ML20155B070: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:/     .,''   .
{{#Wiki_filter:/
                                                      UNITED STATES
. , ' '
    /*             ;                   NUCLEAR REGULATORY COMMISSION
UNITED STATES
    j*,            j                                     REGION I
.
  '
/*
                    t                               475 ALLENDALE RoAO                       *
;
    %,,
NUCLEAR REGULATORY COMMISSION
      ,          /                       KING oF PRUS$1 A. PENNSYL% ANIA 19406
j
          **'*
j
                                                      SEP211M5
REGION I
          Docket Nos. 50-412
*,
          Ouquesne Light Company
t
          ATTN: Mr. J. O. Sieber
475 ALLENDALE RoAO
                    Vice President
*
                    Nuclear Group
%,,
          Post Office Box 4                                                             '
/
          Shippingport, Pennsylvania    15077
KING oF PRUS$1 A. PENNSYL% ANIA 19406
          Gentlemen:
'
          Subject:    Inspection No. 50-412/88-06 0/L
,
          This refers to your letter dated August 18, 1988, in response to our letter
* * ' *
          dated May 9, 1988.
SEP211M5
          Thank you for informing us of the corrective and preventive actions documanted      t
Docket Nos. 50-412
          in your letter. These actions will be examined during a future inspection of
Ouquesne Light Company
          your licensed program.
ATTN: Mr. J. O. Sieber
          Your cooperation with us is appteciated.
Vice President
                                                          Sincerely,
Nuclear Group
j                                                                N E CALLO
Post Office Box 4
                                                          Robert M. Gallo, Chief
                                                          Operations Branch
                                                          Olvision of Reactor Safety
,          cc:
          J. J. Carey, Executive Vice President, Operations                                  !
          J. O. Crockett, General Manager, Corporate Nuclear Serviests
          W. S. Lacey, General Manager, Nuclear Operations                                    :
'
'
          N. R. Tonet, Manager, Nuclear Engineering                                           :
Shippingport, Pennsylvania
          T. P. Noonan, Plant Manager                                                         l
15077
          C. E. Ewing, QA Manager
Gentlemen:
          K. D. Grada, Manager, Nuclear Safety                                               i
Subject:
          Public Document Room (POR)                                                         ;
Inspection No. 50-412/88-06 0/L
          Local Public Document Room (LPDR)                                                   t
This refers to your letter dated August 18, 1988, in response to our letter
          Nuclear Safety Informt. tion Center (NSIC)                                         <
dated May 9, 1988.
          NRC Resident Inspector                                                               l
Thank you for informing us of the corrective and preventive actions documanted
        ,Comonwealth of Peansylvania                                                           1
t
                                                  0FFICIAL RECORD C0pY
in your letter. These actions will be examined during a future inspection of
        se10060175 080927                                                           '
your licensed program.
                                                                                      ~
Your cooperation with us is appteciated.
                                                                                              l
Sincerely,
          DR    ADOCK 050 g 2                                                                 i
j
                                                                                          l
N E CALLO
                                                                                              i
Robert M. Gallo, Chief
Operations Branch
Olvision of Reactor Safety
cc:
,
J. J. Carey, Executive Vice President, Operations
!
J. O. Crockett, General Manager, Corporate Nuclear Serviests
W. S. Lacey, General Manager, Nuclear Operations
:
N. R. Tonet, Manager, Nuclear Engineering
'
T. P. Noonan, Plant Manager
l
C. E. Ewing, QA Manager
K. D. Grada, Manager, Nuclear Safety
i
Public Document Room (POR)
Local Public Document Room (LPDR)
t
Nuclear Safety Informt. tion Center (NSIC)
<
NRC Resident Inspector
,Comonwealth of Peansylvania
0FFICIAL RECORD C0pY
se10060175 080927
~
l
ADOCK 050 g 2
'
DR
i
l
i
_


