{{#Wiki_filter:*,4                                                         September 4, 1998 Mr. Jostph V. Sipek                               Distribution:
{{#Wiki_filter:*,4 September 4, 1998 Mr. Jostph V. Sipek Distribution:
Director- Lic:nsing                               PDill-3 r/f             Dock:t Clinton Power Station                             PUBLIC                 OGC P.O. Box 678                                     RGallo                 RBellamy Mail Code V920                                   MLeach, R3             GGrant, R3 Clinton,IL 61727
Director-Lic:nsing PDill-3 r/f Dock:t Clinton Power Station PUBLIC OGC P.O. Box 678 RGallo RBellamy Mail Code V920 MLeach, R3 GGrant, R3 Clinton,IL 61727


==SUBJECT:==
==SUBJECT:==
Line 25: Line 25:


==Dear Mr. Sipek:==
==Dear Mr. Sipek:==
1 By {{letter dated|date=July 29, 1998|text=letter dated July 29,1998}} (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.
1 By {{letter dated|date=July 29, 1998|text=letter dated July 29,1998}} (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.
Specifically, IP requested conditional licenses that would limit the individuals to operate the facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staff's understanding that because of the extended shutdown at Clinton Power Station these individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR 55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by {{letter dated|date=August 26, 1998|text=letter dated August 26,1998}}.
Specifically, IP requested conditional licenses that would limit the individuals to operate the facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staff's understanding that because of the extended shutdown at Clinton Power Station these individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR 55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by {{letter dated|date=August 26, 1998|text=letter dated August 26,1998}}.
In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity manipulations. Based on this review, the staff determined that licenses limited to shutdown can be issued, given the conditions presented by IP at the Clinton Power Station, without tne need to issue an exemption.' Accordingly, the staff is proceeding to issue reactor operator and senior               l cperator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued following the staff's verification that all other applicable reactor operator licensing requirements have been met.
In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity manipulations. Based on this review, the staff determined that licenses limited to shutdown can be issued, given the conditions presented by IP at the Clinton Power Station, without tne need to issue an exemption.' Accordingly, the staff is proceeding to issue reactor operator and senior l
cperator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued following the staff's verification that all other applicable reactor operator licensing requirements have been met.
If you have any questions concerning this matter, please contact Mr. David Desaulniers (301-415-1043) or Mr. Melvyn Leach (630-829-9705).
If you have any questions concerning this matter, please contact Mr. David Desaulniers (301-415-1043) or Mr. Melvyn Leach (630-829-9705).
Sincerely,l Origina Signed by Douglas Pickett for Jon B. Hopkins, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects - til/lV Office of Nuclear Reactor Regulation Docket No. 50-461 h        O\      O cc: See next page DOCUMENT NAME: g:\clinton\ma2475.ltr                               *See previous concurrence ** Concurred by e-mail To r:ceive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures OFC PM:P,Dlll-;l . C LA:PDlll-3         C BC:HOLB       C OGC                   DD$R6H       REGION 3 NAMIEJHopWns' @ EBarnhillM RGallo*                               STreby*             LSilessard   MLeach**
Sincerely,l Signed by Douglas Pickett for Origina Jon B. Hopkins, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects - til/lV Office of Nuclear Reactor Regulation h
DATE 09/ /98             09 5/98               8/20/98           9/4/98             9/ @ 98       08/27/98 OFFICIAL RECORD COPY
O\\
                                                                                                                          .l 9909140256 990904                                                                         + -g m PFM PDR     ADOCK 05000461                                                   pMp @~. @ I mi- m   -;t a U p                       PDR       u
Docket No. 50-461 O
cc: See next page DOCUMENT NAME: g:\\clinton\\ma2475.ltr
*See previous concurrence ** Concurred by e-mail To r:ceive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures OFC PM:P,Dlll-;l.
C LA:PDlll-3 C
BC:HOLB C OGC DD$R6H REGION 3 NAMIEJHopWns' @ EBarnhillM RGallo*
STreby*
LSilessard MLeach**
DATE 09/ /98 09 5/98 8/20/98 9/4/98 9/ @ 98 08/27/98 OFFICIAL RECORD COPY 9909140256 990904
+ -g m PFM PDR ADOCK 05000461 p p @~. @ I mi-m
-;t a U p
PDR M
u


