{{#Wiki_filter:. _      .                .        ._    _    ._-    . _.
{{#Wiki_filter:.
ler u f (W
ler u f (W ps**0%
:. ps**0%                                                                       g gg3 g-          4                         UNITED STATES
g gg3 4
  . 3            [           NUCLEAR REGULATORY COMMISSION
UNITED STATES g-3
* WASHINGTON, D.C. 30006 4 001 November 6, 1997 1
[
Mr. Nicholas J. Liparulo Manager                                                         l Nuclear Safety and fegulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30006 4 001 November 6, 1997 Mr. Nicholas J. Liparulo Manager l
Nuclear Safety and fegulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230


==SUBJECT:==
==SUBJECT:==
Line 27: Line 28:


==Dear Mr. Liparelo:==
==Dear Mr. Liparelo:==
The Nuclear Regulatory Commission (NRC) will be conducting an inspection of AP600 design control activities at the Westinghouse Energy Center in l
Monroevilla. Pennsylvania, during the week of November 17 through 21, 1997.
The inspectlon will focus primarily on the quality cf documentation developed l
by Westinghouse associated with computer code qualification, testing, and i
design basis analyses.
Most of the Westi'ighouse records are maintained in electronic (paperless) storage. Based on staff observations during a preliminary examination of quality assurance records in September of this year, it was concluded that review of documentation via computer terminal displays is difficult and inefficient.
The NRC staff members participating in the inspection have requested that printed copies of documentation it plans to review be made available. The staff is currently attempting to identify to Westinghouse, in advance, the documentation that it anticipatts will be reviewed durin the inspection.
The staff has been working with Mr. Bob lupper of Westin house to prepare and coordinate this inspection. provides the purpose and scope of the inspection. The inspection team members and overall schedule are provided in Enclosure 2.
:p M )
2 0 H LE S EfJI S C D P Y G
PDR MM llll 11,11Jljll[lill!


The Nuclear Regulatory Commission (NRC) will be conducting an inspection of              .
Mr. Nicholas J. Liparulo November 6, 1997 The cooperation of your staff in providing the supr. ort needed to complete the inspection is appreciated.
AP600 design control activities at the Westinghouse Energy Center in                      l Monroevilla. Pennsylvania, during the week of November 17 through 21, 1997.              !
Should you have any questions concerning this inspection, please contact either Mr. Robert Pettis at (301)-415-3214, or Mr. Bill Huffman at (301)-415-1141.
The inspectlon will focus primarily on the quality cf documentation developed            l by Westinghouse associated with computer code qualification, testing, and                i design basis analyses.
Most of the Westi'ighouse records are maintained in electronic (paperless)                ;
storage. Based on staff observations during a preliminary examination of                  .
quality assurance records in September of this year, it was concluded that                !
review of documentation via computer terminal displays is difficult and inefficient. The NRC staff members participating in the inspection have requested that printed copies of documentation it plans to review be made available. The staff is currently attempting to identify to Westinghouse, in advance, the documentation that it anticipatts will be reviewed durin the inspection. The staff has been working with Mr. Bob lupper of Westin house to prepare and coordinate this inspection.
Enclosure 1 provides the purpose and scope of the inspection. The inspection team members and overall schedule are provided in Enclosure 2.
:p M        )
2 0 H LE S EfJI S C D P Y    ,
G                  PDR MM                        llll 11,11Jljll[lill!
 
