ML20199E095: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
i , c. -                                                          -
i,
c.
December 23, 1998 Southern Nuclear Operating Company, Inc.
December 23, 1998 Southern Nuclear Operating Company, Inc.
ATTN: Mr. Scott Fulmer, Plant Training and Emergency Preparedness Manager Joseph M. Farley Nuclear Plant P. O. Drawer 470 Ashford, AL 36312
ATTN: Mr. Scott Fulmer, Plant Training and Emergency Preparedness Manager Joseph M. Farley Nuclear Plant P. O. Drawer 470 Ashford, AL 36312
Line 28: Line 29:


==Dear Mr. Fulmer:==
==Dear Mr. Fulmer:==
 
This letter refers to the Training Managers' Conference conducted at the Richard B. Russell Building on November 5,1998. Representatives from all utilities in Region 11 participated in the meeting. was the agenda used for the Training Managers' Conference, and Enclosure 2 is the list of attendees. We appreciate the participation of you and your staff and believe that the goal of providing an open forum for discussion of operator licensing issues was met. Mr. Gallo, Chief of the Operator Licensing and Human Factors Branch, Office of Nuclear Reactor Regulation (NRR), made a presentation as noted in the slides in Enclosure 3.
This letter refers to the Training Managers' Conference conducted at the Richard B. Russell Building on November 5,1998. Representatives from all utilities in Region 11 participated in the meeting.
Additionally, I am enclosing our preliminary schedule for FY 1999 and FY2000 as Enclosure 4.
Enclosure 1 was the agenda used for the Training Managers' Conference, and Enclosure 2 is the list of attendees. We appreciate the participation of you and your staff and believe that the goal of providing an open forum for discussion of operator licensing issues was met. Mr. Gallo, Chief of the Operator Licensing and Human Factors Branch, Office of Nuclear Reactor                   i Regulation (NRR), made a presentation as noted in the slides in Enclosure 3.                           I Additionally, I am enclosing our preliminary schedule for FY 1999 and FY2000 as Enclosure 4.
Please review the schedule and supply comments to my staff or myself.
Please review the schedule and supply comments to my staff or myself.
If you have any questions regarding the content of this letter, please contact me at (404)             i 562-4638.                                                                                             !
If you have any questions regarding the content of this letter, please contact me at (404) 562-4638.
l Sincerely,                                               1 Original signed by Thomas A. Peebles Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos.: 50-348 and 50-364 i       License Nos.: NPF-2 and NPF-8 l
Sincerely, 1
Original signed by Thomas A. Peebles Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos.: 50-348 and 50-364 i
License Nos.: NPF-2 and NPF-8 l


==Enclosures:==
==Enclosures:==
As noted                                                                       I cc w/encls:                   200M3                                                              \
As noted I
200M3
\\
cc w/encls:
M. Stinson, General Manager, Joseph M. Farley Nuclear Plant i
M. Stinson, General Manager, Joseph M. Farley Nuclear Plant i
9901200309 981223 PDR     ADOCK 05000348 V                       PDR LY3
9901200309 981223 PDR ADOCK 05000348 V
PDR LY3


i                                             i
i i
* O s
O
  , .o.                                       l 1
.o.
s 1
l l
l l
l l        SNC                   2 i
SNC 2
Distribution w/encis:
i Distribution w/encis:
PUBLIC                               i B. Michael, DRS                     l l                                              l l
PUBLIC B. Michael, DRS l
l l
l l
Ril:DRS               Ril:DRS M                   9 BMICHAEL:             TP   BLES 12/ tr /98           12/g/98 l         Doc Name:
l Ril:DRS Ril:DRS M
9 BMICHAEL:
TP BLES 12/ tr /98 12/g/98 l
Doc Name:


__.__.._______._m                   - . _ . _ _ _ < _ - . _ _ . _ . _ _ . . _ _ _ _ _ . . _ . _ _ _ _ . _ _ _ _ _ . _ . _ .
, __.__.._______._m r'
r'                                                                                                 <-
fO Revised November 3,1998 l
fO
,                    Revised November 3,1998 l
L TRAINING AND OPERATIONS MANAGERS' CONFERENCE U.S. Nuclear Regulatory Commission, Region II Atlanta, Georgia Meeting Agenda November 5,1998 Richard B. Russell Building Auditorium Thursday.11/5/98 l
L TRAINING AND OPERATIONS MANAGERS' CONFERENCE U.S. Nuclear Regulatory Commission, Region II Atlanta, Georgia Meeting Agenda November 5,1998 Richard B. Russell Building Auditorium Thursday.11/5/98 l
8:00 a.m. Conference Registration l
8:00 a.m.
l                     8:20 a.m. Introduction                                                                                 Thomas A. Peebles, Chief, Operator Licensing & Human Performance Branch 8:30 a.m. Opening Remarks                                                                               William Travers,                 ,
Conference Registration l
Executive Director of Operations 8:50 a.m. Welcome / Issues Raised the Last Meeting                                                     Bruce S. Mallett, Director Division of Reactor Safety 9:15 a.m. break 9:45 a.m. Other Issues                                                                                 Robert M. Gallo, Chief Operator Licensing Branch NRR 10:15 a.m. Lessons learned from Recent Exams                                                             Charlie Payne                     l Sampling exam criteria 11:00 a.m. Examination Communications                                                                   Ron Aiello                         l Exam Development & Coordination 11:30 a.m. Lunch                                                                                                     .
l 8:20 a.m.
i
Introduction Thomas A. Peebles, Chief, Operator Licensing & Human Performance Branch 8:30 a.m.
                                                                                      ~
Opening Remarks William Travers, Executive Director of Operations 8:50 a.m.
1:00 p.m. Written Examination Questions and Answers                                                     Rick Baldwin / George Hopper 2:30 p.m. JPM         Examples of questions                                                           Rick Baldwin / George Hopper 3:30 p.m. Open Session - Other Issues                                                                   Training Managers j                     4:00 p.m. Meet with Principle examiners                                                                 All j                     4:30 p.m. Adjorn i
Welcome / Issues Raised the Last Meeting Bruce S. Mallett, Director Division of Reactor Safety 9:15 a.m.
break 9:45 a.m.
Other Issues Robert M. Gallo, Chief Operator Licensing Branch NRR 10:15 a.m.
Lessons learned from Recent Exams Charlie Payne Sampling exam criteria 11:00 a.m.
Examination Communications Ron Aiello Exam Development & Coordination 11:30 a.m.
Lunch i
~
1:00 p.m.
Written Examination Questions and Answers Rick Baldwin / George Hopper 2:30 p.m.
JPM Examples of questions Rick Baldwin / George Hopper 3:30 p.m.
Open Session - Other Issues Training Managers j
4:00 p.m.
Meet with Principle examiners All j
4:30 p.m.
Adjorn i
i i
i i
i j
i j
1
1


License Applicant Adm-inistrative Walkthrough Examination--NRC-1                                                           .
License Applicant Adm-inistrative Walkthrough Examination--NRC-1 Examiner Sheet A.1: Shift Staffing' i
Examiner Sheet A.1: Shift Staffing'                                                                                                               i Question 1: A licensed RO has been off-shin for 6 months to assist in outage scheduling. He is informed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing shift RO. He had a satisfactory physical examination 18 months ago and has maintained satisfactory performance in the licensed operator requalification training                                 I program. In anticipation of rejoining a shift crew, the RO has spent two 8-hour                                       l shins in the control room as the OATC during the past month under the direction of                                   l a shift RO.
Question 1: A licensed RO has been off-shin for 6 months to assist in outage scheduling. He is informed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing shift RO. He had a satisfactory physical examination 18 months ago and has maintained satisfactory performance in the licensed operator requalification training I
program. In anticipation of rejoining a shift crew, the RO has spent two 8-hour l
shins in the control room as the OATC during the past month under the direction of l
a shift RO.
What additional requirements must be met by the RO before he may fill in for the vacationing RO?
What additional requirements must be met by the RO before he may fill in for the vacationing RO?
References Allowed? YES1NO Answer:       The RO must complete an additional 24 (40 - 16) hours of"under dir~ection" on-shift time that must include a plant tour and shift turnover.
References Allowed? YES1NO Answer:
The RO must complete an additional 24 (40 - 16) hours of"under dir~ection" on-shift time that must include a plant tour and shift turnover.


==Reference:==
==Reference:==
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)
Applicant Response:                                                   SAT   UNSAT i
Applicant Response:
SAT UNSAT i


                  .. -.      .      .  -..      .- .  . _ .  - . . -        . - - - . . - - . - ~   - ~ - ..-
. - - -.. - -. - ~
ATTENDEES AT THE NRC REGION ll TRAINING MANAGERS CONFERENCE NOVEMBER 5,1998                                             i l
~ -..-
Sid Crouch             ATTSi                                                                           i David Lane             Sonalysts, Inc.                                                                 l Bill Fitzpatrick       INPO CP&L Rick Gamer             HR       Supv Ops Tmg William Noll           BK     Ops Tmg Supv Max Herrell             BK     Tmg Mgr Scott Poteet           RB     Exam Team Leader Ralph Mullis           BK     Ops Mgr                                                               j Tony Pearson           BK     Ops Tmg Anthony Williams       RB     Tmg Mgr Crystal River - FPC                                                                                   ,
ATTENDEES AT THE NRC REGION ll TRAINING MANAGERS CONFERENCE NOVEMBER 5,1998 i
Wes Young             CR       Supv OpsTng                                                           i Tom Taylor             CR     Dir Nuc Ops Tmg Ivan Wilson           CR       Ops Mgr                                                               l Ktn McCall             CR       Mgr Ops Tmg                                                           '
l Sid Crouch ATTSi i
Duke Power                                                                                             l Gabriel Washbum         OC     Req Team Leader Ronnie B. White, Jr MG         Tmg Mgr W. H. " Soap" Miller   CT     Site Tmg Mgr                                                           !
David Lane Sonalysts, Inc.
P ul Stovall           OC     Mgr Oper Tmg                                                           i Bentley Jones           OC     Tmg Mgr                                                               l James Teofilak         CT     Ops Trng Mgr Alan Orton             MG     Ops Trng Mgr Richard Bugert         Corp Ops Tmg Spec EElk Tmg Mgr Maria Lacal             TP Dennis L. Fadden       SL       Services Mgr                                             -
Bill Fitzpatrick INPO CP&L Rick Gamer HR Supv Ops Tmg William Noll BK Ops Tmg Supv Max Herrell BK Tmg Mgr Scott Poteet RB Exam Team Leader Ralph Mullis BK Ops Mgr j
Jo Magennis             Corp Trng Assessment Spec Tom Bolander           SL       Exam Development Steve McGarry           TP       Maint Tmg Supv Southem Nuclear (SNC) i         John C. Lewis         -HT       Trng & EP Mgr Bill Oldfield           FA     Nuc Ops Tm Supv Steve Grantham         HT     Ops Tmg Supv Scott Fulmer           FA     Mgr Tmg & EP j         Joel Deavers           FA     Sr Pit Inst Bob Brown             VG       Trng Mgr Dan Scukanec           VG       Ops Tmg Supv
Tony Pearson BK Ops Tmg Anthony Williams RB Tmg Mgr Crystal River - FPC Wes Young CR Supv OpsTng Tom Taylor CR Dir Nuc Ops Tmg Ivan Wilson CR Ops Mgr Ktn McCall CR Mgr Ops Tmg Duke Power Gabriel Washbum OC Req Team Leader Ronnie B. White, Jr MG Tmg Mgr W. H. " Soap" Miller CT Site Tmg Mgr P ul Stovall OC Mgr Oper Tmg i
Bentley Jones OC Tmg Mgr James Teofilak CT Ops Trng Mgr Alan Orton MG Ops Trng Mgr Richard Bugert Corp Ops Tmg Spec EElk Maria Lacal TP Tmg Mgr Dennis L. Fadden SL Services Mgr Jo Magennis Corp Trng Assessment Spec Tom Bolander SL Exam Development Steve McGarry TP Maint Tmg Supv Southem Nuclear (SNC) i John C. Lewis
-HT Trng & EP Mgr Bill Oldfield FA Nuc Ops Tm Supv Steve Grantham HT Ops Tmg Supv Scott Fulmer FA Mgr Tmg & EP j
Joel Deavers FA Sr Pit Inst Bob Brown VG Trng Mgr Dan Scukanec VG Ops Tmg Supv


          ,-                                                                                    l l
4 l
4 l                Viroinia Power                                                                 ;
Viroinia Power I
I Steve Crawford   NA   Sr Inst Nuc                                             ;
Steve Crawford NA Sr Inst Nuc Harold McCallum SR Supv Ops Tmg i
Harold McCallum SR   Supv Ops Tmg                                             l l
TVA Dick Driscoll SQ Tmg Mgr Walt Hunt SQ Ops Trng Mgr i
i TVA Dick Driscoll   SQ   Tmg Mgr
Denny Campbell BF SRO Ops Inst l
!                Walt Hunt       SQ   Ops Trng Mgr i               Denny Campbell   BF   SRO Ops Inst l               Jack Cox         WB   Tmg Mgr John Roden       WB   Ops Tmg Mgr Tom Wallace     WB   Ops Supt V. C. Semmer- SCE&G l
Jack Cox WB Tmg Mgr John Roden WB Ops Tmg Mgr Tom Wallace WB Ops Supt V. C. Semmer-SCE&G l
AlKoon           SM   Ops Tmg Supv NRC Particioants Tom Peebles     R 11 Operator Lic. Br. Ch.
AlKoon SM Ops Tmg Supv NRC Particioants Tom Peebles R 11 Operator Lic. Br. Ch.
Rick Baldwin     R ll Sr. Examiner George Hopper   R ll Sr. Examiner Ron Aiello       R 11 Sr. Examiner Charlie Payne   R 11 Sr. Examiner William Travers NRC Executive Dir. Ops.
Rick Baldwin R ll Sr. Examiner George Hopper R ll Sr. Examiner Ron Aiello R 11 Sr. Examiner Charlie Payne R 11 Sr. Examiner William Travers NRC Executive Dir. Ops.
R. M. Gallo     NRR Br. Ch. OL j               Bruce Mallett   R 11 Div. Dir. Reactor Safety l
R. M. Gallo NRR Br. Ch. OL j
l                                                                                               I l
Bruce Mallett R 11 Div. Dir. Reactor Safety l
l l
l
l
                                                                                                )
)
i I
i I
l i
l i


    .        ._-      . .- -~ _         _ - - . - . .            .    -    ..          - - - _ _          . - . .      . -. .
..- -~ _
l     ,.
l p
p l
l l
l FY 99 INITIAL EXAM SCHEDULE AND RESULTS 1
FY 99 INITIAL EXAM SCHEDULE AND RESULTS 1
Drcember 14,1998 I
Drcember 14,1998 RO SRO-l SRO U TOTAL l
RO             SRO-l             SRO U     TOTAL l
D:te Plant Chief Pass Pass Pass Pass f
D:te     Plant                             Chief   Pass     #    Pass     #    Pass         #  Pass     #          !
l 9/28/98 Sequoyah GTH 4
l       9/28/98 Sequoyah                             GTH                                           4   4   4         4         f 10/5/98 Harris                               RFA     2   2           5   5                       7       7 11/30/98 Oconee                             GTH       2   2                               5   5   7       7 l       11/30/98 St Lucie &                         RSB           6               3                                 9 12/14/98 1/25/99 McGuire &                           DCP           6               3                   2             11 2/8/99 2/8/99 C. River &                           GTH           6               6                                 12 2/22/99 2/8/99 B. Ferry                             MEE           4               1                                 5 l       3/29/99 Surry &                             RSB           5               2                   4             11 4/12/99                                                                                                                 l
4 4
!                                                                                                                                1 4/12/99 Watts Bar &                         MEE           6               3                   5             14 4/26/99 5/10/99 Failey                               GTH                           7                   1             8 i
4 10/5/98 Harris RFA 2
5/24/99 Catawba &                           PMS           8               5                   3             16 6/7/99.
2 5
6/28/99 St. Lucie                             RSB                           1                 4             5 07/26/99 Robinson                           MEE           3               2                   2             7 l       08/30/99 Turkey Pt &                           RFA         20                                               20
5 7
_9/13/99 136 RESULTS TO DATE                                       4 4           5   5               9   9   18       18 100             100                 100           100 No initial exams scheduled for:             Brunswick, North Anna and Vogtle FY 00 region 11 write part of Summer & Hatch i
7 11/30/98 Oconee GTH 2
2 5
5 7
7 l
11/30/98 St Lucie &
RSB 6
3 9
12/14/98 1/25/99 McGuire &
DCP 6
3 2
11 2/8/99 2/8/99 C. River &
GTH 6
6 12 2/22/99 2/8/99 B. Ferry MEE 4
1 5
l 3/29/99 Surry &
RSB 5
2 4
11 4/12/99 4/12/99 Watts Bar &
MEE 6
3 5
14 4/26/99 5/10/99 Failey GTH 7
1 8
i 5/24/99 Catawba &
PMS 8
5 3
16 6/7/99.
6/28/99 St. Lucie RSB 1
4 5
07/26/99 Robinson MEE 3
2 2
7 l
08/30/99 Turkey Pt &
RFA 20 20
_9/13/99 136 RESULTS TO DATE 4
4 5
5 9
9 18 18 100 100 100 100 No initial exams scheduled for:
Brunswick, North Anna and Vogtle FY 00 region 11 write part of Summer & Hatch i


FY 00 INITIAL EXAM SCHEDULE AND RESULTS ecember 14,1998 RO         SRO-l       SRO-U   TOTAL Dr.te     Plant                   Chief   Pass     #    Pass   #      Pass Pass   0 I 9/27/99 Summer                       GTH           6                                   6 region ll write
FY 00 INITIAL EXAM SCHEDULE AND RESULTS ecember 14,1998 RO SRO-l SRO-U TOTAL Dr.te Plant Chief Pass Pass Pass Pass 0
10/18/99 Hatch                       DCP                       10           2         12
9/27/99 Summer GTH 6
!   region ll write 12/13/99 Vogtle                     RSB           3           5             2         10 l   2/14/00 Brunswick &                 DCP           12         3                       15 l 2/28/00 1
6 region ll write 10/18/99 Hatch DCP 10 2
03/**/00 Oconee 7                                                                       10 704/10/00 Harris (mayo to/co)                                                           10 705/03/00 St. Lucie                 GTH                       6             5         11 705/**/00 B. Ferry                                 6           3             3         12 705/03/00 McGuire                                               4             8         12 706/07/00Farley                     RSB                         10           2         12 707/26/00 Ciystal River             RFA           3           3             3         9 r:gion ll write?
12
708/**/00 Sequoyah                                 4           2             2         8 709/04/00 Surry?                                                                       10 709/11/00 Nodh Anna                                                                     12 0       0   42       0   46       0 27 0     149
! region ll write 12/13/99 Vogtle RSB 3
* d signates tentative       No initial exams scheduled for:   Catawba Robinson Turkey Point Watts Bar
5 2
10 l 2/14/00 Brunswick &
DCP 12 3
15 l 2/28/00 1
03/**/00 Oconee 7 10 704/10/00 Harris (mayo to/co) 10 705/03/00 St. Lucie GTH 6
5 11 705/**/00 B. Ferry 6
3 3
12 705/03/00 McGuire 4
8 12 706/07/00Farley RSB 10 2
12 707/26/00 Ciystal River RFA 3
3 3
9 r:gion ll write?
708/**/00 Sequoyah 4
2 2
8 709/04/00 Surry?
10 709/11/00 Nodh Anna 12 0
0 42 0
46 0
27 0
149
* d signates tentative No initial exams scheduled for:
Catawba Robinson Turkey Point Watts Bar


I
I
}                                               l l                                               !
}
l i
i I
Operator Licensing
)
lSSueS l
l Region ll j
Training Managers' Conference November 5,1998 i
i i
i i
I
j Robert M.
)    .-
Gallo, Chief i
Operator Licensing lSSueS          .
Operator-Licensing and i
l l
j Human Performance Branch l
l l                          Region ll          -
j      Training Managers' Conference November 5,1998          '
i i
i j
i Robert M. Gallo, Chief i
Operator-Licensing and j
Human Performance Branch l
i 4
i 4
i
i


l OPERATOR LICENSING ISSUES o
l OPERATOR LICENSING ISSUES Part 55 Rulemakings o
Part 55 Rulemakings           _
Status Schedule Final Revision 8 of NUREG-1021 o
Status Schedule o
Examination Quality and Results o
Final Revision 8 of NUREG-1021 o
~
Examination Quality and Results
Generic Fundamentals Exam o
                    ~
Requal Inspections ilP-710.01) o Recent Information Notices o
o Generic Fundamentals Exam o
Exam Integrity i:lN 98-15)
Requal Inspections ilP-710.01) o Recent Information Notices Exam Integrity i:lN 98-15)
Sampling Plans ilN 98-28)
Sampling Plans ilN 98-28)
Eligibility ilN 98-37)
Eligibility ilN 98-37)


RECENT LESSONS LEARNED by
RECENT LESSONS LEARNED by Charlie Payne
                                                                                                                                                                                        ~
~
Charlie Payne Southeastern Training Manager's Conference November 5,1998 t
Southeastern Training Manager's Conference November 5,1998 l
I
r t
I I


                                                                                                              - t PC1LLCY CLARIFICATIONS I
t PC1LLCY CLARIFICATIONS I.
O   In general, the NRC prefers that the written     .
O In general, the NRC prefers that the written exam be administered after the operating tests are complete.
exam be administered after the operating tests are complete.
Allows more time to finalize test.
Allows more time to finalize test.
More flexibility if delays occur.
j More flexibility if delays occur.
Less stressful on candidates.                                                                           3 t
Less stressful on candidates.
t t
3 t
h t
t i
2 i
2 i


PC1LICY C1ARIFICATIONS 9   In general, license class sizes of greater than H candidates will be scheduled for 2 weeks as follows:
PC1LICY C1ARIFICATIONS 9
t exam week 1
In general, license class sizes of greater than H candidates will be scheduled for 2 weeks as follows:
off-week for documentation of week 1 performance 2"d exam week
1 t
1 exam week off-week for documentation of week 1 performance 2"d exam week l
1 i
i


i t
i POLICY C_LARIFICATIC>NS t
POLICY C_LARIFICATIC>NS 9     Examination submittals - 2 copies of draft and final exams l' written, JPMs, and simulator scenarios). Electronic copy is also desired.
l 9
9     Written exams submittals will be reviewed by following a sampling process. When criteria are met, review will be stopped and licensee         3 called.
Examination submittals - 2 copies of draft and final exams l written, JPMs, and simulator i
l Criteria - 10 unacceptable questions out of 30 questions sampled                   ,
scenarios). Electronic copy is also desired.
a   i I
9 Written exams submittals will be reviewed by following a sampling process. When criteria 1
are met, review will be stopped and licensee l
called.
3 l
Criteria - 10 unacceptable questions out of 30 questions sampled i
a I


RECENT LE_SSONS LEARNED SRO-only Questions intended to sample those K/As specific to SRO duties (above and beyond those needed by an RO).
RECENT LE_SSONS LEARNED SRO-only Questions intended to sample those K/As specific to SRO duties (above and beyond those needed by an RO).
Line 174: Line 272:
5
5


2.0 GENERIC KNOWLEDGES AND ABILITIES 2.1       Conduct of Operations 2.1.1 Knowledge of conduct of operations requirements.
2.0 GENERIC KNOWLEDGES AND ABILITIES 2.1 Conduct of Operations 2.1.1 Knowledge of conduct of operations requirements.
(CFR: 41.10 / 45.13)
(CFR: 41.10 / 45.13)
      --          IMPORTANCE         RO 3.7           SRO 3.8 2.1.2 KnowNie of operator responsibilities during all modes of plant operation.
IMPORTANCE RO 3.7 SRO 3.8 2.1.2 KnowNie of operator responsibilities during all modes of plant operation.
                                                            ~
(CFh: 41.10 / 45.13)
(CFh: 41.10 / 45.13)                                                     -
~
IMPORTANCE           RO 3.0           SRO 4.0 2.1.3 Knowledge of shift turnover practices.
IMPORTANCE RO 3.0 SRO 4.0 2.1.3 Knowledge of shift turnover practices.
(CFR: 41.10 / 45.13)
(CFR: 41.10 / 45.13)
IMPORTANCE           RO 3.0         SRO 3.4 2.1.4 Knowledge of shift staffing requirements.
IMPORTANCE RO 3.0 SRO 3.4 2.1.4 Knowledge of shift staffing requirements.
M (CFR: 41.10 /43.2)
M (CFR: 41.10 /43.2)
IMPORTANCE           RO 2.3           SRO 3.4 2.1.5. Ability to locate and use procedures and directives related to shift staffing and activities.
IMPORTANCE RO 2.3 SRO 3.4 2.1.5. Ability to locate and use procedures and directives related to shift staffing and activities.
(CFR: 41.10 / 43.5 / 45.12)
(CFR: 41.10 / 43.5 / 45.12)
IMPORTANCE           RO 2.3           SRO 3.4 2.1.6 Ability to supervise and assume a management role during plant transients and upset conditions.
IMPORTANCE RO 2.3 SRO 3.4 2.1.6 Ability to supervise and assume a management role during plant transients and upset conditions.
4               (CFR: 43.5 / 45.12 / 45.13)
4 (CFR: 43.5 / 45.12 / 45.13)
IMPORTANCE             RO 2.1         SRO 4.3 2.1.7 Ability to evaluate plant performance and make operationaljudgments based on operating characteristics / reactor behavior / and instrument interpretation.
IMPORTANCE RO 2.1 SRO 4.3 2.1.7 Ability to evaluate plant performance and make operationaljudgments based on operating characteristics / reactor behavior / and instrument interpretation.
(CFR: 43.5 /45.12 /45.13)
(CFR: 43.5 /45.12 /45.13)
IMPORTANCE             RO 3.7         SRO 4.4 2.1.8 Ability to coordinate personnel activities outside the control room.
IMPORTANCE RO 3.7 SRO 4.4 2.1.8 Ability to coordinate personnel activities outside the control room.
(CFR: 45.5 /45.12 /45.13)
(CFR: 45.5 /45.12 /45.13)
IMPORTANCE             R O 3.8         SRO 3.6 2-1                 E* REG-1123, hev. 2 l
IMPORTANCE R O 3.8 SRO 3.6 2-1 E* REG-1123, hev. 2 l


____.______.y r
____.______.y r
2.1             Conduct of Operations (continued) l-
2.1 Conduct of Operations (continued) l-2.1.19 Ability to use plant computer to obtain and evaluate parametric information on l
;                    2.1.19 Ability to use plant computer to obtain and evaluate parametric information on l                           system or component status.
system or component status.
!                                      (CFR: 45.12)
(CFR: 45.12)
IMPORTANCE                         RO 3.0                     SRO 3.0 2.1.20 Ability to execute proc' edure steps.
IMPORTANCE RO 3.0 SRO 3.0 2.1.20 Ability to execute proc' edure steps.
(CFR: '41.10 / 43.5 / 45.12)
(CFR: '41.10 / 43.5 / 45.12)
IMPORTANCE                         RO 4.3                       SRO ~4.2
IMPORTANCE RO 4.3 SRO ~4.2
                                                                                                                            ~
~
l                   2.1.21 Ability to obtain and verify controlled procedure copy.
l 2.1.21 Ability to obtain and verify controlled procedure copy.
l                                 (CFR: 45.10 /45.13)
l (CFR: 45.10 /45.13)
IMPORTANCE                           RO 3.1                     SRO 3.2 2.1.22 Ability to determine Mode of Operation.
IMPORTANCE RO 3.1 SRO 3.2 2.1.22 Ability to determine Mode of Operation.
0                                                                                                                 !
0 (CFR: 43.5 / 45.13)
(CFR: 43.5 / 45.13)                                                                                 '
IMPORTANCE R O 2.8 SRO 3.3 l
IMPORTANCE                           R O 2.8                     SRO 3.3 l
2.1.23 Ability to perform specific system and integrated plant procedures during -
2.1.23 Ability to perform specific system and integrated plant procedures during -
(                         different modes of plant operation.
(
!                              (CFR: 45.2 /45.6)
different modes of plant operation.
IMPORTANCE                           RO 3.9                     SRO 4.0                               '
(CFR: 45.2 /45.6)
2.1.24 Ability to obtain and interpret station electrical and mechanical drawings.
IMPORTANCE RO 3.9 SRO 4.0 2.1.24 Ability to obtain and interpret station electrical and mechanical drawings.
(CFR: 45.12 / 45.13)
(CFR: 45.12 / 45.13)
IMPORTANCE                         'RO'2.8                       SRO 3I t
IMPORTANCE
'                  2.1.25 Ability to obtain and interpret station reference materials such as graphs /
'RO'2.8 SRO 3I 2.1.25 Ability to obtain and interpret station reference materials such as graphs /
monographs / and tables which contain performance data.                                                   '
t monographs / and tables which contain performance data.
(CFR: 41.10 / 43.5 / 45.12)
(CFR: 41.10 / 43.5 / 45.12)
;                          IMPORTANCE                           RO 2.8                     SRO 3.1 l
IMPORTANCE RO 2.8 SRO 3.1 l
2.1.26 Knowledge of non-nuclear safety procedures (e.g. rotating equipment / electrical /
2.1.26 Knowledge of non-nuclear safety procedures (e.g. rotating equipment / electrical /
l                         high temperature / high pressure / caustic / chlorine / oxygen and hydrogen).
l high temperature / high pressure / caustic / chlorine / oxygen and hydrogen).
l                             (CFR: 41.10 / 45.12) l IMPORTANCE                           RO 2.2                     SRO 2.6 l
l (CFR: 41.10 / 45.12)
i i
IMPORTANCE RO 2.2 SRO 2.6 l
f 2-3     !."JREG- 110 3 Rev. 2 l
l i
i f
2-3
!."JREG-110 3 Rev. 2 l


