP Wholesale Power specified therein; provided, however, if the Tirn

.I Power Resource is not delivered due solely to an emergency caused 25

by tho failuro of TU Electric's transmission f acilitico or the f ailure of f acilities at Texas Utilities System operating Centar

("TUSoca), TU Electric vill sell or continue to sell such emergency l

power to Cap Rock for an additicnal f our-day peried at the sace rate as aforesaid, including the demand determinations.

I 4.03 Cu.rtailment Plan l

No later than six c:nths prior to the date cap ttock first begins taking power frem a Tirm Power Resource in accordance with the provisions of this Agreement, Cap Rock shall develop and deliver to TU Electric a mutually etcaptable curtail =ent plan, and TU Electric agrees to coeperate with Cap Rock in the development of said curtailment pian, :,dentifying lead equal to tne capacity of such Firm Power Resource to be curtailed and the =eans by which l I said curtailment plan is to be i=plemented in accordance with the 5

ar=vi *="- =' " =**=" '

2 " r

'"- =""" * " "" v2 = =" t thereupon be added as an amanciment to this Agreement and set f orth in Exhibit D hereto.

The curtailment plan may be amended from time to time by mutual agreement of the Parties, provided that, upon the addition of, ol' any increase or reduction in Firs capability of, any Firm Power Resource pursuant to Section 2.04 hereof and by no 1.1ter than ten (10) Working Days prior to the date upon which Cap Rock desires l

to begin taking power from such Firm Power Resouren, Cap Rock shall

develop, in cooperation with TU
Electric, and deliver to TU Einctriic a mutually acceptable revised curtailrant plan, to be added to this Agreement as an a:nendment to Exhibit o herato, 26 4

identifying,lood equoi to tho ecpacity of such Pirm Power Resource g

and the means by which the amended curtailment plan is to be imple=ented.

4.04 scheduled Maintenance Power

.Before cap Rock becosts a control Area ind du:*ina the peried t s) in which TU Electric nay to required to schedule Firm l

Power Resources pursuant to Article V hereof, and if Cap Rock owns or controls its own generation (located within TU Electric's interconnected system),

TU Electric shall sell scheduled maintenance power to Cap

Rock, if available, on

=utually satisf actory terms and conditions, at P. ate WP Wholesale Power or its successor, including the demand deturminations specific 1 therein.

4.05 Limitations on Envrgency and scheduled Maintenance Pavar l

TU Electric shall not be required to sell amargency or scheduled maintenance power if to do so would result in the I

curtail =ent of its native load customers, the inability to l

discharge prior commit =ents or otherwise impair its ability to rreder adequate and reliable electric service.

4.06 other Power and Energy Any power and energy taken by Cap Rock from TU Electric as a result of Cap Rock's presence in the TU Electric Control Area, not permitted by this Agreement and not resulting frem TU Electric's interruption of firm transmission service, will, among

-all other consequences provided for herein, including the Default l

provisions hereof, be paid for by cap Rock at TU Electric's Rate g

n I

a WP Wholconlo

Powcr, or ito succossor, pluo the demand determinations specified therein.

I ARTICLE V.

SCHEDULING 5.01 Scheduling of Power Supply Resources (a)

TU Electric vill schedule power from up to six Power Supply Resources (determined by source and not control area i.e.,

an electric utility generating plant, an electric utility ee:.pany (other than TU Electric) or a qualifying f acility) specified en Exhibit B horeto so long as not more than three of which resources (at least one of which shall be a Firn Power Resource) are scheduled during any 24-hour period.

(b)

TU Electric's obligation to schedule will be limited to Firs Power Resources (except when it has elected to schedule I

econcmy energy and a

mutually satisfactory scheduling agent I

agreement has been executed).

In the event TU Electric agrees to schedule economy energy, any such scheduling agent agreement (s) shall be subject to cancellation by either Party on 30 days' written notica and shall provide for charges in the same menner as set forth in Section 5.05 hereof.

h 5.02 Cap Rock Hotice of Schedules to TU Flectric Cap Rock shall notify W Electric in yriting by f acsimile communication to TUSOC, at the number set forth in Section 10.07 l

hereof, no later than 12:00 noon on the Working Day prior to the Schedule Period during which Cap Rock desires to receive power and 28

\\

I

onergy frca.cny tira Power Roccurco, which writton notico snall sper:ify the amount of energy (MWH) that Cap Rock desires TU i

Electric to schedule on its behalf during each hour of the schedule l

Period from each Firm Power Resource.

5.03 changes in Delivery Rate I

Unless TU Electric agreed otherwise, no notice given by Osp l

Rock pursuant to Section 5.02 hereof shall con *:ain more than tour changen in the delivery rate (two up and two down) in any twenty-f eur hour period for each Tirm Power Resource being scheduled pursuant to the provisions of this article, it being understood and agreed by the Parties that such changes will be acce=plished at a ramp rate of not less than two megawatts / minute nor more than ten magavatts/ minute.

I 5.04 Backup Resources Any backup resource scheduled through the Control Area (excluding the TU Electric Control Area) in which the original Firm Power Resource is located and in lieu of the original Firs Power 3

Resource, toyether with such original Tir:s Power Resource, shall be considered a single resource.

In all-other cases, a backup resource shall be considered a separate resource.

5.05 TU Electric Execution of schedules I

subject to the provisions of this Agreement and the l

execution of mutually acceptable wheeling agreement (s) as provided in Section 7.01 hureof, TU Electric will execute the schedules in accordance with the notices received by TU Electric pursuant to Section 5.02 hereof.