Mr. Nicholas J. Liparulo                                                 November 6, 1997 The cooperation of your staff in providing the supr. ort needed to complete the inspection is appreciated. Should you have any questions concerning this inspection, please contact either Mr. Robert Pettis at (301)-415-3214, or Mr. Bill Huffman at (301)-415-1141.
Sincerely, original signed by:
Sincerely, original signed by:
Suzanne C. Black, Chief Quality Assurance, Vendor Inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No. 52-003
Suzanne C. Black, Chief Quality Assurance, Vendor Inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No. 52-003


==Enclosure:==
==Enclosure:==
As stated cc w/ enc 1:   See next page DISTRIBUTIQB:
As stated cc w/ enc 1:
Dot.ket Fila                       PDST R/F                             HQMB R/F PUBLIC                             JRoe                                 DMatthews TQuay                               TKenyon                             BHuffman JSebrosky                           DScaletti                           JNWilson WDean, 0-5 E23                     ACRS(11)                             JPeralta, 09-Al JMoore 0-15 B18                     RPettis, 09-D4                       LSpessard, 09-E4 RGramm, 09-Al                     SBlack, 09-Al                       RLandry 0-8 E23 GCwalina, 09-04                   EThrom, 0-8 H7                       JStaudenmeier, E2 Alevin, 0-8 E23                     Llois, 0-8 E23                       SNewberry, 0-8 E2 SSun, 0-8 E23                     TCollins, 0-8 E23                   GHalahan, 0-8 E2 RCaruso, 0-8 E2 DOCU"ENT NAME: A:QA-AUDIT.MMO
See next page DISTRIBUTIQB:
: t.   . . ..,, .: ini. .. . in ... i. in. 6..: c . co,, .iinooi . . cam.ois.ncio.o,.   . c.,, .an .ti.cnm.nif.ncio.o,. u . noco,,
Dot.ket Fila PDST R/F HQMB R/F PUBLIC JRoe DMatthews TQuay TKenyon BHuffman JSebrosky DScaletti JNWilson WDean, 0-5 E23 ACRS(11)
0FFICE       HQMB:DRCH       3          SC:HQMB:DRCH         ff   D:PDST:DRPM i           IBC:HQMB:DRCHlL NAME         UPeralta;sh f              RGramm R(.,               TRQuay 42 C             SBlack wh DATE         ll/(p/97
JPeralta, 09-Al JMoore 0-15 B18 RPettis, 09-D4 LSpessard, 09-E4 RGramm, 09-Al SBlack, 09-Al RLandry 0-8 E23 GCwalina, 09-04 EThrom, 0-8 H7 JStaudenmeier, E2 Alevin, 0-8 E23 Llois, 0-8 E23 SNewberry, 0-8 E2 SSun, 0-8 E23 TCollins, 0-8 E23 GHalahan, 0-8 E2 RCaruso, 0-8 E2 DOCU"ENT NAME: A:QA-AUDIT.MMO t.
* ll/lo/97                 11/ ^//97               11/(,/97       '
....,,.: ini.
0FFICIAL RECORD COPY
. in... i. in. 6..:
c. co,,.iinooi.. cam.ois.ncio.o,.
. c.,,.an.ti.cnm.nif.ncio.o,.
u. noco,,
0FFICE HQMB:DRCH SC:HQMB:DRCH ff D:PDST:DRPM i IBC:HQMB:DRCHlL 3
NAME UPeralta;sh RGramm R(.,
TRQuay 4 C SBlack wh 2
f DATE ll/(p/97
* ll/lo/97 11/ ^//97 11/(,/97 0FFICIAL RECORD COPY