I I
I I
l 2.4       Emergency Procedures / Plan (Continued)                                                   ;
l 2.4 Emergency Procedures / Plan (Continued) 2.4.32 Knowledge of operator response to loss of all annunciators.
2.4.32 Knowledge of operator response to loss of all annunciators.
(CFR: 41.10 / 43.5 / 45.13)
(CFR: 41.10 / 43.5 / 45.13)
IMPORTANCE           RO 3.3             SRO 3.5 2.4.33 Knowledge of the process used track inoperable alarms.
IMPORTANCE RO 3.3 SRO 3.5 2.4.33 Knowledge of the process used track inoperable alarms.
          .        (CFR: 41.10 / 43.5 / 45.13)
(CFR: 41.10 / 43.5 / 45.13)
IMPORTANCE           R O 2.4           SRO 2.8 2.4.34 Knowledge of RO tasks performed outside the main control room during emergency operations including sysIem geography and system implications.
IMPORTANCE R O 2.4 SRO 2.8 2.4.34 Knowledge of RO tasks performed outside the main control room during emergency operations including sysIem geography and system implications.
l                   (CFR: 43.5 / 45.13)
l (CFR: 43.5 / 45.13)
IMPORTANCE             R O 3.8           SRO 3.6 2.4.35 Knowledge of local auxiliary operator tasks during emergency operations including system geography and system implications.
IMPORTANCE R O 3.8 SRO 3.6 2.4.35 Knowledge of local auxiliary operator tasks during emergency operations including system geography and system implications.
    --- ->          (CFR: 43.5 / 45.13)
(CFR: 43.5 / 45.13)
IMPORTANCE           R O 3.3             SRO 3.5 l
IMPORTANCE R O 3.3 SRO 3.5 l
2.4.36 Knowledge of chemistry / health physics tasks during emergency operations.
2.4.36 Knowledge of chemistry / health physics tasks during emergency operations.
(CFR: 43.5)
(CFR: 43.5)
IMPORTANCE           R O 2.0             SRO 2.8 2.4.37 Knowledge of the lines of authority during an emergency.
IMPORTANCE R O 2.0 SRO 2.8 2.4.37 Knowledge of the lines of authority during an emergency.
        ;          (CFR: 45.13)
(CFR: 45.13)
IMPORTANCE " R O 2.0                       SRO 3.5 l       2.4.38 Ability to take actions called for in the facility emergency plan / including (if required) supporting or acting as emergency coordinator.
IMPORTANCE R O 2.0 SRO 3.5 l
(CFR: 43.5 /45.11) l               IMPORTANCE             R O 2.2             SRO 4.0
2.4.38 Ability to take actions called for in the facility emergency plan / including (if required) supporting or acting as emergency coordinator.
!                                                                                                              l 1
(CFR: 43.5 /45.11) l IMPORTANCE R O 2.2 SRO 4.0 1
2.4.39 Knowledge of the RO's responsibilities in emergency plan implementation.                       !
2.4.39 Knowledge of the RO's responsibilities in emergency plan implementation.
(CFR: 45.11)
(CFR: 45.11)
IMPORTANCE             RO 3.3             SRO 3.1 2.4.40 Knowledge of the SRO's responsibilities in emergency plan implementation.
IMPORTANCE RO 3.3 SRO 3.1 2.4.40 Knowledge of the SRO's responsibilities in emergency plan implementation.
r                 (CFR: 45.11) l IMPORTANCE             RO 2.3             SRO 4.0 2.4.41 Knowledge of the emergency action level thresholds and classifications.
r (CFR: 45.11) l IMPORTANCE RO 2.3 SRO 4.0 2.4.41 Knowledge of the emergency action level thresholds and classifications.
.      r         (CFR: 43.5 / 45.11)
r (CFR: 43.5 / 45.11)
IMPORTANCE             RO 2.3             SRO 4.1 i
IMPORTANCE RO 2.3 SRO 4.1 i
l NURE:;- n23, Rev 2                                   2-14                                   l
l NURE:;- n23, Rev 2 2-14 l


RECENT LE_S_ SONS LEARNED SRO-only Questions l Cont'd)
RECENT LE_S_ SONS LEARNED SRO-only Questions l Cont'd)
: c. SRO-only dluestions will be based on following categories: A.2, G2.1, G2.2, G2.3, and G2.4.
: c. SRO-only dluestions will be based on following categories: A.2, G2.1, G2.2, G2.3, and G2.4.
differences between SRO and RO outlines shifts only 11 K/As from Tier 2 to Tiers 1 & 3.
differences between SRO and RO outlines shifts only 11 K/As from Tier 2 to Tiers 1 & 3.
      - Otler 14 flexible.
- Otler 14 flexible.
6
6


l ES-401                       BWR SRO Examination Outline                                                     Form ES-401-1 fFacility:                             Date of Exam:                                                     Exam Level:
l ES-401 BWR SRO Examination Outline Form ES-401-1 fFacility:
K/A Category Points Tier         Group                                                                                       Point K   K K     K           K         K   A   A         A                 A     G Total 1   2 3     4           5       6     1   2         3                 4 3*
Date of Exam:
* Mf E?                   '
Exam Level:
gr Er Emergency &
K/A Category Points Tier Group Point K
EEE Bi gg                             f@                 @                 26 C,,L. ,. ,
K K
                                                              ,,,..a.    ,'?'                               w>--
K K
Abnormal             2                       NW            Q,             p@^ Q3..             ' ._            17 3;pe     v
K A
                                                                                                            .yg- .
A A
3 ..
A G
                                                                                          ' ' ~
Total 1
P1 ant                              > -g .      . ..
2 3
w Evolutions        Tier              Ep j,i[              . , .E           g g4                               43                                           +7 Totals                                                     M                  -%
4 5
                                                  ??-s %i'               .
6 1
wip+i: . <g                           G.?                    % .,
2 3
                                                                                                  .h             $.1.;
4 3*
1                                                                                         23 2.
Mf E?
P1 ant                                                                                                       13 Systems             3                                                                                           4 Tier                                                                                           40                                             ,,,7f Tctals
gr Er EEE Bi gg f@ @
: 3. Generic Knowledge and         Cat 1               Cat 2       Cat 3                     Cat 4 Abilities                                                                                           17                                             +$
26 Emergency &
Note:     -
C,,L.,.,
,'?'
P1 ant v
Q, p@^ '._
w>--
Abnormal 2
,,,..a.
3;pe NW
. Q3..
17 3..
' ' ~
.yg-.
> -g.
.,.E g g4 43
+7 Tier Ep j,i[
w Evolutions Totals
??-s
%i' G.?
M wip+i:.
<g
.h
$.1.;
1 23 2.
P1 ant 13 Systems 3
4 Tier 40
,,,7f Tctals 3.
Generic Knowledge and Cat 1 Cat 2 Cat 3 Cat 4 Abilities 17
+$
Note:
Attempt to distribute topics among all K/A categories; select at least one topic from every K/A category within each tier.
Attempt to distribute topics among all K/A categories; select at least one topic from every K/A category within each tier.
Actual point totals must match those specified in the table.
Actual point totals must match those specified in the table.
Select topics from many systems; avoid selecting more than two or three K/A topics from a given system unless they relate to                                                                                     .
Select topics from many systems; avoid selecting more than two or three K/A topics from a given system unless they relate to i
i plant-specific priorities.
plant-specific priorities.
l Systems / evolutions within each group are identified on the associated outline.
l Systems / evolutions within each group are identified on the associated outline.
The shaded areas are not applicable to the category / tier.
The shaded areas are not applicable to the category / tier.
I     NUREG-1021                             10 of 39                         Interim Rev. 8, January 1997 t         .
I NUREG-1021 10 of 39 Interim Rev. 8, January 1997 t


1 6 l
1 6
lt ES-401                         BWR R0 Examination Outline                             Form ES-401-2 l       Facility:                                   Date of Exam:                       Exam Level-         4 I
l lt ES-401 BWR R0 Examination Outline Form ES-401-2 l
K/A Category Points                                   I
Facility:
!            Tier           Group                                                                 Point     !
Date of Exam:
l K   K       K   K   K K   A     A         A   A   G
Exam Level-4 K/A Category Points Tier Group Point l
'    -                                                                                          Total 1   2       3   4   5 6   1     2         3   4 1-Einergency &
K K
1 M
K K
e hh rm g hh
K K
                                                                                  ;g:3 p 13 Abnormal                                   M M     @g                  E    E5          19 P1 ant Evolutions 3                    hj   $$
A A
m gj g;
A A
                                                                                  @@ @;;.          4 Tier g e     m#                 %
G Total 1
g ga m 36 M       O                   E                         )
2 3
Totals                    ggg D :p g;g                 e3 g
4 5
1                                                                   28       l l
6 1
: 2.                                                                                         i 2                                                                   19       i Plant                                                                                          l Systems           3                                                                     4 l                           Tier                                                                   51 Totals
2 3
: 3. Generic Knowledge and             Cat 1   Cat 2   Cat 3           Cat 4 Abilities                                                                   13 Note:     -
4 1-1 Mh h h h 13 Einergency &
e
@g g
;g:3 p rm E
E5 19 Abnormal M
M hj $ $
P1 ant 3
4 Evolutions m e m#
m
,Tier g
gj g; g
ga 36 Totals M
D O
E ggg :p g;g e3 g
1 28 2.
l i
2 Plant 19 i
Systems 3
4 l
Tier 51 Totals 3.
Generic Knowledge and Cat 1 Cat 2 Cat 3 Cat 4 Abilities 13 Note:
Attempt to distribute topics among all K/A categories; select at least one topic from every K/A category within each tier.
Attempt to distribute topics among all K/A categories; select at least one topic from every K/A category within each tier.
Actual point totals must match those specified in the table.
Actual point totals must match those specified in the table.
Select topics from many systems; avoid selecting more than two j                   or three K/A topics from a given system unless they relate to l:                   plant-specific priorities.
Select topics from many systems; avoid selecting more than two j
or three K/A topics from a given system unless they relate to l:
plant-specific priorities.
Systems / evolutions within each group are identified on the associated outline.
Systems / evolutions within each group are identified on the associated outline.
The shaded areas are not applicable to the category / tier.
The shaded areas are not applicable to the category / tier.
s NUREG-1021                                 16 of 39           Interim Rev. 8, January 1997
s NUREG-1021 16 of 39 Interim Rev. 8, January 1997


RE_C_ENT LE_S_S1DNS LEARNED Sam aling Criteria                                         '
RE_C_ENT LE_S_S1DNS LEARNED Sam aling Criteria intent of prodess is to avoid exam i
intent of prodess is to avoid exam predictability.
predictability.
a so to avoid excessive use of repeat test items.
a so to avoid excessive use of repeat test items.
first use systematic process to develoa samale alan using topics from K/A catalog, then use       i facility c uestion resources to accompiish the plan.                             .                i 7   i
l first use systematic process to develoa samale I
alan using topics from K/A catalog, then use i
facility c uestion resources to accompiish the l
plan.
i 7
i l
5


1 l
1 l
A             E
A E
        ,o             5                                                                                                                                         ,,,
,o 5
I b                                                                                                                                         Ch I
b Ch I
        $                                                                                                                                                        cn E
I cn E
o            5                                                                                                                                           >s a             d                                                                                                                                           L.
5
>s o
a d
L.
et 3
et 3
I                                                                                                                                                                 C l
I C
m'O co I
l m'O co I
c)
c)
C:
C:
E L.
E L.
                                                                                                                                                                .C2a C
.C2 a
v
C v
                    'F.
'F.
I                     o l                   >
I o
1                   <
l 1
l         .-        x c
l x
l          3 i         t l
c l
l 2
3 i
          -                                                                                                                                                              l i          -                                                                                                                                                            1
t l
!        .b                                                                                                                                             ..
2 i
a l
1
c                                                                                                                                                 -
.b l
!                                                                                                                                                        S
-a c
,    jE.                                                                                                                                               -
S jE.
c O
O c
c ~3                                                                                                                                               o C.
c ~3 o
oIw
C.
    =,,                                                                                                                                                 c.
oI c.
                                                                                                                                                          =
cn
cn c .,                                                                                                                                              . n c                                                                                                                                                   w lv ur       -
=,, w
c O
=
l   *1           o                                                                                                                                           -
n c
l   DE e-                                                                                                                                                       -
c lv c
moe I   ce             <N s<
w ur O
    "7o           <-
l
*1 o
l DE e-mo e
I ce
<N s<
"7o
>oc j
-$ ' we i
c I
w wN I
i w-5
=-
l 5
m e
l t
=
z c
o 5
E 2
e m
o c
o c
j
L-E s.
                ' we i        c I
r O
w          wN I
T%
i w-5                                      =-                  >                                      >
0 z
l 5                  %                    >        -
O g
e         %
'e.c
                              ,                                      m                      .
-x s x
l                            t                      _
a c
                                                            =
=
                                                                    .                     E c
g c
                                                                                                  > 2                  5 o          "
c g
g E
2 E
E E
E 2
Eo d
I e
a h
j 3
9 3
C
.E e
o o
=
c
..e I
,c e
m C
e o
e o
m                  >    %
s
                                                          >        z c                    *      -             >      L-z        O
-p s
                            <                  'e  .c    %
s
                                                                -x s
.s 3
* E          s.
T.
T%    x  0 g                                                                                                    a c
.=
                  =         .
a w
g r c  %  O
o em s
* g          .
=
g  %    c d
e e
* E  2 >        e   I      *
c e
* E  > E 3
m c
* E          E  2 EoC
co c
* a
e c
                  >      .E      %
.o..
                                          %  *    <        h  j    e -            %            9          3              ,;
_c e
                  ;          e    .        .  .
e e
o     o    .           . =        c          -
v c
o  .$ ..e       I e
2 E
e s
3 A
e s
=
                                    .s
u e
                                              ,c    s 3       =
-.e e
                                                                          .=
o o
m
e 2
                                                                                      - a C
F
w            o s    -p em m          -
%. 3 ri c
T. e
c e
                                                                  . c   .
o e
c     ,
o e
co
o 2
_c    e   e    e    c    v      .
c-c.
e _
E m
o       e           c    ..
[
                                                                                                                    .  .o. .      c
U g
                                  -       -    o    . e  <      . -.e  -.          -            e            o              .  .
7u k
2              E 3    A
i c
                                                      = u      e  2 U
2 e
c-          c. 2        F              3  ri    c    c i
o E
c e        o e
v o
o 2     e   E  m  [
7 g
o   E   v -
U
2 o  e g         %.
.o
                                                                                                              . g 7u
._5 g
                                                                                                                        -. 2 k
2 o
2         0   -
e 2
t       g  E c 2  o  7
3 jc 2
* g           U  .o      ._5          -
3 0
c jc5  2   3                    3
t t.
.                              '                                                                                  a c     e t.*  ->
c.
: c.    . c   c   e c  >            =   .        c           E             e   c                   2     -
g E
2  *            :    -
c 2
2               -            "'          o           -    -
2 c
2o         o                     c   N
5 e
                  *                                                                                                          -o w          .  < E e C       m     ;  E -E  -O  5  C
c 2
                                                                        .c r
c c
I" c-O          "
e
u <o        o                    e    o E
=
                            =-  c      y  .=   z   .o e
c E
a o
a e
y   z   -=                          x             g   a ay   z   z                     -
c 2
                  <          e u .C
-E
                                  -      .C_ _C          o  .C_  e  .C
-O 5
                                                                        .          .C_  _6     .C_           o   s ue   ._g ._g                   e       s A   m E .oJ  Z   !    d   1 O   %  C   1           I   to     I           s   C   e gL 1   %                      O   C W
C c
i                          m   e
I" 2
* m   o   n   w   m e   8   m   v           m   e       x           0   -  84    m   O                     f i
o 2o o
  ,e o
c N
O
<o
-o o
e o
E e
C m
E e
u
.C
.C_
_C e
o o
.C_
-=
.c r
c-w
=
c u
.=
z
.o a
y z
x g
a ay z
z y
e
.C
.C_
_6
.C_
E o
s ue
._g
._g
-e s
A m
E
.o Z
d 1
O C
1 I
to I
s C
e gL 1
O C
J 84 m
O f
W i
m e
m o
n w
m e
8 m
v m
e x
0 o
O O
O N
N N
N N
m m
m e m
O
=
C:
i
,e O
O O
O O
O O
O O
O O
Line 434: Line 696:
O O
O O
O O
O O
O N
O N
O N
O N
O N
O m
O m
O me O>
m 0
O O
O O
                                                                                                                                                      =
O>
o     C:
0 O
D m   m m m   o   m       m m   m   o   m           an   m       m           m     e   oe   m   O                           -
o D
ky tr, M                        m   m m 0)   m   CD   m   m m   En 01 m           en   en     es           th   in m4   in O w                         W   N N N   N   N   N   N N   N   N   N           N   N       N           N     N   N 41[ N   gn
m m
m m
o m
tr, m
m m
o m
an m
m m
e oe m
O M
m m
m 0) m CD m
m m
En 01 m
en en es th in m4 in O
k w
W N
N N
N N
N N
N N
N N
N N
N N
N N 41[
N gn y


f
f RE_C_ENT LE_S_ SONS LEARNED
                                                                                                                ~
~
RE_C_ENT LE_S_ SONS LEARNED
j Sampling Criteria (Cont'd}
                                                                                                      .          j Sampling Criteria (Cont'd}
l 1
each topic in each tier & group should be sampled at east once unless insufficient questions exist to do this. If all topics have been sampled once and other questions need to be selected, the process should be                                                             ,
each topic in each tier & group should be sampled at east once unless insufficient questions exist to do this. If all topics have been sampled once and other questions need to be selected, the process should be systematic and unbiased.
systematic and unbiased.
i final sample alan should have a fairly even f
i final sample alan should have a fairly even 3alance across all Ks & As.
3alance across all Ks & As.
8
8


_BECENT LESS_ SONS LEARNED
_BECENT LESS_ SONS LEARNED
                                                                ~
~
Samalinc Criteria (Cont'd) up to 25 questions from last two NRC exams, facility licensee exams, tests & quizzes (except final audit test) may be used.
Samalinc Criteria (Cont'd) up to 25 questions from last two NRC exams, facility licensee exams, tests & quizzes (except final audit test) may be used.
Chief Examiner (CE) has the option to unilaterally shift or change the selected K/As.
Chief Examiner (CE) has the option to unilaterally shift or change the selected K/As.
i u3  to 5 site-s3eci"ic ariorities may be identified wit 7 CE concurrence (K/A value may be < 2.5               ;
i u 3 to 5 site-s3eci"ic ariorities may be identified wit 7 CE concurrence (K/A value may be < 2.5 with suf"icient 'ustification).
with suf"icient 'ustification).
l
l


                                                                                                                                                                                                    ~
_C'TH ER
_C'TH ER Record Keeping 3er 10 CFR 55 are required to provide evidence that the applicant has successfully comp eted the facility licensee's requirements to be licensed as an operator.
~
Record Keeping 3er 10 CFR 55 are required to provide evidence that the applicant has successfully comp eted the facility licensee's requirements to be licensed as an operator.
this includes successful manipulation of the controls of their facility. As a minimum,5 sic nificant control manipulations which affect reactivity or power level.
this includes successful manipulation of the controls of their facility. As a minimum,5 sic nificant control manipulations which affect reactivity or power level.
10
10


OTHER
OTHER
                                                                  ~
~
Record Keeping (Cont'd)
i Record Keeping (Cont'd)
I this informatipn shou'd be retained anc available for inspection from time of license application to license expiration.
I this informatipn shou'd be retained anc available for inspection from time of license application to license expiration.
t 11
l
[
t k
11


OTHER                                                       -
OTHER Requal Control Mani3ulations if have arogram based on SAT process, list in 10 CFR 55.59(cX3) does not need to be strictly followed.
Requal Control Mani3ulations if have arogram based on SAT process, list in 10 CFR 55.59(cX3) does not need to be strictly followed.
should have sometling similar based on alant JTA and specific plant priorities.
should have sometling similar based on alant JTA and specific plant priorities.
some manipulations are individual operator oriented, most would be team oriented.
some manipulations are individual operator oriented, most would be team oriented.
Line 485: Line 765:
OTHER Requal Control Manipulations (Cont'd) credit for accomplishment should only be given for _ active _ participation in the manipulation.
OTHER Requal Control Manipulations (Cont'd) credit for accomplishment should only be given for _ active _ participation in the manipulation.
NOTE: control manipulations are not synonymous with reactivity manipulations.
NOTE: control manipulations are not synonymous with reactivity manipulations.
n
i n


3 i
3 i
1 3
1 Examination Communications 3
Examination Communications l         Examination Development I                   &
l Examination Development I
3 i               Coordination By I
3 i
i Ronald F. Aiello
Coordination By I
!                                l 4
i Ronald F. Aiello 4
l l
l 2
2
}
}                               1 j
1 j
l i
l i
4
4
Line 501: Line 781:
Facility Suggested improvements
Facility Suggested improvements
: 1. The exam development team and leac examiner sloulc meet at the aeginning of t7e cevelopment arocess to estaa is, common grounds for the ceveloament and execution of the examination:
: 1. The exam development team and leac examiner sloulc meet at the aeginning of t7e cevelopment arocess to estaa is, common grounds for the ceveloament and execution of the examination:
* Changes and interaretations to the NUREG.
Changes and interaretations to the NUREG.
* Scoae of the exam development and administration process.
Scoae of the exam development and administration process.
* Lessons learned from t1e last exam ac ministered.
Lessons learned from t1e last exam ac ministered.


' 2.       Vlove c ue cates "or :le out ine anc t7e exam 3ack to 90 and 60 cays arior to area week. This will provice more time for
' 2.
            ~
Vlove c ue cates "or :le out ine anc t7e exam 3ack to 90 and 60 cays arior to area week. This will provice more time for
~
examination review ay t1e examiner (s).
examination review ay t1e examiner (s).
I
I 3.
: 3. SSNTA continue with efforts to stanc ardize document formats for examination tools (JPMs and scenarios).
SSNTA continue with efforts to stanc ardize document formats for examination tools (JPMs and scenarios).
: 4. Examiners maintain a list of who (plant) does the exam process the best. This s1ould probably ae bro <en cown to eac, 3ortion of the examination. Provide your ratings to the utilities in Region 2, so we l         can meet your expectations anc imarove.
4.
i
Examiners maintain a list of who (plant) does the exam process the best. This s1ould probably ae bro <en cown to eac, 3ortion of the examination. Provide your ratings to the utilities in Region 2, so we l
: 5. T1e 3rinciaal anc t1e utility rearesentative shou c meet early to estaalis, a wor <ing re ations1'ia anc exaectations. If possible this s1ould incluce samales of cuestions,
can meet your expectations anc imarove.
;        JPMs, etc.
i 5.
: 6. The exam should have no outstancing issues /c uestions that arise and need repair at the last minute. These issues should a l have been identified by the prea wee <, to allow time to make changes that     ;
T1e 3rinciaal anc t1e utility rearesentative shou c meet early to estaalis, a wor <ing re ations1'ia anc exaectations. If possible this s1ould incluce samales of cuestions, JPMs, etc.
meet all the criteria.                       l
 
: 7. The chief examiner should exalain up front all the forms in 1021 tlat need to be completed.
6.
: 8. Always check on badcing arior to coming on site.
The exam should have no outstancing issues /c uestions that arise and need repair at the last minute. These issues should a l have been identified by the prea wee <, to allow time to make changes that meet all the criteria.
: 9. As soon as a Chief Examiner is assigned       !
7.
to an exam, the Facility Rea and the C1ief s1ould verify t1e ability to communicate via all channels (inc uding e-mail). When we converted to Lotus Notes, the facility was suddenly unable to send e-mai to his Chief Examiner. This
The chief examiner should exalain up front all the forms in 1021 tlat need to be completed.
8.
Always check on badcing arior to coming on site.
9.
As soon as a Chief Examiner is assigned to an exam, the Facility Rea and the C1ief s1ould verify t1e ability to communicate via all channels (inc uding e-mail). When we converted to Lotus Notes, the facility was suddenly unable to send e-mai to his Chief Examiner. This


became somewlat of a lindrance and s1ould be avoided if 30ssible.
became somewlat of a lindrance and s1ould be avoided if 30ssible.
: 10. It would be helpful if the Chie" Examiner could arovide his schec u e to the Faciity Rep. This includes aroviding updates for any changes to the Chief Examiner's schedule along the way. The facility rep needs to be aware of when the Chief Examiner is available to assist in exam preaaration activities.
: 10. It would be helpful if the Chie" Examiner could arovide his schec u e to the Faciity Rep. This includes aroviding updates for any changes to the Chief Examiner's schedule along the way. The facility rep needs to be aware of when the Chief Examiner is available to assist in exam preaaration activities.
: 11. A face-to-face meeting should be promatly scleduled in order for the Chief to communicate his expectations to the       <
: 11. A face-to-face meeting should be promatly scleduled in order for the Chief to communicate his expectations to the Faciity Rep. The face-to-face requirement could ae waivec if the Clief and the Faciity Rea have areviously wor <ed together and t1e Facility Rea is conficent that he/she understancs the Clief's ex3ectations. In any case, a
Faciity Rep. The face-to-face requirement could ae waivec if the Clief and the Faciity Rea have areviously wor <ed together and t1e Facility Rea is conficent that he/she understancs the     '
Clief's ex3ectations. In any case, a


J.
J.
!          conference call would be the minimum to l         satisfy t1is im aortant first ste 3.
conference call would be the minimum to l
I l
satisfy t1is im aortant first ste 3.
j    12. The Chief and the Facility Rep should
I l 12. The Chief and the Facility Rep should j
;          wor < togetler to establish a firm schedule j         for the exam week (s). This will ensure the l         most efficient schedule is developed (with j         resaect to crew composition and
wor < togetler to establish a firm schedule j
.          personnel movement) to minimize the l         amount of exam material requirec.           l
for the exam week (s). This will ensure the l
) 13. The Chief Examiner and Utility Rep MUST l         remain fixed during t1e entire 180 day l         3eriod. Handing off the responsibility is
most efficient schedule is developed (with j
!          aoth cisru ative and destructive to communication. The expectations of the clief examiner must be j          definec/ communicated early.
resaect to crew composition and personnel movement) to minimize the l
i 14. T1e " time ine" must ae enhanced to l         identify saecific times and dates for i         communication / working meetings between
amount of exam material requirec.
) 13. The Chief Examiner and Utility Rep MUST l
remain fixed during t1e entire 180 day l
3eriod. Handing off the responsibility is aoth cisru ative and destructive to communication. The expectations of the clief examiner must be definec/ communicated early.
j i 14. T1e " time ine" must ae enhanced to l
identify saecific times and dates for i
communication / working meetings between


l l           the examiner and the utility re3. These
l l
{           meetings should be " face to face" to j           assure expectations are understood, and being met, early on.
the examiner and the utility re3. These
l 15. If an examiner and a utility rep have not l           worked together before, the timeline for j           "deliverab es" must be expanded.             I
{
!            Working meetings (face to face) must be
meetings should be " face to face" to j
;            established for the examiner to review l           5-10 questions,1 scenario,1 jpm,5 jam knowledge questions,5 admin questions,
assure expectations are understood, and being met, early on.
;            etc. to assure that the standards and l           exaectations are clear early in the process
l 15. If an examiner and a utility rep have not l
!            anc tlat the utiity can aroduce a product
worked together before, the timeline for j
;            that meets the expectation.
"deliverab es" must be expanded.
i l
Working meetings (face to face) must be established for the examiner to review l
: 16. 398 and 396 forms neec to be available
5-10 questions,1 scenario,1 jpm,5 jam knowledge questions,5 admin questions, etc. to assure that the standards and l
;            electronica y. We took the time to i           develoa an electronic version ourselves j           but I wou d arefer that the e ectronic
exaectations are clear early in the process anc tlat the utiity can aroduce a product that meets the expectation.
  !          master copies came directly from the NRC
i l 16. 398 and 396 forms neec to be available electronica y. We took the time to i
develoa an electronic version ourselves j
but I wou d arefer that the e ectronic master copies came directly from the NRC


so that we have more conficence that everytling is exactly t1e same. We would all benefit from this im arovement.
so that we have more conficence that everytling is exactly t1e same. We would all benefit from this im arovement.
: 17. =A face to face working meeting of eight (8) to twelve (12) hours, approximately two (2) weeks before the thirty (30) day submittal must be established to resolve any issues BEFORE the submittal. The exam materials should be reviewed, line by line, at this meeting to communicate all changes necessary.
: 17. =A face to face working meeting of eight (8) to twelve (12) hours, approximately two (2) weeks before the thirty (30) day submittal must be established to resolve any issues BEFORE the submittal. The exam materials should be reviewed, line by line, at this meeting to communicate all changes necessary.
: 18. Ex3ectations must be established early so that the utility clearly understands the rules and the examiners exaectations. Small samples of develoament must be reviewed early to assure expectations are 3eing met.
: 18. Ex3ectations must be established early so that the utility clearly understands the rules and the examiners exaectations. Small samples of develoament must be reviewed early to assure expectations are 3eing met.
A face to face meeting, arior to the 30 day submitta , to reso ve any/all issues must be schedu ed such tlat adequate time (sucgest 2 weeks) is available to reso ve
A face to face meeting, arior to the 30 day submitta, to reso ve any/all issues must be schedu ed such tlat adequate time (sucgest 2 weeks) is available to reso ve


i comments be" ore the 30 cay limit. No one wants to see 30 questions reviewec anc the exam rejectec. S3ending ~24 hours in 3-4 face to face meetings is a small/ smart l price to aay to avoid hundreds of lours of re-development, the emotional stress on cancidates when the exam must be rescheduled and the impact on the plant when candidates are not licensed to meet plant needs.                                l
i comments be" ore the 30 cay limit. No one wants to see 30 questions reviewec anc the exam rejectec. S3ending ~24 hours in 3-4 face to face meetings is a small/ smart price to aay to avoid hundreds of lours of re-development, the emotional stress on cancidates when the exam must be rescheduled and the impact on the plant when candidates are not licensed to meet plant needs.
: 19. The "new" SSNTA format for JPM level of      !
cetail is NOT what you have liked in the 3ast arid neecs to be either acceated by the NRC as a standard or optimum format, or modified, or rejected. The JPMs we su amitted to you were in t7e "ormat and leve of cetai you had found acceataale in t7e past, and we were surarisec to finc that i t7ey needed significant last-minute rework (additiona level o" cetai).
: 20. Maybe Chief Examiners could senc some copies of good written questions, JPMs, and JPM questions up front that could help                ;
a new developer survive the exam writing                  l process and see where you as an examiner are coming from.
l
l
: 19. The "new" SSNTA format for JPM level of cetail is NOT what you have liked in the 3ast arid neecs to be either acceated by the NRC as a standard or optimum format, or modified, or rejected. The JPMs we su amitted to you were in t7e "ormat and leve of cetai you had found acceataale in t7e past, and we were surarisec to finc that t7ey needed significant last-minute rework (additiona level o" cetai).
: 20. Maybe Chief Examiners could senc some copies of good written questions, JPMs, and JPM questions up front that could help a new developer survive the exam writing process and see where you as an examiner are coming from.