The scheduling of power replaced by Cap Rock 29 I

l

pursucnt to tho provisiens of section 4.01 shall, to the extent practicable, be scheduled withcut such notice period.

n additi:n to any other remedies provided for in this Agreement, ?U Elaetr:c l

shall not be obligated to execute such schedules in the events

{a)

Orp Rock does not give TU Electric advance notice of its schedule in accordance with Secti:n 5.02 hereof; (b)

Cap Rock's Firs Power Resource supplier fails, far ary reason, to deliver during all or any pertion of any schedule period the amount of power and energy f or Cap Rock's account that TU Electric attempts to l

schedule on behalf of Cap Rock; (c) service cannot be functionally or technically accommodated; (d)

TU Electric is prevented from providing such service by any cause beyond its reasonable centrol, including, but not limited to,

storm, fleed, lightning, earthquaxe, fire, explosion # failure or threat cf f ailure of f acilities, civil disturbance, l

strike or other labor disturbance, sabotage, var, or restraint by court er public authority; or I

(e)

Cap Rock is in Default of any material obligation under this Agreement.

5.06 scheduling and Systna Modification Charges Cap Rock Will pay TU Electric for scheduling services for each Firm Power Resource a scheduling charge of $1.00/Hvh, but in 30 I

l l

I

~

i 1

no ovont loss then $10,000 nor more than $20,000 per month per rir:

Power Resource; provided, howaver, that such charges shall not te applicable to a Firm Power Resource not schaduled during any calendar month. The aforesaid sums shall be increased beginning i

January.1, 1991, in accordance with the following:

r (a) the percentage inflation which cecurred during the calendar year preceding Jenuary 1 of each year that thin Agreement is in effect shall be determined from the Bureau I

of Leor Statistics the UnAted States Depart =ent of or Transportation and Public Utilities Electric Services average hourly

earnings, said average hourly earnings numbers to be taken from SIC Code 491 (or if said SIC Code 491 is discontinued, from such other statistics of the 4

Bureau of Labor Statistics of the United Staten Department e.

of Labor that are most nearly comparable to SIC Oade 491 and as agreed by TU Electric and Cap Rock);

(b)

The sum of the integer 1

plus the percentage inflation expressed as a decimal determined in accordance with (a) abovs shall be multiplied by each of the aforesaid sums (i.e., $1.00/Mwh, $10,000 anJ $20,000) and the product of that multiplication shall be the sums applicable during the calendar year 1991, except that the period to be used for calculation of the percentage of inflation for 1990 shall be from July 1, 1990, through December 31, 1990.

I 31 1

__ _ _ _. ~

(c) for years sucacquant to colondar yoor 1991, the percentage inflation expressed as a decimal determined in accordance with (a) above for the preceding calendar year

)

shall be summed with the integer 1, and that num multiplied by the sums applicable during the preceding year to derive I

l i

the sums applicable for the following year, and so en i.

during the ters of this Agreement.

In addition, so long as any Firs Power Resource is being scheduled by TU Electric pursuant to this Agreement, Cap Rock will pay to TU Elcetric the cost of additional or replacement ::: puter hardware and software :henges or the additien of personnel and ether costs incident to the implementation and administration of schedules and the continuation of scheduling services under this

I Agreement, not to exceed $150,000 during any 36-month period.

g Charges imposed upon cap Rock pursuant to the foregoing sentence 1

shall be made with reasonable written notice specifying the reasons therefor.

5.07 Term of scheduling Scheduling will be limited to two years from the date TU Electric is first required to ecm=ence the scheduling of a Firm Power Resource.

In the event Cap Rock, due to no f ault of its cwn, fails to become a Control Area within said two-year period, TU Electric will, subject to the provisions of Section 6.01 hereof, schedule power and energy f or a maxi =um of five years from the date it is first required to commence the scheduling of a Firs Power Resoutce as aforesaid.

32 I

5.08 Full.Requirem nts Points of Dolivory ofter Sch0duling After the expiration of the period (s) provided in Section 5.07 hereof, all points of Delivery remaining in TU Electric's

ntrol Area vill ce full requirements Points of Delivery pursuant to section 3.01 hereof, and TU Electric will.;t be required to achedule power and anergy to any such Points of Delivery in the future.

Cap Rock may terminate full requirements service at any such Point of Delivery upon the same five-year notice as provided in Sections 2.02 and/or 2.04 hereof, in which event TU Electric shall

not, subject to the provisions of Section 3.15 ( b)
hereof, be obligated to provide any servics to Cap Rock at any such Points of Delivery.

l ARTICLE VI.

REGULATION SERVICE 8, AVAILABILITY OF EXERGENCY AND SCKEDULED MAINTENANCE BULE POWER mfd DELIVIRY OF POWER mfd ENERGY 6.01 Regulation Services (a)

TU Electric will provide cap Rock not = ore than 15 MW of regulation power and energy, plus associated

services, pursuant to a mutually acceptable regulation sc; vices agreement (which shall contain mutually acceptable terms and conditions consistent with good utility practices within ERCOT) for the purpose of f acilitating the creation of a cap Rock Control Area; i
previded, however, that should Cap Rock elect to purchase regulation services and baconna a control Area, all scheduling 33

arrang stnto, if any, in a f f of.: at that timo shall thereupon terminate and provided, further, that TU Electric shall not be required to furnish regulation services f or a total of core than five years less such nur.ber of years TU Electric has scheduled Fir =

Power Resources pur.suant to Article V hereof.

Charges (plus the initial :cplementation fee) for the sale of regulation services,

gether with the power and energy included therewith, snall be mutually satisfactory.

Cap Reck shall be solely responsible for securing Control Area status f ran the = ember utilities of ERCOT (which shall include all costs associated with bact=ing a Control Area), failing in which TU Electric shall not be re.sponsible f or the sale of any regulation services to Cap Rock.

Within the context of this Agreement, TU Electric will support Cap Rock's discussions with the ER00T se=ber utilities.