l
Mr. Nicholas J. Liparulo Docket No. 52-003 Westinghouse Electric Corporation AP600 i
:                                                                                                                  l Mr. Nicholas J. Liparulo                                       Docket No. 52-003 Westinghouse Electric Corporation                             AP600 i
cc: Mr. B. A. McIntyre Mr. Russ Bell l
cc: Mr. B. A. McIntyre                                         Mr. Russ Bell                                 l Advanced Plant Safety & Licensing                         Senior Project Manager, Programs             ,
Advanced Plant Safety & Licensing Senior Project Manager, Programs Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 1 Street, NW P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706
Westinghouse Electric Corporation                         Nuclear Energy Institute Energy Systems Business Unit                             1776 1 Street, NW P.O. Box 355                                             Suite 300 Pittsburgh, PA 15230                                     Washington, DC 20006-3706
- Ms. Cindy L. Haag Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office B e 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Sterling Franks GE Nuclear Energy U.S. Department of Energy 175 Curtner Avenue, MC-754 NF-50 San Jose, CA 95125
              - Ms. Cindy L. Haag                                       Ms. Lynn Connor Advanced Plant Safety & Licensing                         Doc-Search Associates Westinghouse Electric Corporation                         Post Office B e 34 Energy Systems Business Unit                             Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230                                     Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Sterling Franks                                       GE Nuclear Energy U.S. Department of Energy                                 175 Curtner Avenue, MC-754 NF-50                                                     San Jose, CA 95125
- 19901 Germantown Road Germantown, MD 20874 Mr. Robert H. Buchholz GE Nuclear Snergy Mr. Frank A. Ro:s 175 Curtner Avenue, MC-781 U.S. Department of Energy, NE-42 San Jose, CA 95125 Office of LWR Safety and Technology 19901 Germantown R9ad Barton Z. Cowan, Esq.
              - 19901 Germantown Road Germantown, MD 20874                                     Mr. Robert H. Buchholz GE Nuclear Snergy Mr. Frank A. Ro:s                                         175 Curtner Avenue, MC-781 U.S. Department of Energy, NE-42                         San Jose, CA 95125 Office of LWR Safety and Technology 19901 Germantown R9ad                                   Barton Z. Cowan, Esq.
Germantown, MD 20874 Eckert Seamans Cherin & Mellott 600 Grant Street 42nd Floor Mr. Cha.rles Thompson, Nuclear Engineer Pittsburgh, PA 15219 AP600 Certification NE-50 Mr. Ed Rodwell, Manager 19901 Germantown Road PWR Design Certification Germantown, MD 20874 Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94303
Germantown, MD 20874                                     Eckert Seamans Cherin & Mellott 600 Grant Street 42nd Floor Mr. Cha.rles Thompson, Nuclear Engineer                   Pittsburgh, PA 15219 AP600 Certification NE-50                                                     Mr. Ed Rodwell, Manager 19901 Germantown Road                                     PWR Design Certification Germantown, MD 20874                                     Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94303
-. ~. -
                    --y w,.-                   ,                                -                                  ,
.m-,,
 
--y w,.-
.-:. . .- = u . -
e w.
                        = = ..:       -  -
-.-e
(                                                                                                               ;
:...- = u.
s
= =..:
(
(
(
i AP600 FINAL QUALITY ASSURANCE INSPECTION PURPOSE:   To determine if quality activities performed as part of the design of the AP600 Simplified Passive Advanced Light Water Reactor                               .
i s
Program were conducted under the appro)riate provisions of the                             ,
AP600 FINAL QUALITY ASSURANCE INSPECTION PURPOSE:
Westinghouse 10 CFR Part 50, Appendix 3, quality assurance program of record in the AP600 SSAR: Westinghouse Electric Corporation, Energy Systems Business Unit,-Quality Management System (QMS),
To determine if quality activities performed as part of the design of the AP600 Simplified Passive Advanced Light Water Reactor Program were conducted under the appro)riate provisions of the Westinghouse 10 CFR Part 50, Appendix 3, quality assurance program of record in the AP600 SSAR: Westinghouse Electric Corporation, Energy Systems Business Unit,-Quality Management System (QMS),
Revision 1, approved by the NRC on February 23, 1996.                                     ,
Revision 1, approved by the NRC on February 23, 1996.
SCOPE:     Review NOTRUMP, LOFTRAN, WCOBRA/ TRAC, and WGOTHIC computer code verification and validation documentation; including code develop-ment records, calculation notes and files, record files for code                           ,
SCOPE:
input modelling, and records rele%d to the independent design                             <
Review NOTRUMP, LOFTRAN, WCOBRA/ TRAC, and WGOTHIC computer code verification and validation documentation; including code develop-ment records, calculation notes and files, record files for code input modelling, and records rele%d to the independent design verification of such computer codes.
verification of such computer codes.
Review of testing program and analysis documentation and its use for code validation.
Review of testing program and analysis documentation and its use for code validation.
Review AP600 SSAR Chapter 6, 15 and Shutdown safety analyses calculations.                                                                             !
Review AP600 SSAR Chapter 6, 15 and Shutdown safety analyses calculations.
Review Westinghouse implementation of corrective actions taken as                         i a result of findings documented during inspections of design certification test facilities (SDSER Confirmatory Items). Review                         ,
Review Westinghouse implementation of corrective actions taken as i
and confirm Westinghouse implementation of corrective measures undertaken as a result of findings identified in NP.C Inspection Report 99900404/97-01 (May 2, 1997).
a result of findings documented during inspections of design certification test facilities (SDSER Confirmatory Items).
These reviews will encompass verification of effective implementa-tion of the relevant portions of the AP600 Quality Assurance Plan (WCAP-12600, "AP600 Advanced Light Water Reactor Design Quality Assurance Program Plan," Revision 3) by Westinghouse and any subcontractors / consultants.                                                   ,
Review and confirm Westinghouse implementation of corrective measures undertaken as a result of findings identified in NP.C Inspection Report 99900404/97-01 (May 2, 1997).
Enclosure 1
These reviews will encompass verification of effective implementa-tion of the relevant portions of the AP600 Quality Assurance Plan (WCAP-12600, "AP600 Advanced Light Water Reactor Design Quality Assurance Program Plan," Revision 3) by Westinghouse and any subcontractors / consultants.


