IR 05000413/1988010: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, ,, | {{#Wiki_filter:SAFEGUARDS INPUnmwwsuf | ||
,, | |||
, | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION | [f( | ||
[' # Mroq'o UNITED STATES NUCLEAR REGULATORY COMMISSION | |||
* ' ~ | |||
" '^y | |||
[' | |||
REGloN il n | |||
y | |||
Report Nos,: S0-413/88-10 and 50-414/88-10 Licensee: Duke Pcwer Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-413 and 50-414 | ,, j 101 MARIETTA STREET,N.W. | ||
* d | |||
h .. 3 -2 -<hI | ~ t ATLANT A. G EORGI A 30323 | ||
, | |||
Personnel and Packages; and ' Personnel Training and Qualification - General | ** | ||
.,,.< | |||
Report Nos,: | |||
S0-413/88-10 and 50-414/88-10 Licensee: Duke Pcwer Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: | |||
50-413 and 50-414 License Nos.: NPF-35 and NPF-52 Facility Name: | |||
Catawba 1 and 2 Inspection Conduc ed: | |||
February 8-12, 1988 | |||
' Inspector: | |||
LOM[Il y | |||
39-H Jerry nn Physical 6 Secdrit I spector Date Signed | |||
. | |||
Approved by:'M _/ | |||
- | |||
h.. | |||
3 -2 -<hI | |||
/0.~R. McGuf' rey Chief, Physical Security Section Date Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: | |||
This routine, unannounced physical security inspection examined the areas of: | |||
Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected Area; Lighting; Assessment Aids; Access Control - | |||
Personnel and Packages; and ' Personnel Training and Qualification - General Requirements. | |||
Results: | |||
No violations, of regulatory requirements were identified. | |||
["ULOWRE CONTArn3-Artcuxnp ggpad3OT,^d'" ' | |||
j!n2ggggggggs a | |||
}} | }} | ||
Latest revision as of 12:16, 11 December 2024
| ML20148B844 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/02/1988 |
| From: | Ennis J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20148B841 | List: |
| References | |
| 50-413-88-10, 50-414-88-10, NUDOCS 8803220160 | |
| Download: ML20148B844 (1) | |
Text
SAFEGUARDS INPUnmwwsuf
,,
,
[f(
[' # Mroq'o UNITED STATES NUCLEAR REGULATORY COMMISSION
- ' ~
" '^y
['
REGloN il n
y
,, j 101 MARIETTA STREET,N.W.
- d
~ t ATLANT A. G EORGI A 30323
,
.,,.<
Report Nos,:
S0-413/88-10 and 50-414/88-10 Licensee: Duke Pcwer Company 422 South Church Street Charlotte, NC 28242 Docket Nos.:
50-413 and 50-414 License Nos.: NPF-35 and NPF-52 Facility Name:
Catawba 1 and 2 Inspection Conduc ed:
February 8-12, 1988
' Inspector:
LOM[Il y
39-H Jerry nn Physical 6 Secdrit I spector Date Signed
.
Approved by:'M _/
-
h..
3 -2 -<hI
/0.~R. McGuf' rey Chief, Physical Security Section Date Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:
This routine, unannounced physical security inspection examined the areas of:
Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected Area; Lighting; Assessment Aids; Access Control -
Personnel and Packages; and ' Personnel Training and Qualification - General Requirements.
Results:
No violations, of regulatory requirements were identified.
["ULOWRE CONTArn3-Artcuxnp ggpad3OT,^d'" '
j!n2ggggggggs a