ML20195H658: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_               -      .  . . . _ . . _  _      _-.      .. _ . _ _ ..
{{#Wiki_filter:_
  ~
~
1 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l                       DOCKET NO. 50-302/ LICENSE NO. DPR-72 l
1 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l
DOCKET NO. 50-302/ LICENSE NO. DPR-72 l
l l
l l
i ATTACHMENT LICENSE AMENDMENT REQUEST #221, REVISION 2 ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM i
i ATTACHMENT LICENSE AMENDMENT REQUEST #221, REVISION 2 ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM i
i Proposed Technical Specification Change Page l
i Proposed Technical Specification Change Page l
l 9811240067 981117 DR ADOCK 050003 2 i
l 9811240067 981117 DR ADOCK 050003 2 i
I
I


            - . . . ~ .       .- . . - . . . . . - . - . _ - . - - - . - . . ~ . - . . - -             . . ~ . -               .--      =-.. . - .-
-... ~.
Reporting Requirements
.-.. -..... -. -. _ -. - - -. -.. ~. -.. - -
      '.'                                                                                                                              5.7 5.7 Reporting Requirements 5.7.2                 Special Reports (continued)
.. ~. -
: 5.         .For first span "B" 0TSG pit-like IGA, a summary of analyses performed to determine if estimated leakage based on the projected end-of-cycle perce9t throughwall distribution-exceeds the leak limit (dete'rmined from the licensing basis dose calculation for the main steamline break) for the next operating cycle.
=-... -.-
: 6.           A deterministic assessment for the first span "B" 0TSG pit-like IGA.
Reporting Requirements 5.7 5.7 Reporting Requirements 5.7.2 Special Reports (continued) 5.
Results of 0TSG tube inspections that fall into Category C-3                                       ,
.For first span "B" 0TSG pit-like IGA, a summary of analyses performed to determine if estimated leakage based on the projected end-of-cycle perce9t throughwall distribution-exceeds the leak limit (dete'rmined from the licensing basis dose calculation for the main steamline break) for the next operating cycle.
shall be reported to the NRC prior to resumption of plant                                         'l operation. This report shall provide a description of                                               '
6.
investigations conducted to determine cause of the tube l                                                     degradation and corrective measures taken to prevent recurrence.
A deterministic assessment for the first span "B" 0TSG pit-like IGA.
I II I     I I
Results of 0TSG tube inspections that fall into Category C-3 shall be reported to the NRC prior to resumption of plant
'l operation. This report shall provide a description of investigations conducted to determine cause of the tube l
degradation and corrective measures taken to prevent recurrence.
I II I I
I l
l l
l l
l L
L i'
i' i
i Crystal River Unit 3 5.0-29A Amendment No.
4                  Crystal River Unit 3                                                   5.0-29A                 Amendment No.
4
                                                  .            ..          .              .  -  -- -      .      .- ---------.--                -,}}
-,}}

Latest revision as of 18:16, 10 December 2024

Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic
ML20195H658
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/17/1998
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20195H655 List:
References
NUDOCS 9811240067
Download: ML20195H658 (2)


Text

_

~

1 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l

DOCKET NO. 50-302/ LICENSE NO. DPR-72 l

l l

i ATTACHMENT LICENSE AMENDMENT REQUEST #221, REVISION 2 ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM i

i Proposed Technical Specification Change Page l

l 9811240067 981117 DR ADOCK 050003 2 i

I

-... ~.

.-.. -..... -. -. _ -. - - -. -.. ~. -.. - -

.. ~. -

=-... -.-

Reporting Requirements 5.7 5.7 Reporting Requirements 5.7.2 Special Reports (continued) 5.

.For first span "B" 0TSG pit-like IGA, a summary of analyses performed to determine if estimated leakage based on the projected end-of-cycle perce9t throughwall distribution-exceeds the leak limit (dete'rmined from the licensing basis dose calculation for the main steamline break) for the next operating cycle.

6.

A deterministic assessment for the first span "B" 0TSG pit-like IGA.

Results of 0TSG tube inspections that fall into Category C-3 shall be reported to the NRC prior to resumption of plant

'l operation. This report shall provide a description of investigations conducted to determine cause of the tube l

degradation and corrective measures taken to prevent recurrence.

I II I I

I l

l l

L i'

i Crystal River Unit 3 5.0-29A Amendment No.

4

-,