ML20195J511: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ - _ _ _ _ _ _ - | {{#Wiki_filter:_ _ _ - _ _ _ _ _ _ - | ||
_ | |||
_ _ _ _ _ _ | |||
D $ 64/~ | |||
' | |||
.s | |||
. | |||
June 17, 1988 | |||
- | - | ||
- | |||
-Docket Nos. 50-321, 50-366 | |||
License Nos. DPR-57, NPF-5 | |||
Georgia Power Company | |||
; | |||
.ATT4: Mr. R. P. Mcdonald' | |||
Executive Vice President - | |||
Nuclear Operations | |||
> | |||
P. O. Box 4545 | |||
Atlanta, GA 30301 | |||
Gentlemen: | |||
SUBJECT: NOTICE OF. VIOLATION | |||
(NRC INSPECTION REPORT NOS. 50-321/88-15AND50-366/88-15) | |||
i | |||
This refers to the Nuclear Regulatory Commission (NRC) Operational Performance | |||
Assessment (0PA) conducted by C. Julian and team on May 9 - 20 1988. | |||
The | |||
inspection evaluated the effectiveness of the Operations group and other plant | |||
, | |||
groups in supporting safe plant operations at your. Hatch facility. The findings | |||
; | |||
of the inspection were discussed with those members of your staff identified | |||
in the enclosed inspection report on June 1 1988. | |||
: | |||
< | |||
Areas examined during the inspection are identified in the report. | |||
Within | |||
- | |||
these areas the inspection consisted of selective examinations of procedures | |||
and representative records, interviews with personnel, and observation of | |||
, | |||
activities in progress. | |||
This was a performance based team assessment of plant Hatch which identified | |||
! | |||
significant operational strengths and weaknesses, rather than a compliance | |||
: | |||
oriented inspection. | |||
However, during the course of the inspection certain | |||
activities were noted which appeared to violate NRC requirements. | |||
The viola- | |||
tions, references to pertinent requirements, and elements to be included in | |||
' | |||
your response are described in the enclosed Notice of Violation. | |||
There is | |||
; | |||
n | n | ||
also an unresolved item identified in the inspection report which will be | |||
i | |||
' | |||
' | |||
pursued during futbre inspections. | |||
' | |||
We believe that substantial enhancements were made to plant operations during | |||
the recent shutdown which improve safety and enhance the ability of the | |||
Operations staff to perform its job effectively. | |||
These enhancements include | |||
' | ' | ||
i | i | ||
; | ; | ||
extensive training on the Emergency Operating Procedures (E0Ps), improving the | |||
; | |||
readability of the E0Ps, consolidating drawing changes with the engineering | |||
drawings in the control room, improving plant labeling, decreasing the number | |||
; | |||
l | l | ||
of lighted annunciators, and emphasizing 'che need for operator professionalism. | |||
We strongly support these and other near-term improvemen,s and we encourage | |||
l | l | ||
aggressive implementation of your longer term enhancem1ntt. | |||
[ | |||
j . | |||
v | |||
l | l | ||
l | l | ||
l | |||
' | |||
\\ | |||
8806290144 880617 | |||
- | |||
! | |||
. | |||
PDR | |||
ADOCK 03000321 | |||
O | |||
DCD | |||
g ol | |||
t | |||
' | |||
e | |||
Georgia Power Company | |||
2 | |||
June 17, 1988 | |||
We also encourage more aggressive management attention to site quality improve- | |||
ment actions. We are concerned that you had failed to flag a number of Quality | |||
Assurance audit findings as significant. | |||
These findings included weaknesses | |||
regarding professional condu.ct in the control room, excessive administrative | |||
workload on the Shift Supervisor, timely incorporation of as-built-notices | |||
into the dr eings available in the control room, technical deviatioas in the | |||
E0Ps from the Emergency Procedure Guidelines (EPGs), the complexity and read- | |||
