ML20154F449: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:h D
h                                                                                               D Septerber 12, 19E8 EN 88-73 0FFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:_ Comonwealth Edison Company                       (EA88-161)
Septerber 12, 19E8 EN 88-73 0FFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:_ Comonwealth Edison Company (EA88-161)
(Quad Cities Units 1 and I)
(Quad Cities Units 1 and I)
Docket Nos. 50-254 and 50-265
Docket Nos. 50-254 and 50-265


==Subject:==
==Subject:==
PROPOSED INFOSITION OF CIVIL PENALTIES - $125,000 This is to inform the Comission that a Notice of Violation and Proposed Irposition of Civil Penalties in the amount of One Hundred Twenty-five Thousand Dollars ($125,000) will be issued on or about Septerber 15, 1988 to Comorwealth Edison Company. This action is based on two problems. First, the shared diesel was unable to respond for approxinately six months, to a Unit 2 auto-start signal because of an undetected failure caused by a wiring error. Second, the ungrounded 125 VCC battery system for Unit 2 was operated in a grounded condition for approximately six renths. This condition was not properly recognized or evaluated by the licensee. The escalation and mitigation factors of the Enforcement Policy were considered for buth of these violatices and the civil penalty for the first violation was escalated 50 percent because of the licensee's failure to take prorpt and thorough corrective actions while the second violation is being proposed at the base civil penalty.
PROPOSED INFOSITION OF CIVIL PENALTIES - $125,000 This is to inform the Comission that a Notice of Violation and Proposed Irposition of Civil Penalties in the amount of One Hundred Twenty-five Thousand Dollars ($125,000) will be issued on or about Septerber 15, 1988 to Comorwealth Edison Company.
This action is based on two problems.
First, the shared diesel was unable to respond for approxinately six months, to a Unit 2 auto-start signal because of an undetected failure caused by a wiring error. Second, the ungrounded 125 VCC battery system for Unit 2 was operated in a grounded condition for approximately six renths.
This condition was not properly recognized or evaluated by the licensee.
The escalation and mitigation factors of the Enforcement Policy were considered for buth of these violatices and the civil penalty for the first violation was escalated 50 percent because of the licensee's failure to take prorpt and thorough corrective actions while the second violation is being proposed at the base civil penalty.
It should be noted that the licensee has not been specifically infomed of the enforcement action. The schedule of issuance and notification is:
It should be noted that the licensee has not been specifically infomed of the enforcement action. The schedule of issuance and notification is:
Mailing of Notice                       September 15, 1968 Telephone Notification of Licensee September 15, 1988 The State of Illinois will be notified.
Mailing of Notice September 15, 1968 Telephone Notification of Licensee September 15, 1988 The State of Illinois will be notified.
The licensee has thirty days from the date of the Notice in which to rcspond.
The licensee has thirty days from the date of the Notice in which to rcspond.
Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.
Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.
Centact:   J. Luehman, OE, 23260                 J. Lieberran, OE, 20741 Distribution 3%o                           5530                   560o OWFN M.i                   OWFN T 6               HNBB yn Chairnan Zech               EDO                   RM Com Roberts                 DEDRO                 AE00 Com. Carr                   NRR Corra. Pogers               OE imSS SECY                       OGC ACPS                       OI CA                           SP GPA                         OSP                 g600 Regionel Offices       Mall 8009190400 00o9:p                                 RI9_j_iRIV43           ADH: Doc. Pgt. Br.
Centact:
PDR     ILE                                       RI! M h RV 46         PDR EN-DG-037           PNU                         Ri!! g                 RES OIA PRELIMINARY INFORMATICh - h0T FOR FLELIC DISCLCSURE UNTIL FLTLICLY ANNOUNCED             A \
J. Luehman, OE, 23260 J. Lieberran, OE, 20741 Distribution 3%o 5530 560o OWFN M.i OWFN T 6 HNBB yn Chairnan Zech EDO RM Com Roberts DEDRO AE00 Com. Carr NRR Corra. Pogers OE imSS SECY OGC ACPS OI CA SP GPA OSP g600 Regionel Offices Mall 8009190400 00o9:p RI9_j_iRIV43 ADH: Doc. Pgt. Br.
                                                                                          -16h}}
PDR ILE RI! M h RV 46 PDR EN-DG-037 PNU Ri!! g RES OIA
\\
PRELIMINARY INFORMATICh - h0T FOR FLELIC DISCLCSURE UNTIL FLTLICLY ANNOUNCED A
-16h}}

Latest revision as of 00:58, 11 December 2024

EN-88-073:on 880915,notice of Violation & Proposed Imposition of Civil Penalty Will Be Issued,Based on Inability of Shared Diesel to Respond for Approx 2 Months & Operating Ungrounded 125-volt Dc Battery Sys as Grounded
ML20154F449
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/12/1988
From: Lieberman J, Luehman J
NRC OFFICE OF ENFORCEMENT (OE)
To:
References
EN-88-073, EN-88-73, NUDOCS 8809190400
Download: ML20154F449 (1)


Text

h D

Septerber 12, 19E8 EN 88-73 0FFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:_ Comonwealth Edison Company (EA88-161)

(Quad Cities Units 1 and I)

Docket Nos. 50-254 and 50-265

Subject:

PROPOSED INFOSITION OF CIVIL PENALTIES - $125,000 This is to inform the Comission that a Notice of Violation and Proposed Irposition of Civil Penalties in the amount of One Hundred Twenty-five Thousand Dollars ($125,000) will be issued on or about Septerber 15, 1988 to Comorwealth Edison Company.

This action is based on two problems.

First, the shared diesel was unable to respond for approxinately six months, to a Unit 2 auto-start signal because of an undetected failure caused by a wiring error. Second, the ungrounded 125 VCC battery system for Unit 2 was operated in a grounded condition for approximately six renths.

This condition was not properly recognized or evaluated by the licensee.

The escalation and mitigation factors of the Enforcement Policy were considered for buth of these violatices and the civil penalty for the first violation was escalated 50 percent because of the licensee's failure to take prorpt and thorough corrective actions while the second violation is being proposed at the base civil penalty.

It should be noted that the licensee has not been specifically infomed of the enforcement action. The schedule of issuance and notification is:

Mailing of Notice September 15, 1968 Telephone Notification of Licensee September 15, 1988 The State of Illinois will be notified.

The licensee has thirty days from the date of the Notice in which to rcspond.

Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.

Centact:

J. Luehman, OE, 23260 J. Lieberran, OE, 20741 Distribution 3%o 5530 560o OWFN M.i OWFN T 6 HNBB yn Chairnan Zech EDO RM Com Roberts DEDRO AE00 Com. Carr NRR Corra. Pogers OE imSS SECY OGC ACPS OI CA SP GPA OSP g600 Regionel Offices Mall 8009190400 00o9:p RI9_j_iRIV43 ADH: Doc. Pgt. Br.

PDR ILE RI! M h RV 46 PDR EN-DG-037 PNU Ri!! g RES OIA

\\

PRELIMINARY INFORMATICh - h0T FOR FLELIC DISCLCSURE UNTIL FLTLICLY ANNOUNCED A

-16h