l.
l.
l Facility General Comments                         l
Facility General Comments 1.
: 1. T1e limited number of NRC license examiners puts the Region and t1e sites at a cisacvantage with resaect to getting l
T1e limited number of NRC license examiners puts the Region and t1e sites at a cisacvantage with resaect to getting l
timely interchange. If the examiner is out of the o"fice on a tria for several weeks, the time you have to provide t7e licensee with i       "eecbac< is very limitec anc results in a l      real struggle to ensure a quality exam.
timely interchange. If the examiner is out of the o"fice on a tria for several weeks, the time you have to provide t7e licensee with i
T1e limited resources and interaction time increases t1e risk o" lower c uality.
"eecbac< is very limitec anc results in a real struggle to ensure a quality exam.
l 2. Region 11 examiners have been very
l T1e limited resources and interaction time increases t1e risk o" lower c uality.
!      arom at in getting bac< to us w1en we have l
l 2.
Region 11 examiners have been very arom at in getting bac< to us w1en we have l
a cuestion even t1ough you may 3e at a remote ocation.
a cuestion even t1ough you may 3e at a remote ocation.
: 3. The cua ity of the communications has 3een gooc. A of t1e examiners tlat I lave ta <ed to lave been thorough, arecise and lave aerformec listening clec<s to
3.
The cua ity of the communications has 3een gooc. A of t1e examiners tlat I lave ta <ed to lave been thorough, arecise and lave aerformec listening clec<s to


verify tlat the correct messages were sent anc received. I would however, like to see more communications by e-mail where approariate. That would 1elp ensure the clarity of the communications even more.
verify tlat the correct messages were sent anc received. I would however, like to see more communications by e-mail where approariate. That would 1elp ensure the clarity of the communications even more.
: 4. With respect to the exam saecifically; there were a number of changes that were made and we had to transmit those by expensive overnig1t or next day delivery. If we coulc figure out a secure e-mail method it would save all of us numerous headaches as well as dollars.
4.
: 5. During my "irst face-to-face meeting with the Chief Examiner (to review c raft exam material), I gainec much-neeced insight into his exaectations. T1is alleviated much stress on my part and, from tien on, the arocess went much more smoothly. T1e C1ief was very le aful curing subsecuent te ephone conversations anc our seconc
With respect to the exam saecifically; there were a number of changes that were made and we had to transmit those by expensive overnig1t or next day delivery. If we coulc figure out a secure e-mail method it would save all of us numerous headaches as well as dollars.
: j.                                                         l l                                                          l l
5.
l       meeting in Atlanta. He was very easy to
During my "irst face-to-face meeting with the Chief Examiner (to review c raft exam material), I gainec much-neeced insight into his exaectations. T1is alleviated much stress on my part and, from tien on, the arocess went much more smoothly. T1e C1ief was very le aful curing subsecuent te ephone conversations anc our seconc
)     work with and very uncerstancing
 
!      concerning my inexperience in this i       arocess. His patient guidance was the key         !
j.
l    -to our success in t1is endeavor. Nex: time, I     wit, a I we've learned, we'll do even better.
l l
i l 6. The biggest problem that I encountered
l meeting in Atlanta. He was very easy to
!      c uring that exam came from the written l     portion tlat was aeing developec by the l     contractor. Since he had written exams j       3efore, I assumed that the quality o" questions he was submitting to us were the c ua ity of questions that were acceptable to
)
      -the NRC. We reviewed his work, made technical corrections and assumec that the questions woulc be acceated by the NRC.
work with and very uncerstancing concerning my inexperience in this i
arocess. His patient guidance was the key l
-to our success in t1is endeavor. Nex: time, I
wit, a I we've learned, we'll do even better.
i l 6.
The biggest problem that I encountered c uring that exam came from the written l
portion tlat was aeing developec by the l
contractor. Since he had written exams j
3efore, I assumed that the quality o" questions he was submitting to us were the c ua ity of questions that were acceptable to
-the NRC. We reviewed his work, made technical corrections and assumec that the questions woulc be acceated by the NRC.
I lac very litt e communication with the NRC on the subject of the written exam anc a c reat deal of communication on t7e subject of the 03erating exam. W1en t1e submittal was fina ly made, the focus went
I lac very litt e communication with the NRC on the subject of the written exam anc a c reat deal of communication on t7e subject of the 03erating exam. W1en t1e submittal was fina ly made, the focus went


to the written exam and most of t1e communication was mace over saea<er 31ones (about 40 hours). It became a very aainful process and coulc have been avoided hac I not out so much fait, in the contractor's exam writing exaerience and communicated more on the subject of the written exam with the clief. We had a 100% aass rate on t7e exam, but t1e exam reaort was arutal in the area of t1e written exam.
to the written exam and most of t1e communication was mace over saea<er 31ones (about 40 hours). It became a very aainful process and coulc have been avoided hac I not out so much fait, in the contractor's exam writing exaerience and communicated more on the subject of the written exam with the clief. We had a 100% aass rate on t7e exam, but t1e exam reaort was arutal in the area of t1e written exam.
: 7. Know the chief examiners expectations from the beginning (prior to any cevelo ament).
7.
: 8. Never assume you know what you're coing
Know the chief examiners expectations from the beginning (prior to any cevelo ament).
    - the chief is just a ahone cal away.
8.
: 9. It's better to deliver material anc review it in oerson rather than over the alone. I alan for four or five trias between t7e start of
Never assume you know what you're coing
- the chief is just a ahone cal away.
9.
It's better to deliver material anc review it in oerson rather than over the alone. I alan for four or five trias between t7e start of


develoament anc arep week. It may sound ike over<i , but it wor <s (It's a so   l safer in the area of security).               l 10.'Su omit materia ear y (especial y the written). I like to have the written exam a done deal arior to the actual submittal date.
develoament anc arep week. It may sound ike over<i, but it wor <s (It's a so safer in the area of security).
: 11. You can never talk to the Chief Examiner       ;
10.'Su omit materia ear y (especial y the written).
too much. During the process, I talk to him     I more than I ta k to my mother.
I like to have the written exam a done deal arior to the actual submittal date.
: 11. You can never talk to the Chief Examiner too much. During the process, I talk to him more than I ta k to my mother.
: 12. The bottom line is that frequent communication, personal contact, and
: 12. The bottom line is that frequent communication, personal contact, and
      'early submittal of materials is the key to a successful NRC exam.
'early submittal of materials is the key to a successful NRC exam.
: 13. ALL 3 rob ems / changes must be resolved at the level of tie examiner anc the utility re 3. In no case s1ould aroolems/ chances be reported / escalated to senior management of the utility or NRC unless
: 13. ALL 3 rob ems / changes must be resolved at the level of tie examiner anc the utility re 3. In no case s1ould aroolems/ chances be reported / escalated to senior management of the utility or NRC unless


i j     both the examiner and t1e utility rep are at j     an abso ute, and mutually acreed, j     impasse.
i j
both the examiner and t1e utility rep are at j
an abso ute, and mutually acreed, j
impasse.
4 i
4 i
! 14. We often felt that we were working in t7e dar<, writing questions on toaics you may l     not want (as we were waiting for comment l     on our skyscrapers), aossibly wasting
! 14. We often felt that we were working in t7e dar<, writing questions on toaics you may l
!    resources, but seeing no other option to j     meet our required cast-in-stone deadlines.
not want (as we were waiting for comment l
l 15. It's difficult to keep JPMs short and i     alausible at the same time.
on our skyscrapers), aossibly wasting resources, but seeing no other option to j
l 16. What is a good " admin JPM", especially for j     ROs?                                           l i
meet our required cast-in-stone deadlines.
l 15. It's difficult to keep JPMs short and i
alausible at the same time.
l 16. What is a good " admin JPM", especially for j
ROs?
i


1   ..
1 g
      . y u estiusa:         av g
. y u estiusa:
The unit is operating at 20% power with all systems in automatic. Bank 'D' control rods
av The unit is operating at 20% power with all systems in automatic. Bank 'D' control rods are at 120 steps. Control Bank C' rod H6 drops to the bottom of the core. No rod control urgent failure alarms occur.
;      are at 120 steps. Control Bank C' rod H6 drops to the bottom of the core. No rod control urgent failure alarms occur.
Where will thermal power and RCS Tavg stabilize in response to the dropped rod without any operator action?
Where will thermal power and RCS Tavg stabilize in response to the dropped rod without any operator action?
A.           Reactor thermal power will be lower than prior to the dropped rod; RCS Tavg will be more than 5'F lower than the temperature prior to the dropped rod.
A.
B.           Reactor thermal power will be lower than prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.
Reactor thermal power will be lower than prior to the dropped rod; RCS Tavg will be more than 5'F lower than the temperature prior to the dropped rod.
C.           Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.
B.
!      D.           Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg l                   will be more than 5'F lower than the temperature prior to the dropped rod.
Reactor thermal power will be lower than prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.
1                           .
C.
l      Answer:
Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.
C           Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.
D.
Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg l
will be more than 5'F lower than the temperature prior to the dropped rod.
1 l
Answer:
C Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.
i l
i l
l l
l l
Line 622: Line 938:
i l
i l
i k
i k
1 g           - , ,                                                        -.
1 g


l e                                                                                             l
l e
  ,                                            Reference Page SRO Question             10             RO Question           10 SRO Tier / Group   -
l Reference Page SRO Question 10 RO Question 10 SRO Tier / Group 111 RO Tier / Group 112 SRO Importance 3.7 RO Importance 3.2 10CFR55.43(b) 10CFR55.41 8
111             RO Tier / Group         112 SRO Importance         3.7             RO Importance         3.2 10CFR55.43(b)                           10CFR55.41           8 fremAddressed                           Item Addressed KA Number               000003AK1.01 KA Statement           Knowledge of the operational implications of the following concepts as they apply to Dropped Control Rod: Reason for turbine following reactor on dropped rod event
fremAddressed Item Addressed KA Number 000003AK1.01 KA Statement Knowledge of the operational implications of the following concepts as they apply to Dropped Control Rod: Reason for turbine following reactor on dropped rod event
~
~
SHNPP Objective       AOP-LP-3.1-2 RECOGNIZE automatic actions that are associated with AOP-001, Malfunction of Rod Control and Indication Systems References             AOP-LP-3.1           AOP-001 AOP-001             Malfunction of Rod Control and Indication Systems SD-104                 Rod Control System Question Source       New Justification (A) Select if he does not recognize that rods will step out to restore temperature and power was restored due to the previous decrease in temperature.
SHNPP Objective AOP-LP-3.1-2 RECOGNIZE automatic actions that are associated with AOP-001, Malfunction of Rod Control and Indication Systems References AOP-LP-3.1 AOP-001 AOP-001 Malfunction of Rod Control and Indication Systems SD-104 Rod Control System Question Source New Justification (A) Select if he does not recognize that rods will step out to restore temperature and power was restored due to the previous decrease in temperature.
(B) Select if he recognizes that rods will step out, but the decreased temperature adds positive reactivity to restore power.
(B) Select if he recognizes that rods will step out, but the decreased temperature adds positive reactivity to restore power.
(C) CORRECT - Power will initially decrease du'e to the dropped rod. As power decreases, temperature will decrease. As temperature decreases, positive reactivity is added to restore power. Bank D rods in auto will cause rods to step out. Rods stepping out will restore power and temperature to the original value.
(C) CORRECT - Power will initially decrease du'e to the dropped rod. As power decreases, temperature will decrease. As temperature decreases, positive reactivity is added to restore power. Bank D rods in auto will cause rods to step out. Rods stepping out will restore power and temperature to the original value.
Line 636: Line 952:
INITIAL EXAMINATIONS QUESTIONS AND ANSWERS TRAINING MANAGERS CONFERENCE NOVEMBER 5,1998 RICK BALDWIN GEORGE HOPPER I
INITIAL EXAMINATIONS QUESTIONS AND ANSWERS TRAINING MANAGERS CONFERENCE NOVEMBER 5,1998 RICK BALDWIN GEORGE HOPPER I


Initial Written Examinations
Initial Written Examinations I
i


==Reference:==
==Reference:==
1 All written examinations are written IAW ES-401, " Preparation of Site-Specific Written Examinations for Power Reactors." Using ES-401-1, ES-401-2, ES-401-3, ES-401-4, BWR/PWR, RO/SRO j
EXAMINATION OUTLINES, and ES-401-6 Written Examination Quality Assurance Checkoff Sheet."


All written examinations are written IAW ES-401, " Preparation of Site-Specific Written Examinations for Power
t OBJECTIVES I
!                        Reactors." Using ES-401-1, ES-401-2, ES-401-3, ES-401-4, BWR/PWR, RO/SRO EXAMINATION OUTLINES, and ES-401-6 Written Examination Quality Assurance Checkoff Sheet."
O BETTER EXAMINATION PRODUCT i
 
i e LESS NRC/ FACILITY REWORK E
OBJECTIVES                       .
t 9 SHARED EXPECTATIONS
O BETTER EXAMINATION PRODUCT e LESS NRC/ FACILITY REWORK 9 SHARED EXPECTATIONS t
[
i 3
t I
i i
i I
[
3 f
t
t


l SESSION OBJECTIVE:
l SESSION OBJECTIVE:
To review validity concepts affecting the NRC                     -
To review validity concepts affecting the NRC t
t i
i written examination for the purpose of:
written examination for the purpose of:
instructing licensee personnel toward I
instructing licensee personnel toward I
construction of more VALID and CONSISTENT NRC license examinations.                     l t
construction of more VALID and CONSISTENT NRC license examinations.
4
l t
4 I


COVERAGE O 3 Levels of Validity i
COVERAGE O 3 Levels of Validity 1
G 3 Levels of Knowledge                                           l i
i G 3 Levels of Knowledge i
l 9 Discrimination, Sampling                                       l G Psychometrics                                                 .
l 9 Discrimination, Sampling l
i 5
h G Psychometrics i
I
5 I
[
[


VALIDITY               -
i VALIDITY A valid test is one which tests what it intends j
A valid test is one which tests what it intends to test.
to test.
In training examinations, testing specific skills and knowledge outlined and taught in
l In training examinations, testing specific skills and knowledge outlined and taught in the objectives.
! the objectives.
In licensing examinations, testing specific skills and knowledge that SHOULD have l
In licensing examinations, testing specific skills and knowledge that SHOULD have l been outlined in the objectives.
been outlined in the objectives.
6
I 6
[
I


                                                                                                                            .-. i 3 LEVELS OF VALIDITY p
i 3 LEVELS OF VALIDITY
G Content
?
                ~
p G Content
I 9 Operational                                                                                                                   ;
~
                                                                                                                                  +
I h
9 Operational
+
3 i
3 i
G Discriminant i
G Discriminant 1
4 i
i 4
7
i 7
t l


CONTENTVALIDITY i
CONTENTVALIDITY i
Addresses K/A coverage and sampling plan coverage.
Addresses K/A coverage and sampling plan coverage.
_________-______-_--____-_-__-__________-____________-____________-----_a
j 1
I l
[
T l
I
----- a


                                                                                                                -r OPERATIONAL VALIDITY '
-r OPERATIONAL VALIDITY '
Addresses two aspects:
Addresses two aspects:
l
: 1. Is the test item important to be known as a part of the operator's job?
: 1. Is the test item important to be known as a part of the operator's job?
: 2. Does the test item require the candidate to perform a job RELATED mental or l
: 2. Does the test item require the candidate to perform a job RELATED mental or l
physical operation?
physical operation?
9
j i
_ __-_______ _________  _________________ ____ -            _ _ _ _ _ _ __      a
9 a


DISCRIMINANT VALIDITY Addresses:
i l
DISCRIMINANT VALIDITY i
Addresses:
9 The cut score is the performance level that we use for making a pass / fail decision 80 percent.
9 The cut score is the performance level that we use for making a pass / fail decision 80 percent.
O The exam must be written at a level of difficulty that intends to discriminate at the 80 percent level.
O The exam must be written at a level of difficulty that intends to discriminate at the 80 percent level.
9 The question, its stem and distractor, interplay, by DESIGN, at least 80 percent of the candidates taking the exam should answer the item correctly.                             '
9 The question, its stem and distractor, interplay, by DESIGN, at least 80 percent of the candidates taking the exam should answer the item correctly.
m
m


                                                                                                                                                                    ~
i
~
VALIDITY  
VALIDITY  


==SUMMARY==
==SUMMARY==
: 1. The exam must be content valid, encompassing job safety significance and sampling.                         .
: 1. The exam must be content valid, encompassing job safety significance and sampling.
: 2. The test item should be operationally oriented: a expected mental or psychomotor requirement of the job. The items should be written at the comprehension or analysis level vice simple memory. Items that measure problem solving, prediction, analysis which are essential to job performance.
l
11
: 2. The test item should be operationally oriented: a expected mental or psychomotor requirement of the job. The items should be written at the j
comprehension or analysis level vice I
simple memory. Items that measure i
problem solving, prediction, analysis which are essential to job performance.
[
11 I


VALIDITY  
VALIDITY  


==SUMMARY==
==SUMMARY==
: 3. The exam must discriminate at a moderate level of difficulty, set by the cut score.
: 3. The exam must discriminate at a moderate I
level of difficulty, set by the cut score.
Meaning the test items as written should provide opportunity for at least 80 percent of the candidates taking the test should answer the item correctly.
Meaning the test items as written should provide opportunity for at least 80 percent of the candidates taking the test should answer the item correctly.
12
i 12


3 LEVELS OF KNOWLEDGE Bloom's Taxonomy e Analysis, Applibation, Synthesis O Comprehension 9 Fundamental (simple memory) k 13
3 LEVELS OF KNOWLEDGE Bloom's Taxonomy e Analysis, Applibation, Synthesis O Comprehension 9 Fundamental (simple memory) k 13


LEVEL OF KNOWLEDGE G Bloom's Taxonomy, NRC Reference Benchmark to classify levels of knowledge.                        .
LEVEL OF KNOWLEDGE G Bloom's Taxonomy, NRC Reference Benchmark to classify levels of knowledge.
O Bloom's Taxonomy, a classification scheme that classifies items by depth of mental performance required to answer the items.
O Bloom's Taxonomy, a classification scheme that classifies items by depth of mental performance required to answer the items.
O Bloom's Taxonomy, can be applied to written, scenarios or JPM questions.
O Bloom's Taxonomy, can be applied to written, scenarios or JPM questions.
m
j m
i


LEVELS                                                                                                                                       ;
LEVELS i
LEVEL 1 l
l LEVEL 1 l
Fundamental, using simple mental processes, recall or recognition of discrete bits of information.                                                                                                                                                    .
Fundamental, using simple mental processes, recall or recognition of discrete bits of information.
i.e. setpo.in ts, definitions, or specific facts.
t i.e. setpo. ts, definitions, or specific facts.
15
in f
____-___. _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - _ _ - _ _ _                -a
i 15
-a


l LEVEL 2 Comprehension, involves understanding
k LEVEL 2 i
;                          material through relating it to its own parts or other material:
i Comprehension, involves understanding material through relating it to its own parts or other material:
i.e. including rephrasing information in different words, recognizing relationships
i i.e. including rephrasing information in different words, recognizing relationships
                              , including consequences or implications.
, including consequences or implications.
16 t
l l
{
16 I
t


                                                                                                                                            -l LEVEL 3                                                                                                         -
- l LEVEL 3 i
Analysis, synthesis, and application testing is more active and product-oriented testing
Analysis, synthesis, and application testing is more active and product-oriented testing which involves the multi-part mental process of assembling, sorting, or integrating the parts so that the whole, and the sum can be used to: predict and event or outcome, solve I
which involves the multi-part mental process                                                                                               ,
a problem or create something new.
of assembling, sorting, or integrating the parts so that the whole, and the sum can be used to: predict and event or outcome, solve a problem or create something new.
i.e. using knowledge to solve problems.
i.e. using knowledge to solve problems.
t 17 l
t 17 l


L t
L t
;    DETERMINANTS OF DISCRIMINATION                                   :
DETERMINANTS OF DISCRIMINATION l
G Level of examination knowledge O Level of examination difficulty i
l G Level of examination knowledge j
i O Level of examination difficulty i
9 Passing Score i
9 Passing Score i
9 Item bank use
9 Item bank use i
                                                                  .      i 18 i
i 18 i
I
i I


l NATURE OF EXAMINATIONS AND TESTS O TESTS are samples of PERFORMANCE 9 infer overall performance based on a sample 9 Sample must be broad-based to make confident inference O Sample must NOT be fully predictable or inferences cannot be made on untested areas.
l NATURE OF EXAMINATIONS AND TESTS l
O ltems MUST discriminate otherwise it has little or NO value.     ,
i O TESTS are samples of PERFORMANCE 9 infer overall performance based on a j
19
sample 9 Sample must be broad-based to make confident inference O Sample must NOT be fully predictable or inferences cannot be made on untested areas.
j O ltems MUST discriminate otherwise it has little or NO value.
j 19 t


PSYCHOMETRICS           .
PSYCHOMETRICS Items may have one or more of the following psychometric errors:
Items may have one or more of the following psychometric errors:
: 1. Low level of kngwiedge (fundamental)
: 1. Low level of kngwiedge (fundamental)
: 2. Low operational validity (not job related)
: 2. Low operational validity (not job related)
Line 763: Line 1,112:
: 8. Backwards logic 20
: 8. Backwards logic 20


                                                                                                        ]
]
006 Emergency Core. Cooling System-/ JPM 236 Recovery From Safetylnjection
006 Emergency Core. Cooling System-/ JPM 236 Recovery From Safetylnjection
      .and Solid Water Conditions'. '- ;- '-                                            '
.and Solid Water Conditions'. '-
Question 2:
Question 2:
Given the following plant conditions:
Given the following plant conditions:
Line 775: Line 1,124:
a.) What is the basis for the direction in FR-C.] to depressurize intact steam generators?
a.) What is the basis for the direction in FR-C.] to depressurize intact steam generators?
b.) Why is this action taken?
b.) Why is this action taken?
References Allowed? YES           X       NO_
References Allowed? YES X
NO_
Answer:
Answer:
a'.') To reduce RCS pressure below 125 psig b.) To allow the ECCS accumulators and RHR pumps to inject water to the RCS.
a'.') To reduce RCS pressure below 125 psig b.) To allow the ECCS accumulators and RHR pumps to inject water to the RCS.


==Reference:==
==Reference:==
KA: 006G4.1S [ 2.7 / 3.6 ) Knowledge of specific bases for EOPs.
OPL271C398 pg 12-15 Applicant Response:
SAT UNSAT l


KA: 006G4.1S [ 2.7 / 3.6 ) Knowledge of specific bases for EOPs.
j INADEQUATE CORE COOLING Rev. 8 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED l
OPL271C398 pg 12-15 Applicant Response:                                                    SAT      UNSAT l
Blocking low steamline pressure Si as soon as pressurizer pressure is NOTE less than 1920 psig will prevent an inadvertent MSIV closure and keep the condenser available for steam dump.
:                                                                                                                                                                                                                    1 j
1 After the low steamline pressure SI signalis blocked, main steamline isolation will occur if the high steam pressure rate is exceeded.
INADEQUATE CORE COOLING Rev. 8 STEP       ACTION / EXPECTED RESPONSE                                                                                                                                   RESPONSE NOT OBTAINED l
r S/G depressurization at the maximum rate may cause S/G narrow range levels to drop to less than 10% {25% ADV). This is acceptable and expected for this inadequate core cooling condition.
NOTE        . Blocking low steamline pressure Si as soon as pressurizer pressure is less than 1920 psig will prevent an inadvertent MSIV closure and keep the condenser available for steam dump.
- 14. DEPRESSURIZE Intact S/Gs to reduce RCS pressure to less than 125 psig:
1
                            . After the low steamline pressure SI signalis blocked, main steamline isolation will occur if the high steam pressure rate is exceeded.                                                                                                                   r
                            . S/G depressurization at the maximum rate may cause S/G narrow range levels to drop to less than 10% {25% ADV). This is acceptable and expected for this inadequate core cooling condition.
              - 14. DEPRESSURIZE Intact S/Gs to reduce RCS pressure to less than 125 psig:
: a. WHEN RCS pressure less than 1920 psig, THEN PERFORM the following:
: a. WHEN RCS pressure less than 1920 psig, THEN PERFORM the following:
: 1) BLOCK low steamline pressure St.           7
: 1) BLOCK low steamline pressure St.
7
: 2) CHECK STEAMLINE PRESS ISOUSI BLOCK RATE ISOL ENASLE permissive LIT.
: 2) CHECK STEAMLINE PRESS ISOUSI BLOCK RATE ISOL ENASLE permissive LIT.
IM-4A, A4]
IM-4A, A4]
: b. DUMP steam to condenser                                                                               b. DUMP steam at maximum rate at maximum rate.                                                                                                                   USING intact S/G atmospheric relie1(s).
: b. DUMP steam to condenser
IF local control of atmospheric relie1(s) is necessary, THEN j
: b. DUMP steam at maximum rate at maximum rate.
DISPATCH personnelto dump steam i                                                                                                                                                           USING E A-1-2, Local Control of
USING intact S/G atmospheric relie1(s).
      ~
IF local control of atmospheric relie1(s) is necessary, THEN DISPATCH personnelto dump steam j
i USING E A-1-2, Local Control of
~
S/G PORVs.
S/G PORVs.
(Step cont:nued en next oage.)
(Step cont:nued en next oage.)
W
W


l 1
1
l l
.026,Conraintnent Spray System /.JPM.# 57AP Respond to High Contamment
      .026,Conraintnent Spray System /.JPM.# 57AP Respond to High Contamment
. Pressure 4PJace'RHR Spmy.in Service'! -
      . Pressure 4PJace'RHR Spmy.in Service'! -          -                      -
Question 2:
Question 2:
Given the following plant conditions:
Given the following plant conditions:
Unit I has tripped from 100% power due to a LOCA.
Unit I has tripped from 100% power due to a LOCA.
Containment pressure is 3.0 psid Transfer of Containment Spray pump suction to the containment sump is being perfonned in accordance with ES-1.3, Transfer to RHR Containment Sump.                                                 ,
Containment pressure is 3.0 psid Transfer of Containment Spray pump suction to the containment sump is being perfonned in accordance with ES-1.3, Transfer to RHR Containment Sump.
a.) Why must both CS pumps be placed in PULL-TO Lock while transferring suction to the
a.) Why must both CS pumps be placed in PULL-TO Lock while transferring suction to the containment sump?
!    containment sump?
l b.) What does placing both CS pumps in PULL-TO-Lock prevent?
l   b.) What does placing both CS pumps in PULL-TO-Lock prevent?
References Allowed? YES X
References Allowed? YES           X     NO l                                                                                                               I Answer:
NO l
a.) While shifting to the containment sump, both the RWST and the containment sump suction valves to the CS pumps will be closed at the same time.                                                     !
Answer:
b.) Placing the CS pumps in PULL-TO-Lock will prevent running a CS pump without a source of                 l l    water.
a.) While shifting to the containment sump, both the RWST and the containment sump suction valves to the CS pumps will be closed at the same time.
b.) Placing the CS pumps in PULL-TO-Lock will prevent running a CS pump without a source of l
water.