ability of the E0Ps and fire brigade training. | |||
A fully effective Quality | |||
Assurance prugram and management followup would have resulted in more timely | |||
licensee-initiated programs to correct the above weaknesses. | |||
Ir the area of E0Ps we note that the technical bases for differences between | |||
the Hatch E0Ps and the General Electric Owners Group EPGs are still not | |||
documented and de present E0Ps are still complex and difficult to follow. | |||
Action should he taken en a priority basis to simplify the E0Ps and to | |||
establish documentation of deviations. | |||
Your plans for completing this work | |||
will be discussed with the NRC in a management meeting in the near future. | |||
In accordance with Section 2.790 of the NRC's "Rules of Practice" Part 2 | |||
Title 10 Code of Federal Regulations a copy of this letter and its enclosures | |||
will be placed in the NRC Public Document Room. | |||
The responses directed by this letter and its enclosures are not subject to | |||
the clearance procedures of the Office of Management and Budget as required by | |||
the Paperwork Reduction Act of 1980 Pub. L. No. 96-511. | |||
Should you have any questions concerning this letter, please contact us. | |||
Sincerely, | |||
(Original signed by J. Nelson Grace) | |||
J. Nelson Grace | |||
Regional Administrator | |||
Enclosures: | |||
1. | |||
Notice of Violation | |||
2. | |||
NRC Inspection Report | |||
cc w/encls: | |||
J. T. Beckham, Vice President, | |||
Plant Hatch | |||
H. C. Nix, Plant Manager | |||
0. M. Fraser, Site Quality | |||
Assurance (QA) Supervisor | |||
t. Gucwa, Manag?r, Nuclear | |||
Safety and Licensing | |||
bcc w/ encl: | |||
(See page 3) | |||
l | l | ||
. | |||
. | |||
_ _ - _ _ _ _ _ | |||
f | |||
' | |||
s | |||
Georgia Power Company | |||
3 | |||
June 17, 1988 | |||
bec w/ encl: | |||
DRS Technical Assistant | |||
Hugh S. Jordan | |||
NRC Resident Inspector | |||
Docur, ant Control Desk | |||
State of Georgia | |||
i | i | ||
! | ! | ||
> | |||
gh | |||
RIIb{W | |||
W | |||
,V | |||
' | |||
y\\ , | |||
RIIf/ | |||
, | , | ||
G.9 E*% | |||
})id& &g()' | |||
yf dOW'!" GSirA';f3 | |||
73W | |||
C"< t 0 - | |||
RIII | |||
RII | |||
RII | |||
' | ' | ||
RI | |||
v | |||
NRR | |||
, | |||
' | |||
RButcder | |||
LCrocker | |||
RGibbs | |||
Odonklin AMorrongiello W Connor CPatterson | |||
: | : | ||
06//s/88 | |||
06/6/88 06/)6/88 06/6/88 06//5/88 | |||
D6//f/88 | |||
06//s/88 | |||
i | i | ||
l | RII | ||
RII | |||
RII | |||
RII | |||
RI | |||
RI | |||
l | RII | ||
l | |||
0498ttl, | |||
dNhv | |||
Y$ | |||
C f | |||
b | |||
lock | |||
CJul | |||
n | |||
AG son | |||
MSin | |||
se VBr6wnlee | |||
l | |||
DStarkey' | |||
lWatson | |||
' | |||
MShyp/88 | |||
06//6'/88 | |||
06/%/88 | |||
06/ /88 06/jg/88 | |||
06// >/88 | |||
06/6/88 | |||
06/lg | |||
i | i | ||
RII e | |||
RII | |||
DLY hof | |||
CReyas | |||
MErnst | |||
06/[ 88 | |||
l | 06//7 /88 | ||
l | |||
. | |||
- | |||
}} | }} | ||
Latest revision as of 18:05, 10 December 2024
| ML20195J511 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/17/1988 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Mcdonald R GEORGIA POWER CO. |
| Shared Package | |
| ML20195J514 | List: |
| References | |
| NUDOCS 8806290144 | |
| Download: ML20195J511 (3) | |
See also: IR 05000321/1988015
Text
_ _ _ - _ _ _ _ _ _ -
_
_ _ _ _ _ _
D $ 64/~
'
.s
.
June 17, 1988
-
-
-Docket Nos. 50-321, 50-366
Georgia Power Company
.ATT4: Mr. R. P. Mcdonald'
Executive Vice President -
Nuclear Operations
>
P. O. Box 4545
Atlanta, GA 30301
Gentlemen:
SUBJECT: NOTICE OF. VIOLATION
(NRC INSPECTION REPORT NOS. 50-321/88-15AND50-366/88-15)
i
This refers to the Nuclear Regulatory Commission (NRC) Operational Performance
Assessment (0PA) conducted by C. Julian and team on May 9 - 20 1988.
