ML20153D323: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
p it:9 n
p it:9 fW O
O
n UNITED STATES f
              &                                UNITED STATES                               fW f
j NUCLEAR REGULATORY COMMISSION 6 POIOl'j WASHINGTON, D.C. m =1
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. m =1 6 POIOl'j
%,*****/
%,*****/
BEP1s1998 MEMORANDUM TO:
BEP1s1998 MEMORANDUM TO:                 Samuel J. Collins, Director Office of Nuclear Reactor Regulation                               l FROM:                           Russell A. Pew-ll                   ,
Samuel J. Collins, Director Office of Nuclear Reactor Regulation FROM:
FOIA/PA Officer
Russell A. Pew-ll FOIA/PA Officer


==SUBJECT:==
==SUBJECT:==
RELEASE OF RECORDS RELATING TO A DIFFERING PROFESSIONAL VIEW FROM FREDERICK                         l BURROWS By memorandum dated August 21,1998, TaJuan Carter of your office, requested that my office coordinate the review for release of records, in accordance with NRC Management Directive 10.159, relating to a Differing Professional View for placeme , 'n the Public Document Room (PDR). The review of the subject records has now been cornpsted.
RELEASE OF RECORDS RELATING TO A DIFFERING PROFESSIONAL VIEW FROM FREDERICK BURROWS By memorandum dated August 21,1998, TaJuan Carter of your office, requested that my office coordinate the review for release of records, in accordance with NRC Management Directive 10.159, relating to a Differing Professional View for placeme, 'n the Public Document Room (PDR). The review of the subject records has now been cornpsted.
The records behind Tab A, identified on the enclosed Appendix, should be placed in the PDR and NUDOCS by your office. Record 1 and the attachment to record 10 is copyrighted.
The records behind Tab A, identified on the enclosed Appendix, should be placed in the PDR and NUDOCS by your office. Record 1 and the attachment to record 10 is copyrighted.
Therefore, place the copyrighted records in the PDR for inspection only. Do not send the copyrighted records through NUDOCS for processing.
Therefore, place the copyrighted records in the PDR for inspection only. Do not send the copyrighted records through NUDOCS for processing.
Line 36: Line 36:
: 2. Records r
: 2. Records r
D Fv3
D Fv3
[by4 9809250026 980915 PDR     TOPRP ENVWEST
[by4 9809250026 980915 PDR TOPRP ENVWEST C
* C                      PDR
PDR vf)/dgGC,
* vf)/dgGC,


s
s
                                      - APPENDlX DPV FROM FREDERICK BURROWS NO. DATE     DESCRIPTION /(PAGE COUNT) 1, 9/94     ISA-S67.04, Part I, Setpoints for Nuclear Safety-Related Instrumentation (23 pages)(COPYRIGHTED, WILL BE RELEASED TO THE PDR FOR INSPECTION ONLY)
- APPENDlX DPV FROM FREDERICK BURROWS NO.
: 2. 3/6/96   Memorandum to J Wermiel from F Burrows,  
DATE DESCRIPTION /(PAGE COUNT) 1, 9/94 ISA-S67.04, Part I, Setpoints for Nuclear Safety-Related Instrumentation (23 pages)(COPYRIGHTED, WILL BE RELEASED TO THE PDR FOR INSPECTION ONLY) 2.
3/6/96 Memorandum to J Wermiel from F Burrows,  


==Subject:==
==Subject:==
Westinghouse Standard Technical Specifications - Requirements for Electrical / instrumentation and Control Systems (9 pages)
Westinghouse Standard Technical Specifications - Requirements for Electrical / instrumentation and Control Systems (9 pages) 3.
: 3. 4/2/96   Memorandum for F Burrows from C Grimes and J Wermiel  
4/2/96 Memorandum for F Burrows from C Grimes and J Wermiel  


==Subject:==
==Subject:==
 
Technical Specification Requirements for Instrumentation and Control Systems (4 pages) 4.
Technical Specification Requirements for Instrumentation and Control Systems (4 pages)
8/9/96 Memorandum to J Wermiel and C Grimes from F Burrows,  
: 4. 8/9/96   Memorandum to J Wermiel and C Grimes from F Burrows,  