==Reference:==
==Reference:==
 
K/A: 026G4.18 [ 2.7 / 3.6 ] Knowledge of specific bases for EOPs OPL271CO24 pg 14-1S CCD NO:1-47W611-72-1 ES-1.3,pages Il-13 OPL271C388 pg 9 Applicant Response:
K/A: 026G4.18 [ 2.7 / 3.6 ] Knowledge of specific bases for EOPs OPL271CO24 pg 14-1S CCD NO:1-47W611-72-1 ES-1.3,pages Il-13 OPL271C388 pg 9 Applicant Response:                                                 SAT         UNSAT l
SAT UNSAT l
t I
t I
e
e


License Applicant Administrative Walkthrough Examination--NRC-1
License Applicant Administrative Walkthrough Examination--NRC-1 Examiner Sheet A'.1: Shift Staffing Question 1: A licensed RO has been off-shift for 6 months teassist in scheduling an upcoming outage.
* Examiner Sheet A'.1: Shift Staffing                                 '
He had his last physical examination 18 months ago and has had satisfactory performance in the licensed operator requalification training program.
Question 1: A licensed RO has been off-shift for 6 months teassist in scheduling an upcoming
    ,                                            outage.           He had his last physical examination 18 months ago and has had           -
satisfactory performance in the licensed operator requalification training program.
He is informed that he is needed to join a shift crew in 3 days to fill in for a vacationing Unit OATC.
He is informed that he is needed to join a shift crew in 3 days to fill in for a vacationing Unit OATC.
Can the RO fillin for the vacationing RO? Why or why not?             w References Allowed? YES _.2L NO                                                     -
Can the RO fillin for the vacationing RO? Why or why not?
Answer:                 No. The RO must first reactivate his license by completing at least 40 hours of "under direction" on-shift time.                                                             '
w References Allowed? YES _.2L NO Answer:
No. The RO must first reactivate his license by completing at least 40 hours of "under direction" on-shift time.


==Reference:==
==Reference:==
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)
Applicant Response:                                                                     SAT UNSAT e
Applicant Response:
                                                                --,        ,              ,m .-
SAT UNSAT e
,m


License Applicant Administrative Walkthrough Examination--NRC-1 Examiner Sheet A.1:' Shift Staffing Question 1: A licensed RO has been off-shift for 6 months to assist in outage scheduling. He is informed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing shift RO. He had a satisfactory physical examination 18 months ago and has maintained satisfactory performance in the licensed operator requalification training program. In anticipation of rejoining a shift crew, the RO has spent two 8-hour shifts in the control room as the OATC during the past month under the direction of a shift RO.
License Applicant Administrative Walkthrough Examination--NRC-1 Examiner Sheet A.1:' Shift Staffing Question 1: A licensed RO has been off-shift for 6 months to assist in outage scheduling. He is informed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing shift RO. He had a satisfactory physical examination 18 months ago and has maintained satisfactory performance in the licensed operator requalification training program. In anticipation of rejoining a shift crew, the RO has spent two 8-hour shifts in the control room as the OATC during the past month under the direction of a shift RO.
What additional requirements must be met by the RO before he may fill in for the vacationing RO?
What additional requirements must be met by the RO before he may fill in for the vacationing RO?
References Allowed? YES J'_ NO Answer:         The RO must complete an additional 24 (40 - 16) hours of"under direction" on-shift time that must include a plant tour and shift turnover.
References Allowed? YES J'_ NO Answer:
The RO must complete an additional 24 (40 - 16) hours of"under direction" on-shift time that must include a plant tour and shift turnover.


==Reference:==
==Reference:==
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)
Applicant Response:                                                     SAT   UNSAT l
Applicant Response:
SAT UNSAT l


l Given the following conditions:
l Given the following conditions:
: 1. The reactor has experienced a Steam Generator Tube Rupture.
1.
: 2. All systems responded as expected.
The reactor has experienced a Steam Generator Tube Rupture.
  .            2. The performance of E0P-04 is in progress.
2.
: 3. One Steam Generator has been isolated.
All systems responded as expected.
: 4. All RCPs have been stopped.
2.
I             5. RCS cooldown using natural circulation is in progress.
The performance of E0P-04 is in progress.
3.
One Steam Generator has been isolated.
4.
All RCPs have been stopped.
I 5.
RCS cooldown using natural circulation is in progress.
Which One of the following describes the concern associated with the isolated
Which One of the following describes the concern associated with the isolated
              .SG pressure prior to placing the RCS on SDC?
.SG pressure prior to placing the RCS on SDC?
: a. The isolated SG pressure would be too low due to excessive cooldown causing RCS water to enter the SG and reducing RCS inventory.     ,
a.
: b.     The strategy during the performance of E0P-04 is to maintain the affected SG pressure slightly less that RCS pressure to prevent secondary water entering the RCS.
The isolated SG pressure would be too low due to excessive cooldown causing RCS water to enter the SG and reducing RCS inventory.
: c.     Since the RCS cooldown rate was maintained greater than 30deg/hr. the affected loop has not been cooled sufficiently to allow SG depressurization.
b.
: d.     The affected SG pressure is high due to thermal stratification of the secondary water.
The strategy during the performance of E0P-04 is to maintain the affected SG pressure slightly less that RCS pressure to prevent secondary water entering the RCS.
c.
Since the RCS cooldown rate was maintained greater than 30deg/hr. the affected loop has not been cooled sufficiently to allow SG depressurization.
d.
The affected SG pressure is high due to thermal stratification of the secondary water.
l
l
                                                                                                  /
/


    ^
^
  /
/
Reactor Operator Examination
(
(
I
Reactor Operator Examination I
: 65. Given the following conditions:
: 65. Given the following conditions:
The reactor has expenenced a Steam Generator Tube Rupture.
The reactor has expenenced a Steam Generator Tube Rupture.
All systems responded as expected.
All systems responded as expected.
The performance ofEOP-04 is in progress.                                                     l One steam generator has been isolated.                                                       l RCS cooldown using natural circulation is in progress.                                       l Which ONE of the following describes the concem associated with the affected SG pressure prior to placing the RCS on SDC?                                                                         j l
The performance ofEOP-04 is in progress.
: a. The SG pressure would be too low due to u cessive cooldown causing RCS water to enter the SG and reducing RCS inventory.
One steam generator has been isolated.
: b. The SG pressure would be slightly less than RCS pressure causing water to enter the RCS resulting in a dilution.
l RCS cooldown using natural circulation is in progress.
: c. The SG temperature would be too high to allow for SG depressurization.                   !
Which ONE of the following describes the concem associated with the affected SG pressure prior to placing the RCS on SDC?
1
j l
: d. The SG pressure would be too high due to thermal straification of the secondary water.
The SG pressure would be too low due to u cessive cooldown causing RCS water to enter a.
the SG and reducing RCS inventory.
b.
The SG pressure would be slightly less than RCS pressure causing water to enter the RCS resulting in a dilution.
c.
The SG temperature would be too high to allow for SG depressurization.
1 d.
The SG pressure would be too high due to thermal straification of the secondary water.
4 i
4 i
i e
i e


Which one of the following describes the response of the Unit I charging pumps following receipt of an automatic SIAS signal, coincident with a Loss of Offsite Power?
Which one of the following describes the response of the Unit I charging pumps following receipt of an automatic SIAS signal, coincident with a Loss of Offsite Power?
: a.         One charging pump is automatically started on each emergency bus 5 minutes after it is energized by the diesel.
a.
: b.         All charging pumps are automatically started immediately after their respective bus is energized.
One charging pump is automatically started on each emergency bus 5 minutes after it is energized by the diesel.
: c.       The operator must manually start one charging pump on each emergency bus 5 minutes after it is energized by the diesel.
b.
: d.       One charging pump is automatically started onto each emergency bus, immediately after it is energized by the diesel.                 ~
All charging pumps are automatically started immediately after their respective bus is energized.
c.
The operator must manually start one charging pump on each emergency bus 5 minutes after it is energized by the diesel.
d.
One charging pump is automatically started onto each emergency bus, immediately after it is energized by the diesel.
~
l l
l l
l 1
l 1
e l
e l
: 19. Which ONE of the following describes the response of the Unit-1 charging pumps following receipt of an automatic SIAS signal, coincident with a Loss of Offsite Power? Assume normal electrical lineup and all equipment is operable.
: 19. Which ONE of the following describes the response of the Unit-1 charging pumps following receipt of an automatic SIAS signal, coincident with a Loss of Offsite Power? Assume normal electrical lineup and all equipment is operable.
: a. Only one charging pump is automatically started on each emergency bus 5 minutes after it is energized bythe diese!.
a.
: b. All charging pumps are automatically started immediately after their respective bus is energized by the diesel.
Only one charging pump is automatically started on each emergency bus 5 minutes after it is energized bythe diese!.
: c. All charging pumps are automatically started 5 minutes after their respective buses are energized by the diesel.
b.
: d. Only one charging pump is automatically started onto each emergency bus immediately after it is energized bythe diesel.
All charging pumps are automatically started immediately after their respective bus is energized by the diesel.
                                          /
c.
All charging pumps are automatically started 5 minutes after their respective buses are energized by the diesel.
d.
Only one charging pump is automatically started onto each emergency bus immediately after it is energized bythe diesel.
/


Charging pumps are running on Unit 1 an SIAS is present.       (Assume no operator action)
Charging pumps are running on Unit 1 an SIAS is present.
Which one of the following lists the charging pump response when the BAM t6nks
(Assume no operator action)
  . are emptied?
Which one of the following lists the charging pump response when the BAM t6nks are emptied?
The charging pumps will;
The charging pumps will; a.
: a. trip on low oil pressure.
trip on low oil pressure.
: b. trip on low suction pressure.
b.
: c. automatically align to the RWT.
trip on low suction pressure.
: d. continue to run and become gas bound.
c.
automatically align to the RWT.
d.
continue to run and become gas bound.
6 l
6 l
l I
l I
Line 907: Line 1,289:


i
i
(                                             Reactor Operator Exa.~ir.a: ion l
(
i
Reactor Operator Exa.~ir.a: ion l
: 27. Charging pumps are runnmg on Unit I and an SIAS is present. (Assume no operator action)
: 27. Charging pumps are runnmg on Unit I and an SIAS is present. (Assume no operator action) i Which ONE of the following lists the charging pump response when the BAM tanks are emptied?
Which ONE of the following lists the charging pump response when the BAM tanks are emptied?
l The charging pumps will:
l       The charging pumps will:
a.
: a. trip on thermal overload.
trip on thermal overload.
b., trip on low su:: tion pressure.
b.,
l
trip on low su:: tion pressure.
: c. automatically align to the RWT.
l c.
: d. continue to run and become gas bound.                                                                   '
automatically align to the RWT.
d.
continue to run and become gas bound.
i I
i I


Given the following conditions:
Given the following conditions:
Unit 1 CEDM fan HVE-21A is in AUTO after START l Unit 1 CEDM fan HVE-21B is in AUTO after STOP.
Unit 1 CEDM fan HVE-21A is in AUTO after START l
l Unit 1 CEDM fan HVE-21A trips on overcurrent.
Unit 1 CEDM fan HVE-21B is in AUTO after STOP.
l Unit 1 CEDM fan HVE-21A trips on overcurrent.
Which ONE of the following completely lists the logic that will start HVE-21B?
Which ONE of the following completely lists the logic that will start HVE-21B?
: a. The trip signal from HVE-21A.
a.
: b. The trip signal from HVE-21A concurrent with a low flow signal.
The trip signal from HVE-21A.
: c. A low flow signal.
b.
: d. The trip signal from HVE-21A concurrent with a low flow signal an6 air inlet temperature to the cooling coils is greater than 100 deg F.
The trip signal from HVE-21A concurrent with a low flow signal.
                            <f l
c.
A low flow signal.
d.
The trip signal from HVE-21A concurrent with a low flow signal an6 air inlet temperature to the cooling coils is greater than 100 deg F.
<f l


4 Reactor Operator Examina: ion
4 Reactor Operator Examina: ion
(
(
l l'-     59. Given the following conditions:
l l'-
: 59. Given the following conditions:
Unit 1 CEDM fan HVE-21 A is in AUTO after START.
Unit 1 CEDM fan HVE-21 A is in AUTO after START.
l                             Unit 1 CEDM fan HVE-21B is in AUTO after STOP.
l Unit 1 CEDM fan HVE-21B is in AUTO after STOP.
                        - Unit 1 CEDM fan HVE-21 A trips on overcurrent.                                                                                    .
- Unit 1 CEDM fan HVE-21 A trips on overcurrent.
Which ONE of the following lists the signals required by the logie needed to start HVE-21B?
Which ONE of the following lists the signals required by the logie needed to start HVE-21B?
a.-    The trip signal from HVE-21 A.
The trip signal from HVE-21 A.
I
a.-
: b.     The trip signal from HVE-21 A concurrent with a low flow signal.
I b.
: c.     A low flow signal.
The trip signal from HVE-21 A concurrent with a low flow signal.
l                         d.     The trip signal from HVE-21 A concurrent with a low flow signal and air inlet temperature signal to the cooling coils is greater than 100 F.
c.
A low flow signal.
l d.
The trip signal from HVE-21 A concurrent with a low flow signal and air inlet temperature signal to the cooling coils is greater than 100 F.
l l
l l
4                                                                                             :
4 b
b
l
                                                                                  ~
~
l t
t I'
I' I
I f
f i
i w
        - - - , .                    w                              ,-.- . . - , , , , .                        . , - - , + - - - , - . - .
., - -, + - - -, -. -.
: 13.       Given the following plant conditions:
 
                . Unit 1 was at 73% power
13.
                . A reactor trip / safety injection on low steam line pressure occurred 21 minutes ago
Given the following plant conditions:
                . Average Core Exit TC temperature is 375'F
Unit 1 was at 73% power A reactor trip / safety injection on low steam line pressure occurred 21 minutes ago Average Core Exit TC temperature is 375'F RCS pressure is 225 psig All S/G pressures are DECREASING slowly
                . RCS pressure is 225 psig
#2 and #3 S/G ievels are 5% NR and DECREASING slowly
                . All S/G pressures are DECREASING slowly
#1 S/G levelis 6% NR, and INCREASING slowly
                .  #2 and #3 S/G ievels are 5% NR and DECREASING slowly
#4 S/G levelis STEADY at 2% NR Total feedwater flow is 340 gpm PZR levelis 37% and INCREASING RCS T-cold temperature is 325'F and DECREASING slowly Containment pressure is 5 psid and INCREASING slowly At this po nt, which DNE of the following Critical Safety Functions is the MOST degraded?
                .  #1 S/G levelis 6% NR, and INCREASING slowly
a.
              .    #4 S/G levelis STEADY at 2% NR
Heat Sink b.
              . Total feedwater flow is 340 gpm
Core Cooling c.
              . PZR levelis 37% and INCREASING
Containment d.
              . RCS T-cold temperature is 325'F and DECREASING slowly
Pressurized Thermal Shock Answer.
              . Containment pressure is 5 psid and INCREASING slowly                               ,
A K/A:
At this po nt, which DNE of the following Critical Safety Functions is the MOST degraded?
000040K101
: a. Heat Sink
[4.1/4.4]
: b. Core Cooling
: c. Containment
: d. Pressurized Thermal Shock Answer.             A K/A:                 000040K101       [4.1/4.4]


==Reference:==
==Reference:==
E-0, Foldout Page Objective:           OPL271C395, B.1 Level:               Analysis Source:                                                 000040K101       001 History:           Stem and distracters a and d modified (7/7/93)
E-0, Foldout Page Objective:
Note:               Provide PTS curve with this question.
OPL271C395, B.1 Level:
Analysis Source:
000040K101 001 History:
Stem and distracters a and d modified (7/7/93)
Note:
Provide PTS curve with this question.
Justification:
Justification:
: a. Correct answer because all S/G levels are Jess than 10% NR and total feeowater flow is less than 440 gpm.
a.
: b. Incorrect because RCS temperature is 325'F (core exit T/Cs less than 1200*F).                     l
Correct answer because all S/G levels are Jess than 10% NR and total feeowater flow is less than 440 gpm.
: c. Incorrect because containment pressure is less than 12.0 psid.
b.
d,   incorrect because RCS temoerature is 325'F (T-cold is greater tnan 250*F) 1 l
Incorrect because RCS temperature is 325'F (core exit T/Cs less than 1200*F).
c.
Incorrect because containment pressure is less than 12.0 psid.
d, incorrect because RCS temoerature is 325'F (T-cold is greater tnan 250*F) l


l I
l l
l l                                                                                                                          i
i 13.
: 13.         Given tne following plant tenditions:
Given tne following plant tenditions:
                    . Unit 1 was at 73% power A reactor trip / safety injection on low steam line pressure occurred 21 minutes aco
Unit 1 was at 73% power A reactor trip / safety injection on low steam line pressure occurred 21 minutes aco Averace Core Exit TC temperature is.37pF
                                                                                                              ~
~
                    .      Averace Core Exit TC temperature is.37pF
~
                                  ~
RCS pressure is 225'psig ISSP 7#
                    .      RCS pressure is 225'psig ISSP               7#                                                 i
All S/G pressures are DECREASING slowly
                  .      All S/G pressures are DECREASING slowly
#2 and #3 S/G levels are 5% NR and DECREASING slowly
                          #2 and #3 S/G levels are 5% NR and DECREASING slowly
*1 S/G levelis 5% NR, and INCREASING slowly i
                  .      *1 S/G levelis 5% NR, and INCREASING slowly                                                     i
#4 S/G levelis STEADY at 2% NR Totalfeedwatepflow is 340 gpm PZR levelis)7% and INCREASING RCS T-cold temperature is 325'F and DECREASING slowly Containment pressure is 5 psid and INCREASING slowly At inis poin. which ONE of the following Cntical Safety Functions is the MOST degraded?
                  .      #4 S/G levelis STEADY at 2% NR                                                                   l
a.
                  .      Totalfeedwatepflow is 340 gpm PZR levelis)7% and INCREASING
Heat Sink b.
                  .      RCS T-cold temperature is 325'F and DECREASING slowly
Core Cooling
                  .      Containment pressure is 5 psid and INCREASING slowly                                   ,        I At inis poin . which ONE of the following Cntical Safety Functions is the MOST degraded?
. Containment d.
: a. Heat Sink
Pressurized Thermal Shock Answer:
: b.     Core Cooling
A K/A:
                    . Containment
000040K101 (4.1/4.4J
: d.     Pressurized Thermal Shock Answer:               A K/A:                 000040K101           (4.1/4.4J


==Reference:==
==Reference:==
E-0, Foldout Page Objective:           OPL271C39,5, B.1 7
E-0, Foldout Page Objective:
Level:               Analysis             ,
OPL271C39,5, B.1 7
a f
Level:
Source:             E                                         000040K101             001 History:               Stem and distracters a and d modified (7/7/9S)
Analysis a
Note:                 Provide PTS curve with this question.
f Source:
E 000040K101 001 History:
Stem and distracters a and d modified (7/7/9S)
Note:
Provide PTS curve with this question.
Just:ii:ation:
Just:ii:ation:
: a. Cone:t answer because at SIG 4evels are Jess tnan 10% NR and totalieeowater fiow is less than e-40 gpm.
a.
: b. Incorrect because RCS temperature is 325'F (: ore eot T/Cs less inan 1200*:)
Cone:t answer because at SIG 4evels are Jess tnan 10% NR and totalieeowater fiow is less than e-40 gpm.
b.
Incorrect because RCS temperature is 325'F (: ore eot T/Cs less inan 1200*:)
l
:. Incorre: De:ause containment pressure is fess inan 2.0 psid.
:. Incorre: De:ause containment pressure is fess inan 2.0 psid.
l 1
1 i
i        d incorrect oe:ause RCS temperature is 325''? (~-50:d is greater inan 250*:)
d incorrect oe:ause RCS temperature is 325''? (~-50:d is greater inan 250*:)
                                                                                          ,                ,          , /
, /
                                                                          ,a'?                   ?A './ 5   * *  #'
~; __
                                                              ~; __  ;g
;g
                                          -        -a.m                                             <.    .
,a'?
N                                                                       ,o.
?A
I[
'./ 5
e
-a.m N
                                                                                  ,                      _l
e I[
                  ., gy.f, l
_l
y,.l x
,o.
y,y p~
~
                                                              ,h 'S C''' ~     "  * ~'
,h 'S C''' ~
J.    .
* ~'
                                        -_?   ,-
l y,.l
., gy.f, y,y p x
J.
-_?
h :. J
h :. J


e 1
e i
i
20.
: 20.     Given the following plant conditions:
Given the following plant conditions:
            . The control room has been evacuated due to a fire
The control room has been evacuated due to a fire All controis have been transferred per AOP-C 04 MDAFW pumps 1 A-A and 1B-B are injecting into the steam generators The TDAFW pump has been shut down i
            . All controis have been transferred per AOP-C 04
Steam generator pressures and levels are decreasing Which ONE of the following describes the response of the auxiliary feedwater system?
            . MDAFW pumps 1 A-A and 1B-B are injecting into the steam generators
a.
            . The TDAFW pump has been shut down                                                     i
The TDAFW pump will automatically restart when 2/4 steam generators reach low low level.
          . Steam generator pressures and levels are decreasing Which ONE of the following describes the response of the auxiliary feedwater system?
b.
: a. The TDAFW pump will automatically restart when 2/4 steam generators reach low low level.
The MDAFW pump level control valves will automatically control steam generatof levels at 33%.
: b. The MDAFW pump level control valves will automatically control steam generatof
~
                                                                                                ~
The MDAFW pump level control valves will have to be manually adjusted using the c.
levels at 33%.
Manual Output Adjust in the L-381 cabir'et.
: c. The MDAFW pump level control valves will have to be manually adjusted using the Manual Output Adjust in the L-381 cabir'et.
d.
: d. The discharge pressure for the MDAFW pumps will have to be manually adjusted by throttling the manual valves at the l CVs.
The discharge pressure for the MDAFW pumps will have to be manually adjusted by throttling the manual valves at the l CVs.
Answer:           B K/A:               000068A102       [4.3 / 4.5]
Answer:
B K/A:
000068A102
[4.3 / 4.5]


==Reference:==
==Reference:==
AOP-C.04, page 11 Objective:         OPL271C423, B.4 Level:             Comprehension Source:                                             000068A102       001 1
AOP-C.04, page 11 Objective:
History:           Used on 9/97 RO NRC exam l                   Text modrfied to correct grammar errors. Distracters a, b, c, and d reordered (7/22/98). Distracter be restructured (7/29/98)
OPL271C423, B.4 Level:
Note:             Selected fromM exam bank with minor modification of text
Comprehension Source:
000068A102 001 1
History:
Used on 9/97 RO NRC exam l
Text modrfied to correct grammar errors. Distracters a, b, c, and d reordered (7/22/98). Distracter be restructured (7/29/98)
Note:
Selected fromM exam bank with minor modification of text


p                                                                                                 h
p h
: 20.       Given the following p: ant condr:: ens:
20.
Given the following p: ant condr:: ens:
)
)
                            . The control room has been evacuated due to a fire
The control room has been evacuated due to a fire All controls have been transferred per AOP-C.04 MDAFW pumps 1 A-A and 1B-B are injecting into the steam generators The TDAFW pump has been shut down Steam generator pressures and levels are decreasing
                            . All controls have been transferred per AOP-C.04
@ r d, wh M M k oh@ >M /r4 -C-@
                            . MDAFW pumps 1 A-A and 1B-B are injecting into the steam generators
3 Which ONE of tne fo!!owing describes te retocash: Wr.: o,aciy lc;d ater. system?
                            . The TDAFW pump has been shut down
~
                            . Steam generator pressures and levels are decreasing
The TDAFW pump will automatically resta-t when 2/4 steam generators reach low low
                                                                  @ r d, wh M M k oh@ >M /r4 -C-@                         3 Which ONE of tne fo!!owing describes te retocash: Wr.: o ,aciy lc;d ater. system?
: a. level. e ~ d k aa" OviIN 03'y e ( -M/.
              ~
(C o w b.
: a. The TDAFW pump will automatically resta-t when 2/4 steam generators reach low low level. e ~ d k             aa"         OviIN 03'y e ( -M/ .
The MDAFW pump level control valves will automatcally control steam generator,
(C o w
, levels at 33%.
: b. The   MDAFW     pump level control valves will automatcally control steam generator ,
                              , levels at 33%.
The MDAFW pump level =entrol valves will have to be manually aojusted using tne Manual Output Adjust in tne L-381 cautnet.
The MDAFW pump level =entrol valves will have to be manually aojusted using tne Manual Output Adjust in tne L-381 cautnet.
fW                     d. The discharge pressure for the MDAFW pumps will have to be manually adjusted by
fW
  ,,,I  y g [                tnrottling the manual valves at the LCVs.
,,,I g [
  ., Al M
d.
  , f[j,         Answer:             B K/A:                 00005BA102       (4.3 / 4.5]
The discharge pressure for the MDAFW pumps will have to be manually adjusted by y
Reference.           AOP-C.04, page 11 Objective:           OPL271C423, B.4 Level:               Comprehension Source:                                                 00005BA102       001 H: story:           Used on 9/97 RO NRC exam Tex't modtfied to correct grammar errors. Distra~.ers a b, c. and d reordered (7/22/98). Distracter be restructured (7/29/95)
tnrottling the manual valves at the LCVs.
Note:               Selected fromMexam bank with minor modification of text
., Al M
                                                                              ~
, f[j, Answer:
B K/A:
00005BA102 (4.3 / 4.5]
Reference.
AOP-C.04, page 11 Objective:
OPL271C423, B.4 Level:
Comprehension Source:
00005BA102 001 H: story:
Used on 9/97 RO NRC exam Tex't modtfied to correct grammar errors. Distra~.ers a b, c. and d reordered (7/22/98). Distracter be restructured (7/29/95)
Note:
Selected fromMexam bank with minor modification of text
~
l l
l l


                                                                                                                                                                                              +
+
: 23.     Given the following plant conditions:
23.
            . FR C.1,' inadequate Core Cooling", has been entered due to a RED path on Core Cooling
Given the following plant conditions:
            . Core exit temperatures (TCs) are 1250*F and increasing
FR C.1,' inadequate Core Cooling", has been entered due to a RED path on Core Cooling Core exit temperatures (TCs) are 1250*F and increasing NO Feedwater / Aux Feedwater is available l
          . NO Feedwater / Aux Feedwater is available                                                                                                                                       l
At step 12, the CRO checks the S/G NR levels and reports all are <10%.
          . At step 12, the CRO checks the S/G NR levels and reports all are <10%.
As the SRO you should; (Select ONE of the following) a.
As the SRO you should; (Select ONE of the following)
Go to FR-H.1," Loss of Secondary Heat Sink".
: a. Go to FR-H.1," Loss of Secondary Heat Sink".
b.
: b. Depressurize allintact S/Gs to atmospheric pressure to dump accumulators.
Depressurize allintact S/Gs to atmospheric pressure to dump accumulators.
: c. Start RCPs one at a time, until core exit TCs are less than 1200'F.                                                                                           r d
c.
: d. Prepare to initiate RCS Feed and Bleed if WR levelin any 2 S/Gs is less than 60%.
Start RCPs one at a time, until core exit TCs are less than 1200'F.
Answer:           C K/A:             000074K307       .[4.0/4.4]
r d
d.
Prepare to initiate RCS Feed and Bleed if WR levelin any 2 S/Gs is less than 60%.
Answer:
C K/A:
000074K307
.[4.0/4.4]


==Reference:==
==Reference:==
FR.C.1, pages 10 & 17 Objective:       OPL271C398 Level:           Comprehension Source:         MExam Bank 101.                             000074K307                                                                           001 History:         Used on HLC 9807 practice exam Distracters b and c reordered Note:           Selected fro 6 exam bank without modification of text l
FR.C.1, pages 10 & 17 Objective:
OPL271C398 Level:
Comprehension Source:
MExam Bank 101.
000074K307 001 History:
Used on HLC 9807 practice exam Distracters b and c reordered Note:
Selected fro 6 exam bank without modification of text l
I 1
I 1
1 1
1 1
Line 1,090: Line 1,528:
l
l


4      g                                 INADEQUATE CORE COOLING                                 FR-C.1 7q       Rev. 8   '
g INADEQUATE CORE COOLING FR-C.1 4
I
7q Rev. 8 I
!        STEP       ACTION / EXPECTED RESPONSE                           RESPONSE NOT OBTAINED i-CAUTION         Use of a Faufted or Ruptured S/G during performance of the following steps l                         may compound the emergency situation. When NO Intact S/Gs are available, l
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED i-CAUTION Use of a Faufted or Ruptured S/G during performance of the following steps l
a Fautted or Ruptured S/G may be used.                                             '
may compound the emergency situation. When NO Intact S/Gs are available, l
: 12. MAINTAIN intact S/G narrow range                                                     r l             levels:
a Fautted or Ruptured S/G may be used.
: a. Greater than 10% {25% ADV)                 a. MAINTAIN total feed flow greater tnan 440 gpm UNTIL level greater tnan 10% {25% ADV) in at least one S/G.
: 12. MAINTAIN intact S/G narrow range r
l levels:
: a. Greater than 10% {25% ADV)
: a. MAINTAIN total feed flow greater tnan 440 gpm UNTIL level greater tnan 10% {25% ADV) in at least one S/G.
IF total feed flow greater than 440 gpm can NOT be established, THEN PERFORM theiollowing:
IF total feed flow greater than 440 gpm can NOT be established, THEN PERFORM theiollowing:
: 1) CONTINUE attempts to establish heat sink in at least one S/G.
: 1) CONTINUE attempts to establish heat sink in at least one S/G.
                                ,                              2) GO TO Note prior to Step 21.
: 2) GO TO Note prior to Step 21.
: b. Between 10% {25% ADV) and 50%.
: b. Between 10% {25% ADV) and 50%.
l l
l l
l
l l
                                                      ~
~
l P
P
\
\\
Page 10 of 19
Page 10 of 19


