ML20153G465: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:s r | {{#Wiki_filter:s r | ||
OPU Nuclear Corporation | OPU Nuclear Corporation | ||
-. NggIgg Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's D' rect Dlal Number: | |||
(717) 948-8461 September | (717) 948-8461 September 1, 1988 4410-88-L-0140/0416P US Nuclear Regulatory Commission ATTN: Mr. John Hannon - Chief Operator Licensing Branch, OWFN-100-18 Wasnington, DC 20555 | ||
==Dear Mr. Hannon:== | ==Dear Mr. Hannon:== | ||
Three Mile Island Nuclear Station, Unit 2 (THI-2) | Three Mile Island Nuclear Station, Unit 2 (THI-2) | ||
Operating License No. DPR-73 Docket No. 50-320 Generic Letter 88-13: Operator Licensing Examinations In response to the subject letter, attached is an estimate of operator licensing examination reouirements for the fiscal years 1989, 1990, 1991, and 1992. This projection is identical to our September 14, 1987, estimate transmitted by GPU Nuclear letter 4410-87-L-0141 and is contingent upon the completion of defueling of the TMI-2 Reactor Vessel as schec'uled. If completion of defueling of the Reactor Vessel should be delayed, further reaualification examinations may be required and a revised estimate will be forwarded accordingly. | Operating License No. DPR-73 Docket No. 50-320 Generic Letter 88-13: Operator Licensing Examinations In response to the subject letter, attached is an estimate of operator licensing examination reouirements for the fiscal years 1989, 1990, 1991, and 1992. This projection is identical to our September 14, 1987, estimate transmitted by GPU Nuclear letter 4410-87-L-0141 and is contingent upon the completion of defueling of the TMI-2 Reactor Vessel as schec'uled. | ||
If completion of defueling of the Reactor Vessel should be delayed, further reaualification examinations may be required and a revised estimate will be forwarded accordingly. | |||
Sincerely, | Sincerely, | ||
/Y / | |||
/,/ - | |||
F. R. Standerfe Director, TMI-2 EDS/ emf | p F. R. Standerfe Director, TMI-2 EDS/ emf Attachment cc: Senior Resident Inspector, TMI - R. J. Conte Regional Administrator, Region 1 - W. T. Russell Director, Plant Directorate IV - J. F. Stolz Systems Engineer, TMI Site - L. H. Thonus 8809080164 880901 i | ||
Attachment cc: Senior Resident Inspector, TMI - R. J. Conte Regional Administrator, Region 1 - W. T. Russell Director, Plant Directorate IV - J. F. Stolz Systems Engineer, TMI Site - L. H. Thonus | i PDR ADOCK 00000320 l l V | ||
8809080164 880901 | PDC GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation | ||
PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT Facility TMI-2 NRC Region 1 | |||
FY 1989 Fi 1990 FY 1991 FY 1992 (10/1/88-9/30/89)(10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92) 1. | |||
Date | |||
#RO O | |||
O O | |||
O J | |||
#SRO Instant 0 | |||
0 0 | |||
] | 0 0 | ||
0 0 | |||
0 | |||
4 | #5R0 Upgrade | ||
by the date. Please indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three R0 candidates | #5R0 Limited 0 | ||
0 0 | |||
Unit Two, then indicate "R0 3,5**.") | 0 1 | ||
2. | |||
Date | |||
#R0 | |||
] | |||
e5R0 Instant | |||
#SR0 Upgrade | |||
#5R0 Limited i | |||
i 4 | |||
Please indicate initial cold license examinations by placing an asterisk (*) | |||
by the date. | |||
Please indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three R0 candidates with no previo.is license are to be examined on both Units One and Two and five i | |||
RO candidates licensed on Unit One are to be examined to extend their licenset to Unit Two, then indicate "R0 3,5**.") | |||
l i | |||
i i | i i | ||
i | |||
~ ~ | |||
~ | |||
~~ | |||
Date | ti PROPOSED REQUALIFICA"ION EXAMINATION SCHEDULE FORMAI t | ||
Facility TMI-2 NRC Region 1 | |||
FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89) | |||
(10/1/89-9/30/90) | |||
(10/1/90-9/30/91) | |||
(10/1/91-9/30/92) i FHSRO j | |||
1. | |||
Date 12/88 Date Date Date SR0/R0 j | |||
2. | |||
Date 3/89 _ | |||
Date Date Date 3. | |||
Data Date Date Date 4. | |||
Date Date Date Date I | |||
i l | |||
I i | |||
s t | s t | ||
l i | |||
I | I | ||
- - -.,,,.,., - -... - - - -.}} | |||
Latest revision as of 02:21, 11 December 2024
| ML20153G465 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/01/1988 |
| From: | Standerfer F GENERAL PUBLIC UTILITIES CORP. |
| To: | Hannon J Office of Nuclear Reactor Regulation |
| References | |
| 4410-88-L-0140, 4410-88-L-140, GL-88-13, NUDOCS 8809080164 | |
| Download: ML20153G465 (3) | |
Text
s r
OPU Nuclear Corporation
-. NggIgg Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's D' rect Dlal Number:
(717) 948-8461 September 1, 1988 4410-88-L-0140/0416P US Nuclear Regulatory Commission ATTN: Mr. John Hannon - Chief Operator Licensing Branch, OWFN-100-18 Wasnington, DC 20555
Dear Mr. Hannon:
Three Mile Island Nuclear Station, Unit 2 (THI-2)
Operating License No. DPR-73 Docket No. 50-320 Generic Letter 88-13: Operator Licensing Examinations In response to the subject letter, attached is an estimate of operator licensing examination reouirements for the fiscal years 1989, 1990, 1991, and 1992. This projection is identical to our September 14, 1987, estimate transmitted by GPU Nuclear letter 4410-87-L-0141 and is contingent upon the completion of defueling of the TMI-2 Reactor Vessel as schec'uled.
If completion of defueling of the Reactor Vessel should be delayed, further reaualification examinations may be required and a revised estimate will be forwarded accordingly.
Sincerely,
/Y /
/,/ -
p F. R. Standerfe Director, TMI-2 EDS/ emf Attachment cc: Senior Resident Inspector, TMI - R. J. Conte Regional Administrator, Region 1 - W. T. Russell Director, Plant Directorate IV - J. F. Stolz Systems Engineer, TMI Site - L. H. Thonus 8809080164 880901 i
i PDR ADOCK 00000320 l l V
PDC GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT Facility TMI-2 NRC Region 1
FY 1989 Fi 1990 FY 1991 FY 1992 (10/1/88-9/30/89)(10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92) 1.
Date
- RO O
O O
O J
- SRO Instant 0
0 0
0 0
0 0
0
- 5R0 Upgrade
- 5R0 Limited 0
0 0
0 1
2.
Date
- R0
]
e5R0 Instant
- SR0 Upgrade
- 5R0 Limited i
i 4
Please indicate initial cold license examinations by placing an asterisk (*)
by the date.
Please indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three R0 candidates with no previo.is license are to be examined on both Units One and Two and five i
RO candidates licensed on Unit One are to be examined to extend their licenset to Unit Two, then indicate "R0 3,5**.")
l i
i i
i
~ ~
~
~~
ti PROPOSED REQUALIFICA"ION EXAMINATION SCHEDULE FORMAI t
Facility TMI-2 NRC Region 1
FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)
(10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92) i FHSRO j
1.
Date 12/88 Date Date Date SR0/R0 j
2.
Date 3/89 _
Date Date Date 3.
Data Date Date Date 4.
Date Date Date Date I
i l
I i
s t
l i
I
- - -.,,,.,., - -... - - - -.