ML20150F877: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:i DISTRIBUTION Docket File WM-60
{{#Wiki_filter:i DISTRIBUTION Docket File WM-60
                                                                        ;PDR/DCS' DBangart, RIV WM-60/DLJ/88/03/21/0                                         RGonzales MBrown, RCPD, NM LLO Branch ,LLWM URF0 r/f MAR 221988 URFL:DLJ Docket No. WM-60 040WM060110E W. John Arthur, III, Project Manager Uranium Mill Tailings Project Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115
;PDR/DCS' DBangart, RIV WM-60/DLJ/88/03/21/0 RGonzales MBrown, RCPD, NM LLO Branch,LLWM URF0 r/f MAR 221988 URFL:DLJ Docket No. WM-60 040WM060110E W. John Arthur, III, Project Manager Uranium Mill Tailings Project Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115


==Dear Mr. Arthur:==
==Dear Mr. Arthur:==
 
My staff has completed their review of the December 9, 1987, Remedial Action Inspection Plan (RAIP) for the Riverton VMTRA Project.
My staff has completed their review of the December 9, 1987, Remedial Action Inspection Plan (RAIP) for the Riverton VMTRA Project. Their review was limited to the portions of the RAIP dealing with the contaminatcd material that will be removed from the site. As the excavation of contaminated material will conform to the limits established by "Health Physics Personnel" (RAIP Section 4.2.2), the Riverton RAIP is acceptable.
Their review was limited to the portions of the RAIP dealing with the contaminatcd material that will be removed from the site.
As the excavation of contaminated material will conform to the limits established by "Health Physics Personnel" (RAIP Section 4.2.2), the Riverton RAIP is acceptable.
Sincerely, r
Sincerely, r
                                                          /S; Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office Region IV _
/S; Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office Region IV _
* Case Closed:       040WM060110E                     2       M L
Case Closed:
cc:     D. Mann, DOE                                 :
040WM060110E 2
                                                                      }
M L
                                                            ~
cc:
a 5?
D. Mann, DOE
8804060045 880322                                           4 PDR     WASTE WM-60                 PDR
}
  ...l.. f....f..._U_R_F.         _____,_____[_,,,_______l_________,__[___________l___________
a
~
5?
8804060045 880322 4
PDR WASTE WM-60 PDR
...l..
f....f..._U_R_F.
_____,_____[_,,,_______l_________,__[___________l___________
NAME
NAME
* M.P.P c
* M.P.P Gl.s/_d_bj _ffHawkins f
Gl f
c DATE$88/03/21 3kR$ $
                .s/_d_bj _ffHawkins DATE$88/03/21         :
:}}
3kR$ $                 $                $          $            $}}

Latest revision as of 07:22, 11 December 2024

Informs That 871209 Review of Remedial Action Insp Plan (Raip) for Riverton Umtra Project Complete.Review Limited to Portions of Raip Dealing W/Contaminated Matl to Be Removed from Site.Raip Considered Acceptable
ML20150F877
Person / Time
Issue date: 03/22/1988
From: Hawkins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Arthur W
ENERGY, DEPT. OF
References
REF-WM-60 NUDOCS 8804060045
Download: ML20150F877 (1)


Text

i DISTRIBUTION Docket File WM-60

PDR/DCS' DBangart, RIV WM-60/DLJ/88/03/21/0 RGonzales MBrown, RCPD, NM LLO Branch,LLWM URF0 r/f MAR 221988 URFL
DLJ Docket No. WM-60 040WM060110E W. John Arthur, III, Project Manager Uranium Mill Tailings Project Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115

Dear Mr. Arthur:

My staff has completed their review of the December 9, 1987, Remedial Action Inspection Plan (RAIP) for the Riverton VMTRA Project.

Their review was limited to the portions of the RAIP dealing with the contaminatcd material that will be removed from the site.

As the excavation of contaminated material will conform to the limits established by "Health Physics Personnel" (RAIP Section 4.2.2), the Riverton RAIP is acceptable.

Sincerely, r

/S; Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office Region IV _

Case Closed:

040WM060110E 2

M L

cc:

D. Mann, DOE

}

a

~

5?

8804060045 880322 4

PDR WASTE WM-60 PDR

...l..

f....f..._U_R_F.

_____,_____[_,,,_______l_________,__[___________l___________

NAME

  • M.P.P Gl.s/_d_bj _ffHawkins f

c DATE$88/03/21 3kR$ $