ML20199E042: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,   . . _              -- ._                                      -        _
{{#Wiki_filter:,
d OPERATING DATA REPORT DOCKET NO. 50-369 DATE     3/I4/81 COMPLETED BY       .7 . A _ naavis TELEPHONE 704-373-7567
d OPERATING DATA REPORT DOCKET NO.
.                OPERATING STATUS
50-369 DATE 3/I4/81 COMPLETED BY
: 1. Unit Name:                             McGuire-1                                                   Notes
.7. A _ naavis TELEPHONE 704-373-7567 OPERATING STATUS
: 1. Unit Name:
McGuire-1 Notes
* Nameplate Rating
* Nameplate Rating
: 2. Reporting Period: February 1. 1986-February 28. 1986                                                 (Gross MWe) calculated as
: 2. Reporting Period: February 1. 1986-February 28. 1986 (Gross MWe) calculated as
: 3. Licensed Thermal Power (MWt):                     3411                                               1450.000 MVA x .90 power 1305                                              factor per Page 111,
: 3. Licensed Thermal Power (MWt):
3411 1450.000 MVA x.90 power
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
1150                                            NUREG-0020.
1305 factor per Page 111, NUREG-0020.
: 5. Design Eleetrical Rating (Net MWe):
: 5. Design Eleetrical Rating (Net MWe):
1150
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):                               1150
: 7. Maximum Dependable Capacity (Net MWe):
1150
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:
None
None
: 9. Power Level To Which Restricted,if Any (Net MWe):                               None
: 9. Power Level To Which Restricted,if Any (Net MWe):
None
: 10. Reasons For Restrictions. lf Any:
: 10. Reasons For Restrictions. lf Any:
This Month                         Yr.-to.Date       Cumulative i1. Hours In Reporting Period                                                   672.0                         1 416.0             37 224.0
This Month Yr.-to.Date Cumulative i1. Hours In Reporting Period 672.0 1 416.0 37 224.0
: 12. Number Of Hours Reactor Was Critical                                       672.0                         1 404.5             26 410.3
: 12. Number Of Hours Reactor Was Critical 672.0 1 404.5 26 410.3
: 13. Reactor Reserve Shutdown Hours                                             ---                                                      --
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On Line                                                     672.0                         1 402.5             26 114.0
: 14. Hours Generator On Line 672.0 1 402.5 26 114.0
: 15. Unit Resene Shutdown Hours                                                 ---                                                      ---
: 15. Unit Resene Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)                                   2 022 499                       4 494 198           71 860 773
: 16. Gross Thermal Energy Generated (MWH) 2 022 499 4 494 198 71 860 773
: r.  .
: 17. Gross Electrical Energy Generated (MWH) 709 263 1 575 599 24 886 832 r.
: 17. Gross Electrical Energy Generated (MWH)                                   709 263                       1 575 599           24 886 832
: 18. Net Electrical Energy Generated (MWH) 680 955 1 515 475 23 667 489 i
: 18. Net Electrical Energy Generated (MWH)                                     680 955                       1 515 475           23 667 489 i       19. Unit Service Factor                                                           100.0                           '99.0                     70.2 l       20. Unit Availability Factor                                                     100.0                             99.0                   70.2 L       21. Unit Capacity Factor (Using MDC Net)                                           88.1                             93.1                   53.9
: 19. Unit Service Factor 100.0
: 22. Unit Capacity Factor (Using DER Net)                                           88.1                             93.1                   53.9 l       23. Unit Forced Outage Rate                                                           0.0                             1.0                   13.7 i       24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
'99.0 70.2 l
l               Refueling - May 30, 1986 - 11 weeks l
: 20. Unit Availability Factor 100.0 99.0 70.2 L
: 25. If Shut Down ..t End Of Report Period. Estimated Date of Startup:
: 21. Unit Capacity Factor (Using MDC Net) 88.1 93.1 53.9
: 26. Units in Test Status (Prior to Commercial Operation):                                                     Forecast           Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION pg32188n 8688@
: 22. Unit Capacity Factor (Using DER Net) 88.1 93.1 53.9 l
R 6m          l j
: 23. Unit Forced Outage Rate 0.0 1.0 13.7 i
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
l Refueling - May 30, 1986 - 11 weeks l
: 25. If Shut Down..t End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION pg32188n 8688@
6m R
l j