September 4, 1998
September 4, 1998 Mr. Jos;ph V. Sipek Distribution:
  %            Mr. Jos;ph V. Sipek                               Distribution:
Dirrctor - Licsnsing PDill-3 r/f Docket Clinton Power Station PUBLIC OGC P.O. Box 678 RGallo RBellamy Mail Code V920 MLeach, R3 GGrant, R3 Clinton,IL 61727
Dirrctor - Licsnsing                               PDill-3 r/f             Docket
  .            Clinton Power Station                             PUBLIC                 OGC P.O. Box 678                                       RGallo                 RBellamy Mail Code V920                                     MLeach, R3             GGrant, R3 Clinton,IL 61727


==SUBJECT:==
==SUBJECT:==
Line 43: Line 52:


==Dear Mr. Sipek:==
==Dear Mr. Sipek:==
By {{letter dated|date=July 29, 1998|text=letter dated July 29,1998}} (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.
By {{letter dated|date=July 29, 1998|text=letter dated July 29,1998}} (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.
Specifically, IP requested conditional licenses that would limit the individuals to operate the facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staff's understanding that because of the extended shutdown at Clinton Power Station these individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR 55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by {{letter dated|date=August 26, 1998|text=letter dated August 26,1998}}.
Specifically, IP requested conditional licenses that would limit the individuals to operate the facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staff's understanding that because of the extended shutdown at Clinton Power Station these individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR 55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by {{letter dated|date=August 26, 1998|text=letter dated August 26,1998}}.
In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity manipulations. Based on this review, the staff determined that licenses limited to shutdown can be issued, given the conditions presented by IP at the Clinton Power Station, without the need to issue an exemption. Accordingly, the staff is proceeding to issue reactor operator and senior operator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued following the staff's verification that all other applicable reactor operator licensing requirements have been met.
In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity manipulations. Based on this review, the staff determined that licenses limited to shutdown can be issued, given the conditions presented by IP at the Clinton Power Station, without the need to issue an exemption. Accordingly, the staff is proceeding to issue reactor operator and senior operator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued following the staff's verification that all other applicable reactor operator licensing requirements have been met.
if you have any questions conceming this matter, please contact Mr. David Desaulniers (301-415-1043) or Mr. Melvyn Leach (630-829-9705).
if you have any questions conceming this matter, please contact Mr. David Desaulniers (301-415-1043) or Mr. Melvyn Leach (630-829-9705).
l Sincerely,l Origina Signed by Douglas Pickett for                     l Jon B. Hopkins, Senior Project Manager Project Directorate ill-3                                   l' Division of Reactor Projects -Ill/lV Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page                                                                                               l DOCUMENT NAME: g:\clinton\ma2475.ltr                               *See previous concurrence " Concurred by e-mail To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures       '
Sincerely,l Signed by Douglas Pickett for Origina Jon B. Hopkins, Senior Project Manager Project Directorate ill-3 Division of Reactor Projects -Ill/lV Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page DOCUMENT NAME: g:\\clinton\\ma2475.ltr
OFC PM:PJill-A .       C LA:PDill-3             C BC:HOLB     C OGC                 DD$RtfH       REGION 3 NAMlUHopWns'
*See previous concurrence " Concurred by e-mail To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures OFC PM:PJill-A.
* EBarnhillM             RGallo*         STreby*           LSkssard       MLeach"             !
C LA:PDill-3 C
DATE 09/ /98             096/98                 8/20/98         9/4/98             9/ @ 98       08/27/98 OFFICIAL RECORD COPY i
BC:HOLB C OGC DD$RtfH REGION 3 NAMlUHopWns'
* EBarnhillM RGallo*
STreby*
LSkssard MLeach" DATE 09/ /98 096/98 8/20/98 9/4/98 9/ @ 98 08/27/98 OFFICIAL RECORD COPY i
L
L


_. - - .              . - . - -          ~ _ - . - - _           . - - . - . - . - . _ - .              .  ...- -- .---.. - .
~ _ -. - - _
                      @ Ket k                                 UNITED STATES g                                         NUCLEAR REGULATORY COMMISSION e                                               WASHINGTON, D.C. 30006 4001                                           1
@ Ket k
                  '+,                                                     September 4, 1998 Mr. Joseph V. Sipek l                     Director- Licensing Clinton Power Station                                                                                           l j                     P.O. Box 678                                                                                                     l l                    Mail Code V920                                                                                                   !
UNITED STATES g
i                    Clinton,IL 61727                                                                                                 l
NUCLEAR REGULATORY COMMISSION e
(                                                                                                                                     l l                    
WASHINGTON, D.C. 30006 4001 1
'+,
September 4, 1998 Mr. Joseph V. Sipek l
Director-Licensing Clinton Power Station l
j P.O. Box 678 l
Mail Code V920 i
Clinton,IL 61727
(
l l