                                  . ,,                 -      . _ . . - -
. ,,
                                                    <v
. _ . .
                                                                            t
- -
                            ,
-
                  .    .
<v
            .
t
        .
,
          -
.
            Duquesne Light Company                 -2-
.
                                                                            :
.
            bec:                                                           !
Duquesne Light Company
    ^
-2-
            Region I Docket Room (with concurrences)                       i
-
                                                                            '
.
1          Management Assistant, DRMA (w/o enc 1)
:
bec:
!
Region I Docket Room (with concurrences)
i
^
'
'
            L. Iripp, DRP                                     "
Management Assistant, DRMA (w/o enc 1)
                                                                            i
1
            D. Limroth, DRP                                                 t
L. Iripp, DRP
            P. Tam, LPM, NRR     4
i
                                                                            ,
'
l           R. Bores DRSS                                                   i
"
                                                                            >
D. Limroth, DRP
                                                                            i
t
                                                                            '
P. Tam, LPM, NRR
                          s                                                 t
4
                        #
,
l
R. Bores DRSS
i
>
i
'
t
s
#
.,
.,
4
4
                                                                            ?
?
<
<
                                                                            i
i
  l
l
                                                                            L
L
:
:!
:
:
:!                                                                          :
I
                                                                            I
1
1
d                                                                           i
d
                                                                            '
i
)
)
                                                                            .
'
                                                                            ,
l
l .
.,
                                                                              t
t
                                                                              ,
.
,
.
.
                                                                              I
I
                                                                            '
l
'
l
l
                                                                            l
                                                                            !
                                                                            !
!
!
                                                                            ;
!
I                                                                           !
!
                                                                            I
;
  >
I
                                                                              1
!
                                                                            l
I
            g                       '
>
:            94G/88           9/   68
1
l
'
g
94G/88
9/
68
:
;
;
                                                                               1
                                                                               1
1
                                        0FFICIAL RECORD COPY
]
]
  l
0FFICIAL RECORD COPY
l
.i
.i
      "
"
'T
*
--- a-
*---- amm-
-
-
a


    I
                                                                                  cp n
            '
              .
                  ..
I
I
      .     Duquesne @ W $4,;; ~. o -
'
      ..                                     --,, aa
cp n
              .US,Vf * .au                                                           c: m un
..
                                                                  August 18, 1988
.
          U. S. Nuclear Regulatory Commission
I
          Attn     Document Control Desk
Duquesne @ W $4,;; ~. o -
          Washington, DC 20L35
.
          Reference:     Beaver Valley Power Station, Unit No. 2
..
                          Docket No. 50-412, License No, NPF-73
--,, aa
                          Response to NRC Concern Contained Within
.US,Vf * .au
                          Examination Report No. 50-412/88-06 (OL)
c: m un
          Gentlemen
August 18, 1988
                By letter dated May 9,           1988, the NRC provided Duquesne Light
U.
          Company (DLC) with Examination Report No. 50-412/88-06 (OL). In the
S. Nuclear Regulatory Commission
          letter the NRC expressed a concern stemming from DLC's comments on
Attn
          the examination questions which relate to the Abnormai operating
Document Control Desk
          Procedures     (AOPs).     The NRC requested that we review this issue and
Washington, DC
          provide a response         regarding our policy and any actions planned to
20L35
          resolve it.
Reference:
                It   is   stated in the May 9th letter that some AOPs appear to
Beaver Valley Power Station, Unit No. 2
          require prompt operator actions and, therefore, should be memorized.
Docket No. 50-412, License No, NPF-73
          It was     further noted that our AOPs identify no immediate actions,
Response to NRC Concern Contained Within
          only "manual" actions.         We were requested to review our operational
Examination Report No. 50-412/88-06 (OL)
          practices and procedures and identify those time-dependent actions
Gentlemen
          needed to mitigate the consequences of the abnormal conditions for
By
          inclusion in the AOPs.             Through a review of Attachment 3 to the
letter
          May 9th letter,         and the information immediately preceding the above
dated
          request, wo believe that two issues require a retponse:               (1) the
May
          identificacien of immediate manual actions in the AOPs, and (2) our
9,
          policy as to the operational practico concerning those actions.
1988, the NRC provided Duquesne Light
          Based on the above our response follows.
Company
                We are currently reviewing the AOPs to determine critical
(DLC)
          time-dependent actions.           The review is being performed for both the
with Examination Report No. 50-412/88-06 (OL).
          Unit-2 and the Unit-1 AOPs.               Af.ter this review is completed, the
In the
          changes       identified will be reviewed and incorporated into the
letter
          operating manual.         Based on the current status of the above actions,
the
          we   are     scheduling them for completion by December 30,           1988.
NRC
  L
expressed
          Immediate manual actions identified and incorporated into the AOPs
a concern stemming from DLC's comments on
  i        will be subject to the same operational philosochy as the immediate
the
        jnnual       actions in the Emergency Operating Procedures. Consequently,
examination questions
          th(y will require memorization.
which
    .
relate
        (      $$ C y e 0 31 b           2 p (> -
to
                        -
the Abnormai operating
                        9Y ''d pf
Procedures
(AOPs).
The NRC requested that we review this issue and
provide
a
response
regarding
our policy and any actions planned to
resolve it.
It
is
stated
in
the
May
9th letter that some AOPs appear to
require
prompt
operator actions and, therefore, should be memorized.
It
was
further
noted
that
our AOPs identify no immediate actions,
only
"manual"
actions.
We were requested to review our operational
practices
and
procedures
and
identify those time-dependent actions
needed
to
mitigate
the
consequences of the abnormal conditions for
inclusion
in
the
AOPs.
Through
a
review of Attachment 3 to the
May
9th
letter,
and the information immediately preceding the above
request,
wo
believe
that
two
issues
require a retponse:
(1) the
identificacien
of
immediate
manual actions in the AOPs, and (2) our
policy
as
to
the
operational
practico
concerning
those actions.
Based on the above our response follows.
We
are
currently
reviewing
the
AOPs
to
determine
critical
time-dependent
actions.
The review is being performed for both the
Unit-2
and
the
Unit-1
AOPs.
Af.ter this review is completed, the
changes
identified
will
be
reviewed
and
incorporated
into
the
operating
manual.
Based on the current status of the above actions,
we
are
scheduling
them
for
completion
by
December
30,
1988.
L
Immediate
manual
actions
identified
and incorporated into the AOPs
will
be
subject
to the same operational philosochy as the immediate
i
jnnual
actions
in the Emergency Operating Procedures.
Consequently,
.
th(y will require memorization.
(
$$ C y e 0 31 b
2 p (> -
9 ''d pf
-
Y