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-369 UNIT McGuire               1-DATE 3/14/86 COMPLETED BY       J.A.         Reavis TELEPHONE 704-373-7567 MONTH     Februarv.'1986 DAY     AVERAGE DAILY POWER LEVEL             DAY         AVERAGE DAILY POWER LEVEL (MWe-Net)                                         (MWe-Net) 1                 1 157                       17                   1 138
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
+        2                1 157                   '18                     1 155 3               'l 137                         19                 1 154
50-369 UNIT McGuire 1-DATE 3/14/86 COMPLETED BY J.A.
,        4                  702                       20                   1 152 5                   685                       21                   1 153 6                   683'                     22                   1 154 7-                 684                       23                   i isA i'         8                   684                     24                   i isa 9                   684                     25                   1 159 10                   664                     26                   1 1sg 11                   .680                     27                   1 160
Reavis TELEPHONE 704-373-7567 MONTH Februarv.'1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: j.       12                 1 071                       28                   1 160 13                 1 147                       29 14                 1 127                       30 15                 1 127                       31 16                 1 127 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day'
(MWe-Net) 1 1 157 17 1 138 2
      ,In the reporting month. Compute to the nearest whole megawatt.
1 157
'18 1 155
+
3
'l 137 19 1 154 4
702 20 1 152 5
685 21 1 153 6
683' 22 1 154 7-684 23 i isA i'
8 684 24 i isa 9
684 25 1 159 10 664 26 1 1sg 11
.680 27 1 160 j.
12 1 071 28 1 160 13 1 147 29 14 1 127 30 15 1 127 31 16 1 127 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day'
,In the reporting month.
Compute to the nearest whole megawatt.


UNIT SHUTDOWNS AND POWER REDUCTIONS             DOCKET N0. 50-369 UNIT NAME McGuire 1 DATE 3/14/86 REPORT MONTH February, 1986           COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "sO e            I o, o     License               y                         Cause & Corrective 32        c. o3E
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-369 UNIT NAME McGuire 1 DATE 3/14/86 REPORT MONTH February, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s
* y N3.     Date   %    %h       g   jg         Event       ,5e,       g                           Action to
O Cause & Corrective I o, o License y
                          $ o:E H
e32 o3E y
5        E a:
c.
                                            %Eb zmo        Report #      RB mu 8"
N3.
ud                       Prevent Recurrence 5-p 86-02-03 S       --
Date
F     -
%h g
RC     FUELXX     Core Conservation to Extend the Time Until Refueling Outage.
jg Event
6-p 86-02-06 S       --
,5e, g
B     -
Action to o:E E
CC     VALVEX     Turbine Valve Movement Test.
%Eb RB 8"
7-p 86-02-06 S       --
5 ud Prevent Recurrence a:
F     -
zmo Report #
RC     FUELXX     Core Conservation to Extend the Time Until Refueling Outage.
H mu 5-p 86-02-03 S
8-p 86-02-10 F       --
F RC FUELXX Core Conservation to Extend the Time Until Refueling Outage.
A     -
6-p 86-02-06 S
HH     PUMPXX     Repair "B" Feedwater Pump.
B CC VALVEX Turbine Valve Movement Test.
9-p 86-02-10 S       --
7-p 86-02-06 S
F     -
F RC FUELXX Core Conservation to Extend the Time Until Refueling Outage.
RC     FUELXX     Core Conservation to Extend the Time Until Refueling Outage.
8-p 86-02-10 F
10-p   86-02-13 F       --
A HH PUMPXX Repair "B" Feedwater Pump.
A     -
9-p 86-02-10 S
HH     ACCUMU     Repair (ICl) Heater Drain Tank.
F RC FUELXX Core Conservation to Extend the Time Until Refueling Outage.
l 1             2                                               3'                         4 Reason:                                         Method:                   Exhibit S - Instructions SS e led       A-Equipment Failure (Explain)                   1-Manual                   for Preparation of Data-B-Maintenance or Test                           2-Manual Scram             Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram         Event Report (LER)
10-p 86-02-13 F
D-Regulatory Restriction                       4-Other (Explain)         File (NUREG-0161)
A HH ACCUMU Repair (ICl) Heater Drain Tank.
E-Operator Training 6 License Examination F-Administrative                                                         5 G-Operational Error (Explain)                                             Exhibit I - Same Source H-Other (Explain)
l 1
2 3'
4 Reason:
Method:
Exhibit S - Instructions SS e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data-B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 6 License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
(O/77T
(O/77T


