IR 05000413/1988010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:, ,, SAFEGUARDS INPUnmwwsuf
{{#Wiki_filter:SAFEGUARDS INPUnmwwsuf
[f( [' # Mroq'o
,,
*'~
,
UNITED STATES NUCLEAR REGULATORY COMMISSION
[f(
  " '^y
[' # Mroq'o UNITED STATES NUCLEAR REGULATORY COMMISSION
[' REGloN il y
* ' ~
*d
" '^y
  ,, j 101 MARIETTA STREET, , ~ t ATLANT A. G EORGI A 30323
['
  **
REGloN il n
.,,.<
y
Report Nos,: S0-413/88-10 and 50-414/88-10 Licensee: Duke Pcwer Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-413 and 50-414 License Nos.: NPF-35 and NPF-52 Facility Name: Catawba 1 and 2 Inspection Conduc ed: February 8-12, 1988
,, j 101 MARIETTA STREET,N.W.
' Inspector: LOM[Il y   39-H Jerry . nn Physical 6 Secdrit I spector Date Signed Approved by:'M _/ -
* d
h .. 3 -2 -<hI
~ t ATLANT A. G EORGI A 30323
  /0.~R. McGuf' rey Chief, Physical Security Section Date Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced physical security inspection examined the areas of: Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected Area; Lighting; Assessment Aids; Access Control -
,
Personnel and Packages; and ' Personnel Training and Qualification - General Requirement Results: No violations, of regulatory requirements were identifie ["ULOWRE CONTArn3-Artcuxnp ggpad3OT,^d'"
**
        ' j!n2ggggggggs a
.,,.<
Report Nos,:
S0-413/88-10 and 50-414/88-10 Licensee: Duke Pcwer Company 422 South Church Street Charlotte, NC 28242 Docket Nos.:
50-413 and 50-414 License Nos.: NPF-35 and NPF-52 Facility Name:
Catawba 1 and 2 Inspection Conduc ed:
February 8-12, 1988
' Inspector:
LOM[Il y
39-H Jerry nn Physical 6 Secdrit I spector Date Signed
.
Approved by:'M _/
-
h..
3 -2 -<hI
/0.~R. McGuf' rey Chief, Physical Security Section Date Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:
This routine, unannounced physical security inspection examined the areas of:
Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected Area; Lighting; Assessment Aids; Access Control -
Personnel and Packages; and ' Personnel Training and Qualification - General Requirements.
 
Results:
No violations, of regulatory requirements were identified.
 
["ULOWRE CONTArn3-Artcuxnp ggpad3OT,^d'" '
j!n2ggggggggs a
}}
}}

Latest revision as of 12:16, 11 December 2024

Partially Withheld Physical Security Insp Repts 50-413/88-10 & 50-414/88-10 on 880208-12 (Ref 10CFR2.790(d) & 73.21).No Violations of Requlatory Requirements Noted.Major Areas Inspected:Testing & Maint,Locks,Keys & Combinations
ML20148B844
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/02/1988
From: Ennis J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20148B841 List:
References
50-413-88-10, 50-414-88-10, NUDOCS 8803220160
Download: ML20148B844 (1)


Text

SAFEGUARDS INPUnmwwsuf

,,

,

[f(

[' # Mroq'o UNITED STATES NUCLEAR REGULATORY COMMISSION

  • ' ~

" '^y

['

REGloN il n

y

,, j 101 MARIETTA STREET,N.W.

  • d

~ t ATLANT A. G EORGI A 30323

,

.,,.<

Report Nos,:

S0-413/88-10 and 50-414/88-10 Licensee: Duke Pcwer Company 422 South Church Street Charlotte, NC 28242 Docket Nos.:

50-413 and 50-414 License Nos.: NPF-35 and NPF-52 Facility Name:

Catawba 1 and 2 Inspection Conduc ed:

February 8-12, 1988

' Inspector:

LOM[Il y

39-H Jerry nn Physical 6 Secdrit I spector Date Signed

.

Approved by:'M _/

-

h..

3 -2 -<hI

/0.~R. McGuf' rey Chief, Physical Security Section Date Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:

This routine, unannounced physical security inspection examined the areas of:

Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected Area; Lighting; Assessment Aids; Access Control -

Personnel and Packages; and ' Personnel Training and Qualification - General Requirements.

Results:

No violations, of regulatory requirements were identified.

["ULOWRE CONTArn3-Artcuxnp ggpad3OT,^d'" '

j!n2ggggggggs a