(b)

If, due to no fault of Cnp Rock, unanticipated delays in the construction or certification of generation facilities dalay Cap Rock in its efforts to centinue its Taalification as a Control Area af ter the ti=a within which TU Electric is required to provide regulation services under the x

provisions of this

section, TU Electric will provide such regulation aarvices for the period of such unanticipatad delay, but in no event for more than le =enths.

6.02 Availability of Emergency and scheduled Maintenance aulk Power TU Electric will, when Cap Rock becomes a Control Area, cooperate, in its capacity as a = ember of

ERCOT, in making available to Cap Rock emergency and scheduled maintenance bulk 34

(

l l

powcr in accordanco with tho previolone of the ERCOT Cperating Guides.

l ARTICLE VII.

TRANSHISSION WHEELING AND CISTRIBUTION SERVICE 8 7.01

~ Wheeling in Connection with scheduling TU Electric will, on a transacticn specific basis, provide wheeling services to both transmission and distribution Points of Calivery in connection with the scheduling of a Firm Power Rescur:e pursuant to mutually acceptable wheeling agreement (s).

Such wheeling service will be provided at fully allocated embedded ecsts plus a reasenkble return on investment; together with the payment of all costs for any additions or modifications necessary to accommodate each wheeling transaction which can be f orecested by TU Electric at the '%e such wheeling agreement (s) are executed.

Upon the payment of the forogoing costs, Cap Rock shal?. be entitled to firm transuission service for the entire term of such wheeling agreecent(s).

A Firu Power Resource which has replaced a Tirm Power Resource pursuant to Section 2.03 hereof may be wheeled pursuant to the wheeling agreement covering the Firs Power Nscurce so replaced.

7.02 neelfug After Cap Rock Becomes a Control Area (a)

At such time as Cap Rock becomes a Control Area pursuant to the provisions of Section 6.01 hereof or otherwise, TU Electric will, during the term of this Agreements (i) provide firs transmission wheeling (for firm power and energy purchased oy Cap Rock from other sources) to Points of Interconnection, on a 35 l

transaction specific basis, for o term and in accordanco with mutually acceptable inter ennection and transmission wheeling agree =ent(s); and (ii) for a period of two years af ter Cap Roex beco=es a Control Area pursuant to the provisions of Section 6.01 hereof or otherwise, TU Electric will provide distribution whealing servi:e pursuant to a mutually acceptable distribution service agree:ent only to those Points of Interconnection (notwithstanding that the voltage at such Points of Interconnection is less than 60,000 volts) for which Cap Rock has demonstrable plans to supply 4;g at trans=ission voltages within said two-year period, the identity E

and plano for which shall be furnished to TU Electric within a reasonable period of ti=o prior to the date Cap Rock becomes a control Area.

.ig

W (b)

All Points of Interconnection receiving such distribution services will be supplied by cap Rock at transmiscion voltages on or before the expiration of said two-year peri:d, f ailing in which said Points of Interconnection shall revert to TU Eiactric full requirements Points of Delivery pursuant to Section 3,01 hereof.

(c)

Whooling services vill be provided at fully allocated ambedded cost, plus a reasonable return an invast=ent; together with all costs for any additions or

=edifications reasonably necessary to accommodate each wheeling transaction Iwhich can be forecasted by TU Electric at the time such whosling 5 I-agreement (s) aru made) over the term of any such agreement.

Subject to the execution of such interconnection and transmission 36 I

_.,.m a

.m

.-~a am.

.s

--.a 3_A

.-A

  • -+-.a--

,l.

J.

L

.;_AJ2_

m. -,

_._m.. _. _.

__4_34,%.m

_a______,&.__Ao whooling agrooment(o)

Cap Rock shall bo entitled to firm trancnd upon smission service term of the wheeling agreement (s).

for tho 7.02 Transmission Arrangements with Third Partie l

s TU Electric's obligations to schedule or wheel pcVer and energrr shall be subject to Cap Rock's making and 1

maintaining arrangements, including third party transmission arra ngements, for the delivery of all resources; with respect t o Firm Powe: Resources such transmission arrangements vill be for ! irs

service, transmisston i

AR".'ICLE VIII.

BILLINos AND DEFAULT i

j s.01 Billings and Payments i

Bills for sums due hereunder shall be rendered on approximate 30 day intervals, monthly or upon occurre d

nce, as may be convenient for TU Electric.

All bills rendered shall be due and 4

payable within sixteen (16) days after the invoice date.The i

f allure of Cap Rock to pay the total amount of any bill within such 16-day perior! shall constitute a Default hereunder If not paid within thirty (30) days after the invoice date, interest shall accrue on the amount due from the due date until paid at th of nine and one-half e rate percent (9-1/2%)

per annum, compounded g

monthly, but not to exceed the maximum rate which may lawf l charged.

u y be s.02 Billings and Payasnts Subject to Correction 1

37 I

E

Billingo and payuanto will be subject to correction, for a period not to exceed three years from the date thereof, as cay be l

appr:priate as a result of reviews or audits made for the purpose of verification or othervise.

l s.03

.Not.!,ce of Default

[

A Party shall give written notice of a Def ault to the Part'/

in Default.

The Party in Def ault shall have thirty (30) days from the date of receipt of such notice in which to cure such Default.

If the Default is cured within the applicable pericd, the Def ault specified in such notice shall cease to exist.

8.04 Failure to cure Default A Def ault which is not cured as provided in Section 8.03 1

above shall entitle the Party not in Def ault to im=ediately cancel th2s Agreement and be relieved of any further obligation hereunder and to recover from the Party in Def ault twice all amounts due hereunder, including all other damages to which it is entitled at law or in aquity.