==Subject:==
==Subject:==
 
Proposed Revision 3 to Regulatory Guide 1.105, " Instrument Setpoints for Safety Systems (2 pages) 5.
Proposed Revision 3 to Regulatory Guide 1.105, " Instrument Setpoints for Safety Systems (2 pages)
8/29/96 Memorandum to F Burrows from J Wermiel and C Grimes,  
: 5. 8/29/96 Memorandum to F Burrows from J Wermiel and C Grimes,  


==Subject:==
==Subject:==
 
Proposed Revision 3 to Regulatory Guide 1.105, " Instrument Setpoints for i
Proposed Revision 3 to Regulatory Guide 1.105, " Instrument Setpoints for i Safety Systems"(12 pages)                                                 l
Safety Systems"(12 pages) l 6.
: 6. 3/17/97 Memorandum to D Thatcher from F Burrows,  
3/17/97 Memorandum to D Thatcher from F Burrows,  


==Subject:==
==Subject:==
Differing               i Professional View concerning Technical Specification Setpoints and Allowable Values for Instrumentation (4 pages)
Differing i
: 7. 3/24/97 Memorandum to R Zimmerman from S Collins,  
Professional View concerning Technical Specification Setpoints and Allowable Values for Instrumentation (4 pages) 7.
3/24/97 Memorandum to R Zimmerman from S Collins,  


==Subject:==
==Subject:==
Differing             !
Differing Professional View (DPV) Panel with enclosures (6 pages) 8.
Professional View (DPV) Panel with enclosures (6 pages)                   !
5/23/97 Memorandum to L Callan from R Zimmerman,  
: 8. 5/23/97 Memorandum to L Callan from R Zimmerman,  


==Subject:==
==Subject:==
Notification of Delay in Completion Review of Differing Professional View (1 page)       !
Notification of Delay in Completion Review of Differing Professional View (1 page) 9.
: 9. 9/16/97 Memorandum to L Callan from R Zimmerman,  
9/16/97 Memorandum to L Callan from R Zimmerman,  


==Subject:==
==Subject:==
Notification of         l Delay in Completing Review of Differing Professional View (1 page)       i
Notification of l
: 10. 10/31/97 Memorandum to S Collins from R Zimmerman,  
Delay in Completing Review of Differing Professional View (1 page) i 10.
10/31/97 Memorandum to S Collins from R Zimmerman,  


==Subject:==
==Subject:==
Differing             )
Differing
Professional View Conceming Technical Specification Trip Setpoints and   i Allowable Values for Instrumentation (39 pages) attaching                 !
)
COPYRIGHTED ATTACHMENT. WILL BE RELEASED TO THE PDR                       i FOR INSPECTION ONLY (10 PAGES)                                           !
Professional View Conceming Technical Specification Trip Setpoints and i
Allowable Values for Instrumentation (39 pages) attaching COPYRIGHTED ATTACHMENT. WILL BE RELEASED TO THE PDR i
FOR INSPECTION ONLY (10 PAGES)


d a
d a
l
11.
: 11.               10/31/97         Memorandum to F Burrows from S Collins,  
10/31/97 Memorandum to F Burrows from S Collins,  


==Subject:==
==Subject:==
Differing Professional View Conceming Technical Specification Trip Setpoints and Allowable Values for instrumentation (1 page)
Differing Professional View Conceming Technical Specification Trip Setpoints and Allowable Values for instrumentation (1 page) 12.
: 12.               10/31/97         Memorandum to Bsheron and R Zimmerman from S Collins,  
10/31/97 Memorandum to Bsheron and R Zimmerman from S Collins,  


==Subject:==
==Subject:==
 
l Follow-Up Actions to NRR Ad-Hoc Review Panel on the Differing l
l                                                   Follow-Up Actions to NRR Ad-Hoc Review Panel on the Differing l                                                   Professional View on Technical Specification Trip Setpoints and Allowable l                                                   Values for Instrumentation (2 pages)
Professional View on Technical Specification Trip Setpoints and Allowable l
: 13.               6/22/98           Memorandum to Scollins from B Sheron, and B Boger,  
Values for Instrumentation (2 pages) 13.
6/22/98 Memorandum to Scollins from B Sheron, and B Boger,  