                                                                          __ -_ _
__ -_ _
    B'envar vallGy Pow 0r Stction, Unit No. 2
B'envar vallGy Pow 0r Stction, Unit No. 2
    Dockht No. 50-412, Lic;nsa No. NPF-73
Dockht No. 50-412, Lic;nsa No. NPF-73
              '
Pcg3 '2
    Pcg3 '2
'
  .
.
  '
'
.
If
you have any questions on this response, please contact me or
a member of my staff.
Very truly yours,
A * !<~
.
.
          If  you have any questions on this response, please contact me or
D.
    a member of my staff.
Sieber
                                                      Very truly yours,
Vice President
                                                          A * !<~
Nuclear Group
                                                        . D. Sieber
cc
                                                      Vice President
Mr. Robert M. Gallo, Chief Operations Branch, Division of
                                                      Nuclear Group
Reactor Safety
    cc   Mr. Robert M. Gallo, Chief Operations Branch, Division of
Mr. J. Beall, Sr. Resident Inspector
            Reactor Safety
Mr. W. T. Russell, NRC Region I Administrator
          Mr. J. Beall, Sr. Resident Inspector
Mr. P. Tam, Project Manager
          Mr. W. T. Russell, NRC Region I Administrator
Director, Safety Evaluation & Control (VEPCO)
          Mr. P. Tam, Project Manager
          Director, Safety Evaluation & Control (VEPCO)
}}
}}

Latest revision as of 22:28, 10 December 2024

Ack Receipt of 880818 Response to Insp Rept 50-412/88-06OL
ML20155B070
Person / Time
Site: Beaver Valley
Issue date: 09/27/1988
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Seiber J
DUQUESNE LIGHT CO.
References
NUDOCS 8810060175
Download: ML20155B070 (2)


See also: IR 05000412/1988006

Text

/

. , ' '

UNITED STATES

.

/*

NUCLEAR REGULATORY COMMISSION

j

j

REGION I

  • ,

t

475 ALLENDALE RoAO

%,,

/

KING oF PRUS$1 A. PENNSYL% ANIA 19406

'

,

  • * ' *

SEP211M5

Docket Nos. 50-412

Ouquesne Light Company

ATTN: Mr. J. O. Sieber

Vice President

Nuclear Group

Post Office Box 4

'

Shippingport, Pennsylvania

15077

Gentlemen:

Subject:

Inspection No. 50-412/88-06 0/L

This refers to your letter dated August 18, 1988, in response to our letter

dated May 9, 1988.

Thank you for informing us of the corrective and preventive actions documanted

t

in your letter. These actions will be examined during a future inspection of

your licensed program.

Your cooperation with us is appteciated.

Sincerely,

j

N E CALLO

Robert M. Gallo, Chief

Operations Branch

Olvision of Reactor Safety

cc:

,

J. J. Carey, Executive Vice President, Operations

!