8.05 specific Performance and Injunctive Relief TU Electric and cap Rock agree that it may be i=possible to measure in terms of money the damages which may or will accrue by reason of a Def ault under this Agreement and f or that reason, a=eng others, Ttt Electric and cap Rock agree that, in case of any such L

Default, the non-dsfaulting Party will be irreparably damaged if this Agreement is not specifically enforceable and further r.o adequate remedy at law will ewist.

Accordingly, TU Electric and cap Rock agree that the non~ defaulting Party shall be entitled to 38 l

l

specific performance and/or injunctive relief, in addition to any other remedies which may exist at law or in equity.

If the 5

non-defaulting Party institutes any proceedings in accordance with this section, the defaulting Party hereby vaivas any claim or dnf ense-that an adequate remedy at law exists.

l 3.06 No Waiver The failure of a Party to this Agrescent to insist, on any occasion, upon strict performance of any provision of this Agree-ment, including, without limitation, the provisions of this article l

pertaining to Default, shall not be considered to valve the obligations, rights and/or duties imposed upon the Partian hereto.

8.07 Indemnification It is understood that cap Rock assu=es full responsibility for electric energy furnished or delivered to cap Rock at and p,ast the Points of Delivery or Points of Interconnection (as the case may be) and vili indemnify and hold TU Electric, its affiliates, and its or their directors,

officers, e=p.oyees, agents and independent contractors harmless from and against all claims for damages including but not limited to injuries to any persons, including death resulting therefrom, and damages to property occurring upon the precises of Cap Rock arising from electric power and energy delivered by TU Electric whether or not caused by the negligence of TU Electric except when the negligence of TU Electric or its agent or agents was the sole proxi= ate cause of such injuries, death of persons or damages to property.

Without limiting the foregoing, TU Electric is not and shkil 39

^

~ ~ ~ ~ - - - - - --~_____________ _________

not to licblo to Cop Rock for daoogos occasioned by:

(A) trregularities or interruptions (of any duration), or failure to ec=mence electric or other service, caused in whole or in part oy (1) govern = ental or municipal action or authority, litigati:n, public enemies, strikes, acts of God (including weather.=nd resuit:.ngconsequences),

its

( :, an crder of any Court or Judge granted in any bona fide adverse legal proceeding or action or any Ord er of any commission or tribunal having jurisdiction in the pre =ises

[

(3) interruptions in electric or other service to cap Rock when in TU Electric's sole judgment, such interruption:

(a) vill prevent or alleviate an emergency thr,aatening to disrupt the Operation of TU Electric's syste=, or (b) will lesson or remove possible danger to life or pceperty, or (c) will aid in the l

restoration of electric service, or (d) is required to make necessary repairs to, tests of, or changes in TV Electrir's f acilician, or (e) whun such interruption is authori:ed elsewhere in TU Electric's Tariff for Electric service; (4) the absence, inadequacy er failure of protective devices which are the responsibility of Cap Rock, (3) inadequacy or f ailure of ganaratien or transmission facilities, or (6) any other act or thing reasonably beyond the control of

  • U Electric or as

=ay be authorized elsewhere in TU Electric's Tariff for Electric Service; i

or (B) any interruption of electric or other service not occasiened by situations or conditions described in (A) above that has not l

existed continuously for beyond a reasonable period of ti=a after notice to TU Electric, which reasonable period shall under no l

I e

I

circumstances be less than twenty-four (24) hours or any

]

interruption of service of greater than a reasonable duration if l

TU Electric has used reasonable diligence in attempts to restore c

d electric or other service af ter TU E16ctric is notified of suen L

interruption.

TU Electric may perf or= voluntary or emergency acts ::

electric facilities which are the responsibility of cap Rock Out shall have no liability for damages or injurien resulting from said acts except to the extent that said damages or injuries are prox 1=ately caused by acts or omissions of TU Electric vnich are found to be vnnten or villful with the intant to cause injury.

r Cap Rock may perform voluntary cr emergency acts to electric facilities which are the responsibility of TU Electrie but shall have no liability for dumages or injuries resulting from said acts except to the extent that said damages or injuries are proximately caused by acts or omissions of Cap Rock which are !=und to me l

vanton er willful vitit the intent to cause injury.

In any claim or cause of action relating to the provis;:n of electric or other service assarted by cap Rock or any other person against TU Electric, TU Electric sht.11 not be liable f or any consequential, special, or non-direct damages, including but not limited to loss of use of equipment, extra expensa due to the use of temporary or replacement equipment, loss of electronic data or program, loss of business revenue, costs of capital, or any cost not part of necessary repair to or reasonabla replacement of electric equipment whether the claim or cause of action is based 41

7 f

p upon contract, tort, negligence, preducts liability, or any other theory of recovery.

TU flectric makes no warranties whatsoever with regard to d

the provision of electric or 9ther service and disclaims any and all warranties, express or implied, including but not limited to warranties of merchantability or fitness f or a particular purpose.

8.08 Bankruptcy

'l Either Party shall have the right to cancel a.id terminate this Agreateent, upon written notice to the other-Party, if the other Party shall (a) apply for or consent to the appointment of a

B

receiver, trustee, or liquidator of all or

{

substantially all of its assets, or (b) be adjudicated bankrupt or insolvent or file a voluntary petitlen in bankruptcy or admit in writing its inability to psy its debts as they become due, or (c) make a for=al assignment for the benefit of its creditors, or (d) file a petition or answer seeking reorgani:ation or 1

arrangement with creditors or taking advantage of any insolvency law, or (e) file an answer admitting the material allegations of or consenting to, or default in answering, a petition filed against it in any bankruptcy, reorganization, or insolvency proceeding, or 42

'f) if, in any legal action instituted in a court of competent jurisdiction by so=eena other than the

[

other Party, an order, judgment, or decree shall te entered approving a petition seeking reorganization of such Party or appointine a receiver, trustee, or liquidator of such Party or of all or substantially all of such Party's assets and such

order, judgment, or decree shall continue unstayed for a i

period of one hundred twenty (120) days.