___                                --                  -                                          .~. .
.~..
1 FR-C.1 w
FR-C.1 g
g                              INADEQUATE CORE COOLING Rev. 8 STEP       ACTION / EXPECTED RESPONSE                         RESPONSE NOT OBTAINED l.
INADEQUATE CORE COOLING w
NOTE             RCP damage due to absence or loss of normal support conditions is an acceptable consequence in this procedure.
Rev. 8 l.
l       21. CHECK if RCPs should be started:
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE RCP damage due to absence or loss of normal support conditions is an acceptable consequence in this procedure.
: a. , CHECK core exh T/Cs                     a. GO TO Step 22.                                                                       l greater than 1200*F.                                                                                                             l 1
l
: b. CHECK if idle RCS toop available:         b. PERFORM the following:
: 21. CHECK if RCPs should be started:
l l                 1) S/G narrow range level                   a) OPEN pressunzer PORVs and block greater than 10% [25% ADV]                     valves.
: a., CHECK core exh T/Cs
: 2) RCP in associated loop                     b) IF core exTt T/Cs remain                                                         i AVAILABLE AND STOPPED.                         greater than 1200*F, THEN OPEN reactor vessel head vents:
: a. GO TO Step 22.
                                    ,                                . FSV-66-394
greater than 1200*F.
                                                                      . FSV-68-395                                                               )
: b. CHECK if idle RCS toop available:
                                                                      . FSV-68-396                                                               ;
: b. PERFORM the following:
                                                                      . FSV-68-397.
l l
: 1) S/G narrow range level a) OPEN pressunzer PORVs and block greater than 10% [25% ADV]
valves.
: 2) RCP in associated loop b) IF core exTt T/Cs remain i
AVAILABLE AND STOPPED.
greater than 1200*F, THEN OPEN reactor vessel head vents:
FSV-66-394 FSV-68-395
)
FSV-68-396 FSV-68-397.
c) GO TO Step 22.
c) GO TO Step 22.
l
l c.
: c. START RCP in one idle loop.
START RCP in one idle loop.
: d. GO TO Substep 21.a.
d.
l                                                       -
GO TO Substep 21.a.
Page 17 of 19
l Page 17 of 19


e
e
  *                                                                                                    \
\\
: 23.       Given the following plant conddions:
23.
                  -    FR-C.1, inade:;uate Core Cooling", has been entered due to a RED path on Core   l Cooling
Given the following plant conddions:
                  . Core exit temperatures (TCs) are 1250*F and increasing
FR-C.1, inade:;uate Core Cooling", has been entered due to a RED path on Core Cooling Core exit temperatures (TCs) are 1250*F and increasing NO Feedwater / Aux Feedwater is available At step 12, the CRO checks the S/G NR levels and reports all are <10%.
                  . NO Feedwater / Aux Feedwater is available
                  . At step 12, the CRO checks the S/G NR levels and reports all are <10%.
As the SRO you should: (Select ONE of the following)
As the SRO you should: (Select ONE of the following)
L
L a.
: a. Go to FR-H.1,
Go to FR-H.1,
* Loss of Secondary Heat Sink".
* Loss of Secondary Heat Sink".
: b. Depressunze allintact S/Gs to atmospheric pressure to dump accumulators.
b.
                                                                                                  ~
Depressunze allintact S/Gs to atmospheric pressure to dump accumulators.
: c. Start RCPs one at a time, until core exit TCs are less than 1200*F.
c.
g PoR\l.s u ~34 o d \/M.wS
Start RCPs one at a time, until core exit TCs are less than 1200*F.
: d. .JheparWaNCO recJ oud Geod4WR-4eveHrr eny-2-S/Gs4s4ess-thart-608/, -
~
Answer:           C, K/A:             000074K307       [4.0/4.4]
g PoR\\l.s u ~34 o d \\/M.wS
: d..JheparWaNCO recJ oud Geod4WR-4eveHrr eny-2-S/Gs4s4ess-thart-608/, -
Answer:
C, K/A:
000074K307
[4.0/4.4]


==Reference:==
==Reference:==
FR-C.1, pages 10 & 17 Objective:       OPL271C398 Level:           Comprehension Source:                                             000074K307         001                   ,
FR-C.1, pages 10 & 17 Objective:
History:         Used on HLC 9807 practice exam Distracters b and c reordered Note:             Selected from Mexam bank without modification of text
OPL271C398 Level:
                .p.h yW.6!</E/$ f
Comprehension Source:
* W
000074K307 001 History:
: 49. Given tne following plant conditions:
Used on HLC 9807 practice exam Distracters b and c reordered Note:
                . Reactor power is at 20% dunng a unit shutdown
Selected from Mexam bank without modification of text
                . Intermediate Range N-36 failed high
.p.h yW.6!</E/$ f W
                . Operators placed the level trip bypass switch for N-25 to the bypass position Which ONE of the following describes the effect of this failure and action during the remainder of the shutdown?
 
: a. The reactor will automatically trip when the Power Range channels decrease below the P-10 setpoint,
49.
: b. Entry from Mode 1 to Mode 2 is prohibited with an inoperable intermediate Range channel, so the unit must be manually tripped prior to Mode 2 entry.
Given tne following plant conditions:
: c. .Both Source Range channels, N-31 and N-32, must be manually energized when the operable intermediate Range channel (N 35) decreases below the P-6 setpoint.
Reactor power is at 20% dunng a unit shutdown Intermediate Range N-36 failed high Operators placed the level trip bypass switch for N-25 to the bypass position Which ONE of the following describes the effect of this failure and action during the remainder of the shutdown?
: d. Source Range channel N-32 must be manually energized when the operable Intermediate Range channel (N-35) decreases below the P-6 setpoint; Source Range channel N-31 will automatically energize.
: a. The reactor will automatically trip when the Power Range channels decrease below the P-10 setpoint, b.
Answer           C K/A:             015000K407       [3.7/3.B]
Entry from Mode 1 to Mode 2 is prohibited with an inoperable intermediate Range channel, so the unit must be manually tripped prior to Mode 2 entry.
: c..Both Source Range channels, N-31 and N-32, must be manually energized when the operable intermediate Range channel (N 35) decreases below the P-6 setpoint.
d.
Source Range channel N-32 must be manually energized when the operable Intermediate Range channel (N-35) decreases below the P-6 setpoint; Source Range channel N-31 will automatically energize.
Answer C
K/A:
015000K407
[3.7/3.B]


==Reference:==
==Reference:==
AOP-1.01, page 10 ES-0.1, page 13 Objective:       OPL271 C352, B.4 Level:           Comprehension Source:                                           015000K407         001 History:         Not used on 9/97 or 5/98 NRC exams. Not used on practice exam.
AOP-1.01, page 10 ES-0.1, page 13 Objective:
Distracters c and d reordered Note:             Selected fromg exam bank without modification of text
OPL271 C352, B.4 Level:
Comprehension Source:
015000K407 001 History:
Not used on 9/97 or 5/98 NRC exams. Not used on practice exam.
Distracters c and d reordered Note:
Selected fromg exam bank without modification of text


a 0 -                                                                                                            - ,
a 0
                                                                  ^
^
ph g/#E2-             /         WWM W5       Q~/           M   .,          I i                   !    ;
ph g/#E2- /
I I                           l 3[
WWM
* l/L                           '
,,W5 Q~/
: 49.      Given the following plant conditions:                          ,
M I i I I 3[
l/L
(
(
                  . Reactor power is at 20% during a unit shutdown                     \
49.
                  . Intermediate Range N-35 failed high                             _\                       i Gpera crs pied m: ::sPeypassswiterriorth351:rthirDypasspesitiE J           l Which ONE of the following describes the effect of this failure and action during the remainder of       l the shutdown?                                                                                           I
Given the following plant conditions:
Reactor power is at 20% during a unit shutdown
\\
Intermediate Range N-35 failed high
_\\
i Gpera crs pied m: ::sPeypassswiterriorth351:rthirDypasspesitiE J
Which ONE of the following describes the effect of this failure and action during the remainder of the shutdown?
I
: a. The reactor will automatically trip when the Power Range channels decrease below the F-10 setpoint.
: a. The reactor will automatically trip when the Power Range channels decrease below the F-10 setpoint.
1
b.
: b. Entry from Mode 1 to Mode 2 is prohibited with an inoperable Intermediate Range channel, so the unrt must be manually tripped prior to Mode 2 entry.
Entry from Mode 1 to Mode 2 is prohibited with an inoperable Intermediate Range channel, so the unrt must be manually tripped prior to Mode 2 entry.
: c. .Both Source Range channels, N-31 and N-32, must be manually energized when the operabie Intermediate Range channel (N-35) decreases below the P-5 setpoint.
: c..Both Source Range channels, N-31 and N-32, must be manually energized when the operabie Intermediate Range channel (N-35) decreases below the P-5 setpoint.
: d. Source Range channel N-32 must be manually energized when tne operable intermed: ate Range channel (N-35) decreases below the P-5 setpoint; Source Range channel N-31 will automatically energize.
d.
Answer.           C K/A:               015000K407       [3.7/3.8)
Source Range channel N-32 must be manually energized when tne operable intermed: ate Range channel (N-35) decreases below the P-5 setpoint; Source Range channel N-31 will automatically energize.
Answer.
C K/A:
015000K407
[3.7/3.8)


==Reference:==
==Reference:==
AOP-Lol, page 10 ES-0.1, page 13 Objective:         OPL271 C352. B.4 Level:             Comprehension Source:                                               010000K407     001 History:           Not used on 9/97 or 5/98 NRC exams. Not used on practice exam.
AOP-Lol, page 10 ES-0.1, page 13 Objective:
Distra:ters c and d reordered Note:             Selected fromMexam bank without modification of text g          J .5       M                             '
OPL271 C352. B.4 Level:
            ~/
Comprehension Source:
o       ,g j;
010000K407 001 History:
Not used on 9/97 or 5/98 NRC exams. Not used on practice exam.
Distra:ters c and d reordered Note:
Selected fromMexam bank without modification of text J.5 M
g
~
o
,g j;
/


5 i
5 i
: 35.         Given the following plant conditions:
35.
              .                      . Unit 2 is operating at 29% power in accordance with 0-GO-6, Power Reduction From                 !
Given the following plant conditions:
30% Reactor Power to Hot Standby                                                                 l
Unit 2 is operating at 29% power in accordance with 0-GO-6, Power Reduction From 30% Reactor Power to Hot Standby l
  -.-                                . Unit 2 will be going to Cold Shutdown for maintenance                                           l
Unit 2 will be going to Cold Shutdown for maintenance l
                                      . Intermediate Range N-36 has just failed high                                                     ;
Intermediate Range N-36 has just failed high l
l l
l Which ONE of the following actions must be performed before reducing reactor power below 10%?
Which ONE of the following actions must be performed before reducing reactor power below
a.
                                                                                                                                              'l 10%?
Manually energize N-31 and N-32 I
                      .              a. Manually energize N-31 and N-32 I
L b.
L                                     b. Place N-36 LevelTrip switch in BYPASS.
Place N-36 LevelTrip switch in BYPASS.
: c. Remove N-36 instrument power fuses.                                                               t
c.
: d. Manually trip the reactor to prevent an automatic reactor trip.
Remove N-36 instrument power fuses.
Answer;               B i
t d.
K/A:                   000033K302           [3.6/3.9)                                                             ;
Manually trip the reactor to prevent an automatic reactor trip.
Answer; B
i K/A:
000033K302
[3.6/3.9)


==Reference:==
==Reference:==
AOP-l.01, page 10 & 13 i
AOP-l.01, page 10 & 13 i
Objective:             OPL271C352, B.4 Level:                 Analysis                                                                                     i Source:               New question (Developed 7/15/98)                                 ,,
Objective:
7 Justification:                                                                                                     i i
OPL271C352, B.4 Level:
I                                                                                                                                             i
Analysis i
: a. Incorrect because manually restoring N-31 and N-32 to operation in the power range would                 L destroy the source rarige detectors.                                                                     j
Source:
: b. Correct because placing the level trip switch in BYPASS prevents high reactor trip when                   i the low power reactor trip signal is reinstated at the F-10 setpoint (10% power).
New question (Developed 7/15/98) 7 Justification:
: c. Incorrect because action does not bypass the trip signal.-                                               f
i i
: d. Incorrect because a manual reactor trip for the given conditions is not required. Placing N-36 level trip switch in BYPASS allows an orderly reactor shutdown.                                         l l
I i
4 y         .~,                                 _ - . .
Incorrect because manually restoring N-31 and N-32 to operation in the power range would L
a.
destroy the source rarige detectors.
j b.
Correct because placing the level trip switch in BYPASS prevents high reactor trip when i
the low power reactor trip signal is reinstated at the F-10 setpoint (10% power).
c.
Incorrect because action does not bypass the trip signal.-
f d.
Incorrect because a manual reactor trip for the given conditions is not required. Placing N-36 level trip switch in BYPASS allows an orderly reactor shutdown.
l 4
y
.~,
v
,_mm.,
..m.
, _ ~...


I                                                                                               A l
I A
Ie ,
l Ie i
i l
l l
l
50.
: 50.     Given the following piant conditions:
Given the following piant conditions:
                . Large Break LOCA is in progress
Large Break LOCA is in progress RCS pressure is 550 psig Exosensor indicates 25'F superheat No RCPs are operating Which ONE of the following indications would the operator use along with RCS pressure to accurately substantiate core cooling?
                . RCS pressure is 550 psig
a.
                . Exosensor indicates 25'F superheat
Reactor Coolant Tavg value.
                . No RCPs are operating Which ONE of the following indications would the operator use along with RCS pressure to accurately substantiate core cooling?
b.
: a. Reactor Coolant Tavg value.
Average value of all core exit thermocouples.
: b. Average value of all core exit thermocouples.
c.
: c. Hottest Reactor Coolant wide range That value.
Hottest Reactor Coolant wide range That value.
: d. Average value of five hottest core exit thermocouples.
d.
Answer:         D                                                                         l K/A             017000A402       [3.8 / 4.1]
Average value of five hottest core exit thermocouples.
Answer:
D l
K/A 017000A402
[3.8 / 4.1]


==Reference:==
==Reference:==
FR-0, page 3 OPL271C044, page 7, A.1.c Objective:       OPL271 C044, B.1.b Level:           Memory Source:                                           017000A402     001 History:         Used on HLC 9809 practice exam Distracters a, b, c, and d reordered (7/22/98)
FR-0, page 3 OPL271C044, page 7, A.1.c Objective:
Note:           Selected from                 xam bank without modification of text 1
OPL271 C044, B.1.b Level:
Memory Source:
017000A402 001 History:
Used on HLC 9809 practice exam Distracters a, b, c, and d reordered (7/22/98)
Note:
Selected from xam bank without modification of text 1
i
i


l l
l 1
1 I
50.
: 50.       Given tne following plant condmons:
Given tne following plant condmons:
1 1
1 Large Break LOCA is in progress RCS pressure is 550 psig Exosensor indicates 25'F superheat No RCPs are operating Which DNE of the following indications would the operator use along wrth RCS pressure to accuratefy substantiate core cooling?.
                      -  Large Break LOCA is in progress
~,a.9 u_. -
                    . RCS pressure is 550 psig                                                                         !
Y 9ead5 C %en^f 5;; A!NTN ^FA ~4,k.S,,,,,,)
                    . Exosensor indicates 25'F superheat                                                               l
WM' Q
                    . No RCPs are operating Which DNE of the following indications would the operator use along wrth RCS pressure to accuratefy substantiate core cooling?.                                      ,  ,,
t Tc. Abtr rote c.7 ~
u_ . -        --            _ - ,_-. , -    .
s b.
                                                                                  ~,a.9 Y 9ead5 C %en^f 5;; A!NTN ^FA ~4,k.SQ, , , ,,,)                       WM'                   ''#
Average value of all core exit thermocouples, c.
                                    ,                    t Tc. Abtr rote c.7 ~s     -
Hottest Reactor Coolant wide range Thot value.
: b. Average value of all core exit thermocouples,
: c. Hottest Reactor Coolant wide range Thot value.                                     -
i a
i a
: d. Average value of five hottest core exrt thermocouples.
d.
Answer.           D                                                                               s j
Average value of five hottest core exrt thermocouples.
N5 " -I 0;^                   M#
Answer.
K/A               017000A402       [3.8 / 4.1)
D s
j M#
N5 " -I 0;^
K/A 017000A402
[3.8 / 4.1)
- 6 2-


==Reference:==
==Reference:==
FR-0, page 3
FR-0, page 3 OPL271C044, page 7 A.1.c Objective:
                                                                            - 6 2-OPL271C044, page 7 A.1.c Objective:       OPL271 C044, B.1.b Level:           Memory Source:                                             017000A402   001 History:         Used on HLC 9809 practice exam Distracters a, b, c, and d reordered (7/22/98)
OPL271 C044, B.1.b Level:
Note:           Selected from                 exam bank without modification of tert l
Memory Source:
l 1
017000A402 001 History:
1 l
Used on HLC 9809 practice exam Distracters a, b, c, and d reordered (7/22/98)
l I
Note:
Selected from exam bank without modification of tert l
1 I
u
u


1 9"
1 9"
09         09             o a o                                                                                                                                                                                                                                                                          &
09 09 o a on; of o" N "4
n;       of*      o" N             "4                         ?u                   09 0"                                                             on o?h m u. c. c
?u 0 9 0"
* E                      Ob                   EE                                                                                 h h h 'e                                                                                             $
o n E
u E                                                                                               .
Ob EE h h h 'e o?h u
O               m                                 o           e
m u. c. c E
* z               w
O m
                                          >                                =             w                                                                                           o                                                   w m
o e
                                                                                        >                                                                                        z                                                    #                                      8 w                                                                                                                                         w cta                                              w                                                                                         e                               e zo                                                e st                                                                                     z                                 w                                                                 g
z w>
                                <*                                                  o                                                                                   <                                o cz                                              <w                                                                                     c                                 a c<                                               cz                                                                                      92<
=
w=                                               c<
w o
w=                                                                                     s5>
m z
g-ao w c                                              R*
w 8
oc                                                                                    z<c$a                                                                                                   e mQ                                              '"                                                                                    $5<m$
w w
* C)                             aw                                              m<
w e
s_m<2m aw                                                                                                                     a g                             >c                                               >c                                                                                                 w c. 4
ct e
:=                             ce                                               CO                                                                                 $ckz
a e st z
* O                                AL On6                                                                                sk                                                                                                              4k Uiu.                                            'O     m 8
w g
                                                  =     w C                                                       >
zo o
u 0                                                                                             o                         w m
o
2                                 =                        >
<w c
O                                           ,
a cz cz c<
T                                                                                                                                                                                                                S u
92<
w=
c<
s5>
w=
g-R*
<c$a e
o c z
a w o c
$5<m$
mQ
_m<2m C) m<
aw a
s w c. 4 g
>c aw
>c
$ckz
:=
ce CO O
A L On s k 4 k 6
Ui
'O m
u.
8
=
w C
u 0
o m
=
w 2
O T
S u
g
g
                                                    $~                                                                                                                                                                                                                       *
~
                                                    $5                                         YE o=
$5 YE o=
                                                  ,3 w =                                         *-=
,3 w =
                                                  -w                                             m-ocs                                           <3 wC o     m
* - =
                                                  *o$
-w m-ocs
m u                                            an e.- u A
<3 wC A
T                                                                                                          2     W
o m
                                                                                                <c D       m L                     L F               e     b v
*o$
                                                                                                                                                                                                                                                                      =
an m
u b                                       o                         -
e.- u T
0,                                                                                                                                                                         8  N=
2 W
uR                          $              :                        2                                                                                                                                                                                or2'
u
                  -                        = =w           -                    c       2C                                                                                                                                                                           O t 2                        5 . C s=      5                    <
<c D
                                                                                ' w= =o = = .                                                                                                                                                                       $c"xG m ww<-
m L
Sx5                           c e 2 3 .. m                               0 <0 5 -E                                                                                                                                                                    me=w o w ~-                       w     _w m =w ow-a w m                                                                                                                                                                                                   u<o=
L F
            ~
b e
            'Emm                            sm-as
v
                                                -=co      m o
=
s
u 8
                                                                                ~ wum c  _~9                                                                                                                                                                         = cue Eow                           -m       cs                         w_w      _ -
N=
                                            < w us ax m                                                                    2
b o
_va                                                                    00 <u-~
2 0,
W ' w< C 3 c' m                             0 urw<=     'C >                                                                                                                                                                                  i H cawaL 2 w <c<<      ==m
or2' uR
            /N,                     -                      .
=w m
* r
c 2C O
: 88.                       Given the following plant conditions:
< w= =o = =.
                                                          . Unit 2 operating in accordance with 0-GO-5 Normal Power Operation at 73% with a powerincrease to 100% in progress                                                                                           ;
$c"xG 2
  ..                                                      . Chemistry reports Unit 2 RCS loop 1 accumulater boron concentration is 2390 ppm
5. C s=
                                                        . Current time is 0100 I                             Which ONE of the following actions must be taken?                                                                                                         [
5
t                                                                                                                                                                                         !
=
I~                                                     a. Immediately stop the power increase.                                                                                       ,
t 0 <0 5 E m ww<
i
Sx5 c e 2 3.. m me=w o w ~-
: b. Continue the power increase while restoring loop 1 accumulator boron concentration to 2400 to 2700 ppm boron within 1 hour.
w
: c. If loop 1 accumulator boron concentration is NOT restored within 1 hour, be in HOT:
_w m =
l'                                                         < STANDBY by 0700.                                                                                                           ;
w ow-a m
: d. If loop 1 accumulator boron concentration is NOT restored within 1 hour, reduce pressurizer pressure to 1000 psig or less by 1300.
u<o=
Answer:                               A                                                                                                                       i K/A:                                 2.1.1   [3.7/3.8) i
w
'Em sm-as um c
~
s m
~ w _~9
= cue
-=co o
w Eow m
cs w_
-m w x
2
<u-~
us a m_va
' w< C 3 c' m 00
'C >
i 0
W urw<=
H cawaL 2 w
 
==m
/N,
<c<<
 
r 88.
Given the following plant conditions:
Unit 2 operating in accordance with 0-GO-5 Normal Power Operation at 73% with a powerincrease to 100% in progress Chemistry reports Unit 2 RCS loop 1 accumulater boron concentration is 2390 ppm Current time is 0100 I
Which ONE of the following actions must be taken?
[
t I~
a.
Immediately stop the power increase.
i b.
Continue the power increase while restoring loop 1 accumulator boron concentration to 2400 to 2700 ppm boron within 1 hour.
If loop 1 accumulator boron concentration is NOT restored within 1 hour, be in HOT:
c.
l'
< STANDBY by 0700.
d.
If loop 1 accumulator boron concentration is NOT restored within 1 hour, reduce pressurizer pressure to 1000 psig or less by 1300.
Answer:
A i
K/A:
2.1.1
[3.7/3.8) i


==Reference:==
==Reference:==
SSP 12.1, Page 31                                                                                                       ;
SSP 12.1, Page 31 Objective:
Objective:                             OPL271C209. B.2                                                                                                         ,
OPL271C209. B.2 Level:
Level:                                 Comprehension
Comprehension Source:
* Source:                               New question (Developed 7/20/98) .
New question (Developed 7/20/98).
f Note:                                 Provide copy of Technical Specification 3.5.1.1 with the question (exam) 4 Justification:
f Note:
: a.          Correct becausegConduct of Operation (SSP-12.1) restricts power increase when in an LCO action of 6 hours or less. RCS loop 1 accumulator boron concentration cf 2390 ppm boron places Unit 1 in a 1 hour LCO.
Provide copy of Technical Specification 3.5.1.1 with the question (exam) 4 Justification:
: b.           Incorrect because power increase is not allowed when in a 1 hour LCO action statement.                                                   '
Correct becausegConduct of Operation (SSP-12.1) restricts power increase a.
c.-           incorrect because if loop 1 boron concentration is not restored within 1 hour, the Unit 1 must be in HOT standby by 0800.
when in an LCO action of 6 hours or less. RCS loop 1 accumulator boron concentration cf 2390 ppm boron places Unit 1 in a 1 hour LCO.
: d.           Incorrect because if loop 1 boron concentration not restored within 1 hour, pressurizer pressure must be reduced to 1000 psig or less by 1400.
b.
Incorrect because power increase is not allowed when in a 1 hour LCO action statement.
c.-
incorrect because if loop 1 boron concentration is not restored within 1 hour, the Unit 1 must be in HOT standby by 0800.
d.
Incorrect because if loop 1 boron concentration not restored within 1 hour, pressurizer pressure must be reduced to 1000 psig or less by 1400.
l
l
_ _ _ =       _ _ _ _ _ _ - _ _ _ _ _ _ - _ - - _ - -                                                      .  .                    - - - - -                        _ . . __
=


h 3 /4. 5 EMERGENCY CORE COOLING SYSTEMS                                                     j 3 /4. 5.1 ACCUMULATORS COLD LEG TNJECTION ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1.1     Each cold leg injection accumulator shall be OPERABLE with:
h 3 /4. 5 EMERGENCY CORE COOLING SYSTEMS j
: a. The isolation valve open, A contained borated water volume of between 7615 and 8094 gallons of :   a132 b.
3 /4. 5.1 ACCUMULATORS COLD LEG TNJECTION ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1.1 Each cold leg injection accumulator shall be OPERABLE with:
barated water,                                                                 l r
The isolation valve open, a.
: c. Between 2400 and 2700 ppm of boron,
A contained borated water volume of between 7615 and 8094 gallons of : a132 b.
: d. A nitrogen cover-pressure of batween 600 and 683 psig, and RIS4
barated water, l
: e. Power removed from isolation valve when PC5 pressure is above 2000 psig.
r Between 2400 and 2700 ppm of boron, c.
A nitrogen cover-pressure of batween 600 and 683 psig, and d.
RIS4 Power removed from isolation valve when PC5 pressure is above e.
2000 psig.
APPLICABILITY: MODES 1, 2 and 3.*
APPLICABILITY: MODES 1, 2 and 3.*
ACTION:
ACTION:
: a. With one cold leg injection accumulator inoperable, except as a result of boron concentration not within limits, restore the inoperable accumulator to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours and reduce pressurizer pressure.to 1000 psig or less within the following 6 hours.
With one cold leg injection accumulator inoperable, except as a result of boron concentration not within limits, restore the a.
: b. With one cold leg injection accumulator inoperable due to the boron concentration not within limits, restore boron concentration to within fl.imits within 72 hours or be in at least HOT STANDBY within the next 6 hours and reduce pressurizer pressure to 1000 psig or less within the following 6 hours.
inoperable accumulator to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours and reduce pressurizer pressure.to 1000 psig or less within the following 6 hours.
With one cold leg injection accumulator inoperable due to the boron b.
concentration not within limits, restore boron concentration to within fl.imits within 72 hours or be in at least HOT STANDBY within the next 6 hours and reduce pressurizer pressure to 1000 psig or less within the following 6 hours.
* Pressurizer pressure above 1000 psig.
* Pressurizer pressure above 1000 psig.
l December 27, 1994 Amendment No. }!3, 131, 133
l December 27, 1994 Amendment No. }!3, 131, 133
                - UNIT 2                   3/4 5-1
- UNIT 2 3/4 5-1


s o
s o
      #                                                  y                                                              .v
.v y
                          .j .)           Of..'' .S &ol                   Ifh)'
.j.)
: 88.       Given tne following pl ant conditions:
Of..''.S &ol Ifh)'
                        . Unit 2 operating in a:Cordance w:th 0-GO 5, Normal Power Operation at 73*4 with a powerincrease to 100% in progress
88.
                        . Chemistry reports Unit 2 RCS toop 1 accumulator boron concentration is 23E0 opm
Given tne following pl ant conditions:
    ,g                        Current time is 0100 4   /
Unit 2 operating in a:Cordance w:th 0-GO 5, Normal Power Operation at 73*4 with a powerincrease to 100% in progress Chemistry reports Unit 2 RCS toop 1 accumulator boron concentration is 23E0 opm Current time is 0100
,g 4 /
* Which ONS of the following actions must be taken?
* Which ONS of the following actions must be taken?
: a. immediately stop the power increase.                                       ,
a.
: b. Continue the power increase while restoring loy     o ,1 accumulator boron concentration to 2400 to 2700 ppm boron.C.1 un 4 Nw 72 4 ou /~$.,
immediately stop the power increase.
: c. 11 loop 1 accumulator boron concentration is NOT restored within 1 hour, be in HOT STANDBY by 0700.
b.
: d. If loop 1 a:Cumulator boron concentration is NOT restored within 1 hour, reduce pressurizer pressure to 1000 psig or less by 1300.
Continue the power increase while restoring loy,1 accumulator boron concentration o
Answer:               A K/A:                 2.1.1     {3.7/3.8]
to 2400 to 2700 ppm boron.C.1 un 4 Nw 72 4 ou /~$.,
11 loop 1 accumulator boron concentration is NOT restored within 1 hour, be in HOT c.
STANDBY by 0700.
d.
If loop 1 a:Cumulator boron concentration is NOT restored within 1 hour, reduce pressurizer pressure to 1000 psig or less by 1300.
Answer:
A K/A:
2.1.1
{3.7/3.8]


==Reference:==
==Reference:==
SSP-12.1, Page 31 Objective:           OPL271C209, B.2 Level:               Comprehension Source:               New question (Developed 7/20/98)
SSP-12.1, Page 31 Objective:
Note:                 Provide copy of Technical Spe:Hi ation 3.5.1.1 with tne question (exam)
OPL271C209, B.2 Level:
                                                .?
Comprehension Source:
New question (Developed 7/20/98)
Note:
Provide copy of Technical Spe:Hi ation 3.5.1.1 with tne question (exam)
.?
Just#ication:
Just#ication:
: a. Correct becaus                       onduct of Operation (SSP-12.1) restricts power increase when in an LCO acaon or o nours or less. RCS foop 1 a::umulator coron con =emration of 2390 ppm boron places Unit 1 in a 1 hour LCO.
a.
: b. Incorrect because power increase is not allowed wnen in a 1 nour LCO action statement,
Correct becaus onduct of Operation (SSP-12.1) restricts power increase when in an LCO acaon or o nours or less. RCS foop 1 a::umulator coron con =emration of 2390 ppm boron places Unit 1 in a 1 hour LCO.
: c. in:ctre:t because if loop 1 boron concentration is not restored wrinin 1 hour, the Unit 1 l                     must be in HOT standby by 0800.
b.
: d. in:orrect because if loop 1 boron concentration not restored wnnin 1 nour, oressurizer l
Incorrect because power increase is not allowed wnen in a 1 nour LCO action statement, c.
pressure must be reduced to 1000 osig or less by 1400.
in:ctre:t because if loop 1 boron concentration is not restored wrinin 1 hour, the Unit 1 l
                                                      /i       ,,\   si' W
must be in HOT standby by 0800.
                                                    // /MLY
l d.
                                                                      ^
in:orrect because if loop 1 boron concentration not restored wnnin 1 nour, oressurizer pressure must be reduced to 1000 osig or less by 1400.
                            , -(           _t.-f
/i
                                          '                      i
,,\\
            'w'::a .    . .mu v         ~-        ,
si' W
                                                            ,'  Y% 4
// MLY
                                  ,,,    f:;}l''
^
/
i
, -(
_t.-f Y% 4
~-
w'::a
..mu v f:;}l''
w
w
                .; .h , * '
+w
                                  +w N
.;.h, * '
N


                                                                                                      \
\\
i
t l
:                                                                                                      1 t
l l
l l
l        006 Emergency Core Ccoling System-/ JPM 136 Recovery From Safetylnjection
006 Emergency Core Ccoling System-/ JPM 136 Recovery From Safetylnjection l
        .and Solid Water Co'nilitions '. J         .* '> '                              '
.and Solid Water Co'nilitions '. J t
l t
Question 2:
Question 2:
Given the following plant conditions:
Given the following plant conditions:
Line 1,399: Line 2,020:
FR-C.1, " Response to Inadequate Core Cooling," is being implemented.
FR-C.1, " Response to Inadequate Core Cooling," is being implemented.
Core exit TCs are 720*F and increasing.
Core exit TCs are 720*F and increasing.
l       At this point FR-C.1 directs the crew to depressurize intact steam generators.
l At this point FR-C.1 directs the crew to depressurize intact steam generators.
l       a.) What is the basis for the direction in FR-C.] to depressurize intact steam generators?   )
l a.) What is the basis for the direction in FR-C.] to depressurize intact steam generators?
)
b.) Why is this action taken?
b.) Why is this action taken?
l       References Allowed? YES           X     NO l
l References Allowed? YES X
NO l
Answer:
Answer:
a.) To reduce RCS pressure below 125 psig b.) To allow the ECCS accumulators and RHR pumps to inject water to the RCS.
a.) To reduce RCS pressure below 125 psig b.) To allow the ECCS accumulators and RHR pumps to inject water to the RCS.