==SUBJECT:==
==SUBJECT:==
REQUEST FOR OPERATOR LICENSE EXEMPTIONS - CLINTON POWER                                   i i
REQUEST FOR OPERATOR LICENSE EXEMPTIONS - CLINTON POWER i
STATION, UNIT NO.1 (TAC NO. MA2475)                                                       !
i STATION, UNIT NO.1 (TAC NO. MA2475)
1


==Dear Mr. Sipek:==
==Dear Mr. Sipek:==
By {{letter dated|date=July 29, 1998|text=letter dated July 29,1998}} (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.
By {{letter dated|date=July 29, 1998|text=letter dated July 29,1998}} (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.
l                     Specifically, IP requested conditional licenses that would limit the individuals to operate the
l Specifically, IP requested conditional licenses that would limit the individuals to operate the facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staffs understanding that because of the extended shutdown at Clinton Power Station these l
!                    facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staffs understanding that because of the extended shutdown at Clinton Power Station these l                     individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR l                     55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by {{letter dated|date=August 26, 1998|text=letter dated August 26,1998}}.
individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR l
In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment
55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by {{letter dated|date=August 26, 1998|text=letter dated August 26,1998}}.
;                    to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity l                     manipulations. Based on this review, the staff determined that licenses limited to shutdown can i                     be issued, given the conditions presented by IP at the Clinton Power Station, without the need to issue an exemption. Accordingly, the staff is proceeding to issue reactor operator and senior operator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued                     ;
In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity l
following the staffs verification that all other applicable reactor operator licensing requirements l                     have been met.
manipulations. Based on this review, the staff determined that licenses limited to shutdown can i
l P you have any questions concerning this matter, please contact Mr. David Desaulniers (301-t                     415-1043) or Mr. Melvyn Leach (630-829-9705).                                                                   1 Sincerely, V9d         Q Jon B. Hopkins, Senior Project Manager Project Directorate lil-3 Division of Reactor Projects - lil/lV j                                                                       Office of Nuclear Reactor Regulation J
be issued, given the conditions presented by IP at the Clinton Power Station, without the need to issue an exemption. Accordingly, the staff is proceeding to issue reactor operator and senior operator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued following the staffs verification that all other applicable reactor operator licensing requirements l
have been met.
l P you have any questions concerning this matter, please contact Mr. David Desaulniers (301-t 415-1043) or Mr. Melvyn Leach (630-829-9705).
Sincerely, V9d Q
Jon B. Hopkins, Senior Project Manager Project Directorate lil-3 Division of Reactor Projects - lil/lV j
Office of Nuclear Reactor Regulation J
Docket No. 50-461 cc: See next page
Docket No. 50-461 cc: See next page


      .  -          . _ - . . . - . _ . _ . _ _ _ . _ _ _ .                  . _ _ ., . . __.._. ..__..-..___ _ . _ .-._._._ _.__ ~ .
~.
[Q '
[Q '
!          Joseph V. Sipek                                                                   Clinton Power Station, Unit i Illinois Power Company cc:
Joseph V. Sipek Clinton Power Station, Unit i Illinois Power Company cc:
Walter G. MacFarland IV                                                             lilinois Department of Nuclear Safety Senior Vice President                                                             Office of Nuclear Facility Safety l
Walter G. MacFarland IV lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety l
Clinton Power Station
l Clinton Power Station ATTN: Mr. Frank Nizidlek P.O. Box 678 1035 Outer Park Drive Clinton,IL 61727 Springfield,IL 62704 Wayne Romberg Leah Manning Stetzner Manager Nuclear Station VP, General Counsel & Corp. Secretary Engineering Department 500 South 27th Street Clinton Power Station Decatur, IL 62525 -
                                                                                                                                          )
P.O. Box 678 l
l ATTN: Mr. Frank Nizidlek                   l P.O. Box 678                                                                       1035 Outer Park Drive                     {
Clinton,IL 61727 l''
Clinton,IL 61727                                                                   Springfield,IL 62704                       l Wayne Romberg                                                                       Leah Manning Stetzner Manager Nuclear Station                                                             VP, General Counsel & Corp. Secretary Engineering Department                                                         500 South 27th Street
Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill '
!        Clinton Power Station                                                               Decatur, IL 62525 -                         ,
!        P.O. Box 678                                                                                                                     '
Clinton,IL 61727 l                                                                                                                                       l Resident inspector U.S. Nuclear Regulatory Commission                                                                                             I RR#3, Box 229 A Clinton,IL 61727 R. T. Hill '
Licensing Services Manager General Electric Company l
Licensing Services Manager General Electric Company l
175 Curtner Avenue, M/C 481 San Jose, CA 95125 l
175 Curtner Avenue, M/C 481 San Jose, CA 95125 l
Regional Administrator, Region ill U.S. Nuclear Regulatory Commission
Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road j
<        801 Warrenville Road j         Lisle, IL 60532-4351 l       ' Chairman of DeWitt County l         c/o County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers                                                                                                       l l        55 East Menroe Street
Lisle, IL 60532-4351 l
!        Chicago,'l 60603 l                                                                                                                                       i l
' Chairman of DeWitt County l
                                                                                                                                          \
c/o County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers l
55 East Menroe Street Chicago,'l 60603 l
i
\\
l 4
l 4
{
{
                                                                        *----.e     '-
*----.e T
T""}}
T""
_}}