Docket No.: 50-369 Unit: McGuire 1 Date:   3/14/86 NARRATIVE  
Docket No.: 50-369 Unit: McGuire 1 Date:
3/14/86 NARRATIVE  


==SUMMARY==
==SUMMARY==
Month: February, 1986 McGuire 1 operated at 60% for approximately 10 days during February as a core conservation measure designed to help prevent overlapping nuclear system outages. The unit operated at 100% for the-remaining days except for minor reductions to perform maintenance and testing.
Month: February, 1986 McGuire 1 operated at 60% for approximately 10 days during February as a core conservation measure designed to help prevent overlapping nuclear system outages. The unit operated at 100% for the-remaining days except for minor reductions to perform maintenance and testing.
                                                                                  )
)


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name: McGuire, Unit 1
Facility name: McGuire, Unit 1 2.
: 2. Scheduled next refueling shutdown: May, 1986
Scheduled next refueling shutdown: May, 1986 3.
: 3. Scheduled restart following refueling: August, 1986
Scheduled restart following refueling: August, 1986 4.
: 4. Will refueling or resumption of operation thereafter require a~
Will refueling or resumption of operation thereafter require a~
technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). -
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). -
: 7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 152
7.
: 8. Present licensed fuel pool capacity: 1463 Size of requested .or' planned increase:
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 152 8.
: 9. Projected date of last ref: iing which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY                         DATE: March 14, 1986 Name of
Present licensed fuel pool capacity: 1463 Size of requested.or' planned increase:
9.
Projected date of last ref: iing which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: March 14, 1986 Name of


==Contact:==
==Contact:==
J. A. Reavis           Phone:   704-373-7567
J. A. Reavis Phone:
704-373-7567