The
inspection evaluated the effectiveness of the Operations group and other plant
,
groups in supporting safe plant operations at your. Hatch facility. The findings
of the inspection were discussed with those members of your staff identified
in the enclosed inspection report on June 1 1988.
<
Areas examined during the inspection are identified in the report.
Within
-
these areas the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
,
activities in progress.
This was a performance based team assessment of plant Hatch which identified
!
significant operational strengths and weaknesses, rather than a compliance
oriented inspection.
However, during the course of the inspection certain
activities were noted which appeared to violate NRC requirements.
The viola-
tions, references to pertinent requirements, and elements to be included in
'
your response are described in the enclosed Notice of Violation.
There is
n
also an unresolved item identified in the inspection report which will be
i
'
'
pursued during futbre inspections.
'
We believe that substantial enhancements were made to plant operations during
the recent shutdown which improve safety and enhance the ability of the
Operations staff to perform its job effectively.
These enhancements include
'
i
extensive training on the Emergency Operating Procedures (E0Ps), improving the
readability of the E0Ps, consolidating drawing changes with the engineering
drawings in the control room, improving plant labeling, decreasing the number
l
of lighted annunciators, and emphasizing 'che need for operator professionalism.
We strongly support these and other near-term improvemen,s and we encourage
l
aggressive implementation of your longer term enhancem1ntt.
[
j .
v
l
l
l
'
\\
8806290144 880617
-
!
.
ADOCK 03000321
O
g ol
t
'
e
Georgia Power Company
2
June 17, 1988
We also encourage more aggressive management attention to site quality improve-
ment actions. We are concerned that you had failed to flag a number of Quality
Assurance audit findings as significant.
These findings included weaknesses
regarding professional condu.ct in the control room, excessive administrative
workload on the Shift Supervisor, timely incorporation of as-built-notices
into the dr eings available in the control room, technical deviatioas in the
E0Ps from the Emergency Procedure Guidelines (EPGs), the complexity and read-
ability of the E0Ps and fire brigade training.
A fully effective Quality
Assurance prugram and management followup would have resulted in more timely
licensee-initiated programs to correct the above weaknesses.
Ir the area of E0Ps we note that the technical bases for differences between
the Hatch E0Ps and the General Electric Owners Group EPGs are still not
documented and de present E0Ps are still complex and difficult to follow.
Action should he taken en a priority basis to simplify the E0Ps and to
establish documentation of deviations.
Your plans for completing this work
will be discussed with the NRC in a management meeting in the near future.
In accordance with Section 2.790 of the NRC's "Rules of Practice" Part 2
Title 10 Code of Federal Regulations a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980 Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by J. Nelson Grace)
J. Nelson Grace
Regional Administrator
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
J. T. Beckham, Vice President,
Plant Hatch
H. C. Nix, Plant Manager
0. M. Fraser, Site Quality
Assurance (QA) Supervisor
t. Gucwa, Manag?r, Nuclear
Safety and Licensing
bcc w/ encl:
(See page 3)
l
.
.
_ _ - _ _ _ _ _
f
'
s
Georgia Power Company
3
June 17, 1988
bec w/ encl:
DRS Technical Assistant
Hugh S. Jordan
NRC Resident Inspector
Docur, ant Control Desk
State of Georgia
i
!
>
gh
RIIb{W
W
,V
'
y\\ ,
RIIf/
,
G.9 E*%
})id& &g()'
yf dOW'!" GSirA';f3
73W
C"< t 0 -
RIII
RII
RII
'
RI
v
,
'
RButcder
LCrocker
RGibbs
Odonklin AMorrongiello W Connor CPatterson
06//s/88
06/6/88 06/)6/88 06/6/88 06//5/88
D6//f/88
06//s/88
i
RII
RII
RII
RII
RI
RI
RII
l
0498ttl,
dNhv
Y$
C f
b
lock
CJul
n
AG son
MSin
se VBr6wnlee
l
DStarkey'
lWatson
'
MShyp/88
06//6'/88
06/%/88
06/ /88 06/jg/88
06// >/88
06/6/88
06/lg
i
RII e
RII
DLY hof
CReyas
MErnst
06/[ 88
06//7 /88
l
.
-