==Subject:==
==Subject:==
Follow-Up Actions to NRR Ad Hoc Review Panel on Differing Professional View on Technical Specification Trip Setpoints and Allowable Values for Instrumentation (7 pages) l               14,               7/24/98           Memorandum to F Burrows from S Collins,  
Follow-Up Actions to NRR Ad Hoc Review Panel on Differing Professional View on Technical Specification Trip Setpoints and Allowable Values for Instrumentation (7 pages) l 14, 7/24/98 Memorandum to F Burrows from S Collins,  


==Subject:==
==Subject:==
Differing Professional           1 View and Differing Professional Opinion Regarding Technical                       1 l                                                   Specification Setpoints and Allowable Values for Instrumentation (9 L                                                   pages)
Differing Professional 1
!              15.               7/24/98           Memorandum to L Callan from S Collins,  
View and Differing Professional Opinion Regarding Technical l
Specification Setpoints and Allowable Values for Instrumentation (9 L
pages) 15.
7/24/98 Memorandum to L Callan from S Collins,  


==Subject:==
==Subject:==
Differing professional View and Differing Professional Opinion Regarding Technical Specification Setpoints and Allowable Values for Instrumentation (9 pages) l l
Differing professional View and Differing Professional Opinion Regarding Technical Specification Setpoints and Allowable Values for Instrumentation (9 pages) l l
l
l
  ~
~
l _,         _                              _                        _,    .            .-.                    . . - . .
l _,


y a DO C.5 Copyrighted Documents Addressed Under DPV                                                                             ,
y a DO C.5 Copyrighted Documents Addressed Under DPV 4
I 4
For hard copy, refer to the PDR d
For hard copy, refer to the PDR d
DPV  
DPV  


==Subject:==
==Subject:==
Tez.A a,caz _gge n=,in ci o u                               ,c ,,s, Jr.,
Tez.A a,caz
aus p a o w n e c e.                               awe.1 foe ohrreumenrs risa) d
_gge n=,in ci o u
                  ,s. n
,c
,,s, Jr.,
aus p a o w n e c e.
awe.1 foe ohrreumenrs risa) d n
* p ')]
* p ')]
o .-          -
,s.
l 4
o 4


t N
t N
F F
F F
w o
w me o
i:
i: 0 a
me                                  .
gggye n
                <    0 a               gggye n
'L,1-
                        'L,1- , c w.= w Cy g \ k ':^.. 4   ) 4 1
, c w.= w Cy g \\ k ':^..
  .                                                                )
4
) 4 1
)
f
f
      --  ,  .}}
.}}

Latest revision as of 02:56, 11 December 2024

Responds to 980821 Request for Coordination of Review for Release of Records,Iaw NRC Mgt Directive 10.159 Re Differing Professional View for Placement in Pdr.Review Completed. Appendix & Records Encl
ML20153D323
Person / Time
Issue date: 09/15/1998
From: Racquel Powell
NRC OFFICE OF ADMINISTRATION (ADM)
To: Collins S
NRC (Affiliation Not Assigned)
Shared Package
ML20153D328 List:
References
RTR-REGGD-01.105, RTR-REGGD-1.105 NUDOCS 9809250026
Download: ML20153D323 (4)


Text

.

p it:9 fW O

n UNITED STATES f

j NUCLEAR REGULATORY COMMISSION 6 POIOl'j WASHINGTON, D.C. m =1

%,*****/

BEP1s1998 MEMORANDUM TO:

Samuel J. Collins, Director Office of Nuclear Reactor Regulation FROM:

Russell A. Pew-ll FOIA/PA Officer

SUBJECT:

RELEASE OF RECORDS RELATING TO A DIFFERING PROFESSIONAL VIEW FROM FREDERICK BURROWS By memorandum dated August 21,1998, TaJuan Carter of your office, requested that my office coordinate the review for release of records, in accordance with NRC Management Directive 10.159, relating to a Differing Professional View for placeme, 'n the Public Document Room (PDR). The review of the subject records has now been cornpsted.

The records behind Tab A, identified on the enclosed Appendix, should be placed in the PDR and NUDOCS by your office. Record 1 and the attachment to record 10 is copyrighted.