              .                                        -                                        -=-
-=-
OPERATING DATA REPORT DOCKET NO. _50-370 DATE 3/14/86 COMPLETED BY     J.A. Reavis TELEPHONE vnd-173-7567 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. _50-370 DATE 3/14/86 COMPLETED BY J.A. Reavis TELEPHONE vnd-173-7567 OPERATING STATUS Notes
: 1. Unit Name:            Mccnire 2                                    Notes
* Nameplate Rating
* Nameplate Rating
: 2. Reporting Period: February 1. 1986-February 28. 1986                   (Gross MWe) calculated as 3411                              1450.000.MVA x .90 power
: 1. Unit Name:
Mccnire 2
: 2. Reporting Period: February 1. 1986-February 28. 1986 (Gross MWe) calculated as
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
1305,                            factor per Page lii,
3411 1450.000.MVA x.90 power
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):     1150
: 1305, factor per Page lii, S. Design Electrical Rating (Net MWe):
1150
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):             11 i lo
i
: 7. Maximum Dependable Capacity (Net MWe):
11 lo
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Ghe Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Ghe Reasons:
None
None None
: 9. Power Level To Which Restncted lf Any(Net MWe):                 None
: 9. Power Level To Which Restncted lf Any(Net MWe):
: 10. Reasons For Restrictions,if Any:
: 10. Reasons For Restrictions,if Any:
;                                                              This Month           Yr to Date         Cumulative i     '11. Hours In Reporting Period                                   672.0         1 416.0             17 520.0
This Month Yr to Date Cumulative i
: 12. Number Of Hours Reactor Was Critical                         672.0         1 369.5             12 998.1
'11. Hours In Reporting Period 672.0 1 416.0 17 520.0
: 13. Reactor Reserve Shutdown Hours                               --                ---                  ---
: 12. Number Of Hours Reactor Was Critical 672.0 1 369.5 12 998.1
: 14. Hours Generator On-Line                                     672.0         1 365.3             12 630.8
: 13. Reactor Reserve Shutdown Hours
: 15. Unit Reserve Shutdown Hours                                 ---              ---                  --
: 14. Hours Generator On-Line 672.0 1 365.3 12 630.8
: 16. Gross Thermal Energy Generated (MWH)                 2 262 594         4 546 842           40 697 219
: 15. Unit Reserve Shutdown Hours
: 17. Gross Electrical Energy Generated (MWH)                   797 678     1 6ns s7R           1a in6 nos
: 16. Gross Thermal Energy Generated (MWH) 2 262 594 4 546 842 40 697 219
: 18. Net Electrical Energy Generated (MWH)                     769 484     1 546 460           13 700 113
: 17. Gross Electrical Energy Generated (MWH) 797 678 1 6ns s7R 1a in6 nos
: 19. Unit Service Factor                                         100.0               96.4                 72.1       ,
: 18. Net Electrical Energy Generated (MWH) 769 484 1 546 460 13 700 113
: 20. Unit Availability Factor                                     100.0               96.4                 72.1
: 19. Unit Service Factor 100.0 96.4 72.1
: 21. Unit Capacity Factor (Using MDC Net)                             99.6             95.0                 66.4
: 20. Unit Availability Factor 100.0 96.4 72.1
: 22. Unit Capacity Factor (Using DER Net)                             99.6             95.0                 66.4 l     23. Unit Forced Outage Rate                                           0.0               3.6                 20.7
: 21. Unit Capacity Factor (Using MDC Net) 99.6 95.0 66.4
: 22. Unit Capacity Factor (Using DER Net) 99.6 95.0 66.4 l
: 23. Unit Forced Outage Rate 0.0 3.6 20.7
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
Refueline - March 14. 1986 - 9 weeks
Refueline - March 14. 1986 - 9 weeks
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Statu> IPrior to Commercial Operation):                     Forecast           Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l         .                                                                                                        (9/77)
: 26. Units In Test Statu> IPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
(9/77)


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-370 UNIT McGuire 2-DATE 3/14/86 COMPLETED BY   J.A. Reavis TELEPHONE 704-373-7567 MONTH February, 1986 DAY AVERAGE DAILY POWER LEVEL         DAY (MWe-Net)                             AVERAGE DAILY POWER LEVEL (MWe-Ne t) 1 1'162             _
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
17                 1 161 2               1 162                       18                 1 162 3               1 159                       19                 1 156 4               1 159                       20                     741 5               1 159                       21                   1 157 6                 1 160                       22                   1 158 7                 1 160                       23     __
50-370 UNIT McGuire 2-DATE 3/14/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH February, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
1 159 8                 1 160                       24                 1 159
(MWe-Ne t) 1 1'162 17 1 161 2
      'S                 1 158                       25                 1 163 10                 1'157                     26                   l'.163 11                 1 158                       27                   1 164 12                 1 159                       28                 1 163' 13-               1 158                       29 14                 1 160                       30 15                 1 163 31 16                 1 163 INSTRUCTIONS On this format, list in the re. porting month. the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.
1 162 18 1 162 3
1 159 19 1 156 4
1 159 20 741 5
1 159 21 1 157 6
1 160 22 1 158 7
1 160 23 1 159 8
1 160 24 1 159
'S 1 158 25 1 163 10 1'157 26 l'.163 11 1 158 27 1 164 12 1 159 28 1 163' 13-1 158 29 14 1 160 30 15 1 163 31 16 1 163 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the re. porting month.
Compute to the nearest whole megawatt.
4
4