==Reference:==
==Reference:==
KA: 006G4.18 ( 2.7 / 3.6 ) Knowledge of specific bases for EOPs.
KA: 006G4.18 ( 2.7 / 3.6 ) Knowledge of specific bases for EOPs.
l       OPL271C398 pg 12-15 i
l OPL271C398 pg 12-15 i
Applicant Response:                                                   SAT       UNSAT         I
Applicant Response:
                                    .7 i                                                                                                     I l
SAT UNSAT
.7 i
l l
l l
l I
l I
l i
l i


d et
d et INADEQUATE CORE COOLING
                                                                                                                ~ ''
~ ''
              ~
~
INADEQUATE CORE COOLING Rev. 8 STEP     ACTION / EXPECTED RESPONSE                           RESPONSE NOT OBTAINED NOTE      . Blocking low steamline pressure Si as soon as pressurizer pressure is less than 1920 psig will prevent an inadvertent MSIV closure and keep the condenser available for steam dump.
Rev. 8 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED Blocking low steamline pressure Si as soon as pressurizer pressure is NOTE less than 1920 psig will prevent an inadvertent MSIV closure and keep the condenser available for steam dump.
                          . After the low steamline pressure SI signal is blocked, main steamline isolation will occur if the high steam pressure rate is exceeded.                         :
After the low steamline pressure SI signal is blocked, main steamline isolation will occur if the high steam pressure rate is exceeded.
                          . S/G depressurization at the maximum rate may cause S/G narrow range levels to
S/G depressurization at the maximum rate may cause S/G narrow range levels to
      ~
~
drop to less than 10% [25% ADV). This is acceptable and expected for this inadequate core cooling condhion.
drop to less than 10% [25% ADV). This is acceptable and expected for this inadequate core cooling condhion.
: 14. DEPRESSURIZE Intact S/Gs to reduce RCS pressure to less than 125 psig:
: 14. DEPRESSURIZE Intact S/Gs to reduce RCS pressure to less than 125 psig:
            ~
~
: a. WHEN RCS pressure less than 1920 psig, THEN PERFORM the following:
: a. WHEN RCS pressure less than 1920 psig, THEN PERFORM the following:
1
1
: 1) BLOCK low steamline pressure St.           g i
: 1) BLOCK low steamline pressure St.
: 2) CHECK STEAMLINE PRESS                                                                             '
g
ISOUSl BLOCK RATE ISOL                                                       '
: 2) CHECK STEAMLINE PRESS ISOUSl BLOCK RATE ISOL ENABLE permissive L1T.
ENABLE permissive L1T.
[M-4A, A4]
[M-4A, A4]
: b. DUMP steam to condenser                       b. DUMP steam at maximum rate at maximum rate.                                   USING Intact S/G atmospheric relief (s).
b.
DUMP steam to condenser
: b. DUMP steam at maximum rate at maximum rate.
USING Intact S/G atmospheric relief (s).
IF local control of atmospheric relief (s) is necessary, THEN DISPATCH personnel to dumo steam USING E A-1-2, Local Control of S/G PORVs.
IF local control of atmospheric relief (s) is necessary, THEN DISPATCH personnel to dumo steam USING E A-1-2, Local Control of S/G PORVs.
(Steo continued on next page )
(Steo continued on next page )
Page 13 of 19
Page 13 of 19


i 026, Containment Spray System /,JPM # 57AP Respond to High Contamment Presstir'e4PJace'RHR Sphy.in Seivice'#:                                 ~
i 026, Containment Spray System /,JPM # 57AP Respond to High Contamment Presstir'e4PJace'RHR Sphy.in Seivice'#:
~
Question 2:
Question 2:
Given the following plant conditions:
Given the following plant conditions:
Line 1,445: Line 2,071:
a.) Why must both CS pumps be placed in PULL-TO-1 ock while transferring suction to the containment sump?
a.) Why must both CS pumps be placed in PULL-TO-1 ock while transferring suction to the containment sump?
b.) What does placing both CS pumps in PULL-TO-Lock prevent?
b.) What does placing both CS pumps in PULL-TO-Lock prevent?
References Allowed? YES         X     NO Answer:
References Allowed? YES X
NO Answer:
a.) While shifting to the containment sump, both the RWST and the containment sump suction valves to the CS pumps will be closed at the same time, b.) Placing the CS pumps in PULL-TO-Lock will prevent running a CS pump without a source of water.
a.) While shifting to the containment sump, both the RWST and the containment sump suction valves to the CS pumps will be closed at the same time, b.) Placing the CS pumps in PULL-TO-Lock will prevent running a CS pump without a source of water.


==Reference:==
==Reference:==
K/A: 026G4.18 [ 2.7 / 3.6 ) Knowledge of specific bases for EOPs OPL271CO24 pg 14-18, CCD NO:1-47W611-72-1, ES-1.3, pages Il-13, OPL271C388 pg 9 Applicant Response:
SAT UNSAT


K/A: 026G4.18 [ 2.7 / 3.6 ) Knowledge of specific bases for EOPs OPL271CO24 pg 14-18, CCD NO:1-47W611-72-1, ES-1.3, pages Il-13, OPL271C388 pg 9 Applicant Response:                                                              SAT  UNSAT
License Applicant Administrative Walkthrough Examination--NRC-1 Examiner Sheet K.1:? Shift StafHng
 
'e
License Applicant Administrative Walkthrough Examination--NRC-1
~
* Examiner Sheet l
~'
K.1:? Shift StafHng             'e             -
                                                                            ~
                                                                                              ~'
l
l
(
(
Question 1: A licensed RO has been off-shift for 6 months to assist in scheduhng an upconun, outage. He had his last physical exarr.ination 18 months ago and has had                 i satisfactory performance in the licensed operator requalification training program.
Question 1: A licensed RO has been off-shift for 6 months to assist in scheduhng an upconun, outage.
He had his last physical exarr.ination 18 months ago and has had i
satisfactory performance in the licensed operator requalification training program.
l He is informed that he is needed to join a shift crew in 3 days to fill in for a i
l He is informed that he is needed to join a shift crew in 3 days to fill in for a i
vacationing Unit OATC.                                                                       :
vacationing Unit OATC.
_            Can the RO fill in for the vacationing RO? Why or why not?           %                      i References Allowed? YES.2L.NO                             -
Can the RO fill in for the vacationing RO? Why or why not?
Answer:       No. The RO must first reactivate his license by completing at least 40 hours of               t "under direction" on-shift time.
i References Allowed? YES.2L.NO Answer:
t l              
No. The RO must first reactivate his license by completing at least 40 hours of t
"under direction" on-shift time.
t l


==Reference:==
==Reference:==
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4) i Applicant Response:                                               SAT         UNSAT I
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4) i Applicant Response:
                                              ?
SAT UNSAT I
?
[
[
c I
c I
Line 1,479: Line 2,110:
i
i


,            License Applicant Administrative Walkthrough Examination--NRC-1 j                                               Examiner Sheet l
License Applicant Administrative Walkthrough Examination--NRC-1 j
A.1: Shift Staffing'-           a t
Examiner Sheet l
Question 1: A licensed RO has been off-shiR for 6 months to assist in outage scheduling. He is       '
A.1: Shift Staffing'-
infoimed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing
a t
,                    shift RO. He had a satisfactory physical examination 18 months ago and has i
Question 1: A licensed RO has been off-shiR for 6 months to assist in outage scheduling. He is infoimed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing shift RO. He had a satisfactory physical examination 18 months ago and has i
maintained satisfactory performance in the licensed operator requalification training   I program. In anticipation of rejoining a shin crew, the RO has spent two 8-hour j
maintained satisfactory performance in the licensed operator requalification training I
program. In anticipation of rejoining a shin crew, the RO has spent two 8-hour j
shiRs in the control room as the OATC during the past month under the direction of a shin RO..
shiRs in the control room as the OATC during the past month under the direction of a shin RO..
s What additional requirements must be met by the RO before he may fill in for the       !
s What additional requirements must be met by the RO before he may fill in for the i
i                                                                                                  r vacationing RO?                                                                         l J
vacationing RO?
4
r J
;      References Allowed? YES _2L NO Answer:       The RO must complete an additional 24 (40 - 16) hours of"under direction" on-shift time that must include a plant tour and shift turnover.
4 References Allowed? YES _2L NO Answer:
The RO must complete an additional 24 (40 - 16) hours of"under direction" on-shift time that must include a plant tour and shift turnover.


==Reference:==
==Reference:==
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)
SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)
Applicant Response:                                                       SAT       UNSAT
Applicant Response:
                                  ?                                                                         \
SAT UNSAT
I l
?
I i
\\
I i}}
i i}}

Latest revision as of 08:03, 10 December 2024

Submits Summary of 981105 Training Manager Conference with Representatives from All Utils in Region II Re Operator Licensing Issues.List of Attendees & Agenda Encl
ML20199E095
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/23/1998
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Fulmer S
SOUTHERN NUCLEAR OPERATING CO.
References
NUDOCS 9901200309
Download: ML20199E095 (102)


Text

i,

c.

December 23, 1998 Southern Nuclear Operating Company, Inc.

ATTN: Mr. Scott Fulmer, Plant Training and Emergency Preparedness Manager Joseph M. Farley Nuclear Plant P. O. Drawer 470 Ashford, AL 36312

SUBJECT:

MEETING

SUMMARY

- TRAINING MANAGERS' CONFERENCE CONDUCTED ON NOVEMBER 5,1998 - JOSEPH M. FARLEY NUCLEAR PLANT

Dear Mr. Fulmer:

This letter refers to the Training Managers' Conference conducted at the Richard B. Russell Building on November 5,1998. Representatives from all utilities in Region 11 participated in the meeting. was the agenda used for the Training Managers' Conference, and Enclosure 2 is the list of attendees. We appreciate the participation of you and your staff and believe that the goal of providing an open forum for discussion of operator licensing issues was met. Mr. Gallo, Chief of the Operator Licensing and Human Factors Branch, Office of Nuclear Reactor Regulation (NRR), made a presentation as noted in the slides in Enclosure 3.

Additionally, I am enclosing our preliminary schedule for FY 1999 and FY2000 as Enclosure 4.

Please review the schedule and supply comments to my staff or myself.

If you have any questions regarding the content of this letter, please contact me at (404) 562-4638.

Sincerely, 1

Original signed by Thomas A. Peebles Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos.: 50-348 and 50-364 i

License Nos.: NPF-2 and NPF-8 l

Enclosures:

As noted I

200M3

\\

cc w/encls:

M. Stinson, General Manager, Joseph M. Farley Nuclear Plant i

9901200309 981223 PDR ADOCK 05000348 V

PDR LY3

i i

O

.o.

s 1

l l

SNC 2

i Distribution w/encis:

PUBLIC B. Michael, DRS l

l l

l Ril:DRS Ril:DRS M

9 BMICHAEL:

TP BLES 12/ tr /98 12/g/98 l

Doc Name:

, __.__.._______._m r'

fO Revised November 3,1998 l

L TRAINING AND OPERATIONS MANAGERS' CONFERENCE U.S. Nuclear Regulatory Commission, Region II Atlanta, Georgia Meeting Agenda November 5,1998 Richard B. Russell Building Auditorium Thursday.11/5/98 l

8:00 a.m.

Conference Registration l

l 8:20 a.m.

Introduction Thomas A. Peebles, Chief, Operator Licensing & Human Performance Branch 8:30 a.m.

Opening Remarks William Travers, Executive Director of Operations 8:50 a.m.

Welcome / Issues Raised the Last Meeting Bruce S. Mallett, Director Division of Reactor Safety 9:15 a.m.

break 9:45 a.m.

Other Issues Robert M. Gallo, Chief Operator Licensing Branch NRR 10:15 a.m.

Lessons learned from Recent Exams Charlie Payne Sampling exam criteria 11:00 a.m.

Examination Communications Ron Aiello Exam Development & Coordination 11:30 a.m.

Lunch i

~

1:00 p.m.

Written Examination Questions and Answers Rick Baldwin / George Hopper 2:30 p.m.

JPM Examples of questions Rick Baldwin / George Hopper 3:30 p.m.

Open Session - Other Issues Training Managers j

4:00 p.m.

Meet with Principle examiners All j

4:30 p.m.

Adjorn i

i i

i j

1

License Applicant Adm-inistrative Walkthrough Examination--NRC-1 Examiner Sheet A.1: Shift Staffing' i

Question 1: A licensed RO has been off-shin for 6 months to assist in outage scheduling. He is informed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing shift RO. He had a satisfactory physical examination 18 months ago and has maintained satisfactory performance in the licensed operator requalification training I

program. In anticipation of rejoining a shift crew, the RO has spent two 8-hour l

shins in the control room as the OATC during the past month under the direction of l

a shift RO.

What additional requirements must be met by the RO before he may fill in for the vacationing RO?

References Allowed? YES1NO Answer:

The RO must complete an additional 24 (40 - 16) hours of"under dir~ection" on-shift time that must include a plant tour and shift turnover.

Reference:

SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)

Applicant Response:

SAT UNSAT i

. - - -.. - -. - ~

~ -..-

ATTENDEES AT THE NRC REGION ll TRAINING MANAGERS CONFERENCE NOVEMBER 5,1998 i

l Sid Crouch ATTSi i

David Lane Sonalysts, Inc.

Bill Fitzpatrick INPO CP&L Rick Gamer HR Supv Ops Tmg William Noll BK Ops Tmg Supv Max Herrell BK Tmg Mgr Scott Poteet RB Exam Team Leader Ralph Mullis BK Ops Mgr j

Tony Pearson BK Ops Tmg Anthony Williams RB Tmg Mgr Crystal River - FPC Wes Young CR Supv OpsTng Tom Taylor CR Dir Nuc Ops Tmg Ivan Wilson CR Ops Mgr Ktn McCall CR Mgr Ops Tmg Duke Power Gabriel Washbum OC Req Team Leader Ronnie B. White, Jr MG Tmg Mgr W. H. " Soap" Miller CT Site Tmg Mgr P ul Stovall OC Mgr Oper Tmg i

Bentley Jones OC Tmg Mgr James Teofilak CT Ops Trng Mgr Alan Orton MG Ops Trng Mgr Richard Bugert Corp Ops Tmg Spec EElk Maria Lacal TP Tmg Mgr Dennis L. Fadden SL Services Mgr Jo Magennis Corp Trng Assessment Spec Tom Bolander SL Exam Development Steve McGarry TP Maint Tmg Supv Southem Nuclear (SNC) i John C. Lewis

-HT Trng & EP Mgr Bill Oldfield FA Nuc Ops Tm Supv Steve Grantham HT Ops Tmg Supv Scott Fulmer FA Mgr Tmg & EP j

Joel Deavers FA Sr Pit Inst Bob Brown VG Trng Mgr Dan Scukanec VG Ops Tmg Supv

4 l

Viroinia Power I

Steve Crawford NA Sr Inst Nuc Harold McCallum SR Supv Ops Tmg i

TVA Dick Driscoll SQ Tmg Mgr Walt Hunt SQ Ops Trng Mgr i

Denny Campbell BF SRO Ops Inst l

Jack Cox WB Tmg Mgr John Roden WB Ops Tmg Mgr Tom Wallace WB Ops Supt V. C. Semmer-SCE&G l

AlKoon SM Ops Tmg Supv NRC Particioants Tom Peebles R 11 Operator Lic. Br. Ch.

Rick Baldwin R ll Sr. Examiner George Hopper R ll Sr. Examiner Ron Aiello R 11 Sr. Examiner Charlie Payne R 11 Sr. Examiner William Travers NRC Executive Dir. Ops.

R. M. Gallo NRR Br. Ch. OL j

Bruce Mallett R 11 Div. Dir. Reactor Safety l

l l

l

)

i I

l i

..- -~ _

l p

l l

FY 99 INITIAL EXAM SCHEDULE AND RESULTS 1

Drcember 14,1998 RO SRO-l SRO U TOTAL l

D:te Plant Chief Pass Pass Pass Pass f

l 9/28/98 Sequoyah GTH 4

4 4

4 10/5/98 Harris RFA 2

2 5

5 7

7 11/30/98 Oconee GTH 2

2 5

5 7

7 l

11/30/98 St Lucie &

RSB 6

3 9

12/14/98 1/25/99 McGuire &

DCP 6

3 2

11 2/8/99 2/8/99 C. River &

GTH 6

6 12 2/22/99 2/8/99 B. Ferry MEE 4

1 5

l 3/29/99 Surry &

RSB 5

2 4

11 4/12/99 4/12/99 Watts Bar &

MEE 6

3 5

14 4/26/99 5/10/99 Failey GTH 7

1 8

i 5/24/99 Catawba &

PMS 8

5 3

16 6/7/99.

6/28/99 St. Lucie RSB 1

4 5

07/26/99 Robinson MEE 3

2 2

7 l

08/30/99 Turkey Pt &

RFA 20 20

_9/13/99 136 RESULTS TO DATE 4

4 5

5 9

9 18 18 100 100 100 100 No initial exams scheduled for:

Brunswick, North Anna and Vogtle FY 00 region 11 write part of Summer & Hatch i

FY 00 INITIAL EXAM SCHEDULE AND RESULTS ecember 14,1998 RO SRO-l SRO-U TOTAL Dr.te Plant Chief Pass Pass Pass Pass 0

9/27/99 Summer GTH 6

6 region ll write 10/18/99 Hatch DCP 10 2

12

! region ll write 12/13/99 Vogtle RSB 3

5 2

10 l 2/14/00 Brunswick &

DCP 12 3

15 l 2/28/00 1

03/**/00 Oconee 7 10 704/10/00 Harris (mayo to/co) 10 705/03/00 St. Lucie GTH 6

5 11 705/**/00 B. Ferry 6

3 3

12 705/03/00 McGuire 4

8 12 706/07/00Farley RSB 10 2

12 707/26/00 Ciystal River RFA 3

3 3

9 r:gion ll write?

708/**/00 Sequoyah 4

2 2

8 709/04/00 Surry?

10 709/11/00 Nodh Anna 12 0

0 42 0

46 0

27 0

149

  • d signates tentative No initial exams scheduled for:

Catawba Robinson Turkey Point Watts Bar

I

}

l i

i I

Operator Licensing

)

lSSueS l

l Region ll j

Training Managers' Conference November 5,1998 i

i i

j Robert M.

Gallo, Chief i

Operator-Licensing and i

j Human Performance Branch l

i 4

i

l OPERATOR LICENSING ISSUES Part 55 Rulemakings o

Status Schedule Final Revision 8 of NUREG-1021 o

Examination Quality and Results o

~

Generic Fundamentals Exam o

Requal Inspections ilP-710.01) o Recent Information Notices o

Exam Integrity i:lN 98-15)

Sampling Plans ilN 98-28)

Eligibility ilN 98-37)

RECENT LESSONS LEARNED by Charlie Payne

~

Southeastern Training Manager's Conference November 5,1998 l

r t

I I

t PC1LLCY CLARIFICATIONS I.

O In general, the NRC prefers that the written exam be administered after the operating tests are complete.

Allows more time to finalize test.

j More flexibility if delays occur.

Less stressful on candidates.

3 t

h t

t i

2 i

PC1LICY C1ARIFICATIONS 9

In general, license class sizes of greater than H candidates will be scheduled for 2 weeks as follows:

1 t

1 exam week off-week for documentation of week 1 performance 2"d exam week l

1 i

i

i POLICY C_LARIFICATIC>NS t

l 9

Examination submittals - 2 copies of draft and final exams l written, JPMs, and simulator i

scenarios). Electronic copy is also desired.

9 Written exams submittals will be reviewed by following a sampling process. When criteria 1

are met, review will be stopped and licensee l

called.

3 l

Criteria - 10 unacceptable questions out of 30 questions sampled i

a I

RECENT LE_SSONS LEARNED SRO-only Questions intended to sample those K/As specific to SRO duties (above and beyond those needed by an RO).

Jurpose is to meet the requirements of 10 CFR 55.43(b) (items (1) - (7)).

K/A catalog cross-references K/As to associated portions of 10 CFR 55.

5

2.0 GENERIC KNOWLEDGES AND ABILITIES 2.1 Conduct of Operations 2.1.1 Knowledge of conduct of operations requirements.

(CFR: 41.10 / 45.13)

IMPORTANCE RO 3.7 SRO 3.8 2.1.2 KnowNie of operator responsibilities during all modes of plant operation.

(CFh: 41.10 / 45.13)

~

IMPORTANCE RO 3.0 SRO 4.0 2.1.3 Knowledge of shift turnover practices.

(CFR: 41.10 / 45.13)

IMPORTANCE RO 3.0 SRO 3.4 2.1.4 Knowledge of shift staffing requirements.

M (CFR: 41.10 /43.2)

IMPORTANCE RO 2.3 SRO 3.4 2.1.5. Ability to locate and use procedures and directives related to shift staffing and activities.

(CFR: 41.10 / 43.5 / 45.12)

IMPORTANCE RO 2.3 SRO 3.4 2.1.6 Ability to supervise and assume a management role during plant transients and upset conditions.

4 (CFR: 43.5 / 45.12 / 45.13)

IMPORTANCE RO 2.1 SRO 4.3 2.1.7 Ability to evaluate plant performance and make operationaljudgments based on operating characteristics / reactor behavior / and instrument interpretation.

(CFR: 43.5 /45.12 /45.13)

IMPORTANCE RO 3.7 SRO 4.4 2.1.8 Ability to coordinate personnel activities outside the control room.

(CFR: 45.5 /45.12 /45.13)

IMPORTANCE R O 3.8 SRO 3.6 2-1 E* REG-1123, hev. 2 l

____.______.y r

2.1 Conduct of Operations (continued) l-2.1.19 Ability to use plant computer to obtain and evaluate parametric information on l

system or component status.

(CFR: 45.12)

IMPORTANCE RO 3.0 SRO 3.0 2.1.20 Ability to execute proc' edure steps.

(CFR: '41.10 / 43.5 / 45.12)

IMPORTANCE RO 4.3 SRO ~4.2

~

l 2.1.21 Ability to obtain and verify controlled procedure copy.

l (CFR: 45.10 /45.13)

IMPORTANCE RO 3.1 SRO 3.2 2.1.22 Ability to determine Mode of Operation.

0 (CFR: 43.5 / 45.13)

IMPORTANCE R O 2.8 SRO 3.3 l

2.1.23 Ability to perform specific system and integrated plant procedures during -

(

different modes of plant operation.

(CFR: 45.2 /45.6)

IMPORTANCE RO 3.9 SRO 4.0 2.1.24 Ability to obtain and interpret station electrical and mechanical drawings.

(CFR: 45.12 / 45.13)

IMPORTANCE

'RO'2.8 SRO 3I 2.1.25 Ability to obtain and interpret station reference materials such as graphs /

t monographs / and tables which contain performance data.

(CFR: 41.10 / 43.5 / 45.12)

IMPORTANCE RO 2.8 SRO 3.1 l

2.1.26 Knowledge of non-nuclear safety procedures (e.g. rotating equipment / electrical /

l high temperature / high pressure / caustic / chlorine / oxygen and hydrogen).

l (CFR: 41.10 / 45.12)

IMPORTANCE RO 2.2 SRO 2.6 l

l i

i f

2-3

!."JREG-110 3 Rev. 2 l

I I

l 2.4 Emergency Procedures / Plan (Continued) 2.4.32 Knowledge of operator response to loss of all annunciators.

(CFR: 41.10 / 43.5 / 45.13)

IMPORTANCE RO 3.3 SRO 3.5 2.4.33 Knowledge of the process used track inoperable alarms.

(CFR: 41.10 / 43.5 / 45.13)

IMPORTANCE R O 2.4 SRO 2.8 2.4.34 Knowledge of RO tasks performed outside the main control room during emergency operations including sysIem geography and system implications.

l (CFR: 43.5 / 45.13)

IMPORTANCE R O 3.8 SRO 3.6 2.4.35 Knowledge of local auxiliary operator tasks during emergency operations including system geography and system implications.

(CFR: 43.5 / 45.13)

IMPORTANCE R O 3.3 SRO 3.5 l

2.4.36 Knowledge of chemistry / health physics tasks during emergency operations.

(CFR: 43.5)

IMPORTANCE R O 2.0 SRO 2.8 2.4.37 Knowledge of the lines of authority during an emergency.

(CFR: 45.13)

IMPORTANCE R O 2.0 SRO 3.5 l

2.4.38 Ability to take actions called for in the facility emergency plan / including (if required) supporting or acting as emergency coordinator.

(CFR: 43.5 /45.11) l IMPORTANCE R O 2.2 SRO 4.0 1

2.4.39 Knowledge of the RO's responsibilities in emergency plan implementation.

(CFR: 45.11)

IMPORTANCE RO 3.3 SRO 3.1 2.4.40 Knowledge of the SRO's responsibilities in emergency plan implementation.

r (CFR: 45.11) l IMPORTANCE RO 2.3 SRO 4.0 2.4.41 Knowledge of the emergency action level thresholds and classifications.

r (CFR: 43.5 / 45.11)

IMPORTANCE RO 2.3 SRO 4.1 i

l NURE:;- n23, Rev 2 2-14 l

RECENT LE_S_ SONS LEARNED SRO-only Questions l Cont'd)

c. SRO-only dluestions will be based on following categories: A.2, G2.1, G2.2, G2.3, and G2.4.

differences between SRO and RO outlines shifts only 11 K/As from Tier 2 to Tiers 1 & 3.