0 1
0 1
AP600 FINAL QUALITY ASSURANCE INSPECTION                                       :
AP600 FINAL QUALITY ASSURANCE INSPECTION f
f DATES:               November 17-21, 1997                                                             ,
DATES:
INSPECTION SCHEDULE AND ROUTINE:
November 17-21, 1997 INSPECTION SCHEDULE AND ROUTINE:
e     Entrance Meeting         11:00 am, November 17, 1997                     I e     Exit Meeting             11:00 am, November 21, 1997 e     Normal Hours             8:00 am - 5:30 pm INSPECTION TEAM:
e Entrance Meeting 11:00 am, November 17, 1997 I
e Exit Meeting 11:00 am, November 21, 1997 e
Normal Hours 8:00 am - 5:30 pm INSPECTION TEAM:
Robert Pettis, Team Leader, HQMB Juan Peralta. HQMB Alan Levin, Testing, SRXB"'
Robert Pettis, Team Leader, HQMB Juan Peralta. HQMB Alan Levin, Testing, SRXB"'
Ralph Landry, NOTRUMP and LOFTRAN, SRXB'''
Ralph Landry, NOTRUMP and LOFTRAN, SRXB'''
Lambros Lois, WCOBRA/ TRAC, LBLOCA, LTC, and Chapter 15, SRXB Summer Sun, Chapter 15, SRXB Ed Throm, WGOTHIC, Containment Testing, Chapter 6, SCSB Joe Staudermeier, Technical Staff Assistant, SRXB Bill Huffman, Project Manager, PDST (1) Mr. Levin will only be participating in the inspection for one day (November 18, 1997)
Lambros Lois, WCOBRA/ TRAC, LBLOCA, LTC, and Chapter 15, SRXB Summer Sun, Chapter 15, SRXB Ed Throm, WGOTHIC, Containment Testing, Chapter 6, SCSB Joe Staudermeier, Technical Staff Assistant, SRXB Bill Huffman, Project Manager, PDST (1) Mr. Levin will only be participating in the inspection for one day (November 18, 1997)
(2) The dates for Mr. Landry's participation in the inspection have not yet been finalized.                                                                                   -
(2) The dates for Mr. Landry's participation in the inspection have not yet been finalized.
Enclo'sure 2
Enclo'sure 2
_.}}
_.}}