UNIT SHUTDOWNS AND POWER REDUCTIONS           ~ DOCKET NO. 50-370             -
UNIT SHUTDOWNS AND POWER REDUCTIONS
UNIT NAME McGuire 2 DATE 3/14/86 REPORT MONTH February, 1986         COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_
~ DOCKET NO. 50-370 UNIT NAME McGuire 2 DATE 3/14/86 REPORT MONTH February, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_
O c            'a eny     License               y                        Cause & Corrective 37      "c   v5$         Event-
O
                                                                  'a E
'a eny License Cause & Corrective y
Action to N3. Date   ~. %h           3   2g                     ,&c,       gm, H
c37 "c
                        $ o-EE        E a:
v5$
                                          %5b xmo       Report #     EE        BB                      Prevent Recurrence mo       oa 6-p 86-02-19   S       --
E
B       -
'a N3.
CC     VALVEX     Turbine Valve Movement Test.
Date
1             2                                               3                       4 Reason:                                         Method:                   Exhibit G - Instructions SS     led     A-Equipment Failure (Explain)                   1-Manual                 for Preparation of Data B-Maintenance or Test                         2-Manual Scram           Entry Sheets for Licensee C-Refueling                                   3-Automatic Scram         Event Report (LER)
~.
D-Regulatory Restriction                       4-Other (Explain).       File (NUREG-0161)
%h 3
E-Operator Training 4 License Examination F-Adninistrative                                                     5 G-Operational Error (Explain)                                           Exhibit I - Sane Source H-Other (Explain)
2g Event-
,&c, gm, Action to EE E
%5b EE BB Prevent Recurrence H
o-a:
xmo Report #
mo oa 6-p 86-02-19 S
B CC VALVEX Turbine Valve Movement Test.
1 2
3 4
Reason:
Method:
Exhibit G - Instructions SS led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain).
File (NUREG-0161)
E-Operator Training 4 License Examination F-Adninistrative 5
G-Operational Error (Explain)
Exhibit I - Sane Source H-Other (Explain)
(O/771
(O/771


A.<-
A.<-
        .-e, Docket No.: 50-370 Unit: McGuire 2 Date:   3/14/86 NARRATIVE  
.-e, Docket No.: 50-370 Unit: McGuire 2 Date:
3/14/86 NARRATIVE  


==SUMMARY==
==SUMMARY==
Month: February, 1986 McGuire 2 operated at 100% throughout the month except for a slight reduction on February 19'to perform a Turbine Valve Movement test.
Month: February, 1986 McGuire 2 operated at 100% throughout the month except for a slight reduction on February 19'to perform a Turbine Valve Movement test.


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST
: 1. . Facility name: McGuire, Unit 2
: 1.. Facility name: McGuire, Unit 2 2.
: 2. ' Scheduled next refueling shutdown: March, 1986
' Scheduled next refueling shutdown: March, 1986 3.
: 3. Scheduled restart following refueling: May, 1986
Scheduled restart following refueling: May, 1986 4.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other ' license amendment? Yes If yes,'what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
Will refueling or resumption of operation thereafter require a technical specification change or other ' license amendment? Yes If yes,'what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
: 6. Important licensing considerations (new or different. design or i:                           supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Important licensing considerations (new or different. design or i:
: 7. iNumber of fuel assemblies (a) in the core: 193
supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
.                                                                            (b) in the spent fuel pool: 81 4
: 7. iNumber of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 81 8.
: 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
Present licensed fuel pool capacity: 1463 4
: 9. Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 l
Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 l;-
(
(
DUKE POWER COMPANY                                           DATE: March 14, 1986 Name of
DUKE POWER COMPANY DATE: March 14, 1986 Name of


==Contact:==
==Contact:==
J. A. Reavis           Phone: 704-373-7567 i-l l
J. A. Reavis Phone:
704-373-7567 i-l l
l f
l f
l
l
  - - , . - - - . -,              - - . - . _ - - . . , . - - . , . . - ~ -
- -. -. _ - -..,. - -.,.. - ~ -


a
a
              .j McGUIRE NUCLEAR STATION Monthly Operating Status Report
.j McGUIRE NUCLEAR STATION Monthly Operating Status Report 1.
: 1. Personnel Exposure For the month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
Personnel Exposure For the month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
: 2. The total station liquid release for January has be compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
2.
The total station liquid release for January has be compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for' January has been compared with the Technical Specifications maximum annual dose commitment and cas less.than 10 percent of this limit.
The total station gaseous release for' January has been compared with the Technical Specifications maximum annual dose commitment and cas less.than 10 percent of this limit.
t 4
t 4
k I
k I
i                                 y f
i y
I 6.
f I
6.