J. O. Crockett, General Manager, Corporate Nuclear Serviests

W. S. Lacey, General Manager, Nuclear Operations

N. R. Tonet, Manager, Nuclear Engineering

'

T. P. Noonan, Plant Manager

l

C. E. Ewing, QA Manager

K. D. Grada, Manager, Nuclear Safety

i

Public Document Room (POR)

Local Public Document Room (LPDR)

t

Nuclear Safety Informt. tion Center (NSIC)

<

NRC Resident Inspector

,Comonwealth of Peansylvania

0FFICIAL RECORD C0pY

se10060175 080927

~

l

ADOCK 050 g 2

'

DR

i

l

i

_

. ,,

. _ . .

- -

-

<v

t

,

.

.

.

Duquesne Light Company

-2-

-

.

bec:

!

Region I Docket Room (with concurrences)

i

^

'

Management Assistant, DRMA (w/o enc 1)

1

L. Iripp, DRP

i

'

"

D. Limroth, DRP

t

P. Tam, LPM, NRR

4

,

l

R. Bores DRSS

i

>

i

'

t

s

.,

4

?

<

i

l

L

!

I

1

d

i

)

'

l

.,

t

.

,

.

I

l

'

l

!

!

!

I

!

I

>

1

l

'

g

94G/88

9/

68

1

]

0FFICIAL RECORD COPY

l

.i

"

'T

--- a-

  • ---- amm-

-

-

a

I

'

cp n

..

.

I

Duquesne @ W $4,;; ~. o -

.

..

--,, aa

.US,Vf * .au

c: m un

August 18, 1988

U.

S. Nuclear Regulatory Commission

Attn

Document Control Desk

Washington, DC

20L35

Reference:

Beaver Valley Power Station, Unit No. 2

Docket No. 50-412, License No, NPF-73

Response to NRC Concern Contained Within

Examination Report No. 50-412/88-06 (OL)

Gentlemen

By

letter

dated

May

9,

1988, the NRC provided Duquesne Light

Company

(DLC)

with Examination Report No. 50-412/88-06 (OL).

In the

letter

the

NRC

expressed

a concern stemming from DLC's comments on

the

examination questions

which

relate

to

the Abnormai operating

Procedures

(AOPs).

The NRC requested that we review this issue and

provide

a

response

regarding

our policy and any actions planned to

resolve it.

It

is

stated

in

the

May

9th letter that some AOPs appear to

require

prompt

operator actions and, therefore, should be memorized.

It

was

further

noted

that

our AOPs identify no immediate actions,

only

"manual"

actions.

We were requested to review our operational

practices

and

procedures

and

identify those time-dependent actions

needed

to

mitigate

the

consequences of the abnormal conditions for

inclusion

in

the

AOPs.

Through

a

review of Attachment 3 to the

May

9th

letter,

and the information immediately preceding the above

request,

wo

believe

that

two

issues

require a retponse:

(1) the

identificacien

of

immediate

manual actions in the AOPs, and (2) our

policy

as

to

the

operational

practico

concerning

those actions.

Based on the above our response follows.

We

are

currently

reviewing

the

AOPs

to

determine

critical

time-dependent

actions.

The review is being performed for both the

Unit-2

and

the

Unit-1

AOPs.

Af.ter this review is completed, the

changes

identified

will

be

reviewed

and

incorporated

into

the

operating

manual.

Based on the current status of the above actions,

we

are

scheduling

them

for

completion

by

December

30,

1988.

L

Immediate

manual

actions

identified

and incorporated into the AOPs

will

be

subject

to the same operational philosochy as the immediate

i

jnnual

actions

in the Emergency Operating Procedures.

Consequently,

.

th(y will require memorization.

(

$$ C y e 0 31 b

2 p (> -

9 d pf

-

Y

__ -_ _

B'envar vallGy Pow 0r Stction, Unit No. 2

Dockht No. 50-412, Lic;nsa No. NPF-73

Pcg3 '2

'

.

'

.

If

you have any questions on this response, please contact me or

a member of my staff.

Very truly yours,

A * !<~

.

D.

Sieber

Vice President

Nuclear Group

cc

Mr. Robert M. Gallo, Chief Operations Branch, Division of

Reactor Safety

Mr. J. Beall, Sr. Resident Inspector

Mr. W. T. Russell, NRC Region I Administrator

Mr. P. Tam, Project Manager

Director, Safety Evaluation & Control (VEPCO)