ML20199B790: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
,                                                  TECHNICAL SPECIFICATION UNIVERSITY OF MISSOURI
TECHNICAL SPECIFICATION UNIVERSITY OF MISSOURI RESEARCH REACTOR FACILITY Number G.1 Page 1
            ,                                              RESEARCH REACTOR FACILITY Number   G.1 Page 1 of   8 Date
of 8
Date


==SUBJECT:==
==SUBJECT:==
Administration Applienbility This specification applies to the administrative controls over operation of the Research Reactor.
Administration Applienbility This specification applies to the administrative controls over operation of the Research Reactor.
Obiective The objective of this specification is to assure proper and safe operation of the facility and experimental programs.
Obiective The objective of this specification is to assure proper and safe operation of the facility and experimental programs.
Specification
Specification a.
: a. The organization for the management and operation of the reactor shall be as indicated in figure 6.0.
The organization for the management and operation of the reactor shall be as indicated in figure 6.0.
: b. Written procedures shall be in effect for normal operations of the reactor, emergencies, radiological control and the preparation for shipping and the                     ]
: b. Written procedures shall be in effect for normal operations of the reactor, emergencies, radiological control and the preparation for shipping and the
shipping of byproduct material produced under the reactor license. Copies of the operating, emergency and radiological control procedures shall be                         ]
]
available in the reactor contml room. The Reactor Manager shall annually                       ]
shipping of byproduct material produced under the reactor license. Copies of the operating, emergency and radiological control procedures shall be
review and approve Reactor Operating and Emergency Procedures. The Manager, Reactor Health Physics, shall annually twiew and approve                             ]
]
radiological control procedures and the procedures for preparation for                       ]
available in the reactor contml room. The Reactor Manager shall annually
shipping and the shipping of byproduct material.                                             ]
]
9801290019 900122 PDR     ADOCK 05000186 P                               PDR Amendment No. 30 l}}
review and approve Reactor Operating and Emergency Procedures. The Manager, Reactor Health Physics, shall annually twiew and approve
]
radiological control procedures and the procedures for preparation for
]
shipping and the shipping of byproduct material.
]
9801290019 900122 PDR ADOCK 05000186 P
PDR Amendment No. 30 l}}

Latest revision as of 08:30, 10 December 2024

Proposed Tech Specs Page,Revising TS 6.1.b Re Preparation of Byproduct Matl for Shipping
ML20199B790
Person / Time
Site: University of Missouri-Columbia
Issue date: 01/22/1998
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
Shared Package
ML20199B783 List:
References
NUDOCS 9801290019
Download: ML20199B790 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

TECHNICAL SPECIFICATION UNIVERSITY OF MISSOURI RESEARCH REACTOR FACILITY Number G.1 Page 1

of 8

Date

SUBJECT:

Administration Applienbility This specification applies to the administrative controls over operation of the Research Reactor.

Obiective The objective of this specification is to assure proper and safe operation of the facility and experimental programs.

Specification a.

The organization for the management and operation of the reactor shall be as indicated in figure 6.0.

b. Written procedures shall be in effect for normal operations of the reactor, emergencies, radiological control and the preparation for shipping and the

]

shipping of byproduct material produced under the reactor license. Copies of the operating, emergency and radiological control procedures shall be

]

available in the reactor contml room. The Reactor Manager shall annually

]

review and approve Reactor Operating and Emergency Procedures. The Manager, Reactor Health Physics, shall annually twiew and approve

]

radiological control procedures and the procedures for preparation for

]

shipping and the shipping of byproduct material.

]

9801290019 900122 PDR ADOCK 05000186 P

PDR Amendment No. 30 l