8.09 Non-Exclusive Remedy The remedies set forth in this article are in addition to any other right or retady provided in this Agreement or now or hereafter existing at law or in equity or by statute and the exercise of said remedies shall not be deemed a

valver, or g

relinquishment by said nondefaulting Party of its right to recover any damages resulting from the other Party's breach.

1 ARTICLE II.

INTRA 8TATh OPERATIONN 9.01 Interstate Conunerce Except in compliance with the orders of the Federal Energy Regulatory Commission (the "TERC") in TERC Dockets Nos. EL-79-8 and E-9558 issued on October 28, 1981, November 5, 1981, and January 29, 1982, and the Order issued in FERC Docket No. EL-79-8-002 en July 23, 1987, TU Electric and Cap Rock represent and warrant to each other that they do not, eithnr directly or through connections y

a L

t

+

vith othor er.titico (who are either directly or indirectly L

interconnected with facilities owned or operated by TU tiectric) p transmit electric energy in interstate c =erce or sell electr::

energy in interstate ce=erce or own or operate any facilities theref or and TU Ilectric and Osp Rock each agrees tnat it vill not except :n ec=pliance with such orders, hereafter engage, directly or thrcugh other entities, in any such interstate activities or

operate, establish,

=aintain,

modify, or utilize, directly r

through cther entities, any connection or f aci'.ity used or to be used for the sale or transmission of electric energy in interstate ce=erce uithcut one year's prier written notice to the other Party; provided further, that such Party desiring to ec=ence interstate operation agrees to file an application with, and use its best efforts to obtain an order

  • rem, the FGC, applicable to the other Party (unless such other Party agrees in writing that such application nee.d not be filed), under Sections 210, :11 and 212 of the Federal Power
Act, requiring the establishment, maintenance, modification, or utilization of any such connecti:n which may be involved; provided, however, that compliance with such orders shall not require further notice to the Parties or application to the FGC pursuant to this article.

9.02 Failure to Comply It is understood and agreed that the f ailure of the Party electing to commence interstate operations to comply with any provision of this article or said orders chan entitle the other Party to disconnect its facilities.

44

_ - - - - - ~ ~

9,03 8700ifio P0rfC: man 30 TU Electric and cap Rock agree that it will be i=pegsidia to measure in terms of money the damages which may or willaccrue ey reason of any breach of the representation and warranty above set forth, or any failure in the performance of any Of the obligati:ns contained in this article and, for that reason, among others, TU Electric and Cap Rock agree that, in case of any such breach or failure, the non-breaching Party will be irreparably da= aged if this Agreement is not specifically enforceable, and acc rdingly, TU Electric and cap Rock agree that the non-breaching Party is entitled to specific performance of the previsions of thi s article, in addition to any other remedies which may exist.

9.04 Bona Fide Emergencies Nothing contained in this article shall preclude One utili:ation of connections for the transmission of electric energy in interstate commerce under bona fide emergancies pursuar t to the provisions of Section 202(d) of the Federal Power Act.

ARTICLE I.

MIDCELLANEOUS PROVISIONS 10.01 Amendment This Agreement may be amended only upon mutual agree =ent of the Parties hereto, which amendment shall not ba effective until reduced to writing and executed by the Parties.

10.02 Entirety of Agreement and Prior Agreements Superseded This Actreament, including all Exhibits attached hereto which 45

__ __ _ __ - - - - - ----- ~

~

3.

l are hereby expressly made a

part hereof for all

purposes, constitutes the entire agreement and understanding between ne l

Parties with regard to the subject matter hereof.

The Parties shall not be bound by or liable f or any statement, representation, promise, inducement, understanding or undertaking of any kind or nature (whether written or oral) with regard to the sut]ect matter hereof not set forth or provided for herein.

l This Agreement replaces all prior agreements and undertakings, oral or written, between the Parties with regard to

a subject matter hereof, including without limitation the Principles of Agreement, dated May 15, 1990, between the Parties and all such agreements and undertakings are agreed by the Parties l

to no longer be of any force or effect; provided, however, that this Agreement shall not replace, superande or otherwise af f act tap Rock's Agreement for Purchase of Power dated June 2,

1963, as a= ended, or the Agreement for Purchase of Power between Lone Wolf and TU Electric, dated July 2, 1963, as amended, such agreements to continue until terminated in artcordance with their respective terms, at which tima said agreements shall have no f orce or af f act whatsoever.

10.03 kuccessors and Ansigns This Agreement shall be binding upon and inure to the benefit of the Parties and their respective successors and assigns, each of whom shall agree to be bound by all ter=n and conditions of this Agreement and the Mutual Release executed contemporaneously herewith, provided that this Agreement may be assigned by either 46

Party only upon the written consent of the other and provided further that any such assignment shall not relieve either Party of their respective obligations nor shall TU Electric's obligations be enlarged, in whole or in part, by reason thereof.

Such consent I

will not be unreasonably withheld, provided that either Party will not be required to consent to any assign =ent which

'uld in its sole judgment, among other reasons, subject it to addit:,onal f ederal or state regulation, subject it to the plenary jurisdiction of the Federal Energy Regulatory Commission, result in the imposition of additional costs of administration which Cap Rocs does not agree to reimburse, or in any way diminish the reliabilny of its system, enlarge its obligations or otherwise create or l

maintain an unacceptable condition.

The respective obligations of TU Electric and cap Rock under this Agreement may not bb enanged, modified, amended or enlarged, in whole or in part, by reason of g

the sale, merger or other business combination of either Party with any other person or entity (other than Lone Wolf), nor say. !"