Latest revision as of 08:43, 10 December 2024

Informs That NRC Will Be Conducting Insp of AP600 Design Control Activities at W Energy Ctr in Monroeville,Pa During Wk of 971117-21.Insp Will Focus on Primarily on Quality of Documentation Developed by W.Encl Provides Scope of Insp
ML20199B118
Person / Time
Site: 05200003
Issue date: 11/06/1997
From: Black S
NRC (Affiliation Not Assigned)
To: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9711180220
Download: ML20199B118 (5)


Text

.

ler u f (W ps**0%

g gg3 4

UNITED STATES g-3

[

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30006 4 001 November 6, 1997 Mr. Nicholas J. Liparulo Manager l

Nuclear Safety and fegulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230

SUBJECT:

CONFIRMATION OF NUCLEAR REGULATORY COP 9tISSION INSPECTION OF WESTING-HOUSE ELECTRIC CORPORATION AP600 ADVANCED REACTOR DESIGN QUALITY CONTROL ACTIVITIES

Dear Mr. Liparelo:

The Nuclear Regulatory Commission (NRC) will be conducting an inspection of AP600 design control activities at the Westinghouse Energy Center in l

Monroevilla. Pennsylvania, during the week of November 17 through 21, 1997.

The inspectlon will focus primarily on the quality cf documentation developed l

by Westinghouse associated with computer code qualification, testing, and i

design basis analyses.

Most of the Westi'ighouse records are maintained in electronic (paperless) storage. Based on staff observations during a preliminary examination of quality assurance records in September of this year, it was concluded that review of documentation via computer terminal displays is difficult and inefficient.

The NRC staff members participating in the inspection have requested that printed copies of documentation it plans to review be made available. The staff is currently attempting to identify to Westinghouse, in advance, the documentation that it anticipatts will be reviewed durin the inspection.

The staff has been working with Mr. Bob lupper of Westin house to prepare and coordinate this inspection. provides the purpose and scope of the inspection. The inspection team members and overall schedule are provided in Enclosure 2.

p M )

2 0 H LE S EfJI S C D P Y G

PDR MM llll 11,11Jljll[lill!

Mr. Nicholas J. Liparulo November 6, 1997 The cooperation of your staff in providing the supr. ort needed to complete the inspection is appreciated.

Should you have any questions concerning this inspection, please contact either Mr. Robert Pettis at (301)-415-3214, or Mr. Bill Huffman at (301)-415-1141.

Sincerely, original signed by:

Suzanne C. Black, Chief Quality Assurance, Vendor Inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No.52-003

Enclosure:

As stated cc w/ enc 1:

See next page DISTRIBUTIQB:

Dot.ket Fila PDST R/F HQMB R/F PUBLIC JRoe DMatthews TQuay TKenyon BHuffman JSebrosky DScaletti JNWilson WDean, 0-5 E23 ACRS(11)

JPeralta, 09-Al JMoore 0-15 B18 RPettis, 09-D4 LSpessard, 09-E4 RGramm, 09-Al SBlack, 09-Al RLandry 0-8 E23 GCwalina, 09-04 EThrom, 0-8 H7 JStaudenmeier, E2 Alevin, 0-8 E23 Llois, 0-8 E23 SNewberry, 0-8 E2 SSun, 0-8 E23 TCollins, 0-8 E23 GHalahan, 0-8 E2 RCaruso, 0-8 E2 DOCU"ENT NAME: A:QA-AUDIT.MMO t.

....,,.: ini.

. in... i. in. 6..:

c. co,,.iinooi.. cam.ois.ncio.o,.