Therefore, place the copyrighted records in the PDR for inspection only. Do not send the copyrighted records through NUDOCS for processing.

Enclosures:

1. Appendix
2. Records r

D Fv3

[by4 9809250026 980915 PDR TOPRP ENVWEST C

PDR vf)/dgGC,

s

- APPENDlX DPV FROM FREDERICK BURROWS NO.

DATE DESCRIPTION /(PAGE COUNT) 1, 9/94 ISA-S67.04, Part I, Setpoints for Nuclear Safety-Related Instrumentation (23 pages)(COPYRIGHTED, WILL BE RELEASED TO THE PDR FOR INSPECTION ONLY) 2.

3/6/96 Memorandum to J Wermiel from F Burrows,

Subject:

Westinghouse Standard Technical Specifications - Requirements for Electrical / instrumentation and Control Systems (9 pages) 3.

4/2/96 Memorandum for F Burrows from C Grimes and J Wermiel

Subject:

Technical Specification Requirements for Instrumentation and Control Systems (4 pages) 4.

8/9/96 Memorandum to J Wermiel and C Grimes from F Burrows,

Subject:

Proposed Revision 3 to Regulatory Guide 1.105, " Instrument Setpoints for Safety Systems (2 pages) 5.

8/29/96 Memorandum to F Burrows from J Wermiel and C Grimes,

Subject:

Proposed Revision 3 to Regulatory Guide 1.105, " Instrument Setpoints for i

Safety Systems"(12 pages) l 6.

3/17/97 Memorandum to D Thatcher from F Burrows,

Subject:

Differing i

Professional View concerning Technical Specification Setpoints and Allowable Values for Instrumentation (4 pages) 7.

3/24/97 Memorandum to R Zimmerman from S Collins,

Subject:

Differing Professional View (DPV) Panel with enclosures (6 pages) 8.

5/23/97 Memorandum to L Callan from R Zimmerman,

Subject:

Notification of Delay in Completion Review of Differing Professional View (1 page) 9.

9/16/97 Memorandum to L Callan from R Zimmerman,

Subject:

Notification of l

Delay in Completing Review of Differing Professional View (1 page) i 10.

10/31/97 Memorandum to S Collins from R Zimmerman,

Subject:

Differing

)

Professional View Conceming Technical Specification Trip Setpoints and i

Allowable Values for Instrumentation (39 pages) attaching COPYRIGHTED ATTACHMENT. WILL BE RELEASED TO THE PDR i

FOR INSPECTION ONLY (10 PAGES)

d a

11.

10/31/97 Memorandum to F Burrows from S Collins,

Subject:

Differing Professional View Conceming Technical Specification Trip Setpoints and Allowable Values for instrumentation (1 page) 12.

10/31/97 Memorandum to Bsheron and R Zimmerman from S Collins,

Subject:

l Follow-Up Actions to NRR Ad-Hoc Review Panel on the Differing l

Professional View on Technical Specification Trip Setpoints and Allowable l

Values for Instrumentation (2 pages) 13.

6/22/98 Memorandum to Scollins from B Sheron, and B Boger,

Subject:

Follow-Up Actions to NRR Ad Hoc Review Panel on Differing Professional View on Technical Specification Trip Setpoints and Allowable Values for Instrumentation (7 pages) l 14, 7/24/98 Memorandum to F Burrows from S Collins,

Subject:

Differing Professional 1

View and Differing Professional Opinion Regarding Technical l

Specification Setpoints and Allowable Values for Instrumentation (9 L

pages) 15.

7/24/98 Memorandum to L Callan from S Collins,

Subject:

Differing professional View and Differing Professional Opinion Regarding Technical Specification Setpoints and Allowable Values for Instrumentation (9 pages) l l

l

~

l _,

y a DO C.5 Copyrighted Documents Addressed Under DPV 4

For hard copy, refer to the PDR d

DPV

Subject:

Tez.A a,caz

_gge n=,in ci o u

,c

,,s, Jr.,

aus p a o w n e c e.

awe.1 foe ohrreumenrs risa) d n

  • p ')]

,s.

o 4

t N

F F

w me o

i: 0 a

gggye n

'L,1-

, c w.= w Cy g \\ k ':^..

4

) 4 1

)

f

.