- Otler 14 flexible.

6

l ES-401 BWR SRO Examination Outline Form ES-401-1 fFacility:

Date of Exam:

Exam Level:

K/A Category Points Tier Group Point K

K K

K K

K A

A A

A G

Total 1

2 3

4 5

6 1

2 3

4 3*

Mf E?

gr Er EEE Bi gg f@ @

26 Emergency &

C,,L.,.,

,'?'

P1 ant v

Q, p@^ '._

w>--

Abnormal 2

,,,..a.

3;pe NW

. Q3..

17 3..

' ' ~

.yg-.

> -g.

.,.E g g4 43

+7 Tier Ep j,i[

w Evolutions Totals

??-s

%i' G.?

M wip+i:.

<g

.h

$.1.;

1 23 2.

P1 ant 13 Systems 3

4 Tier 40

,,,7f Tctals 3.

Generic Knowledge and Cat 1 Cat 2 Cat 3 Cat 4 Abilities 17

+$

Note:

Attempt to distribute topics among all K/A categories; select at least one topic from every K/A category within each tier.

Actual point totals must match those specified in the table.

Select topics from many systems; avoid selecting more than two or three K/A topics from a given system unless they relate to i

plant-specific priorities.

l Systems / evolutions within each group are identified on the associated outline.

The shaded areas are not applicable to the category / tier.

I NUREG-1021 10 of 39 Interim Rev. 8, January 1997 t

1 6

l lt ES-401 BWR R0 Examination Outline Form ES-401-2 l

Facility:

Date of Exam:

Exam Level-4 K/A Category Points Tier Group Point l

K K

K K

K K

A A

A A

G Total 1

2 3

4 5

6 1

2 3

4 1-1 Mh h h h 13 Einergency &

e

@g g

g
3 p rm E

E5 19 Abnormal M

M hj $ $

P1 ant 3

4 Evolutions m e m#

m

,Tier g

gj g; g

ga 36 Totals M

D O

E ggg :p g;g e3 g

1 28 2.

l i

2 Plant 19 i

Systems 3

4 l

Tier 51 Totals 3.

Generic Knowledge and Cat 1 Cat 2 Cat 3 Cat 4 Abilities 13 Note:

Attempt to distribute topics among all K/A categories; select at least one topic from every K/A category within each tier.

Actual point totals must match those specified in the table.

Select topics from many systems; avoid selecting more than two j

or three K/A topics from a given system unless they relate to l:

plant-specific priorities.

Systems / evolutions within each group are identified on the associated outline.

The shaded areas are not applicable to the category / tier.

s NUREG-1021 16 of 39 Interim Rev. 8, January 1997

RE_C_ENT LE_S_S1DNS LEARNED Sam aling Criteria intent of prodess is to avoid exam i

predictability.

a so to avoid excessive use of repeat test items.

l first use systematic process to develoa samale I

alan using topics from K/A catalog, then use i

facility c uestion resources to accompiish the l

plan.

i 7

i l

5

1 l

A E

,o 5

b Ch I

I cn E

5

>s o

a d

L.

et 3

I C

l m'O co I

c)

C:

E L.

.C2 a

C v

'F.

I o

l 1

l x

c l

3 i

t l

2 i

1

.b l

-a c

S jE.

O c

c ~3 o

C.

oI c.

cn

=,, w

=

n c

c lv c

w ur O

l

  • 1 o

l DE e-mo e

I ce

<N s<

"7o

>oc j

-$ ' we i

c I

w wN I

i w-5

=-

l 5

m e

l t

=

z c

o 5

E 2

e m

o c

L-E s.

r O

T%

0 z

O g

'e.c

-x s x

a c

=

g c

c g

g E

2 E

E E

E 2

Eo d

I e

a h

j 3

9 3

C

.E e

o o

=

c

..e I

,c e

m C

e o

s

-p s

s

.s 3

T.

.=

a w

o em s

=

e e

c e

m c

co c

e c

.o..

_c e

e e

v c

2 E

3 A

=

u e

-.e e

o o

e 2

F

%. 3 ri c

c e

o e

o e

o 2

c-c.

E m

[

U g

7u k

i c

2 e

o E

v o

7 g

U

.o

._5 g

2 o

e 2

3 jc 2

3 0

t t.

c.

g E

c 2

2 c

5 e

c 2

c c

e

=

c E

a e

c 2

-E

-O 5

C c

I" 2

o 2o o

c N

O

<o

-o o

e o

E e

C m

E e

u

.C

.C_

_C e

o o

.C_

-=

.c r

c-w

=

c u

.=

z

.o a

y z

x g

a ay z

z y

e

.C

.C_

_6

.C_

E o

s ue

._g

._g

-e s

A m

E

.o Z

d 1

O C

1 I

to I

s C

e gL 1

O C

J 84 m

O f

W i

m e

m o

n w

m e

8 m

v m

e x

0 o

O O

O N

N N

N N

m m

m e m

O

=

C:

i

,e O

O O

O O

O O

O O

O O

O O

O O

O O

O>

0 O

o D

m m

m m

o m

tr, m

m m

o m

an m

m m

e oe m

O M

m m

m 0) m CD m

m m

En 01 m

en en es th in m4 in O

k w

W N

N N

N N

N N

N N

N N

N N

N N

N N 41[

N gn y

f RE_C_ENT LE_S_ SONS LEARNED

~

j Sampling Criteria (Cont'd}

l 1

each topic in each tier & group should be sampled at east once unless insufficient questions exist to do this. If all topics have been sampled once and other questions need to be selected, the process should be systematic and unbiased.

i final sample alan should have a fairly even f

3alance across all Ks & As.

8

_BECENT LESS_ SONS LEARNED

~

Samalinc Criteria (Cont'd) up to 25 questions from last two NRC exams, facility licensee exams, tests & quizzes (except final audit test) may be used.

Chief Examiner (CE) has the option to unilaterally shift or change the selected K/As.

i u 3 to 5 site-s3eci"ic ariorities may be identified wit 7 CE concurrence (K/A value may be < 2.5 with suf"icient 'ustification).

l

_C'TH ER

~

Record Keeping 3er 10 CFR 55 are required to provide evidence that the applicant has successfully comp eted the facility licensee's requirements to be licensed as an operator.

this includes successful manipulation of the controls of their facility. As a minimum,5 sic nificant control manipulations which affect reactivity or power level.

10

OTHER

~

i Record Keeping (Cont'd)

I this informatipn shou'd be retained anc available for inspection from time of license application to license expiration.

l

[

t k

11

OTHER Requal Control Mani3ulations if have arogram based on SAT process, list in 10 CFR 55.59(cX3) does not need to be strictly followed.

should have sometling similar based on alant JTA and specific plant priorities.

some manipulations are individual operator oriented, most would be team oriented.

I 12

OTHER Requal Control Manipulations (Cont'd) credit for accomplishment should only be given for _ active _ participation in the manipulation.

NOTE: control manipulations are not synonymous with reactivity manipulations.

i n

3 i

1 Examination Communications 3

l Examination Development I

3 i

Coordination By I

i Ronald F. Aiello 4

l 2

}

1 j

l i

4

Facility Suggested improvements

1. The exam development team and leac examiner sloulc meet at the aeginning of t7e cevelopment arocess to estaa is, common grounds for the ceveloament and execution of the examination:

Changes and interaretations to the NUREG.

Scoae of the exam development and administration process.

Lessons learned from t1e last exam ac ministered.

' 2.

Vlove c ue cates "or :le out ine anc t7e exam 3ack to 90 and 60 cays arior to area week. This will provice more time for

~

examination review ay t1e examiner (s).

I 3.

SSNTA continue with efforts to stanc ardize document formats for examination tools (JPMs and scenarios).

4.

Examiners maintain a list of who (plant) does the exam process the best. This s1ould probably ae bro <en cown to eac, 3ortion of the examination. Provide your ratings to the utilities in Region 2, so we l

can meet your expectations anc imarove.

i 5.

T1e 3rinciaal anc t1e utility rearesentative shou c meet early to estaalis, a wor <ing re ations1'ia anc exaectations. If possible this s1ould incluce samales of cuestions, JPMs, etc.

6.

The exam should have no outstancing issues /c uestions that arise and need repair at the last minute. These issues should a l have been identified by the prea wee <, to allow time to make changes that meet all the criteria.

7.

The chief examiner should exalain up front all the forms in 1021 tlat need to be completed.

8.

Always check on badcing arior to coming on site.

9.

As soon as a Chief Examiner is assigned to an exam, the Facility Rea and the C1ief s1ould verify t1e ability to communicate via all channels (inc uding e-mail). When we converted to Lotus Notes, the facility was suddenly unable to send e-mai to his Chief Examiner. This

became somewlat of a lindrance and s1ould be avoided if 30ssible.

10. It would be helpful if the Chie" Examiner could arovide his schec u e to the Faciity Rep. This includes aroviding updates for any changes to the Chief Examiner's schedule along the way. The facility rep needs to be aware of when the Chief Examiner is available to assist in exam preaaration activities.
11. A face-to-face meeting should be promatly scleduled in order for the Chief to communicate his expectations to the Faciity Rep. The face-to-face requirement could ae waivec if the Clief and the Faciity Rea have areviously wor <ed together and t1e Facility Rea is conficent that he/she understancs the Clief's ex3ectations. In any case, a

J.

conference call would be the minimum to l

satisfy t1is im aortant first ste 3.

I l 12. The Chief and the Facility Rep should j

wor < togetler to establish a firm schedule j

for the exam week (s). This will ensure the l

most efficient schedule is developed (with j

resaect to crew composition and personnel movement) to minimize the l

amount of exam material requirec.

) 13. The Chief Examiner and Utility Rep MUST l

remain fixed during t1e entire 180 day l

3eriod. Handing off the responsibility is aoth cisru ative and destructive to communication. The expectations of the clief examiner must be definec/ communicated early.

j i 14. T1e " time ine" must ae enhanced to l

identify saecific times and dates for i

communication / working meetings between

l l

the examiner and the utility re3. These

{

meetings should be " face to face" to j

assure expectations are understood, and being met, early on.

l 15. If an examiner and a utility rep have not l

worked together before, the timeline for j

"deliverab es" must be expanded.

Working meetings (face to face) must be established for the examiner to review l

5-10 questions,1 scenario,1 jpm,5 jam knowledge questions,5 admin questions, etc. to assure that the standards and l

exaectations are clear early in the process anc tlat the utiity can aroduce a product that meets the expectation.

i l 16. 398 and 396 forms neec to be available electronica y. We took the time to i

develoa an electronic version ourselves j

but I wou d arefer that the e ectronic master copies came directly from the NRC

so that we have more conficence that everytling is exactly t1e same. We would all benefit from this im arovement.

17. =A face to face working meeting of eight (8) to twelve (12) hours, approximately two (2) weeks before the thirty (30) day submittal must be established to resolve any issues BEFORE the submittal. The exam materials should be reviewed, line by line, at this meeting to communicate all changes necessary.
18. Ex3ectations must be established early so that the utility clearly understands the rules and the examiners exaectations. Small samples of develoament must be reviewed early to assure expectations are 3eing met.

A face to face meeting, arior to the 30 day submitta, to reso ve any/all issues must be schedu ed such tlat adequate time (sucgest 2 weeks) is available to reso ve

i comments be" ore the 30 cay limit. No one wants to see 30 questions reviewec anc the exam rejectec. S3ending ~24 hours in 3-4 face to face meetings is a small/ smart price to aay to avoid hundreds of lours of re-development, the emotional stress on cancidates when the exam must be rescheduled and the impact on the plant when candidates are not licensed to meet plant needs.

l

19. The "new" SSNTA format for JPM level of cetail is NOT what you have liked in the 3ast arid neecs to be either acceated by the NRC as a standard or optimum format, or modified, or rejected. The JPMs we su amitted to you were in t7e "ormat and leve of cetai you had found acceataale in t7e past, and we were surarisec to finc that t7ey needed significant last-minute rework (additiona level o" cetai).
20. Maybe Chief Examiners could senc some copies of good written questions, JPMs, and JPM questions up front that could help a new developer survive the exam writing process and see where you as an examiner are coming from.

l.

Facility General Comments 1.

T1e limited number of NRC license examiners puts the Region and t1e sites at a cisacvantage with resaect to getting l

timely interchange. If the examiner is out of the o"fice on a tria for several weeks, the time you have to provide t7e licensee with i

"eecbac< is very limitec anc results in a real struggle to ensure a quality exam.

l T1e limited resources and interaction time increases t1e risk o" lower c uality.

l 2.

Region 11 examiners have been very arom at in getting bac< to us w1en we have l

a cuestion even t1ough you may 3e at a remote ocation.

3.

The cua ity of the communications has 3een gooc. A of t1e examiners tlat I lave ta <ed to lave been thorough, arecise and lave aerformec listening clec<s to

verify tlat the correct messages were sent anc received. I would however, like to see more communications by e-mail where approariate. That would 1elp ensure the clarity of the communications even more.

4.

With respect to the exam saecifically; there were a number of changes that were made and we had to transmit those by expensive overnig1t or next day delivery. If we coulc figure out a secure e-mail method it would save all of us numerous headaches as well as dollars.

5.

During my "irst face-to-face meeting with the Chief Examiner (to review c raft exam material), I gainec much-neeced insight into his exaectations. T1is alleviated much stress on my part and, from tien on, the arocess went much more smoothly. T1e C1ief was very le aful curing subsecuent te ephone conversations anc our seconc

j.

l l

l meeting in Atlanta. He was very easy to

)

work with and very uncerstancing concerning my inexperience in this i

arocess. His patient guidance was the key l

-to our success in t1is endeavor. Nex: time, I

wit, a I we've learned, we'll do even better.

i l 6.

The biggest problem that I encountered c uring that exam came from the written l

portion tlat was aeing developec by the l

contractor. Since he had written exams j

3efore, I assumed that the quality o" questions he was submitting to us were the c ua ity of questions that were acceptable to

-the NRC. We reviewed his work, made technical corrections and assumec that the questions woulc be acceated by the NRC.

I lac very litt e communication with the NRC on the subject of the written exam anc a c reat deal of communication on t7e subject of the 03erating exam. W1en t1e submittal was fina ly made, the focus went

to the written exam and most of t1e communication was mace over saea<er 31ones (about 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />). It became a very aainful process and coulc have been avoided hac I not out so much fait, in the contractor's exam writing exaerience and communicated more on the subject of the written exam with the clief. We had a 100% aass rate on t7e exam, but t1e exam reaort was arutal in the area of t1e written exam.

7.

Know the chief examiners expectations from the beginning (prior to any cevelo ament).

8.

Never assume you know what you're coing

- the chief is just a ahone cal away.

9.

It's better to deliver material anc review it in oerson rather than over the alone. I alan for four or five trias between t7e start of

develoament anc arep week. It may sound ike over<i, but it wor <s (It's a so safer in the area of security).

10.'Su omit materia ear y (especial y the written).

I like to have the written exam a done deal arior to the actual submittal date.

11. You can never talk to the Chief Examiner too much. During the process, I talk to him more than I ta k to my mother.
12. The bottom line is that frequent communication, personal contact, and

'early submittal of materials is the key to a successful NRC exam.

13. ALL 3 rob ems / changes must be resolved at the level of tie examiner anc the utility re 3. In no case s1ould aroolems/ chances be reported / escalated to senior management of the utility or NRC unless

i j

both the examiner and t1e utility rep are at j

an abso ute, and mutually acreed, j

impasse.

4 i

! 14. We often felt that we were working in t7e dar<, writing questions on toaics you may l

not want (as we were waiting for comment l

on our skyscrapers), aossibly wasting resources, but seeing no other option to j

meet our required cast-in-stone deadlines.

l 15. It's difficult to keep JPMs short and i

alausible at the same time.

l 16. What is a good " admin JPM", especially for j

ROs?

i

1 g

. y u estiusa:

av The unit is operating at 20% power with all systems in automatic. Bank 'D' control rods are at 120 steps. Control Bank C' rod H6 drops to the bottom of the core. No rod control urgent failure alarms occur.

Where will thermal power and RCS Tavg stabilize in response to the dropped rod without any operator action?

A.

Reactor thermal power will be lower than prior to the dropped rod; RCS Tavg will be more than 5'F lower than the temperature prior to the dropped rod.

B.

Reactor thermal power will be lower than prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.

C.

Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.

D.

Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg l

will be more than 5'F lower than the temperature prior to the dropped rod.

1 l

Answer:

C Reactor thermal power will be the same as prior to the dropped rod; RCS Tavg will be within l'F of the temperature prior to the dropped rod.

i l

l l

l l

i l

i k

1 g

l e

l Reference Page SRO Question 10 RO Question 10 SRO Tier / Group 111 RO Tier / Group 112 SRO Importance 3.7 RO Importance 3.2 10CFR55.43(b) 10CFR55.41 8

fremAddressed Item Addressed KA Number 000003AK1.01 KA Statement Knowledge of the operational implications of the following concepts as they apply to Dropped Control Rod: Reason for turbine following reactor on dropped rod event

~

SHNPP Objective AOP-LP-3.1-2 RECOGNIZE automatic actions that are associated with AOP-001, Malfunction of Rod Control and Indication Systems References AOP-LP-3.1 AOP-001 AOP-001 Malfunction of Rod Control and Indication Systems SD-104 Rod Control System Question Source New Justification (A) Select if he does not recognize that rods will step out to restore temperature and power was restored due to the previous decrease in temperature.

(B) Select if he recognizes that rods will step out, but the decreased temperature adds positive reactivity to restore power.

(C) CORRECT - Power will initially decrease du'e to the dropped rod. As power decreases, temperature will decrease. As temperature decreases, positive reactivity is added to restore power. Bank D rods in auto will cause rods to step out. Rods stepping out will restore power and temperature to the original value.

(D) Select if he recognizes that power was restored due to the previous decrease in temperature, but does not recognize that rods will step out to restore temperature and W

e

INITIAL EXAMINATIONS QUESTIONS AND ANSWERS TRAINING MANAGERS CONFERENCE NOVEMBER 5,1998 RICK BALDWIN GEORGE HOPPER I

Initial Written Examinations I

i

Reference:

1 All written examinations are written IAW ES-401, " Preparation of Site-Specific Written Examinations for Power Reactors." Using ES-401-1, ES-401-2, ES-401-3, ES-401-4, BWR/PWR, RO/SRO j

EXAMINATION OUTLINES, and ES-401-6 Written Examination Quality Assurance Checkoff Sheet."

t OBJECTIVES I

O BETTER EXAMINATION PRODUCT i

i e LESS NRC/ FACILITY REWORK E

t 9 SHARED EXPECTATIONS

[

t I

i i

i I

[

3 f

t

l SESSION OBJECTIVE:

To review validity concepts affecting the NRC t

i written examination for the purpose of:

instructing licensee personnel toward I

construction of more VALID and CONSISTENT NRC license examinations.

l t

4 I

COVERAGE O 3 Levels of Validity 1

i G 3 Levels of Knowledge i

l 9 Discrimination, Sampling l

h G Psychometrics i

5 I

[

i VALIDITY A valid test is one which tests what it intends j

to test.

l In training examinations, testing specific skills and knowledge outlined and taught in the objectives.

In licensing examinations, testing specific skills and knowledge that SHOULD have l

been outlined in the objectives.

I 6

[

I

i 3 LEVELS OF VALIDITY

?

p G Content

~

I h

9 Operational

+

3 i

G Discriminant 1

i 4

i 7

t l

CONTENTVALIDITY i

Addresses K/A coverage and sampling plan coverage.

j 1

I l

[

T l

I


a

-r OPERATIONAL VALIDITY '

Addresses two aspects:

l

1. Is the test item important to be known as a part of the operator's job?
2. Does the test item require the candidate to perform a job RELATED mental or l

physical operation?

j i

9 a

i l

DISCRIMINANT VALIDITY i

Addresses:

9 The cut score is the performance level that we use for making a pass / fail decision 80 percent.

O The exam must be written at a level of difficulty that intends to discriminate at the 80 percent level.

9 The question, its stem and distractor, interplay, by DESIGN, at least 80 percent of the candidates taking the exam should answer the item correctly.

m

i

~

VALIDITY

SUMMARY

1. The exam must be content valid, encompassing job safety significance and sampling.

l

2. The test item should be operationally oriented: a expected mental or psychomotor requirement of the job. The items should be written at the j

comprehension or analysis level vice I

simple memory. Items that measure i

problem solving, prediction, analysis which are essential to job performance.

[

11 I

VALIDITY

SUMMARY

3. The exam must discriminate at a moderate I

level of difficulty, set by the cut score.

Meaning the test items as written should provide opportunity for at least 80 percent of the candidates taking the test should answer the item correctly.

i 12

3 LEVELS OF KNOWLEDGE Bloom's Taxonomy e Analysis, Applibation, Synthesis O Comprehension 9 Fundamental (simple memory) k 13

LEVEL OF KNOWLEDGE G Bloom's Taxonomy, NRC Reference Benchmark to classify levels of knowledge.

O Bloom's Taxonomy, a classification scheme that classifies items by depth of mental performance required to answer the items.

O Bloom's Taxonomy, can be applied to written, scenarios or JPM questions.

j m

i

LEVELS i

l LEVEL 1 l

Fundamental, using simple mental processes, recall or recognition of discrete bits of information.

t i.e. setpo. ts, definitions, or specific facts.

in f

i 15

-a

k LEVEL 2 i

i Comprehension, involves understanding material through relating it to its own parts or other material:

i i.e. including rephrasing information in different words, recognizing relationships

, including consequences or implications.

l l

{

16 I

t

- l LEVEL 3 i

Analysis, synthesis, and application testing is more active and product-oriented testing which involves the multi-part mental process of assembling, sorting, or integrating the parts so that the whole, and the sum can be used to: predict and event or outcome, solve I

a problem or create something new.

i.e. using knowledge to solve problems.

t 17 l

L t

DETERMINANTS OF DISCRIMINATION l

l G Level of examination knowledge j

i O Level of examination difficulty i

9 Passing Score i

9 Item bank use i

i 18 i

i I

l NATURE OF EXAMINATIONS AND TESTS l

i O TESTS are samples of PERFORMANCE 9 infer overall performance based on a j

sample 9 Sample must be broad-based to make confident inference O Sample must NOT be fully predictable or inferences cannot be made on untested areas.

j O ltems MUST discriminate otherwise it has little or NO value.

j 19 t

PSYCHOMETRICS Items may have one or more of the following psychometric errors:

1. Low level of kngwiedge (fundamental)
2. Low operational validity (not job related)
3. Low discriminatory validity ( hard or easy)
4. Implausible distractors
5. Confusing language or ambiguous questions
6. Confusing or inappropriate negatives
7. Collection of true/ false statements
8. Backwards logic 20

]

006 Emergency Core. Cooling System-/ JPM 236 Recovery From Safetylnjection

.and Solid Water Conditions'. '-

Question 2:

Given the following plant conditions:

Unit 2 was operating at 100% power.

The plant experienced a large break LOCA with a failure of the ECCS system.

FR-C.1, " Response to Inadequate Core Cooling," is being implemented.

Core exit TCs are 720*F and increasing.

At this point FR-C.1 directs the crew to depressurize intact steam generators.

a.) What is the basis for the direction in FR-C.] to depressurize intact steam generators?

b.) Why is this action taken?

References Allowed? YES X

NO_

Answer:

a'.') To reduce RCS pressure below 125 psig b.) To allow the ECCS accumulators and RHR pumps to inject water to the RCS.

Reference:

KA: 006G4.1S [ 2.7 / 3.6 ) Knowledge of specific bases for EOPs.

OPL271C398 pg 12-15 Applicant Response:

SAT UNSAT l

j INADEQUATE CORE COOLING Rev. 8 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED l

Blocking low steamline pressure Si as soon as pressurizer pressure is NOTE less than 1920 psig will prevent an inadvertent MSIV closure and keep the condenser available for steam dump.

1 After the low steamline pressure SI signalis blocked, main steamline isolation will occur if the high steam pressure rate is exceeded.

r S/G depressurization at the maximum rate may cause S/G narrow range levels to drop to less than 10% {25% ADV). This is acceptable and expected for this inadequate core cooling condition.

- 14. DEPRESSURIZE Intact S/Gs to reduce RCS pressure to less than 125 psig:

a. WHEN RCS pressure less than 1920 psig, THEN PERFORM the following:
1) BLOCK low steamline pressure St.

7

2) CHECK STEAMLINE PRESS ISOUSI BLOCK RATE ISOL ENASLE permissive LIT.

IM-4A, A4]

b. DUMP steam to condenser
b. DUMP steam at maximum rate at maximum rate.

USING intact S/G atmospheric relie1(s).

IF local control of atmospheric relie1(s) is necessary, THEN DISPATCH personnelto dump steam j

i USING E A-1-2, Local Control of

~

S/G PORVs.

(Step cont:nued en next oage.)

W

1

.026,Conraintnent Spray System /.JPM.# 57AP Respond to High Contamment

. Pressure 4PJace'RHR Spmy.in Service'! -

Question 2:

Given the following plant conditions:

Unit I has tripped from 100% power due to a LOCA.

Containment pressure is 3.0 psid Transfer of Containment Spray pump suction to the containment sump is being perfonned in accordance with ES-1.3, Transfer to RHR Containment Sump.

a.) Why must both CS pumps be placed in PULL-TO Lock while transferring suction to the containment sump?

l b.) What does placing both CS pumps in PULL-TO-Lock prevent?

References Allowed? YES X

NO l

Answer:

a.) While shifting to the containment sump, both the RWST and the containment sump suction valves to the CS pumps will be closed at the same time.

b.) Placing the CS pumps in PULL-TO-Lock will prevent running a CS pump without a source of l

water.

Reference:

K/A: 026G4.18 [ 2.7 / 3.6 ] Knowledge of specific bases for EOPs OPL271CO24 pg 14-1S CCD NO:1-47W611-72-1 ES-1.3,pages Il-13 OPL271C388 pg 9 Applicant Response:

SAT UNSAT l

t I

e

License Applicant Administrative Walkthrough Examination--NRC-1 Examiner Sheet A'.1: Shift Staffing Question 1: A licensed RO has been off-shift for 6 months teassist in scheduling an upcoming outage.

He had his last physical examination 18 months ago and has had satisfactory performance in the licensed operator requalification training program.

He is informed that he is needed to join a shift crew in 3 days to fill in for a vacationing Unit OATC.

Can the RO fillin for the vacationing RO? Why or why not?

w References Allowed? YES _.2L NO Answer:

No. The RO must first reactivate his license by completing at least 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of "under direction" on-shift time.

Reference:

SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)

Applicant Response:

SAT UNSAT e

,m

License Applicant Administrative Walkthrough Examination--NRC-1 Examiner Sheet A.1:' Shift Staffing Question 1: A licensed RO has been off-shift for 6 months to assist in outage scheduling. He is informed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing shift RO. He had a satisfactory physical examination 18 months ago and has maintained satisfactory performance in the licensed operator requalification training program. In anticipation of rejoining a shift crew, the RO has spent two 8-hour shifts in the control room as the OATC during the past month under the direction of a shift RO.

What additional requirements must be met by the RO before he may fill in for the vacationing RO?

References Allowed? YES J'_ NO Answer:

The RO must complete an additional 24 (40 - 16) hours of"under direction" on-shift time that must include a plant tour and shift turnover.

Reference:

SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)

Applicant Response:

SAT UNSAT l

l Given the following conditions:

1.

The reactor has experienced a Steam Generator Tube Rupture.

2.

All systems responded as expected.

2.

The performance of E0P-04 is in progress.

3.

One Steam Generator has been isolated.

4.

All RCPs have been stopped.

I 5.

RCS cooldown using natural circulation is in progress.

Which One of the following describes the concern associated with the isolated

.SG pressure prior to placing the RCS on SDC?

a.

The isolated SG pressure would be too low due to excessive cooldown causing RCS water to enter the SG and reducing RCS inventory.

b.

The strategy during the performance of E0P-04 is to maintain the affected SG pressure slightly less that RCS pressure to prevent secondary water entering the RCS.

c.

Since the RCS cooldown rate was maintained greater than 30deg/hr. the affected loop has not been cooled sufficiently to allow SG depressurization.

d.

The affected SG pressure is high due to thermal stratification of the secondary water.

l

/

^

/

(

Reactor Operator Examination I

65. Given the following conditions:

The reactor has expenenced a Steam Generator Tube Rupture.

All systems responded as expected.

The performance ofEOP-04 is in progress.

One steam generator has been isolated.

l RCS cooldown using natural circulation is in progress.

Which ONE of the following describes the concem associated with the affected SG pressure prior to placing the RCS on SDC?

j l

The SG pressure would be too low due to u cessive cooldown causing RCS water to enter a.

the SG and reducing RCS inventory.

b.

The SG pressure would be slightly less than RCS pressure causing water to enter the RCS resulting in a dilution.

c.

The SG temperature would be too high to allow for SG depressurization.

1 d.

The SG pressure would be too high due to thermal straification of the secondary water.

4 i

i e

Which one of the following describes the response of the Unit I charging pumps following receipt of an automatic SIAS signal, coincident with a Loss of Offsite Power?

a.

One charging pump is automatically started on each emergency bus 5 minutes after it is energized by the diesel.

b.

All charging pumps are automatically started immediately after their respective bus is energized.

c.

The operator must manually start one charging pump on each emergency bus 5 minutes after it is energized by the diesel.

d.