Electric be required to sell power and energy by reason thereof ether than that specifically provided f or in Sections 3.01 and 3.02

,I hereof.

10.04 Taxes All present or future federal, state, municipal or other lawful taxes (other than f ederal income taxes) applicable by reason g

of the sale of power and energy, the services performed by TU Electric, or the compensation paid to TU Electric hereunder shall be paid by cap Rock.

's c

8

10.05 Agreement to Control It is distinctly understood and agreed that the full and partial requirements power and energy sold to Cap Rock pursuant to this Agreement vill be at Rate WP Wholesale Power as approved by the PL'CT.

It is expressly underste d and agreed that all other ter=s and conditions of sale and the terms, conditions and charges for all other services (including but not limited to regulation power and energy and associated services) provided by TU nectri:

to cap Rock hereunder shall be governed by this Agree =ent, notwithstanding the provisions of said Rate WP Wholesale Power or g

any other tariff of TU Electric which may hereafter be fixed and approved by the PUCT.

TU Electric and Cap Rock agree that neither of them shall petition uny regulatory cuthority to review the ter=s of this Agreement or to change the charges established from time to ti=a pursuant to this Agreement or the accounting set forth herein.

10.06 service Regulations Except as otherwise specifically provided in this Agree =ent, the sale of power and energy by TU Electric to Cap Rock under this Agreement shall be subject to the service regulations of TU Electric's Tariff for E.lectric Service as same may f rom ti=e to time be fixed and approved by the PUCT.

10.07 Governing Law and venus This Agreement was executed in the state of Texas and shall in all respects be governed by, interpreted, construed and enf orced in accordance with the laws thereof.

Tha venue of any legal 48

j proceeding relative to this Agreement shall be in Dallas County, Texas.

10.os Notices i

Notices of an administrative nature, including but not limited to notice of termination, limitation on access or request for a=end=ent shall be given as provided herein to the designates listed below and shall be deemed to have been duly delivered hand delivered or cent by United States certified mail, return receipt requested, postage prepaid, tot (a)

If to TJ Electrict Texas Utilities Electric company l

Attnt Pitt Pittman, Vice President Skyway Tower 400 North Olive Street, L.B.

81 Dallas, Texas 75201 (b)

If to Cap Rock Cap Rock Electric Cooperative, Inc.

Attnt Steve Collier, Director of Power Supply P.

O.

Box 9589 Austin, Texas 78765-9589 All other notices required to be given by Cap Rock to TU Electric under this Agreement shall be in writing and telecopied to:

Texas Utilities System operating Center at 214/330-4598, and sent by United States mail, postage prepaid, to:

Texas Utilities Electric Company Attnt Manager, Inter-Utility Services 31st Floor, Skyway Tovar 400 North Olive Street, L.B.

81 Dallas, Texas 75201 49

i All othi,r notices required to be given by TU Electric to cap neeg i

under this Agreement shall be in vriting and telecopied to:

Cap Rock Electric Cooperative, Inc.

at (512) 454-4221, Attnt Steve Collier, and sent by United States mail, postage prepaid, to:

Cap Rock Electric Cooperative, Inc.

Attn Steve Collier, Director of Power Supply P. C. Box 9589 Austin, Texas 78765-9589 The abra-listed names, titles, addresses, and telephone nusters of either Party may be changed by written notification to tha I

ether.

10.09 Interruption of service The Parties agree that TU Electric may interrupt any service it is required to provide under this Agreement to make repairs, tc change equipment or to install new equipment, but only for suen periods as =ay be reasonably unavoidable.

TU Electric a-rees to provide reasonable advance notice of such interruptions to cap Rock if, in TU Electric's sole discretion, the nature of the situati:n I

permits.

~

10.10 No Third-Party Beneficiaries This Agreement is not. intended to and shall not create rights, remedies or benefits of any character whatsoever in favor of any persons, corporations, associations or entities other than the Parties hereto, and the obligations herein assumed are solely for the use and benefit of the Parties hereto, their successors in interest and, where permitted as provided herein, their assigns.

10.11 Multiple counterparts 50

l' This Agreement m&y be executed in two or = ore counterparts, each of which shall be desced an original but all shall constitute one and the same instrument.

10.12 Headings I

The descriptive headings of the varicun articles and l

sections of this Agreement have been inserted for convenience of reference only and shall be afforded no significance in the intaiTretation or construction of this Agreement.

10.13 Dev?-ability In.ao event any of the terms, covenants, or conditions of this Agreement, or any application therno!, is finally determined to be invalid, illegal or unenforceable by any court or regulatory I

authority having jurisdiction.

all other terms, covenants, and conditions of this Agreement shall not be af f ected thereby and g

shall remain in full force and effect; provided, however, that if either Party determines, in its sole discretion, that there is a material change in this Agreement by reason of any provision or application being finally determined to be invalid, illegal or unenforceable that Party may terminat2 this Agreement on three (3) days' prior written notice to the other Pt.rty.

10.14 Agreements to be Negotiated in Good faith l

All mutually acceptable agreements and procedure required or permitted by this Agreement shall be negotiated by the Parties in good faith.

The inability to reach a mutually acceptable agreement or procedure shall not itself constitute any evidence g

that either Party failed to negotiate in good faith.

I 51

K. M a

therein.