Latest revision as of 04:24, 11 December 2024

Discusses Licensee 980729 Request to Permit Five Individual RO & SRO Trainees to Receive Conditional Licenses. Determined That Licenses Limited to Shutdown Can Be Issued, Given Conditions Presented by IP at Plant
ML20151V339
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/04/1998
From: Hopkins J
NRC (Affiliation Not Assigned)
To: Sipek J
ILLINOIS POWER CO.
References
TAC-MA2475, NUDOCS 9809140256
Download: ML20151V339 (4)


Text

  • ,4 September 4, 1998 Mr. Jostph V. Sipek Distribution:

Director-Lic:nsing PDill-3 r/f Dock:t Clinton Power Station PUBLIC OGC P.O. Box 678 RGallo RBellamy Mail Code V920 MLeach, R3 GGrant, R3 Clinton,IL 61727

SUBJECT:

REQUEST FOR OPERATOR LICENSE EXEMPTIONS - CLINTON POWER STATION, UNIT NO.1 (TAC NO. MA2475) i

Dear Mr. Sipek:

1 By letter dated July 29,1998 (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.

Specifically, IP requested conditional licenses that would limit the individuals to operate the facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staff's understanding that because of the extended shutdown at Clinton Power Station these individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR 55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by letter dated August 26,1998.

In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity manipulations. Based on this review, the staff determined that licenses limited to shutdown can be issued, given the conditions presented by IP at the Clinton Power Station, without tne need to issue an exemption.' Accordingly, the staff is proceeding to issue reactor operator and senior l

cperator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued following the staff's verification that all other applicable reactor operator licensing requirements have been met.

If you have any questions concerning this matter, please contact Mr. David Desaulniers (301-415-1043) or Mr. Melvyn Leach (630-829-9705).

Sincerely,l Signed by Douglas Pickett for Origina Jon B. Hopkins, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects - til/lV Office of Nuclear Reactor Regulation h

O\\

Docket No. 50-461 O

cc: See next page DOCUMENT NAME: g:\\clinton\\ma2475.ltr

  • See previous concurrence ** Concurred by e-mail To r:ceive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures OFC PM:P,Dlll-;l.

C LA:PDlll-3 C

BC:HOLB C OGC DD$R6H REGION 3 NAMIEJHopWns' @ EBarnhillM RGallo*

STreby*

LSilessard MLeach**

DATE 09/ /98 09 5/98 8/20/98 9/4/98 9/ @ 98 08/27/98 OFFICIAL RECORD COPY 9909140256 990904

+ -g m PFM PDR ADOCK 05000461 p p @~. @ I mi-m

-;t a U p

PDR M

u

September 4, 1998 Mr. Jos;ph V. Sipek Distribution:

Dirrctor - Licsnsing PDill-3 r/f Docket Clinton Power Station PUBLIC OGC P.O. Box 678 RGallo RBellamy Mail Code V920 MLeach, R3 GGrant, R3 Clinton,IL 61727

SUBJECT:

REQUEST FOR OPERATOR LICENSE EXEMPTIONS - CLINTON POWER STATION, UNIT NO.1 (TAC NO. MA2475)

Dear Mr. Sipek:

By letter dated July 29,1998 (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.