  - .                                                                  i DUKE POWER COMPANY P.O. HOX 33180 CHARLOTTE, N.C. *28242 IIAL D. TUCKER                                                                 TELEPHONE nce Paramewv                                                              (704) 373-4531 WWLEAR PMTTION March 14, 1986 4
i DUKE POWER COMPANY P.O. HOX 33180 CHARLOTTE, N.C. *28242 IIAL D. TUCKER TELEPHONE (704) 373-4531 nce Paramewv WWLEAR PMTTION March 14, 1986 4
i Director 4
i Director Office of Inspection and Enforcement 4
Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: -Document Control Desk Re: McGuire Nuclear Station Docket No. 50-369 and 50-370
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: -Document Control Desk Re: McGuire Nuclear Station Docket No. 50-369 and 50-370


==Dear Sir:==
==Dear Sir:==
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of February, 1986.
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of February, 1986.
Very truly yours, M       /
Very truly yours, M
Hal B. Tucker JAR: sib Attachment i-J
/
                                                                                        $                li i
Hal B. Tucker JAR: sib Attachment i-J li i
I
I


                                            .,              _                    =                                       .-    .- ..
=
  '9       e Dirccter March 14, 1986 Page Two.
'9 e
xc:         Dr. J. Nelson Grace, Reg'ional Administrator U. S. Nuclear Regulatory Coussission Region II
Dirccter March 14, 1986 Page Two.
                        - 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Phil:Ross U. S. Nuclear Regulatory Constission MNBB 5715 4
xc:
Washington, D. C.                   20555
Dr. J. Nelson Grace, Reg'ional Administrator U. S. Nuclear Regulatory Coussission Region II
:                      American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032 Director INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Office of' Nuclear-Reactor Regulation U. S. Nuclear Regulatory Comunission Washington, D.'C.                   20555 Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092
- 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Phil:Ross U. S. Nuclear Regulatory Constission MNBB 5715 Washington, D. C.
;                      = Mr. Richard G. Oehl, NE-44 U. S. Department of Energy 19901 Germantown Road Germantown, Maryland 20874-L
20555 4
    . .,m.-   -,.-.._m       _ _ . . . _ ,    ....-,c._..-     . . - , , _ . . . - _ _ . , _ . - . . . . . . . . _ _ . _ _ _ . .      . . . . _ ,__ -,.. .,_.._,- ,._..... .-- ..__,}}
American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032 Director INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Office of' Nuclear-Reactor Regulation U. S. Nuclear Regulatory Comunission Washington, D.'C.
20555 Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092
= Mr. Richard G. Oehl, NE-44 U. S. Department of Energy 19901 Germantown Road Germantown, Maryland 20874-L
.,m.-
-,.-.._m
....-,c._..-
,__ -,...,_.._,-,._......--..__,}}

Latest revision as of 08:03, 10 December 2024

Monthly Operating Repts for Feb 1986
ML20199E042
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/28/1986
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8603240500
Download: ML20199E042 (13)


Text

,

d OPERATING DATA REPORT DOCKET NO.

50-369 DATE 3/I4/81 COMPLETED BY

.7. A _ naavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name:

McGuire-1 Notes

  • Nameplate Rating
2. Reporting Period: February 1. 1986-February 28. 1986 (Gross MWe) calculated as
3. Licensed Thermal Power (MWt):

3411 1450.000 MVA x.90 power

4. Nameplate Rating (Gross MWe):

1305 factor per Page 111, NUREG-0020.

5. Design Eleetrical Rating (Net MWe):

1150

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1150

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe):

None

10. Reasons For Restrictions. lf Any:

This Month Yr.-to.Date Cumulative i1. Hours In Reporting Period 672.0 1 416.0 37 224.0

12. Number Of Hours Reactor Was Critical 672.0 1 404.5 26 410.3
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 672.0 1 402.5 26 114.0
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 2 022 499 4 494 198 71 860 773
17. Gross Electrical Energy Generated (MWH) 709 263 1 575 599 24 886 832 r.
18. Net Electrical Energy Generated (MWH) 680 955 1 515 475 23 667 489 i
19. Unit Service Factor 100.0

'99.0 70.2 l

20. Unit Availability Factor 100.0 99.0 70.2 L
21. Unit Capacity Factor (Using MDC Net) 88.1 93.1 53.9
22. Unit Capacity Factor (Using DER Net) 88.1 93.1 53.9 l
23. Unit Forced Outage Rate 0.0 1.0 13.7 i
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

l Refueling - May 30, 1986 - 11 weeks l

25. If Shut Down..t End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION pg32188n 8688@

6m R

l j

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-369 UNIT McGuire 1-DATE 3/14/86 COMPLETED BY J.A.