(b)

Subject to the provisions of Section 10.18 hereof,

_3 Cap Rock will, on the basis of the settlement ptovided for herein move for dismissal of its appeal in can Reck Electric Coegative,

Inc, v.- United States Muclear Fefru'agorv Co nission, and t!yt tfnited States of M erica No. 89-1735, pending in the United Stat.es Court I

]

of Appeals for the District of Columbia Circuit, and ove to trithdraw its "Requent for an order Enforcing and Modifying Antitrust License Conditions,"

filed May 12,

1989, in Texas Utilities Electric CcecAng (Comtnehe Paak Staam Electric Station)

Cap Rock and TU Electric agree that any order of dismissal say refer to the Agreement and this Mutual Release providad that in no event will TO Electric be required to admit or indica.te, nor shall Cap Rock assert, g

that TU Electric has at any ti=e or in any =anner been in violation of the License Conditions for Comanche Peak Steam s

a Electric Station Units 1 and 2 i

~

(" License conditions") or any other 1aw or regulaticn promulgated by any government a.gency or entity, er taken any action inconsistent the swith.

Nor shall the Agreement constitute any amendment of, addition to n

interpretation of the License conditions and Cap Rock and TU Electric agran that the Nuclear Regulatury Cc==ission shall have no jurisdiction to enforce, directly or indirectly, any provision of the Agreement, its enf atcament jurisdiction being limited to the License Conditions.

10.18 Conditions Precedent This Agreement is subject to approval by the respective a

53 am"

"-" " ^

d Boards of Directors of Cap Rock, TU Electric and Lone Wolf on or

~

cefore

Thursday, June 21r
1990, pursuant to resolutions f.

satisfacCCOY M f or::t and substance to the Parties hereto, ft.iling in which the same shall, in all things, terminate and be of no force oi effact.

g EXECUTED on the date and year first above written, 45 i

TEXAS UTILITIES ELECTRIC COMPANY I

ig LY h

=_

~ ~ '

j W Pitt Pittman TITLE: Vit.'

  • Midenw ATTEST:

S

/ ),c A [ v t u

/

i

~

E Secretary CAP ROCK ELECTRIC COOPERATIVE, IN'C.

ATTEST:

BY:

M David Prus.tt g,

'SAcretary '

V TITLE:

President and Chief I

/

Executive Officer BYI n

Jx Russell Jones T1rLE: President of the Board BY:

/

Steven E. Collier TITLE:

Director of Power Supply ii I

e4

.I

LONE k'OM' ELECTRIC COOPERATIVE, INC.

s BY:

w r

m ~e./,

TITLE:

President of the Board

~

AtrEST:

!I

,;;f&p -

s.

.n, is 18 8

3 I

I 8

I:

I

.I ss

'I

EXHIDIT A Cap Rock Electric Cooperative, Inc.

Points of Delivery I

Q t rset Demand t v.W )

'.'eitsee (v.m h

.I I

I I

I I

(Information to be specified on the Effectiva 9 ate of this Agreement) i I

I I

I B

I I

I

I E;GIBIT Cao Rock Power,.,sunelv Resour es I

Name and Location Firs Ters (Years) of Control Capability Beginning Ending Lower suco1v Resource Area DDi).

Date One 1,.

(To be specified pursuant to Section 2.03 of this Agreement]

I 2.

[To be specified pursuant to section 2.03 of this Agreement]

8 3.

[To be specified pursuant to Section 2.03 of this Agreement)

I 4.

[To be specified pursuant to section 2.03 of this Agreement]

E 5.

[To be specified pursuant to Section 2.03 of this Agreement) 6.

I

[O be specified pursuant to section 2.03 of this Agreement) i I

I I

I

a-

~_-.s

..m.A_**

4.>

d a_,a.4

  • r s.e,w 4A_

I-u_

I

.-av E-a E.

E e

I l

II is l

I sg, a

Ei_ l II i

~

His 31 3

at 8is lt lEE E

53

!sa I

E if i

E li 5

g as 3

i

$ail!

I E

E!

hnI I

EXHIBIT C (Page 2 ot 2) l

(

TU Electric Fuel Ccst Factor Fill 1D9 l

PUCT Docket No. 72C9 TU ELECTRIC 1'IS CALCULATIOWS Bb3 OR l

ESTI3tRTED kWh SALBf AfD SITER INFUT BY TULTASE LETRL l

I l

l I

I l

RMLNEtt IIffER_INE 19fEERfit IREft* LIB l

l i

misser it/3ss,3n,9ee tr,ase,ssT.ses 1.estMt e.sensa tene merstes e,3se,3es, set 9 set.142,v M

s. spree e.,snes l

l l

l c

l l

Cao Rock Curtail:nent Plan lII (This Exhibit to be developed as provided in Section 4.03)

I

I I
I
l
I B

B

I I

il i

5

Ie EXHIBIT E Mutual Release For and in consideration of the premises and mutual agreements forth herein and the agreements, undertakings, premises, and set covenants set I

forth in the power Supply Agree =ent, of even date

herewith, (hereinaf ter referred to as the " Agraement")

by and between CJ.P ROCK ELECTRIC COOPCRATIVE, INC.,

(" Cap Rock") and TEXA5 UTILITIES ELECTR2C CCMPANY ("TU Electric"), Cap Rock, Lone Wolf Electric Cooperative, Inc.

(" Lone Wolf") and TU Electric do hereby covenant and agres as follows:

Cap Rock, Lone Wolf and TU Electric, each on behalf of itself and on behalf of any person or entity, private or governmentul, claiming by, through or under it, including without limitation, to I

the extent it has the standing and right under law to do so,,its present and past customers, predecessorn, parents, shareholders,

officers, directors, agents
servants, employees,
insurers, subsidiaries, affiliates, divis'ons, consultants, attorneys, i

su:cessors, assigns and legal representatives (which, together with Cap Rock, Lone Wolf and TU Electric are referred to herain collectively as

" Releasing Parties"),

hereby absolutely, unconditionally and completely releases and discharges forever and for all purpoems and in all respects, the other and' the other's prasent and past customers, predecessors, parents, shareholders,

officers, directors,
agents, servants, employees,
insurers, I

subsidiaries, affiliates, divisions, consultants, attorneys, successors, assigns and legal representatives (which, together with Cap Rock, Lone Wolf and TU Electric are referred to herein I