One charging pump is automatically started onto each emergency bus, immediately after it is energized by the diesel.

~

l l

l 1

e l

19. Which ONE of the following describes the response of the Unit-1 charging pumps following receipt of an automatic SIAS signal, coincident with a Loss of Offsite Power? Assume normal electrical lineup and all equipment is operable.

a.

Only one charging pump is automatically started on each emergency bus 5 minutes after it is energized bythe diese!.

b.

All charging pumps are automatically started immediately after their respective bus is energized by the diesel.

c.

All charging pumps are automatically started 5 minutes after their respective buses are energized by the diesel.

d.

Only one charging pump is automatically started onto each emergency bus immediately after it is energized bythe diesel.

/

Charging pumps are running on Unit 1 an SIAS is present.

(Assume no operator action)

Which one of the following lists the charging pump response when the BAM t6nks are emptied?

The charging pumps will; a.

trip on low oil pressure.

b.

trip on low suction pressure.

c.

automatically align to the RWT.

d.

continue to run and become gas bound.

6 l

l I

(

l

i

(

Reactor Operator Exa.~ir.a: ion l

27. Charging pumps are runnmg on Unit I and an SIAS is present. (Assume no operator action) i Which ONE of the following lists the charging pump response when the BAM tanks are emptied?

l The charging pumps will:

a.

trip on thermal overload.

b.,

trip on low su:: tion pressure.

l c.

automatically align to the RWT.

d.

continue to run and become gas bound.

i I

Given the following conditions:

Unit 1 CEDM fan HVE-21A is in AUTO after START l

Unit 1 CEDM fan HVE-21B is in AUTO after STOP.

l Unit 1 CEDM fan HVE-21A trips on overcurrent.

Which ONE of the following completely lists the logic that will start HVE-21B?

a.

The trip signal from HVE-21A.

b.

The trip signal from HVE-21A concurrent with a low flow signal.

c.

A low flow signal.

d.

The trip signal from HVE-21A concurrent with a low flow signal an6 air inlet temperature to the cooling coils is greater than 100 deg F.

<f l

4 Reactor Operator Examina: ion

(

l l'-

59. Given the following conditions:

Unit 1 CEDM fan HVE-21 A is in AUTO after START.

l Unit 1 CEDM fan HVE-21B is in AUTO after STOP.

- Unit 1 CEDM fan HVE-21 A trips on overcurrent.

Which ONE of the following lists the signals required by the logie needed to start HVE-21B?

The trip signal from HVE-21 A.

a.-

I b.

The trip signal from HVE-21 A concurrent with a low flow signal.

c.

A low flow signal.

l d.

The trip signal from HVE-21 A concurrent with a low flow signal and air inlet temperature signal to the cooling coils is greater than 100 F.

l l

4 b

l

~

t I'

I f

i w

., - -, + - - -, -. -.

13.

Given the following plant conditions:

Unit 1 was at 73% power A reactor trip / safety injection on low steam line pressure occurred 21 minutes ago Average Core Exit TC temperature is 375'F RCS pressure is 225 psig All S/G pressures are DECREASING slowly

  1. 2 and #3 S/G ievels are 5% NR and DECREASING slowly
  1. 1 S/G levelis 6% NR, and INCREASING slowly
  1. 4 S/G levelis STEADY at 2% NR Total feedwater flow is 340 gpm PZR levelis 37% and INCREASING RCS T-cold temperature is 325'F and DECREASING slowly Containment pressure is 5 psid and INCREASING slowly At this po nt, which DNE of the following Critical Safety Functions is the MOST degraded?

a.

Heat Sink b.

Core Cooling c.

Containment d.

Pressurized Thermal Shock Answer.

A K/A:

000040K101

[4.1/4.4]

Reference:

E-0, Foldout Page Objective:

OPL271C395, B.1 Level:

Analysis Source:

000040K101 001 History:

Stem and distracters a and d modified (7/7/93)

Note:

Provide PTS curve with this question.

Justification:

a.

Correct answer because all S/G levels are Jess than 10% NR and total feeowater flow is less than 440 gpm.

b.

Incorrect because RCS temperature is 325'F (core exit T/Cs less than 1200*F).

c.

Incorrect because containment pressure is less than 12.0 psid.

d, incorrect because RCS temoerature is 325'F (T-cold is greater tnan 250*F) l

l l

i 13.

Given tne following plant tenditions:

Unit 1 was at 73% power A reactor trip / safety injection on low steam line pressure occurred 21 minutes aco Averace Core Exit TC temperature is.37pF

~

~

RCS pressure is 225'psig ISSP 7#

All S/G pressures are DECREASING slowly

  1. 2 and #3 S/G levels are 5% NR and DECREASING slowly
  • 1 S/G levelis 5% NR, and INCREASING slowly i
  1. 4 S/G levelis STEADY at 2% NR Totalfeedwatepflow is 340 gpm PZR levelis)7% and INCREASING RCS T-cold temperature is 325'F and DECREASING slowly Containment pressure is 5 psid and INCREASING slowly At inis poin. which ONE of the following Cntical Safety Functions is the MOST degraded?

a.

Heat Sink b.

Core Cooling

. Containment d.

Pressurized Thermal Shock Answer:

A K/A:

000040K101 (4.1/4.4J

Reference:

E-0, Foldout Page Objective:

OPL271C39,5, B.1 7

Level:

Analysis a

f Source:

E 000040K101 001 History:

Stem and distracters a and d modified (7/7/9S)

Note:

Provide PTS curve with this question.

Just:ii:ation:

a.

Cone:t answer because at SIG 4evels are Jess tnan 10% NR and totalieeowater fiow is less than e-40 gpm.

b.

Incorrect because RCS temperature is 325'F (: ore eot T/Cs less inan 1200*:)

l

. Incorre: De:ause containment pressure is fess inan 2.0 psid.

1 i

d incorrect oe:ause RCS temperature is 325? (~-50:d is greater inan 250*:)

, /

~; __

g

,a'?

?A

'./ 5

-a.m N

e I[

_l

,o.

~

,h 'S C ~

  • ~'

l y,.l

., gy.f, y,y p x

J.

-_?

h :. J

e i

20.

Given the following plant conditions:

The control room has been evacuated due to a fire All controis have been transferred per AOP-C 04 MDAFW pumps 1 A-A and 1B-B are injecting into the steam generators The TDAFW pump has been shut down i

Steam generator pressures and levels are decreasing Which ONE of the following describes the response of the auxiliary feedwater system?

a.

The TDAFW pump will automatically restart when 2/4 steam generators reach low low level.

b.

The MDAFW pump level control valves will automatically control steam generatof levels at 33%.

~

The MDAFW pump level control valves will have to be manually adjusted using the c.

Manual Output Adjust in the L-381 cabir'et.

d.

The discharge pressure for the MDAFW pumps will have to be manually adjusted by throttling the manual valves at the l CVs.

Answer:

B K/A:

000068A102

[4.3 / 4.5]

Reference:

AOP-C.04, page 11 Objective:

OPL271C423, B.4 Level:

Comprehension Source:

000068A102 001 1

History:

Used on 9/97 RO NRC exam l

Text modrfied to correct grammar errors. Distracters a, b, c, and d reordered (7/22/98). Distracter be restructured (7/29/98)

Note:

Selected fromM exam bank with minor modification of text

p h

20.

Given the following p: ant condr:: ens:

)

The control room has been evacuated due to a fire All controls have been transferred per AOP-C.04 MDAFW pumps 1 A-A and 1B-B are injecting into the steam generators The TDAFW pump has been shut down Steam generator pressures and levels are decreasing

@ r d, wh M M k oh@ >M /r4 -C-@

3 Which ONE of tne fo!!owing describes te retocash: Wr.: o,aciy lc;d ater. system?

~

The TDAFW pump will automatically resta-t when 2/4 steam generators reach low low

a. level. e ~ d k aa" OviIN 03'y e ( -M/.

(C o w b.

The MDAFW pump level control valves will automatcally control steam generator,

, levels at 33%.

The MDAFW pump level =entrol valves will have to be manually aojusted using tne Manual Output Adjust in tne L-381 cautnet.

fW

,,,I g [

d.

The discharge pressure for the MDAFW pumps will have to be manually adjusted by y

tnrottling the manual valves at the LCVs.

., Al M

, f[j, Answer:

B K/A:

00005BA102 (4.3 / 4.5]

Reference.

AOP-C.04, page 11 Objective:

OPL271C423, B.4 Level:

Comprehension Source:

00005BA102 001 H: story:

Used on 9/97 RO NRC exam Tex't modtfied to correct grammar errors. Distra~.ers a b, c. and d reordered (7/22/98). Distracter be restructured (7/29/95)

Note:

Selected fromMexam bank with minor modification of text

~

l l

+

23.

Given the following plant conditions:

FR C.1,' inadequate Core Cooling", has been entered due to a RED path on Core Cooling Core exit temperatures (TCs) are 1250*F and increasing NO Feedwater / Aux Feedwater is available l

At step 12, the CRO checks the S/G NR levels and reports all are <10%.

As the SRO you should; (Select ONE of the following) a.

Go to FR-H.1," Loss of Secondary Heat Sink".

b.

Depressurize allintact S/Gs to atmospheric pressure to dump accumulators.

c.

Start RCPs one at a time, until core exit TCs are less than 1200'F.

r d

d.

Prepare to initiate RCS Feed and Bleed if WR levelin any 2 S/Gs is less than 60%.

Answer:

C K/A:

000074K307

.[4.0/4.4]

Reference:

FR.C.1, pages 10 & 17 Objective:

OPL271C398 Level:

Comprehension Source:

MExam Bank 101.

000074K307 001 History:

Used on HLC 9807 practice exam Distracters b and c reordered Note:

Selected fro 6 exam bank without modification of text l

I 1

1 1

I I

l

g INADEQUATE CORE COOLING FR-C.1 4

7q Rev. 8 I

STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED i-CAUTION Use of a Faufted or Ruptured S/G during performance of the following steps l

may compound the emergency situation. When NO Intact S/Gs are available, l

a Fautted or Ruptured S/G may be used.

12. MAINTAIN intact S/G narrow range r

l levels:

a. Greater than 10% {25% ADV)
a. MAINTAIN total feed flow greater tnan 440 gpm UNTIL level greater tnan 10% {25% ADV) in at least one S/G.

IF total feed flow greater than 440 gpm can NOT be established, THEN PERFORM theiollowing:

1) CONTINUE attempts to establish heat sink in at least one S/G.
2) GO TO Note prior to Step 21.
b. Between 10% {25% ADV) and 50%.

l l

l l

~

P

\\

Page 10 of 19

.~..

FR-C.1 g

INADEQUATE CORE COOLING w

Rev. 8 l.

STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE RCP damage due to absence or loss of normal support conditions is an acceptable consequence in this procedure.

l

21. CHECK if RCPs should be started:
a., CHECK core exh T/Cs
a. GO TO Step 22.

greater than 1200*F.

b. CHECK if idle RCS toop available:
b. PERFORM the following:

l l

1) S/G narrow range level a) OPEN pressunzer PORVs and block greater than 10% [25% ADV]

valves.

2) RCP in associated loop b) IF core exTt T/Cs remain i

AVAILABLE AND STOPPED.

greater than 1200*F, THEN OPEN reactor vessel head vents:

FSV-66-394 FSV-68-395

)

FSV-68-396 FSV-68-397.

c) GO TO Step 22.

l c.

START RCP in one idle loop.

d.

GO TO Substep 21.a.

l Page 17 of 19

e

\\

23.

Given the following plant conddions:

FR-C.1, inade:;uate Core Cooling", has been entered due to a RED path on Core Cooling Core exit temperatures (TCs) are 1250*F and increasing NO Feedwater / Aux Feedwater is available At step 12, the CRO checks the S/G NR levels and reports all are <10%.

As the SRO you should: (Select ONE of the following)

L a.

Go to FR-H.1,

  • Loss of Secondary Heat Sink".

b.

Depressunze allintact S/Gs to atmospheric pressure to dump accumulators.

c.

Start RCPs one at a time, until core exit TCs are less than 1200*F.

~

g PoR\\l.s u ~34 o d \\/M.wS

d..JheparWaNCO recJ oud Geod4WR-4eveHrr eny-2-S/Gs4s4ess-thart-608/, -

Answer:

C, K/A:

000074K307

[4.0/4.4]

Reference:

FR-C.1, pages 10 & 17 Objective:

OPL271C398 Level:

Comprehension Source:

000074K307 001 History:

Used on HLC 9807 practice exam Distracters b and c reordered Note:

Selected from Mexam bank without modification of text

.p.h yW.6!</E/$ f W

49.

Given tne following plant conditions:

Reactor power is at 20% dunng a unit shutdown Intermediate Range N-36 failed high Operators placed the level trip bypass switch for N-25 to the bypass position Which ONE of the following describes the effect of this failure and action during the remainder of the shutdown?

a. The reactor will automatically trip when the Power Range channels decrease below the P-10 setpoint, b.

Entry from Mode 1 to Mode 2 is prohibited with an inoperable intermediate Range channel, so the unit must be manually tripped prior to Mode 2 entry.

c..Both Source Range channels, N-31 and N-32, must be manually energized when the operable intermediate Range channel (N 35) decreases below the P-6 setpoint.

d.

Source Range channel N-32 must be manually energized when the operable Intermediate Range channel (N-35) decreases below the P-6 setpoint; Source Range channel N-31 will automatically energize.

Answer C

K/A:

015000K407

[3.7/3.B]

Reference:

AOP-1.01, page 10 ES-0.1, page 13 Objective:

OPL271 C352, B.4 Level:

Comprehension Source:

015000K407 001 History:

Not used on 9/97 or 5/98 NRC exams. Not used on practice exam.

Distracters c and d reordered Note:

Selected fromg exam bank without modification of text

a 0

^

ph g/#E2- /

WWM

,,W5 Q~/

M I i I I 3[

l/L

(

49.

Given the following plant conditions:

Reactor power is at 20% during a unit shutdown

\\

Intermediate Range N-35 failed high

_\\

i Gpera crs pied m: ::sPeypassswiterriorth351:rthirDypasspesitiE J

Which ONE of the following describes the effect of this failure and action during the remainder of the shutdown?

I

a. The reactor will automatically trip when the Power Range channels decrease below the F-10 setpoint.

b.

Entry from Mode 1 to Mode 2 is prohibited with an inoperable Intermediate Range channel, so the unrt must be manually tripped prior to Mode 2 entry.

c..Both Source Range channels, N-31 and N-32, must be manually energized when the operabie Intermediate Range channel (N-35) decreases below the P-5 setpoint.

d.

Source Range channel N-32 must be manually energized when tne operable intermed: ate Range channel (N-35) decreases below the P-5 setpoint; Source Range channel N-31 will automatically energize.

Answer.

C K/A:

015000K407

[3.7/3.8)

Reference:

AOP-Lol, page 10 ES-0.1, page 13 Objective:

OPL271 C352. B.4 Level:

Comprehension Source:

010000K407 001 History:

Not used on 9/97 or 5/98 NRC exams. Not used on practice exam.

Distra:ters c and d reordered Note:

Selected fromMexam bank without modification of text J.5 M

g

~

o

,g j;

/

5 i

35.

Given the following plant conditions:

Unit 2 is operating at 29% power in accordance with 0-GO-6, Power Reduction From 30% Reactor Power to Hot Standby l

Unit 2 will be going to Cold Shutdown for maintenance l

Intermediate Range N-36 has just failed high l

l Which ONE of the following actions must be performed before reducing reactor power below 10%?

a.

Manually energize N-31 and N-32 I

L b.

Place N-36 LevelTrip switch in BYPASS.

c.

Remove N-36 instrument power fuses.

t d.

Manually trip the reactor to prevent an automatic reactor trip.

Answer; B

i K/A:

000033K302

[3.6/3.9)

Reference:

AOP-l.01, page 10 & 13 i

Objective:

OPL271C352, B.4 Level:

Analysis i

Source:

New question (Developed 7/15/98) 7 Justification:

i i

I i

Incorrect because manually restoring N-31 and N-32 to operation in the power range would L

a.

destroy the source rarige detectors.

j b.

Correct because placing the level trip switch in BYPASS prevents high reactor trip when i

the low power reactor trip signal is reinstated at the F-10 setpoint (10% power).

c.

Incorrect because action does not bypass the trip signal.-

f d.

Incorrect because a manual reactor trip for the given conditions is not required. Placing N-36 level trip switch in BYPASS allows an orderly reactor shutdown.

l 4

y

.~,

v

,_mm.,

..m.

, _ ~...

I A

l Ie i

l l

50.

Given the following piant conditions:

Large Break LOCA is in progress RCS pressure is 550 psig Exosensor indicates 25'F superheat No RCPs are operating Which ONE of the following indications would the operator use along with RCS pressure to accurately substantiate core cooling?

a.

Reactor Coolant Tavg value.

b.

Average value of all core exit thermocouples.

c.

Hottest Reactor Coolant wide range That value.

d.

Average value of five hottest core exit thermocouples.

Answer:

D l

K/A 017000A402

[3.8 / 4.1]

Reference:

FR-0, page 3 OPL271C044, page 7, A.1.c Objective:

OPL271 C044, B.1.b Level:

Memory Source:

017000A402 001 History:

Used on HLC 9809 practice exam Distracters a, b, c, and d reordered (7/22/98)

Note:

Selected from xam bank without modification of text 1

i

l 1

50.

Given tne following plant condmons:

1 Large Break LOCA is in progress RCS pressure is 550 psig Exosensor indicates 25'F superheat No RCPs are operating Which DNE of the following indications would the operator use along wrth RCS pressure to accuratefy substantiate core cooling?.

~,a.9 u_. -

Y 9ead5 C %en^f 5;; A!NTN ^FA ~4,k.S,,,,,,)

WM' Q

t Tc. Abtr rote c.7 ~

s b.

Average value of all core exit thermocouples, c.

Hottest Reactor Coolant wide range Thot value.

i a

d.

Average value of five hottest core exrt thermocouples.

Answer.

D s

j M#

N5 " -I 0;^

K/A 017000A402

[3.8 / 4.1)

- 6 2-

Reference:

FR-0, page 3 OPL271C044, page 7 A.1.c Objective:

OPL271 C044, B.1.b Level:

Memory Source:

017000A402 001 History:

Used on HLC 9809 practice exam Distracters a, b, c, and d reordered (7/22/98)

Note:

Selected from exam bank without modification of tert l

1 I

u

1 9"

09 09 o a on; of o" N "4

?u 0 9 0"

o n E

Ob EE h h h 'e o?h u

m u. c. c E

O m

o e

z w>

=

w o

m z

w 8

w w

w e

ct e

a e st z

w g

zo o

o

<w c

a cz cz c<

92<

w=

c<

s5>

w=

g-R*

<c$a e

o c z

a w o c

$5<m$

mQ

_m<2m C) m<

aw a

s w c. 4 g

>c aw

>c

$ckz

=

ce CO O

A L On s k 4 k 6

Ui

'O m

u.

8

=

w C

u 0

o m

=

w 2

O T

S u

g

~

$5 YE o=

,3 w =

  • - =

-w m-ocs

<3 wC A

o m

  • o$

an m

e.- u T

2 W

u

<c D

m L

L F

b e

v

=

u 8

N=

b o

2 0,

or2' uR

=w m

c 2C O

< w= =o = =.

$c"xG 2

5. C s=

5

=

t 0 <0 5 E m ww<

Sx5 c e 2 3.. m me=w o w ~-

w

_w m =

w ow-a m

u<o=

w

'Em sm-as um c

~

s m

~ w _~9

= cue

-=co o

w Eow m

cs w_

-m w x

2

<u-~

us a m_va

' w< C 3 c' m 00

'C >

i 0

W urw<=

H cawaL 2 w

==m

/N,

<c<<

r 88.

Given the following plant conditions:

Unit 2 operating in accordance with 0-GO-5 Normal Power Operation at 73% with a powerincrease to 100% in progress Chemistry reports Unit 2 RCS loop 1 accumulater boron concentration is 2390 ppm Current time is 0100 I

Which ONE of the following actions must be taken?

[

t I~

a.

Immediately stop the power increase.

i b.

Continue the power increase while restoring loop 1 accumulator boron concentration to 2400 to 2700 ppm boron within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

If loop 1 accumulator boron concentration is NOT restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, be in HOT:

c.

l'

< STANDBY by 0700.

d.

If loop 1 accumulator boron concentration is NOT restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, reduce pressurizer pressure to 1000 psig or less by 1300.

Answer:

A i

K/A:

2.1.1

[3.7/3.8) i

Reference:

SSP 12.1, Page 31 Objective:

OPL271C209. B.2 Level:

Comprehension Source:

New question (Developed 7/20/98).

f Note:

Provide copy of Technical Specification 3.5.1.1 with the question (exam) 4 Justification:

Correct becausegConduct of Operation (SSP-12.1) restricts power increase a.

when in an LCO action of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or less. RCS loop 1 accumulator boron concentration cf 2390 ppm boron places Unit 1 in a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LCO.

b.

Incorrect because power increase is not allowed when in a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LCO action statement.

c.-

incorrect because if loop 1 boron concentration is not restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the Unit 1 must be in HOT standby by 0800.

d.

Incorrect because if loop 1 boron concentration not restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, pressurizer pressure must be reduced to 1000 psig or less by 1400.

l

=

h 3 /4. 5 EMERGENCY CORE COOLING SYSTEMS j

3 /4. 5.1 ACCUMULATORS COLD LEG TNJECTION ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1.1 Each cold leg injection accumulator shall be OPERABLE with:

The isolation valve open, a.

A contained borated water volume of between 7615 and 8094 gallons of : a132 b.

barated water, l

r Between 2400 and 2700 ppm of boron, c.

A nitrogen cover-pressure of batween 600 and 683 psig, and d.

RIS4 Power removed from isolation valve when PC5 pressure is above e.

2000 psig.

APPLICABILITY: MODES 1, 2 and 3.*

ACTION:

With one cold leg injection accumulator inoperable, except as a result of boron concentration not within limits, restore the a.

inoperable accumulator to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure.to 1000 psig or less within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With one cold leg injection accumulator inoperable due to the boron b.

concentration not within limits, restore boron concentration to within fl.imits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to 1000 psig or less within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

  • Pressurizer pressure above 1000 psig.

l December 27, 1994 Amendment No. }!3, 131, 133

- UNIT 2 3/4 5-1

s o

.v y

.j.)

Of...S &ol Ifh)'

88.

Given tne following pl ant conditions:

Unit 2 operating in a:Cordance w:th 0-GO 5, Normal Power Operation at 73*4 with a powerincrease to 100% in progress Chemistry reports Unit 2 RCS toop 1 accumulator boron concentration is 23E0 opm Current time is 0100

,g 4 /

  • Which ONS of the following actions must be taken?

a.

immediately stop the power increase.

b.

Continue the power increase while restoring loy,1 accumulator boron concentration o

to 2400 to 2700 ppm boron.C.1 un 4 Nw 72 4 ou /~$.,

11 loop 1 accumulator boron concentration is NOT restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, be in HOT c.

STANDBY by 0700.

d.

If loop 1 a:Cumulator boron concentration is NOT restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, reduce pressurizer pressure to 1000 psig or less by 1300.

Answer:

A K/A:

2.1.1

{3.7/3.8]

Reference:

SSP-12.1, Page 31 Objective:

OPL271C209, B.2 Level:

Comprehension Source:

New question (Developed 7/20/98)

Note:

Provide copy of Technical Spe:Hi ation 3.5.1.1 with tne question (exam)

.?

Just#ication:

a.

Correct becaus onduct of Operation (SSP-12.1) restricts power increase when in an LCO acaon or o nours or less. RCS foop 1 a::umulator coron con =emration of 2390 ppm boron places Unit 1 in a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LCO.

b.

Incorrect because power increase is not allowed wnen in a 1 nour LCO action statement, c.

in:ctre:t because if loop 1 boron concentration is not restored wrinin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the Unit 1 l

must be in HOT standby by 0800.

l d.

in:orrect because if loop 1 boron concentration not restored wnnin 1 nour, oressurizer pressure must be reduced to 1000 osig or less by 1400.

/i

,,\\

si' W

// MLY

^

/

i

, -(

_t.-f Y% 4

~-

w'::a

..mu v f:;}l

w

+w

.;.h, * '

N

\\

t l

l l

006 Emergency Core Ccoling System-/ JPM 136 Recovery From Safetylnjection l

.and Solid Water Co'nilitions '. J t

Question 2:

Given the following plant conditions:

Unit 2 was operating at 100% power.

The plant experienced a large break LOCA with a failure of the ECCS system.

FR-C.1, " Response to Inadequate Core Cooling," is being implemented.

Core exit TCs are 720*F and increasing.

l At this point FR-C.1 directs the crew to depressurize intact steam generators.

l a.) What is the basis for the direction in FR-C.] to depressurize intact steam generators?

)

b.) Why is this action taken?

l References Allowed? YES X

NO l

Answer:

a.) To reduce RCS pressure below 125 psig b.) To allow the ECCS accumulators and RHR pumps to inject water to the RCS.

Reference:

KA: 006G4.18 ( 2.7 / 3.6 ) Knowledge of specific bases for EOPs.

l OPL271C398 pg 12-15 i

Applicant Response:

SAT UNSAT

.7 i

l l

l I

l i

d et INADEQUATE CORE COOLING

~

~

Rev. 8 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED Blocking low steamline pressure Si as soon as pressurizer pressure is NOTE less than 1920 psig will prevent an inadvertent MSIV closure and keep the condenser available for steam dump.

After the low steamline pressure SI signal is blocked, main steamline isolation will occur if the high steam pressure rate is exceeded.

S/G depressurization at the maximum rate may cause S/G narrow range levels to

~

drop to less than 10% [25% ADV). This is acceptable and expected for this inadequate core cooling condhion.

14. DEPRESSURIZE Intact S/Gs to reduce RCS pressure to less than 125 psig:

~

a. WHEN RCS pressure less than 1920 psig, THEN PERFORM the following:

1

1) BLOCK low steamline pressure St.

g

2) CHECK STEAMLINE PRESS ISOUSl BLOCK RATE ISOL ENABLE permissive L1T.

[M-4A, A4]

b.

DUMP steam to condenser

b. DUMP steam at maximum rate at maximum rate.

USING Intact S/G atmospheric relief (s).

IF local control of atmospheric relief (s) is necessary, THEN DISPATCH personnel to dumo steam USING E A-1-2, Local Control of S/G PORVs.

(Steo continued on next page )

Page 13 of 19

i 026, Containment Spray System /,JPM # 57AP Respond to High Contamment Presstir'e4PJace'RHR Sphy.in Seivice'#:

~

Question 2:

Given the following plant conditions:

Unit I has tripped from 100% power due to a LOCA.

Containment pressure is 3.0 psid Transfer of Containment Spray pump suction to the containment sump is being performed in accordance with ES-1.3, Transfer to RHR Containment Sump.

a.) Why must both CS pumps be placed in PULL-TO-1 ock while transferring suction to the containment sump?

b.) What does placing both CS pumps in PULL-TO-Lock prevent?

References Allowed? YES X

NO Answer:

a.) While shifting to the containment sump, both the RWST and the containment sump suction valves to the CS pumps will be closed at the same time, b.) Placing the CS pumps in PULL-TO-Lock will prevent running a CS pump without a source of water.

Reference:

K/A: 026G4.18 [ 2.7 / 3.6 ) Knowledge of specific bases for EOPs OPL271CO24 pg 14-18, CCD NO:1-47W611-72-1, ES-1.3, pages Il-13, OPL271C388 pg 9 Applicant Response:

SAT UNSAT

License Applicant Administrative Walkthrough Examination--NRC-1 Examiner Sheet K.1:? Shift StafHng

'e

~

~'

l

(

Question 1: A licensed RO has been off-shift for 6 months to assist in scheduhng an upconun, outage.

He had his last physical exarr.ination 18 months ago and has had i

satisfactory performance in the licensed operator requalification training program.

l He is informed that he is needed to join a shift crew in 3 days to fill in for a i

vacationing Unit OATC.

Can the RO fill in for the vacationing RO? Why or why not?

i References Allowed? YES.2L.NO Answer:

No. The RO must first reactivate his license by completing at least 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of t

"under direction" on-shift time.

t l

Reference:

SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4) i Applicant Response:

SAT UNSAT I

?

[

c I

i I

h I

I 5

i

{

f 4

i

License Applicant Administrative Walkthrough Examination--NRC-1 j

Examiner Sheet l

A.1: Shift Staffing'-

a t

Question 1: A licensed RO has been off-shiR for 6 months to assist in outage scheduling. He is infoimed that he is needed to join a shift crew in 2 weeks to fill in for a vacationing shift RO. He had a satisfactory physical examination 18 months ago and has i

maintained satisfactory performance in the licensed operator requalification training I

program. In anticipation of rejoining a shin crew, the RO has spent two 8-hour j

shiRs in the control room as the OATC during the past month under the direction of a shin RO..

s What additional requirements must be met by the RO before he may fill in for the i

vacationing RO?

r J

4 References Allowed? YES _2L NO Answer:

The RO must complete an additional 24 (40 - 16) hours of"under direction" on-shift time that must include a plant tour and shift turnover.

Reference:

SSP-12.1, Conduct of Operations, p. 61 and 62 K/A 2.1.4 (2.3/3.4)

Applicant Response:

SAT UNSAT

?

\\

i i