Reavis TELEPHONE 704-373-7567 MONTH Februarv.'1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1 157 17 1 138 2

1 157

'18 1 155

+

3

'l 137 19 1 154 4

702 20 1 152 5

685 21 1 153 6

683' 22 1 154 7-684 23 i isA i'

8 684 24 i isa 9

684 25 1 159 10 664 26 1 1sg 11

.680 27 1 160 j.

12 1 071 28 1 160 13 1 147 29 14 1 127 30 15 1 127 31 16 1 127 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day'

,In the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-369 UNIT NAME McGuire 1 DATE 3/14/86 REPORT MONTH February, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s

O Cause & Corrective I o, o License y

e32 o3E y

c.

N3.

Date

%h g

jg Event

,5e, g

Action to o:E E

%Eb RB 8"

5 ud Prevent Recurrence a:

zmo Report #

H mu 5-p 86-02-03 S

F RC FUELXX Core Conservation to Extend the Time Until Refueling Outage.

6-p 86-02-06 S

B CC VALVEX Turbine Valve Movement Test.

7-p 86-02-06 S

F RC FUELXX Core Conservation to Extend the Time Until Refueling Outage.

8-p 86-02-10 F

A HH PUMPXX Repair "B" Feedwater Pump.

9-p 86-02-10 S

F RC FUELXX Core Conservation to Extend the Time Until Refueling Outage.

10-p 86-02-13 F

A HH ACCUMU Repair (ICl) Heater Drain Tank.

l 1

2 3'

4 Reason:

Method:

Exhibit S - Instructions SS e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data-B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training 6 License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

(O/77T

Docket No.: 50-369 Unit: McGuire 1 Date:

3/14/86 NARRATIVE

SUMMARY

Month: February, 1986 McGuire 1 operated at 60% for approximately 10 days during February as a core conservation measure designed to help prevent overlapping nuclear system outages. The unit operated at 100% for the-remaining days except for minor reductions to perform maintenance and testing.

)

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown: May, 1986 3.

Scheduled restart following refueling: August, 1986 4.

Will refueling or resumption of operation thereafter require a~

technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). -

7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 152 8.

Present licensed fuel pool capacity: 1463 Size of requested.or' planned increase:

9.

Projected date of last ref: iing which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: March 14, 1986 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

-=-

OPERATING DATA REPORT DOCKET NO. _50-370 DATE 3/14/86 COMPLETED BY J.A. Reavis TELEPHONE vnd-173-7567 OPERATING STATUS Notes

  • Nameplate Rating
1. Unit Name:

Mccnire 2

2. Reporting Period: February 1. 1986-February 28. 1986 (Gross MWe) calculated as
3. Licensed Thermal Power (MWt):

3411 1450.000.MVA x.90 power

4. Nameplate Rating (Gross MWe):
1305, factor per Page lii, S. Design Electrical Rating (Net MWe):

1150

6. Maximum Dependable Capacity (Gross MWe):

i

7. Maximum Dependable Capacity (Net MWe):

11 lo

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Ghe Reasons:

None None

9. Power Level To Which Restncted lf Any(Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr to Date Cumulative i

'11. Hours In Reporting Period 672.0 1 416.0 17 520.0

12. Number Of Hours Reactor Was Critical 672.0 1 369.5 12 998.1
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 672.0 1 365.3 12 630.8
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 2 262 594 4 546 842 40 697 219
17. Gross Electrical Energy Generated (MWH) 797 678 1 6ns s7R 1a in6 nos
18. Net Electrical Energy Generated (MWH) 769 484 1 546 460 13 700 113
19. Unit Service Factor 100.0 96.4 72.1
20. Unit Availability Factor 100.0 96.4 72.1
21. Unit Capacity Factor (Using MDC Net) 99.6 95.0 66.4
22. Unit Capacity Factor (Using DER Net) 99.6 95.0 66.4 l
23. Unit Forced Outage Rate 0.0 3.6 20.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