Specifically, IP requested conditional licenses that would limit the individuals to operate the facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staff's understanding that because of the extended shutdown at Clinton Power Station these individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR 55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by letter dated August 26,1998.

In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity manipulations. Based on this review, the staff determined that licenses limited to shutdown can be issued, given the conditions presented by IP at the Clinton Power Station, without the need to issue an exemption. Accordingly, the staff is proceeding to issue reactor operator and senior operator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued following the staff's verification that all other applicable reactor operator licensing requirements have been met.

if you have any questions conceming this matter, please contact Mr. David Desaulniers (301-415-1043) or Mr. Melvyn Leach (630-829-9705).

Sincerely,l Signed by Douglas Pickett for Origina Jon B. Hopkins, Senior Project Manager Project Directorate ill-3 Division of Reactor Projects -Ill/lV Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page DOCUMENT NAME: g:\\clinton\\ma2475.ltr

  • See previous concurrence " Concurred by e-mail To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures OFC PM:PJill-A.

C LA:PDill-3 C

BC:HOLB C OGC DD$RtfH REGION 3 NAMlUHopWns'

  • EBarnhillM RGallo*

STreby*

LSkssard MLeach" DATE 09/ /98 096/98 8/20/98 9/4/98 9/ @ 98 08/27/98 OFFICIAL RECORD COPY i

L

~ _ -. - - _

@ Ket k

UNITED STATES g

NUCLEAR REGULATORY COMMISSION e

WASHINGTON, D.C. 30006 4001 1

'+,

September 4, 1998 Mr. Joseph V. Sipek l

Director-Licensing Clinton Power Station l

j P.O. Box 678 l

Mail Code V920 i

Clinton,IL 61727

(

l l

SUBJECT:

REQUEST FOR OPERATOR LICENSE EXEMPTIONS - CLINTON POWER i

i STATION, UNIT NO.1 (TAC NO. MA2475)

Dear Mr. Sipek:

By letter dated July 29,1998 (U-603047), Illinois Power (IP) requested exemptions to permit five individual reactor operator and senior operator trainees to receive conditional licenses.

l Specifically, IP requested conditional licenses that would limit the individuals to operate the facility only in Mode 4, COLD SHUTDOWN, with the reactor mode switch in SHUTDOWN. It is the staffs understanding that because of the extended shutdown at Clinton Power Station these l

individuals have not had the opportunity to perform reactivity manipulations required by 10 CFR l

55.31(a)(5), or operate the facility at a power level greater than 20%. IP provided additional information pertaining to the request by letter dated August 26,1998.

In response to IP's request, the staff reviewed the rulemaking record for the 1987 amendment to 10 CFR Part 55 that resulted in the 10 CFR 55.31(a)(5) requirement for reactivity l

manipulations. Based on this review, the staff determined that licenses limited to shutdown can i

be issued, given the conditions presented by IP at the Clinton Power Station, without the need to issue an exemption. Accordingly, the staff is proceeding to issue reactor operator and senior operator licenses as appropriate, all of which will be limited to Mode 4, COLD SHUTDOWN, for the five individuals identified in your July 29,1998 request. These licenses will be issued following the staffs verification that all other applicable reactor operator licensing requirements l

have been met.

l P you have any questions concerning this matter, please contact Mr. David Desaulniers (301-t 415-1043) or Mr. Melvyn Leach (630-829-9705).

Sincerely, V9d Q

Jon B. Hopkins, Senior Project Manager Project Directorate lil-3 Division of Reactor Projects - lil/lV j

Office of Nuclear Reactor Regulation J

Docket No. 50-461 cc: See next page

~.

[Q '

Joseph V. Sipek Clinton Power Station, Unit i Illinois Power Company cc:

Walter G. MacFarland IV lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety l

l Clinton Power Station ATTN: Mr. Frank Nizidlek P.O. Box 678 1035 Outer Park Drive Clinton,IL 61727 Springfield,IL 62704 Wayne Romberg Leah Manning Stetzner Manager Nuclear Station VP, General Counsel & Corp. Secretary Engineering Department 500 South 27th Street Clinton Power Station Decatur, IL 62525 -

P.O. Box 678 l

Clinton,IL 61727 l

Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill '

Licensing Services Manager General Electric Company l

175 Curtner Avenue, M/C 481 San Jose, CA 95125 l

Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road j

Lisle, IL 60532-4351 l

' Chairman of DeWitt County l

c/o County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers l

55 East Menroe Street Chicago,'l 60603 l

i

\\

l 4

{

  • ----.e T

T""

_