. c.,,.an.ti.cnm.nif.ncio.o,.

u. noco,,

0FFICE HQMB:DRCH SC:HQMB:DRCH ff D:PDST:DRPM i IBC:HQMB:DRCHlL 3

NAME UPeralta;sh RGramm R(.,

TRQuay 4 C SBlack wh 2

f DATE ll/(p/97

  • ll/lo/97 11/ ^//97 11/(,/97 0FFICIAL RECORD COPY

Mr. Nicholas J. Liparulo Docket No.52-003 Westinghouse Electric Corporation AP600 i

cc: Mr. B. A. McIntyre Mr. Russ Bell l

Advanced Plant Safety & Licensing Senior Project Manager, Programs Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 1 Street, NW P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706

- Ms. Cindy L. Haag Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office B e 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Sterling Franks GE Nuclear Energy U.S. Department of Energy 175 Curtner Avenue, MC-754 NF-50 San Jose, CA 95125

- 19901 Germantown Road Germantown, MD 20874 Mr. Robert H. Buchholz GE Nuclear Snergy Mr. Frank A. Ro:s 175 Curtner Avenue, MC-781 U.S. Department of Energy, NE-42 San Jose, CA 95125 Office of LWR Safety and Technology 19901 Germantown R9ad Barton Z. Cowan, Esq.

Germantown, MD 20874 Eckert Seamans Cherin & Mellott 600 Grant Street 42nd Floor Mr. Cha.rles Thompson, Nuclear Engineer Pittsburgh, PA 15219 AP600 Certification NE-50 Mr. Ed Rodwell, Manager 19901 Germantown Road PWR Design Certification Germantown, MD 20874 Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94303

-. ~. -

.m-,,

--y w,.-

e w.

-.-e

...- = u.

= =..:

(

(

i s

AP600 FINAL QUALITY ASSURANCE INSPECTION PURPOSE:

To determine if quality activities performed as part of the design of the AP600 Simplified Passive Advanced Light Water Reactor Program were conducted under the appro)riate provisions of the Westinghouse 10 CFR Part 50, Appendix 3, quality assurance program of record in the AP600 SSAR: Westinghouse Electric Corporation, Energy Systems Business Unit,-Quality Management System (QMS),

Revision 1, approved by the NRC on February 23, 1996.

SCOPE:

Review NOTRUMP, LOFTRAN, WCOBRA/ TRAC, and WGOTHIC computer code verification and validation documentation; including code develop-ment records, calculation notes and files, record files for code input modelling, and records rele%d to the independent design verification of such computer codes.

Review of testing program and analysis documentation and its use for code validation.

Review AP600 SSAR Chapter 6, 15 and Shutdown safety analyses calculations.

Review Westinghouse implementation of corrective actions taken as i

a result of findings documented during inspections of design certification test facilities (SDSER Confirmatory Items).

Review and confirm Westinghouse implementation of corrective measures undertaken as a result of findings identified in NP.C Inspection Report 99900404/97-01 (May 2, 1997).

These reviews will encompass verification of effective implementa-tion of the relevant portions of the AP600 Quality Assurance Plan (WCAP-12600, "AP600 Advanced Light Water Reactor Design Quality Assurance Program Plan," Revision 3) by Westinghouse and any subcontractors / consultants.

0 1

AP600 FINAL QUALITY ASSURANCE INSPECTION f

DATES:

November 17-21, 1997 INSPECTION SCHEDULE AND ROUTINE:

e Entrance Meeting 11:00 am, November 17, 1997 I

e Exit Meeting 11:00 am, November 21, 1997 e

Normal Hours 8:00 am - 5:30 pm INSPECTION TEAM:

Robert Pettis, Team Leader, HQMB Juan Peralta. HQMB Alan Levin, Testing, SRXB"'

Ralph Landry, NOTRUMP and LOFTRAN, SRXB

Lambros Lois, WCOBRA/ TRAC, LBLOCA, LTC, and Chapter 15, SRXB Summer Sun, Chapter 15, SRXB Ed Throm, WGOTHIC, Containment Testing, Chapter 6, SCSB Joe Staudermeier, Technical Staff Assistant, SRXB Bill Huffman, Project Manager, PDST (1) Mr. Levin will only be participating in the inspection for one day (November 18, 1997)

(2) The dates for Mr. Landry's participation in the inspection have not yet been finalized.