Refueline - March 14. 1986 - 9 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Statu> IPrior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

(9/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-370 UNIT McGuire 2-DATE 3/14/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH February, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t) 1 1'162 17 1 161 2

1 162 18 1 162 3

1 159 19 1 156 4

1 159 20 741 5

1 159 21 1 157 6

1 160 22 1 158 7

1 160 23 1 159 8

1 160 24 1 159

'S 1 158 25 1 163 10 1'157 26 l'.163 11 1 158 27 1 164 12 1 159 28 1 163' 13-1 158 29 14 1 160 30 15 1 163 31 16 1 163 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the re. porting month.

Compute to the nearest whole megawatt.

4

UNIT SHUTDOWNS AND POWER REDUCTIONS

~ DOCKET NO. 50-370 UNIT NAME McGuire 2 DATE 3/14/86 REPORT MONTH February, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_

O

'a eny License Cause & Corrective y

c37 "c

v5$

E

'a N3.

Date

~.

%h 3

2g Event-

,&c, gm, Action to EE E

%5b EE BB Prevent Recurrence H

o-a:

xmo Report #

mo oa 6-p 86-02-19 S

B CC VALVEX Turbine Valve Movement Test.

1 2

3 4

Reason:

Method:

Exhibit G - Instructions SS led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain).

File (NUREG-0161)

E-Operator Training 4 License Examination F-Adninistrative 5

G-Operational Error (Explain)

Exhibit I - Sane Source H-Other (Explain)

(O/771

A.<-

.-e, Docket No.: 50-370 Unit: McGuire 2 Date:

3/14/86 NARRATIVE

SUMMARY

Month: February, 1986 McGuire 2 operated at 100% throughout the month except for a slight reduction on February 19'to perform a Turbine Valve Movement test.

MONTHLY REFUELING INFORMATION REQUEST

1.. Facility name: McGuire, Unit 2 2.

' Scheduled next refueling shutdown: March, 1986 3.

Scheduled restart following refueling: May, 1986 4.

Will refueling or resumption of operation thereafter require a technical specification change or other ' license amendment? Yes If yes,'what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different. design or i:

supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7. iNumber of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 81 8.

Present licensed fuel pool capacity: 1463 4

Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 l;-

(

DUKE POWER COMPANY DATE: March 14, 1986 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 i-l l

l f

l

- -. -. _ - -..,. - -.,.. - ~ -

a

.j McGUIRE NUCLEAR STATION Monthly Operating Status Report 1.

Personnel Exposure For the month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for January has be compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for' January has been compared with the Technical Specifications maximum annual dose commitment and cas less.than 10 percent of this limit.

t 4

k I

i y

f I

6.

i DUKE POWER COMPANY P.O. HOX 33180 CHARLOTTE, N.C. *28242 IIAL D. TUCKER TELEPHONE (704) 373-4531 nce Paramewv WWLEAR PMTTION March 14, 1986 4

i Director Office of Inspection and Enforcement 4

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: -Document Control Desk Re: McGuire Nuclear Station Docket No. 50-369 and 50-370

Dear Sir:

Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of February, 1986.

Very truly yours, M

/

Hal B. Tucker JAR: sib Attachment i-J li i

I

=

'9 e

Dirccter March 14, 1986 Page Two.

xc:

Dr. J. Nelson Grace, Reg'ional Administrator U. S. Nuclear Regulatory Coussission Region II

- 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Phil:Ross U. S. Nuclear Regulatory Constission MNBB 5715 Washington, D. C.

20555 4

American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032 Director INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Office of' Nuclear-Reactor Regulation U. S. Nuclear Regulatory Comunission Washington, D.'C.

20555 Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092

= Mr. Richard G. Oehl, NE-44 U. S. Department of Energy 19901 Germantown Road Germantown, Maryland 20874-L

.,m.-

-,.-.._m

....-,c._..-

,__ -,...,_.._,-,._......--..__,