I

E' o

collectively,as " Released Parties"), or any of them, jointly and severally, from any and all claims, demands, actions, causes of action, suits, and damages, including attorneys' feen and related disbursements, of any kind or nature whatsoever, direct or consequ'enti al, fixed or contingent, and the consequences thereof, existing at, or at any ti=a prior to and including, the date hereof, arising out of or in any way incident to any allegation

=ade, or which could have been

made, in any
judicial, administrative (except Federal Energy Regulatory Commission Occket I

Nos. EL79-8, ER82-545-000, at al. and EL79-B-002) or legislative procaeding (federal, state, municipal or otherwise) in which Cap Rock is, was or could have been a party, an intervenor or a

witness, or has, had or could have had any other
interest, including, but not limited to, PUCT Docket Nos. 9300 and 5540, l

Nuclear Regulatory Commission Dot:ket Nos. 50-445A and 50-446A, and Cause No. 89-1735 pending in the United States Court of Appeals f or the District of Columbia Circuit, except, however, any claims, lI liabilities or obligations arising after the date hereof out of or in any way relating to the Agreement or any agreement or instru=ent executed and delivered pursuant thereto; that certain Agreement f or Purchase of Power between Cap Rock and TU Electric, dated June 2, 1963, as amended; that certain Agreement for' Purchase of Power between Lone Wolf and TU Electric, dated July 2, 1963, as amended; or this Mutual Release (hereinaf ter collt:tively ref erred to as the

" Released Claim 3");

provided, however, that nothing herein is intended to be, or shall constitute, a release, waiver or discharge I

2 l

of cny claim, dcfcnco or counterclaim assertad, or which eculd 'ca assertad, by any of the respective Releasing Partise againstany person, firm, corporation or other entity other than any of the respective Released Parties.

Cap Rock, Lone Wolf and TU I

Electric each hereby agrees to indemnity, datand and hold harmless the other and its present and past customers, predacassers,

parents, shareholders,
officers, directors,
agents, servants, employaas,
insurers, subsidiaries, affiliates, divisions, consultants, attorneys, successors, assigns and legal representatives, or any of them, jointly and severally, from and against and with respect to any and all past, present and future obligations, liabilities, claims, losses, demands
actions, causes of
action, suits,
damages, interest, penalties, deficiencies, judgments (and costs and expenses in connection therewith, including, without limitation, attorneys' fees and ralated disbursements) in any way arising out of or othe.m/ise relating to any of the Released Claims.

Cap Rock, Lone Wolf and TU Electric aach hereby covenants and agrees that it will forsvar refrain frem instituting, maintaining, pres.acuting or continuing to prosecuta or maintain any suit, action I

v. proceeding of any kind, or collecting from or proceeding against the othat or the ether's present and past customers, predecessors
parents, shareholders,
officars, directors,
agents, servants, employees,
insurers, subsidiaries, affiliates, divisions, consultants, attorneys, successors, assigns and legal representatives, or any of them, jointly or severally, or any other I

3

_ _ - - _ - - - ~ - - - - - -

-~~ -

Person, firm or corporation, based upon any of the Released Claims.

EXECUTID in multiple counterparts on this, the date of 1990.

~

TEXAS UTILITIES ELECTRIC COMPANY I

BY:

Pitt Pit *aan

-I TITLE: Vice President ATTEST:

Secretary CAP ROCK ELECTRIC COOPERATIVE, INC.

ATTEST:

BY:

David PYuitt

.I Sacrata.7 TITLE:

President and Chief Executive Officer BY:

Russell Jones TITLE: President of the Board I

BY:

Steven E. Collier I

TITLE:

Director of Power Sucply I

I I

4 1

I

P LONE WOLF ELECTRIC COOPERATIVE, INC.

g j

BY:

.I TITLE:

l-ATTEST:-

lI Secretary

I

!I lI 4

!I l

i l

!I 4

i 5

lI

.il i

l

)

=

5

=

t

I EXHIBIT F DOCKET No. 9300 I

APPLICATION OF TEXA3 UTILITIES 5

BEFORE THE ELECTRIC COMPANY FOR AUTHORITY S

PUBLIC UTILITY COMMISSIcN TO CHANGE RATES S

OF TEXAS NOTICE CAP ROCK ELECTRIC COOPERATIVE, INC.

(" Cap Rock") and LONE WOLF ELECTRIC COOPERATIVE, INC.

(" Lone Wolf"), by and through their attorney of record, hereby give notice that they (i) have reached a settlement of their disputes with TEXAS UTILITIES ELECTRIC COMPANY ("TU Electric") in this proceeding; (ii) hereby cease all participation, directly or indirectly, in this proceeding; (iii) no longer

desire, directly or indirectly, to prosecute their

}

intervention or take any position adverse to the position of TU l

Electric in this proceeding; (iv) hereby withdraw all testimony, motions, objections and other pleadings haretofore filed in this proceeding on behalf of Cap Rock cnd Lone Wolf; and (v) hereby support TU Electric's proposed cost allocation and rate design in this proceeding.

Respectfally submitted, E

EARNEST CASSTEVENS

5 901 hopac South 400 Barton Oaks Plaza Two 13 Austin, Texas 78746 l3 (512) 318-361.

!I i

By:

EARNEST CASSTEVENS State Bar No. 03980400

!l

CERTIFICATE OF SERYTCE l

I hereby certify that a true and correct copy of the above and foregoing has been served upon all parties of record to this l

proceeding by ma!.1 or hand delivey on this the day of June, 1990.

I EARNEST CASSTEVENS I

I I

I I

~

I I

I I

I I

I I I

-